INSPECTION SHEET (FOOTING OVERALL) SL NO: IS(F)-


1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) FOOTING NO :
5) DEPTH OF FOUNDATION FROM EGL ft
6) FOOTING SIZE:
7) LOCATION OF THE FOOTING (GRID NOS, AS PER STRUCTURAL DRAWING) :
8) SAFETY CHECK LIST ITEMS ARE CONSIDERED PROPERLY YES NO
9) REFERENCE NOS OF SAFETY CHECK LIST.
10) CHECKLIST FOR SITE, ARCHITECTURAL AND FOUNDATION LAYOUT ARE CONSIDERED PROPERLY. YES NO
11) REFERENCE NOS OF SITE, ARCHITECTURAL AND FOUNDATION LAYOUT.
12) CHECKLISTS FOR EXCAVATION WORK ARE CONSIDERED PROPERLY YES NO
13) REFERENCE NOS OF EXCAVATION WORK.
14) CHECKLISTS FOR SHUTTERING WORK (FOOTING) ARE CONSIDERED PROPERLY YES NO
15) REFERENCE NOS OF CHECKLISTS FOR SHUTTERING WORK (FOOTING).
16) CHECKLIST FOR REINFORCEMENT WORK (FOOTING) ARE CONSIDERED PROPERLY. YES NO
17) REFERENCE NOS OF REINFORCEMENT WORK (FOOTING).
18) CHECKLIST FOR CONCRETING WORK (During Construction) ARE CONSIDERED PROPERLY YES NO
19) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (During Construction)
DRAFT COPY
20) CHECKLIST FOR CONCRETING WORK (Mixing) ARE CONSIDERED PROPERLY YES NO
21) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (Mixing)
22) CHECKLIST FOR EQUIPMENT AND MATERIAL PREPARATION ARE CONSIDERED PROPERLY YES NO
23) REFERENCE NOS OF CHECKLISTS FOR EQUIPMENT AND MATERIAL PREPARATION.
24) CHECKLIST FOR PILE ARE CONSIDERED PROPERLY YES NO N/A
25) REFERENCE NOS OF CHECKLISTS FOR PILE. N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
N/A
N/A
N/A
N/A
N/A
N/A
DRAFT COPY
N/A
N/A
Draft Copy
INSPECTION SHEET (FOR COLUMN OVERALL) SL NO: IS(C)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) COLUMN NO : C-
5) NUMBER OF FLOOR LEVEL
6) LOCATION OF THE COLUMN GRID NOS, AS PER STRUCTURAL DRAWING:
7) COLUMN SIZE :
inch x inch
8) COLUMN CASTING HEIGHT 1st LIFT ft 2nd LIFT
9) SAFETY CHECK LIST ITEMS ARE CONSIDERED PROPERLY YES NO
10) REFERENCE NOS OF SAFETY CHECK LIST.
11) CHECKLISTS FOR SHUTTERING WORK (Column) ARE CONSIDERED PROPERLY YES NO
12) REFERENCE NOS OF CHECKLISTS FOR SHUTTERING WORK (Column).
13) CHECKLIST FOR REINFORCEMENT WORK (Column) ARE CONSIDERED PROPERLY. YES NO
14) REFERENCE NOS OF REINFORCEMENT WORK (Column).
15) CHECKLIST FOR CONCRETING WORK (During Construction) ARE CONSIDERED PROPERLY YES NO
16) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (During Construction)
17) CHECKLIST FOR CONCRETING WORK (Mixing) ARE CONSIDERED PROPERLY YES NO
18) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (Mixing)
Draft Copy
19) CHECKLIST FOR EQUIPMENT AND MATERIAL PREPARATION ARE CONSIDERED PROPERLY YES NO
20) REFERENCE NOS OF CHECKLISTS FOR EQUIPMENT AND MATERIAL PREPARATION.
21) COLUMN RE-BAR SIZE AND NUMBERS WITH SKETCH
Nos mm Dia 3"
Nos mm Dia
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
Draft Copy
Draft Copy
DRAFT COPY
INSPECTION SHEET (FOR BEAM AND SLAB OVERALL) SL NO: IS(B)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) BEAM NO :
5) NUMBER OF FLOOR LEVEL
6) LOCATION OF THE BEAM (GRID NOS, AS PER STRUCTURAL DRAWING) :
7) BEAM SIZE :
inch x inch
SLAB SIZE
ft x ft
9) SAFETY CHECK LIST ITEMS ARE CONSIDERED PROPERLY YES NO
10) REFERENCE NOS OF SAFETY CHECK LIST.
