Sunteți pe pagina 1din 27

Last Update : 10 April 2013

No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
0 As-Built
1 Nov.28.'12 New Tank In Sea Side Area
2 L0601-00-04-002 Equipment Index 0 As-Built
3 L0601-00-04-003 Legend & Symbols 0 As-Built
4 L0601-00-04-004 Equipment Symbols Legend 0 As-Built
5 L0601-00-04-005 Wash Oil Detail 0 As-Built
0 As-Built
1 Jan.13.'10 Install Additional Service Water Line to P0108B
2 Feb.4.'10 Additional block valve in seal flushing line
7 L0601-00-04-007 Air Cooled Heat Exchangers & Analyzer Shelter Details 0 As-Built
8 L0601-00-04-008A Sample Station I 0 As-Built
9 L0601-00-04-008B Sample Station II 0 As-Built
0 As-Built
1 Jan.12.'10 Install stem trap in MPS line for ejector process sump (MM-105)
2 Feb.2.'10 Install drip leg in IBL steam line (UT-P11)
0 As-Built
1 Jan.31.'11 Temporary Line BPP UCO
2 Dec. 27.'11 Install jumper Line From UCOS to WOR at Battery Limits
3 Nov.28.'12 New Tank In Sea Side Area
12 L0601-VD-04-002 Preheat Train (1) 0 As-Built
13 L0601-VD-04-003 Preheat Train (2) 0 As-Built
14 L0601-VD-04-004 Reboiler Heater 0 As-Built
15 L0601-VD-04-004A Air Preheater 0 As-Built
0 As-Built
1 Feb.2.'10 Install drip leg in IBL steam line (UT-P11)
0 As-Built
1 Dec.23.'11 Install Fill up Line to Vacuum Tower (V0101) Pump Around
0 As-Built
1 Dec.23.'11 Install Fill up Line to Vacuum Tower (V0101) Pump Around
19 L0601-VD-04-007 150 Distillate Stripper 0 As-Built
0 As-Built
1 Feb.2.'10 Size-Up line to heavy slop from bottom V0101
2 Jan.14.'10 Size-up the sensing line of 150D analyzer (A-1003)
Pump Seal Plan
L0601-VD-04-006 UCO Steam Generator 18
L0601-VD-04-008 150 Distillate LP Steam Generator / Air Cooler
L0601-00-04-006
L0601-VD-04-001 Feed Surge Drum
Soot Blower L0601-VD-04-004B
6
10
11
16
AUX. for
VDU
VDU
Traps, LG Drain, And Air Bottle L0601-00-04-009
1 L0601-00-04-001 Drawing Index
20
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
17 L0601-VD-04-005 Vacuum Column
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
3 Feb.2.'10 Additional jump over line from lube R/D to CDW feed tank (distillate tank)
4 Dec.12.'11 Install New Coriolis Meter for Custody Transfer
0 As-Built
1 Feb.2.'10 Inst. Add. Gate Valve at LPS to CDW & VDU
0 As-Built
1 Jan.8.'10 Install additional spillback line for diesel pump (P0113)
2 Jan.14.'10 Additional jump over line from lube R/D to CDW feed tank (distillate tank)
3 Dec.12.'11 Install New Coriolis Meter for Custody Transfer
0 As-Built
1 Feb.2.'10 Inst. Vent at CWS/CWR line of ejector cond.
2 Jun.1.'10 Inst. Line 3" for cooler /cond. Pass.
3 Dec.12.'11
Switch Caustic injection facility with alum facility in WWTU
24 L0601-VD-04-012 Overhead Cond. Drum / Offgas KO Drum 0 As-Built
25 L0601-VD-04-013 UCO Return Surge Drum 0 As-Built
0 As-Built
1 Jan.11.'10 Install additional spillback line for diesel pump (P0113)
2 Jan.11.'10 Tie-in VDU diesel line to WOS header
3 Jan.12.'10 Install Block Valve in LPS Line to Seaside Tank (UT-P18)
4 Dec.12.'11
Install New Coriolis Meter for Custody Transfer
5 Dec.12.'11
Switch Caustic injection facility with alum facility in WWTU
6 Dec.23.'11 Install Fill up Line to Vacuum Tower (V0101) Pump Around
27 L0601-VD-04-015 Reboiler Header Burner Piping 0 As-Built
0 As-Built
1 Oct. 19.'09 MOC (01-09-001)
2 Jan.12.'10 Install stem trap in MPS line for ejector process sump (MM-105)
3 Apr. 28.'12 Change LI-1073 to LIC-1073
29 L0601-VD-04-019 Interlock Matrices 0 As-Built
0 As-Built
1 Feb.2.'10 Size-up the sensing line of 150D analyzer (A-1003)
2 Feb.2.'10 Modif. Of Analyzer Shelt. Cooling Water Line
