Sunteți pe pagina 1din 206

Sections

BUILDING WORKS
(A) - Earth Work, Antitermite Treatment (1 19)
(B) Dismantling,Cutting Chase, Holes (21 - 31)
(C) Brick Works, Concrete Works etc. (33 - 89)
(D) Flooring (91 - 121)
(E) Roofing and Sheet Walling (123 - 143)
(F) Structural Steel Works, Grills, Gates etc. (145 - 177)
(G) Carpenter's Works (179 - 305)
(H) Band Moulding, Cornice etc. (307 - 317)
(I) Plastering, Pointing etc. (319 - 327)
(J) White Wash, Colour Wash, Distemper (329 - 339)
(K) Paining, Varnishing etc. (341 - 349)
(L) Glazier's Work (351 - 353)
(M) Drain, Down Pipes, Chimney pipes etc. (355 - 365)
(N) Thatch, Mud and Bamboo Works (367 - 375)
(O) Fencing (377 - 391)
(P) Soling, Edging and Metalling (393 - 399)
(Q) Maintenance of Statues and Monuments etc. (401)
( R ) Aluminium Works (403 - 429)
(S) Well for Water Supply (431 - 443)
(T) Miscellaneous Works (445 - 483)
Page 1
Sections
SANITARY AND PLUMBING WORKS
(A) Plumbing Works
I. Ferrule and Feruule Connection (Original & Repair works) (1)
II. G. I./PVC Pipe Works and fittings (Original & Repair works) (2 - 32)
III. Cistern, G.I./PVC Tanks with Parts (Original & repair works) (33 - 37)
IV. Basins and sinks with Parts (original & repair works) (38 - 45)
V. Tube Well (Original & Repair works) (46 - 54)
(B) Sanitary and Drainage works
I. Hydrants and Allied Works. (Original & Repair Works) (55,56)
II. Soil-Pipe and Fittings (Original & repair works) (57 - 74)
III. Water Closets and Urinals (Original & repair works) (75 - 81)
IV. Inspection Pit, Septic Tank, Soak Pit etc. (original & repair works) (81 - 92)
( C ) Materials and Labour etc.
I. Miscellaneous (93 - 96)
II. Cost of Materials (97 - 105)
III. Wages to Various Labourers. (106)
IV. Selection of Pipe Diameters. (107)
Page 2
Sections
ROAD, BRIDGE AND CULVERT WORKS
4.1 Embankment works
4.2 Soil compaction & Stabilization works
4.3 Soil boring & Testing works
4.4 Bridge & Culvert works
4.5 Repair and Rehabilitation works
4.6 Soling, Edging & Metalling works
4.7 Bituminous works
4.8 Miscellaneous works
4.9 Loading, Unloading & Stacking works
4.10 Road Transportation & Carriage works
Annexures:
Issue Rates of different Materials
Supply of different materials
Rates of Stone materials
Distances from refineries
Page 3
Building
Rate (Rs.)
PC-I/PC-
II/EC/SC
SECTION -1: BUILDING WORKS
1 (A) Earth Work, Anti Termite Work.
1 1 Surface Dressing of the ground in any kind of soil including
removing vegetation inequalities not exceeding 15 cm
depth and disposal of the rubbish within a lead upto 75 m
as directed.
Sq.m
6.45
1 2 Earth work in excavation of foundation trenches or drains,
in all sorts of soil (including mixed soil but excluding laterite
or sandstone) including removing, spreading or stacking
the spoils within a lead of 75 m. as directed. The item
includes necessary trimming the sides of trenches,
levelling, dressing and ramming the bottom, bailing out
water as required complete.
1 (a) Depth of excavation not exceeding 1.500 mm. %Cum 7377.04
1 (b) Depth of excavation for additional depth beyond 1.500
mm. and upto 3.000 mm. but not requiring shoring
%Cum
11898.81
1 (c) Depth of excavation for additional depth beyond 3000
mm. upto 4000mm. excluding cost of shoring as necessary
%Cum
14516.33
1 d) Add extra for excavation in morum soil %Cum
1 e) Add extra for cutting lateriate/sandstone
3 1) Cutting with chisel %Cum
3 2) by blasting operation %Cum
3 3 Earth work in filling in foundation trenches or plinth with
good earth, in layers not exceeding 150 mm. including
watering and ramming etc. layer by layer complete.
(Payment to be made on the basis of measurement of
finished quantity of work)
3 a) With earth obtained from excavation of foundation. %Cum 4759.52
3 b) With earth obtained by fresh excavation
(including cost of excavation upto 1,800 mm. depth)
from land arranged by the Deptt. within a lead of 00 m.
%Cum
8448.04
3 c) (i) With carried earth arranged by he contractor within a
radius of 1 km. ncluding cost of carried earth.
%Cum
24125.37
3 (ii) With carried earth arranged by the contractor within a
radius of 3 km. ncluding cost of carried earth.
%Cum
27546.13
3 (iii) With carried earth arranged by the contractor within a
radius exceeding 3 cm. but not exceeding 5 km. including
he cost of carried earth.
%Cum
30906.91
5 (iv) With carried earth arranged by the contractor within a
radius exceeding 5 km. but not exceeding 10 km. including
cost of carried earth.
%Cum
38343.94
Pag
e
No.
SI.
No.
Description of Items Unit
Page 4
Building
5 4 (A) Filling in foundation or plinth by silver sand in layers not
exceeding 150 mm as directed and consolidating the same
by thorough saturation with water ramming complete
including the cost of supply of sand, (payment to be made
on measurement of finished quantity)
%Cum
58305.30
5 (B) Do - by fine sand %Cum 64249.10
5 5 Earth work in filling in compound, tank, low land, ditches
etc. with good earth, in layers not exceeding 150 mm.
including breaking clods and consolidating the same by
ramming and dressing complete. (Payment will be made on
profile measurement before and after the work)
5 [a) With earth obtained by fresh excavation upto 1800 mm.
depth [including the cost of excavation from and arranged
by the Deptt. within a lead of 100 m.)
%Cum
10648.94
5 b) (i) With carried earth arranged by the contractor within a
radius of 3 km.i ncluding cost of carried earth.
%Cum
29092.65
7 (ii) With carried earth arranged by the contractor within a
radius exceeding 3 km. but not exceeding 5 km. including
the cost of carried earth.
%Cum
32215.67
7 (iii) With carried earth arranged by the contractor within a
radius exceeding 5 km. but not exceeding 10 km. including
cost of carried earth.
%Cum
39652.70
7 6 Hire and labour charges for shoring work (including
necessary close plank walling, framing, Eucalyptus/Jhou
bulla piling, strutting etc) complete as per direction of the
Engineer-in-charge for foundation excavation (vertical
surface are in contact with supported earth is to be
measured.) (This item should be executed on specific
direction of the Enginner in charge).
7 a) Depth upto 1.5 m. Sq.M. 352.30
7 b) For additional depth beyond 1.5 m. and upto 3.00 m Sq.M. 388.37
7 c) For additional depth beyond 3.00 m. Sq.M. 435.88
7 d) (i) For basement work and Depth upto 1.50 m. Sq.m. 450.84
7 (ii) For basement work and Depth beyond 1.50 m and upto
3.00 m.
Sq.m.
487.51
9 (iii) For basement work and Depth beyond 3.00 m. Sq.m. 52S.80
9 7 Pre-Constructional Anti-termite measures:
9 (a) Anti termite treatment to bottom surface ( in case of
masonry foundation and basements) and the sides ( upto a
height of 300 mm. from bottom) of the excavation
trenches with chemical emulsion by admixing
chloropyrofos emulsifiable solution
Sq.m. 86.99
9 (b) Anti termite treatment to back filling of the masonry
foundation with chemical emulsion by admixing
chloropyrofos emulsifiable concentrates ( 1%
concentration) with water by weight at the.rate of 7.5 Litres
per sq. m. of the vert
Sq.m. 122.77
Page 5
Building
11 (c) Anti termite treatment to the top surface of the
consolidated earth within plinth walls with chemical
emulsion by admixing chloropyrofos emulsifiable
concentrates ( 1% concentration) with water by weight at
the rate of 5 Litres per sq. m. of the surfa
Sq.m. 97.44
11 (d) Treatment to the back filling of R.C.C. foundation with
chemical emulsion by admixing chloropyrofos emulsifiable
concentrate (1% concentration) with water by weight at the
rate of 7.5 Itr. per sq.m. of the vertical surface of the
substructure of each
Sq.m. 126.88
13 Post Constructional Measures
13 8 (a) Anti-termite treatment to the outside of foundations with
chemical emulsion by admixing chloropyrofos emulsifiable
concentrates (1 %concentration) with water by weight
including cutting shallow channel by excavating soil a
Mtr 59.99
15 (b) Anti-termite treatment to the outside of foundation with
chemical emulsion by admixing chloropyrofos emulsifiable
concentrate (1% concentration) with water by weight,
drilling 12mm. dia holes in concrete or masonry apron at an
interval of 300mm. to a
Mtr 66.77
15 (c) Anti-termite treatment to the soil under floor with
chemical emulsion by admixing chloropyrofos emulsifiable
concentrate (1% concentration) with water by weight
including drilling vertically 12mm. dia holes at the junction
of floor and wall at 300mm.
Sq.M. 78.77
17 d) Anti-termite treatment to the junction of wood work and
masonry walls with chemical emulsion by admixing
chloropyrofos emulsifiable concentrates (1 %
concentration) with water by weight including spraying at
the points of contact with the adjoining masonry by
drilling 6mm. dia holes at a downward angle of about 45
degree at the junction of woodwork and masonry and
squirting chemical emulsion into these holes at the rate of
half litre per hole. The entire work is to be carried out
as per specification of Code I.S.-6313 (Part-lll)-1981. The
shutters are to be sprayed with emulsion, on both sides. All
wooden fixtures like almirahs, racks etc. are also to be
throughly sprayed with chemical emulsion. (Payment will be
made on the basis of outside measurements of doors
and windows)
Sq.M
51.88
Page 6
Building
19 (e) Spot application for insecticides using Aqua base spray
for pest (for bugs, cockroaches, silverfish, spider, termites,
mosquitoes) to walls and ceiling etc. with chemical
emulsion by admixing chloropyrofos emulsifiable
concentrates (1% concentration) with water by weight
including spraying the emulsified chemical @ 0.5 litres per
sq.m. by a hand operated pressure pump on wall surfaces,
ceiling, electrical fixture.electrical lines including drilling
holes in-places where source of termite s detected squirting
chemical solution nto the holes and sealing the holes with
cement grout. (Rate is per sq.m. of the floor area while
actual work will be all walls ceiling, rack, partition and
umiture).
Sq.m.
44.22
21 (B) Dismantling, Cutting, Chase, Holes etc
21 1 Dismantling all types of masonry excepting cement
concrete plain or reinforced, stacking serviceable materials
at site and removing rubbish as directed within a lead of 75
m.
21 a) In ground floor including roof. Cu.M. 276.64
21 b) Extra rate for each addl. Floor over the rate of ground
floor
Cu.M.
30.00
21 (c) Extra rate for careful dismantling and recovering at least
150 no of useable bricks per cum
Cu.M.
35.55
21 2 Dismantling all types of plain cement concrete works,
stacking serviceable materials at site and removing rubbish
as directed within a lead of 75 m
21 In ground floor including roof.
21 (a) upto 150 mm. thick Cu.M. 582.16
21 (b) above 150 mm. thick Cu.M. 877.69
21 (c ) Extra rate for each addl floor over the rate of ground
floor.
Cu.M.
30.00
21 3 Dismantling R.C. floor, roof, beams etc. including cutting
rods and removing rubbish as directed within a lead of 75
m. including stacking of steel bars.
23 (a) In ground floor including roof. Cu.M. 1210.99
23 (b) Extra rate for each addl floor over the rate of ground
floor
Cu.M. 30.00
23 4 Dismantling terraced roof in ground floor roof (including
floor finish, if any.) taking out carefully tiles with beams,
joists, tees or burgahs covering floor below, sorting and
stacking sevicable materials at site and removing rubbish
as directed within
23 (a) In Ground Floor including roof. Sq.M. 142.31
23 (b) Extra rate for each addl floor over the rate of ground
floor
Sq.M. 3.57
23 5 Dismantling carefully terraced floor only (including floor
finish if any) or lime terracing in ground floor roof and
removing rubbish as directed within a lead of 75 m.
Cu.M. 457.73
Page 7
Building
23 (a) In Ground Floor including roof.
23 (b) Extra rate for each addl floor over the rate of ground
floor
Cu.M. 30.00
23 6 Dismantling artificial stone flooring upto 50 mm. thick by
carefully chiselling without damaging the Dase and
removing rubbish as directed within a lead of 75 m.
25 a) In ground floor including roof. Sq.M. 30.94
25 b) Extra for each addl. Floor over the rate of ground floor Sq.M. 3.57
25 7 Taking out carefully Ranigunge pattern tiles from roof,
stacking seviceable tiles at site and removing rubbish as
directed within a lead of 75m.
Sq.M.
38.07
25 (Payment to be made on the measurement of portion of
roof removed).
25 8 Taking out carefully G.C.I, or C.I. or asbestos sheets
(including ridges etc.) from roof or wall after unscrewing
bolts, nuts, screws etc.and stacking the material at site as
directed.
Sq.M.
25.59
25 (Payment to be made on measurement of portion of roof or
wall removed.)
25 9 Dismantling Chunar stone flooring carefully including
removing rubbish within a lead of 75 m. and stacking the
serviceable materials as directed.
Sq.M.
21.42
25 10 Stripping off worn out plaster and raking out joints of walls,
celings etc. upto any height and in any floor ncluding
removing rubbish within a ead of 75 m as directed.
Sq.M.
11.60
27 11 Cutting chase upto 125 x 150 mm. and subsequent
mending of damages.
27 (a) in brick wall [Cement-3.6 Kg/Mtr] Mtr. 70.33
27 (b) in concrete wall [Cement-3.6 Kg/Mtr] Mtr. 82.23
27 12 Cutting holes and subsequent mending good
damages.
27 (a) Diameter upto 150 mm.
27 (i) In brick work [Cement-4.0 Kg/Mtr] Mtr. 83.04
27 (ii) In concrete work (plain or R.C.) [Cement- 3.0 Kg/Mtr] Mtr. 95.42
27 (b) Diameter exceeding 150 mm. but not exceeding 300
mm.
27 (i) In brick work [Cement-6.0 Kg/Mtr] Mtr. 122.51
27 (ii) In concrete work (plain or R.C.) [Cement-4.6 Kg/Mtr] Mtr. 194.09
27 (c) Diameter exceeding 300 mm. but not exceeding 450
mm.
27 (i) In brick work [Cement-10.0 Kg/Mtr] Mtr. 190.64
29 (ii) In concrete work (plain or R.C.) [Cement-7.5 Kg/Mtr] Mtr. 268.35
29 13 Removal of rubbish.earth etc. from the working site and
disposal of the same beyond the compound, in conformity
with the Municipal / Corporation Rules for such disposal,
loading into truck and cleaning the site in all respect as per
direction of Engineer in charge
Cu.M.
143.99
Page 8
Building
29 14 Labour for breaking 1/2 Bricks or Full Bricks (Old / New)
into metal / Khoa / chips as per specific size and stacking
the same at site or stackyard with due allowance of sinkage
/ shrinkage as per direction of the Engineer in charge.
29 (a) Metal Size 50 mm to 65 mm Cu.M. 145.76
29 (b) Khoa Size 32 mm to 25 mm Cu.M. 167.76
29 (c) Chips Size 20 mm to 10 mm Cu.M. 299.86
29 15 Labour for dismantling the necessary bases of R.C. or
wooden railing post for taking out the damaged posts
(scattered job)
Each
37.49
29 16 Dismantling worn out wall or ceiling of Tarja or Durmamat
and removing the dismantled materials as directed.
Sq.M.
8.33
31 17 Dismantling carefully wooden walling, flooring of ceiling and
stacking dismantled materials as directed.
Sq.M. 9.08
31 18 Labour for scrapping and picking up old dilapidated mortar /
plaster (Cement / Surki / Lime mortar) from the surface of
old Brick faces including cleaning the frog without
damaging the Brick and stacking the Bricks at Site /
Stackyard as per direction of
1000
Nos
588.83
31 19 Dismantling carefully wood work in posts, postplates,
rafters, partition etc., sorting and . stacking serviciable
materials at site and removing rubbish as directed.
Cu.M. 176.43
33 (C) Brickworks, Concrete Works etc.
33 1 Single Brick Flat Soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints
with local sand .
Sq.M.
264.31
33 2 Labour for laying single brick flat soling including ramming
and dressing bed to proper level and filling joints with
powdered earth.
Sq.M.
25.18
33 3 Supplying and laying brick Khoa of ordinary bats of size (38
mmx 63 mm)of approved quality in 100 mm layer (loose)
filling in gaps with small ones rammed and compact as
directed true to level and grade.
Sq.M.
152.36
33 4 Cement concrete with graded jhama khoa (30 mm size)
excluding shuttering In ground floor and foundation.
33 (a) 1:3:6 proportion Cu.M. 4326.01
33 (b) 1:4:8 proportion Cu.M. 3955.05
33 5 Ordinary Cement concrete (mix 1:2:4) with graded stone
chips (20 mm nominal size) excluding shuttering and
reinforcement,rf any, in gound floor as per relevant IS
codes.
33 a) Pakur Variety Cu.M. 5001.28
33 (b) River bazree Cu.M.
33 (c)RajMahal Cu.M.
33 (d) With local hard blackstone variety chips (crusher
broken)
Cu.M.
Page 9
Building
35 6 (a) Controlled Cement concrete with well graded stone chips
(20 mm nominal size) excluding shuttering anc
reinforcement with complete design of concrete as per :
456 and relevant special publications submission oi job mix
formula after preliminary mix design after testing of
concrete cubes as per direction of Engineer-in charg
Consumption of cement will not be less than 300 Kg oi
cement with Super plasticiser per cubic meter oi controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix foumula. In ground
floor and foundation, [using concrete mixture] M 20 Grade
35 (i) Pakur Variety Cu.M. 5652.32
35 (ii) N.B. Variety (Stone Metal) Cu.M.
35 (iii) RajMahal Cu.M.
35 (iv) With local hard blackstone variety chips (crusher
3roken)
Cu.M.
35 6(b) Controlled Cement concrete with well graded stone chips
(20 mm nominal size ) excluding shuttering and
reinforcement with complete design of concrete as per 1
456 and relevant special publications submission of ob mix
formula after preliminary mix design after testing of
concrete cubes as per direction of Engineer-in chargi
Consumption of cement will not be less than 300 Kg of
cement with Super plasticiser per cubic meter of controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix oumula. In ground
floor and foundation, using concrete mixture] M 25 Grade
35 (I) Pakur Variety Cu.M. 6036.84
35 (ii) N.B. Variety (Stone Metal) Cu.M.
37 (iii) RajMahal Cu.M.
37 (iv) With local hard blackstone variety chips (crusher
broken)
Cu.M.
37 6(c) Controlled Cement concrete with well graded stone chips
(20 mm nominal size ) excluding shuttering and
reinforcement with complete design of concrete as per 1 :
456 and relevant special publications submission of job mix
formula after preliminary mix design after testing of
concrete cubes as per direction of Engineer-in chargi
Consumption of cement will not be less than 320 Kg of
cement with super plasticiser per cubic meter of
controlled concrete but actual consumption will be
determined on the basis of preliminary test and job mix
foumula. In ground floor and foundation. [using concrete
mixture] M 30 Grade
37 (i) Pakur Variety Cu.M. 6237.60
37 (ii) N.B. Variety (Stone Metal) Cu.M.
37 (iii) RajMahal Cu.M.
Page 10
Building
37 (iv) With local hard blackstone variety chips (crusher
broken)
Cu.M.
39 6(d) Controlled Cement concrete grade mix with well gradec
stone chips (20 mm nominal size) including adequate
plasticiser& excluding shuttering and reinforcementwith
complete design of concrete as per IS : 456 and relevant
special publications submission of job mix formula after
preliminary mix design after testing of concrete cubes as
per direction of Engineer-in charge. Consumption of
cement will not be less than 340 Kg of OPC [43/53 grade ]
cement with Super plasticiser per cubic meter of controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix foumula. In ground
floor and foundation, [using concrete mixture] With Pakur
Variety M 35 Grade of Concrete
Cu.M 6629.67
39 6(e) Controlled Cement concrete grade mix with well graded
stone chips (20 mm nominal size) including adequate
plasticiser & excluding shuttering and reinforcementwith
complete design of concrete as per IS : 456 and relevant
special publications submission of job mix formula after
preliminary mix design after testing of concrete cubes as
3er direction of Engineer-in charge. Consumption of
cement will not be less than 360 Kg of OPC [43/53 grade ]
cement with Super plasticiser per cubic meter of controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix foumula. In ground
floor and foundation, [using concrete mixture] With Pakur
Variety M 40 Grade of Concrete
Cu.M 6802.88
39 7 Ordinary Cement concrete (mix 1:1.5:3) with graded stone
chips (20 mm nominal size) excluding shuttering and
reinforcement if any, in ground floor as per relevant IS
codes.
39 (I) Pakur Variety Cu.M. 5675.32
39 (ii) River Bazree Cu.M.
39 (iii) RajMahal Cu.M.
41 (iv) With local hard blackstone variety chips (crushe
broken)
Cu.M.
41 8 Plum concrete work with 40 % cement concrete with 30 mm
down graded stone metal and 60 % stone boulde of size
150 mm and above, placed in position as directed
excluding shuttering if any.
41 (i) (1:3:6) proportion Cu.M
41 (ii) (1:4:8) proportion Cu.M
Page 11
Building
41 9A
(a)
Batch Mixed concrete of M 20 Grade with well Graded
stone chips of 20 mm nominal size containing designed
quantity of cement per Cu. M of Wet concrete produced in
computerised batching plant under controllec condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix
with agitation in transit mixer to work site depositing the mix
on a platform erected for the purpose at required level of
concreting and then placing the mix in its final location of
form work compacting and curing the same complete as
per specification and direction of the Engineer-in charge
including hire charges of computerised batching plant,
transit mixer with all accessories vibrators etc. inclusive of
all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separa tern.
Consumption of cement will not be less than 300 (g of
cement per cubic meter of controlled concrete but actual
consumption will be determined on the basis of jreliminary
test and job mix foumula. [Cement to be supplied by Deptt,
if Cement is supplied by agency then tern rate to be
deduced as per Format A of Annexure I] with Batching
Plant & transit mixer], In Ground Floor and Foundation.
Pakur Variety].
41 i) Without approved concrete pump. Cu.M 5643.88
41 ii) With approved concrete pump. Cu.M 5881.63
Page 12
Building
43 9A
(b)
Batch Mixed concrete of M 25 Grade with well Graded
stone chips of 20 mm nominal size containing designec
quantity of cement per Cu. M of Wet concrete produced in
computerised batching plant under controlled condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix with
agitatbnin transit mixer to work site depositing the mix on a
platform erected for the purpose at required level of
concreting and then placing the mix in its final location of
form work compacting anc curing the same complete as
per specification anc direction of the Engineer-in charge
including hire charges of computerised batching plant,
transit mixer with all accessories vibrators etc. inclusive of
all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separa item.
Consumption of cement will not be less than 300 Kg of
cement per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary
test and job mix foumula. [Cement to be supplied by Deptt,
if Cement is supplied by agency then item rate to be
deduced as per Format A of Annexure I]
43 [with Batching Plant & transit mixer]
43 In Ground Floor& Foundation. [Pakur Variety].
43 (i) Without approved concrete pump. Cu.M 6028.29
43 (ii) With approved concrete pump. Cu.M 6266.04
Page 13
Building
45 9A(c) .) Batch Mixed concrete of M 30 Grade with well Gradec
stone chips of 20 mm nominal size containing designec
quantity of cement per Cu. M of Wet concrete producec in
computerised batching plant under controllec condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix with
agitation in transit mixer to work site depositing the mix on a
platform erected for the purpose at required level of
concreting and then placing the mix in its final location of
form work compacting and curing the same complete as
per specification and direction of the Engineer-in charge
including hire charges of computerised batching plant,
transit mixer with all accessories vibrators etc. inclusive of
all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separa item.
Consumption of cement will not be less than 320 Kg of
cement per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary
test and job mix foumula. [Cement to be supplied by Deptt,
if Cement is supplied by agency then item rate to be
deduced as per Format A of Annexure I]
45 [with Batching Plant & transit mixer]
45 In Ground Floor& Foundation. [Pakur Variety].
45 (i) Without approved concrete pump. Cu.M 6211.60
45 (ii) With approved concrete pump. Cu.M 6449.36
Page 14
Building
47 9A(d) Batch Mixed concrete of M 35 Grade with well Graded
stone chips of 20 mm nomial size containing designed
quantity of cement perCu. M of Wet concrete producec in
computerised batching plant under controllec condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix
with agitation in transit mixer to work site depositing the mix
on a platform erected for the purpose at required level of
concreting and then placing the mix in its final location of
form work compacting and curing the same complete as
per specification and direction of the Engineer-in charge
including hire charges of computerised batching plant,
transit mixer with all accessories vibrators etc. inclusive of
all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separa item.
Consumption of cement will not be less than 340 Kg of
OPC [43/53 grade ] cement per cubic meter of controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix foumula. [Cement to
be supplied by Deptt, if Cement is supplied by agency then
item rate to be deduced as per
:
ormat A of Annexure I]
47 with Batching Plant & Transit Mixer]
47 In Ground Floor& Foundation [Pakur Variety].
47 (i) Without approved concrete pump. Cu.M 6602.67
47 (ii) With approved concrete pump. Cu.M 6841.54
Page 15
Building
49 9A(e) Batch Mixed concrete of M 40 Grade with well Graded
stone chips of 20 mm nominal size containing designed
quantity of cement per Cu. M of Wet concrete produced in
computerised batching plant under controllec condition
using approved super plasticizer designing concrete mix
following I.S 10262 and I.S. 456 transporting the mix with
agitation in transit mixerto work site depositing the mix on a
platform erected for the purpose at required level of
concreting and then placing the mix in its final location of
form work compacting and curing the same complete as
per specification and direction of the Engineer-in charge
including hire charges of computerised batching plant,
transit mixer with all accessories vibrators etc. inclusive of
all other incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separa item.
Consumption of cement will not be less than 360 Kg of
OPC (43/53 grade ) cement per cubic meter of controlled
concrete but actual consumption will be determined on the
basis of preliminary test and job mix foumula. [Cement to
be supplied by Deptt, if Cement is supplied by agency then
item rate to be deduced as per Format A of Annexure I]
49 [with Batching Plant & transit mixer]
49 In Ground Floor* Foundation. [Pakur Variety]
49 (i) Without approved concret pump Cu.M 6745.99
49 (ii) With approved concret pump Cu.M 6983.75
[Note:- If Transit Mixer is not used then Rs 135/-per Cu.m
to be deducted from all items of 9 A]
51 9B(a) Supplying ready mixed concrete of M 20 Grade with well
graded stone chips of 20 mm nominal size containing
designed quantity of cement per Cu.m of wet concrete
produced in computerised batching plant under controlled
condition using approved super plastisizei designing
concrete mix following I.S. 10262 and I.S. 456 transporting
the mix with agitation in transit mixerto work site depositing
the mix on a platform erected for the purpose at required
levels of concreting and then placing the mix in its final
location of form work compacting and curing the same
complete as per. specification & direction of the Engineer-in-
charge including computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of all other
incidental charges in this connection complete but
excluding cost of hire charge of platform and its supporting
staging which would be paid through separate item.
[Cement to be supplied by the Manufacturer or supplier]
Page 16
Building
51 In ground floor and foundation.
51 (i) Without approved concrete pump. Cu.M 6207.16
51 (ii) With approved concrete pump. Cu.M 6488.24
53 9B(b) Supplying ready mixed concrete of M 25 Grade with well
graded stone chips of 20 mm nominal size containing
designed quantity of cement per Cu.m of wet concrete
produced in computerised batching plant under controlled
condition using approved super plastisizer designing
concrete mix following I.S. 10262 and I.S. 456 transporting
the mix with agitation in transit mixer to work site depositing
the mix on a platform erected for the purpose at required
levels of concreting and then placing the mix in its final
location of form work compacting and curing the same
complete as per specification & direction of the Engineer-in-
charge including computerised batching plant transit mixer
with all accessories vibrators etc. inclusive of all other
incidenta charges in this connection complete but excluding
cost of hire charge of platform and its supporting staging
which would be paid through separate item, [cement to be
supplied by the Manufacturer/ supplier]
53 In Ground Floor and Foundation
53 (i) Without approved concrete pump Cu.M 6619.34
53 (if) With approved concrete pump Cu.M 6900.42
55 9B(c) Supplying ready mixed concrete of M 30 Grade with well
graded stone chips of 20 mm nominal size containing
designed quantity of cement per Cu.m of wet concrete
produced in computerised batching plant under
controlled condition using approved super plastisizei
designing concrete mix following I.S. 10262 and I.S.456
transporting the mix with agitatb-in transit mixer to work site
depositing the mix on a platform erected for the purpose at
required levels of concreting and then placing the mix in its
final location of form work compacting and curing the same
complete as per specification & direction of the
Engineer-in-charge including computerised batching
plant transit mixer with all accessories vibrators etc.
inclusive of all other incidental charges in this connection
complete but excluding cost of hire charge of platform and
its supporting staging which would be paid through
separate item, [cement to )e supplied by the Manufacturer/
supplier]
55 In ground floor and foundation.
55 i) Without approved concrete pump Cu.M 6822.65
55 ii) With approved concrete pump Cu.M 7103.73
Page 17
Building
57 9B(d) Supplying ready mixed concrete of M 35Grade with wel
graded stone chips of 20 mm nominal size containing
designed quantity of cement per Cu.m of wet concrete
produced in computerised batching plant under
controlled condition using approved super plastisiser
designing concrete mix following I.S. 10262 and I.S. 456,
transporting the mix with agitation in transit mixer to work
site depositing the mix on a platform erected for the
purpose at required levels of concreting and then placing
the mix in its final location of form work compacting anc
curing the same complete as per specification & direction
of the Engineer-in-charge including computerised
batching plant transit mixer with al accessories vibrators
etc. inclusive of all other incidenta charges in this
connection complete but excluding cost of hire charge of
platform and its supporting staging which would be paid
through separate item, [cement to be supplied by the
Manufacturer/ supplier]
57 In ground floor and foundation.
57 (i) Without approved concrete pump Cu.M 7242.61
57 (ii) With approved concrete pump Cu.M 7523.69
59 9B(e)
Supplying ready mixed concrete of M 40 Grade with well
graded stone chips of 20 mm nominal size containing
designed quantity of cement per Cu.m of wet concrete
produced in computerised batching plant under
controlled condition using approved super plastisiser,
designing concrete mix following I.S. 10262 and I.S. 456,
transporting the mix with agitation in transit mixertd worksite
depositing the mix on a platform erected for the purpose at
required levels of concreting and then placing the mix in its
final location of form work compacting and curing the same
complete as per specification & direction of the
Engineer-in-charge including computerised batching
plant transit mixer with all accessories vibrators etc.
inclusive of all other incidental charges in this connection
complete but excluding cost of hire charge of platform and
its supporting staging which would be paid through
separate item, [cement to be supplied by the Manufacturer/
supplier]
59 In ground floor and foundation.
59 (i) Without approved concrete pump Cu.M 7379.26
59 (ii) With approved concrete pump Cu.M 7660.35
59 [Note: 1. Lifting charge for items of 9 A and 9 B without
approved concrete pump as per item 11.
59 2. Lifting charge for items of 9 A and 9 B with approved
concrete pump @ Rs 20/- per Cu.m per floor.]
Page 18
Building
59 10 (I) Cement concrete with graded stone ballast (40 mm size
excluding shuttering)
59 In ground floor
59 A) [Pakur Variety]
59 a) 1:3:6 proportion Cu.M 4168.36
59 b) 1:4:8 proportion Cu.M 3818.06
59 (B) With N.B. Variety stone metal.
59 (a) 1:3:6 proportion Cu.M
61 (b) 1:4:8 proportion Cu.M
61 (II) Cement concrete with 30 mm down graded shingles
excluding shuttering. N.B. Variety
61 In ground floor
61 (a) 1:3:6 proportion Cu.M
61 (b) 1:4:8 proportion Cu.M
61 (III) Cement concrete with 32 mm down graded gravel
excluding shuttering
61 In ground floor
61 (a) 1:3:6 proportion Cu.M
61 (b) 1:4:8 proportion Cu.M
61 11 Add extra over the rate of ground floor for basement and
each additional floor above ground floor for items 4 to 1
61 (i) upto 4 th floor. Cu.M. 58.88
61 (ii) above 4thftoor Cu.M. 71.44
61 Note: 1) For thin concrete members upto a thickness of 65
mm involving shuttering and scaffolding rate of concrete
enhanced by 150 % of rate by volume (Cost of shuttering &
reinforcement excluded). 2. For tall structure like overhead
reservoir on R.C. frame, the ground floor equivalent height
shall be taken as 4 m. Every 4 m or part thereof above 4 m
shall be taken as each additional floor for purpose of this
item.
61 12 Hire and labour charges for shuttering with centering and
necessary staging upto 4 m using approved stout props
and thick hard wood planks of approved thickness with
required bracing for concrete slabs, beams and columns,
lintels curved or straight including fitting, fixing and striking
out after completion of works (upto roof of ground floor)
63 (When the height of a particular floor is more than 4 m the
equivalent floor height shall be taken as 4 m and extra for
works beyond the initial 4 m ht. shall be allowec under 12
(e) for every 4 m or part thereof)
63 (a) 25 mm to 30 mm thick wooden shuttering as per
decision & direction of Engineer-ln-Charge.
Sq.m
265.73
63 (b) Above 30 mm & upto 37 mm thick wooden shuttering as
per decision & direction of Engineer-ln-Charge.
Sq.m
280.46
63 (c) Steel shuttering or 9 to 12 mm thick approved quality ply
board shuttering in any concrete work
Sq.m
310.82
Page 19
Building
63 (d) Extra for works beyond the roof of ground floor per
additional floor
63 (I) upto 4th (per floor) and in basement. Sq.m 11.15
63 ii) above 4th floor (per floor). Sq.m 13.64
63 e) Extra for staging beyond 4 m in any floor (Mode of
measurement: area in plan x mean height of staging up
soffit of shuttering above initial 4 m)
Cu.M
53.89
63 f) 25 mm to 30 mm shuttering without staging in oundation Sq. m
167.10
63 totes:- For shuttering in shell roof, grid roof with vertical
aces folded plate, arched roof the rate in 12 (a), 12(b) & 12
(c ) above to be increased by 100 % . For grid roof with
splayed faces, rate is to be increased by 150%.
63 13 a) Hire and labour charges for shuttering for concrete work
in overhead R.C. Reservoir on separate R.C. frarr ncluding
fitting, fixing and striking off after compeltionof work
including staging upto 4 m using ply board or steel
shuttering. Not applicable for resting on roof top)
Sq.m
682.78
65 (b) Extra for Staging beyond 4 m [mode of measurement:
Area of unsupported horizontal projection (where staging
beyond 4 m is practically unavoidable) x mean height of
staging] above initial 4 m.
Cu.M
147.00
65 14 Hire and Labour Charges for shuttering with hard wooc for
precast R.C. Slab curved, or stright and striking out the
same including fitting, fixing the precast slab in position with
necessary carriage and haulage, hosting etc, complete in
all respect, (only the area in contact with concrete to be
measured)
Sq.m
71.66
65 15 Reinforcement for reinforced concrete work in all sorts of
structures including distribution bars, stirrups, binders etc
initial straightening and removal of loose rust (if necessary),
cutting to requisite length, hooking and bending to correct
shape, placing in proper position and binding with 16 gauge-
black annealed wire at every intersection, complete as per
drawing and direction.
65 (a) For works in foundation, basement and upto roof of
ground floor/upto 4 m
65 (i) Tor steel/Mild Steel M.T. 55954.40
65 (b)Extra For works beyond the roof of ground floor/initia 4m
67 (i) Up to 4 th floor roof in each addl. floor Qntl 30.33
67 (ii) Above 4 th floor roof per addl. floor/every 4 m Qntl 35.44
67 16 Labour for straightening of coil bars of any dia including
stacking
Qntl
96.44
Page 20
Building
67 17 Labour for Placing on forms (i.e. shuttering) of I.R.C. or
similar welded mesh fabric of approved sizes. (Payment to
be made on net area used including cutting straightening,
bending, binding with 16 gauge black annealed wire,
removing rust etc, complete as per direction)
Sq.m
16.55
67 18 Cement concrete (1:1.5:3) with graded stone chips 5.6 mm
size with hexagonal square mesh wire netting, I.R.C. fabric
mesh or X.P. M. fitted and fixed after tying the existing
reinforcement on concrete without distributing the same
and with proper scarping and cleaning the reinforcement
and disturbed concrete with wire brush etc. after applying a
coat of cement including the cost of wire netting I.R.C or X.
P. M. & cost of all handling and scaffolding complete as per
direction of Engineer-in -charge.
67 a) 20 mm thick Sq.m 394.97
67 b) 25 mm thick Sq.m 421.65
67 c) 37.5mm thick Sq.m 485.54
67 19 Brick work with 1st class bricks in lime and surki mortar 1:2)
( 1 lime putty/paste: 2 surki) lime to be slaked at site and
the mortar to be prepared with such lime putty and first
class surki made from kiln burnt bricks having ts fineness
modulus between 2 and 2.5 and which masses through
B.S. sieve No 8 with correspondesto I.S sieve No 200 with
considerable grinding and pugging it complete.
67 a) In foundation and plinth Cu.M 4485.89
69 b) In Super structure, ground floor. Cu.M 4633.87
69 20 Brick work with 1st class bricks in lime and surki mortar
(1:3) (1 lime putty/paste: 3 surki) lime to be slaked at site
and the mortar to be prepared with such lime putty and first
class surki made from kiln burnt bricks having its fineness
modulus between 2 and 2.5 and which passes through B.S.
sieve No 8 with correspondesto I.S sieve No 200 with
considerable grinding and pugging it complete.
69 a) In Foundation and Plinth. Cu.M. 4302.01
69 b) In Super structure, Ground Floor. Cu.M. 4450.00
69 Notes:-(a) For lime surki brick work in foundation below
G.L. hydraulic lime as per specification should be used. In
other lime-surki brick work (aboveG.L.) fat lime as pei
specification will be used, (b) In all items of works viz. brick
work, plastering, lime terracing etc. involving use of lime,
the proportion of lime in all such items indicating its
measurementby volume is of putty/paste form, which may
be obtained from unslaked lime in the following rate, i.e.
633 kg of unslaked lime form 100 Cu.m by volume of lime
putty/paste.
Page 21
Building
69 21 Brick work with 1 st class bricks in cement mortar (1:4)
69 (a) In foundation and plinth Cu.M. 4377.56
69 (b) In superstructure, ground floor Cu.M. 4525.55
69 22 Brick work with 1st class bricks in cement mortar (1:6)
69 (a) In foundation and plinth Cu.M. 4073.37
69 (b) In superstructure, ground floor Cu.M. 4221.36
71 23 Brick work with 1st class bricks in composite mortar with
cement, lime and sand (1:1:6) (1 cement: 1 lime
putty/paste:6 sand)
71 (a) In foundation and plinth Cu.M. 4342.90
71 (b) In superstructure, ground floor Cu.M. 4491.00
71 NOTE : 633 kg of unslaked lime @1 cu.m. of lime
putty/paste.
71 24 Brick work with 1st class bricks in composite mortar with
cement, lime and sand (1:2:9) ( 1 cement: 2 lime
putty/paste: 9 sand)
71 (a) In foundation and plinth Cu.M. 4235.35
71 (b) In superstructure, ground floor Cu.M. 4383.45
71 NOTE : 633 kg of unslaked lime @1 cu.m. of lime
putty/paste.
71 25 Extra Labour for brick for string course and set square brick
work, brackets and similar other projection brick works to
be paid in respective item.
Cu.M. 157.76
71 26 Brick work with 1st class modular bricks
71 (a) With cement mortar (1:4).
71 (i) In foundation and plinth Cu.M. 4128.03
71 (ii) In superstructure, ground floor Cu.M. 4227.36
71 (b) With cement mortar (1:6)
71 (i) In foundation and plinth Cu.M. 3836.06
71 (ii) In superstructure.ground floor Cu.M. 3911.61
71 27 Add extra for basement and each additional floor over the
rate for ground floor on item Nos. 19 to 26 except 2
71 (a) Upto 4th floor Cu.M. 66.99
71 (b) Above 4th floor Cu.M. 80.33
73 28 Extra over rate of corresponding items for brick works in
arches including hire and labour charges for shuttering,
centring etc. complete.
73 (a) Clear span not exceeding 1,500 mm. Cu.M. 729.93
73 (b) Clear span exceeding 1,500 mm. but not exceedinc
2,400 mm.
Cu.M. 774.37
73 (c) Clear span exceeding 2,400 mm. but not exceeding
3,600 mm.
Cu.M. 805.48
73 (d) Clear span exceeding 3,600 mm. but not exceedinc
4,800 mm.
Cu.M. 819.92
73 N.B. : While calculating the volume of brick work only the
thickness of the arch shall be taken into consideration.
73 29 125 mm. thick brick work with 1st class bricks in cement
mortar (1:4) in ground floor.
Sq.M. 558.94
Page 22
Building
73 30 125 mm. thick brick work with 1st class bricks in cement
mortar (1:3) in ground floor.
Sq.M. 592.27
73 31 Extra for using approved H.B netting in every third layer in
29 & 30 above in any floor
Sq.M. 37.72
73 32 (a) 100 mm. thick brick work with 1st class Modular bricks
set in cement sand mortar (1:4) including raking out joints,
curing, scaffolding etc. complete in all respec in ground
floor.
Sq.M. 436.52
73 (b) 100 mm. thick brick work with 1st class Modular bricks
set in cement sand mortar (1:4) including raking out
joints,.curing, scaffolding etc. complete in all respect with
H.B. netting in every third layer in ground floor.
Sq.M. 458.43
73 33 (a) 100 mm. thick brick work with special class Modula
bricks set in cement sand mortar (1:4) including raking out
joints, curing, scaffolding etc. complete in all respect in
ground floor
Sq.M. 460.63
73 (b) 100 mm. thick brick work with special class Modula
bricks set in sand cement mortar(1:4) including raking out
joints, curing, scaffolding etc. complete in all respec with
H.B. netting in every third layer of ground floor.
Sq.M. 482.54
75 34 a) 75 mm. thick brick work with 1st class bricks set in
cement, sand mortar (1:4) in ground floor including H.B.
etting in every alternate layers.
Sq.M.
383.27
75 (b) 75 mm. thick brick work with 1st class bricks set in S
ement, sand mortar (1:3) in ground floor including H.B.
etting in every alternate layers.
Sq.M.
433.08
75 35 affri brick work 125 mm. thick with 1st class bricks in J
^ement mortar (1:4) including 15 mm. thick cement plaster
(1:4) in all faces in ground floor.
Sq.M.
554.66
75 36 200 mm. thick Brick work with Fly Ash Bricks set in cement
sand mortar (1:6) including raking out joints, curing,
scaffolding etc. complete in all respect.
75 (a) In ground floor Cu.M. 3740.85
75 (b) Add extra for each addl. Floor
75 i) Up to 4th floor Cu.M. 70.55
75 ii) Above 4th floor Cu.M. 85.10
75 37 100 mm. thick brick work with Fly Ash Bricks set in cement
sand mortar (1:4) including raking out joints, curing,
scaffolding etc. complete in all respect.
(a) In ground floor 424.47
75 (b) Add extra for each addl. floor over the rate of ground
floor
Sq.M
6.24
(i) up to 4th floor
75 (ii) above 4th floo Sq.M 8.03
75 38 Precast pierced concrete jally work as per design and
manufacturer's specification including moulding etc. with
stone chips and necessary reinforcement shutterinj
complete including fitting, fixing in position in all floors.
75 (a) 50 mm. thick panels Sq.M 353.74
Page 23
Building
75 (b) 37.5 mm thick panels Sq.M 305.53
75 (Cement and steel required for item no. 38 will not b issued
by Deptt.)
77 39 R.C. weather board (1:1.5:3) with stone chips and
necessary reinforcement upto 1% (including main and
distribution bars), shuttering and 10 mm. thick cement
plaster (1:4) including all moulding, drip course etc.
complete in ground floor.
77 50 mm. thick Sq.M 883.13
77 40 R.C. shelves (1:1.5:3) either precast or cast in situ with
stone chips and necessary reinforcement upto 1% (0.8%
main and 0.2% distribution bars), shuttering etc. and 10
mm. thick cement plaster (1:4) including neat cement
finishing and cutting chase fitting and fixing in position,
mending good damages as necessary complete. In
ground floor
77 (a) 50 mm. Thick panels Sq.M 921.58
77 (b) 37.5 mm. Thick panels Sq.M 799.70
77 41 Bonding new brick work with old at every 4th course
including cutting chase and mending damages in cement
mortar (1:4) and curing.
Sq.M
177.54
77 42 Add extra for each additional floor over the rate for ground
floor on items from (i) 29 to 35 except 31
77 (a) upto 4th floor Sq.M 7.14
77 (b) above 4th floor Sq.M 8.03
77 (ii) 39,40 & 41
77 (a) upto 4th floor Sq.M 5.36
77 (b) above 4th floor Sq.M 6.24
79 43 Supplying.hoisting.fittingand fixing R.C.C. precast thin
lintels, 75 mm. thick (1:1.5:3) conforming to the
specification laid down in C.B.R.I. data sheet No.1 with
stone chips, sand, cement and reinforcement (both main
and distribution) bars upto 1.00 percent as per drawing and
specification including placing in situ and supporting
arrangement for taking the load of super-imposed brick
work and striking of the same when directed.
Cum
11113.56
79 44 1st class brick work of width 200 mm. with non-modular
aricks in cement sand mortar (1:6)
79 (a) In foundation and plinth Cum 4139.36
79 (b) In superstructure ground floor Cum 4265.46
79 45 1st class brickwork of width 200 mm. with non-modular
Dricks in cement and sand mortar (1:4)
79 (a) In foundation and plinth Cum 4447.44
79 (b) In superstructure ground floor Cum 4573.54
79 46 1st class brick work of width 200 mm. with non-modular
jricks in lime and surki mortar (1:3) (1 lime putty/paste: 3
surki).
79 a) In foundation and plinth Cum 4403.78
79 b) In superstructure and ground floor Cum 4529.88
Page 24
Building
79 NOTES : (a) (i) For item 44 above cement 0.055 cu.m.sand
0.33 cu.m. per cu.m. of such brick work will be consumed.
79 (ii)For item 45 above cement 0.083 cu.m. sand 0.33 cu.m.
per cu.m. of such brick work will be consumed, b) 633 kg
of unslaked lime make 1 cu.m. of lime putty / paste.
79 47 Add extra for each additional floor over the rate for ground
floor on items 44, 45,46 above.
79 (a) upto 4th floor Cum 66.99
81 (b) above 4th floor Cum 80.33
81 48 Manufacturing and supplying (ex-manufacturers stackyard
precast stone masonary block in 1:5:8 (cement.sand and
stone chips) with average compressive strength of 70
Kg/Sq.cm as per specification and drawing laid down in
C.B.R.I data she No 8 having the normal size.
81 (a) 290x190x140 mm each
81 (b) 290x140x140 mm each
81 (c) 290x90x140 mm each
81 Note: For Casting of 100 Nos of Blocks
81 49 For (a) cement 1.54 bags, sand 0.27 Cu.m coarse
aggregate (10 mm) 0.43 Cu.m and stone pieces 0.37 Cu.m
(b) cement 1.14 bags, sand 0.20 Cu.m coarse aggregate
(10 mm) 0.32 Cu.m and stone pieces 0.27 Cu.m (c) cement
0.77 bags, sand 0.14 Cu.m coarse aggregate (10 mm) 0.27
Cu.m and stone pieces 0.15 Cu.m Dry Rubble Masonry
with hard dressed stone from approved quarries including
all carriage of materials
Cu.M
81 50 Hand Packed rough dressed stone walls by masons with
hard stones from approved quarries including all carriage of
materials to site
Cu.M
81 51 Hand Packed rough dressed boulder wall with boulders
from approved quarries including all carriage of all
materials to site
Cu.M
81 52 Masonry work with Precast cement concrete (1:5:8) closed
cavity hollow stone blocks having compressive strength 70
Kg/ Sq. cm as per C.B.R.I. Specification in cement sand
mortar (1:6) including scaffolding curing etc. complete.
81 (a) In foundation & Plinth Cu.M
83 (Consumption per Cu.m -Block 400x200x200-57 Nos.
Cement-0.055 Cu.m Sand-0.33 Cu.m)
(b) In Superstructure ground floor
83 (i) 200 mm thick wall Sq. M
83 (Consumption per Cu.m -Block 400x200x200-114 Nos.
Cement-0.107 Cu.m Sand-0.642 Cu.m)
83 (ii) 150 mm thick wall Sq. M
Page 25
Building
83 (Consumption per Cu.m -Block 400x200x150-114 Nos.
Cement-0.08 Cu.m Sand-0.48 Cu.m)
83 (iii) 100 mm thick wall Sq.M
83 (Consumption per Cu.m -Block 400x200x100-114 Nos.
Cement-0.055 Cu.m Sand-0.33 Cu.m)
83 (c) Add for each addl. Floor
83 (i) 200 mm thick wall Sq. M
83 (ii) 150 mm thick wall Sq.M
83 (iii) 100 mm thick wall Sq.M
83 53 Rubble masonry in cement (1:6) with hard dressed stones
from approved quarries and clean, coarse and washed
sand including carriage of all materials to site
83 (a) In Road and Jhora Work Cu.M
83 (b) In Fine dressed work in Building
83 (i) In Ground Floor Cu.M
83 (ii) In First Floor Cu.M
85 54 Rubble masonry in cement (1:4) with hard dressed stones
from approved quarries and clean, coarse and washed
sand including carriage of all materials to site
85 (a) In Road and Jhora Work Cu. M
85 (b) In Fine dressed work in Building
85 (i) In Ground Floor Cu. M
85 (ii) In First Floor Cu. M
85 55 Brick work in mud mortar in all thickness of wall Cu. M
85 56 Cleaning the concrete surface by removing dirt and debris,
marking defective locations and removing loose concrete
by careful stripping untill hard surface is exposed, cutting
the concrete to regular shape, wire brushing the exposed
surface and removing debris from site complete as per
direction of the Engineer - in -Charge.
Sq. M
59.55
85 57 Cleaning .the exposed reinforcement preferably upto full
diameter by wire brush, applying two coats of polymei
based rust removing compound left for 24 hours, removing
the coating and then applying two (2) coats of polymer
modified anti corrosive protective coating formulated to
inhibit the corrosion of reinforcement as per manufacturer's
specification]
Sq. M
of
affecte
d
reinfor
ced
area
893.47
85 58 Applying epoxy based reactive joining agent for joining the
old concrete with fresh concrete to be applied within
manufacturer's specified time as per manufacturers
specification. (0.4 Kg / m
z
of concrete surface).
Sq. M
331.41
85 Note: Applicable only when the full diameter of
reinforcement steel is exposed.
Page 26
Building
85 59 'a) Applying 2 coats of bonding agent with synthetic multi
functional rubber emulsion having adhesive and water
proofing properties by mixing with water in proportion (1
bonding agent: 4 water: 6 cement) as per Manufacturer's
specification [Cement to be supplied by the Department]
Sq. M
78.21
87 (b) Applying 2 coats of Non-Toxic Acrylic Polymer modified
Paint having adhesive & waterproofing properties by mixing
in proportion (1 liquid: 4 cementitious material) or as per
manufacturer's specification for water proofing layer in
water tank etc. (No Departmental Cement is required)
Sq. M
281.19
87 60 Extra rate for using water proofing and plasticising
admixture @ 0.2% by weight of cement (or at
manufacturer's specified rate) for concrete of various
grades.
kg
132.65
87 61 Polymer concrete made with water resistant bonding agent
of synthetic rubber emulsion as per manufacturer's
specification excluding the cost of cement concrete (2.75
Kg / bag of cement) Note: Payment on volume of (1: VA : 3)
Concrete.
Cu.M
3017.48
87 62 Removing corroded worn out portion of reinforcement
(when the area of bar is damaged by more than 25%) by
cutting and replacing the same by a new plain round bar of
requisite diameter by binding with required lap / welding
with old bar, including cost of reinforcement complete in all
respect including removing unserviceable materials from
site as per direction of the Engineer- in -charge. Note :
Payment on weight (Kg.) of new reinforcement.
Kg
82.66
87 63 Masonry work with precast stone Masonry Block having
compressive strength 70 kg/Sq.cm as per C.B.R.I.
specification and drawing laid down in C.B.R.I. Data sheet
No 08 having the normal size with cement and sand mortar
(1:6) including scaffodding, curing, supply of materials,
stone masory block etc complete .
87 (a) 290x190x140 mm Cu.M
87 Consumption per Cu.M- Block 117 Nos,Cement-0.09 Cu.M,
Sand-0.33 Cu.M
87 (b) 290x140x140 mm Cu.M
89 Consumption per Cu.M- Block 159 Nos,Cement-0.0.09
Cu.M, Sand-0.33 Cu.M
89 (c) 290x90x140 mm Cu.M
89 Consumption per Cu.M- Block 247 Nos,Cement-0.09 Cu.M,
Sand-0.33 Cu.M
89 64 Extra rate for adding Polyester Fibre anti shrinkage material
@ 0.25% by weight of cement [or as per Manufacturer's
Specification] as secondary reinforcement to arrest hair
crack in concrete including cost of Fibre
Kg
389.96
Page 27
Building
91 (D) Flooring
91 1 Terraced flooring of lime concrete with stone lime, surki &
32 mm down Jhama khoa(1.5:2:7) (1.5 lime putty:2 surki:
7jhama khoa)
91 (a) 75 mm. thick Sq.M 346.59
91 (b) 100 mm. thick Sq. M 457.19
91 NOTE : 633 kg. unslaked lime make @ 1 cu.m. of lime
putty / paste.
91 2 Brick-on-edge floor or pavement with 1st class brick set
close in cement mortar (1:6) and laid with cushion of sand
below (including cost thereof) including ruled or flush
pointing with cement mortar (1:4) on top.
Sq.M 624.16
91 3 Artificial stone in floor, dado, staircase etc with cement
concrete (1:2:4) with stone chips, laid in panels as directed
with topping made with ordinary or white cement (as
necessary) and marble dust in proportion (1:2) including
smooth finishing and rou
91 In ground floor.
91 3 mm. thick topping (High polishing grinding on this item is
not permitted with ordinary cement).
91 Using grey cement
91 (i) 20 mm. thick Sq.M 192.48
91 (ii) 25 mm. thick Sq.M 219.04
91 (iii) 35 mm. thick Sq.M 271.48
91 (Add extra @1.5% for each addl. floor upto 4th floor and
@1.75% for each additional floor above 4th floor for item
No.l and 3).
91 4 Extra cost of colouring over corresponding items of artificial
stone
91 (A) For item 3
91 [with 3 mm thick colour topping]
91 (i) Colouring black Sq.M 115.88
93 (ii) Colouring red Sq. M 124.21
93 (iii) Colouring pink, cream, yellow, green Sq. M 132.54
93 (These colour items should be done by using white cement
only for 3 mm topping using white cement @ 3.4 kg/Sq.m,
marble dust @ 1.7 kg/Sq.m and pigment @ 0.35 kg/ Sq.m.)
93 [White cement to be supplied by the Agency including cost
thereof and Departmental Cement @ 5.1 kg/ Sq.m be
less issued corresponding to item 3.]
93 5 Extra cost of labour over grey artificial stone for
93 (i) Chequering Sq. M 9.11
93 (ii) Border (upto 75 mm. width) % Metre 881.02
93 (iii) Nosing, bead, moulding etc. % Metre 991.01
93 (iv) Moulding hand-rail of verandah, staircase etc. % Metre 1540.96
Page 28
Building
93 6 35 mm. thick (finished) terrazo work, cast in situ in floor and
20 mm. thick (finished) in dado, skirting staircase etc. laid in
panels or pattern using cement concrete (l:2:4)backing with
12 mm stone chips as directed and necessary terrazo
topping with m
93 (Add extra @ 1.5% for each additional floor upto 4 th floor
and @ 1.75 % for each addl. floor above 4 th floor)
93 [White cement for item No 6 to be supplied by the
contractor including cost thereof-and grey cement willbe
supplied by the Dept at the isuue rate]
93 In ground floor.
93 (A) 9 mm. thick terazo topping, laying and finished to 6 mm.
thick after final grinding with 0 to 7 mm. size mosaic chips
93 (i) In ordinary grey colour Sq. M 489.17
93 (ii) In black colour Sq. M 546.98
93 (iii) In red colour Sq. M 556.50
95 (iv) In silver grey {ordinary cement and white cement to be
used in equal proportion in topping)
Sq. M
531.22
95 (v) In pink, green, yellow, light green colour using white
cement only and necessary pigment.
Sq.M
633.81
95 (B) 12 mm. thick terrazo topping, laying and finihsed to 9
mm. thick after final grinding with 0 to 10 mm. size mosaic
chips.
95 (i) In ordinary grey colour Sq. M 537.75
95 (ii) In black colour Sq.M 619.27
95 (iii) In red colour Sq.M 632.84
(iv) In silver grey (ordinary cement and white cement to be
used in equal proportion in topping)
Sq.M
574.98
95 (v) In pink, green, yellow, light green colour using white
cemeny only and necessary pigment.
Sq.M
721.39
95 7 20 mm. thick (finished) terrazo work with precast tiles set
on 20 mm avg thick cement mortar (1:3) and sides with
admixture of pigment and white/grey cement as necessary
in floor, dado, skirting, staircase etc. laid in panels or in
patterns including high polishing, raking out joints,
roughening of concrete surface & application of cement
slurry before flooring works using cement (@ 1.75 kg. per
sq.m. all complete including all materials & labour. Add
extra @ 1.5 % for each additional floor upto 4th floor and
@ 1.75 % for each additional floor above 4th floor), n ground
floor.
95 (A) 9 mm. thick terrazo topping, laying and finished to 6
mm. thick after final grinding with 0 to 7 mm. size mosaic
chips.
95 (i) In ordinary grey colour Sq.M 672.84
95 (ii) In black colour Sq.M 727.66
95 (iii) In red colour Sq.M 748.13
Page 29
Building
97 (iv) In silver grey (ordinary cement and white cement to be
used in equal proportion in topping).
Sq. M
745.59
97 (v) In pink, green, yellow, light green colour using white
cement only and necessary pigment.
Sq. M
900.90
97 (B) 12 mm. thick terrazo topping, laying and finished to 9
mm. thick after final grinding with 0 to 10 mm. size mosaic
chips.
97 (i) In ordinary grey colour Sq. M 693.79
97 (ii) In black colour Sq.M 753.84
97 (iii) In red colour Sq. M 774.30
97 (iv) In silver grey (ordinary cement and white cement to be
used in equal proportion in topping)
Sq.M
756.07
97 (v) In pink, green, yellow, light green colour using white
cement only and necessary pigment.
Sq.M
914.09
97 8 Extra over corresponding item of precast terrazo work
including cost of materials, labour etc.
97 (i) For 25 mm. (finished) thick. Sq.M 28.36
97 9 NOTE : (For Kern no. 7 & 8, no cement will be supplied by
the Deptt, for manufacture of precast / tiles). Extra' cost of
labour over corresponding items of mosaic work
97 (a) For borders (upto 75 mm. width) % Metre 835.47
97 (b) For nosing, bead moulding etc. % Metre 927.69
97 (c) For moulded hand rail of verandah, staircase etc % Metre 1392.08
97 10 Supplying dividing strip fitted and fixed with cement mortar
(1:3) in mosaic or patent stone floor, dado etc complete as
per direction of the Engineer-in-change. (i) Glass-3mm.
thick
97 (a) 20 mm. wide strip Metre 11.60
97 (b) 25 mm. wide strip Metre 12.91
97 (c) 37 mm. wide strip Metre 14.22
99 (ii) Aluminium - 25 mm. wide & 2mm. thick. Metre 42.42
99 11 25mm. thick damp proof course with cement concrete with
stone chips (1:1.5:3) [with graded stone aggregate 10 mm
nominal size] and admixture of water proofing compound
as per manufacturer's specification followed by two coat of
polymer based paint, (1st c
Sq.m 165.82
99 12 25 mm. thick damp proof with cement concrete (1:1.5:3)
(with graded stone aggregate 10 mm. normal size) and
painting the top surface with a coat of bitumen [V6.40 ]
using 1.7 kg. per sq.m. including heating the bitumen arid
cost and carriage of all materi
Sq.m 246.72
99 13 Supplying and laying Polythene Sheet (150gm / sq.m.) over
damp proof course or below flooring or roof terracing or in
foundation or in foundation trenches.
Sq. M 17.55
99 14 40 mm. thick damp proof course with cement concrete
(1:1.5:3)
Sq. M 261.23
Page 30
Building
99 (with graded stone chips 20 mm nominal size) with water
proofing compound of approved brand @ 0.2% weight of
cement including cost of materials over two coats of non
toxic acrylic polymer modified cementitious waterproofing
slurry coat complete [cost of w
101 15 (a) Supplying, fitting and fixing 20 mm. to 37.5 mm. thick
Chunar / Mirzapur / Dholpur slab in floor set in 20 mm thick
(avg) cement mortar (1:4) bed and pointing in cement
mortar (1:2) [1 cement: 2 marble dust] with admixture of
pigment matching the stone shade, polishing all complete
as per direction of the E-l-C (Using cement slurry for
bedding @ 4.4 kg/Sq.m and jointing @ 2.4 kg/Sq.m).
101 In ground floor Sq. M 979.35
101 (b) Supplying fitting and fixing in position 8 mm. to 12 mm.
thick Dholpur slab in wall, dado making suitable
arrangement to hold the stone properly with approved
polymerised adhesives (6 mm thick) as per ISI specification
including pointing with cement mortar (1:2) (1 cement: 2
marble dust) with admixture of pigment matching the stone
shades all complete as per direction of Engineer-in-charge
including cost of all materials,.labour, scaffolding, staging,
curing complete [using white cement for pointing @ 2.4 kg/
Sq.m].
101 In ground floor Sq. M 1053.78
101 16 Supplying and laying true to line and level vitrified tiles of
approved brand (size not less than 600 mm X 600 mm X10
mm thick) in floor, skirting etc. set in 20 mm sand cement mortar
(1:4) and 2 mm thick cement slurry back side of tiles using
cement @ 2.91Kg./M
2
or using polymerised adhesive (6 mm
thick layer applied directly over finished artificial stone
floor/Mosaic etc without any backing course) laid after
application slurry using 1.75 Kg of cement per M
2
below mortar
only, joints grouted with admixture of white cement and
colouring pigment to match with colour of tiles / epoxy grout
materials of approved make as directed and removal of wax
coating of top surface of tiles with warm water and polishing the
tiles using soft and dry cloth upto mirror finish complete
including the cost of materials, labour and all other incidental
charges complete true to he manufacturer's specification and
direction of Engineer-in-Charge.(White cement, synthetic
adhesive and grout material to be supplied by the contractor)
Page 31
Building
103 (I) With application slurry @1.75 kg/ Sq.m, 20 mm sand
cement mortar (1:4) & 2 mm thick cement slurry at back
side of tiles, 0.2 kg/ Sq.m white cement for joint filling with
pigment.
103 (A) Deep Colour & White Sq. M 1449.86
103 (B) Light Colour Sq. M 1075.00
103 (II) With Polymerised Adhesive [6 mm thick] & epoxy
grouting materials for filling joints including spacer-2 mm
[Applied directly over finished artificial stone floor/ mosaic
etc.]
103 (A) Deep Colour & White Sq. M 1599.95
103 (B) Light Colour Sq. M 1225.10
103 17 Resetting old glazed porcelain tiles in 20 mm thick cement'
mortar 1:4) including 4 Nos of key stone (10 mm) fixed with
adhesive of approved quality & 2 mm thick cement slurry
using cement@ 2.91 cg/Sq.m at the back of tiles and
finishing joints with white cement & colouring oxide [if
required] to match the colour of tiles over application slurry
@ 1.75 kg/ Sq.m below cement mortar including
dismantling the old mortar etc.
Sq. M
296.64
103 18 Resetting old Mirzapur stone slabs in 20 mm thick [avg]
cement mortar (1:4) bed including dismantling old mortar
etc.
Sq. M
161.54
103 19 Taking out Mirzapur or glazed porcelain tiles carefully by
chiselling rom walls or floor including stacking serviceable
material as irected.
Sq. M
65.44
103 20 eparing cracks in floor with cement mortar (1:2) with
necessary igment to match with existing works, including
prior cutting and leaning the cracks as directed.
% M
451.07
103 21 illing rat-holes with broken glass and cement concrete
(1:3:6) with lama chips including shaping holes and
mending damages.
each
41.11
103 22 Washing and cleaning with oxalic acid powder using 33
gms./sq.m.
105 (a) Marble floor/ marble dado % Sq. M 483.29
105 (b) Floor/ dado other than marble % Sq. M 394.41
105 23 Supplying, fitting and fixing Marble Slab/tile of 15 to 18 mm
thickness in floor, lobby, stair, landing & treads etc. over 20
mm (av.) thck base of Cement mortar (1:2) laid with white
cement slurry @ 4.4 kg/Sq.m before placing marble & jointed
with white cement slurry @ 2.0 kg/Sq.m with necessary
pigments including grinding and Granite polishing as per
direction of Engineering -in -Charge in Ground Floor. {White
cement and Pigment to be supplied by the Agency]
105 (a) With Makrana plain pink / Adranga Pink / Garbh
Gulabi / Udaypur pink / Udaypur Green / Black Bhaslana
105 i) Area of each Slab/tile upto 0.3 sq.m. Sq. M 1327.31
Page 32
Building
105 ii) Area of each Slab/tile exceeding 0.3 sq.m. but not
exceeding 0.6 sq.m.
Sq. M
1557.51
105 iii) Area of each Slab/tile exceeding 0.60 sq.m but not
exceeding 1.00 sq.m.
Sq. M
1885.92
105 iv) Area of each slab/tile exceeding 1.00 sq.m (This item to
be executed on specific permission of Superintending
Engineer)
Sq. M
2214.33
105 (b) With Chawk Dungri
105 i) Area of each tile upto 0.3 sq.m. Sq. M 1530.18
105 ii) Area of each tile exceeding 0.3sq.m. but not exceeding
0.6 sq.m.
Sq. M
1735.38
105 iii) Area of each tile exceeding 0.6 sq.m but not excedding
1 sq.m.
Sq. M
2884.82
107 (iv) Area of each slab/tile exceeding 1.00 sq.m (This item to
be executed oh Specific permission of Superintending
Engineer)
Sq. M
4198.47
107 23
(A)
Extra cost of labour for prefinished and premoulded Nosing
to treads of steps, railing, window sill etc. of Marble Stone.
Meter
161.21
107 23 (B) Extra cost of labour for Marble Stone Floor in treads of
Steps.
Sq. M
141.32
107 24 Supplying, fitting, fixing marble slab/tiles, 15 mm. to 18 mm.
thick in dado / wall in 15 mm thick [avg] cement mortar (1:2)
including making suitable arrangements to hold the stones
properly by brass / copper hooks applying white cement
slurry @ 4.4 kg/ sq.m at the back side of marble & pointing
in cement mortar (1:2) (1 cement, 2 marble dust) with
admixture of pigment matching the stone shades including
polishing all complete as per direction of the Engineer-in-
charge including cost of materials, labours, scaffolding,
staging, curing complete. [White cement, Pigment to be
supplied by the Agency]
107 (a) With Makrana plain pink / Adranga Pink / Garbh Gulabi /
Udaypur Pink / Udaypur green / Black Bhalsana (i) Area of
each Slab/tile upto 0.3 sq.m.
Sq. M
1411.75
107 (ii) Area of each slab/tile exceeding 0.3sq.m. but not
exceeding 0.6 sq.m.
Sq. M
1642.28
107 (iii) Area of each slab/tile exceeding 0.6 sq.m but not
excedding 1sq.m.
Sq. M
1988.69
107 (iv) Area of each slab/tile exceeding 1.00 sq.m (This item to
be executed on Specific permission of Superintending
Engineer)
Sq. M
2299.10
107 (b) With Chawk Doongri
107 (i) Area of each tile upto 0.3 sq.m. Sq. M 1614:95
107 (ii) Area of each tile exceeding 0.3sq.m. but not exceeding
0.6 sq.m.
Sq.M
1820.26
107 (iii) Area of each tile exceeding 0.6 sq.m but not excedding
1 sq.m.
Sq. M
2969.59
Page 33
Building
109 (iv) Area of each slab/tile exceeding 1.00 sq.m (This item to
be executed on Specific permission of Superintending
Engineer)
Sq. M
4283.24
109 24
(A)
Supplying fitting and fixing 15 to 18 mm thick Marble
slab/Tile in riser of step or skirting (upto 300 mm ht) over
15mm (avg) thick base of Cement mortar (1:2) laid with
white cement slurry @ 4.4 kg/ Sq.m at back side of marble
and jointed with white cement slurry @ 2.2 kg/ Sq.m with
necessary pigments including grinding and Granite
Polishing. [White cement and Pigment to be supplied by the
Agency]
109 (a) With Makrana plain pink / Adranga Pink / Garbh Gulabi /
Udaypur Pink / Udaypur green / Black Bhalsana
109 (i) Area of each Slab/tile upto 0.3 sq.m. Sq. M 1423.86
109 (ii) Area of each tile exceeding 0.3sq.m. but not exceeding
0.6 sq.m. (b) With Chawk Doongri
Sq. M
1656.50
109 (i) Area of each tile upto 0.3 sq.m. Sq. M 1629.06
109 (ii) Area of each tile exceeding 0.3sq.m. but not exceeding
0.6 sq,m. Note:- Plain Polish may be accepted with
approval of Engineer-in-charge with reduction Rs. 50/- per
Sq.m for item 23(a), 23 (b), 24 A.
Sq. M
1834.37
109 25 Polishing only of old marble or terrazo work with oxalic acid
powder using 33 gms/ sq.m. by manual labour / machine
where necessary-
Sq. M
28.34
109 26 Supplying and laying chequered tiles of any shade & of
approved quality with (l:15i:3) cement concrete laid in
panels or patterns as directed in pavement, footpath etc.
including necessary underlay 25 mm thick [avg] cement
mortar (1:3) complete in all respect With all abour and
materials. [Using cement slurry @ 4.4 kg/Sq.m at back side
and @2.4 kg/Sq.m for joint filling]
109 Red Variety
109 (i) 25 mm. thick Sq. M 464.72
111 (ii) 30 mm. thick Sq. M 497.39
111 27 18 mm. to 22 mm. thick, kota stone slab set in 20 mm thick
(avg] cement mortar (1:4) in floor, stair & lobby including
pointing in cement slurry with admixture of pigment
matching the stone shade, including grinding & polishing as
per direction of Enginee
Sq. M 963.01
111 27 (A)Extra cost of labour for prefinished and premoulded Nosing
to treads of steps, railing, window sill etc. of Kota Stone.
m 139.21
111 27 (B)Extra cost of labour for grinding Kota Stone Floor in treads
and riser of Steps.
Sq. M 130.32
111 28 Supplying, fitting and fixing 18 mm. to 22 mm. thick kota
stone slab in wall, dado in 15 mm thick [avg] cement mortar
(1:3) including making suitable arrangement to hold the
stone properly by brass / copper hooks including pointing in
cement mortar (1:2)
Sq. M 1056.21
Page 34
Building
111 29 Grinding to marble / mosaic floor including remaining stone,
if necessary, after cutting with manual labour / machine,
where necessary
Sq. M 15.38
111 30 Supplying, fitting & fixing 1st quality Ceramic tiles in walls
and floors to match with the existing work & 4 nos. of key
stones (10mm) fixed with araldite at the back of each tile &
finishing the joints with white cement mixed with colouring
oxide if req
111 A) Floor
111 With Sand Cement Mortar (1:4) 20 mm thick & 2 mm thick
cement slurry at back side of tiles using cement @ 2.91
Kg/Sq.m & joint illing using white cement slurry @
0.20kg/Sq.m.
113 (a) Area of each tile upto 0.09 Sq.m
113 (i) Coloured decorative Sq.M 711.71
113 (ii) Other than Coloured decorative including white Sq.M 661.71
113 (b) Area of each tile above 0.09 Sq.m
113 (i) Coloured decorative Sq.M 759.26
113 (ii) Other than Coloured decorative including white Sq.M 724.26
113 (B) Wall
113 With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick
cement slurry at back side of tiles using cement @ 2.91
Kg/Sq.m & joint filling using white cement slurry @
0.20kg/Sq.m.
113 (a) Area of each tile upto 0.09 Sq.m
113 (i) Coloured decorative Sq.M 724.93
113 (ii) Other than Coloured decorative including white Sq. M 674.93
113 (b) Area of each tile above 0.09 Sq.m
113 (i) Coloured decorative Sq.M 962.35
113 (ii) Other than Coloured decorative including white Sq.M 888.13
113 (C ) Floor
113 With Polymerised Adhesive and Epoxy grout pointing
including spacer- 2 mm (When Tiles are laid over existing
hard ready surface)
113 (a) Area of each tile upto 0.09 Sq.m [using adhesive 3 mm
thick]
113 (i) Coloured decorative Sq.M 819.47
113 (ii) Other than Coloured decorative including white Sq.M 769.48
113 b) Area of each tile above 0.09 Sq.m [using adhesive 4.5
mm thick]
113 i) Coloured decorative Sq.M 862.25
113 ii) other than Coloured decorative including white Sq.M 827.36
115 (D )Wall
115 With Polymerised Adhesive and Epoxy grout pointing
including spacer- 2 mm (When Tiles are laid over existing
hard ready surface)
115 (a) Area of each tile upto 0.09 Sq.m [using adhesive 3 mm
thick]
115 (i) Coloured decorative Sq. M 844.47
Page 35
Building
115 ii) Other than Coloured decorative including white Sq.M 794.48
115 b) Area of each tile above 0.09 Sq.m [using adhesive 4.5
mm thick]
115 I) Coloured decorative Sq.M 1077.23
115 ii) other than Coloured decorative including white Sq.M 1002.23
115 Note:-1. If Cement grout is used in place of epoxy grout
then deduct Rs 124/ Sq.m for item 30 (C) [a] & 30 (D) [a]
and Rs 93/ Sq.m foritem30{C)[b]&30(D)[b]
115 2. Add extra for each addl, floor over the rate for item 16 &
30.
115 I) upto 4 th floor-Rs 5/ Sq.m
115 ii) above 4 th floor-Rs 6.25/ Sq.m
115 31A Supplying, fitting & fixing granite tiles 10mm to 12mm. thick
in columns, wall, facia etc. with 15 thick [avg] cement
mortar (1:2) ncluding making suitable arrangements to hold
the stones properly by brass / copper hooks including
pointing in cement mortar (1:2) (1 white cement: 2 marble
dust) with admixture of pigment matching the stone shades
all complete as per direction of the Engineer-in-charge
including cost of all materials, labours, scaffolding, staging
curing and roughening of concrete surface complete. Using
cement slurry at back side of tiies@ 4.4 kg/sq.m & white
cement slurry for joint filling @ 1.8 kg/sq.m]
115 Area of each slab upto 0.2 Sq.m Sq.M 1785.71
117 31 B Supplying, fitting & fixing granite slabs 15mm to 18 mm.
thick with uniform texture & without decorative veins in
columns, wall, facia etc. with 15 mm thick [avg] cement
mortar (1:2) including making suitable arrangements to hold
the stones properly by brass /coppe hooks including
pointing in cement mortar (1:2) (1 white cement: 2 marble
dust) with admixture of pigment matching the stone shades
all complete as per direction of the Engineer-in-charge
including cost of all materials, labours, scaffolding,
staging .curing and roughening of concrete surface
complete. [Using cement slurry at back side of granite @
4.4 kg/sq.m & white cement slurry for joint filling @ 1.8 kg/sq.m]
Sq. M
2450.42
117 32 A) Supplying & laying of approved brand of scratch proof,
sem flexible P.V.C. blended homogeneous marble Vinyle
flooring in tiles conforming to IS:3461, fixing with synthetic
acrylic adhesive after preparing the floor, levelling &
smothaning when necessary with suitable putty, as per the
design & instruction of the Engineer-in-charge.
Sq. M
498.28
117 2 mm thick
Page 36
Building
117 B) Supplying & laying of approved make and brand of
scratch proof, flexible & homogeneous P.V.C. Vinyle
flooring conforming to IS:3462 - 1982 in required finish,
fixed with synthetic acrylic adhesive after preparing the
floor, levelling & smothaning when necessary with suitable
putty, as per the design & instruction of the Engineer-in-
charge.
117 (i) 2 mm thick (Plain) Sq. M 430.18
117 ii) 1.5 mm thick {with stud / checkered) Sq. M 410.52
117 33 enewing burnt day tiles of tiled flooring to match with
existing
Sq. M
117.21
117 work set in cement mortar (1: 4) complete.
117 34 abour for setting tiles in floor / pavement in cement mortar
(1:4)
Sq. M
67.88
117 oints finished with white cement.
117 35 75 mm glazed ceramic tiled border (listel type)
117 a) with 15 mm thick cement mortar (1:3) and 2 mm thick
cement urry using cement @ 2.91 Kg/Sq.m
m
202.09
119 b) Polymerised adhesive and epoxy grout jointing m 215.42
36 Washing and cleaning with soap water and rubbing with oil
cloth in all types of floor and dado.
Sq. M
4.40
119 37 Labour for setting Qota / Dungri stone slabs in cement
mortar (1:2) including necessary underlay of mortar (1:2).
Sq. M
170.87
119 38 Supplying, fitting and fixing Black Stone slab used in
Kitchen slab, alcove, wardrobe etc. laid and jointed with
necessary adhesive Cement mortar (1:2) including grinding
or polishing as per direction of Engineer-in -Charge in
Ground Floor.
119 a) Slab Thickness 20 to 25 mm Sq.M 661.49
119 b) Slab Thickness above 25 mm and upto 37.5 mm Sq. M 745.04
119 Add extra for each addl, floor over the rate for item 23, 24,
24 (A), 27, 28, 31A, 31B & 38 upto 4 th floor- Rs. 12/-per
Sq.m
119 II) above 4th floor -Rs. 16/- per Sq.m
119 39 Supplying& laying 20 mm designer chequered tiles of any
shade and of approved quality as per IS: 1237:1980 laid in
patterns as directed n pavement, footpath including
necessary underlay 25 mm thick average cement mortar
(1:3) complete in all respect with all labour and materials
[using cement slurry @ 4.4 kg/Sq.m at back side of iles.
[Cement of mortar & slurry will be supplied by the
Department. Border concrete if necessary to be paid
separately].
Sq.M
887.23
Page 37
Building
119 40 Supplying & laying interlocking designer paver block of any
shade and of approved quality as per IS: 1237-1980 laid in
pattern as directed in pavement, footpath, driveway, etc
including necessary underlay complete in all respect with all
labour and material. Border concrete if necessary to be
paid separately].
119 a) 25 mm thick Block (over 25 mm thick (Avg) Cement
mortar (1:3) & Cement Slurry @ 4.4 kg/Sq.m at back side
of Block. Cement for Mortar & Slurry to be supplied by
Department).
121 (i)Grey Sq.M 858.36
121 (ii) Coloured Decorative Sq.M 939.56
121 (b) 40 mm thick Block (Over 150 mm Medium Sand bed
including cost of sand but excluding cost of earthwork in
excavation or dismantling of existing hard surface if
necessary)
121 (i)Grey Sq.M 957.38
121 (ii) Coloured Decorative Sq.M 1069.83
121 (c) 60 mm thick Block (Over 150 mm Medium Sand bed
including cost of sand but exlcuding cost of earthwork in
excavation or dismantling of existing hard surface if
necessary)
121 (i)Grey Sq.M 1252.05
121 (ii) Coloured Decorative Sq.M 1411.97
(E) Roofing and Sheet Walling
123 1 Lime terracing on roof with lime concrete(2:2:7) (2 lime
putty / paste : 2 surki : 7 brick khoa ) laid to proper slope,
throughly beaten and cured including top finishing,
providing ghoondies at junction with parapet etc., shaping
and finishing at mouths of rain water pipes, complete as per
direction.
123 (For item 1 add extra for each addl. floor over the rate @
1.5% upto 4th floor and @ 1.75% above 4th floor.) Roof of
one storied structure (Payment to be made on surface area
of terracing including ghoondies.)
123 (a) 75 mm. thick (average) Sq.M 424.70
123 (b) 100 mm. thick (average) Sq.M 552.05
123 (c) 125 mm. thick (average) Sq.M 656.13
123 (d) 150 mm. thick (average) Sq.M 781.93
123 NOTE: 633 kg. of unslaked lime = 1 cu.m. of lime putty / paste.
123 2 Renewing rounding only (100 mm. radius) at the junction of
roof and parapet etc. with beaten lime concrete (2:2:7) with
slaked ime (2 lime putty / paste : 2 surki: 7 brick khoa)
Metre
57.87
123 3 Renewing ceiling tile including pointing in cement mortar
(1:3)
123 (a) In single layer (Cement 1.7 Kg/ Sq.m) Sq.M 178.01
Page 38
Building
123 (b) In double layer (Cement 3.4 Kg/ Sq.m) Sq.M 318.22
123 4 Repairs to roof cracks with cement and sand mortar (1:4)
ncluding cutting grooves and cleaning cracks arid grouting
the cracks with neat cement before repairs. (Cement 0.63
Kg/Mtr.)
Metre
10.95
123 5 tepair to roof cracks with Bitumen(VG-40) including cutting
grooves and cleaning cracks, heating bitumen as directed
and inished with sand blinding. (Bitumen 1.687 Kg/Sq.m,
Meadium and 0.6 Cu.m/100 Sq.m) (Bitumen to be supplied
by contractor)
Sq.M
176.58
123 6 Repairs to cracks in terraced roof by cutting V-grooves 75
mm. to 00 mm. deep and 15.0 mm. to 200 mm. wide and
filling the same with beaten lime concrete (2:2:7) with lime
putty / paste and nishing complete (2 lime putty / paste : 2
surki: 7 brick khoa)
Metre
130.81
125 7 Labour for painting roof surface with Bitumen [using 135 kg
(avg.) per % Sq.m.Jinduding cleaning roof, heating bitumen as
directed and spreading sand and complete including cost of sand
@ 0.6 cu.m. per % Sq.m. and cost of carriage of Bitumen from
deptt godown but excluding the cost of bitumen. (If heating is
not reqd. then deduct Rs.3.45/- per Sq.m)
Sq.M
17.67
125 8 Cow dung (green and not dry hard) and cement wash (3
cow dung: 1 cement by wt.) not less than 1.5 mm. thick.
(Cement 1.08Kg/Sq.m)
Sq.M
12.03
125 9 (i) Examining wooden beam by sounding or boring Each 37.18
125 (ii) Examining wooden burghas by sounding Each 1.26
125 10 Opening out and examining portion of bearing of beam
including mending good damages as necessary.
Each
Bearin
g
101.73
125 11 Replacing wooden beam or R.S. joist by R.S. joist or by
another wooden beam joist and fixed complete, including
