Un-tanking of Generator Transformer during MOH

Checking the core of the 250MVA GT

Checking the HV Middle phase winding lead terminal of GT

Inspection of windings of Generator Transformer at TS-II

Major Overhauling Team of Engineers & workers

Heating arrangement for drying out using Nitrogen method

Testing of oil samples for Tan & Resistivity at LD Lab, TS-2

HV Bushing erection in 250MVA GT using telescopic crane

Extraction of Dissolved gases from transformer Oil sample for analysis using Gas Chromatograph at Liquid Dielectric Lab in TS II

Dissolved Gas analysis using Gas Chromatograph at LD Lab in TS-II

Dissolved Gas Analysis using Gas Chromatograph

Ultra High Purity Nitrogen Gas cylinder used for drying out the core & coil of 250MVA GT

Erection of 245kV Bushing on 250MVA GT

Drawing out the thimble of the HV Lead through the 245kV bushing

Vacuum Pulling arrangement during drying out of 250MVA GT

Damaged Tap Lead of the 250MVA Generator Transformer

High vacuum Filter Machines of capacity 6000 & 8000LPH