11) CHECKLISTS FOR SHUTTERING WORK (BEAM & SLAB) ARE CONSIDERED PROPERLY YES NO
12) REFERENCE NOS OF CHECKLISTS FOR SHUTTERING WORK (BEAM & SLAB).
13) CHECKLIST FOR REINFORCEMENT WORK (BEAM & SLAB) ARE CONSIDERED PROPERLY. YES NO
14) REFERENCE NOS OF REINFORCEMENT WORK (BEAM & SLAB).
15) CHECKLIST FOR CONCRETING WORK (During Construction) ARE CONSIDERED PROPERLY YES NO
16) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (During Construction)
17) CHECKLIST FOR CONCRETING WORK (Mixing) ARE CONSIDERED PROPERLY YES NO
18) REFERENCE NOS OF CHECKLISTS FOR CONCRETING WORK (Mixing)
19) CHECKLIST FOR EQUIPMENT AND MATERIAL PREPARATION ARE CONSIDERED PROPERLY YES NO
DRAFT COPY
20) REFERENCE NOS OF CHECKLISTS FOR EQUIPMENT AND MATERIAL PREPARATION.
21) BEAM RE-BAR SIZE AND NUMBERS WITH SKETCH
Nos mm Dia 3"
Nos mm Dia
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR PILE WORK SL NO: IS(P)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) Proportion of casting is fixed as per design specifications. YES NO N/A
5) Pile form works are placed straight horizontally. YES NO N/A
6) Pile casting place is plane. YES NO N/A
7) SHUTTERING MATERIALS ARE PROPER (STEEL, WOOD AND THIN CI SHEET) YES NO N/A
8) FORMS ARE CLEANED WITH STEEL SCRAPER OR STEEL BRUSH TO MAKE IT FREE YES NO N/A
OF RUST, MORTAR ENCRUSTATIONS OR OTHER FOREIGN MATERIAL.
9) OIL IS APPLIED TO THE FORM EITHER MOBIL OR THIN TAR TO AVOID STICKING YES NO N/A
OF THE CONCRETE WITH FORM.
10) EXCESS OIL FROM FORM WORK IS WIPED OUT. YES NO N/A
11) THIN METAL OF 32 SWG SHEET LINING ARE USED BETWEEN THE JOINTS OF YES NO N/A
WOODEN FORM AND IT WAS PROPERLY NAILED.
12) USE OF WARPED WOOD FOR SHUTTER IS PREVENTING. YES NO N/A
13) PROPER PACKING ARE ENSURE TO CHECK LEAKAGE. YES NO N/A
14) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE ZONE CONSIDERED) YES NO N/A
15) RE-BAR STRENGTH (GRADE) ARE AS PER DESIGN SPECIFICATIONS. YES NO N/A
16) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
17) HOOKS AND BENDS ARE PROVIDED APPROPRIATELY. YES NO N/A
18) REBAR IS FREE FROM ANY CRACK OR INJURIES DEFECT. YES NO N/A
19) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DESIGN YES NO N/A
20) NUMBER & SPACING OF RE-BAR ARE AS PER DESIGN. YES NO N/A
21) SPLICE LENGTH IS ACCURATE. YES NO N/A
22) STANDARD SCIESMIC HOOK IS PROVIDED. YES NO N/A
23) TRUE HORIZONTAL ALIGNMENT OF REBAR IS ENSURED. YES NO N/A
24) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE) YES NO N/A
25) MORTAR BLOCKS IS SET PROPERLY YES NO N/A
DRAFT COPY
26) RE-BAR IS CLEANED FROM ALL LOOSE SCALE, DIRT, AND PAINT OIL, GREASE YES NO N/A
27) OR OTHER FOREIGN SUBSTANCE. YES NO N/A
28) Level of Pile Top is fixed as per design instruction. YES NO N/A
29) Pile driving position is marked. YES NO N/A
30) Pile lifting position is painted. YES NO N/A
31) Follower is kept in driving place. YES NO N/A
32) Hammer weight and fall height is followed with design instructions. YES NO N/A
33) Pile lifting position is used strictly. YES NO N/A
34) Pile driving is truely vertical. YES NO N/A
35) Standard pile driving record is properly maintained. YES NO N/A
36) Column position is set at center of all pile groups. YES NO N/A
37) Number of blows required for the last 3 feet of a pile is satisfactorily with respect YES NO N/A
to test pile driving record.
38) For splice pile, welding at joint is done properly. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR SHUTTERING WORK (Column). SL NO: IS(SC)-
A. NAME OF THE PROJECT :
B. LOCATION OF THE PROJECT:
C. DATE: G. TYPES OF SHUTTER: SINGLE DUBLE MULTI
D.