31 L0601-10-04-001 Drawing Index 0 As-Built
32 L0601-10-04-002 Equipment Index 0 As-Built
33 L0601-10-04-003 Legend & Symbol 0 As-Built
Vacuum System Package L0601-VD-04-011
L0601-VD-04-008 150 Distillate LP Steam Generator / Air Cooler
Process Sewer Sump
21
22
23
26
VDU
Analyzer Shelter L0601-VD-04-020 30
L0601-VD-04-009 100 Distillate Stripper
Light Lube Pumparound Train L0601-VD-04-014
20
28
100 Distillate LP Steam Generator / Air Cooler L0601-VD-04-010
L0601-VD-04-016
AUX. for
CDW
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
34 L0601-10-04-004 Equipment Symbol Legend 0 As-Built
35 L0601-10-04-005 Wash Oil And Steam Ring Detail 0 As-Built
0 As-Built
1 Feb.4.'10 Additional block valve in seal flushing line
37 L0601-10-04-007 Air Cooled Heat Exchangers Details 0 As-Built
38 L0601-10-04-008A Sample Station I 0 As-Built
39 L0601-10-04-008B Sample Station II 0 As-Built
40 L0601-10-04-009 Traps, LG Drain, And Air Bottle 0 As-Built
41 L0601-CD-04-001 Waxy Lube Feed Filter And Exchanger 0 As-Built
0 As-Built
1 Dec.27.'11 Install Manifold to Process Sewer Line at P0201 suction
43 L0601-CD-04-003 Reactor Feed / Effluent Exchangers 0 As-Built
44 L0601-CD-04-004 Reactor Feed Charge Heater 0 As-Built
45 L0601-CD-04-005 HDW Reactor 0 As-Built
46 L0601-CD-04-006 HDF Reactor 0 As-Built
47 L0601-CD-04-007 Hot Separators 0 As-Built
48 L0601-CD-04-008 Reactor Effluent Coolers 0 As-Built
0 As-Built
1 Jan.14.'10 Relocate the ATM line from CLPS (D0205)
2 Dec.19.'11 Install Permanent Line (1.5" #300) to D0205 O/H to Flare
50 L0601-CD-04-010 Sour Water Degasser 0 As-Built
0 As-Built
1 Jan.25.'11 Additional CSO and CSC
0 As-Built
1 Jan.25.'11 Additional CSO and CSC
53 L0601-CD-04-013 Wash Water Injection 0 As-Built
54 L0601-CD-04-014 Product Stripper Feed Exchangers 0 As-Built
55 L0601-CD-04-015 Product Stripper 0 As-Built
0 As-Built
1 Jan.14.'10 Additional Wet Slop Line from D0253 to Flare KO drum
2 Jan.15.'10 Size-up Control Valve PV-2035 From 1" to 1.5"
3 Dec.16.'11 install Fill up Line (1.5" #300) to D0251 With Lube Product
57 L0601-CD-04-017 Vacuum Tower Feed Heater 0 As-Built
58 L0601-CD-04-018 Vacuum Tower 0 As-Built
L0601-CD-04-011
L0601-CD-04-009 Cold Separators
L0601-CD-04-012
Product Stripper Overhead L0601-CD-04-016
49
51
52 Recycle Gas Compressor CD-C0201B
L0601-CD-04-002
36
56
42 Reactor Feed Surge Drum And Pump
Recycle Gas Compressor CD-C0201A
Pump Seal Plan L0601-10-04-006
AUX. for
CDW
CDW
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
0 As-Built
1 Jan.15.'10 Additional jump over line from lube R/D to CDW feed tank (distillate tank)
2 Dec.12.'11 Switch Caustic injection facility with alum facility in WWTU
3 Dec.16.'11 install Fill up Line (1.5" #300) to D0251 With Lube Product
60 L0601-CD-04-020 External Reflux Pumps 0 As-Built
0 As-Built
1 Dec.12.'11
Switch Caustic injection facility with alum facility in WWTU
0 As-Built
1 Feb.2.'10 Inst. Vent at CWS/CWR line of ejector cond.
2 Dec.12.'11 Switch Caustic injection facility with alum facility in WWTU
63 L0601-CD-04-023 Reactor Feed Charge Heater Burner Piping 0 As-Built
0 As-Built
1 Jan.25.'11 Additional CSO and CSC
65 L0601-CD-04-025 Interlock Matrices 0 As-Built
66 L0601-CD-04-026 Interlock Matrices 0 As-Built
67 L0601-CD-04-027 HDW Reactor CD-R0201 Skin Te's 0 As-Built
68 L0601-CD-04-028 HDF Reactor CD-R0202 Skin Te's 0 As-Built
69 L0601-CD-04-029 Recycle Gas Compressor CD-C0201A Details (Lube Oil) 0 As-Built
70 L0601-CD-04-030 Recycle Gas Compressor CD-C0201B Details (Lube Oil) 0 As-Built
