Any deviation fromthese drawings must be communicated in writing to
and reviewed by your local GE Healthcare Installation Project Manager
prior to making changes. Make arrangements for any rigging, special handling, or facility modifications that must be made to deliver the equipment to the installation site. If desired, your local GE Healthcare Installation Project Manager can supply a reference list of rigging contractors. New construction requires the following; 1. Secure area for equipment, analysis, 4. Restrooms. Provide for refuse removal and disposal (e.g. crates, cartons, packing) 2. Power for drills and other test equipment, 3. Capability for image Contact a radiation physicist or consultant to specify radiation containment requirements. Women's Health Site Planning Is th is ite m
re a d y ? W ill ite m b e
re a d y ? 1 2 3 4 5 6 7 8 9 10 Ite m # All walls primed(final coat not neededonDay1), andcounter tops that will support equipment must beinstalled. Nodust- producingcabinetryworkininstallationareas. Mechanical supplier hasbeenprovidedwithaset of equipment installationdrawingsfor reference. For California, permittedconstructiondrawingsor PMI-specifiedinstallation drawings arerequired. Predict (Pre-ship) Equipment installationdrawingsmust matchactual roomsize andmust meet clearancerequirements. Deviationsthat meet installationrequirementsmaybered-lined, if red-liningis allowedbylocal code. Seismicrequirementsareidentifiedon constructiondrawings. Deliveryroutetoinstallationor storageareameets requirementsandhasbeendiscussedandscheduledwiththe customer. Ensurefloor protectionisdiscussed, requirements identified, andwill beavailableat timeof deliveryand installation. Roomsthat will containequipment, includingstorageareas, aredust free. Roomsecuritytoprevent unauthorizedaccess andtheft hasbeendiscussedwithcustomer. Thecustomer is awareof thesesecurityissues, implications andresponsibility. InroomHVACductworkandunits (inroom)must be mechanicallyinstalledanddust free. Installationrooms appear tomeet environmental conditions(seeFurther Definitions)andobservedissueshavebeencommunicatedto thecustomer. If beingstored, storageareamust meet PIM storagecriteria. S to ra g e : Is ite m re a d y ? IssuedDate:7/9/07Rev11 Conduit/electrical cableducting/dividers/ accessflooring installed, withtheexceptionof surface-mountedfloor ducting. Wiringtothemaindisconnect panel isinstalledandcompliant withequipment installationdrawingsor pre-installation manual. Ceilinggridisinstalled, Unistrut islocatedper theinstallation drawings, andpermanent lightingis installedandoperational. Floor iscleanandpreparedfor final floor covering. Customer hasverifiedfloor levelingmeetstheequipment installation drawingsandPIMspecsandnovisibledefectsareobserved. Gantryandtablebaseplateareinstalledprior todelivery(if applicable) Accesstoaworkingphoneat thefacilityfor emergencyuse, includingMRmagnet delivery. MI Supplier: Lead Installer: Phone Number: Inspection Date The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments. GEHCMinimumRequirements
Comments If "N", pleaseenter incommentsor action plan V e rify
(D e liv e ry ): Is ite m re a d y ? V a lid a te
(M e c h In s ta ll): Is ite m re a d y ? Customer: GEHealthcareSiteReadiness Checklist Helper: GEHCGlobal Order #: GEHCOn-siteRepresentative: Nameof customer reviewedwith: GEHCPMI : Target SitePrepCompletionDate: GE Healthcare Customer Site Readiness Requirements Drawing Index A mandatory component of this drawing set is the GE Healthcare Preinstallation manual. Failure to reference the preinstallation manual will result in incomplete documentation required for site design and preparation. Preinstallation documents for GE Healthcare products can be accessed on the web at: http://www.gehealthcare.com/company/docs/siteplanning.html These sheets are a document set and should not be separated. Electrical information and references are contained on all sheets. GE Equipment Delivery Requirements Items1through8ontheGEHealthcareSiteReadinessChecklist areREQUIREDtofacilitateequipment deliverytotheinstallationsite. Equipment will not bedeliveredif theserequirements arenot satisfied. * REQUIRED REFERENCE * Preinstallation Manual These equipment installation drawings indicate the placement and interconnection of the listed equipment components. These drawings are not construction or site preparation drawings. Customer remains ultimately responsible for preparing the site to accommodate the installation and operation of such equipment in compliance with GE Healthcare's written specifications and all applicable federal, state, and/or local requirements.