Sunteți pe pagina 1din 69

R

S
M
S-4
E
S
O
O
T
RS
T.S.
XX
XX
GR
P & ID No.
XX
XX
XX
P&ID NO.
LP STEAM
TO/ FROMHEADER
A
245
NOTE NUMBER
BUTTERFLY VALVE
(VBFY)
GR - COMMODITY
AE - ANALYZER
TSO
SPECTACLE BLIND (CLOSED)
(BLDC)
- BLOWDOWN & RELIEF
- CARBON DIOXIDE GAS
DK
- HYDROGEN SULPHIDE GAS
SH
- SLOP OIL
WS
- FIRE WATER
- FILTERED WATER
CONTINUATION ARROW
TO ANOTHER DRAWING
(ARROW1)
FOUNDATION FIELDBUS
SIGNAL (FF)
DIAPHRAGMVALVE
(VDIA)
X - NOMINAL LINE SIZE
- FAIL LOCK LAST POSITION
X
DUPLEX TYPE STRAINER
(DUPLEX)
- NORMALLY CLOSED
- LOCKED OPEN
BD
DRAIN OR VENT WITH PLUG
OR BLIND FLANGE
(DRORVT)
FIRE HYDRANT
- COOLING WATER SUPPLY
HV
- INERT GAS (NITROGEN)
- CAUSTIC
- PROCESS PIPING
FIRE ISOLATION VALVE
[GREENWOOD TYPE]
(FIV)
- AERATION AIR
CWS
GI
KC
SEQUENCE NO.
P
Y TYPE GLOBE
(VGLY)
SLIDE VALVE [MANUAL]
(SLDE)
CSC
4=WAY VALVE
(VA4WY)
- COMPRESSOR TRIM
- LOWPRESSURE H2
- AMMONIA, ANHYDROUS
###
GLOBE VALVE
(VGL 1)
- CAR SEALED CLOSED
CSO
COMMODITY DESIGNATIONS
CT
GHL
PLT. UNIT NO.
GATE VALVE
(VGA)
VT
SINGLE ACTION
CYLINDER ACTUATOR
(AIR (PISTON) OPERATED VALVE)
(AIRV)
- CAR SEALED OPEN
LN
VALVE WITH BLEED
OR PURGE CONNECTION
(VBLEED)
- CHLORINE
HOSE CONNECTION
(HC)
FUTURE
WM
CLOSED SEWER DRAIN
(SEWERCL)
REFER TO SEWER
DESIGNATIONS FOR XX
- ATMOSPHERIC VENT
MOTOR OPERATED VALVE
(MV)
- LOCKED NEUTRAL
FOR EACH SPECIFIC UNIT AND FOR EACH SPECIFIC FLUID
DESIGNATION WITHIN THAT UNIT THE LINE NUMBERING WILL
BEGIN AT 001.
LC
ANGLE VALVE
(VANG)
TRAP STATION
(TRAP)
DR
POST INDICATOR VALVE
- CHILLED WATER SUPPLY
GC
- DRAIN FLUSH (CLOSED HYDROCARBON DRAIN)
FL
VALVE POSITIONS DESIGNATIONS
- PROCESS AIR
DT
DA
GR
- PROPYLENE REFRIGERANT
OF
SS
RA
LINES CONNECTED
(ARROWS AS REQUIRED)
DOUBLE BLOCK & BLEED
GAUGE VALVE
SPEC BREAK
(SPECBRK)
FIRE HYDRANT
WITH MONITOR
AR
- OILY DRAIN
- ACID SEWER
- PURGE GAS
RP
- AMMONIA, AQUEOUS
-TEMPERED COOLING WATER RETURN
- PUMP TRIM
WB
FO
FC
BALL VALVE
HIGH PRESSURE
SIDE SHADED
LINE DESIGNATION
UTILITY CONNECTION (UTCON).
REFER TO COMMODITY
DESIGNATION FOR XX
AP
TRACED LINE
DO
FOR XX, USE THESE SYMBOLS
GP
- POND EFFLUENT
KW
WR
PT
- RAWWATER
CONTROL VALVES
BALL VALVE
(VBA)
- NORMALLY OPEN
UTILITY STATION
(USTN)
AI
- AMINE DRAIN
SEWER_DESIGNATIONS
- OXYGEN GAS
EF
- SULPHUR
- PROCESS WATER
- PROCESS CONDENSATE
WA
FL(C)
MIN. FLOWCHECK VALVE
(VCHKMIN)
MIXING OR INJECTION POINT
AC
DM
- FULL PORT
GO
- SANITARY SEWER
KS
WP
PC
- VESSEL TRIM
STOP CHECK VALVE
(VCHK_STOP)
SAMPLE POINT
AA
- COOLING WATER RETURN
FP
- NATURAL GAS
DS
- PROCESS CHEMICALS
- CHILLED WATER RETURN
- PROCESS AMMONIA
CHECK VALVE
(VCHK)
SILENCER
(SIL)
- INSTRUMENT AIR
CWR
- HAND CONTROL VALVE
GN
- STORMSEWER
KP
PA
PLUG VALVE
(VPLG)
FUTURE LINE
FLEXIBLE HOSE
(FH)
ECCENTRIC REDUCER
(ECCFOT)
(ECCFOB)
NNF
RE
SM
- OIL MIST
TT
MAIN LINE PROCESS
& UTILITY
TIE-IN POINTS SHALL BE DESIGNATED AS FOLLOWS
SEAL LEG
(SLEG)
- PROCESS DRAIN
KA
- LOW- PRESSURE STEAM (350 kPa(ga))
OM
- VACUUM STEAM
PACKAGE UNIT BOUNDARY
- FAIL LOCK (ULTIMATE CLOSE)
GRADE
(GRADE)
SPACER
(SPACER)
DP
- INHIBITOR
SL
- LOWPRESSURE OIL
SV
CONTROL VALVE
AND MANUAL ACTUATOR
(HV)
OTHER_DESIGNATIONS
- FAIL INTERMEDIATE (ULTIMATE OPEN)
LINE BREAK
CL
GHH
IN
- HIGH-PRESSURE SULPHUR PLANT STEAM(4200 kPa(ga))
OPL
- STEAMTRACING
CONTROL VALVE
AND DIAPHRAGMACTUATOR
[WITH HANDLEWHEEL]
(CV1)
INSTRUMENT ARROW
(ARRINT)
LINE SIZE ORIFICE (ORIF)
ANNOTATE RO DIAMETER
ZZZ - PIPE MATERIAL CLASS
- FAIL INTERMEDIATE (ULTIMATE CLOSE)
END CAP SCREWED OR
SOCKETWELD (ENDSCR)
- CATALYST
- HYDROGEN GAS
DO
- HEATER TRIM
- OILY SEWER (CLOSED - ABOVE GROUND)
- HIGH PRESSURE OIL
WU
- MISCELLANEOUS TRIM, SAMPLE POINTS
CONTROL VALVE
AND DIAPHRAGMACTUATOR
(CV)
FLOWARROW
(ARRFLW)
HUB JOINT
WITH BLIND
WK
YYY - LINE NUMBER (1 THRU 999)
- FAIL LOCK (ULTIMATE OPEN)
END FLANGED
(ENDFLG)
- BOILER BLOWDOWN
GH
- AMINE SEWER
HT
OS
OPH
- TREATED WATER
XT
END CAP BUTTWELD
(ENDCAP)
TIE POINT SYMBOL (TP).
SEE NOTES
JACKETED PIPE
((JACKET)
HUB JOINT
- DEMINERALIZED WATER
(V) - VACUUMSERVICE
FL(O)
SPADE BLIND
(BLD)
CA
- FUEL GAS
DM
- SULPHURIC ACID
SI
- PURGE/FLUSHING OIL
WT
- HOT WATER SUPPLY
- CLARIFIED WATER
CONTINUATION ARROW
TO/FROM ANOTHER DRAWING
ELECTROMAGNECTIC,
SONIC OR NUCLEAR
SIGNAL (ELECMAG)
DIAPHRAGMSEAL
(SEAL)
WI
### - PLANT UNIT NUMBER
- TIGHT SHUTOFF
SPECTACLE BLIND (OPEN)
(BLDO)
BO
GF
- CHEMICAL SEWER
HS
- HIGH-PRESSURE STEAM(2500 kPa(ga) SAT.)
OP
- SOUR WATER
WH
WZ
LINE CONTINUED ON THE
SAME DRAWING
(ARROW2)
HYDRAULIC
(HYDRA)
- OILY WATER SEWER (OPEN)
BATTERY LIMIT
(XXX=MATCHING AREA
CODE NUMBER)
- HIGH PRESSURE H2
SECONDARY PROCESS LINE
& SERVICE LINE
CONCENTRIC REDUCER
(RED)
EXPANSION JOINT
(EXJ)
TEMPORARY STRAINER
(TS)
3=WAY VALVE
F=FAIL POSITION
(VA3WY)
SOLENOID VALVE
MANUAL RESET
(SOLEMANR)
FOR GR, USE THESE SYMBOLS
CONVAL VALVE
W/HILTAP COUPLING
NEEDLE VALVE
(VND)
- COMBUSTION AIR
PIPING AND COMPONENTS SYMBOLS
- BOILER FEED WATER
ELEVATED FIRE MONITOR
(SUPPORTED)
- MEDIUM-PRESSURE STEAM(900kPa(ga) SUPERHEATED)
DISSIMILAR MATERIAL
WELDING
OL
BASKET TYPE STRAINER
(BASKET)
LINE NUMBER SHALL BE ASSIGNED TO ALL PIPING AND
LDT (LINE DESIGNATION TABLES) AS FOLLOWS:
- LUBE OIL & SEAL OIL
DETONATION ARRESTOR
X - GR - ###YYY - ZZZ
INITIAL FEED TO THE
UNIT (ARROW3)
GX
- EXHAUST STEAM
OS
ST
WF
WF
SOFTWARE LINK
(SOFTWARE)
PRESSURE / VACUUM
(RVPRES)
- FAIL CLOSED
CONTINUOUS PURGE
REFER TO COMMODITY
DESIGNATIONS FOR XX
(PURGECON)
- BREATHING AIR
- FLARE HEADER (UNDETERMINED)
DF
- WASTE GAS
SE
- STEAMOUT
- DOMESTIC WATER
- CIRCULATING WATER
INSTRUMENT CAPILLARY
TUBING (CAPILL)
WL
- FAIL OPEN
INTERMITTENT PURGE
REFER TO COMMODITY
DESIGNATIONS FOR XX
(PURGEINT)
BA
FL
- CAUSTIC SEWER
GW
- LOWPRESSURE CONDENSATE
SO
WD
WX
PROCESS MEASUREMENT
OR MECHANICAL LINKAGE
[PROCESS]
- HOT WATER RETURN
FX(O)
NC
Y-TYPE PERMANENT
STRAINERS
(YTP)
- UTILITY AIR
- EXCHANGER TRIM
DC
- SYNTHESIS GAS
SCL
- HOT OIL
- TEMPERED WATER SUPPLY
- WASTE WATER
LINES CROSSING
NOT CONNECTED
VACUUMRELIEF VALVE
FX(C)
NO
T-TYPE PERMANENT
STRAINERS
(TTP)
AU
ET
- BENZENE DRAIN
GS
- HIGH PRESSURE CONDENSATE
OH
SN
WC
WW
ELECTRICAL SIGNAL
[ELECTRICAL]
RELIEF VALVE
(RV)
TRACED LINE ANNOTATE
ET [ELECTRICAL], GT[GLYCOL] & ST[STEAM]
SHOWTRACING MAINTENANCE TEMP.
(INSULTRCD)
LEVEL
- LOCKED CLOSED
HAND OPERATED VALVES
ELEVATED FIRE MONITOR
(SELF SUPPORTED)
- REGENERATION AIR
- DUCT TRIM
DB
- REFORMED GAS
SCH
- FUEL OIL
- HIGH-PRESSURE STEAM(4500 kPa(ga) SUPERHEATED)
- AMMONIA REFRIGERANT
- UTILITY WATER
PNEUMATIC SIGNAL
[INSTAIR]
MULTI PORT VALVE
(VMULTI)
INSULATED LINE ANNOTATE
H-HEAT OR C-COLD CONSERVATION,
A-ACOUSTIC, PP-PERSONNEL PROTECTION
SYMBOLS CAN BE COMBINED AS REQUIRED
(INSUL). SHOWINSULATION THICKNESS
CHANGE OF SLOPE
(SLOPE)
SEWER DRAIN
(SEWEROP)
REFER TO SEWER
DESIGNATIONS FOR XX VA
CONTROL SELF ACTUATED
REGULATOR.
POINTS TO CONTROLLED
PRESSURE SIDE
(CVINTER)
UNDERGROUND LINE
LO
REMOVABLE SPOOL
FLAME ARRESTOR
(FLAME)
- NORMALLY NO FLOW
- ETHYLENE REFRIGERANT
UTILITY
- SATURATED STEAM
SPECIALTY TAG
(SPTAG)
- TANK TRIM
P&ID NO.
XXX
SP
001
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE
SYMBOL DESCRIPTION.
UP 1:500
DAB(U) CAB
UT
F
F
B/L
AREA XXX
- MP - 001
001
CWRETURN
TOHEADER
F
ET 20
50
PP
50
---
SS
001
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
ADDITIONS / MODIFICATIONS
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
0
7
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
0
7
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
5
: 3
4
: 3
4
P
M
B
Y
:a
h
m
1
4
8
8
7
A
LEGENDS AND SYMBOLS
UNIT 200 - COMMON
200.0000.000.041.007
ELECTROMAGNECTIC,
SONIC SIGNAL (NOT GUIDED)
FREE DRAINING
FREE DRAINING
- STEAMCONDENSATE SC
147
TXE
002
I
113
FX
110
HIS
LTE
112
HS
404
HS
403
L
147
TXE
402
HS
004
FT
111
HIS
147 B
CB
197
*YE
401
HIS
XHS
005
PSHE
197
UE
I
I
113
PI
110
HS
111
HS
113
FR
113
FIC
XHIS
FI PI
E
LL
ZIK
ZRS
GI
T
E
M
P
E
R
A
T
U
R
E
- INSTRUMENT AIR SUPPLY
UNIT NO.
QRS
*E
FI
SR TDR
FAL
TY
FIT
UT
VSL
CR
R/S
PDC
TDCV
FLOWSWITCH, SPST
OPENS ON DECREASING
FLOW
DI
KT
-C
C-
LSL
PZ
XC
ZIC
3. NUMBERING SHALL FOLLOWTHE SAME PROCEDURE AS INSTRUMENTS.
O/C
SIS
QRC
LETTER CODE PER TABLE
RELAY COIL
DCS INTERLOCK
NO.001
TDRC
SIT
LG
Z
TX
FA
UV
FRS
VS
CIT
SEL
JX
KR
-
KV
-
THE SUFFIX LETTER "E" IS TO BE USED TO IDENTIFY COMPONENTS OF
A SAFETY SYSTEM- I.E.- SHUTDOWN, DEPRESSURING, LOCK UP, ETC.,
(PALE - ALARM ON LOWPRESSURE SHUTDOWN).
LS
-
FUNCTION IN DCS SYSTEM
DISPLAY TO OPERATE
XAL
TDRS
PDA
ZI
FOR ELABORATE CONTROL SYSTEMS A SEPARATE DRAWING (EITHER VENDOR OR CONTRACTOR) MAY BE REQUIRED.
IN SUCH A CASE, A BLOCK WILL BE DRAWN ON THE P&ID WITH A DRAWING NUMBER IDENTIFICATION AND SHOWING
ALL THE INPUT AND OUTPUT SIGNALS.
RECORDING SWITCH
FO
FC-245 017
B = BLUE
QRT
SIS INTERLOCK
NO.002
TW
SRS
X
1. ALL REDUNDANT TRANSMITTERS HAVE DEVIATION ALARMS IN THE DCS.
THE DEVIATION ALARMS ARE NOT SHOWN ON THE P&ID.
TR
FRC
UY
IRS
VT
TDRT
CIS
R/S
JR
KR
DE
-
KY
BA
LT
MSL
XA
PDZ
-
FIELD OR LOCAL
INSTRUMENT
RECORDING CONTROLLER
FE
QIS
G = GREEN
TDSL
RELAY
FUNCTION
=SUMMING
SRC
TG
ALARM
W
TIT
FUNCTIONAL LOGIC DIAGRAMS
HIS
UX
IRC
VV
CIK
JIT
KX
LV
FFAL
MS
TDT
XZ
PCV
ZE
LOOP NO.
INDICATING TRANSMITTER
A/S
Y = AMBER
QIK
RELAY TRANSDUCER ETC
DRIVE OR ACTUATOR
PG
SRT
-
V INSTRUMENT FUNCTION
TRS
HIK
UR
FFRC
IRT
TDV
VY
JRS
APPLICATION OF INSTRUMENT IDENTIFICATION TO P.&I.D.'S
KR
LY
MT
SWITCH
SWITCH LOW(L), MEDIUM(M), HI (H) PSL
ZC
INSTRUMENT
FUNCTION
FFRS
QIC
R = RED
SIS
FRT
GE
U
TRC
HIC
UIT
R
IIS INDICATING SWITCH
VX
EC
WS
KIT
RECORDER
LX
FFRT
MV
PS
ZAL
LP -
INDICATING CONTROLLER
INDICATING CONTROL STATION
INSTRUMENT ABBREVIATION
S
P
E
E
D
QI
LEGEND FOR
GC
T
TRT
HI
FFSL
URS
IIK
VR
JRT
WT
EAL
KRS
IS USED FOR SCANNING - I.E.- FOR TEMPERATURE TJI OR TJR.
ART
LR
MY
PT
ZA
-
FQIC
START HAND MANUAL
STOP OFF TRIP
RUN AUTO RESET
READY JOG ARMED
FUNCTIONAL ABBREVIATIONS MAYBE USED:
-S/S - START/STOP
-HOA - HAND-OFF-AUTO
-
Q
U
A
N
T
IT
Y
O
R
E
V
E
N
T
SIC
GAL
TIS
-
URC
IIC
VIT
EA
JIS
WV
J-
KRC ARC
FQIK
LIT
MX
E -
PV
ZZ
-
GENERAL_INSTRUMENTS_SYSTEMS
PILOT LIGHT
2. SOME TYPICAL FUNCTIONS ARE:
P
R
E
S
S
U
R
E
D
IF
F
E
R
E
N
C
E
QE
SI
GA
TIK
FQRC
-
URT
II
HARDWIRED SHUTDOWN INTERLOCK SYSTEM
VRS
JIK
WY
INSTRUMENT IDENTIFICATION LETTERS
KRT
AR
LRS
-
MR
B
PY
FFC
NOTES
FQRS
QC
S
P
R
E
S
S
U
R
E
-
GZ
TIC
HC
UIS
-
VRC
MEASURED VARIABLES
JIC
WX
FIS
R-
KIS
FQRT
AIT
CI
LRC
A
X -
MIT
AZ
Y -
PX
G E F
NOTES
M
O
IS
T
U
R
E
O
R
H
U
M
ID
IT
Y
QAL
SE
FFA
FQSL
TI
HAL
UIK
-
EXAMPLE
VRT
JI
WR
OPEN CLOSED HAND SWITCH MOUNTED ON A LOCAL PANEL FOR ACTUATING
A "XV" ON/OFF VALVE.
DCS COMPOSITE POINT SELECTOR SWITCH WITH OPEN/CLOSED INDICATION
FROM"XV" LIMIT SWITCHES OR POSITION TRANSMITTER.
FIK KIK
M
IS
C
E
L
L
A
N
E
O
U
S
- REMOTE SET POINT
GRC
GAUGE GLASS (TUBE)
TRANSMITTER
QS
PUSHBUTTON, MOMENTARY TYPE
NORMALLY OPEN CONTACT BLOCK
HR
ZY
-
- DIAL THERMOMETER
EI
IY
UA
ERC
"NAND" LOGIC GATE
FQR
JT
TDC
PDSL
L-
VC
FSL KSL
-
CX
DR
BX
SOLENOID VALVE
ON EMERGENCY
SYSTEMS
MOTOR CONTROL DISPLAYS IN THE DCS ARE DESIGNATED AS BELOW:
A
N
A
L
Y
Z
E
R
F
L
O
W
R
A
T
IO
W
E
IG
H
T
WCV
ELEMENT
V
GRT
PUSHBUTTON, MOMENTARY TYPE
NORMALLY CLOSED CONTACT BLOCK
QT
ZX
-
- PRESSURE GAUGES
SSL
2.
IX
ERT
UZ
"NOR" LOGIC GATE
LP
FQIT
JV
FS
VAL
PC
CV
DIT
WRC
BS
BACK OF PANEL
OR RACK MOUNTED
INSTRUMENT
TDA
MOTOR CONTROL
XIS
F
L
O
W
RTD
GIS
CONTROL VALVE (SELF OPERATING)
QV
LEVEL SWITCH, SPST
OPENS ON DECREASING
LEVEL
HRS
ZR
SS
RV
-
IR
TCV
FI
"AND" LOGIC GATE
WRS
O/C
MZ
VA
FT
WC
CT
DRS
BV
WILL BE USED OUTSIDE BALLOON TO IDENTIFY VENDOR SUPPLIED INSTRUMENTS.
TDZ
PDRC
HEXAGON DENOTES COMPUTER OR RTU FUNCTION
XIK
V
O
L
T
A
G
E
(E
M
F
)
WRT
3.
CONTROL
SP
GIK
PRESSURE SWITCH, SPST
OPENS ON DECREASING
PRESSURE
QY
ZIT
HRC
FSV
ST
-
FG
KS
TSL
TDAL
"OR" LOGIC GATE
FV
FQIS
VZ
WAL
CSL
TO PUMP
P-100B MOTOR
DRC
WSL
-
TWO STAGE VABIABLE ALARMS SHALL BE IDENTIFIED BY H AND HH,
OR L AND LL, - I.E.- H- HIGH LEVEL ALARM
- HH- VERY HIGH LEVEL ALARM
NOTE: SAFETY SYSTEMWILL BE GENERALLY BE HE NOT HHE.
SIS INTERLOCK
XIC
D
E
N
S
IT
Y
V
IS
C
O
S
IT
Y
-
- SAFETY INSTRUMENTED SYSTEM
GIC
ALARMLOW(L), MEDIUM(M), HI (H)
QX
LIMIT SWITCH
SINGLE - POLE
SINGLE - THROW[SPST]
JIY
SV
RV
-
LOOP NO.
XRC
TS
FE
S
1.
UCV
FY
WA
CS
TO PUMP
P-100A MOTOR
DRT
TDIC
BG
H/L -
DCS OR PLC INTERLOCK
XI
ZRT
6.
XRS
M
U
L
T
I V
A
R
IA
B
L
E
- FLOWRESTRICTION ORIFICE
FQZ
ELECTRONIC ALARM RELAY CONTACT
OPEN ON POWER FAILURE AND ABOVE
HI OR BELOWLO SET POINTS. CLOSED
DURING NORMAL OPERATING LIMITS.
IIT
QR
PDI
PSE
SY
H
FCV
TT
TDIK
F
FX
USL
WZ
CRT
HOA
XRT
DIC
BE
V -
FQAL PAL
DUAL FUNCTION (FOR SERVICES) INSTRUMENT
XG
ZIS
5. INDICATING LIGHTS SHALL BE COLOR CODED AS FOLLOWS:
RUNNING/OPEN - BLUE
STOPPED/CLOSED - YELLOW
TDIS
T
E
M
P
E
R
A
T
U
R
E
D
IF
F
E
R
E
N
C
E
-
- FLOWELEMENT
QIT
CONTACTS
HEAT TRACED
TRANSMITTER
SX
FG
ZRC
TV
FC
US
AS A GENERAL GUIDE, THE EXTENT OF INSTUMENTATION SHOWN ON THE P&ID SHOULD BE SUFFICIENT TO PERMIT
THE OBSERVER TO IDENTIFY THE MAIN COMPONENTS AND THE FINAL READOUT CONTROL AND/OR ALARM ACTION
AND TO UNDERSTAND THE FULL FUNCTION OF THE INSTRUMENT SYSTEM. IDENTIFICATION OF ALL COMPONENTS
AND THE FULL SCHEMATIC RELATIONSHIP ARE SHOWN ON THE INSTRUMENT HARD WIRED LOOP DWGS.
START/STOP AND H-O-A HAND SWITCHES FOR PUMP "A" WILL HAVE A
SEQUENTIAL NUMBER. A DIFFERENT SEQUENTIAL NUMBER IS USED FOR PUMP "B".
THE DCS SOFT DEVICE BLOCK TAG WILL NOT HAVE A SUFFIX (I.E. HS-110) THE
LOCAL HAND SWITCHES FOR H-O-A AND LOCAL START/STOP WILL HAVE SUFFIX
STARTING WITH A (I.E. HS-110A). COMMON HAND SWITCH FOR BOTH PUMPS
(I.E. SELECTOR SWITCH) WILL HAVE ITS OWN SEQUENTIAL NUMBER.
ALL CONTROLLERS COMING INTO DCS DO NOT NEED TO BE MARKED AS AN IC OR
RC AS I AND R ARE IMPLICIT FOR EVERY POINT.
ALARMPRESENTATION (MINIMIZE NUMBER OF BALLOONS)
THE OPERATOR HAS THE ABILITY TO SET AN H OR L FOR ANY POINT.
THESE OPERATOR ALERTS WILL NOT BE SHOWN ON P&ID ALARMS UNDER ENGINEERING CHANGE
CONTROL WILL BE SHOWN AS:
FAILURE ACTION FOR SOLENOID AND PNEUMATIC 3-WAY INSTRUMENT VALVES
WILL BE SHOWN WITH AND ARROWAND FO, FC, NOMENCLATURE- SIMILAR TO THAT
USED FOR CONTROL VALVES.
IS USED TO SHOWA MULTIFUNCTION INSTRUMENT. - I.E.- COMBINATION
RECORDING SCANNING, TOTALIZING, ETC. OR MULTIFUNCTION SYSTEM
THAT MAY BE DETAILED SEPARATELY.
AIS
CIC
LRT
XCV
1
HZ
MRS ARS
IS USED TO IDENTIFY COMPUTING TYPE RELAYS, FUNCTION CAN BE
SHOWN OUTSIDE BALLOON.