0 As-Built
1 Jan.13.'10 Install Strainer by pass for C0201 Seal Cooler
0 As-Built
1 Jan.13.'10 Install Strainer by pass for C0201 Seal Cooler
73 L0601-CD-04-033 Recycle Gas Compressor CD-C0201A Details (Inst. Air) 0 As-Built
74 L0601-CD-04-034 Recycle Gas Compressor CD-C0201A Details (Inst. Air) 0 As-Built
75 L0601-CD-04-035 Reactor Feed Charge Pump CD-P0201A Details I 0 As-Built
76 L0601-CD-04-036 Reactor Feed Charge Pump CD-P0201A Details II 0 As-Built
0 As-Built
1 Feb.08.'09 Install Blind in E2 By pass
78 L0601-CD-04-038 Reactor Feed Charge Pump CD-P0201B Details II 0 As-Built
0 As-Built
1 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
79 L0601-20-04-001 Drawing Index
80 L0601-20-04-002 Equipment Index
72
L0601-CD-04-021 Diesel Pumparound
AUX. for
UTOS
L0601-CD-04-031 Recycle Gas Compressor CD-C0201A Details (Cyl. Lube, CW)
Vacuum Tower Feed Heater Burner Piping L0601-CD-04-024
Recycle Gas Compressor CD-C0201B Details (Cyl. Lube, CW) L0601-CD-04-032
Vacuum Tower Bottoms Coolers L0601-CD-04-019
Vacuum System L0601-CD-04-022
61
59
62
64
71
CDW
77 L0601-CD-04-037 Reactor Feed Charge Pump CD-P0201B Details I
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
1 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
82 L0601-20-04-004 Equipment Symbol Legend 0 As-Built
83 L0601-20-04-005 Flushing Oil Detail 0 As-Built
0 As-Built
1 Feb.3.'10 Install Control Valve for Drain Control of D0301 (UT-P20)
2 Feb.4.'10 Additional block valve in seal flushing line
3 Dec.27.'11 Change The Seal Plan of P0306 to 11/62
4 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Feb.2.'10 Install Desuperheater from MPS to LPS and Install LPS Venting System (UT-P09)
2 Feb.11.'10 Install Steam Trap in LPS to LPG Vaporizer (UT-P14)
3 Nov.28.'12 New Tank In Sea Side Area
86
L0601-20-04-008 Sample Station 0
As-Built
0 As-Built
1 Mar.21.'11 Temporary Line BPP UCO
2 Dec.12.'11 Install Flushing line to fuel oil transfer line
3 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Feb.2.'10 Install Desuperheater from MPS to LPS and Install LPS Venting System (UT-P09)
2 Feb.11.'10 Install Block Valve in LPS Line to Seaside Tank (UT-P19)
3 May.25.'10 Install Line 4" Service Water Header to Fire Water Line in Cooling Tower Area
4 Mar.21.'11 Temporary Line BPP UCO
5 Apr.18.'11 Install new facilities for transfer UCO BPP
6 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Feb.17.'12 Install new Line For Utilization of T0303 For NBF
2 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Mar.21.'11 Temporary Line BPP UCO
2 Feb.17.'12 Install new Line For Utilization of T0303 For NBF
3 Nov.28.'12 New Tank In Sea Side Area
Utility Interconnection L0601-Y-04-002
150D Tank/Pumps L0601-Y-04-004
80 L0601-20-04-002 Equipment Index
AUX. for
UTOS
85
88
87
90
81
84
L0601-Y-04-001 Process Interconnection
L0601-Y-04-003 100D Tanks 89
UTOS
Pump Seal Plan L0601-20-04-006
L0601-20-04-003 Legend & Symbol
Sample Station, Trap and LG Drain L0601-20-04-007
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
91 L0601-Y-04-005 100N Tanks (Process) 0 As-Built
92 L0601-Y-04-006 150N Tank / Pumps (Process) 0 As-Built
0 As-Built
1 Feb.22.'11 Switch 100 N loading pipeline to 150 N
2 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Feb.22.'11 Switch 100 N loading pipeline to 150 N
2 Nov.28.'12 New Tank In Sea Side Area
95 L0601-Y-04-008A 100N Tanks (Process) 0 Nov.28.'12 As-Built (New Tank In Sea Side Area)
96 L0601-Y-04-008B UCO Tanks/Pumps (Process) 0 Nov.28.'12 As-Built (New Tank In Sea Side Area)
0 As-Built
