COATING REHABILITATION NEW TECHNOLOGICAL DEVELOPMENTS IN THE FIELD OF COATING BY RAJESH UPRETY CHIEF PROJECTS MANAGER IOCL
CROSS COUNTRY PIPELINE A DIFFERENT PERCEPTION JOURNEY OF PIPE : STEEL PLANT PIPE PLANT COATING PLANT STOCKYARD CONSTRUCTION SITE LAID INTO TRENCH BACK FILLING
CROSS COUNTRY PIPELINE A DIFFERENT PERCEPTION JOURNEY OF PIPE : PIPE CANNOT SPEAK, MUTE SUFFERER SUBJECTED TO INTERNAL CYCLIC LOADING (BLOOD PRESSURE) SUBJECTED TO STATIC & DYNAMIC LOAD (TENSION & WORRIES) LAID ON UNEVEN TERRAIN (PIPE NEEDS TO BE DUCTILE & COATING NEEDS TO BE FLEXIBLE) PASSES DIFFERENT SOIL CONDITIONS SUBJECTED TO CATHODIC PROTECTION (ELECTRIC SHOCK)
CROSS COUNTRY PIPELINE A DIFFERENT PERCEPTION JOURNEY OF PIPE : IT IS THEREFORE, OUR SINCERE DUTY TO SELECT RIGHT PIPE MATERIAL, MANUFACTURE QUALITY PIPES, SELECT RIGHT TYPE OF COATING, APPLY IT PROPERLY, HANDLE IT WITH CARE & PASSION AND LASTLY MAINTAIN IT PROPERLY WITH PROPER & EFFECTIVE CATHODIC PROTECTION & TIMELY REFURBISHMENT. WE MUST, THEREFORE, PUT OURSELVES IN PLACE OF THE PIPE TO UNDERSTAND THE PAIN OF PIPE.
PIPELINE COATINGS PIPELINE COATINGS FOR NEW PIPELINES
INADEQUATE MANUFACTURERS TECHNICAL DATA SHEET HIGH COATING THICKNESS UV RESISTANCE OF COATINGS MISCONCEPTIONS ABOUT COHESIVE FAILURE PRE-HEATING BEFORE SHOT/ GRIT BLASTING SHOULD BE MADE MANDATORY. RANDOM CHECKING OF SURFACE PROFILE BY PRESS-O-FILM SHOULD BE MADE MANDATORY. RESIDUAL MAGNETISM
CRITICAL ISSUES FOR COATING OFTEN NEGLECTED CONTROL ON PROCESS PARAMETERS SUCH AS BARE PIPE TEMPERATURE, NOZZLE PRESSURE, MILL SPEED ETC., WATER QUENCHING SHOULD BE UNIFORM (LIKE AN UMBRELLA) FLUIDIZED BED SHOULD BE IN AN AC ROOM AND NOT NEAR THE EPOXY APPLICATION BOOTH LONG TERM PERFORMANCE TESTS (E.G., HOT WATER IMMERSION TEST IN TAP WATER FOR 120 DAYS FOLLOWED BY PEEL TEST). ISO 21809 PART-3 HAS NOW INTRODUCED HOT WATER IMMERSION TEST FOR 28 DAYS FOLLOWED BY PEEL TEST. DOLLY TEST MUST BE INCLUDED IN THE SPECS
CRITICAL ISSUES FOR COATING OFTEN NEGLECTED
APPLICATION WINDOW CALCULATIONS TO BE PROPERLY CARRIED OUT. MAJOR & MINOR COATING REPAIR TO BE APPROPRIATELY DEFINED SO AS TO AVOID ANY AMBIGUITY. CALIBRATION OF EQUIPMENTS SHOULD BE SERIOUSLY REVIEWED. CONDUCTING RUBBER MUST BE USED IN HOLIDAY DETECTION MACHINE. COATING FAILURES TO BE ANALYSED AND DISCUSSED IN APPROPRIATE FORUMS.
RECENT DEVELOPMENTS IN COATINGS
COATING SELECTION IS NEARLY ALWAYS BASED ON TEST RESULTS ON NEW SAMPLES NOT ON AGED COATINGS.
COATINGS NEED TO BE FIRST STRESSED BY EXPOSURE TO A COMBINATION OF HEAT, WATER AND TIME, AND THEN SUBJECTED TO ADHESION TESTS.