PR
FQ
FQI
PDAL
MOTOR CONTROL ITEMS ON LOCAL PANEL OR FIELD MOUNTED ARE DESIGNATED AS BELOW:
L - INDICATING LIGHT, IF ASSOCIATED WITH HAND SWITCHES
OR PUSH BUTTONS OR ALARM IF USED FOR ALARMAL, ALH
QA
L
E
V
E
L
SC
TG
HA
WITH THE EXCEPTION OF HAND SWITCHES, FOR INSTRUMENTS THAT ARE LOCATED ON IDENTICAL PARALLEL EQUIPMENT,
THE IDENTICAL INSTRUMENTS ON EACH PIECE OF EQUIPMENT SHALL BE NUMBERED XXXA, XXXB, XXXC ETC. EXAMPLE: PARALLEL
INSTRUMENTS SHALL BE NUMBERED 017A, 017B & 017C.
UIC
IC
VIS
-
FIC
PDG
FFS
KIC
AIK
-
LIS
1
FZ
MRC
AY
ANALYZERS MAY BE FURTHER IDENTIFIED BY DESCRIPTIVE LETTERS OR
WORDS WRITTEN OUTSIDE THE TAGGING BALLOON.
FF
PIT
-
LC-
HS - HAND SWITCH OR PUSH BUTTON
QZ
SAL
PDCV
SOLENOID VALVE COIL
TE
-
EXAMPLE
UI
IAL
VIK
-
ESL
FFT
KI
O-
AIC
CE
LIK
TD
FFZ
MRT
AV
A-
PRS
-
N-
IDENTIFICATION LETTERS:
INSTRUMENT
ON LOCAL
PANEL
L
SA
TC
GSL
-
WIT
Q
IA
JC
ES
5. ALL CONTACTS THAT REQUIRE ANNUNCIATOR POINTS
AND/OR VALVE STATUS LIGHTS SHALL BE EITHER
DOUBLE-POLE FOR INTERLOCK AND THE OTHER FOR
ANNUNCIATOR OR STATUS LIGHT, OR DIRECT INPUT TO
PLC WITH REPEATED OUTPUT TO AUXILIARY DEVICE.
N-
FFV
KG
AI
CC
LIC
IS USED WITH T AS TWFOR TEMPERATURE WELL.
MIS
PDS
AX
THE COMBINATION OF LETTERS SHOWN INCLUDE THOSE MOST FREQUENTLY ENCOUNTERED. OTHER COMBINATIONS MAY BE DERIVED FROMTABLE 1 ISA-S-5.1
STANDARD. IF AN INSTRUMENT HAS ADDITIONAL FUNCTIONS, IT SHOULD BE SHOWN BY TWO GROUPS OF LETTERS RATHER THAN EXCEEDING THREE LETTERS
(E.G. FQI AND FRC NOT FQIRC).
PRC
TYPICAL CUTBACK CONTROL REPRESENTATION SEE APPLICABLE
P&ID FOR COMPLETE INTERACTION.
-
EIS
SZ
NUMBER DISPLAYED IN A SQUARE
REPRESENTS THE STEP NUMBER
SHOWN ON THE SQUENCE STEP INDICATOR.
TAL
GS
IZ
PD
TDS
- RELIEF VALVE (SYMBOL REF. DWG. 245.0000.000.041.001)
JAL
J
ET
FFY
KE
-
CAL
LI
W-
MIK
AT
DSL
PDT
PRT
9.
FQC
XSL
- INDICATING LIGHT
-
CB-
NUMBER DISPLAYED IN OR NEXT TO
A SYMBOL REPRESENTS THE LOGIC
GATE NUMBER.
VIC
GT
P
-
- EXCESS FLOWVALVE
JA
EV
L
3. LOGIC SYMBOLS REPRESENT FUNCTIONAL AND
OPERATIONAL SEQUENCE OF EVENTS AND DO NOT
NECESSARILY REFLECT ACTUAL LOGIC GATES.
SNAP
FFX
KC
AE
CA
LG
DC
MIC
PDV
ASL
DS
T
IM
E
O
R
T
IM
E
S
C
H
E
D
U
L
E
PIS
SOLENOID VALVES ON EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YE-XXX, I.E. XYE-001.
SOLENOID VALVES ON NON-EMERGENCY SYSTEMS SHOULD BE TAGGED AS *YI-XXX, I.E. LYI-001.
XS
RUN
TDY
FQA
-
WILL BE USED FOR DIGITAL INPUT/OUTPUT TO MICROPROCESSOR BASED SYSTEMS.
- I.E.- MECHANICAL EQUIPMENT ON/OFF MANUAL CONTROL OR EQUIPMENT STATUS-
RUN/STOP.
FUNCTIONAL LOGIC DIAGRAMS
GV
INSTRUMENT IDENTIFICATION_NUMBERS
INSTRUMENTS SYMBOLS
HSL
M
- PRESSURE SAFETY VALVE
JZ
K
EY
2. ALL ELECTRICALLY AND ELECTRONIC CONTROLLED
DEVICES ARE SHOWN IN THE DE - ENERGIZED
CONDITION PRIOR TO START-UP POSITION, UNLESS
OTHERWISE SPECIFICALLY NOTED.
FFR
KAL
IS ALSO USED TO MEAN SAFETY AS IN PSE RUPTURE DISC.
-
LE
DAL
MI
AS
DT
P
O
W
E
R
PDY
PIK
8 .
XT
LP
TA
WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENT AT LOCAL CONSOLES.
LEGEND FOR
GY
DCS STATUS LIGHT
-
HS
- RUPTURE DISC
-
EX
1. GRAPHICS LOGIC SHOWN ON DWGS. CONFORMTO ISA
GRAPHIC SYMBOLS.
S-
FFIT
FQS
KA
AAL
INDICATOR
LC
DA
-
TDX
A
DV
C
U
R
R
E
N
T
PIC
SOLENOID VALVES ON NON- EMERGENCY SYSTEMS SHOULD BE TAGGED AS UYI- XXX.
XV
- ILLUMINATED PUSH BUTTON
WITH STOP ACTION
LOCAL PANEL MOUNTED
PDIC
QSL
GX
DCS ALARM
-
ZSL
- SIGHT FLOWGLASS
ISL
I
EZ
DIAGRAMS
FQT
KZ
IS USED AS A MEASURED VARIABLE FOR RADIOACTIVITY MEASUREMENT.
AA
LAL
PDIK
WIS
D
D, F, Q,-
ME
DY
PI
CUT BACK CONTROL
7.
XY
LP
GR
PDIS
ANNUCIATOR [STANDARD]
ZS
HV
- PURGEMETERS
IS
ER
H
FUNCTIONAL LOGIC
FQV
-
FFIS
VI
AC
PDX
LA
WIK
CRS
MC
DX
PG
C
FRONT PANEL
INSTRUMENT
PDIT
XX
STOP
H
A
N
D
- WITH VENDOR SUPPLIED EQUIPMENT
GIT
MISCELLANEOUS
ANNUNCIATOR [FIRST OUT]
HY
ZT
- LEVEL GAUGES
EIK
IT
UC
EIT
GENERAL NOTES FOR
FQY
JSL
U-
VG
FFIK
PDR
LZ
WIC
CZ
MAL
DZ
PE
BZ
HIGH PRESSURE
SHUTDOWN
SWITCH
6.
XR
- SOFT HAND SWITCH OR
PUSH BUTTON WITH
RUN/STOP ACTION
AND RUN STOPPED STATUS DISPLAY
C
O
N
D
U
C
T
IV
IT
Y
G
A
U
G
IN
G
P
O
S
IT
IO
N
PDRS
CONTROL VALVE OR DAMPER
- RESISTANCE TEMPERATURE DETECTOR
GRS
RESISTOR
ZV
HX
- TEMPERATURE TEST WELL
TZ
EIC
IV
ERS
UAL
-
SIGNAL INVERTER
IS USED FOR PILOT LGHT. THE LETTER "L" MAY BE USED ALONE
OR IF PART OF A LOOP, IT CAN TAKE THE LOOP LETTERS AS A PREFIX.
E.G.F. , ETC.
FQX
JS
FFIC
VE
-
WI
CY
MA
DIS
4.
BY
MULTIFUNCTION
LOGIC FOR
EMERGENCY
SYSTEMS
PDRT
XIT
R/S
B
U
R
N
E
R
F
L
A
R
E
F
L
O
W
T
O
T
A
L
DIK
TDIT
-
IS USED WITH ZSC TO GIVE CLOSED POSITION.
LCV
FFI
PA
HARDWIRED INTERLOCK SYSTEM
XE
FR
-
CRC
HOA
-
ELECTRICAL ACCESSORIES, COIL RELAYS, AMPLIFIERS AND I/P TRANSDUCERS AT
CONTROL VALVES, ARE NORMALLY OMITTED ON THE P&ID. THE LATTER MAY
BE SHOWN FOR THE LOOPS, WITH TWO OR MORE VALVES OR SEPARATE DEVICES, OR
WITH THE AIR SIGNAL GOING TO AN INSTRUMENT PRIOR TO THE VALVE.
THE IDENTIFICATION NUMBER FOR LOOPS WILL HAVE SIX DIGITS, THE FIRST THREE BEING UPGRADER COMPLEX UNIT NUMBER.
SNAP ACTING
RELAY ON TEMP.
TRIP SYSTEM
4. STATE OF LOGIC IS SHOWN AT LOGIC "0" WITH POWER OFF
AND ALL INPUTS AND OUTPUTS IN THE FAIL SAFE CONDITION.
THE FOLLOWING THREE DIGITS WILL PROVIDE A SINGLE SEQUENCE OF LOOP NUMBERS FOR EACH PROCESS VARIABLE
IDENTIFICATION OF EACH LOOP.
HOA - LOCAL HAND-OFF-AUTO
TO MOTOR
(ONE BALLOON CAN REPRESENT MORE
THAN ONE FUNCTION)
THE LOOP NUMBERING SEQUENCE WILL BEGIN WITH THE NUMBER 001 FOR EACH PROCESS VARIABLE IDENTIFICATION FOR
EACH UNIT, INCLUSIVE OF THE FOLLOWING LOCAL INSTRUMENTS.
LETTER DISPLAYED IN A DIAMOND
REPRESENTS AN EXTERNAL CONNECTION
BETWEEN THE LOAD SIDE OF AN OUTPUT
MODULE AND THE LINE SIDE OF AN
INPUT MODULE FOR TRIAC FAILURE
DETECTION.
THE FIRST THREE DIGITS (UNIT NUMBER) WILL BE OMITTED FROMTHE BALLOONS FOR IMPROVED READABILITY OF LOOP
IDENTIFICATION NUMBERS. A GENERAL NOTE ON THE P&ID WILL REFERENCE THIS AND IDENTIFY THE OMITTED PLANT NUMBER.
THE INSTRUMENT LOOP NUMBERS WILL THEN BE THREE DIGITS, I.E. 017.
IF MEASUREMENT POINT HAS A LOGIC INTERLOCK; THE INDICATED VALUE WILL BE AVAILABLE
IN THE DCS. THE LL OR HH SIGNIFIES THE TRIP ACTION UNDER ENGINEERING CONTROL,
WHICH THE OPERATOR CANNOT ADJUST.
IS USER'S CHOICE - EITHER AS A MEASUREMENT OR OUTPUT FUNCTION.
INTERLOCK NUMBERS ARE SIX DIGITS AND ARE ASSIGNED BY THE INSTRUMENT DEPARTMENT. THE FIRST THREE DIGITS DESIGNATE
THE UNIT AND THE LATTER THREE ARE SEQUENTIAL, COMMENCING AT 001 IN EACH UNIT. THE FIRST THREE DIGITS ARE OMITTED ON
THE P&ID.
IS USED WITH F TO GIVE FO, FLOWORIFICE RESTRICTION.
IS USED WITH ZSO TO GIVE OPEN POSITION.
* - E SYMBOL USED WHEN TRACING POWER COMES FROM
EMERGENCY SYSTEM.
1. THE SWITCH/LIGHT FUNCTION SHALL BE SHOWN OUTSIDE OF CIRCLE
IS USED TO SHOWON/OFF TYPE NON ADJUSTABLE RELAYS IN A LOOP.
- I.E.- SOLENOIDS, PNEUMATIC 3-WAY VALVES ETC.
ARE MODIFYING LETTERS FOR DIFFERENCE (D), FRACTION OR RATIO (F),
AND QUALITY OR TOTAL (Q). THEY MAY BE USED WITH OTHER FIRST
LETTERS THAN THOSE SHOWN IN THE TABLE , E.G. KQ-TOTAL TIME,
SD-SPEED DIFFERENCE, DF DENSITY RATIO.
WILL BE USED OUTSIDE BALLOON TO IDENTIFY INSTRUMENTS AT LOCAL PANELS.
IF MORE THAN ONE PANEL, THEN IDENTIFY THEM NUMERICALLY AND
REFERENCE IN GENERAL NOTES.
SIK
JRC
RECORDING TRANSMITTER
FUNCTION IN DCS SYSTEM
NOT REQUIRED TO BE
DISPLAYED TO OPERATE
RELAY
4. FOR MOTOR CONTROL SWITCHES AND LIGHTS, ONLY PANEL MOUNTED ITEMS ARE SHOWN
ON P&ID'S EXCEPT WHERE LOCAL DEVICES ARE OTHER THAN START/STOP.
ALL LOCAL DEVICES ARE THE RESPONSIBILITY OF THE ELECTRICAL DEPT.
EE
THE BALLOONS MAY BE DRAWN TANGENTIALLY TO SHOWA COMMON INSTRUMENT WHERE PRACTICAL. 5.
LP
OR
AND
AND
OR
-
-
A 05/08/10 ISSUED FOR REVIEW
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
E
E
002
I
001
I
001
I
2
0
0
. 0
0
8
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
0
8
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 2
2
: 3
1
P
M
B
Y
:a
h
m
1
4
8
8
7
A
INSTR ID LETTERS SYMBOLS AND LOOP NO
UNIT 200 - COMMON
200.0000.000.041.008
8
AUXILIARY LOCATION
NORMALLY INACCESSIBLE
TO AN OPERATOR
FO - FLOWORIFICE
M
044
PG
172
FE
043
PG
TYPICAL FLOWLOOP
018
LG
311
TAHH
001
FT
ORIFICE PLATE
COMPLETE WITH LOCAL
FLOWINDICATOR
WINTERIZED
LEVEL TRANSMITTER
EXTERNAL FLOAT
FURNACE
CAPACITANCE,
DIELECTRIC OR
CONDUCTIVITY
TYPE SWITCH
FUSIBLE PLUG
OR DISC
311
TI
ORIFICE PLATE WITH
FLANGE TAPS
LEVEL TRANSMITTER
INTERNAL FLOAT
SIDE CONNECTION
LEVEL INDICATOR
FLOAT WITH WIRE
AND PULLEY
010
PI
323
LT
LEVEL REGULATOR
WITH MECHANICAL
LINKAGE
PNEUMATIC OR ELECTRONIC PER PROJECT REQUIREMENT
006
FC
s
THERMOMETER
PURGEMETER
OR ROTAMETER
311
TTE
TANK
045
PP
TANK
IN LINE AND TANK MOUNTED INSTRUMENTS
CONT.
REMOTE PRESSURE
GAUGE WITH CAPILLARY
& LINE MOUNTED
DIAPHRAGMSEAL
ORIFICE PLATE
CONNECTED TO
DIFFERENTIAL
PRESSURE
FLOWTRANSMITTER
020
LG
LEVEL
009
TT
LEVEL TRANSMITTER
DP TYPE
THERMAL RADIATION
TYPE TEMPERATURE
ELEMENT
ORIFICE PLATE
WITH VENA
CONTRACTA
RADIUS OR
PIPE TAPS
001
FC
004
FT
TANK
TANK
SP
TANK
002
LT
173
FT
TEMPERATURE ELEMENT
WITH OR WITHOUT WELL
(NOT CONNECTED TO
SECONDARY INSTRUMENT)
(REFER TO PROJECT
DWG. 245.0000.000.041.002)
TANK
TANK
TEMPERATURE
TEST CONNECTION
WITH WELL
TYPICAL FLOWLOOP INCLUDING DCS INTERLOCK
MULTI-ELEMENT
THERMOCOUPLE FOR
DIFFERENT ELEVATIONS
WITH WELL IN TANK
RUPTURE
DISC
TEMPERATURE
TANK
TEMPERATURE TRANSMITTER
WITH TW& TE
TANK
(REFER TO PROJECT
DWG. 245.0000.000.041.002)
TANK
SIZE AND SET
PRESSURE
TANK
TYPICAL FLOWLOOP INCLUDING SIS
INTERLOCK & SOLENOID VALVE
LEVEL INDICATOR
MAGNETIC TYPE
SELF-ACTUATED REGULATORS
325
LI
TANK
MAG
AI
069
TG
006
FT
001
FC
INLINE FLOWMETER
WITH INTEGRAL
TRANSMITTER
MOTOR OPERATED
(MOV) VALVE
WITH HANDWHEEL
LEVEL TRANSMITTER
DP TYPE WITH
BUBBLER SYSTEM&
DIP TUBE
011
FX
067
TI
PRESSURE/VACUUM
SAFETY VALVE
SIZE AND SET
PRESSURES
020
LT
FLOWSIGHT
GLASS
BUTTERFLY VALVE WITH SMART
POSITIONER WITH HANDWHEEL
FAILS CLOSED
011
FT
PRESSURE POINT
FIXED
RESTRICTION
ORIFICE
POSITIVE
DISPLACEMENT
METER
DIAPHRAGMGLOBE
WITH SMART POSITIONER
WITHOUT HANDWHEEL
FAILS OPEN
VACUUMRELIEF
SAFETY VALVE
SIZE AND SET
PRESSURE
322
LT
POSITIVE DISPLACEMENT
(POSDISPL)
DESUPERHEATER
(DESUPER)
GAUGE GLASS
EXTERNALLY
CONNECTED
001
FT
MAGNETIC
LP
STEAM
SLIDE VALVE
042
PG
CORIOLIS
(CORIO)
HP
STEAM
SIZE AND SET
PRESSURE
329
LX
009
TI
1. INSTRUMENT TAG REQUIRED FOR INTEGRAL DESUPERHEATING VALVE.
WEDGE
(WEDGE)
WATER
PRESSURE RELIEF VALVES
329
LT
VORTEX
SOLENOID
OPERATED
DIAPHRAGMVALVE
WITH SMART
POSITIONER
FAILS CLOSED
ACTUAL
TEMPERATURE
327
LS
STRAIGHTING VANES
(STVANES)
581
TE
TEMPERATURE
FILLED SYSTEM
WITH WELL
FLOWCOMP
PRESSURE GAUGE
DIRECT CONNECTED
PRESSURE GAUGE
DIAPHRAGMSEAL
LINE MOUNTED
WITH EXTERNAL
PRESSURE TAP
TURBINE OR
PROPELLER
FLOWMETER
PRESSURE
579
TE
324
LY
TEMPERATURE AND PRESSURE COMPENSATION
004
FC
SELF-CONTAINED
ROTAMETER OR
PURGEMETER
WITH NEEDLE
VALVE ON INLET
577
TE
FLOW
TYPICAL LEVEL - FLOWCASCADE LOOP. WINTERIZED
P&ID ABBREV.
180
FT
DOUBLE ACTING
CYLINDER
THREE WAY VALVE
FAILS LOCKED
IN LAST POSITION
FLUME
LEVEL
578
TE
184
FT
R
S
002
LC
SINGLE ACTING
CYLINDER
ANGLE VALVE
FAILS CLOSED
179
FT
ULTRASONIC
FLOWMETER
070
TT
CONTROL VALVE
MICROPROCESSOR (DCS/PLC) BASED SYSTEM
087
FG
RADIOACTIVE OR
SONIC SOURCE
EXCESS FLOW
VALVE
324
LT
WEDGE
066
TE
TYPICAL LOOPS
011
FC
M
PITOT OR
PITOT VENTURI
OR ANNUBAR
311
TTE
VENTURI TUBE
OR FLOWNOZZLE
064
TW
R
S
FV
006
L
H
FYE
006
FV
001
L
H
FYI
001
FSV
099
HH
FO
FV
010
FQI
182
FI
087
FE
186
FE
178
TSE
536
FO
185
VAC
RV
024
RV
023
PCV
421
PCV
420
PCV
999
FL
FC
FE
177
FE
176
FI
081
FE
173
FE
169
L
FE
169
H
LCV
314
FC
FO
FC
FV
001
L
H
FE
011
PSE
046
FV
004
FE
004
010
PT
FO
FO
PVSV
025
FC
TANK
1
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
ADDITIONS / MODIFICATIONS
2. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.
A 05/08/10 ISSUED FOR REVIEW
E
101
I
003
E
002
E
101
2
0
0
. 0
0
9
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
0
9
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 2
1
: 1
5
P
M
B
Y
:a
h
m
1
4
8
8
7
A
ID LETTERS SYMBOLS AND LOOP NO.
UNIT 200 - COMMON
200.0000.000.041.009
20.
X
19.
1-0 or ON - OFF
or LOWEST (MEASURED
VARIABLE)
18.
or HIGHEST (MEASURED
VARIABLE)
17.
SQ. RT.
LOW
SELECTION
(FDR24)
5.
16.
EXTRACT
SQUARE ROOT
(FDR11)
4.
UNCLASSIFIED
DERIVATIVE
(FDR10)
3.
CURRENT TO
PNEUMATIC
TRANSDUCER
(FDR21)
2.
VOLT TO
CURRENT
TRANSDUCER
PNEUMATIC
TO CURRENT
TRANSDUCER
(FDR22)
1.
15.
FUNCTION
ANALOG TO
DIGITAL
(FDR7)
INVERSE DERIVATE
HIGH
SELECTION
(FDR20)
14.
SYMBOL
DERIVATIVE OR RATE
13.
EXPONENTIAL
(FDR6)
INTEGRATED (TIME INTEGRAL)
BOOST
(FDR19)
12. 1:1
* *
ADD OR TOTALIZE (ADD AND SUBTRACT)
INSTRUMENT ON LOCAL PANEL
(INSTR3)
FUNCTION
OF TIME
(FDR13)
f(x)
*
AUTOMATICALLY CONNECT, DISCONNECT, OR TRANSFER ONE OR MORE CIRCUITS
PROVIDED THAT IS NOT THE FIRST SUCH DEVICE IN A LOOP
NO.
TXT
NONLINEAR OR
UNSPECIFIED
FUNCTION
(FDR12)
1/n
USED FOR RELAY TWO OR MORE INPUTS.
or DIFF
FRONT PANEL INSTRUMENT
(INSTR2)
f(t)
X
USED FOR SINGLE - INPUT RELAY.
or ADD
NO.
TXT
f(x)
or
FIELD INSTRUMENT
(INSTR1)
n
PIPING AND INSTRUMENT DIAGRAM (P&ID) SYMBOLS
NO.
n
1:1
6.
11.
NO.
TXT
X
% or 1:3 or 2:1 [TYPICAL]
MULTIPLY
(FDR18)
10.
PROPORTIONAL
(FDR5)
X
FOR INPUT / OUTPUT SEQUENCES OF THE FOLLOWING:
A - ANALOG, D - DIGITAL
THE FUNCTION DESIGNATIONS ASSOCIATED WITH RELAYS SHALL BE USED AS FOLLOWS, INDIVIDUALLY OR IN COMBINATION
9.
K
REVERSE
SUMMATION
(FDR17)
8.
(ISA S5.1)
DIVIDE * *
CURRENT
TO CURRENT
TRANSDUCER
(FDR1)
LOW- SELECT. SELECT LOWEST (LOWER) MEASURED VARIABLE (NOT SIGNAL,
UNLESS SO NOTED).
FUNCTION DESIGNATIONS FOR RELAYS
7. MULTIPLY * *
HIGH- SELECT. SELECT HIGHEST (HIGHER) MEASURED VARIABLE (NOT SIGNAL,
UNLESS SO NOTED).
RESET FOR
LATCH TYPE
SOLENOID
(FDR16)
AS REQUIRED
GAIN OR ATTENUATE (INPUT : OUTPUT) *
WINTERIZED
R
BOOST
I/D
AVERAGE
PROGRAMMABLE LOGIC TYPE
INTERLOCK SYSTEM
(INTLOCK4)
CHARACTERIZE
AUTO
MANUAL
(FDR15)
D or d/dt
BIAS *
RAISE TO POWER
A/D or D/A
AVG.
BACK OF PANEL OR
RACK MOUNTED INSTRUMENT
(INSTR4)
EXTRACT SQUARE ROOT
REVERSE
(FOR14)
REV.
SUBTRACT * *
NO.
TXT
REV
LP
A
M
I
P
P
I
d
dt
E
I
A
D
I
I
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.
A 05/08/10 ISSUED FOR REVIEW
I
2
0
0
. 0
1
0
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
0
. p
i d
M
O
D
E
L
D
A
T
E
: 1
/ 5
/ 2
0
1
1
1
0
: 2
1
: 2
9
A
M
B
Y
: a
h
m
1
4
8
8
7
A
FUNCTION DESIGNATIONS
UNIT 200 - COMMON
200.0000.000.041.010
VACUUMPUMP
(PMPVAC)
RECIPROCATING PUMP
(PMPRECIP)
CENTRIFUGAL PUMP
(PMPCENT)
SYNCHRONOUS MOTOR
*DC FOR DC MOTORS
(EMDC)
ELECTRIC MOTORS
AC MOTOR
*VFD FOR VARIABLE
FREQUENCY DRIVE
(EM)
TANK MIXER
(TKMIX)
IN-LINE STATIC MIXER
(INMIX)
EJECTOR/INJECTOR
EDUCTOR
BASIC SYMBOL
(EJECTOR)
VERTICAL IN-LINE PUMP
(PMPINL)
FILTER (FLT)
ROTARY SCREW
COMPRESSOR (COMPROTS)
ROTARY SCREW
PUMP (PMPROTS)
VERTICAL SUMP PUMP
(PMPSUMP)
INJECTION PUMP
(PMPINJEC)
METERING PUMP
(PMPMETER)
CETRIFUGAL SIDE
IN/OUT BETWEEN
BEARING PUMP
VERTICAL IN-LINE
CANNED PUMP
(PMPICAN)
CENTRIFUGAL CANNED PUMP
(PMPCCAN)
MULTISTAGE
PUMP
(PMPMULTI)
HIGH SPEED
CENTRIFUGAL
PUMP
(PMPHSC)
TOP SUCTION/DISCH. PUMP
(PMPTT)
M
T
T
G
CENTRIFUGAL
COMPRESSOR
WITH GUIDE VANES
(COMPC)
STEAMTURBINE
(STMTUR)
TURBINE WITH
PNEUMATIC
SPEED CONTROL
(STMTURPN)
CENTRIFUGAL FAN
OR BLOWER
(CFB)
RECIPROCATING
COMPRESSOR
(RCOMP)
ROTARY LOBE
BLOWER (RLB)
SHELL & TUBE
(HORIZONTAL)
(STHORIZ)
DOUBLE PIPE
(DPIPE)
NON-INTEGAL
GEAR BOX
(GEARBOX)
KETTLE REBOILER
(REBOIL)
ELEVATION FROM
FINISHED SURFACE
AT GRADE
LOADING ARM
(LOADARM)
TRUCK LOADING
STATION
(TRKLOAD)
OIL MIST
DISTRIBUTION
BLOCK WITH 2
RECLASSIFIERS.