SHUTTERING MEMBER'S
E. LOCATION OF THE MEMBER'S
F. REBAR CHECK LIST REFERANCE NUMBER
1) RE-BAR CHECK LIST IS COSIDERED YES NO N/A
2) QUALITY OF SHUTTERING MATERIALS ARE APPROVED BY SITE INCHARGE.
3) JOINTS OF WOODEN SHUTTER ARE COVERED WITH THIN CI SHEET PIECE.
4) FORMS ARE CLEANED WITH STEEL SCRAPER OR STEEL BRUSH TO MAKE IT FREE YES NO N/A
FROM RUST, MORTAR ENCRUSTATIONS OR OTHER FOREIGN MATERIAL.
5) SHUTTER OIL IS APPLIED PROPERLY YES NO N/A
6) LATERAL BRACING IS PROVIDED
7) SHUTTER JOINTS ARE PROPERLY FIXED RUBBER GASKET. YES NO N/A
8) SHUTTER SURFACE ARE PROPRLY LEAK PROOF.
9) SHUTTER SUPPORTS ARE AT BOTH END FIXED PROPRLY YES NO N/A
10) PROPS AT BOTH ENDS ARE TIGHTEN. YES NO N/A
11) LOOSE PROPS/DEFECTIVE PROPS ARE REMOVED. YES NO N/A
12) SCAFFOLDING IS SET FOR SAFETY WHERE IT IS NECESSARY. YES NO N/A
13) WHEN SHUTTERING HEIGHT EXCEED 12 FEET, SPECIAL TYPE OF SCAFFOLDING YES NO N/A
WITH CROSS BRACING IS USED.
14) SHUTTERING NUTS AND BOLT ARE FIXED PROPERLY. YES NO N/A
15) ELECTRIC CONDUITS / SANITARY DUCT ARE SET PROPERLY BEFORE CASTING. YES NO N/A
16) CLEAR COVER IS SET PROPERLY YES NO N/A
17) POLTYTHINE NOT USED IN SHUTTERING WORK. YES NO N/A
26) PROPER VERTICAL ALIGNMENT OF SHUTTERING IS MAINTAINED. YES NO N/A
29) UNIFORM LATERAL SUPPORTS ARE ENSURED. YES NO N/A
DRAFT COPY
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR SHUTTERING WORK (SLAB & BEAM). SL NO: IS(SSB)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) BEAM NO :
5) NUMBER OF FLOOR LEVEL
6) LOCATION OF SLAB (GRID NO, AS PER STRUCTURAL DRAWING):
7) SLAB SIZE :
ft x
ft
inch x
inch
8) SHUTTERING MATERIALS ARE PROPER (STEEL, WOOD AND THIN CI SHEET) YES NO N/A
9) FORMS ARE CLEANED WITH STEEL SCRAPER OR STEEL BRUSH TO MAKE IT FREE YES NO N/A
OF RUST, MORTAR ENCRUSTATIONS OR OTHER FOREIGN MATERIAL.
10) OIL IS APPLIED TO THE FORM EITHER MOBIL OR THIN TAR TO AVOID STICKING YES NO N/A
OF THE CONCRETE WITH FORM.
11) EXCESS OIL FROM FORM WORK IS WIPED OUT. YES NO N/A
12) THIN METAL OF 32 SWG SHEET LINING ARE USED BETWEEN THE JOINTS OF YES NO N/A
WOODEN FORM AND IT WAS PROPERLY NAILED.
13) TYPES OF SHUTTERING IS PROPER. (SINGLE, DOUBLE, MULITISTGE) YES NO N/A
14) USE OF WARPED WOOD FOR SHUTTER IS PREVENTING. YES NO N/A
15) GAPS/HOLES IN THE FORM ARE CLOSED WITH PAPER, PUTTY OR WITH THIN METAL YES NO N/A
STEELS NOT TO PERMIT LEAKAGE OF CEMENT GROUT.
16) PROPS AT BOTH ENDS ARE TIGHTEN. YES NO N/A
17) LOOSE PROPS/DEFECTIVE PROPS ARE REMOVED. YES NO N/A
18) SCAFFOLDING IS SET FOR SAFETY WHERE IT IS NECESSARY. YES NO N/A
19) WHEN SHUTTERING HEIGHT EXCEED 12 FEET, SPECIAL TYPE OF SCAFFOLDING YES NO N/A
WITH CROSS BRACING IS USED.
20) SPACING OF BAMBOO PROP @ 600 MM/2 C/C STEEL OR AS SPECIFIED IN PWD
SCHEDULE ANALYSIS ITEM.