SELECTION CRITERIA OF NEW PIPELINE COATING (A HOLISTIC APPROACH) REFURBISHMENT COATING SHOULD BE KEPT IN MIND. e.g., 3 LPE COATING IS VERY HARD TO REMOVE DIAMETER OF PIPE SOIL CONDITIONS LIKE ROCKY TERRAIN ABRASION RESISTANCE/ MECHANICAL STRENGTH JOINT COATING CONSTRUCTION EXPERIENCE
BASIS OF SELECTION OF MAIN LINE COATING CONSTRUCTION RELATED Handling and transportation Above ground storage Bending Stringing and lowering Withstand high black body temperature and UV exposure Easy to repair
IN-SERVICE PERFORMANCE RELATED
Good adhesion to the pipe surface not just at 23 o C but at the max. operating temperature of the pipe, and for the in-service life Withstand shear forces at the max. operating temperature of the pipe Effective moisture and oxygen barrier Effective electrical insulator Low cathodic disbondment at holidays Resist chemical, heat and UV degradation ISSUES RELATED TO 3 LPE COATING PRACTICAL EXPERIENCE 3 LPE with excellent insulating properties, although allows water to permeate, shields CP current in case of a pin hole, leading to disbondment. As per DIN 30670 peel test to be carried out within 24 hrs, which is not correct In 3 LPE coating, white latex paint is used in the coating plant, which is washed away in case the storage duration is long or in case the latex paint is not applied properly, thus causing degradation of outer layer and disbondment of coating. In case of refurbishment it is almost impossible to remove 3 LPE coating. While selecting a type of coating , refurbishment of coating related issues also to be kept in mind. 3 LPE does not have good abrasion and gouge resistance. As such it is not ideally suited for HDD applications. In case of HSAW pipes, DFBE coating is better as it covers the intricate parts such as seam weld, girth weld etc., in a uniform manner. 3- Layer PE Adhesion Loss 3- Layer PE Adhesion Loss 3-Layer PE: Corrosion in Girthweld Area What is Dual-Layer FBE? An anti-corrosion layer of FBE
Overcoated with a 2nd layer for special properties
Application of FBE
Cleaning of substrate by abrasive blast cleaning, phosphoric acid pretreatment, (chromate) Pre-heating by induction to 230C Application by spray with multiple gun set-up Coating bonds to substrate Quenching after typically two minutes QC and testing
Fluid beds Coating Booths pipe Electrostatic guns Primary Coat Dust Collector Topcoat Dust Collector DFBE Application Corrosion Coating Topcoat Properties of the Corrosion Protection Base Layer Good adhesion to substrate Sufficient flexibility Compatible with the CP system Good resistance to under creep of coating Barrier to both oxygen and water Suitable reactivity to be compatible / work with subsequent layers Properties of Protective Layer - 2 nd Layer Good adhesion to corrosion protection layer to form a composite coating
Must complement corrosion protection layer
Needs to have sufficient flexibility
Damage resistant coatings must be capable of withstanding different types of field damage
Coatings designed for use at high temperatures must give good barrier properties and sufficient strength at service temperature Types of DFBE Coatings Mechanical protection for damage resistance
High friction for concrete weight coating
UV resistance for storage resilience