ADD RECLASSIFIERS
AS REQUIRED.
(OILMIST)
AIR
ELIMINATOR
(AIREL)
E
VERTICAL
VESSEL
BASIC SYMBOL
(VES)
HORIZONTAL
VESSEL
WITH BOOT
(VESBOOT)
SPHERE
(SPHERE)
CONICAL ROOF TANK
(TK)
OPEN TANK
(TKOPEN)
INTERNAL FLGATER
(TKGF)
OPEN TOP FLGATER
(TKOPF)
MANWAY
(MANWAY)
VORTEX BREAKER
(VORTEX)
PLATE & FRAME
(PLATEEXCH)
VFD
FORCED DRAFT SINGLE (COOLER)
BAY AIR COOLER
(LOUVERS AS REQUIRED)
MAP
AV
VARIABLE/SINGLE SPEED
MOTOR SHOWN AS REQUIRED
VFD_VARIABLE FREQUENCY
DRIVE
TYPICAL ARRANGEMENT SHOWN
ACTUAL SYMBOL TO CONFIRMTO
CORRECT CONFIGURATION
TIC
HIC
VERTICAL CYLINDRICAL NATURAL
DRAFT FURNACE WITH SEPARATE
(HORIZONTAL OR CROSS FLOW)
CONVECTION SECTION
SHELL & TUBE
VERTICAL THERMOSYPHON
(VERT_THER)
SHELL & TUBE
VERTICAL
(OVHD_EXCH)
TYPICAL ARRANGEMENT SHOWN
ACTUAL SYMBOL TO CONFIRMTO
CORRECT CONFIGURATION
STEAMDRUM
VENDOR
EXAMPLES:
INDICATION OF
POINT OF CHANGE
CHANGE IN
RESPONSIBILITY
VESSEL
SWAGED
(VESSWG)
DEMISTER
DISTRIBUTOR
TROUGH & TRAY
LIQUID SPRAY
(PERFORATED)
LIQUID SPRAY
(NOZZLE)
TOTAL DRAW-OFF
PARTIAL DRAW-OFF
CHIMNEY
VANE TYPE INLET
(HORIZONTAL)
VANE TYPE INLET
(VERTICAL)
DIFFUSER
CYCLONE
DOLLAR PLATE
PACKED SECTION
REDISTRIBUTION
(LIQUID/LIQUID)
REDISTRIBUTION
(GAS/LIQUID)
BAFFLE WITH
PARTITION
VORTEX BREAKER
SCHOEPENTOETER
INTERNALS WHEN DRAWN TO BE DASHED
24
15
14
1
BASIC SYMBOL
TRAY NUMBERS
FROMBOTTOM
BASIC SYMBOL
T.L. ELEV. (TYP.)
1) SINGLE PASS
2) TWO PASSES
3) CALMING
SECTION
GENERAL
GRID
SIEVE
VALVE
BUBBLE CAP
1. ALL EQUIPMENT SHALL BE REPRESENTED BY A TAG NUMBER. COMPOSED OF A
LETTER PLUS A NUMBER. THE FIRST THREE DIGITS OF WHICH ARE THE PLANT
NUMBER AND THE FINAL TWO DIGITS ARE A NUMBER RUNNING CONSECUTIVELY
FROM 01 FOR EACH GROUP OF EQUIPMENT.
2. WHERE A CHOICE BETWEEN TWO OR MORE LETTERS HAS TO BE MADE THE MORE
IMPORTANT FUNCTION SHOULD PREVAIL FOR EXAMPLE, IF A JET IS USED FOR
MIXING PUPPOSES, Mx IS USED OVER I.
3. DRIVERS ARE NUMBERED BY THE DRIVER EQUIPMENT AND TYPE OF DRIVER.
E.G. EM-MOTOR FOR AIR COOLER, CT-TURBINE MOTOR FOR AIR COOLER,
CT -TURBINE FOR COMPRESSOR, PM-PUMP MOTOR, EF-AIR COOLER FAN.
C
CG
CT
CM
E
B FIRED BOILERS
COMPRESSORS & BLOWERS
LIQ RING VAC PUMP
COMPRESSOR GEARS
COMPRESSOR TURBINE
COMPRESSOR MOTOR
EXCHANGERS, HEAT TRANSFER EQUIPMENT
EMERGENCY GENERATOR EG
EM
ER
F
G
GT
H FIRED HEATERS, INCINERATORS
GAS TURBINE GENERATOR
GENERATORS
AIR COOLER FANS AND
COOLING TOWER FANS
EMERGENCY EQUIPMENT.
EXCHANGER MOTOR
I
M
ME
MF
MM
Mx
P
PG
PM
JETS (INJECTORS & EJECTORS)
MOTORS
ELECTRIC MOTORS
FAN MOTOR
MIXER MOTORS
MIXERS, AGITATORS
PUMPS
PUMP GEARS
PUMP MOTORS
PT
S
ST
T
Tk
V
X
XM
PUMP TURBINE
SPECIAL (SILENCERS, STACKS, PACKAGE UNITS
DETONATION ARRSTOR FLAME ARRSTOR, STATIC
MIXER STRAINER, SUMP)
STEAMTURBINE
TURBINE
TANKS (ATMOSPHERIC)
VESSELS INCLUDING COLUMNS, PRESSURE
STORAGE & FILTERS
STATIONARY TRANSPORT EQUIPMENT
STATIONARY TRANSPORT EQUIPMENT MOTOR
XZ
Z
BULK LOADING ARMMOTOR
BULK LOADING ARMS
4. EQUIPMENT NUMBERING ON FLOWDAIGRAMS SHOULD PREFERABLY BE DONE
FROM LEFT TO RIGHT.
EXAMPLE OF EQUIPMENT NUMBERING: V-41101.
V-EQUIPMENT DESIGNATION (REFER TO PARAGRAPH 1) 41101- VESSEL
No. 01 IN PROCESS UNIT 411.
EQUIPMENT SPARING WILL BE SHOWN AS FOLLOWS:
EXAMPLE: (PUMP) P-41112A, B, C, ETC.
ANY EXISTING EQUIPMENT WHICH IS TO BE REPLACED WITH NEW
EQUIPMENT IN THE SAME SERVICE WILL RETAIN ITS OLD EQUIPMENT
NUMBER WITH THE EXCEPTION THAT A "R" WILL BE ADDED TO THE
END. IE) E-42011 WILL BECOME E-42011R.
ANY EQUIPMENT THAT IS BEING COMPLETELY REMOVED FROMSERVICE
WILL HAVE ITS NUMBER RETIRED AND NOT REUSED FOR OTHER EQUIPMENT.
FOR REUSED EQUIPMENT IN THE SAME UNIT, THE EQUIPMENT NUMBER
WILL STAY THE SAME AND THE SERVICE DESCRIPTION WILL CHANGE.
REUSED EQUIPMENT TO BE USED IN A DIFFERENT UNIT WILL RECEIVE A
NEWEQUIPMENT NUMBER AND SERVICE DESCRIPTION, THAT IS
CONSISTENT WITH THE UNIT THAT IT IS BEING INSTALLED IN.
NOTES:
IDENTIFICATION OF EQUIPMENT
LETTER OF
GROUP
DECSRIPTION
ROTATING DISC
CONTACTOR
SEPARATE
CONVECTION COIL
MUD DRUM
1. AUTOCAD BLOCK NAMES ARE SHOWN IN ROUND BRACKETS UNDER THE SYMBOL
DESCRIPTION.
FIRED HEATER DEPICTION
(HTRFIRE)
TRAYED COLUMN
PACKED COLUMN
TRAYS
TRAY WITH
DOWNCOMERS
HALF PIPE
SWIRL DECK
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
ADDITIONS / MODIFICATIONS
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
1
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
1
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
5
: 5
1
: 4
3
P
M
B
Y
:a
h
m
1
4
8
8
7
A
FLOW DIAGRAM SYMBOLS FOR EQUIPMENT
UNIT 200 - COMMON
200.0000.000.041.011
5
PI
PI
PI
TG
PI
S-3
S-1
S-4 S-2
S-5
S-8
S-9 S-12
TG
S-4A
PI
PI
IG
TG
4
7 7
CWR
CWS
CWR
CWS
AU
CWR
FL FL
FL
CWR
CWS
VA
AU
VA
FL
CWS
S-5
STEAMAND CONDENSATE AND HOT WATER
ABOVE 45C
12
9
13
S-9
SOUR LIQUIDS (SOUR WATER AMINE)
45C AND ABOVE
ABOVE GRADE
AND AWAY FROM
OPERATING
PLATFORM
11
13
16
S-8
SOUR LIQUIDS (SOUR WATER AMINE)
BELOW45C
3
MIN. 8m
ABOVE GRADE
3
7 7
SAMPLE BOMB
(BY SHELL)
2
10
16
13
17
8
17
8
S-4A
SWEET/SOUR HYDROCARBON GAS/LIQUID
BELOW45C
16 13
9
5
7
7
7 7
10. THE TYPE OF FITTING (SOCKOLET OR WELDOLET WITH FLANGE) AND THE FIRST
VALVE OR VALVES AT THE MAIN LINE SHALL BE AS PER VENT (OR DRAIN)
REQUIREMENTS FOR THE MAIN LINE PIPING CLASS. SEE SPECIFICATION
245.0311.035.005.
9. DELETE SECOND VALVE WHEN ROOT VALVE IS ACCESSIBLE FROMTHE SAMPLE
VALVE.
7. PRESSURE LIMIT FOR SNAP- ON SAMPLE BOMB FITTINGS IS 45 MPa AT 65C. FOR
HIGHER PRESSURES USE DIRECT SCREWED BOMB CONNECTIONS.
HYDROCARBONS
45C AND ABOVE
4. SEWER CHOICE PER AVAILABILITY.
LIQUID HYDROCARBONS AND WATER
BELOW45C
S-3
S-1
(TYPICAL FOR ALL TYPES)
1. SEE DRAWING 200.0000.000.041.007, 008, 009, 010, & 011 FOR SYMBOL
IDENTIFICATION AND GENERAL NOTES.
LIQUID HYDROCARBONS
BELOW45C
S-2
LIQUID HYDROCARBONS AND WATER
BELOW45C
S-1
SWEET/SOUR HYDROCARBON GAS/LIQUID
BELOW45C
SHORT NIPPLE AND CAP
HYDROCARBONS
45C AND ABOVE
S
A
M
P
L
E
P
O
IN
T
A
C
T
U
A
L
D
E
T
A
IL
A
R
R
A
N
G
E
M
E
N
T
A
P
P
L
IC
A
T
IO
N
A
N
D
D
E
S
C
R
IP
T
IO
N
S-4A
SWEET/SOUR HYDROCARBON GAS/LIQUID
BELOW45C
17. ANY DEVICE OR INSTRUMENT THAT CREATES A PRESSURE DROP
TO ASSURE OF SUFFICIENT FLOWTHROUGH THE FAST LOOP.
P&ID SYMBOL MAY VARY ACCORDING TO DEVICE BEING USED.
SAMPLE BOMB
(BY SHELL)
S-4
SWEET/SOUR HYDROCARBON GAS/LIQUID
BELOW45C
16. SAMPLING VALVES MUST BE CLOSE CONNECTED TO FAST LOOP (SAMPLING
BYPASS).
S-4
LIQUID HYDROCARBONS
BELOW45C
15. ADD APPROPRIATE WINTERIZATION AND PERSONNEL PROTECTION.
S-3
S-2
14. DO NOT MANIFOLD MORE THAN ONE SAMPLE LINE TO ONE COOLER TO PREVENT
CONTAMINATION.
13. SAMPLE LINE PIPING CLASS SHALL CORRESPOND TO THE PIPING CLASS OF THE
MAIN LINE.
12. ISOKINETIC SAMPLE PROBE (JONAS) REQUIRED FOR STEAM SAMPLE.
11. THE STEEL CABINET IS TO BE COMPLETE WITH AN INTEGRALLY MOUNTED AIR
EJECTOR. THE FRONT WALL TO BE A CLEAR PLASTIC DOOR. PROVIDE SLOTS IN
THE FLOOR FOR VENTILATION. SEVERAL SAMPLING CONNECTIONS CAN BE BR-
OUGHT INTO THE SAME CABINET. HOWEVER EACH CONNECTION MUST HAVE ITS
OWN SPIGOT TO PREVENT CONTAMINATION.
2. ARRANGEMENT S-1 TO BE USED ONLY WHERE THE SAMPLING VALVE CAN BE
WELDED DIRECTLY TO A NORMALLY FLOWING LINE IN AN ACCESSIBLE LOCATION.
TO BE CONFIRMED IN EPC.
3. BRIDGE WELD ALL ROOT VALVES TO THE MAIN LINE EXCEPT IN ARRANGEMENT
LOCATION. TO BE CONFIRMED IN EPC.
5. SAMPLE COOLER MODEL NO. LATER.
6. ALL SAMPLE POINTS TO BE LOCATED AT GRADE. WHERE POSSIBLE, INCORPORATE
SAMPLE POINT WITH ANALYZER CONDITIONING TO REDUCE ADDITIONAL COOLING,
ETC. WHERE POSSIBLE, SAMPLES TO BE COOLED BELOW45C FOR PERSONNEL
PROTECTION.
SAMPLE BOMB
(BY SHELL)
8. SAMPLE CONNECTION ON TOP OF HORIZONTAL LINE FOR GAS. SAMPLE
CONNECTION ON SIDE OF HORIZONTAL LINE FOR LIQUID SAMPLE.
MIN. DISTANCE
FOR ACCESS
17
S-5
STEAMAND CONDENSATE
ABOVE 45C
SOUR LIQUIDS (SOUR WATER AMINE)
BELOW45C
S-8
17
17
9
SOUR LIQUIDS (SOUR WATER AMINE)
45C AND ABOVE
S-9
17
SWEET/SOUR HYDROCARBON GAS/LIQUID
45C AND ABOVE
S-12
8
17
12
FLOW
75
D
16
8
S-12
SWEET/SOUR HYDROCARBON GAS/LIQUID
45C AND ABOVE
88
16
9
8
13
5
P
&
ID
W
IL
L
S
H
O
W
S
A
M
P
L
E
P
O
IN
T
A
C
T
U
A
L
D
E
T
A
IL
A
R
R
A
N
G
E
M
E
N
T
A
P
P
L
IC
A
T
IO
N
A
N
D
D
E
S
C
R
IP
T
IO
N
P
&
ID
W
IL
L
S
H
O
W
8 8
8
5
3
/4
"
3/4" 3/4"
3/4"
3/4"
N
O
N
O
3/4"
3/4"
3/4"
N
O
N
O
3
/4
"
3/4"
3/4"
3
/4
"
3/4"
3/4"
3
/4
"
3/4"
N
O
3/4"
3/4"
3
/4
"
3/4"
3/4"
3/4"
N
O
N
O
N
O
N
O
3
/4
"
3/4"
3/4"
3
/4
"
3/4" 3/4"
NC
P P P
P P
P
P
P P P
MAIN LINE CLASS
LOWER PRESSURE
SIDE CLASS
MAIN LINE
CLASS
MAIN LINE CLASS
MIN.
SAMPLE BOTTLE
(BY SHELL)
SEE DETAIL
TO RIGHT
3/4" VALVE
3/4" PIPE
TO SAMPLE COOLER
3" BLIND
FLANGE
3/4" VALVE
FLOW 45
2" AND SMALLER
MIN. 8m
SAMPLE BOTTLE
(BY SHELL)
MAIN LINE CLASS
SIDE CLASS
LOWER PRESSURE
CLASS
MAIN LINE
MIN.
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
P
P P P P
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
2
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
2
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 1
5
: 0
6
P
M
B
Y
:a
h
m
1
4
8
8
7
A
STANDARD DETAIL - SAMPLING SYSTEMS
UNIT 200 - COMMON
200.0000.000.041.012
IN
S
T
R
.
P
IP
IN
G
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR. PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
INSTR.
PIPING
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3/4"
1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
- 3/4" 'PHOENIX' DOUBLE BLOCK & BLEED GAUGE VALVE.
- 1/2" 'SWAGELOK' DOUBLE BLOCK & BLEED GAUGE VALVE.
3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.
3
/ 4
"
INST.
PIPING
INST.
PIPING
3
/ 4
"
INST.
PIPING
3
/ 4
"
X
"
X
"
INST.
PIPING
3/4"
X
"
X
"
INST.
PIPING
PURGE
3/4"
3/4"
1
"
2
"
INST.
PIPING 1
"
2
"
INST.
PIPING
3/4"
X
"
X
"
INST.
PIPING
3/4"
X
"
X
"
INST.
PIPING
PURGE
3/4"
PURGE
3/4"
IN
S
T
.
P
IP
IN
G
3/4"
IN
S
T
.
P
IP
IN
G
3/4"
IN
S
T
.
P
IP
IN
G
PURGE
3/4"
IN
S
T
.
P
IP
IN
G
PURGE
IF REQUIRED
FIELD MOUNTED TEMPERATURE INSTRUMENT (TG, TT)
FIELD MOUNTED PRESSURE INSTRUMENT (PG, PT, PS, PP)
EACH PRESSURE DIFFERENTIAL TAP IS AS SHOWN.
ANALYZER CONNECTIONS
TT
TT
INST.
PIPING
TT
INST.
PIPING
AT
INST.
PIPING
2"
AT
INST.
PIPING
2"
1/2"
BLEED
1/2"
BLEED
1/2"
BLEED
1/2"
BLEED
3/4"
1/2"
3
3
X"x3/4"
X"x3/4"
X"x3/4" X"x3/4"
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
ALL PIPING CLASSES PIPING CLASSES
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#, 2500#)
ALL PIPING CLASSES PIPING CLASSES
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#, 2500#)
PIPING CLASSES
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#, 2500#)
PIPING SPECS WITH
THREADED CONNECTION
PIPING SPECS
(150#, 300#, 600#, 1500#)
PIPING SPECS
(1500#, 2500#)
PIPING SPECS
(900# TO 2500#)
PIPING SPECS
(150# TO 2500#)
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
(FOR VESSEL CONNECTION)
PIPING CLASSES
(1500#, 2500#)
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
3
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
3
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 1
3
: 4
5
P
M
B
Y
:a
h
m
1
4
8
8
7
A
PRESSURE INSTRUMENT CONNECTION DETAILS
UNIT 200 - COMMON
200.0000.000.041.013
(FOR VESSEL CONNECTION)
(FOR VESSEL CONNECTION)
(FOR VESSEL CONNECTION)
1-1/2"
4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOWIMPLIED BREAKS.
X"x3/4"
X"x3/4"
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
X"
X"
(150#, 300#, 600#, 900#, 1500#)
ALL PIPING CLASSES
3/4"
3/4"
3/4"
3/4"
INST.
X"
X"
(150#, 300#, 600#, 900#, 1500#)
PIPING CLASSES
3/4"
3/4"
PIPING
PIPING
INST.
PURGE
PURGE
INST. X"
X"
(1500#, 2500#)
PIPING CLASSES
3/4"
3/4"
PIPING
PIPING
INST.
PURGE
PURGE
IF REQUIRED
IF REQUIRED
INST. X"x3/4"
X"x2"
(1500#, 2500#)
PIPING
INST.
PURGE
WITH UTILITY CONNECTION
IF REQUIRED
IF REQUIRED
PURGE
2
"
PIPING
2"x3/4"
INST.
(150#, 300#, 600#)
PIPING CLASSES
PIPING
INST.
PIPING
PURGE
PURGE
BLEED
BLEED
1
/ 2
"
1
/ 2
"
3
/ 4
"
3
/ 4
"
(600# H2 SERVICE, 900#, 1500#)
PIPING CLASSES
PURGE
PURGE
BLEED
BLEED
1
/ 2
"
1
/ 2
"
3
/ 4
"
3
/ 4
"
(150#, 300#, 600#)
PIPING CLASSES
BLEED
BLEED
1
/ 2
"
1
/ 2
"
(600# H2 SERVICE, 900#, 1500#)
PIPING CLASSES
BLEED
BLEED
1
/ 2
"
1
/ 2
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
3
/ 4
"
(1500# , 2500#)
PIPING CLASSES
BLEED
BLEED
3
/ 4
"
3
/ 4
"
(1500#, 2500#)
PIPING CLASSES
PURGE
PURGE
BLEED
BLEED
3
/ 4
"
3
/ 4
"
P
I P
I N
G
I N
S
T
.
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
2"
2"
P
IP
IN
G
IN
S
T
.
P
IP
IN
G
IN
S
T
.
2"
2"
P
IP
IN
G
IN
S
T
.
2"
2"
3
/4
"
3
/4
"
PIPING CLASSES
(150#, 300#, 600#)
P
IP
IN
G
IN
S
T
.
2"
2"
2"
2"
3
/4
"
3
/4
"
PIPING CLASSES
(600# H2 SERVICE, 900#, 1500#)
1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
3/4"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
1/2"
3. EXCEPT PIPING SPECS, UAB, UAZ, UAY, UJB, ULB.
4 4
4 4
4
4
3
LEVEL OR D/P INSTRUMENT ON VESSEL (PDT, LT,LTE)
LEVEL INSTRUMENT (LG/LT, LS)
1
/2
"
1
/2
"
1
/2
"
1
/2
"
3
P
IP
IN
G
IN
S
T
.
P
IP
IN
G
IN
S
T
.
P
IP
IN
G
IN
S
T
.
P
IP
IN
G
IN
S
T
.
P
IP
IN
G
IN
S
T
.
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
INST.
PIPING
CAPACITANCE/
GUIDED WAVE
MAG/
CAPACITANCE/
GUIDED WAVE
MAG/
CAPACITANCE/
GUIDED WAVE
MAG/
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
4
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
4
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 1
3
: 0
8
P
M
B
Y
:a
h
m
1
4
8
8
7
A
LEVEL INSTRUMENT CONNECTION DETAILS
UNIT 200 - COMMON
200.0000.000.041.014
4. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOWIMPLIED BREAKS.
3"
3"
3"
3" 3"
3" 3"
3"
3
/4
"
3
/4
"
D
V
3
/4
"
3
/4
"
D
V
3"
3" 3"
3"
3"
3" 3"
3"
3" 3"
3" 3" 3" 3"
3" 3"
P
IP
IN
G
IN
S
T
.
PIPING SPECS
(UAB, UAZ, UAY, UJB, ULB)
2"
2"
P
IP
IN
G
IN
S
T
.
3/4"
3
/4
"
D
V
GWR
2"
2"
2"
2"
3
/4
"
3
/4
"
P
IP
IN
G
P
IP
IN
G
IN
S
T
R
.
IN
S
T
R
.
3/4"
3
/4
"
GWR
PIPING CLASSES
(150#, 300#, 600#)
3
D
V
3
/4
"
3
/4
"
D
V
FT
FE
1
/2
"
O
R
3
/4
" INST.
PIPING
FT
INST.
PIPING PURGE
IF REQUIRED
PURGE
IF REQUIRED
3
/4
"
3
/4
"
INST.
PIPING
FE
P
IP
IN
G
IN
S
T
.
IN
S
T
.
P
IP
IN
G
FT
1
/2
"
O
R
3
/4
"INST.
PIPING
3
/4
"
FE
PIPING
INST.
1
/2
"
O
R
3
/4
"INST.
PIPING
3
/4
"
FT
PIPING
INST.
FT
INST.
PIPING
3
/4
"
PIPING
INST.
INST.
PIPING
3
/4
"
FT
PIPING
INST.
P
IP
IN
G
IN
S
T
.
IN
S
T
.
P
IP
IN
G
3
/4
"
3
/4
"
FT
INST.
PIPING
3
/4
"
FE
PIPING
INST.
INST.
PIPING
3
/4
"
FT
PIPING
INST.
3
/4
"
3
/4
"
FT
INST.
PIPING
3
/4
"
PIPING
INST.
3
/4
"
FT
INST.
PIPING
3
/4
"
PIPING
INST.
INST.
PIPING
3
/4
"
FT
PIPING
INST.
3
/4
"
3
/4
"
FT
INST.
PIPING
3
/4
"
PIPING
INST.
3
/4
"
P
IP
IN
G
IN
S
T
.
IN
S
T
.
P
IP
IN
G
ORIFICE FLANGE - MOUNTED FLOWMEASUREMENT (FT)
VENTURI - MOUNTED FLOWMEASUREMENT (FT)
1
/2
"
O
R
3
/4
"INST.
PIPING
FT
1
/ 2
"
O
R
3
/ 4
"
FE
WEDGE - MOUNTED FLOWMEASUREMENT (FT)
INST.
PIPING
FT
PIPING
INST.
FE
PURGE
INST.
PIPING
1/2"
BLEED
3/4" 3/4"
PURGE
INST.
PIPING
1/2"
BLEED
X"
FT
INST.
PIPING
1/2"
BLEED
2
"
2
"
2
"
2
"
3/4" 3/4"
INST.
PIPING
1/2"
BLEED
X"
PIPING
INST.
PIPING
INST.
PIPING
INST.
INST.
PIPING
INST.
PIPING
FE
FE
PURGE
INST.
PIPING
1/2"
BLEED
3/4" 3/4"
PURGE
INST.
PIPING
1/2"
BLEED
X"
FT
INST.