hire and labour charges for necessary sal bullah props,
necessary packing between beams and burgahs but
excluding the cost of joist or wooden beam and concrete/
Brick works etc needed for mending damages.
125 Mode of payment for wooden beam (replacing the old one)
will je made against Item No. 4 of carpanter's work]
125 i) Height not exceeding 5m
125 a) Clear span not exceeding 3.7m. Each 2141.66
125 b) Clear span exceeding 3.7m but not exceeding 5m. Each 2598.52
125 c) Clear span exceeding 5m but not exceeding 6m. Each 2958.18
125 d) Clear span exceeding 6m but not exceeding 7.3m. Each 3415.03
125 ii) Height exceeding 5m but not exceeding 7.3m.
125 a) Clear span not exceeding 3.7m. Each 2692.41
125 b) Clear span exceeding 3.7m but not exceeding 5m. Each 3343.64
127 (c) Clear span exceeding 5m but not exceeding 6m. Each 3852.33
Page 39
Building
127 (d) Clear span exceeding 6m but not exceeding 7.3m. Each 4502.92
127 12 Labour for changing burgahs excluding mending damages. Each 18.00
127 [Payment for the wooden burgahs (replacing the old ones)
will be made against Item 4 of carpenter's work ]
127 13 Encasing R.S. joist / beam with 16 to 18 B.W.G. wire
netting (13 to 19 mm. mesh) and cement concrete (1:1..5:3)
with stone chips including finishing with 15 mm. thick
cement plaster (1:4) and 2 coats white washing completed
Cement 18.9 Kg/ Sq.m)
Sq.M 501.90
127 (Payment to be made on area of exposed surface)
127 14 Cutting shallow channel drain of roof for easy passage of
rain water cement plastered (1:4) complete. (Payment for
Cement plaster to be paid separately)
Metre 11.90
127 15 Roofing of Ranigunge pattern tiles 1st class quality
(excluding supporting frame work) including tying
eaves tiles with galvanised wire and pointing all joints
with
127 (a) Valamoid or similar bituminous paste as approved Sq.M 234.91
127 (b) Cement mortar (1:3) (Cement O.SKg/Sq.m) Sq.M 221.36
127 16 Ridging of Ranigunge pattern tiled roof of 1st class quality
fitted and fixed including the cost of setting and pointing
with
127 (a) Valamoid or similar bituminous paste as approved Metre 100.81
127 (b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 99.18
127 17 Renewing (in job work) Ranigunge pattern tile of 1st class
quality including pointing joints with
127 (a) Valamoid or similar bituminous paste as approved Each 22.31
127 (b) Cement mortar (1:3) (Cement 5Kg/100 nos) Each 20.75
129 18 Roofing of Ranigunge pattern tiles (with dismantled tiles of
the Deptt.) excluding the cost of tile but including the cost of
pointing all joints with (a) Valamoid or similar bituminous
paste as approved
Sq.M
57.29
129 (b) Cement mortar (1:3) (Cement O.5Kg/Sq.m) Sq.M 39.75
129 19 Ridging of Ranigunge pattern tiled roof (with dismantled
ridge tiles of the Deptt.) excluding the cost of the ridge tiles
but including the cost of fitting, fixing and of setting and
pointing joints with
129 (a) Valamoid or similar bituminous paste as approved Metre 15.41
129 (b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 17.64
129 20 Resetting old ridging of R.T roof including fresh pointing
with
129 (a) Valamoid or similar bituminous paste as approved Metre 10.93
129 (b) Cement mortar (1:3) (Cement 0.2Kg/Mtr) Metre 8.70
129 21 Re-pointing R.T. roof with
129 (a) Valamoid or similar bituminous paste as approved Sq.M 23.05
129 (b) Cement mortar (1:3) (Cement 0.5Kg/Sq.m) Sq.M 8.71
129 22 Cleaning throughly heavy soots and foreign matters from
underneath Ranigunge pattern tiled roof.
Sq.M
12.49
Page 40
Building
129 23 Asbestos corrugated (Trafford or similar approved quality)
sheet (6 mm thick) work (excluding the supporting
framework) fitted and fixed with 9.5mm. dia. J or L hook-
bolt and nuts, limpet and bitumen washers and putty with
150 mm end lap & one corrugation minimum side lap
complete. (Payment should be made on area of finished
work)
129 (a) In Roof Sq.M 515.98
129 (b) In Wall Sq.M 509.29
131 24 Galvanised corrugated iron sheet work (excluding the
supporting frame work) fitted and fixed with 10 mm. dia J or
L hook-boits limpet and bitumen washers and putty
complete with 150 mm end lap and one corrugation
minimum side lap. (Payment to be made on area of finished
work)(GCI sheet to be supplied by contractor)
131 (i) In Roof:-
131 a) With 0.60 mm thick sheet Sq.M 533.64
131 b) With 0.63 mm thick sheet Sq.M 555.95
131 c) With 0.80 mm thick sheet Sq.M 681.63
131 (ii) ln Wall:-
131 a) With 0.60 mm thick sheet Sq.M 525.31
131 b) With 0.63 mm thick sheet Sq.M 547.62
131 c) With 0.80 mm thick sheet Sq.M 672.56
131 25 Supplying, fitting and fixing glass reinforced polyester
translucent iber glass sheet to match with GGI Corrugation
as per IS: 12866 -1989 in roof fitted and fixed with 10 mm
dia "J" or "L" hook, bolts nd nuts, limpet and bitumen
washers and putty with 150mm nd lap and one corrugation
minimum side lap complete.
131 a) 1.6mm +/- 0-2 mm thick sheet.(2.6Kg/Sq.m)
131 I) Natural white or tinted blue colour Sq.M 807.56
131 ii) Fire retardant milky white Sq.M 896.80
131 iii) Coloured other than natural white or tinted blue Sq.M 867.06
131 iv) Special coloured textured tissue Sq.M 947.37
131 b) 2.0mm +/- 0.2 mm thick sheet.(3.25Kg/Sq.m)
131 I) Natural white or tinted blue colour Sq.M 999.28
131 ii) Fire retardant milky white Sq.M 1090.01
131 iii) Coloured other than natural white or tinted blue Sq.M 1090.01
131 iv) Special coloured textured tissue Sq.M 1191.15
133 26 Supplying, fitting and fixing glass reinforced polyester
translucent ridging 450 mm long each way as per IS 2866 -
1989 fitted and fixed with bolts J hooked screws and
bitumen washers complete.
133 a) 1.6mm+/-0.2 mm thick sheet.
133 i) Natural white or tinted blue colour Metre 626.70
133 ii) Fire retardant milkyl white Metre 701.07
133 iii) Coloured other than natural white or tinted blue Metre 701.07
133 iv) Special coloured textured tissue Metre 820.35
Page 41
Building
133 (Pro rata increase of rate may be allowed for arriving at
rates of thickness in excess of 1.6mm and up to 2mm)
133 27 Supplying, fitting and fixing glass reinforced polyester
translucent fiber sheet 300mm wide in half round gutter in
roof as per IS: 12866 - 1989 fitted and fixed with 50 X 6mm
MS Clamp with necessary bolts and nuts, screws and
jointing material complete as per direction of Engineer - in -
Charge.
133 a) 1.6mm +/- 0.2 mm thick-sheet.
133 ) Natural white or tinted blue colour Metre 724.32
133 i) Fire retardant milky white Metre 791.25
133 ii) Coloured other than natural white or tinted blue Metre 791.25
133 v) Special coloured textured tissue Metre 925.11
133 Pro rata increase of rate may be allowed for arriving at
rates of thickness in excess of 1.6mm and up to 2mm)
133 28 Salvanised plain sheet works (excluding supporting
framework) itted and fixed with 6 mm. dia J or L hook-bolts
and nuts, sheet-Dolls, limpet and bitumen washers and
putty with 150 mm. end ap & 50 mm. minimum side lap
complete.
133 (a) In roof: with 0.63 mm. sheets. Sq.M 410.98
133 (b) In wall: with 0.63 mm. sheets. Sq.M 400.43
133 29 Vsbestos ridging (with standard lap) fitted and fixed with
lecessary hook, bolts, nuts, washers, etc. complete.
133 (a) Close fitting adjustable type Metre 290.15
135 (b) Serrated adjustable type Metre 233.03
135 30 Galvanised iron sheet ridging fitted with necessary bolts,
screws, washers etc complete.(225mm end lapping)
135 (A) 300 mm lapping each way
135 (a) With 0.60 mm sheet Metre 292.62
135 (b) With 0.63 mm sheet Metre 304.93
135 (c) With 0.80 mm sheet Metre 371.43
135 (B) 450 mm lapping each way
135 (a) With 0.60 mm sheet Metre 387.47
135 (b) With 0.63 mm sheet Metre 405.95
135 (c) With 0.80 mm sheet Metre 505.70
135 31 Galvanised iron sheet eaves gutter fitted and fixed with
necessary 50 mm X 6 mm M.S flat bar clamps bent to
design, bolts, nuts, washers etc. complete. Eaves gutter
made of 0.63 mm. sheets.(300mm End lapping)
135 (a) 225 mm. wide gutter Metre 272.76
135 (b) 300 mm. wide gutter Metre 324:03
135 32 Galvanised iron sheets valley gutter with perimeter not less
than 750 mm with 225 mm lap each way fitted and fixed
with necessary bolts, nuts, screws, etc.complete. Valley
gutter made of 0.63 mm. thick sheets. (300mm End
lapping)
Metre
447.58
Page 42
Building
135 33 Fitting and fixing old pieces of asbestos, G.C.I, or C.I.
sheets or plain sheets including closing old holes with
washers and sheet-bolts and nuts, etc. and including fixing
the same to supporting frame with necessary hook-bolts,
washers, putty etc. (excluding cost of sheets). (Payment to
be made on area of finished work.)
135 (i) With about half old and half new fittings, including the cost
of new fittings. (a) In roof
Sq.M
52.66
135 (b) In wall Sq.M 46.09
137 (ii) With all new fittings including the cost thereof.
137 (a) In roof Sq.M 84.08
137 (b) In wall Sq.M 73.21
137 34 Fitting and fixing old pieces of asbestos, G.C.I. or C.I. sheet
or plain sheet ridging or gutter including closing old holes
with washers and sheet-holts and nuts etc. and including
fixing the same to supporting frame with necessary
hookbolts, washers, putty etc. (excluding the cost of the
ridge or gutter pieces).
137 (Payment to be made on length of finished work.)
137 (a) With about half old and half new fittings, including the
cost of new fittings.
Metre
71.15
137 b) With all new fittings including the cost thereof. Metre 88.52
137 35 Renewing galvanised J or L hook-bolt with nut and with
necessary limpet and bitumen washers, putty etc fitted and
fixed complete. (Total length of bolt upto 225 mm)
137 (a) 10 mm dia. bolt Each 19.68
137 (b) 8 mm dia. bolt Each 18.49
137 (c) 6 mm dia. bolt Each 17.30
137 (d) 4 mm dia. bolt Each 16.11
137 36 Labour for curving C.I. or G.C.I, sheet for curved roof etc.
Payment to be made on area of finished works done with
the urved sheets.)
Sq.M
15.25
137 37 topping roof leakages in C.I. or G.C.I, or asbestos roofing.
137 i) With putty and paint %Sq.M 765.00
137 ii) With limpet and bitumen washer and putty %Sq.M 874.57
137 iii) Closing holes in C.I. or G.C.I, or asbestos roofing with
sheet jolt, limpet and bitumen washers, putty etc.
Each
12.48
139 38 Filling up joints (both vertical and horizontal) of curved C.I.
roofing of Lahore type sheds by a thick paste made of jute
chopping mixed with bituminous paint and stopping
roof leakages including the leakages through other weak
spots with limpet and bitumen washers and putty etc.
Sq.M
20.28
139 39 Walling or roofing fitted and fixed complete with cut drum
sheets including the cost of drums, cost of cutting drums
and flattening the sheets and cost of necessary nails and
screws.
Sq.M
194.09
Page 43
Building
139 40 (Cost of empty bitumen drums issued by the Deptt. will be
recovered at Rs. 100.00 for each drum.) Galvanised or
painted wind-tie made of M.S. flats, fitted and fixed
complete including cost of necessary fittings.
139 (a) Made with 40 mm. X 6 mm. flats Metre 108.40
139 (b) Made with 50 mm. X 6 mm. flats Metre 131.94
139 (c) Made with 50 mm. X10 mm. flats Metre 210.40
139 (Materials will not be supplied by the Deptt.)
139 41 Taking out wind-tie from roof including cutting out rusted
bolts, nuts etc. and removing materials to any distance
within the compound and stacking.
Metre
9.40
139 42 Fixing old wind-tie with new fittings including painting. Metre 12.01
139 43 Labour for assembling, hoisting, placing, fitting & fixing
tubular roof trusses.
139 (a) Above 1.5 m to 3 m span Each 282.60
139 (b) Above 3 m to 6 m span Each 517.60
139 (c) Above 6 m to 9 m span Each 1064.95
139 (d) Above 9 m to 12 m span Each 1493.30
139 (e) Above 12 m to 15 m span Each 2189.38
141 44 Supplying and laying true to line and level 20 mm / 25 mm.
thick precast roof tiles made of cement cone, with stone
chips as pe approved strength and density set in 25mm
avg. thick cemen morter(l:3) and filling up joint (3 mm wide)
with cement sane mortar (1:1) applying cement slurry @
1.75 kg per Sq.m back o tiles and then settting close the
precast tiles, finishing up the joints with slurry already laid
and finally finishing the top surface including providing 150
mm. high skirting with the same tiles flushed with the inside
surface of parapet wall,finishing the mouth of rain water
pipes, curving etc. as necessary complete as per direction
of the Engineer-in-charge. (Levelling if necessary may be
paid separately)
141 (a) For 20 mm. thick precast tiles (cement 14.6 kg/ Sq.m for
underlayer)
Sq.M
389.98
141 (b) For 25 mm. thjck precast tiles (cement 14.6 kg/ Sq.m
underlayer) (Add extra @ 1.5% for each additional floor
upto 4th floor and @1.75% for each additional floor above 4th
floor)
Sq.M
431.39
Page 44
Building
141 45 Providing waterproofing treatment over concrete roof
surface (old or new) by the application of two coats of slurry
prepared with latex of approved brand, water and cement
in the proportion of (LP.W. Cement -1:4:6) by volume, with
brush in a time gap of minimum 4(four) hours to
14(fourteen) hours between the two layers, laying 20mm
thick and sand and cement consolidated plaster (1:4)
admixed with Plastocrete Super of approved brand 0.2% by
weight of cement, laying flat 1st class Brick Bats / Bricks
over the mortar keeping a gap of 10-20 mm between two
bats, filling the vertical joints with the. aforesaid mortar,
providing a second layer of 20 mm thick sand and cement
plaster (1:4) admixed with Plastocrete Super as above over
the brick layer, the top surface of the treatment should be
chequered to provide the antistrip property. Note - the
applicator is to be specialised in such type of work as per
specification and maintain the I.S.I. Marked of the
ingredients of the application. The skilled worker such as
Head Mason, Mason, Bhistri, Majdoor should be trained
from expert and recognised technical Personal/Institution
having affiliated ISO-9001)
143 (a) By Bricks (cement 25.66 kg/ Sq.m) Sq.M 674.85
143
(b) By 1
st
Class Brick Bats (cement 29.66kg/ Sq.m)
Sq.M
572.75
143 46 Supplying , Fitting and fixing Narriah tiles(Khapra) in slope
roof over GCI/Plane Sheet roofing or bamboo frame work
with necessary side restrain attachment by wooden plank or
MS flat ,angle, etc including cost of tile, labour complete but
excluding cost of GCI/ Plane sheet roofing or bamboo
frame work or side restrain work.
Sq.M
143 47 Supplying, Fitting and fixing Narriah tiles(Khapra) Ridging
with necessary lapping with side slopes of Narriah tiles
roofing ncluding cost of ridging, labour complete but
excluding cost of GCI/ Plane sheet roofing or bamboo
frame work.
Sq.M
143 48 Labour for taking out and refixing of Narriah tiles(Khapra) in
slope roof over GCI/Plane Sheet roofing or bamboo frame
work.
Sq.M
143 49 .abour for taking out and refixing of Narriah tiles(Khapra)
ridging n slope roof over GCI/Plane Sheet roofing or
bamboo frame work.
Metre
145 (F) Structural Steel Work,.Grills,Gates etc.
Page 45
Building
145 1 M.S. structural works in columns, beams etc. with simple
rolled structural members (e.g. joists, angle, channel
sections conforming to IS: 226, IS: 808 & SP (6)-1964
connected to one another with bracket, gussets, cleats as
per design, direction of Engineer-in- charge complete
including cutting to requisite shape and length, fabrication
with necessary bolting, metal arc welding conforming to IS:
816-1956 & IS: 1995 using electrodes of approved make
and brand conforming to IS:814- 1957, haulage, hoisting
and erection all complete. The rate includes the cost of
rolled steel section, consumables such as electrodes, gas
and hire charge of all tools and plants and labour required
for the work including all incidental chages such as
electricity charges, labour insurance charges etc. Payment
to be made on the basis of calculated weight of structural
members only in finished work as per IS specified weight.
Payment for gusset, bracket, cleat, rivets, bolts and nuts
may be make by adding the actual weight of such items
with the weight of finished structural members or 7% of
weight for finished structural members weighing not less
than 22.5 Kg. / m. or 15 % of weight for finished structal
members weighing less than 22.5 Kg. / m. may be
increased allow for bracket, cleat, rivet, bolts and nuts etc.
and no seperate payment being made for these items, as
per direction of Engineer In Charge. The rates are
considered for a height of erection 8m. / 2nd floor level from
the ground. Add 1.5% extra over the rate for each
147 I) For structural members of specified sections weighing
not less than 22.5 Kg./m
MT
64643.03
147 II) For Structural Works in Roof Trusses etc. using joists,
channels and angles of specified section weighing less than
22.5 kg/m
MT
65450.02
147 III) For built up sections / srtuctural members of
specified sections weighing not less than 22.5 Kg./m
MT
66478.20
Page 46
Building
147 2 M.S. structural works in roof trusses with tubular sections
conforming to IS: 806-1957 & IS: 1161- 1958 cnnected to
one another with bracket, gusset cleats as per design,
direction of Engineer-in-charge complete including
cutting to requisite size, fabrication with
necessary metal arc welding conforming to IS: 816-
1956 & IS: 9595 using electrodes of approved make and
brand conforming to IS:814- 1957, haulage, hoisting and
erection all complete. The rate includes the cost of rolled
steel section, consumables such as electrodes, gas and
hire charge of all tools and plants and labour required for
the work including all incidental chages such as
electricity charges, labour insurance charges etc. Payment
to be made on the basis of calculated weight of
structural tubular memebrs as specified in relevent IS
code in finished work. Payment for gusset, bracket, cleat
may be made by adding the actual weight of such items
with weight of finished structural members. The rates
are considered for a height of erection 8 m./ 2nd floor level
from the ground. Add 1.5 % extra over the rate for each
additional floor or 4m. beyond the initial 8 m. or part
thereof.
149 i) For trusses spanning up to 12.00 m MT. 64862.20
149 ii) For trusses spanning above 12.00 m and up to 20 .00 m MT.
66545.87
149 iii) for trusses spanning above 20.00 m and up to 30.00m MT.
67758.88
Page 47
Building
149 2A M.S. structural works with hollow sections (TATA make
square or rectangular shape) conforming to IS: 806-1957
& IS:1161-1958) connected to one another with
bracket, gusset, cleat as per design, drawing &
direction of Engineer-in-Charge complete including
cutting to requisite shape & size, fabrication including
metal arc welding conforming to IS: 816-1956 & IS: 9595
using electrodes of approved make and brand conforming
to IS:814-1957, haulage, hoisting and erection all complete.
The rate includes the cost of all M.S. Hollow section, all
consumables such as electrodes, gas and hire
charges of all tools and plants and labour required for
execution and all incidental chages (such as
electricity, labour insurance) etc. complete. Payment to be
made on the basis of calculated weight of structural
memebrs of MS Holow Section as specified in relevent IS
code in finished work. Payment for gusset, bracket, cleat
may be made by adding the actual weight of such items
with weight of finished structural members. The rates are
considered for a night of erection 8 m./ 2nd floor level from
the ground. Add 1.5 % extra over the rate for each
additional floor or 4m. beyond the initial 8 m. or part
thereof.
149 i) For roof truss works
149 a) Span up to 12 Mtr MT. 72742.22
151 b) Span beyond 12 Mtr and up to 20.00 Mtr MT. 74742.02
151 c) Span beyond 20 Mtr and up to 30 Mtr MT. 76798.38
151 ii) For other Structural works like galleries etc. MT. 74624.86
151 3 Cutting to requisite length or shape departmental R.S.
joists, channels, angles tees, plates etc.
Sq. cm.
5.60
151 ( Payment to be made on area of cut surface)
151 4 Drilling holes of requisite diameter in R.S. joists channels,
tees. Plates etc.
151 (a) (I) Dia. Upto 12mm and depth upto 10 mm. Each 6.78
151 (ii) Extra for drilling beyond depth of 10mm Each 6.78
151 (b) (I) Dia.above 12mm and depth upto 10 mm. Each 10.18
151 (ii) Extra for drilling beyofcd depth of 10mm Each 10.18
151 5 Labour for hoisting and placing in proper josition ( up to 1st
floor level) departmental R.S. joists, channels, angles.
Tees, plates etc. including fitting and fixing same with bolts
and nuts, if necessary ( but by excluding cost of such bolts
and nuts)
Qntl.
260.98
151 a) Add extra for each additional floor over 1st floor. Qntl. 50.60
151 6 Labour for lowering and stacking after dismantling in parts
R.S. joists, channels, angles, tees, plates etc.complete as
directed.
151 a) From 1 st floor level Qntl. 127.36
153 (b) Add extra for each addl. Floor Qntl. 35.65
Page 48
Building
153 7 Ordinary grating bars made of round or square M.S. rods
fitted and fixed in holes of window frames etc, complete.
153 In ground floor. Qntl. 5639.84
153 (Steel materials will not be issued by the Deptt.)
153 (Add extra @1% for each additional floor upto 4th floor.
@1.25% for each additional floor above 4th floor).
153 8 M.S. round or square bar grating of windows etc. fitted and
fixed in holes of window frame and with intermediate flat
bar stiffened with necessary holes for the grating bars and
with the ends turned and fixed to timber frame with
necessary screws) complete, as directed.
153 In ground floor. Qntl. 5748.92
153 (Steel materials will not be issued by the Deptt.)
153 9 M.S. works in framed gratings of window etc.made of round
or square bars and frame work or M.S. flats (with the bars
securely fixed to the flat bar frame ) with or without
intermediate flat bar stiffener and fixed with necessary
screws etc. complete , as directed.
153 In ground floor. Qntl. 5860.02
155 10 (a) M.S.or W.I. Ornamental grill of approved design joints
continuously welded with M.S W.I. Flats and bars of
windows, railing etc fitted and fixed with necessary screws
and lugs in ground floor.
155 (Add extra @ 1% for each addl. floor upto 4th floor and @
1.25% for each addl. floo above 4th floor)
155 (i) Grill weighing above 10 KgVsq.mtr and upto 16 Kg./sq.
mtr.
Qntl
6382.19
155 (ii) Grill weighing above 16 Kg./sq.mtr and above Qntl 6238.77
155 MODE OF MEASUREMENT):-
155 The weight of grill per sq.m. will be determined by taking
the physical weight of abricated grill and dividing the same
by covered area of the same.
155 N.B. No shop priming will be allowed to acilitate inspection
of workmanship. Weight of grill is to be taken after final
grinding and finishing the weld.
155 b) Extra for work in grill gate.
155 I) For hanging and locking arrangements including supply
of materials and labour complete. (15% extra over the
corresponding item of grill)
155 ii) For supplying fitting and fixing bottom rollers including all
labour complete.
155 5% extra over the corresponding item of grill)
157 11 Supplying, fitting, fixing in position rails on any surface. Kg. 58.89
Page 49
Building
157 12 Supplying 1.5mm thick M.S. sheet fitted and fixed on one or
both faces of M.S./ W.I. gate etc. with point welding at not
more than 150mm apart complete in all respect as per
design including cost of all labour and materials.
Sq.m.
1002.28
157 13 M.S. gate of Jail type as per approved design made of
strong M.S. frame work, intermediate stiffeners and round /
square bars or angles. M.S. sheet (not less than 14 gauge)
gussets, cleats etc. including necessary riveting, bolting,
welding, locking and hanging arrangements, fitting and
fixing complete as per direction of the Engineer-in -charge.
157 In ground floor. Qntl. 7391.84
157 (Add extra @ 1% for each addl. floor upto 4th floor and @
1.25% for each addl. floor above 4th floor)
157 (Portion of locking arrangement inside the wal to be paid
separately)
157 14 Locking arrangement for Jail type doors including supplying
fitting and fixing in position complete as per approved
design.
Kg.
353.00
157 (Concrete to be paid extra)
159 15 Collapsible gate with 40mm x 40mm x 6mm Tee as top and
bottom guide rail, 20mm x 10mm x 2mm vertical channels
100mm apart in fully stretched position 20mm x 5mm M.S.
flats as collapsible bracings properly rivetted and washered
including 38mm steel rollers including locking
arrangements, fitted and fixed in position with lugs set in
cement concrete and including cutting necessary holes,
chasing etc. in walls, floors etc. and making good damages
complete. (Add extra @ 1% for each addl. floor upto 4th
floor and @ 1.25% for each addl. floor above 4th floor)
159 In ground floor. Sq.m. 2924.51
159 (Payment will be made on the area of th gate covered by
two guard rails and two extreme channels)
159 (A) Extra over the corresponding item of collapsible gate for
top hung
Sq.m.
122.00
159 16 (a) Supplying, fitting and fixing steel rolling shutter profile
type with 18 B.G . of approved type steel latch section
75mm wide, fitted with coil wire spring to necessitate the
fitting of required Nos. of C:l. Pulleys on heavy type solid
drawn seamless steel tube complete with locking
arrangements both inside and outside specially builtup side
guide channels including providing a hood for the steel
rolling shutter in the room, painting two coats of approved
aluminum paint over a coat of red lead primer complete.
Sq.m.
2876.31
Page 50
Building
161 1. (Measurement will be made on the area of opening
covered by the rolling shutter corrected upto 2 decimal.) 2.
Payment of painting to be separately.
Sq.m.
3739.02
161 (b) Supplying fitting and fixing steel rolling grills link type,
shutter with 18 B.G .of approved type steel to the section
75mm wide, fitted with coil wire spring to necessiate the
fitting of required Nos. of C.I. Pulleys on heavy type solid
drawn seamless steel tube complete with locking
arrangements both inside and outside specially builtup side
guide channels including providing a hood for the steel
rolling shutter in the room, painting two coats of approved
aluminium paint over a coat of red lead primer complete.
161 (Measurement will be made on the area of opening covered
by the rolling shutter corrected upto 2 decimal.)
161 17 Renewing bottom rail or top runners of collapsible gate
including mending good all damages.
Kg.
72.64
161 18 Renewing haskal as per design or direction, including fitting
and fixing same with necessary new bolts and nuts
complete. (Payment to be made on weight of haskal and
bolts and nuts)
Kg.
71.14
161 19 Renewing doomney as per design or direction including
cutting hole in masonary and fixing the doomney with
cement concrete 1:3:6 with jhama chips.
Kg.
57.67
163 (payment to be made on weight oi doomney, No
separate pament wiil be made for cutting holes or fixing
with concrete.)
163 20 Holding down bolt with nut including 100 x 100 x 6 mm
plate washer at bottom fitted complete and packing the hole
with cement concrete or cement grout as directed.
163 (i) 16mm dia bolt
163 (a) 300 mm long Each 88.34
163 (b) 450 mm long Each 126.38
163 (ii) 20 mm dia bolt.
163 (a) 300 mm long Each 110.97
163 (b) 450 mm long Each 140.00
163 (c) 600 mm long Each 169.00
163 (iii) 25 mm dia.
163 (a) 450 mm long. Each 191.00
163 (b) 500 mm long. Each 206.00
163 (c) 750 mm long Each 283.47
163 (iv) 32 mm dia:
163 (a) 450 mm long Each 241.79
163 (b) 500 mm long Each 266.84
163 (c) 750 mm long Each 394.10
163 21 Supplying, fitting, fixing bolts with nuts, washer:
163 (i) 10 to 16 mm dia:
163 (a) Length up to 75 mm Kg. 80.70
163 (b) Length above 75 mm and upto 150 mm. Kg. 74.13
Page 51
Building
165 (c) Length above 150mm. Kg. 71.31
165 (ii) 20 to 25 mm dia bolt: (a) Length up to 7.5 mm dia: Kg., 73.12
165 (b) Length above 75 mm and upto 150 mm. Kg. 68.68
165 (c) Length above 150mm. Kg. 66.66
165 22 Renewing steel plated or oxidised casement stay or peg
stay of steel window frames including painting two coats
with approved paint complete.
Each
54.14
165 23 Repairing steel shutter with new rivets including taking out
and refixing, adjusting, welding, cleaning cutting holes,
mending good damage to match with the existing one.
Sq.M.
325.04
165 24 Renewing M.S. members of steel shutters by welding
including taking out the old, mending good damages
complete, including taking out and refixing the glass panes.
Mtr.
208.46
165 25 Easing, oiling and adjusting the steel shutters including
scraping all members and fitting so as to make the shutters
easily operable ( no extra payment will be made or taking
out and fixing glass, if necessary).
Pair
30.91
165 (Each means a pair of shutter in a frame)
167 26 M.S. works in brackets made from flats angles, tees etc. to
sizes specialy bent twisted, forged; making holes drilled anc
fitted to rafter of trusses with necessary bolts, nuts, washer
or screws etc. (length of straight not less than 230 mm) (To
be used for repair works only)
Qntl.
6887.19
167 27 Renewing knobs of steel window frames including fixing
with steel casement by welding or riveting as directed
including painting complete.
Each
31.41
167 28 Renewing one point steel (oxidised) handle of steel door
and windows as directed including painting complete.
Each
44.50
167 29 Renewing two point steel plated or oxidised nandle of steel
doors and windows as directed including painting complete.
Each
50.44
167 30 Renewing hinge of steel shutter including taking out old one
by cutting and fixing new linges by welding and mending
good damages complete.
Each
197.86
167 31 Welding in M.S. structural work with gas or electric: a) Tack
weld
point
8.12
167 b) Continuous weld. cm run 8.12
167 32 Taking out heavy iron grated door or window (jail pattern or
existing) with locking arrangement after cutting out from
walls and refixing the same including mending all
damages.[Mending charges to be paid separately]
Sq.M.
141.51
Page 52
Building
169 33 Supplying, fitting and fixing windows and ventilators with or
without integrated grills conforming to IS 1038-1975
and manufactured from rolled steel sections conforming
to IS 7452-1974 with non-friction projecting type, box
type, hinges, glazing clips, lugs locking bracket, handle
plate etc, including hoisting in position, straightening if
required, fixing lugs in cement concrete ( 1:2:4) with
stone chips 20 mm down cutting holes and mending good
damages to match with existing surface complete in all
respect excluding glazing. ( Add extra @ 1.2 % for each
additional floors upto 4th floor and @ 1.5% for each addl.
Floor above 4th floor.)
169 In Ground floor
169 Flash butt welded windows and ventilators (No shop
priming will be allowed to facilitate inspection of
workmanship)
169 Without integrated grills.
169 (a) Fixed type steel windows as per IS sizes with horizontal
glazing bars.
Sq. M.
1048.38
169 (b) Openable steel windows as per IS sizes with side hung
shutters and horizotal glazing bars with/without fixed type
ventilators.[The extra rate admissible for the openable
portion only]
Sq,. M.
1532.17
169 (c) Extra over item no. 33 (a) and (b) for,
171 (1) Fixed type ventilators as per I.S. sizes with horizontal
glazing bars height being limited to 580 mm.
Sq,. M.
88.00
171 (ii) Top hung side hung ventilators as per I.S. sizes 580
mm.
Sq,. M.
174.00
171 (iii)Centre hung ventilators as per I.S. sizes 580 mm. Sq,. M. 314.00
171 (iv) Two point nose steel handle including fitting and fixing. Each
27.00
(v) Two point nose aluminium handle including fitting
and fixing,
Each
29.00
171 (vi) steel peg stay 300 mm long including fitting and fixing. Each
20.00
171 (vii) Aluminium peg stay 300 mm long including fitting and
fixing.
Each
30.00
171 (viii) M.S. integrated grill as per approved design integrated
with steel window or ventilator, joints continuously welded
with M.S. flats and bars.
Kg.
59.67
171 Mode of measurement.
171 (The weight of grill will be determined ( theoritically) from
section of the grills actually used excluding the rolled steel
section of the window / vent. The weight of the grill should
be calculated at 7.85 gm./ cu.cm.]
171 Note:- For windows and ventilators joints welded by arc
welding, the above rates at (a) and (b) shall be reduced by
10%.
Page 53
Building
171 34 Reparing collapsible gate by cutting out all rivets as
necessary re-assambling all members including welding
pieces of channels, sraightening bent bars and rivetting
with new rivets and fitting in position and painting two coats.
Sq.M.
343.15
173 35 Easing and oiling, cleaning collapsible gate and repairing to
locking arrangements.
Sq.M. 11.62
173 36 Easing and oiling, cleaning rolling shutters excluding repair
to inside locks.
Sq.M. 8.00
173 37 Easing and oiling W.I. Gate or G.I. Gate. Sq.M. 5.00
173 38 Labour for taking out rolling shutter ( only shutter portion)
dismantling by parts for repair or( replacement of damaged
parts only), rehanging and refitting the same in position
after necessary repairs (excluding the cost of supply of new
parts).
Sq.M. 187.59
173 39 Renewing seam pipe for rolling shutter as per existing size
and shape fitting, fixing complete.
Mtr. 177.76
173 40 Renewing side split pin for seam pipe for rolling shutter. Each 18.18
173 41 Oiling and greasing of rolling shutter and repair to in side
lock.
Sq.M. 61.27
173 42 Renewing profile of rolling shutter including fitting fixing
complete as per existing size and shape.
M. 45.25
173 43 Renewing spring of rolling shutter as per exinsting size and
shape including fitting fixing complete.
Each 520.15
173 44 Taking out M.S. or W.I. Grills from wooden frame including
cutting lugs from masomy wall and refitting the same and
mending good damages after repairs. (Excluding the cost
of necessary repair of damages) or doing any other
necessary works.
Each 61.91
175 45 Renewing bottom curved rail of M.S. Flat with necessary
clamps under the curved M.S.flats and fixing them after
cutting holes with cement concrete (1:2:4) with stone chips
and mending good damages to run smooth the heavy iron
gated door or G.C.I Sheet door or gate.
175 (i) 50mm x 6 mm M.S. flat Mtr. 220.28
175 (ii) 40 mm x 6 mm flat Mtr. 187.15
175 46 Renewing W.I. or M.S. wheel or roller of steel door or gate
fitted and fixed with neceessary clamps and nuts and bolts
and erected complete.
175 (i) Above 50 mm. Each 107.77
175 ii) below 50mm. Each 89.99
175 47 Labour for taking out steel door and window frame for
repairs and re-fixing the same ( or replacement by new
one) including mending good damages (excluding the cost
of repair of damages) and applying a protective coat of
paint.
175 Upto one sq.m. area of frame. Each 95.95
Page 54
Building
175 48 Supplying, fitting and fixing cast iron heavy ype spiral
staircase of approved design with 50 mm.dia. Stem and
C.I. Steps 150 mm as per design 900 mm. high C.I, railing
ncluding necessary M.S. tie of suitable section embedded
to wall with cement concrete (1:2:4) including cost
of ntermediate C.I. platform secured with necessary tie
to stem and wall with cement concrete (1:2:4) including
fixing the stem in ground with cement concrete 1:3:6
complete in all respect with all labour and materials.
Payment to be made on vertical height in between 1st step
and top platform.)
177 (a) With 1200 mm.dia. well Mtr. 4766.44
177 (b) With 900 mm.dia. well Mtr. 4374.82
177 N.B. : No steel materials will be issued in this section.
179 (G) Carpenter's Works
179 NOTE: (1) Without the specific permission of
th Superintending Engineer no work involving 1st class best
India teak and Siliguri Sal wood should be carried out.
179 (2) In case of of using under specified timber in frame,
shutte etc. penal rate of reduction to a maximum of 50%
will be made in such under specified tim ber work.
179 1 Wood work in door and window frame fitted and fixed in
position complete including a protective coat of painting at
the contact surface of the frame exluding cost of concrete.
Iron Butt Hinges and M.S clamps. {The quantum should be
correted upto three decimals).
179 (a) 1st class Best Indian teak. Cu.M 165729.00
179 (b) Ordinary teak. Cu.M 124500.00
179 (c) Sal: Siliguri. Cu.M 106134.00
179 (d) Sal: Local. Cu.M 59532.00
179 (e) Sal: Malayasian Cu.M 69527.00
179 (f) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Cu.M 65779.00
179 (g) Kappoor Cu.M 52036.00
179 (h) Neem, Jam, Jackfruits Cu.M 44540.00
179 (i) Other Local Wood. Cu.M 37043.00
179 Note: Extra for Lifting Charges:- i) upto 4th floor Rs. 200/-
per cu.m ii) Above 4th floor Rs. 250/- per cu.m
Page 55
Building
181 1 (A) Supplying fitting and fixing door frame with M.S. angle
as per drawing & direction of required section. The holes for
counter sunk machine screw & nuts will be such as to fit 8
to 10 mm Iron screw. The counter sunk nut to be welded
The nuts are to be welded after careful checking with
screw.All welding spots should be properly filed or rounded
smooth including cost of welding hinges for lugs for hasp
bolt, socket bolt etc. and necessary M.S. clamps of 25mm x
6mm flat 225mm long as per direction welded to the frame
fitted and fixed in position excluding cost of concrete.
Kg.
75.51
181 Mode of measurement: Weight of frame shall be calculated
for the M.S. sections of frames. Payment of butt hinges,
hasp bolt, socked bolt, screw will be paid seperately. The
weight of section should be calculated at 7.85 gm/Cu.cm
181 2 Extra rate for Curved wood works in doors and window
frame fitted and fixed complete over corresponding Items of
Item No. 1. (In measuring such average length and average
breadth to be taken into consideration, depth remaining
constant). (The quantum should be corrected upto three
decimals)
Cu.M
10.00%
181 3 A) Wood work in posts, post plates, rafters, battens, truss
members; purlins etc. fitted and fixed complete (excluding
the cost of bolts, paints, but including the cost of nails,
screws etc.) The quantum should be corrected upto three
decimals)
181 i) Sal: Siliguri. Cu.M 105991.97
181 ii) Sal: Local. Cu.M 59390.14
181 iii) Sal: Malayasian Cu.M 69385.21
181 B) Dressed wood work in post, plate , battens . etc. fitted &
ixed complete (excluding the cost of bolts only, but
including the cost of nails, screws etc.) The quantum should
be corrected upto three decimals)
183 (i) Sal: Siliguri. Cu.M 108966.62
183 (ii) Sal: Local. Cu.M 62364.93
183 (iii) Sal: Malayasian Cu.M 72359.86
Note: Extra for Lifting Charges:- i) upto 4th floor Rs. 200/-
per Cu.m ii) Above 4th floor Rs. 250/- per Cu.m
183 4 Wood work in beams and burgahs fitted and fixed in
position complete. (Cost for repair of damage to be paid
seperately)
183 (i) Sal: Siliguri. Cu.M 99574.63
183 (ii) Sal: Malayasian Cu.M 63425.67
183 (iii) Local Sal. Cu.M 53437.64
Note: Extra for Lifting Charges:- i) upto 4th floor Rs. 200/-
per Cu.m ii) Above 4th floor Rs. 250/- per Cu.m
Page 56
Building
183 5 Wood work in upper rails of railing, hand rail of staircase,
balcony etc. includig necessary bend, moulding fitted and
fixed complete (for purpose of payment section will be
measured in the square).
183 (a) 1st class best Indian teak. Cu.M 179589.44
183 (b) Ordinary teak. Cu.M 136505.83
183 (c) Sishu, Gamar, Champ, Badam, Bhola, Morga, Hallak. Cu.M
75144.31
183 (d) Other Local Wood. Cu.M 45182.36
Note: Extra for Lifting Charges:-
i) upto 4th floor Rs. 200/- per Cu.m
ii) Above 4th floor Rs. 250/- per Cu.m
183 6 Labour for wood work in sawing from old timber to sizes as
required for making (Payment to be made on quantity of
finished work):
185 (a) Beams of smaller length but of same section. Cu.M 352.07
185 (b) Beams of smaller section. Cu.M 1408.03
185 (c) Burgahs fitted and fixed complete. Cu.M 3665.61
185 (d) Door and window frames fitted and fixed complete. Cu.M 2958.19
185 (e) Post, post plates, rafters, battens, truss members,
purlins etc. (excluding cost of bolts only but including cost
of nails, screws etc. as directed.
Cu.M
3530.00
185 (f) Extra over (a) or (b) for hoisting and fitting, fixing beam
in position. (Damage if any will be repaired separetly)
Cu.M
1963.33
185 7 Weather board 12mm. Thick fitted and fixed with screws
complete.
a) 1st class best Indian Teak, Sq.M 2650.74
185 b) Ordinary Teak Wood. Sq.M 2017.25
185 c) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1115.00
185 d) Other Local Wood. Sq.M 673.47
185 N.B.: This item is meant for repair works only.
185 8 Renewing 25mm. Square wooden gauge of railing upto lm
ht. itted and fixed complete.
185 a) 1st class best Indian Teak. Metre 128.43
185 b) Ordinary Teak Wood. Metre 101.44
185 c) Sal: Siliguri. Metre 89.41
185 d) Sal: Malayasian Metre 65.44
185 e) Local Sal. Metre 58.90
187 9 Wooden sash bar 50mm. X 35mm. Upto 1200 mm length
with coach screw and flat iron clamps (40mm. X 6mm.)
fitted and fixed complete in any position.
187 (a) 1st class best Indian Teak. Each 392.39
187 (b) Ordinary Teak Wood. Each 301.68
187 (c)Sal: Siliguri. Each 261.28
187 (d)Sal: Malayasian Each 180.74
187 (e) Local Sal. Each 158.75
Page 57
Building
187 10 Renewing wooden sash bar 50mm. X 35mm. Upto
1200mm length with new coach screws and flat iron clamps
(40mm. X 6mm.) fitted and fixed complete in any position.
187 (a) 1st class best Indian Teak. Each 400.84
187 (b) Ordinary Teak Wood. Each 310.13
187 (c) Sal: Siliguri. Each 269.73
187 (d) Sal: Malayasian Each 189.19
187 (e) Local Sal. Each 167.20
187 11 M.S. sash bar upto 1200mm. Length with coach screws
and flat iron clamps 40mm X 6mm fitted and fixed
complete.
187 (a) With 40mm. X 10mm flat. Each 230.15
187 (b) With 40mm. X 6mm flat. Each 162.38
187 12 Renewing M.S. sash bar upto 1200mm. Length with coach
screws (new) and flat iron clamps (40mm X 6mm) fitted and
fixed complete.
187 (a) With 40mm. X 10mm flat. Each 240.71
187 (b) With 40mm. X 6mm flat. Each 172.94
189 13 Renewing M.S. clamps 40mm. X 6mm. Only for sash bar
fitted and fixed complete.
Each
23.80
189 14 Refixing sash bar with new coach screws. Each 13.45
189 15 Refixing M.S. clamps for sash bar with new screws. Each 7.13
189 16 Supplying, fitting and fixing hinge cleat in position excluding
the cost hinge and other fiffitngs.
189 a) with 50mm iron Butt-hinge
189 i) Sal: Siliguri. Each 27.79
189 ii) Sal: Malayasian Each 22.00
189 iii) Local Sal. Each 20.42
189 b) with 75mm iron Butt-hinge
189 i) Sal: Siliguri. Each 34.82
189 ii) Sal: Malayasian Each 27.15
189 iii) Local Sal. Each 25.06
189 17 Renewing iron chain and staples fitted and fixed complete.
189 a) upto 150mm long Each 19.53
189 b) Above 150mm long Each 21.91
189 18 Supplying, fitting and fixing M.S. clamps for door and
window frame made of flat bent bar, end bifurcated with
necessary screws etc. by cement concrete(l:2:4) as per
direction. (Cost o concrete will be paid separately)
189 (a) 40mm X 6mm, 250mm Length Each 34.30
191 [b) 40mm X 6mm, 200mm Length Each 29.84
191 (c) 40mm X 6mm, 125mm Length Each 23.13
191 (The concreting will have to be done for equivalent
thickness of 2 layers of brick work and for the entire width
of the wall. No deduction on brick work will be made).
Page 58
Building
191 19 Renewing M.S. clamps for door and window frame made of
flat bent bar, end bifurcated with necessary screws etc. In
cement concrete(l:2:4) including cutting of brick
work/concrete work as per direction. (Cost of concrete will
be paid separately)
191 (a) 40mm X 6mm, 250mm Length Each 45.60
191 (b) 40mm X 6mm, 200mm Length Each 41.15
191 (c) 40mm X 6mm, 125mm Length Each 34.41
191 20 Iron butt hinges of approved quality fitted and fixed with
steel screws, with ISI mark.
191 (i) 50mm. X 37mm. X 1.50mm. Each 15.14
191 (ii) 50mm. X 40mm. X 2.5mm. Each 25.85
191 (iii) 75mm. X 40mm. X 1.12mm. Each 25.76
191 (iv) 75mm. X 47mm. X 1.70mm. Each 28.43
191 (v) 75mm. X 60mm. X 3.15mm. Each 48.52
(vi) 100mm. X 50mm. X 1.25mm. Each 41.30
191 (vii) 100mm. X 58mm. X 1.90mm. Each 45.73
191 (viii) 100mm. X 75mm. X 3.50mm. Each 68.74
191 (Add Extra 30% for Oxidised Fittings)
193 21 iron parliamentary binges conforming to IS 362-1982 fitted
and fixed complete with steel screws.
193 (a) 50mm. X 100mm. X 20mm. X 2.24mm. Each 57.92
193 (b) 65mm. X 100mm. X 20mm. X 2.24mm. Each 66.29
193 (c) 75mm. X 100mm. X 20mm. X 2.24mm. Each 75.37
193 (d) 90mm. X 100mm. X 20mm. X 2.24mm. Each 83.73
193 (e) 100mm. X 125mm. X 27mm. X 2.50mm. Each 102.66
193 (f) 125mm. X 125mm. X 27mm. X 2.50mm. Each 119.39
193 (g) 150mm. X 125mm. X 27mm. X 2.50mm. Each 136.80
193 (h) 175mm. X 125mm. X 27mm. X 2.50mm. Each 153.57
193 (i) 200mm. X 125mm. X 27mm. X 2.50mm. Each 173.87
193 22 Taking out old brass hinges and fitting, fixing the same with
new jrass screws.
193 a) 50mm. long butt hinge. Each 7.45
193 b) 75mm. Long butt hinge. Each 12.08
193 [c) 100mm. Long butt hinge. Each 17.14
193 [d) 125mm. Long but hinge. Each 17.14
193 (e) 150mm. Long butt hinge. Each 20.11
193 (f) 75mm. Long parliamentary hinge. Each 12.40
193 (g) 100mm. Long parliamentary hinge. Each 17.65
195 (h) 125mm. Long parliamentary hinge. Each 17.65
195 (i) 150mm. Long parliamentary hinge. Each 24.60
195 (j) 175mm. Long parliamentary hinge. Each 24.60
195 (k) 200mm. Long parliamentary hinge. Each 32.28
195 23 Taking out old iron higes and fitting, fixing the same
with new steel screws.
195 (a) 50mm. Long butt hinge. Each 5.31
(b) 65mm. Long butt hinge. 5.31
195 (c) 75mm. Long butt hinge. Each 7.08
Page 59
Building
195 (d) 90mm. Long butt hinge. Each 7.08
195 (e) 100mm. Long butt hinge. Each 11.88
195 (f) 125mm. Long butt hinge. Each 11.88
195 (g) 150mm. Long butt hinge. Each 13.61
195 h) 50mm. Long parliamentary hinge. Each 8.69
195 j) 65mm. Long parliamentary hinge. Each 8.69
195 j) 75mm. Long parliamentary hinge. Each 10.62
195 k) 100mm. Long parliamentary hinge. Each 12.89
195 1) 125mm. Long parliamentary hinge. Each 12.89
195 m) 150mm. Long parliamentary hinge. Each 15.68
195 n) 175mm. Long parliamentary hinge. Each 15.68
197 (o) 200mm. Long parliamentary hinge. Each 18.00
197 24 Iron catch hook of approved quality fitted and fixed to
shutter and chowkat.
197 (a) 6mm dia x 100mm long. Each 35.99
197 (b) 6mm dia x 225mm long. Each 69.45
197 ('c) 10mm dia x 300mm long. Each 90.59
197 (d) 10mm dia x 375mm long. Each 110.67
197 (e) 10mm dia x 450mm long. Each 130.75
197 (f) 12mm dia x 600mm long. Each 144.81
197 (g) 12mm dia x 750mm long. Each 211.74
197 25 Iron socket bolt of approved quality fitted and fixed
complete.
197 a) 75mm long x 10mm dia bolt. Each 32.27
197 b) 100mm long x 10mm dia bolt. Each 39.29
197 c) 150mm long x 10mm dia bolt. Each 58.52
197 d) 225mm long x 10mm dia bolt. Each 79.59
197 e) 300mm long x 10mm dia bolt. Each 100.68
197 26 Iron skeleton bolt of approved quality fitted and fixed
complete.
197 a) 375mm long x 10mm dia rod. Each 94.18
197 b) 450mm long x 10mm dia rod. Each 107.57
199 27 i) Iron hasp bolt of approved quality fitted and fixed
complete (oxidised) with 16mm dia rod with centre bplt and
round fitting.
-
199 (a) 200mm long Each 144.09
199 (b) 250mm long. Each 173.54
199 (c) 300mm long. Each 182.91
199 ii) Brass hasp bolt of approved quality fitted and fixed
complete (oxidised) with 16mm dia rod with centre bolt and
round fitting.
199 (a) 200mm long Each 393.07
199 (b) 250mm long. Each 527.53
199 (c) 300mm long. Each 579.89
199 28 Iron pad bolt (lock) of approved quality rod and handle
single cast:
199 (i) 115mm x 10mm dia rod 65mm x 3mm plate. Each 85.95
199 ii) 200mm x 16mm dia rod 105mm x 3mm plate. Each 115.65
Page 60
Building
199 29 Double acting Iron Spring Hinges of approved quality fitted
and ixed complete:-
199 a) 100mm size Each 182.30
199 b) 125mm size Each 242.53
199 c) 150mm size Each 358.52
199 30 Iron Gravity Hinge (block patent best quality) fitted and
fixed complete.
Each
112.46
199 31 Iron Tee Hinges of approved quality fitted and fixed
complete:
199 a) 75 x 65 x 20mm size Each 37.23
199 b) 100 x 75 x 20mm size. Each 50.61
201 (c) 125 x 75 x 25mm size. Each 64.00
201 (d) 150 x 75 x 25mm size. Each 90.77
201 (e) 200 x 90 x 25mm size. Each 107.09
201 (f) 250 x 100 x 30mm size. Each 113.79
201 (g) 300 x 115 x 30mm size. Each 133.86
201 32 Helical door spring hinge of approed quality fitted and fixed
complete. Iron (Heavy type)
201 (i) 100mm long. Each 112.39
201 (ii) 125mm long. Each 123.10
201 {iii) 150mm long. Each 159.24
201 33 Renewing iron mortice lock (local best approved quality) 6
lever with handle, connected rods and keys consisting a
complete set.
201 (a) With chromium plated handle. Each 904.31
201 (b) With oxidised handle. Each 703.52
201 (c) With anodised aluminium white handle. Each 998.02
201 (d) With anodised aluminium decorative handle. Each 1038.18
201 34 Renewing reheated iron mortice lock (local best approved
quality) with handle, connected rods and keys consisting a
complete set with I.S.I, mark.
201 (a) With chromium plated handle. Each 907.28
201 (b) With oxidised handle. Each 710.95
201 (c) With anodised aluminium white handle. Each 1020.32
201 (d) With anodised aluminium decorative handle. Each 1097.67
201 35 Renewing mortice lock handle with connected rod:
203 a) With chromium plated. Pair 266.24
203 b) Oxidised. Pair 236.50
203 c) Anodised aluminium (white). Pair 284.09
203 d) Anodised aluminium (decorative). Pair 397.13
203 36 a) Supplying 'Godrej' mortice lock chromium plated with
latch and keys 4 levers, including fitting and fixing
complete.
Each
1097.67
203
b) Supplying 'Godrej
1
mortice lock chromium plated with keys
6levers including fitting & fixing complete.
Each
1407.04
203 (c) Supplying 6levers 'Godrej' Crystal Satine Mortice Lock
with keys including fitting & fixing complete.
Each
1668.81
203 37 Cord for fan light fitted & fixed complete. Each 23.21
Page 61
Building
203 38 Cord for clerestory window fitted and fixed complete. Each 24.76
203 I) Brass floor door stopper Each 123.08
203 (ii) Anodised aluminium floor door stopper Each 67.91
203 (iii) Steel body foot-door holder. Each 64.67
203 40 Renewing iron catch hook of approved quality for fan light o
clerestory window 50mm size with 6mm rod.
Each
20.86
203 41 Renewing hinges for fan light or clerestory window (iron). Each 14.53
203 42 Renewing iron eye of hasp bolt. Each 15.86
203 43 i) Hydraulic door closer of approved quality as per I.S.I,
standar fitted and fixed complete.
203 (a)Heavy type(I.S.I.size 3) Each 916.21
205 (b) Medium (I.S.I. size 2) Each 715.41
205 (c) Light (I.S.I. size 4) Each 675.26
205 i) Godrej Hydraulic door closer fitted and fixed complete.
205 (a) Heavy type Each 2150.70
205 b) Medium type Each 1466.53
205 (c) Light type Each 1407.04
205 44 Renewing 125mm long wooden buffer block
205 i) With Sal: Siliguri. Each 59.55
205 ii) With Sal :Malayasian Each 42.81
205 iii) With Local Sal. Each 38.24
205 45 Renewing hinged cleat with old hinge and new screws.
205 i) Sal: Siliguri. Each 37.26
205 ii)Sal:Malayasian Each 30.28
205 iii) Local Sal. Each 28.38
205 46 Renewing brass eye of hasp bolt. Each 42.93
205 47 Renewing 14 SWG woven wire netting only as per existing
design including taking out old batten etc. (As necessary
and fixing the same with new stapples and hooks)
205 (a) 75mm x 75 mm mesh Each 543.76
205 (b) 125mm x 125 mm mesh Each 476.29
205 48 Renewing twisted damp 225mm long and 37.Smm x 6mm
flat bar fitted and fixed to post plate and rafter with coach
screws including drilling hole.
Each
49.71
205 49 Refixing ceiling battens with new screws including fixing
ceiling to position with new screws (excluding cost of
ceiling).
Metre
10.04
207 50 Labour for fitting and fixing different type of automatic door
closer with necessary screws.
Each
40.16
207 51 Renewing wood moulding (50mm x 37.5m) of panel
partition or panel door.
207 (a) With 1st class Best Indian teak. Metre 320.75
(b) With Ordinary teak, Metre 243.53
207 (c) With Gamari wood. Metre 133.54
207 52 Extra for Teak wood corner moulding (50mm x 12mm) of
panel partition or panel door.
Each
42.24
207 53 Renewing X.P.M. including taking out and refixing with old
battens but with new screws etc. complete.
Page 62
Building
207 (a) 25mm x 75mm strand 3.25mm x 1.6mm. Sq.M 400.02
207 (b) 25mm x 75mm strand 3.25mm x 3.15mm. Sq.M 437.76
207 (c) 20mm x 50mm strand 2.5mm x 1.25mm. Sq.M 407.57
207 (d) 40mm x 115mm mesh 3mm x 3mm. Sq.M 490.59
207 (e) 12mm x 50mm mesh 6mm x 1.5mm. Sq.M 566.06
207 54 Renewing X.P.M. including taking out and refixing with new
battens made of local sal wood of size 50mmx25mm and
new screws etc. complete.
207 (a) 25mm x 75mm strand 3.25mm x 1.6mm. Sq.M 770.17
207 (b) 25mm x 75mm strand 3.25mm x 3.15mm. Sq.M 807.91
207 (c) 20mm x 50mm strand 2.5mm x 1.25mm. Sq.M 777.72
207 (d) 40mm x 115mm mesh 3mm x 3mm. Sq.M 860.73
209 (e) 12mm x 50mm mesh 6mm x 1.5mm. Sq.M 936.20
209 55 Taking out and refixing wire netted frames or shutters
including providing new screws.
Sq.M
23.65
209 56 (a) Supplying fitting and fixing door made with IRC febric
mesh of 75mm x 50mmx4.5mmx2.7mm on 50mm x 50mm
x 6mm angle iron frames ail round and one 37.5mm x 6mm
M.S. flat bar over the netting all round welded to angle iron
frame and providing locking arrangements if necessary and
with two coats of synthetic enamel paint(Other than Hi-
gloss) fitted and fixed with clamps or haskal doomney etc.
complete including flat stiffeners on every 1.0 m apart both
ways. (Cost of Concrete for fixing will be paid separately)
Sq.M
1800.23
209 (b) Renewing IRC febric mesh of 75mm x
50mmx4.5mmx2.7mm on 50mm x 50mm x 6mm old angle
iron frames all round and one 37.5mm x 6mm M.S. flat bar
over the netting all round welded to angle iron frame and
providing locking arrangements if necessary and with two
coats of synthetic enamel paint(Other than Hi-gloss) fitted
and fixed with clamps or haskal doomney etc. complete
including flat stiffeners on every 1.0 m apart both ways.
Cost of Concrete for fixing will be paid separately)
Sq.M
1197.35
209 57 Renewing brass hasp and staple for locking arrangement
100mm long with brass screws complete.
Each
39.69
209 58 Repairs to automatic door closer including replacement of
damaged main spring, oiling and adjusting as necessary
including taking out and refitting the same.
Each
342.09
209 59 (A) Iron door ring of approved quality fitted and fixed with
nut and washer complete.
209 (i)50mmdia. Each 17.02
209 (ii)75mmdia. Each 30.31
211 (B) Split shank iron door ring fitted and fixed complete
211 I) 50mm dia. Each 30.41
211 (ii) 75mm dia. Each 43.80
Page 63
Building
211 60 Supplying anodised aluminium catch hook with eye fitted
and fixed to shutter and chowkat complete of best quality:
211 (i) 150mm long. Each 35.87
211 (ii) 225mm long. Each 42.56
211 61 Anodised aluminium barrel /tower/ socket bolt (full covered)
of approved manufactured from extruded section
conforming to I.S. 204/74 fitted and fixed with cadmium
plated screws:
211 (i) 50mm long x 10mm dia. bolt. Each 44.10
211 (ii) 75mm long x 10mm dia. bolt. Each 49.45
211 (iii) 100mm long x 10mm dia. bolt. Each 54.81
211 (iv) 150mm long x 10mm dia. bolt. Each 66.86
211 (v) 150mm long x 12mm dia. bolt. Each 96.31
211 (vi) 200mm long x 10mm dia. bolt. Each 84.26
211 (vii) 225mm long x 10mm dia. bolt. Each 92.29
211 (viii) 225mm long x 12mm dia. bolt. Each 127.09
211 (ix) 300mm long x 10mm dia. bolt. Each 109.69
211 (x) 300mm long x 12mm dia. bolt. Each 171.27
211 62 Anodised aluminium skeleton bolt of approved
quality manufactured from extruded section
conforming to I.S: specification (I.S: 204/74) fitted and
fixed with cadmiim plated screws:
211 (i) 225mm long x 10mm dia. bolt. Each 80.63
211 (ii) 225mm long x 12mm dia. bolt. Each 120.79
213 (iii) 300mm long x 10mm dia. bolt. Each 98.41
213 (iv) 300mm long x 12mm dia. bolt. Each 127.86
213 (v) 450mm long x 10mm dia. bolt. Each 149.28
213 (vi) 450mm long x 12mm dia. bolt. Each 212.20
213 (vii) 600mm long x 10mm dia. bolt. Each 180.93
213 (viii) 600mm long x 12mm dia. bolt. Each 254.68
213 63 Anodised aluminium Aldrop / Sliding bolts of approved
quality manufactured from extruded section
conforming to I.S. specification (I.S. 2681/66) fitted and
fixed complete.
213 (i) 250mm x 16mm dia bolt. Each 246.34
213 (ii) 250mm x 19mm dia. bolt. Each 318.62
213 (iii) 300mm x 16mm dia. bolt. Each 254.37
213 [iv) 300mm x 19mm dia. bolt. Each 332.01
213 64 Anodised aluminium butt hinges of approved quality
manufactured from extruded section conforming to
I.S. specification (I.S. 205/66) and fitted and fixed with
cadmium plated screws:
213 (i) 50 x 45 x 2.5mm. Each 34.44
213 (ii) 65x45x2.5mm. Each 36.82
213 iii) 75 x 45 x 2.5mm. Each 46.12
213 iv) 75 x 63 x 3.2mm. Each 58.02
213 v) 100 x 63 x 3.2mm. Each 69.92
213 vi) 125 x 63 x 3.2mm. Each 83.01
Page 64
Building
213 (vii) 100 x 75 x 4.0mm. Each 94.68
213 viii) 125 x 63 x 4.0mm. Each 111.34
213 (ix) 125 x 75 x 4.0mm. Each 116.10
213 x) 150 x 75 x 4.0mm. Each 139.90
215 65 Anodised aliminium D-type handle of approved
quality manufactured from extruded section
conforming to I.S. specification (I.S. 230/72) fitted and
fixed complete:
215 (a) With continuous plate base (Hexagonal / Round rod)
215 (i) 75 mm grip x 10 mm dia rod. Each 61.66
215 (ii) 100 mm grip x 10 mm dia rod. Each 72.37
215 (iii) 100 mm grip x 12 mm dia rod. Each 87.93
215 (iv) 125 mm grip x 10 mm dia rod. Each 94.87
215 (v) 125 mm grip x 12 mm dia rod. Each 106.92
215 (vi) 150 mm grip x 10 mm dia rod. Each 100.22
215 (vii) 150 mm grip x 12 mm dia rod. Each 118.96
215 (b) With round base:
215 (i) 75 mm grip x 10 mm dia rod. Each 46.42
215 (ii) 100 mm grip x 10 mm dia rod. Each 54.45
215 (iii) 100 mm grip x 12 mm dia rod. Each 61.15
215 (iv) 150 mm grip x 10 mm dia rod. Each 85.69
215 (v) 150 mm grip x 12 mm dia rod. Each 92.38
215 66 Anodised aluminium decorative handle (hexagonal / fluted)
of approed quality fitted and fixed complete.
215 (i) 150mm plate x 10mm dia rod x 12mm hexagonal/fluted. Each
90.85
215 (ii) 175mm plate x 12mm dia rod x 60mm hexagonal /fluted. Each
104.24
215 67 (a) Metallic magic eye of approved quality fitted and fixed
complete.
Each
46.07
217 (b) Plastic magic eye of approved quality fitted and fixed
complete.
Each
32.68
217 68 Anodised aluminium grip handle with base plate of
approved quality fitted and fixed complete.
217 (a) With base plate.
217 [i) 165mm grip x 12mm dia rod x 42mm plate x 3.2mm
thick.
Each
138.82
217 ii) 225mm grip x 16mm dia rod x 38mm plate x 3.2mm
thick.
Each
174.52
217 iii) 300mm grip x'20mm dia rod x 50mm plate x 3.2mm thick. Each
211.20
217 69 Supplying fitting and fixing 4mm thick acrylic ornamental
finger )late made of transparent acrylic sheet including
providing ides of knobs and keys as per existing shutter
and chamfering the edges of the acrylic sheet.
Sq.M
568.17
217 70 Iron door handle of approved quality fitted and fixed
complete:
217 i) 100mm x 5mm. Each 36.76
Page 65
Building
217 ii) 150mm x 5.5mm. Each 46.13
217 71 Supplying , fitting and fixing Godrej ultra vertibold brass rim
lock.
Each
1811.60
217 72 Labour for taking out door and window frame including
shutter or repair or replacement of different parts of the
frame & refixing the same including mending good all
damaes complete. Concrete and brick work for mending
damage will be paid separately)
217 a) Upto area 2.5 Sq.m Sq.M 79.15
217 b) Above area 2.5 Sq.m Sq.M 115.09
219 73 Taking out shutter of door and window, dismantling by parts
(for repair or replacement of damaged parts), reassembling
and refitting and rehanging same with old fittings but with
new screws as necessary. (Where different parts of same
shutter are renewed under different item, payment under
item 73 will be made once only).
Sq.M
86.67
219 74 Taking out door and window shutters and rehanging the
same with old fittings.
219 (a) With new, iron screws. Sq.M 53.60
219 (b) With old screws. Sq.M 41.82
219 75 Easing door and windows. Each 10.56
219 76 Wooden Venetian/ Louvered valves, fitted and fixed with
plated hooks complete:
219 (i) 19mm thick valves.
219 (a) 1st class best Indian teak. Sq.M 2376.87
219 (b) Ordinary teak. Sq.M 1913.31
219 (ii) 12mm thick valves.
219 (a) 1st class best Indian Teak, Sq.M 1767.05
219 (b) Ordinary Teak Wood. Sq.M 1467.11
219 (c) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1039.91
219 (c) Other Local Wood. Sq.M 830.85
219 (This is a repair item. Item No. 73 or 74 will be admissible in
addition).
219 77 Renewing plated hook of Venetian Valve with screws. Each 10.77
219 78 Renewing valve rod of size 37.5mmx 37.5mm for Venetian
Shutters fitted and fixed with old plated screw
221 (a) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Metre 237.25
221 (b) Other Local Wood. Metre 156.76
221 79 Strengthening corners of shutters with M.S. corner plate
(150 mm x 37.5 mm) fitted with screws:
221 (a) With 4.5mm thick plate. Each 22.96
221 (b) With 3.0mm thick plate. Each 19.20
221 (c) With 1.5mm thick plate. Each 15.53
221 80 Renewing gauge bar(40x40mm) of glazed shutter to match
with the existing one
221 (a) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Metre 177.77
221 (b) Other Local Wood. Metre 128.51
Page 66
Building
221 81 Renewing 12mm. Thick louver of fixed lauvered shutter to
match with the existing one including necessary railing
pieces:
221 (a) Ordinary Teak Wood. Sq.M 1553.46
221 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1126.26
221 (c) Other Local Wood. Sq.M 917.20
221 82 Styles and rails of wooden shutters fitted and fixed
complete. Payment to be made on area of new work only).
In Ground Floor
221 (i) For 25mm. Thick shutter.
221 (a) Ordinary Teak Wood. Sq.M 2435.29
221 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1413.58
221 (c) Other Local Wood. Sq.M 914.88
221 (ii) 35mm Thick shutter.
223 (a) Ordinary Teak Wood. Sq.M 3289.36
223 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1872.61
223 (c) Other Local Wood. (iii) 37.5mm. Thick shutter. Sq.M 1179.30
223 (a) Ordinary Teak Wood. Sq.M 3432.15
223 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1940.83
223 (c) Other Local Wood. Sq.M 1211.04
223 (iv) 40mm. Thick shutter.
223 (a) Ordinary Teak Wood. Sq.M 3670.12
223 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2054.53
223 (c) Other Local Wood. Sq.M 1263.92
223 (v) 45mm. Thick shutter.
223 (a) Ordinary Teak Wood. Sq.M 4101.12
223 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2261.84
223 (c) Other Local Wood. Sq.M 1361.76
223 (vi) 50mm. Thick shutter.
223 (a) 1st class best Indian teak. Sq.M 5894.80
223 (b) Ordinary Teak Wood. Sq.M 4481.23
223 (This is a repair Item Item No. 73 will be admissible in
addition). Lifting Charges for upper floors refer item 86.
225 83 Panel (made of single plank) of door and window shutters
to design as directed: In Ground Floor Payment to be made
on area of exposed new work). (In case of non-supply of
single plank penal rate of reduction to a maximum of 30%
will be made).
225 i) 12mm Thick panel of 30cm to 45cm width
225 a) Ordinary Teak Wood. Sq.M 1052.38
225 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak.0 Sq.MH 704.41
225 (c) Other Local Wood. Sq.M 534.12
225 (ii) 19mm thick panel of 30cm to 45cm width
225 (a) Ordinary Teak Wood. Sq.M 1480.74
225 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 909.07
225 (c) Other Local Wood. Sq.M 629.32
225 (iii) 25mm thick panel of 30cm to 45cm width
Page 67
Building
225 (a) 1st class best Indian teak. Sq.M 2402.50
225 (b) Ordinary Teak Wood. Sq.M 1861.50
225 (c) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1090.99
225 (d) Other Local Wood. Sq.M 713.93
225 (This is a repair Item, item No. 73 will be admissible in
addition). Lifting Charges for upper floors refer Item 86.
227 84 Panel shutters of door and window, as per design (each
pane consisting of single plank without joint), including
fitting and fixing the same in position but excluding the cost
of hinge and other fittings. In ground floor. (In case of non-
supply of single plank, penal rate of reduction o 20% will be
made)
227 (i) 50 mm thick shutters with 25 mm thick panel of size 30
to 45 Cm.
227 (a) 1st class best Indian teak. Sq.M 7970.08
227 (b) Ordinary teak wood. Sq.M 6015.51
227 (ii) 40 mm thick shutters with 19 mm thick panel of size 30
to 45 Cm.
227 (a) Ordinary Teak Wood. Sq.M 4824.31
227 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2637.04
227 c) Other Local Wood. Sq.M 1566.68
227 iii) 35 mm thick shutters with 19 mm thick panel of size 30
to 45 Cm.
227 a) Ordinary Teak Wood. Sq.M 4443.55
227 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2455.12
227 c) Other Local Wood. Sq.M 1482.07
227 iv) 25 mm thick shutters with 12 mm thick panel of size 30
to 45 Cm.
227 a) Ordinary Teak Wood. Sq.M 3202.10
227 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1835.06
227 c) Other Local Wood. Sq.M 1166.09
229 Note: i) Lifting Charges for upper floors refer item 86.
229 (ii) In case of panel with Rly. Type batton the rates will be
reduced by Rs.20.00 /Sq.m.
229 85 Venetian shutters of doors and windows as per design with
valves fixed to valve and rod with plated hooks including
cost oi plated hooks and fitting, fixing shutters in position
but excluding the cost of hinges and other fittings. In
ground floor:
229 (i) 50mm thick shutters with 19mm thick valve.
229 (a) 1st class best Indian teak. Sq.M 8568.80
229 (b) Ordinary teak. Sq.M 6687.29
229 (ii) 35mm thick shutters with 12mm thick valve.
229 (a) Ordinary Teak Wood. Sq.M 5051.21
229 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 3225.90
229 c) Other Local Wood. Sq.M 2332.66
229 Note: Lifting Charges for upper floors refer item 86.
Page 68
Building
229 86 Add extra over the rate of ground floor for each addl. Floor.
229 i) Upto 4th floor. Sq.M 17.85
229 ii) Above 4th floor. Sq.M 22.31
229 87
:
ixed louver shutters of doors and windows as per design,
ncluding fitting & fixing same in position but excluding the cost of
hinges and other fittings in ground floor.
229 i) 50mm thick shutters with 19mm thick valve.
231 (a) 1st class best Indian teak. Sq.M 7930.89
231 (b) Ordinary teak. Sq.M 6131.19
231 ii) 40mm thick shutters with 12mm thick valve.
231 (a) Ordinary Teak Wood. Sq.M 4941.31
231 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2999.49
231 (c) Other Local Wood. Sq.M 2049.24
231 (iii) 35mm thick shutters with 12mm thick valve.
231 (a) Ordinary Teak Wood. Sq.M 4495.10
231 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2786.31
231 (c) Other Local Wood. Sq.M 1950.08
231 (iv) 25mm thick shutters with 12mm thick valve.
231 (a) Ordinary Teak Wood. Sq.M 3598.57
231 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2278.13
231 c) Other Local Wood. Sq.M 1631.96
231 Note: Lifting Charges for upper floors refer item 86.
231 88 Glazed shutters of doors, windows, fan light,
clerestory windows etc. as per design (with ordinary glass
of 7.4kg./sq.m. mm. Thick) fitted with putty bed and teak
wood bead and nails ncluding fitting and fixing shutter in
position but excluding the ost of hinges and other fittings,
cost of glass, putty, wooded leads etc which will be paid
seperately. n Ground floor
231 i) 40mm thick shutters.
231 a) Ordinary Teak Wood. Sq.M 3793.97
233 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2281.26
233 (c) Other Local Wood. Sq.M 1540.99
233 (ii) 35mm thick shutters.
233 (a) Ordinary Teak Wood. Sq.M 3530.63
233 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2155.44
233 (c) Other Local Wood. Sq.M 1482.48
233 (iii) 25mm thick shutters.
233 (a) Ordinary Teak Wood. Sq.M 2740.62
233 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1777.99
233 (c) Other Local Wood. Sq.M 1306.92
233 Note: i) Lifting Charges for upper floors refer item 86.
233 89 Glazed shutters of doors, as per design with sheet glass of
5.0mm thick beded in putty and fitted with teak bead and
nails the styles 150mm wide, top & bottom rail 200mm wide
if not otherwise mentioned) including fitting and fixing
shutters in position but
Page 69
Building
233 50mm Thick shutters
233 a) 1st class best Indian teak. Sq.M 4852.00
233 b) Ordinary Teak Wood. Sq.M 3681.83
233 Note: i) Lifting Charges for upper floors refer item 86.
233 ii) In case of panel with Rly. Type battens the rate will be
reduced by Rs. 10.00 per sq.m.)
235 90 Shutter of l/3rd panel, 2/3 glazed of doors and windows, as
per design (each panel consisting of a single plank without
joint and with ordinary glass of 7.4 kg per Sq.m/3mm Thick)
fitted with putty bed, teak wood bead and nails including
fitting and fixing shutters in position but excluding the cost
of glass , putty, teak bead, nails, hinges etc. and other
fittings, in ground floor.
235 (i) 50mm thick shutters with 25mm thick panel.
235 (a) 1st class best Indian teak. Sq.M 7045.59
235 (b) Ordinary teak. Sq.M 5376.78
235 (ii) 40mm thick shutters with 19mm thick panel.
235 a) Ordinary Teak Wood. Sq.M 4359.43
235 b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2513.92
235 c) Other Local Wood. Sq.M 1610.80
235 (iii) 35mm thick shutters with 19mm thick panel.
235 a) Ordinary Teak Wood. Sq.M 3931.07
235 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2309.27
235 (c) Other Local Wood. Sq.M 1515.61
235 (iv) 25mm thick shutters with 12mm thick panel.
235 (a) Ordinary Teak Wood. Sq.M 2965.78
235 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1791.37
235 |c) Other Local Wood. Sq.M 1216.66
235 Note: i) Lifting Charges for upper floors refer item 86.
237 91 Shutters of 2/3rd panel and l/3rd glazed of doors and
windows as per design (each panel consisting of a single
plank without oint and with ordinary glass of 7.4kg. Per
sq.m./3mm thick) fitted with putty bed and teak wood beads
and nails including fitting and fixing shutters in position but
excluding the cost of glass , putty, teak bead, nails, hinges
etc. and other fittings, in ;round floor.
237 (i) 50mm. Thick shutters with 25mm thick panel.
237 (a) 1st class best Indian teak. Sq.M 7686.04
237 (b) Ordinary teak. Sq.M 5857.19
237 (ii) 40mm thick shutters with 19mm thick panel.
237 (a) Ordinary Teak Wood. Sq.M 4839.85
237 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2773.61
237 (c) Other Local Wood. Sq.M 1761.03
237 (iii) 35mm thick shutters with 19mm thick panel.
237 (a) Ordinary Teak Wood. Sq.M 4414.46
237 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2568.96
Page 70
Building
237 (c) Other Local Wood. Sq.M 1662.87
237 (iv) 25mm thick shutters with 12mm thick panel.
237 (a) Ordinary Teak Wood. Sq.M 3288.54
237 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2002.28
237 (c) Other Local Wood. Sq.M 1369.86
237 Note: i) lifting Charges for upper floors refer item 86.
239 (ii) In case of panel with Rly. Type battens the rate will be
reduced by Rs. 12.00 per Sq.m]
239 92 Shutter of l/3rd fixed louvered, 2/3rd glazed of doors as per
design (with ordinary glass of 7.4kg per sq.m./3mm. Thick)
fixed with putty bed, teak wood beads and nails including
fitting and fixing shutters in position but excluding the cost
of glass , putty , teak bead, nails, hinges etc. and other
fittings, in ground floor.
239 (i) 50mm thick shutters with 19mm thick valve.
239 (a) 1st class best Indian teak. Sq.M 6252.13
239 (b) Ordinary teak. Sq.M 4809.33
239 (ii) 40mm thick shutters with 12mm thick valve.
239 (a) Ordinary Teak Wood. Sq.M 3962.58
239 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2349.88
239 (c) Other Local Wood. Sq.M 1557.92
239 (iii) 35mm thick shutters with 12mm thick valve.
239 (a) Ordinary Teak Wood. Sq.M 3458.96
239 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2080.35
239 (c) Other Local Wood. Sq.M 1402.95
239 (iv) 25mm thick shutters with 12mm thick valve.
239 (a) Ordinary Teak Wood. Sq.M 2761.63
239 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 1721.18
239 (c) Other Local Wood. Sq.M 1212.02
241 Note: i) Lifting Charges for upper floors refer item 86.
241 93 Shutters 2/3 fixed louvered, l/3rd glazed of doors and
windows as per design (with ordinary glass of 7.4kg. Per
sq.m./3mm. Thick) fitted with putty beds, teak wood beads
and nails including fitting and fixing shutters in position but
excluding the cost of glass , putty , teak bead, nails, hinges
etc and other fittings, in ground floor.
241 (i) 50mm thick shutters with 19mm thick valve.
241 (a) 1st class best Indian teak. Sq.M 6899.10
241 (b) Ordinary Teak. Sq.M S310.20
241 (ii) 40mm thick shutters with 12mm thick valve.
241 (a) Ordinary Teak Wood. Sq.M 4314.01
241 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2571.25
241 (c) Other Local Wood. Sq.M 1718.41
241 (Hi) 35mm thick shutters with 12mm thick valve.
241 (a) Ordinary Teak Wood. Sq.M 3915.54
241 (b) Sishu, Gamar, Champ,Badam,Bhola, Mogra, Hallak. Sq.M 2380.87
241 (c) Other Local Wood. Sq.M 1629.87
241 (iv) 25mm thick shutters with 12mm thick valve.
241 (a) Ordinary Teak Wood. Sq.M 3057.72
Page 71
Building
241 (b) Sishu, Gamar, Champ,Badam,8hola, Mogra, Hallak. Sq.M 1887.20
241 (c) Other Local Wood. Sq.M 1314.40
243 Note: i) Lifting Charges for upper floors refer item 86.
243 94 Z-batten shutters of door and window as per design
havings tongued and groove-half lap jointed as per
direction of the Engineer-in-Charge including fitting and
fixing shutter in position, but excluding the cost of hinges
and other fittings in ground floor.
243 (A) Shutter with 25mm thick planks, 19mm thick battens.
243 (i) Sal: Local. Sq.M 2384.40
243 (ii) Sal: Malayasian Sq.M 2736.73
243 (iii) Sishu, Gamar, Champ, Badam, Bhola, Morga, Hallak. Sq.M
2604.60
243 (iv) Other Local Wood Sq.M 1591.66
243 (B) Shutter with 19mm thick planks, 19mm thick
battens.
243 (i) Sal: Local. Sq.M 2061.43
243 (ii) Sal: Malayasian Sq.M 2345.77
243 (iii) Sishu, Gamar, Champ, Badam, Bhola, Morga, Hallak. Sq.M
2239.14
243 (iv) Other Local Wood Sq.M 1421.68
243 Note: i) Lifting Charges for upper floors refer item 86.
245 95 Providing and fixing of false ceiling with powder coated
exposed G.I. grid suspension system (E-Grid T 2430/1510
or equivalent load carrying capacity with mid span
deflection not exceeding 1/360 span with hanger spacing of
1200mm c/c ) consisting of Main Runner 3600 mm long,
Cross Tee 1200 mm / 600 mm long and Wall Angle. The
Wall Angle shall be fixed on PVC Dash Fasteners on the
perimeter of the wall by steel screws with distance 300mm
c/c. The Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the pre-cut slots of
Main Runner at regular interval of 600 mm to form a
modular grid of 1200mm X 600mm. Additional Cross Tees
of 600 mm shall be placed perpendicular to the Cross Tee
1200 mm long to finally form a grid of 600 mm X 600 mm.
Grid of module size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4 mm thick High
Pressure Steam Cured Non Asbestos Fibre Cement
Standard Ceiling Board {Density > 1300 Kg/m3) of size 595
mm X 595 mm, conforming IS 14862 & Type B Category
111 of ISO 8336, tested as per AS-1530 part 3 & BS-476
Part 4,5,6,7 & 8, should be placed in the Grid module to form a
False Ceiling. All complete as per the drawing & directions of
Engineer-in-charge.
Page 72
Building
245 a) False Ceiling (with 4mm thick Fibre Cement Standard
Ceiling Board and E-Grid T-2430/1510).
Sq.M 545.42
247 96 (A) Providing and fixing of false ceiling with powder coatee
exposed G.I. grid suspension system "(E-Grid T 2430
or equivalent load carrying capacity with mid span
deflection not exceeding 1/360 span with hanger spacing of
1200mm c/c consisting of Main Runner 3600 mm long,
Cross Tee 1200 mm / 600 mm long and Wall Angle. The
Wall Angle shall be fixed on PVC Dash Fasteners on the
perimeter of the wall by steel screws with distance 300mm
c/c. The Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the pre-cut slots of
Main Runner at regular interval of 600 mm to form a
modular grid of 1200mm X 600mm. Additional Cross Tees
of 600 mm shall be placed perpendicular to the Cross Tee
1200 mm long to finally form a grid of 600 mm X 600 mm.
Grid of module size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 6 mm thick High
Pressure Steam Cured Non Asbestos Fibre Cement
Standard Ceiling Board (Density > 1300 Kg/m3) of size 595
mm X 595 mm, conforming IS 14862 & Type B Category III
of ISO 8336, tested as per AS-1530 part 3 & BS-476 Part
4,5,6,7 & 8, should be placed in the Grid module to form a
False Ceiling. All complete as per the drawing & directions
of Engineer-in-charge.
247 False Ceiling (with 6mm thick Fibre Cement Standard
Ceiling Board and E-Grid T-2430). in Ground Floor
Sq.M 629.50
249 (B) False Ceiling with concealed metal (G.I.) Framework
:-
Page 73
Building
249 Providing and fixing in position 6 mm. thick High Pressure
Steam cured non-asbestos Fiber Cement Ceiling Board
(Density > 1250 Kg/M3) Confirming IS 14862 & Type - B
Category - III of ISO 8336, Tested as per AS-1530 Part - 3
& BS-476 Part - 4,5,6,7 & 8 fixed to G.I. Section (perimeter
channels having one flange of 20 mm. and another flange
of 30 mm. with thickness of, 0.55 mm. and web of length 27
mm., along the perimeter of the ceiling, screws fixed to the
wall with help of nylon sleeves or PVC dash fastners @610
mm c/c. then suspend G.I. intermidiate 'C section with web
45 mm. and flanges of 15 mm. each from soffit @ 1200
mm c/c with ceiling angle of size 25 mm. X 10 mm. X 0.55
mm. fixed to soffit G.I. Cleat and Steel expansion fasteners.
Ceiling section of 0.55 mm. thickness having web of 51.5
mm. and two flanges of 26 mm. each with lips of 10.55
mm., are then fixed on to the intermediate channel with the
help of connecting clips in the direction perpendicular to the
intermidiate channel @ 610 mm c/c) withlled worker such
as Head Mason, Mason, Bhistri, Majdoor should be trained
from expert and recognised technical Personal/Institution
having affiliated ISO-9001)Cement is supplied by agency
then item rate to be deduced as per :o
249 Section specification :-
249 Perimeter Channel:- 30 mm X 20 mm X 27 mm, thickness
0.55 mm (min).
249 Intermidiate Channel :- 15 mm X 45 mm, thickness 0.90
mm (min).
249 Ceiling Section :- 51.5 mm X 26 mm X 10.55 mm,
thickness 0.55 mm (min).
249 Ceiling Angle :- 25 mm X10 mm, thickness 0.55 mm (min).
249 False Ceiling (with 6mm thick Fibre Cement Standard
Ceiling Board and E-Grid T-2430).
249 In Ground Floor Sq.M 588.15
Page 74
Building
251 97 Providing and fixing of false ceiling with powder coated
exposed G.I. grid suspension system (E-Grid T 2430/1510
or equivalent load carrying capacity with mid span
deflection not exceeding 1/360 span with hanger spacing of
1200mm c/c ) consisting oi Main Runner 3600 mm long.
Cross Tee 1200 mm / 600 mm long and Wall Angle. The
Wall Angle shall be fixed on PVC Dash Fasteners on the
perimeter of the wall by steel screws with distance 300mm
c/c. The Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the pre-cut slots of
Main Runner at a regular interval of 600 mm to form a
modular grid of 1200mm X 600mm. Additional Cross Tees
of 600 mm shall be placed perpendicular to the Cross Tee
1200 mm long to finally form a grid of 600 rnm X 600 mm.
Grid of module size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4 mm thick High
Pressure Steam Cured Non Asbestos Pearl Designer Fibre
Cement Standard Ceiling Board (Density > 1500 Kg/m3) of
size 595 mm X 595 mm, conforming IS 14862 & Type A
Category IV of ISO 8336, tested as per AS-1530 part 3 &
BS-476 Part 4,5,6,7 & 8, should be placed in the Grid
module to form a False Ceiling. All complete as per the
drawing & directions of Engineer-in-charge.
a) False Ceiling (with 4mm thick Pearl Designer Fibre
Cement Board and E-Grid T-2430/1510). In Ground Floor
Sq.M 765.92
Page 75
Building
253 98 Providing and fixing of false ceiling with powder coated
exposed G.I. grid suspension system (E-Grid T 2430/1510
or equivalent load carrying capacity with mid span
deflection not exceeding 1/360 span with hanger spacing of
1200mm c/c ) consisting of Main Runner 3600 mm long.
Cross Tee 1200 mm / 600 mm long and Wall Angle. The
Wall Angle shall be fixed on PVC Dash Fasteners on the
perimeter of the wall by steel screws with distance 300mm
c/c. The Main Runners to be placed @ 1200 mm. The
Cross Tee 1200mm will be inserted in the pre-cut slots of
Main Runner at a regular interval of 600 mm to form a
modular grid of 1200mm X 600mm. Additional Cross Tees
of 600 mm shall be placed perpendicular to the Cross Tee
1200 mm long to finally form a grid of 600 mm X 600 mm.
Grid of module size 600 mm X 600 mm shall be supported
by 6 mm dia G.I. wire from purlins / soffit. 4 mm thick High
Pressure Steam Cured Non Asbestos Fibre Cement