1 Feb.22.'11
Switch 100 N loading pipeline to 150 N
2 Mar.21.'11
Temporary Line BPP UCO
3 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Mar.21.'11 Temporary Line BPP UCO
2 Feb.17.'12 Install new Line For Utilization of T0303 For NBF
3 Nov.28.'12 New Tank In Sea Side Area
99 L0601-Y-04-011 Wet Slop Tank / Pumps 0 As-Built
100 L0601-Y-04-012 Fuel Oil Tank / Pumps 0 As-Built
0 As-Built
1 Feb.3.'10 Tie-in Y-E0301 Vapor Line to Y-DA0301 Overhead to Silencer (UT-P18)
2 Feb.3.'10 Install Control Valve for Drain Control of D0301 (UT-P20)
3 Feb.3.'10 Make Permanent Line for Condensate Line in BL
0 As-Built
1 Feb.3.'10 Inst. Add. Block Valve for PK0305 & PK0306
2 Feb.3.'10 Tie-in Y-E0301 Vapor Line to Y-DA0301 Overhead to Silencer (UT-P18)
3 Jun.1.'10 Install line 3" for cooler/condenser pass
4 Dec.19.'11 Inst. Demin Line For Hydrostatic Test At High Press Exchanger Area
103 L0601-Y-04-015 BD Flash Drum 0 As-Built
104 L0601-Y-04-016 Water Treatment Plant (1/2) 0 As-Built
105 L0601-Y-04-017 Water Treatment Plant (2/2) 0 As-Built
0 As-Built
LPG Vaporizer / Fuel Oil Heater L0601-Y-04-018
Deaerator And BFW Pumps L0601-Y-04-014
Heavy Slop Tank / Pumps L0601-Y-04-010 98
101
102
106
L0601-Y-04-008 150N Tank / Pumps (Seaside)
L0601-Y-04-009 Marine Loading Arms
93
94
UTOS
L0601-Y-04-007
97
L0601-Y-04-013 LP Condensate Drum
100N Tanks (Seaside)
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
1 Feb.2.'10 Install Steam Trap in LPS to LPG Vaporizer (UT-P14)
2 Jan.25.'11 Additional CSO and CSC
107 L0601-Y-04-019 Fuel Gas Balance Drum 0 As-Built
108 L0601-Y-04-020A N2 Generation Unit (PSA System 1 of 2) 0 As-Built
109 L0601-Y-04-020B N2 Generation Unit (PSA System 2 of 2) 0 As-Built
0 As-Built
1 Feb.2.'10 Install N2 Line and Manifold at reactor Area (Ut-P13)
111 L0601-Y-04-020D N2 Generation Unit (Air Compressor) 0 As-Built
0 As-Built
1 Feb.2.'10 Inst. Line from CWR to open ditch for s/w
2 Feb.3.'10 Install Presure Gauge at C0301A/B Discharge Line (UT-P11)
3 Feb.3.'10 Install Permanent Line for Vent of C0301 Discharge (UT-P12)
4 Apr.19.'11 Connected Air Compessor
0 As-Built
1 Feb.2.'10 Inst. Line from CWR to open ditch for s/w
2 Feb.3.'10 Install Presure Gauge at C0301A/B Discharge Line (UT-P11)
3 Feb.3.'10 Install Permanent Line for Vent of C0301 Discharge (UT-P12)
0 As-Built
1 Feb.3.'10 Install Permanent Line for Vent of C0301 Discharge (UT-P12)
2 Feb. 17.'12 Modif. Pipe Inlet/Outlet of Air Receiver Tank (00303)
115 L0601-Y-04-025 Flare Process Knockout Drum 0 As-Built
116 L0601-Y-04-026 Flare Offsite Knockout Drum 0 As-Built
0 As-Built
1 Nov.28.'12 New Tank In Sea Side Area
0 As-Built
1 Apr.18.'11 Install new facilities for transfer UCO BPP
119 0 As-Built
120 1 Jun.05.'12 Install Pressure Gauge to P0316 Suction
0 As-Built
1 Feb.2.'10 Install Drainage Line form CWR to Open Ditch (UT-P03)
122 L0601-Y-04-032 Cooling Water Pumps 0 As-Built
123 L0601-Y-04-032A Details Y-P0315-TPA 0 As-Built
124 L0601-Y-04-033 Cooling Water Chemical Injection 0 As-Built
0 As-Built
LPG Vaporizer / Fuel Oil Heater L0601-Y-04-018
110
112
113
114
121
106
118
125
L0601-Y-04-028 Uco Export Tank And Pump
L0601-Y-04-030 Cooling Water Make-up System
Air Compressor (1/2) L0601-Y-04-021A
Air Compressor (2/2) L0601-Y-04-021B
Air Dryer L0601-Y-04-022
N2 Generation Unit (Vaporization System) L0601-Y-04-020C
UTOS
117 L0601-Y-04-027 Flare Stack
Cooling Tower L0601-Y-04-031
L0601-Y-04-034 Process Area Only Water Sump & Pumps
Last Update : 10 April 2013
No. Discipline Drawing No. Drawing Title Rev. Date of Rev. Issue For Rev.