PIPING
1/2"
BLEED
INST.
PIPING
1/2"
BLEED
X"
INST.
PIPING
INST.
PIPING
FE
FE
3/4" 3/4"
1. FOR GENERAL NOTES AND DETAILS SEE DWGS. 245.0311.000.053.005, 006, 007
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
3/4"
PIPING CLASSES
(150#, 300#, 600#, 900#)
PIPING CLASSES
(1500#, 2500#)
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
PURGE
PURGE
IF REQUIRED
IF REQUIRED
PIPING CLASSES
(1500#, 2500#)
PIPING CLASSES
(150#, 300#, 600#, 900#, 1500#)
PIPING CLASSES
PIPING CLASSES
PIPING CLASSES
(1500#, 2500#)
PIPING CLASSES
(900#, 1500#)
PIPING CLASSES
(150#, 300#, 600#)
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#)
1
/ 2
"
O
R
3
/ 4
"
FE
3
/ 4
"
3
/ 4
"
2
"
2
"
2
"
2
"
2
"
2
"
2
"
2
"
1/2"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
5
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
5
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 1
2
: 1
8
P
M
B
Y
:a
h
m
1
4
8
8
7
A
FLOW ELEMENT CONNECTION DETAILS
UNIT 200 - COMMON
200.0000.000.041.015
3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOWIMPLIED BREAKS.
PIPING CLASSES
FT
FT FT FT FT
FT FT FT FT
FT FT
WEDGE - MOUNTED FLOWMEASUREMENT (FT)
BLEED
1/2" INST.
PIPING
PIPING
INST.
BLEED
1/2"
1/2"
IF REQUIRED IF REQUIRED
X"
BLEED
1/2" 1/2"
BLEED BLEED
1/2"
1/2"
BLEED
X"
1/2"
BLEED BLEED BLEED
1/2"
BLEED
1/2"
X"
PIPING
INST.
PIPING
1/2"
X"
BLEED
1/2"
BLEED
1/2"
BLEED BLEED
INST. 1/2"
1/2"
X"
BLEED
1/2"
BLEED
1/2"
BLEED
PIPING
INST. 1/2"
BLEED
PIPING
INST.
X"
BLEED
1/2" 1/2"
BLEED
1/2"
BLEED
1/2"
BLEED
IF REQUIRED IF REQUIRED
INST.
PIPING
INST.
INST.
INST.
PIPING
INST.
PIPING PIPING
INST.
PIPING
INST.
PIPING
PIPING
PIPING CLASSES
PIPING
INST.
PIPING
INST. INST.
IF REQUIRED IF REQUIRED
PIPING CLASSES
(1500#, 2500#)
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#)
PIPING
PIPING CLASSES
(150#, 300#, 600#)
PIPING CLASSES
(900#, 1500#)
(1500#, 2500#)
PIPING CLASSES
3/4" 3/4" 3/4"
PURGE PURGE
2
"
2
"
2
"
2
"
PURGE PURGE
PURGE PURGE
3/4"
3/4"
3/4" 3/4"
3/4"
PURGE PURGE PURGE PURGE
PURGE PURGE PURGE PURGE
2
"
2
"
3/4"
3/4"
2
"
2
"
3/4"
2
"
3/4"
2
"
2
"
2
"
3/4"
3/4"
3/4" 3/4"
3/4" 3/4" 3/4"
3/4" 3/4"
FE
FE FE
FE FE
FE
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
1. FOR GENERAL NOTES AND DETAILS SEE DWGS 245.0311.000.053.005, 006, 007,
008, 009, 010, 011, 012, 013, 018 AND 019.
2. LEGEND:
1/2"
- 3/4" "PHOENIX" DOUBLE BLOCK & BLEED GAUGE VALVE.
- 1/2" "SWAGELOK" DOUBLE BLOCK & BLEED GAUGE VALVE.
A 05/08/10 ISSUED FOR REVIEW
2
0
0
. 0
1
6
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\2
0
0
\ 2
0
0
. 0
1
6
. p
i d
M
O
D
E
L
D
A
T
E
: 2
/ 1
/ 2
0
1
1
4
: 0
6
: 5
8
P
M
B
Y
:a
h
m
1
4
8
8
7
A
FLOW ELEMENT CONNECTION DETAILS
UNIT 200 - COMMON
200.0000.000.041.016
3. PIPING/INSTRUMENTATION SCOPE BREAKS ARE NOT TO BE SHOWN ON THE P&ID'S.
DETAILS ON THESE CONNECTIONS SHOWIMPLIED BREAKS.
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
HIS
I HS
HOA(TOA)
HOA(TOA)
VFD
ES SIS
VIB
TEMP
VIB
TEMP
M
O
N
IT
O
R
IN
G
C
O
N
T
R
O
L
W
IN
D
IN
G
T
E
M
P
DCS VFD CONTROL
MCC
ES HS
VIB
TEMP
VIB
TEMP
M
O
T
O
R
R
U
N
S
T
A
T
U
S
NON DCS STARTER CONTROL
SIS
HOA(TOA)
VIB
TEMP
VIB
TEMP
VIB
TEMP
VIB
TEMP
MCC
ES
MCC
ES
SIS
I HS HSZ
HOA(TOA) HOA(TOA)
HS
A/B
HIS HIS
HOA(TOA) HOA(TOA)
W
IN
D
IN
G
T
E
M
P
W
IN
D
IN
G
T
E
M
P
'A' MOTOR 'B' MOTOR
DCS STARTER CONTROL
SIS
ISSUED FOR CLIENT REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
0
0
. X
X
1
F
I L
E
: \ \ F
: \ 1
0
2
5
\ D
R
A
W
I N
G
S
\ U
T
I L
I T
I E
S
\ 2
0
0
\ 2
0
0
. X
X
1
. p
id
M
O
D
E
L
D
A
T
E
: 2
/ 2
/ 2
0
1
1
2
: 3
5
: 5
5
A
M
B
Y
: b
e
s2
9
4
5
1
UNIT 200 - COMMON
200.0000.000.041.XX1
W
IN
D
IN
G
T
E
M
P
MONITORING MONITORING
CONTROL CONTROL
155A
LT
154
LTE
064
PDT
064
PDI
075
FC
020
XZI
S
030
TI
031
TT
155
LC
031
TI
102
I
014
HZTE
s
155B
LT
450
E
030
TT
M
155B
LI
155A
LI
155
LHS
450
E
PP
451
E
155
LG
075
FT
451
E
450
E 014
HIC
S
020
XZTE
104
I
015
HIC
S
104
I
453
E
015
HZTE
102
I
103
I
450
E
453
E
T
H2 RAWGAS
FROMHMU 1
241.009
12054
H2 RAWGAS
TO HMU 1 PSA
241.022
12039
240.030
FL
12967
ANTI-FOAM
TO V-24218
242.021
12206
SET POINT
FROMLX-246001
246.002
12642
LEAN AMINE
FROMP-24602A/B/C
246.011
12633
LEAN AMINE
TO V-24218
242.021
12286
ANTI-FOAM
FROMP-24606
246.014
12715
240.029
SL
12717
240.028
GI
12055
H2 RAWGAS
TO V-24119
241.022
12716
240.029
SCL
12981
LEAN AMINE FLOWSIGNAL
TO UC-246002
246.011
MW
MW
D
8 . LOCALIZED DEGASSINGOF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOWAND VIBRATION.
DETAILS FOR INJECTION QUILL TO BE FINALIZED.
SAMPLE STATION SPECIALITY ITEMNUMBERS.
FO
D
DETAIL 'A'
D
V
D
D
D
FO
A/S
TWOPHASE FLOW
4
0
0
0
m
m
24"
MW
FREE DRAINING
FREE DRAINING
/ HV @150 C
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
B
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
3 . BOTTOMOF COLUMN IS PACKED WITH 600 mmOF #2 RASCHIGRINGS.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES AND CONNECTION DETAILS.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
STATED.
SWING
ELBOW
START-UP
BYPASS
MIN
V
1
25
DP
VACUUMTRUCK
V
FO
F
R
E
E
D
R
A
IN
IN
G
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
FIRE
7 . ELECTRIC TRACE TO HLL (ET 10).
SWING
ELBOW
D
11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
BY INTERLOCK I-102
9 . 316 SS HARDFACED TRIMMATERIAL IS REQUIRED FOR THIS CHECK VALVE.
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
PJG(0.4)
10 . TWOCHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.
INJECTION QUILL
DAG
S-9
D
S
-4
(TOP)
(BTM)
MP-001
D
13 . TOP CONNECTION.
DETAIL "A"
14 . 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
CENTERED IN PROCESS LINE.
D
D
HH
E
T
1
0
5
0
3
/4
"
H
3"
3"
H
3
/4
"
3
/4
"
FO
HV
015
V-24118
AMINE ABSORBER 1
3350 mmID x 23400 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @95 C DESIGN PR. & TEMP:
SIZE:
FYE
075
4
"
14"-P-241055-HJE(0.4)
2" 3
/4
"
HJE(0.4)
GWR
D
A
G
3"
XYE
020
ET 10
3
"
3"
3"
8"
8
HH
2"
C
S
C
ET 38
75
LLLL=300 mm
3
/4
"
1-1/2"
LLL=1900 mm
3"
16"-P-246080-DAG
FC
HV
014
HYE
014
24"
2"
3
/4
"
3
/4
"
6"-FL-241020-PAC
3
/4
"
8"x6"
H
38
12"-P-241056-HJE(0.4)
3
/4
" 3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
8"-P-241064-DJE(0.4)
3/4"-KP-246005-PJG(0.4)
3/4"-KP-241001-PJG(0.4)
E
T
1
0
3
8
12"-P-241061-DAG
7
3
/4
"
D
J
E
( 0
.4
)
12"-P-241063-DJE(0.4)
4
SO
XV
020
2"
L
8"
CSO
2"
SP
004
SP
003
16"
1
" - S
L
- 2
4
1
X
X
X
- S
A
B
1
"
CSC
11
9
RV
023
SET@
3500 kPa-g
1-1/2H3
1-1/2"
16"x12"
3
/4
"
ET 38
75
3/4"
1"-SCL-241XXX-SAB
4"-P-241066-DJE(0.4)
3/4"
HHLL=4400 mm
18"x14"
16"x12"
14"
3/4"
18"
3
/4
"
D
A
E
2"
3/4"
C
S
O
NLL=2800 mm
N/A
4
"
2"
HLL=3500 mm
3
/4
"
14"-P-241055-HJE(0.4)
ET 10
38
12"-P-241062-DAE
5
FV
075
2"
2"-GI-240022-ULB
2"-P-241065-DJE(0.4)
3
6
14"-P-241054-HJE(0.4)
V-24118
4
"
L
3"-SL-240020-SAB
3/4"
MAG
3
/4
"
LV
155
3"
2"-P-241057-HJE(0.4)
16"x12"
12"
3"
3"
LL
8"
3
/4
"
2"
ULB
2"x3/4"
FC
FC
8"
6"
3
/4
"
H
3
/4
"
12"-P-241074-DAG
3
/4
"
HJE(0.4)
16"
FC
8"-P-241064-DJE(0.4)
3
/4
"
D
A
E
2
"
2"
3
/4
"
P-241080-HJE(0.4)
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
1
.0
2
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
1
\2
4
1
.0
2
1
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:4
8
P
M
B
Y
:b
e
s2
9
4
5
1
G
AMINE ABSORBER 1
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
241.0000.000.041.021
36"
E
T
1
0
3
8
3
/4
"
6"x3"
2
" x
1
- 1
/2
"
11
5
6
P-241084-DJE(0.4)
7
CSC
12"x8"
12"x8"
12"x8"
PJG(0.4)
DAG
12"x8"
10
10
12
ET 10
50
12
13
M
IN
MIN MIN
8"x6"
SP
002
FO
HYE
015
SP
001
ET 10
50
12"x8"
PAC
14"x12"
14"x12"
14
SP
007
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FLOW
12635
RICH AMINE
TOE-24602A/B
242.021
ISSUED FOR HAZOP

S
159
LTE
032
TI
067
PT
019
XZTE
076
FT
157
LG
156
LI
159
LI
452
E 157B
LT
DP
453
E
S
066
PDI
453
E
067
PC
016C
AP
074
FHS
066
PDT
074
FT
065
PT
065
PI
032
TT
PP
074B
FX
016
AIT
016
AI
157B
LI
101
I
156
LTE
453
E
157A
LHS
157A
LT
157A
LI
016
AE
076
FC
016B
AP
074B
FI
074A
FI
074A
FX
f(x)
450
E
H2 RAWGAS
TO HMU 1 PSA
241.009
FC SIGNAL
FROMFC-377
241.009
13030
FLOWSIGNAL
TO FX-246076
246.022
12054
H2 RAWGAS
FROMHMU 1
241.021
12055
H2 RAWGAS
FROMV-24118
241.021
12968
WASH WATER
FROMP-24609A/B
246.022
12969
WASH WATER
TO V-24219
242.022
12407
CIRCULATINGWATER
TOP-24108A/B
241.023
12409
LC SIGNAL
TO LC-157
241.023
12061
240.030
FL
12408
CIRCULATINGWATER
FROME-24129
241.023
13045
240.030
FL
24"
MW
24"
MW
7 . HAND SWITCH TOSEND FLOWSETPOINT FROMFC-377 TO PSA WHEN QUEST IS
ISOLATED.
A/S
CO2 CO2 LEAN
6 . EITHER LTE-241156 OR LTE-241159 SHALL BE SELECTABLE AS THE INPUT TO
SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARMTO MONITOR THE
TWOINSTRUMENTS SHALL BE PROVIDED AT THE DCS.
CO2 RICH
7
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
D
6
24"
MW
F
R
E
E
D
R
A
IN
IN
G
FREE DRAINING
MIN
FREE DRAINING
FREE DRAINING
SET POINT
TOPSA LOGIC
GWR
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "241" UNLESS OTHERWISE
STATED.
5 . ELECTRIC TRACE TOHLL (ET 10).
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
3 . CALCULATE AMOUNT OF CO2 REMOVED FROMRAWH2 GAS.
D
DP
D
HOLDS:
24"
MW
V
D
INST
PIPING
9
1
7
8
6
0
m
m
BYPASS
MAG
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
HOLD
DETAIL "B"
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UN IT.
LLL=870 mm
FC
10"-FL-241021-PAC
H
H
3
/4
"
3"
3
5
2"
H
J
E
( 0
.4
)
3
/4
"
4"
ET 10
50
3
/4
"
3
/4
"
2"
2"
CSC
TSO
6"
9
V-24119
ABSORBER 1 WASH WATER VESSEL
1800 mmID x 10900 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @60 C DESIGN PR. & TEMP:
SIZE:
14"-P-241055-HJE(0.4)
NLL=1050 mm
14"
FC
FC
3
"
3
/4
"
HH
LL
2"
3"
P-241081-HJE(0.4)
3
/4
"
3"
3
/4
"
H
J
E
( 0
.4
)
6"-P-241067-PJE(0.4)
3"-P-241073-PJE(0.4)
AP
016A
2"x1"
3
"
2
" - S
C
H
- 2
4
1
X
X
X
- S
A
G
3
/4
"
3"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
L
S
A
D
FYE
076
2"-SCH-242XXX-SAG
10"x6"
3"
XYE
019
7
6
4
ET 38
75
2"
3"
PV
067
4"x3"
H
1"
1"
3
/4
"
L
H
FV
076
LLLL=300 mm
14"-P-241058-HJE(0.4)
2"
H
38
2"-SCH-241XXX-SAD
ET 10
38
L
HLL=2300 mm
3"
H
S
A
G
3
"
3
/4
"
P
A
C
ET 10
50
FO
3
/4
"
6
" - P
- 2
4
1
0
5
9
- H
J
E
( 0
.4
)
3
/4
"
3"
3/4" 3/4"
3/4" 3/4"
8
8
6
CSC
2"x1" ET 10
38
3"x2"
8 8
3
/4
"
3
/4
"
3"
3"
3
/4
"
3"
E
T
3
8
6
3
2"
2"
3"
2"-SCH-246003-SAG
12"
FO
XV
019
6"
12"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
1
.0
2
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
1
\2
4
1
.0
2
2
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:5
0
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 1 WASH WATER VESSEL
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
241.0000.000.041.022
14"x12"
V-24119
3
/4
"
HHLL=2450 mm
S
A
D
2"
3
/4
"
ET 38
75
12"-P-241056-HJE(0.4)
3
/4
"
5
14"x12"
2"
1-1/2"
SO
3/4"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FLOW
INST
PIPING
2"x1" 2"x1"
DETAIL "B"
SAMPLE QUILL
P
J
E
( 0
.4
)
H
J
E
( 0
.4
)
3"-P-241XXX-HJE(0.4)
/ HV @150 C
ISSUED FOR HAZOP

070
PI
103
I
VFD
017
XL
PP
PP
I
033
TG
016
XA
PP
I
016
XL
017
SI
034
TG
016
SI
077
FC
452
E
100
I
100
I
157B
LHS
PP
017 A
HS
016
HIS
157
LC
VFD
016A
HS
035
TW 070
PT
017
XA
452
E
077
FT
017
HIS
XXX
HS
452
E
S
018
XZTE
018
XZI
R
S
R
S
12637
PURGE WATER
TO V-24602
246.006
12638
PURGE WATER
FROME-24229
242.023 12409
LC SIGNAL
FROMLHS-157A
241.022
12618
COOLINGWATER SUPPLY
FROMHEADER
242.023
12619
COOLINGWATER RETURN
TOHEADER
242.023
12407
CIRCULATINGWATER
FROMV-24119
241.022
12408
CIRCULATINGWATER
TO V-24119
241.022
V
M
IN
.
D
TO
GRADE
REMOTE
V
4 . CV OF CONTROL VALVE TO BE MINIMUM.
FAULT
VFD
REMOTE
LOCAL/
BACK FLUSH
FAULT
D
D
D
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
D
V
D
TO
GRADE
D
6 . ELECTRIC TRACE (ET 10).
D
D D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
LOCAL/
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
VFD
D
D
HOLDS:
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
M
IN
.
FO
A/S
D
D
S-8
SEL
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
COMFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
XV
018
ET 10
50
8
3/4" 3/4"
3
/4
"
3
/4
"
3
" - P
- 2
4
1
0
7
2
- P
J
E
( 0
.4
)
XYE
018
FC
3"-P-241072-PJE(0.4)
7
3
" - P
- 2
4
1
0
7
7
- P
J
E
( 0
.4
)
8
3
/4
"
2"x1" 2"x1"
2"x1" 2"x1"
1"
1"
SP
005
SP
006A
SP
006B
7
7
3"-P-241073-PJE(0.4)
ET 10
38
P-24108B
6
" - P
- 2
4
1
0
6
9
- P
J
E
( 0
.4
)
ET 10
38
ET 10
38
4"-CWR-241003-UAB
4"-CWS-242003-UAB
ET 10
50
E
T
1
0
N
/A
N
/A
3
"
3
" - P
- 2
4
1
0
7
1
- P
J
E
( 0
.4
)
3
/4
"
6"x3"
3/4" 3/4"
3
" - P
- 2
4
1
0
7
0
- P
J
E
( 0
.4
)
ET 10
38
4
FC
3"-P-241076-PJE(0.4)
5
3
/4
"
3
/4
"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
1
.0
2
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
1
\2
4
1
.0
2
3
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:5
2
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 1 WASH WATER COOLER
UNIT 241 - HYDROGEN MANUFACTURING UNIT TRAIN 1
241.0000.000.041.023
3
/4
"
E-24129
/B
3/4"
CWR-241004-PJE(0.4)
CSO
3"-P-241073-PJE(0.4)
6"-P-241067-PJE(0.4)
3
LL
3/4"
2
" - P
- 2
4
1
0
7
5
- P
J
E
( 0
.4
)
E
T
1
0
3/4"
2"-P-241076-PJE(0.4)
3
/4
"
3/4"
6
" - P
- 2
4
1
0
6
8
- P
J
E
( 0
.4
)
E
T
1
0
5
0
L
L
3"x2"
R/S HOA
3/4"
6"x3"
3/4"
6
LV
157A
FC
H
3/4"
4
2
"
3
/4
" 3
/4
"
P-241083-PJE(0.4)
6
" x
3
"
3
/4
"
3/4"
N
C
6"x4"
3
/4
"
R/S
LV
157B
3
/4
"
1-1/2"
HOA
6"x4"
P-241082-PJE(0.4)
1-1/2"
E
T
1
0
5
0
6
6
1-1/2"
P-24108A
5.6 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
322 kPa DIFF. PR.:
RATED FLOW: 39.1 m^3/hr
ABSORBER 1 CIRCULATING WATER WASH PUMPS
3
/4
"
P-24108A
2"-P-242076-PJE(0.4)
6
" x
3
"
6
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
3"x2" 3"x2"
E-24129
ABSORBER 1 CIRCULATING WATER COOLER
0.2 MW
BEU TEMA TYPE:
/ /
60 C / 150 C
CS + 3 mm304L SS CLAD
3900 kPa-g / HV
SUPER DUPLEX 2507 + 0.38 mmCA
58 C /
3010 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
37.9 m^2
6"x3" 3"x2" 6"x3" 3"x2"
UAB
UAB
PJE(0.4)
PJE(0.4)
ISSUED FOR HAZOP

ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
2
.0
2
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
2
\2
4
2
.0
2
1
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
2
:0
2
:3
9
P
M
B
Y
:b
e
s2
9
4
5
1
G
AMINE ABSORBER 2
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2
242.0000.000.041.021
031
TI
155
LC
155
LHS
155A
LI
155B
LI
020
XZTE
064
PDI
450
E
155
LG
450
E
155B
LT
155A
LT
075
FC
075
FT
M
PP
064
PDT
S
S
014
HIC
031
TT
451
E
020
XZI
154
LTE
451
E
450
E
s
014
HZTE
102
I
103
I
102
I
015
HZTE
450
E
453
E
S
015
HIC
104
I
453
E
H2 RAWGAS
FROMHMU 2
242.009
T
D
12967
ANTI FOAM
FROMP-24606
241.021
12064
H2 RAWGAS
TO V-24219
242.022
12065
H2 RAWGAS
TO HMU 2 PSA
242.022
12633
LEAN AMINE
FROMP-24602A/B/C
241.021
12712
240.029
SCL
12403
SET POINT
FROMLX-246001
246.002
12982
LEAN AMINE FLOWSIGNAL
TO UC-246002
246.011
12063
240.030
FL
12713
240.028
GI
12711
240.029
SL
D
MIN
DETAILS FOR INJECTION QUILL TO BE FINALIZED.
D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
MW
25
24"
MW
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
FO
BYPASS
3 . BOTTOMOF COLUMN IS PACKED WITH 600 mmOF #2 RASCHIGRINGS.
V
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES AND CONNECTION DETAILS.
D
SWING
ELBOW
D
D
V
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
FO
FO
VACUUMTRUCK
7 . ELECTRIC TRACE TO HLL (ET 10).
FREE DRAINING
MIN
START-UP
FREE DRAINING
SWING
ELBOW
DP
B
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
HOLDS:
V
1
F
R
E
E
D
R
A
IN
IN
G
(TOP)
(BTM)
FIRE
S
-4
MW
D
TWOPHASE FLOW
13. TOP CONNECTION.
INJECTION QUILL
4
0
0
0
m
m
A/S
9 . 316 SS HARDFACED TRIMMATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10 . TWOCHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION. SEPARATED BY AT LEAST 500 mm.
11 . INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
BY INTERLOCK I-102
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.
D
DETAIL "A"
PJG(0.4)
DAG
DETAIL 'A'
8 . LOCALIZED DEGASSINGOF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOWAND VIBRATION.
D
D
14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
CENTERED IN PROCESS LINE.
D
MP-001
D
S-9
3
/4
"
4
"
HV
014
18"
2"
3"-SL-240018-SAB
2"x3/4"
6
7
1
"-S
L
-2
4
2
X
X
X
-S
A
B
2"
2
"
2"-GI-240020-ULB
XYE
020
3
/4
"
3
/4
"
2"
2"
3
/4
"
1-1/2"
3"
HJE(0.4)
ULB
3
/4
"
3
/4
"
36"
ET 10
38
2"
12"
2"
3"
3
/4
"
DAG
14"-P-242055-HJE(0.4)
2"
2"
3"
3
/4
"
3
/4
"
2"-P-242065-DJE(0.4)
3/4"
DJE(0.4) DAE
3"
P-242080-HJE(0.4)
N/A
FV
075
2"
C
S
O
3
/4
"
L
ET 10
8"-P-242064-DJE(0.4)
3
5
3
/4
"
3/4"
4"-P-242066-DJE(0.4)
HYE
014
ET 38
75
3
/4
"
2"-P-242057-HJE(0.4)
3"
HJE(0.4)
GWR
2"
MAG
3
/4
"
14"-P-242055-HJE(0.4)
3
/4
"
1"-SCL-242XXX-SAB
FC
4
"
3
/4
"
SO
6"-FL-242020-PAC
3"
3
/4
"
3/4"
4
24"
12"-P-242063-DJE(0.4)
3
/4
"
PJG(0.4)
12"-P-242062-DAE
3
/4
"
CSC
6
16"
H
38
5
9
CSC
11
12 DAG
ET 10
50
10
E
T
1
0
3
8
3
/4
"
6"x3"
2
" x
1
- 1
/2
"
10
P-242084-DJE(0.4)
7
RV
023
SET@
3500 kPa-g
1-1/2H3 V-24218
AMINE ABSORBER 2
3350 mmID x 23400 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @95 C DESIGN PR. & TEMP:
SIZE:
HH
FYE
075
DAE
8"
3
/4
"
8"
L
LL
FC
16"
3/4"
HHLL=4400 mm
3/4"-KP-241001-PJG(0.4)
8
12"-P-242056-HJE(0.4)
H
LLL=1900 mm
HLL=3500 mm
H
V-24218
14"-P-242054-HJE(0.4)
12"x8"
XV
020
LLLL=300 mm
12"-P-241074-DAG
NLL=2800 mm
C
S
C
3/4"
14"
FC
4
"
6"
FC
18"x14"
16"x12"
8"
CSO
LV
155
HYE
015
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
FO
HV
015
8"
FO
8"x6" 8"x6"
11
3
/4
"
ET 10
50
12"x8"
12"x8"
13
MIN
ET 38
75
M
IN
12
SP
004
SP
003
PAC
SP
001
SP
002
3
"
12"x8"
14"x12"
12"x8" 14"x12"
14
16"x12"
8"-P-241064-DJE(0.4)
10"x8"
10"-P-242064-DJE(0.4)
/ HV @150 C
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FLOW
12634
RICH AMINE
FROMV-24118
246.001
12635
RICH AMINE
FROMV-24118
241.021
TWOPHASE FLOW
SP
007
ISSUED FOR HAZOP

15
S
S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
f(x)
FLOW
453
E
MAG
065
PT
159
LTE
066
PDT
067
PT
032
TI
12064
H2 RAWGAS
FROMV-24218
242.021
12065
H2 RAWGAS
FROMHMU 2
242.021
067
PC
PP
016C
AP
159
LI
101
I
016B
AP
FREE DRAINING
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
7
8
6
0
m
m
D
016
AI
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
076
FT
074A
FI
065
PI
D
076
FC
066
PDI
24"
MW
12146
240.030
FL
H2 RAWGAS
TO HMU 2 PSA
242.009
FC SIGNAL
FROMFC-377
242.009
453
E
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
016
AE
24"
MW
074B
FX
157
LG
HOLDS:
24"
MW
157B
LT
12411
CIRCULATINGWATER
FROME-24229
242.023
12413
LC SIGNAL
TO LC-157
242.023
1
156
LTE
FREE DRAINING
CO2
032
TT
074B
FI
F
R
E
E
D
R
A
IN
IN
G
6 . EITHER LTE-242156 OR LTE-242159 SHALL BE SELECTABLE AS THE INPUT TO SAFETY
INTERLOCKS E-452 AND E-453. A DEVIATION ALARMTO MONITOR THE TWO
INSTRUMENTS SHALL BE PROVIDED AT THE DCS.