Designer Ceiling Board (Density > 1300 Kg/m3) of size 595
mm X 595 mm, conforming IS 14862 & Type B Category III
of ISO 8336, tested as per AS-1530 part 3 & BS-476 Part
4,5,6,7 & 8, should be placed in the Grid module to form a
False Ceiling. All complete as per the drawing & directions
of Engineer-in-charge.
253 a) False Ceiling (with 4mm thick Fibre Cement Designer
Board and E-Grid T-2430/1S10). In Ground Floor
Sq.M 618.97
Page 76
Building
255 99 Providing and fixing of false ceiling with powder coated
exposed G.I. grid suspension system (E-Grid T-2430 or
equivalent load carrying capacity with mid span deflection
not exceeding 1/360 pan with hanger spacing of 1200mm
c/c ) consisting of Main runner 3600 mm long. Cross Tee
1200 mm / 600 mm long and Wall Angle. The Wall Angle
shall be fixed on PVC Dash Fasteners on the perimeter of
the wall by steel screws with distance 300mm c/c. The Main
Runners to be placed @1200 mm. The cross Tee 1200mm
will be inserted in the pre-cut slots of Main Runner at a
regular interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of 600 mm shall
be placed perpendicular to the Cross Tee 1200 mm long to
finally form a grid of 600 mm X 600 mm. Grid of module
size 600 mm X 500 mm shall be supported by 6 mm dia
G.I. wire from purlins / soffit. 6 mm thick High Pressure
Steam Cured Non Asbestos
:
ibre Cement Standard Ceiling
Board (Density > 1300 Kg/m3) of size 595 mm X 595 mm,
conforming IS 14862 & Type B Category II of ISO 8336, tested as
per AS-1530 part 3 & BS-476 Part 1,5,6,7 & 8, should be placed in
the Grid module to form a False Veiling. All complete as per the
drawing & directions of Engineer n-charge.
255 a) False Ceiling (with 6mm thick Fibre Cement Designer
Board and E-Grid T-2430). n Ground Floor
Sq.M 743.80
257 100 Providing and fixing of false ceiling with powder coated
exposed S.I. grid suspension system (E-Grid U-1520 or
equivalent load carrying capacity with mid span deflection
not exceeding 1/350 span with hanger spacing of 1200mm
c/c ) consisting of Main Runner 3600 mm long. Cross Tee
1200 mm / 600 mm long and Wall Angle. The Wall Angle
shall be fixed on PVC Dash Fasteners on the perimeter of
the wall by steel screws with distance 300mm c/c. The Main
Runners to be placed @ 1200 mm. The Cross Tee
1200mm will be inserted in the pre-cut slots of Main Runner
at a regular interval of 600 mm to form a modular grid of
1200mm X 600mm. Additional Cross Tees of 600 mm shall
be placed perpendicular to the Cross Tee 1200 mm long to
finally form a grid of 600 mm X 600 mm. Grid of module
size 600 mm X 600 mm shall be supported by 6 mm dia
G.I. wire from purlins / soffit. 15mm thick OW Acoustic
Board (Mineral Fiber Acoustic Ceiling Tiles) of approved
pattern and size 595mm X 595mm with NRC value > 0.65
should be placed in the Grid module to form a False
Ceiling. All complete as per the drawing & directions of
Engineer-in-charge.
Page 77
Building
257 a) Acoustic False Ceiling (with 15mm thick OW Acoustic
Board and E-Grid U-1520). In Ground Floor
Sq.M 1320.63
259 101 Supplying solid flush type doors of commercial quality, the
timber frame consisting of top and
1
bottom rails and side
styles of well seasoned timber 65mm wide each and the entire
frame fitted with 37.5mm wide battens places both ways in
order to make the door of solid core and interna lipping with
Garjan or similar wood veneers using phenol formaldehyde as
glue etc. complete, including fitting, fixing shutters in position
but excluding the cost of hinges anc other fittings in ground floor.
259 (a) 35 mm thick shutters (single leaf) Sq.M. 2447.64
259 (b) 32 mm thick shutters (single leaf) Sq.M. 2284.63
259 (For upper floors refer to item 128 also)
259 102 Supplying solid flush type doors of deluxe decorative (both
side) quality, conforming to I:S 2202 timber frame
consisting of top and bottom rail and side styles of well
seasoned timber 65mm wide each and the entire frame
fitted with 27.5mm wide battens places both ways in order
to made the door of solid core and internal lipping with teak,
mahogony or rose wood approved decorative veneers
using phenol formaldehyde as glue etc. complete, including
fitting, fixing the shutters in position but excluding the cost
of hinges and other fittings in ground floor:
259 a) 35mm thick shutters (single leaf) Sq.M. 3882.64
259 b) 25mm thick shutters (single leaf) Sq.M. 3722.00
259 For upper floors refer to item 128 also)
259 103 Extra over item No. 101 and 102 for providing:
259 a) Vision aperture (round or rectangular in shape) with
7.4kg. Per sq.m./ 3mm thick glass pane with wooden
beads. ( Cost of glass panes and wooden beads will be
paid separately).
Each 21.12
259 b) Rabbet cutting in shutters Sq.M.
of
Shutte
rs
28.42
261 (c) Double leaf shutters Sq.M.
of
Shutte
rs
18.94
261 (For upper floors refer to item 128 also)
261 104 Supplying, fitting and fixing Fly/Mosquito proof nylon ne on
any type of window, door shutter/frame with necessary
fixing arrangements complete.
Sq.M. 930.12
261 105 Ceiling with 12mm thick wooden planks fitted and fixed
complete (excluding the supporting framework) as per
direction of the Engineer-in-charge. In Ground Floor
Page 78
Building
261 (a) Ordinary Teak Sq.M. 1553.37
261 (b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 849.92
261 (For upper floors refer to item 128)
261 106 Wall panelling / partition with Melamine faced 3 layered flat
pressed wood particle board of approved make and brand
as per direction of Engineer - in - Charge of requisite grade
bonded with phenol formaldehyde synthetic resin
conforming to IS: 848 - 1974 (excluding the cost of
supporting frame work and teak wood battens / lipping)
261 In Ground Floor
261 A) Plain : Conforming to IS: 3087 -1985
261 I) Plain: Exterior grade.
261 a) 9 mm thick Sq.M. 676.61
261 b) 12 mm thick. Sq.M. 844.23
261 c) 18 mm thick. Sq.M. 1137.88
261 B) Prelaminated particle board conforming to IS: 3087 -985
and IS 12823-1990.
261 One side decorative laminated
261 a) Exterior grade
261 9mm thick Sq.M. 858.52
261 12mm thick Sq.M. 900.10
261 b) Interior Grade
263 9mm thick Sq.M. 761.07
263 12mm thick Sq.M. 858.52
263 (ii) Both side decorative laminate
263 (a) Exterior grade
263 9mm thick Sq.M. 905.30
263 12mm thick Sq.M. 946.88
263 (b) Interior Grade
263 9mm thick Sq.M. 858.52
263 12mm thick Sq.M. 941.68
263 (c ) Extra for Ceiling Work Sq.M. 14.08
263 107 Supplying, fitting and fixing boiling water proof ply
conforming to IS: 710-1977 bonded with phenol
formaldehyde synthetic resin conforming to IS: 848-1974 of
approved make and brand fitted and fixed as per design as
per approval and direction of Engineer-in-
Charge.[excluding the cost of supporting frame work and
eak wood batten/Lipping] n Ground Floor
263 i)4mm Sq.M. 909.01
263 ii) 6mm Sq.M. 1002.72
263 lii) 9mm Sq.M. 1177.63
263 iv) 12mm Sq.M. 1420.01
263 v) 16mm Sq.M. 1970.06
263 vi) 19mm Sq.M. 2158.72
Page 79
Building
263 108 Supplying, fitting and fixing boiling water resistant ply
conforming to IS: 303-1989 bonded with phenol
formaldehyde synthetic resin of approved make and brand
fitted and fixed as per design as per approval and direction
f Engineer-in-Charge.[excluding the cost of supporting
rame work and teak wood batten/Lipping]
263 In Ground Floor
265 (i) 4mm Sq.M. 665.39
265 (ii) 6mm Sq.M. 831.55
265 (iii) 9mm Sq.M. 950.24
265 (iv) 12mm Sq.M. 1165.14
265 (v) 16mm Sq.M. 1526.53
265 (vi) 19mm Sq.M. 1800.15
265 109 Supplying, fitting and fixing boiling water proof block board
conforming to IS: 1659-1990 conforming to IS:848-1974 of
approved make and brand, fitted and fixed as per design as
per direction of Engineer-in-charge.[excluding the cost of
supporting frame work and teak wood batten/Lipping]
265 In Ground Floor
265 (i) 16mm Sq.M. 1784.58
265 (ii) 19mm Sq.M. 1986.98
265 (iii) 25mm Sq.M. 2737.54
265 (Note: For Boiling Water Resistant Block Boards
reduce the above rates by 5%).
265 For upper floor refer Item 128 for item 106,107,108,109
265 110 Hessian ceiling as per design fitted and fixed complete
excluding the cost of supporting frame work and teak wood
batten/Lipping but including necessary wood battens
of size 25 mmx25 mm).
265 a Malayasian Sal Sq.M. 161.57
265 b) Local Sal Sq.M. 149.60
265 c) Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 157.08
265 111 Hessian partition as per design fitted and fixed complete
(excluding supporting framework but including necessary
wood battens of size 25 mmx25 mm).
265 a) Malayasian Sal Sq.M. 140.46
267 (b) Local Sal Sq.M. 128.48
267 (c)Sishu/Champ/Badam/Gamar/Bhqla/Mogra/Hallak Sq.M. 135.96
267 112 Renewing hessian only of ceiling including taking out old
battens etc. (as necessary) and refixing same with new
screws.
Sq.M. 64.26
267 113 Canvas partition as per design fitted and fixed complete
(excluding the supporting framework but including
necessary wood battens of size 25 mmx25mm).
267 (a) Sal Malayasian Sq.M. 166.80
267 (b) Sal: Local Sq.M. 154.83
267 (c)Sishu/Champ/Badarn/Gamar/Bhola/Mogra/Hallak Sq.M. 162.31
Page 80
Building
267 114 Canvas ceiling as per design fitted and fixed complete
(excluding the supporting framework but including
necessary wood battens of size 25 mmx25mm).
267 (a) Malayasian Sal Sq.M. 187.92
(b ) Sal: Local Sq.M. 175.94
267 (c)Sishu/Gamar/Champ/Badam/Bhola/Mogra/Hallak Sq.M. 183.43
267 115 Renewing canvas only of ceiling including taking out old
battens etc. and refixing the same with new screws.
Sq.M. 90.60
267 116 Ceiling of soft-insulation boards (12mm thick) as per design
fitted and fixed complete (excluding the support framework
but including necessary wood battens of size 40 mmx25
mm). In Ground Floor
267 (a) Ordinary Teak Sq.m. 585.27
267 (b) Sal: Local Sq.m. 457.41
267 117 Ceiling of masonite board as per design fitted and fixed
complete (excluding the supporting framework but
ncluding necessary wood battens of size 40 mmx25 mm).
In Ground Floor
269 (i) 4.5mm thick
269 (a) Ordinary Teak Sq.M. 563.25
269 (b) Sal Local Sq.M. 435.39
269 (ii) 6.0mm thick
269 (a) Ordinary Teak Sq.M. 604.84
269 (b) Sal Local Sq.M. 476.98
269 118 Ceiling of commercial ply as per design fitted and fixed
complete (excluding the supporting framework but
including necessary wood battens of size 40 mm X 25 mm).
In Ground Floor
269 (i) 4mm thick
269 (a) Sal Local Sq.M. 495.18
269 (ii) 6mm thick
269 (a) Sal Local Sq.M. 642.05
269 (Hi) 12mm thick
269 (a) Ordinary Teak Sq.M. 1005.16
269 119 Partition with soft insulation board (of 12mm thick) as per
design fitted and fixed complete (excluding the supporting
framework but including necessary wood battens of size 40
mm & 25 mm).
269 In Ground Floor
(a) Ordinary Teak Sq.M. 578.59
269 (b) Sal Local Sq.M. 450.73
271 120 Providing, fitting and fixing in position, medium density fibre
board conforming to IS: 12406-1988 for plain and IS 14587-
1998 for prelaminated made of wood fibre bonded with
Urea formaldehyde for interior grade and Phenol
Formaldehyde for exterior grade conforming to per IS:848^
1974 as per approved make and brand as per direction of
Engineer-in-Charge.
271 In Ground Floor
Page 81
Building
271 (A)Plain:
271 (a) Exterior grade.
271 (i) 6mm Sq.M. 671.16
271 (ii) 8mm Sq.M. 811.54
271 iii) 12mm Sq.M. 909.02
271 b) Interior grade.
271 i)6mm Sq.M. 741.35
271 ii) 8mm Sq.M. 881.73
271 iii) 12mm Sq.M. 1090.99
271 B) One side decorative lamination
271 I) Exterior Grade
271 i)8mm Sq.M. 799.79
271 ii) 12mm Sq.M. 931.02
271 II) Interior Grade
271 i)8mm Sq.M. 708.56
271 ii) 12mm Sq.M. 837.28
271 C) Both side decorative lamination
273 I) Exterior Grade
273 (i)8mm Sq.M. 902.28
273 (ii) 12mm Sq.M. 1033.50
273 (II) Interior Grade
273 (i) 8mm Sq.M. 839.79
273 (ii) 12mm Sq.M. 958.51
273 121 Supplying fitting, fixing decorative lamination conforming to
IS: 2046 : 1995 as per approved make, brand, finish and
thickness with fitting, fixing the same on Particle/MDF / Ply
Boards with recommended / approved adhesive with
proper clipping the sides for better attachment as per
direction of Engineer-in-charge.The rate includes the cost
of labour, adhesive and all incidental charges thereof. In
Ground Floor
273 Glossy/Matt/Suede excluding surface texture or metallic
ustre.
273 i) Thickness of laminate 1.5mm Sq.M. 848.02
273 ii) Thickness of laminate 1 mm Sq.M. 663.29
273 122 A) Partition of commercial ply as per design fitted and fixed
complete (excluding the supporting framework but including
necessary teak wood battens of size 40mmx 25 mm):
273 In Ground Floor
273 i) 4mm thick Sq.M. 613.55
273 ii) 6mm thick Sq.M. 760.42
273 ii) 12mm thick Sq.M. 995.67
273 123 Partition of masonite board as per design fitted and fixed
complete (excluding the supporting framework but
including necessary wood battens of size 40 mmx25 mm):
273 In Ground Floor
275 (a) Teak Wood
Page 82
Building
275 (i) 4.5mm thick Sq.M. 552.69
275 (ii) 6.0mm thick Sq.M. 594.29
275 (b) Sal Local
275 (i) 4.5mm thick Sq.M. 424.83
275 (ii) 6.0mm thick Sq.M. 466.42
275 124 Partition of teak veneer [1 mm] as per design fitted and
fixed complete (excluding the supporting frame work &
necessary teak wood battens): In Ground Floor
275 (i) 4mm thick commercial quality Sq.M. 442.40
275 125 Scantling upto 50mm wide and 12mm thick (chamfering or
rounding) for ceiling/partition battens including fitting, fixing
in position with washers, coach screws etc. complete.:
275 (a) Ordinary teak Mtr. 103.22
275 (b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Mtr. 64.07
275 126 Taking out existing partition/ceiling of particle board,
masonite board, ply board, soft board etc. of any thickness
and refixing same in new position with necessary clamps
making holes in walls, floor, roof and mending damages if
any.[concrete plaster will be paid separately]
Sq.M. 38.62
275 127 Plain and finished timber planks in partition, shelves etc.
fitted and fixed complete as per design (butt joints)
275 In ground floor.
275 i) 12mm thick planks
275 a) Sal Malayasian Sq.M. 780.69
275 b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 735.74
275 c) Other local Wood Sq.M. 391.12
275 ii) 19mm thick planks
277 (a) Sal Malayasian Sq.M. 1186.14
277 (b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 1114.74
277 (c) Other Local Wood Sq.M. 567.40
277 (iii) 25mm thick planks
277 (a) Sal Malayasian Sq.M. 1523.93
277 (b) Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 1430.72
277 (c) Other local Wood Sq.M. 716.13
277 (iv) 32mm thick planks
277 (a) Sal Malayasian Sq.M. 1962.37
277 (b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 1842.06
277 (c) Other local Wood Sq.M. 919.68
277 (v) 35mm thick planks
277 (a) Sal Malayasian Sq.M. 2124.54
277 (b)Sishu/Champ/Badam/Gamar/Bhola/Mogra/Hallak Sq.M. 1993.66
277 (c) Other local Wood Sq.M. 990.19
277 128 Add extra over rate of ground floor for each addl. Storey for
items 95 to100, 116 to124,127, 130, 135,136, 139, 143,
145 to 148,151, 152, 155 to 159
277 (i) Upto 4th floor Sq.M. 8.93
277 (ii) Above 4th floor Sq.M. 11.16
Page 83
Building
277 129 Add extra over correspnding item 127 and 130:
277 (i) Half lap joint Sq.M. 15.17
277 (ii) Tongued and grooved joint Sq.M. 29.45
277 130 Rough dressed timber planks fitted and fixed with nut jolts
excluding framework complete: In Ground Floor
277 i) 25mm thick planks
277 (a) Sal Malayasian Sq.M. 1532.96
279 (b) Sal Local Sq.M. 1282.65
279 (ii) 35mm thick planks
279 (a) Sal Malayasian Sq.M. 2124.54
279 (b) Sal Local Sq.M. 1775.51
279 (iii) 50mm thick planks
279 (a) Sal Malayasian Sq.M. 3020.21
279 (b) Sal Local Sq.M. 2519.57
279 (iv) Above 50mm thick planks
279 (a) Sal Malayasian Cu.M. 59703.38
279 (b) Sal Local Cu.M. 49714.27
279 131 Easing drawers of laboratory tables of any size (labour
only)
Each 16.51
279 132 Easing tower wrench, barrel, skeleton, socket bolt etc. by
scraping and oiling.
Each 2.75
279 133 Taking Out and Refixing wooden moulded knobs of
drawers fitted and fixed complete.
Each 11.01
279 134 Taking out and refixing after oiling and cleaning including
adjusting spring of different type of automatic door closer
with necessary screw complete.
Each 49.83
279 135 wooden eaves board as per design, fitted and fixed
complete:
In Ground Floor
279 i) Plain eaves board (Local Sal)
279 a) 19mm thick Sq.M. 1196.43
279 d) 25mm thick Sq.M. 1502.23
279 ii) Ornamental eaves board (Ordinary Teak)
279 a) 19mm thick Sq.M. 2610.30
279 b) 25mm thick Sq.M. 3318.28
279 iii) Ornamental eaves board Badam/Gamar/Champ/Hallak)
279 a) 19mm thick Sq.M. 1447.79
281 (b) 25mm thick Sq.M. 1780.36
281 136 Square or hexagonal mesh netting made with 18 B.W.G.
galvanised wire, fitted and fixed complete as per design
(excluding the supporting framework but including local sal
wood battens of size 37.5 mm x 25 mm). In Ground Floor
281 (a) 19mm mesh. Sq.M. 359.54
281 (b) 25mm mesh Sq.M. 330.04
281 (c) 37.5mm mesh Sq.M. 308.95
Page 84
Building
281 137 Renewing square or hexagonal mesh netting only (made
with 18 B.W.G. galvanised wire) as per existing design
including taking out old battens etc. (as necessary) and
refixing with new screws:
281 (a) 19mm mesh. Sq.M. 204.92
281 (b) 25mm mesh Sq.M. 175.41
281 (c) 37.5mm mesh Sq.M. 154.32
281 138 Extra for providing hand hole (upto 150mm x 150mm size)
including necessary timber frame [ size of batten 37.5
mmx25mm].
281 (a) Sal Malayasian Each 50.35
281 (b) Sal Local Each 44.64
281 139 Supplying fitting and fixing I.R.C. fabric mesh with covering
battens including cost of screws etc complete (excluding
the cost of battens). In Ground Floor
281 (a) 50mm x 25mm x 2.7mm x 2.7mm. Sq.M. 210.84
281 (b) 75mm x 25mm x 2.7mm x 2.7mm. Sq.M. 205.47
281 (c) 75mm x 25mm x 4.5mm x 2.7mm. Sq.M. 247.13
281 (d) 75mm x 50mm x 4.5mm x 3.0mm. Sq.M. 207.48
283 (e) 75mm x 50mm x 2.7mm x 2.7mm. Sq.M, 204.12
283 (f) 75mm x75mm x 4.5mm x 4.5mm. Sq.M. 251.17
283 (g) 75mm x 75mm x 2.7mm x 2.7mm. Sq.M. 175.88
283 (h) 100mm x 100mm x 2.7mm x 2.7mm. Sq.M. 159.75
283 (i) 25mm x 25mm x 2.7mm x 2.7mm. Sq.M. 289.19
283 (j) 25mm x 25mm x 2.2mm x 2.2mm. Sq.M. 174.92
283 140 Renewing G.I. sheet door with old sheet but with new local
sal wood frame (styles, rails and diagonal braces 100mm x
35mm) including fitting, fixing with proper screws and
rehanging shutter with haskal and doomney (excluding the
cost of haskal and doomney).
Sq.M. 1282.70
283 141 Renewing G.I. sheet door with new 0.63mm sheet but with
old local sal wood frame (styles, rails and diagonal braces
100mm x 35mm) including fitting, fixing with proper screws
and rehanging shutter with haskal and doomney 'excluding
the cost of haskal and doomney).
Sq.M. 575.16
283 142 a) Supplying, fitting fixing I.S.I, approved quality and srand
hydraulic (oil check) floor door spring, heavy duty double
action with brass shoe, brass top centre aluminium op
cover etc. complete set as per direction of Engineer-in-
charge.
Set 2323.24
283 b) Supplying, fitting fixing Godrej type hydraulic (oil check)
loor door spring, heavy duty double action with brass shoe,
brass top centre aluminium top cover etc. complete set as
per irection of Engineer-in-charge.
Set 3870.09
Page 85
Building
283 143 Supplying, fitting & fixing fibre reinforced polymer (FRP)
Composite door shutters as per approved design with glass
fibre reinforced plastic moulded skins and a special
sandwich core, so as to impart monolitaheic composite
structure as per approved technology of Department of
Science and Technology (DST) to satisfy IS:4020 door
esting performance criteria.
In Ground Floor
285 (i) 32 mm thick Sq.m 3200.48
285 (ii) 25 mm thick Sq.m 2982.74
285 144 Supplying, fitting and fixing fibre reinforced polymer (FRP]
Composite door frame as per approved section with glass
fibre reinforced plastic moulded skins and a special
sandwich core, so as to impart monolitaheic composite
structure as per approved technology of Department of
Science and Technology (DST) to safisfy IS: 4020 door
testing performance criteria.
285 (i) 66mm x 90mm Mtr. 571.93
285 (ii) 66mm x 70mm Mtr. 5.10.71
285 145 Supplying, Fitting & Fixing 30 mm thick Factory made solid
Panel PVC Door Shutter consisting of outer frame made
out of M.S. tubes of 19 gauge thickness and size 19
mmx19 mm for styles, top and bottom rails, M.S. frame
shall have cost of steel primers of approved make and
manufacture, M.S. frame covered with 5 mm th. heat
moulded PVC "C" channel of size 30 mm th, 70 mm width
out of which 50 mm shall be flat and 20 mm shall be
tapered in 45 degree angle on either sides forming styles;
and 5 mm th. 95 mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree on the inner
side to form top & bottom rail and 115 mm wide PVC sheet
out of which 75mm shall be flat and 20 mm shall be tapered
on both sides to form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with 10 mm (5
mmx2) th.,20 mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th. both side PVC
sheet to be fitted in the M.S. frame welded/sealed to the
styles &rails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined together with
solvent cement adhesive. An additional 5 mm th. PVC strip
of 20 mm which is to be stuck on the interior side of the "C"
channel using PVC solvent adhesive etc. complete
excluding all necessary hardwares as per direction of
Engineer-in-Charge.
285 In Ground Floor Sq.m 1978.25
Page 86
Building
287 146 Supplying, Fitting & Fixing 30 mm thick both side
prelaminated Factory made solid Panel PVC Door Shutter
consisting of outer frame made out of M.S. tubes of 19
gauge thickness and size 19 mmx19 mm for styles, top and
bottom rails, M.S. frame shall have cost of steel primers of
approved make and manufacture, M.S. frame covered with
5 mm th. heat moulded PVC "C" channel of size 30 mm th,
70 mm width out of which 50 mm shall be flat and 20 mm
shall be tapered in 45 degree angle on either sides forming
styles; and 5 mm th. 95 mm wide PVC sheet out of which
75 mm shall be flat and 20 mm tapered in 45 degree on the
inner side to form top & bottom rail and 115 mm wide PVC
sheet out of which 75mm shall be flat and 20 mm shall be
tapered on both sides to form lock rail. Top, bottom and
lock rails shall be provided either side of the panel with 10
mm (5 mmx2) th.,20 mm wide cross PVC sheet as gap
insert for top rail and bottom rail sheet to be fitted in the
M.S. frame welded/sealed to the styles &rails with 7 mm (5
mm+2 mm) th.x15 mm wide PVC sheet beading on inner
side and joined together with solvent cement adhesive. An
additional.5 mm th. PVC strip of 20 mm which is to be stuck
on the interior side of the "C" channel using PVC solvent
adhesive etc. complete excluding all necessary hardwares
as per direction of Engineer-in-Charge.
287 In Ground Floor Sq.m 2513.70
Page 87
Building
289 147 Supplying, Fitting & Fixing 30 mm thick Double Leaf
Factory made solid Panel PVC Door Shutter consisting of
outer frame made out of M.S. tubes ot 19 gauge thickness
and size 19 mmx19 mm for styles, top and bottom rails,
M.S. frame shall have cost of steel primers of approved
make and manufacture, M.S. frame covered with 5 mm fh.
heat moulded PVC "C" channel of size 30 mm th, 70 mm
width out of which 50 mm shall be flat and 20 mm shall be
tapered in 45 degree angle on either sides forming styles;
and 5 mm th. 95 mm wide PVC sheet out of which 75 mm
shall be flat and 20 mm tapered in 45 degree on the inner
side to form top & bottom rail and 115 mm wide PVC sheet
out of which 75mm shall be fiat and 20 mm shall be tapered
on both sides to form lock rail. Top, bottom and lock rails
shall be provided either side of the panel with 10 mm (5
mmx2) th.,20 mm wide cross PVC sheet as gap insert for
top rail and bottom rail. Paneling of 5 mm th. both side PVC
sheet to be fitted in the M.S. frame welded/sealed to the.
styles Srails with 7 mm (5 mm+2 mm) th.x15 mm wide PVC
sheet beading on inner side and joined together with
solvent cement adhesive. An additional 5 mm th. PVC strip
of 20 mm which is to be stuck on the interior side of the "C"
channel using PVC solvent adhesive etc. complete
excluding all necessary hardwares as per direction of
Engineer-in-Charge.
289 In Ground Floor Sq.m 2312.89
Page 88
Building
291 148 Supplying, Fitting & Fixing 30 mm thick thick both side
prelaminated Double Leaf Factory made solid Panel PVC
Door Shutter consisting of outer frame made out of M.S.
tubes of 19 gauge thickness and size 19 mmx19 mm for
styles, top and bottom rails, M.S. frame shall have cost of
steel primers of approved make and manufacture, M.S.
frame covered with 5 mm th. heat moulded PVC "C"
channel of size 30 mm th, 70 mm width out of which 50 mm
shall be flat and 20 mm shall be tapered in 45 degree angle
on either sides forming styles; and 5 mm th. 95 mm wide
PVC sheet out of which 75 mm shall be flat and 20 mm
tapered in 45 degree on the inner side to form top & bottom
rail and 115 mm wide PVC sheet out of which 75mm shall
be flat and 20 mm shall be tapered on both sides to form
lock rail. Top, bottom and lock rails shall be provided either
side of the panel with 10 mm (5 mmx2) th.,20 mm wide
cross PVC sheet as gap insert for top rail and bottom rail.
Paneling of 5 mm th. both side PVC sheet to be fitted in the
M.S. frame welded/sealed to the styles &rails with 7 mm (5
mm+2 mm) th.x15 mm wide PVC sheet beading on inner
side and joined together with solvent cement adhesive. An
additional 5 mm th. PVC strip of 20 mm which is to be stuck
on the interior side of the "C" channel using PVC solvent
adhesive etc. complete excluding all necessary hardwares
as per direction of Engineer-in-Charge.
291 In Ground Floor Sq.m 2714.49
293 149 Supplying, Fitting & Fixing Factory made P.V.C. door frame
of size 50 mmx47 mm with a wall thickness of 5 mm, made
out of extruded"5 fnm
v
PVC sheet miter cut at two corners and
joined with two nos of 1.5 mm long brackets of 15 mm x15 mm
M.S. square tube. The two vertical door profiles are to be
reinforced with 19 mmx 19 mm M.S. Square tube of 19 gauge,
weather seal to be provided through out the frame. The door
frame shall be fixed with the wall using 65/100 mm long M.S.
Screws through the frame by using P.V.C fasteners. A minimum
of 4 Nos of screws to be provided for each vertical member and
minimum 2 Nos for horizontal member etc. complete as per
Manufacturer's specification and direction of Engineer-in-
Charge.
Mtr. 335.97
Page 89
Building
293 150 Supplying, Fitting & Fixing Factory made prelaminated
P.V.C. door frame of size 50 mmx47 mm with a wall
thickness of 5 mm, made out of extruded 5 mm
prelaminated PVC sheet miter cut at two corners and joined
with two nos of 1.5 mm long brackets of 15 mm x15 mm
M.S. square tube. The two vertical door profiles are to be
reinforced with 19 mmx 19 mm M.S. Square tube of 19
gauge, weather seal to be provided through out the frame.
The door frame shall be fixed with the wall using 65/100
mm M.S. Screws through the frame by using P.V.C
fasteners. A minimum of 4 Nos of screws to be provided for
each vertical member and minimum 2 Nos for horizontal
member etc. complete as per Manufacturer's specification
and direction of Engineer-in-Charge.
Mtr. 431.33
295 151 Supplying, Fitting & Fixing 30 mm thick Factory made
moulded Door shutter, wood free consisting of frame made
out of 25 mm, M.S. tube, M.S. frame shall have a coat of
steel primer. The inner panel shall consist of 25 mm thick
High Density EPS. With 2 mm thick termite proof, water
proof and fire resistant moulded PVC sheet with raised
panel design in different plain and /or prelam colours after
routing the moulded design on one side & 2 mm plain and/
or prelam PVC sheet on other side of the EPS. The edge of
Panel to be sealed with lipping of 10 mm wide P.V.C. sheet
batten made by sticking 2 Nos P.V.C. rigid foam sheet of 5
mm thickness using P.V.C. solvent cement and style sides
25 mm [5x5 mm] th. and 30 mm with PVC sheet fitted
along M.S. tube for lock provision and for lock height 5 mm
thick PVC sheet [150 mrn x 100 mm] fixed with upper and
lower face of inner side of EPS Panel etc. complete
excluding hardwares as necessary as per direction of.
Engineer-in-Charge and Manufacturer's Specification. In
Grround Floor
295 (a) Moulded door using 2 mm moulded PVC sheet or 2 mm
etched moulded PVC sheet on one side & 2 mm PVC sheet
on other side.
Sq.M. 3072.05
295 (b) Moulded door using 2 mm Prelam moulded PVC sheet
on both side.
Sq.M. 3505.46
Page 90
Building
297 152 Supplying, Fitting & Fixing 30 mm thick Factory made
moulded Door shutter, consisting of solid core single leaf
flash door of 30 mm thickness lipped with-15 mm [5mmx3
thick x 30 mm wide on one style and*top rail and 10 mm
[5mmx2] thick x 30 mm wide of the other style and bottom
rail. The inner panel laminated with 2 mm thick termite
proof water proof and fire resistant moulded PVC sheet with
raised panel designed in different plain/ or Prelam colour on
one side after routing the moulded design on flash door and
2mm plain and or Prelam PVC sheet on other side using
rubber adhesive on flash door and solvent cement
adhesive on the PVC lipping etc. complete excluding
hardwares as necessary as per direction of Engineer-in
Charge, Manufacturer's Specification and drawing.
297 In.Ground Floor
297 (a) Moulded door using 2 mm moulded PVC sheet or 2 mm
etched moulded PVC sheet on one side & 2 mm PVC sheet
on other side.
Sq.M. 3807.99
297 (b) Moulded door using 2 mm Prelam moulded PVC sheet
on both side.
Sq.M. 4241.58
297 153 Taking out door shutter and rehanging the same by fixing
aluminium sheet [0.457 mm] with proper nail etc.
Sq.M. 500.91
299 154 Supplying fitting and fixing in position approved P.V.C. door
frame(matt finish) made of extruded P.V.C.
multichamber hollow section having, dimensions 60mm x
50mmx 2mm (0.2mm), horizontal section will be joined
with vertical section by galvanised steel screws after
inserting two number steel brackets as reinforcement
making suitable space for placing hinges, one steel tube
40mm x 20mm x 1.20 mm will be inserted on one full
vertical side of the frame (hinge side) as reinforcement, the
frame will then be fixed in the opening with the help of
P.V.C. expandable fastner wooden gutties and galvanised
steel screws including cost of all materials and labour, hire
charges of tools and appliances, carriage of all materials,
taxes and all other incidental charges complete.
Mtr. 252.70
Page 91
Building
299155(A)PVC Door Shutter-37mm thick: Supplying fitting and fixing
P.V.C. door shutter of approved quality & shade in position,
the style & rail of the P.V.C. door shutter will be made of
rigid P.V.C. multicavity hollow chamber of suitable size and
section with 2.0mm(+ 0.2mm) wall thickness, the section
will have 2nos. built in beads, horizontal & vertical section
shall be fixed to each other by self tapping screws and 2
nos. of solid plastic or M.S. tubular galvanised brackets of
length 200mm x 80mm and other 100mm x 100mm both
1.20 mm in each corner of the shutter frame for placing
hinges. Polymer based multicavity hollow section of
105mm x 37mm with 2.0mm(0.2mm) wall thickness
will be fitted in the middle as lock rail reinforced by solid
polymer bar of 200mm long at both ends & screws'for both
sides. The section frame will then be fitted in by prepanels
of size 100mmx20mm, with wall thickness 1.2mm(0.2mm)
and 2 nos. of 6mm dia bright rod will be inserted
horizontally with both side check and nut system and
stretches where fixing of hinges / hasp bolt / tower bolt /
door ring are required to be strong enough to with stand
wear and tear. The rate is inclusive of cost of all materials,
labour, and hire of tools and plants and appliencies.
Carriage of all materials taxes and all other incidental
charges complete.The rate is exclusive of cost of hinges,
hasp bolt.tower bolt.door ring etc.
299 In Ground Floor Sq.m. 2038.67
Page 92
Building
301155(B)PVC Door Shutter-30mm thick: Supplying, fitting&fixing
PVC door Shutter of approved quality & shade in position,
the style & rail of PVC door shutter will be made of rigid
PVC multicavity hollow chamber of 59mm x 30mm section
with 2.0mm( 0.2mr wall thickness. Horizontal & Vertical
section shall be fixed to each other by self tapping screws
and one solid polymeric/M.S. galvanised tubular L-
shaped bracket 100mm x 200mm in each corner of the
shutter frame for placing hinges. Polymer based multicavity
hollow section of 120mm x 30mm with 2.0mm(+0.2mm)
wall thickness will be placed in the middle, reinforced by
solid polymer bar of 200mm long at both ends and screws
from both sides as lock rail. The section frame will then be
fitted in by PVC panels of size 100mm x 25mm with wall
thickness 1.2mm(0.2mm) and 2 nos of 6mm dia bright rod
will be inserted horizontally with both side check and nut
system and stretches where fixing of hinges / hasp bolt /
tower bolt / door ring are required to be strong enough to
with stand wear and tear. The rate is inclusive of cost of all
materials, labour, and hire of tools and plants and
appliances Carriage of all materials taxes and all other
incidental charges complete. The rate is exclusive of cost of
hinges, hasp bolt.tower bolt.door ring etc.
In Ground Floor Sq.M. 1892.31
301 156 Wall paneling with Gypsum Plaster Board of 12.5 mm thick
fitted to G.I. channel of 55 mmx50 mm placed at 300 mm
c/c in horizontal direction and metal stand 55 mmx48 mm
placed @900 mm c/c in vertical direction connected with
G.I. connecting clips. 12.5 mm thick Gypsum plaster based
are to be fixed with G.I. channel by machine screws. The
boards are to be joined with jointing compound and fibre
tape and finished with top coat etc the rate includes the
cost of all materials, labour charges including scaffolding
etc. complete as per direction of the Engineer-in-charge. In
Ground Floor
Sq.M. 812.94
Page 93
Building
303 157 M.F. suspended ceiling made with 12.5 mm thick Gypsum
plaster board including G.I. perimeter channel of 0.55 mm
flush (having two flanges 20 mm and 30 mm respectively
and web 27 mm ) along with perimeter of ceiling with G.I.
intermediate channel of 0,9 mm thick size 45 mmx15mm
placed at 750 mm c/c with G.I. ceiling angle of size 25
mmx10mmx0.55 mm thick fixed to the ceiling with G.I.
Cleat and steel expansion fastener ceiling section 0.55 mm
thick of size 51.50 mmx26mm fixed to the
intermediate channels with the help of connecting clip and
in the direction of perpendicular to the intermediate
channel of 300 mm c/c 12.5 mm thick Gypsum plastered
board are to be fixed under ceiling section as above by
machine screws. The boards are to be joined and finished
with jointing compound, paper tape and application of top
coat etc. as per the direction of Engineer-in-charge. (The
rate includes of cost of all materials including taxes, cost of
accessories, fittings and fixtures, scaffolding and labour
charges etc. complete)
In Grounr Floor Sq.M. 931.52
303 158 PVC PARTITION: Supplying.fitting and fixing the
partition.frame will be made with rectangular steel tube of size
50mmx25mm with wall thickness not less than 1.00mm. The
vertical members duly welded to the horizontal members shall
be placed between 1000mm to 1200mm apart the entire
partition frame will be securedly fixed to the wall, ceiling and
floor using rawlplug or wooden gutties and screws etc.the frame
will be painted with synthetic paint, the section of the partition
frame will then fitted with PRINTED LAMINATED P.V.C extruded
hollow section of size 100mmx25mm. panel with approved
quality fixed in the place by means of P.V.C extruded beading on
both sides or P.V.C extruded angles (20mmx18mm) on one side
and P.V.C extruded beading (9mmx9mm) on other side
,angle/beading will be fixed to the steel frame by 19mm (nos.6)
self tapping steel screw placed at an interval of 450mm and
complete in all respect as per direction of Engineer-in-Charge
with all labour and materials
303 In ground floor.. Sq.M 2091.28
Page 94
Building
305 159 PVC FALSE CEILING: Providing False Ceiling made~with
framework of steel tube of 40mm x 20mm of not less than 18
gauge.the long and cross section will be welded with each other
1000mm to 1200mm apart the entire framework will be fixed in
wall using rawlplug or gutties or screws etc. and suspended from
ceiling with M.S flat 19mmx3mm as necessary,the entire frame
will be painted with red oxide. PRINTED LAMINATED P.V.C
Section 150mm x 12mmx 1.00mm (+/-0.01mm) of approved
quality and colour will be fixed on the frame so that the entire
framework will not be visible from below P.V.C Section will be
fixed with the frame with the help of self tapping steel screws
including all materials and labour-charges including fitting.fixing
the same and hoisting including mending the damages in all
respect and cost of paint as required as per direction of Engineer-
in-Charge. In ground floor.
Sq.M 1436.19
307 (H) Band Moulding, Cornice etc.
307 1 Band moulding (horizontal or vertical) rectangular
section,made with cement plaster (1:4) complete.
307 In Ground Floor
307 (i) Projection upto 25 mm
307 (a) Depth or width (75 mm to 1Q0 mm) (Cement
1.25Kg/Mtr.)
Metre 28.32
307 (b) Depth or width (125 mm to 150 mm] (Cement
1.65Kg/Mtr.)
Metre 36.34
307 (ii) Projection 40 mm in Ground Floor.
307 (a) Depth or width (75 mm to 100 mm) (Cement 2.0
Kg/Mtr.)
Metre 40.97
307 (b) Depth or width (125 mm to 150 mm] (Cement
2.6Kg/Mtr.)
Metre 49.07
307 2 Multiple-band moulding (horizontal or vertical) made with
15mm cement plaster (1:4) complete :
307 In Ground Floor
307 (i) Projection upto 25 mm
307 (a) Depth or width (75 mm to 100 mm) (Cement 2.5Kg/Mtr.) Metre 41.81
307 (b) Depth or width (125 mm to 150 mm) (Cement
3.5Kg/Mtr.)
Metre 55.22
307 (ii) Projection 40 mm
307 (a) Depth or width (75 mm to 100 mm) (Cement 3.5
Kg/Mtr.)
Metre 56.32
307 (b) Depth or width (125 mm to 150 mm) (Cement
3.74Kg/Mtr.)
Metre 61.44
Page 95
Building
307 3 Band moulding (horizontal or vertical) of rectangular section
made with 15 mm thick cement plaster (1:4) on brick
projection or concrete projection (excluding the cost of such
brick"or concrete projection).
307 In Ground Floor
307 (i) Projection upto 75 mm.
307 (a) Depth or width (75 mm to 150 mm) (Cement
2.46Kg/Mtr.)
Metre 47.28
309 (ii) Projection above (75 mm and upto 150 mm)
309 (a) Depth or width (75 mm to 150 mm) (Cemen 3.3Kg/Mtr.) Metre 58.93
309 4 Masonry curb or sill in floor of rectangular sectio finished
with 15 mm. thick cement plaster (1:4) and neat cement
punning complete (including cost o masonary made with
1st class bricks and 1:4 cement morter):
309 In Ground Floor
309 (a) 125 mm. x 75 mm. section (Cement
3.24Kg/Mtr.)
Metre 74.06
309 (b) 125 mm. x 150 mm. section (Cement
6.48Kg/Mtr.)
Metre 136.49
309 (c) 100 mm. x 100 mm. section (Cement
3.12Kg/Mtr.)
Metre 83.08
309 5 Concrete chowkat with rabbet (in sill of door or window)
made with cement concrete (1:2:4) and inished with 15
mm. thick cement plaster (1:4) and eat cement punning
complete :
309 In Ground Floor
309 (i) With rabbet on one side
309 a) 75 mm. x 50 mm. or 75 mm. x 75 mm. sec (Cement
.7Kg/Mtr.)
Metre 58.43
309 b)100 mm. x 50 mm. or 100 mm. x 75 mm. sec Cement
4.6Kg/Mtr.)
Metre 71.41
309 c) 125 mm. x 50 mm. or 125 mm. x 75 mm. sec Cement
5.4Kg/Mtr.)
Metre 86.59
309 d) 150 mm. x 50 mm. or 150 mm. x 75 mm. sec Cement
6.1Kg/Mtr.)
Metre 97.05
309 (ii) With rabbet on both sides
309 a) 100 mm. x 50 mm. or 100 mm. x 75 mm. sec Cement
4.6Kg/Mtr.)
Metre 77.48
309 b) 125 mm. x 50 mm. or 125 mm. x 75 mm. sec Cement
5.4Kg/Mtr.)
Metre 88.88
309 c) 150 mm. x 50 mm. or 150 mm. x 75 mm. sec Cement
6.1Kg/Mtr.)
Metre 99.54
311 6 Renewing throating,nosing or drip course moulding with 15
mm. thick cement plaster (1:4) complete. (Cement
0.7Kg/Mtr.) In Ground Floor
Metre 13.73
Page 96
Building
311 7 Making ornamental R.C. hand rail upto 160 sq.cm. cross
sectional area excluding cost of reinforcement and
including cost of shuttering with (1:1.5:3) cement concrete
in stone chips, plastered 15 mm. thick (1:4), neat cement
finishing and polishing complete
Metre 184.73
311 8 Finishing of 75 mm. or 125 mm. thick wall with 15 mm. thick
cement plaster (1:4) and moulding (30 mm deep and 6 mm.
or 10 mm. projection) on side, including neat cement
punning complete. (Payment to be made on length of wall)
311 (a) With moulding on one side only (Cement 1.5Kg/Mtr.) Metre 31.62
311 (b) With moulding on both sides (Cement 2.0Kg/Mtr.) Metre 36.97
311 9 Renewing coping of compound wall with brick work and 15
mm. thick cement plaster (1:4) complete [Payment to be
made on length of wall):
311 (a) 125 mm. wide coping (Cement 3.8Kg/Mtr.) Metre 97.94
311 (b) 250 mm. wide coping (Cement 5.0Kg/Mtr.) Metre 143.81
311 (c) 375 mm. wide coping (Cement 7.7Kg/Mtr.) Metre 200.05
311 (d) 500 mm. wide coping (Cement 9.7Kg/Mtr.) Metre 256.38
311 10 Renewing plaster and coping of compound wall Including
petty repairs to brick work) with 15 mm. thick cement
plaster (1:4). (Payment to be made on ength of wall):
311 (a) 125 mm. Wide coping (Cement 1.5Kg/Mtr.) Metre 37.38
313 (b) 250 mm. Wide coping (Cement 2.4Kg/Mtr.) Metre 54.24
313 (c) 375 mm. wide coping (Cement 3.1Kg/Mtr.) Metre 68.30
313 (d) 500 mm. wide coping (Cement 3.8Kg/Mtr.) Metre 82.35
313 11 Renewing cornice(with mouldings but without floral o similar
intricate patterns) including necessary masonry work and
15 mm. thick cement plaster(l:4) complete: In Ground Floor
313 (i) Projection (75 to 150) mm.
313 (a) Depth (100 to 150) mm (Cement 4.3Kg/Mtr.) Metre 148.67
313 (b) Depth (150 to 200) mm (Cement 5.5Kg/Mtr.) Metre 177.26
313 (ii) Projection (175 to 225) mm.
313 (a) Depth (100 to 150) mm (Cement 6.6Kg/Mtr.) Metre 196.55
313 (b) Depth (150 to 200) mm (Cement 8.0Kg/Mtr.) Metre 238.16
313 (c) Depth (225 to 300) mm (Cement ll.OKg/Mtr,) Metre 317.95
313 (iii) Projection (250 to 300) mm.
313 (a) Depth (100 to 125) mm (Cement 8.5Kg/Mtr.) Metre 242.10
313 (b) Depth (150 to 200) mm (Cement 10.6Kg/Mtr.) Metre 295.87
313 (c) Depth (225 to 300) mm (Cement 13.0Kg/iyttr.) Metre 348.05
313 (iv) Projection (325 to 375) mm.
313 (a) Depth (150 to 200) mm (Cement 13.0Kg/Mtr.) Metre 359.26
313 (b) Depth (225 to 300) mm (Cement 17.0Kg/Mtr.) Metre 483.89
313 (c) Depth (325 to 400) mm (Cement 22.0Kg/Mtr.) Metre 648.02
313 v) Projection (400 to 450) mm.
313 (a) Depth (150 to 200) mm (Cement 15.0Kg/Mtr.) Metre 428.75
Page 97
Building
315 (b) Depth (225 to 300) mm (Cement 20.0Kg/Mtr.) Metre 592.77
315 (c) Depth (325 to 400) mm (Cement 26.0Kg/Mtr.) Metre 779.62
315 12 Renewing plaster of cornice (with moulding but without
floral or similar intricate pattems)including petty repairs to
masonry with 15 mm thick cement plaster (1:4) (Payment
to be made on length of cornice): In Ground Floor (i)
Projection (75 to 125) mm
315 (a) Depth (100 to 125) mm (Cement 2.5Kg/Mtr.) Metre 66.56
315 (b) Depth (150 to 200) mm (Cement 3.0Kg/Mtr.) Metre 74.74
315 (ii) Projection (175 to 225) mm
315 (a) Depth (100 to 125) mm (Cement 4.0Kg/Mtr.) Metre 89.69
315 (b) Depth (150 to 200) mm (Cement 4.0Kg/Mtr.) Metre 107.57
315 (c) Depth (225 to 300) mm (Cement 5.0Kg/Mtr.) Metre 125.44
315 (iii) Projection (250 to 300) mm
315 (a) Depth (100 to 125) mm (Cement 4.4Kg/Mtr.) Metre 121.71
315 (b) Depth (150 to 200) mm (Cement 5.0Kg/Mtr.) Metre 130.59
315 (c) Depth (225 to 300) mm (Cement 6.0Kg/Mtr.) Metre 161.40
315 (iv) Projection (325 to 375) mm
315 (a) Depth (150 to 200) mm (Cement 6.0Kg/Mtr.) Metre 158.57
315 (b) Depth (225 to 300) mm (Cement 7.0Kg/Mtr.) Metre 177.66
315 (c) Depth (325 to 400) mm (Cement 8.0Kg/Mtr.) Metre 201.09
317 (v) Projection (400 to 450) mm
317 (a) Depth (150 to 200) mm (Cement 7.0Kg/Mtr.) Metre 171.30
317 (b) Depth (225 to 300) mm (Cement 8.0Kg/Mtr.) Metre 201.90
317 (c) Depth (325 to 400) mm (Cement 9.0Kg/Mtr.) Metre 234.42
317 13 String course uo to 75 mm projection and upto 150 mm
depth 15 mm thick plasterd (1:4) (including tripping off old
surface where necessary) complete. Cement 6.6Kg/Mtr.)
317 In Ground Floor Metre 103.95
317 Note:- Add extra @1.5% for each additional floor upto
4th floor and 1.
319 (I) Plastering, Pointing etc.
319 1 Labour for Chipping of concrete surface before taking up
Plastering work.
Sq.M 13.09
319 2 Plaster (to wall, floor, ceiling etc.) with sand and cement
mortar including rounding off or chamfering corners as
directed and raking out joints including throating, nosing
and drip course, scaffolding/staging where necessary
(Ground floor).[Excluding cost of chipping over concrete
surface]
319 (i) With 1:6 cement mortar
319 (a) 25 mm thick plaster Sq.M 146.19
319 (b) 20 mm thick plaster Sq.M 124.75
319 (c) 15 mm thick plaster Sq.M 105.72
319 (ii) With 1:4 cement mortar
319 (a) 20 mm thick plaster Sq.M 146.56
Page 98
Building
319 (b) 15 mm thick plaster Sq.M 123.41
319 (c) 10 mm thick plaster Sq.M 95.78
319 (iii) With 1:3 cement mortar
319 (a) 20 mm thick plaster Sq.M 168.38
319 (b) 15 mm thick plaster Sq.M 138.35
319 (c) 10 mm thick plaster Sq.M 104.41
319 (iv) 1:2 cement mortar (to be used in floors and for
special works) (a) 15 mm. thick plaster
Sq.M 161.41
319 (b) 10 mm. thick plaster Sq.M 125.87
321 3 Plaster (to wall, floor, ceiling etc.) with composite mortar of
sand, lime and cement including round off or chamfering
corners as directed and raking out joints and roughening
of concrete surface including throating, nosing and
drip course where necessary (Ground floor).
321 (i) With (1:2:9) composite mortar with 1 cement : 2 lime
paste/putty: 9 sand
321 (a) 35 mm. thick plaster Sq.M 194.64
321 (b) 25 mm. thick plaster Sq.M 154.73
321 (c) 20 mm. thick plaster Sq.M 129.27
321 (d) 15 mm. thick plaster Sq.M 112.18
321 (ii) With (1:1:6) composite mortar with 1 cement: 1 lime
paste/putty: 6 sand (a) 20 mm. thick plaster
Sq.M 136.72
321 (b) 15 mm. thick plaster Sq.M 117.61
321 (c) 10 mm. thick plaster Sq.M 90.51
321 4 Plaster with lime and surki mortar including rounding off or
chamfering corners as directed and raking out joints
(Ground floor).
321 (i) With lime & surki morter (1:2)
321 (a) 20 mm. thick plaster Sq.M 142.17
321 (b) 15 mm. thick plaster Sq.M 118.27
321 (ii) With lime & surki morter (1:3)
321 (a) 25 mm thick plaster Sq.M 142.94
321 (b) 19 mm thick plaster Sq.M 126.89
321 (c) 12.5 mm thick plaster Sq.M 95.01
323 (iii) With lime & surki morter (1:4)
323 (a) 25 mm thick plaster Sq.M 136.44
323 (b) 19 mm thick plaster Sq.M 110.68
323 (c) 12.5 mm thick plaster Sq.M 86.01
323 5 Extra for each additional floor over the rate for ground floor
items 2 to 4 :
323 (i) External plaster
323 (a)Upto4thfloor Sq.M 2.68
323 (b) Above 4th floor Sq.M 3.12
323 (ii) Internal plaster
323 (a) Upto 4th floor Sq.M 2.23
323 (b) Above 4th floor Sq.M 2.68
323 6 Extra for Rusticated plaster (over rate of corresponding
item of plaster)
Page 99
Building
323 (a) With sand plus cement (Cement 0.053
Cu.m/lOOSq.m)
Sq.M 11.30
323 (b) With stone chips (Cement 0.086 Cu.m/lOOSq.m) Sq.M 39.69
323 7 Extra for fluted, corrugated or ribbed plaster (over rate of
corresponding rate of plaster). (Cement 0.135
Cu.m/lOOSq.m)
Sq.M 32.23
323 8 Neat cement punning about 1.5 mm. thick in wall, dado,
window, sills, floor, drain etc. NOTE: Cement 0.152 cu.m.
per 100 sq.m.
Sq.M 28.51
323 9 Lime punning about 3 mm. thick with stone lime and shell
lime (1:2)
Sq.M 59.08
325 10 Sand rubbing including preparing and smoothening surface
with admixture of pigment if necessary as directed:
325 (a) Ground floor Sq.M 40.16
325 (b) Extra for each additional floor Sq.M 2.69
325 11 Making V-groove line (6 mm. wide, 6 mm. deep) in
plastered surface.
%Metre 309.37
325 12 Making V-groove line ( 12 mm wide,12 mm deep) in
plastered surface.
%Metre 364.41
325 13 . Closing gap between door and window frame and jambs
with cement mortar (1:3) including removing old mortar
(throughout entire surface of contact) and cleaning the joint.
(Cement 0.012 Cu.m/100 Mtr.)
%Metre 746.67
325 (This item is not payable for new works).
325 14 Flush pointing to brick work in cement mortar (1:4)
including raking out joints.
Sq.M 52.72
325 . 15 Flush pointing to ceiling tiles in cement mortar including
raking out joints (1:4)
Sq.M 52.13
325 16 Flush pointing to arched ceiling in cement mortar (1:4) &
top finishing including raking out joints.
Sq.M 56.12
325 17 Flush pointing to tiled floor in cement mortar (1:4) with
admixture of pigment to match with colour of tiles including
raking out joints.
Sq.M 54.33
325 18 Rule pointing to brick work in cement mortar (1:4) including
raking out joints & top finishing.
Sq.M 54.75
325 19 Rule pointing to brick work in cement mortar (1:4) with
admixture of pigment to match with colour of brick including
raking out joints.
Sq.M 57.13
325 NOTE : For items 14 to 19 cement 0.091 Cu.m. sand 0.366
Cu.m per 100 Sq.m.
327 20 Rule pointing to brick work with ruled joints in lime and surki
1:2 mortar including raking out joints and top finishing (1
lime paste/ putty: 2 surki).
Sq.M 39.68
327 21 Tuck pointing to brick work in cement mortar (1:3] including
raking out joints. (Cement 0.119 Cu.m/100 Sq.m)
Sq.M 74.51
Page 100
Building
327 22 Sand and lime plaster including rounding off or
chamfering corners as directed and raking out joints where
necessary.
327 (i) (1:2) with Lime & Sand mortar
327 (a) 19 mm thick plaster Sq.M 114.41
327 (b) 12 mm thick plaster Sq.M 82.72
327 (ii) (1:3) with Lime & Sand mortar
327 (a) 25 mm thick plaster Sq.M 117.57
327 (b) 19 mm thick plaster Sq.M 96.31
327 (c) 12.5 mm thick plaster Sq.M 76.75
327 (iii) (1:4) with Lime & Sand mortar
327 (a) 25 mm thick plaster Sq.M 103.31
327 (b) 19 mm thick plaster Sq.M 83.96
327 (c) 12.5 mm thick plaster Sq.M 67.12
327 23 Surki beaten plaster (1:2) including rounding off or
chamfering corners, as directed and raking out joints or
roughening surface
327 (a) 19 mm thick plaster Sq.M 134.27
327 (b) 12.5 mm thick plaster Sq.M 97.36
327 24 Flush pointing to stone masonry wall in cement morter (1:3)
including racking out joints (Cement 0.119 Cu.m/100
Sq.m)
Sq.M 32.68
329 (J) White Wash, Colour Wash, Distemper
329 1 Scraping of moss, blisters etc. thoroughly from exterior
surface of walls necessitating the use of scraper, wire
brush etc.(Payment against this item will be made only when
this has been done on the specific direction of the Engineer-in-
charge)
Sq.M 4.46
329 2 Scraping and removing greasy soot from walls or ceiling of
kitchen or similar smoke affected rooms and preparing the
surface.
Sq.M 7.14
329 3 White washing including cleaning and smoothening surface
thoroughly.
329 All floors:
329 (a) One coat %Sq.M 839.31
329 (b) Two coats (to be done on specific instruction). %Sq.M 1163.52
329 (c) Three coats (on new works only). %Sq.M 1289.77
329 4 Colour washing with "ELLA" with a coat of white wash
priming including cleaning and smoothening surface
thoroughly:
329 i) Internal (all floors)
329 (a) One coat %Sq.M 946.37
329 (b) Two coats %Sq.M 1416.02
329 ii) External surface (ground floor)
329 (a) One coat %Sq.M 963.54
329 (b) Two coats %Sq.M 1440.26
Page 101
Building
329 N.B. : Extra for each additional floor in external walls refer
tern 20
329 5 Colour washing with any shade with Stainers, as required
ncluding cleaning and smoothening surface thoroughly:
329 i) Internal surface (All floors)
329 a) One coat of colour wash
329 (i) Other than yellow, pink. %Sq.M 1005.96
329 (ii) Yellow, pink. %Sq.M 1017.07
331 (b) Two coats (on new works only).
331 (i) Other than yellow, pink. %Sq.M 1416.02
331 (ii) Yellow, pink. %Sq.M 1434.20
331 (ii) External surface (Ground floor)
331 (a) One coat
331 (i) Other than yellow, pink. %Sq.M 1059.49
331 (ii) Yellow, pink. %Sq.M 1070.60
331 (b) Two coats (on new works only).
331 (i) Other than yellow, pink. %Sq.M 1504.90
331 (ii) Yellow, pink. %Sq.M 1523.08
331 6 N.B. : Extra for each additional floor in external walls refer
Item 20 Cement washing including cleaning and
smoothening surface horoughly (cement to be used @15
kg./100 sq.m. of surface or one coat and @25 kg./100 sq.m
of surface for two coats):
331 External surface (Ground floor)
331 (a) One coat %Sq.M 614.08
331 (b) Two coats (on new works only). %Sq.M 953.44
331 B. : Extra for each additional floor in external walls refer
Item 20
331 ' 7 Red oxide wash of approved shade including cleaning and
moothening surface thoroughly (without specific permission
om the Engineer-in-charge this item of work must not be
one on an old painted surface which has not received such
ed oxide wash before):
331 xternal surface (Ground floor)
331 (a) One coat %Sq.M 1850.32
331 (b) Two coats (on new works only). %Sq.M 2588.63
331 B.: Extra for each additional floor in external walls refer Item 20
333 8 Rounding corners with cement mortar (1:3) for crack
repairs.
Metre 10.84
333 9 Removing old scales, blisters etc. of interior surface of
walls,ceiling by scraping etc. and preparing smooth and
even surface with rendering or cement mortar (1:2) (as
necessary), to make the surface suitable for
receiving distemper. (Payment against this item will be
made only when this has been done on the specific
direction of the Engineer-in-charge).
%Sq.M 684.78
Page 102
Building
333 10 Acrylic Distemper to interior wall, ceiling with a coat of
solvent based interior grade acrylic primer (as per
manufacturer's specification) including cleaning
and smoothning of surface. 1 Two Coats
Sq.M 57.53
333 11 Synthetic Distemper to interior wall, ceiling with a coat of
solvent based interior grade acrylic primer (as per
manufacturer's specification) including cleaning
and smoothning of surface. Two Coats
Sq.M 52.18
333 12 Bordering (upto 75 mm. width) in distemper including cost
of materials by two coats acrylic distemper and one coat
solvent based acrylic primer.
%Metre 556.51
333 13 Bordering (upto 75 mm. width) in distemper including cost
of materials by two coats Synthetic distemper and one coat
solvent based acrylic primer.
%Metre 516.11
333 14 Applying Interior grade Acrylic Primer of approved quality
and brand on plastered or concrete surface old or new
surface to receive Distemper/ Acrylic emulsion paint
including scraping and preparing the surface throughly,
complete as per manufacturer's specification and as per
direction of the EIC. (In Ground Floor)
333 (a) One Coat
333 i) Water based interior grade Acrylic Primer %Sq.M 2545.20
333 ii) Solvent based interior grade Acrylic Primer %Sq.M 2838.10
333 (b) Two Coats
335 i) Water based interior grade Acrylic Primer %Sq.M 3686.50
335 ii) Solvent based interior grade Acrylic Primer %Sq.M 4130.90
335 [This item to be done under specific instruction of the
Superintending Engineer]
335 15 Applying Exterior grade Acrylic primer of approved quality
and brand on plastered or concrete surface old or new
surface to receive decorative textured(matt finish) or
smooth finish acrylic exterior emulsion paint including
scraping and preparing the surface thoroughly, complete
as per manufacturer's specification and as per direction of
the EIC.
335 In Ground Floor:
335 (a) One Coat %Sq.M 2585.60
335 (b) Two Coats %Sq.M 3747.10
335 This item to be done under specific instruction of the
Superintending Engineer] N.B.:-Extra for each additional
floor in external walls refer tern 20
335 16 Applying decorative cement based paint of approved quality
after preparing the surface including scraping the same
thoroughly (plastered or concrete surface) as per
manufacturer's specification.
335 In Ground floor:
335 (i) One coat on old surface. Sq.M 23.90
335 (ii) One coat on new surface. Sq.M 27.13
335 (iii) Two coats. Sq.M 39.74
Page 103
Building
335 17 Chalk washing (one coat) - any height. Sq.M 5.76
337 18 Protective and Decorative Textured exterior high class matt
finish paint of approved quality, composed of specia
Tharmoplastic Resin containing fine crystalline additives
derive from Granite as per manufacturer's specification anc
as per direction of EIC to be applied over acrylic primer as
required. The rate includes cost of material, labour,
scaffolding and all incidental charges but excluding the cost
ol primer.
337 In Ground floor
337 Two Coat Sq.M 92.21
337 N.B. This item is to be selected only with written permission
of Superintending Engineer for very resticted and small
areas of a building.
337 19 Protective and Decorative Acrylic exterior emulsion paint of
approved quality, as per manufacturer's specification and
as per direction of EIC to be applied over acrylic primer as
required. The rate includes cost of material, labour,
scaffolding and all incidental charges but excluding the cost
of primer.
337 In Ground floor (Two Coat)
337 a) Normal Acrylic Emulsion Sq.M 54.54
337 b) Premium 100% Acrylic Emulsion Sq.M 72.92
337 c) Super Protective 100% Acrylic Emulsion. Sq.M 87.26
337 N.B. The items 19(b) & 19(c) are to be selected only with
written permission of Superintending Engineer for very
resticted and small areas of a building.
337 20 Add extra for each additional floor over the rate for ground
floor on items 4 to 7 and item 15,16,18 & 19
337 External surface
337 (i) Upto 4th floor %Sq.M 59.59
337 (ii) Above 4th floor %Sq.M 71.71
339 NOTE: For all structures the-ground floor equivalent height
shall be taken as 4 meters. Every 4 meters or part thereof above
4 meters shall be taken as each additional floor for purpose of
item 4, 5, 6, 7 and 15,16,18 &19.
339 21 Dry Distemparing to interior walls or ceiling including
cleaning, washing, smoothening surface
339 (a) One Coat Sq.M 21.82
339 (b) Two coat Sq.M 32.32
339 22 Bordering (upto 7.5 cm. width) with dry distemper Sq.M 3.69
341 (K) Painting,Varnishing etc.
341 1 Removing loose scales, blisters etc. from old painted
surface and thoroughly smoothening the surface to make
the same suitable for receiving fresh coat of paint.
Sq.M 14.95
Page 104
Building
341 2 Removing old paint from blistered painted surface with
application of soda, sajimati or any approved chemical paint
remover and exposing the original surface including
cleaning and thorough washing to remove all traces of the
removing agent including taking out shutters and refixing
the same where necessary.
Sq.M 27.47
341 3 Removing old paint from blistered painted surface of steel
or other metal by chipping including scraping and cleaning
and exposing the original surface.
Sq.M 33.13
341 4 Removing thick layers of paint from heavily cracked and
blistered painted surface of timber by careful burning with
blow lamp including smoothening exposed surface of
timber with pumice stone or glass and preparing the same
for fresh treatment.
Sq.M 36.66
341 N.B. Payment against item 1, 2, 3, 4 will be made only
when done at specific direction of the Engineer- in-charge.
Cost of taking out shutter etc.for this item and rehanging
the same or changing glass panes cracked or broken in the
operation will be deemed to be covered by the rate of this
item and no seperate payment therefor shall be made.
341 5 (a) Rendering the surface of walls and ceiling with plaster of
paris (thickness not less than 1.5 mm.)
Sq.M 55.25
341 (b) Rendering the surface of walls and ceiling with white
cement based wall putty of approved make and
brand(1.5mm thick)
Sq.M 71.61
341 6 (a)Cleaning the walls and ceiling by scraping, sand
papering and smoothening'down the surface including
putting.
Sq.M 11.92
341
(b) Washing & cleaning the wall surface
;
; ceiling by soft
detergent powder & soft water & render e surface free of dust,
stain etc.
Sq.M 5.25
343 7 (a) Priming one coat on timber of plastered surface with
synthetic oil bound primer of approved quality including
smoothening surfaces by sand papering etc.
Sq.M 28.38
343 (b) Priming one coat on steel or other metal surface with
synthetic oil bound primer of approved quality including
smoothening surfaces by sand papering etc.
Sq.M 23.13
343 (This item is applicable to new work or old work when the
original surface has been exposed by removal of old paint.)
343 8 (A) Painting with best quality synthetic enamel paint of
approved make and brand including smoothening surface
by sand papering etc. including using of approved putty etc.
pn the surface, if necessary :
343 (a) On timber or plastered surface :
343 With super gloss (hi-gloss) -
343 (i) One coat (white in shade) Sq.M 38.58
Page 105
Building
343 (ii) Two coats (white in shade) Sq.M 57.87
343 [iii) One coat (with any shade except white) Sq.M 41.81
343 [iv) Two coats (with any shade except white) Sq.M 62.62
343 With other than hi-gloss of approved quality-
343 (i) One coat (white in shade) Sq.M 34.85
343 (ii) Two coats (white in shade) Sq.M 52.22
343 Iii) One coat (with any shade except white) Sq.M 36.97
343 [iv) Two coats (with any shade except white) Sq.M 57.17
343 b) On steel or other metal surface:
345 With super gloss (hi-gloss)
345 (i) One coat (white in shade) Sq.M 35.75
345 (ii) Two coats (white in shade) Sq.M 55.75
345 (iii) One coat (with any shade except white) Sq.M 38.58
345 (iv) Two coats (with any shade except white) Sq.M 59.99
345 With other than hi-gloss of approved quality-
345 (i) One coat (white in shade) Sq.M 33.03
345 ii) Two coats (white in shade) Sq.M 51.31
345 iii) One coat (with any shade except white) Sq.M 34.95
345 iv) Two coats (with any shade except white) Sq.M 54.14
345 8 B) Painting with superior quality aluminium paint of
approved make and brand including smoothening surface
by sand papering etc. On steel surface :
345 (a) One coat Sq.M 23.33
345 (b) Two coats Sq.M 38.08
345 9 Applying Acrylic Emulsion Paint of approved make and
brand on walls and ceiling including sand papering in
intermediate coats including putty (to be done under
specific instruction of Superintending Engineer): (Two
coats)
(I) Standard Quality Sq.M 49.59
345 (ii) Luxury Quality Sq.M 56.26
345 10 Painting with ready mixed red lead paint of approved make
and brand:
345 (a) One coat Sq.M 24.95
347 (b) Two coats Sq.M 42.42
347 11 Painting with ready mixed Black Japan of approved make
and brand including smoothening surface
347 (a) One coat Sq.M 26.66
347 (b) Two coats Sq.M 44.54
347 12 Borders (up to 150 mm. width) with two coats of Black
Japan paint.
Metre 6.40
347 13 Washing and cleaning old painted surface and oiling with
linseed oil.
Sq.M 4.67
347 14 Cleaning old painted surface and oiling with linseed oil with
admixture of paint (25% of linseed oil by volume.)
Sq.M 6.87
347 15 Coal tarring:
347 (a) One coat Sq.M 13.33
347 (b) Two coats Sq.M 21.51
Page 106
Building
347 16 Painting with oil type wood preservative of approved brand
& make.
347 (a) One coat Sq.M 20.71
347 (b) Two coats Sq.M 30.30
347 17 Copal varnish of approved quality including preparing
surface
347 i) On new wood work:
347 (a) One coat Sq.M 74.03
347 (b) Two coats Sq.M 111.00
347 ii) On old varnish surface including removing old varnish
and exposing original surface:
347 (a) One coat Sq.M 105.65
347 (b) Two coats Sq.M 153.52
349 18 French polishing to wood work including preparing surface
[ordinary gloss)
349 (a) On new wood work Sq.M 342.69
349 (b) On old French polished surface including complete
removal of the old polish.
Sq.M 385.52
349 NOTE : For high gloss polish the rate shall be increased by
50% over the rate for ordinary gloss and this work should
not be executed without specific permission of
Superintending Engineer.
349 19 Ready mix Wax polishing to wood work including preparing
surface.
349 a) On new wood work. Sq.M 50.90
349 b) On old wax polished surface including removal of old
polish.
Sq.M 74.24
349 20 Frosting glass panes by dabbing white paint Sq.M 29.29
349 21 Painting black board with approved paint after scraping and
polishing surface etc.
Sq.M 58.58
351 (L) Glaziers' Work
351 1 Supplying best Indian sheet glass panes set in putty and
fitted and fixed with nails and putty complete. (In all floors
for internal wall & upto 6 m height for external wall)
351 (i) 3 mm thick (weighing 7.4 kg/Sq.m) Sq.M 492.58
351 (ii) 4 mm thick Sq.M 562.97
351 2 Supplying best Indian sheet glass panes set in putty (as per
I.S specification) and fitted and fixed with teak wood beads
and nails complete. (In all floors for internal wall & upto 6 m
height for external wall)
351 (i) 3 mm thick (weighing 7.4 kg/Sq.m) Sq.M 952.13
351 (ii) 4 mm thick Sq.M 881.63
351 3 Supplying best Indian Reinforced wire safety glass 6 mm
thick including cutting to required sizes, setting on putty
bases and fitted and fixed with teak glazing bead (19mm x
12mm) including putty and nails as necessary complete. (In
all floors for internal wall & upto 6 m height for external wall)
Sq.M 3131.51
Page 107
Building
351 4 Supplying best Indian Sheet glass 5 mm thick including
cutting to required sizes,setting on putty bases and fitted
and fixed with teak glazing beads (19 mm x 12 mm)
including putty and nails as necessary complete. (In all
floors for internal wall & upto 6 m height for external wall)
Sq.M 986.16
351 5 Supplying best Indian figured glass viz. hammered, fluted,
ribbed, pinhead etc. type including cutting to required sizes,
setting on putty bases and fitted and fixed with nails and
putty complete.(In all floors for internal wall & upto 6 m
height for external wall)
351 (i) 3 mm thick(White) Sq.M 441.47
351 (ii) 3 mm thick(Coloured) Sq.M 511.97
351 6 Supplying best Indian laminated safety glass 5 mm. thick
including cutting to required sizes, setting on putty bases
and
:
itted and fixed with teak glazing beads (19 mm x 12 mm)
ncluding putty and nails as necessary complete.(In all floors for
nternal wall & upto 6 m height for external wall)
Sq.M 2296.84
353 7 Extra for fixing glass panes in steel window. Sq.M 42.22
353 8 Renewing worn out putty of glass panes :
353 (a) Panes not exceeding 0.2 Sq.m Each 23.44
353 (b) Panes exceeding 0.2 Sq.m but not exceeding 0.5 Sq.m Each 36.59
353 9 Renewing teak wood beads of glass panes (each pane not
exceeding 0.2 Sq.m)
Each 48.42
353 10 Cleaning and removing paint mark from glass pane with
spirit and removing strains etc.
Sq.M 11.31
353 11 Supplying, fitting and fixing in position fibre glass panes oi
approved quality with resin, nail, clip etc. as per IS:12866-
1989. (In all floors for internal wall & upto 6 m height for
external wall)
353 (a) 1.2 mm thick (1.85 Kg/Sq.m) Sq.M 591.96
353 (b) 1.6 mm thick (2.5 Kg/Sq.m) Sq.M 789.82
353 (c) 2.0 mm thick (3.36 Kg/Sq.m) Sq.M 1063.13
353 (d) 3.0 mm thick (5.10 Kg/Sq.m) Sq.M 1581.86
353 (e) 4.0 mm thick (6.72 Kg/Sq.m) Sq.M 1984.95
353 (f) 6.0 mm thick (10.0 Kg/Sq.m) Sq.M 2997.78
353 12 Taking out carefully from shutter existing broken glass
panes, cutting the same to smaller and utilising the same,
small pane including cost of fitting and fixing.
(a) Putty and Nails Each 13.74
353 (b) With Teak wood Beads and Nails Each 29.96
353 Note:- Add 5% extra for each 6 Mtr. height or part
thereof beyond the initial height of 6 Mtr. for item 1 to 5
& 10 only. This extra rates is applicable for
external works. For maintenance work, 20% extra on
the rate of corresponding item to be added.
Page 108
Building
(M) Drains, Down Pipes, Chimney Pipes etc.
355 1 Filling up cracks with cement morar (1:3) at the junction of
the out side wall and drain. (Cement 11.4 Kg/100 Mtr.)
%Metre 196.95
355 2 Cutting shallow drain on roof for easy passage of rain water
finised with cement plaster (1:4) complete. (Cement 153.0
Kg/100 Mtr.)
%Metre 2208.87
355 3 Saucer drain upto 150 mm. width in floor and upto 75 mm.
Depth including cement plaster (1:3) and neat cement
finishing. (Cement 224.0 Kg/100 Mtr.)
%Metre 2783.56
355 4 Regrading mouth of down pipe for easy out let of rain water
including cement plaster (1:3) including cutting slope and
mending damages. (Cement 57.0 Kg/100 Nos)
Each 13.39
355 5 Khasia drain of 150 mm. To 225 mm. width in ceement
morter [1:4) finished with neat cement and including edges
35 mm. raised complete. (Cement 270.0 Kg/100 Mtr.)
Metre 39.40
355 6 Making kutcha drain upto 450 mm. deep and upto 750 mm
width to grade including trimming sides and beds, removing
spoils to any distance and speading.
Metre 20.23
355 7 Resectioning kutcha drain by mathor labour after removing
sludge, filth, night soil etc. and bailing out water from
source, making earthen bundh where necessary and
removing afterwords, trimming the sides and regrading
bottom including necessary chilchalling involving earth work
upto 150 mm average thickness and disposal of spoils as
directed and fine dressing. (Payment to be made on area
trimmed and dressed .e. the length measured along the
profile length).
Sq.M 13.32
355 8 Supply fitting fixing cast iron down pipes conforming to
IS:3989 1970 and IS:1729-1964 in position with necessary
clamps, nails including making hole in wall, floor etc. and
cutting trenches in any soil through masonry concrete
structures etc. if necessary and mending good damages
including joining with jointing materials complete.[ Payment
will be made on centre line measurement of the total pipe
line including specials. Payment for specials will however
be paid separately ].
355 i) 75 mm. Oia. (Internal) Metre 559.93
357 (ii) 100 mm. Dia. (Internal) Metre 643.59
357 (iii) 150 mm. Dia. (Internal) Metre 1113.41
357 9 Supplying fitting fixing C.I. Specials of down pipes in
position with clamps nails etc. with jointing materials
including cutting holes in masonry or concrete,
mending good damages complete.
357 (A) (1) C. 1 Head or T or T junction (single) of down pipe
(without door)
Page 109
Building
357 (i) 75 mm. Dia. Each 569.94
357 (ii) 100 mm. Dia. Each 758.01
357 (iii) 150 mm. Dia. Each 1810.43
357 (A) (2) C. 1 Head or V or T junction (single) of down pipe,
(with door)
357 (i) 75 mm. Dia. Each 655.59
357 (ii) 100 mm. Dia. Each 846.58
357 (iii) 150 mm. Dia. Each 1964.45
357 (B) (1) C. 1 Head or T or T junction (double) of down pipe,
(without door)
357 (i) 75 mm. Dia. Each 658.02
357 (ii) 100 mm. Dia. Each 940.61
357 (iii) 150 mm. Dia. Each 1915.67
357 B) (2) C. 1 Head or T or T junction (double) of down pipe,
with door)
357 (i) 75 mm. Dia. Each 705.59
357 (ii) 100 mm. Dia. Each 948.90
357 (iii) 150 mm. Dia. Each 2088.28
357 C) C. 1 Offset of down pipe
357 (i) 75 mm. Dia projection 75 mm. Each 403.39
357 (ii) 75 mm. Dia projection 150 mm. Each 512.27
357 (iii) 100 mm. Dia projection 75 mm. Each 512.88
359 (iv) 100 mm. Dia projection 150 mm. Each 607.41
359 (v) 150 mm. Dia projection 75 mm. Each 834.06
359 (vi) 150 mm. Dia projection 150 mm. Each 1090.50
359 (D)(l) C. 1 Bend of down pipe (Without door)
359 (i) 75 mm. Dia. Each 380.77
359 (ii) 100 mm. Dia. Each 483.08
359 (iii) 150 mm. Dia. Each 892.44
359 (D)(2) C. 1 Bend of down pipe (With door)
359 (i) 75 mm. Dia. Each 455.71
359 (ii) 100 mm. Dia. Each 536.61
359 (iii) 150 mm. Dia. Each 999.50
359 E) C. 1 shoe of down pipe.
359 (i) 75 mm. Dia. Each 308.15
359 (ii) 100 mm. Dia. Each 356.93
359 (iii) 150 mm. Dia. Each 512.88
359 10 Supplying, fitting, fixing C.I Grating (Heavy type).
359 a) Up to 100 mm Square or 100 mm Dia. Each 65.08
359 b) Above 100 mm and upto 150 mm Square or round. Each 112.69
359 11 Supplying, fitting, fixing approved quality asbestos cement
quality down pipe in position with necessary clamps, nails
including making holes in wall, floor etc. and cutting
trenches n any soil or through masonry, concrete structures
etc. if necessary and mending good damages including
jointing materials complete.
359 (i) 76.2 mm Dia. Metre 93.93
359 (ii) 101.6 mm Dia. Metre 111.00
359 (iii) 152.4 mm Dia. Metre 173.11
Page 110
Building
361 12 Supplying, fitting, fixing-approved quality asbestos cement
specials of down pipe in position with clamps, nails etc. with
jointing materials including cutting holes in masonry or
concrete, mending good damages complete.
361 (a) Asbestos cement plain bend shoe of down pipe.
361 (i) 76.2mmDia. Each 96.66
361 (ii) 101.6 mm Dia. Each 109.79
361 (iii) 152.4 mm Dia. Each 162.41
361 (b) Asbestos cement slotted vent/ cowl of down pipe.
361 (i) 76.2 mm Dia. Each 65.75
361 (ii) 101.6 mm Dia. Each 91.91
361 (iii) 152.4 mm Dia. Each 127.66
361 (c) Asbestos cement cone cap / cowl of down pipe.
361 (i) 76.2 mm Dia. Each 71.71
361 (ii) 101.6 mm Dia. Each 109.79
361 (iii) 152.4 mm Dia. Each 144.23
361 13 Taking out rain water down pipes, removing chokages and
refixing the same in position including mending good
damages of taking out and refixing)
Metre 7.91
361 14 Taking out rain water down pipe. %Metre 559.54
361 15 Removing chokage of rain water pipes with split bamboo. %Metre 469.65
361 16 Renewing cemented joint of down pipe. Each joini 10.86
361 17 Taking out and refixing C. 1. Grating of down pipe after
cleaning the mouth including mending good damages in
cement mortar 1:3).
Each joini 12.07
361 18 G.I. Rain water spout 75 mm. Dia. And 600 to 750 mm.
Long upplied fitted and fixed complete with two coats of
paint to >oth exposed portion.
Each 136.35
363 19 Galvanised Iron pipe outlet for water with bevelled end at
outlet, supplied fitted and fixed complete including painting
two coats to the expdsed portion.
(a) 25 mm. Dia. Metre 223.82
363 (b) 32 mm. Dia. Metre 251.89
363 (c) 40 mm. Dia. Metre 318.35
363 (d) 50 mm. Dia. Metre 378.95
363 20 Steel chimney supplied, fitted and fixed with necessary cowl
complete with necessary stiffeners, guy rope etc. as
directed complete with two coats of anticorrosive paint
(internal surface to be painted with bituminous paint). (i)
Made of 2.54mm steel sheets.
363 (a) 150 mm. Dia. Metre 1144.91
363 (b) 175 mm. Dia. Metre 1255.29
363 c) 200 mm. Dia. Metre 1408.23
363 ii) Made of 3.17mm steel sheets.
363 a) 200 mm. Dia. Metre 1679.73
363 b) 225 mm. Dia. Metre 1836.76
363 c) 250 mm. Dia. Metre 2031.30
Page 111
Building
363 d) 275 mm. Dia. Metre 2176.55
363 e) 300 mm. Dia. Metre 2335.50
363 21 Supplying, fitting & fixing UPVC pipes A- Type and fittings
conforming to IS:13592-1992 with all necessary clamps
nails, ncluding making holes in walls, floor etc. cutting
trenches in any soil through masonry concrete structures
etc if necessary and mending good damages including
joining with jointing materails (Spun Yarn,
Valamoid/Bitumen/M-Seal etc) complete.
365
A) UPVC Pipes:
:
365 (i) 75 mm. Dia. Metre 163.12
365 (ii) 110 mm. Dia. Metre 260.48
365 (iii) 160 mm. Dia. Metre 559.04
365 B) UPVC Fittings:
365 a) Plain Tee
365 (i) 75 mm. Dia. Nos 106.96
365 (ii) 110 mm. Dia. Nos 190.28
365 (iii) 160 mm. Dia. Nos 590.04
365 b) Plain Y
365 (i) 75 mm. Dia. Nos 134.33
365 ii) 110 mm. Dia. Nos 250.88
365 iii) 160 mm. Dia. Nos 675.69
365 c) Bend 87.5 degree
365 i) 75 mm. Dia. Nos 85.65
365 ii) 110 mm. Dia. Nos 152.21
365 iii) 160 mm. Dia. Nos 398.45
365 d) Shoe
365 i) 75 mm. Dia. Nos 78.38
365 ii) 110 mm. Dia. Nos 117.67
365 ii) 160 mm. Dia. Nos 348.45
(N) Thatch, Mud and Bamboo Works
367 1 Fixing of bamboo posts by digging hole in all sorts of soil
and subsequent thorough repacking the same with spoils
including the cost of one coat of coal-tarring the embedded
portion of the bamboo:
367 (a) Depth 450 mm. Each 11.78
367 (b) Depth 600 mm. Each 14.57
367 (c) Depth 750 mm. Each 16.90
367 2 Strong bamboo posts, posts plates, rafters, ties etc. fitted
and fixed complete with coir rope or nails as directed.
(Embedded portion of posts shall also be paid for against
this item cost of digging hole and repacking being paid for
seperately):
367 (a) 75 mm. dia bamboo Metre 38.68
367 (b) 100 mm. dia bamboo Metre 50.20
Page 112
Building
367 3 Strong bamboo frame work (for thatched roofing) with 75
mm. dia full bamboo rafters spaced at 350 mm. centres
and tied with transverse bracings at 380 mm. spacing (each
bracing consisting of a pair of quarter bamboo, one at top
and the other at the bottom of the rafters) fitted and fixed in
position complete.
Sq.M 182.25
367 4 Renewing with part old and part new materials bamboo
frame works (of thatched roof) consisting of 75 mm.'dia, full
bamboo rafters spaced at 350 mm. centres and tied with
tranverse iracing at 380 mm. spacing (each bracing
consisting of pair of quarter bamboo.one at top and the
other at bottom of the rafters) fitted and fixed in position.
367 a) With half old and half new materials Sq.M 124.12
367 b) With one fourth old and three-fourth new materials Sq.M 146.56
367 5 Repairs to bamboo frame work (of thatched roof consisting
of 75mm dia. Bamboo) by retying with new rope and with
old pieces of quarter bamboo (including cost of new
materials as required).
Sq.M 29.80
369 6 Single durma mat lining (over bamboo roof frame) fitted
and fixed complete.
Sq.M 53.13
369 7 Renewing single durma mat lining (over bamboo roof
frame) with half old and half new material fitted and fixed
complete.
Sq.M 31.92
369 8 Rice straw thatching in roof including ridges and hips.
369 (a) 150 mm. (pressed) thick Sq.M 188.67
369 (b) 225 mm. (pressed) thick Sq.M 231.19
369 9 Renewing rice straw thatching in roof with half old and half
new material including ridges and hip with entirely new
materials:
369 (a) 150 mm. (pressed) thick Sq.M 82.92
369 (b) 225 mm. (pressed) thick Sq.M 123.83
369 10 Renewing ridges or hips of thatched roof:
369 (a) Excluding jaffry Metre 42.72
369 (b) Including new jaffry Metre 73.23
369 11 Renewing jaffry of ridges or hips of thatched roof fitted and
fixed in position:
369 (Payment to be made on length of ridges or hips)
369 (a) With half old and half new materials Metre 41.92
369 (b) With entirely new materials Metre 55.65
369 12 Split bamboo jaffry in thatched roof, fitted and fixed in
position:
369 (a) Coarse jaffry Sq.M 33.73
369 (b) Fine jaffry Sq.M 40.30
369 13 Renewing split bamboo jaffry in thatched roof with half old
and half new materials fitted and fixed in position:
369 (a) Coarse jaffry Sq.M 22.62
371 (b) Fine jaffry Sq.M 25.86
371 14 Oloo thatching 150 mm.(pressed) thick in roof including
ridges and hips and including tying as necessary.
Sq.M 76.86
Page 113
Building
371 15 Renewing oloo thatching 150 mm. (pressed) thick in roof
with half old and half new materials including ridges and
hips with entirely new materials.
Sq.M 59.89
371 16 75 mm.(pressed) thick oloo thatching over existing
thatching including new ridges and hips and including tying
as necessary.
Sq.M 56.76
371 17 Repairing thatching of roof with straw kuchi to stop roof
leaking and including tying as necessary
Sq.M 30.50
371 18 Diagonally woven crushed bamboo mat including durma
mat ining and both longitudinal and transverse intermediate
stiffners (about 300 mm. centre each way) and tied with 18
B.W.G. galvanised wire fitted and fixed in position complete
but excluding costof supporting frame work.
371 (a) In wall fencing etc. Sq.M 85.95
371 (b) In ceiling Sq.M 92.72
371 19 Renewing with half old and half new materials diagonally
woven crushed bamboo mat including durma mat lining and
30th longitudinal and tranverse intermediate stffiners (about
300 mm centre each way) made on each face and tied with
entirely new 18 B.W.G.galvanised wire fitted and fixed in
Dosition complete(but excluding the cost of supporting
frame work):
371 (a) In wall fencing etc. Sq.M 54.74
371 (b) In ceiling Sq.M 60.80
371 20 Bamboo walling made of crushed bamboo or split bamboo
or )amboo twigs(kanchis) as directed and tied with
necessary stiffners of split bamboo (in pairs) made of
100mm dia. Bamboo fitted and fixed complete(but
excluding the cost of supporting frame work)
Sq.M 108.58
373 21 Renewing with half old and half new materials bamboo
walling made of crushed bamboo or split bamboo or
bamboo twigs (kanchis) as directed and tied with necessary
stiffners of split bamboo (in pairs) fitted and fixed complete
(but excluding the cost of supporting frame work)
Sq.M 65.75
373 22 100 mm. thick dab wall made of bamboo walling (with
crushed bamboo or split bamboo twigs) mud plastered both
sides and finished with lipping of cowdung and earth (1:4)
mixture complete but excluding the cost of supporting
frame work)
Sq.M 80.60
373 23 Thick mud walling made with prepared and weathered
earth and admixture of straw chopping etc. (land where
from earth may be obtained will be made available by the
dept. within 100 metre).
Cum 216.54
Page 114
Building
24 Ceiling made of bamboo mat of crushed bamboo,split
bamboo or bamboo twigs (as directed) fitted and fixed in
position with mud plaster on underside finished smooth with
lipping of cowdung and earth (1:4) mixture complete (but
excluding the coast of supporting framework).
Sq.M 90.40
373 25 Mud pluster (25 to 37.5) mm. thick with prepared mixture of