Mechanical Protection Systems What does MPS deliver? Improved backfill damage resistance Improved resistance to damage
How do we know this? Simulation of laying condition back fill Directional drill and dragged pipe simulation Gouge test
Improved Backfill Damage Resistance Evaluated using a stone drop test - Modified ASTM G13 Crushed riverbed aggregate 25mm 7.5Kg per drop Impact angle 45 degrees
Improved Damage Resistance 400 microns of standard FBE = holidays
300 microns of standard FBE and 300 microns of mechanical protection system using 10 drops = NO holidays Gouge and Impact Testing of Damage Resistant DLFBE and PE Improved Gouge Resistance Gouge Test Weight loaded on an engineered tip
Dragged over test piece
Assessed for penetration Panel of Damage Resistant DLFBE after 50 kg Gouge Test Panel of 3LPE After 40 and 50 kg Gouge Test 50 Kg Gouge Test Results
EXPECTATIONS OF REFURBISHMENT COATING EASE OF APPLICATION & HANDLING ADHESION RESISTANCE TO CATHODIC DISBONDMENT HIGH RESISTANCE TO INDENTATION/ PENETRATION HIGH SOIL RESISTANCE RESISTANCE TO BACTERIAL ATTACK RESISTANCE TO BACKFILL HIGH ABRASION RESISTANCE MINIMUM SHIELDING OF CP CURRENT
EXPECTATIONS OF REFURBISHMENT COATING EASE OF INSPECTION DURING APPLICATION FAST CURE TIME AND MINIMUM TIME TO BACKFILL NO TENTING EASY TO REMOVE ENVIRONMENT FRIENDLY UV RESISTANT COMPATIBILITY WITH OTHER EXISTING COATINGS ECONOMICAL EXPECTATIONS OF REFURBISHMENT COATING RESISTANCE TO CREEP HIGH IMPACT RESISTANCE LOW MOISTURE PERMEABILITY FLEXIBILITY LONG LIFE HARDNESS TEMPERATURE RESISTANCE (SERVICE TEMPERATURE) Determining Pipeline health Survey is done every 5 years. CAT (Current attenuation technique) DCVG (Pin pointing defects) CIPS Combination of these to prioritize & finalize the location and identify interferences etc., Bell Hole Survey
PIPE LINE COATINGS 3 LPE (2 to 3.5mm thk) DFBE (0.7mm thk) FBE (0.45mm thk) 3 LPP (2 to 3.5mm thk) PIPELINE COATINGS TEMP RATING FACTORY APPLIED COATING PICTORIAL VIEW MAXIMUM TEMPERATURE RATING Coal Tar Enamel 60C 3 Layer Polypropylene 140C
Dual Layer Fusion Bonded Epoxy 110C 3 Layer Polyethylene 80C *In case of 3LPE coating the thickness of outer layer varies based on the following factors:- - Water/Humidity barrier. - Antirock system(rock shield) required or not. - Special precaution required during storage, transportation, handling,trench bottom preparation, back filling etc - -Laying & service conditions. -- Environmental temperature.
** In case of FBE coating the outer layer thickness is fixed and all necessary precautions have to be taken into consideration for preventing damage to the FBE coating which are OFFSET by providing higher thickness of 3LPE Coating.
COMPARISON OF 3LPE/DFBE PIPELINE COATINGS THICKNESS 3LPE DFBE Anti Corrosion Layer 150 300-350 micron Hot Melt Adhesive Layer 200 - Outer Layer (Mechanical Protection/ARO) 1800 to 3800*
250-350** COATINGS DURING CONSTRUCTION Tuesday, July 02, 2013 39 DFBE 3LPE 3LPP CTE TYPE OF FIELD JOINT COATINGS FIELD JOINT COATINGS TYPE OF MAIN LINE COATINGS 3LPE 3LPP FBE Three Layer Heat Shrink Sleeves
Liquid Epoxy Coatings
Liquid Tar Urethane Coatings
Liquid Urethane Coatings
Liquid Epoxy Urethane Coatings
Multi layer Cold Applied Tape Coatings