A/S
016
AIT
6
BYPASS
FREE DRAINING
157A
LHS
9
GWR
MIN
019
XZTE
453
E
5 . ELECTRIC TRACE TOHLL (ET 10).
D
157A
LI
D
24"
MW
157A
LT
DP
3 . CALCULATE AMOUNT OF CO2 REMOVED FROMRAWH2 GAS.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
V
12412
CIRCULATINGWATER
TOP-24208A/B
242.023
157B
LI
CO2 RICH
13031
FLOWSIGNAL
TO FX-246076
246.022
7
156
LI
452
E
SET POINT TO
PSA LOGIC
074
FT
12707
240.030
FL
CO2 LEAN
DP
7 . HAND SWITCH TOSEND FLOWSETPOINT FROMFC-377 TO PSA WHEN QUEST
IS ISOLATED.
074
FHS
12969
WASH WATER
FROMP-24609A/B
241.022
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
450
E
DETAIL 'B'
INSTR
PIPING
HOLD
074 A
FX
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
INST.
PIPING
3
/4
"
3
/4
"
HLL=2300 mm
LLL=870 mm
1-1/2" XV
019
12"
12"
3
/4
"
H
PV
067
3
/4
"
2"-SCH-241XXX-SAG
PAC
6
" - P
- 2
4
2
0
5
9
- H
J
E
( 0
.4
)
3
/4
"
14"
H
3
/4
"
FC
SAG
L
XYE
019
3"
H
3
/4
"
3
/4
"
3
"
3
/4
"
3
/4
"
2"
3
/4
"
2"
3
/4
"
3
/4
"
3"-P-242073-PJE(0.4)
12"-P-242056-HJE(0.4)
2"
3
/4
"
10"x6"
3
/4
"
ET 10
50
3"
6"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
2
.0
2
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
2
\2
4
2
.0
2
2
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:5
0
:4
7
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 2 WASH WATER VESSEL
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2
242.0000.000.041.022
FO
H
38
7
2"
P-242081-HJE(0.4)
6"-P-242067-PJE(0.4)
FV
076
4"x3"
1"
2"-SCH-242XXX-SAD
NLL=1050 mm
3
FC
3"
HJE(0.4)
3"
10"-FL-242021-PAC
ET 10
38
2"
2"
3
/4
"
FYE
076
SO
3"
V-24219
2"
3"
2"
ET 38
75
2"x1"
4
3"
HHLL=2450 mm
3
/4
"
3
"
1"
3
/4
"
14"x12"
3
/4
"
4"
H
ET 10
50
3" LL
FO
HH
5
SAD
LLLL=300 mm
L
3"
3
/4
"
14"-P-242058-HJE(0.4)
H
AP
016A
L
3
/4
"
SAD
3
/4
"
14"x12"
3/4"
FC
E
T
3
8
7
5
3"
2"
HJE(0.4)
ET 38
75
3
"
3"
3"
V-24219
ABSORBER 2 WASH WATER VESSEL
1800 mmID x 10900 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @60 C DESIGN PR. & TEMP:
SIZE:
14"-P-242055-HJE(0.4)
2"
TSO
ET 10
38
5
6"
8
CSC
3/4" 3/4"
3/4" 3/4"
8
6
3"x2"
8 8
CSC
2"x1"
3
/4
"
9
6
2"x1" 2"x1"
D
SAMPLE QUILL
DETAIL 'B'
/ HV @150 C
P
J
E
( 0
.4
)
H
J
E
( 0
.4
)
3"-P-242XXX-HJE(0.4)
ISSUED FOR HAZOP

S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FO
018
XZTE
12618
COOLINGWATER SUPPLY
TO E-24129
241.023
017A
HS
033
TG
D
D
100
I
I
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
12411
CIRCULATINGWATER
TO V-24219
242.022
12412
CIRCULATINGWATER
FROMV-24219
242.022
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
077
FC
077
FT
157B
LHS
452
E
D
R
S
R
S
034
TG
V
V
TO
GRADE
D
V
TO
GRADE
070
PI
D
035
TW
BACK FLUSH
D
M
IN
.
4 . CV OF CONTROL VALVE TO BE MINIMUM.
A/S
12638
PURGE WATER
TO V-24602
241.023
REMOTE
FAULT
016
XL
VFD
VFD
016
XA
D
157
LC
12413
LC SIGNAL
FROMLHS-157A
242.022 HOLDS:
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
PP
ABSORBER 2 CIRCULATING WATER WASH PUMPS
PP
D
PP
I
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "242" UNLESS OTHERWISE
STATED.
PP
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
ABSORBER 2 CIRCULATING WATER COOLER
100
I
D
017
XA
017
XL
452
E
452
E
REMOTE
VFD
FAULT
D
12619
COOLINGWATER RETURN
FROME-24129
241.023
018
XZI
070
PT
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
6 . ELECTRIC TRACE (ET 10).
016
SI
VFD
LOCAL/
D
D
M
IN
.
D
017
SI
016
HIS
016A
HS
017
HIS
LOCAL/
HS
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
S-8
SEL
COOLINGWATER RETURN
TOHEADER
240.003
COOLINGWATER SUPPLY
FROMHEADER
240.003
103
I
FC
3
/4
"
3
/4
"
1-1/2"
N
C
2
"-P
-2
4
2
0
7
5
-P
J
E
(0
.4
)
LV
157A
E
T
1
0
N
/A
5
3
/4
"
4"-CWR-242XXX-UAB
/B
6"x4"
3"-P-242073-PJE(0.4)
3
" - P
- 2
4
2
0
7
7
- P
J
E
( 0
.4
)
3
/4
"
6
" x
3
"
ET 10
50
3"-P-242072-PJE(0.4)
ET 10
38
N
/A
6"-CWS-240015-UAB
4"-CWR-241003-UAB
P-24208A
5.6 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
322 kPa DIFF. PR.:
RATED FLOW: 39.1 m^3/hr
XV
018
2
"
6
" x
3
"
3
/4
"
3
/4
"
R/S HOA
P-24208A P-24208B
3
/4
"
P-242082-PJE(0.4)
R/S HOA
1-1/2"
ET 10
50
6"-P-242067-PJE(0.4)
E-24229
H
L
1-1/2"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
2
.0
2
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\2
4
2
\2
4
2
.0
2
3
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:5
2
:0
5
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 2 WASH WATER COOLER
UNIT 242 - HYDROGEN MANUFACTURING UNIT TRAIN 2
242.0000.000.041.023
4
ET 10
50
2"-P-242076-PJE(0.4)
3/4"
XYE
018
3/4"
3/4" 3/4"
6
" - P
- 2
4
2
0
6
8
- P
J
E
( 0
.4
)
E
T
1
0
5
0
E
T
1
0
5
0
FC
3
4"-CWS-242003-UAB
6
3/4"
6
" - P
- 2
4
2
0
6
9
- P
J
E
( 0
.4
)
CSO
ET 10
38
3
/4
"
6"x3" 6"x3"
WR-242004-PJE(0.4)
3/4"
3
/4
"
3"-P-242073-PJE(0.4)
3/4"
ET 10
50
3
/4
"
4
LV
157B
6"x4"
3/4"
3
" - P
- 2
4
2
0
7
0
- P
J
E
( 0
.4
)
FC
7
3/4"
3
/4
"
P-242083-PJE(0.4)
3
"
4"-CWS-240XXX-UAB
3
" - P
- 2
4
2
0
7
1
- P
J
E
( 0
.4
)
6"-CWR-242003-UAB
E
T
1
0
3/4" 3/4"
3
/4
"
3
/4
"
SP
005
6
LL
2"x1" 2"x1"
2"x1" 2"x1"
1"
1"
6 6
7 7
3"x2" 3"x2"
SP
006B
SP
006A
E-24229
0.2 MW
BEU TEMA TYPE:
/ /
60 C / 150 C
CS + 3 mm304L SS CLAD
3900 kPa-g / HV
SUPER DUPLEX 2507 + 0.38 mmCA
58 C /
3010 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
37.9 m^2
6"x3" 3"x2" 6"x3" 3"x2"
ET 10
50
UAB
UAB
ET 10
38
PJE(0.4)
PJE(0.4)
ISSUED FOR HAZOP

001
FT
001
FC
002
PDI
004
TT
003
PI
003
TI
001
TT
002
TI
002
TT
002
PT
002
PI
001
TI
028
PI
028
PT
001
PT
001
PI
005
TT
005
TI
003
TT
003
PT
M
002
TT
004
PT
004
TI
004
PI
D
12634
RICH AMINE
FROMV-24118 / V-24218
242.021
12227
246.033
DM
12230
LEAN AMINE
FROMP-24601A/B/C
246.007
12281
LEAN AMINE
FROMP-24602A/B/C
246.011
12252
LEAN AMINE
TOE-24604B
246.009
12225
FC SIGNAL
TO FFX-001A
246.003
12212
RICH AMINE
TO V-24601
246.002
12181
LEAN AMINE
TOE-24604A
246.008
12686
RICH AMINE
FROMV-44118
246.101
7 . LOCALIZED DEGASSINGOF C02 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC.
RESULTING IN LOCALIZED TWO-PHASE FLOWAND VIBRATION.
S
T
A
R
T
-U
P
V
6 . EXCHANGER TOBE DRAINED IF ISOLATED FOR MAINTENANCE.
3 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
9 . ELECTRIC TRACE (ET 10).
D
D
D
V
START-UP / MINIMUMFLOW
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
D
D
D
TWOPHASE FLOW
V
4 . SYMMETRICAL PIPING.
M
IN
D
8 . A PERMANENT SELF VENTINGCONNECTION IS REQUIRED TOPREVENT
ACCUMULATION AND TRAPPING OF GASES.
(TOTAL)
TWOPHASE FLOW DONOT POCKET
HOLDS:
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
M
IN
10. VALVES ARE FOR BATTERY LIMIT ISOLATION.
S-9
D
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
TWOPHASE FLOW
V
V
/B
8
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
1
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
0
:1
2
A
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN / RICH AMINE EXCHANGER
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.001
3
/4
"
2"-P-246105-DJE(0.4)
2" 2"
2"
P-246122-DJE(0.4)
2"
2"
ET 10
50
1
0
"
12"
P-246121-DJE(0.4)
C
S
O
1
0
" - P
- 2
4
6
0
0
5
- D
J
E
( 0
.4
)
1-1/2"
1-1/2"
1-1/2"
2"
H
L
6
ET 10
50
7
2"
8
4
ET 10
50 4
3
/4
"
3
/4
"
2
"
ET 10
63
3
/4
"
3
/4
"
242 246
N
C
8
"
1-1/2"
ET 10
50
2" 2"
2" 2"
2"
3
/4
"
DJE(0.4)
10"-P-246006-DJE(0.4)
ET 10
63
ET 10
50
2
" - D
M
- 2
4
6
0
0
2
- D
A
B
1
2
" - P
- 2
4
6
0
5
0
- D
J
E
( 0
.4
)
1
4
" x
1
0
"
2"-DM-246003-DAB
14"-P-246001-DJE(0.4)
9
10"-P-246002-DJE(0.4)
1
4
" x
1
0
"
1
4
" x
1
0
"
3
/4
"
9
2
"
3/4"
10
2"
16"-P-246054-DAB
1
0
"
D
A
E
D
J
E
( 0
.4
)
3
/4
"
3
/4
"
4
5
1-1/2"
ET 10
63
3
/4
"
E-24602A
LEAN / RICH AMINE EXCHANGER
64.5 MW
/ /
130 C / 150 C
PLATES: 316L SS / GRAPHITE
2700 kPa-g / HV
FRAME: CS
120 C / 150 C
3500 kPa-g / HV
COLD
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
HOT
SURFACE AREA:
RATED DUTY:
1521.0 m^2
14"-P-246007-DJE(0.4)
1
0
"
14"x10"
16"-P-246051-DAB
E-24602B
DAB
H
E-24602A
3
2"
6
1
2
"
ET 10
63
2
"
3
/4
"
2"
12"-P-246049-DJE(0.4)
DJE(0.4)
1
0
" - P
- 2
4
6
0
0
3
- D
J
E
( 0
.4
)
1
0
" - P
- 2
4
6
0
0
4
- D
J
E
( 0
.4
)
1
6
" x
1
2
"
1
6
" x
1
2
"
C
S
O
16"-P-246048-DJE(0.4)
DAB
C
S
O
7
2"-P-246106-DJE(0.4)
SP
001
ET 10
63
ET 10
63
3
/4
"
3
/4
"
2
"
10"-P-242064-DJE(0.4)
8"-P-246085-DAE
1
4
" x
1
0
"
2
"
TEMA TYPE: COMPABLOC
3"
3" 3"
3"
ET 10
38
ET 10
38
8
"
3"
3"
C
S
O
2
"
1
0
"
3
/4
"
3
/4
"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
D
C
S
O
2"-DM-246001-DAB
2
" - D
M
- 2
4
6
0
0
4
- D
A
B
DJE(0.4) DAB
13143
246.033
DM
13144
2
4
6
.0
3
3
D
M
13145
246.033
DM
ET 10
63
DJE(0.4) DAB
RS
RS
RS
RS
RS
RS RS
RS
20"
20" 20"
20"
20" 20"
20" 20"
ISSUED FOR HAZOP

012
PI
011
PI
012
PT
010
TI
011
TT
001
LT
013
TC
013
TT
001
LC
010
PHS
013
PT
013
PI
010
PT
003
FC
001
LX
f(x)
002
LI
003
FT
012
PDI
013
PDI
010
TT
011
TI
002
LT
010
PC
001
LG
001
I
011
PT
PP
014
TT
014
TI
002
I
020
I
D
T
O
A
T
M
D
D
D
D
T
B
T
O
A
T
M
B
T
O
A
T
M
B
12207
REBOILER LIQUID RETURN
FROME-24603B
246.004
12275
OVERHEAD VAPOURS
TOE-24601A/B
246.005
12206
SET POINT
TO FC-241075
241.021
12182
LEAN AMINE
TOP-24601A/B/C
246.007
12211
TC SIGNAL
TO FFX-001B
246.003
12212
RICH AMINE
FROME-24602A/B
246.001
12213
REBOILER FEED
TOE-24603A
246.003
12214
REBOILER VAPOUR RETURN
FROME-24603A
246.003
12215
REBOILER LIQUID RETURN
FROME-24603A
246.003
12210
REBOILER FEED
TOE-24603B
246.004
12401
RECOVERED AMINE
FROMV-24605
246.013
12288
REBOILER VAPOUR RETURN
FROME-24603B
246.004
12405
SET POINT
TO FC-441075
441.029
12697
246.030
GI
12694
246.029
SL
12695
246.029
SCL
12403
SET POINT
TO FC-242075
242.021
12696
AMINE INVENTORY/MAKE-UP
FROMP-24605/24604
246.012
12283
ANTI-FOAM
FROMP-24606
246.014
12282
WATER REFLUX
FROMP-24603A/B
246.006
13125
AMINE DRAIN
TO V-24606
246.007
M
IN
.
MIN.
SWING
ELBOW
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . ANTI-FOAMIS ADDED INTERMITTENTLY BY THE OPERATOR BASED ON HIGH DP
ACROSS THE TRAYED SECTION OF THE AMINE STRIPPER.
MW
8
6
0
0
m
m
20
F
R
E
E
D
R
A
IN
IN
G
NNF
TWOPHASE FLOW
D
SWING
ELBOW
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
MW
D
DONOT POCKET
TWOPHASE FLOW
BLOCKED DISCHARGE
MP-001
1/2" WEEP HOLE 1/2" WEEP HOLE
TOATMOSPHERE
AT SAFE LOCATION
TOATMOSPHERE
AT SAFE LOCATION
(BTM)
TOATMOSPHERE
AT SAFE LOCATION
(TOP)
BLOCKED
DISCHARGE
BLOCKED
DISCHARGE
BLOCKED
DISCHARGE
D
FREE DRAINING
FREE DRAINING
7 . SYMMETRICAL PIPING ON INLET AND OUTLET OF CONTROL VALVE.
8 . PV-010A/B ARE 2x50%VALVES. SPARE VALVE TO BE MAINTAINED ON SITE.
9 . PIPINGFROMCONTROL VALVE TO VESSEL NOZZLE TOHAVE 1.5 mmCORROSION
ALLOWANCE.
B
DONOT POCKET
4 . TOP OF WEIR IN REBOILERS E-24603A/B TOBE AT SAME ELEVATION AS HLL IN
AMINE STRIPPER.
MIN
FREE DRAINING
10. SLUGFLOWDURINGTURNDOWN.
MW
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
FREE DRAINING
M
IN
21
1
FREE DRAINING
START-UP
FREE DRAINING
MIN
SEE DETAIL "A"
FREE DRAINING
1/2" WEEP HOLE
DONOT POCKET
5 . SYMMETRICAL PIPING TO/FROME-24603A AND E-24603B.
SPLIT
FREE DRAINING
GWR
11. ELECTRIC TRACE TOHLL (ET 10).
DETAILS FOR CHEMICAL INJECTION QUILL TOBE FINALIZED.
FREE DRAINING
TWOPHASE FLOW
6 . CV OF CONTROL VALVES PV-010A/B TO BE MINIMUM. CV AFFECTS RV-005 SIZING
FOR VAPOUR BLOWTHROUGH CASE.
MAG
V
12. LOCATE RV-001 MINIMUMDISTANCE FROMPV-010A/B INLET.
13. TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 mm.
14. 316 STAINLESS STEEL INJECTION QUILL. OUTLET OF INJECTION QUILL TO BE
CENTERED IN PROCESS PIPE.
15. 304SS PIPINGFROMCONTROL VALVE TO V-24601 TOHAVE 1.5 mmCORROSION
ALLOWANCE.
D
24
MW
V
INJECTION QUILL
D
D
10
V
DETAIL "A"
HLL=6175 mm
4
"-P
-2
4
6
0
0
8
-D
J
E
(0
.4
)
20"-P-246013-DJB(0.4)
3/4"
36"x24"
C
S
O
CSO
30"-P-246035-DJB(0.4)
24"-P-246082-DJB(0.4)
10"
11
DJB(0.4)
DJB(0.4)
9
DJB(0.4)
LLLL=475 mm
5
LLL=2175 mm
6
V-24601
3"
5
36"
10
3
24"-P-246083-DJB(0.4)
20"x10"
20"
3
/4
"
2"
P
J
B
(0
.4
)
ET 10
N/A
12"x10"
3/4"
RV
005B
C
S
O
SET@
375 kPa-g
8T10
P
J
B
(0
.4
)
N/A
ET 10
DAB
2"
3
/4
"
8
"
1
4
" x
1
0
"
36"-P-246034-DJB(0.4)
CSC
L
2"
3
/4
"
3
/4
"
2"
1
0
" x
8
"
D
J
B
( 0
.4
)
3/4"
14"x10"
2"
3
/4
"
3
/4
"
2"
3
/4
"
3
/4
"
FL(C)
D
J
E
( 0
.4
)
PJB(0.4)
DJB(0.4)
D
J
B
( 0
.4
)
DJB(0.4)
P-246123-DJB(0.4)
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
2
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
0
:1
4
A
M
B
Y
:b
e
s2
9
4
5
1
G
AMINE STRIPPER
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.002
2
0
" - P
- 2
4
6
0
1
2
- D
J
E
( 0
.4
)
8
20"-P-246010-DJE(0.4)
DAB
D
J
B
( 0
.4
)
6
"
3/4"
3/4"
H
3"-SL-246004-SAB
2"
14"x8"
8"-P-246100-DJB(0.4)
10"-P-246107-DJB(0.4)
8
" - V
A
- 2
4
6
0
0
3
- P
J
B
( 0
.4
)
1
2
" - V
A
- 2
4
6
0
0
2
- P
J
B
( 0
.4
)
1
2
" - V
A
- 2
4
6
0
0
1
- P
J
B
( 0
.4
)
14"-P-246100-DJB(0.4)
12
7
D
J
B
( 0
.4
)
1-1/2"
2"
DAB
3
/4
"
3/4"
3/4" 2"x3/4"
D
J
E
( 0
.4
)
3/4"-KP-246001-PJE(0.4)
H
4
5
4"-P-246093-DAB
2"
6"-DM-246005-DAB
2"x3/4"
P
J
E
( 0
.4
)
30"-P-246029-DJB(0.4)
2"
2"
8
6
"
D
J
E
( 0
.4
)
6
2"
RV
001 3
/4
"
4"-P-246009-DJB(0.4)
14"-P-246007-DJE(0.4)
D
J
E
( 0
.4
)
5
2"
36"
4"x2" 4"x2"
HHLL=7590 mm
H
50
H
2"
H
75
H
50
H
75
PV
010A
2"
2"
FV
003
L
H
2
"
3/4"
7
3
/4
"
2"
NLL=4175 mm
20"x10"
20"
ET 10
38
3/4"
C
S
O
4
" x
3
"
SET@
3500 kPa-g
3L4
D
J
B
( 0
.4
)
14"x10"
10"-P-246100-DJB(0.4)
1
0
" x
8
"
12"x10"
RV
005A
SET@
375 kPa-g
8T10
36"x24"
24"
42"-P-246015-PJB(0.4)
4"-P-246026-PJB(0.4)
36"-P-246040-DJB(0.4)
24"-P-246041-DJB(0.4)
V-24601
AMINE STRIPPER
6300 mmID x 30400 mmT/T
TRIM:
H / 50 mm INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
385 kPa-g @150 C DESIGN PR. & TEMP:
SIZE:
1"-SCL-246010-SAB
3
/4
"
10
30" 30"x24"
P
J
B
( 0
.4
)
ET 10
8
" x
6
"
C
S
O
3/4"
SET@
385 kPa-g
6Q8
RV
005C
4"
13
14
11
3/4"
ET 10
N/A
24"
HH
LL
36"
N/A
3
/4
"
3
/4
"
3
/4
"
3
/4
"
2"-GI-246003-ULB
DAB
30"
14
15
15
D
A
B
24"
7
2
"
ET 10
63
PV
010B
5
2"
2"-P-246098-DAB
42"
FO
3/4"
ET 10
38
ET 10
38
5
3/4"
H
50
1-1/2"
H
ET 10
75
ET 10
38
4"
24"
36"
30"
2
" x
3
/4
"
3/4"
P-246124-DJB(0.4)
36"
/ FV @150 C
24"
20"-P-246011-DJB(0.4)
SO
LL
FL(C)
3"
DJB(0.4)
DAB
2"-DM-246045-DAB
9
2"-DM-246005-DAB
1
" - S
L
- 2
4
6
X
X
X
- S
A
B
D
J
B
( 0
.4
)
D
J
B
( 0
.4
)
ET 10
50
4"x3" 4"x3"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FLOW
SP
002
14"
24"x20"
24"x20"
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
D
005
LX
005
FX
V
(PER SHELL)
001C
FFX
001B
FFX
001A
FFX
B
MW
12454
CONDENSATE
TO E-24606
246.020
MAG
8 . ELECTRIC TRACE (ET 10).
TWOPHASE FLOW
015
TT
015
TI
12228
246.029
SCL
V
12234
FLOWSET POINT
TO FC-006
246.004
MW
005
LG
005
LC
5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
4 . BOTTOMTAN LINE OF V-24603A TO BE SET 2920 mmBELOWBOTTOMTUBE SHEET OF
REBOILER.
3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
005
FT
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12225
FC SIGNAL
FROMFC-001
246.001
T
O
A
T
M
TO ATMOSPHERE AT
SAFE LOCATION
1/2" WEEP HOLE
014
PT
12214
REBOILER VAPOUR RETURN
TO V-24601
246.002
12215
REBOILER LIQUID RETURN
TO V-24601
246.002
D
PP
T
12685
LP STEAM
FROMDISTRIBUTION
246.029
001
FFIC
FIRE
D
FREE DRAINING
V
V
FREE DRAINING
F
R
E
E
D
R
A
IN
IN
G
FREE DRAINING
12211
TC SIGNAL
FROMTC-013
246.002
12213
REBOILER FEED
FROMV-24601
246.002
SP
014
PC
R
S
7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER
005
LT
D
O
N
O
T
P
O
C
K
E
T
R
S
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
(PER SHELL)
020
I
6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
9 . HIGH HIGH AMINE STRIPPER LEVEL TOFORCE FX-005 INTO MANUAL WITH 0%
OUTPUT, CLOSINGFV-005.
005
FC
FREE DRAINING
NUMBER AND LOCATION OF STEAMTRAPS TO BE DETERMINED BASED ON
PIPING LAYOUT.
