Seismic Load Calculation

Load Calculation
Items Quantity Unit Remarks load
Slab Thickness 0.183 m With plaster Floor Slab 381.8773
Beam width 0.3 m Beam
Beam Depth 0.45 m Without Slab Column 24
Column Length 0.6 m B/Wall
Column Breadth 0.6 m Floor finish load 381.8773
Column Height 2.448 m Partition load 381.8773
B/w thickness (230 mm) 0.2625 m Including Plaster Parapet wall load 0
B/w thickness (115 mm) 0.1475 m Including Plaster 25 or 50 % of live load 381.8773
B/w height 2.448 m
Finish load 1.339 Kn/m2 Total GF load =
Partition load 1 Kn/m2 Total FF =
Parapet height 1 m Total SF =
parapet width 0.1475 m Including Plaster Total TH =
Live load 4 Kn/m2 Total FF =
Brick Masonry Density 19.2 kN/M3 Total Top floor =
RCC Density 25 kN/M3
Ground Floor load = 3928.049
First Floor load = 3928.049
Second Floor Load = 3928.049
Third Floor load = 3928.049
Fourth Floor load = 3928.049
Top Floor = 3928.049
Total weight of building = 23568.29
Ground Floor
Unit Load
Sqm 1742.315 kN
Rm 0 kN
nos 528.768 kN
Rm 0 kN
Sqm 511.3337 kN
Sqm 381.8773 kN
Rm 0 kN
Sqm 763.7546 kN
Total GF load = 3928.049 kN
3928.049
3928.049
3928.049
3928.049
Total Top floor = 3928.049
kN
kN
kN
kN
kN
kN
kN
Time Period
Sno Description of Item Quantity Unit
1 T=0.075 H ^0.75 Sec
Height (H)=19.279
T=0.075 *19.279^0.75
Time Period= 0.690 Sec
0.690 Sec
Base Shear Calculation
2 Vb= Ah*w
Ah= Design Horizontal Seismic Coefficient
W= Weight of the Building
Ah= (Z*I*Sa/g)/2R
Zone Factor (Z) 0.36
Importance Factor (I) 1
Response Reduction Factor ( R) 5
Spectral Acceleration (Sa/g) 2.5
Ah= (Z*I*Sa/g)/2R 0.09
Weight of the Building 23568.29 KN
Base Shear (Vb) 2121.15 KN
Distribution of Base Shear NNBC 205
Floor Weight of The Floor( KN) Height ( Hi) WiHi
Top 3928.05 18.288 71836.16
Fourth 3928.05 15.24 59863.47
Third 3928.05 12.192 47890.77
Second 3928.05 9.144 35918.08
First 3928.05 6.096 23945.39
Ground 3928.05 3.048 11972.69
Grand Total 251426.56
NNBC 105 Seismic Design
Remarks
Clause 7.6.1, IS 1893:2002 T1 = 0.06 H for concrete frames
0.55 sec
In X-Direction Base Shear Calculation
In Z-Direction
Cd = CZIK cd = horizontal Seismic Coefficient
Basic Seismic coefficient (c) =
Clause 7.5.3; IS 1893:2002 Seismic Zoning Factor (Z) =
Importance factor (I) =
Structural Performance Factor (K) =
Clause 6.4.2, IS 1893:2002 Cd =
For Zone V Table 2; IS 1893:2002
For Mercantile Building Table 6; IS 1893:2002 Base shear Vb = Cd * Wt
For Special Moment Resisting Frame Table 7; IS 1893:2002
From Chart Figure 2; IS 1893:2002
From Weight Calculation Sheet
Using IS 1893:2002
Fi=Vb*WiHi/sum of (Wi*Hi)
606.04
505.03
404.03
303.02
202.01
101.01
2121.15
for concrete frames Clause 7.3 a; NBC 105
cd = horizontal Seismic Coefficient Clause 8.1.1; NBC 205
0.08 figure 8.1; NBC 205
1 figure 8.2; NBC 205
1 Table 8.1; NBC 205
1 Table 8.2; NBC 205
0.08
1885.46 kN clause 10.1.1; NBC 205