21) CONSTRUCTION JOINT IS AS PER INSTRUCTION BY ENGINEER IN CHARGE. YES NO N/A
BEAM SIZE:
DRAFT COPY
INSPECTION SHEET FOR SHUTTERING WORK (SLAB & BEAM). SL NO: IS(SSB)-
22) PROPER PACKING ARE ENSURE TO CHECK LEAKAGE. YES NO N/A
23) NUTS AND BOLT ARE FIXED PROPERLY. YES NO N/A
24) ELECTRIC CONDUITS / SANITALY DUCT ARE SET PROPERLY BEFORE CASTING. YES NO N/A
25) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE ZONE CONSIDERED) YES NO N/A
26) ALL POLTYTHINE INSIDE THE BEAM-COLUMN JOINT ARE REMOVED. YES NO N/A
27) JOINTS OF WOODEN SHUTTER ARE COVERED WITH THIN CI SHEET PIECE. YES NO N/A
28) PROPER HORIZONTALL ALIGNMENT OF SHUTTERING. YES NO N/A
29) STEEL SHUTTER FOR BEAMS ARE PREPARED WHERE DIRECTED, MADE OF 16 SWG YES NO N/A
STEEL SHEETS WITH NECESSARY HOLES,CLAMPS AND STRONG MS ANGLE FRAME.
30) CAMBER IN BEAM AND SLAB @ 1 INCH/20FT IS USED TO COUNTERACT THE EFFECTS YES NO N/A
OF DEFLECTION.
31) WOODEN BEAM BELOW PLANKS ARE PLACED AT SPACING NOT TO EXCEED 2-6 C/C. YES NO N/A
32) FREE END OF SHEET IS FIXED WITH WOOD BY NAILS. YES NO N/A
33) STEEL PROPS OR BAMBOO POSTS OF 3" DIA @ 2-6 C/C ARE USED FOR SLAB. YES NO N/A
34) SUPPORT FOR EACH PROP TO CHECK DEFLECTION (IN CASE OF 1ST FLOOR). YES NO N/A
35) FORM OF SLAB IS LEVELED PROPERLY. YES NO N/A
36) CENTER OF SLAB IS RAISED TO CHECK DEFLECTION YES NO N/A
37) CLEAR GAP BETWEEN EACH PLANK IS WITHIN 6. YES NO N/A
38) SPACING AND SIZE OF PLANKS IS AS PER RELEVANT PWD ANALYSIS ITEM. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
INSPECTION SHEET FOR SHUTTERING WORK (FOOTING). SL NO: IS(SC)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) FOOTING NO :
5) NUMBER OF BASEMENT LEVEL
6) LOCATION OF FOOTING (GRID NO, AS PER STRUCTURAL DRAWING):
7) FOOTING SIZE : ft x ft
8) SHUTTERING MATERIALS ARE PROPER (STEEL, WOOD AND THIN CI SHEET) YES NO N/A
9) FORMS ARE CLEANED WITH STEEL SCRAPER OR STEEL BRUSH TO MAKE IT FREE YES NO N/A
OF RUST, MORTAR ENCRUSTATIONS OR OTHER FOREIGN MATERIAL.
10) OIL IS APPLIED TO THE FORM EITHER MOBIL OR THIN TAR TO AVOID STICKING YES NO N/A
OF THE CONCRETE WITH FORM.
11) EXCESS OIL FROM FORM WORK IS WIPED OUT. YES NO N/A
12) THIN METAL OF 32 SWG SHEET LINING ARE USED BETWEEN THE JOINTS OF YES NO N/A
WOODEN FORM AND IT WAS PROPERLY NAILED.
14) USE OF WARPED WOOD FOR SHUTTER IS PREVENTING. YES NO N/A
15) GAPS/HOLES IN THE FORM ARE CLOSED WITH PAPER, PUTTY OR WITH THIN METAL YES NO N/A
STEELS NOT TO PERMIT LEAKAGE OF CEMENT GROUT.