2
9
2
0
m
m
D
SET@
500 kPa-g
2J3
3
"x
2
"
4"x3"
H
50
ET 10
2"-P-246108-DJB(0.4)
2
"
9
P-246125-DJB(0.4)
RV
010
ET 10
N/A
ET 10
N/A
30"-P-246033-DJB(0.4)
24"
4
"x
2
"
LLL=250 mm
10"
4"
2
"-S
L
-2
4
6
0
1
0
-S
A
B
3"-SL-246005-SAB
24"-SL-246009-SAB
/ FV @250 C
8
24"-P-246082-DJB(0.4)
24"-SL-246009-SAB
30"x24"
5
V-24603A
STRIPPER REBOILER CONDENSATE POT
1500 mmID x 4200 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mmCA MATERIAL(VESSEL/INTERNALS):
500 kPa-g @250 C DESIGN PR. & TEMP:
SIZE:
HLL=4200 mm
1
"-S
L
-2
4
6
0
0
9
-S
A
B
24"
24"
10"
24"
E-24603A
10"-SCL-246001-SAB
TRIM
ET 10
24"
2
"
7
L
RATIO
FV
005
3
/4
"
N/A
H
L
4"-VA-246005-SAB
N/A
N/A
2
"
36"x30" 36"x30"
2
"
5
30"-P-246029-DJB(0.4)
36"-P-246034-DJB(0.4)
NLL=1020 mm
1"-SCL-246003-SAB
24"
V-24603A
2
"
30"x24"
3/4"
20"
FE
005
2"
8"-SCL-246002-SAB
3
/4
"
L
2"
24"-P-246030-DJB(0.4)
30"-P-246032-DJB(0.4)
3
/4
"
30" 30"
10"
3/4"
C
S
O
8"
3
/4
"
FC
3
L
4
4
H
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
3
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
0
:1
6
A
M
B
Y
:b
e
s2
9
4
5
1
G
STRIPPER REBOILER "A" AND CONDENSATE POT
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.003
6
H
50
2"
SPLIT
24"-P-246031-DJB(0.4)
2
"
10"
2"
SL-246030-SAB
1-1/2"
ET 10
H
75
D
2
"
24"x20" 24"x20"
10 . STAGED CUTBACK SCHEME FOR REDUCTION OF LP STEAMFLOWTO REBOILERS
IN THE EVENT OF LOWUTILITY PLANT HEADER PRESSURE. FOR DETAILS. REFER
TO CONTROL NARRATIVE 246.1611.000.012.xxx.
101 A
CB
101 B
CB
101 C
CB
021
I
002 C
PI
LL
LL
L
SP LIMIT
13128
CUTBACK SIGNAL
TO FX-006
246.004
10
STMHDR PRESSURE
FROMPX-251022
251.110
E-24603A
STRIPPER REBOILER
50.4 MW
BKU TEMA TYPE:
H / NONE /
150 C / 150 C
CS + 3 mm304L SS CLAD
385 kPa-g / FV
316L SS + 0.6 mmCA
250 C / 250 C
500 kPa-g / FV
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
1755.5 m^2
251
ET 10
50
13139
LC SIGNAL
TO LV-005
246.020
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
006
FX
016
TI
V
016
TT
7 . ELECTRIC TRACE PIPE TO ELEVATION OF WEIR IN REBOILER.
NUMBER AND LOCATION OF STEAMTRAPS TO BE DETERMINED BASED ON PIPING
LAYOUT.
V
HOLDS:
SP
D
O
N
O
T
P
O
C
K
E
T
12400
246.029
SCL
TWOPHASE FLOW
006
FC
006
FT
5 . ALL REBOILER PIPING TO BE SYMMETRICAL.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
4 . BOTTOMTAN LINE OF V-24603B TO BE SET 2920 mmBELOWBOTTOMTUBE SHEET
OF REBOILER.
3 . CONTROL VALVE BYPASS TO BE INSTALLED SO FREE DRAINING.
MW
006
LG
TO ATMOSPHERE AT
SAFE LOCATION
12207
REBOILER LIQUID RETURN
TO V-24601
246.002
12288
REBOILER VAPOUR RETURN
TO V-24601
246.002
(PER SHELL)
8 . ELECTRIC TRACE (ET 10).
12665
LP STEAM
FROMDISTRIBUTION
246.029
V
D
D
B
FREE DRAINING
PP
2
9
2
0
m
m
6 . WEIR TO BE SET AT SAME ELEVATION AS HLL IN AMINE STRIPPER.
D
FREE DRAINING
V
FREE DRAINING
016
PT
016
PC
R
S
12234
FLOWSET POINT
FROMFFX-001C
246.003
D
MW
12210
REBOILER FEED
FROMV-24601
246.002
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
1/2" WEEP HOLE
006
LC
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
FREE DRAINING
FIRE
12680
CONDENSATE
TO E-24606
246.020
006
LT
T
D
D
R
S
F
R
E
E
D
R
A
IN
IN
G
H
50
5
24"
24"
24"
E-24603B
8
NLL=1020 mm
4"
N/A
30"
24"
P-246126-DJB(0.4)
10"
ET 10
N/A
N/A
ET 10
24"-SL-246002-SAB
FV
006
V-24603B
STRIPPER REBOILER CONDENSATE POT
1500 mmID x 4200 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mmCA MATERIAL(VESSEL/INTERNALS):
500 kPa-g @250 C DESIGN PR. & TEMP:
SIZE:
ET 10
N/A
N/A
36"x30"
2
"
10"-SCL-246004-SAB
30"-P-246035-DJB(0.4)
V-24603B
LLL=250 mm
6
3
/4
"
2
"
L
7
30"-P-246039-DJB(0.4)
30"-P-246038-DJB(0.4)
24"-P-246036-DJB(0.4)
2"
2"
3
/4
"
3
/4
"
10"
8"
3
/4
"
FC
1-1/2"
2
"
2
"
4
24"-SL-246002-SAB
10"
H
50
1
" - S
L
- 2
4
6
0
0
2
- S
A
B
30"x24"
4
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
4
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
0
:1
8
A
M
B
Y
:b
e
s2
9
4
5
1
G
STRIPPER REBOILER "B" AND CONDENSATE POT
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.004
H
50
3"-SL-246004-SAB
SL-246031-SAB
/ FV @250 C
36"x30"
5
2"
24"-P-246083-DJB(0.4)
20"
2"
HLL=4200 mm
24"
H
75
2
"
1"-SCL-246006-SAB
C
S
O
2"-P-246109-DJB(0.4)
3/4"
24"-P-246037-DJB(0.4)
2
" - S
L
- 2
4
6
0
0
3
- S
A
B
FE
006
2"
36"-P-246040-DJB(0.4)
L
3
3
/4
"
10"
ET 10
8"-SCL-246005-SAB
3
/4
"
ET 10
4
" x
2
"
30"x24"
24"
30"
4"-VA-246006-SAB
006
LX
020
I
9 . HIGH HIGH AMINE STRIPPER LEVEL TOFORCE FX-006 INTO MANUAL WITH 0%
OUTPUT, CLOSINGFV-006.
(PER SHELL)
RV
011
SET@
500 kPa-g
2J3
9
4"x3"
3
" x
2
"
24"x20" 24"x20"
13128
CUTBACK SIGNAL
FROMCB-101A/B/C
246.003
SP LIMIT
10. STAGED CUTBACK FOR REDUCTION OF LP STEAMFLOWTO REBOILERS IN THE
EVENT OF LOWUTILITY PLANT HEADER PRESSURE FOR DETAILS. REFER TO
CONTROL NARRATIVE 246.1611.000.012.xxx.
10
2"
D
E-24603B
STRIPPER REBOILER
50.4 MW
BKU TEMA TYPE:
H / NONE /
150 C / 150 C
CS + 3 mm304L SS CLAD
385 kPa-g / FV
316L SS + 0.6 mmCA
250 C / 250 C
500 kPa-g / FV
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
1755.5 m^2
13140
LC SIGNAL
TO LV-0006
246.020
H
L
L
ET 10
50
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12271
246.025
CWS
R
S
R
S
R
S
BACK
FLUSH
V
12274
246.025
CWR
12275
OVERHEAD VAPOURS
FROMV-24601
246.002
12246
OVERHEAD VAPOUR/LIQUID
TO V-24602
246.006
019
TT
019
TI
PP
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
017
TW
018
TW
(TOTAL)
TWOPHASE FLOW
FREE DRAINING
FREE DRAINING
FREE DRAINING
FREE DRAINING
FREE DRAINING
3 . SYMMETRICAL PIPING.
R
S
BACK
FLUSH
V
FREE DRAINING
3
3
1-1/2"
1-1/2" 3
/4
"
N
C 4
"
P-246127-PJB(0.4)
4
2
"x
3
0
"
E
T
1
0
3
8
30"-P-246017-PJB(0.4)
10"-CWS-246030-UAB
42"-P-246020-PJB(0.4)
10"-CWR-246011-UAB
10"-CWS-246030-UAB
6
"
6"
2
"
4
2
"x
3
0
"
4
2
"x
3
0
"
4
"-C
W
R
-2
4
6
0
1
4
-U
A
B
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
5
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
5
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
1
:4
8
A
M
B
Y
:b
e
s2
9
4
5
1
G
STRIPPER OVERHEAD CONDENSER
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.005
N/A
CSO
N
/A
N/A
ET 10
P-246128-PJB(0.4)
E
T
1
0
4
2
"x
3
0
"
4
" - C
W
S
- 2
4
6
0
2
8
- U
A
B
30"-P-246016-PJB(0.4)
12"-CWS-246029-UAB
10"-CWR-246011-UAB
30"-P-246018-PJB(0.4)
2"
1-1/2"
42"-P-246015-PJB(0.4)
30"-P-246019-PJB(0.4)
ET 10
C
S
O
ET 10
N/A
V
D
D
V
CWR-246030-UAB
CWR-246031-UAB
2
"
2
"
10"-CWR-246012-UAB
14"x10"
14"x10"
30"x28"
30"x28" 30"x28"
30"x28" 30"x28"
2
"
1
4
" x
1
0
"
14"x12"
2
"
30"x28" 30"x28"
30"x28"
E-24601A
E-24601A
STRIPPER OVERHEAD CONDENSER
HEAT TRACE MEDIA/TEMP:
26.60 MW
BHU TEMA TYPE:
PP/ NONE/
150 C/150 C
CS + 3 mm304L SS CLAD
385.00 kPa-g /FV
DUPLEX 2205 + 0.38 mmCA
58 C/
1100.00 kPa-g/
TUBE
TRIM:
INSULATION TYPE/THIK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
2272.0 m^2
E-24601B
28" 28"
28" 28"
28" 28"
28" 28"
14"
14"
14"
14" E
T
1
0
4
"
N
C
13146
246.025
CWS
13147
246.025
CWR
12"-CWS-246029-UAB
10"-CWR-246012-UAB
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
V
010A
LC
I
12131
WATER MAKE-UP
FROME-24607
246.021
010B
LC
12244
KO LIQUIDS
FROMV-24702
247.002
12246
OVERHEAD VAPOUR/LIQUID
FROME-24601A/B
246.005
003
I
NNF
TWOPHASE FLOW
D
D
7 . ELECTRIC TRACE (ET 10).
V
D
M
IN
MIN
4
8
0
0
m
m
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12368
CO2
TO V-24701
247.001
D
12391
246.033
DM
D
D
007A
HS
003
I
003
I
I
D
PP
PP
4 . MAKE-UP WATER REQUIREMENTS TO THE AMINE SYSTEMARE NORMALLY SATISFIED
BY THE PURGE WATER FLOWFROMHMU 1 AND 2.
008
HIS
008A
HS
R/S
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
PP
010
LT
MAG
GWR
015
PT
015
PI
3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
011
LT
12636
PURGE WATER
FROME-24129/24229
241.023
FREE DRAINING
011
LI
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
S-8
TOATMOSPHERE
TWOPHASE FLOW
6 . ELECTRIC TRACE TO HLL (ET 10).
FREE DRAINIING
007
FC
009
FI
009
FT
010
LG
D
1/2" WEEP HOLE
AT SAFE LOCATION
FREE DRAINING
12282
WATER REFLUX
TO V-24601
246.002
D
PP
PP
D
M
IN
HOA
007
HIS
M
IN
D
V
V
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
MINIMUMFLOW
V
M
IN
R/S
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS
OTHERWISE STATED.
D
MW
008
FT
12653
WASTE WATER
TO WWTP 271
246.027
HOLDS:
13033
K.O. LIQUID
FROMV-24703
247.003
TWOPHASE FLOW
TWOPHASE FLOW
8 . AUTO-START BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
109
HS
SEL
008
FC
007
FT
FREE DRAINIING
HOA
BLOWTHROUGH
13032
K.O. LIQUID
FROMV-24704
247.004
PJB(0.4)
2"
1"
P-24603A
15.0 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
559 kPa DIFF. PR.:
RATED FLOW: 50.3 m^3/hr
STRIPPER REFLUX PUMPS
3/4"
3/4"
3/4"-DM-246009-DAB
3
/4
"
3/4"
3
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
6
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
6
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
0
:4
2
:3
0
A
M
B
Y
:b
e
s2
9
4
5
1
G
STRIPPER REFLUX DRUM & REFLUX PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.006
ET 10
38
3
/4
"
24"
4
"
N/A
3"-P-241076-PJE(0.4)
2"-P-247002-PJB(0.4)
6
"-P
-2
4
6
0
2
2
-P
J
B
(0
.4
)
36"-GC-246001-PJB(0.4)
3
/4
"
P-24603B
6
"-P
-2
4
6
0
2
3
-P
J
B
(0
.4
)
/B
SO
FC
P-24603A
42"-P-246020-PJB(0.4)
LLLL=300 mm
NLL=675 mm
V-24602
2"
4"-P-246024-PJB(0.4)
LL
V-24602
STRIPPER REFLUX DRUM
3300 mmID x 7300 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
385 kPa-g @150 C DESIGN PR. & TEMP:
SIZE:
4
"
4
"
2"
2"
3/4"
2
"
PJB(0.4) PJB(0.4)
3/4" 2"
2"
3"-P-241113-PJB(0.4)
FC
SAB
3
/4
"
L
3
/4
"
3/4"
3/4"
1-1/2"
3
/4
"
H
10"
3
/4
"
LV
010
4
"
LLL=400 mm
6
/ FV @150 C
3
/4
"
FV
007
2"x1"
5
3"
3
" 4
ET 10
38
6"-P-246021-PJB(0.4)
3"-P-246028-PJB(0.4)
3
/4
"
4"-VA-246004-PJB(0.4)
B
3/4"
C
S
O
P-246129-PJB(0.4)
E
T
1
0
5
0
3/4"-DM-246007-DAB
2"-DM-246011-DAB
2"
7
2"x1"
DAB
PJB(0.4)
3
/4
"
2
" - D
M
- 2
4
6
0
0
8
- D
A
B
4"-P-246025-PJB(0.4)
1"
ET 10
ET 10
38
3/4"
HLL=3075 mm
DAB DAB
2
" - D
M
- 2
4
6
0
1
0
- D
A
B
FV
008
ET 10
38
ET 10
38
4"-P-246026-PJB(0.4)
3/4"
2"-SC-246020-SAB
3
/4
"
PJB(0.4)
FO
42"
2"-P-246027-PJB(0.4)
6"
ET 10
38
SET@
385 kPa-g
3K4
4"-P-246074-PJB(0.4)
P
J
B
( 0
.4
)
P
J
E
( 0
.4
)
36"
4
" x
3
"
RV
013
2"-P-247003-PJB(0.4)
2"-P-247004-PJB(0.4)
ET 10
38
3"x2"
2"x1" 2"x1"
2"
3"x1-1/2" 3"x1-1/2"
SP
003
SP
004B
SP
004A
8
8
8
6
3/4"
ET 10
38
3/4"
3
/4
"
3/4"
3
/4
"
3
/4
"
3/4"
3/4"
D
D
4"x3" 4"x3"
3"x2" 3"x2"
3
/4
"
3
/4
"
2"x1" 2"x1"
D
DAB
ET 10
38
ET 10
38
ET 10
38
E
T
1
0
3
8
ISSUED FOR HAZOP

PP
I
010
FI
I
001
XA
001
XL
PP
002
I
I
PP
VFD
003
XA
002
HIS
PP
M
002
XA
002
SI
003
XL
003
SI
001
I
002A
HS
003
HIS
001A
HS
001
HIS
001
SI
010
FT
PP
001
I
VFD
002
I
002
I
PP
001
I
002
XL
VFD
003A
HS
104
HS
SEL
12182
LEAN AMINE
FROMV-24601
246.002
12904
VFD SET POINT
FROMPC-041
246.011
12230
LEAN AMINE
TOE-24602A/B
246.001
13130
AMINE DRAIN
TO V-24606
246.013
13125
AMINE DRAIN
FROMV-24601
246.002
D
3 . SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
5 . AUTO-START LOGIC FOR P-24601A/B/C SHALL TAKE INTO CONSIDERATION
THE NUMBER OF LEAN AMINE CHARGE PUMPS COMMANDED TO RUN
SIMULTANEOUSLY. REFER TO DRAWING 246.011.
DD
HOA
M
IN
M
IN
(EACH)
6 . ELECTRIC TRACE (ET 10).
D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
D
M
INM
IN
M
IN
M
IN
4 . 3 x 50%PUMPS FOR TOTAL DESIGN FLOWRATE OF 1510.6 m3/h.
HOA
LOCAL/
REMOTE
VFD
FAULT
VFD
FAULT
LOCAL/
REMOTE
HOLDS:
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
R/S
D
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF EITHER PRIMARY PUMP.
8 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
R/S
VFD
FAULT
LOCAL/
REMOTE
HOA
M
IN
M
IN
M
IN
V V V
R/S
P-246134-DJE(0.4)
DAB
3
/4
"-D
M
-2
4
6
0
2
0
-D
A
B
3
/4
"
2
"-D
M
-2
4
6
0
1
7
-D
A
B
E
T
1
0
6
3 E
T
1
0
6
3
DJB(0.4)
3
/4
"-D
M
-2
4
6
0
1
6
-D
A
B
1
6
"-P
-2
4
6
0
4
4
-D
J
E
(0
.4
)
3/4"
3/4"
3
/4
"
P-246133-DJE(0.4)
DAB DAB
DJE(0.4)
12"-P-246048-DJE(0.4)
3/4"
3
/4
"
3
/4
"
3/4"
4
5
3
/4
"
3
/4
"
2
"-D
M
-2
4
6
0
1
3
-D
A
B
3
/4
"-D
M
-2
4
6
0
1
2
-D
A
B
2
"
3
/4
"
DJE(0.4) DJE(0.4)
DJE(0.4)
DJB(0.4)
DJE(0.4)
1
6
"-P
-2
4
6
0
4
3
-D
J
E
(0
.4
)
1
2
" - P
- 2
4
6
0
4
5
- D
J
E
( 0
.4
)
DJE(0.4)
P-24601C
/B
3/4"
3
/4
"
P-24601A
261.0 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
H /
909 kPa DIFF. PR.:
RATED FLOW: 755.3 m^3/hr
LEAN AMINE PUMPS
1
2
" - P
- 2
4
6
0
4
7
- D
J
E
( 0
.4
)
2"
E
T
1
0
5
0
1
6
" - P
- 2
4
6
0
4
2
- D
J
E
( 0
.4
)
1
2
" - P
- 2
4
6
0
4
6
- D
J
E
( 0
.4
)
2
" - D
M
- 2
4
6
0
2
1
- D
A
B
ET 10
75
ET 10
63
ET 10
63
6
DJE(0.4)
DAB
2"
2
"
DAB
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
7
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
7
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:2
9
P
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN AMINE PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.007
E
T
1
0
5
0
1
"
3/4"
P-24601A P-24601B
E
T
1
0
5
0
16"-P-246048-DJE(0.4)
4
4
DJE(0.4)
P-246132-DJE(0.4)
1
"
DAB
1
"
DAB
3/4"
DAB
DJE(0.4)
3/4"-DM-246022-DAB
DJE(0.4)
3/4"-DM-246014-DAB
3/4"
DAB
2"
DJE(0.4) 2
"
DJB(0.4)
4
3/4"
3
/4
"
3
24"-P-246041-DJB(0.4)
/C
E
T
1
0
6
3
3/4"-DM-246018-DAB
2
" - D
M
- 2
4
6
0
1
5
- D
A
B
2"
8 8 8
2
" - D
M
- 2
4
6
0
1
9
- D
A
B
14"
16"x14" 16"x14"
7
1
6
" x
1
2
"
1
2
" x
8
"
7 7
2" 2"
2
" - D
M
- 2
4
6
0
2
3
- D
A
B
DJE(0.4)
SP
005A
SP
005B
SP
005C
5 5
D
J
E
( 0
.4
)
D
A
B
D
A
B
D
J
E
( 0
.4
)
D
A
B
D
J
E
( 0
.4
)
7
6"-DM-246006-DAB
6"-DM-246005-DAB
1
6
" x
1
2
"
1
2
" x
8
"
1
6
" x
1
2
"
1
2
" x
8
"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
PP
025
TW
M
IN
.
MIN.
M
IN
.
029
TW
RS RS
V
12181
LEAN AMINE
FROME-24602A/B
246.001
4 . LOCATE TT-027 MINIMUM10 PIPE DIAMETERS DOWNSTREAMOF BYPASS MIXING
POINT.
5 . ELECTRIC TRACE (ET 10).
028
TW
RS
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
026
TI
026
TT
1 2 5 9 6
2
4
6
.0
3
3
D
M
12253
LEAN AMINE
TOFILTRATION/P-24602A/B/C
246.010
R
S
B
V
BACK FLUSH
027
TT
027
TC
12949
LEAN AMINE
FROME-24605B
246.009
12957
246.025
CWR
12958
246.025
CWS
R
S
12251
LEAN AMINE
FROME-24604B
246.009
D
12960
2
4
6
.0
2
5
C
W
S
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
D
MIN.
RS
3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
12959
2
4
6
.0
2
5
C
W
R
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
V
BACK FLUSH
N/A
ET 10
N/A
1
0
" - C
W
S
- 2
4
6
0
2
3
- U
A
B
E
T
1
0
6
3
N/A
ET 10
N/A
ET 10
63
RV
002
CSO
3/4"
F
C
L
1-1/2"
3"-P-246053-DAB
CSO
N
C
1-1/2"
ET 10
50
P-246135-DAB
6
"
TV
027
4"-CWS-246024-UAB 4"-CWR-246007-UAB
E-24605A
LEAN AMINE TRIMCOOLER
15.5 MW
/ /
105 C / 150 C
PLATES: 316L SS / GRAPHITE
1500 kPa-g / HV
FRAME: CS
58 C /
1155 kPa-g /
COLD
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
HOT
SURFACE AREA:
RATED DUTY:
676.0 m^2
6"
E-24605A
3
/4
"
3/4"
P-246136-DAB
C
S
O
NC
4"
4
"
2
"
E
T
1
0
5
0
8"-P-246055-DAB
2
"
3"-DM-246062-DAB
1-1/2" 24"x16"
2
4
" x
1
6
"
12"x8"
12"x8"
12"-P-246104-DAB
24"-P-246059-DAB
ET 10
50
1-1/2"
3
/4
"
3
/4
"
1
0
"
1
0
"
12"
4
" - C
W
R
- 2
4
6
0
0
2
- U
A
B
4
" - C
W
S
- 2
4
6
0
1
9
- U
A
B
1-1/2"
E
T
1
0
3
8
3
ET 10
63
5
E
T
1
0
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
8
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
8
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:3
0
P
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN AMINE COOLING TRAIN "A"
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.008
E
T
1
0
E
T
1
0
N
/A
4
N
/A
5
2" 2"
2"
N
/A
ET 10
2"
H
16"-P-246051-DAB
8"-P-246052-DAB
ET 10
63
8
"
C
S
O
1
6
" - P
- 2
4
6
0
5
7
- D
A
B
3
12"
ET 10
E-24604A
3
16"-P-246105-DAB
E
T
1
0
N
/A
2"
FIRE
V
D
1
6
" x
1
2
"
3
" x
1
- 1
/2
"
SET@
1500 kPa-g
1-1/2G3
CWR-246032-UAB
12"-CWR-246001-UAB
12"-CWS-246018-UAB
1
2
" x
8
"
1
2
" x
8
"
1
6
" x
1
2
"
16"
2"
2"
16"
16" 16"
1
0
" - C
W
R
- 2
4
6
0
0
6
- U
A
B
ET 10
38
246.033
DM
2
" - D
M
- 2
4
6
0
6
3
- D
A
B
E-24604A
LEAN AMINE COOLER
20.8 MW
BEU TEMA TYPE:
/ /
130 C / 150 C
CS + 3mm304L SS CLAD
1500 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1155 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
829.0 m^2
TEMA TYPE: PLATE & FRAME
ET 10
38
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
MIN.
MIN.
V
039
TW
12252
LEAN AMINE
FROME-24602A/B
246.001
D
12949
LEAN AMINE
TO FILTRATION /
P-24602A/B/C
246.008
3 . PIPING BETWEEN TRAIN "A" AND TRAIN "B" TO BE AS SYMMETRICAL AS POSSIBLE.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12251
LEAN AMINE
TO BYPASS
246.008
R
S
4 . ELECTRIC TRACE (ET 10).
RS RS
RS
V
035
TW
FIRE
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
BACK
FLUSH
V
B
RS
PP
BACK
FLUSH
13026
CWR
13027
CWS
V
D
13028
CWR
13029
CWS
038
TW
1 2 2 6 2
2
4
6
.0
3
3
D
M
HOLDS:
16"
6
"
4
"
4
" - C
W
R
- 2
4
6
0
0
9
- U
A
B
E
T
1
0
3
8
CSO
4
" - C
W
R
- 2
4
6
0
0
4
- U
A
B
N
C
N/A N/A
N/A N/A
ET 10
ET 10
4
2"
2" 2"
2
" - D
M
- 2
4
6
0
6
5
- D
A
B
3
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
0
9
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
0
9
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
2
:5
9
:1
3
P
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN AMINE COOLING TRAIN "B"
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.009
3
3
ET 10
38
P-246137-DAB
1
6
" - P
- 2
4
6
0
5
8
- D
A
B
ET 10
63
4
" - C
W
S
- 2
4
6
0
2
1
- U
A
B
ET 10
63
E-24605B
E-24605B
LEAN AMINE TRIMCOOLER
15.5 MW
/ /
105 C / 150 C
PLATES: 316L SS / GRAPHITE
1500 kPa-g / HV
FRAME: CS
58 C /
1155 kPa-g /
COLD
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
HOT
SURFACE AREA:
RATED DUTY:
676.0 m^2
ET 10
50
16"-P-246110-DAB
P-246138-DAB
10"
10"
12"
ET 10
63
3"-P-246056-DAB
8"-P-246055-DAB
E
T
1
0
MIN.
