N ACTIVIDAD
1 OBRAS GENERALES
MONTO
215,502.19
0
-
2 PAVIMENTO FLEXIBLE
1,407,770.23
788,832.37
80,010.66
214,030.66
1,081,643.78
1
32,103.50
32,103.50
22,546.33
-
2
74,678.01
74,678.01
57,543.23
-
3
19,015.72
19,015.72
13,456.32
-
20,038.74
18,765.76
12,345.43
-
98,921.98
96,764.98
81,231.43
8,001.06
7,576.87
4,324.54
21,403.06
18,645.34
10,532.00
216,328.76
105,435.76
98,765.54
419,332.87
11.07
15.30
579,639.49
303,100.96
8.00
12.20
462,134.42
252,396.74
379,634.15
295,494.20
295,494.20
263,345.43
32,004.27
29,765.87
19,761.32
85,612.26
83,645.23
65,674.54
324,493.13
320,222.54
300,345.76
756,619.58
19.98
35.28
1,336,259.07
748,143.56
19.75
31.95
1,210,277.98
662,583.37
1,042,217.52
3 VEREDAS
Valorizacion a precios aprobados (VPA)
Costos reales de lo efectuado (CRE)
4 RAMPAS
Valorizacion a precios aprobados (VPA)
Costos reales de lo efectuado (CRE)
5 SARDINELES SUMERGIDOS
6 MUROS DE SOSTENIMIENTO
Valorizacion a precios aprobados (VPA)
Costos reales de lo efectuado (CRE)
Costo presupuestado trabajo planeado (BCWS)
Avance planeado %
Avance planeado acumulado %
Avance planeado acumulado (APA)
Costo presupuestado trabajo realizado (BCWP)
Avance real %
Avance real acumulado %
Avance real acumulado (ARA)
Costo real del trabajo realizado (ACWP)
108,164.38
108,164.20
92,345.65
160,306.62
4.23
4.23
160,306.62
159,033.46
4.20
4.20
159,033.46
127,237.41
127,237.41
4
2,508.52
2,508.52
1,754.54
193,697.91
193,697.91
156,783.32
295,494.21
294,754.54
258,654.54
32,004.27
30,765.87
15,341.43
85,612.27
80,643.23
65,294.54
324,493.13
322,765.65
303,245.43
933,810.31
24.65
59.93
2,270,069.38
925,135.72
24.42
56.38
2,135,413.70
801,073.80
1,843,291.32
5
7,485.57
7,485.57
4,535.45
1,023,343.16
1,023,343.16
989,654.98
78,883.24
70,764.65
54,765.87
8,001.06
7,900.98
3,456.54
21,403.07
18,987.12
10,112.43
108,164.38
103,654.98
85,435.54
1,247,280.48
32.93
92.86
3,517,349.86
1,232,136.46
32.53
88.91
3,367,550.16
1,147,960.81
2,991,252.13
6
79,710.87
79,710.87
65,675.43
190,729.16
190,729.17
154,789.65
12,288.24
5,654.78
4,001.06
2,654.43
12,109.74
4,567.43
121,400.65
100,324.32
270,440.03
7.14
100.00
3,787,789.89
420,239.73
11.09
100.00
3,787,789.89
333,666.04
3,324,918.17
215,502.19
215,502.19
165,511.30
1,407,770.23
1,407,770.24
1,301,227.95
788,832.37
788,832.37
675,997.48
80,010.66
80,010.65
45,538.26
214,030.66
214,030.66
156,180.94
1,081,643.78
1,081,643.78
980,462.24
3,787,789.89
100.00
3,787,789.89
100.00
3,324,918.17
Significado
4 meses
Descripcion/formula
Avance planeado
Avance planeado acumulado
Avance real
BCWP
ACWP
20.96
71.78
15,535
68,600
28,300
86,450
36,200
-26.02
-12,030.00
-26.02
-27.92
12,765.00
-27.92
-14.92
82.17
50.81
50.81
20.96
71.78
64.04
64.04
26.81
90.85
EAC = BAC/CPI
170,127.55
172,685.51
EDP = Plazo/IDT
4.7
2.2
CPI = BCWP/ACWP
0.79
0.78
SPI = BCWP/BCWS
0.85
1.82
Costo
presupuestado
del Dato resultante del planeamiento
trabajo planeado
Costo
presupuestado
del Dato resultante del trabajo ejecutado
trabajo realizado
Costo real del trabajo realizado Dato resultante del costo real, segn
CV
SV
%CV
Variacin de costo
Variacin de tiempo
SV = BCWP-BCWS
%SV
%PC
%PCA
Porcentaje de completado
%PG
%PGA
EAC
EDP
CPI
SPI
Porcentaje de completado
acumulado
PG (%) = (ACWP/BAC) x100
Porcentaje de gastado
Porcentaje
de
gastado
acumulado
Costo estimado del proyecto al
termino
Plazo estimado para el termino
del proyecto
ndice de desempeo de
costos
ndice de desempeo de
tiempo
50.81
50.81
80,630
BCWS
1
59.73
59.73
1.82
1.5
3
SPI
0.5
0.85
1
0.5
NALISIS DE RESULTADOS
Monto contractual $US
3
14.64
85.87
135,000.00
4
14.13
100
6
100
Total
100.01
18.96
90.74
19,760
18.37
109.11
19,075
5.78
114.89
25,600
24,800
7,800
155,100.00
28,150
28,000
4,600
183,400.00
-9.96
5,840.00
-9.96
-12.9
5,725.00
-12.9
41.03
7,800.00
41.03
29.55
30.01
18.96
90.74
18.37
109.11
5.78
114.89
20.85
111.7
20.74
132.44
3.41
135.85
148,447.27
152,419.35
79,615.38
3.09
3.08
0.91
0.89
1.3
1.3
1.82
1.5
1.3
1.3
114.88
135,000.00
1.7
-26.02
-14.92
-26.02
(61.79)
135.85
170,127.55
1.3
1.3
1
0.85
0.5
0
CPI
1.5