Sunteți pe pagina 1din 2

Kirsten Staloch

ARCH 371
Gleye
Fall 2009

Detail drawing of designed bricks with ribbon window

South East
Exterior Perspective

D
4th Ave N A A
D

B
B B 15
B 15
1
2

3 5 5
14
4
5 6 6

8
7 16

10

17
11 18

3rd Ave N C C C 6 C

9 Plan Schedule
1. Gallery
12
2. Kiosk
3. Activity Room
4. Security Office
5. Mechanical/ Closet
6. Office
13 11 7. Career Center
8. Career Counseling
9. Auditorium
10. Break Room
11. Classroom
12. Conference Room
First Floor Second Floor 13. Culture Center
Site/ Context Plan Scale 1’= 1/16” Scale 1’=1/16”
Scale 1”=80’ 14. Mixed Use Space
15. Study Room
16. Computer Cluster
D A D
A 17. Library
18. Preparatory Space

Sections
Scale 1’= 1/16”
C D
A B
West North South

Elevations
Scale 1’=1/16”

Transitions with Time

Gallery Interior Perspective

Joint detail of roof hinge Clerestory detail of direct light

Egress Exiting Plan = Black Arrows


Universal Access Plan = Blue Arrows

Site Light Plan


Library Interior Perspective

South West Exterior Perspective

S-ar putea să vă placă și