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
1 Dec.12.'11 Switch Caustic injection facility with alum facility in WWTU
0 As-Built
1 Feb.8.'10 Make Permanent Line for Condensate Line in BL
2 Feb.16.'12 Utilization of Stormwater Holding Basin For Press Up Hydrant Line
127 L0601-Y-04-035A C/T And Flare Area Oily Water Sumps & Pumps 0 As-Built
128 L0601-Y-04-036 Seaside & WWT Area Oily Water Sumps & Pumps 0 As-Built
129 L0601-Y-04-036A WWT Sea Side Tank Area Oily W.W Sump 0 Nov.28.'12 As-Built (New Tank In Sea Side Area)
130 L0601-Y-04-037 Equalization Tank 0 As-Built
131 L0601-Y-04-038 Primary Clarifier Package 0 As-Built
132 L0601-Y-04-039 Daf Package (1/2) 0 As-Built
133 L0601-Y-04-040 Daf Package (2/2) 0 As-Built
134 L0601-Y-04-041 Skimmed Oil Tank & Sludge Holding Sump 0 As-Built
135 L0601-Y-04-042 Aeration Tanks 0 As-Built
136 L0601-Y-04-043 Clarifier Package & Final Effluent Basin 0 As-Built
0 As-Built
1 Nov.09.'11 PSV Setting Press
138 L0601-Y-04-044 Thickener Package 0 As-Built
139 L0601-Y-04-045 Belt Press Filter Package 0 As-Built
0 As-Built
1 Dec.28.'11 Make Polymer Injection Pot (WWTU)
0 As-Built
1 Dec.28.'11 Switch Caustic injection facility with alum facility in WWTU
142 L0601-Y-04-048 Interlock Matrices 0 As-Built
143 L0601-Y-04-048A Interlock Matrices 0 As-Built
126
125
L0601-Y-04-047 Chemical Injection (2/2)
L0601-Y-04-043A Air Compressor / Receiver Tank
L0601-Y-04-046 Chemical Injection (1/2)
L0601-Y-04-035 Stormwater Holding Basins & pumps
137
140
141
L0601-Y-04-034 Process Area Only Water Sump & Pumps
WWTU
MOC No
MOC : 03-12-008
MOC : 01-09-007
MOC : 04-09-001
MOC : 01-09-003
MOC : 03-09-006
MOC : 01-10-003
MOC : 03-12-008
MOC : 03-09-006
MOC : 01-11-001
MOC : 01-11-001
MOC : 01-09-005
MOC : 01-09-008
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 02-09-004
MOC : 01-10-002
MOC : 01-09-002
MOC : 02-09-004
MOC : 01-10-002
MOC : 04-10-003
MOC : 01-09-002
MOC : 01-09-006
MOC : 01-09-012
MOC : 01-10-002
MOC : 04-10-003
MOC : 01-11-001
MOC : 01-09-001
MOC : 01-09-003
MOC : 01-11-002
MOC : 01-09-008
MOC : 01-09-013
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 04-09-001
MOC : 02-10-008
MOC : 02-09-003
MOC : 02-09-003
MOC : 02-10-001
MOC : 02-10-001
MOC : 02-09-002
MOC : 02-09-005
MOC : 02-10-007
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 02-09-004
MOC : 04-10-003
MOC : 02-10-007
MOC : 04-10-003
MOC : 04-10-003
MOC : 02-10-001
MOC : 02-09-001
MOC : 02-09-001
MOC : 03-12-008
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 03-12-008
MOC : 01-09-013
MOC : 04-09-001
MOC : 04-09-001
MOC : 03-12-008
MOC : 03-09-005
MOC : 03-09-010
MOC : 03-12-008
MOC : 03-10-013
MOC : 03-12-008
MOC : 03-09-005
MOC : 03-09-012
MOC : 03-10-004
MOC : 04-10-005
MOC : 03-11-003
MOC : 03-12-008
MOC : 03-11-011
MOC : 03-12-008
MOC : 04-10-005
MOC : 03-11-011
MOC : 03-12-008
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 03-10-017
MOC : 03-12-008
MOC : 03-10-017
MOC : 03-12-008
MOC : 03-12-008
MOC : 03-12-008
MOC : 03-10-017
MOC : 04-10-005
MOC : 03-12-008
MOC : 04-10-005
MOC : 03-11-011
MOC : 03-12-008
MOC : 03-09-011
MOC : 03-09-013
MOC : 03-09-014
MOC : 03-09-011
MOC : 04-10-001
MOC : 03-10-011
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 03-09-010
MOC : 03-10-002
MOC : 03-09-009
MOC : 03-09-007
MOC : 03-09-008
MOC : 03-11-004
MOC : 03-09-007
MOC : 03-09-008
MOC : 03-09-008
MOC : 03-11-007
MOC : 03-12-008
MOC : 03-11-003
MOC : 03-10-012
MOC : 03-09-001
MOC No
DRAWING INDEX
PIPING & INSTRUMENT DIAGRAM
MOC : 04-10-003
MOC : 03-09-014
MOC : 03-11-002
MOC : 03-12-008
MOC : 03-11-014
MOC : 03-10-003
MOC : 03-10-016
Last Update : 10 April 2013
No Discipline Drawing No.