16) PROPS AT BOTH ENDS ARE TIGHTEN. YES NO N/A
17) LOOSE PROPS/DEFECTIVE PROPS ARE REMOVED. YES NO N/A
18) SCAFFOLDING IS SET FOR SAFETY WHERE IT IS NECESSARY. YES NO N/A
20) PROPER PACKING ARE ENSURE TO CHECK LEAKAGE. YES NO N/A
21) NUTS AND BOLT ARE FIXED PROPERLY. YES NO N/A
22) ELECTRIC CONDUITS / SANITALY DUCT ARE SET PROPERLY BEFORE CASTING. YES NO N/A
23) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE ZONE CONSIDERED) YES NO N/A
24) ALL POLTYTHINE INSIDE THE BEAM-COLUMN JOINT ARE REMOVED. YES NO N/A
25) JOINTS OF WOODEN SHUTTER ARE COVERED WITH THIN CI SHEET PIECE. YES NO N/A
26) PROPER HORIZONTAL & VERTICAL ALIGNMENT OF SHUTTERING. YES NO N/A
DRAFT COPY
27) CORK SHEETS ARE USED TO SEPARATE THE ADJACENT CLOSE FOOTING. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
INSPECTION SHEET FOR EXCAVATION SL NO: IS(EX)-
NAME OF THE PROJECT :
LOCATION OF THE PROJECT:
DATE:
1) As built site plan is present. YES NO N/A
2) R.L (Reduced level) Sheet is presented before excavation YES NO N/A
3) Earth cutting location & variable depth is considered. YES NO N/A
4) Protection methods of soil are considered. YES NO N/A
5) Deconposed layer is indicated with sign. YES NO N/A
6) Excavation is executed to the target depth. YES NO N/A
7) Foundation bed is properly compacted and level. YES NO N/A
8) Sand over the foundation bed is compacted well. YES NO N/A
9) Khoa -sand over the foundation bed is compacted well. YES NO N/A
10) Any objectionable observations in foundation bed are removed. YES NO N/A
11) Existing utility lines (Gas, Sewerage, Electric, Supply water, Etc) are considered YES NO N/A
12) Existing hazards structure are considered. (suface drain,pit,piller etc.) YES NO N/A
13) Provision for dewatering is considered YES NO N/A
14) Rain protection during excavation is considered. YES NO N/A
15) Earth stacking yard is considered YES NO N/A
16) Photographs are taken YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR REINFORCEMENT WORK (Column) SL NO: IS(RC)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) COLUMN NO : C-
5) NUMBER OF FLOOR LEVEL
6) LOCATION OF THE COLUMN GRID NOS, AS PER STRUCTURAL DRAWING
7)
COLUMN SIZE :
inch x inch
8) RE-BAR STRENGTH (GRADE) ARE AS PER ESIGN SPECIFICATIONS. YES NO N/A
9) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
10) HOOKS AND BENDS ARE PROVIDED APPROPRIATELY. YES NO N/A
11) REBAR IS FREE FROM ANY CRACK OR INJURIES DEFECT. YES NO N/A
12) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
13) NUMBER OF RE-BAR ARE AS PER DESIGN. YES NO N/A
14) SPACING OF RE-BAR ARE AS PER DESIGN. YES NO N/A
15) MAIN RE-BAR DIRCTION ARE AS PER DESIGN INSTRUCTION. YES NO N/A
16) RE-BAR IS TIED WITH 24G WIRE (IN EACH AND EVERY JOINT) YES NO N/A
17) SPLICE LENGTH IS ACCURATE. YES NO N/A
18) STANDARD SCIESMIC HOOK IS PROVIDED. YES NO N/A
19) VERTICALL ALIGNMENT OF REBAR IS PROPER. YES NO N/A
20) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE) YES NO N/A
21) MORTAR BLOCKS IS SET PROPERLY YES NO N/A
22) RE-BAR IS CLEANED FROM ALL LOOSE SCALE, DIRT, AND PAINT OIL, GREASE YES NO N/A
OR OTHER FOREIGN SUBSTANCE.
23) LOCATION OF SPLICE IS AT THE MIDDLE OF COLUMN YES NO N/A
24) TIE SPACING IS MAINTAINED PROPERLY. YES NO N/A
DRAFT COPY
25) CLOSER TIE SPACING NEAR SPLICE ZONE IS AS PER DESIGN. YES NO N/A
26) INNER TIE IS PROVIDED AS PER DESIGN. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR CONCRETING WORK (MIXING & CASTING) SL NO: IS(MC)-
NAME OF THE PROJECT :
LOCATION OF THE PROJECT:
DATE:
CONCRETING MEMBER FOOTING COLUMN BEAM SLAB
CASTING LOCATION
7) Volume of concrete is estimated and the target time is set. YES NO N/A
8) Adhesive admixture for bonding between old and new concrete is used YES NO N/A
as per design specification.
9) Admixture for incresing the workability of concrete is used YES NO N/A
as per design specification.
10) Mixture machine is in good condition. YES NO N/A
11) Measuring equipment is provided for aggregates and sand by fara YES NO N/A
(local name), equivalent to a bag of cement, to maintain the proportion.
12) Mixing portion of cement, aggregates and sand are investigated as per YES NO N/A
design specification.
13) Material such as cement, aggregates and sand are present with respect YES NO N/A
to volume of work.