Visco Elastic Tape Coatings
FBE / Adhesive / PE or PP hot tape system
Spray applied FBE powder
Flame Spray PE / PP
PROTECTIVE CURRENT DENSITY FOR NEWLY COATED PIPES
(*) SOURCE IS 8062-2006 (CATHODIC PROTECTION OF BURIED PIPELINE/STRUCTURE FOR TRANSPORTATION OF NATURAL GAS, OIL AND LIQUIDS CODE OF PRACTICE) SOIL RESISTIVITY Ohm-meter 3LPE A/m FBE/DFBE A/m <10 50 70 10-100 25 50 >100 15 25 COATING RESISTIVITY
COATING - PHILOSOPHY THOUGH PIPELINE COATINGS ARE DESIGNED TO REMAIN BONDED TO STEEL FOR DESIGN LIFE OF PIPELINE --- IN REAL LIFE, COATINGS TENDS TO FAIL PREMATURELY OR AFTER THE DESIGN LIFE THE PIPELINE OPERATOR STILL WANTS TO OPERATE THE PIPELINE AND WOULD REQUIRE RE-COATING
CONSEQUENSES OF CORROSION
PIPELINE COATINGS FAILURES FAILURE OF COATINGS LEAD TO CORROSION PIPE RUPTURE SEVERE CORROSION PIPE RUPTURE FAILURE FROM THE SEAM
WHY DO COATINGS FAIL ? WHY DO COATINGS FAIL ? IMPROPER COATING SELECTION
IMPROPER COATING APPLICATION
LAYING DAMAGES
PREMATURE FAILURE OF COATING MATERIAL
IMPROPER CATHODIC PROTECTION
FAILURE OF COATINGS
WHEN COATINGS START TO FAIL WHAT STEPS ARE TO BE TAKEN ? CORRECTIVE MEASURES
ENHANCE CATHODIC PROTECTION
RECONDITION / RECOAT
REPLACE THE PIPE LINE
RECONDITION / RECOAT
VARIOUS TECHNOLOGIES OF RECOATING COAL TAR OVER THE DITCH HOT APPLIED COAL TAR TAPE COLD APPLIED TAPE VISCO ELASTIC TAPE HIGH BUILD LIQUID EPOXY LIQUID POLYURETHANE MCU (MOISTURE CURE URETHANE) Current Practices/Technologies COAL TAR ENAMEL BENEFITS LOW COST EASY TO APPLY
LIMITATIONS LOW SOIL STRESS RESISTANCE DIFFICULT TO MAINTAIN APPLICATION TEMPERATURE UNEVEN FLOW OF MOLTEN CTE RESULTING IN UNEVEN/INADEQUATE COATING THICKNESS PARTICULARLY AT 4 O CLOCK AND 8 OCLOCK POSITIONS SUSCEPTIBLE TO SCC HEALTH AND SAFETY CONCERNS
COAL TAR ENAMEL 58 COAL TAR ENAMEL Current Practices/Technologies Cold Applied Tape BENEFITS NO HEATING EASY TO APPLY WITH WRAPPING MACHINE HIGH PRODUCTIVITY UNIFORM THICKNESS LESS DEPENDENCE ON HUMAN SKILLS
LIMITATIONS LOW ADHESION AND SUSCEPTIBLE TO DE-LAMINATION SUSCEPTIBLE TO SCC CATHODIC SHIELDING TENTING EFFECT OBSERVED ON SAW PIPES
Current Practices/Technologies Coal Tar Based Tapes-Hot applied BENEFITS LOW COST
LIMITATIONS LOW ADHESION AND SUSCEPTIBLE TO DELAMINATION SUSCEPTIBLE TO SCC HEATING DURING APPLICATION POSES RISK TO PIPELINE AND HUMAN LIFE CATHODIC SHIELDING TENTING AT WELD SEAM LUMPING AND THINNING HOLIDAYS, WRINKLING ETC., DIFFICULT TO APPLY LOW PROGRESS
HOT APPLIED TAPE 61
Current Practices/Technologies VISCO ELASTIC SELF HEALING COATING BENEFITS PERMANENT SOLUTION IMPREGNATING STEEL NO ADHESION PROBLEM COLD APPLIED NO CRACKS SIMPLE AND EASY FOR APPLICATOR ONLY ST 2/3 SURFACE PREPARATION NEEDED ONE COMPONENT MATERIAL TENSIONLESS APPLICATION NO SPECIAL TOOLS NEEDED REMAINS FLEXIBLE FOREVER EASY TO MOULD VERY FAST AND EASY TO APPLY
Current Practices/Technologies VISCO ELASTIC COATING BENEFITS NO WASTE AND NON-TOXIC HAS NO LIMITS FOR STORAGE SHELF LIFE OR APPLICATION TIME
LIMITATIONS NO SOIL STRESS RESISTANCE HENCE CAN WRINKLE IN BLACK COTTON SOIL CLEANING CLAIM THAT COATING CAN BE DONE IN St-3 SURFACE, HOWEVER, BASED ON OUR EXPERIENCE/ FEEDBACK BLASTING IS NECESSARY REMOVAL IS DIFFICULT