3"-DM-246064-DAB
2
"
6
"
2
"
4
"
1-1/2"
N
C
4
E-24604B
2"
RV
003
12"
4
" - C
W
S
- 2
4
6
0
2
6
- U
A
B
CSO
CSO
1-1/2"
2
"
3
/4
"
3
/4
"
1-1/2"
C
S
O
3/4"
3
/4
"
16"-P-246054-DAB
E
T
1
0
3
8
E
T
1
0
N
/A
N
/A
CWR-246034-UAB
12"-CWR-246003-UAB
E
T
1
0
E
T
1
0
N
/A
N
/A
MIN.
12"-CWS-246020-UAB
2
"
2"
1
6
" x
1
2
"
16"
16"
16"
1
6
" x
1
2
"
10"-CWR-246008-UAB
10"-CWS-246025-UAB
SET@
1500 kPa-g
1-1/2G3
3
" x
1
- 1
/2
"
246.033
DM
R
S
E
T
1
0
3
8
E-24604B
LEAN AMINE COOLER
20.8 MW
BEU TEMA TYPE:
/ /
130 C / 150 C
CS + 3 mm304L SS CLAD
1500 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1155 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
829.0 m^2
TEMA TYPE: PLATE & FRAME
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
D
D
R
S
015
FC
MW
PP
12140
START-UP AMINE
FROMP-24604
246.012
12387
2
4
6
.0
3
3
D
M
12390
2
4
6
.0
3
3
D
M
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
016
FT
016
FC
036
PDT
036
PDC
B
SHUT DOWN
R
S
PP
PP
037
PDC
5 . ELECTRIC TRACE (ET 10).
V
4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
3 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
PP
035
PDT
035
PDC
015
FX
12462
246.034
SC
12253
LEAN AMINE
FROME-24605A/B
246.008
016
FX
V
V
V
12690
2
4
6
.0
3
0
G
I
D
D
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
PP
D
12235
FILTERED LEAN AMINE
TOP-24602A/B/C
246.011
037
PDT
12142
FILTERED LEAN AMINE
TO TK-24601
246.012
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
M
IN
V
B
015
FT
D
D
D
12687
246.033
DM
D
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
START-UP
V-24609
71 m^3/hr
LEAN AMINE POST FILTER
INSULATION TYPE/THK: /
35 kPa / 103 kPa PRESSURE DROP (CLEAN/DIRTY):
ID x F/T SIZE:
1500 kPa-g @90 C DESIGN PR. &TEMP:
TRIM:
CS + 3 mmCA + PWHT / 316L SS INTERNAL MATERIAL:
RATED FLOW:
3
/4
"
10"-P-246066-DAB
3
24"-P-246059-DAB
4
V-24609
C
S
C
4
"
1
"
ET 10
38
3
/4
"
3/4"
CSO
1
"-P
-2
4
6
0
6
4
-D
A
B
CSO
C
S
O
2
" - P
- 2
4
6
0
6
5
- D
A
B
CSC
1"
ET 10
38
1
0
" - P
- 2
4
6
0
6
3
- D
A
B
3"
H
H
2"-SC-246012-SAB
FO
3"
H
2
" - S
C
- 2
4
6
0
1
5
- S
A
B
SAB
3"
3
"
DAB
SAB
16"
16"
8"
3
/4
"
FV
015
V-24604
24"-P-246059-DAB
E
T
1
0
5
0
6"-P-246068-DAB
6"-P-246070-DAB
2"-DM-246029-DAB
P-246139-DAB P-246141-DAB
3
/4
"
SAB
3/4"
2
"
2
" - D
M
- 2
4
6
0
3
0
- D
A
B
3
/4
"
3 4
3/4"
3
/4
"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
1
0
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
1
0
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
3
:0
4
:2
1
P
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN AMINE FILTRATION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.010
1"-P-246076-DAB
2"-P-246069-DAB
DAB
2"x1"
3/4"
3/4"
3
/4
"
ULB
DAB
DAB
3/4"
ET 10
38
3
/4
"
3
3
/4
"
3
/4
"
2"
2"
2
" x
1
"
4"-P-246088-DAB
E
T
1
0
3
8
3/4"
3/4" 3/4"
E
T
1
0
3
8
3
/4
"
3
/4
"
ET 10
50
3
/4
"
ET 10
75
4
3/4"
4
3
3
/4
" FO
N
C
C
S
O
1
0
" x
6
"
V-24604
355 m^3/hr
LEAN AMINE FILTER
INSULATION TYPE/THK: /
35 kPa / 103 kPa PRESSURE DROP (CLEAN/DIRTY):
ID x F/T SIZE:
1500 kPa-g @90 C DESIGN PR. &TEMP:
TRIM:
CS + 3 mmCA + PWHT / 316L SS INTERNAL MATERIAL:
RATED FLOW:
ET 10
38
3
/4
"
P-246140-DAB
FV
016
6"-P-246072-DAB
E
T
1
0
5
0
3
"
DAB
3
/4
"
3
"
ET 10
50
DAB
3/4"
3
/4
"
ULB
S
6 . MECHANICAL MINIMUMFLOWSTOP TO BE PROVIDED.
040
HIS
040
HZT
S8
S
8
FIRE
FIRE
S
8
S
8
MIN
M
IN
M
IN
M
IN
040
HZI
A/S
O/C
5 5 5
SP
006
24"x16" 24"x16"
6
2
" x
1
"
2
" - S
C
- 2
4
6
0
1
4
- S
A
B
E
T
1
0
3
8
E
T
1
0
3
8
L
ET 10
50
10"-P-246066-DAB
ET 10
50
ET 10
75
6"-P-246075-DAB
HV
040
FC
10"x8"
RV
020
SET@
1500 kPa-g
1D2
SP
007
10"x8"
6
RV
021
SET@
1500 kPa-g
1-1/2H3
2
" x
1
- 1
/2
"
SP
008
SP
009
FO
HYI
040
2"-P-246084-DAB
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3/4" 3/4"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
1
0
" x
8
"
1
0
" x
8
"
N/A
ET 10
M
IN
2"-DM-246025-DAB
6"x4" 6"x4"
2
" - D
M
- 2
4
6
0
2
4
- D
A
B
E
T
1
0
3
8
N/A
ET 10
3"-DM-246027-DAB
3"-DM-246026-DAB
ET 10
38
ET 10
38
13135
246.033
DM
13134
246.033
DM
13136
2
4
6
.0
3
3
D
M
V-24608
71 m^3/hr
LEAN AMINE CARBON FILTER
INSULATION TYPE/THK: /
35 kPa / 70 kPa PRESSURE DROP (CLEAN/DIRTY):
3200 mmID x 6000 mmT/T SIZE:
1500 kPa-g @90 C DESIGN PR. &TEMP:
TRIM:
CS + 3 mmCA + PWHT / 316L SS INTERNAL MATERIAL:
RATED FLOW:
M
IN
24"
3"
E
T
1
0
3
8
2
" - G
I- 2
4
6
0
1
4
- U
L
B
2"-GI-246012-ULB
13141
246.030
GI
ULB
ET 10 N/A
2
" - G
I- 2
4
6
0
1
3
- U
L
B
13142
2
4
6
.0
3
0
G
I
2"-SC-246XXX-SAB
6"-P-246XXX-DAB
/ HV @150 C / HV @150 C
PARTICLE RETENTION SIZE: 10 microns ABSOLUTE PARTICLE RETENTION SIZE: 10 microns ABSOLUTE
/ HV @150 C
ET 10
38
V-24608
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
f(x)
FLOW
SP
010
START-UP / MINIMUMFLOW
DETAILS FOR INJECTION QUILL TO BE FINALIZED.
002
I
E
005A
HS
006
HIS
006A
HS
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
004A
HS
PP
020
FT
V
001
I
001
I
4 . 3 x 50%PUMPS FOR A TOTAL FLOWOF 1418 m3/h.
PP PP
E
I
12235
FILTERED LEAN AMINE
FROME-24605A/B &
FILTRATION
246.010
12238
LEAN AMINE
TO V-44118
246.101
12239
ANTI-FOAM
FROMP-24606A/B
246.014
12281
LEAN AMINE
TO E-24602A/B
246.001
I
PP
5 . ANTI-FOAMIS ADDED INTERMITTENTLY BY THE OPERATOR ON HIGH DP ACROSS
THE AMINE ABSORBERS. ON HIGH DP IN EITHER V-24118 OR V-24218, ANTI-FOAMWILL
BE SENT TO BOTH ABSORBERS.
(EACH)
041
PT
M
IN
M
IN
SEE DETAIL "A"
6 . PUMP SUCTION PIPING TO BE AS SYMMETRICAL AS POSSIBLE.
9 . ELECTRIC TRACE (ET 10).
042
PI
042
PT
002
I
12644
LEAN AMINE
TOV-24118/V-24218
241.021
D
D D D
MIN.
M
IN
DETAIL "A"
005
HIS
002
I
12983
LEAN AMINE FLOWSIGNAL
FROMFC-441075
441.029
D
12985
D
M
12982
LEAN AMINE FLOWSIGNAL
FROMFC-242075
242.021
020
FC
12904
VFD SET POINT
TO P-24601A/B//C
246.007
E
041
PC
MP-002
001
I
SAFETY SYSTEMPUMP TRIP REQUIREMENTS TO BE CONFIRMED DURING DETAILED
ENGINEERING.
SP
11 . VALVE AND SPACER TO BE ORIENTED IN THE HORIZONTAL PLANE.
12 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
13 . 316 SS INJECTION QUILL AND 304 SS HEADER TEE. OUTLET OF INJECTION QUILL
TOBE CENTERED IN PROCESS PIPE.
M
IN
M
IN
M
IN
002
I
10 . TWOCHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
002
I
004
HIS
3 . CLOSES FV-020 IF NO LEAN AMINE CHARGE PUMPS ARE RUNNING.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
D D D
D
7 . AUTO-START LOGIC FOR P-24602A/B/C SHALL ALSOCONSIDER THE NEED TO
RAMP UP AND/OR AUTOSTART P-24601A/B/C. REFER TO DRAWING 246.007.
8 . UC-002 SHALL MONITOR LEAN AMINE FLOWS TO EACH HMU PLANT AND THE
TOTAL LEAN AMINE FLOWINCLUDING THE MINIMUMFLOWRECYCLE. UC-002
WILL PROVIDE A SET POINT TO FC-020 BASED ON THE NUMBER OF RUNNING
PUMPS AND WILL AUTOMATICALLY PREVENT EXCESSIVE PUMPING BY STOPPING
ONE OF THE RUNNING PUMPS VIA I-002.
002
UC
PV
PV
002
I
107
HS
12981
LEAN AMINE FLOWSIGNAL
FROMFC-241075
241.021
PP PP
PJG(0.4)
DAG
(EACH)
D
HOLDS:
V
001
I
I
2
"-D
M
-2
4
6
0
3
4
-D
A
G
2
"-D
M
-2
4
6
0
3
8
-D
A
G
2"
11 11 11 11 11 11
13
DAG
8"x6"
LL
13
10 10
PJG(0.4)
12
7
DAB
DAG
DAG DAG
8"x6"
3
/4
"-D
M
-2
4
6
0
3
5
-D
A
G
2
"-D
M
-2
4
6
0
3
6
-D
A
G
2
"
3
/4
"
8
P-24602A P-24602C
/B
2"-DM-246043-DAB
/C
P-246143-DAG
2
"
P-246144-DAG
9
3
/4
"
3
/4
"
3/4"
3
/4
"
4 4
P-246142-DAG
ET 10
63
E
T
1
0
6
3
3
/4
"
3/4"
3
/4
"
3
/4
"
3/4"
3/4"
3
/4
"
ET 10
75
FO
106
3/4"
3/4"
16"-P-246077-DAG
1
8
"-P
-2
4
6
0
6
1
-D
A
G
16"-P-246079-DAG
1
8
"-P
-2
4
6
0
6
0
-D
A
G
24"-P-246059-DAB
DAB
HOA
R/S
2
"-D
M
-2
4
6
0
4
0
-D
A
G
SEL
3
DAG
3/4"-KP-246003-PJG(0.4)
3/4"
3/4"
6"
1
"
1
"
FO
108
3/4"
3/4"
4
3/4"
LL
24"-P-246080-DAG
2"
3
/4
"
P-24602A
1119.0 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
3603 kPa DIFF. PR.:
RATED FLOW: 709.0 m^3/hr
LEAN AMINE CHARGE PUMPS
HOA
16"-P-246078-DAG
2
"
ET 10
50
2" 2"
SP
011A
SP
011B
SP
011C
1
"
7
5
1
8
"-P
-2
4
6
0
6
2
-D
A
G
DAB
24"x16"
2"
3
/4
"
FV
020
FO
R/S
HOA
R/S
3
/4
"-P
-2
4
6
0
3
9
-D
A
G
ET 10
50
14"-P-246081-DAG
24"x18" 24"x18"
24"x16" 24"x16"
16"-P-246080-DAG
L
8"-P-246085-DAE
ET 10
63
L
E
T
1
0
6
3
E
T
1
0
6
3
DAB
2
" - D
M
- 2
4
6
0
5
7
- D
A
B
4
6
3/4" 3/4"
E
T
1
0
6
3
FO
107
LL
P-24602B
2
"
3
/4
"
3
/4
" - D
M
- 2
4
6
0
3
1
- D
A
G
3
/4
"
2
" - D
M
- 2
4
6
0
3
2
- D
A
G
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
1
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
1
1
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:3
5
P
M
B
Y
:b
e
s2
9
4
5
1
G
LEAN AMINE CHARGE PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.011
E
T
1
0
6
3
2
" - D
M
- 2
4
6
0
4
2
- D
A
G
7
1
6
" x
8
"
1
8
" x
1
2
"
1
6
" x
8
"
1
8
" x
1
2
"
1
6
" x
8
"
1
8
" x
1
2
"
3/4"-DM-246033-DAG 3/4"-DM-246037-DAG 3/4"-DM-246041-DAG
DAG DAE
8"-P-246XXX-DAG
ET 10
38
ET 10
75
V
2"
M
IN
E
T
1
0
6
3
3/4" 3/4" 3/4"
D D D
D
A
G
D
A
B
D
A
G
D
A
B
D
A
B
D
A
G
M
IN
M
IN
3
/4
"
D
3"-DM-246043-DAB
INJECTION QUILL
3"x2" 2"
ISSUED FOR HAZOP

I
MW MW
007
I
006
I
015
LI
048A
PC
016
LT
040
TC
016
LHS
016
LI
025
FT
025
FC
S
009
HIS
R/S
004
I
PP
010
HIS
R/S
I
010A
HS
HOA
005
XHIS
027
FG
009A
HS
HOA
I
005
I
005
XZT
048B
PC
PP
PP
015
LT
016 A
LI
048
PIT
040
TT
116
HS
006
I
PP
041
TC
041
TT
017
LT
017
LI
V
T
V
T
D
D
12142
FILTERED LEAN AMINE
FROMV-24609
246.010
12125
CONDENSATE
FROMP-24608A/B
246.021
12139
RECOVERED AMINE
FROMV-24605
246.013
12140
START-UP AMINE
TO V-24604
246.010
12145
246.030
GI
12143
246.029
SCL
12144
246.029
SL
12696
AMINE INVENTORY/MAKE-UP
TO V-24601
246.002
1
2
6
2
0
2
4
6
.0
3
3
D
M
13167
246.029
SL
13168
246.029
SCL
V
HOLDS:
SHELL __mm ROOF __mm
MIN
GAUGE
HATCH
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
BERM
5 . AMINE MAKE-UP TANK CONTAINS UNDILUTED AMINE.
MAKE-UP AMINE
6 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
10. STEAMCOIL AND ALL TANK APPURTENANCES LOCATED BELOWLLL.
8 . FG-027 TO BE VISIBLE FROM VALVE. FLOWGAUGE AND VALVE TO BE AT GRADE
NEAR TANK.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
9 . ALL AMINE PUMPS ARE CONTAINED WITHIN CURBED CONTAINMENT AREA.
V
SET@kPa(g) Vacuum
kPa(g) Positive Press
12. RENTAL TANK CONNECTION.
13. TANK VENDOR TO SUPPLY PVSV.
3 . PUMP WILL HAVE A WAREHOUSE SPARE.
A/S
(TYPICAL OF 2)
CV FAILURE
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
-0.25 kPag @60C
D
START-UP
11. ELECTRIC TRACE (ET 10), PIPING,PUMPS & NOZZLES.
HORN
SILENCE
HORN
TEST
V
4 . TRUCK CONNECTION NEAR TANK. LOCAL CONTAINMENT FOR TRUCK UNLOADING.
TEMPORARY / RENTAL TANKS TO BE PLACED ON PAVED, CURBED AREA BESIDE
AMINE STORAGE FACILITY. PAVED AREA TO BE PART OF THE CAPTURE AREA
STORMWATER DRAINAGE FACILITIES.
START-UP
0.75 M
SHELL __mm ROOF __mm
TO ATMOSPHERE AT
SAFE LOCATION
GAUGE
HATCH
1/2" WEEP HOLE
MW
(TYPICAL OF 2)
-0.25 kPag @60C
SET@kPa(g) Vacuum
kPa(g) Positive Press
IN
T
E
R
M
IT
T
E
N
T
NNF
TO ATMOSPHERE
AT SAFE LOCATION
0.75 M
D
D
START-UP
D
STORAGE FACILITY TO BE VERTICAL TANK (API 650) OR HORIZONTAL DRUM
(ASME SECT VIII). MECHANICAL TO ADVISE LEAST COST ALTERNATIVE.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
MW
7 . LEVEL INDICATION AT GRADE TO BE VISIBLE AT TRUCK UNLOADING LOCATION.
6"x4" 6"x4"
ET 10
63
SP
6" 6"
H
25
6"
8"
3
/4
"
?
N/A
HLL=11500 mm
2
"
??
6
"
-
V
A
-2
4
6
0
1
1
-
U
L
B
DESIGN PR. & TEMP.:
TK-24602
AMINE MAKE-UP TANK
5000 mmID x 12600 mmHEIGHT SIZE:
IH / INSULATION TYPE/THK:
1 kPa-g @
196 m^3
TRIM:
LEAN DUPLEX 2101 + 0.4 mmCA / DUPLEX 2205 + 0.4 mmCA MATERIAL (SHELL/COIL):
WORKING CAPACITY:
2"x1-1/2"
PVSV
046
2"x1-1/2"
ET 10
TV
041
2"
ET 10
4"
ET 10
38
24"
2"-SCL-246007-SAB
ET 10
38
2"
?
?
ET 10
NLL=2600 mm
FO
2"-SL-246020-SAB
N/A
PV
048B
HHLL=12000 mm
? ?
C-1
C
-
2
?
FO
?
2"
?
1-1/2"
?
ET 10
63
4"-P-246092-DAB
P-24639039-DAB
?
TK-24602
?
?
24"
LLL=1500 mm
?
3
/ 4
"
?
?
3"
?
DAB
ET 10
63
3
/ 4
"
-
D
M
-
2
4
6
0
4
9
-
D
A
B
3
/ 4
"
3
/ 4
"
N/A
3
/4
"
L
24"
2"-GI-246010-ULB
3/4"
FV
025
3/4"-DM-246052-DAB
3
/ 4
"
3
5
ET 10
38
3/4"-DM-246048-DAB
3
/ 4
"
PVSV
047
8
DESIGN PR. & TEMP.:
TK-24601
AMINE MAKE-UP TANK
5000 mmID x 12600 mmHEIGHT SIZE:
IH / INSULATION TYPE/THK:
1 kPa-g @
196 m^3
TRIM:
LEAN DUPLEX 2101 + 0.4 mmCA / DUPLEX 2205 + 0.4 mmCA MATERIAL (SHELL/COIL):
WORKING CAPACITY:
2"-P-246091-DAB
6"
2"-P-246090-DAB
P-24605
1.3 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
300 kPa DIFF. PR.:
RATED FLOW: 15.0 m^3/hr
AMINE MAKE-UP PUMP
4"-SC-246009-SAB HLL=11500 mm
N/A
ET 10
38
4
3/4"
11
3
/ 4
"
3/4"-DM-246047-DAB
FO
9
8"
4"
2
"
-
D
M
-
2
4
6
0
5
5
-
D
A
B
O/C
XV
005
PCV
045
PV
048A
4
"
H
25
P-24604
12.6 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
758 kPa DIFF. PR.:
RATED FLOW: 60.0 m^3/hr
AMINE RE-INVENTORY PUMP
8
FO
P-246150-DAB
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
1
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
1
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/8
/2
0
1
1
2
:5
7
:2
0
P
M
B
Y
:a
h
m
1
4
8
8
7
G
AMINE MAKE-UP TANK & PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.012
2"x1-1/2" 2"x1-1/2"
24"
1-1/2"
4"-P-246093-DAB
2"
2
"
NC
2
"
-
D
M
-
2
4
6
0
5
0
-
D
A
B
P-246149-DAB
N
C
H
N
C
ET 10
50
4"-P-246088-DAB
2
"
NC
3
/ 4
"
3/4"-DM-246046-DAB
3/4"
3
/ 4
"
6
3"
ET 10
3
/ 4
"
P-24605
LLL=1500 mm
TK-24601
P-246148-DAB
10
SET@
75 kPa-g
HHLL=12000 mm
7
HH
FC
2
"
-
G
I -
2
4
6
0
1
1
-
U
L
B
2"-SL-246009-SAB
FO
3
/ 4
"
3
/4
"
3
/ 4
"
9
24"-P-246112-DAB
GWR
FO
110
NC
2"-DM-246053-DAB
NLL=2600 mm
ET 10
11
6"-P-246075-DAB
SAB
3
/ 4
"
C
S
O
4"x3"
3
/ 4
"
2
"
2"
3
/ 4
"
L
FC
LAH
016A
3/4"
H
RADAR
2"-SCL-246015-SAB
3/4"
NC
3
/ 4
"
-
D
M
-
2
4
6
0
5
1
-
D
A
B
2"
24"
P-24604
XYI
005
3/4"-DM-246054-DAB
ET 10
38
4"-VA-246010-ULB
TV
040
2"x1-1/2" 2"x1-1/2"
1-1/2"
ET 10
63
6"-P-246086-DAB
6"x4" 4"x3"
RV
046
SET@
90 kPa-g
2J3
SP
019
1-1/2"
6
"
x
3
"
3
"
-
P
- 2
4
6
0
8
7
-
D
A
B
SP
022A
4" 4"
NC
12
SP
020
ET 10
50
E
T
1
0
3
8
SP
022B
ET 10
38
ET 10
63
2"-P-246099-DAB
?
C-2
?
C
-1
?
C
-
1
?
E
T
1
0
5
0
E
T
1
0
3
8
2"
4
"
-
P
- 2
4
6
0
8
8
-
D
A
B
2"x1-1/2" 2"x1-1/2"
3"x2"
2"x3"
C-1
5
0
6
3
3
5
7
C
-
1
5061864
?
?
C
-
1
5156168
5163480
C-1
C-1
?
C
-
2
5156893
C
-
2
?
C
-
2
5156893
C-1
5
0
6
1
8
6
4
?
?
C
-1 ?
C
-
1
?
C
-
2
?
C
-
2
C-1
C
-
1
C
-
1
5163612
?
? ?
5
0
6
3
3
5
7
?
5156168
?
?
?
?
?
?
?
C-1
C-1
5156168
C-1
5
0
6
1
8
6
4
?
?
C-2
?
C
-
1
?
C
-
1
5
0
6
3
3
5
7
C
-
1
?
C
-
1
? 5063357
C-1 C-1
?
5
1
1
5
2
2
7
?
?
?
?
?
5
1
1
5
2
2
7
?
?
?
5163612
5156168
5163612 5156168
C-1
? ? 5
1
1
9
1
6
0
?
?
5119160
?
?
?
C-1
?
C-1
5
1
6
3
6
1
2
C
-
1
5061864
?
5
1
5
6
1
6
8
H
L
SP
021
4" 4"
12
13
ET 10
38
2"-P-246089-DAB
?
?
?
C
-
1
5156168
5163612
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
2"
H
L
2
"
2
"
6"-P-246071-ULB
12
BERM
4"
6"
6"
14. PLATFORMBETWEEN ROOF AREAS OF EACH TANK.
5
10
2"
?
?
MIN. 2 m
ET 10
63
13
6"
ET 10
2"
14 14
3"
15. TANKS TO BE NO FURTHER THAN 2m APART, 24 NPS TIE LINE TO BE MINIMUM
LENGTH AND TANK NOZZLES TO BE LOCATED AS CLOSE TO GRADE AS POSSIBLE,
NO POCKET.
2"-P-246091-DAB
3
"
2"-P-246111-DAB
ET 10
50
ET 10
50
13174
246.023
DM 13175
246.023
DM
13176
246.023
DM
15
ET 10
50
2"-DM-246044-DAB
2"-DM-246056-DAB
E
T
1
0
3
8
E
T
1
0
5
0
ISSUED FOR ESTIMATE

3
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
R
S
S
O
FREE DRAINING
R
S
R
S
R
S
1mx 1m
D
NNF
5 . PUMP WILL HAVE A WAREHOUSE SPARE.
3 . VACUUMTRUCK CONNECTION.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
050A
PC
052
PDI
12139
RECOVERED AMINE
TO TK-24601
246.012
TO ATMOSPERE
AT SAFE
LOCATION
NNF
12294
WASTE WATER
TO WWTP 271
246.027
12477
AMINE DRAINS
FROMCOLLECTION HEADER
246.033
12. ELECTRIC TRACE (ET 10).
D
S-24601
V
B
V
NNF
MW
12401
RECOVERED AMINE
TO V-24601
246.002
12463
246.034
SC
045
TT
R
S
V
D
10. DISCHARGE PIPE FOR RELIEF VALVE TO BE DIRECTED INTOBOTTOMOF AMINE
DRAIN DRUMSUMP. ENTRY PROCEDURES INTO SUMP ARE REQUIRED FOR
OPERATION / MAINTENANCE TOENSURE THERE IS NORELIEF OR OVERFILL OF
AMINE INTOTHE SUMP.