earth and cowdung (10:1) with admixture of straw chopping
and finishing smooth with lipping of cowdung and earth
(1:4):
373 (a) In walls or floors Sq.M 18.18
373 (b) In ceilings Sq.M 18.18
373 26 Mud lipping with of cowdung and earth mixture (1:4):
373 (a) In walls or floors Sq.M 30.00
373 (b) In ceilings Sq.M 47.47
373 27 Durma mat works strengthened with'split bamboo placed
both ways (225 mm. apart) both sides and tied together
fitted and fixed complete (but excluding the cost of
supporting ramewprk):
373 i) Single durma mat works
375 (a) In walls or floors Sq.M 51.51
375 (b) In ceilings Sq.M 57.97
375 (ii) Double durma mat works
375 (a) In walls or floors Sq.M 67.17
375 (b) In ceilings Sq.M 90.70
375 28 Renewing with half old half new materials durma mat works
strengthened with split bamboo placed both ways (225 mm.
apart) on both sides and tied together fitted and fixed
complete (but excluding the cost of supporting
frameworks):
375 (i) Single durma mat works
375 (a) In walls or floors Sq.M 33.03
375 (b) In ceilings Sq.M 39.59
375 (ii) Double durma mat works
375 (a) In walls or floors Sq.M 53.83
375 (b) In ceilings Sq.M 54.44
375 29 Double durma mat door or window strengthened
with necessary split bamboo with strong outer frame and
diagonals of bamboos and half bamboo complete, including
tying and handling the same.
Sq.M 111.30
30 Restoring scoured surface of mud walls by dabbing with
prepared and weathered earth (with mixture of
straw choppings etc.) (Payment to be made on area
restored.).
375 (a) Thickness restored 50 to 75 mm. Sq.M 8.79
375 (b) Thickness restored exceeding 75 mm. but not
exceeding 100 mm. . .
Sq.M 12.63
375 (c) Thickness restored exceeding 100 mm. but not
exceeding 125 mm.
Sq.M 15.45
Page 115
Building
375 (d) Thickness restored exceeding 125 mm. but not
exceeding 150 mm.
Sq.M 16.26
(O) Fencing
377 1 Fixing post of iron or precast concrete by digging hole in the
ground (in all sorts of soil) and embedding the same by
packing the hole with cement concrete (1:3:6) (with jhama
khoa. For Purulia, Bankura and Darjeeling Hill by Pakur
Variety, Local Black Hard Stone & Bazree respectively) and
finishing the top surface to regular shape (as directed) with
15 cm cement plaster (1:6) complete, including the cost of
concrete, plaster etc.but excluding the cost of the post:
377 (i) Average dia. of the hole 200 mm. to 300 mm.
377 (a) Depth 450 mm. to 500 mm. [cement 8 kg/No] Each 152.98
377 (b) Depth exceeding 500 mm. but not exceeding 600 mm.
(Cement -9.65 kg/NO)
Each 185.26
377 (c) Depth exceeding 600 mm. but not exceeding 675 mm.
(Cement-10.9 Kg/NO)
Each 209.76
377 (d) Depth exceeding 675 mm. but not exceeding 750 mm.
(Cement-12.1 KG/No)
Each 23i.O3
377 (ii) Average dia. of the hole 300 mm. to 400 mm.
377 (a) Depth 450 mm. to 500 mm. (Cement-14.35 Kg/No.) Each 274.58
377 (b) Depth exceeding 500 mm. but not exceeding 600 mm.
[Cement-17.2 Kg/No.]
Each 328.69
377 (c) Depth exceeding 600 mm. but not exceeding 675 mm.
[Cement-19.35 Kg/No.]
Each 370.69
377 (d) Depth exceeding 675 mm. but not exceeding 750 mm.
[Cement-21.5 Kg/No.]
Each 410.46
379 2 Petty repairs to top of concrete embedment of fencing post
including replastering with 15 mm thick cement mortar (1:6)
and finishing to shape. [Cement-0.5 Kg/No.]
Each 15.50
379 3 Straightening deformed iron post of fencing carefully
without damaging or loosening the base.
Each 27.83
379 4 Straightening deformed iron railing of fencing carefully by
dismantling and repairing and refixing the same.
Each 28.83
379 5 Labour for fitting line of wire through holes in fencing post
(already made in the body of the posts or formed by staples
already fixed thereto) and tightening and fixing the wire in
taut condition with straining bolts (including the cost of
making holes, cost of staples and cost of cutting and
lappping joints in wire as necessary but excluding the cost
of straining bolts): (Payment to be made on the length of
the individual lines of wire.)
379 (a) Galvanised wire of 9 to 12 B.W.6. %Mtr. 213.31
379 (b) Strand wire (3 to 7 ply) upto 6 mm. dia. %Mtr. 316.64
379 (c) Standard wire (3 to 7 ply) above 6 mm. dia %Mtr. 372.19
379 (d) Barbed wire %Mtr. 419.96
Page 116
Building
379 6 a) Supplying, fitting galvanised 3 ply 12 gauge / 4 points
line of barbed wire in fencing (holes already made in the
body of the post) or fixed by staples tightening and fixing
the wires in taut condition with straining bolts including the
cost of cutting and of lapping joints in the wire as necessary
but excluding the cost of galvanised staples,straining bolt
and sinding wire where necessary. (Payment to be made
on the length of individual lines of wire.)
%Mtr. 2448.64
381 (b) Supplying, fitting galvanised 2 ply 12 gauge / 2 points
line of barbed wire in fencing (holes already made in the
body o1 the post) or fixed by staples"tighteping' and fixing
the wires in taut condition with straining bolts including the
cost oi cutting and of lapping joints in the wire as necessary
but excluding the cost of galvanised staples.straining bolt
and binding wire as necessary. (Payment to be made on
the length of individual lines of wire.) :
%Mtr. 2186.45
381 7 Labour for fitting wove wire or similar fencing net tightening
and fixing the same to post with staples at every bar
(including the cost of cutting and lapping joints in the net,
the cost of staples, binding wire etc. and of labour for fixing
such staples as necessary). (Payment to be made on the
length of net in finished work.)
381 (a) Net upto 1350 mm. height %Mtr. 662.16
381 (b) Net above 1350 mm. height %Mtr. 829.92
381 8 Labour for repairs to snapped line of wire by jointing
snapped ends with links of new wire as necessary,
stretching and refixing the line in taut condition (excluding
the cost of new materials)
381 (Payment to be made on the length of the portion of wire
which had become loose due to snapping.)
381 (a) Galvanised wire of 9 to 12 B.W.G. %Mtr. 59.99
381 (b) Strand wire (3 to 7 ply) upto 6 mm. dia. %Mtr. 68.88
381 (c) Standard wire (3 to 7 ply) above 6 mm. dia %Mtr. 79.99
381 (d) Barbed wire %Mtr. 91.10
383 9 Labour for replacement of damaged or broken portion of
wove wire or similar net in fencing including cutting and
removing the net of the affected bay and restoring the gap
with new net and fitting fixing the same in taut condition and
also tightening and securing the adjacent affected bays
(including the cost of new staples and of labour for fixing such
new staples)
383 (Payment to be made on the length of the replaced bay.)
383 (a) Net upto 1350 mm. height %Mtr. 934.35
383 (b) Net above 1350 mm. height %Mtr. 1157.66
Page 117
Building
383 10 Labour for taking out (from fencing) line of wire (galvanised,
strand or barbed) by drawing the same out through holes in
the body of the post or through holes formed by fixed
staples.
%Mtr. 59.99
383 (Payment to be made on the length of the wire taken out.)
383 11 Labour for taking out (from fencing) line of wire (galvanised,
strand or barbed) including the cost of taking out staples
(by cutting or otherwise, as necessary).
%Mtr. 79.99
383 (Payment to be made on the length of the wire taken out.)
383 12 Labour for taking out wove wire or similar net (from fencing)
including the cost of taking out staples (by cutting or
otherwise,as necessary).
383 (a) Net upto 1350 mm. height %Mtr. 288.86
383 (b) Net above 1350 mm. height %Mtr. 333.30
383 13 Supplying galvanised straining bolts (with eye at one end
with double nuts and washers) fitted and fixed complete.
383 (i) 10 mm. dia.
383 (a)150mm. Each 43.91
383 (b) 200 mm. Each 51.34
383 (ii) 12 mm. dia.
383 (a) 200 mm. Each 70.98
385 (b) 250 mm. Each 77.53
385 (c) 300 mm. Each 84.07
385 (iii) 16 mm. dia.
385 (a) 250 mm. Each 104.29
385 (b) 300 mm. Each 110.83
385 14 Supplying galvanised staples fitted and fixed complete.
385 (a) 19 mm. to 25. mm. size %Nos 174.99
385 (b) 32.5 mm. to 37.5 mm. size %Nos 240.53
385 (c) 44 mm..to 50 mm. size %Nos 305.53
385 15 Supplying 7 ply galvanised strand wire 19 gauge fitted and
fixed complete with necessary eyes, hooks and straining
bolts (excluding the cost of straining bolts.)
Mtr. 31.61
385 16 Supplying 6 ply galvanised strand wire 19 gauge fitted and
fixed complete with necessary eyes, hook and straining
bolts (excluding the cost of straining bolts.)
Mtr. 27.44
385 17 Taking out bulged out wire netting fitted and fixed in window
frames with nails and refixing the same after straightening with
new galvanised staples and lapping with new (50 x 13) mm.
Badam/ Gamari batten fitted and fixed with iron screws
including hire and labour of scaffolding complete.
Sq. M 25.44
Page 118
Building
385 18 Double knotted wove wire 1.2 m. height (11 bars), vertical
300 mm. apart,horizontal spacing starting from 88 mm.
ending 200 mm. top and bottom wire lOg and all other
intermediate and upright wjre 9g. with finished border 2 ply
twisted fencing including tightening and fixing the same to
posts with staples at every bar including cost of cutting and
of lapping joints in the net as necessary including cost of
staples and wove wire.
Mtr. 370.80
385 payment to be made on the length of the finished netting
work)
387 19 Double kontted wove wire 2.1 m height (17 bars) vertical
300 mm apart horizontal spacing_starting from 88 mm
ending 200 mm top and bottom wire lOg and all other
intermediate and upright wire 9g with finished border 2 ply
twisted fencing complete including tightening and fixing the
same to posts with staples at every bar including cost of
cutting and of lapping joints in net as necessary including
cost of staples and wove wire.
Mtr. 644.39
387 (payment to be made on the length of the finished netting
work)
387 20 Supplying, fitting, fixing G.I chain link fencing 75 mm x 75
mm mesh 12 g wire to the R.C.C or wooden posts with
galvanised riooks or staples etc. complete as per direction.
Sq. M 160.98
387 21 Supplying, fitting, fixing. Chain link fencing of approved
quality with R.C.C posts wooden posts or iron posts by
means of galvanised "C" clips to grid of horizontal strands
of galvanised high tensile spring steel wire of 12 S.W.G
which have to be tensioned and fixed to the vertical posts
by means of galvanised special clips, bolts and nuts etc.
387 The rate is exclusive of the cost of posts)
387 (1) 50 mm. x50mm. x8g. Sq. M 433.29
387 II) 65 mm. x 65 mm. x 8 g. Sq. M 393.29
387 Ill) 75 mm. x 75 mm. x 8 g. Sq. M 342.08
387 IV) 75 mm. x 75 mm. x 6 g. Sq. M 446.96
387 V) 100 mm. x 100 mm. x 6 g. Sq. M 411.96
387 VI) 25 mm. x 25 mm. x 12 g. Sq. M 376.96
387 VII) 12.5 mm. x 12.5m. x 12 g. Sq. M 576.39
389 22 Supplying, fitting, fixing in position netting with PVC Coate
Crinkle mesh of approved colour with wooden or steel o
concrete frame work including cost of galvanised bolts, nuts
screws, nails, spacers, shape welding etc complete bu
excluding the cost of supporting frame works, battens etc.
389 (a) 25 mm. x 25 mm. x 8 g. Sq.M 737.59
389 (b) 25 mm. x 50 mm. x 8 g. Sq. M 561.50
389 (c) 50 mm. x 50 mm. x 8 g. Sq.M 456.51
389 (d) 75 mm. x 75 mm. x 8 g. Sq.M 386.52
Page 119
Building
389 (e) 75 mm. x 25 mm. x 8 g. Sq.M 526.50
389 23 Supplying fitting and fixing 600 mm (+/- 30 mm) diametre
R.B.T (Reinforced Barbed Tape) Concertina fencing on wall
op using concertina coils stretched to approx.6 meters
ength at site clipped with two nos. of horizontal R.B.T
trands which will be tensioned and fixed with the vertical
M.S angle iron posts by means of security fasteners (such
as C clips, R.B.T clips etc.) The rate is exclusive of the cost
of posts)
Mtr. 411.53
389 24 Labour for fitting line of wire to posts, tightening by straining
bolts and fixing the wire (in taut condition) to the post with
staples (including the cost of cutting and lapping joints in
the wire, as necessary and including the cost of staples and
straining bolts and also the labour for fixing the staples but
excluding the cost of straining bolts) Payment to be made
on length of the individual line of wire)
389 a) Galvanised wire 9 to 12 BWG %Mtr. 141.10
389 b) Strand wire (3 to 7 ply) upto 6 mm dia %Mtr. 174.43
389 c) Strand wire (3 to 7 ply) above 6 mm dia %Mtr. 205.54
389 d) Barbed wire %Mtr. 211.09
391 25 Supplying at site or stackyard or as directed PCC (1 : 2 :4)
Fencing Post 215 cm 150 mm X 150 mm section at bottom,
100 mm X 100 mm section at top with T-Base 300 mm X
150 mm X 100 mm, having 4 nos 6 mm dia vertical M.S.
reinforcement and 6 mm dia binders @ 200 mm centres,
finished smooth etc., complete.
Each 390.63
(P) Soling, Edging Metalling
393 1 Brick soling with picked jhama bricks including preparation
of bed as necessary with brick joints properly filled in and
packed with powdered earth and including necessary
cushion of similar material below the soling (and in between
layers when more than one layer is used) completes as per
direction.
393 (a) Single brick flat soling (thickness 75 mm.) Sq.M 251.81
393 (b) Double brick flat soling (thickness 150 mm.) Sq.M 490.96
393 (c) Soling or dry pavement with one brick-on-edge on a
layer of brick flat (thicknass 125 mm. plus 75 mm.)
Sq.M 656.20
393 (d) Soling or dry pavement with one brick-on-edge laid in
herring abne pattern over a layer of brick flat (thickness 125
mm plus 75 mm)
Sq.M 664.38
393 (e) Soling or dry pavement with one brick-on-edge
(thickness 125 mm.)
Sq.M 419.66
393 (f) Soling or dry pavement with one brick-on-edge laid in herring
3one pattern (thickness 125 mm.)
Sq.M 423.29
393 (g) Extra rate for using local sand inlieu of powered earth in
Single layer soling.
Sq.M 6.70
Page 120
Building
393 (h) Extra rate for using local sand inlieu of powered earth in
Double layer soling.
Sq.M 13.38
393 2 Labour for laying soiling with departmental bricks including
carriage of departmental bricks within a lead of 150 metres
sreparation of bed as necessary with brick joints properly
filled in and packed with brick joints properly filled in and
packed with ocal sand or powdered earth and including
necessary cushion of similar materials below the soling
(and in between layers when more than one layer is used)
393 The item, included the cost of obtaining local sand or
powdered earth)
395 (a) Single brick flat soling (thickness 75 mm) %Sq.M 2225.03
395 (b) Double brick flat soling (thickness 75 mm. plus 75 mm) %Sq.M 3338.05
395 (c) Soling with one brick-on-edge on a layer of brick flat
(thickness 75 mm plus 125 mm)
%Sq.M 3914.76
395 (d) Soling or dry pavement with one brick-on-edge laid in
herring bone pattern on a layer of brick flat (thickness 75
mm. plus 125 mm)
%Sq.M 4561.16
395 (e) Soling or dry pavement with one brick thickness (125
mm.) (laid in herring bone pattern)
%Sq.M 3338.05
395 /f) Soling (125 mm thick) or dry pavement with one brick-on-
edge.
%Sq.M 3777.40
395 3 Brick edging 75 mm wide with picked jhama bricks, laid true
to ine and level including cutting necessary trench in soil or
in hard metalled surface, laying the bricks and repacking
the trench (on 30th side of the edging) with spoils and
ramming the same thoroughly complete as per direction.
395 (a) Brick-on-edge edging (125 mm) depth. %Metre 3394.61
395 (b) Brick-on-end edging (250 mm) depth. %Metre 6589.24
395 4 .abour for laying brick edging (75 mm wide) with
departmental irick laid true to line and level including
carriage of departmental )ricks within a lead of 150 metres
cutting necessary trench in soil or in hard metalled surface
laying the brick and repacking the trench (on both sides of
the edging) with spoils and ramming the same thoroughly.
395 (a) Brick-on-edge edging (125 mm) depth. %Metre 466.62
395 (b) Brick-on-end edging (250 mm) depth. %Metre 734.27
397 5 Labour for taking out old brick-on-edge edging including
removing debris to flank or berm sorting out serviceable
materials and stacking.
%Sq.M 392.89
397 6 Labour for taking out old soling edging including removing
debris
397 (a) Single flat soling %Sq.M 607.01
397 (b) Double flat soling %Sq.M 892.84
Page 121
Building
397 7 Labour for taking out brick-on-end edging including
removing debris to flank or berm sorting out serviceable
materials and stacking.
%Metre 410.06
397 8 Labour for taking out brick- on-edge of herring bone bond
including removing debris to flank or berm sorting out
serviceable materials and stacking.
%Sq.M 1070.60
397 9 Labour for taking out brick -on-edge of herring bone bond
set in cement mortar including removing debris to flank or
berm sorting out serviceable materials and stacking.
%Sq.M 2142.21
397 10 Supplying cinder including throwing spreading rough
leavlling anc dressing. (Measurement will be taken on the
basis of profile, before and after the work with deduction of
1/9 th of the volume for sinkage and / shrinkage).
Cum 241.59
397 11 Ornamental brick edging (75 mm wide) in compound roads,
gardens etc. with 1st class or picked jhama bricks laid
diagonally on end and with a corner slightly raised from the
adjoining surface thus giving saw tooth appearance
including cutting trench laying bricks and repacking the
trench thoroughly on both sides of the edging complete as
per direction.
%Metre 5316.64
399 12 Labour for laying stone edging with departmental stone
materials laid to correct line and level including carriage of
departmental stone materials within a lead of 150 metres
cutting necessary trench in soil or in hard metalled surface,
laying the stones and repacking the trench on both sides of
the edging with spoils and ramming the same thoroughly.
399 (a) 100 mm wide and 125 mm deep edging with stone sets
laid-on-edge.
%Metre 860.52
399 (b) 100 mm wide and 250 mm deep edging with stone sets
laid-on-edge.
%Metre 1223.11
399 13 Labour for taking out carefully existing stone edging,
relaying edging in the same trench after rectifying line and
level as required with all old materials or with partly old and
partly new departmental materials (including carriage of
new materials within a lead of 120m) and repacking the
trench thoroughly on both sides of the edging.
399 (a) 100 mm. wide and 125 mm. deep edging with stone
sets laid-on-edge.
%Metre 1160.00
399 (b) 100 mm. wide and 250 mm. deep edging with stone
sets laid-on-edge.
%Metre 1718.00
399 14 Relaying disturbed kerb stone on new lime concrete (18 :
36 : 100) bed up to 75 mm thick.
Metre 37.77
399 15 Relaying disturbed channel stone on new lime concrete (18
: 36 : 100) bed up to 75 mm thick.
Metre 75.55
Page 122
Building
399 16 Labour for taking out soling from road and stacking the
serviceable materials at site.
399 150mm boulder soling Sq.M 13.43
(Q) Maintenance of Statues and Monuments.
401 1 Filling up the joints of marble or granite stone etc. of
statues after chiseling out joints including grouting with
cement mortar (1 : 3) with white cement carefully (with
cement gun) and matching colour with necessary pigment.
Metre 22.56
401 2 Cleaning and removing stains as far as possible from
pedestals and bases below statues of granite and syenite
stone including cleaning ornamental cornice, base
moulding curvings, sunk panel surface with carborandum
block No. 1 of coarse and medium grains of grades 60 and
40 respectively by skilled labour and washing them with
soap and soda water.
Sqm 17.25
401 3 Cleaning and removing stains as far as possible from
pedestals and bases below statues of sand stone including
cleaning ornamental cornice, base moulding curvings sunk
panel surface with carborandum block No. 1 of coarse and
medium grains of grades 60 and 40 respectively by skilled
labour and washing them with soap and soda water.
Sqm 13.69
401 4 Cleaning and removing stains as far as possible from
pedestals and below starues of marble or artificial cast
white stone including plasters and ornamental cap and
moulding and flowes with No. 1 No. 2 and No. 3 stone as
necessary.
Sqm 8.18
401 5 Hire and labour charges for high scaffolding all round
(outside) body domes and finials etc. of Saheed Minar.
L.S. 24511.69
401 6 Hire and labour charges for high scaffolding all round
(outside) body domes and finials etc. of Luscar Memorial.
L.S. 6603.38
( R ) - Aluminium Works.
403 1 Supplying profiles of required section made of Aluminium
Alloy Extrusions conforming to IS: 732-1983 and IS: 1285-
1975; Annodized (with required film thickness and specified
colour / natural) matt finished conforming to IS:
1868-1983 for fabrication of composit door, sliding &
casement windows, partitions, formed of basic sections of
any ISI embossed / certified make and brand as per
direction of Engineer - In-Charge. (Payment will be made
on finished length of the work).
403 (A) In 10-12 Micron thickness Annodizing film
403 1) Natural white
403 a) 2- track sliding window
Page 123
Building
403 i) Bottom frame Metre 254.52
403 ii) Top and side frame. Metre 227.25
403 b) 3- track sliding window
403 i) Bottom frame Metre 362.59
403 ii) Top and side frame. Metre 314.11
403 c) 4-track sliding window
403 i) Bottom frame Metre 437.33
403 ii) Top and side frame. Metre 377.74
403 d) Shutter for all track sliding window.
403 i) Bottom & Top member. Metre 137.36
403 ii) Style side member. Metre 139.38
403 Hi) Interlock member. Metre 173.72
403 e) Casement window (40 mm Depth series)
403 i) Outer frame. Metre 182.81
403 ii) Mullion. Metre 260.58
405 iii) Shutter. Metre 180.79
405 iv) Glazing clip. Metre 48.48
405 v) Cleate angle. (Non-annodized) Metre 311.08
405 f) Casement window (34 mm Depth series)
405 i) Outer frame. Metre 154.53
405 ii) Mullion. Metre 226.24
405 iii) Shutter. Metre 132.71
405 iv) Glazing clip. Metre 51.51
405 v) Cleate angle. (Non-annodized) Metre 311.08
405 g) Fixed glazing.
405 i) Top and bottom & side member. Metre 377.74
405 ii) Mullion. Metre 398.95
405 iii) Glazing clip. Metre 49.49
405 h) Lowered window.
405 i) Top, bottom and side member. Metre 216.14
405 ii) Louvered Section. Metre 772.65
405 ii) Cleat angle (Non-annodized). Metre 311.08
405 i) Fixed partitions.(Unsupported length of vertical
member upto 1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9 sq.m.)
I) Top, bottom & side member. Metre 377.74
405 ii) Intermediate member. Metre 398.95
405 iii) Glazing clip. Metre 49.49
407 j) Fixed partitions. (Unsupported length of vertical
member upto 1.5 mtr. Height of both ends of vertical
member restrained but panels within 0.9 sq.m.)
407 i) Top, bottom & side member. Metre 543.38
407 ii) Intermediate member. Metre 564.59
407 iii) Glazing clip. Metre 45.05
407 k) Movable door shutter.
407 i) Door frame. (Top & sides). Metre 371.68
407 ii) Shutter:
Page 124
Building
407 Top rail. Metre 357.54
407 Bottom rail. Metre 528.94
407 Lock rail Metre 442.38
407 Door vertical. Metre 390.87
407 Glazing cleap. Metre 49.49
407 I) Rimless door.
407 i) Top & bottom rail. Metre 954.45
407 ii) Coloured
407 a) 2- track sliding window
407 i) Bottom frame Metre 279.77
407 ii) Top and side frame. Metre 250.48
407 b) 3-track sliding window
407 i) Bottom frame Metre 402.99
407 i) Top and side frame. Metre 351.48
409 c) 4-track sliding window
409 i) Bottom frame Metre 473.69
409 ii) Top and side frame. Metre 418.14
409 d) Shutter for all track sliding window.
409 i) Bottom & Top member. Metre 150.49
409 ii) Style side member. Metre 148.47
409 iii) Interlock member. Metre 186.85
409 e) Casement window (40 mm Depth series)
409 i) Outer frame. Metre 198.97
409 ii) Mullion. Metre 275.73
409 iii) Shutter. Metre 193.92
409 iv) Glazing clip. Metre 54.54
409 v) Cleate angle. (Non-annodized) Metre 311.08
409 f) Casement window (34 mm Depth series)
409 i) Outer frame. Metre 170.69
409 ii) Mullion. Metre 243.41
409 iii) Shutter. Metre 167.66
409 iv) Glazing clip. Metre 58.58
409 v) Cleat angle. (Non-annodized) Metre 311.08
409 g) Fixed Glazing.
409 i) Top, bottom & side member. Metre 390.87
409 ii) Mullion. Metre 416.12
409 iii) Glazing clip. Metre 54.54
411 h) Louvered window.
411 i) Top, bottom and side member. Metre 225.23
411 ii) Louvered Section. Metre 786.79
411 iii) Cleat angle ( Non-annodized). Metre 311.08
411 i) Fixed partitions. [Unsupported length of vertical member
upto 1.5 mtr. Height of both ends of vertical member
restrained but panels within 0.9 sq.m.)
411 i) Top, bottom & side member. Metre 390.87
411 ii) Intermediate member. Metre 416.12
411 iii) Glazing clip. Metre 54.54
Page 125
Building
411 j) Fixed partitions. [Unsupported length of vertical member
more than 1.5 mtr.or both ends of vertical member
restrained but panels more than 0.9 sq.m.)
411 I) Top, bottom & side member. Metre 562.57
411 ii) Intermediate member. Metre 584.79
411 iii) Glazing clip. Metre 54.54
411 k) Movable door shutter.
411 i) Door frame. (Top & sides). Metre 371.68
411 ii) Shutter:
411 Top rail. Metre 371.68
411 bottom rail. Metre 568.63
411 Lock rail Metre 466.62
411 3oor vertical. Metre 408.04
411 Glazing clip. Metre 54.54
413 1) Rimless door.
413 i) Top & bottom rail. Metre 976.67
413 (B) 15 Micron colour annodizing.
413 a) 2-track sliding window
413 i) Bottom frame Metre 290.38
413 ii) Top and side frame. Metre 260.58
413 b) 3-track sliding window
413 i) Bottom frame Metre 419.15
413 ii) Top and side frame. Metre 365.52
413 c) 4- track sliding window
413 i) Bottom frame Metre 502.98
413 ii) Top and side frame. Metre 434.30
413 d) Shutter for all track sliding window.
413 i) Bottom & Top member. Metre 156.55
413 ii) Style side member. Metre 152.51
413 iii) Interlock member. Metre 191.90
413 e) Casement window (40 mm Depth series)
413 i) Outer frame. Metre 205.03
413 ii) Mullion. Metre 281.79
413 iii) Shutter. Metre 198.97
413 iv) Glazing clip. Metre 57.57
413 v) Cleate angle. (Non-annodized) Metre 311.08
413 f) Casement window (34 mm Depth series)
415 i) Outer frame. Metre 176.75
415 ii) Mullion. Metre 250.48
415 iii) Shutter. Metre 173.72
415 iv) Glazing clip. Metre 61.61
415 v) Cleat angle. (Non-annodized) Metre 311.08
415 g) Fixed glazing.
415 I) Top, bottom and side member. Metre 395.92
415 ii) Mullion. Metre 422.18
415 iii) Glazing clip. Metre 57.57
415 h) Louvered window.
415 I) Top, bottom and side member. Metre 228.26
415 ii) Louvered Section. Metre 795.88.
Page 126
Building
415 iii) Cleat angle (Non-annodized). Metre 311.08
415 I) Fixed partitions. Unsupported length of vertical member
upto 1.5 mtr. Height of both ends of vertical member
restrained but panels within 0.9 q.m.)
415 I) Top, bottom & side member. Metre 395.92
415 I) Intermediate member. Metre 422.18
415 ii) Glazing clip. Metre 57.57
415 j) Fixed partitions. Unsupported length of vertical member
more than 1.5 mtr.or oth ends of vertical member restrained
but panels more than .9 sq.m.)
415 I) Top, bottom & side member. Metre 570.65
415 ii) Intermediate member. Metre 593.88
417 iii) Glazing clip. Metre 57.57
417 k) Movable door shutter.
417 i) Door frame. (Top & sides). Metre 371.68
417 ii) Shutter:
417 Top rail. Metre 376.73
417 Bottom rail. Metre 575.70
417 Lock rail Metre 472.68
417 Door vertical. Metre 415.11
417 Glazing clip. Metre 57.57
417 1) Rimless door.
417 i) Top & bottom rail. Metre 985.76
417 2 Labour charge for fabrication and installation of composite
door, window , partitions made from annodized extruded
alloy aluminium sections for the following units:-
419 (A) Glazed aluminium sliding windows made of extruded
and annodized alloy aluminium sections, fabrications,
including cutting to proper shape and size, drilling and
aligning of window shutter frame fitted with in built locking
arrangements, sliding rollers and other necessary fittings,
fixture, adhesives and joineries along with extruded
neoprine or EPDM gasketing in between window frame and
masonry work (walls, column, beam.lintels etc.) as well as
between glass and shutter frame for fixing glass and Poly
Shulphate sealant and in between shutter and window
frame where necessary including cutting to requisite size
and fixing glass as per drawing, specification and direction
of EIC. The rate includes the hire charge of all tools and
plants, including all incidental charges, adhesive, joineries
such as screw, cleate angle etc. but excludes the cost of
extruded aluminium sections, glass, neoprene / EPDM
gasketing, locking arrangement and rollers.
419 i) 2 track sliding window. Sq.M 471.77
419 ii) 3/4 track sliding window. Sq.M 641.96
419 iii) Openable / Casement window. Sq.M 763.36
419 iv) Fixed glazzing. Sq.M 523.58
Page 127
Building
419 v) Louvered window. Sq.M 499.75
419 vi) Add for special architectural feature, where members /
sections are required to be bent as per requirement.
R.M. 174.93
421 (B) Partly glazed partly panelled or fully glazed single leaf
alunminium swing door made of extruded and annodized
alloy aluminium sections, fabrication including cutting to
proper shape and size, drilling and aligning, fitted with
heavy duty hydraulic action floor sping placed in the floor,
with mending damages,with top pin assembly of approve
make and brand, fitted with in built locking arrangement,
flush bolt, glazing clips and all other necessary fittings,
fixtures, adhesives and joineries, cutting glass of approved
make to requisite shape and size fitting with dry set
neoprene or EPOM gasketing, cutting to requisite shape
and size panel board (prelaminated particle block) fixing
them with glazing clips as per drawing, specification and
direction of Engineer in charge. The rate includes the hire
charge of all tools and plants, adhesive, joineries such as
screw, cleate angle etc. but excludes the cost of extruded
alumium sections, glass,panel boards neoprene / EPDM
gasketing, locking arrangement, weather gasketing / wool
pile, floor spring, top pin, handle, tower bolt, glazing clips
etc. (10% rate reduction has to be made for swing doors or
partitions where floor sping is not used. 10% enhancement
of rate is to be made where door frame of extruded
aluminium sections has to be fitted and fixed to masonry
wall. 5% rate enhancement may be allowed for double leaf
swing door. Payment shall be made for the shutter area
only exept where door frame is fixed the entire opening
shall be taken to consideration.Payment for door frame
Sq.M 948.29
Page 128
Building
423 (C) Fully glazed singleleaf reamless swing door made of
anodized aluminium alloy extrusions fabrication after cutting
to proper shape and size, drilling and aligning fitted with
heavy duty hydraulic action floor spring with top pin
assembly and fitted with inbuilt locking arrangement and all
other necessary fittings, fixture, adhesives and joineries,
cutting the glass to requisite shape and size mounting the
edges for fitting the same with dry set neoprine/EPDM
gasket. The rate includes the hire charge of all tools and
plants, adhesive, joineries but excludes the cost of extruded
aluminium sections, glass, panel boards EPDM gasket,
locking arrangement, weather gasketing / wool pile, floor
spring, top pin, handle, tower bolt etc. (D) Partly glazed and
partly panelled partition or fixed glazing made of extruded
and anodised alloy aluminium sections, fabrications after
cutting to proper shape and size, drilling and aligning fitted
with inbuilt locking arrangement cutting the glass / board
(prelaminated / particle block) to requisite shape and size
moulding the edges fitted and fixed glazing clips and dry set
neoprine /EPDM gasket, along with all other necessary
arrangements for fixing the partition to walls, floors, beams,
columns polysulphide sealant for water proofing if
necessary complete in all respect as per drawing and
specifications and direction of the Engineer in charge.
Sq.M 1085.75
423 The rate includes the hire charge of all tools and plants,
adhesive, joineries such as screw, fastener but excludes
the cost of extruded aluminium sections, EPDM gasket,
glass, board, glazing clips, locking arrangement, etc.
1) For partitions using section of size:
423 a) 63.50 mm x 38.10 mm Sq.M 566.41
423 b) 101.50mm x 44.45 mm Sq.M 701.45
425 Note: Add extra for each Addl. Floor over the rate of item2A,
2B,2C and 2D except 2A(vi)
i) Upto 4th Floor Rs.12.00 per Sq.m
ii) Above 4th Floor Rs.16.00 per Sq.m
425 3 Supplying heavy duty hydraulic double action floor spring
along with top pin/set of pivots conforming to IS: 6315 or
any approved make as per direction of Engineer in charge.
Each 2043.23
425 4 Supplying heavy duty top pin/set of pivots of local make
and approved by the Engineer-in-charge. (This item to be
provided where floor spring not used).
Pair 350.98
425 5 Supplying concealed type heavy duty PVC headed
aluminium tower bolt for double leaf doors as per approved
make and brand as per direction of Engineer-in-Charge.
Page 129
Building
425 (a) 200 mm long Each 72.11
425 (b) 250 mm long Each 78.07
425 c) 300 mm long Each 86.56
425 d) 450 mm long Each 193.52
425 6 Supplying PVC rollers for sliding windows as per direction
of Engineer in charge.
Each 14.44
425 7 Supplying maruti lock (100mm) Pair 55.25
425 8 Supplying EPDM gusket of approved make and brand as
per direction of Engineer in charge.
425 I) For sliding windows
425 a) T shaped EPDM gasket for frames. Metre 12.02
425 b) 'U' shaped EPDM gasket for frames. Metre 14.42
425 ii) For openable / Casement windows
425 a) EPDM / weather gasket for outer frame and mullion. Metre 14.42
425 iii) weather gasket / wool pile for door vertical. Metre 18.03
427 9 Supplying bubble free float glass of approved make and
brand conforming to IS: 2835-1987.
427 i) 4mm thick clear glass. Sq.M 461.97
427 ii) 4mm thick coloured / tinted / smoke glass. Sq.M 542.98
427 iii) 5mm thick clear glass. Sq.M 604.38
427 iv) 5mm thick coloured / tinted / smoke glass. Sq.M 681.14
427 v) 6mm thick clear glass. Sq.M 709.02
427 vi) 6mm thick coloured / tinted / smoke glass! Sq.M 774.67
427 vii) 8mm thick clear glass. Sq.M 993.74
427 viii) 8mm thick coloured/tinted/smoke glass. Sq.M 1060.80
427 ix) 10mm thick clear glass. Sq.M 1278.46
427 x) 10 mm thick coloured / tinted / smoke glass. Sq.M 1344.82
427 xi) 12mm thick clear glass. Sq.M 1454.40
427 xii) 12mm thick coloured / tinted / smoke glass. Sq.M 2163.42
427 xiii) 12mm thick cleared toughened glass coforming to IS:
2553-1992 (Part-ll)
Sq.M 3842.44
427 xiv) 12mm thick coloured / tinted / toughened glass
coforming to IS: 2553-1992 (Part-ll)
Sq.M 4886.48
427 10 Supplying stainless steel functional hinge for casement
window as per approved brand as directed by Engineer- in -
charge. (Natural White)
427 a) 250 mm long Each 223.51
427 b) 300 mm long Each 261.99
427 11 Supplying annodized aluminium extruded section box hinge
for casement windows as per approved brand and make
directed by Engineer- in -Charge.(Natural White)
Each 43.23
429 12 Supplying 4 lever mortice lock of any approved make and
brand as per direction of the Engineer- in -Charge.
429 i) 150 mm. Each 385.82
429 ii) 100 mm. Each 230.79
429 iii) 75 mm. Each 156.25
429 13 (A) Supplying Aluminium casted body hydraulic door closer
as per I.S.I.
Each 744.88
Page 130
Building
429 (B) Supplying 125 mm. Dia acrylic handle for aluminium
door as per approved make & brand.
429 (a) Natural Colour Each Set 170.69
429 (b) Colour Each Set 189.88
429 C) Supplying Heavy Duty Aluminium Handle (EBCO Type)
(Natural White)
Each 69.69
429 D) Supplying Aluminium casted body Hinge (KOBRA type).
(Natural white)
Each Set 67.27
429 E) Supplying 250mm long Heavy Type Aluminium window
Peg Stay (Natural White)
Each 62.52
429 F) Supplying Zinc powered coated star lock (Natural White) Each 48.08
429 Note:- For Colour anodizing rate of item
no. 10,11,13A,13C,13D,13Eenhanced by 10%.
(S) Well for Water Supply.
431 1 Digging earth in any soil including mixed soil but excluding
moorum, laterite sand stone or any other hard stone
including spreading or stacking the spoils within a lead of
75 metres as directed bailing out water upto 1 metre depth,
shoring etc., when and if required and back filling with fine
sand (including cost of sand) on completion of steining
works.
431 A) R.C.C. Ring Well
i) 1.2 metre diameter of digging for 0.9 metre internal
diameter of well ring.
431 a) Upto 3 metre below G.L. Metre 454.77
b) Beyond 3 metre upto 6 metre below G.L. Metre 484.77
431 c) Beyond 6 metre upto 9 metre below G.L. Metre 534.02
431 d) Beyond 9 metre upto 12 metre below G.L. Metre 613.64
431 e) Beyond 12 metre upto 15 metre below G.L. Metre 662.90
431 f) Beyond 15 metre upto 18 metre below G.L. Metre 762.15
431 ii) 1.5 metre diameter of digging for 1.2 metre internal
diameter of well ring.
431 a) Upto 3 metre below G.L Metre 581.79
431 b) Beyond 3 metre upto 6 metre below G.L. Metre 611.42
431 c) Beyond 6 metre upto 9 metre below G.L. Metre 661.05
431 d) Beyond 9 metre upto 12 metre below G.L. Metre 710.67
431 e) Beyond 12 metre upto 15 metre below G.L. Metre 789.92
433 f) Beyond 15 metre upto 18 metre below G.L. Metre 869.54
433 iii) 1.8 metre diameter of digging for 1.5 metre interna
diameter of well ring.
433 a) Upto 3 metre below G.L. Metre 935.83
433 b) Beyond 3 metre upto 6 metre below G.L Metre 965.83
433 c) Beyond 6 metre upto 9 metre below G.L. Metre 1015.45
433 d) Beyond 9 metre upto 12 metre below G.L. Metre 1094.71
433 e) Beyond 12 metre upto 15 metre below G.L. Metre 1173.96
Page 131
Building
433 f) Beyond 15 metre upto 18 metre below G.L. Metre 1213.58
433 B) Masonry Steining Well
i) 2.1 metre diameter of digging for 1.2 metre internal
diameter of well.
433 a) Upto 3 metre below G.L. Metre 730.30
433 b) Beyond 3 metre upto 6 metre below G.L. Metre 759.92
433 c) Beyond 6 metre upto 9 metre below G.L Metre 859.17
433 d) Beyond 9 metre upto 12 metre below G.L. Metre 938.42
433 e) Beyond 12 metre upto 15 metre below G.L. Metre 1037.67
433 f) Beyond 15 metre upto 18 metre below G.L. Metre 1116.93
433 ii) 2.4 metre diameter of digging for 1.5 metre internal
diameter of well.
435 a) Upto 3 metre below G.L Metre 831.77
435 b) Beyond 3 metre upto 6 metre below G.L. Metre 911.02
435 c) Beyond 6 metre upto 9 metre below G.L. Metre 1010.27
d) Beyond 9 metre upto 12 metre below G.L. Metre 1109.52
435 e) Beyond 12 metre upto 15 metre below G.L. Metre 1188.77
f) Beyond 15 metre upto 18 metre below G.L. Metre 1268.02
435 iii) 2.7 metre diameter of digging for 1.8 metre internal
diameter of well.
a) Upto 3 metre below G.L. Metre 903.61
435 b) Beyond 3 metre upto 6 metre below G.L Metre 933.24
435 c) Beyond 6 metre upto 9 metre below G.L. Metre 1012.49
435 d) Beyond 9 metre upto 12 metre below G.L. Metre 1092.11
435 e) Beyond 12 metre upto 15 metre below G.L. Metre 1190.99
435 f) Beyond 15 metre upto 18 metre below G.L. Metre 1270.61
435 iv) 3.0 metre diameter of digging for 2.1 metre internal
diameter of well.
Metre 1005.08
a) Upto 3 metre below G.L.
435 b) Beyond 3 metre upto 6 metre below G.L. Metre 1034.71
435 c) Beyond 6 metre upto 9 metre below G.L. Metre 1114.33
435 d) Beyond 9 metre upto 12 metre below G.L. Metre 1193.58
435 e) Beyond 12 metre upto 15 metre below G.L. Metre 1292.83
435 f) Beyond 15 metre upto 18 metre below G.L. Metre 1372.09
435 v) 3.6 metre diameter of digging for 2.4 metre internal
iameterof well.
a) Upto 3 metre below G.L. Metre 1279.13
435 b) Beyond 3 metre upto 6 metre below G.L. Metre 1308.76
435 c) Beyond 6 metre upto 9 metre below G.L. Metre 1388.38
437 d) Beyond 9 metre upto 12 metre below G.L Metre 1467.63
437 e) Beyond 12 metre upto 15 metre below G.L. Metre 1566.51
437 f) Beyond 15 metre upto 18 metre below G.L. Metre 1646.13
437 vi) 4.2 metre diameter of digging for 3.0 metre interna
diameter of well,
a) Upto 3 metre below G.L. Metre 1440.97
437 b) Beyond 3 metre upto 6 metre below G.L. Metre 1500.22
437 c) Beyond 6 metre upto 9 metre below G.L. Metre 1599.47
437 d) Beyond 9 metre upto 12 metre below G.L. Metre 1678.72
437 e) Beyond 12 metre upto 15 metre below G.L. Metre 1777.97
Page 132
Building
437 f) Beyond 15 metre upto 18 metre below G.L. Metre 1857.22
437 vii) 4.8 metre diameter of digging for 3.6 metre internal
diameter of well.
437 a) Upto 3 metre below G.L. Metre 1582.80
437 b) Beyond 3 metre upto 6 metre below G.L. Metre 1642.43
437 c) Beyond 6 metre upto 9 metre below G.L. Metre 1741.31
437 d) Beyond 9 metre upto 12 metre below G.L Metre 1820.93
437 e) Beyond 12 metre upto 15 metre below G.L. Metre 1900.18
437 f) Beyond 15 metre upto 18 metre below G.L. Metre 1979.43
437 N.B.
a) Extra 10% per metre for work beyond the initial depth of
18 metre will be paid.
437 b) For well done by sinking process 30% extra over the
corresponding rate for digging the respective internal dia of
the well will be allowed on the different stages of depth.
439 ( c ) Extra rock cutting over the corresponding rate for
digging for the respective internal diameter of the well will
be allowed on the different stage of depth.
439 i) 5% extra for cutting moorum
439 ii) 100 % extra in Laterite rock or sand stone cutting with chisel
and jumpers, but not requiring blasting.
439 iii) 200 % extra in hard rock requiring blasting including cost of
explosive etc. and done with permission from the Engineer-in-
Charge.
439 iv) 300 % extra in hard rock in built up areas using chisel,
jumper and manual labour.
439 2 R.C.C. Well ring made with cement concrete 1:1.5:3 with
stone chips and 0.80% reinforcement (including the cost of
.shuttering and reinforcement) cast at site fitted and fixed in
position after proper curing true to plumb in the well
including jointing with cement mortar 1:2 complete as per
direction.
439 a) 65 mm thick and 0.9 metre internal dia. Metre 2263.80
439 cement for joint filling-4 kg/meter
439 b) 65 mm thick and 1.2 metre internal dia. Metre 2875.40
439 Cement for joint filling-6 Kg/m
439 c) 75 mm thick and 1.5 metre internal dia. Metre 3963.30
439 Cement for joint filling-8Kg/m
439 3 Supplying and fitting fixing in position 15 cm Dia. C.I. Pully
(extra payment will be made for pully bar and other allied
item n respective item)
Each 432.08
439 4 1st class brick work for steining wall of well in cement
morter 1 :4 below G.L. including cuttng bricks if required.
439 a) 0 metre to 6 metre depth. Cum 4625.94
439 b) above 6 metre to 9 metre depth. Cum 4693.26
441 c) above 9 metre to 12 metre depth. Cum 4710.20
d) above 12 metre to 15 metre depth. 4726.92
Page 133
Building
441 e) above 15 metre to 18 metre depth. Cum 4764.65
441 f) above 18 metre up to any depth. Cum 4781.37
441 5 Taking out and removing silt from the bottom of well after
bailing out water, removing moss and weed from the well
surface (by wire brush) and disinfecting the well complete.
441 (i) Well depth 9 metre to 12 metre
441 (a) Dia of well 0.9 m to 1.2 m Each 327.80
441 (b) Dia of well 1.3 m to 1.5 m Each 432.30
441 c) Dia of well 1.6 m to 1.8 m Each 599.50
441 d) Dia of well 1.9 m to 2.1 m Each 768.90
441 e) Dia of well 2.2 m to 2.4 m Each 936.10
441 f) Dia of well 2.5 m to 2.75 m Each 960.30
441 g) Dia of well 2.85 m to 3 m Each 1296.90
441 h) Dia of well 3.6 m Each 1464.10
441 ii) Wells of depth above 12 metre but not exceeding 18
metre
441 a) Dia of well 0.9 m to 1.2 m Each 372.90
441 b) Dia of well 1.3 m to 1.5 m Each 476.30
441 c) Dia of well 1.6 m to 1.8 m Each 812.90
441 d) Dia of well 1.9 m to 2.1 m Each 982.30
443 (e) Dia of well 2.2 m to 2.4 m Each 1149.50
443 (f) Dia of well 2.5 m to 2.75 m Each 1149.50
443 (g) Dia of well 2.85 m to 3 m Each 1486.10
443 (h) Dia of well 3.6 m Each 1655.50
443 6 Removing and cleaning hard scum and silt from the bottom
of the masonry well from 45cm below the ordinary sijt level
the kerb level.
443 (a) Dia of well 0.9 m to 1.2 m Metre 339.90
443 (b) Dia of well 1.3 m to 1.5 m Metre 508.20
443 (c) Dia of well 1.6 m to 1.8 m Metre 695.20
443 (Mode of measurement:- Payment to be made per metre
depth of scum removed)
443 7 Sinking Precast R.C. well ring made with cement concrete
1:2:4 with stone chips and necessary reinforcement fitted
and fixed in position true to plumb including all labour and
hire charges of tools and Plant complete as directed and
jointing rings with cement mortar (1:2)
443 (a) 90 cm dia (internal) Metre 160.60
443 cement for joint filling-4 kg/meter
443 (b) 120 cm dia (internal) Metre 203.50
443 Cement for joint filling-6 Kg/m
443 (c) 150 cm dia (internal) Metre 288.20
443 Cement for joint filling-8Kg/m
(T) Miscellaneous works
Page 134
Building
445 1 Number plaque of building (plaque size up to 225 mm x
225 mm) made of sand cement piaster (1:2) on face of wall
or plinth with 50 mm size letters P.W.D and the number of
the structure formed thereon (in sunk type) including
painting the letters and the number complete as per
direction.
Each 76.99
445 (Cement-1 kg/No.}
445 2 Petty repairs to number-plaque of building including
repainting the letters and the number.
Each 35.22
445 3 Repainting the letters and the number of number plaque of
buildings. '
Each 22.22
445 4 Repairing crack in wall by cement grouting (1 : 2) including
widening the crack on the surface (into V section} cleaning
and packing the same with cement mortar (1:2) and
finishing off to match with adjacent surface.
%Mtr. 1099.89
445 (cement-69 Kg/100 m)
445 5 (A) Stitching crack in brick wall by carefully cutting out face
brick 125 mm. deep into the wall, cleaning the gap and
filling up the same with precast cement concrete block
carefully set in cement mortar (1:3) including mending good
damages andfinishing the surface to match with adjacent
areas complete as per direction.
445 (i) With plain cement concrete btocks(1:1.5:3) with stone
chips.
445 (a) Block size 250 x 125 x 75 mm. thick Block 63.83
445 (Cement-1.85 Kg/No.)
445 (b) Block size 250x125x150 mm. thick Block 75.83
445 (Cefnent-2.5Kg/No.
447 (ii) With reinforced cement concrete blocks (1:1.5:3) with
stone chips and nominal reinforcement..
447 (a) Block size 250 x 125 x 75 mm. thick (Cement-1.85
Kg/No.)
Block 83.66
447 (b) Block size 250 x 125 x 150 mm. thick (Cement-2.5
Kg/No.)
Block 102.99
447 (B) Stitching crack in brick wall by carefully cutting out face
brick 250 mm. long, 75 mm. thick and 125 mm deep into
the wall, cleaning the gap and filling up the same with
sound new brick, carefully set in cement mortar (1:3)
including mending good damages and finishing the
surface to match with adjacent areas complete as per
direction. (Cement-1 Kg/No.)
Brick 31.55
447 (C) Renewing weathered face brick including taking
out the old brick completely and setting the head brick
carefully in cement mortar (1:3) complete, including
making good all damages.
447 (i) In stretcher course (Cement-0.75 Kg/No.) Brick 27.28
447 (ii) In header course- (Cement-1.0 Kg/No.) Brick 29.16
Page 135
Building
447 (iii) In header course with the new brick projecting 62
mm. to 225 mm. from the wall surface (Cement-0.5Kg/No.)
Brick 23.83
447 6 Renewing ornamental baluster (Balustrade) as per design
including mending good all damages complete.
447 (a) With baluster of burnt clay (floral or intricate pattern of
height not exceeding 1200 mm.)
Each 233.31
449 (b) With baluster of plain cement concrete with (1:1 :3)
with stone chips(floral or intricate pattern of height not
exceeding 1200 mm.)
Each 292.75
449 (c) With baluster of plain cement concrete with jhama chips
(1:3:6) (floral or intricate pattern of height not exceeding
1200 mm.)
Each 251.09
449 (d) With baluster of cement concrete (1:1 :3) with stone
chips and with nominal reinforcement (floral or intricate
pattern height not exceeding 1200 mm.) and including the
cost of reinforcement and shuttering
Each 352.19
449 7 Vertical sleeve joint in wall etc. or horizontal joint in floor
roof etc. Including shaping and finishing adjacent surface
and caulking the joint with hemp rope thoroughly soaked in
bituminous material and fixing rope in position by staples or
other suitable devices complete as per direction (including
cost of all materials)
449 (Payment to be made on length of rope caulking)
449 (a) With 10 mm. dia rope Mtr. 36.22
449 (b) With 12 mm. dia rope Mtr. 40.33
449 (c) With 16 mm. dia rope Mtr. 44.33
449 (d) With 19 mm. dia rope Mtr. 49.77
449 8 Expansion joint in floor roof etc. formed with V strips made
of 22.5 cm wide strips of 24 gauge aluminium sheets with
anchor arm projecting on each side (and end turned )
embedded in adjacent cement concrete, including shaping
and finishing the edges on either side of the joint (including
the cost of bituminous filler if any) complete as per
direction.
Mtr. 348.52
451 9 Bituminous filler of approved type in expansion joints of
dummy joints including finishing the top surface as directed.
(The quantam should be corrected upto three decimals)
Cum 51498.18
451 10 Uprooting and removing plants from the surface of walls
parapet etc and making good damages. Repairing of
damages to be paid separately.
451 (a) Small plant of girth of exposed stem upto 75 mm. lift
upto 6 mtr.
Each 38.22
451 (b) Medium size plant of girth of exposed stem above 75
mm. but not exceeding 150 mm. lift upto 6 mtr.
Each 44.16
451 (c) Large plant of girth of exposed stem above 150 mm. but
not exceeding 225 mm. lift upto 6 mtr.
Each 123.10
Page 136
Building
Note : For lift beyond initial 6 mtr. the rate will be increased
@ 20% for each additional lift if 6 mtr. or part thereof
451 11 Removing scum form the bottom floor of service latrine
washing the floor thoroughly and treating he same with
liberal sprinkling of bleaching powder (including cost of
bleaching power) Payment to be made on area of floor)
Sq. M 21.24
451 12 Constructing brick chulla with 1st class brick in lime mortar
(1:2) and 20 mm thick (1:2) surki beaten plaster and
necessary C.I grating and cheeks (overall measurements
not less than 1 cu m)
Each 4781.74
451 13 Constructing brick chulla with 1st class brick in ime mortar
(1:2) and 20 mm thick (1:2) surki beaten plaster and
necessary C.I grating and cheeks (overall measurements
not less than 0.5 cu.m.)
Each 3093.02
453 14 Constructing brick chulla with 1st class brick in lime mortar
(1:2) and 20 mm thick (1:2) surki beaten plaster and
necessary C.I grating and cheeks (overall measurements
not less than 0.3 cu.m.)
Each 2046.46
453 15 Reconstructing brick chulla with old and new 1st class
bricks in lime mortar (1:2) and 20 mm thick (1:2) surki beaten
plaster arid renewal oi grating and cheeks (overall measurement
not less than 1 cum.)
Each 3702.96
453 16 Reconstructing brick chulla with old and new 1st
class bricks in lime mortar (1:2) and 20 mm thick (1:2) surki
beaten plaster and renewal of grating and cheeks (overall
measurement not less than 0.5 cum)
Each 2487.53
453 17 Renewing iron grating with 19 mm M.S rod @ 5 cm centers
of chulla including fixing in position in lime mortar (1:3) and
plaster to match with the existing
Sq.Mo
f
grating
2495.31
453 18 Renewing C.I boxes of chulla 375 x 375 x 300 mm
including fixing in position and mending damages to match
with the existing
Each 579.94
453 19 Lifting up bodily (1.5 x 0.9 x 0.9) meters wooden work
bench table with drawers or reagent racks along with sink
and waste pipe and removing the same outside the room
carefully without disturbing or damaging other working table
and resetting again after completion of channel drain
construction.
Each 89.44
453 20 Extra for high scaffolding in water tower for repairing
painting etc.
Each 4736.19
453 NOTE : Height of the bottom of the tank not less than
15mtrs.
Page 137
Building
455 21 Labour for propping up overhead members as a
precautionary measure against-falling as directed with
necessary planks Eucalyptus'props, packing nails, wire
ropes, iron wires etc. including hire charges of all materials
fitting, fixing dismantling and removing the props etc and all
ancillary works in this connection complete.
Cum 43.77
455 (Payment to be made on volume measurement considering
the hight and contact area)
455 22 Supplying fitting approved type ventilator in position after
cutting holes in walls, setting in cement mortar, mending
damages to wall and plaster and two coats of paint of
approved brand sand shade. Payment of mending two
damages of wall & plaster and painting to be made
separately.
455 (a) C.I. ventilator of 5 mm. thick
455 (i) Upto 0.10 sq.m. area Each 65.99
455 (ii) Above 0.10 sq.m. area Each 77.99
455 (b) R.C.C ventilator of 20 mm. thick
455 (i) Upto 0.10 sq.m. area Each 89.88
455 (ii) Above 0.10 sq.m. area Each 113.66
455 23 Bailing or pumping out water from foundation trenches. %Cum 1546.51
455 This item should be executed on the specific direction of
the Engineer-in-charges when he is satisfied in his absolute
discretion that this has not been necessitated due to any
fault on the part of he contractor
457 (Payment if permitted, will be made on the quantify of water
calculated on the basis of initial and final water calculated on
the basis of initial and final water level measured before
starting and completion of each day's work which necessitates
bailing pumping of wafer from the trench. The final level of
water to be measured, will depend on the level at which the days
work will be taken up. The rate includes any seepage water mat
may percolate in the trench during pumping}
457 24 Pumping out water from ponds or tanks (Payment If
permitted will be made on the quantity of water calculated
on the basis of initial water level and final level on
consideration being made for any water that may have
been added through percolation or otherwise)
%Cum 773.26
457 25 Extra over the corresponding item of earth work for
removing semi liquid mud or slushy earth by iron pans,
buckets etc (This item is to be done with express approval
of Engineer In Charge)
%Cum 1647.61
Page 138
Building
457 26 Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo
(in single line) driven about half length into the ground at very
close spacing side by side including necessary bamboo stays ties
runners etc and lining the exposed portion with sheets made
form cut-drums fitted and fixed complete as per direction.
457 (Payment to be made on length of wall)
457 (a) With bamboos of length between 1.20 m. and 1.80 m.
each.
Mtr. 643.05
457 (b) With bamboos of length above 1.80 m. and up to 2.40
to each
Mtr. 776.37
457 (c) With bamboos of length above 2.40 m. and up to 3.00
m. each.
Mtr. 958.46
459 27 Renewing bamboo piles 75 mm dia including driving upto
1.50 m , '
Mtr. 38.00
459 28 Half bamboo runners (made from 75 mm dia stout bamboo)
and fitting fixing in positions with country made rose headed
nails.
Mtr. 25.78
459 29 (a) Brick gabion 1.50 m.internal diameter and 1.20m. high
with 150 mm. deep solid brick band (in 1:6 cement mortar)
at base,125 mm.thick body of jaffry brick work set in
cement mortar (1:4) and 150 mm. deep solid brick band at
top in cement mortar (1:6) and cement plaster (1:6) (all
faces) including colour wash (all surfaces) to the top band
and redoxide or similar approved wash (all surfaces) to the
remaining portion, complete as per direction. (Cement-105
Kg/No)
Each 3059.69
459 (b) Mending good damages to brick gabions (with old
materials as available and with new materials as
necessary) including fresh colour wash and oxide wash to
the entire gabion.
459 (i) When less than half gabion has to be restored.
(Cement- 25 Kg/No)
Each 718.82
459 (ii) When more than half the gabion has to be restored.
(Cement- 50 Kg/No)
Each 991.01
459 30 Making gabions from old tar or bitumen drums after cutting
strips 75 mm wide x 300 mm long including fitting and fixing
in position using 1 % No of drums for each gabion including
cost of drums.
Each 239.20
459 31 Making gabions from old tar or bitumen drums after cutting
strips 75 mm wide x 300 mm long including fitting and fixing
in position using one number of drums for each gabion
including cost of drums.
Each 173.76
461 32 Brick pavement with 1 st class-or, picked jhama bricks as
directed with joints set close in cement mortar (1 :6) and
rule\flush pointing with cement mortar (1:4)
461 (i) When laid with a cushion of sand below (including cost
thereof).
Page 139
Building
461 (a) One brick flat pavement. (Cement-1.4 Kg/Sq.M) Sq. M 313.19
461 (b) One brick-on-edge pavement. (Cement-10.7 Kg/Sq.M) Sq. M 549.61
461 (c) One brick-on-edge pavement in herring bone pattern.
(Cement-10.7 Kg/Sq.M)
Sq. M 556.94
461 (ii) When laid with cement mortar (1:6) on the under side as
well (including cost thereof)
461 (a) One brick flat pavement. (Cement-6.4 Kg/Sq.M) Sq. M 375.19
461 (b) One brick-on-edge pavement. (Cement-15 Kg/Sq.M) Sq. M 606.27
461 (c) One brick-on-edge pavement in herring bone pattern.
Cement-15 Kg/Sq.M
Sq. M 616.27
461 33 Taking out stone slabs of flat V-shaped drain of road side
and resetting the same to correct line and level with
cement mortar (1:4) including cement pointing (1:2)
463 (a) Vertical kerb stone. (Cement-1.25 Kg/M) Mtr. 24.08
463 (b) Flat channel stone. (Cement-1.75 Kg/M) Mtr. 36.89
463 34 Renewing cement pointing (1:2) in joints of flat V-shaped
road side drain made of kerb stone and channel stone
including opening up and cleaning the joints properly.
(Cement-26 Kg/100 M)
%Mtr. 405.52
463 (Payment to be made on length of drain pointed i.e. kerb
stone and channel stone taken together.)
463 35 Hire and labour charges for 75 mm dia bamboo railing on
Jhau/Eucalyptus or other approved timber\bamboo posts
1.4 m above G.L and 0.60 m below G.L including tying
strongly with coir ropes and boring holes for posts in any
soil/ concrete surface/Bituminious surface packing the
sides etc including cost of carriage of all materials and
labour complete including cost of restoration to the
damages of the ground to its original condition as per
direction of Engineer in charge after removing the
barricade.( Cost of restoration would be paid separately.).
463 (a) 75mm. dia bamboo railing & 125mm. dia
Jhau/Eucalyptus/other approved timber posts @ 1.60m
apart
463 (i) Railing with 4 rows. Mtr. 57.77
463 (ii) Railing with 3 rows. Mtr. 50.66
463 (b) 75mm, dia bamboo railing & 100mm. dia bamboo posts
@ 1.40m. apart.
463 (i) Railing with 4 rows. Mtr. 48.00
465 (ii) Railing with 3 rows. - - Mtr. 40.22
Page 140
Building
465 36 Hire and labour charges for 100 mm dia bamboo railing on
Jhau/Eucalyptus post 1.40 m above G.L and 0.60 m below
G.L tied strongly with bamboo railing with coir rope, digging
holes for posts in any sort of soil or concrete surface,
packing the sides etc including cost of carriage of all
materials and labour complete including cost of restoration
to the damages of the ground to its original condition as per
direction of Engineer in charge after removing the
barricade.(Cost of restoration to be paid separately.)
465 (a) 100 mm. dia bamboo railing and 150 mm. dia.
Jhaubullah/Eucalyptus posts @ 1.80 m. apart.
465 (i) Railing with 4 rows. Mtr. 72.49
465 (ii) Railing with 3 rows. Mtr. 61.27
465 37 Hire and labour charges for coir rope fencing 25 mm dia
rope single on 120 m dia bamboo posts 1.40 m above G.L
and 600 mm below G.L 1.50 m apart including digging
holes complete
Mtr. 13.78
467 38 Hire and labour charges for coloured and twisted cloth rope
fencing as per design approved by Engineer-in-charge one
line with 100 mm dia Eucalyptus or bamboo posts 0.60 m
above G.L and 300 mm below G.L 1.50 m apart fitted and
fixed complete including painting with white zinc painting (2
coat) complete. Payment of Painting to be made
separately.
Mtr. 17.00
467 39 Labour for fitting and fixing special type M.S clamp with
necessary wooden packing to elec. Lamp post upto 7.60 m
height with necessary scaffolding and tightening the bolts
and nuts and one coat of white painting complete including
dismantling the clamps and depositing the same to P.W.D
office after the foundation.
Each 46.22
467 40 Labour charges for fitting and fixing flag up to 1.80 m x 1.20
m size in the special type clamp including sticking the flag
as necessary with scaffolding upto 7.6 m and bringing down
the flag immediately after the function and depositing the
same to P.W.D office (Bringing down of the flag to be
completed in the afternoon on the date specified by
Engineer-in-charge)
Each 106.66
467 41 Hire and labour charges for erecting temporary latrine and
urinals with thick canvas (new) walling fitted and fixed with
strong bamboo frames and posts including cutting drain,
making seats with porcelain pans and urinals as directed
with hire charges completed. (Payment to be made on the
covered ground area between temporary wallings. One
basin or pan or urinal to be fixed for every 3 sq m covered
area or part.)
Sq. M 233.50
Page 141
Building
469 42 Hire and labour for erecting new thick canvas shade 6.10 m
x 3.70 m with roof covering with strong bamboo frame for
2~nos ladies cloak room with canvas on all sides as per
direction oi Engineer- in- charges including maintaining the
shades as required including fitting and fixing white
squatting urinals and one pan complete with drainage as
directed.
Set 5206.15
469 43 Supplying on hire "Garden" chairs during function and
arranging those properly on ground as per direction of
Engineer -in -charge including carriage of chairs to site,
their retention till the end of the function and their removal
after conclusion of function including cost of all labour and
material complete.
Each 10.53
469 44 Supplying on hire basis cushioned chairs for VIPs arranging
properly on the dias as per direction of Engineer- in -charge
including carriage of chairs etc complete.
Each 36.95
469 45 Hire and labour charges for providing "Drop Gate" with 15
cm dia salbullah of length not less than 8 meter including
hoisting and fitting fixing with bolts and nuts to vertical posts
(100 mm dia : 2 nos on each flank embedded 750 mm
below G.L) and providing counter load of concrete or stone
or iron block at the fulcrum end including painting two coats
in alternate band providing 'STOP' plate, jute rope of
necessary length etc complete including dismantling and
removing as per direction of the Engineer in charge.
Each 569.94
469 46 Labour charge for hoisting and fitting, fixing drop gate
including carriage of the gate by parts from he
departmental godown / stack yard and dismantling and
returning the gate to the place of supply as per direction of
the Engineer- in -charge
Each 419.96
471 47 Supplying sign-board made of 25 mm thick sal plank and
frame on all side of sal batten 50 x 32 mm and 3.15 m x
100 mm x 100 mm sal posts fitting fixing such with digging
holes of dia 300 mm and depth 750 mm in all sorts of soil
and repacking and consolidating the gap around the post
with cement concrete (1:3:6) painting 2 coats including cost
of nails, bolts and nuts etc. complete in all respect as per
direction of the Engineer- in -charge. Payment of concrete
and painting to be made separately.
471 (i) 600 mm. x 450 mm. size of board. Each 497.62
471 (ii) 900 mm. x 600 mm. size of board. Each 870.02
471 48 Projection of individual brick 12.5 cm x 7.5 cm x 6.5 cm to
12.5 cm projection from wall surface. (The rate covers the
projection only, the embedded portion being including in the
measurement of the wall against appropriate item)
Each 9.44
Page 142
Building
471 49 Cleaning and removing conservancy garbage mixed with
rubbish & other filthy materials from the road side flank,
drain and compound including sutting, loading, unloading to
and from truck or cart by Mathor labour & removing the
same to any distance.
%Cum 5116.16
471 50 7.5 cm. thick compacted lime concrete with moorum and
best quality slaked stone lime ( 5% by volume) properly
mixed, laid and rammed on bed of foundation including cost
of all materials, labour and curing etc. complete in all
respect as per direction of Engineer-in-Charge (10 cm.
loose consolidated to 7.5 cm. thick)
Sq. M 106.10
473 51 Making one set of scaffolding only for replacing glass
panels, painting, uprooting plant and another repairing
works of building and S&P works for external works only
with 10 cm. dia bamboo as main posts at the rate of 1
metre centre to centre and 7.5 cm. dia bamboo ties @0.75
metre apart fitting and fixing with necessary coir, nails etc.
as per direction of the Engineer-in-charge.
473 (This item should be executed only after prior approval of
the Engiheer-in-charge). Firstly, one number to be paid and
then labour rate for shifting up to further nineteenth (19)
times @ 10% each time to be considered. If necessary
further after twenty times of total use, another one number
new and labour rate for shifting to be considered
accordingly.
473 a) 3.90 metre height Each 333.30
473 b) Extra for additional 3.6 height or part thereof Each 305.53
473 52 Supplying (in bulk) at depots as directed boundary pillars
0.9m. high 27 cm. dia at base and 22.5m. dia at top with
chamfered flat face in the top with sunk inscription there on
complete with top 45cm length finished smooth with cement
rendering or thin plaster (1:3) but without any wash or
painting. (No Departmental cement will be issued)
473 a) Made of cement concrete 1:3:6 with jhama chips Each 240.37
473 b) Made of cement concrete 1:3:6 with stone chips or
gravel
Each 282.03
473 53 Fitting and fixing boundary pillar in correct position as
directed with embedment of 60 cm. into the ground
including making hole in ground and repacking the same
thoroughly and carriage of the boundary pillar to site.
475 a) With carriage upto 150 metre (When the pillar are
delivered near the area by departmental carriage)
Each 32.44
475 b) With carriage beyond 150 metre and upto 3.00 Km Each 34.83
475 c) With carriage beyond 3.00 Km and upto 8.00 Km Each 37.16
475 54 White wash or colour wash to boundary pillar and painting
as directed.
Each 18.89
Page 143
Building
475 55 Supplying (in bulk), at depots as instructed R.C.guard posts
(with cement concrete 1:2:4 with stone chips and normal
reinforcement), 1.35m. long and of octagonal section
measuring 20 cm. accross opposite flat surfaces at the
base tapering to corresponding dimension of 15 cm. at the
top and with top and face level finished complete as per
direction, including smooth finishing to the top 90 cm.
length with cement rendering of thin plaster 1:3 but
excluding painting. (No Departmental cement will be
issued)
Each 298.42
475 56 Fitting and fixing guard post in correct position as directed,
true to line and level with embedment of 53 cm. to 68 cm.
(as directed) into the ground including making hole,
repacking the same thoroughly and including carriage of
the guard post of the site.
475 a) With carriage upto 150 metre (When the pillar are
delivered near the area by departmental carriage)
Each 32.44
475 b) With carriage beyond 150 metre and upto 3.00 Km Each 34.83
475 c) With carriage beyond 3.00 Km and upto 8.00 Km Each 37.16
477 57 Painting guard post with horizontal alternate bands n
different colours as directed with approved oil-bound paint.
477 a) One coat Each 33.16
477 b) Two coats Each 40.89
477 58 Painting the vertical end faces and the inside face of pillar
or railing or parapet (1.05 m. to 1.75 m. high) with
horizontal alternate bands in different colours, as directed
with approved oil-bound paint.
477 Length of each band ranging between 0.75 m. and 1.2 m.)
477 a) One coat Each 39.22
477 b) Two coats Each 55.38
477 59 Painting block letters or digits in Black Japan or any
approved paint as per direction.
477 a) Size 2 cm. to 2.5 cm. Each 5.06
477 b) Size above 2.5 cm. and upto 4 cm. Each 7.39
477 c) Size above 4 cm. and upto 5 cm. Each 8.55
477 d) Size above 5 cm. and upto 7.5 cm. Each 9.72
477 e) Size above 7.5 cm. and upto 10 cm. Each 10.89
477 f) Size above 10 cm. and upto 12.5 cm. Each 12.05
477 g) Size above 12.5 cm. and upto 15 cm. Each 13.28
477 h) Size above 15 cm. and upto 20 cm. Each 14.44
477 NB. (a) The above rates will be enhanced by 100% the
letters are engraved and painted.
479 (b) 25% extra for painting the letters of K.M. Post and M
Post etc.
479 60 Supplying Surki, shifting and spreading the same as
directed. (Payment to be made on prior measurement with
the allowance for sinkage or shrinkage)
Cu.M. 1969.25
Page 144
Building
479 61 Labour for laying 150 mm to 200 mm boulder soling
including rough dressing hand packing and ramming down
small pieces in the interstics including rolling and
preparing the bed to proper level and filling up all joints with
sandy clay or earth. NB. - This rate only for Northern Circle,
NBCC-I & NBCC-II
Sq.m.
479 62 Do - - Do - without rolling but including ramming. NB. --
This rate only for Northern Circle, NBCC-I & NBCC-II
Sq.m.
479 63 Taking out carefully existing (75 mm. wide) brick edging
and relaying the edging in the same trench after rectifying
line and level as required and repacking the trench
thoroughly on both sides of the edging. NB. - This rate only
for Northern Circle, NBCC-I & NBCC-II
479 (i) Relaying with all old bricks or with partly old and partly
new departmental bricks (including carriage of such bricks
within a lead of 150m.)
479 a) Brick on edge edging (125 mm. depth) Mtr.
479 b) Brick on edge edging (250 mm. depth) Mtr.
479 64 Taking out carefully existing (75 mm. wide) ornamental
brick edging of Saw-tooth type (with bricks laid diagonally
on end) and relaying the edging in the same trench after
rectifying line and level as required and repacking the
trench thoroughly on both sides of the edging.
Mtr. 4.47
481 65 Labour for taking out carefully-existing stone edging and
relaying the edging on the same trench rectifying line and
level as required with all old materials or with partly old and
partly new departmental materials (including carriage of
new materials within a lead of 150 m.) and repacking the
trench thoroughly on both sides of the edging.
481 (a) 125 mm to 150 mm width and 225 mm to 250 mm deep
edging with stone boulders with the top portion rough
dressed.
Mtr. 6.69
481 (b) 100 mm wide and 125 mm deep edging with stone sets
laid on edge.
Mtr. 4.47
481 (c) 100 mm wide and 250 mm deep edging with stone sets
laid on edge.
Mtr. 4.47
481 66 Stone set pavement with the joints set close in cement
mortar (1:6) excluding the cost of stone sets but including
the cost of carriage thereof within a lead of 150 m.
481 (i) When laid with a cushion of sand below (including cost
thereof).
481 (a) 100 mm thick pavement Sq.m. 41.55
481 (b) 125 mm thick pavement. Sq.m. 46.66
(ii) When laid with cement mortar (1:6) on the underside as
well (including cost thereof).
481 (a) 100 mm thick pavement Sq.m. 39.66
Page 145
Building
481 (b) 125 mm thick pavement. Sq.m. 45.66
481 67 Supplying, fitting and fixing Fan Hook for ceiling with 1
metre long 16mm. dia rod complete including mending
damages. Payment for damage and repair to be made
separately.
Each 86.99
483 68 Clearing compound premises of shurbs, plants, jungles etc.
by cutting and removing as directed (Specific permission of
Engineer-in-Charge prior to execution will be necessary).
(Payment to be made on area cleared)
Sq.m. 6.84
Page 146
Sanitary&Plumbing
Rates (Rs.)
All Districts
of West
Bengal
SECTION (A)-PLUMBING WORKS
(A)-(l) FERRULE AND FERRULE CONNECTION
1 (a) Original Works
1 1 Supplying,fitting and fixing brass ferrule including
connection with G.I. pipes of TATA make of following dia.
and upto 450 mm long with screw, jamnut, sockets etc.,
complete in all respect, including cutting trenches in all
sorts of soil and filling up the trenches as per direction of
the Engineer-in -Charge.
1 (i) 25 mm dia. Each 1464.00
1 (ii) 20 mm dia. Each 1007.00
1 (iii) 15 mm dia. Each 761.00
1 (iv) 10 mm dia. Each 751.00
1 2 Supplying, fitting and fixing brass ferrule including
connection with P.V.C. pipe of approved make upto 450
mm long with plumbing joint,brass over C.P. coupling at
both ends, with cap and lining complete in all respect,
including cutting trenches in all sorts of soil and filling up
trenches as per direction of the Engineer-in-charge.
1 (i) 25 mm dia. Each 1399.00
1 (ii) 20 mm dia. Each 962.00
1 (iii) 15 mm dia. Each 713.00
1 (iv) 10 mm dia. Each 701.00
1 (b) REPAIR WORKS
1 1 Renewing brass ferrule for connecting mains.
1 (i) 25 mm dia. Each 1300.00
1 (ii) 20 mm dia. Each 875.00
1 (iii) 15 mm dia. Each 640.00
1 (iv) 10 mm dia. Each 630.00
1 2 Dismantling ferrule with all pipe connections. Each
Set
107.00
1 3 Dismantling existing ferrule with fittings and refixing same
after cleaning.
Each
Set
119.00
2 (A)-(II) G.I./P.V.C. PIPE WORKS AND FITTINGS
2 (a) Original Works
2 Supplying, fitting and fixing G.I. pipes of TATA make with
all necessary accessories, specials viz. socket, bend,
tee, union, cross, elbo, nipple, long screw, reducing
socket, reducing tee, short piece etc. fitted with holder
bats clamps, including cutting pipes, making threads,
fitting, fixing etc. complete in all respect including
cost of all necessary fittings as required jointing
materials and two coats of painting with approved paint in
any position above ground.
2 (Payment will be made on the centre line measurements
of total pipe line including all specials. No separate
payment will be made for accesories, specials. Payment
for painting will be made seperately)
2 (A) For Exposed Work
2 (a) (i) 15 mm dia. light quality Mtr 165.00
2 (a) (ii) 15 mm dia. Medium quality Mtr 194.00
2 (b) (i) 20 mm dia. light quality Mtr 208.00
2 (b) (ii) 20 mm dia. medium quality Mtr 221.00
(c) (i) 25 mm dia light qualitv Mtr 262.00
2 (c) (ii) 25 mmdia. mediumquality Mtr 300.00
2 (d) (i) 32 mm dia. light quality Mtr 303.00
2 (d) (ii) 32 mm dia. medium quality Mtr 343.00
2 (e) (i) 40 mm dia. light quality Mtr 387.00
2 (e) (ii) 40 mm dia. medium quality Mtr 399.00
2 (f) (i) 50 mm dia. light quality Mtr 453.00
2 (f) (ii) 50 mm dia. medium quality Mtr 520.00
2 (g)(i) 65 mm dia. light quality Mtr 606.00
2 (g) (ii) 65 mm dia. medium quality Mtr 653.00
2 (h) (i) 80 mm dia. light quality Mtr 699.00
2 (h) (ii) 80 mm dia. medium quality Mtr 841.00
2 (i)(i) 100 mmdia. mediumquality Mtr 1184.00
2 (i) (ii) 100 mmdia. heavy quality Mtr 1363.00
3 (j) (i) 125 mm dia. medium quality Mtr 1526.00
3 (j) (ii) 125 mm dia. heavy quality Mtr 1697.00
3 (k) (i) 150 mm dia. medium quality Mtr 1788.00
3 (k) (ii) 150 mm dia. heavy quality Mtr 1946.00
3 (B) For Concealed Work
3 (a) 15 mm dia. medium quality Mtr 224.00
3 (b) 20 mm dia. medium quality Mtr 246.00
3 (c) 25 mm dia. medium quality Mtr 337.00
3 2 Supplying, fitting and fixing in position G.I.pipes of TATA
make for underground works with all necessary
accessories,specials viz.socket, bend, tee, union, cross,
elbow, nipple, short piece etc.including cost of all
materials,jointing materials ,cutting pipes,making
threads,cutting trenches upto 1.5 metre below surface in
all sorts of soil and refilling the same as directed with two
coats of painting on G.I. pipes and specials with
bituminous paint complete in all respect.
3 (Payment will be made on the centre line measurement of
the total pipe line including all specials No separate
payment will be made for accessories, specials.Payment
for painting will be made seperately)
3 (i) 15 mm dia. medium quality metre 202.00
3 ii) 20 mm dia. medium quality metre 229.00
3 iii) 25 mm dia. medium quality metre 309.00
3 iv) 32 mmdia. mediumquality metre 342.00
3 v) 40 mm dia. medium quality metre 390.00
3 vi) 50 mm dia. medium quality metre. 507.00
3 vii) 65 mm dia. medium quality metre 640.00
3 viii) 80 mm dia. medium quality metre 829.00
3 ix) 100 mm dia. medium quality metre 1167.00
3 x) 125 mm dia. medium quality metre 1509.00
3 xi) 150 mm dia. medium quality metre 1766.00
4 3 Supplying, fitting and fixing shower of approved brand and
make.
4 (a) (i) Chromium plated round shower with revolving joint
100 mm dia with rubid cleaning system (Equivalent to
Code No. 542(N) & Model - Tropical /Sumthing Special of
ESSCO or similar brand).
each 565.00
4 (a) (ii) Chromium plated round shower with revolving joint
(Equivalent to Code No. 541(N) & Model - Tropical /
Sumthing Special of ESSCO or similar brand).
each 446.00
4 (a) (iii) Chromium plated shower arm 190 mm long
(Equivalent to Code No. 536(A) & Model - Tropical /
Sumthing Special of ESSCO or similar brand).
each 380.00
Pag
e No
Item
No.
Description of Item Unit
Page 147
Sanitary&Plumbing
4 (b) Chromium plated Rose shower with revolving joint and
150 mm long shower arm (Equivalent to Code No. 5489 &
Model - Florentine of Jaquar or similar brand).
each 1570.00
4 (c) PTMT overhead shower ( Prayag or equivalent)
4 (i) 75 mm round each 171.00
4 (ii) 150 mm round each 285.00
4 (d) Polythene of approved make
4 (i) 15 mm X 125 mm each 142.00
4 4 Supplying, fitting and fixing Peet's valve fullway gunmetal
standard pattern best quality of approved brand bearing
I.S.I, marking with fittings (tested to 21 kg per sq. cm.).
4 (Note: Item (i),(ii) and (iii) to be done as per specific
direction of the Superintending Engineer)
4 (i) 100 mm each 12602.00
4 (ii) 80 mm each 6653.00
4 (iii) 65 mm each 4668.00
4 (iv) 50 mm each 2650.00
5 v) 40 mm each 1800.00
5 vi) 32 mm each 1293.00
5 vii) 25 mm each 926.00
5 viii) 20 mm each 645.00
5 ix) 15 mm each 505.00
5 5 Supplying, fitting and fixing gunmetal wheel valve of
approved brand and make tested to 21 kg per sq. cm. (for
water lines only).
5 (i) 100 mm each 9270.00
5 (ii) 80 mm each 4842.00
5 (iii) 65 mm each 3175.00
5 (iv) 50 mm each 1824.00
5 (v) 40 mm each 1250.00
5 (vi) 32 mm each 1015.00
5 (vii) 25 mm each 708.00
5 (viii) 20 mm each 550.00
5 (ix) 15 mm each 432.00
5 6 Supplying, fitting and fixing gunmetal wheel valve of
approved brand and make tested to 35 kg per sq. cm. (for
gas line only).
5 (i) 100 mm each 11210.00
5 (ii) 80 mm each 7100.00
5 (iii) 65 mm each 4940.00
5 (iv) 50 mm each 2965.00
5 (v) 40 mm each 2000.00
5 (vi) 32 mm each 1437.00
5 (vii) 25 mm each 1078.00
6 (viii) 20 mm each 678.00
6 (ix) 15 mm each 445.00
6 7 Supplying, fitting and fixing bib cock or stop cock.
6 (a) (i) Chromium plated Bib Cock short body (Equivalent
to Code No. 511 & Model - Tropical / Sumthing Special of
ESSCO or similar brand).
each 511.00
6 (a) (ii) Chromium plated Bib Cock long body with wall
flange with aerator (Equivalent to Code No. 512 & Model -
Tropical / Sumthing Special of ESSCO or similar brand)
each 648.00
6 (b) (i) Chromium plated Stop Cock (Equivalent to Code
No. 513(A) & 513(B) & Model - Tropical / Sumthing
Special of ESSCO or similar brand).
each 499.00
6 (b) (ii) Chromium plated Concealed Stop Cock (Equivalent
to Code No. 514(A) & Model - Tropical / Sumthing Special
of ESSCO or similar brand).
each 785.00
6 (c) (i) Chromium plated Bib Cock (angular shape with wall
flange) (Equivalent to Code No. 5037 & Model - Florentine
of Jaquar or similar brand).
each 892.00
6 (c) (ii) Chromium plated Bib Cock with wall flange
(Equivalent to Code No. 5047 & Model - Florentine of
Jaquar or similar brand).
each 916.00
6 (d) (i) Chromium plated angular Stop Cock with wall
flange (Equivalent to Code No. 5053 & Model - Florentine
of Jaquar or similar brand).
each 856.00
6 (d) (ii) Chromium plated concealed Stop Cock heavy duty
(Equivalent to Code No. 5083 & Model - Florentine of
Jaquar or similar brand).
each 1118.00
6 (e) PTMT (Polytetra methylene trephthalet) Bib Cock /
Stop Cock C706 - (i) 15 mm
each 157.00
6 (f) (i) Polythene Bib Cock / Stop Cock (HD) with metal
inlet (EMCO / ATLAS or equivalent) - (i) 15 mm
each 89.00
6 f) (ii) Polythene Bib Cock / Stop Cock with plastic inlet
(EMCO / ATLAS or equivalent) - I) 15 mm
each 89.00
7 (g) Supplying, fitting and fixing alloy iron with brass
spindle bib cock/ stop cock of approved brand and make,
spray painted and tested to 21 kg per sq.cm.
7 (i) 15 mm each 168.00
7 (ii) 20 mm each 330.00
7 (iii) 25 mm each 522.00
7 (Note: Item 3(b),7c(i),(ii) & 7d (i) ,(ii) to be done as per
specific direction of the Superintending Engineer.)
7
7 8 Supplying, fitting and fixing push cock of heavy quality
and of approved make and brand.
7 (a) Cast iron
7 (i) 15 mm each 188.00
7 (ii) 20 mm each 216.00
7 (b) Cast iron with brass spindle
7 (i) 15 mm each 210.00
7 (ii) 20 mm each 246.00
7 (c) (i) PTMT Push Cock (20 mm F/T) with spout ( Prayag
or equivalent)
each 149.00
7 (c) (ii) PTMT Push Cock with reducer 15x20 mm ( Prayag
or equivalent)
each 180.00
7 (c) (iii) PTMT Push Cock 15 mm (Female thread) (
Prayag or equivalent)
each 130.00
7 (c) (iv) PTMT Push Cock 15 mm with spout ( Prayag or
equivalent)
each 140.00
7 (d) Polythene
7 (i) 15 mm each 92.00
7 (ii) 20 mm each 107.00
8 9 C.I. sluice valve with flanged ends drilled to as per f.S.
1358/62 and having all cast iron components as per I.S.