1 L-0601-VD-02-001
2 L-0601-VD-02-001A
3 L-0601-VD-02-001B
4 L-0601-VD-02-001C
5 L-0601-VD-02-001D
6 L-0601-VD-02-001E
7 L-0601-VD-02-001F
8 L-0601-VD-02-001G
9 L-0601-VD-02-001H
10 L-0601-VD-02-001I
11 L-0601-VD-02-001J
12 L0601-CD-02-000
13 L0601-CD-02-001
14 L0601-CD-02-001A
15 L0601-CD-02-002
16 L0601-CD-02-002A
17 L0601-CD-02-011
18 L0601-CD-02-012
19 L0601-CD-02-013
20 L0601-CD-02-014
21 L0601-CD-02-015
22 L0601-00-02-001
24 L0601-Y-02-002
26
L0601-Y-02-003A
27 L0601-Y-02-004
28 L0601-Y-02-005
29 L0601-Y-02-006
30 L0601-Y-03-001
31 L0601-Y-03-002
32 L0601-Y-03-003
33 L0601-Y-03-004
34 L0601-Y-03-005
35 L0601-Y-03-006
36 L0601-Y-03-007
37 L0601-Y-03-008
38 L0601-Y-03-009
39 L0601-Y-03-010
DRAWING INDEX
PROCESS FLOW DIAGRAM
VDU
CDW
PFD & UFD UTOS
23 L0601-Y-02-001
25 L0601-Y-02-003
40 L0601-Y-03-011
41 L0601-Y-02-005
42 L0601-Y-02-006
WWT
PFD & UFD UTOS
Drawing Title Rev. Date Of Rev.
Drawing Index 0 Aug.27. 2008
Vacuum Distillation Unit (Case : LA1) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : NA1) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : LB) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : MB) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : NB) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : LA2) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : MA2) 0 Aug.27. 2008
Vacuum Distillation Unit (Case : NA2) 0 Aug.27. 2008
Vacuum Distillation Unit Stream Data 0 Aug.27. 2008
Vacuum Distillation Unit Stream Data 0 Aug.27. 2008
Drawing Index 0 Aug.27. 2008
Catalytic Dewaxing Unit (Reaction Section, 100N SOR/EOR) 0 Aug.27. 2008
Catalytic Dewaxing Unit (Reaction Section, 150N SOR/EOR) 0 Aug.27. 2008
Catalytic Dewaxing Unit (Fractionation Section, 100N SOR/EOR) 0 Aug.27. 2008
Catalytic Dewaxing Unit (Fractionation Section, 150N SOR/EOR) 0 Aug.27. 2008
CDW Material Balance (100N SOR) 0 Aug.27. 2008
CDW Material Balance (100N EOR) 0 Aug.27. 2008
CDW Material Balance (150N SOR) 0 Aug.27. 2008
CDW Material Balance (150N EOR) 0 Aug.27. 2008
CDW Material Balance (100N EOR_Pilot) 0 Aug.27. 2008
Drawing Index 0 Aug.27. 2008
0 Aug.27. 2008
1 Nov.28.'12
100N & 150N Process Tanks 0 Aug.27. 2008
0 Aug.27. 2008
1 Nov.28.'12
NBF Sea Side Tanks 0 Nov.28.'12
Heavy Slop/Wet Slop/Fuel Oil Tanks 0 Aug.27. 2008
Eq. Tank, Primary Clarifier And Daf Package 0 Aug.27. 2008
Biotreatment And Sludge Treatment 0 Aug.27. 2008
Steam, Condensate And BFW (1/2) 0 Aug.27. 2008
Steam, Condensate And BFW (2/2) 0 Aug.27. 2008
IA/PA 0 Aug.27. 2008
N2 0 Aug.27. 2008
Fuel Gas & Fuel Oil (1/2) 0 Aug.27. 2008
Fuel Gas & Fuel Oil (2/2) 0 Aug.27. 2008
Flare 0 Aug.27. 2008
Cooling Water 0 Aug.27. 2008
Potable Plant Water And Cooling Water 0 Aug.27. 2008
Oily Water 0 Aug.27. 2008
DRAWING INDEX
PROCESS FLOW DIAGRAM
100D & 150D Process Tanks
100N & 150N Seaside Tanks
Refinery Water Balance 0 Aug.27. 2008
Eq. Tank, Primary Clarifier And Daf Package 0 Aug.27. 2008
Biotreatment And Sludge Treatment 0 Aug.27. 2008
Issue For Rev. MOC No
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
New Tank In Sea Side Area MOC : 03-12-008

As built
As built
New Tank In Sea Side Area MOC : 03-12-008

As Built (New Tank In Sea Side Area) MOC : 03-12-008

As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
As built
DRAWING INDEX
PROCESS FLOW DIAGRAM
As built
As built
As built
Last Update : 10 April 2013
1 L-0601-Y-04-101 Utilities Distribution BFW/Blowdown System
2 L-0601-Y-04-102 Utilities Distribution Cooling Water (1/2)