14) Aggregates are properly soaked YES NO N/A
15) Aggregates are well graded YES NO N/A
16) Work assistant at the mixing point is deputed to count and control the batch
as per concrete pouring slip and load count slip.
17) Manpower for mixing is enough with respect to volume of work YES NO N/A
18) Measured quantity of materials as per proportion are dumped in the drum YES NO N/A
of mixture machine.
19) Mixiing is executed with required quantity of water instantly YES NO N/A
20) Proper water cement ratio is maintained. YES NO N/A
21) Workability of concrete is adequate (slump is proper) YES NO N/A
22) Cubes are ready to take concrete sample for testing. YES NO N/A
23) Thickness is checked @ 3-0 interval over the concrete slab. YES NO N/A
24) Compaction is done within the 15 minutes after the fresh concrete is YES NO N/A
placed in position.
25) Vibrating is stopped as soon as laitance of mortar appears on the surface. YES NO N/A
(excessive vibration segregates the mix.) YES NO N/A
26) Vibrating nozzle is placed vertically. YES NO N/A
27) Vibrating is executed without touching the re-bar. YES NO N/A
28) Proper surface vibration of slab surface are done with thick & plain wooden plank. YES NO N/A
29) Concrete is placed within 30 minutes after mixing the water. YES NO N/A
30) Height of free fall concrete is within 3 feet. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
INSPECTION SHEET FOR CONCRETING WORK (BEFORE CONCRETING) SL NO: IS(CC)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) CONCRETING ITEM FOOTING COLUMN BEAM SLAB
5) NUMBER OF FLOOR LEVEL
6) Location as per grid nos of structural drawing:
7) For bonding with old concrete, the edges of old concrete are to be YES NO N/A
Rough to give a firm bonding.
8) Concrete rough surface are washed properly with clean water. YES NO N/A
9) Grouting is used for construction joint. YES NO N/A
10) Electrical pipes are in proper place. YES NO N/A
11) Rain protection arrangement is considered YES NO N/A
12) Clear cover are monitored before placing of concrete. YES NO N/A
13) Casting sequence/phase are decided with engineer in charge. YES NO N/A
14) Estimated volumn of concrete materials (with admixture) are present sufficiently YES NO N/A
15) Chutes, concrete buckets are cleaned and ready for use. YES NO N/A
16) Vibrator nozle are checked and ready for use. YES NO N/A
17) Tower crane for vertical lifting is provided. YES NO N/A
18) Thickness checking device is provided. YES NO N/A
19) Enough manpower (including site engineer) are present. YES NO N/A
20) At mixture machine location, specific person for load counting is deputed. YES NO N/A
21) During casting sufficient shuttering worker are kept for constant watch on prop. YES NO N/A
22) Water is sprayed on shutter material. YES NO N/A
23) Frequent movement of labours over reinforcement is avoided during casting. YES NO N/A
Use of plain sheet as walk way for carrying concrete at place.
24) Immediate remedial measures are present in case of props being loosened. YES NO N/A
25) Vibrator with spare nozzles are present and tested for proper compaction. YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
INSPECTION SHEET FOR CONCRETING WORK (Equipment and Material's Preparation) SL NO: IS(EC)- RETROFIT
NAME OF THE PROJECT : DATE:
LOCATION OF THE PROJECT:
MATERIALS
1) Aggregate is free from dust YES NO N/A
2) Aggregates size is as per specification. YES NO N/A
3) Brick aggregates are well burnt. YES NO N/A
4) Aggregates are well graded. YES NO N/A
5) Aggregates are stored on solid platform. YES NO N/A
6) F.M of sand is as per specification. YES NO N/A
7) Sand is free from dust & other impurities YES NO N/A
8) Sand is stored on cleaned solid platform YES NO N/A
9) Types of cement (CEIM-1 , CEIM-2) is satisfied as per specification. YES NO N/A
10) Cement bags are properly stored. YES NO N/A
11) Admixture as per design specification is presented. YES NO N/A
12) Availability of portable water. YES NO N/A