780/71 solid forged bronze inside screw spindle having
ultimate tensile strength not less than 4.72 MT per sq.
cm. Spindle nut valve and seat faces of hard wear
resisting, manufactured from best quality gunmetal
conforming to I.S. 780/71, painted black all over with
asphalt base paint tested to 21 kg (hydraulic pressure)
per sq. cm., valve opening to anticlockwise direction, fitted
and fixed complete.
8 (i) 50 mm each 2550.00
8 (ii) 80 mm each 3645.00
8 (iii) 100mm each 4809.00
8 (iv) 125mm each 5973.00
8 (v) 150 mm each 7138.00
Page 148
Sanitary&Plumbing
8 (vi) 200 mm each 12451.00
8 (vii) 250 mm each 18892.00
8 (viii) 300 mm each 23403.00
8 10 Sluice valve chamber with C.I. heavy cover with locking
arrangement, (weight not less than 25 kg) (size of
chamber 450 mm X 600 mm inside upto 900 mm depth)
250 mm thick cement brick walls (6:1), 150 mm thick
cement concrete (6:3:1) bed with stone chips, 20 mm
thick cement plaster (6:1) for inside wall and 15 mm thick
cement plaster (4:1) for outer walls including rounding
corners.
each set 7576.00
8 11 Supplying, fitting and fixing C.I. tail pieces in pair
conforming to I.S. specifications.
8 (i) 100 mm each pair 1496.00
8 (ii) 80 mm each pair 1299.00
9 12 Supplying, fitting and fixing cast iron spun pipe
conforming to I.S. 1536/1976 with all necessary specials
including cutting trenches in any soil or through masonry,
concrete etc., if necessary,and mending good all damages
including jointing pipes with Tyton joints as per
manufacturer's specifications and filling up the trenches
all complete but excluding the cost of masonry or concrete
work, if required.
9 (a) Class A:
9 (i) 80 mm nominal dia. metre 1085.00
9 (ii) 100 mm nominal dia. metre 1315.00
9 (iii) 125 mm nominal dia. metre 1643.00
9 (iv) 150 mm nominal dia. metre 2004.00
9 (v) 200 mm nominal dia. metre 2853.00
9 (vi) 250 mm nominal dia. metre 3834.00
9 (vii) 300 mm nominal dia. metre 4946.00
9 (b) Class B:
9 (i) 80 mm nominal dia. metre 1157.00
9 (ii) 100 mm nominal dia. metre 1398.00
9 (iii) 125 mm nominal dia. metre 1749.00
9 (iv) 150 mm nominal dia. metre 2154.00
9 (v) 200 mm nominal dia. metre 3079.00
9 (vi) 250 mm nominal dia. metre 4141.00
9 (vii) 300 mm nominal dia. metre 5149.00
9 (c) Class LA:
9 (i) 80 mm nominal dia. metre 996.00
9 (ii) 100 mm nominal dia. metre 1188.00
9 (iii) 125 mm nominal dia. metre 1496.00
9 (iv) 150 mm nominal dia. metre 1819.00
10 (v) 200 mm nominal dia. metre 2635.00
10 (vi) 250 mm nominal dia. metre 3527.00
10 (vii) 300 mm nominal dia. metre 4530.00
10 13 Renewing specials only of cast iron spun pipe conforming
to I.S. 1536/1976 including cutting trenches in any soil or
through masonry, concrete etc., if necessary and
mending good damages including jointing with Tyton
joints as per manufacturer's specifications excluding the
cost of concrete or masonry work, if required, but
including the cost of filling up trenches (for all dia.
specials, payment will be made on the basis of actual
weight of the specials).
Kg 79.00
10 14 Supplying, fitting and fixing C.I. holder bat clamp including
cutting holes in wall etc. and mending good all damages in
cement concrete with jhama chips (4:2:1) and cement
plaster (6:1) to match and curing complete in all respect.
10 (i) 15 mm each 22.00
10 (ii) 20 mm each 25.00
10 (iii) 25mm each 28.00
10 (iv) 32mm each 44.00
10 (v) 40 mm each 47.00
10 (vi) 50 mm each 61.00
10 (vii) 65 mm each 126.00
10 (viii) 80 mm each 138.00
10 (ix) 100 mm each 156.00
10 15 Supplying, fitting and fixing self closing C.P. water tap of
approved brand and make - 15 mm dia.
each 232.00
10 16 Supplying, fitting and fixing G.I. gravity operated water tap
for public use with pilfer proof arrangement of approved
brand and make.
10 i) 15 mm dia. each 314.00
11 (ii) 20 mm dia. each 362.00
11 17 Supplying/fitting and fixing steel reducing bush.
11 (i) 20 mm X 15 mm and below each 25.00
11 (ii) 25 mm X 20 mm and below each 30.00
11 (iii) 15 mm X 10 mm and below each 25.00
11 (iv) 32 mm X 25 mm each 47.00
11 (v) 40 mm X 32 mm each 60.00
11 (vi) 50 mm X 40 mm each 97.00
11 18 Labour for fitting and fixing high density poly-ethylene
pipes or P.V.C. pipes for above ground work including
cost of jointing materials paints etc. fitting and fixing all
necessary specials, cutting pipes, making threads, cutting
holes in walls or R.C. floor where necessary and mending
good all damages excluding the cost of masonry or
concrete work, if necessary, but including the cost and
fitting and fixing holder bat clamps(any floor) or for
underground work including cutting trenches upto 1.5
metre and refilling the same complete as per direction of
the Engineer-in-charge.
11 (Payment will be made on centre line measurement of the
total pipeline including specials.)
11 (A)Above Ground
11 (I) 15 mm dia. metre 17.00
11 (ii) 20mm dia. metre 17.00
11 (iii) 25 mm dia. metre 18.00
11 (iv) 32 mm dia. metre 19.00
11 (v) 40 mm dia. metre 25.00
11 (vi) 50 mm dia. metre 27.00
11 (vii) 65 mm dia. metre 32.00
11 (viii) 75 mm dia. / 80 mm dia. metre 38.00
11 ix) 100 mm dia. /110 mm dia. metre 40.00
12 (x) 140 mmdia. metre 49.00
12 (xi) 160 mmdia. metre 51.00
12 (B)Under Ground
(i) 15 mm dia. metre 27.00
12 (ii) 20mm dia. metre 27.00
12 (iii) 25 mm dia. metre 27.00
12 (iv) 32 mm dia. metre 30.00
12 (v) 40 mm dia. metre 37.00
12 (vi) 50 mm dia. metre 39.00
12 (vii) 65 mm dia. metre 46.00
12 (viii) 75 mm dia. / 80 mm dia. metre 56.00
12 (ix) 100 mm dia. /110 mm dia. metre 58.00
12 (x) 140 mm dia. metre 58.00
12 (xi) 160 mm dia. metre 59.00
Page 149
Sanitary&Plumbing
12 19(1) Supplying, fitting and fixing PVC pipes of approved make
of (medium duty) conforming to ASTMD -1785 and
threaded to match with Gl Pipes as per IS : 1239 (Part -
1). with all necessary accessories, specials viz. socket,
bend, tee, union, cross, elbow, nipple, long screw,
reducing socket, reducing tee, short piece etc. fitted with
holder bats clamps, including cutting pipes, making
threads,fitting, fixing etc. complete in all respect including
cost of all necessary fittings as required jointing materials
and two coats of painting with approved paint in any
position above ground. (Payment will be made on the
centre line measurements of total pipe line including ail
specials. No separate payment will be made for
accessories, specials. Payment for painting will be made
separately)
12 (a) For Exposed Work
12 PVC Pipes
13 15 mmDia metre 80.00
13 20 mm Dia. metre 102.00
13 25 mm Dia metre 142.00
13 32 mm Dia metre 191.00
13 40 mmDia metre 233.00
13 50 mm Dia metre 314.00
13 65 mmDia metre 472.00
13 80 mm Dia metre 617.00
13 100 mm Dia metre 887.00
13 125 mm Dia metre 1216.00
13 150 mm Dia metre 1669.00
13 200 mm Dia metre 2508.00
13 250 mm Dia metre 3698.00
13 300 mm Dia metre 4995.00
13 (b) For Concealed Work
13 15 mm dia. metre 102.00
13 20 mm dia. metre 120.00
13 25 mm Dia metre 160.00
13 19(II) Supplying, fitting and fixing PVC pipes for underground
work of approved make (medium duty) conforming to
ASTMD - 1785 and threaded to match with Gl Pipes as
per IS : 1239 (Part -1). with all necessary accessories,
specials viz. socket, bend, tee, union, cross, elbow,
nipple, long screw, reducing socket, reducing tee, short
piece etc. fitted including cost of all materials jointing
materials, cutting pipes, making threads ,cutting trenches
upto 1.5 metre below surface in all sorts of soil and
refilling the same as directed complete in all respect.
(Payment will be made on the centre line measurement of
the total pipe line including ail specials No separate
payment will be made for accessories, specials.)
13 PVC Pipes 1.00
14 15 mmDia metre 89.00
14 20 mm Dia. metre 111.00
14 25 mm Dia metre 150.00
14 32 mm Dia metre 199.00
14 40 mmDia metre 245.00
14 50 mm Dia metre 325.00
14 65 mmDia metre 483.00
14 80 mm Dia metre 633.00
14 100 mm Dia metre 904.00
14 125 mm Dia metre 1232.00
14 150 mm Dia metre 1676.00
14 200 mm Dia metre 2515.00
14 250 mm Dia metre 3701.00
14 300 mm Dia metre 5002.00
14 19(III) Supply of PVC pipes & fittings (medium duty) conforming
to ASTMD - 1785 and threaded to match with Gl Pipes as
per IS : 1239 (Part -1).
14 (A) PVC Pipes
14 15 mmDia metre 50.87
14 20 mm Dia. metre 67.84
14 25 mm Dia metre 99.29
14 32 mm Dia metre 138.46
14 40 mmDia metre 167.27
14 50 mm Dia metre 231.81
14 65 mmDia metre 358.36
14 80 mm Dia metre 464.68
14 100 mm Dia metre 679.44
14 125 mm Dia metre 942.13
15 150 mm Dia metre 1296.42
15 200 mm Dia metre 1969.94
15 250 mm Dia metre 2919.70
15 300 mm Dia metre 3962.30
15 (B) Socket
15 15 mm Dia. Each 7.65
15 20 mm Dia. Each 10.60
15 25 mm Dia Each 14.38
15 32 mm Dia Each 21.92
15 40 mm Dia Each 31.36
15 50 mm Dia Each 49.29
15 65 mm Dia Each 78.60
15 80 mm Dia Each 95.58
15 100 mm Dia Each 126.72
15 125 mm Dia Each 160.69
15 150 mm Dia Each 217.47
15 200 mm Dia Each 390.96
15 250 mm Dia Each 491.11
15 300 mm Dia Each 642.09
15 (C) Elbow
15 15 mm Dia. Each 10.60
15 20 mm Dia. Each 17.21
15 25 mm Dia Each 23.81
15 32 mm Dia Each 37.97
15 40 mm Dia Each 54.95
15 50 mm Dia Each 87.98
16 65 mm Dia Each 151.25
16 80 mm Dia Each 179.56
16 100 mm Dia Each 302.23
16 125 mm Dia Each 377.71
16 150 mm Dia Each 906.29
16 200 mm Dia Each 1128.05
16 250 mm Dia Each 1510.44
16 300 mm Dia Each 1812.14
16 (D) Bend (90 Degree)
16 15 mm Dia. Each 24.98
16 20 mm Dia. Each 30.89
16 25 mm Dia Each 52.88
16 32 mm Dia Each 93.55
16 40 mm Dia Each 130.21
16 50 mm Dia Each 183.54
16 65 mm Dia Each 289.02
16 80 mm Dia Each 551.33
16 100 mm Dia Each 834.41
Page 150
Sanitary&Plumbing
16 125 mm Dia Each 1043.89
16 150 mm Dia Each 1183.71
16 200 mm Dia Each 3280.36
16 250 mm Dia Each 4095.63
16 300 mm Dia Each 4907.11
16 E) Tee
16 15 mm Dia. Each 14.38
16 20 mm Dia. Each 20.98
17 25 mm Dia 'Each 29.47
17 32 mm Dia Each 43.63
17 40 mm Dia Each 66.27
17 50 mm Dia Each 98.36
17 65 mm Dia Each 178.62
17 80 mm Dia Each 260.71
17 100 mm Dia Each 480.57
17 125 mm Dia Each 868.63
17 150 mm Dia Each 1908.64
17 200 mm Dia Each 2878.65
17 250 mm Dia Each 3586.09
17 300 mm Dia Each 4303.21
17 (F) (i) Nipple (75 mm long)
17 15 mm Dia. Each 11.95
17 20 mm Dia. Each 15.32
17 25 mm Dia Each 19.09
17 32 mm Dia Each 28.53
17 40 mm Dia Each 34.19
17 50 mm Dia Each 36.08
17 65 mm Dia Each 58.15
17 80 mm Dia Each 85.83
17 100 mm Dia Each 98.41
17 ii) Nipple (100 mm long)
17 15 mm Dia. Each 17.21
17 20 mm Dia. Each 22.74
17 25 mm Dia Each 26.64
18 32 mm Dia Each 34.95
18 40 mm Dia Each 39.85
18 50 mm Dia Each 43.63
18 (iii) Nipple (150 mm long)
18 15 mm Dia. Each 19.09
18 20 mm Dia. Each 25.70
18 25 mm Dia Each 28.53
18 32 mm Dia Each 36.08
18 40 mm Dia Each 44.57
18 50 mm Dia Each 52.12
18 65 mm Dia Each 95.58
18 80 mm Dia Each 123.89
18 100 mm Dia Each 138.04
18 (iv) Nipple (200 mm long)
18 15 mm Dia. Each 25.70
18 20 mm Dia. Each 34.95
18 25 mm Dia Each 47.65
18 32 mm Dia Each 56.84
18 40 mm Dia Each 70.05
18 50 mm Dia Each 85.15
18 65 mm Dia Each 127.35
18 80 mm Dia Each 165.09
18 100 mm Dia Each 220.32
18 (v) Nipple (300 mm long)
19 15 mm Dia. Each 28.53
19 20 mm Dia. Each 37.97
19 25 mm Dia Each 53.06
19 32 mm Dia Each 64.39
19 40 mm Dia Each 85.15
19 50 mm Dia Each 104.02
19 65 mm Dia Each 170.12
19 80 mm Dia Each 228.63
19 100 mm Dia Each 264.48
19 125 mm Dia Each 330.53
19 150 mm Dia Each 453.37
19 200 mm Dia Each 685.49
19 250 mm Dia Each 1038.39
19 300 mm Dia Each 1578.13
19 (G) Flange
19 15 mm Dia. Pair 47.65
19 20 mm Dia. Pair 66.27
19 25 mm Dia Pair 85.15
19 32 mm Dia Pair 104.02
19 40 mm Dia Pair 132.20
19 50 mm Dia Pair 160.63
19 65 mm Dia Pair 255.05
19 80 mm Dia Pair 311.66
19 100 mm Dia Pair 377.71
19 125 mm Dia Pair 472.07
19 150 mm Dia Pair 595.16
19 200 mm Dia Pair 896.85
19 250 mm Dia Pair 1038.39
20 300 mm Dia Pair 1321.34
20 (H) Threaded Adopter
20 15 mm Dia. Each 11.55
20 20 mm Dia. Each 15.32
20 25 mm Dia Each 19.09
20 32 mm Dia Each 37.97
20 40 mm Dia Each 68.16
20 50 mm Dia Each 94.58
20 65 mm Dia Each 113.51
20 80 mm Dia Each 132.25
20 100 mm Dia Each 179.56
20 125 mm Dia Each 236.18
20 150 mm Dia Each 274.09
20 200 mm Dia Each 679.70
20 (I) Union
20 15 mm Dia. Each 28.53
20 20 mm Dia. Each 41.74
20 25 mm Dia Each 56.84
20 32 mm Dia Each 85.15
20 40 mm Dia Each 122.89
20 50 mm Dia Each 151.20
20 J) Threaded End Cap
20 15 mm Dia. Each 9.66
20 20 mm Dia. Each 14.54
20 25 mm Dia Each 18.49
20 32 mm Dia Each 23.56
21 40 mm Dia Each 33.92
21 50 mm Dia Each 46.35
21 65 mm Dia Each 70.11
21 80 mm Dia Each 88.20
21 100 mm Dia Each 123.47
21 125 mm Dia Each 296.13
21 150 mm Dia Each 303.85
21 200 mm Dia Each 755.05
21 250 mm Dia Each 957.14
Page 151
Sanitary&Plumbing
21 300 mm Dia Each 1156.66
21 (K) End Plug
21 100 mm Dia Each 220.39
21 125 mm Dia Each 523.50
21 150 mm Dia Each 690.15
21 200 mm Dia Each 926.80
21 250 mm Dia Each 1188.99
21 (L) Reducing Socket (mm X mm)
21 20X15 Each 15.32
21 25X15 Each 26.64
21 25X20 Each 22.74
21 32X25 Each 30.42
21 40 X 25 Each 70.99
21 40X32 Each 43.63
21 50X25 Each 138.32
21 50 X40 Each 66.61
21 65X40 Each 114.92
22 65 X.50 Each 117.43
22 80X40 Each 136.43
22 80X50 Each 142.35
22 80X65 Each 151.53
22 100 X 40 Each 203.43
22 100 X 50 Each 172.44
22 100 X 80 Each 143.32
22 125 X 50 Each 217.86
22 125 X 80 Each 812.32
22 125 X100 Each 651.91
22 150 X 50 Each 661.35
22 150-X 80 Each 457.53
22 150 X100 Each 446.08
22 150 X 125 Each 472.63
22 (M) Reducing Tee (mm X mm)
22 20 X 15 Each 37.02
22 25 X 15 Each 43.63
22 25 X 20 Each 47.65
22 40 X 15 Each 101.19
22 40 X 20 Each 103.07
22 40 X 25 Each 74.95
22 40 X 32 Each 154.36
22 50X15 Each 236.45
22 50X25 Each 210.98
22 50X32 Each 181.72
22 65 X 15 Each 457.25
22 65X40 Each 304.39
22 65 X 50 Each 296.72
23 80X25 Each 470.71
23 100 X 32 Each 727.40
23 100 X 65 Each 763.25
23 (N) Reducing Elbow (mm X mm)
23 25X15 Each 67.22
23 25 X 20 Each 63.44
23 80X50 Each 236.12
23 (0) Solvent Cement
23 250 Gm. 250 gm. 100.00
23 20 Supply of High Density Poly-ethylene Pipe conforming to
IS - 4984 - 1985 (Dia) [PE - 63]
23 A. 6Kg/Sq.Cm.(Dia) (Working Pressure)
40 mm m 73.00
50 mm m 112.00
63 mm m 176.00
75 mm m 251.00
23 110 mm m 551.00
23 B. 10Kg/Sq.Cm.(Dia) (Working Pressure)
15 mm m 22.00
20 mm m 28.00
25 mm m 44.00
23 32 mm m 70.00
23 21 Supply ,Fitting & Fixing of Polypropylene Random
Copolymer Pipe (U.V STABILISED) for hot & cold
conforming to IS:15801-2008 including necessary fittings
and joining complete as required.
23 A. For Exposed Work
24 20 mm (outer dia) m 125.00
24 25 mm (outer dia) m 173.00
24 B. For Concealed Work
24 20 mm (outer dia) m 150.00
24 25 mm (outer dia) m 210.00
24 22 Supply,Fitting & Fixing of complete Bottle waste tap
24 i) 32 mm Each 129.00
24 ii) 40 mm Each 158.00
24 23 Supply ,Fitting & Fixing of 32 mm Waste Nozzle with
jamnut, full thread of half thread complete.
Each 39.00
24 24 Supply ,Fitting & Fixing of 40 mm Waste Nozzle with
jamnut, full thread of half thread complete.
Each 46.00
24 25 Supply,Fitting & Fixing of Plug with chain for waste with
jamnut, full thread of half thread complete.
Each 28.00
24 26 Supply,Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 15 mm size
Each 22.00
24 27 Supply,Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 20 mm size
Each 22.00
24 28 Supply,Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 25 mm size
Each 23.00
24 29 Supply,Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 32 mm size
Each 24.00
24 30 Supply,Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 40 mm size
Each 35.00
24 31 Supply .Fitting & Fixing of Polythene Coupling - (Nipple &
Nut) 50 mm size
Each 37.00
24 32 Supply,Fitting & Fixing of Polythene flange.
24 I)15mm Each 42.00
24 ii) 20 mm Each 61.00
25 iii) 25 mm Each 73.00
25 iv) 40 mm Each 122.00
25 v) 50 mm Each 149.00
25 33 (A) Labour for fitting and fixing G.I. pipes above ground
(exposed) in structures with holder bat clamps including cost
of jointing materials, holder bat clamps etc.,as necessary,
including cutting pipe, making threads etc. complete in all
respect with two coats of painting with approved paint any
height
25 (Payment will be made on the centre line measurement of
the total pipeline including specials. Payment of painting
will be paid separately)
25 (i) 15 mmdia. metre 30.00
25 (ii) 20 mm dia. metre 35.00
25 (iii) 25 mm dia. metre 36.00
25 (iv) 32 mm dia. metre 52.00
25 (v) 40 mm dia. metre 61.00
25 (vi) 50 mm dia. metre 62.00
25 (vii) 65 mm dia. metre 62.00
25 (viii) 80 mm dia. metre 63.00
25 (ix) 100 mm dia. metre 83.00
Page 152
Sanitary&Plumbing
25 (x) 125 mm dia. metre 84.00
25 (xi) 150 mm dia. metre 86.00
25 (B) Labour for fitting and fixing G.I. pipes above ground
(concealed) in structures with holder bat clamps including
cost of jointing materials, holder bat clamps etc.,as necessary,
including cutting pipe, making threads etc. complete in all
respect with two coats of painting with approved paint any
height.
25 (Payment will be made on the centre line measurement of
the total pipeline including specials. Payment of painting
will be paid seperately.)
26 (i) 15 mm dia. metre 60.00
26 (ii) 20 mm dia. metre 60.00
26 (iii) 25 mm dia. metre 60.00
26 34 Labour for fitting and fixing G.I. pipes for under ground
work including cost of jointing materials, cutting
pipes,making threads etc. complete in all respect
including cutting trenches upto 1.5 metre below surface in
all sorts of soil and refilling the same as directed with two
coats of painting to G.I. pipes and specials with
bituminous paint.
26 (Payment will be made on the centre line measurement of
the total pipeline including specials. Payment of painting to
be paid separately)
26 (i) 15 mm dia. metre 39.00
26 (ii) 20 mm dia. metre 44.00
26 (iii) 25 mm dia. metre 45.00
26 (iv) 32 mm dia. metre 52.00
26 (v) 40 mm dia. metre 58.00
26 (vi) 50 mm dia. metre 59.00
26 (vii) 65 mm dia. metre 59.00
26 (viii) 80 mm dia. metre 60.00
26 (ix) 100 mm dia. metre 75.00
26 (x) 125 mm dia. metre 77.00
26 (xi) 150 mm dia. metre 78.00
26 35 Labour for fitting and fixing G.I. specials including cost of
jointing materials.
26 a) Plug.
26 i) Upto 25 mm dia. each 5.00
26 ii) Above 25 mm upto 50 mm dia. each 6.00
27 (iii) Above 50 mm upto 80 mm dia. each 7.00
27 (iv) Above 80 mm upto 150 mm dia. each 9.00
27 (b) Socket, Reducing socket, Bend, Plain equal elbow,
Reducing elbow, Nipple, Short piece.
27 (i) Upto 25 mm dia. each 5.00
27 (ii) Above 25 mm upto 50 mm dia. each 6.00
27 (iii) Above 50 mm upto 80 mm dia. each 7.00
27 (iv) Above 80 mm upto 150 mm dia. each 9.00
27 (c) Plain tee, Reducing tee, Pendent tee, Jamnut, Socket
and Nipple.
27 (i) Upto 25 mm dia. each 5.00
27 (ii) Above 25 mm upto 50 mm dia. each 6.00
27 (iii) Above 50 mm upto 80 mm dia. each 7.00
27 (iv) Above 80 mm upto 150 mm dia. each 9.00
27 (d) Cross, Union, Long screw.
27 (i) Upto 25 mm dia. each 5.00
27 (ii) Above 25 mm upto 50 mm dia. each 6.00
27 (iii) Above 50 mm upto 80 mm dia. each 7.00
27 (iv) Above 80 mm upto 150 mm dia. each 9.00
27 (b) Repair Works
27 1 Labour for dismantling G.I. pipe with fittings.
27 (i) 15 mm metre 4.00
28 (ii) 20 mm metre 4.00
28 (iii) 25 mm . metre 4.00
28 (iv) 32 mm metre 4.00
28 (v) 40 mm metre 5.00
28 (vi) 50 mm metre 5.00
28 (vii) 65mm metre 5.00
28 (viii) 80 mm metre 7.00
28 (ix) 100 mm metre 7.00
28 2 Refixing G.I. pipe with fittings after cleaning where
necessary.
28 (i) 15 mm metre 4.00
28 (ii) 20 mm metre 4.00
28 (iii) 25 mm metre 4.00
28 (iv) 32 mm metre 6.00
28 (v) 40 mm metre 6.00
28 (vi) 50 mm metre 6.00
28 (vii) 65 mm metre 10.00
28 (viii) 80 mm metre 11.00
28 (ix) 100 mm metre 11.00
28 3 Removing chokage in G.I. pipe including cleaning pipe.
28 (i) 15 mm metre 4.00
28 (ii) 20 mm metre 4.00
28 (iii) 25 mm metre 4.00
28 (iv) 32 mm metre 6.00
28 (v) 40 mm metre 6.00
29 (vi) 50 mm 6.00
29 (vii) 65 mm metre 7.00
29 (viii) 80 mm metre 7.00
29 (ix) 100 mm metre 7.00
29 4 Renewing C.I. clamp for pipe including cutting hole in wall
etc. and mending good all damages with cement
concrete(4:2:l) with jhama chips and cement plaster (6:1)
to match with and curing.
29 (i) 15 rnm each 22.00
29 (ii) 20 mm each 25.00
29 (iii) 25 mm each 28.00
29 (iv) 32 mm each 44.00
29 (v) 40 mm each 47.00
29 (vi) 50 mm each 61.00
29 (vii) 65 mm each 126.00
29 (viii) 80 mm each 138.00
29 (ix) 100 mm each 156.00
29 5 Renewing P.V.C. clip with necessary screws.
29 (i) 15 mm each 4.00
29 (ii) 20 mm each 4.00
29 (iii) 25 mm each 6.00
29 (iv) 32 mm each 7.00
29 (v) 40 mm each 7.00
29 (vi) 50 mm each 9.00
29 (vii) 65 mm each 10.00
30 6 Opening out leaky water supply pipe and making the
joints water tight including cutting threads where
necessary.
30 (i) Upto 40 mm dia. each 41.00
30 (ii) 50 mm dia. each 48.00
30 (iii) 65 mm to 100 mm dia. each 80.00
30 7 Renewing iron jamnut with washer.
30 (i) 15 mm each 9.00
30 (ii) 20 mm each 10.00
Page 153
Sanitary&Plumbing
30 (iii) 25 mm each 11.00
30 8 Cutting out pipe and making threads.
30 (i) Upto 20 mm dia. each 6.00
30 (ii) Above 20 mm upto 32 mm dia. each 8.00
30 (iii) Above 32 mm upto 50 mm dia. each 15.00
30 (iv) Above 50 mm upto 80 mm dia. each 20.00
30 (v) Above 80 mm upto 150 mm dia. each 28.00
30 9 Perforating G.I. pipe of all diameters by drilling including
taking G.I. pipes to workshop and back if required.
Dozzen 56.00
30 10 Making bend/offset in G.I. pipe by heat.
30 (i) Upto 50 mm dia. each 21.00
30 (ii) Above 50 mm upto 80 mm dia. each 38.00
30 (iii) Above 80 mm upto 150 mm dia. each 109.00
30 11 Cutting out section of G.I. water main pipe upto 100 mm. each 25.00
30 12 Dismantling and refixing bib cock or stop cock.
30 (i) 15 mm each 8.00
31 (ii) 20 mm each 10.00
31 13 Rewashering stop cock/ bib cock/ push cock/ pillar cock
including gland packing if necessary.
31 (i) 15 mm each 10.00
31 (ii) 20 mm each 12.00
31 (iii) 25 mm each 14.00
31 (iv) 40 mm each 20.00
31 14 Renewing brass spindle and valve of stop cock/bib
cock/push cock/pillar cock.
31 (i) 15 mm each 58.00
31 (ii) 20 mm each 76.00
31 15 Dismantling and refixing shower rose after cleaning. each 8.00
31 16 Renewing cromium plating of
31 (a) bib cock/ stop cock/ pillar cock/ waste fittings. each 35.00
31 (b) Elbow action bib/ pillar tap. each 43.00
31 17 Cutting out existing G.I.F.W. or U.F.W. or gas pipeline to
required size and making threads including taking out and
refixing.
31 (i) 15 mm to 20 mm set 39.00
31 (ii) 25 mm to 32 mm set 40.00
31 (iii) 40 mm to 50 mm set 57.00
31 (iv) 65 mm to 80 mm set 71.00
31 (v) 100 mm set 76.00
31 18 Drilling and tapping C.I. main.
32 (I) Upto 15 mm set 100.00
32 (ii) Above 15 mm upto 25 mm set 125.00
32 (iii) Above 25 mm set 150.00
32 19 Plugging up C.I. main with necessary materials & Labour
Complete
set 123.00
32 20 Renewing copper plated gas cock C.P. or oxidised
(approved brand, wall/ bench type).
32 (a) 6 mm/ 10 mm/15 mm
32 (i) One way each 133.00
32 (ii) Two way each 148.00
32 (iii) Three way each 210.00
32 (iv) Four way each 260.00
32 21 Renewing special make up piece of pipe having threads
on both sides.
32 i) 15 mm each 42.00
32 ii) 20 mm each 49.00
32 iii) 25 mm each 54.00
32 iv) 32 mm each 60.00
32 v) 40 mm each 69.00
32 vi) 50 mm each 72.00
32 22 Dismantling upto 100 mm sluice valve by parts and
cutting out worn out bolts nd reassembling the same after
regrinding valve,rewashering flanges, asbestos diamond
packing including studs,bolts, nuts and necessary repairs.
Each Set 301.00
33 (A)-(III) CISTERN, G.I./P.V.C. TANKS WITH PARTS
33 (a) Original Works
33 1 Supplying, fitting and fixing 10 litre porcelain low-down
cistern of approved make with either side or bottom inlet,
side overflow, brackets complete with all internnal PVC
fittings.
33 White each 2181.00
33 2 Supplying, fitting and fixing 10 litre P.V.C. low-down
cistern conforming to I.S. specification with P.V.C. fittings
complete,C.I. brackets including two coats of painting to
bracket etc.
each 1129.00
33 3 Supplying, fitting and fixing 10 litre porcelain low-down
cistern of approved make without fittings and brackets.
33 White each 1368.00
33 For item 1 & 3 above for using coloured Porcelain :-
33 N.B. Cisterns the rate will enhanced over the
corresponding item of white Porcelain cistern as follows.
33 (a) Sky blue, Venetian, Min. green, Turquoise, Citrus
yellow , Champage, Saphire - By 50%
33 (b) Roman brown, Fern green, Misty lilac, Orange, Sienna
gold, Silver grey, Sepia, Alpine, Cornil sorvinto blue -100%
33 (c) Burgandy, Emerald green coloured - 200%
33 4 Supplying G.I. tank with Galvanised iron sheet with 450
mm dia C.I. raised approved type locking cover and 50
mm cleaning flange and plug.
33 (a) With 2 mm thick G.I. sheet
33 (i) 1812 litre capacity each 16182.00
33 (ii) 1364 litre capacity each 14150.00
33 (b) With 1.6 mm thick G.I. sheet
33 (i) 908 litre capacity each 9412.00
33 (ii) 540 litre capacity each 8073.00
34 5 Supplying P.V.C. water storage tank of approved quality
with closed top with lid (Black) Multilayer
34 (a) 500 litre capacity each 3016.00
34 (b) 1000 litre capacity each 5991.00
34 (c) 1500 litre capacity each 8986.00
34 (d) 2000 litre capacity each 11961.00
34 (e) 2500 litre capacity each 15292.00
34 (f) 3000 litre capacity each 18520.00
34 (g) 4000 litre capacity each 24470.00
34 (h) 5000 litre capacity each 30461.00
34 6 Supplying, fitting and fixing cast iron raised rain proof tank
cover 450 mm.
each 1127.00
34 7 Supplying, fitting and fixing cast iron raised rain proof tank
cover 500 mm dia. with locking arrangements (weighing
not less than 12 kg).
each 1182.00
34 8 Hoisting G.I. tank (upto and including 1812 litre capacity).
34 (a) 1st story from G.L each 271.00
34 (b) Extra for each additional story each 89.00
34 9 Labour for hoisting plastic water storage tank.
34 (i) Upto 1500 litre capacity.
Page 154
Sanitary&Plumbing
34 (a) Upto 1st story from G.L. each 59.00
34 (b) Extra for each additional story each 27.00
34 (ii) Above 1500 litre upto 5000 litre capacity.
34 (a) Upto 1st story from G.L. each 95.00
34 (b) Extra for each additional story each 45.00
34 10 Lowering G.I. tank (upto and including 1812 litre
capacity).
35 (a) From 1st story to G.L each 193.00
35 (b) Extra for each additional story each 59.00
35 11 Labour for lowering plastic water storage tank and
stacking in places as directed.
35 (i) Upto 1500 litre capacity
35 (a) From 1st floor to G.L . each 36.00
35 (b) Extra for each additional story each 18.00
35 (ii) Above 1500 litre upto 5000 litre capacity
35 (a) From 1st story to G.L. each 59.00
35 (b) Extra for each additional story each 27.00
35 12 Labour for punching hole in plastic water storage tank
upto 50 mm dia.
each 12.00
35 (b) Repair Works
35 1 Supplying, fitting and fixing low-down cistern parts.
35 (i) Internal fittings for cistern complete of approved make. Each Set 239.00
35 ii) Outlet Assembly each 275.00
35 iii) Intlet Assembly each 46.00
35 iv) Rubber Kid each 275.00
35 v) Knob each 275.00
35 vi) Brackets (pair) each 275.00
35 vii) CP Flush Bend (local) best quality
a) Orrisa & Indian Pattern WC each 275.00
b) E. W.C. & Anglo-Indian W.C. each 275.00
35 2 Renewing bolts and nuts for cistern. Each Set 15.00
35 3 Renewing brass screws in auto cistern. Each Set 10.00
35 4 Changing the lather only of syphon of automatic cistern
including taking out and refixing necessary parts.
Each Set 23.00
36 Renewing high pressure polythene ball cock of approved
quality with polythene ball and aluminium lever complete
for pipe of dia.:
36 (i) 32 mm each 167.00
36 (ii) 25 mm each 114.00
36 (iii) 20 mm each 96.00
36 (iv) 15 mm each 78.00
36 6 Renewing polythene ball of approved quality for pipe of
dia.:
36 (i) 32 mm each 150.00
36 (ii) 25 mm each 84.00
36 (iii) 20 mm each 60.00
36 (iv) 15 mm each 37.00
36 7 Dismantling G.I. tank including disconnecting pipe
connection.
each 71.00
36 8 Fixing G.I. tank in position including refitting pipe
connection.
each 71.00
36 9 Dewatering and repairing G.I. tank above 1000 litre and
upto 2000 litre capacity with G.I. washer, bolts, nuts and
cement concrete at bottom as necessary.
each 202.00
36 10 Dewatering and repairing G.I. tank upto 1000 litre capacity
with G.I. washer, bolts and nuts and washer.
each 159.00
36 11 Punching holes in tank(G.L). each 24.00
36 12 Cleaning and removing mud upto 2000 litre Water Tank
including masonry reservoir.
each 69.00
36 13 Cleaning and removing mud above 2000 litre Water Tank
including masonry reservoir.
Cum 42.00
36 14 Cleaning and disinfecting upto 2000 litre Water Tank
including masonry reservoir.
each 102.00
36 15 Cleaning and disinfecting above 2000 litre Water Tank
including masonry reservoir.
Cum 60.00
37 16 Repairing damaged G.I. tank of any capacity after
lowering on roof by replacing with new 2 mm thick G.I.
sheet by rivetting with necessary packing, painting new
portions, refixing the existing C.I. tank cover by rivetting in
new position, if necessary, after taking out old cover very
carefully etc. complete (excluding the cost of dismantling
and refixing tank but including the cost of cutting out worn
out portion by suitable means to regular shape). (Payment
will be made on the basis of area of damaged portion
replaced.)
sq. m. 1670.00
38 (A)-(IV) BASIN AND SINKS WITH PARTS
38 (a) Original Works
38 1 Wash basin white vitreous china of approved make
(without fittings) supplied,fitted and fixed in position on
75mm X 75 mm X 75 mm wood blocks and C.I. brackets
including two coats of painting of C.I. Brackets.
38 (i) 450 mm X 300 mm size each 981.00
38 (ii) 550 mm X 400 mm size each 1248.00
38 (iii) 630 mm X 450 mm size each 1425.00
38 (iv) Angle back wash basin 400 mm X 400 mm each 962.00
38 (v) Surgeon's wash basin 650 mm X 450 mm each 4113.00
38 (vi) Spitton for Dental Surgeon each 2300.00
38 2 Supplying, fitting and fixing white vitreous china best
quality approved make wash basin with C.I. brackets on
75 mm X 75 mm wooden blocks, C.P. waste fittings of 32
mm dia., one approved quality brass C.P. Pillar cock of 15
mm dia., C.P. chain with rubber plug of 30 mm dia.,
approved quality P.V.C. waste pipe with C.P. nut 32 mm
dia., 900 mm long approved quality P.V.C. connection
pipe with heavy brass C.P. Nut including mending good
all damages and painting the brackets with two coats of
approved paint.
38 (i) 450 mm X 300 mm size each 1734.00
38 (ii) 550 mm X 400 mm size each 2038.00
38 (iii) 630 mm X 450 mm size each 2720.00
38 (iv) Angle back wash basin 400 mm X 400 mm size each 1752.00
38 3 Supplying, fitting and fixing pedestal of approved make for
wash basin (white)
each 1266.00
38 4 Best quality sink in mosaic in silver grey colourwith C.P.
waste and other fittings, rubber plug and chain, C.I. heavy
brackets with two coats of approved paint.
38 (i) 600 mm X 450 mm X 200 mm each 737.00
38 (ii) 600 mm X 450 mm X 250 mm each 784.00
38 (iii) 750 mm X 450 mmX 250 mm each 998.00
39 5 Supplying, fitting and fixing White Vitreous China Sink in
position on C.I. brackets including two coats of painting of
brackets.
39 (a) Plain edge sink with overflow
39 (i) 610 mm X 450 mm X 200 mm each 4404.00
39 (ii) 610 mm X 450 mm X 250 mm each 4852.00
39 (b) Laboratory sink with rim and overflow
39 (i) 450 mm X 300 mm X 150 mm each 2103.00
39 (ii) 500 mm X 300 mm X 150 mm each 3099.00
Page 155
Sanitary&Plumbing
39 (c) Laboratory table sink including cutting of laboratory
table as required.
each 2150.00
39 450 mm X 300 mm X 150 mm
39 N.B. For using coloured Basin, Sink, Pedestal etc. th
rates of the corresponding rates of white viterous
porcelain colour will be enhanced by as followes:
39 (a) Sky blue, Venetian, Min. green, Turquoise, Citrus
yellow , Champage, Saphire - By 50%
39 (b) Roman brown, Fern green, Misty lilac, Orange, Sienna
gold, Silver grey, Sepia, Alpine, Cornil sorvinto blue -100%
39 (c) Burgandy, Emerald green coloured - 200%
39 6 Supplying, fitting and fixing stainless steel sink complete
with waste fittings and two coats of painting of C.I.
Brackets.
39 (a) Sink only
39 (i) 530 mmX 430 mmx 180 mm each 3613.00
39 (ii) 630 mm X 550 mm X 180 mm each 4208.00
39 (b) Sink with drain board 1050 mm X 450 mm X 180 mm each 5993.00
39 7 Supplying, fitting and fixing of Fire clay Kitchen Sink with
overflow conforming to IS: 771 with waste fittings and C.I.
Brackets.(White Colour)
39 (i) 750 mm X 450 m X 250 mm each 5334.00
40 (ii) 60 mm X 400 mm X 250 mm each 4431.00
40 (iii) 600 mm X 450 mm X 200 mm each 4326.00
40 8 Supplying, fitting and fixing Drain boards for sinks with
brackets in position.
40 (a) Porcelain fluted drain board of approved make
40 (i) 530 mm X 450 mm each 1854.00
40 9 Supplying, fitting and fixing approved brand P.V.C.
CONNECTOR white flexible, with both ends coupling with
heavy brass C.P. nut, 15 mm dia.
40 (i) 300 mm long each 38.00
40 (ii) 450 mm long each 56.00
40 (iii) 600 mm long each 74.00
40 (iv) 750 mm long each 91.00
40 (v) 900 mm long each 132.00
40 10 Supplying,fitting and fixing approved brand 32 mm
dia.P.V.C. waste pipe, with PVC coupling at one end fitted
with necessary clamps.
40 (i) 600 mm long each 46.00
40 (ii) 750 mm long each 66.00
40 (iii) 900 mm long each 86.00
40 (iv) 1050 mm long each 104.00
40 11 Supplying, fitting and fixing C.P. chain and stay with
rubber plug.
40 (i) 25 mm dia. of plug Each Set 48.00
40 (ii) 32 mm dia. of plug Each Set 58.00
40 (iii) 40 mm dia. of plug Each Set 61.00
40 (iv) 45 mm dia. of plug Each Set 61.00
40 (v) 50 mm dia. of plug Each Set 69.00
41 12 Supplying, fitting and fixing CP. chain 1200 mm long with
rubber plug 65 mm dia.
Each Set 162.00
41 13 Supplying, fitting and fixing CP. chain or stay for wash
basin
each 9.00
41 14 Supplying,fitting and fixing rubber plug.
41 (i) 25 mm dia. each 6.00
41 (ii) 32 mm dia. each 8.00
41 (iii)40 mm dia. each 10.00
41 (iv) 45 mm dia. each 12.00
41 (v) 50 mm dia. each 16.00
41 15 Supplying, fitting and fixing complete Bottle waste trap
(Heavy Quality)
41 (a) Chromium plated Bottle trap 32 mm with 190 mm long
connecting pipe and wall flange (Equivalent to Code No.
545 & Model - Tropical / Sumthing Special of ESSCO or
similar brand).
Each 677.00
41 (b) PTMT Bottle trap 32 mm with connecting pipe( Prayag
or equivalent).
Each 457.00
41 16 Supplying, fitting and fixing 15 mm swan neck tap with left
& right hand operating nob with aerator (Equivalent to
Code No. 510, 510(A) and Model - TROPICAL /
SUMTHING SPECIAL of ESSCO or similar brand).
Each 951.00
41 17 Supplying, fitting and fixing Waste fittings complete.
41 a) C.P. over brass
41 i) 25 mm each 172.00
41 ii) 32 mm each 218.00
41 iii) 40 mm each 274.00
41 b) Polythene
41 i) 32 mm each 36.00
41 ii) 40 mm each 59.00
41 iii) 50 mm each 72.00
42 18 Supplying, fitting and fixing C.I. bracket including two
coats of painting.
42 (a) Wash basin, Dental spitton each 115.00
42 (b) Sink, Drain board each 133.00
42 (c) Surgeon's basin each 121.00
42 (d) Cistern each 68.00
42 (e) Aluminium brackets each 77.00
42 19 Supplying, fitting and fixing pillar cock of approved make.
42 a) (i) CP Pillar Cock - 15 mm. (Equivalent to Code No.
507 & Model -Tropical / Sumthing Special of ESSCO or
similar brand).
Each 528.00
42 a) (ii) CP Pillar Cock Super Deluxe with Aerator - 15 mm.
(Equivalent to Code No. 508 & Model No. Tropical /
Sumthing Special of ESSCO or similar brand).
Each 617.00
42 b) PTMT Pillar Cock -15 mm. (Prayag or equivalent). Each 232.00
42 c) CP Pillar Cock - 15 mm. (Code No. 5011 & Model -
FLORENTINE of JAQ.UAR or equivalent).
Each 885.00
42 d) Polythene Piller Cock (EMCO / ATLAS or equivalent) -
(i) 15 mm
each 88.00
42 e) (i) CP Centre hole Basin mixture with regular spout
without popup waste system with 450 mm long braided
hoses. (Equivalent to Code No. 5167(B) & Model -
FLORENTINE of JAQUAR or similar brand).
Each 2759.00
42 e) (ii) CP Wall Mixture without spout but with provision for
connection to Telephone Shower and exposed pipe for
Overhead shower (Equivalent to Code No. 5215 & Model -
FLORENTINE of JAQUAR or similar brand).
Each 2432.00
43 f) CP Pillar Cock with 200 mm extended Lever Handle
(Equivalent to Code No. 5031 & Model - FLORENTINE of
JAQUAR or similar brand).
Each 1123.00
43 (Note: Item 19(c),e(i),(ii) & f(i) to be done as per specific
direction of the Superintending Engineer.)
43 20 Supplying, fitting and fixing CP. Extension Pipe Each 101.00
43 21 Supplying, fitting and fixing CP. Offset Each 378.00
43 22 Supplying, fitting and fixing CP. Wall Flange Each 77.00
43 23 Supplying, fitting and fixing dome shaped CP. waste
grating for urinals.
Page 156
Sanitary&Plumbing
43 (i) 32 mm each 209.00
43 (ii) 50 mm each 289.00
43 (b) Repair Works
43 1 Dismantling wash basin with brackets with or without
waste fittings.
each 22.00
43 2 Refixing wash basin with brackets with or without waste
fittings.
each 44.00
43 3 Dismantling Surgeon's wash/ Dental spitton with
brackets with or without waste fittings.
each 22.00
43 4 Refixing Surgeon's wash/ Dental spitton with brackets
with or without waste fittings.
each 49.00
43 5 Dismantling sink with brackets with or without waste
fittings.
43 i) Upto 450 mm length each 25.00
43 ji) Above 450 mm and upto 600 mm length each 33.00
43 iii) Above 600 mm and upto 750 mm length each 37.00
43 iv) Above 750 mm length each 47.00
43 6 Refixing sink with brackets with or without waste fittings.
43 i) Upto 450 mm length each 47.00
43 ii) Above 450 mm and upto 600 mm length each 47.00
44 (iii) Above 600 mm and upto 750 mm length each 47.00
44 (iv) Above 750 mm length each 73.00
44 7 Renewing wooden block of approved variety of size 150
mm X 100 mm X 75 mm with nails and screws for fixing
brackets for sinks/ basins.
each 33.00
44 8 Renewing wooden scantling 450 mm X 25 mm X 12 mm
under the table for fixing laboratory sink in proper position
with nails and screws complete.
each 24.00
44 9 Cutting table for sink. each 30.00
44 10 Dismantling pillar cock of wash basin. each 5.00
44 11 Refixing pillar cock of wash basin. each 5.00
44 12 Dismantling drain board. each 10.00
44 13 Refixing drain board. each 11.00
44 14 Fixing brackets for wash basin/ sink/ drain board/ cistern. each 15.00
44 15 Renewing China stopper for wash basin. each 72.00
44 16 Dismantling bath tub. each 62.00
44 17 Refixing bath tub each 98.00
44 18 Cleaning wash basin/sink with acid. each 10.00
44 19 Cleaning sink with soda and soap. each 8.00
44 20 Cleaning bath tub with acid. each 27.00
44 21 Renewing cap and lining of heavy quality CP. over brass.
44 (I) 15 mm each 22.00
44 (ii) 20 mm each 43.00
44 (iii) 25 mm each 63.00
44 (iv) 32 mm each 74.00
44 (v) 40 mm each 81.00
45 (vi) 45 mm each 95.00
45 (vii) 50 mm each 105.00
45 22 Renewing 32 mm N.P. waste fittings for wash basin
including coupling
each 95.00
45 C.P. chain and rubber plug.
45 23 Renewing Simla cap and lining brass union, heavy type
best Indian make.
45 (i) 15 mm each 40.00
45 (ii) 20 mm each 49.00
45 24 Rectifying leakage of bed pan sink, renewing rubber
washer fully complete with G.I. nuts and bolts.
each 60.00
45 25 Renewing brass neck only of swan neck cock. each 101.00
45 26 Renewing bottle jet of bed pan sink. each 381.00
45 27 Dismantling and refixing Surgeon's mixing valve after
repairs.
each 184.00
45 28 Dismantling and taking out lead / polythene waste pipe
and refixing the same after removing chokage including
necessary bendings/ offsets and straightening and
replacement of damaged parts, if any.
each 19.00
45 29 Cleaning and refixing displaced laboratory sink in proper
position and making the edges of sinks perfectly water
tight by renewing packing and putty joints and setting with
rubber sheeting.
each 34.00
45 30 Dismantling and re-fixing Swan Neck Piller Cock after
necessary repairing, packing, washering complete.
each 47.00
45 31 Dismantling and removing heavy porcelain / enamelled
bath tub for repairing the same or for repairing the floor
underneath and placing the same in its original position.
each 140.00
46 (A)-(V) TUBE WELL
46 (a) Original Works .
1 Labour for boring tube well of required dia. by water jet
system through any type of soil strata including hire and
labour charges for boring pipes, scaffolding, tools and
plants as necessary and taking out them and lowering
pipes, strainers, blind pipe etc. and fitting and fixing the
same complete including bucket washing and other
incidental works in the connection. The tube well should
have a minimum 50 mm gap in between the outside of the
tubewell pipe and the bore
46 (a) For depth upto 150 metre.
46 (i) 40 mm dia.boring etc. metre 74.00
46 (ii) 50 mm dia. boring etc. metre 119.00
46 (iii) 80 mm dia. boring etc. metre 158.00
46 (b) For depth more than 150 metre.
46 (i) 40 mm dia. boring etc. beyond 150 metre metre 89.00
46 (ii) 50 mm dia. boring etc. beyond 150 metre metre 148.00
46 (iii) 80 mm dia. boring etc. beyond 150 metre metre 174.00
46 (c) For depth upto 150 metre for 40 mm dia. Tube well
with top enlargement of 80 mm dia.
46 (i) 40 mm dia. boring etc. metre 119.00
46 (ii) 80 mm dia. boring etc. top enlargement metre 231.00
46 (d) For depth upto 150 metre for 50 mm dia. tube well
with top enlargement of 100 mm dia.
46 (i) 50 mm dia. boring etc. metre 231.00
46 (ii) 100 mm dia. boring etc. top enlargement metre 344.00
46 (e) For depth upto 150 metre for 80 mm dia. tube well
wuth top enlargement of 150 mm dia.
46 (i) 80 mm dia. boring etc. metre 231.00
47 (ii) 150 mm dia. boring etc. top enlargement metre 518.00
47 (f) For depth more than 150 metre for 50 mm dia. tube
well with top enlargement of 100 mm dia.
47 (i) 50 mm dia. boring etc. beyond 150 metre metre 174.00
47 (ii) 100 mm dia. boring etc. top enlargement metre 344.00
47 Note - To arrive at labour cost for boring, lowering of a
tube well of 50 mm dia. with top enlargement of 100 mm
dia. of depth 30 metre having a total depth of boring say
200 metre from G.L.: (i) 30 m X f(ii) + 120 m X d(i) + 50
m X f(i) = Rs.10320.00 + Rs.27720.00 + Rs. 8700.00 =
Rs.46740.00
Page 157
Sanitary&Plumbing
47 2 Labour for boring through any type of soil for sinking tube
well of required dia. with top enlargement by rig boring
system (either by reserve circulation or by direct rotary
method) including hire charges and labour for rig
machine, tools and plants, staging, force pumping set and
making arrangement for water required for boring etc.
complete and lowering of pipes, strainers, blind pipes etc.
complete.
47 (a) For depth upto 250 metre for 100 mm dia. Tube well
with top enlargement of 200 mm dia.(upto 50 metre).
47 (i) First 50 metre metre 894.00
47 (ii) Next 50 metre metre 793.00
47 (iii) Next 50 metre metre 948.00
47 (iv) Rest 100 metre metre 970.00
47 (b) For depth upto 250 metre for 150 mm dia. Tube well
with top enlargement of 250 mm dia.(upto 50 metre).
47 (i) First 50 metre metre 951.00
47 (ii) Next 50 metre metre 937.00
47 (iii) Next 50 metre metre 1119.00
47 (iv) Rest 100 metre metre 1150.00
48 (c) For depth upto 250 metre for 150 mm dia. tube well
with top enlargement of 300 mm dia.(upto 50 metre.)
48 (i) First 50 metre metre 963.00
48 (ii) Next 50 metre metre 951.00
48 (iii) Next 50 metre metre 1140.00
48 (iv) Rest 100 metre metre 1297.00
48 Note: (i) For item no. 2, measurement will be taken below
G.L taking G.L. as zero for payment, (ii) For item no. 1 &
2 for bored depth where no lowering of pipe is involved the
corresponding rates would be reduced by 30%.
48 3 Supplying brass-strainer with brass socket of approved
make. (Heavy type)
48 (i) 40 mm dia. metre 793.00
48 (ii) 50 mm dia. metre 1136.00
48 (iii) 75 mm dia. metre 1446.00
48 (iv) 100 mm dia. metre 1686.00
48 4 Supplying G.I. pipe strainer with brass net & jacketted of
approved quality. (Heavy Type)
48 (i) 40 mm dia. metre 930.00
48 (ii) 50 mm dia. metre 1377.00
48 (iii) 80 mm dia. metre 1789.00
48 5 Supplying high density polythene strainer of approved
make with adapter conforming to I.S. specifications.
48 (i) 40 mm dia. metre 359.00
48 (ii) 50 mm dia. metre 508.00
49 (iii) 80 mm dia. metre 783.00
49 (iv) 100 mm dia. metre 1259.00
49 6 Supplying, fibre glass reinforced Epoxy resin slotted of 1
mm slot width in 6.1m length of approved make and as
per direction of the Engineer - in Charge
49 (a) 100 mm nominal dia
49 (i) 6.00 mm wall thickness metre 1699.00
49 (b) 150 mm nominal dia
49 (i) 6.0 mm wall thickness metre 2540.00
49 (ii) 7.00 mm wall thickness metre 2949.00
49 (c) 200 mm nominal dia
49 (i) 6.0 mm wall thickness metre 3345.00
49 (ii) 7.00 mm wall thickness metre 3902.00
49 7 Supplying M.S. male / female adopter of approved make
and brand for coupling of M.S. pipe and fibre glass
strainers, as per direction of the Engineer - in Charge.
49 (i) 100 mm metre 2850.00
49 (ii) 150 mm metre 3469.00
49 (iii) 200 mm metre 3716.00
49 8 Supplying, fitting and fixing steel cutter piece upto 450
mm long with sockets.
49 (i) 40 mm dia. each 100.00
49 (ii) 50 mm dia. each 162.00
49 (iii) 75 mm dia. each 232.00
49 9 Supplying, fitting and fixing plug of approved make
conforming to I.S. Specifications.
49 (i) 40 mm each 40.00
49 (ii) 50 mm each 57.00
50 iiii) 75 mm each 79.00
50 10 Supplying, fitting and fixing chech valve (vertical) G.M.
tested to 21 kg per sq. cm.
50 (i) 15 mm each 226.00
50 (ii) 20 mm each 307.00
50 (iii) 25 mm each 437.00
50 (iv) 32 mm each 746.00
50 (v) 40 mm each 907.00
50 (vi) 50 mm each 1241.00
50 11 Supplying,fitting and fixing check valve (horizontal) G.M.
tested to 21 kg per sq. cm.
50 (i) 15 mm each 282.00
50 (ii) 20 mm each 412.00
50 (iii) 25 mm each 622.00
50 (iv) 32 mm each 944.00
50 (v) 40 mm each 1284.00
50 (vi) 50 mm each 1860.00
50 12 Supplying, fitting and fixing special hand pump no. 6 of
approved make [for 50 mm or 40 mm dia. tube well).
each 2814.00
50 13 Supplying, fitting and fixing popular Maya pump no-6 or
similar.
50 (i) for 40 mm dia. tube well each 1824.00
50 (ii) Domestic Pump of approved make of 40/50 mmdia. each 958.00
50 14 Supplying, fitting and fixing 65 mm dia. deep well brass
cylinder with necessary fittings and accessories.
each 2257.00
50 15 Supplying, fitting and fixing 15 mm dia. galv. M.S.
connecting rod with sockets.
metre 69.00
50 16 Supplying, fitting and fixing heavy type bell mouth
reducing socket.
51 (i) 50 mm X 100 mm each 535.00
51 (ii) 75 mm X 150 mm each 727.00
51 (iii) 100 mm X 150 mm each 727.00
51 (iv) 100 mm X 200 mm each 1024.00
51 (v) 200 mm X 250 mm each 1791.00
51 17 Supplying, fitting and fixing G.I. cap at top
51 (i) 100 mm each 121.00
51 (ii) 150 mm each 356.00
51 (iii) 200 mm each 405.00
51 (iv) 300 mm each 789.00
51 18 Supplying, fitting and fixing M.S socket ring
51 (i) 100 mm each 121.00
Page 158
Sanitary&Plumbing
51 (ii) 150 mm each 234.00
51 (iii) 200 mm each 305.00
51 (iv) 300 mm each 578.00
51 19 Washing and developing tube well with air compressor
pump and engine for 8 (eight) hours continuous
pumping per day with necessary arrangements for
testing the yield in gallons per hour with 'V' notch including
hire and labour charges for all tools and plants and
scaffolding as required.
day 6712.00
52 20 Surging of existing tube well with chemical treatment and
bucket wash (prior to use of compressor machine) and
developing the tube well with compressor machine at least
3 (three) days at 8 (eight) hours per day till the yield is
obtained at least by 75% of the total specified yield of the
tube well (measured by V notch tank) and draw down is
within the permissible limit of 10% variation and water so
obtained after such washing and developing will be free
from sand and bacteria for which test report from the
Public Analyst is to be obtained. (The rate is inclusive of
all labour and materials including hire charges of tools and
plants and cost of materials.)
52 (a) For tube well from 40 mm to 100mm top enlarged to
have yield from 1500 to 3000 gallons per hour as per size
and yield.
each 15949.00
52 (b) For tube well of size bigger than 100mm dia. with top
enlargement to have yield of 6000 gallons per hour.
each 26030.00
52 (c) For additional period beyond 3(three) days. Per Day 4959.00
52 N.B. This item is to be executed with the special approval
of the Engineer-in-charge.
52 21 Labour for making arrangement for showing verticality test
including the cost for hire charges of tools and plants,
scaffolding, labour etc. all complete.
L.S. 773.00
52 22 Collecting sample of water for bacteriological and
chemical test from any depth at any time during execution
of work including hire and labour charges for tools and
plants and sterilizing the equipments, paying all charges
and fees, testing etc. complete in all respect as per
direction.
L.S. 1130.00
52 23 Packing the annular space between the outside of the
tube well pipes & strainers and the bore with pea size
washed gravel of approved quality having size from 2 mm
to 5 mm or the size approved by the Engineer-in-charge
including cost of all materials labour and equipment
complete.
cu. m. 1824.00
52 Note: Initial 6 m. of Annular space between the housing
pipe and the bore should not be shrouded with Pea size
gravel to avoid contamination with surface water.
53 24 Packing annular space between the outside of the
housing pipe and the bore with puddled clay balls of
approved size as per direction of the Engineer-in-charge
with cost of all materials and labour complete.
cu. m. 308.00
53 25 Providing and fixing bell plug as required upto 250 mm
(internal) dia. ERWMS pipe including cost of materials
and labour complete.
each 463.00
53 26 Supplying, fitting and fixing 300 mm M.S. housing clamp
of approved quality.
Per Set 2621.00
53 27 Providing 200 mm centre guide.
53 i) With Clamp Per Set 145.00
53 ii) With Flat Per Set 77.00
28 Geophysical investigation of the acquifer by electrologging
system with all tools and plants as necessary including
supply of necessary report.
53 (b) Repair Works
53 1 Taking out pipes of existing tube well including strainer
etc. complete fo (a) Upto 20 metre below G.L
53 (i) 40 mm dia. metre 23.00
53 (ii) 50 mm dia. metre 37.00
53 (iii) 80 mm dia. metre 43.00
53 (iv) 100 mm dia. metre 64.00
53 (v) 150 mm dia. metre 80.00
53 (vi) 200 mm dia. metre 107.00
53 (vii) 250 mm dia. metre 118.00
53 (viii) 300 mm dia. metre 133.00
53 (ix) 350 mm dia. metre 144.00
53 (b) Beyond 20 metre below G.L.
54 (i) 40 mm dia. metre 37.00
54 (ii) 50 mm dia. metre 43.00
54 (iii) 80 mm dia. metre 68.00
54 (iv) 100 mm dia. metre 80.00
54 (v) 150 mm dia. metre 107.00
54 (vi) 200 mm dia. metre 118.00
54 (vii) 250 mm dia. metre 133.00
54 (viii) 300 mm dia. metre 144.00
54 (ix) 350 mm dia. metre 160.00
54 2 Repairing chocked up tube well by cleaning and washing
with chemical
54 (i) 40 mm to 50 mm dia. tube well upto 100 metre deep Each Set 1838.00
54 (ii) Above 50 mm to 100 mm dia. tube well upto 100 metre
deep
Each Set 2696.00
54 3 Supplying, fitting and fixing brass cylinder parts.
54 (i) Brass plunger complete each 461.00
54 (ii) Brass plunger complete without G.I. rod each 405.00
54 (iii) C.I. top socket each 87.00
54 (iv) C.I. bottom socket each 96.00
54 (v) 65 mm brass tube (both ends threaded) each 1309.00
55 SECTION (B)-SANITARY AND DRAINAGE WORKS
55 (B)-(I) HYDRANTS AND ALLIED WORKS
55 (a) Original Works
55 1 Supplying, fitting and fixing ground hydrant of approved
make.
55 (i) 20 mm each 916.00
55 (ii) 25 mm each 1380.00
55 (iii) 32 mm each 2522.00
55 (iv) 40 mm each 3414.00
55 2 Supplying, fitting and fixing street pattern hydrant
65 mm with guaranteed spindles and C.I.cover
complete.
each 4034.00
55 3 Supplying, fitting and fixing C.I. cover for street pattern
hydrant.
each 684.00
55 4 Supplying, fitting and fixing fire hydrant of approved make.
55 (i) 20 mm each 725.00
55 (ii) 25 mm each 987.00
55 (iii) 32 mm each 2654.00
55 (iv) 40 mm each 3673.00
55 (b) Repair Works
55 1 Dismantling and refixing 65 mm street hydrant. each 45.00
55 2 Renewing C.I. square head of street hydrant. each 106.00
Page 159
Sanitary&Plumbing
55 3 Renewing leather washer of street hydrant.
55 (i) 50 mm each 46.00
55 (ii) 45 mm each 42.00
55 4 Renewing 150 mm X 150 mm grey rubber washer for
flange of street hydrant.
each 33.00
55 5 Supplying, fitting and fixing spindle (G.M.) nipple for
hydrants to make house union 25 mm to 40 mm size.
each 227.00
55 6 Regrinding valve seat of street hydrant. each 95.00
55 7 Renewing brass jumper of street hydrant. each 93.00
56 8 Dismantling garden hydrant and refixing the same after
repair including regrinding seat 40 mm and above.
each 114.00
56 9 Dismantling fire hydrant after plugging off the supply for
repairs and refixing the same including taking to workshop
and back.
each 301.00
56 10 Renewing bolt and nut for hydrant. each 10.00
56 11 Renewing spindle of hydrant.
56 (i) 15 mm each 60.00
56 (ii) 20 mm each 71.00
56 (iii) 25 mm each 83.00
56 (iv) 32 mm each 126.00
56 (v) 50 mm each 223.00
56 (vi) 75 mm each 470.00
56 12 Renewing pin for hydrant. each 19.00
56 13 Renewing 65 mm bridge guage. each 262.00
56 14 Renewing cap for 65 mm bridge guage. each 113.00
56 15 Renewing brickets for hydrant. each 102.00
56 16 Renewing English rubber seat.
56 (i) 80 mm dia. 10 mm thick each 20.00
56 (ii) 125 mm dia. 6 mm thick each 24.00
57 (B)-(II) SOIL PIPE AND FITTINGS
57 (a) Original Works
57 1 Supplying, fitting & fixing Cast iron soil pipe only
conforming to I.S. 3989 / 1970 and I.S. 1729/1964 with
bobbins, nails etc. including making holes in the wall, floor
etc. and cutting trenches etc. in any floor through
masonry concrete, if necessary, and mending good
damages with necessary jointing materials and painting
two coats to the exposed surface with approved paint
complete. (Measurement will be made along the center
line of the total pipe Ijne in fitted condition including
specials,payment for specials & Painting will however be
paid seperately).
57 (a) With valamoid joints including sealing with sand
cement morter (4:1) upto quarter depth.
57 (i) 150 mm dia. (internal) metre 1204.00
57 (ii) 100 mm dia. (internal) metre 712.00
57 (iii) 75 mm dia. (internal) metre 614.00
57 (iv) 50 mm dia. (internal) metre 453.00
57 (b) With lead caulked joints.
57 (i) 150 mm dia. (internal) metre 1294.00
57 (ii) 100 mm dia. (internal) metre 768.00
57 (iii) 75 mm dia. (internal) metre 654.00
57 (iv) 50 mm dia. (internal) metre 489.00
57 2 Supplying, fitting & fixing Cast iron single branch
equal with door conforming to I.S. 1729/1970 including
joining and painting two coats to theexposed surface with
approved paint complete. (Payment of Painting will
however be paid seperately).
57 (a) With valamoid joints including sealing the top with
cement mortar (4:1)
57 (i) 150 mm dia. each 1528.00
57 (ii) 100 mm dia. each 748.00
57 (iii) 75 mm dia. each 497.00
57 (iv) 50 mm dia. each 441.00
58 (b) With lead caulked joints.
58 (i) 150 mm dia. each 1705.00
58 (ii) 100 mm dia. each 855.00
58 (in) 75 mm dia. each 571.00
58 (iv) 50 mm dia. each 484.00
58 3 Supplying, fitting & fixing Cast iron double branch equal
with door conforming to I.S. 1729/1970 including jointing
and painting two coats to the exposed surface with
approved paint complete. (Payment of Painting will
however be paid seperately). (a) With valamoid joints
including sealing the top with cement mortar (4:1)
58 (i) 150 mm dia. each 1909.00
58 (ii) 100 mm dia. each 915.00
58 (iii) 75 mm dia. each 676.00
58 (iv) 50 mm dia. each 599.00
58 (b) With lead caulked joints
58 (i) 150 mm dia. each 2169.00
58 (ii) 100 mm dia. each 1063.00
58 (iii) 75 mm dia. each 778.00
58 (iv) 50 mm dia. each 664.00
58 N.B. For single or double junction without door, the rates
for items 2 & 3 will be reduced by Rs. 50.00.
58 4 Supplying, fitting & fixing H.C.I, bend with door
conforming to I.S.S. including jointing complete and
painting two coats to the exposed surface with approved
paint complete. (Payment of Painting will however be paid
seperately).
58 (a) With valamoid joints including sealing the top with
cement mortar (4:1)
58 (i) 150 mm dia. each 909.00
59 (ii) 100 mm dia. each 495.00
59 (iii) 75 mm dia. each 405.00
59 (iv) 50 mm dia. each 336.00
59 (b) With lead caulked joints
59 (i) 150 mm dia. each 1082.00
59 (ii) 100 mm dia. each 593.00
59 (iii) 75 mm dia. each 482.00
59 (iv) 50 mm dia. each 384.00
59 5 Supplying, fitting & fixing H.C.I, bend without door
conforming to I.S.S. including jointing complete and
painting two coats to the exposed surface with approved
paint complete. (Payment of Painting will however be paid
seperately).
59 (a) With valamoid joints including sealing the top with
cement mortar (4:1)
59 (i) 150 mm dia. each 807.00
59 (ii) 100 mm dia. each 432.00
59 (iii) 75 mm dia. each 341.00
59 (iv) 50 mm dia. each 261.00
59 (b) With lead caulked joints
59 (i) 150 mm dia. each 980.00
59 (ii) 100 mm dia. each 530.00
59 (iii) 75 mm dia. each 419.00
59 (iv) 50 mm dia. each 309.00
Page 160
Sanitary&Plumbing
59 6 Supplying, fitting & fixing H.C.I, heel rest bend conforming
to I.S.S. Including jointing complete and painting two
coats to the exposed surface with approved paint
complete. (Payment of Painting will however be paid
seperately).
60 (a) With valamoid joints including sealing the topwith
cement mortar (4:1)
60 (i) 150 mm dia. each 984.00
60 (ii) 100 mm dia. each 515.00
60 (iii} 75 mm dia. each 409.00
60 (iv) 50 mm dia. each 346.00
60 (b) With lead caulked joints
60 (i) 150 mm dia. each 1157.00
60 (ii) 100 mm dia. each 613.00
60 (iii) 75 mm dia. each 487.00
60 (iv) 50 mm dia. each 395.00
60 7 (A) Supplying, fitting & fixing H.C.I, offset conforming to
I.S.S. Including jointing complete with or without ear (75
mm projection) and painting two coats to the exposed
surface with approved paint complete. (Payment of
Painting will however be paid seperately).
60 (a) With valamoid joints including sealing the top with
cement mortar (4:1)
60 (i) 150 mm dia. each 822.00
60 (ii) 100 mm dia. each 532.00
60 (iii) 75 mm dia. each 391.00
60 (iv) 50 mm dia. each 299.00
60 (b) With lead caulked joints
60 (i) 150 mm dia. each 995.00
60 (ii) 100 mm dia. each 630.00
60 (iii) 75 mm dia. each 469.00
60 (iv) 50 mm dia. each 347.00
61 (B) Supplying, fitting & fixing H.C.I, offset conforming to
I.S.S. Including jointing complete with or without ear (150
mm projection) and painting two coats to the exposed
surface with approved paint complete. (Payment of
Painting will however be paid seperately).
61 (a) With valamoid joints including sealing the top with
cement mortar (4:1)
61 (i) 150 mm dia. each 1126.00
61 (ii) 100 mm dia. each 663.00
61 (iii) 75 mm dia. each 518.00
61 (iv) 50 mm dia. each 361.00
61 (b) With lead caulked joints
61 (i) 150 mm dia. each 1299.00
61 (ii) 100 mm dia. each 731.00
61 (iii) 75 mm dia. each 595.00
61 (iv) 50 mm dia. each 409.00
61 8 (a) H.C.I, bell mouth plain trap supplied, fitted and fixed
with lead jointing complete 100 mm dia and painting two
coats to the exposed surface with approved paint
complete. (Payment of Painting will however be paid
seperately).
each 789.00
61 (b) H.C.I, bell mouth plain trap supplied, fitted and fixed
with valamoid joint complete 100 mm dia and painting two
coats to the exposed surface with approved paint
complete. (Payment of Painting will however be paid
seperately).
each 691.00
61 9 Supplying, fitting & fixing approved patent vent cowl I.C.I,
conforming to I.S.S and painting two coats to the
exposed surface with approved paint complete. (Payment
of Painting will however be paid seperately).
61 I) 100 mm dia. each 317.00
61 (ii) 75 mm dia. each 237.00
61 (iii) 50 mm dia. each 195.00
62 10 Supplying, fitting & fixing Aluminium domical grating.
62 (i) 150 mm each 66.00
62 (ii) 125 mm each 54.00
62 (iii) 100 mm each 46.00
62 (iv) 87.5 mm each 42.00
62 (v) 75 mm each 39.00
62 (vi) 50 mm each 37.00
62 11 Supplying, fitting & fixing Cast Iron Fresh air inlet valve
100 mm and painting two coats to the exposed surface
with approved paint complete. (Payment of Painting will
however be paid seperately).
each 180.00
62 12 Supplying, fitting & fixing Cast iron inverted single junction
or antisyphon all degrees conforming to I.S. 3989/1970
and 1729/ 1964 including jointing and painting two coats
to the exposed surface.(Painting will however be paid
seperately).
62 (a) With valamoid joints including sealing the top with
cement mortar (4:1) upto quarter depth.
62 (i) 50 mm X 50 mm each 499.00
62 (ii) 100 mm X 50 mm each 708.00
62 13 Supplying, fitting & fixing Cast iron inverted double
junction or antisyphon all degrees conforming to I.S.
3989/1970 and 1729 / 1964 including jointing and
painting two coats to the exposed surface with approved
paint complete. ( Painting will however be paid
seperately).
62 (a) With valamoid joints including sealing the top with
cement mortar (4:1) upto quarter depth.
62 (i) 100 mm X 50 mm X 50 mm each 915.00
62 (b) with lead caulked joints.
62 (i) 100 mm X 50 mm X 50 mm each 1018.00
63 14 Supplying,fitting and fixing cast iron 'P' or'S' trap
conforming to I.S. 3989/ 1970 and 1729 / 1964 including
lead caulked joints and painting two coats to the exposed
surface. (Painting to be paid separately).
63 (A) 'P
'
Trap
(i) 50 mm each 475.00
63 (ii) 75 mm each 591.00
63 (iii) 100 mm each 943.00
63 (iv) 150 mm each 1708.00
63 (B) 'S
'
Trap
(i) 50 mm each 604.00
63 (ii) 75 mm each 628.00
63 (iii) 100 mm each 764.00
63 (iv) 150 mm each 1581.00
63 15 Supplying, fitting and fixing cast iron extension pipes for
using in Traps only (connector) conforming to
I.S.3989/1970 and 1729/1964 including lead caulked
joints complete and painting two coats to the exposed
surface with approved paint complete. (Payment of
Painting will however be paid seperately).
63 (a) (i) 100 mm X 150 mm each 384.00
63 (ii) 100 mm X 225 mm each 436.00
63 (iii) 100 mm X 300 mm each 502.00
63 (iv) 100 mm X 375 mm each 544.00
63 (v) 100 mm X 450 mm each 586.00
Page 161
Sanitary&Plumbing
63 (vi) 100 mm X 525 mm each 628.00
63 (vii) 100 mm X 600 mm each 663.00
63 (b) Extension 50 mm one way (i) 100 mm X 375 mm each 591.00
63 (c) Extension 50 mm two way (i) 100 mmX 375 mm each 722.00
64 16 Supplying, fitting and fixing with cement jointing (3:1) salt
glazed stoneware pipe including excavation of earth upto
1.50 metre depth in all sorts of soil both mixed or unmixed
and refilling (but excluding concreting at bottom and
sides).
64 (i) 300 mm Mtr. 925.00
64 (ii) 225 mm Mtr. 502.00
64 (iii) 150 mm Mtr. 300.00
64 (iv) 100 mm Mtr. 224.00
64 17 Supplying, fitting and fixing with cement jointing (3:1) with
jute gasket soaked in cement mortar.
64 (a) Stoneware bend
64 (j) 300 mm each 509.00
64 (ii) 225 mm each 405.00
64 (iii) 150 mm each 327.00
64 (iv) 100 mm each 228.00
64 (b) Stoneware single T or Y junction
64 (i) 225 mm each 489.00
64 (ii) 150 mm each 415.00
64 (iii) 100 mm each 281.00
64 [c) Stoneware double T or Y junction
64 (i) 150 mm each 483.00
64 (ii) 100 mm each 412.00
64 18 Supplying, fitting and fixing C.I. round grating.
64 1) 100 mm each 58.00
64 ii) 150 mm each 86.00
64 iii) 225 mm each 112.00
64 19 Supplying, fitting and fixing C.I. square jalli.
65 (i) 100 mm each 58.00
65 (ii) 150 mm each 98.00
65 (iii) 225 mm each 148.00
65 (iv) 300 mm each 190.00
65 (v) 450 mm each 302.00
65 20 Supplying, fitting and fixing yard gully with approved
H.C.I, grating complete.
65 (i) 225 mm X 150 mm with 230 mm gratings each 514.00
65 (ii) 150 mm X 100 mm with 150 mm gratings each 270.00
65 21 Supplying, fitting and fixing S.W. master trap.
65 (i) 150 mm X 150 mm each 955.00
65 (ii) 225 mm X 225 mm each 5439.00
65 22 Cast Iron fittings for soil pipe line conforming to I.S.
1729/1970 including jointing and fitting and fixing in
position and painting two coats to the exposed surface
complete including cost of all materials & labour.(Payment
of painting will be paid separately)
65 (a) Single junction of 150 mm.X 100 mm. dia with door
65 (I) With valamoid joint including sealing the top with
cement mortar (4:1)
each 1459.00
65 (ii) With lead caulked joints each 1555.00
65 (b) Double junction of 150 mm.dia X 100 mm.dia X 100
mm. with door
65 (i) With valamoid joints including sealing the top with
cement mortar (4:1)
each 1582.00
65 (ii) With lead caulked joints each 1758.00
65 (c) Double Y junction of 150 mm.dia X 100 mm.dia X 100
mm.dia with door
65 (i) With valamoid joints including sealing the top with
cement mortar (4:1)
each 1582.00
66 (ii) With lead caulked joints each 1758.00
66 N.B. For any junction without door the rate for above
items will be reduced by Rs. 50.00
66 23 Supply of UPVC pipes (B Type) & fittings conforming to
IS-13592-1992
66 (A) (i) Single Socketed 3 Meter Length
66 (a) 75 mm metre 205.00
66 (b) 110 mm metre 305.00
66 (c) 160 mm metre 570.00
66 (ii) Double Socketed 3 Meter Length.
66 (a) 75 mm metre 221.00
66 (b) 110 mm metre 328.00
66 (c) 160 mm metre 625.00
66 (iii) Single Socketed 1.8 Meter Length
66 (a) 75 mm metre 222.00
66 (b) 110 mm metre 318.00
66 iv) Double Socketed 1.8 Meter Length
66 (a) 75 mm metre 227.00
66 (b) 110 mm metre 344.00
66 v) Double Socketed 1.2 Meter Length
66 (a) 75 mm metre 238.00
66 (b) 110 mm metre 345.00
66 vi) Double Socketed 0.9 Meter Length
67 (a) 75 mm metre 246.00
67 (b) 110 mm metre 353.00
67 (vii) Double Socketed 0.60 Meter Length
67 (a) 75 mm metre 256.00
67 (b) 110 mm metre 366.00
67 (B) Fittings
67 (i) Coupler
67 (a) 75 mm Each 48.00
67 (b) 110 mm Each 89.00
67 (c) 160 mm Each 276.00
67 (ii) Plain Tee
67 (a) 75 mm Each 84.00
67 (b) 110 mm Each 162.00
67 (c) 160 mm Each 535.00
67 (iii) Door Tee
67 (a) 75 mm Each 107.00
67 (b) 110 mm Each 206.00
67 (c) 160 mm Each 548.00
67 iv) DoorTee(LH)&(RH)
67 (a) 75 mm Each 188.00
67 (b) 110 mm Each 329.00
67 v) Plain Y
67 (a) 75 mm Each 109.00
67 (b) 110 mm Each 218.00
67 (c) 160 mm Each 615.00
67 vi) DoorY(LH)&(RH)
68 (a) 75 mm Each 147.00
68 (b) 110 mm Each 292.00
68 vii) Double Y
68 (a) 75 mm Each 159.00
68 (b) 110 mm Each 289.00
68 viii) Double Y with Door
68 (a) 75 mm Each 227.00
68 (b) 110 mm Each 364.00
68 ix) Bend 45
68 (a) 75 mm Each 57.00
Page 162
Sanitary&Plumbing
68 (b) 110 mm Each 94.00
68 (c) 160 mm Each 309.00
68 x) Bend 87.5
68 (a) 75 mm Each 64.00
68 (b) 110 mm Each 126.00
68 (c) 160 mm Each 356.00
68 xi) Door Bend (T.S.)
68 (a) 75 mm Each 87.00
68 (b) 110 mm Each 155.00
68 (c) 160 mm Each 391.00
68 ii) Door Bend (LH) & (RH)
68 (a) 75 mm Each 133.00
68 (b) 110 mm Each 299.00
68 iii) Cross Tee
68 (a) 75 mm Each 153.00
68 (b) 110 mm Each 196.00
68 iv) Cross Tee with Door
68 (a) 75 mm Each 228.00
68 (b) 110 mm Each 252.00
69 xv) Vent Cowl
69 (a) 75 mm Each 27.00
69 (b) 110 mm Each 35.00
69 (c) 160 mm Each 60.00
69 xvi) Pipe Clip
69 (a) 75 mm Each 17.00
69 (b) 110 mm Each 22.00
69 (c) 160 mm Each 46.00
69 xvii) W.C. Connector (150 mm long) 125 X 110(W/WC
Ring)
69 75 mm Each 151.00
69 xviii) W.C. Connector (450 mm long) W / lipring
69 75 mm Each 293.00
69 xix) W.C. Connector Bend W / lipring
69 75 mm Each 165.00
69 xx) 125/110 P Trap with W.C. Ring
69 75 mm Each 359.00
69 xxi) 110 X HOP Trap
69 75 mm Each 296.00
69 xxii) 125/110 S Trap with W.C. Ring
69 75 mm Each 582.00
69 xxiii) 110/110 S Trap
69 75 mm Each 458.00
69 xxiv) 125/110 Q Trap with W.C. Ring
69 75 mm Each 498.00
69 xxv) 110/110 Q Trap
69 75 mm Each 365.00
69 xxvi) Reducer 110 X 75 mm
69 75 mm Each 84.00
69 xxvii) Reducing Tee (110 X 75 mm)
69 75 mm Each 151.00
70 xxviii) Reducing Tee (160 X 110 mm)
70 75 mm Each 427.00
70 xxix) Passover
70 (a) 75 mm Each 301.00
70 (b) 110 mm Each 429.00
70 xxx) Cleaning Pipe
70 (a) 75 mm Each 98.00
70 (b) 110 mm Each 192.00
70 (c) 160 mm Each 485.00
70 xxxi) Plain Floor Trap with Top tile & Strainer
70 75 mm Each 152.00
70 xxxii) Plain Floor Trap without Top tile & Strainer
70 75 mm Each 153.00
70 xxxiii) Multi Floor Trap with Top tile & Strainer
70 75 mm Each 181.00
70 xxxiv) Multi Floor Trap without Top tile & Strainer
70 75 mm Each 182.00
70 xxxv) Socket Plug
70 (a)75 mm Each 44.00
70 (b)110 mm Each 57.00
70 xxxvi) Reducing Door Tee 160 X 110 mm
70 75 mm Each 469.00
70 xxxvii) Reducing Door Tee 160 X 75 mm
70 75 mm Each 184.00
70 xxxviii) Reducing Tee 160 X 75 mm
70 75 mm Each 427.00
70 xxxix) Reducing Y110 X 75 mm
70 75 mm Each 168.00
70 xl) Branch Saddle 110 X 75 mm
70 75 mm Each 89.00
71 xli) Branch Saddle 110X50 mm 75 mm Each 83.00
71 xlii) Branch Saddle 110X40 mm 75 mm Each 74.00
71 xliii) Branch Saddle 75X50 mm 75 mm Each 21.00
71 xliv) Branch Saddle 75X40 mm 75 mm Each 22.00
71 xlv) Round Jali 75 mm Each 23.00
71 xlvi) Door Cap
(a) 75 mm Each 39.00
(b) 110 mm Each 54.00
71 xlvii) W.C. Ring 110 mm Each 132.00
71 xlviii) Lip Ring 110 mm Each 64.00
71 xlix) Door Gasket
(a) 75 mm Each 6.00
(b) 110 mm Each 8.00
71 L) Rubber Ring
71 (a) 75 mm Each 14.00
71 (b) 110 mm Each 18.00
71 (c) 160 mm Each 32.00
71 Li) Nahani Trap 90 mm Each 111.00
71 C) Rubber Lubricant 500 ML 500 ML 211.00
72 D) .. Solvent Cement 250 ML 250 ML 119.00
72 24 Labour for fitting and fixing. U.P.V.C. pipes for above
ground work including cost of jointing materials etc. fitting
and fixing all necessary specials, cutting pipes, cutting
holes in walls or R.C. floor where necessary and mending
good all damages excluding the cost of masonry or
concrete work, if necessary, but including the cost and
fitting and fixing holder bat clamps (any floor) or for
underground work including cutting trenches upto 1.5
metre and refilling the same complete as per direction of
the Engineer-in-charge. (Payment will be made on centre
line measurement of the total pipeline including specials.
72 (A)Above ground
72 (i) 75 mm dia. metre 30.00
72 (ii) 110 mm dia. metre 38.00
72 (iii) 160 mm dia. metre 44.00
72 (B)Under ground
72 (i) 75 mm dia. metre 47.00
72 (ii) 110 mm dia. metre 55.00
72 (iii) 160 mm dia. metre 61.00
72 (b) Repair Works
Page 163
Sanitary&Plumbing
72 1 Dismantling H.C.I, pipe with fittings including melting lead
caulked joints.
72 (i) 50 mm metre 19.00
72 (ii) 75 mm metre 23.00
72 (iii) 100 mm metre 28.00
72 (iv) 150 mm metre 34.00
72 2 Refixing H.C.I, pipe with fittings including lead caulked
joints (with the old molten lead).
72 (i) 50 mm metre 23.00
73 (ii) 75 mm metre 34.00
73 (iii) 100 mm metre 45.00
73 (iv) 150 mm metre 56.00
73 3 Melting out lead caulked joint.
73 (i) 50 mm metre 10.00
73 (ii) 75 mm metre 14.00
73 (iii) 100 mm metre 17.00
73 (iv) 150 mm metre 23.00
73 4 Renewing lead caulked joints for H.C.I, pipe with new
gaskets.
73 (i) 150 mm (2.07 kg of lead) each 368.00
73 (ii) 100 mm (1.25 kg of lead) each 232.00
73 (iii) 75 mm (0.87 kg of lead) each 162.00
73 (iv) 50 mm (0.56 kg of lead) each 110.00
73 5 Renewing cast iron inspection door with bolts and nuts
complete for fittings of 50 mm dia. to 150 mm dia. H.C.I,
pipe.
each 64.00
73 6 Dismantling door of H.C.I, bend or junction and taking out
broken nuts by drilling and refixing the same with new
nuts including putty joints complete.
each 20.00
73 7 Cutting out patent stone / mosaic floor for embedding pipe
and mending good all damages including concreting
(4:2:1) and bringing the floor to original nature.
metre 69.00
73 8 Renewing door of H.C.I, bend or junction with new bolts
and nuts including taking out.
set 71.00
73 9 Dismantling yard gully with gratings,
(i) 100 mm each 22.00
73 (ii) 150 mm each 22.00
73 (iii) 225 mm each 33.00
74 (iv) 300 mm each 33.00
74 10 Refixing yard gully including necessary cement brick work-
(4:1) and 13 mm thick cement plaster (2:1) etc. complete
including mending good all damages. (Cement work will
be paid separately).
74 (i) 100 mm each 13.00
74 (ii) 150 mm each 13.00
74 (iii) 225 mm each 22.00
74 (iv) 300 mm each 22.00
74 11 Removing chokage of yard gully. each 15.00
74 12 Removing chokage of H.C.I, or S.W. pipe with split
bamboo, (a) Underground
metre 7.00
74 (b) Overground metre 6.00
74 13 Scraping the hard scum of' 'S' trap carefully to render the
flushing flow easy after soaking with strong acid through
W.C. pan on floor and also cleaning through flanged
junction door underneath the ceiling including necessary
scaffolding and resetting the flanged door watertight by
putty joints by methor labour.
each 56.00
75 (B)-(III) WATER CLOSETS AND URINALS
75 (a) Original Works
75 1 Supplying, fitting and fixing Shallow water closet Indian
pattern (I.P.W.C.) of approved make in white vitreous
chinaware in position (excluding cost of concrete for
fixing).
75 (i) 580 mm long each 803.00
75 (ii) 510 mm long each 734.00
75 (iii) 450 mm long each 712.00
75 2 Supplying, fitting and fixing E.W.C. in white glazed
vitreous chinaware of approved make complete in position
with necessary bolts, nuts etc.
75 (a) With 'P' trap each 1279.00
75 (b) With 'S' trap each 1372.00
75 3 Supplying, fitting and fixing Anglo-Indian W.C. in white
glazed vitreous china ware of approved make complete in
position with necessary bolts, nuts etc.
75 (a) With 'P' trap (with vent) each 2941.00
75 (b) With 'S
1
trap (with vent) each 3126.00
75 N.B. For W.C. with trap without vent the rate will be
reduced by Rs.25.00
75 4 Supplying, fitting and fixing Orissa pattern water closet in
white glazed vitreous chinaware of approved make in
position complete excluding 'P' or 'S' trap (excluding cost
of concrete for fixing).
75 (i) 580 mm X 440 mm each 1660.00
75 (ii) 530 mm X 410 mm each 1502.00
75 5 Supplying, fitting and fixing Flat back urinal (half stall
urinal) in white vitreous chinaware of approved make in
position with brass screws on 75 mm X 75 mm X 75 mm
wooden blocks complete.
75 (i) 590 mm X 390 mm X 380 mm each 2937.00
75 (ii) 465 mm X 355 mm X 265 mm each 766.00
76 (iii) Corner urinal 430 mm X 340 mm X 260 mm each 1061.00
76 6 Supplying, fitting and fixing Squating plate with integral
flushing in white vitreous chinaware of approved make in
cement concrete (6:3:1) with jhama chips complete.
(Payment of concrete will be paid seperately).
76 (i) 450 mm X 350 mm each 1049.00
76 7 Supplying, fitting and fixing Half round,channel with or
without outlet as required set in cement concrete (6:3:1)
with jhama chips complete. (Payment of concrete will be
paid seperately).
76 (i) 600 mm X 100 mm
76 (a) Salt glazed stone ware metre 119.00
76 (b) White vitreous chinaware metre 546.00
76 (ii) 600 mm X 150 mm
76 (a) Salt glazed stone ware " metre 156.00
76 (b) White vitreous chinaware metre 729.00
76 (A) Extra for item 7(i)(b) & 7(ii)(b)
76 (i) Channel with outlet, stop end metre 36.00
76 (ii) Channel with 'L
'
or ' T' metre 238.00
76 8 Supplying, fitting and fixing Foot rest for water closet of
size 275 mm X 125 mm with
76 (a) Artificial stone (1:2:4) with 6 mm stone chips and
chequered including adding colour as necessary.
Each Pair 47.00
76 (b) Porcelain of approved make. Each Pair 195.00
76 9 Supplying, fitting and fixing Closet seat of approved make
with lid and C.P. hinges, rubber buffer and brass screws
complete.
76 a) E.W.C.
76 i) Plastic (hallow type) black each 298.00
76 ii) Plastic (hallow type) white each 379.00
76 iii) Bestolite (solid type) black each 559.00
Page 164
Sanitary&Plumbing
77 (iv) Bestolite (solid type) white each 762.00
77 (b) Anglo Indian
77 (i) Plastic (hallow type) black each 352.00
77 (ii) Plastic (hallow type) white each 405.00
77 10 Supplying,fitting and fixing 32 mm dia. Flush Pipe of
approved make with necessary fixing materials and
clamps complete.
77 i) Polythene Flush Pipe each 112.00
77 ii) C. P. Flush Pipe each 276.00
77 11 Supplying, fitting and fixing urinal flush pipe fittings of
approved brand.
77 (a) C.P. urinal flush pipe fittings range of one each 448.00
77 (b) C.P. urinal flush pipe fittings range of two each 1043.00
77 (c) C.P. urinal flush pipe fittings range of three each 1459.00
77 12 Supplying, fitting and fixing 25 mm thick marble partition
slab with
sq. m. 2753.00
77 chawk doongri marbel square cut, both sides polished
with two front corners rounded and edges polished.
77 13 Supplying, fitting and fixing porcelain partition wall of
approved make of size 618 mm X 310 mm complete in all
respect.
each 1246.00
77 14 Supplying, fitting and fixing bevelled edged mirror 5.5 mm
thick silver red as per I.S. 3438 /1965 together with brass
C.P. Hinges.
77 (i) 450 mm X 300 mm each 334.00
77 (ii) 600 mm X 450 mm each 441.00
77 15 Supplying, fitting and fixing glass shelf with aluminium
guard rails.
77 (a) Ordinary type with 5.5 mm sheet glass
77 (i) 450 mm X 125 mm ?ach 322.00
77 (ii) 600 mm X 125 mm each 370.00
77 16 Supplying, fitting and fixing liquid soap container.
77 (a) Cromium plated. each 428.00
77 (b) PTMT(Prayag or equivalent) each 196.00
78 (c ) Fibre glass each 182.00
78 (d) Polythene each 89.00
78 17 Supplying, fitting and fixing soap holder.
78 (a) PTMT(Prayag or equivalent) each 164.00
78 (b) Fibre glass each 64.00
78 (c) Polythene each 50.00
78 18 Supplying, fitting and fixing best quality Indian make mirror
5.5 mm thick with silvering as per I.S.I, specifications
supported on fibre glass frame of any colour, frame size
550 mm X 400 mm
each 488.00
78 19 Supplying, fitting and fixing Tooth brush and Tumbler
holder of approved make of size 140 mm X 65 mm
(porcelain).
each 184.00
78 20 Supplying, fitting and fixing PTMT Smart Shelf of
approved make of size 300 mm.
each 247.00
78 21 Supplying, fitting and fixing towel rail with two brackets.
78 (a) C.P. over brass
78 (i) 25 mm dia. and 450 mm long each 301.00
78 (ii) 25 mm dia. and 600 mm long each 339.00
78 (iii) 25 mm dia. and 750 mm long each 395.00
78 (b) Aluminium
78 (i) 25 mm dia. and 450 mm long each 83.00
78 (ii) 25 mm dia. and 600 mm long each 107.00
78 (iii) 25 mm dia. and 750 mm long each 154.00
78 22 Supplying, fitting and fixing porcelain toilet paper holder of
approved make with wooden spindle as necessary.
78 (i) Roll type size 250 mm X 125 mm each 297.00
78 (ii) Box type size 175 mm X 150 mm each 341.00
78 (iii) Recess roll type size 150 mm X 150 mm each 341.00
78 23 Supplying, fitting and fixing porcelain soap tray of
approved make.
79 (i) Recessed soap tray of size 150 mm X 150 mm each 375.00
79 24 Supplying, fitting and fixing bathroom shelf of approved
make of size 580 mm X 150 mm (porcelain).
each 555.00
79 N.B. For coloured sanitary wares rates will be enhanced
over the rates of corresponding items of white glazed
sanitary wares as follows:
79 (a) Sky blue, Venetian pink, Min. green, Turquoise,
Citrus yellow, Champange, Saphire - by 50 %
79 (b) Roman brown, Fern green, Misty lilac, Orange, Sienna
gold, Sepia, Silver grey, Alpine, Comil, Sorvinto Blue - by
100%
79 (c) Burgandy, Emerald green - by 200%
79 (b) Repair Works
79 1 Foot rest for Indian pattern water closet.
79 (a) Dismantling pair 11.00
79 (b) Refixing pair 13.00
79 2 Dismantling Indian W.C. including taking out base
concrete as necessary.
each 28.00
79 3 Refixing Indian W.C. excluding cost of base concrete if
necessary complete.
each 44.00
79 4 Dismantling E.P. or Anglo-Indian W.C. each 28.00
79 5 Refixing E.P. or Anglo-Indian W.C. each 55.00
79 6 Dismantling Orissa pattern W.C. including taking out of
base concrete, if necessary, complete.
each 28.00
79 7 Refixing Orissa pattern W.C. Including cost of base
concrete, if necessary, complete. Payment of concrete to
be paid separately
each 55.00
79 8 Dismantling urinal. each 21.00
79 9 Refixing urinal. each 22.00
79 10 Dismantling flush pipe of water closet. each 11.00
79 11 Refixing flush pipe of water closet. each 14.00
80 12 Refixing flush pipe/ M.S. bend/ C.P. flush pipe with I.R.
adapter.
each 22.00
80 13 Cleaning I.P.W.C. with acid. each 13.00
80 14 Cleaning E.P. or Anglo-Indian.W.C. with acid. each 18.00
80 15 Cleaning urinal with channel with acid. Each Set 13.00
80 16 Cleaning glazed tiles with acid. sq. m. 7.00
80 17 Cleaning white glazed channels with acid. metre 7.00
80 18 Cleaning and polishing marble or mosaic partition
including removing stains.
sqm 7.00
80 19 Dismantling and refixing marble or mosaic partition. each 67.00
80 20 Removing chokage of water closet. each 16.00
80 21 Removing chokage of urinal and waste trap. each 16.00
80 22 Repairing C.P. hinges of W.C. seat. each 60.00
80 23 Repairing W.C. seat with brass plate and screws. set 60.00
80 24 Polishing W.C. seat. set 26.00
80 25 Rectifying leakage of W.C. by new joints by methor
mistry.
each 26.00
80 27 Renewing best quality C.P. hinges for mirror. set 60.00
80 28 Renewing rubber buffer with brass screws. each 11.00
81 SECTION (B)-SANITARY AND DRAINAGE WORKS
Page 165
Sanitary&Plumbing
81 (B)-(IV) INSPECTION PIT, SEPTIC TANK, SOAK PIT
ETC.
PC-I/PC-II
/EC/SC/BNC
WC-II
81 (a) Original Works
K
o
l
k
a
t
a
/
2
4