3 L-0601-Y-04-103 Utilities Distribution Cooling Water (2/2)
0 As-Built
1 Jan.25.'11 MOC : 02-09-003
2 Feb.2.'10 MOC : 03-09-006
3 Feb.2.'10 MOC : 03-09-010
4 Feb.8.'10 MOC : 03-09-014
5 Jan.25.'11 Additional of Flare Line From D0205 Overhead MOC : 02-10-002
5 L-0601-Y-04-105 Utilities Distribution MP Steam / IP Steam
6 L-0601-Y-04-106 Utilities Distribution HP Steam
7 L-0601-Y-04-107 Utilities Distribution Nitrogen/Plant Air/Instrument Air
0
1 Jan.13.'10 MOC : 01-09-007
9 L-0601-Y-04-109 Utilities Distribution Process Sewer
10 L-0601-Y-04-110 Utilities Distribution Oily Water Sewer System
11 L-0601-Y-04-111 Utilities Distribution Flare Collection
0
1 Jan.12.'10 MOC : 01-09-005
2 Jan.12.'10 MOC : 01-09-006
3 Dec, 27.'11 Install Jumper Line form UCOS to WOR at Battery Limits MOC : 01-10-003
L-0601-Y-04-113 Utilities Station For Onsite
13 L-0601-Y-04-113A Utilities Station For Offsite
0 As-Built
1 Nov.28.'12 New Tank In Sea Side Area MOC : 03-12-008
15 L-0601-Y-04-116 Utilities Distribution IA/PA/LPS/PW/OWS For WWT Area
DRAWING INDEX
UTILITY FLOW DIAGRAM
Date of Rev. Remark Rev. Drawing Title Drawing No. No Issue For Rev.
4
8
12 Utilities Distribution Flushing Oil L-0601-Y-04-112
L-0601-Y-04-104 Utilities Distribution LP Steam / LP Cond.
14 L-0601-Y-04-114 Utilities / Offsite Oily Water Sewer for Offsite
L-0601-Y-04-108 Utilities Distribution Plant Water/Potable water
No Discipline Drawing No. Drawing Title Rev.
1 95002 Overall Plot Plant
2 L-0601-LBO-50-001 Plot Plan For LBO Plant
3 L-0601-LBO-50-002 Equipment Location Plan For LBO Plant (1/5)
4 L-0601-LBO-50-003 Equipment Location Plan For LBO Plant (2/5)
5 L-0601-LBO-50-004 Equipment Location Plan For LBO Plant (3/5)
6 L-0601-LBO-50-005 Equipment Location Plan For LBO Plant (4/5)
7 L-0601-LBO-50-006 Equipment Location Plan For LBO Plant (5/5)
8 L-0601-LBO-50-007
Location Plan For Safety Shower & Utility Station
9 L0601-Y-50-100 Plot Plant For Onsite Tankage Area
10 L0601-Y-50-101
Equipment Location Dwg. For Onsite Tankage Area
(1/4)
11 L0601-Y-50-102
Equipment Location Dwg. For Onsite Tankage Area
(2/4)
12 L0601-Y-50-103
Equipment Location Dwg. For Onsite Tankage Area
(3/4)
13 L0601-Y-50-104
Equipment Location Dwg. For Onsite Tankage Area
(4/4)
14 L0601-Y-50-200 Plot Plant For Seasite Tankage Area
15 L0601-Y-50-201
Equipment Location Plan For Seaside Tankage Area
16 A0-2193-510 Coke Calcining Unit Plot Plan
17 A0-2203-10D Flare System Plot Plan
18 A0-2203-10E
Tank Area 140-T4, 925-T1 & T2, 945-T1 & T2, T24 &
T25 Plot Plan
19 A0-2203-10H Tank Area 945-T11, T12, T13, T14 & T15 Plot Plan
20 A0-2203-10I
Spheres In Tank Area 945-T27, T-30, T-31, &T-32 Plot
Plan
21 A0-2203-10L (1/3) Jetty Facilities Plot Plan
22 A0-2203-10L (2/3) -
23 A0-2203-10N Sea Water System Plot Plan
24 A0-2204-10 Interconnecting Area Plot Plan
25 L0601-Y-50-001 Plot Plan For Cooling Tower Area
26 L0601-Y-50-300 Plot Plan For Jetty Facilities
27 L0601-Y-50-400 Plot Plan For Water Treatment Process Area
DRAWING INDEX

ONSITE
TANKAGE AREA
SEASIDE
TANKAGE AREA
UTOS
Remark
DRAWING INDEX

Last Update : 10 April 2013
No. Drawing No. Drawing Title Equipment Rev. Date of Rev. Issue For Rev. MOC No
0 As-Built
1 23 Dec 2012 Install Control Valve to Fire Hydrant Line MOC : 03-11-006
2 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
2 L0601-LBO-04-502 P&ID For Fire Fighting Distribution System Onsite-Tankage Area (1) 0 As-Built