13) Reinforcement as per design specification (Strength, Size,Brand). YES NO N/A
14) Reinforcement are proprly stored according to Engineer instruction. YES NO N/A
15) Carbon fiber as per design specification are present. YES NO N/A
16) Adhesive for carbon fiber raping are present. YES NO N/A
17) Epoxy Adhesive are present. YES NO N/A
YES NO N/A
EQUPMENTS YES NO N/A
18) Mixure machine is provided. YES NO N/A
19) Standard size of steel buckets are provided, to carry aggregates. YES NO N/A
20) Vbrator machines are provided. YES NO N/A
21) Vibrator spare nozzles are present YES NO N/A
22) Levelling instruments are present. YES NO N/A
23) Equipment is tested before the comencement of works and well condition. YES NO N/A
24) Roof/ Tower hoist machine is provided. YES NO N/A
25) Cylender mold are presented as per requirement YES NO N/A
26) Slump cone is presented. YES NO N/A
27) Drill machine, having proper dia of dril bit's are present. YES NO N/A
28) Available power line or generator power system. YES NO N/A
29) Special type pump machine for casting none shrink micro concrete are present. YES NO N/A
30) Epoxy Adhesive injector's for injecting adhesive inside narrow hole, are present. YES NO N/A
31) Photographs are taken YES NO N/A
DRAFT COPY
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
RETROFIT
DRAFT COPY
INSPECTION SHEET FOR REINFORCEMENT WORK (FOOTING) SL NO: IS(RF)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) FOOTING NO : F-
5) NUMBER OF BASEMENT FLOOR
6) LOCATION OF FOOTING AS PER STRUCTURAL DRAWING (GRID LINES)
7)
FOOTING SIZE :
ft x ft
8) RE-BAR STRENGTH (GRADE) ARE AS PER ESIGN SPECIFICATIONS. YES NO N/A
9) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
10) HOOKS AND BENDS ARE PROVIDED APPROPRIATELY. YES NO N/A
11) REBAR IS FREE FROM ANY CRACK OR INJURIES DEFECT. YES NO N/A
12) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
13) NUMBER OF RE-BAR ARE AS PER DESIGN. YES NO N/A
14) SPACING OF RE-BAR ARE AS PER DESIGN. YES NO N/A
15) MAIN RE-BAR DIRCTION ARE AS PER DESIGN INSTRUCTION. YES NO N/A
16) RE-BAR IS TIED WITH 24G WIRE (IN EACH AND EVERY JOINT) YES NO N/A
17) SPLICE LENGTH IS ACCURATE. YES NO N/A
18) STANDARD SCIESMIC HOOK IS PROVIDED. YES NO N/A
19) VERTICALL ALIGNMENT OF REBAR IS PROPER. YES NO N/A
20) HORIZONTAL ALIGNMENT OF REBAR IS PROPER. YES NO N/A
21) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE) YES NO N/A
22) MORTAR BLOCKS IS SET PROPERLY YES NO N/A
23) RE-BAR IS CLEANED FROM ALL LOOSE SCALE, DIRT, AND PAINT OIL, GREASE YES NO N/A
OR OTHER FOREIGN SUBSTANCE.
24) TOP LAYER RE-BAR (BOTH DIRECTION) FOR COMBINE FOOTING ARE YES NO N/A
DRAFT COPY
PLACED PROPERLY.
25) TOP LAYER RE-BAR DIRECTION IS AS PER DESIGN. YES NO N/A
26) SEPERATOR IS PROVIDED PROPERLY BETWEEN TOP AND BOTTOM RE-BAR YES NO N/A
YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR REINFORCEMENT WORK (SLAB & BEAM) SL NO: IS(SB)-
1) NAME OF THE PROJECT :
2) LOCATION OF THE PROJECT:
3) DATE:
4) LOCATION OF SLAB AS PER STRUCTURAL DRAWING (GRID LINES)
5)
SLAB SIZE :
ft x
ft
;;
BEAM SIZE:
inch x inch
6) RE-BAR STRENGTH (GRADE) ARE AS PER ESIGN SPECIFICATIONS. YES NO N/A
7) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
8) HOOKS AND BENDS ARE PROVIDED APPROPRIATELY. YES NO N/A
9) REBAR IS FREE FROM ANY CRACK OR INJURIES DEFECT. YES NO N/A
10) SIZE (LENGTH AND DIAMETER) OF RE-BAR ARE AS PER DRAWING YES NO N/A
11) NUMBER OF RE-BAR ARE AS PER DESIGN. YES NO N/A
12) SPACING OF RE-BAR ARE AS PER DESIGN. YES NO N/A
13) MAIN RE-BAR DIRCTION ARE AS PER DESIGN INSTRUCTION. YES NO N/A
14) RE-BAR IS TIED WITH 24G WIRE (IN EACH AND EVERY JOINT) YES NO N/A
15) SPLICE LENGTH IS ACCURATE. YES NO N/A
16) STANDARD SCIESMIC HOOK IS PROVIDED. YES NO N/A
17) HORIZONTAL ALIGNMENT OF REBAR IS PROPER. YES NO N/A
18) CLEAR COVER IS SET PROPERLY (SALINE & NONE-SALINE) YES NO N/A
19) MORTAR BLOCKS IS SET PROPERLY YES NO N/A
20) RE-BAR IS CLEANED FROM ALL LOOSE SCALE, DIRT, AND PAINT OIL, GREASE YES NO N/A
OR OTHER FOREIGN SUBSTANCE.
