2013
S.No 1 2 3 Item Description Below Main Wall Below Wall Flooring PCC Last Layer Flooring PCC Above Morrum Main Wall Front Main Wall Back Main Wall Side Internal Wall W1 W2 D1 Below Main Wall Outer Front Outer Back Outer Side W1 W2 D1 Outer Front Outer Back Outer Side Internal Wall UOM Cum Cum Cum Nos 1 1 1 Length 26.14 8.9 8.24 width 1 2.97 2.31 height 0.3 0.15 0.05 Total 7.842 3.965 0.952 Remarks Excavation PCC PCC
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Cum Cum Cum Cum Cum Cum Cum Cum Cum Sqm Sqm Sqm Cum Cum Cum Sqm Sqm Sqm Sqm
1 1 1 2 1 -4 -2 -2
PCC Massonry Massonry Massonry Massonry Massonry Massonry Massonry Filling Plaster 20 mm Plaster 20 mm Plaster 20 mm Plaster 20 mm Plaster 20 mm Plaster 20 mm Plaster 12 mm Plaster 12 mm Plaster 12 mm Plaster 12 mm
1 1 2 -4 -2 -2 1 1 2 2
8.7 8.7 2.77 1.5 1.2 2.1 2.1 8.7 8.7 2.54
32.19 28.71 19.39 -7.2 -2.4 -4.2 2.1 32.19 57.42 17.78
23 24 25 26 27 28
W1 W2 D1 Lintel Lintel
-4 -2 -2 1 4 4
UOM Assumptions Based on Available Manpower 1. Massonry Out Put / Masson / day = 1.8 Cum /day 2. Plastering Out Put / Masson / day = 10 Sqm /day 3. Available Masson =2 & Helper = 2 Cum Cum Cum Cum Cum Cum Sqm Sqm LS Sqm
Activity Excavation PCC Filling Massonry RCC Morrum Plaster 20 mm Plaster 12 mm Roofing Flooring
Cycle
2 1 14