4 - PROJECT INTEGRATION MANAGEMENT

C  onfiguration status accounting. Information is recorded and reported as to when appropriate data about the conguration item should be provided. This information includes a listing of approved conguration identication, status of proposed changes to the conguration, and the implementation status of approved changes. C  onfiguration verification and audit. Conguration verication and conguration audits ensure the composition of a projects conguration items is correct and that corresponding changes are registered, assessed, approved, tracked, and correctly implemented. This ensures the functional requirements dened in the conguration documentation have been met.

4.5.1 Perform Integrated Change Control: Inputs


4.5.1.1 Project Management Plan
Described in Section 4.2.3.1. Elements of the project management plan that may be used include, but are not limited to: Scope management plan, which contains the procedures for scope changes; Scope baseline, which provides product denition; and C  hange management plan, which provides the direction for managing the change control process and documents the formal change control board (CCB). Changes are documented and updated within the project management plan as part of the change and conguration management processes.

4.5.1.2 Work Performance Reports


Described in Section 4.4.3.2. Work performance reports of particular interest to the Perform Integrated Change Control process include resource availability, schedule and cost data, and earned value management (EVM) reports, burnup or burndown charts.

4.5.1.3 Change Requests


All of the Monitoring and Controlling processes and many of the Executing processes produce change requests as an output. Change requests may include corrective action, preventive action, and defect repairs. However, corrective and preventive actions do not normally affect the project baselinesonly the performance against the baselines.

2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fifth Edition

97

Licensed To: Jorge Diego Fuentes Sanchez PMI MemberID: 2399412 This copy is a PMI Member benefit, not for distribution, sale, or reproduction.

S-ar putea să vă placă și