21) STIRRUP SPACING IS PROPER (BEAM)
22) BEAM-COLUMN JOINT IS TIED PROPERLY. YES NO N/A
23) LENGTH OF EXTRA TOP BAR FROM COLUMN / BEAM FACE IS AS PER DESIGN. YES NO N/A
24) CRANK POSITION FROM BEAM FACE IS PROPER. YES NO N/A
25) RE-BAR AT MIDDILE POSITION FOR TORSION IS SET PROPER (FOR BEAM) YES NO N/A
26) TOP RE-BAR LAPPING IS PROVIDED AT THE CENTER OF BEAM. YES NO N/A
DRAFT COPY
27) BOTTOM RE-BAR LAPPING IS PROVIDED AT THE END OF BEAM. YES NO N/A
28) CORNER RE-BAR FOR SLAB IS PROVIDED PROPERLY. YES NO N/A
29) SEPERATOR IS PROVIDED PROPERLY BETWEEN TOP AND BOTTOM RE-BAR YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
DRAFT COPY
DRAFT COPY
INSPECTION SHEET FOR SAFETY AND DEMOLISHING WORK SL NO: IS(SD)-
NAME OF THE PROJECT :
LOCATION OF THE PROJECT:
DATE:
LOCATION OF WOEK
SAFETY
1) Sufficient helmet are present. YES NO N/A
2) Sufficient gloves are present. YES NO N/A
3) Sufficient shoes are present. YES NO N/A
4) Safety belt for fall protections are present. YES NO N/A
5) First aid box is present & equipped. YES NO N/A
6) Proper supply of pure dinking water. YES NO N/A
7) Sefety net is present. YES NO N/A
8) Sefety canopy is present. YES NO N/A
14) Warning signboards instructions for safety operation are present. YES NO N/A
15) Scaffolds are erected on solid supports with handrails and tied with fixed structure. YES NO N/A
16) Ladders are inspected and in good condition. YES NO N/A
17) Fixed ladders in excess of 15 feet have extra protection. YES NO N/A
18) Ropes and cables are in good condition. YES NO N/A
19) Excavation work is barricaded and lightings are provided. YES NO N/A
20) Power lines are deactivated, removed, or posted with warning signs. YES NO N/A
21) At least 25 feet clearance from overhead power lines are secured. YES NO N/A
22) Fire protection arrangement has done.
23) Photographs are taken
FOR DEMOLISHING WORK
24) Engineering survey reports are prepared properly. YES NO N/A
25) Chutes are provided for disposing of materials. YES NO N/A
26) Demolishing plan is accepted by concern engineer. YES NO N/A
27) Utilities like gas, water and electricity lines are disconnected. YES NO N/A
28) Hazardous materials/chemicals are removed from any pipes, tanks, or equipment. YES NO N/A
29) All signs, warning signals, and protective equipment are in place. YES NO N/A
30) Photographs are taken YES NO N/A
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER
DRAFT COPY
INSPECTION SHEET FOR ADMINISTRATIVE AND TECHNICAL APPROVAL. SL NO: IS(AT)-
NAME OF THE PROJECT :
LOCATION OF THE PROJECT:
DATE:
1) Administrative approval documents like DPP and other relavant papers are present. YES NO N/A
2) Notification of award is present. YES NO N/A
3) Bill of quantity as per tender is present. YES NO N/A
4) Work program schedule is present. YES NO N/A
5) As built detail drawings are present. YES NO N/A
6) Retrofit detail design drawings are present. YES NO N/A
7) Concrete core cutting results are present. YES NO N/A
8) Approved site plan is present. YES NO N/A
9) Temporary labor shed is indicated and adequate. YES NO N/A
10) Location of water supply arrangement is indicated and adequate. YES NO N/A
11) Location of material storing place is idicated and adequate. YES NO N/A
12) Critical distance from existing building is considered. YES NO N/A
13) Electric over head line passing over the site is considered. YES NO N/A
14) Trees and houses to be removed from site are considered. YES NO N/A
15) Site is cleaned, cleared from temporary obstacles. YES NO N/A
16) Photographs are taken YES NO N/A
ARCHITECTURAL AND STRUCTURAL DRAWINGS
17) Approved detail architectural drawings are kept in the site. YES NO N/A
18) Approved detail structural drawings are kept in the site. YES NO N/A
19) Architectural drawing and Structural drawing are coinciding each YES NO N/A
other (no difference) .
CONTRACTOR SUB-ASSISTANT ENGINEER SUB-DIVISIONAL ENGINEER