P
g
s

(
N
&
S
)

/
A
r
e
a

o
f

K
a
l
y
a
n
i

S
u
b

D
i
v
B
r
d
h
a
m
a
n
P
u
r
u
l
i
a
B
i
r
b
h
u
m
Howrah /
Hoogly
M
e
d
i
n
i
p
u
r

(
E
)
M
e
d
i
n
i
p
u
r

(
W
)
B
a
n
k
u
r
a
N
a
d
i
a
M
u
r
s
h
i
d
a
b
a
d
M
a
l
d
a
D
a
r
j
e
e
l
i
n
g

e
x
c
e
p
t

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
D
i
v
J
a
l
p
a
i
g
u
r
i

&

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
D
i
v

&

A
r
e
a

o
f

H
a
l
d
i
b
a
r
i

P
.
S
.
C
o
o
c
h
b
e
h
a
r

e
x
c
l
u
d
i
n
g

t
h
e

a
r
e
a

o
f

H
a
l
d
i
b
a
r
i

P
.
S
.
U
t
t
a
r
/

D
a
k
s
h
i
n

D
i
n
a
j
p
u
r

D
i
s
t
.
81 1 (a) Original Works Constructing Inspection pit of inside
measurement 600mm X 600mm X upto 600mm (depth)
with 250 mm thick 1st. class brick work in cement mortar
(1:4) on all sides, bottom of the pit consisting of 100 mm
thick cement concrete (1:3:6) with stone chips over a
layer of jhama brick flat soling,15 mm thick (1:4) cement
plaster to inside walls and out-side walls upto G.L and 20
mm.thick (1:4) plaster to bottom of the pit, providing
necessary invert with cement concrete (1:3:6) with stone
chips as per direction, neat cement finishing to entire
internal surfaces, top of the pit covered with 100 mm thick
R.C.C. slab (1:1.5:3) with stone chips and necessary
reinforcements upto 1% and shuttering including 6 mm
thick cement plaster (1:4) in all external surfaces of the
slab and one 560 mm dia. R.C.C. manhole cover of
approved make supplied, fitted and fixed in the slab with
necessary fittings, necessary earthwork in excavation in
all sorts of soil, filling sides of the pit with earth and
removing spoils after work complete in all respect with all
costs of labour and materials.
81 i) With Pakur variety. Each 6018.02 5609.23 5310.00 5179.33 6018.02 5873.20 5815.98 5440.14 5775.88 5723.69 5612.69
81 ii) With Bazree (N.B Varity) Each 6767.58 5420.50 5247.66 5524.93
81 iii) Extra for each additional depth of 150 mm or part
thereof beyond initial 600 mm depth.
Each 1148.42 937.22 809.61 809.61 1148.42 1039.55 934.31 833.40 1106.31 1106.31 1044.60 1651.74 973.52 891.47 990.16
81 2 Constructing Inspection pit to a depth of 1.5 metre
(inside), 250 mm thick 1st class brick work (1:4) in all
sides over a layer of jhama brick soling and 150 mm thick
cement concrete with stone chips (1:3:6) including
necessary earth work, fitting and fixing approved type
S.W. master trap, constructing masonry invert with
cement concrete (1:1.5:3) with stone chips, plastering
inside and outside (outside upto 300 mm below G.L.) with
20 mm thick cement plastering (1:4) and neat cement
punning, including supplying/fitting and fixing one 560
mm. dia R.C.C. manhole cover of approved make with
R.C.C. slab of 100 mm thick with cement concrete
[1:1.5:3) with stone chips including necessary
reinforcement (upto 1%) and shuttering and necessary
corbelling brick work (1:4) so that the R.C.C. cover slab
rests 150 mm above adjucent G.L., cement plaster (1:4)
10 mm thick on all external surfaces of the top slab as
directed complete in all respect and removal of surplus
earth with all costs of labour and materials (excluding the
cost of master trap only).
81 (i) 900 mmX 750 mm(inside) chamber including fitting and
fixing S.W. master trap of 150 mmdia. of approved make
81 A) With Pakur variety. Each 9575.94 8960.66 8548.65 8321.84 9575.94 9335.95 9255.09 8715.92 9182.94 9093.31 8917.06
83 B) With Bazree(N.B Varity) Each 10218.55 8477.15 8219.09 8573.04
83 (ii) 900 mm X 750 mm (inside) chamber including fitting
and fixing S.W. master trap of 100 mm dia. of approved
make
83 A) With Pakur variety. Each 9248.72 8633.44 8233.32 8006.52 9248.72 9008.74 8927.87 8400.59 8867.63 8778.00 8601.73
83 B) With Bazree(N.B Varity) Each 9831.86 8090.44 7847.25 8201.21
83 (iii) 1050 mm X 750 mm (inside) chamber including fitting
and fixing S.W. master trap of 225 mm dia. of approved
make
83 A) With Pakur variety. Each 9945.53 9259.64 8838.74 8575.36 9945.53 9676.34 9590.34 9020.98 9529.15 9424.03 9222.97
83 B) With BazreefN.B Varity) Each 10999.87 8864.54 8619.38 9064.34
83 (iv) 1050 mm X 750 mm (inside) chamber including fitting
and fixing S.W. master trap of 300 mm dia. of approved
make
83 A) With Pakur variety. Each 10272.74 9586.86 9154.06 8890.69 10272.74 10003.56 9917.55 9336.30 9844.47 9739.34 9538.28
83 B) With BazreefN.B Varity) Each 11327.09 9191.75 8934.69 9379.66
83 (v) Extra for additional depth beyond 1.5 metre.
83 (a)For(i)and(ii) Per
Mtr.
Depth
2616.05 ' 2439.34 2188.65 2188.65 2616.05 2584.63 2554.27 2288.11 2482.62 2482.62 2464.82 3166.43 2449.83 2304.87 2449.11
83 (b) For (iii) and (iv) Per
Mtr.
Depth
2772.10 2582.31 2313.88 2313.88 2772.10 2738.18 2705.41 2420.50 2629.49 2629.49 2610.27 3362.88 2593.62 2438.57 2593.32
CENTRAL CIRCLE NC/NBCC-I/NBCC-II WC I SOUTH-WESTERN CIRCLE
Page 166
Sanitary&Plumbing
83 3 Construction of septic tank of different capacities as per
approved drawing with 1st class brick work in cement
mortar (1:4) including two 560 mm dia. R.C.C. manhole
cover(heavy type)of approved make supplied, fitted and
fixed in the 100mm thick R.C.C (1:1.5:3) top slab with
necessary fittings, 20mm thick cement plaster (4 : 1) with
neat cement finish to the internal surfaces and 15 mm
thick cement plaster (4 : 1) to outside wall upto 200 mm
below G.L floor finished with 25 mm thick grey artificial
stone over 100 mm thick R.C.C(1:1.5:3) bottom slab
including supplying, fitting and fixing all necessry specials,
fittings, S.W. tees, C.I. foot rest etc. including excavation
earth in all sorts of soil, shoring, bailing out and pumping
out water as necessary, ramming, dressing the bed and
fefilling the sides of the tanks with earth, removing spoils,
filling up the chamber with clear water, removing foreign
materials from the chamber and including constructing
attached inspection pit as per approved drawing and
connecting all necessary pipes, joints etc. with internal
plaster work and artificial stone flooring is to be done with
admixture of water proofing compound @ 0.5% by weight
of cement with all costs of labour and materials.
85 (i) For 10 users
85 A) With Pakur variety. Each 29984.38 28401.34 27128.03 26652.43 29984.38 29456.05 29261.29 27674.40 28956.39 28764.99 28377.96
85 B)WithBazree(N.BVarity) 32993.09 27708.22 26971.71 28073.17
85 (ii) For 20 users
85 A) With Pakur variety. Each 39712.61 37612.08 35857.43 35260.23 39712.61 39028.74 38764.87 36606.04 38339.59 38098.82 37600.95
85 B) With Bazree(N.B Varity) 43838.47 36750.47 35734.69 37208.81
85 (Hi) For 30 users
85 A) With Pakur variety. Each 51280.80 48345.73 46053.93 45140.63 51280.80 50276.85 49910.97 47037.27 49395.45 49030.88 48294.15
85 B) With BazreefN.B Varity) 56731.26 46998.76 45682.25 47709.19
85 (iv) For 50 users
85 A) With Pakur variety. Each 74921.87 70524.10 67318.71 65824.87 74921.87 73369.41 72856.40 68724.27 72130.49 71534.22 70378.38
85 B) With BazreefN.B Varity) 82505.46 68173.18 66347.28 69352.22
85 v) For 100 users
85 A) With Pakur variety. Each 95426.49 89805.38 86040.77 83959.31 95426.49 93363.84 92745.38 87727.89 91911.99 91081.15 89526.70
85 B) With BazreefN.B Varity) Each 104605.88 86662.62 84519.88 88303.94
85 vi) For 200 users
85 A) With Pakur variety. Each 149479.75 139850.36 133933.33 130081.68 149479.75 145837.49 144859.63 136670.25 143545.60 142008.35 139228.77
85 B) With BazreefN.B Varity) Each 164147.80 133977.39 130641.02 137051.24
87 4 Construction of circular soak well 2.5 metre deep in all
types of sandy soils with dry brick work upto 1.6 metre
from the bottom having ISO mm intermediate cement
brick work (1:4) band all round and cement brick work
(1:4) upto 0.90 metre from top with 20mm thick cement
plastering (1:4) to inside face upto the depth of cement
brick work, 15mm thick cement plaster (1:4) on outer face
from top of the well upto G.L. and 6 mm thick cement
plaster (1:4) on top of the R.C.C. cover slab including
filling bottom 1.00 metre of inside of the well with brick
metal (50 mm to 63 mm size) including R.C.C. cover slab
of 100 mm thick with cement cone (1:1.5:3) with stone
chips with necessary reinforcement and shuttering
including one 560 mm dia. R.C.C. manhole cover (heavy
type)of approved make supplied, fitted and fixed in the
cover slab with necessary fittings, making nacessary
arrangements for pipe connections, excavation of well
including shoring, dewatering and removing the exess
earth from the premises as per direction complete in all
respect with all costs of labour and materials. With 250
mm thick dry brick work and 250 mm thick cement brick
work (6:1) and 1.00m inside dia.
Each 13058.22 12182.26 11080.38 11015.25 13058.22 12843.96 12747.82 11514.28 12386.53 12360.53 12264.61 15453.71 12259.54 11745.94 12288.66
87 5 Open jointed stone ware pipe 100 mm dia. supplied, laid
and fitted in position duly encircled all round by 150 mm
thick layer jhama metal (38 mm to 50 mm size) including
excavation of earth in any soil upto required depth
including refilling trench,watering and ramming complete.
(Cost of Jhama Metal to be paid seperately).
Each 210.61 210.61 210.61 210.61 210.61 1 210.61 210.61 210.61 210.61 210.61 210.61 230.84 210.61 210.61 210.61
87 6 Construction of soak gallery (600 mm X 450 mm) with
two layers of jhama metal/Brick bats (38 mm to 50 mm
size) 150 mm thick and 3 layers of dry brick flats in
between the layers of jhama metal leaving an opening of
100 mm X 150 mm in section along the G.L. as per
sketch including cutting trenches in required grade,back
filling and compacting to its original G.L etc. complete
including costs of labour and materials. (This item is
suitable for moorum and sandy area and predominantly
sandy soils @ 1.50 metre length per head of user.)
Each 735.98 622.37 506.54 560.09 737.17 655.57 733.74 533.96 621.77 621.77 616.42 942.56 617.01 574.65 608.92
89 (a) Original Works
89 7 Supplying, fitting and fixing in position R.C.C. Manhole/ pit
cover of approved make with rim of approved make
(Heavy type)
(i) 450 mm dia. each 234.00
89 (ii) 560 mm dia. each 308.00
89 8 Supplying, fitting and fixing in position reinforced cement
polymer concrete manhole /gully pit cover with matching
frame.As per I.S-12592(M.D)
89 (i) 35 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 4570.00
89 Cover: 700 mm X 100 mm
89 Frame: 900 mm X 200 mm
89 Weight: 250 kg (approx)
89 (ii) 25 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 3806.00
89 Cover: 630 mm X 100 mm
89 Frame: 780 mm X 180 mm
89 Weight: 200 kg (approx)
89 (iii) 20 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 3471.00
89 Cover: 600 mm X 75 mm
89 Frame: 750 mm X 150 mm
89 Weight: 140 kg (approx)
89 (iv) 15 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 2803.00
89 Cover: 460 mm X 75 mm
89 Frame: 620 mm X 150 mm
89 Weight: 105 kg (approx)
89 (v) 12 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 3326.00
89 Cover: 600 mm X 75 mm
90 Frame: 750mm X 150 mm
90 Weight: 140 kg (approx)
Page 167
Sanitary&Plumbing
90 (ii) 5 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 2857.00
90 Cover: 550 mm X 65 mm
90 Frame: 650 mm X 135 mm
90 Weight: 105 kg (approx)
90 (iii) 3 MT load bearing capacity round manhole cover
provided with two lifter hooks fitted with matching frame of
size
each 1407.00
90 Cover: 450 mm X 50 mm
90 Frame: 540 mm X 100 mm
90 Weight: 47 kg (approx)
90 (iv) 1 MT load bearing capacity round manhole cover
provided with two lifter hook with matching frame of size
each 1032.00
Cover: 450 mm X 40 mm
90 Frame: 540 mm X 80 mm
90 Weight: 35 Kg. (approx)
90 (v) 5 MT Joad bearing capacity gully pit cover with frame
and hinge arrangement for opening of size
each 1876.00
90 Cover: 425 mm X 380 mm X 55 mm
90 Frame: 585 mm X 545 mm X 175 mm
90 Weight: 96 kg (approx)
90 (vi) Light duty gully pit cover (yard gully) with with frame
and hinge arrangement for opening of size
each 349.00
90 Cover: 275 mm X 230 mm X 30 mm
90 Frame: 350 mm X 300 mm X 75 mm
90 Weight: 14 kg (approx)
90 9 Supplying, fitting and fixing in position C.I. manhole/ pit
cover with rim.
91 a)Round
91 i) 450 mm X100 mm X 21 kg (approx.) each 1732.00
91 ii) 450 mm X 100 mm X 25 kg (approx.) each 2066.00
91 (iii) 450 mm X 100 mm X 50 kg (approx.) each 3908.00
91 (iv) 450 mm X 100 mm X 75 kg (approx.) each 5898.00
91 (b)Square
91 (i) 450 mm X 450 mm X 16 kg (approx.) each 1383.00
91 (ii) 450 mm X 450 mm X 50 kg (approx.) each 3940.00
91 (iii) 600 mm X 600 mm X 32 kg (approx.) each 2906.00
91 (i) 600 mm X 600 mm X 50 kg (approx.) each 3946.00
91 (c) Rectangular
91 (i) 600 mm X 450 mm X 25 kg (approx.) each 1677.00
91 (i) 600 mm X 450 mm X 32 kg (approx.) each 2136.00
91 (i) 600 mm X 450 mm X 50 kg (approx.) each 3359.00
91 (b) Repair Works
91 1 Dismantling & Refixing pit cover each 22.00
91 2 Cleaning silt of inspection pit. each 92.00
91 3 Removing sludge from septic tank, soak well etc. by
methor labour including disposal of the same outside the
compound as directed.
91 (a) Upto 20 users:-
91 (i) Within a lead of 150 metre Each 1118.00
91 (ii) Beyond a lead of 150 metre and outside the Municipal
limit
Each 1696.00
91 (b) Upto 30 users:-
92 (i) Within a lead of 150 metre Each 1229.00
92 (ii) Beyond a lead of 150 metre and outside the Municipal
limit
Each 2326.00
92 (c) Upto 50 users:-
92 (i) Within a lead of 150 metre Each 1339.00
92 (ii) Beyond a lead of 150 metre and outside the Municipal
limit
Each 2683.00
92 (d) Upto 100 users:-
92 (i) Within a lead of 150 metre Each 1577.00
92 (ii) Beyond a lead of 150 metre and outside the Municipal
limit
Each 3141.00
92 (e) Upto 200 users:-
92 (i) Within a lead of 150 metre Each 2017.00
92 (ii) Beyond a lead of 150 metre and outside the Municipal
limit
Each 4278.00
92 4 Cleaning soak pit by removing the top slab and replacing
inner filling with jhama bats and repairing the pit as
necessary including fitting the slab.
each 1164.00
92 5 Cleaning silt of master trap pit. each 678.00
92 6 Making connection with the existing pit. each 55.00
93 SECTION (C)-MATERIALS AND LABOUR ETC
93 (C)-(I) MISCELLANEOUS
93 1 Cutting trench thorugh passage upto 40 mm wide
including refilling, watering and ramming.
metre 18.00
93 2 Cutting out asphaltum road and restoring the same with
spoils including guarding and barricading
metre 18.00
93 3 Cutting trench upto 1.00 metre deep through masonry
foundation.
metre 48.00
93 4 Opening out mud holes of boiler, grinding the same to
proper size and refixing including supplying, packing
washer to watertight (hot water installation) including
carriage to workshop and back.
Each
Set
606.00
93 5 Decarbonising and cleaning gas pipe including necessary
scaffolding, pumping and testing complete including
dismantling and refixing pipe where necessary.
93 (i) Upto 25 mm dia. pipe metre 12.00
93 (ii) Above 25 mm dia. and upto 40 mm dia. pipe metre 14.00
93 (iii) Above 40 mm dia. and upto 80 mm dia. pipe metre 17.00
93 6 Renewing gas tubing upto 1.00 metre. each 45.00
93 7 Renewing 50 mm gas syphon. each 224.00
93 8 Tracing out underground pipe or pit by opening out test
trench including filling it up.
each 24.00
93 9 Cutting hole through wall, roof or cornice and mending
good all damages.
each 46.00
93 10 Renewing 15 mm C.P. over brass spreader. each 261.00
93 11 Renewing 15 mm G.I. spreader. each 53.00
93 12 Dismantling and refixing 15 mm brass spreader. each 15.00
93 13 Dismantling and refixing water distiller. each 44.00
93 14 Dismantling large distilling or cooking gas burner cock,
refixing after
each 80.00
93 repair, greasing and cleaning 50 mm dia.
94 15 Labour for jointing and lowering G.I. or E.R.W. M.S. pipes
including strainer within the tube well bore vertically with
necessary sockets, special fittings and welding as
required including cost of all jointing materials, hire
charges of tools and plants, cutting pipes to required
sizes, making threads, welding pieces together etc. as
necessary as per direction of the Engineer-in-charge.
94 (i) Upto 100 mm dia. pipe metre 43.00
94 (ii) Above 100 mm dia. and upto 200 mm dia. pipe metre 58.00
94 (iii) Above 200 mm dia. and upto 300 mm dia. pipe metre 85.00
94 (iv) Above 300 mm dia pipe metre 140.00
Page 168
Sanitary&Plumbing
94 16 Labour charges for making slots in E.R.W. M.S. pipe as
per direction of the Engineer-in-charge for the purpose of
using the slotted pipe as strainer including cost of labour
and hire charges of tools and plants,all complete.
94 (i) 100 mm dia. pipe metre 327.00
94 (ii) 150 mm dta. pipe metre 470.00
94 (iii) 200 mm dia, pipe metre 589.00
94 17 Dismantling ball cock and refixing the same after repair
including straightening lever and renewing split pin.
94 (i) 15 mm each 19.00
94 (ii) 20 mm each 24.00
94 (iii) 25 mm each 29.00
94 (iv) 32 mm each 36.00
94 (v) 40 mm each 40.00
94 [vi) 50 mm each 44.00
94 [vii) 65 mm each 48.00
95 18 Cleaning and removing silt from choked up gully pit
including painting C.I.
each 23.00
95 grating with bituminous paint.
95 19 Cleaning, scraping and removing sediment etc. from
masonry urinal or
each 16.00
95 through latrine seat including cleaning with acid by methor
labour.
95 20 Renewing rose headed nails 100mm. Each Set 8.00
95 21 Repairing 25 mm to 40 mm pit valve including renewing
packing to gland
each 25.00
95 etc.
95 22 Renewing spindle valve and wheel of fire-hydrant
including taking out and refixing the same.
95
95 (i) 25 mm size Each Set 151.00
95 (ii) 32 mm size Each Set 168.00
95 (iii) 40 mm size Each Set 185.00
95 (iv) 50 mm size Each Set 192.00
95 23 Dismantling and refixing drain pipe including cutting
trench and refilling the same.
95
95 (i) Upto 100 mm metre 44.00
95 (ii) 150 mm metre 12.00
95 (iii) 225 mm metre 44.00
95 (iv) 300 mm metre 44.00
95 24 Renewing hinged gully grating with frame.
95 i) 100 mmX100 mm each 21.00
95 ii) 150 mmX 150 mm each 33.00
95 iii) 225 mmX 225 mm each 42.00
95 iv) 300 mmX 300 mm each 111.00
95 25 Renewing gully grating.
96 (i) 375 mm X 300 mm X 40 mm X 18 kg each 1446.00
96 (ii) 375 mm X 300 mm X 75 mm X 25 kg each 1963.00
96 (iii). 450 mm X 375 mm X 150mm X 40 kg each 3042.00
96 (iv) 500 mm x 400 mm X 150 mm X 75 kg each 5568.00
96 (v) 600 mm x 450 mm X 100 mm X 80 kg each 5691.00
96 26 Renewing 75 mm rubber washer. each 16.00
96 27 Renewing fly or spindle. each 32.00
96 28 Cleaning rubbish, sludge, weeds scum, liquid earth, mud
etc.etc.from road side masonary drain/ hume pipe drain/
culvert etc. by mathor labour after removing
concrete.Slab/manhole cover etc.without damaging the
same and refixing the same properly after cleaning as
necessary and removing the sludge etc.etc.by using iron
pans,buckets including all labour, tools & plants including
removing the spoils in dry condition and disposing the
same by truck beyond the road side in conformity with
municipal/corporation rules for such disposal including
loading into truck and cleaning the road side in all
respects as per direction of the Engineer-in-
Charge.(Payment will be made on the basis of actual
stack measurment of spoils in dry condition at roadside)
cum 195.00
96 29 Repairing damaged lead caulked joint by cutting trench
through any type of surface including taking out lead
from the joint,recasting and hammering the same with
additional lead and lead wool,refilling the trench and
mending good damages of the surface complete in all
respect including cost of lead and lead wool.
96 (i) 100 mm dia. each 178.00
96 (ii) 150 mm dia. each 211.00
97 SECTION (C)-MATERIALS AND LABOUR ETC
97 (C)-(II) COST OF MATERIALS
97 1 Supply of G.I. pipes of TATA make including necessary
sockets.
(a) 15 mm dia.
97 (i) Light quality metre 109.00
97 (ii) Medium quality metre 133.00
97 (b) 20 mm dia.
97 (i) Light quality metre 141.00
97 (ii) Medium quality metre 151.00
97 (c) 25 mm dia.
97 (i) Light quality metre 184.00
97 (ii) Medium quality metre 215.00
97 (d) 32 mm dia.
97 (i) Light quality metre 204.00
97 (ii) Medium quality metre 236.00
97 (e) 40 mm dia.
97 (i) Light quality metre 260.00
97 (ii) Medium quality metre 270.00
97 (f) 50 mm dia.
97 (i) Light quality metre 310.00
97 (ii) Medium quality metre 364.00
97 (g) 65 mm dia.
97 (i) Light quality metre 434.00
97 (ii) Medium quality metre 472.00
97 (h) 80 mm dia.
97 (i) Light quality metre 509.00
97 (ii) Medium quality metre 624.00
98 (i) 100 mm dia.
98 (i) Medium quality metre 887.00
98 (ii) Heavy quality metre 1032.00
98 j) 125 mm dia.
98 (i) Medium quality metre 1163.00
98 (ii) Heavy quality metre 1302.00
98 (k) 150 mm dia.
98 (i) Medium quality metre 1371.00
98 (ii) Heavy quality metre 1500.00
98 2 Supply of galvanised iron socket with I.S.I, mark.
98 (i) 15 mm dia each 11.00
98 (ii) 20 mm dia. each 16.00
98 (iii) 25 mm dia. each 24.00
98 (iv) 32 mm dia. each 37.00
Page 169
Sanitary&Plumbing
98 (v) 40 mm dia. each 50.00
98 (vi) 50 mm dia. each 82.00
98 (vii) 65 mm dia. each 142.00
98 [viii) 80 mm dia. each 198.00
98 [ix) 100 mm dia. each 346.00
98 3 Supply of galvanised iron jamnut.
98 (i) 15 mm each 6.00
98 ji) 20 mm each 8.00
98 jii) 25 mm each 10.00
98 iv) 32 mm each 17.00
99 (v) 40 mm 24.00
99 (vi) 50 mm each 38.00
99 (vii) 65 mm each 56.00
99 (viii) 80 mm each 73.00
99 (ix) 100 mm each 101.00
99 4 Supply of G.I. plug
99 (i) 15 mm each 7.00
99 (ii) 20 mm each 9.00
99 (iii) 25 mm each 15.00
99 (iv) 32 mm each 29.00
99 (v) 40 mm each 35.00
99 (vi) 50 mm each 51.00
99 (vii) 65 mm each 106.00
99 (viii) 80 mm each 140.00
99 (ix) 100 mm each 201.00
99 5 Supply of G.'l. reducing socket with I.S.I, mark.
99 (i) 20 mm each 16.00
99 (ii) 25 mm each 23.00
99 (iii) 32 mm each 33.00
99 (iv) 40 mm each 48.00
99 (v) 50 mm each 63.00
99 (vi) 65 mm each 97.00
99 (vii) 80 mm each 237.00
99 (viii) 100 mm each 410.00
99 6 Supply of G.I. bend.
99 (I) 15 mm each 36.00
100 (ii) 20 mm each 54.00
100 (iii) 25 mm each 69.00
100 (iv) 32 mm each 84.00
100 (v) 40 mm each 112.00
100 (vi) 50 mm each 139.00
100 (vii) 65 mm each 251.00
100 (viii) 80 mm each 374.00
100 (ix) 100 mm each 723.00
100 7 Supply of G.I. plain equal elbow of approved brand and
make.
100 (i) 15 mm each 17.00
100 (ii) 20 mm each 27.00
100 (iii) 25 mm each 45.00
100 (iv) 32 mm each 70.00
100 (v) 40 mm each 94.00
100 (vi) 50 mm each 142.00
100 (vii) 65 mm each 242.00
100 (viii) 80 mm each 372.00
100 (ix) 100 mm each 653.00
100 8 Supply of G.I. plain tee of approved brand and make
100 (i) 15 mm each 27.00
100 (ii) 20 mm each 27.00
100 (iii) 25 mm each 63.00
100 (iv) 32 mm each 91.00
100 (v) 40 mm each 125.00
101 (vi) 50 mm each 199.00
101 (vii) 65 mm each 317.00
101 (viii) 80 mm each 440.00
101 (ix) 100 mm each 777.00
101 9 Supply of pendent tee with I.S.I, mark.
101 (i) 15 mm X 15 mm X 20 mm each 26.00
101 (ii) 15 mm X 15 mm X 25 mm each 40.00
101 (iii) 20 mm X 20 mm X 25 mm each 40.00
101 (iv) 25 mm X 25 mm X 32 mm each 60.00
101 (v) 25 mm X 25 mm X 50 mm each 118.00
101 (vi) 32 mm X 32 mm X 40 mm each 93.00
101 (vii) 40 mm X 40 mm X 50 mm each 118.00
101 10 Supply of G.I. reducing tee of approved brand and make
101 (i) 20 mm X 15 mm each 47.00
101 (ii) 25 mm X 15 mm each 70.00
101 (iii) 25 mm X 20 mm each 70.00
101 (iv) 32 mm X 15 mm each 101.00
101 [V) 32 mm X 20 mm each 101.00
101 [vi) 32 mm X 25 mm each 101.00
101 [vii) 40 mm X 15 mm each 137.00
101 [viii) 40 mmX 20 mm each 137.00
101 ix) 40 mm X 25 mm each 137.00
101 x) 40 mm X 32 mm each 137.00
101 xi) 50 mm X 15 mm each 219.00
101 xii) 50 mm X 20 mm each 219.00
102 (xiii) 50 mm X 25 mm each 219.00
102 (xiv) 50 mm X 32 mm each 219.00
102 (xv) 50 mm X 40 mm each 219.00
102 (xvi) 65 mm X 50 mm each 342.00
102 (xvii) 80 mm X 50 mm each 484.00
102 (xviii) 100 mm X 80 mm each 855.00
102 (xix) 100 mm X 65 mm each 855.00
102 11 Supply of G.I. nipple standard 50 mm long.
102 (i) 15 mm each 8.00
102 (ii) 20 mm each 10.00
102 (iii) 25 mm each 14.00
102 (iv) 32 mm each 16.00
102 (v) 40 mm each 18.00
102 (vi) 50 mm each 23.00
102 (vii) 65 mm each 38.00
102 (viii) 80 mm each 35.00
102 12 Supply of long screw (150 mm long) of TATA make with
sockets (TATA make) and jamnut.
102
102 (i) 15 mm each 38.00
102 (ii) 20 mm each 47.00
102 (iii) 25 mm each 65.00
102 (iv) 32 mm each 76.00
102 (v) 40 mm each 87.00
102 (vi) 50 mm each 117.00
102 (vii) 65 mm each 184.00
102
103 (viii) 80 mm each 245.00
103 (ix) 100 mm each 362.00
103 13 Supply of G.I. union.
103 (i) 15 mm each 47.00
103 (ii) 20 mm each 72.00
103 (iii) 25 mm each 101.00
103 (iv) 32 mm each 146.00
103 (v) 40 mm each 181.00
Page 170
Sanitary&Plumbing
103 (vi) 50 mm each 276.00
103 (vii) 65 mm each 542.00
103 (viii) 80 mm each 764.00
103 (ix) 100 mm each 1031.00
103 14 Supply of G.I. cross.
103 (i) 15 mm each 44.00
103 (ii) 20mm each 62.00
103 (iii) 25 mm each 99.00
103 (iv) 32 mm each 157.00
103 (v) 40 mm each 208.00
103 (vi) 50 mm each 316.00
103 15 Supply of G.I. short piece of TATA make (Above 50mm &
uptol50 mm
103 long)
103 (i) 15 mm each 21.00
103 (ii) 20 mm each 27.00
103 (iii) 25 mm each 37.00
103 (iv) 32 mm each 42.00
104 (v) 40 mm each 48.00
104 (vi) 50 mm each 64.00
104 (vii) 65 mm each 87.00
104 (viii) 80 mm each 109.00
104 (ix) 100 mm each 156.00
104 16 Supply of G.I. reducing elbow.
104 (i) 20 mm X 15 mm each 30.00
104 (ii) 25 mm X 15 mm each 49.00
104 (iii) 25 mm X 20 mm each 49.00
104 (iv) 32 mm X 15 mm each 77.00
104 (v) 32 mm X 20 mm each 77.00
104 (vi) 32 mm X 25 mm each 77.00
104 (vii) 40 mm X 15 mm each 103.00
104 (viii) 40 mm X20 mm each 103.00
104 (ix) 40 mm X 25 mm each 103.00
104 (x) 40 mm X 32 mm each 103.00
104 (xi) 50 mm X 15 mm each 156.00
104 (xii) 50 mm X 20 mm each 156.00
104 (xiii) 50 mm X 25 mm each 156.00
104 (xiv) 50 mm X 32 mm each 156.00
104 (xv) 50 mm X 40 mm each 156.00
104 (xvi) 65 mm X 50 mm each 156.00
104 (xvii) 80 mm X 50 mm each 156.00
104 (xviii) 100 mm X 80 mm each 156.00
104 (xix) 100 mm X 65 mm each 409.00
105 17 (A) Sypply of E.R.W.M.S. black pipe of of TATA
make(heavy quality) as per standard specification, 5 mm
thick.
105 (i) 100 mm dia. (internal) metre 858.00
105 (ii) 150 mm dia. (internal) metre 1254.00
105 (iii) 200 mm dia. (internal) metre 1592.00
105 (iv) 250 mm dia. (internal) metre 1996.00
105 (v) 300 mm dia. (internal) metre 2394.00
105 (B) Supply of E.R.W.M.S. black pipe of approved
make(heavy quality) as per standard specification having
wall thickness not less than 8 mm.
105 (i) 200 mm dia. (internal) metre 2510.00
105 (ii) 300 mm dia. (internal) metre 3780.00
105 N.B. The rates for supply of non TATA but I.S.I, marked G.I.
pipes anc fittings will be arrived at by reducing the
corresponding rates for TATA pipes and fittings by 20%.
106 SECTION (C)-MATERIALS AND LABOUR ETC
106 (C)-(III) WAGES OF VARIOUS CATEGORIES OF
LABOURERS
106 1 Plumbing mistry each 200.00
106 2 Mazdoor each 150.00
106 3 Methor mistry each 200.00
106 4 Methor mazdoor each 185.00
106 5 Plumbing helper each 170.00
106 Note: The above rates of labour are exclusive of 10%
profit & 1% Labour welfare cess, which would be
admissible to the contractors, but contractual percentage
will not be applicable on the above rates.
RECOMMENDATION ON SELECTION OF DIAMETER
OF PIPE IN DISTRIBUTION SYSTEM
2 inch 1 inch 1 inch 1 inch inch inch
2 inch 1 2 3 6 12 32
1 inch 1 2 3 6 16
1 inch 1 2 4 10
1 inch 1 2 6
inch 1 3
inch 1
DETAILS OF SEPTIC TANK
NO. OF USER LI L2 B F H
200 5900 3000 2700 1400 1700
100 3800 1900 2100 1400 1700
50 3300 1700 1600 1300 1600
30 2000 1000 1500 1300 1600
20 1500 800 1100 1300 1600
10 1300 700 900 1000 1300
Diameter of Delivery Main Diameter of Branch Pipe
Page 171
Roads_I_181-216
Page
No.
Item
No.
Description of Items Unit All districts of West Bengal and
Darjeeling plain of Siliguri Subdivision
Darjeeling hill
area
Remarks
181 1 Earthwork in excavation from borrow pits (land owned/arranged by
the Department) and depositing in layers of 250 mm. Including breaking clods and
to fill up back of abutments depressions and ruts with an initial lead up to 50 mand
initial lift up to 1.5 m making bunds at top as directed dressing complete. (For
petty emergent works).
For Item No. 1 to 3, Cost should be
evaluated considering 100 m
3
borrow pit
earth = 115m
3
of embankment earth.
181 (a) In ordinary soil. m
3
36.70 39.30
181 (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) m
3
40.80 43.60
181 (c) In mixed hard soil (i,e hard moorum and soil containing laterite and
boulders which do not require blasting)
m
3
48.90 52.40
181 2 Extra for carriage of all kinds of soil for each additional unit lead of 50m (or
part thereof) including loading and unloading.
181 (a) Beyond the initial lead of 50 m up to total lead of 150 m. m
3
5.10 5.40
181 (b) Beyond 150 m but up to 500 m. m
3
6.10 6.50
181 3 Extra for each additional unit lift of 1.5m (or part thereof) beyond the initial
unit of 1.5 m.
m
3
4.10 .4.40
181 4 Earthwork in cutting to form road section in correct profile including removal
of spoils not exceeding initial lead of 50m and initial lift of 1.5m.
181 (a) In ordinary soil. m
3
32.60 34.90
181 (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) m
3
36.70 39.30
181 (c) In mixed hard soil (i,e hard moorum and soil containing laterite and
boulders which do not require blasting)
m
3
44.90 48.00
182 5 Extra for manual compaction of earth by rammers in 250 mm layers
including watering etc. if required.(Borrow pit measurement).
cum 8.60 9.20
182
Un-compacted Earthwork
182 6 Earth work in embankment to correct profile as per desired formation level
with earth obtained from land owned or arranged by the . Department
depositing in layers of 250 mm thickness "Including breaking clods,
dressing etc. complete as per specification, drawing and direction of
Engineer-ln-Charge.
Rates to be specified by the Engineer-in-
Charge considering Item nos. 1 to 5. 100
cum borrow pit earth = 115 cum of
embankment earth.
182 (a) In ordinary soil.
182 (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.)
182 (c) In mixed hard soil (i,e hard moorum and soil containing laterite
and boulders which do not require blasting)
182 (Paying will be made in cubic meter on the basis of quantity arrived at on
pre-work and post work level Section measurements)
182 N.B.:
182 1. This type of Earth work should be done in rural roads at inaccessible
remote areas and the height of embankment should not normally exceed
2.0 m.
182 2. Extra lead and lift are also to be considered if necessary with
specific permission from Engineer-in-Charge.
182 3. Construct additional height of bank for future consolidation
settlement @ 17% of designed height except sandy soil.
183 7 Earth work in embankment to correct profile in any kind of earth obtained
from land owned / arranged by the Contractor as per desired formation level
with earth obtained from land owned or arranged by the Department depositing in
layers of 250 mm thickness Including breaking clods, dressing etc. complete
as per specification, drawing and direction of Engineer-ln-Charge. N.B. To arrive
at the rate for land owned 1 arranged by the Contractor, add Rs. 20.00/ m
3
extra over corresponding items of earthwork for the lands owned/arranged by
the Department. This is applicable for all items of Earth work where land is
owned and arranged by Contractor
m
3
100 cum borrow pit earth- 115 m
3
of
embankment earth.
183
Compacted Earth Work
183 8 Earthwork in road embankment in ordinary soil to correct profile as per
designed formation level with earth obtained from land owned /arranged by the
Department, depositing in layers of 250 mm thickness including breaking
clods .dressing and compacting by power roller (not at OMC) etc.
complete as per specification, drawing and direction of Engineer-in-charge.
(Payment shall be made in m
3
on finished work on the basis of pre-work and
post-work level section measurements. Rates to be evaluated considering
100 m
3
of borrow pit earth = 115 m
3
of embankment earth = 92 m
3
of
compacted earth. Therateis only for Roller Compaction, which includes hire
charges of.Roller, fuel and crews etc. for which deduction from the contractor
will be made.)
184 (a) In ordinary soil. cum 17.10 17.20
184 (b) In mixed soil (i,e. clay mixed with kankar, pebbles, moorum etc.) cum 17.90 18.20
184 (c) In mixed hard soil (i,e hard moorum and soil containing iaterite
and boulders which do not require blasting)
cum 18.80 19.10
184 (100 m3 borrow pit earth = 115 m3 of embankment earth.)
4.1 Embankment Works
paid production necessary documents in
support of payment made towards the
royalties. During initial payment of bill, a
deduction @ Rs. 13.25/m3 may be made.
Page 172
Roads_I_181-216
184 9 Earthwork in road embankment and construction of sub-grade in all sorts
of soil at different chainage by obtaining earth from road side borrow pits
and throwing the same in not more than 250 mm.(loose) thick layers and
compaction by power roller, each layer of soil up to 450 mm below the
subgrade level at O.M.C to 95 % Proctor density and top 450 mm up to
the sub-grade level at O.M.C to 97% Proctor density including breaking all
clods thoroughly, watering, dressing, cambering, etc. filling depression,
making sufficient number of benches on existing embankment, bailing out
water, dressing side slopes and crest to proper profile in accordance with
the procedure of work as detailed in specification including stripping off
the grass-sods, weeds etc. including making proper arrangement for
quality control work up to a depth of 150 mm. rolling the original ground,
including the hire charge of roller, fuel and crew, etc for which necessary
deduction from the contractor shall be made (if Departmental machinery
be used) and as per direction of the Engineer-in-charge.
184 (Payment will be made in m3 on the finished work as per specification on
the basis of pre-work and post-work level section measurements)
184 (a) For initial lead up to 50 m. m
3
61.60 65.20 Ret to remarks above.
185 (b) Extra for each additional unit lead of 50 m (or part thereof) beyond the
initial unit lead of 50m.upto total lead of 150 m.
m
3
4.60 4.90
185 (c) Extra for each additional unit lead of 50 m (or part thereof) beyond the
initial unit lead of 150m.upto total lead of 500 m.
m
3
8.10 8.60
185 (d) Extra for additional unit lift of 1.5m (or part thereof) beyond the initial
unit lift of 1.5 m.
m
3
4.60 4.90
185 Compacted Earthwork by Mechanical means
185 10 Earthwork in embankment to correct profile with approved materials /
soil obtained from borrow pit, depositing in layers, spreading to required
slope and compacting the same to thickness not more than 200 mm at
OMC to at least 97% of maximum dry density by vibratory roller (or static
roller not less than 8-10 T capacity) as per the direction of the Engineer-in-
Charge. Cost is inclusive of all labours, loading and unloading charges, hire
charges of machinery e.g., hydraulic excavator, tipper, dozer, motor
grader, water tanker, vibratory roller, crews, etc. with initial lead of 1.0
Km and all lifts.
m
3
100.60 100.70
185 Cost of soil is to be included if the Departmental land is not available
with necessary carriage beyond 1.0 Km., if required.
185 11 Construction of road embankment with fly ash conforming to IRC: SP:
58 with initial lead of 1Km obtaining from local coal or lignite burning
thermal plant as waste materials, spread and compacted in layer of 200
mm thickness each at OMC, to at least 95% of maximum dry density and
al! as specified in IRC: SP: 58 and as per approved drawings.
m
3
108.40 Construction wing will add cost of extra
carriage beyond 1 Km to work site.
186 Note: The earth cover on sides and intermediate layers of earth
sandwithching the flyash has not been included in this analysis. The same
are required to be provided as per approved design and priced separately as
embankment construction.
186 12 Dressing and chilchalling Road flanks including cutting and filling with
earth up to 150 mmaverage thickness finished with outward cross-grade of 1 in 30.
(Extra quantity of earth for filling shall be obtained from road side borrow pits.)
m
2
5.00 5.30
186 13 Earth work in road embankment in flank (depth exceeding 150 mm) and
slopes to correct profile in layers not exceeding of 150 mm including breaking of clods,
dressing and including light ramming by hand rammers (cross grade in flanks 1 in 30 and
side slope 1:2).
m
3
41.70 45.00 For Item No. 13 add Rs.5.00 per m
3
for
all other district and Rs.5.70 per m
3
for
Darjeeling hill area , over the rates
mentioned in Item No. 1 &2 to arrive at the
complete rate.
186 (a) With 50 m lead and 1.5m lift from roadside land in ordinary soil. m
3
45.80 49.30
186 (b) With 50 m lead and 1.5 m lift from roadside land in mixed soil. m
3
53.90 58.10
186 (c) With 50 m lead and 1.5m lift from roadside land in mixed hard soil. m
3
186 (d) With carried earth, land arranged by the department. m
3
186 (e) With carried earth, land arranged by the contractor. m
3
186 N.B.: Prior permission of Engineer-in-Charge should be necessary for
execution of the work in sub - Item No. (d) and (e)
186 14 Excavation in ordinary rock using manual means including removal of spoil
within all lifts and lead upto 50 m.
m
3
70.90 75.90
186 15 Excavation for roadway in Hard rock (requiring chiselling where blasting is
prohibited) including removing of spoil'within all lifts and lead upto 50 mtrimming
bottom and side slopes in accordance with requirements of lines, grades and cross
sections.
m
3
365.50 392.80
187 16 Excavation for roadway in Hard rock (requiring blasting) by drilling, blasting
and breaking, trimming of bottom and side slopes in accordance with requirements
of lines, grades and cross sections including removing of spoil within all lifts and
lead upto 50 m inclusive of all materials and labour complete.
m
3
197.70 198.00
187 17 Extra costs for removal of spoil for each additional unit lift of 1.5 m (or part
thereof) beyond the initial lift of 1.5 m.
m
3
4.60 4.90
187 18 Clearing and removing earth and/or sand slip including labour charges for
accumulation of spoils in a regular shape as directed by the Engineer-in-Charge.
187 (a) Removal of spoils on the khad side. m
3
11.50 12.40
187 (b) Removal of spoils within a lead of 50 m. m
3
23.10 24.70
187 19 Clearing and removing of mixed slip of (Earth mixed with moorum, kankar,
pebbles, Rock boulders etc.)
187 (a) Removal of spoils on the khad side. m
3
23.10 24.70
187 (b) Removal of spoils within a lead of 50 m. m
3
38.10 40.80
187 20 Extra cost for removal of spoil or earth silp or mixed slip for each additional unit
lead of 50 m. (or part thereof) beyond the initial unit lead of 50 m. up to a total lead
of 200 m.
m
3
4.60 4.90
187 21 Turfing with grass sods 50 mm to 80 mm thick (Turf to be arranged by the
contractor at no extra cost) including watering and maintaining till the grass is fully
grown.
m
2
10.60 11.30
When space for stacking is
available the serviceable stone
obtained from Item No. 14 to 16
should be stacked for which an extra rate
of Rs. 2.00 per m
3
will be allowed.
Page 173
Roads_I_181-216
187 22 Labour for roughening the berms and slopes of earthen embankment and
spreading good quality of grass seeds including necessary watering and guarding
till the grass is grown complete including all cost of materials and labours as
required as per direction of Engineer-in-Charge.
m
2
10.40 11.10
188 23 Cutting kutcha drain of 600 mm wide and depth up to 300 mm, including
disposal of excavated material in embankment slopes within a lead of 50 m.
188 (a) Through ordinary soil. m 5.90 6.30
188 (b) Through Mixed soil. m 6.60 7.10
188 (c) Through Hard rock. m 8.10 8.60
188 24 Diverting water current of jhoras / small water courses during execution of
works including cutting kutcha drain through mixed soil on hire of temporary
wooden or iron sheet drain.
m 8.50 9.10
188 25 Cutting uprooting and removing bamboo clusters as per direction of Engineer-
in-Charge.
75.10 139.00 225.00 358.00 80.30 148.00
241.00 383.00
188 (a) Diameter at base up to 150 cm. Each
cluster
75.10 80.30
188 (b) Diameter at base above 150 cm up to 275 cm. Each
cluster
139.00 148.00
188 (c) Diameter at base above 275 cm up to 375 cm. Each
cluster
225.00 241.00
188 (d) Diameter at base above 375 cm up to 475 cm. Each
cluster
358.00 383.00
188 26 Uprooting and removing stumps and roots, compaction of backfilling and
stacking of serviceable materials by manual means as the direction of the Engineer-
in-Charge.
188 (i) Lead upto 100 m
188 (a) Girth at breast height upto 600 mm Each 56.40 59.80
188 (b) Girth at breast height above 600 mm to 900 mm Each 94.50 100.00
189 (c) Girth at breast height above 900 mm to 1800 mm Each 192.00 203.00
189 (d) Girth at breast height above 1800 mm to 2700 mm Each 371.00 394.00
189 (e) Girth at breast height above 2700 mm to 4500 mm Each 755.00 801.00
189 (ii) Lead upto 1000 m Each
189 (a) Girth (at breast height) upto 600 mm Each 59.40 62.80
189 (b) Girth at breast height above 600 mm to 900 mm Each 105.00 110.00
189 (c) Girth at breast height above 900 mm to 1800 mm. Each 205.00 216.00
189 (d) Girth at breast height above 1800 mm to 2700 mm. Each 388.00 411.00
189 (e) Girth at breast height above 2700 mm to 4500 mm Each 777.00 822.00
189 27 Jungle cutting in flank and Slopes of embankment including cutting trees up to
7.5 cm. diameter, Where necessary, and removing the same as directed.
100 m
2
10.40 11.10
189 28 Supplying and laying open mesh Jute Geotextile (JGT) for slope
protection in road embankments, having overall weight of 500gm/m
2
, thickness
5 mm, width 1220 mm, strength 10 KN/m (in warp direction) and 7.5 KN/m (in
weft direction) on slopes of embankments dressed and cut to a stable gradient,
providing side lapping of 100 mm and horizontal lapping of 250 mm including
cutting and anchoring trenches upto 150 mm depth at top and bottom of slope and
refilling the same with excavated earth as per direction complete.
m
2
20.30 20.80 (Payment of this item will be made on the
finished area of jute geotextile)
190 29 Supplying, testing and installation of 2.0 m wide Woven Jute
Geotextile for strengthening of sub-grades, having minimum tensile strength
of 25 KN/m with a porometry range of 200 to 400 micron, duly secured to sub-
grade by u-shaped M.S. staples (11 gauge) at an interval of 750 mm or as per
direction of Engineer-in-Charge. The jute fabric should be laid with an overlap of
150 mm cross-wise and 300 mm longitudinally as per direction of the
Engineer-in-Charge.
(Payment of this item will be made on
the finished \ area of jute \
geotextile) j
190 (a) Using Untreated Woven Jute Geotextile (Grey) m 41.20 43.20
190 (b) Using Treated Woven Jute Geotextile with approved rot-resistant
additive.
m
2
53.90 55.90
191 1 Supplying, spreading and consolidation of brick bats (size 45 mm and
down) and medium sand including premixing the material in suitable
mixer conforming the combined material to the Grading - I of Granular Sub-base
Materials and in proportion of 60 :40 and rolling at O.M.C. to achieve at least
97% of maximum dry density, maintaining proper gradient and camber,
watering as necessary and lighting, guarding, barricading and making
adequate earthen bundh on both sides where necessary to protect the edges and
curing with water including ail incidental charges for the work and cost of
rolling complete. Note: Payment will be made on the basis of finished
compacted volume of material, either by pre-work and post-work level
sections or by digging holes at random as desired by Engineer-in-Charge and
plugging the holes after measurement as per direction of Engineer-in-Charge.
m
3
173.70 Cost of 0.90 m
3
of brick bats and 0.48 m
3
of
medium sand (loose volume) are to be added to arrive at
the consolidated rate. Labour rate for breaking bricks
bats to required size is included.
191 2 Supplying and spreading of Moorum (80%) and Sand (20%) by volume
to the required thickness in layers as specified and directed by the Engineer-in-
Charge, stabilizing the same by adding requisite quantity of water to get O.M.C,
remixing in wet condition, wet rolling with power roller to the required compacted
thickness to proper grade, camber, super-elevation etc. with power roller,
including proper tampering and curing the same for 5 days to have maximum dry
density as specified and lighting, guarding, barricading and making adequate
earthen bundh for protecting the edges etc., including all incidental charges
of roller, cost of fuel & lubricants etc. complete as per Specification.
m
3
106.60 Labour rate per cubic meter is provided,
cost of Moorum and sand to be added to
arrive at the consolidated rate. The
compaction factor is 0.70. (The payment
is to be made on the basis of the
finished compacted volume.)
Section 4.2 - Soil Compaction & Stabilisation Work
Page 174
Roads_I_181-216
192 3 Supplying, spreading and consolidating Moorum to a depth of 75 mm at
desired density and C.B.R. as per specification with power roller to proper gradient
and camber including watering as necessary, and lighting, guarding, barricading
and making adequate earthen bundh where necessary to protect the edges and
curing with water for 2 to 3 days, mending cracks by rolling where necessary
including all incidental charges of roller, cost of fuel & lubricants etc. complete as
per specification. (The payment is to be made on the basis of the finished
compacted volume of moorum.)
m
3
87.50 Labour rate per cubic meter is
provided, cost of Moorum to be added
to arrive at the consolidated rate.
The compaction factor is 0.67.
192 4 Supplying, spreading and consolidating River Bed Materials to a depth of
100 mm and above with power roller to proper gradient and camber including
watering as necessary, and lighting, guarding, barricading and making adequate
earthen bundh where necessary to protect the edges and curing with water for 2 to 3
days, mending cracks and depressions by rolling where necessary including all
incidental charges of roller, cost of fuel & lubricants etc. complete as per
specification. (The payment is to be made on the basis of the finished compacted
volume of river bed materials.)
m
3
91.10 93.40 Labour rate per cubic meter is
provided, cost of river bed
materials to be added to arrive at the
consolidated rate. The compaction
factor is 0.70.
192 5 Labour for spreading River Bed Materials in layers as per direction of
Engineer-in-Charge.
m
3
27.20 29.10
192 6 Labour for spreading Moorum in layers, including compacting manually by hand
rammer as per direction of Engineer-in-Charge, including necessary watering
complete in all respect. (Labour rate per cubic meter is provided; cost of moorum
is to be added to arrive at the consolidated rate. The compaction factor is 0.67.)
m
3
18.60 ... Payment is to be made on the basis of
the finished compacted
193 7 Supplying, spreading and compacting Sand to required thickness, in layers not
exceeding 150 mm to proper gradient and camber, inundating each layer by water
and packing and ramming layer by layer to achieve desired compaction- excluding
cost of sand but including lighting, guarding, barricading and making adequate
earthen bundh where necessary, curing with water as per direction, mending cracks
and depressions by ramming wherever necessary. (The payment is to be made
onjhe basis of the finished compacted volume.)
m
3
47.00 #
#
#
#
#
#
#
#
#
Labour rate per cubic meter is
provided, cost of sand to be added to
arrive at the consolidated rate. The
compaction factor for dry, clean sand
is 0.835. Suitable considerations
should be made for bulkage of sand.
193 8 Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and
above at desired density and CB.R. as per Specification with power roller to proper
gradient and camber including watering as necessary, and lighting, guarding,
barricading and making adequate earthen bundh where necessary to protect the
edges and curing with water for 2 to 3 days, mending cracks and depressions by
rolling where necessary including all incidental charges of roller, cost of fuel &
lubricants complete as per specification. (The payment is to be made on the basis
of the finished compacted volume of stone dust.)
m
3
87.90 \
90.40
Labour rate per cubic meter is
provided; cost of stone dust is to be
added to arrive at the consolidated rate.
The compaction factor is 0.70.
194 9 Supplying, spreading and consolidating an uniform and
homogeneous mixture of.Stone Dust and Sand (mixed in proportion of 3 :1
by volume and by any approved m^thed as per direction of Engineer-in-Chafge) to
the required'thickness in layers at 97% Proctor Density (not less' than 1.7 gm/cc)
with power roller to proper gradient and camber, including watering as necessary,
lighting, guarding, barricading and making adequate earthen bundh where
necessary to protect the edges and curing with water for 2 to 3 days, mending
cracks and depressions by rolling where necessary complete as per
Specification including all incidental charges of roller, cost of fuel &
lubricants. (The payment is to be made on the basis of the finished compacted
volume of mixture of stone dust and sand.)
m
3
49.30 50.90 Labour rate per cubic meter is
provided, cost of stone dust and sand to
be added to arrive at the consolidated
rate. The compaction factor is 0.67.
General notes:
195 1. All items of work shall be done strictly according to relevant Codes
published by The Bureau of Indian Standards (B.I.S.) and also according
to IRC 75 and 78 and Clause 2400 of Specifications for Road and Bridge
Works (4 th Revision) published by IRC
195 2. It is imperative that testing of soil is done only with standard testing
equipments capable of giving the desired level of accuracy. Departmental
Officers, such as, should have free access to the laboratory test
procedures of soil samples when tests are done in laboratories other than
Government or recognised laboratories.
195 1 Mobilisation Charges of air tools & Plants along with accessories, material,
labour, supervision etc at site of work required in connection with boring and
testing work, including setting up boring rigs and shifting to different Bore-hole
points etc. and also including withdrawal of same from the site after completion of
work, complete as per direction of Engineer-in-Charge. (Payment will be made
after successful completion of work)
(Preliminary Investigation is mainly for
collection of disturbed samples where
deployment of heavy machineries are not
involved)
195 (a) Preliminary Investigation: L.S. 8170.00 8740.00
195 (b) Detailed Investigation: L.S. 25840.00 27650.00
195 2 Carriage of all Disturbed & Undisturbed Samples from site of
work to the Divisional office or elsewhere including loading and unloading as per
direction of Engineer-in-Charge. Detailed Investigation: (Some samples are to be
kept at Sub-Division Office for Additional testing By the Engineer-in-Charge.)
L.S. 1650.00 1770.00
195 3 Field determination of California Bearing Ratio as per IS 2720 (Part
XXXI)
Per
test
1920.00 2060.00
196 4 Conducting Plate Load Test over cohesive & non-cohesive soils
of consistency very soft to very stiff / very loose to dense by making pit of
required site at foundation level (Depth not greater than 1.5rh) providing
necessary platform for loading plates, jacks, Datum bars, Dial guage,
magnetic boxes, loading materials (Gunny bags filled with sand) and
labours, supervisor etc. all complete to perform the same including
shifting the same to other points after the test as per IS 1988.
196 (a) For evaluation of Bearing Capacity & Settlement. L.S. 9840.00 10530.00
196 (b) For evaluation of sub-grade modulus. L.S. 10840.00 11600.00
Section 4.3 - Soil Boring & Testing Works
Page 175
Roads_I_181-216
196 5 Labour for boring by sinking and finally withdrawing 50mm to 100mm
dia. (internal) pipe by a standard method to any depth below ground level /
bed level in all types of soil like clay, silt, sand, stiff clay, mixed soils etc.
except rocks, including collection of disturbed soil samples and including
preparation and submission of bore-log as per standard proforma and also
including hire charges of tool and plants complete as per direction of
Engineer-in-Charge.
(Payment will be made on the driven into
the ground)
196 (a) Depth 0m to 30m : m 150.00 160.00
196 (b) Depth greater than 30m upto 60m : m 200.00 220.00
196 (c) Extra for boring in water (1.2m and higher depths): L.S. 9500.00 10170.00
196 6 Labour for making Bore-Holes of 150mm to 250mm dia. by any standard
method to any depth below ground level / bed level in all kinds of soil like
clay, , silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of
collecting Disturbed & Un disturbed soil samples, conducting Standard
Penetration Test at suitable intervals etc.) including preparation
and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of
Specifications for Road & Bridge Works (4
lh
Revision), Published by IRC, and also
including hire charges of tools and plants complete as per the direction of Engineer-in-
Charge.
197 (a) When Casing pipe is used to prevent collapse of bore hole
(casing pipe to be finally withdrawn):
197 (i) Depth Om to 10m m. 340.00 360.00
197 (ii) Depth greater than 10m and upto 20m. m. 400.00 430.00
197 (iii) Depth greater than 20m and upto 30m. m. 470.00 500.00
197 (iv) Depth greater than 30m. and upto 40m. m. 550.00 590.00
197 (v) Depth greater than 40m and upto 50m. m. 650.00 700.00
197 (vi) Depth greater than 50m and upto 60m. m. 750.00 810.00
197 (b) When drilling mud "Bentonite of suitable consistency" is used to
prevent collapse of bore hole :
197 (i) Depth 0m to 10m m. 290.00 310.00
197 (ii) Depth greater than 10m and upto 20m. m. 350.00 380.00
197 (iii) Depth greater than 20m and upto 30m. m. 420.00 450.00
197 (iv) Depth greater than 30m. and upto 40m. m. 470.00 500.00
197 (v) Depth greater than 40m and upto 50m. m. 520.00 560.00
197 (vi) Depth greater than 50m and upto 60m. m. 690.00 740.00
197 (c) Extra for boring in water (1.2m and higher depths): L.S. 10670.00 11420.00
198 7 Labour for collecting disturbed sample upto any depth (each sample
shall weigh 500 gms approximately) including keeping in polythene /
plastic / tin containers, lebelling, packing etc. and also including hire
charges of tools & Plants complete as per the direction of Engineer-in-
Charge. (a) Preliminary Investigation (Samples to be collected at
intervals of 1m or at change of strata) (b) Detailed Investigation
(Samples to be collected at intervals of 3m or at change of strata)
Each
Each
20.00 30.00 20.00
30.00
198 8 Labour for collecting Undisturbed soil sample of 10cm dia. And about
40cm. long at intervals of 3m, 2m and 1.5m o at change of strata as
required upto any depth, with the help of standard Sampling Tube
including filling the tube at both ends with paraffin wax (25mm thick),
numbering, lebelling, packing etc. and also including hire charges of Tools
& Plants complete as per direction of Engineer-in-Charge for
detailed investigation.
Each 90.00 100.00
198 9 Labour for conducting Standard Penetration Tests (S.P.T.) in the bore
hole already made at intervals of 3m, 2m, and 1.5m or at change of strata as
required upto any depth in all kinds of soils like clay, silt, sand and stiff clay etc.
except rocks including collection of samples for further testing keeping all
records and submission of results in prescribed proforma and also including hire
charges of tools and plant complete as per direction of Engineer-in-charge as per IS
2131 for detailed investigations.
Each 110.00 120.00
198 10 Labour for conducting I n-situVaneShear Test for soil, in the bore hole already
made at intervals of 3m, 2m, and 1.5m or at change of strata as required upto any
depth in very soft to soft soils, medium to stiff soils including keeping all records
and submission of results in prescribed proforma and also including hire charges of
tools and plant complete as per direction of Engineer-in-charge as per IS 4434 for
detailed investigations.
199 (a) For very soft to soft clay using 100mm dia. Vane, Each 390.00 410.00
199 (b) For medium stiff clay using 75mm dia. Vane. Each 440.00 470.00
199 11 Labour for conducting Dynamic Cone-Penetration Test using 50mm cone
without using Bentonite slurry as per IS 4968 (Part-I).
Each 220.00 240.00
199 12 Labour for conducting Static Cone-Penetration Test as per' IS 4968 (Part-
III).
Each 240.00 250.00
199 13 Determination of Dry Density of soil in place by Sand-replacement Method as
per IS 2720 (Part-XXVIII).
Per
test.
290.00 310.00
199 14 Conducting Benkelman BeamTest as per IRC 81. Per
point
650.00 700.00
199 15 Performing Laboratory Test on disturbed / Undisturbed soil samples as
per standard procedure including tabulation of test results in prescribed
proforma as per direction of Engineer-in-Charge.
199 A. Preliminary Investigation on Disturbed Samples:
199 (a) Liquid Limit & Plastic Limit as per IS 2720 (Part - V) on 50% of
samples collected from each bore hole.
Each 70.00 70.00
199 (b) Sieve Analysis as per IS 2720 (Part-IV) on 25% of samples collected
from each bore hole.
Each 80.00 80.00
199 B. Detailed investigations on Disturbed Samples:
199 (i) Collected from Item No. - 7 ,
199 (a) Liquid Limit & Plastic Limit as per IS 2720 (Part - V) on 50% of
samples collected from each bore hole
Each 70.00 70.00
199 (b) Sieve Analysis as per IS 2720 (Part-IV) on 25% of samples collected
from each bore hole.
Each 80.00 80.00
200 (ii) Collected from Item No. - 9
200 (a) Liquid Limit & Plastic Limit as per IS 2720 (Part - V) on 50% of
samples collected from each bore hole.
Each 70.00 80.00
200 (b) Sieve Analysis as per IS 2720 (Part - IV) on 25% of samples collected
from each bore hole.
Each 50.00 50.00
Page 176
Roads_I_181-216
200 (c) Hydrometer Analysis al per IS 2720 (-Part-IV) on 20% of samples
collected.
Each 90.00 100.00
200 (d) Natural Moisture content & Dry Density as per IS 2720 (Part - II) on
100% of samples collected.
Each 60.00 70.00
200 (e) Specific Gravity as per IS 2720 (Part - III) on 20% of samples
collected.
Each 60.00 70.00
200 (f) Direct Shear Test as per IS 2720 (Part - XIII) on 5% of samples
collected.
Each 240.00 250.00
200 (g) Unconfined Compression Test as per IS 2720 (Part-X) on 80% of
samples collected.
200 (1) Undisturbed. Each 130.00 140.00
200 (2) Remoulded. Each 170.00 180.00
200 C. Detailed Investigation On Undisturbed samples.
200 (a) Liquid Limit & Plastic Limit as per IS 2720 (Part - V) on 50% of
samples collected from each bore hole.
Each 60.00 60.00
200 (b) Sieve Analysis as per IS 2720 (Part- IV) on 25% of samples collected
from each bore hole.
Each 60.00 70.00
200 (c) Hydrometer Analysis as per IS 2720 (Part-IV) on 20% of samples
collected.
Each 110.00 120.00
200 (d) Natural Moisture content & Dry Density as per IS 2720 (Part - II)
on 100% of samples collected.
Each 40.00 50.00
200 (e) Specific Gravity as per IS 2720 (Part - III) on 20% of samples
collected.
Each 70.00 70.00
201 (f) Direct Shear Test as per IS 2720 (Part - XIII) on 5% of samples
collected.
Each 200.00 220.0
0 .
201 (g) Unconfined Compression Test as per IS 2720 (Part-X) on 80% of
samples collected.
201 (1) Undisturbed. Each 130.00 140.00
201 (2) Remoulded. Each 170.00 180.00
201 (h) Tri-Axial Compression Test as per IS 2720 (Part - XI) on 50% of
samples collected.
201 (1) Determination of Shear strength Parameters of a specimen tested
in Unconsolidated Undrained Tri-axial compression without
measurement of pore water pressure.
Each 320.00 340.00
201 (2) Determination of Shear strength Parameters of soil from
Consolidated Undrained Tri-axial compression Test with measurement of
pore water pressure.
Each 380.00 410.00
201 (3) Determination of Shear strength Parameters of soil from
Consolidated Drained Tri-axial compression Test without measurement of
pore water pressure.
Each
201 (i) Consolidation Test as per IS 2720 (Part - XV) on 20% of samples
collected.
Each 300.00 330.00
201 (j) Permeability Test (Constant head or Variable head) as per IS 2720
(Part- XV) on 25% of samples for consolidation.
Each 270.00 290.00
201 FIELD TEST ON ROCKS :
201 16 Boring and drilling of rocks and collection / recovery of rock
ore including supplying information on the physical condition and type of
rock, length of pieces of core, joints, colour, weathering changes and other
effects in the drilling logs as per IS 4464 and IS 5313 complete.
202 a) By Diamond Drills: Each 1850.00 1980.00
202 b) By Tungsten Cutters: Each 950.00 1020.00
202 17 LABORATORY TEST ON ROCKS :
202 a) Determination of Compressive Strength as per IS 1121 (Part-I). Each 530.00 570.00
202 b) Determination of Transverse Strength as per IS 1121 (Part-II). Each 1400.00 1500.00
202 c) Determination of Tensile Strength as per IS 1121 (Part -III). Each 1350.00 1450.00
202 d) Determination of Shear Strength as perlS 1121 (Part-IV). Each 2450.00 2630.00
202 e) Determination of True Specific Gravity as per IS 1122. Each 250.00 270.00
202 f) Determination of Water Absorption as per IS 1124. Each 280.00 300.00
202 18 Preparation and submission of report in 6 (Six) copies, giving all
relevant information data like site plan, Bore log and water table, test
results, calculations, discussions, suggestions and recommendations in
respect of suitable foundation etc. including determination of silt
factor calculation of waterways and complete design of foundation
including analysis of Bearing Capacities and settlements in bound and
presentable form complete as per direction of Engineer-in-Charge.
202 a) Preliminary Investigation: L.S. 5000.00 5350.00
202 b) Detailed Investigation: L.S. 12500.00 13380.00
203 1 Earthwork in excavation for foundation of structures as per drawing
and technical specification including setting out, removing, spreading
or stacking of spoils within a lead of 150 m. as directed and including
trimming the sides of the trenches, leveling, dressing and ramming the
bottom, complete as per direction of the Engineer-in-Charge in all
sorts of soil excluding marshy soil & rocks (soft or hard) by manual
means.
203 (a) Depth up to 3 m.:
203 (i) With pumping out water including shoring as required. m
3
49.70 53.10
203 (ii) With pumping out water excluding shoring. m
3
48.30 51.60
203 (iii) Without pumping out water but including shoring as required. m
3
46.00 49.20
203 (iv) Without pumping out water and shoring. m
3
44.60 47.70
203 (b) Depth above 3 m. and up to 6 m.:
203 (i) With pumping out water including shoring as required. m
3
70.80 75.80
203 (ii) With pumping out water excluding shoring. m
3
64.40 68.90
203 (iii) Without pumping out water but ' including shoring as required. m
3
63.70 68.20
203 (iv) Without pumping out water and shoring. m
3
57.30 .61.30
204 (c) Depth above 6 m.:
204 (i) With pumping out water including shoring as required. m
3
97.90 104.70
204 (ii) With pumping out water excluding shoring. m
3
89.00 95.20
Section 4.4 - Bridge & Culvert Works
Only one test from item number 15 C (h)
is to be conducted depending on the
type of soil in consultation with the
Engineer-in-Charge.
Page 177
Roads_I_181-216
204 (iii) Without pumping out water but including shoring as required. m
3
85.30 91.20
204 (iv) Without pumping out water and shoring. m
3
76.40 81.70
204 2 Earthwork in excavation for foundation of structures as per drawing and
technical specification including setting out, removing, spreading or
stacking of spoils within a lead of 150 m. as directed and including
trimming the sides of the trenches, leveling, dressing and ramming the
bottom, complete as per direction of the Engineer-in-Charge in all sorts
of soil excluding marshy soil & rocks (soft or hard) by mechanical means
(using excavator of suitable capacity).
204 (a) Depth up to 3 m.:
204 (i) With pumping out water. m
3
51.20 51.50
204 (ii) Without pumping out water. m
3
49.20 49.50
204 (b) Depth above 3 m. and up to 6 m.:
204 (i) With pumping out water. m
3
59.70 60.00
204 (ii) Without pumping out water. m
3
56.20 56.50
204 (c) Depth above 6 m.:
204 (i) With pumping out water. m
3
72.50 73.10
204 (ii) Without pumping out water. m
3
67.00 67.50
205 3 Earthwork in excavation for foundation of structures as per drawing and
technical specification including setting out, removing, spreading or stacking of
spoils within a lead of 150 m. as directed and including trimming the sides of the
trenches, leveling, dressing and ramming the bottom, complete as per direction of
the Engineer-in-Charge in ordinaryrock (not requiring blasting).
205 (a) By manual means: .
205 (i) With pumping out water. m
3
137.80 147.50
205 (ii) Without pumping out water. m
3
127.30 136.20
205 (b) By mechanical means using excavator of suitable capacity:
205 (i) With pumping out water. m
3
69.40 69.70
205 (ii) Without pumping out water. m
3
64.10 64.40 -
205 4 Earthwork in excavation for foundation of structures as per drawing and
technical specification including setting out, removing, spreading or stacking of
spoils within a lead of 150 m. as'directed and including trimming the sides of the
trenches, leveling, dressing and ramming the bottom, complete as per direction of
the Engineer-in-Charge inhardrock (requiringblasting) including cost of hire &
operational charges of air compressor with necessary accessories and cost of all
necessary blasting materials.
205 (a) With pumping out water. m
3
209.70 218.40
205 (b) Without pumping out water. m
3
196.70 204.80
205 5 Earthwork in excavation for foundation of structures as per drawing and
technical specification including setting out, removing, spreading or stacking
of spoils within a lead of 150 m. as directed and including trimming the sides of the
trenches, leveling, dressing and ramming the bottom, complete as per direction of
the Engineer-in-Charge in hard rock (blasting prohibited) including cost of hire
& operational charges of air compressor with necessary accessories
and cost of all necessary blasting materials.
206 (a) With pumping out water,