3 L0601-LBO-04-503 P&ID For Fire Fighting Distribution System Onsite-Tankage Area (2) 0 As-Built
4 L0601-LBO-04-504 P&ID Water Spray System (1) (Process Area) 0 As-Built
5 L0601-LBO-04-505 P&ID Water Spray System (2) (Process Area) 0 As-Built
0 As-Built
1 26 Dec 2012 New Tank in Sea Side Area MOC : 03-12-008
7 L0601-LBO-04-508 P&ID Air Foam System (1) (Onsite-Tankage Area) Y-T0314 & Y-T0315 0 As-Built
8 L0601-LBO-04-509 P&ID Air Foam System (2) (Onsite-Tankage Area) Y-T0316 & Y-T0317 0 As-Built
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
10 L0601-LBO-04-512 P&ID For Fire Fighting Distribution System Admin. Building Area 0 As-Built
11 L0601-LBO-04-513 P&ID For Fire Water Distribution System (Flare Stack Area) 0 As-Built
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
13 L0601-LBO-08-502 Fire Fighting Conceptual Layout For Onsite Tankage Area (1) 0 As-Built
14 L0601-LBO-08-503 Fire Fighting Conceptual Layout For Onsite Tankage Area (2) 0 As-Built
0 As-Built
1 26 Dec 2012 New Tank in Sea Side Area MOC : 03-12-008
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
0 As-Built
1 26 Dec 2012 New Tank in Sea Side Area MOC : 03-12-008
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
21 L0601-LBO-08-509A Fire Fighting Conseptual Layout For Admin. Building Area 0 As-Built
22 L0601-LBO-08-509B Fire Fighting Conseptual Layout For Flare Stack Area 0 As-Built
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
0 As-Built
1 02 Apr 2013 Revise F/F P&ID and Drawing as per Actual Condition MOC : 04-12-005
25 L0601-LBO-08-510 Gas Detector Location Plan For Process Area 0 As-Built
26 L0601-LBO-08-510A Gas Detector Location Plan For Onsite Tankage Area 0 As-Built
27 L0601-LBO-08-510B Gas Detector Location Plan For Flare Stack Area 0 As-Built
28 L0601-LBO-08-511 Fire Proofing Layout For Process Area 0 As-Built
29 L0601-LBO-08-512 Fire Proofing Layout For Onsite Tankage Area (1) 0 As-Built
30 L0601-LBO-08-513 Fire Proofing Layout For Onsite Tankage Area (2) 0 As-Built
0 As-Built
1 26 Dec 2012 New Tank in Sea Side Area MOC : 03-12-008
32 L0601-LBO-08-515 Fire Proofing Layout For Waste Water Treatment Area 0 As-Built
33 L0601-LBO-08-516 Fire Proofing Layout For Cooling Tower Area 0 As-Built
34 L0601-LBO-08-603
Information Drawing For Water Spray System
(CD-E0204/E0206/E0253/E0256)
0 As-Built
35 L0601-LBO-08-604
Information Drawing For Water Spray System
(CD-E0204/E0253/E0256)
0 As-Built
23 L0601-LBO-08-509C Fire Fighting Plan For Administration Building
24 L0601-LBO-08-509I Fire Fighting Conceptual Layout For Cooling Tower Area
18 L0601-LBO-08-507 Fire Extinguisher Location Plan For Onsite Tankage Area (2)
20 L0601-LBO-08-509 Fire Extinguisher Location Plan For Substation & Control Building
12 L0601-LBO-08-501 Fire Fighting Conceptual Layout For Process Area
16 L0601-LBO-08-505 Fire Extinguisher Location Plan For Process Area
9 L0601-LBO-04-510 P&ID For FM200 System (Substation & Control Building)
L0601-LBO-04-501 1 P&ID For Fire Fighting Distribution System (Process Area)
DRAWING INDEX
P&ID and Drawing For Fire Fighting
6 L0601-LBO-04-507 P&ID Fire Fighting Distribution System Seaside-Tankage Area
31 L0601-LBO-08-514 Fire Proofing Layout For Seaside Tankage Area
15 L0601-LBO-08-504 Fire Fighting Conceptual Layout For Seaside Tankage Area
19 L0601-LBO-08-508 Fire Extinguisher Location Plan For Seaside Tankage Area
17 L0601-LBO-08-506 Fire Extinguisher Location Plan For Onsite Tankage Area (1)