MARKING SCHEME

PEPERIKSAAN PERCUBAAN
SIJIL PELAJARAN MALAYSIA 2008
ENGINEERING TECHNOLOGY
PAPER 1

NO ANSWER MARKS
1 B, D, A, C 4
i) Adjustable Equipment
2 ii) Special Equipment 3
iii) Skilled Workers
3 2, 3, 1 3
4 X ,  , , X 4
i) Straight Turning
5 ii) Boring Turning 3
iii) Knurling Turning
6 2, 1, 3, 5, 4 4
i) Piercing
7 2
ii) Blanking

analog

8 3

Carrier wave

AM

a. To limit (resist) the flow of current in a particular circuit. 1


9
b. 3
26 x 10 ± 20% @ 26000 Ω ± 20% @ 26 KΩ ± 20% 2
a. Increase/decrease voltage to the desired voltage
b. Used for amplification or switching.
10 3
c. Allows current to flow one direction only / rectifier circuit / signal detectors
in radio receiver.
i) Thick Film
ii) Hybrid
11
iii) Monolithic
iv) Thin Film
12 C, A, D, B 4
i) Allow data to be transmitted into the computer system (input/output
device).Etc : audio card, TV card, modem card
13 ii) Produced hard copies for text or graphic 4
iii) Display information from computer
iv) Used to enter data into the computer
a. X : Low Pressure Steam 2
Y : Low Pressure Steam
14 b. i) Free source of energy 2
ii) Energy is renewable
iii) No pollution
15 X,,X 3
16 A, C, B 3
a. X : Stator Winding 2
17 Y : Squirrel Cage Rotor
b. To produced magnetic field 1
FA = FB 1 marks
AA AB
FA = FB x AA
18 AB 3
= 200(10) x 0.1 1 marks
0.5
= 400 N 1 marks
a. 1

19
b. B : Pump 2
C : Fillter
20 D, B, C 3
i) Limit switch
21 ii) Buoy switch 3
iii) Push button (N/C)
a. X: Circuit Breaker 2
22 Y: Push Button (stop)
b. To detect overload current that flows to motor 1
23 X,,X 3
i) Contract Supplier
24 ii) Subcontractor 3
iii) Main Contractor
1 Site Clearing ½
2 Setting Out ½
3 Excation ½
25 4
4 Rebar Work ½
5 Form Work 1
6 Concrete Pouring ½
i) Sulphate resistance portland cement
26 ii) Rapid hardening portland cement 3
iii) Ordinary portland cement
i) 1:3:6
ii) 1:2:4
27 4
iii) 1:5:10
iv) 1:5:10
i) Mullion
ii) Temporary Struts
28 4
iii) Steel Wall Cramp
iv) Wood Pad
29 D, B, A, C 4
30 ,  , X 3