347.20 352.00
206 (b) Without pumping out water.

320.70 325.10
206 6 Earthwork in excavation for foundation of structures as per drawing and
technical specification including setting out, removing, of spoils up to any lead as
directed and including trimming the sides of the trenches, leveling, dressing and
ramming the bottom, complete as per direction of the Engineer-in-Charge in
marshysoil for depths not exceeding 3 m.
206 (a) By manual means: .
206 (I) With pumping out water including shoring as required. m
3
246.20 263.50
206 (ii) With pumping out water excluding shoring. m
3
222.50 238.20
206 (iii) Without pumping out water but including shoring as required. m
3
198.90 212.80
206 (iv) Without pumping out water and shoring. 175.20 187.50
206 (b) By mechanical means using excavator of suitable capacity and tipper
trucks.:
206 (i) With pumping out water including shoring as required. m
3
98.30 100.60
207 (ii) With pumping out water excluding shoring. m
3
91.80 93.90
207 (iii) Without pumping out water but including
shoring as required.
m
3
85.30 87.30
207 (iv) Without pumping out water and shoring. m
3
78.80 80.60
207 7 Earthwork in filling in foundation trenches with good earth in layers not
exceeding 15cm. including watering and ramming layer by layer complete with
earth obtained from excavation of foundation or from fresh excavation of land
arranged by Department within a lead of 150 m.
m
3
39.00 41.70
207 8 Earth in filling in foundation trenches and at the back of
abutments with good earth (sandy soil) in layers not exceeding 15 cm. including
watering and ramming layer by layer complete with earth obtained by fresh
excavation from land arranged by Department beyond 150 m. but within 300
m. including all lifts. Earth to be approved by the Engineer-in-charge.
m
3
68.20 73.00
207 9 Sand filling in foundation trenches and at the back of
abutments, wing-walls etc. with good local sand free from earth in layers not
exceeding 15 cm. including inundating each layer by profuse water and
poking and ramming layer by layer complete excluding supply of sand. Quality of
sand is to be approved by the Engineer-in-charge.
m
3
27.20 30.20
207
N.B. 1. Labour rate per m
3
is provided, Cost of sand is to be added to
arrive at the complete item rate. 2. compaction factor of dry clean sand is
0.835; Suitable correction should be made for bulkage of sand.
Page 178
Roads_I_181-216
208 10 Providing form work and staging including hire and labour charge all
complete for slabs of culvert and cross-drain upto 3 m clear span
including stripping off and removing after completion of work as per
specification and direction.
208 (a) Form work so as to give smooth concrete finish with timber plank
not less than 38mm thick.
m
2
236.00 247.00
208 (b) Extra over the rate of (a) above for form work with plywood of
quality as stipulated in IS: 4990 instead of plank so as to give fine finish.
m
2
3.00 3.00
208 (c) Extra over the rate of (a) above for form work with steel sheet plate
instead of plank so as to ensure fine finish.
m
2
4.00 4.00
208 11 Providing form work and staging including hire and labour charges for the
same as required for foundation concrete works of depth not exceeding
500mm and for concrete works in vertical faces of parapet kerb, road kerb, cable
tray, cable tray cover, rail post so as to give good concrete finish including
stripping off and removing after completion of work as per specification.
m
2
84.00 89.00
208 12 Providing form work for soffits of slabs/beam (above 3 m. clear span) of
culverts and bridges (Major and Minor) and box culverts including hire and labour
charges for the same striping off and removing after completion of works as
per specification but excluding staging.
208 (a) Form work so as to give smooth concrete finish with timber plank
not less than 38 mm thick.
208 (i) Clear span above 3 m. and up to 7 m. m
2
143.00 150.00
209 (ii) Clear span above 7 m. and up to 15 m. m
2
150.00 158.00
209 (iii) Clear span above 15 m. and up to 30 m. m
2
158.00 163.00
209 (iv) Clear span above 30 m. m
2
163.00 176.00
209 (v) Add extra charges for shuttering in case of curved surface in
soffit.
6.10 6.30
209 (b) Extra over the rates under item 12(a) for form work with ply wood
conforming to IS: 4990.
m
2
3.00 3.00
209 (c) Extra over the rates under item 12(a) for form work with steel sheet
plate instead of plank so as to give fine finish.
m
2
4.20 4.20
209 13 Providing form work using steel plates and staging including hire and labour
charges for the same for vertical walls and top slab of hollow super structure of
bridges so as to give fine finish including stripping off and removing clearing
on completion (for bottom slab of such structure, payment will be made as per
preceding items), including hire charges of props and runners complete. Note
: If timber shuttering is used, it should be lined with steel plates.
m
2
247.00 257.00
209 14 Providing form work including hire and labour charges for the same for the
same for pre-stressed concrete girders, slabs or in any other member of a
bridge with steel section or best quality timber planks of 45mm thick with steel
lining or of ply wood as approved by Engineer-in-charge so as to give fine finish
and with props and concrete pedestals including stripping off and removing
after completion as per direction of Engineer-in-charge.
m
2
362.00 378.00
210 15 Providing form work and staging including hire and labour charges for
the same for pre-stressed concrete box girders of bridge by cantilever
construction with steel gantry and including hanging arrangement of H.T.
Strand / Cable, shuttering with steel section or best quality timber planks of 45mm
thick with steel lining or slip form shutter as approved by Engineer-in-charge so as
to give fine finish and with props and other accessories etc. including stripping off
and removing the gantry after completion and filling holes as per direction of
Engineer-in-charge.
m
3
903.00 935.00
210 16 Hire and labour charges for staging with sal-bullah for super structure of
bridge (Major and Minor) including stripping off and removing clearing on
completion of work as per design and drawing approved by the
Engineer-in-charge.
210 (a) For bridges and culverts of clear span above 3 m. and up to 7 m..
210 (i) With driving of sal-bullah piling and taking out of the same after
stripping off the staging,
m
3
95.00 99.00
210 (ii) Without sal-bullah driving but with adequate soil compaction and sal-
bullah supports on adequate sleeper base.
m
3
74.00 85.00
210 (b) For bridges and culverts of clear span above 7 m. and up to 15 m..
210 (i) With driving of sal-bullah piling and taking out of the same after
stripping off the staging,
m
3
147.00 154.00
210 (ii) Without sal-bullah driving but with adequate soil compaction and sal-
bullah supports on adequate sleeper base.
m
3
116.00 121.00
211 (c) For bridges of clear span more than 15 m. and up to 30 m.
211 (i) With driving of sal-buliah piling and taking out of the same after
stripping off the staging.
m
3
218.00 228.00
211 (ii) Without sal-bullah driving but founding on sleeper base on compacted
bed.
m
3
158.00 165.00
211 (d) For bridges of clear span more than 30 m.
211 (i) With driving of sal-bullah piling and taking out of the same after
stripping off the staging.
m
3
347.00 247.00
211 (ii) Without sal-bullah driving but founding on sleeper base on compacted
bed.
m
3
353.00 257.00
211 Notes regarding volume measurement and staging:-
211 1. For the purpose of length the distance between the two transverse
vertical planes through the centre of bearing of abutment and articulation
or articulation and pier or two piers or between abutment and piers or two
articulations will be considered as the case may be, but the volume of
piers or verticals intercepted within the calculation should be deducted.
211 (a) The unit rate for staging of cantilever span/arm will be considered
equal to the unit rate of the main span to which the cantilever is related to:
Page 179
Roads_I_181-216
211 (b) The clear span of the suspended span of a Balances or
Anchored cantilever Bridge will be considered as the length between
the centre of bearings of the suspended span and the unit rate of
staging admissible will be accordingly ascertained.
212 2. For the purpose of width the distance between the outermost vertical
faces of the superstructure including footpath and railing will be
considered.
212 3. The rates shall be reduced by 20% if eucalyptus builah are allowed to
be sued in staging in place of salbullah.
212 4. For height the bottom and top level should be taken as follows:
212 (a) Bottom level:
212 Average bed surface of the river/channel or the ground surface as
specified between the inner surfaces of two abutments/end supports of
superstructure, as the case may be. Average R.L. of bottom of launched
pre-cast P.S.C. girders for deck slab of such bridge.
212 (b) Top level:
212 (i) For portion of footpath with railing.
212 The average (in both longitudinal & cross direction) bottom level should be
considered.
212 (ii) The bottom level of deck portion.
212 (I) The average (in both longitudinal & cross direction) bottom level of
beam/girder/deck slab as the case may be should be taken in case of T-
beam slab.
212 (II) The average (in both longitudinal & cross direction) level of the
bottom levels of soffit slab in case of box girder/solid slab.
212 17 Hire and labour charges for staging for superstructure of bridge with
tubular steel pipe (TATA or equivalent) conforming to IS: 11239 (Part I &
II) consisting of H-Frame (2m x 1m) made of 40mm NB (Heavy) pipe and
horizontal and diagonal bracing with 40mm NB (Medium) pipe including
necessary, clamping arrangement of approved make etc. complete as per
design & drawings, and direction of the Engineer-in-charge including
releasing, dismantling, removing and clearing the site on completion of
work.
213 a) For bridges of clear span more than 15 m. and up to 30 m..
213 i) With driving sal-bullah piling and providing sleeper base and taking out
of the same after removal of the staging on completion of work.
m
3
210.00 226.00
213 ii) Without sal-bullah piling but founded on sleeper base and on
compacted bed.
m
3
131.00 144.00
213 b) For bridges of clear span more than 30 m.
213 i) With driving sal-bullah piling and providing sleeper base and taking out
of the same after removal of staging on completion of work.
m
3
315.00 341.00
213 ii) Without sal-bullah piling but founded on sleeper base and on
compacted bed.
m
3
210.00 231.00
213 18 Providing form work and staging so as to give smooth concrete surface
finish including hire and labour charges for the same for bridges and
culverts including stripping off and removing after completion of works
and providing necessary Batter, curved surface etc. all complete.
213 a) Form work with timber plank in Well steining, kerb, components of
Pier, Abutment, Retaining Wall, Wall of Box Retaining wall, wall of Box
type bridges, vertical and inclined sides of superstructure
other than hollow box-type bridges, parapet kerb, road kerb, rail
post, cable tray, cable tray cover etc.
214 (i) For portion of the height up to 1 m. m
2
116.00 126.00
214 (ii) For portion of the height above 1 m. and up to 3 m. m
2
163.00 168.00
214 (iii) For portion of the height above 3 m. and up to 6 m. m
2
200.00 210.00
214 (iv) For portion of the height above 6 m. m
2
284.00 294.00
214 b) Extra over the rates under item 18(a)(i) to (iv) for form work with ply
wood conforming to IS: 4990.
m
2
3.00 3.00
214 c) Extra over the rates under item 18(a)(i) to (iv) for form work withsteel
sheet /plate.
m
2
4.20 4.20
214 19 Supplying bending and binding and laying in position steel
reinforcement of different dimensions in cement concrete work
i.e. R.C.C., P.S.C. etc. of different components in foundation, substructure
and in superstructure etc. including initial straightening, straightening of
coils bars, removal of loose rust (if any), cutting to requisite length
bending, binding with annealed wire not less than 1 mm in size and
conforming to IS 280 at every intersection hooked and bent to correct
shape and placed on forms etc. including cost of black annealed wire and
cost of loading, unloading, carriage of all steel materials from
departmental godown complete as per drawing and direction of Engineer-in-
charge.
215 a) For M.S. Rounds / Tor Steel / H.Y.S.D. Bars MT 51063.00 51321.00
215 b) For corrosion resistant steel (TISCON CRS 42 or any other approved
brand).
MT 55433.00 55692.00
215 Note: When steel is supplied by Contractor, rate per MT is to be arrived at as
per the following format (in which case the term "from departmental godown"
shall be omitted from the description of item.)
215 1. Rate of Item 19(a)/(b) Rs.
215 2. Deduct Issue Rate (per MT) of respective quality steel x 1.05. Rs.
215 3. Add basic price at outlet of steel of respective quality x 1.05. Rs.
215 4. Add contractor's profit @10% on cost of steel only (si. No. 3)
Rs.
215 5. Add cost of carriage from outlet to site with necessary
loading, unloading & stacking charges for 1.05 MT steel.
Rs.
215 Final rate of item =(1)-(2)*(3)*(4)*(5)
215 20 Fabrication, erecting and laying steel cutting edge for well kerb
including cost & carriage of all materials as per drawing, technical
specification and direction of Engineer-in-charge.
kg 54.60 55.00
The rate for shuttering of open foundation
of depth above 500 mm, well steining and
well kerb shall be as per item 18(a)(i) &
(ii). The heights of pier, abutment and
retaining walls shall be measured from
the bottom of their shaft portion. The
heights for walls of box bridges,
vertical faces of superstructure
shall be measured from their bottom. 50%
Page 180
Roads_I_181-216
215 21 Supplying & laying of pre-stressed tendons with H.T. strands of
required diameters in fabricated sheaths including necessary
joineries of approved quality, including supplying, fitting, fixing in
position spacers, anchorages etc., stressing the pre-stressing tendons
with standard jacks as per drawing specification and direction of
Engineer-in-Charge complete including grouting the duct with cement
slurry as approved and also including supply of all materials, labour and
hire charges of tools & plants and cost of strands and MS suspenders.
MT 99682.00 99851.00
216 22 Launching, hoisting, hauling, fitting and fixing in position of precast
prestressed concrete girders with all necessary arrangements as per
approved drawing and direction of Engineer-in-charge including side
shifting and placing over bearing complete. Necessary staging and
support required for such operation are to be arranged as per specification
and direction including supply of all necessary fixtures complete.
MT 1015.00 1015.00
Note: One cubic metre of girder shall be considered to weigh 2.5 MT
including reinforcements, H.T. Cables and other components and fixtures.
233 44 Providing Expansion joints in bridges in deck slab, wheel guard, footpath, curb
and parapet etc. complete as per approved drawing & specification including
cost and carriage of all materials.
233 a) with aluminium strip and bitumen filler (without M.S. angles, plates
and bars) and joint sealing compound with 2mm thick and 250mm wide
strip.
m 180.00 190.00
233 b) With M.S. angles, plates, bars and bitumen fillers in deck slab and
also wearing course including necessary welding etc.
kg 60.00 65.00
233 c) With standard rubber "V" strip of approved brand, gauge and
quality.
m 210.00 215.00
233 d) 'Finger' type expansion joint in deck slab or wearing course with M.S.
finger plates, base plates, anchor bolts etc. as per drawing including
necessary welding fitting fixing etc. complete.
kg 60.00 70.00
233 e) With Corrugated Copper plate, Compressible fiber, board, pre-
moulded joint filler and joint Sealing Compound as per drawing
and technical specification. (With 2mm thick Copper plate of 250 mm
width)
m 660.00 670.00 ft
233 45 Providing and installing reinforced Elastomeric (neoprene) slab-seal type
expansion joint complete with steel inserts of either Exjomet / Transflex /
wabaflex makes or equivalent (equivalent makes being subject to prior approval
by the Department) in deck slab as per approved drawing and specification
including cost and carriage of all materials, temperature-correction during
installation as per mean temperature and also installation under supervision
of a specialist of manufacturer:
234 a) For movement up to 10 mm. m 9500.00 9500.00
234 b) For movement up to 16 mm. m 11000.00 11000.00
234 c) For movement up to 25mm. m 14500.00 14500.00
234 d) For movement up to 40mm. m 22000.00 22000.00
234 e) For movement up to 62.5mm. m 40000.00 40000.00
234 f) For movement up to 80 mm. m 60000.00 60000.00
234 46 g) For movement up to 125mm. Providing Elastomeric (Neoprene)
dowel cap with stainless steel pins at fixed ends as per approved drawing and
specification including carriage of all materials.
m 82000.00 82000.00
234 a) Nominal diameter 16 mm, height 45 mm.
234 (i) Dowel cap. Each 85.00 85.00
234 (ii) Stainless Steel Dowel pin of suitable length &
diameter with anchoring arrangement.
m 350.00 350.00
234 b) Nominal diameter 20 mm, height 50 mm.
234 (i) Dowel cap. Each 104.00 104.00
234 (ii) Stainless Steel Dowel pin of suitable length & diameter with anchoring
arrangement. .
m 540.00 540.00
234 c) Nominal diameter 25 mm, height 56 mm
234 (i) Dowel cap. Each 135.00 135.00
234 (ii) Stainless Steel Dowel pin of suitable length &
diameter with anchoring arrangement.
m 850.00 850.00
234 d) Nominal diameter 32 mm, height 63 mm.
234 (i) Dowel cap. Each 185.00 185.00
234 (ii) Stainless Steel Dowel pin of suitable length &
diameter with anchoring arrangement.
m 1400.00 1400.00
235 47 Providing single gap (unitary) strip seal. Type expansion joint of total
movement capacity 80 mm complete with suitable edge beam, anchorage and lock
Seal' type sealing element of either Mageba- India or Maurer Shone brand or
equivalent (equivalent makes being subject to prior approval by the Department) in
deck slab as per approved drawing and specification as per clause 2607 of
specification of Roads and Bridge works published by I.R.C. including cost and
carriage of all meterials and installation under supervision of a specialist
manufacturer.
m 16000.00 16000.00
235 48 Providing fully imported Modular strip seal type expansion joint with "Lock
Seal' type sealing element and 'Single Support Bar Control' system of either
Mageba Sa or Maurer Shone 'make or equivalent (equivalent makes being subject
to prior approval by the Department) in deck slab as per approved drawing and
specification as per clause 2607 of specification of Road and Bridges works
published by I.R.C., pre-setting during installation under supervision of a specialist
of manufacturer.
235 a) For total movement up to 160 mm. m 140000.00 140000.00
235 b) For total movement up to 240 mm. m 220000.00 220000.00
235 c) For total movement up to 320 mm. m 280000.00 280000.00
235 d) For total movement up to 400 mm. m 360000.00 360000.00
Item No. - 23 to 43
Page 181
Roads_I_181-216
235 49 Supplying, fitting, fixing in position true to line and levels approved
Elastomeric (Neoprene) Bearing as per IRC code (83 -part I) approved
specification and drawings and direction of the Engineer-in-Charge including
making of mortar / Epoxy bed over sub-structure complete including its
installation and testing.
cubic
cm
1.00 1.00
236 50 Supplying, fitting, fixing in position true to line and level steel
bearings conforming to latest IRC Code & Guidelines complete
including all accessories as per drawings specifications and
direction of Engineer-in-charge including labour, carriage and cost of all
material.
236 a) Mild Steel Bearings.
236 i) Rocker cum Roller bearing, kg 85.00 85.00
236 ii) Rocker bearing. kg 80.00 80.00
236 b) Cast Steel Bearings.
236 i) Rocker cum Roller bearing, kg 115.00 115.00
236 ii) Rocker bearing. kg 110.00 110.00
236 51 Supplying fitting, fixing in position true to line and level steel plate
bearing complete with all accessories as per latest IRC / relevant
Code of specification drawing and direction of the Engineer-in-charge
including labour, carriage and cost of all materials.
236 a) Stainless Steel plate bearing complete with accessories as per
I.R.C.: 83 (Part-ll)
kg 300.00 300.00
236 b) Mild steel cum stainless steel bearing with P.T.F.E. sliding
surface complete with accessories conforming to BS:5400
kg 150.00 150.00
236 c) Cast steel cum stainless steel bearing with PT.F.E. sliding
surface with accessories.
kg 220.00 220.00
236 52 Supplying, fitting and fixing in position true to line and levels cast
steel Fixed Pot Bearings (Verso-fixed) as well as Pot-cum PTFE and
mono-axial Stainless steel sliding Bearings (either verso-mono-axial or
verso-bi-axial) complete with all accessories as per BS: 5400/latest IRC
Code and as per approved specification& drawings and direction of
Engineer-in-charge including all labour, carriage and cost of all raw
materials complete including its installation and testing.
kg 175.00 175.00
237 53 Supplying fitting and fixing in position true to line and level cast steel
spherical/ cylindrical type Knuckle bearing with stainless steel plate with
PTFE sliding surface as per clause 2004 of specification of Roads &Bridge
works published by I.R.C. complete with all accessories as per drawing and
direction of Engineer-in-Charge including labour, charge and including cost
of all material complete including its installation and testing.
kg 200.00 200.00
237 54 Providing bearing at articulation in deck with 20 mm. dia stainless steel
dowel bars with 20 gauge aluminium strip casing including making
curvature as per drawing & specification and direction of the Engineer-in-
charge including cost of all materials but excluding the cost of M.S.
reinforcements as per Departmental dowel Drawing No.-77 MAL (-)
25/3/1261 (D-ll) including its installation and testing.
Each
dowel
point
370.00 370.00
237 55 Providing drainage spouts as per M.O.S.T's drawing No- SD/205
complete, in superstructure including providing drip mouldings and also
including supplying, fitting and fixing approved type of materials complete
as per drawing and specification vide clause no. 2705 of MoRT&H's
Specification for Road & Bridge Works.
237 a) In slab type bridges, Each 1364.00 1366.00
237 b) In girder type bridges. Each 3160.00 3162.00
237 56 Providing weep holes (150 x 75 mm.) in abutment or wing wall for the
entire thickness, with slope 1:20 towards drainage surface, including
packing with different sizes of brick bats or boulders of approved quality
and sizes at the back side as per direction of Engineer-in-Charge.
Each 106.00 106.00
237 57 Sinking as per I.R.C. specification including drawing Foundation Wells
true to position and plumb with area under cutting edge as mentioned
below, including hire charges of all tools and plants etc. and supplying
power, dewatering etc, initial excavation of earth as per
specification and direction of the Engineer-in-charge including throwing
the spoils clear off the well up to 150m. radius (Measurement to be taken
in the following stages from the level of the bottom of capping slab on well
up to the bottom of cutting edge) through any kind of soil including rocky
soil and rock till 25% of cutting edge (linear) comes in contact with rock
including testing of bottom plug by dewatering the well upto 5 meters and
checking the rise in water level as per clause 1208 of IRC Specification.
Note: Where the cutting edge
(linear) comes in contact with rocky soil
for more than 25% of linear length, the
rates of item no. 57(a) & (b) are to be
enhanced by Rs. 2500 per meter for
soft rock and Rs. 3500 per metre for hard
rock. The type of rock is to be determined
from actual test results and as per
direction of the Engineer-in-Charge.
238 a) Area under cutting edge not exceeding 55 square meter:
238 i) Depth 0 m to 3 m. m 6000.00 6000.00
238 ii) Depth greater than 3 m upto 6m m 7400.00 7400.00
238 iii) Depth greater than 6 m upto 9m m 8350.00 8350.00
238 iv) Depth greater than 9 m upto 12 m m 9380.00 9380.00
238 v) Depth greater than 12 m upto 15 m m 11170.00 11170.00
238 vi) Depth greater than 15 m upto 18 m m 13200.00 13200.00
238 vii) Depth greater than 18 m upto 21 m m 15700.00 15700.00
238 viii) Depth greater than 21 m upto 24 m m 19250.00 19250.00
238 ix) Depth greater than 24 m upto 27 m m 23900.00 23900.00
238 x) Depth greater than 27 m upto 30 m m 29700.00 29700.00
238 xi) Depth greater than 30 m upto 35 m m 34300.00 34300.00
238 b) Area under cutting edge exceeding 55 square meter:
238 i) Depth 0 m to 3 m m 7200.00 7200.00
238 ii) Depth greater than 3 m upto 6m m 8900.00 8900.00
238 iii) Depth greater than 6 m upto 9m m 10000.00 10000.00
239 iv) Depth greater than 9 m upto 12m m 11270.00 11270.00
239 v) Depth greater than 12 m upto 15 m m 13400.00 13400.00
239 vi) Depth greater than 15 m upto 18 m m 15800.00 15800.00
239 vii) Depth greater than 18 m upto 21 m m 18060.00 18060.00
239 viii) Depth greater than 21 m upto 24 m m 21160.00 21160.00
Page 182
Roads_I_181-216
239 ix) Depth greater than 24 m upto 27 m m 25100.00 25100.00
239 x) Depth greater than 27 m upto 30 m m 31050.00 31050.00
239 xi) Depth greater than 30 m upto 35 m m 36000.00 36000.00
239 58 Drilling holes up to 15 cm. dia and up to 1.5 m depth through rock including
bailing out / pumping out water and fitting / fixing anchor-bolts 20mm. to 40mm.
dia. with necessary fillings with cement concrete 1 : 1.5 : 3 and as directed by
Engineer-in-charge including cost of all materials.
m 308.00 322.00
239 59 Sand filling in well pockets in layers duly compacted by inundation with water
including local carriages etc. a) Where sand is available from the bed of the river
including royalty.
m
3
96.00 101.00
239 b) Where sand is not available from the bed of the river including royalty
with medium sand.
m
3
517.00 851.00
239 60 Providing driven cast in situ R.C.C. piles of required diameter and required
length (length to be measured from the bottom of raft/Pile Cap to the
bottom of shoe) as per drawing and specification including cost of all materials
and labour for casting, hoisting, driving etc. and also including cost of dummy
lengths of pile and of hire charges of all instruments as necessary
(cement concrete should have an ultimate crushing strength of not less than N /
mm
2
on 150 mm cube after 28 days) but excluding the cost of concrete and
reinforcement.
240 a) 45 cm. diameter pile:
240 i) 15m. length, m 1362.00 1365.00
240 ii) 20m. length, m 1349.00 1351.00
240 iii) 25m. length, m 1342.00 1343.00
240 iv) 30m. length. m 1336.00 1337.00
240 b) 50 cm. diameter pile:
240 i) 15m. length, m 1390.00 1393.00
240 ii) 20m. length, m 1377.00 1379.00
240 iii) 25m. length, m 1370.00 1371.00
240 iv) 30m. length. m 1364.00 1366.00
240 c) 55 cm. diameter pile:
240 i) 15m. length, m 1420.00 1422.00
240 ii) 20m. length, m 1407.00 1409.00
240 iii) 25m. length, m 1399.00 1400.00
240 iv) 30m. length. m 1394.00 1395.00
240 d) 60 cm. diameter pile:
240 i) 15m. length, m 1450.00 1453.00
240 ii) 20m. length, m 1437.00 1439.00
240 iii) 25m. length, m 1429.00 1431.00
240 iv) 30m. length. m 1424.00 1425.00
240 (The rate provided is exclusive of cost of concrete and. Construction wing
is to add cost of concrete of desired grade for volume corresponding to
1.04m length of pile length, to arrive at the complete rate. Also the desired
crushing strength is to be mentioned in the space provided in the
description of item.)
240 61 Providing RCC cast in situ bored piles in position as per specifications in
all kinds of soil except rock of any hardness including cost of boring using
drilling mud to stabilize the bore and flushing the bore of excess mud with
freshly prepared drilling fluid by using pumps prior to placing concrete by
tremie pipe in one continuous operation and including the cost of all
materials and labour for placing of concrete and also including the cost of
mobilization and hire charges of all equipments necessary for boring,
welding of reinforcement cage as necessary and lowering of
reinforcement cage & steel liner (if any), preparation and placing of
concrete, complete but excluding the cost of reinforcement and labour for
bending binding etc. but including the cost of concrete. Work to be executed
as per IS: 2911 (Part II Sec 2). (cement concrete should have an ultimate
crushing strength of not less than kg/cm2 on 15 cm cube after 28 days).
241 (a) Using hydraulic piling rig with power unit and complete
accessories including cost of shifting of machinery from one bore
location to other, removal of excavated earth with all lifts and lead up to 1
km by tipper trucks:
241 (i) 400 mm. diameter pile. m 1574.00
241 (ii) 450 mm. diameter pile. m 1651.00
241 (iii) 500 mm. diameter pile. m 1735.00
241 (iv) 550 mm. diameter pile. m 1827.00
241 (v) 600 mm. diameter pile. m 1928.00
241 (vi) 650 mm. diameter pile. m 2162.00
241 (vii) 700 mm. diameter pile. m 2304.00
241 (viii) 750 mm. diameter pile. m 2464.00
241 (ix) 800 mm. diameter pile. m 2648.00
241 (x) 1000 mm. diameter pile. m 3751.00
241 (xi) 1200 mm diameter pile. m 4215.00
241 (b) Using tripod, winches and other accessories including shifting
of all machinery from one. bore location to another and removal of
excavated earth with all lifts and lead upto 150 m.
241 (i) 400 mm. diameter pile. m 760.00
241 (ii) 450 mm. diameter pile. m 860.00
241 (iii) 500 mm. diameter pile. m 950.00
241 (iv) 550 mm. diameter pile. m 1040.00
241 (v) 600 mm. diameter pile. m 1140.00
241 (vi) 650 mm. diameter pile. m 1230.00
241 (vii) 700 mm. diameter pile. m 1330.00
241 (viii) 750 mm. diameter pile. m 1420.00
241 (ix) 800 mm. diameter pile. m 1520.00
241 (x) 1000 mm. diameter pile. m 1900.00
241 (xi) 1200 mm diameter pile. m 2270.00
242 N.B.
Page 183
Roads_I_181-216
242 1. The rate provided is exclusive of cost of concrete and. Construction
wing is to add cost of concrete of desired grade for volume corresponding
to 1.0 m length of pile length, to arrive at the complete rate. Also the
desired crushing strength is to be mentioned in the space provided in
the description of item.
242 2. Fixation of diameter and length of R.C.C. bored pile is a matter that
concerns design and load testing. As such during preparation of items in
the priced schedule of tender document the requirement of load
capacity will have to be spelt in the item itself in the appropriate manner.
242 62 Extra above item no. 61, for supplying, fitting, fixing of MS casing pipe
around RCC cast-in-situ bored piles of different diameters in
position including cost of all materials, fabrication, handling etc.
complete as per direction of Engineer-in-Charge.
242 a) 6 mm thick casing:
242 i) 400 mm. diameter pile. m
242 ii) 450 mm. diameter pile. m
242 iii) 500 mm. diameter pile. m
242 iv) 550 mm. diameter pile. m
242 v) 600 mm. diameter pile. m
242 vi) 650 mm. diameter pile. m
242 vii) 700 mm. diameter pile. m
242 viii) 750 mm. diameter pile. m
242 ix) 800 mm. diameter pile. m
242 x) 1000 mm. diameter pile. m
242 xi) 1200 mm diameter pile. m
242 b) 10 mm thick casing:
242 i) 400 mm. diameter pile. m
242 ii) 450 mm. diameter pile. m
242 iii) 500 mm. diameter pile. m
242 iv) 550 mm. diameter pile. m
242 v) 600 mm. diameter pile. m
242 vi) 650 mm. diameter pile. m
242 vii) 700 mm. diameter pile. m
242 viii) 750 mm. diameter pile. m
242 ix) 800 mm. diameter pile. m
242 x) 1000 mm. diameter pile. m
242 xi) 1200 mm diameter pile. m
243 63 Driving reinforced pre-cast concrete piles with iron monkey including
hoisting, placing in position, supplying and fitting necessary pile cap for
protection of pile head against damages and staging as necessary in all type
of soil and as per IS specification.
243 a) 200 mm x 200 mm size pile, m 929.00 929.00
243 b) 250 mm x 250 mm size pile, m 936.00 936.00
243 c) 300 mm x 300 mm size pile, m 1224.00 1225.00
243 d) 500 mm x 500 mm size pile, m 1387.00 1388.00
243 e) 750 mm x 750 mm size pile. m 1736.00 1737.00
243 64 Performing lateral load test on two piles or two groups of piles by
introducing a hydraulic jack with gauge between two piies or pile groups
under test by applying horizontal loads in increments of about 20% of the
estimated safe load at each stage and applying the next increment after the
rate of displacement is nearer to 0.1 mm. per 30 minutes till the total
displacement becomes, 12 mm at the cut-off level including the cost of
arranging the entire set-up, hire charges of all implements including at least
two dial gauges, preparing the pile head if necessary, and removal of all
arrangement after completion of etc. complete in all respect as per direction
of Engineer-in-charge and as per IS specification.
243 a) Test between two piles, Each 5325.00 5325.00
243 b) Test between two groups piles. Each 8785.00 8785.00
243 65 Vertical Load Test (Compression) by hydraulic jacks on pile/piles
with 1.5 times the design load including preparation of the head of piles
with concrete of required strength for receiving the jacks with all ancilliary
arrangements for setting up gauges, construction of suitable platforms,
keying the loads and dismantling and removing all arrangement etc.
complete as per direction of the Engineer-in-charge including cost of
carriage of all materials and as per IS specification.
244 a) On single pile:
244 i) Testing load up to 60 T Each 19300.00 19300.00
244 ii) Testing load between 60 T and 100 T. Each 22265.00 22265.00
244 iii) Testing load above 100 T. Each 26310.00 26310.00
244 b) On double pile:
244 i) Testing load up to 60 T Each 26925.00 26925.00
244 ii) Testing load between 60 T and 100 T. Each 30970.00 30970.00
244 iii) Testing load above 100 T. Each 34900.00 34900.00
244 N.B. This test shall be done on working piles only in a pile group and
should satisfy the provisions of routine test as, given in IS-2911 (Part-4)
1985.
244 66 Performing vertical load test (compression) by hydraulic jack on
pile/piles with testing load equal to ultimate load carrying capacity of the
pile according to C.R.P. (constant rate of penetration) method as per
specification including cost of arranging the entire set-up and hire
charge of all implements dismantling and removal of all arrangements
after completion of work etc. complete in all respects as per direction of
the Engineer-in-charge including cost of carriage of all materials.
Each
Each
Each
Each
Each
Each
Each
244 a) On single pile:
244 i) Testing load up to 60 T Each 20205.00 20205.00
244 ii) Testing load between 60 T and 100 T. Each 23220.00 23220.00
244 iii) Testing load between 100 T and 150 T. Each 25010.00 25010.00
244 iv) Testing load between 150 T and 200 T Each 26300.00 26300.00
244 v) Testing load above 200 T. Each 28070.00 28070.00
244 b) On double pile:
Page 184
Roads_I_181-216
244 i) Testing load up to 60 T Each 30310.00 30310.00
244 ii) Testing load between 60 T and 100 T. Each 32130.00 32130.00
244 iii) Testing load between 100 T and 150 T. Each 33955.00 33955.00
245 iv) Testing load between 150 T and 200 T. Each 35065.00 35065.00
245 v) Testing load above 200 T. Each 36820.00 36820.00
245 This test shall be applicable on pile/piles outside the pile group of the
main structure and is to be performed as an initial test as per relevant
provision of IS-2911 (Part-4)-1985.
245 67 Labour for driving Sal-bullah /Eucalyptus buliah piles by monkey in
sorts of soil including hoisting and placing piles in position, protecting the
pile head with iron ring and cutting and shaping heads before and after
driving and including hire and labour for necessary driving appliances and
all tackles.
245 a) When work under considerable (i.e. above 1m.) standing water is not
involved.
245 i) 100mm diameter m 31.00 34.00
245 ii) 125 mm. diameter m 35.00 36.00
245 iii) 150mm. diameter m 41.00 43.00
245 iv) 175 mm. diameter m 46.00 49.00
245 v) 200 mm. diameter m 49.00 55.00
245 vi) 225 mm. diameter m 55.00 56.00
245 vii) 250 mm. diameter m 59.00 63.00
245 viii) 275 mm. diameter m 66.00 71.00
245 ix) 300 mm. diameter m 71.00 81.00
245 x) Above300mmand up to 375mmdiameter m 101.00 105.00
245 b) When work under considerable (i.e. above 1 m.) standing water is
involved.
245 i) 100mm diameter m 36.00 39.00
245 ii) 125 mm. diameter m 41.00 45.00 -
245 iii) 150mm. diameter m 46.00 48.00
245 iv) 175 mm. diameter m 55.00 57.00
245 v) 200 mm. diameter m 57.00 62.00
245 vi) 225 rnm. diameter m 62.00 64.00
245 vii) 250 mm, diameter m 74.00 77.00
245 viii) 275 mm. diameter m 87.00 92.00
245 ix) 300 mm. diameter m 102.00 118.00
245 x) Above300mmand up to 375mmdiameter. m 140.00 150.00
245 N.B. 1. Payment to be made on the length driven into the ground,
diameter of the measured at 1.5m. from the thicker end.
246 2. For string staging under specific instruction of Engineer-in-charge
or for driving from pontoon or boats the rate will be enhanced by Rs. 4.00
per meter.
246 3. For driving done by pile engine set (without staging) under
specific instruction of Engineer-in-charge, the rates will be enhanced by
Rs. 4.00 per meter.
246 4. For driving done by pile engine set (with heavy staging or from specially
made pontoon) under specific instruction of Engineer-in-charge. The rates
will be enhanced by Rs. 7.00 per meter.
246 68 Joining Sal-bullah / Eucalyptus - bullah pile of 20 cm. to 30 cm.
diameter with half lap joints (lap length at least 90 cm long) with 3 nos. of
collars made of 50 cm. x 6 mm. M.S. Flat, clamps, bolts and nuts and
washers as per approved drawing and design.
Each 462.00 469.00
246 69 Butt joining Sal / Eucalyptus bullah piles of diameter from 20 cm. to 30 cm.
inserting 25 mm. dia and 45 cm long M.S. Rod as dowel bar 22 cm.
minimum at the centre of each bullah and fastened with 4 nos. 75 cm. long
65 mm. x 65 mm. x 10 mm. M.S. angles placed diametrically opposite to
each other and fixed by nuts and bolts (16 mm. dia)-8 nos; and
washersbeing tied with 4 Nos. 50 mm. x 6 mm. M.S. Flat suitably profiled
to grip the M.S. angle at upper and lower ends of M.S. angles fitted and
fixed with nuts, bolts and washers etc. including coal-tarring two coats
complete etc. as per, drawing and direction of the Engineer-in- Charge.
Each 1862.00 1862.00
246 70 Labour for fitting and fixing 10 cm. to 13 cm. diameter sal-bullah as ties
and runners including necessary nails, bolts and nuts.
m 10.50 11.90
246 71 Labour for hand planting wooden piles after making necessary holes and
packing the sides with earth after planting. (Measurement to be allowed
for length to be embeded in earth).
m 14.00 15.40
247 72 Sal-wood work rough dressed including necessary hoisting and fitting,
and fixing in position including cost of nails but excluding cost of bolts,
nuts and washer.
m
3
- 41300.00 * Rate applicable for districts N & S Dinajpur, Darjeeling,
J alpaiguri and Coochbehar
247 73 Sal-wood dressed including necessary hoisting and fitting, and fixing in
position including cost of nails but excluding cost of bolts, nuts and
washer.
m
3
49560.00 *-Do-
247 74 Sal-wood work rough dressed in bridge floor fitted and fixed with patent or
round headed nails including cost of materials and fittings.
m
3
- 41300.00 *-Do-
247 75 Labour for sal-wood work in scantling in bridge floor, railing post,
wheel guard including cost of supply of bolts, nuts, washers etc. as
directed,
* Rate applicable for districts N & S Dinajpur, Darjeeling,
J alpaiguri and Coochbehar
247 a) Undressed, m
3
2205.00
247 b) Dressed. m
3
2821.00
247 76 Supplying sal-wood blocks, 15cm x 10 cm x 10 cm, and fitting, fixing the
same at the base of railing post in wooden deck bridges, including cost of
nails but excluding cost of bolts, nuts and washer.
Each - 74.00 *-Do-
247 77 Labour for sal-wood work in bridge members with o!d timber including
cutting out rotten portion sizing, dressing, cutting to sizes, taking out nails
etc. compiete with supply of new snap headed country nails.
m
3
- 1358.00 *-Do-
247 78 Dismantling old wood work in bridges and culvert including taking out
bolts, nuts, nails clamps and cleats etc. and carrying and stacking
materials in the nearest stack-yard.
m
3
476.00 504.00
247 79 Taking out Sal / Eucalyptus piles from river bed or from else where
including carrying stacking materials in the nearest stack yard.
247 a) Up to 17.5 cm. diameter, m 8.40 8.40
247 b) Above 17.5 cm. and up to 25 cm. diameter, m 9.80 9.80
247 c) Above 25 cm. diameter. m 13.30 13.30
Page 185
Roads_I_181-216
248 80 Coal tarring on wooden surfaces including cost of materials.
248 a) Double coat, m
2
7.90 9.20
248 b) Single coat. m
2
7.00 7.70
248 81 Supplying and fitting fixing M.S. Iron pile shoe as per approved drawing.
248 a) For timber pile, kg 72.00 79.00
248 b) For R.C.C. pile. kg 72.00 79.00
248 82 Supplying and fitting fixing M.S. Iron ring with 50 mm. x 6 mm. flat over
the head of pile for driving including cutting of head of pile.
kg 57.00 61.00
248 83 M.S. Works in bolts and nuts of different sizes fitted and fixed in position
including drilling holes and welding including cost of labour and materials.
kg 65.00 68.00
248 84 Labour for M.S. work in rolled steel joists, channels, angles. Tees, plates
etc. including hoisting, placing in position including providing staging and
removing after completion of works and cutting to sizes as required.
kg 4.00 4 00
248 85 Labour for M.S. work in rolled steel joists, channels, angles, Tees,
plates etc. including cutting to sizes, forging or welding, drilling
holes, riveting or bolting, hoisting, placing in position and fixing
including cost of bolts, nuts, rivets, welding etc. complete. (Payment
will be made on total weight of structural steel (joist, channels, tees,
angles, plates etc.) used in thework without deductingvolumeof holes
made.).-
kg 13.00 14.00
248 86 Dismantjing old M.S. works in joists, runners, bracings etc. including
cutting rusty bolts and nuts etc. from damaged bridges, stacking the
materials, within 150 m. of site.
kg 2.15 2.30
248 87 Labour for hoisting and placing in position departmental R.S. joists,
channels, angles, tees, plates etc. in bridges including fitting fixing in
position with bolts and nuts washers, rivets including drilling holes in iron
kg 4.20 4.50
249 works cutting to size as necessary with hire and labour charges for
staging as per specification and removing after completion of work
but excluding the cost of bolts and nuts and rivets.
249 88 Cutting to requisite length or shape of departmental R.S. joist, angles,
Tees, plates, and other steel materials by sawing. (Payment to be made
based on area of cut surface)
cm
2
1.20 1.20
249 89 Drilling holes of requisite diameter in departmental R.S. joist,
channels, angles, Tees and plates etc.
249 a) Diameter of bore up to 12mm.
249 i) Depth up to 10 mm. Each
hole
3.50 3.80
249 ii) Depth above 10mm. Each
hole
6.60 7.00
249 b) Diameter of bore above 12mm.
249 i) Depth up to 10 mm. Each
hole
3.50 3.90
249 ii) Depth above 10mm. Each
hole
7.00 7.70
249 90 Re-fitting old joists, runners etc. in position with necessary bolts, nuts &
washers etc.
kg 2.10 2.20
249 91 Taking out trough plates from the old bridges and stacking same at the
site as directed.
m
2
38.50 42.00
249 92 Re-fixing trough plate in position with necessary bolts and washer etc. m
2
53.90 63.00
249 93 Labour for dismantling iron railing including wheel guard, railing
standard hand rails.
m 20.30 23.10
249 94 Re- fitting the railing with old and new bolts as required. m 33.60 37.10
249 95 Straightening curved or twisted steel elements.
249 a) R.S. joists and channel, kg 2.10 2.40
249 b) Angles, tees, kg 1.80 2.10
249 c) Rounds of long length. kg 1.00 1.10
250 96 Labour for filling empty cement bags with sand and placing them in
position including tying or sewing mouth (cost of thread included) and all
incidental charges complete but excluding cost of sand and gunny bags.
100
bags
190.00 200.00
250 97 Supplying empty cement bags in good condition. 100
nos.
385.00 385.00
250 98 Dismantling existing structure irrespective of all heights and depth
including stacking serviceable materials at site and removing the
unserviceable materials as directed within a lead of 150m.
250 a) Masonry work, m
3
175.00 185.00
250 b) Lime concrete, m
3
132.00 145.00
250 c) Plain cement concrete, m
3
400.00 420.00
250 d) R.C. Concrete including cutting rods with special tools and plants if
necessary.
m
3
670.00 710.00
250 99 Dry rubble masonry with hard, dressed Stones from approved
quarries including cost and carriages of all materials to site,
250 a) Un-coursed. m
3
185.00 203.00
250 b) Coursed. m
3
217.00 231.00
250 [Rates provided are exclusive of cost and carriage of stones. Construction
wing is to add cost and carriage of stones only to arrive at the complete
rate.]
250 100 Hand Packed rough dressed stone work with boulder (Local) excluding
cost of boulder.
m
3
185.00 203.00
250 101 Dry Stone V type drain 60 cm wide and 30cm deep with dressed stone
laid on edge including cost and carriage of all materials to site.
250 a) With 150 mm to 230 mm thick dressed stone, m 168.00 185.00
250 b) With 230 mm to 300mm thick dressed stone. m 203.00 217.00
250 102 Renewing sides of 60cm. wide V type drain with old and new dressed
stone including cost and carriage of all materials to site.
250 a) Vertical side, m 36.00 41.00
250 b) Sloped side. m 62.00 67.00
Page 186
Roads_I_181-216
251 103 Dry stone square drain 30 cm. x 30 cm. with hard dressed stone including
cost and carriage of all materials.
m 91.00 98.00
251 104 Renewing dry stone square drain 30cm x 30cm with Old & new stones
including cost and carriage of all materials.
m 46.00 50.00
251 105 Dry stone Cross drain or bund 150 mm wide 460 mm deep including cost
and carriage of all materials.
m 32.00 35.00
251 106 Dry stone Box drain 46 cm to 60 cm wide and 30 cm deep with dressed
stone from approved quarries including cost & carriages of all materials to
site.
m 120.00 133.00
251 107 Renewing parts of box drain 46 cm to 60 cm wide and 30 cm deep with
dressed stone from approved quarries including cost & carriages of all
materials to site.
251 a) Bed of box drain, m 38.00 41.00
251 b) Sides of box drain. m 35.00 39.00
251 108 Labour for laying Hume pipe or R.C. Spun pipe in proper position including
handling within 50 m lead, fitting and fixing with collars and fixing the joints with
1 : 2 cement sand mortar and jute packing etc. complete including the cost of
cement sand and jute packing.
Payment to be made on the basis of net
volume in stack measurements, j
251 a) Diameter up to 450 mm. m 92.00 101.00
251 b) Diameter above 450 mm and up to 600 mm. m 116.00 126.00
251 c) Diameter above 600 mm and up to 900 mm. m 147.00 161.00
251 d) Diameter above 900 mm and up to 1200 mm. m 185.00 200.00
251 109 Labour for stone or brick-bat filling on the back side of the abutment, wing
walls etc. include hand packing and carriage of stone or brick-bats from road side
stacks.
m
3
56.00 63.00
252 110 Labour for Dumping boulders / brick-bats in scoured beds
as directed including carrying the materials within a lead of
150 m
m
3
35.00 39.00 Payment to be made on the basis of net
volume in stack measurements.
252 111 Pitching on slopes and berms and aprons including cost and
carriage of stones / boulder from road side stacks within 150 m.
252 a) With boulders or stones including rough dressing & hand
packing 150 mm thick,
m
2
14.00 15.00
252 b) With boulders or stones including rough dressing & hand
packing 300 mm thick,
m
2
27.00 28.00
252 c) With boulders or stones including rough dressing and hand
packing 450 mm thick,
m
2
32.00 36.00
252 d) With boulders or stones including rough dressing and hand
packing 600 mm thick.
m
2
39.00 43.00
252 112 Labour for Making stone metal / gravel / shingle base (filter media) below
boulder pitching including hand packing all complete.
m
3
49.00 54.00
252 113 Labour for Boulder pitching including hand packing and filling the interstices
with smaller variety of the same all complete.
m
3
80.00 88.00 Payment to be made on finished volume
of work.
252 114 Painting with approved quality curing compound on the vertical or
inclined surfaces of concrete, where water curing is not possible. Painting is to be
done-with a brush on new surfaces, immediately after removal of shuttering,
including supply of all materials and other incidental charges complete as per
direction of the Engineer-in-charge.
m
2
20.00 21.00
253 1 Chipping carefully and stripping off worn out concrete, cleaning the existing
surface to depth of sound concrete by removing loose materials by wire brush,
making the surface dust-free and thoroughly cleaning the rusted reinforcement bars
on the concrete and finally removing all unserviceable materials beyond a lead of
150m from the site, complete as per instruction of the Engineer-in-Charge.
m
2
33.30 35.70
253 2 Removing corroded worn-out portion of reinforcements by cutting and
replacing by new ones as necessary by welding / binding with required lap length,
excluding the cost of reinforcements, complete in all respect deluding removing
unserviceable materials from site as per directions of the Engineer-in-Charge.
kg 23.30 23.40 Construction wing shall add cost of 1kg of
HYSD bars to arrive at the consolidated
rate.
253 3 Providing anti-corrosive protective coating to inhibit the corrosion to
HYSD reinforcements including two coats of anti-corrosive coatings of
consumption as per manufacturer's specification, cleaning etc. complete as per the
direction of the Engineer-in-Charge.
m
2
331.30 334.50
253 4 Applying 10 mm thick epoxy mortar over leached, honey-combed and
spilled concrete surface and exposed steel reinforcements including supply of
materials, labour and applying epoxy as per manufacturer's specification and the
direction of the Engineer-in-Charge.
m
2
224.40 231.20
253 5 Removal of existing cement concrete wearing coat manually or with the help of
jack hammers, including its disposal complete, without causing any detrimental
effect on any part of the bridge superstructure as per Clause 2809 of Specification
of Roads & Bridge Works (4
th
Revision) published by IRC. The rate includes cost
of hire charge of machineries, labour, fuel, lubricants, etc.
m
2
93.00 94.00
253 6 Guniting concrete surface with an average thickness of 25 mm with cement
mortar applied with compressor, including supplying, fitting, fixing of wire
mesh of 50 mm x 50 mm size of 3 mm wire and guniting equipment after cleaning
surface and spraying with epoxy @ 1.0kg per 1.5 m
2
of surface area complete as
per Clause 2807 of Specification of Roads & Bridge Works (4
th
Revision)
published by IRC, including cost of preparation, of surface, supply of all materials,
fuel, hire charges of machineries and labour, etc. all complete as per the direction
of the Engineer-in-Charge.
m
2
1069.50 1091.10
254 7 Providing and inserting nipples with approved fixing compound after drilling
holes, including cost of preparation of surface, supply of all materials and fuel, hire
charges of machineries and labour etc. all complete.
Each 68.90 71.10
254 8 Sealing of cracks by injection process through nipples by grout pump complete
as per Clause 2803 of Specification of Roads & Bridge Works (4
th
Revision)
published by IRC, including cost of materials, labour, fuel etc. and hire
charges of machineries etc. complete.
254 a) With cement grout: K
g
53.90 56.80
254 b) With epoxy grout: K
g
398.00 400.90
N.B.: 1. Labour rate provided, cost of
stone boulder to be added to arive at the
complete item rate. 2. Payment to be
made on the basis of net volume in
stack measureme nts.
Section 4.5 - Repair & Rehabilitation of Bridge
Page 187
Roads_I_181-216
254 9 Concrete depositing with an average thickness of 35 mm using the guniting
equipment with compressed air under pressure using air-compressor; the mix
comprising of cement ,sand and stone aggregates (11.2 mm size) with a proportion
of 1:1.5:1.5 and Accelerator Compound @ 4% by weight of cement including
supplying, fitting, fixing of 50 mm x 50 mm size of 3 mm wire mesh and complete
as per Clause 2807 of Specification of Roads & Bridge Works (4
th
Revision)
published by IRC, including cost of preparation of surface, supply of all materials,
fuel, hire charges of machineries and labour etc. all complete as per the direction of
the Engineer-in-Charge.
m
2
909.10 953.30
255 10
Epoxy bonding of new concrete to old concrete @ 0.8 kg/ m
2
(minimum) and as
per other details of Clause 2805 of Specification of Roads & Bridge Works (4
th
Revision) published by IRC, including cost of preparation of surface, supply of all
materials , hire charges of machineries and labour etc. all complete as per technical
specification and direction of the Engineer-in-Charge.
m
2
545.20 546.20 Fresh concrete shall be placed within 60-
90 minutes at normal temperature
255 11 Cleaning the exposed corroded Reinforcement as well as worn out concrete by
sand blasting with air compressor including all materials , hire charges of
machineries and labour etc. all complete as per technical specification and direction
of the Engineer-in-Charge.
m
2
461.50 482.90
257 1 Box cutting or filling in Road embankment in all sorts of soil including
spreading the spoils properly over the flank as necessary or on berm to approximate
grade & camber and rolling the sub-grade with power roller to proper camber and
grade as per direction and satisfaction of and grade as per direction and satisfaction
of Engineer-in-charge including uprooting and removing plants and jungles when
and where necessary.
257 (a) Depth up to 150mm
m
2
7.70 8.10
257 (b) Depth above 150 mm and up to 300 mm
m
2
9.60 10.10
257 2 Rolling subgrade by power roller in all sorts of soil to proper camber and grade
including watering as per direction and satisfaction of Engineer-ln-Charge.
m
2
1.80 1.80
257 3 Labour for laying 150 mm (approximate ^finished thickness) boulder
soling including rough dressing, breaking, necessary hand/, packing and ramming
down small stone pieces in the interstices including rolling and preparing the bed
to proper level and camber with necessary cushioning over bed and ultimate filling
of voids with moorum or sands or kiln rubbish including cost of all materials but
excluding cost of boulder.
m
2
38.90 41.60 To add cost at site of 0.15 m
3
of boulder (150-
225mm) for complete rate.
257 4 Labour for picking up existing metalled road surface to a specified average
depth, Including screening and stacking the pavement materials.
m
2
m
2
For Sub-item (d) the payment shall be
done based on volumes calculated from
pre-work& post-work levels.
257 (a) For average depth up to 40 mm by manual means:
257 (i) Stone-metal surface,
m
2
7.80 8.30
257 (ii) Brick / Jhama metal surface.
m
2
5.30 5.70
257 (b) For average depth above 40mm but not exceeding 75 mm by manual
means:
257 (i) Stone-metal surface.
m
2
10.40 11.20
258 (ii) Brick/Jhama metal surface. m
2
7.80 8.30
258 (c) For average depth above 75mm but not exceeding 150mm by manual
mean:
258 (i) Stone-metal surface. m
2
13.10 14.00
258 (ii) Brick / Jhama metal surface. m
2
10.40 11.20
258 (d) For average depth of p eking above
258 150mm in case of:
258 (i) By manual means. m
3
277.40 285.90
258 (ii) By mechanical means.. m
3
223.80 226.30
258 5 Labour for construction of Granular Sub-base using approved quality of
coarse aggregates and sand, including screening aggregates, mixing the
graded aggregates using rotavator as per mix design, adding water to
achieve the required OMC, spreading the mix in uniform layer using Motor
Grader over prepared surface in proper, grade and camber,
compacting the layer to achieve the desired density, including lighting,
guarding,barricading, including cost of all materials, machinery, tools
and plants, complete including cost of quality control as per
258 (a) Close Graded GSB:
258 (i) Grading-I m
3
144.10 144.50
258 (ii) Grading-II m
3
139.60 140.00
258 (iii) Grading-III m
3
126.10 126.50
258
258 Close graded GSB -.Grading -I
258 37.5 mm aggregate m
3
0.35
258 22.4 mm aggregates m
3
0.29
258 11.2 mm aggregates m
3
0.13
258 5.6mm aggregates m
3
0.13
258 Sand m
3
0.38
258 Close graded GSB -.Grading - //
258 37.5 mm aggregate m
3
0.19
258 22.4 mm aggregates m
3
0.13
258 11.2 mm aggregates m
3
0.13
259 5.Bmm aggregates m
3
0.15
259 Sand m
3
0.68
259 Close graded GSB -.Grading - III
259 13.2 mm aggregates m
3
0.13
259 11.2 mm aggregates m
3
0.13
259 5.6mm aggregates m
3
0.35
259 sand m
3
0.68
259
259 (b) Coarse Graded GSB:
259 (i) Grading -I
m
3
258.40 258.70
Section 4.6 Soling, Edging & Metalling
To add cost at site of the following materials for complete rate
Page 188
Roads_I_181-216
259 (ii) Grading-II
m
3
256.30 256.50
259 (iii) Grading-III
m
3
224.80 225.10
259 To add cost at site of the following materials for complete rate
259 Close graded GSB -.Grading -I
259 37.5 mm aggregate m
3
0.45
259 22.4 mm aggregates m
3
0.45
259 11.2 mm aggregates m
3
0.13
259 5.6mm aggregates m
3
0.13
259 Sand m
3
0.13
259 Close graded GSB -.Grading - //
259 37.5 mm aggregate m
3
0.45
259 22.4 mm aggregates m
3
0.19
259 11.2 mm aggregates m
3
0.32
259 5.Bmm aggregates m
3
0.13
259 Sand m
3
0.19
259 Close graded GSB -.Grading - III
259 13.2 mm aggregates m
3
0.26
259 11.2 mm aggregates m
3
0.45
259 5.6mm aggregates m
3
0.13
259 sand m
3
0.45
259 6 Labour for spreading and consolidating 1st class brickbats in hard crust or
shouldering in layers not exceeding a thickness of 150 mm. Of loose bats
(size of bats 63 mm to 90 mm.) including screening the metal as
necessary, hand packing, sweeping, watering and rolling with power-
roiler, lighting, guarding and barricading complete including carriage within
150 meters of road side and making necessary earthen bundh one meter
wide on each side where necessary to protect the edges and preparing the
bed by necessary cutting, filling and ramming.
m
3
135.40 138.50 To add cost at site of 1.0 m3 of brick bats
for complete rate.
259 (This item of work should be adopted for the bottom most layer only when
the embankment is prepared by ordinary uncompacted earth).
259 7 Labour for spreading and consolidating 1st class brick bats/ Jhama
metal/Laterite chelly or metal / shingles of specific size in hard crust to requisite
thickness (measured after compaction) in layers including screening of bats/metals
etc. as necessary, hand packing, sweeping, watering and rolling in stages with
power roller to proper line, grade and camber, lighting, guarding & barricading and
making necessary earthen bundh of one metre width on each side where necessary
to protect edges and preparing the bed by necessary cutting or filling and rolling all
complete including the cost of all materials and hire and labour charges of all man
and machineries and as per specification and direction of Engineer-in-charge but
excluding the cost of bats/chelly.
For sub-item (a): To add cost at site of 0.132 m3 of Grading-I aggregates, 0.0285 m3 of Type-A screening for complete rate.
260 (a) Using Brick bats / Laterite Chelly of size 90 mm- 45 mm for compacted
thickness 100mm.
m
2
19.00
260 (b) Using Brick bats / Jhama metal / Laterite metal of size 63 mm - 45
mm for compacted thickness 75mm.
m
2
14.20
260 (c) Using broken shingles of size 53 mm -22.4 mm for compacted
thickness 75mm.
m
2
11.90 11.90
260 8 Labour for spreading and consolidating stone metals of specific size in hard
crust to requisite thickness (measured after compaction) in. layers
including screening of. bats/metals etc. as necessary, spreading manually or with
the help of motor grader, sweeping, watering and rolling in stages with power roller
to proper line, grade and camber, spreading and sweeping requisite type and
quantity of screening materials to fill up the interstices of coarse aggregates,
applying binding materials as directed, including lighting, guarding &
barricading and making necessary earthen bundh of one metre width on each side
where necessary to protect edges and preparing the bed by necessary cutting or
filling and rolling all complete including the cost of all materials and hire and
labour charges of all man and machineries and as per specification and direction of
Engineer-in-charge but excluding the cost of stone metal.
261 (a) With coarse aggregate size range 90-45 mm (Grading - 1) with Type -
A Screening for 100 mm compacted thickness:
For sub-item (a): To add cost at site of
0.132 m3 of Grading-I aggregates, 0.0285
m3 of Type-A screening for complete rate.
261 (i) Using manual means:
m
2
21.30 20.60
261 (ii) Using Motor Grader:
m
2
18.50 17.20
261 (b) With coarse aggregate size range 63-45 mm (Grading - II) with Type -
A Screening for 75 mm compacted thickness:
For sub-item (b): To add cost at site of 0.1
m3 of Grading-II aggregates, 0.0135 m3
of Type-A screening for complete rate.
261 (i) Using manual means:
m
2
16.70 16.80
261 (ii) Using Motor Grader:
m
2
14.60 14.30
261 (c) With coarse aggregate size range 63-45 mm (Grading - II) with Type -
B Screening for 75 mm compacted thickness:
For sub-item (c): To add cost at site of 0.1
m3 of Grading-II aggregates, 0.021 m3 of
Type-B screening for complete rate.
261 (i) Using manual means:
m
2
16.40 16.50
261 (ii) Using Motor Grader :
m
2
14.30 14.00
261 (d) With coarse aggregate size range 53-22.4 mm (Grading - III) with
Type - B Screening for 75 mm compacted thickness:
For sub-item (d): To add cost at site of 0.1
m3 of Grading-III aggregates and 0.02 m3
of Type-B screening for complete rate.
261 (i) Using manual means :
m
2
14.90 15.80
261 (ii) Using Motor Grader :
m
2
12.80 13.30
261 Note: Cost of 0.0075 m3 of blinding material may be included in the rates
of Sub-item (d), if it is felt necessary to be applied by the Engineer-in-
Charge.
Page 189
Roads_I_181-216
262 9 Labour for spreading & compacting approved stone aggregates to Wet
Mix Macadam specification including screening of aggregates and granular
materials, mixing the materials in proper grading using mechanical mixer, adding
water to achieve required OMC, carrying the mix to work-site using tipper trucks
within a iead of 10 km, laying the mixed materials in uniform thickness over
prepared surface, rolling with 8-1 Ot roller in stages to proper grade, camber, until
the desired density is achieved, including supply of all materials, machinery, fuel &
lubricants, including incidental costs for lighting, guarding, barricading, making of
earthen bundfh to protect the edges, controlling traffic, etc. as per direction of
Engineer-in-Charge complete, including cost of quality control.
m
3
273.90 312.40
To add cost at site of 0.396 m
3
of
37.5 mm chips, 0.264 m
3
of 13.2 mm
chips, 0.356 m
3
of 5.6 mm chips and
0.304 m
3
of stone dust for complete
rate.
262 10
Labour for laying picked Jhama or 1
st
class brick edging, including cutting
necessary trenches in all classes of soils or road crust, including re-filling the
trenches with spoil and ramming the sides and backing with earthen bundh (600mm
wide and 150mm average depth) all complete as per specification and direction of
Engineer-in-Charge, excluding the cost of bricks. (a) Brick edging on edge
(75mm wide and 127mm deep):
To add cost at site of 4 nos bricks for
sub-item (a) and 8 nos. bricks for sub-
item (b) to arrive at the complete rate.
262 (a) Brick edging on edge (75mm wide and 127mm deep): m 5.10 5.40
262 (b) Brick edging on end (75mm wide and 254mm deep): m 7.40 7.80
262 11 Labour for laying stone boulder edging (150mm wide and 250mm deep),
with rough dressing of boulders, including cutting necessary trenches in all
classes of soils or road crust, including re-filling the trenches with spoil and
ramming the sides and backing with earthen bundh (1000mm wide) all
complete as per specification and direction of Engineer-in-Charge,
excluding the cost of boulders.
m 16.70 17.90
To add cost at site of 0.034 m
3
of
boulder (150-225mm) for complete rate.
263 12 Labour for taking out carefully existing 75mm wide brick edging and re-laying
the bricks as edging in the trench, after rectifying line and levels as required and re-
packing the trench on both sides of the edging including backing with earthen
bundh (1m wide) and including carriage of bricks within 150m for re-laying.
263 (a) Brick on edge edging (127mm deep). m 9.00 9.70
263 (b) Brick on end edging (254mm deep) m 10.80 11.60
263 13 Labour for taking out carefully existing stone boulder / stone set edging and re-
laying the edging in the trench, after rectifying line and levels as required with all
old materials and repacking the trench on both sides of the edging including
backing with earthen bundh (1m wide) and including carriage of old materials
within 150m for re-laying.
263 (a) 127 to 152mm wide and 230 to 254mm deep edging with stone
boulders and with top portion rough dressed.
m 20.00 21.40
263 (b) 100mm wide and 250mm deep edging with stone sets laid on edge. m 16.30 17.50
263 14 Taking out old edgings / broken portions of concrete pavements
carefully, stacking the materials in proper stacks and depositing the spoils as
directed within a lead of 150m.
263 (a) Brick edging. m 3.60 3.90
263 (b) Single brick flat soling
m
2
6.10 6.50
263 (c) Double brick flat soling.
m
2
9.10 9.80
263 (d) Boulder soling of any thickness.
m
2
19.40 20.80
263 (e) Boulder edging. m 6.10 6.50
263 (f) Cracked, broken and damaged portion of concrete road slabs of
thickness up to 100mm thickness.
m
2
13.40 14.30
264 15 Labour for spreading blindage for road topping using sand / moorum / kiln
rubbish etc. in approximately 6mm thick layer, including watering and
rolling complete excluding cost of blinding materials.
m
2
2.50 2.70
To add cost at site of 0.006-m
3
of
blinding material for complete rate.
264 16 Patching of potholes by draining - water, cutting the pothole area to
rectangular shape with vertical edges, removing all loose
1
materials, screening
and stacking the same for reuse with new materials as per requirement,
filling the pothole area with additional volume of crushed stone materials 1
laterite / Jhama 1 broken shingles / coated stones of Pakur variety etc. and
screenings as applicable, and compacting the same with static roller as per Water
Bound Macadam Specification, including cost of all materials and machineries but
excluding the cost of coarse aggregates and screening.
m
3
178.20 179.30 To add cost at site of Infiof coarse
aggregates (Grading -II) and 0.21 m
3
of Type -B Screening .for complete rate.
264 Note: 1. The payment is to be done based on loose net volume of coarse
aggregates only.
264 2. This item of work may be executed for temporary restoration of road
and should be covered with bituminous overlay as soon as possible.
264 3. If filling is done using coated stone aggregates, a 75mm thick
WBM (grading- III) layer shall overlay the fill using Pakur stone materials,
before laying of bituminous course.
265 1 Roughening old black top surface by cutting 50mm x 50mm furrows at 45
degrees to the central line of road at 1 m intervals, or closer including removal of
loose scum etc. for proper bonding with new treatment.
m
2
9.70 10.40
265 (An instance where this item may be necessary is where the
existing bituminous layer is thick and the total crust thickness is
required to be increased by addition of a thin course, say 5 to 8
cm, of new metal consolidation, in which case it is not desirable to
loose the thickness of the existing bituminous layers by its complete
removal).
265 2 Picking up and removing old bituminous layer or sand sealing coat from
old black topped surface and cleaning the exposed surface by scraping and stacking
the material as directed.
265 (a) By manual means :
265 (i) From 25 mm to 50 mm thick. m
2
12.20 13.00
265 (ii) From 50 mm to 100 mm thick. m
2
18.20 19.50
265 (iii) Above 100 mm thick. m
2
24.30 26.00
265 (b) By mechanical means :
265 (i) From 25mm to 50mm thick. m
2
3.50 3.70
Section 4.7 - Bituminous Works
Page 190
Roads_I_181-216
265 (ii) From 50mm to 100mm thick m
2
7.00 7.40
265 (iii) Above 100mm thick. m
2
14.10 14.80
265 3 Providing and applying tack coat using Cationic bituminous emulsion of
approved grade conforming to IS : 8887-1978, over prepared surface including
cleaning of surface with mechanical broom, moistening the surface, applying tack
coat including cost and carriage of emulsion, hire charges of machineries and
labour, cost of fuel and lubricants all complete as per specification and
direction of the Engineer-in-charge.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
266
(a) Over Water Bound Macadam surface @ 4.0 kg per 10m
2
:
266 (i) By manual means, m
2
3.70 3.90
266 (ii) By mechanical means. m
2
1.80 1.80
266
(b) Over black topped surface @ 3.0 kg per 10m
2
:
266 (i) By manual means, m
2
3.60 3.80
266 (ii) By mechanical means. m
2
1.60 1.70
266 4 Providing and applying bituminous Primer Coat for priming of base
course with Cationic bituminous emulsion of approved grade and
requisite quantity including preparation of the surface to be primed,
through cleaning and sweeping, uprooting weeds, grass etc.
dampening the surface beforehand spraying the primer using sprayer
mounted on distributor truck or with hand sprayer using mechanical pump
including cost and carriage of bitumen emulsion and all other incidental
costs of work.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
266
(a) For surfaces with low porosity (@7.5 kg/10 m
2
).
m
2
2.40 2.50
266
(b) For surfaces with medium porosity (@ 10.5 kg 110 m
2
).
m
2
2.90 2.90
266
(c) For surfaces with high porosity (@ 13.5 kg/10 m
2
).
m
2
3.30 3.40
266 5 Laying Bituminous Penetration Macadam (full grout) on granular or
bituminous surface, including thorough cleaning of surface, applying tack
coat as per specification, screening and grading the aggregates as per
specifications, spreading the coarse aggregates, hand packing and rolling with
power roller, true to camber and grade, applying hot binder uniformly at
specified rate, spreading key aggregates uniformly, rolling the surface
with power roller and dragging with drag-brooms until the key aggregates are
locked in the surface, including the cost and carriage of stone & key
aggregates, bitumen, cost of heating, hire charges including cost of fuel and
lubricants of roller and other machines with all other incidental charges in
this connection but excluding cost of applying tack coat
Add cost of materials and carriage as per
consumption chart to get the Final
consolidated item rate.
267 (a) For 50 mm compacted thickness. m
2
58.60 60.30
267 (b) For 75 mm compacted thickness. m
2
79.70 82.90
267 6 Laying Built up spray grout of 75 mm compacted thickness including thorough
cleaning of the surface, applying tack coat, screening and cleaning of stone
materials, spreading uniformly 1st layer of stone metals conforming to required
grading including hand packing, rolling by power roller to proper camber,
grade and super-elevation and covering with hot bitumen @ 15 kg per 10m
2
of
surface, followed by similar operation of spreading 2
nd
layer of graded stone
metals including hand packing rolling to proper camber, grade etc. and
covering once again with hot bitumen layer @ 15 kg per 10 m
2
of surface
completely covering the surface uniformly by spreading key aggregates
conforming to required . grading with necessary hand packing, thoroughly
compacting by power roller in proper camber, grade and super-elevation, including
the cost and carriage of stone metals, bitumen, key aggregates and cost of heating
the bitumen and all other incidental costs including hire charges of all sorts of
machineries and equipments for construction, cost of fuel and lubricants,
procedures and quality control as per specification, excluding cost of applying Tack
coat.
m
2
43.40 45.50 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
268 7 Laying Bituminous Macadam of specified grade using Hot Mix Plant
(HMP) and using approved aggregates conforming to specified grading
and bitumen over prepared surface, including carrying the hot premixed
materials by means of tipper truck, spreading, the mixed material at
specified laying temperature over the prepared surface by means of a
suitable paver finisher, tamping and finishing the mix to specified grade,'
line and camber, thorough rolling with suitable power rollers for break
down, inter-mediate and finished rolling as per specification, hand packing
and pinning to give an even surface including cost and carriage of stone
materials & bitumen, and hire charges of HMP and all other machines and
equipments, cost of fuels and lubricants and wages of operational staff,
quality control as per IRC Specification all complete excluding cost of
applying tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
268 (A) In Profile Corrective Course using 3.0% binder content by weight of
total mix.
268 (i) Using HMP of capacity 100-120 TPH. m
3
1207.00 1259.00
268 (ii) Using HMP of capacity 60-90 TPH.
m
3
1330.00 1389.00
268 (iii) Using HMP of capacity 40-60 TPH.
m
3
1604.00 1676.00
269 (B) In Base / Binder Course using 3.4 % binder content by weight of total
mix.
269 (a) 40mm compacted thickness:
269 (i) Using HMP of capacity 100-120 TPH. m
2
49.00 51.10
269 (ii) Using HMP of capacity 60-90 TPH. m
2
53.70 56.00
269 (iii) Using HMP of capacity 40-60 TPH. m
2
64.80 67.70
269 (b) 50mm compacted thickness:
269 (i) Using HMP of capacity 100-120 TPH. m
2
61.20 63.80
269 (ii) Using HMP of capacity 60-90 TPH. m
2
67.10 70.00
269 (iii) Using HMP of capacity 40-60 TPH. m
2
81.10 84.70
269 (c) 75mm compacted thickness:
269 (i) Using HMP of capacity 100-120 TPH. m
2
91.80 95.80
269 (ii) Using HMP of capacity 60-90 TPH. m
2
100.70 105.10
269 (iii) Using HMP of capacity 40-60 TPH. m
2
121.60 127.00
Page 191
Roads_I_181-216
269 8 Laying Bituminous Macadam of specified grade by Mobile Hot Mix Plant
(Light Duty) using approved aggregates conforming to specified grading and
bitumen on prepared surface, screening and cleaning the aggregates, pre-heating,
preparing a uniform and quality mix, carrying the hot premixed materials by means
of approved and suitable arrangements, spreading the mixed materials at specified
laying temperature over the surface by means of suitable arrangements, tamping
and finishing the mix to specified grade, line and cross section, thorough
rolling with suitable power roller for breakdown, inter-mediate and finished
rolling as per Specification, hand packing and pinning to give an even surface
complete including hire charges, fuel and lubricants of Mobile Hot Mix Plant
(Light Duty) and all other machineries and equipments, quality control as per IRC
specification excluding cost of applying tack coat
Add cost of materials and carriage as per
consumption chart to get the Final
consolidated item rate.
270 (A) In Profile Corrective Course using 3.0% binder content by weight of total
mix.
m
3
707.40 737.50
270 (B) In Base / Binder Course using 3.4 % binder content by weight of total mix.
270 (a) 40mm compacted thickness. m
2
29 00 30.20
270 (b) 50 mm compacted thickness m
2
36.30 37.80
270 9 Laying Dense Bituminous Macadam layer (as base / binder course) by
Hot Mix Plant using coarse aggregate, fine aggregate, filler and binder as per
design Job Mix Formula, conforming Marshall Method as per specification, over
prepared surface coated with tack coat, including screening, cleaning of chips and
preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogenous
mix, in which all particles of the mineral aggregates are coated uniformly, carrying
the hot premixed materials by means of tipper truck, spreading the mixed materials
at specified laying temperature over the prepared surface by means of a
suitable paver finisher, tamping and finishing the mix to specified grade, line and
cross section, through rolling with suitable power rollers for break down, inter -
mediate and finished rolling to achieve the desired density of at least 98% of
that of Lajwratory Marshall specimen, hand packing and pinning to give an
even surface including cost and carriage of bitumen/CRMB, course and fine
aggregates and filler materials and hire charges of Hot Mix Plant and all other
machines, equipments for construction and quality control as per IRC
specification, fuels, and lubricants and wages of operational staff complete
excluding the cost of applying Tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
271 (a) 50 mm compacted thickness:
271 (i) Using HMP of capacity 100-120 TPH. m
2
67.30 70.00
271 (ii) Using HMP of capacity 60-90 TPH. m
2
73.40 76.50
271 (iii) Using HMP of capacity 40-60 TPH. m
2
88.10 91.90
271 (b) 75 mm compacted thickness:
271 (i) Using HMP of capacity 100-120 TPH. m
2
100.90 105.00
271 (ii) Using HMP of capacity 60-90 TPH. m
2
110.20 114.80
271 (iii) Using HMP of capacity 40-60 TPH. m
2
132.20 137.90
271 10 Providing & Laying 20 mm thick open graded Premixed Carpet by Hot Mix
Plant using 13.2 mm (@ 0.18 m3/m2) and 11.2 mm (@0.09 m3/m2) size
stone aggregates, including thorough cleaning of the surface, applying
tack coat, screening cleaning and pre-heating stone chips and fully pre-
coating the same with hot matrix @ 54 kg/m3 of aggregate mix, carrying
the mixture by tipper trucks or by any other suitable arrangements, laying
the mixture uniformly over the surface with paver finisher, including
manual operations as and when required for proper level, grade and
camber, thoroughly rolling by power roller, including the cost and carriage
of stone chips and matrix, heating the matrix, preheating the aggregates to
required temperature and including the hire charges of Hot Mix Plant and
other machineries, pay of operators, cost of fuel and lubricants etc. all
complete excluding cost of applying tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
272 (a) Using HMP of capacity 100-120 TPH. m
2
17.30 18.00
272 (b) Using HMP of capacity 60-90 TPH. m
2
18.80 19.50
272 (c) Using HMP of capacity 40-60 TPH. m
2
22.30 23.20
272 11 Providing & Laying 20 mm thick Open Graded Premixed Carpet using 13.2
mm (0..18 m
3
/m
2
) and 11.2 mm (0.09 m
3
/m
2
) size stone aggregates,
including thorough cleaning of the surface, applying tack coat, screening,
cleaning and preheating stone chips and fully pre-coating the same with matrix @
54 kg per m
3
of aggregates, laying the premixed chips uniformly over the surface,
hand packing, thoroughly rolling by power roller, including the cost and carriage of
stone chips and matrix, heating the matrix and all other cost and charges in this
connection including hire charges and cost of fuel and lubricants of machineries
and equipments for construction and quality control as per IRC specification
complete excluding cost of applying tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
272 (a) Using Mobile HMP (Light duty), m
2
14.50 15.00
272 (b) Using Concrete Mixer. m
2
11.80 12.20
272 12 Providing & Laying 20 mm thick Open Graded Premixed Carpet using 13.2
mm (0.18 m
3
/m
2
) and 11.2 mm (0.09 m
3
/m
2
) size stone aggregates, premixed
with Cationic Bituminous Emulsion (M.S. grade) conforming to IS : 8887-1970
@ 75 kg per m
3
of stone chips, including cleaning, moistening the surface,
applying tack coat with cationic bitumen emulsion, screening, cleaning
and washing the stone chips, intimately mixing with emulsion using
Concrete Mixer, laying the mixture uniformly over the surface and rolling with
power roller after hand packing and pinning adequately to ensure a compact
surface all complete as per specification and direction of the Engineer-in-
charge including cost and carriage of stone materials and emulsion, including
cost of labour,. hire and running charges of road roller and other tools and plants
and cost of all other incidental charges including hire charges and cost of fuel and
lubricants of machineries and equipments for construction and quality control
as per IRC specification complete excluding cost of applying tack coat.
m
2
10.20 10.60 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
Page 192
Roads_I_181-216
273 13 Providing & Laying 12 nim thick Open Graded Premixed Carpet using
premixed stone chips of approved quality with hot matrix using 1.00 m
3
of
11.2 mm chips and 0.6m
3
of 5.6 mm chips per 100 m
2
of surface, including
cleaning the surface, applying tack coat as per specification, preheating the stone
chips on suitable pans and intimately mixing the hot chips separately with hot
matrix @ 56 kg per m
3
of stone chips, laying the mixture uniformly over the
surface and rolling with power roller, after hand packing and pinning adequately
to ensure a compact surface, including cost of supplying requisite quantity of
stone chips, and including, cost and carriage of matrix, hire and running
charges including fuel and lubricants of machineries and equipments for
construction and quality control as per IRC specification, excluding cost of
applying Tack coat.
Add cost of materials and carriage as per
consumption
274 (a) Using Mobile HMR (Light duty), m
2
8.90 9.20 chart to get the final consolidated item
rate.
274 (b) Using Concrete Mixer.