VISCO ELASTIC COATING Current Practices/Technologies LIQUID EPOXY COATING BENEFITS GOOD ADHESION AND CD RESISTANCE GOOD SOIL RESISTANCE GOOD PERFORMANCE IN WET CONDITIONS NO KNOWN INSTANCES OF SCC FAST APPLICATION AND LESS DEPENDENCE ON HUMAN SKILLS NO TENTING EFFECT ON SAW PIPES EXCELLENT BONDING ON ALL INTRICATE STRUCTURES
LIMITATIONS LONGER CURE TIME COMPARED TO URETHANE, SLOW CURE BELOW 5 DEG C INSECT AND DUST CONTROL TILL CURING IS ACHIEVED PROPER PPE REQUIRED DURING APPLICATION/INSPECTION LESS SURFACE IMPERFECTION TOLERANT
TYPICAL TEST PROPERTIES LIQUID EPOXY
Property Typical Value Specific Gravity 1.35 Mixed+_ 0.10 Color Green Mix ratio 2A:1B by volume. Shelf Life Min 6 Months. Dry to Touch Time 24C 2 Hrs Max. 50C 30 minutes Max. Viscosity in cps Spray Grade Part A: 60000-90000. Part B : 9000-20000 Abrasion Resistance 0.5 g max loss Impact Resistance At Room Temp Joule Value =2.5 Min Flexibility 20C 0.5 /PD Min. Coating Rehabilitation Current Practices/Technologies PU COATING BENEFITS
GOOD ADHESION AND CD RESISTANCE GOOD SOIL RESISTANCE FAST CURING AND LOW TEMPERATURE CURE NO KNOWN INSTANCES OF SCC HIGHER IMPACT RESISTANCE THAN LIQUID EPOXY SYSTEM ADEQUATE MECHANICAL STRENGTH TO ABSORB SHOCK, HANDLING, ABRASION FAST APPLICATION AND LESS DEPENDENCE ON HUMAN SKILLS AS COATING DOES NOT SHRINK, EXTREMELY GOOD FOR FIELD JOINTS & ON WELD SEAMS. UV RESISTANT BASIC PROPERTY OF PU. AS TOUCH DRY TIME IS LESS, IT IS FAST PUT BACK INTO SERVICE VERY DIFFICULT TO REMOVE
Current Practices/Technologies PU COATING
LIMITATIONS
LESS RESISTANCE TO CD THAN LIQUID EPOXY SYSTEM INSECT AND DUST CONTROL TILL CURING IS ACHIEVED PROPER PPE REQUIRED DURING APPLICATION/ INSPECTION LESS SURFACE IMPERFECTION TOLERANT LOW POT LIFE OF PU CARRYING SKID/ SPRAY EQUIPMENT IN ROW REMOVAL OF PU COATING AT SITE FOR FURTHER REFURBISHMENT LIMITED APPLICATORS PRESENT IN THE INDUSTRY VERY DIFFICULT TO APPLY BY BRUSH Automatic Spray Application
COMPARISON- PU & LQUID EPOXY
S. No TEST PROPERTIES TEST MET HOD PU 2 COMP SOLVENT FREE EPOXY (1) THICKNESS ELCO METE R 2000 MICRONS 1000 MICRONS (2) ADHESION D- 4541 1200 PSI 2500 PSI (3) HARDNESS D- 2240 > 60 SHORE D > 85 SHORE D (4) WATER PERMEABILITY ASTM E-96 0.3 gms/24 Hour/M 2
Max. 0.1 gms/24 Hour/M 2
max. (5) ABRASION RESISTANCE (1OOO GM LOAD, 1000 CYCLES) D- 4060 Weight loss < 0.05 gms (H10 Wheel) Weight loss < 0.05 gms (H10 Wheel) COMPARISON- PU & LQUID EPOXY
S. No TEST PROPERTIES TEST MET HOD PU 2 COMP SOLVENT FREE EPOXY (6) CATHODIC DISBONDMENT (28 days @ 25 0 C)
G-8 < 5 mm < 4 mm FUNCTIONAL PROPERTIES OF LQUID EPOXY COATING ARE FAR SUPERIOR TO ELASTOMERIC POLYURETHANE COATINGS. Current Practices/Technologies MCU COATING BENEFITS
LONG TERM ADHESION FAST CURING EASY TO USE: ONE COMPONENT/AVOID MIXING FAILURES/NO RECOAT WINDOW APPLY IN ALL WEATHER CONDITIONS : 6 99% RH APPLICATION TO DAMP SUBSTRATES NO DEW POINT RESTRICTIONS RESISTANT TO FOG, RAIN AND DEW CURES EVEN AT -15 C ALL YEAR ROUND AND NIGHT APPLICATION POSSIBLE SURFACE TOLERANT : BEST ADHESION ON MINIMAL PREPARED SURFACES LOW STEEL ROUGHNESS REQUIRED: 25 M OR HAND AND POWER TOOL PREPARED FLASH RUST TOLERANT
FINAL CONCLUSION MAINLINE COATING DUAL FBE GOOD MECH STRENGTH REFURBISHMENT COATING LIQUID EPOXY/ VISCO ELASTIC TAPE
NO TENTING JOINT COATING LIQUID EPOXY/ HEAT SHRINK SLEEVES THANK FOR THE PATIENT HEARING !