Any deviation fromthese drawings must be communicated in writing to

and reviewed by your local GE Healthcare Installation Project Manager


prior to making changes.
Make arrangements for any rigging, special handling, or facility
modifications that must be made to deliver the equipment to the
installation site. If desired, your local GE Healthcare Installation Project
Manager can supply a reference list of rigging contractors.
New construction requires the following; 1. Secure area for equipment,
analysis, 4. Restrooms.
Provide for refuse removal and disposal (e.g. crates, cartons, packing)
2. Power for drills and other test equipment, 3. Capability for image
Contact a radiation physicist or consultant to specify radiation
containment requirements.
Women's Health
Site Planning
Is
th
is
ite
m

re
a
d
y
?
W
ill ite
m
b
e

re
a
d
y
?
1
2
3
4
5
6
7
8
9
10
Ite
m
#
All walls primed(final coat not neededonDay1), andcounter
tops that will support equipment must beinstalled. Nodust-
producingcabinetryworkininstallationareas.
Mechanical supplier hasbeenprovidedwithaset of
equipment installationdrawingsfor reference. For California,
permittedconstructiondrawingsor PMI-specifiedinstallation
drawings arerequired.
Predict
(Pre-ship)
Equipment installationdrawingsmust matchactual roomsize
andmust meet clearancerequirements. Deviationsthat meet
installationrequirementsmaybered-lined, if red-liningis
allowedbylocal code. Seismicrequirementsareidentifiedon
constructiondrawings.
Deliveryroutetoinstallationor storageareameets
requirementsandhasbeendiscussedandscheduledwiththe
customer. Ensurefloor protectionisdiscussed, requirements
identified, andwill beavailableat timeof deliveryand
installation.
Roomsthat will containequipment, includingstorageareas,
aredust free. Roomsecuritytoprevent unauthorizedaccess
andtheft hasbeendiscussedwithcustomer. Thecustomer is
awareof thesesecurityissues, implications andresponsibility.
InroomHVACductworkandunits (inroom)must be
mechanicallyinstalledanddust free. Installationrooms
appear tomeet environmental conditions(seeFurther
Definitions)andobservedissueshavebeencommunicatedto
thecustomer. If beingstored, storageareamust meet PIM
storagecriteria.
S
to
ra
g
e
:
Is
ite
m
re
a
d
y
?
IssuedDate:7/9/07Rev11
Conduit/electrical cableducting/dividers/ accessflooring
installed, withtheexceptionof surface-mountedfloor ducting.
Wiringtothemaindisconnect panel isinstalledandcompliant
withequipment installationdrawingsor pre-installation
manual.
Ceilinggridisinstalled, Unistrut islocatedper theinstallation
drawings, andpermanent lightingis installedandoperational.
Floor iscleanandpreparedfor final floor covering. Customer
hasverifiedfloor levelingmeetstheequipment installation
drawingsandPIMspecsandnovisibledefectsareobserved.
Gantryandtablebaseplateareinstalledprior todelivery(if
applicable)
Accesstoaworkingphoneat thefacilityfor emergencyuse,
includingMRmagnet delivery.
MI Supplier:
Lead Installer:
Phone Number:
Inspection Date
The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments.
GEHCMinimumRequirements

Comments
If "N", pleaseenter incommentsor action
plan
V
e
rify

(D
e
liv
e
ry
):
Is
ite
m
re
a
d
y
?
V
a
lid
a
te

(M
e
c
h
In
s
ta
ll):
Is
ite
m
re
a
d
y
?
Customer:
GEHealthcareSiteReadiness Checklist
Helper:
GEHCGlobal Order #:
GEHCOn-siteRepresentative:
Nameof customer reviewedwith:
GEHCPMI :
Target SitePrepCompletionDate:
GE Healthcare
Customer Site Readiness
Requirements
Drawing Index
A mandatory component of this drawing set is the GE Healthcare
Preinstallation manual. Failure to reference the preinstallation
manual will result in incomplete documentation required for
site design and preparation.
Preinstallation documents for GE Healthcare products can be
accessed on the web at:
http://www.gehealthcare.com/company/docs/siteplanning.html
These sheets are a document set and should not be separated.
Electrical information and references are contained on all sheets.
GE Equipment Delivery
Requirements
Items1through8ontheGEHealthcareSiteReadinessChecklist areREQUIREDtofacilitateequipment
deliverytotheinstallationsite. Equipment will not bedeliveredif theserequirements arenot satisfied.
* REQUIRED REFERENCE *
Preinstallation Manual
These equipment installation drawings indicate the placement and
interconnection of the listed equipment components. These drawings are
not construction or site preparation drawings. Customer remains ultimately
responsible for preparing the site to accommodate the installation and
operation of such equipment in compliance with GE Healthcare's written
specifications and all applicable federal, state, and/or local requirements.