m
6.90 7.20
274 14 Providing & Laying 12 mm nominal thick Premixed Carpet using premixed
stone chips of approved quality using 1.00 m
3
of 11.2 mm chips and 0.6m
3
of 5.6
mm chips per 100 m
2
of surface, including cleaning the surface, premixing with
Cationic Bitumen Emulsion (MS grade) conforming to IS. 8887-1978 @ 80 kg
per m
3
of stone chips, including cleaning and moistening the surface applying tack
coat, screening, cleaning and washing the stone chips, intimately mixing with
emulsion using Concrete Mixer, laying the mixture uniformly over the surface and
rolling with power roller after hand packing and pinning adequately to ensure
compact surface all complete as per specification and. direction of the Engineer-in-
charge, including cost and carriage of stone materials and emulsion and including
cost of labour, hire and running charges including fuel and lubricants of
machineries and equipments for construction and quality control as per IRC
specification, excluding cost of applying Tack coat, complet^ as per specification.
m
2
7.10 7.30 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
274 15 Providing & laying 6 mm nominal thick Premixed Carpet with premixed stone
chips and sand of approved quality with hot matrix using 0.8 m
3
of stone chips
(passing fully through 8 mm sieve and wholly retained on 2.36 mm sieve) and 0.25
m
3
medium sand per 100 m
2
, including cleaning the surface applying tack coat with
bitumen emulsion uniformly, preheating the stone chips and sand and intimately
mixing the aggregate with hot matrix @ 70 kg per m
3
of mixed aggregate, laying
the mixture uniformly over the surface and rolling with power roller after adequate
hand packing and pinning to ensure a compact surface including cost of supplying
requisite quantity of stone chips and sand, including cost and carriage of matrix to
work site, cost of all other incidental charges including hire charges and cost of
roller and all other machineries and equipments for construction and quality control
as per specification but excluding cost of applying Tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
275 (a) Using suitable pan. m
2
5.40 5.60
275 (b) Using Mobile HMP (Light duty). m
2
5.20 5.40
275 16 Laying liquid Sea! Coat (Type A) with approved quality stone chips and hot
bitumen binder on thoroughly cleaned bi(?ck top surface, including applying hot
bitumen @ 98 kg per 100m
2
on the surface, spreading screened & cleaned stone
aggregates (100 % passing through 11.2 mm sieve and retained on 2.36 mm sieve)
uniformly @ 0.09 m
3
of dry aggregate per 10 m
2
of area using suitable means,
brushing the chips, if necessary, to ensure uniformity, followed by rolling with
power roller including the cost and carriage of binder and stone chips, cost of
heating the binder and all other incidental charges, cost of fuei and lubricants,
including hire charges of machineries, tools & plants required for construction and
quality control complete.
m
2
5.90 6.30 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
275 17 Laying Liquid Seal Coat (Type A) with approved quality stone chips and
Cationic bituminous emulsion binder (RS or MS grade) conforming to IS. 8887-
1978 on thoroughly cleaned black top surface, including applying emulsion @ 150
kg per 100m
2
on the surface, spreading screened & cleaned stone aggregates (100
% passing through 11.2 mm sieve and retained on 2.36 mm sieve) uniformly @
0.09 m
3
of dry aggregate per 10 m
2
of area using suitable means, brushing the
chips, if necessary, to ensure uniformity, followed by rolling with power roller
including the cost and carriage of binder and stone chips, and all other incidental
charges, cost of fuel and lubricants, including hire charges of machineries, tools &
plants required for construction and. quality control complete.
m
2
5.70 5.90 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
276 18
Laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m
3
/
100 m
2
and hot bitumen binder on thoroughly cleaned black top surface coated
with tack coat, including heating and mixing cleaned sand/grit (100 % passing
through 2.36 mm sieve and retained on 180 sieve) uniformly with hot binder (@
113.5 kg per m
3
of grit or sand in suitable pan / Mobile Hot Mix Plant (Light duty),
laying and spreading the mix at an uniform rate using suitable means, brushing the
surface, if necessary, to ensure uniformity, followed by rolling with power roller
including the cost and carriage of binder and aggregates, cost of heating the binder
and aggregates and all other incidental charges, cost of fuel and lubricants,
including hire charges of machineries, tools & plants required for construction and
quality control complete excluding cost of applying tack coat.
Add cost of materials and carriage as per
consumption chart to get the Final
consolidated item rate.
276 (a) Using suitable mixing pan. m
2
5.20 5.60
276 (b) Using Mobile Hot Mix Plant (Light duty) m
2
9.90 11.00
Page 193
Roads_I_181-216
276 19 Laying Premixed Seal Coat (Type B) with approved quality sand/grit and
Cationic bituminous emulsion binder (RS or MS grade) conforming to IS. 8887-
1978 on thoroughly cleaned black top surface coated with tack coat, including
mixing cleaned sand/grit (100 % dry aggregate per 10 m
2
of area using suitable
means, brushing the chips, if necessary, to ensure uniformity, followed by rolling
with power roller including the cost and carriage of binder and stone chips, and all
other incidental charges, cost of fuel and lubricants, including hire charges of
machineries, tools & plants required for construction and quality control complete.
m
2
5.20 5.60 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
277 20 Providing & Laying 20 mm thick Mix Seal Surfacing (MSS) by Hot Mix
Plant using 0.27 m3 of approved variety mineral aggregates (coarse and
fine) per 10 m2 of surface as per specification and approved job mix
formula, over thoroughly cleaned surface coated with tack coat, including
screening and cleaning the aggregates as necessary, preheating, pre-
coating the same in Hot Mix Plant with hot matrix, carrying the mixture by
tipper trucks or any other suitable arrangements, laying premixed
materials uniformly with paver finisher, including manual operations as
and when required, compacting with power roller including the cost and
carriage of aggregates and matrix, cost for heating the matrix and
aggregates, including hire charges of Hot Mix Plant and other
machineries, pay of operators, cost of fuel and lubricantsetc. including all
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
277 (a) Type - A : Using 2.2 kg bitumen per square meter.
277 (i) Using HMP of capacity 100-120 TPH.
m
2
24.00 26.30
277 (ii) Using HMP of capacity 60 -90 TPH.
m
2
26.80 29.20
278 (iii) Using HMP of capacity 40-60 TPH.
m
2
32.20 35.20
278 (b) Type - B : Asing 1.9 kg bitumen per square meter.
278 (i) Using HMP of capacity 100-120 TPH.
m
2
23.50 25.80
278 (ii) Using HMP of capacity 60-90 TPH.
m
2
26.20 28.70
278 (iii) Using HMP of capacity 40-60 TPH.
m
2
31.70 34.70
278 21
Providing & Laying 20 mm thick Mix Seal Surfacing (MSS) using 0.27 m
3
of
approved variety mineral aggregates (coarse and fine) per 10 m
2
of surface as per
specification and approved job mix formula, over thoroughly cleaned surface
coated with Tack coat, including screening and cleaning the aggregates as
necessary, preheating, pre-coating the same in Mobile Hot Mix Plant (Light
Duty) with hot matrix, carrying the mixture by any suitable arrangements, and
laying premixed materials uniformly, including manual operations as and
when required, compacting with power roller including the cost and carriage of
aggregates and matrix, cost for heating the matrix and aggregates. Including hire
charges of Mobile Hot Mix Plant (Light Duty) and other machineries, pay of
operators, cost of fuel and lubricants etc. including all incidental charges
complete excluding cost of applying Tack coat.
m
2
Add cost of materials and carriage as per-
consumption chart to get the final
consolidated item rate.
278 (a) Type - A : Using 2.2 kg bitumen per square meter. 19.10 20.70
278 (b) Type - B : Using 1.9 kg bitumen per square meter. 18.60 20.20
278 22 Providing & laying Semi-dense Bituminous Concrete (SDBC) as wearing
coarse by Hot Mix Plant, using coarse aggregates, fine aggregates, filler
materials and binder of required specification and grading as per approved job
mix formula, over thoroughly cleaned surface coated . with tack coat, including
screening, cleaning of aggregates, mixing the components as per approved Job Mix
Formula with hot binder, carrying the mixture by tipper truck or any other
approved suitable arrangements, laying the mixture uniformly, maintaining the
specified laying temperature, thorough rolling with power roller with necessary
hand packing and pinning to give an uniform surface to achieve the desired density
of at least 98% of that of Laboratory Marshall specimen, including the cost and
carriage of aggregates, filler and binder, heating the binder, preheating the
aggregates, and filler to the specified temperature, including the hire charges of Hot
Mix Plant and other machineries, pay of operators, cost of fuel and lubricants and
all other incidental charges complete excluding cost of applying tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
279 (a) 25mm compacted thickness:
279 (i) Using HMP of capacity 100-120 TPH. m
2
23.70 37.70
279 (ii) Using HMP of capacity 60-90 TPH. m
2
36.70 41.20
279 (iii) Using HMP of capacity 40-60 TPH. m
2
43.90 49.50
279 (b) 40mm compacted thickness:
279 (i) Using HMP of capacity 100-120 TPH. m
2
53.20 59.70
279 (ii) Using HMP of capacity 60-90 TPH. m
2
58.00 55.10
279 (iii) Using HMP of capacity 40-60 TPH. m
2
69.60 78.40
279 23 Providing & laying Bituminous Concrete (BC) as wearing coarse by Hot
Mix Plant, using coarse aggregates, fine aggregates, filler materials and
binder of required specification and grading as per approved job mix
formula, over thoroughly cleaned surface coated with tack coat, including
screening, cleaning of aggregates, mixing the components in required
proportion with hot binder, carrying the mixture by tipper truck or any
other approved suitable arrangements, laying the mixture
uniformly, maintaining the specified laying temperature, thorough
rolling with power roller with necessary hand packing and pinning to give
an uniform surface to achieve the desired density of at least 98% of
that of Laboratory Marshall specimen, including the cost and
carriage of aggregates, filler and binder, heating the binder,
preheating the aggregates, and filler to the specified temperature,
including the hire charges of Hot Mix Plant and other machineries, pay of
operators, cost of fuel and lubricants and all other incidental charges
complete excluding cost of applying tack coat
280 (a) 25 mm compacted thickness:
280 (i) Using HMP of capacity 100-120 TPH.
m
2
34.50 38.50
280 (ii) Using HMP of capacity 60-90 TPH.
m
2
37.50 41.90
280 (iii) Using HMP of capacity 40-60 TPH.
m
2
44.70 50.20
280 (b) 40 mm compacted thickness:
Page 194
Roads_I_181-216
280 (i) Using HMP of capacity 100-120 TPH.
m
2
56.40 62.90
280 (ii) Using HMP of capacity 60-90 TPH.
m
2
51.20 58.40
280 (iii) Using HMP of capacity 40-60 TPH.
m
2
72.80 81.60
281 24 Laying a single layer, 25mm thick Mastic Asphalt wearing course in road
pavement/bridge decks using approved coarse aggregate, fine aggregate,
filler material and bitumen, including cost and carriage of all ingredients,
cost of heating aggregates and binder, mixing in specified proportions
conforming to approved Job Mix Formula, laying the mix, compacting,
sealing the construction joints and surface finishing conforming to
specifications, construction procedure and quality control vide Section 515
of Specifications of Road & Bridge Works (4th Revision) published by
IRC, including the hire charges of all tool, plants and machineries, pay of
operators, cost of fuel and lubricants and all other incidental charges and
quality control complete. (N.B. The rates for 50 mm & 40 mm thick layers
may be worked out on pro-rata basis.)
m
2
181.80 203.30 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
281 25 Repairing pot-holes and making up small depressions with ramming or power
rolling including screening, cleaning chips or metals and washing, drying as
necessary and heating the chips or metal where necessary, cutting pot holes to
regular shapes with vertical edges, cleaning the disintegrated materials, heating
matrix and applying tack coat (including sides), finishing the top of repaired
surface levelled with adjoining area, including cost and carriage of stone
aggregates and matrix, excludingcost of applying tack coat.. [Tack coat is to
be considered separately]
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate. [Payment to the
Contractor is to be made on the basis
of loose net volume of coarse
aggregate only excluding key
aggregates]
281
(a) With premixed Chips or Bajrees with 54 kg of bitumen per m
3
of loose
net volume of stone chips using concrete mixer machine. {The payment is to be
made on the basis of loose net volume of stone materials consumed in the work)
282 (i) Using concrete mixer. m
3
431.40 450.00
282 (ii) Using Mobile Hot Mix Plant (Light duty) m
3
403.30 417.40
282
(b) By grouting method using matrix @ 70 kg / m
3
of loose net volume of
course aggregate. Requirement of key aggregate may be taken as 10% of coarse
aggregate and size 11.2 mm.
m
3
397.70 411.80
282 26 Repairing pot-holes and making up small depressions using cationic
bituminous emulsion conforming to IS 8887-1978 with stone metals / chips
premixed with emulsion in concrete mixer or any other method approved, by the
Engineer-in-Charge, including cutting the pothole area in regular shapes with
vertical edges, thorough cleaning & moistening of surface, applying tack coat,
filling up the pot-holes with premixed metals/chips in layer/layers as per
specification and direction of the Engineer-in-charge, compacting by power roller,
finishing the top of repaired surface levelled with adjoining area including cost
and carriage of stone aggregates, blinding material & bitumen
emulsion, hire & running charges of rollers and other tools & plants, cost of fuel &
lubricants and other incidental charges excluding cost of applying tack coat
[Using stone chips of size 22.4 mm and 11.2 mm in 60:40 proportion, premising
with bitumen emulsion @ 70.7 kg per m
3
of loose net volume of stone chips.]
m
3
446.90 466.40 (The payment is to be made on the basis
of loose net volume of stone materials
consumed in the work). Add cost of
materials and carriage as per
consumption chart to get the final
consolidated item rate.
282 27(a)
Pre-coating stone aggregates with hot matrix @ 56 kg/m
3
of net volume of
stone aggregate in concrete mixer including preheating the stone aggregate at a
suitable temperature including the cost of carriage of the stone aggregate at the
mixing yard and carriage of the pre-coated materials for dumping at a suitable
place as directed including cost and carriage of bitumen and including hire charges
of machineries and all incidental charges complete as per direction of Engineer-in-
charge. (The payment is to be made on the basis of loose net volume of stone
materials consumed in the work)
m
3
441.40 508.90 Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
283 27(b) Labour for repairing pot holes with pre-coated stone materials
including cutting, loading pre-coated stone materials at departmental stack-yard
or any other approved pre-defined location, including carriage of pre-
coated stone materials from source to different kilometers of road by truck and
laying directly from truck and compacting with plate compactor / power roller
including cutting the pot hole to regular shape clearing the pot holes of loose
materials, drying the bed of pot holes, where necessary, by soaking with
gunny bags and using lime, where necessary, before laying of pre-coated
materials etc. complete as per direction of Engineer-in-charge, excluding cost of
applying Tack coat.
m
3
m
3
This item may be done in conjunction with
item no. 27(a).
283 (i) Within a distance up to 10 kms. m
3
946.50 996.30
283 (ii) Within a distance above 10 kms and up to 20 kms. m
3
1020.00 1029.00
283 28 Providing & applying Surface Dressing using approved quality stone
aggregates and hot bitumen including thorough cleaning of the surface, screening
and cleaning of stone chips, applying uniformly requisite quantity of hot
bitumen, spreading uniformly dry stone aggregates, rolling with power roller
with necessary hand packing or spreading of chips to obtain closed surface
including the cost and carriage of bitumen and stone chips, heating the bitumen
and all other cost and charges of fuel, lubricants in this connection including hire &
operational charges of machinery and equipments for construction and quality
control complete as per IRC specification.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
284
(a) Single coat or 1
st
coat over granular surface using bitumen @ 12 kg per 10
m
2
and stone chips / bajree (100% passing through 22.4 mm sieve and 100%
retained on 11.2 mm sieve) @ 0.15 m
3
per 10 m
2
surface.
m
2
7.40 7.70
284 (b) Second coat or renewal coat on black topped surface using bitumen @ 10
kg per 10-m
2
and stone chips / bajree (100% passing through 13.2 mm sieve and
100% retained on 5.6 mm sieve) @ 0.10 m
3
per 10 m
2
surface.
m
2
6.80 7.10
Page 195
Roads_I_181-216
284 29
Spreading of sand over the bituminous surface @ 0.003 m
3
per m
2
of
surface from the road side stacks and carriage of the same up to a distance of 150
m from stack complete including cost of sand.
100 m
2
89.90 90.40
284 30 Providing and laying Slurry Seal approved quality fine aggregates of proper
grading, Portland cement filler, bituminous emulsion and water on a road
surface, including thorough cleaning of surface, application of tack coat,
mixing of slurry seal in a suitable mobile plant, laying and compacting with
pneumatic-tyred roller, if required, to provide even riding surface, including
cost & carriage of all ingredients hire & operational charges of roller and other
tools & plants including cost of fuel, lubricants and all other incidental
charges, quality control vide Clause 516 of MORT&H's Specifications for Road &
Bridge Works (4
th
Revision) excluding cost of applying Tack coat.
Add cost of materials and carriage as per
consumption chart to get the final
consolidated item rate.
285 (a) For 5 mm finished thickness, m
2
4.40 4.70
285 (b) For 3 mm finished thickness, m
2
2.90 3.10
285 (c) For 1.5 mm finished thickness. m
2
1.60 1.70
285 31 Providing and applying Fog Spray using low viscosity (SS Type) Cationic
bituminous emulsion on prepared surface including thorough cleaning of surface
using* scrubber & compressed air jets, applying SS type Bituminous emulsion @
7.5 kg per 10 m
2
area using bitumen pressure distributor, including cost and
carriage of all ingredients and hire & operational charges of all machineries, tools
& plant including fuel, lubricants and cost of quality control vide Clause no. 518
MORT&H's Specifications for Road & Bridge Works.
m
2
2.40 2.50 Add cost and carriage of bitumen
emulsion as per consumption chart to get
the final consolidated item rate. Blinding
of surface, if necessary, may be done
through item no. 29 (Spreading of...)
285 32 Labour for mixing stable anti-stripping agent of approved quality conforming to
Table-A 5-1 of Appendix-5 of Specification for Road & Bridge Works of
MoRT&H (Rev-4) to the binder @ 0.5% to 1% by weight of binder (depending up
on size & stripping value of the aggregates) and allowing 15 to 30 minutes of
circulation or stirring in the hot bitumen tank to ensure a homogeneous mix of
binder and anti-stripping agent for different bituminous works as per Technical
Specifications given in Appendix - 5 of Specification for Road & Bridge Works of
MoRT&H (Rev-4) and direction of Engineer-in-Charge complete including cost
and carriage of all materials, labours, hire charges of T&P but excluding the cost
but including carriage of anti-stripping agent from Depttl godown to site of works.
kg 2.40 2.60
286 33 Labour charges for transferring bulk bitumen from departmental vats in to
empty bitumen drums by cutting or other suitable means, including hire charges of
bitumen drums, carriage & handling up to a lead of 30 m, including all incidental
charges, T&P, fuel, lubricants etc. complete.
MT 280.00 299.70
295 8 Painting (one coat) guard posts with 6nos. of 16cm wide horizontal
alternate band in different colours after the scrapping the surface free from
old paint etc. as directed with best quality synthetic enamel paint of
approved make and brand after fixing old existing guard post in correct
position true to line and level with repacking the ground at base properly
and mending good damages if necessary complete in all respect.
each 59.00 62.00
295 9 Painting (one coat) to Salbullah guard post with 6 nos. of 16cm wide horizontal
alternate band with white/Tannery yellow and black, with best quality synthetic
enamel paint of approved make and brand after fixing old existing guard post in
correct position true to line and level with repacking the ground at base properly
complete in all respect.
each 44.00 45.00
295 10 Painting (one coat) K.M. post with best quality synthetic enamel paint of
approved make and brand of different shades as directed after cleaning and
washing the surface including mending good damages as necessary complete in all
respect.
295 (a) 5th K.M. Post each 73.00 75.00
295 (b) Ordinary K.M. Post each 42.00 44.00
295 11 Painting (one coat) 200m post with best quality synthetic enamel paint of
approved make and brand of different shades as directed after cleaning and
washing the surface including mending good damages as necessary, complete in all
respect.
each 13.00 13.00
295 12 Painting the vertical end faces of posts, wheel guards or railing or parapet
with alternate bands of different colours as directed by the Engineer-in-charge with
approved synthetic enamel paint.
295 (a) One coat m
2
35.60 36.50
295 (b) Two coats m
2
59.20 60.40
296 13 Painting with approved synthetic enamel paint circular panel (upto
30cm) or rectangular panel (size 38cm to 30cm x 25cm to 20cm) including
the Load classification number or the number of bridge or culvert painted
thereon in a different colour, complete as directed by Engineer-in-charge.
each 31.00 33 00
296 14 Painting block letters or digits in black japan or any approved synthetic
enamel paint as per direction of Engineer-in-charge.
296 (a) Size above 7.5cm and upto 10 cm Each 3.40 3.60
296 (b) Size above 10cm and upto 12.5 cm Each 4.40 4.60
296 (c) Size above 12.5cm and upto 15 cm Each 5.30 5.60
296 15 Priming one coat to timber or plastered surface with ready mixed
primer of approved quality including scrapping and smoothening surface.
m
2
30 70 31.10
296 16 Painting (any shade as directed by Engineer-in-charge) with best quality
synthetic enamel paint of approved make and brand (except red lead or
black Japan) including smoothening surface.
296 (a) On Timber or Plaster surface
296 (i) One coat m
2
36.90 37.70
296 (ii) Two coats m
2
55.60 56.60
296 (b) On steel or other surface
296 (i) One coat m
2
28.60 29.30
Section 4.8 Miscellaneous Works
Page 196
Roads_I_181-216
296 (ii) Two coats m
2
45.90 47.00
296 17 Painting with ready mixed red lead paint of approved make and brand including
smoothening surface,
296 (a) One coat m
2
26.90 27.70
296 (b) Two coats m
2
37.70 38.70
296 18 Cement washing with admixture of pigment if necessary as directed by
Engineer-in-charge including cleaning and smoothening surface thoroughly.
(Cement to be used @15kg/100m2 surface of one coat @ 25kg/100m2 of
surface of two coats).
297 (a) One coat

m
2
4.60 4.80
297 (b) Two coats

m
2
8.80 9.30
297 19 Extra to cover increased labour cost etc. for construction of pucca surface drain
(Relevant item of works for pucca surface drain i.e., earth work, concrete,
masonry plaster etc. will be paid at rates against respective items. This item is
payable in addition to cover extra cost of labour etc. in such case. Payment will
be made on the basis of length of drain).
m 10.00 10.70
297 20 Close bamboo walling made of 65mm to 75mm dia. bamboos >(in
single line) driven about half'length into the ground side by side, with stout
stays at an interval of 1m, 3nos. of half split bamboo runner of same dia
fitted and fixed with nails etc. complete as per direction. (Measurement to
be taken along the length of piling after finishing the works).
-
297 (a) With bamboos of length between 1.25m to 2.00m each. m 409.00
297 (b) With bamboos of length above 2.00m and upto 2.50m each. m 551.00
297 (c) With bamboos of length above 2.50m and upto to 3.00m each. m 683.00
297 21 Bamboo pile walling made of 6.5cm to 7.5cm dia bamboo (in single line)
driven about half length into ground at very close spacing of 30cm c/c side by side,
with stout stays at an interval of 90cm fixed with bamboo post of length 1.25m
driven 1m below G.L., 3 nos. of half split bamboo runner of same dia fitted and
fixed with nails etc. and lining exposed portion with sheets made from cut drums
(empty bitumen drums) fitted and fixed with a lap width of 100 mm at each joint,
complete as per direction including the cost of drum sheets and including the cost of
nails, wires etc.
298 (a) With bamboos of length between 1.25m &upto 2.0m each. m 405.00 -
298 (b) With bamboos of length above 2.00 & upto 2.50m each. m 516.00
298 (c) With bamboos of length above 2.50m & upto 3.00m each. m 665.00
298 22 Weaving wire mattress as directed with wire of 4mm dia. and making sausage
crate of required shape after tying all intersections including joining longitudinal
ends, closing ends of sausage, carriage of wire to site of work complete in all
respect as per direction of the Engineer-in-charge includingcost of supplyof G.I .
Wire.
298 (a) 100mm x 100mm mesh m
2
238.00 238.00
298 (b) 150mm x 150mm mesh m
2
145.00 145.00
298 23 Filling properly the empty sausage crates with boulders of any size &
shape with hand packing after preparation of bed of placement, placing the
crate in position, carriage of boulders from road stacks with a lead upto 150m etc.
complete in all respect including stitching the rest of the crate with wire (passage
for filling boulders) after filling up the crate with boulders and launching the crate
in position if necessary and as directed by the Engineer-in charge. [Rate provided
is exclusive of the cost of stone boulders and sausage crate]
m
3
112.00 121 00
298 24 Labour for dismantling old wood work in bridges, culverts etc.
including taking out bolts, nuts, clamps, cleats etc. and stacking the
materials within 150m of site as directed by Engineer-in-
charge(measurements to be allowed on cubic contents of the wood)
m
3
217.00 220 00
298 25 Taking out stone slabs of kerb & channel of road side drain resetting to
correct line and level with cement mortar (1:4) including cement pointing
(1:2)
299 (a) Vertical kerb stone. m 24.60 26.20
299 (b) Flat channel stone m 21.00 22.40
299 26 Snowcem (or similar approved quality) decorative finish of approved shade two
coats after scraping the surface thoroughly on plastered or concrete surface
(Manufacturer's specification to be followed) upto any height.
m
2
28.00 29.00
299 27 Painting with acrylic exterior surface finish (Weather shield of ICI or
Snowcryl XT of Snowcem Paints or other similar approved product) on different
concrete surface of the bridge & culvert with different approved colours (two coats)
over a coat of Snowcemplus or other approved quality paints as per manufacturer's
specification including thorough cleaning of the surface complete as directed by the
Engineer-in-charge. Rate includes of total three coats of paints all complete
including supply, labour and necessary scaffolding etc.
m
2
78.00 79.00
299 28 Painting with Dekguard of Fosroc or other approved quality products on
different concrete surface of the bridge & culvert with different approved colours
(two coats) over a coat of primer of approved quality paint as per manufacturer's
specification including thorough cleaning of the surface complete as directed by the
Engineer-in-charge. Rate includes of total three coats of paints all complete
including supply, labour and necessary scaffolding etc. complete in costal area.
m
2
220.00 221.00
299 29 Labour for dagbelling 10cm to 15cm wide and 7cm to 10cm deep 'V shaped
including clearing jungles, circular marking (15cm dia) in every chainage and cost
of all tools and plants complete as per direction of Engineer-in-charg^e.
1000
metre
347.00 371.00
299 30 Pumping out water from ponds or tanks (Payment is to to be made on
quantity of water calculated on the basis of initial and final water level, no
consideration being made for any water that may have been added through
percolation or otherwise)
m
3
3.70 3.90
300 31 Providing and laying of Interlocking Concrete Block Pavements as per
drawing and Technical Specification Clause 1504 of MORD Specifications.
Page 197
Roads_I_181-216
300 (a) Using Concrete(M40) Blocks having thickness 80mm
300 (i) Cement / Grey Colour,
m
2
948.00 1003.00
300 (ii) Other colours.
m
2
1033.00 1089.00
300 (b) Using Concrete(M30) Blocks having thickness 60mm
300 (i) Cement / Grey Colour,
m
2
683.00 728.00
300 (ii) Other colours.
m
2
764.00 809.00
300 32 Providing and applying road markings over bituminous surface using
hot applied thermoplastic compound, 2.5 mm thick including
reflectorising glass beads @ 250gms per m
2
area, thickness of 2.5mm is
exclusive of surface applied glass beads as per IRC:35. The finished surface to be
level, uniform and free from streaks and holes. (Rate is inclusive of all materials,
labour, hire & usage charges of machinery and all incidental charges in this
connection)
m
2
371.00 371.00
301 1 Loading materials in to wagon including necessary carriage by head load
within a lead of 30 m.
-
301 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
48.00
301 (b) Steel materials. M 63.00
301 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
49.00
301 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
53.00
301 (e) Bricks, 1
0
0
0
122.00
301 (f) Stone Sets. 1
0
0
0
134.00
301 2 Unloading materials from railway wagon including necessary
carriage by head load within a lead of 30 m.
301 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
48.00
301 (b) Steel materials. M 63.00
301 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
49.00
301 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.

m
3
53.00
302 (a) Bricks. 1
0
0
0
122.00
302 (b) Stone Sets. 1
0
0
0
134.00
302 3 Loading in to trucks at the lifting point, unloading at destination, stacking
properly in go downs or yard etc. as directed including carriage by head load up to
a lead of 30 m at each of the two points.
The apportionment of cost may be
considered as follows: Loading : 40%
Unloading : 35% Stacking : 25%
302 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
MT 58.00 62.00
302 (b) Steel materials. MT 69.00 74.00
302 (c) Sand, Cinder, Lime, Moorum and similar materials. m
3
58.00 62.00
302 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
62.00 66.00
302 (e) Bricks. 1
0
0
0
144.00 154.00
302 (f) Sausage wire netting. 100 m
2
12.30 13.20
302 (g) Heavy sections of R.S. Joists 460 mm x 150 mm and above and steel
bars of 20 mm dia. or above and lengths exceeding 7.5 m.
MT 116.00 124.00
302 (h) Stone sets. 1
0
0
0
173.00 185.00
302 4 Labour for carriage by head load for each additional 30 m or part thereof
beyond the initial 30 m at the loading point or at unloading point, where the trucks
have no nearer access.
This item is payable only when the
Engineer-in-Charge at his discretion is
satisfied about the condition of
accessibility.
303 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
13.00 14.00
303 (b) Steel materials. M 21.00 22.00
303 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
19.00 21.00
303 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
23.00 25.00
303 (e) Bricks, 1
0
0
0
39.00 41.00
303 (f) Stone Sets. 1
0
0
0
41.00 44.00
Section 4.9 - Loading, Unloading & Stacking
The Contractor is required to bring
materials to the station when wagons are
available and stack the material at the
railway yard or station for loading, within
permissible time limit. The Contractor
shall be liable to pay any wharfage
demurrage that may have to be paid or
any transit arrangement that the
contractor may make to avoid such
The contractor is required to take delivery
of the materials immediately on arrival of
the wagon and to unload the wagon and
stack the same at the railway yard or
station for immediate removal to
destination and cleaning the railway yard
or destination within the permissible time
limit. The Contractor shall be liable to pay
any wharfage demurrage that may have
Page 198
Roads_I_181-216
303 5 Labour for unloading from truck and loading in to boat at ferry crossing
where loaded trucks are not allowed to be ferried across including carriage
by head load with necessary lead & lift.
303 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
39.00
303 (b) Steel materials. M 58.00
303 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
39.00
303 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
40.00
303 (e) Bricks, 1
0
0
0
81.00
303 (f) Stone Sets. 1
0
0
0
104.00
304 6 Labour for unloading from boat and loading in to truck at ferry crossing where
loaded trucks are not allowed to be ferried across including carriage by head load
with necessary lead & lift.
304 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
39.00
304 (b) Steel materials. M 58.00
304 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
39.00
304 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
40.00
304 (e) Bricks, 1
0
0
0
81.00
304 (f) Stone Sets. 1
0
0
0
104.00
304 7 Labour for loading into boat and unloading the same at the opposite bank
where loaded trucks are not allowed to be ferried across including carriage by
head load with necessary lead & lift.
-
304 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
39.00
304 (b) Steel materials. M 58.00
304 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
35.00
304 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
37.00
305 (e) Bricks, 1
0
0
0
81.00 -
305 (f) Stone Sets. 1
0
0
0
104.00
305 8 Labour for loading into boat and unloading the same and loading into truck at
the opposite bank or destination where loaded trucks are not allowed to be
ferried across including carriage by head load with necessary lead.
-
305 (a) Cement in bags, Tar or asphalt in drums and timber and similar
miscellaneous materials.
M
T
60.00
305 (b) Steel materials. M 85.00
305 (c) Sand, Cinder, Lime, Moorum, Stone dust and similar materials. m
3
39.00
305 (d) Brick-bats, Boulder, Stone materials, Slag materials, Stone
chips, Gravels and Shingles and similar materials.
m
3
40.00
305 (e) Bricks, 1
0
0
0
92.00
305 (f) Stone Sets. 1
0
0
0
127.00
305 9 Labour for loading RCC pipe into truck at the lifting point, unloading at
destination and stacking properly in go down or yard as directed including
carriage by head load, lead up to 30 m at each of the two points.
The apportionment of cost may be
considered as follows: Loading : 40%
Unloading : 35% Stacking : 25%
305 (a) Up to 600 mm diameter. m. 46.00 46.00
305 (b) Above 600 mm upto 900 mm diameter. m. 61.00 62.00
306 c) Above 900 mm and upto 1200 m. m. 79.00 80.00
306 10 Labour for carriage of RCC pipe manually for each additional lead of 30
m. or part thereof beyond the initial 30 m. lead at the loading or at the
unloading point.
The apportionment of cost may be
considered as foilows: Loading : 40%
Unloading : 35% Stacking 25%
306 (a) Up to 600 mm diameter,
306 (i) Over surfaced road. m. 6.70 6.70
306 (ii) Over Katcha track and track in river / nallah bed and choe bed. m. 16.20 16.20
306 (b) Above 600 mm upto 900 mm diameter,
306 (i) Over surfaced road. m. 9.40 9.40
306 (ii) Over Katcha track and track in river / nallah bed and choe bed. m. 22.60 22.60
306 (c) Above 900 mm and upto 1200 mm.
306 (i) Over surfaced road. m. 15.60 15.60
306 (ii) Over Katcha track and track in river / nallah bed and choe bed. m. 37.70 37.70
Page 199
Roads_I_181-216
306
ANNEXURE
TABLE I -1 : ISSUE RATES OF CEMENT & STEEL MATERIALS
Item
No.
Description of Items Issue Rate (Supplied by Department) Basic Price
(Supplied by
Contractor)
Remarks
315 1 2 3 4 5 6
315 1 Cement: MT 5500.00 -
315 2 Steel materials:
315 (i) Mild Steel rods.: MT 46750.00 42550.00
315 (ii) Tor Steel rods/HYSD bars/TMT bars. MT 46750.00 42550.00
315 (iii) TISCON-CRS 42 or any other approved brand. MT 51400.00 46900.00
315 (iv) Strands TATA SSL/USHA Martin or any other approved brand. MT 81450.00 74950.00
315 (v) Steel plates:
315 (a) 6-10 mm. MT 41410.00
315 (b) 10-20 mm. MT 43670.00
315 (c) 25 - 40 mm. MT 45490.00
315 (vi) Structural steel (MS) angles, joists, channels, flats etc.
315 (a) up to 200mm size. MT 42790.00 38840.00
315 (b) above 200mm and up to 400 mm size. MT 51760.00 48220.00
315 (c) Above 400 mm size. MT 54940.00
315
(2) For Sub-items of Item No. 2, the
Basic Prices, exclusive of contractor's
profit are given in column 5. To arrive at
the complete rate, actual carriage cost
from source to site and contractor's profit
are to be added with the Basic Prices.
(3) In calculating the carriage cost the
source of the materials under item No. 2
may be considered at Durgapur or
atKolkata.
(1) Rates furnished in column - 4 for item
1 & 2are the Issue Rates of the materials
at Departmental Stack yards / Godowns.
In case of misuse or loss of the materials
from the Contractor's custody, the cost is
to be recovered from the Contractor's bill
or other dues as specified in P. W.
Department Order No. 2809 (3)-A dated
24.07.1971.
Page 200
Roads_I_217-232
Page
No.
Sl.
No.
Description of Items
U
n
i
t
K
o
l
k
a
t
a

2
4

P
a
r
g
a
n
a
s

(
N

&

S
)
B
u
r
d
w
a
n
P
u
r
u
i
i
a
B
i
r
b
h
u
m
H
o
w
r
a
h

/

H
o
o
g
l
y
E
a
s
t

M
i
d
n
a
p
u
r
W
e
s
t

M
i
d
n
a
p
u
r
B
a
n
k
u
r
a
N
a
d
i
a
M
u
r
s
h
i
d
a
b
a
d
M
a
l
d
a
h
J
a
l
p
a
i
g
u
r
i

/

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
d
i
v
i
s
i
o
n
/

C
o
o
c
h
b
e
h
a
r

e
x
c
l
u
d
i
n
g

H
a
i
d
i
b
a
r
i

P
.
S
.
N

&

S

D
i
n
a
j
p
u
r
D
a
r
j
e
e
l
i
n
g

e
x
c
l
u
d
i
n
g

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
Remarks
217 23 First class brick work in cement sand mortaT in steining
of well, pier, abutment, wing wall, parapets cross
drain. HP. culverts, guard wall etc. including curing,
scaffolding, raking out joints etc. complete including cost
and carriage of all materials
217 (a) In 1:3 proportion. m
3
3910.00 3487.00 3370.00 3357.00 3811.00 3525.00 3472.00 3416.00 3515.00 3461.00 3469.00 3461.00 3469.00 3525.00 4144.00
217 (b) In 1:4 proportion. m
3
3698.00 3271.00 3153.00 3140.00 3600.00 3310.00 3257.00 3199.00 3300.00 3245.00 3256.00 3245.00 3256.00 3309.00 3932.00
217 (c) In 1:6 proportion. m
3
3441.00 3014.00 2896.00 2882.00 3342.00 3052.00 2999.00 2941.00 3043.00 2988.00 2998.00 2988.00 2998.00 3051.00 3674.00
217 24 Extra labour for First Class brick work in arches
including hire charges of shuttering.
217 (a) Up to 1.5 m span. m
3
97.00 86.00 80.00 82.00 94.00 95.00 95.00 82.00 85.00 87.00 90.00 90.00 90.00 86.00 124.00
217 (b) Up to 4.5 m span. m
3
0.11 *1Q1 94.00 96.00 110.00 111.00 111.00 96.00 100.00 101.00 105.00 105.00 105.00 101.00 145.00
217 (c) Up to 6.0 m span. m
3
133.00 118.00 110.00 112.00 129.00 130.00 130.00 113.00 117.00 119.00 123.00 123.00 123.00 118.00 170.00
217 25 Plaster with sand and cement mortar including
rounding off comers or chamfering corners as
directed and including raking out joints or roughening of
concrete surface, curing with cost and carriage of all
materials.
218 (a) With 4:1 cement mortar.
218 (i) 10 mmthick plaster. m
2
59.00 53.30 62.40 51.90 58.70 54.70 54.50 52.40 54.40 54.00 56.10 54.00 56.10 53.60 59.70
218 (ii) 15 mmthick plaster. m
2
70.40 63.60 68.40 61.80 70.10 65.30 65.00 62.40 64.90 64.40 66.90 64.40 66.90 66.80 71.30
218 (iii) 20 mmthick plaster. m
2
92.30 82.10 80.40 79.50 91.80 84.70 84.20 80.40 84.00 82.40 87.10 82.40 87.10 82.50 92.60
218 (b) With 6:1 cement mortar:
218 (i) 15 mmthick plaster. m
2
66.90 58.50 57.00 56.30 66.50 60.30 60.20 57.00 60.10 59.60 62.60 59.60 62.60 58.80 67.50
218 (ii) 20 mmthick plaster. m
2
80.70 69.50 67.50 66.50 80.10 72.30 71.70 67.50 71.60 70.90 74.90 70.90 74.90 69.90 80.90
218 26 Rule pointing to brick work in sand and cement mortar (3:1)
including raking out joints, curing and cost and carriane of
all material.
m
2
57.50 55.80 55.50 55.30 57.40 56.20 56.10 55.50 56.10 56.00 56.60 56.00 56.60 55.80 58.50
219 27 Neat cement punning on cement plaster surface. m
2
29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 29.80 31.00
219 28 String course up to 75mm. projection and up to 150mm.
depth cement plastered (4:1) (including stripping off old
surface where necessary) complete.
m 71.40 63.30 61.40 60.90 70.10 64.50 63.70 61.90 64.20 63.30 64.60 63.30 64.60 63.80 74.20
219 29 Supplying, fitting & fixing pre-cast neat cement finished R.C.
Handrails as per drawing and specification with concrete mix
in M-30 Grade concrete with excellent concrete finish with
casting on a vibratory platform with proper cover as per
direction of Engineer-in-Charge including cost of
219 (a) Having cross sectional area less than 200 cm2 m 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 325.00 343.00
219 (b) Having cross sectional area more than 200 cm2. m 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 397.00 424.00
220 30 Providing & laying cement concrete, with or without
reinforcements, in any part of foundation / sub-structure
/super-structure or bridges/culverts with graded stone
chips/gravel/bajree of specified nominal sizes, including
screening and cleaning of coarse aggregates and sand, cost
of curing with water, including cost and carriage of all
materials but excluding cost of formwork and reinforcement
works complete.
220 (a) 1:1.5:3 concrete. m
3
3260.00 3102.00 3005.00 2997.00 3236.00 3102.00 3093.00 3007.00 3122.00 3050.00 3126.00 3074.00 3122.00 3188.00 3219.00
220 [b). 1:2 :4 concrete. m
3
2672.00 2459.00 2421.00 2403.00 2661.00 2512.00 2501.00 2421.00 2499.00 2485.00 2563.00 2485.00 2563.00 2467.00 2658.00
220 (c) 1:3:6 concrete. m
3
2112.00 1903.00 1866.00 1848.00 2101.00 1955.00 1945.00 1866.00 1942.00 1929.00 2005.00 1929.00 2005.00 1911.00 2099.00
220 (d) 1:4:8 concrete. m
3
1802.00 1593.00 1556.00 1537.00 1795.00 1643.00 1626.00 1556.00 1633.00 1620.00 1697.00 1620.00 1697.00 1601.00 1792.00
Note-1 Construction wing is to add cost and carriage of coarse
aggregates only to arrive at consolidated rate.
Note-2 :While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
agregates intended to be used should be selected and
mentioned in the item.
221 31 Providing and laying cement concrete wearing course, with or
without reinforcement for average thickness 8.5 cm, with
graded stone chips 19mm down including screening and
cleaning approved stone chips and sand as necessary laying,
finishing complete to camber and grade, curing with water,
including cost and carriage of all materials and hire charges
for form work and including cost and carriage of stone
materials but excluding the cost of reinforcement works.
221 (a) With 1:11/2:3 concrete. m
2
385.00 362.00 368.00 345.00 383.00 381.00 387.00 387.00 374.00 382.00 356.00 376.00 391.00 369.00 437.00
221 (b) With M-30 Grade concrete (Design Mix) m
2
406.00 382.00 389.00 364.00 404.00 402.00 409.00 408.00 395.00 303.00 373.00 397.00 413.00 390.00 461.00
222 32 Providing and laying Design Mix concrete for reinforced
concrete work in any part of bridge (excluding bottom
plugging) with coarse aggregates of appropriate nominal size
and grading, fine aggregate (sand) conforming to proper
grading zone, both of approved quality and cement, as
necessary, including labour, cost and carriage of all materials
and including preparation of design mix, approval of the same
by the Engineer-in-Charge and cost for quality control,
sampling, testing etc. all complete but excluding cost of
labour and materials for formwork & reinforcement works.
222 (a) M-15 Grade using concrete mixer. m
3
2852.00 2687.00 2585.00 2577.00 2827.00 2687.00 2677.00 2587.00 2707.00 2632.00 2712.00 2657.00 2707.00 2787.00 2803.00
222 (b) M-20 Grade:
222 (i) Using concrete mixer. m
3
3082.00 2917.00 2815.00 2807.00 3057.00 2917.00 2907.00 2817.00 2937.00 2862.00 2942.00 2887.00 2937.00 3007.00 3033.00
223 (ii) Using Batching Plant, Transit Mixer & Concrete Pump. m
3
2935.00 2770.00 2668.00 2661.00 2910.00 2770.00 2760.00 2671.00 2790.00 2715.00 2795.00 2740.00 2790.00 2860.00 2874.00
223 c) M 25 Grade:
223 (i) Using concrete mixer. m
3
3424.00 3259.00 3156.00 3149.00 3399.00 3259.00 3249.00 3159.00 3279.00 3204.00 3284.00 3229.00 3279.00 3349.00 3374.00
223 (ii) Using Batching Plant, Transit Mixer & Concrete Pump. m
3
3277.00 3112.00 3010.00 3002.00 3252.00 3112.00 3102.00 3012.00 3132.00 3057.00 3137.00 3082.00 3132.00 3202.00 3216.00
223 d) M 30 Grade:
223 (i) Using concrete mixer. m
3
3453.00 3288.00 3185.00 3178.00 3428.00 3288.00 3278.00 3188.00 3308.00 3232.00 3313.00 3258.00 3308.00 3378.00 3404.00
223 (ii) Using Batching Plant, Transit Mixer & Concrete Pump. m
3
3298.00 3134.00 3031.00 3024.00 3274.00 3134.00 3124.00 3034.00 3154.00 3079.00 3159.00 3104.00 3154.00 3224.00 3238.00
223 e) M 35 Grade:
223 (i) Using concrete mixer. m
3
3546.00 3381.00 3279.00 3271.00 3531.00 3381.00 3371.00 3281.00 3401.00 3326.00 3406.00 3351.00 3401.00 3471.00 3498.00
223 (ii) Using Batching Plant, Transit Mixer & Concrete Pump. m
3
3392.00 3227.00 3125.00 3117.00 3367.00 3227.00 3217.00 3137.00 3247.00 3172.00 3252.00 3197.00 3247.00 3317.00 3331.00
224 Note-1 Construction wing is to add cost and carriage of
coarse aggregates only to arrive at consolidated rate.
224 Note-2 :While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
agregates intended to be used should be selected and
mentioned in the item.
224 Note-3: From durability consideration, the value of
minimum cement content and maximum water cement ratio to
be considered in the mix design shall be as per the direction
of the Engineer-in-Charge.
224 33 Providing and laying Design Mix concrete for reinforced
concrete work with coarse aggregates of appropriate nominal
size and grading, fine aggregate (sand) conforming to proper
grading zone, both of approved quality,cement and
admixtures, as necessary of all approved quality, including
labour, cost and carriage of all materials and including
preparation of design mix, approval of the same by the
Engineer-in-Charge and cost for quality control, sampling,
testing etc. all complete but excluding cost of labour and
materials for formwork & reinforcement works.
225 a) M 40 Grade:
Section 4.4 - Bridge & Culvert Works
Page 201
Roads_I_217-232
225 (i) Using concrete mixer. m
3
3705.00 3540.00 3437.00 3430.00 3680.00 3540.00 3530.00 3440.00 3560.00 3485.00 3565.00 3510.00 3560.00 3630.00 3657.00
225 (ii) Using Batching Plant, Transit Mixer & Concrete Pump. m
3
3539.00 3374.00 3272.00 3264.00 3514.00 3374.00 3364.00 3274.00 3294.00 3319.00 3399.00 3344.00 3394.00 3464.00 3479.00
225 b) M 45 Grade: Using Batching Plant, Transit Mixer &
Concrete Pump.
m
3
3761.00 3591.00 3489.00 3481.00 3731.00 3591.00 3581.00 3491.00 3611.00 3536.00 3616.00 3561.00 3611.00 3681.00 3695.00
225 c) M 50 Grade: Using Batching Plant, Transit Mixer &
Concrete Pump.
m
3
3919.00 3749.00 3647.00 3639.00 3889.00 3749.00 3739.00 3649.00 3769.00 3694.00 3774.00 3719.00 3769.00 3839.00 3853.00
226 d) M 55 Grade: Using Batching Plant, Transit Mixer &
Concrete Pump.
m
3
4167.00 3997.00 3895.00 3887.00 4137.00 3997.00 3987.00 3987.00 4017.00 3942.00 4022.00 3967.00 4017.00 4087.00 4101.00
226 Note-1 Construction wing is to add cost and carriage of
coarse aggregates only to arrive at consolidated rate.
226 Note-2 :While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
agregates intended to be used should be selected and
mentioned in the item.
226 Note-3: From durability consideration, the value of
minimum cement content and maximum water cement ratio
to be considered in the mix design shall be 400 Kg/cu.m and
0.4 respectively.
226 34 Labour for adding and mixing superplastisizer in concrete as
per manufacturer's specification and direction of Engineer-in-
Charge. The rate is exclusive of cost of superplastisizer.
m
3
6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00
227 35 Providing and laying Design Mix concrete for reinforced
concrete in bottom plug with tremie pipe method using graded
stone chips/ gravels/ bajree, with approved sizes, including
cleaning and screening of aggregates and coarse sand with
cost and carriage of all materials and including using
appropriate quantity of admixteures. The slump of concrete
should be about 150 mm.
227 (a) With Concrete grade M - 20 m
3
3489.00 3324.00 3222.00 3215.00 3464.00 3324.00 3314.00 3225.00 3344.00 3269.00 3349.00 3294.00 3344.00 3414.00 3440.00
227 (b) With Concrete grade M - 25 m
3
3679.00 3515.00 3412.00 3405.00 3654.00 3515.00 3505.00 3415.00 3535.00 3460.00 3540.00 3485.00 3525.00 3604.00 3630.00
227 Note-1 Construction wing is to add cost and carriage of
coarse aggregates only to arrive at consolidated rate.
227 Note-2 :While actually providing the item in estimate or
agreement of work, maximum nominal size of coarse
agregates intended to be used should be selected and
mentioned in the item.
228 Note-3: From durability consideration, the value of
minimum cement content and maximum water cement ratio
to be considered in the mix design shall be 400 Kg/cu.m and
0.4 respectively.
228 36 Supplying Sal-bullah piles at work site, including dressing
and making one end pointed.
228 (a) 10 cm. diameter pile. 133.00 126.00 126.00 127.00 140.00
228 (b) 12.5 cm. diameter pile. 185.00 182.00 182.00 182.00 183.00
228 (c) 15 cm. diameter pile. 291.00 286.00 286.00 286.00 293.00
228 (d) 17.5cm dtemetBr pile. 419.00 394.00 394.00 394.00 397.00
228 (e) 20 cm. diameter pile. 615.00 598.00 598.00 598.00 610.00
228 (f) 22.5 cm diameter pile. 774.00 751.00 751.00 751.00 767.00
228 (g) 25 cm. diameter pile, 992.00 961.00 961.00 961.00 984.00
228 (h) 28 cm. diameter pile, 1183.00 1152.00 1152.00 1152.00 1180.00
228 (i) 30 cm. diameter pile. 1452.00 1401.00 1401.00 1401.00 1416.00
(Diameter-of pile to be measured at a distance of 1.5m from
the thicker end.)
229 37 Supplying Eucalyptus-bullah piles at work site,including
dressing and making one end pointed.
229 (a) 10 cm. diameter pile. m 56.00 50.00 43.00 50.00 55.00 43.00 43.00 43.00 55.00 55.00 50.00 50.00 50.00 50.00
229 (b) 12.5 cm. diameter pile. m 83.00 72.00 70.00 73.00 78.00 70.00 70.00 70.00 78.00 78.00 73.00 73.00 73.00 73.00
229 (c) 15 cm. diameter pile. m 124.00 116.00 102.00 109.00 119.00 102.00 102.00 102.00 119.00 119.00 116.00 116.00 116.00 116.00
229 (d) 17.5 cm diameter pile. m 188.00 182.00 168.00 182.00 184.00 168.00 168.00 168.00 184.00 184.00 174.00 174.00 174.00 174.00
229 (e) 20 cm. diameter pile. m 262.00 247.00 233.00 247.00 259.00 233.00 233.00 233.00 259.00 259.00 247.00 247.00 247.00 247.00
229 (f) 22.5 cm diameter pile. m 290.00 276.00 269.00 276.00 284.00 269.00 269.00 269.00 284.00 284.00 276.00 276.00 276.00 276.00
229 (g) 22.5 cm diameter pile. (Diameter of pile to be m 364.00 334.00 328.00 334.00 348.00 328.00 328.00 328.00 348.00 348.00 319.00 319.00 319.00 319.00
229 (Diameter-of pile to be measured at a distance of 1.5m from
the thicker end.)
229 38 Flushing the joints (at least 4 cm depth) in the top surface
of . boulders with cement concrete 1: 3: 6 and/or cement
mortar 1: 6 as necessary including raking out and clearing
the joints.
m
2
32.30 31.60 31.40 31.50 32.30 31.80 31.80 31.40 31.60 31.40 31.40 31.40 31.40 31.40 33.50
229 39 Providing and laying M-15 grade concrete blocks of size 500
mm x 500 mm x 150 mm in pitching, flooring complete as per
drawing and
m
2
647.00 605.00 616.00 574.00 643.00 639.00 651.00 650.00 626.00 640.00 594.00 631.00 658.00 618.00 543.00
230
MoRT&H Specification for Road & Bridge Works (4
th
Rev.)
and direction of Engineer-In-Charge including cost of carriage
of all materials complete.
230 40 Brick pitching with 25 cm thick standard I shaped brick
blocks withfirst class kiln burnt bricks, set in ceme nt mortar
1:4 at apron or side slopes over a layer of brick flat soing,
including earth cutting, preparation of bed with levelling and
dressing top surface flush cement pointed with 1:4 cement
mortar including cost of all materials complete.
m
2
1254.00 1126.00 989.00 1026.00 1226.00 1064.00 1083.00 1026.00 1093.00 1045.00 1026.00 1083.00 1083.00 1045.00 1026.00
230 41 Supplying pre-cast R.C.C bell-mouths, cast in 1:2:4 mix with
stone chips as coarse aggregates and fitting and fixing the
same to the end of R.C.C. Spun pipe culverts as per
departmental drawing no. 63T(A/AA) 13/2B 1083/D-1.
231 (a) Diameter above 600 mm and upto 900 mm Nos. 1706.00 1597.00 1568.00 1576.00 1670.00 1592.00 1699.00 1568 1677.00 1619.00 1641.00 1532.00 1532.00 1677.00 1568.00
231 b) Diameter up to 600 mm. Nos. 1300.00 1198.00 1183.00 1191.00 1267.00 1278.00 1278.00 1183 1263.00 1234.00 1249.00 1169.00 1169.00 1263.00 1186.00
231 42 Rubble masonry in cement mortar with hard, dressed stones
from approved quarries and clean washed coarse sand
including cost and carriage of all materials to site (in road and
jhora works).
231 a) With cement-sand mortar 1:6
231 I) Random m
3
892.00 899.00 492.00 905.00 905.00 962.00
231 ii) Coursed m
3
956.00 962.00 956.00 962.00 962.00 1025.00
231 iii) Square and coursed m
3
968.00 975.00 968.00 987.00 987.00 1057.00
231 b) With cement-sand mortar 1:5
231 I) Random m
3
987.00 994.00 987.00 994.00 994.00 1019.00
231 ii) Coursed m
3
1044.00 1057.00 1044.00 1057.00 1057.00 1082.00
231 iii) Square and coursed m
3
1057.00 1063.00 1057.00 1063.00 1063.00 1133.00
232 (c) With cement-sand mortar 1:4
232 (i) Random. m
3
1127.00 1133.00 1127.00 1133.00 1133.00 1197.00
232 (ii) Coursed. m
3
1184.00 1197.00 1184.00 1197.00 1197.00 1255.00
232 (iii) Squared & coursed. m
3
1191.00 1203.00 1191.00 1006.00 975.00 1203.00 1203.00 1261.00
232 Note:Construction wing is to add cost and carriage of
coarse aggregates only to arrive at consolidated rate.
1203.00 1178.00
232 43 Masonry work with rough dressed laterite stones of size as
directed with cement mortar, true to line, level and shape,
including dressing and shaping boulders to size as required,
curing complete including cost and carriage of all materials
complete.
232 (a) With cement-sand mortar 1:6 m
3
943.00 962.00 975.00 968.00 968.00 962.00
232 (b) With cement-sand mortar 1:4 m
3
1184.00 1171.00 1184.00 1197.00 1197.00 1171.00
Note: Construction wing is to add cost and caniage of 1.21
cu.m. of laterite only to arrive at consolidated rate.
Page 202
Roads_I_287-294
Page
No.
Sl.
No.
Description of Items
U
n
i
t
K
o
l
k
a
t
a

2
4

P
a
r
g
a
n
a
s

(
N

&

S
)
B
u
r
d
w
a
n
P
u
r
u
i
i
a
B
i
r
b
h
u
m
H
o
w
r
a
h

/

H
o
o
g
l
y
E
a
s
t

M
i
d
n
a
p
u
r
W
e
s
t

M
i
d
n
a
p
u
r
B
a
n
k
u
r
a
N
a
d
i
a
M
u
r
s
h
i
d
a
b
a
d
M
a
l
d
a
h
J
a
l
p
a
i
g
u
r
i

/

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
d
i
v
i
s
i
o
n
/

H
a
l
d
i
b
a
r
i

P
.
S
.
C
o
o
c
h
b
e
h
a
r

e
x
c
l
u
d
i
n
g

H
a
i
d
i
b
a
r
i

P
.
S
.
N

&

S

D
i
n
a
j
p
u
r
D
a
r
j
e
e
l
i
n
g

e
x
c
l
u
d
i
n
g

p
l
a
i
n
s

o
f

S
i
l
i
g
u
r
i

S
u
b
-
d
i
v
i
s
i
o
n
287 1 Supplying fitting and fixing R.C guard post 1.37m
long wit cs.1:2;4 with gradid stone chips of
13,2mm down casting , caring corripJete including
cost of 'providing 4nos.of 12mm dia, rod of length
1.14m as main reinforcement and 6 nos, of
round shaped 8mm dia rods used as binders; the
placing of the first binder should be at 75mm
below the top finished surface and the other 5 nos
of binders should be placed at 245mm c/c ; the
guard post is of octagonal section with inscribed
circle of dia 24cm at the base tappering to
corresponding dimensions of 16cm at the top
including two coats of painting with best quality
synthetic enamel paint of approved make and
grade to form 6 nos. horizontal alternate bands in
whfte/tanery yellow and black to 90 cm length
standingjp above ground after mending good
damages if any during striking off shuttering,
making hole in ground of 47cm depth and
30cm minimum dia, fixing the guard posts in the
same holes and-repacking the earth properly so
as to keep the guard posts standing properly erect
in correct position true to line and length
including carriage of R. C. Guard Po'st with due
care to the 'site including loading into the truck
and unloading at site complete in all respect.
Each 968.00 953.00 945.00 940.00 968.00 966.00 970.00 943.00 961.00 968.00 953.00 934.00 937.00 954.00 964.00
288 2 Supplying, fitting and fixing rectangular R.C.
200 m post of size 65cm x 15cm x 10cm with
cement concrete 1:2:4 with graded stone chips of
13.2mm down including cost of providing 2 nos. of
inverted U-shaped 6mm dia M.S. rods of length
1.40mand 5 nos. of 6mm dia M.S. binders
Each 387.00 371.00 363.00 358.00 387.00 382.00 390.00 361.00 380.00 385.00 371.00 351.00 354.00 373.00 375.00
289 3 Supplying, fitting and fixing 5
th
KM post / KM post
as per standard drawing enumerated in IRC: 8-
1080 (for type designs for Highway Kilometre
stone) with cement concrete 1:2:4 with chips of
size 26,5mm down in correct position true to line
and level with 60cm embedment into the ground
after making hole into the ground of section 15cm
more on all sides of the post and repacking the
with 1:4:8 cement concrete with stone chips with
two coats of painting on the exposed portion of the
post with best quality synthetic enamel paint of
approved make and brand of different shades as
directed complete in all respect including carriage
of the post to the site with loading & unloading
and printing of letters and numbers.
290 (a) 5th Kilometer Post: Each 2429.00 2297.00 2229.00 2186.00 2425.00 2413.00 2446.00 2211.00 2364.00 2429.00 2299.00 2129.00 2160.00 2308.00 2317
290 (b) Ordinary Kilometer Post. Each 1892.00 -1761.00 1692.00 1649.00 1888.00 1887.00 1909.00 1674.00 1828.00 1892.00 1762.00 1592.00 1623.00 1781.00 1767.00
290 4 Supply fitting and fixing boundary pillars as per
type design IRC-25 1969 with cement concrete
1:2:4 with stone chips including cost of providing 2
nos. of 6 mm dia M.S. rods of length 1.84 m in the
form of inverted U-Sape as main reinforcements
placed crosswise to each other and 5 nos. of
round shaped 6 mm dia M.S. rods used as
binders; the placing of 1st binder should be at
75mm below the top finished surface and the other
4 nos of binders should be placed at 1.85 mmC/C
and to be of 90 cms. long with 20cm dia at the
base tapering to 15cm dia at the top with head
properly round and sunk inscriptions (as directed)
at the side with 60cm embedment into the ground
after making hole in the ground of size 50cm x
50cm x 75cm and repacking the hole properly with
cement cone. 1:4:8 with stone chips and finishing
the exposed portion of 30cm length with white
wash & painting the inscription as directed
including carriage of the post to the site with
loading & unloading etc. complete in all respect.
Each 881.00 816.00 781.00 760.00 879.00 874.00 891.00 772.00 850.00 882.00 816.00 730.00 745.00 821.00 815.00
291 5 Brick pavement with 1st class / picked jhama
bricks (as per direction of Engineer in charge)
with joints set closed in cement mortar 1:6
including preparation of bed by cutting or filling
with ramming the filled up earth to the same profile
as that of the finished pavement. Rate is inclusive
of cost of supply of all materials, labour and all
incidental charges in this connection,
292 (a) When laid with a cushion of sand below
including cost thereof:
292 (i) One brick flat pavement. m
2
261.00 223.00 213.00 212.00 254.00 228' 224.00 217.00 222.00 226.00 226.00 222.00 226.00 226.00 277.00
292 (ii) One brick on edge pavement. m
2
382.00 331.00 317.00 315.00 371.00 333.00 330.00 322.00 328.00 330.00 330.00 328.00 330.00 336.00 409.00
292 (iii) One brick on edge pavement laid in herring
bone bond pattern.
m
2
393.00 341.00 327.00 326.00 381.00 346.00 340.00 333.00 339.00 341.00 341.00 339.00 341.00 346.00 419.00
292 (b) When laid in cement mortar (1:6) on the under
side as well.
292 (i) One brick flat pavement. m
2
294.00 255.00 245.00 243.00 287.00 260.00 256.00 248.00 254.00 258.00 258.00 254.00 258.00 258.00 310.00
292 (ii) One brick on edge pavement. m
2
416.00 365.00 350.00 348.00 405.00 369.00 363.00 355.00 362.00 364.00 364.00 362.00 364.00 369.00 443.00
292 (iii) One brick on edge pavement laid in herring
bone bond pattern.
m
2
430.00 377.00 363.00 362.00 418.00 384.00 376.00 369.00 375.00 377.00 377.00 375.00 377.00 382.00 457.00
293 6 Drum sheet walling 1.40m (av) high on Sal /
Eucalyptus bullah piling 10 cm dia and 3.25m long
driven 1.75m (av) below G.L. and 75cm centre to
centre including fitting fixing 3 nos. of half bullah
pieces (from 10 cm dia) and drum(empty bitumen)
sheet (approved condition) of height 1.5m , cutting
and straightening drum sheet (each joint must
have lap length of min.50mm) including cost of
necessary nails, bolts, nuts etc and providing 2 to
3m long half bullah ties of 10cm dia @ 2.25 m
centre to centre fixed with 10 cm dia bullah posts
driven 1.5m below G.L. including cost of all
materials and one coat of coal tarring to all bullah
etc complete as per direction.
m
293 (a) Using eucalyptus bullah 869.00 802.00 749.00 802.00 839.00 749.00 749.00 749.00 839.00 839.00
293 (b) Using sal bullah 1425.00 1373.00 1373.00 1380.00
Section 4.8 - Miscellaneous Works
Page 203
Roads_I_287-294
294 7 Construction of cement concrete kerb with top and
bottom width 115 and 165 mm respectively, 250
mm high in M 20 grade PCC on M 10 grade
foundation 150 mm thick, foundation having 50
mm projection beyond kerb stone, kerb stone laid
with kerb laying machine, foundation concrete laid
manually, all complete as per Clause 408 of
MORT&H's specification.(Rate is inclusive of cost
of all materials, labour, hire & usage charges of
machinery and all .incidental charges in this
connection)
m 454.00 415.00 383.00 370.00 450.00 449.00 461.00 377.00 436.00 451.00 405.00 387.00 393.00 430.00 437.00
Item No. 8 to 32
Page 204
Roads_II
Page
No.
Item
No.
Description of Items Unit Zone Up to
1km.
Above
1km up to
2 km
Above 2
km . up
to 3 km
Above 3
km up to
4 km
Above 4
km up to
5 km
Above 5
km up to
10 km
Above 10
km up to
20 km
Above 20
km up to
50 km
Above 50
km up to
100 km
Above
100 km
up to 200
km
Above
200 km
308 A 61.00 74.00 86.00 98.00 110.00 11.00 per km 10.00 per km 9.80 per km 9.50 per km
B 91.00 108.00 133.00 151.00 172.00 16.50 per km 15.00 per km 14.70 per
km
14.25 per
km
308 A 5.90 per km. 5.80 per km 5.50 per km 5.10 r per
km'
B 8.85 per km 8.70 per km 8.25 per km 7.65 per km
308 A 6.20 per km 6.00 per km 5.80 per km 5.60 per km
B 9.30 per km 9.00 per km 8.70. per
km
8.40 per km
308 A 10.00 /km 9.20 /km 9.00 /km 8.70 /km
B 15.00 /km 13.80 /km 13.50 /km 13.05 /km
308 A 10.00 /km 9.20 /km 9.00. /km 8.70-/km
B 15.00 /km 13.80 /km 13.50 /km 13.05 /km
308 A 24.50 /km 23.00 /km 22.00 /km 21.30 /km
B 36.75 /km 34.50 /km 33.00 /km 31.95 /km
309 A 4.00 /km 3.90 /km 3.80 /km 3.70 /km
B 6.00 /km 5.85 /km 5.70 /km 5.55 /km
309 A 5.00 /km 4.90 /km 4.80 /km 4.60 /km
B 7.50 /km
7
7.35 /km 7.00 /km 6.90 /km
309 A 11.00
/km
9.80 /km 9.70 /km 9.30 /km
B 16.50
/km
14.70
/km
14.55 /km 13.95 km
309 A 9.00 /km 8.10 /km 8.00 /km 7.70 /km
B 13.50
/km
12.15
/km
12.00 /km 11.55 /km
309 A 4.30 per km 4.00 per km
B 6.45 per km 6.00 per km
310 A 2.00
B 4.70
310 A 6.00
B 10.00
310 A
B
310 A
B
310 A
B
310 A
B
311 A
B
311 A
B
311 A
B
CARRIAGE BY VAN RICKSAW INCLUDING LOADING, UNLOADING & STACKING (AS NECESSARY)
(This item is applicable for Zone - A only when carriage by truck/ tipper is not feasible)
Ite
m
No
Description of Items Unit
311 20 (a) Carriage of Brick-bats, Jhama
metal, stone materials, Moorum and
similar materials.
m
3
311 (b) Carriage of Bricks. 1000
nos.-
311 (c) Carriage of Bitumen, cement &
steel materials.
MT
P.W. (Roads) Directorate
119.00 Rs. 22.50 per km Rs. 14.50 per km
32.00 Rs. 5.50 per km Rs. 3.50 per km
Distance not exceeding 2 kms. Distance exceeding 2 kms but not exceeding 5
kms (per km or part thereof)
Distance exceeding 5 kms but not exceeding 10 kms
(per km or part thereof)
44.00 Rs. 8.00 per km Rs. 5.00 per km
19 Carriage of Miller Mixer over pucca
road including loading, unloading &
stacking.
Each 47.00
90.00
20 Carriage of Concrete Mixer over pucca
road including loading, unloading &
stacking.
Each 31.00
56.00
17 Carriage of Hand Mixing drums with
stands (detachable) over pucca roa.
Each 12.00
28.50
18 Carriage of Hand Mixing drums with
stands (fixed with drum) over pucca
road.
Each 16.00
37.50
15 Carriage of Hand Roller over pucca
road including loading & unloading for
weight of roller above 3 tonne
Each 31.00/km
56.00/km
16 Carriage of Tar Boiler including loading,
unloading and carriage by truck over
pucca road.
Each 31.00/km
56,00/km
13 Carriage of Boundary Pillar, R.C Guard
posts, Km Posts etc. from godown or
stackyard to work site, including
loading, unloading as per direction.
Each Rs. 2.00 /km
Rs. 3.70/km
14 Carriage of Hand Roller over pucca
rdad including loading & unloading for
weight of roller upto 3 tonne.
Each 24.00/km
44.00/km
11 Carriage of Bitumen in bulk in insulated
tanks from refinery to work site
including loading, unloading the same
at hot mix plant/ bitumen storage tanks /
empty bitumen dums / tar boiler as per
direction of the Engineer - in - Charge
at specified temperature including
necessary heating arrangements during
transfer & transit with all incidental
MT 468.00
866.00
12 Collecting & carrying empty tar or
bitumen drums, including loading,
unloading & stacking complete.
Each Rs. 1.00 per km.
Rs. 1.80 per km
10 Carriage of Sausage wire netting over
pucca road.
1000
m
2
70.00 7.10/km
135.80 10.65/km
9 Carriage of RCC pipes and collars upto
1200 mm diameter over pucca road.
m. 84.00 8.60 /km
144.00 12.90/km
8 Carriage of RCC pipes and collars upto
900 mm diameter over pucca road.
m. 42.00 4.30/km
78.00 6.45/km
7 Carriage of RCC pipes and collars upto
600 mm diameter over pucca road.
m. 34.00 3.40 /km
68.00 5.10/km
6 Carriage of Brick over pucca road. 1000
nos.
242.00 19.20/km
464.00 . 28.80/km
5 Carriage of Brick-bat, Boulder, Stone
metal, Stone chips, gravel, slag metal,
Shingle, stone set and similar
miscellaneous mateTTals over pucca
road.
Rs. per
m
3
79.00 8.00/km
124.00 12.00/km
4 Carriage of Sand, Cinder, Soorkey,
Lime, Moorum and similar
miscellaneous materials over pucca road.
Rs. per
m
3
.
79.00 8.00 /km
124.00 12.00/km
3 Carriage of steel materials over pucca
road.
Rs. per
MT
85.00 5.10 per km
110.00 7.65 per km
2 Carriage of Cement (in bags), tar or
asphalt (in drums), timber and similar
miscellaneous materials over pucca road.
Rs. per
MT
68.00 4.60 per km
96.00 6.90 per km
Section 4.10 - Road Transportation &
Carriage works
1 Carriage of Earth over pucca road.
m
3
8.70 per km
13.05 per km
Page 205
Roads_II
Schedule of Rates : 2008-2009
CARRIAGE BY BOAT INCLUDING LOADING, UNLOADING & STACKING (AS NECESSARY)
(This item is applicable for Zone - A only when tarriage by road by any nieans is not feasible)
Section 4.10
Road Transportation & Carriage works
Ite
m
No
Description of Items Unit
312 (a) Carriage of Stone materials,
Sand, Brick bats and similar materials.
m
3
312 (b) Carriage of Bricks. 1000
nos.
312 (c) Carriage of Bitumen (in drums),
cement (in bags).
MT
312 (d) Carriage of steel materials MT
TABLE I - 2 : EX-OUTLET PRICES OF BITUMEN
1 Bitumen (Bulk): 80/100 MT
2 Bitumen (Packed): 80/100 MT
3 Bitumen (Bulk): 60/70 MT
4 Bitumen (Packed): 60/70 MT
5 Bitumen (Bulk): 30/40 MT
6 Bitumen (Packed): 30/40 MT
7 Bituminous Emulsion (Packed) RS
Type
MT
8 Bituminous Emulsion (Packed) MS
Type
MT
9 Bituminous Emulsion (Packed) SS
Type
MT
10 CRMB-50 (Bulk) MT
11 CRMB-50 (Packed) MT
12 CRMB-55 (Bulk) MT
13 CRMB-55 (Packed) MT
14 CRMB-60 (Bulk) MT
15 CRMB-60 (Packed) MT
Note
1 All the above rates (si. 1 to1S)are
inclusive of all Taxes, Duties etc. at the
outlet of manufacturer.
2 The rates of packed materials
mentioned under column "Description
of items" arejals? inclusive of cost of
containers.
3 To evaluate the cost of
Bitumen/CRMB/Bitumen emulsion, cost
of drums offts. 1000/-per MT is to be
considered.
4 To evaluate Issue Rate and cost at site
of bitumen I CRMB I bituminous
emufsion issued by the Department
refer Format-A.
5 To evaluate cost at site of bitumen I
CRMB I bituminous emulsion supplied
by the Contractor refer Format - B.
316
SI.
No.
Description of item Rates at outlets (Rs.)
Unit At
Haldia
At
Uluberia
At
Ramnagar
At Siliguri
Rate
21 Rs. 13.00 per km
Rs. 26.50 per km
Rs. 15.50 per km
Rs. 20.00 per km
Page 206