Documente Academic
Documente Profesional
Documente Cultură
C onfiguration status accounting. Information is recorded and reported as to when appropriate data about the conguration item should be provided. This information includes a listing of approved conguration identication, status of proposed changes to the conguration, and the implementation status of approved changes. C onfiguration verification and audit. Conguration verication and conguration audits ensure the composition of a projects conguration items is correct and that corresponding changes are registered, assessed, approved, tracked, and correctly implemented. This ensures the functional requirements dened in the conguration documentation have been met.
2013 Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fifth Edition
97
Licensed To: Jorge Diego Fuentes Sanchez PMI MemberID: 2399412 This copy is a PMI Member benefit, not for distribution, sale, or reproduction.