FREE DRAINING
1/2" WEEP HOLE
F
R
E
E
D
R
A
IN
IN
G
I
011A
HS
S
O
4 . CHECKER PLATE ON TOP OF SUMP.
R
S
R
S
RS
021
LIT
019
I
PARTICLE RETENTION SIZE:
12626
KO LIQUIDS
FROMV-24701
247.001
8 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
9 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
050
PT
045
TI
13. VALVE STEMTO EXTEND ABOVE GRADE.
14. PUMP P-24607 TO BE MANUALLY STARTED ON HIGH LEVEL ALARM.
FIRE
VAPOUR BLOWTHROUGH
HORN
SILENCE
S
8
B
021
LI
121
HS
HORN
TEST
021A
LHS
HORN
SILENCE
PP
S-24601
AMINE DRAIN DRUMSUMP
008
I
011
HIS
020
LT
008
I
020
LI
D
FREE DRAINING
FREE DRAINING
R
S
6 . ELECTRIC TRACING TO HLL (ET 10).
11. ACCESS HATCH.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
D
HOLDS:
12461
246.030
GI
D
D
D
13036
AMINE DRAINS
FROMCOLLECTION HEADER
246.033
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
021
LHS
7 . EXTEND BELOWLLL.
10 microns ABSOLUTE
13037
AMINE DRAINS
FROMCOLLECTION HEADER
246.033
052
PDT
CSO
CSO
CSO
13
13
3
/4
"
3
/4
"
3
/4
"
H
RV
025
SET@
350 kPa-g
4M6
1-1/2"
4
"x
3
"
SP
013
SET@
100 kPa-g
1"
36"
7
LAH
021A
11
3
"x
2
"
ET 10
38
SP
012A
SP
012B
ET 10
50
13
6"
6"
6"
6"-DM-246060-DAB
6"-DM-246061-DAB
ET 10
50
ET 10
50
ET 10
38
P-246146-DAB
PV
050A
3
/4
"
3/4"
2
"
NC
2"
3
/4
"
3
/4
"
3/4"
8
"-V
A
-2
4
6
0
0
9
-D
A
B
3
/4
"
2
"
3
/4
"
3
/4
"
P-246147-DAB
3
/4
"
9
2"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
1
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
1
3
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
3
:1
3
:4
3
P
M
B
Y
:b
e
s2
9
4
5
1
G
AMINE DRAIN DRUM
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.013
6"-VA-246007-DAB
4
"-P
-2
4
6
1
0
3
-D
A
B
3"-VA-246008-DAB
ET 10 N/A
2"-P-246102-DAB
C
S
O
2"-P-246099-DAB
3"
2
"-P
-2
4
6
0
9
7
-D
A
B
E
T
1
0
3
8
L
4
"-P
-2
4
6
1
0
1
-D
A
B
2"
DAB
2"-GI-246007-ULB
12
P-246145-DAB
2"
SAB
2"-DM-246058-DAB
H
HH
ET 10
38
E
T
1
0
3
8
3"
2
"-P
-2
4
6
0
9
5
-D
A
B
2"-DM-247002-PJB(0.4)
ULB
V-24605
25 m^3/hr
DRAINED AMINE FILTER
INSULATION TYPE/THK: /
35 kPa / 150 kPa PRESSURE DROP (CLEAN/DIRTY):
ID x SIZE:
1050 kPa-g @150 C DESIGN PR. &TEMP:
TRIM:
CS + 3 mmCA + PWHT / 316 SS INTERNAL MATERIAL:
RATED FLOW:
2"-DM-246059-DAB
2
"-P
-2
4
6
0
9
4
-D
A
B
7
HOA R/S
V-24605
ET 10
38
3
/4
"
NC
5
2"
CSO
L
DAB
ET 10
38
2"-SC-246013-SAB
V-24606
LLL=200 mm
HLL=2255 mm
HHLL=2405 mm
36"
P-24607
2"-P-246098-DAB
3
3
4
2"-WP-246003-DAB
6"-DM-246006-DAB
V-24606
AMINE DRAIN DRUM
2600 mmID x 8100 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 6 mmCA + PWHT / 316 SS + 0.4 mmCA MATERIAL(VESSEL/INTERNALS):
350 kPa-g @150 C DESIGN PR. & TEMP:
SIZE:
PCV
049
C
S
O
N
C
E
T
1
0
3
8
GWR
6
RV
026
SET@
1050 kPa-g
1D2
2"-P-246096-DAB
2
" x
1
"
GWR
PV
050B
FO
2"
12
H
FC
7
P-24607
7.5 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
641 kPa DIFF. PR.:
RATED FLOW: 25.0 m^3/hr
AMINE DRAIN PUMP
8
3
/4
"
2"
10
2
"
4"x2"
4"x2"
ET 10
38
C
S
C
3
"
CSC
6
2"
/ HV @150 C
3"x1-1/2" 3"x1-1/2"
R
S
4" 2" 2" 4" 2" 3"
6" 6"
/ HV @150 C
6"
HOLD
13130
AMINE DRAINS
FROMCOLLECTION HEADER
246.007
6"-DM-246006-DAB
TWOPHASE FLOW
ET 10
50
2"x1" 2"x1"
C
S
O
3/4"
D
050B
PC
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
D
R/S
6" FILL CAP
FI
PULSATION
DAMPENER
3
/4
"-S
S
T
U
B
IN
G
3/4"-SS TUBING
023
LG
023
LI
5 . SS TUBINGTOPIPE CONNECTOR.
3/4"-SS TUBING SS TUBING
6" FILL CAP
HOLDS:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL INDICATION
AND INJECTION PUMP CALIBRATION.
12283
ANTI-FOAM
TO V-24601
246.002
12286
ANTI-FOAM
TOV-24118/24218
241.021
023
LT
023A
LHS
H
O
S
E
H
O
S
E
HOSE
H
O
S
E
FI
HORN
SILENCE
HORN
TEST
HORN
SILENCE
VENDOR
VENDOR
VENDOR
111
112
CURB CURB
D
055
PT
055
PI
D
1000 L
TOTE TANK
(OPERATING)
D
1000 L
TOTE TANK
(REMOVABLE)
D
FI
057
PG
PP
D
010
I
HOA
I
12239
ANTI-FOAM
TO V-44118
246.011
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
023
LHS
023
HS
SS TUBING
009
I
110
(BY SHELL)
015A
HS
015
HS
VENDOR
2"
3
/4
"
3
/4
"
2"
5
5
P-24606
0.75 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
NONE /
3850 kPa DIFF. PR.:
RATED FLOW: 160 L/hr
ANTI-FOAMINJECTION PUMP
C
S
C
2"
3/4" 3/4"
LAH
023A
3
/4
"
3
/4
"
OUTSIDE INSIDE
ET 10
38
ET 10
38
2" 2"x3/4"
3
/4
"
SP
015
3
2"
2"x1"
2
"x
1
"
S- 02NULL
ANTI-FOAMINJECTION PACKAGE
3/4"-KP-246005-PJG(0.4)
PJE(0.4)
ET 10
38
3/4"
1
"
3/4"-KP-246001-PJE(0.4)
3/4"
1
-1
/2
"x
1
"
1
"
1
"
OUTSIDE
1"-VA-246017-PAB
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
1
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
1
4
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:4
0
P
M
B
Y
:b
e
s2
9
4
5
1
G
ANTI-FOAM INJECTION PACKAGE
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.014
3
/4
"
3
/4
"
3
/4
"
RV
030
3
2"x1"
1
"-V
A
-2
4
6
0
1
6
-P
A
B
1
"-V
A
-2
4
6
0
1
8
-P
A
B
PJG(0.4)
S- 02NULL
1
"
P-24606
2
"
3/4"
SP
014B
SP
014A
3
/4
"
N/A
LG
024
1
-1
/2
"x
1
"
INSIDE
4
5
2
"
ET 10
H
3/4"-KP-246003-PJG(0.4)
3/4"
2"x1"
6 . VERTICAL ORIENTATION REQUIRED FOR ROTAMETER WITH INLET FLOWINTO
THE BOTTOMOF THE INSTRUMENT.
7 . WAREHOUSE SPARE PUMP TO BE PROVIDED AND STORED IN THE ANTI-FOAM
INJECTION SHELTER.
8 . ANTI-FOAMINJECTION PUMP TO AUTOMATICALLY STOP 5 MINUTES AFTER
BEINGSTARTED.
SS TUBING
INSTR. PIPING
PIPING INSTR.
PIPING INSTR.
009
I
MAG
010
I
SP
018
2"
SP
017
SP
016
6
6
6
PJG(0.4)
8
7
7
L
LL
SET@
3500 kPa-g
2"
ISSUED FOR HAZOP

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
050
TX
12130
MINIMUMFLOWSIGNAL
FROMFT-030
246.021
3 . HP CONDENSATE AND FLASHING LP CONDENSATE LINES TO ENTER V-24607
BELOWLLL.
RELIEF LINE (INLET AND OUTLET) SIZING.
12664
246.030
GI
050
TT
TO ATMOSPHERE
AT SAFE LOCATION
MW
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12454
CONDENSATE
FROME-24603A / V-24603A
246.003
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
12126
CONDENSATE
FROMTK-25101
246.027
061
PC
025
LG
025
LT
030
FC
050
TC
12128
RECOVERED CONDENSATE
TO P-24608A/B
246.021
1/2" WEEP HOLE
TO ATMOSPHERE
AT SAFE LOCATION
061
PT
12127
RECYCLED CONDENSATE
FROME-24607
246.021
12129
LEVEL SIGNAL
TOLC-025
246.021
D
054
TW
D
12457
LP CONDENSATE
FROMCOLLECTION
246.029
7 . VESSEL SUPPORTED BY MODULE STRUCTURE AND IS LOCATED ABOVE
EXCHANGERS E-24606A/B.
D
(TOTAL)
MAG
PP
TO ATMOSPHERE
AT SAFE LOCATION
12680
CONDENSATE
FROME-24603B / V-24603B
246.004 12681
HOT DEMIN WATER
TO V-25102
246.101
SPLIT
5 . ELECTRIC TRACE TO HHLL (ET 10) AND EXCHANGERS.
6 . REQUIRE HEIGHT TO BE AS LOWAS POSSIBLE (MINIMUM 2.6m) FOR PROCESS
HYDRAULICS.
12427
HP CONDENSATE
FROMV-24805
248.002
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TWO PHASE FLOW
B
12270
DEMIN WATER
FROMP-24610A/B
246.023
5
3
0
0
m
m
D
HOLDS:
V
START-UP
D
D D
057
TW
056
TW
055
TW
D D
051
TW
052
TW
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
CV FAILURE
CV FAILURE
13139
FROMLX-005
246.003
13140
FROMLX-006
246.004
SCL-246XXX-SAG
7
SCL-246030-SAB
E-24606A
LP COND. / DEMIN WATER EXCHANGER
13.5 MW
/ /
150 C / 150 C
PLATES: 304 SS
1150 kPa-g / FV
FRAME: CS
125 C / 125 C
1450 kPa-g / HV
COLD
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
HOT
SURFACE AREA:
RATED DUTY:
WI-246020-UJB(0.4)
1
0
"
SET@
90 kPa-g
2J3
RV
033
SET@
500 kPa-g
3L4
3"
H
ET 10
75
2"-SCH-248002-SAG
PCV
060
PV
061B
H
2
"
3/4"
4"x3"
HLL=2900 mm
LLL=1150 mm
6"-WI-246006-UJB(0.4)
8"x4"
V-24607
CONDENSATE FLASH DRUM
3000 mmID x 6300 mmT/T
TRIM:
IH / INSULATION TYPE/THK:
CS + 3 mmCA MATERIAL(VESSEL/INTERNALS):
500 kPa-g @150 C DESIGN PR. & TEMP:
SIZE:
1-1/2"
E
T
1
0
8
8
4"
4
"
x
3
"
6"x4"
2"
12"
ULB
ET 10
50
ET 10
88
E
T
1
0
7
5
8
"
-
S
C
-2
4
6
0
0
1
-
S
A
B
4"-SC-246016-SAB
C-2
5
1
1
5
2
7
7
C
-
3
5156140
C-1
5156863
C-1
? C
-
1
5156862
C-1
5070551
C-2
5
1
1
9
1
6
0
6"-SC-246011-SAB
10"-SC-246002-SAB
3"-SCL-246012-SAB
5
5
3/4"
3/4"
3
/ 4
"
HHLL=3800 mm
6"
1-1/2"
3"
4
1-1/2"
1-1/2"
3
/ 4
"
RV
034
FC
TV
050
L
6
SET@
75 kPa-g
V-24607
8"
C-2
5245480
?
C-2
C-2
?
C-2
5156140
C-2
?
C-2
?
C-2
5156140
C-1
5
1
1
5
2
2
7
C
-
2
5156140
C-1
5
1
1
5
2
7
7
C
-
3
5158143
C-1
5158143
C-1
5158143
8
"
x
6
"
5
1
5
6
1
4
0
?
LV
005
4"
6
"
4" LV
006
?
5
1
5
6
1
4
0
6
"
x
4
"
6
"
x
4
"
6
"
6"-WI-246010-UJB(0.4)
5
2
4
2
5
2
5
C
-
2
6"-WI-246011-UJB(0.4)
8"-SC-246016-SAB
2"
5158143
C-2
2"
5158143
C-2
/B
ET 10
50
6"-SC-246XXX-SAB
1-1/2" 1-1/2"
E-24606B
1-1/2"
1-1/2"
6"
C-2
5242525
C-2
?
C-2
?
C-2
5156140
C-2
6"-VA-246015-SAB
E-24606A
1-1/2" 1-1/2"
1-1/2"
10"
2"
LLLL=250 mm
C
S
O
2
"
2"
CSO
SAB
ET 10
38
PV
061A
F
O
2
"
-
G
I -
2
4
6
0
0
6
-
U
L
B
ET 10
75
CSO
24"
4"-VA-246019-ULB
5
6"-WI-246007-UJB(0.4)
ET 10
100
3
/ 4
"
?
C-2
C-2
?
5245480
8"
1-1/2"
1-1/2"
6
"
x
4
"
FO
1-1/2"
12"-VA-246020-SAB
3
/ 4
"
ET 10
38
3
3
1-1/2"
8"-SCL-246002-SAB
8"-SCL-246005-SAB
2"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
0
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
0
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
9
:2
9
:4
9
P
M
B
Y
:m
u
k
2
2
2
9
6
G
CONDENSATE RECOVERY EXCHANGER & FLASH DRUM
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.020
8"
1
2
"
1
2
"
x
1
0
"
1
2
"
x
1
0
"
C
-
2
?
C-2
5156140
C-1
5115227
C-2
5
1
5
6
1
4
0
C
-
1
5115277
C-2
?
C
-
1
5119160
ET 10
75
/ FV @150 C
4"x3" 4"x3"
2"x1-1/2" 2"x1-1/2"
2"-GI-246005-ULB 4"-VA-246014-SAB
6"
1-1/2"
C-1
C-1
C-1
C
-
1
C-1
C-1
SLOPE
053
TW
1-1/2"
ET 10
50
6
"
F
C
ET 10
100
ET 10
75
F
C
6
"
x
4
"
C
S
O
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
3 . 2x100% PUMPS FOR TOTAL FLOWRATE OF 183 m3/h.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
START-UP
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
PP
HOA
R
S
12579
FLUSHING CONDENSATE
TO DISTRIBUTION
246.034
R
S
12125
CONDENSATE
TO TK-24601
246.012
012
I
030
FT
12128
RECOVERED CONDENSATE
FROMV-24607
246.020
12127
RECYCLED CONDENSATE
TO V-24607
246.020
12129
LEVEL SIGNAL
FROMLT-025
246.020
12130
MINIMUMFLOWSIGNAL
TOFC-030
246.020
12654
RECOVERED CLEAN
CONDENSATE
TO TK-25101
246.027
R/S
BACK
FLUSH
064
TW
HOA
R/S
(TOTAL)
D
PP
I
017A
HS
018
HIS
018A
HS
062
TT
D
D
TBD
D
061
TW
012
I
I
5 . ELECTRIC TRACE (ET 10).
D
D
D
NNF
D
011
I
012
I
12131
WATER MAKE-UP
TO V-24602
246.006
017
HIS
D
V
HOLDS:
D
V
12123
COOLED CONDENSATE
TO P-24609A/B
246.022
12119
246.025
CWR
12120
246.025
CWS
025
LC
PP
D
D
065
PT
065
PI
PP
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
119
HS
SEL
062
TI
4
"
-
S
C
- 2
4
6
0
0
7
-
S
A
B
5
CWR-246035-UAB
5
6
"
-
S
C
-2
4
6
0
0
5
-
S
A
B
6
"
-
S
C
-2
4
6
0
0
6
-
S
A
B
3
/4
"
8"-SC-246004-SAB
6
"
x
4
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
9
:3
8
:4
8
P
M
B
Y
:m
u
k
2
2
2
9
6
G
CONDENSATE RECOVERY PUMPS & COOLER
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.021
FC
3
/4
"
LL
LL
3
"
3
/4
"
3/4"
ET 10
50
6"x4"
6"x4"
CSO
3/4"
/B
ET 10
50
3/4"
1-1/2"
3
/4
"
P-24608A
3/4"
3
/4
"
L
3
/4
"
3
/4
"
6
"
x
4
"
6
"
x
4
"
E-24607A
CONDENSATE COOLER
0.7 MW
BEU TEMA TYPE:
/ /
150 C / 150 C
1200 kPa-g / FV
/ 58 C
1200 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
C-1
5
1
5
6
1
4
0
C
-
1
?
C
-
1
5
1
1
5
2
2
7
C
-
1
5
1
1
5
2
2
7
C
-
1
5
1
1
5
2
2
7
C
-
1
5156140
C-1
5
1
1
5
2
2
7
C
-
1
C-1
5115227
5156140
5
1
1
5
2
2
7 5156140
5
1
5
6
1
4
0C-1
C
-
2
C-1
C
-
2
?
C-2
5
1
5
6
1
4
0
C
-
2
5115227
C-2
5307521
C-2
5115227
H
/B
6"
SP
023B
1-1/2"
10"-SC-246002-SAB 8"-SC-246003-SAB
5
C-1
?
C-1
5
1
6
3
4
8
0
C
-
1
5115227
C-1
5
1
5
6
1
4
0
C
-
1
?
C
-
1
5
1
1
5
2
2
7
C
-
1
5
1
1
5
2
2
7
C
-
1
?
C
-
1
5156140
C-1
?
C-1
5
1
6
3
4
8
0
C
-
1
5115227
5
1
1
5
2
7
3
C
-
2
5307521
C-2
5
1
1
5
2
7
3
C
-
2
5115227
C-2
5
1
5
6
1
4
0
C
-
2
3
/4
"
N
C
ET 10
38
ET 10
38
ET 10
38
P-24608B
6"-CWR-246014-UAB
ET 10
50
ET 10
38
SP
023A
4"-SC-246016-SAB
3
"
4
3
/4
"
6"-CWS-246031-UAB
1-1/2"
3/4"
SC-246042-SAB
H
L
6"-SC-246008-SAB
4"-SC-246009-SAB
2"-SC-246017-SAB
2"-SC-246020-SAB
ET 10
38
2"-SC-246010-SAB
3
3
/4
"
3
/4
"
ET 10
50
LV
025
3/4"
3/4"
SC-246040-SAB
SC-246041-SAB
P-24608A
30.5 kW DRIVER:
INSULATION TYPE/THK:
CS CS
INTERNALS CASING
MATERIAL:
TRIM:
/
602 kPa DIFF. PR.:
RATED FLOW: 183.0 m^3/hr
RECOVERED CLEAN CONDENSATE PUMP
6
"
x
4
"
E
T
1
0
5
0
10"x8"
E-24607B
E-24607A
C
-
2
C-1
6" 6"
4
"
ISSUED FOR ESTIMATE

/ Tk-24602
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
12133
WASH WATER
TO V-24119 / V-24219
241.022
12123
COOLED CONDENSATE
FROME-24607
246.021
021
HIS
021A
HS
R/S
014
I
I
020
HIS
020A
HS
014
I
HOA
I
D D
R/S
HOA
D
070
PT
PP
4 . ELECTRIC TRACE (ET 10).
3 . 2x100% PUMPS. ONE OPERATING, ONE SPARE.
V
070
PI
D
V
PP
PP
D
5 . TOTAL WASH WATER MAKE-UP FLOWTO V-24119 AND V-24219.
13030
FLOWSIGNAL
FROMFC-241076
241.022
13031
FLOWSIGNAL
FROMFC-242076
242.022
076
FX
018
I
076
FI
014
I
PP
D D
011
I
018
I
D
122
HS
SEL
011
I
018
I
C-1
?C
-
1
?
C
-1
?
C
-
1
?
C
-
1
?
C-1
?
C
-
1
5115277
C-1
?
C
-
1
?
C
-
1
?
C
-1
?
C
-
1
?
C-1
?
C-1
5
0
6
3
2
4
6
C
-
1
?
C-1
?
C
-
1
L LL
P-24609A
7.5 kW DRIVER:
INSULATION TYPE/THK:
CS CS
INTERNALS CASING
MATERIAL:
TRIM:
/
2741 kPa DIFF. PR.:
RATED FLOW: 9.9 m^3/hr
WATER MAKE-UP PUMPS
5
2"-SCH-246003-SAG
3/4"
4
E
T
1
0
3
8
LL
P-24609B
SCH-246XXX-SAG
L
3
/ 4
"
2"-SC-246018-SAG
2
"
-
S
C
H
-
2
4
6
0
0
1
-
S
A
G
3
/ 4
"
3
/ 4
"
2"-SC-246019-SAG
2
"
-
S
C
H
-
2
4
6
0
0
2
-
S
A
G
3
/ 4
"
SAB SAG
SAG
3
/ 4
"
3/4"
SCH-246XXX-SAG
ISSURD FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/4
/2
0
1
1
1
:1
6
:1
9
P
M
B
Y
:a
h
m
1
4
8
8
7
G
WASH WATER MAKE-UP PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.022
SAB
3
P-24609A
3
/ 4
"
ET 10
38
3
/4
"
3
/4
"
3/4" 3/4"
2"-SC-246017-SAB
ET 10
38
/B
3/4"
?
C-2
?
C-1
5
0
6
3
2
4
6
?
C
-
1
C-1
5115277
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
PP
D
D
12270
DEMIN WATER
TO E-24606
246.020
12137
DEMIN WATER
FROMFV-251001
246.101
D D
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOWRATE OF 185 m3/h.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
I
026
HIS
026A
HS
FAULT
VFD
REMOTE
LOCAL/
FAULT
VFD
REMOTE
LOCAL/
025
SI
025
XL
075
PT
026
XL
026
XA
HOA
PP
5 . ELECTRIC TRACE (ET 10).
VFD VFD
D
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
025
HIS
R/S
HOA
015
I
I
PP
PP
TO GRADE
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
R/S
035
FT
035
FC
B
D
D
D
4 . TRIP ONE PUMP ON HIGH LEVEL(3234 mm) AND BOTH PUMPS ON HIGH HIGH LEVEL
(4801 mm) IN V-25102. REFER TO P&ID 251.0000.000.041.103.
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
015
I
025
XA
026
SI
025A
HS
6 . INTERLOCK I-015 TO FORCE HV-027 OPEN WHEN BOTH DEMIN WATER SUPPLY
PUMPS ARE STOPPED.
BLOCKED DISCHARGE
SET POINT
FROMLC-251001D
251.103
SP
075
PI
015
I
027
HIS
O/C
3/4"
P-24610A
?C
-
1
5
1
3
4
2
8
9
C
-
1
?
C
-
1
5242525
P-24610B
4"-WI-246009-UJB(0.4)
6"-WI-246003-UJB(0.4)
3
/4
"
3
/4
"
4
4"x3"
3
/4
"
4
"
x
3
"
P-24610A
26.0 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
503 kPa DIFF. PR.:
RATED FLOW: 92.5 m^3/hr
DEMIN WATER SUPPLY PUMPS
6"x4"
/B
WI-246031-UJB(0.4)
4
"
-
W
I - 2
4
6
0
0
8
-
U
J
B
(
0
. 4
)
3
/ 4
"
3
/ 4
"
3
/ 4
"
6"-WI-246002-UJB(0.4)
4
WI-246032-UJB(0.4)
5
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
3
.p
id
M
O
D
E
L
D
A
T
E
:7
/6
/2
0
1
1
1
0
:4
2
:5
8
P
M
B
Y
:m
u
k
2
2
2
9
6
G
DEMIN WATER PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.023
3/4"
3/4"
3
/4
"
3
/4
"
3
/ 4
"
3/4"
3/4"
C
S
O
6"x4"
ET 10
50
4
"
6"-WI-246001-UJB(0.4)
6"-WI-246006-UJB(0.4)
H
L
E
T
1
0
5
0
3
RV
032
C
S
O
C
S
O
HV
027
FO
6"
E
T
1
0
5
0
C
-
2
ET 10
50
6
SET@
1450 kPa-g
3L4
5134289
C-1
?
C-1
5
2
4
8
4
5
0
C
-
1
?
C-2
5
2
4
2
5
2
5
C
-
1
?
C-1
5
2
4
8
4
5
0
C
-
1
?
4
"
-
W
I - 2
4
6
0
0
5
-
U
J
B
(
0
. 4
)
C-2
5
2
4
2
5
2
5
C
-
1
5134289
C-1
?
C
-
1
5
1
3
4
2
8
9
C
-
1
?
C
-
1
5242525
C-1
5242525 5248450 5242525
C-1 C-1 C-1
5
2
4
2
5
2
5
C
-
1
5134289
C-2
4
"
-
W
I - 2
4
6
0
0
4
-
U
J
B
(
0
. 4
)
C-1
?
3
/ 4
"
D
ET 10
50
6"-WI-246021-UJB(0.4)
C-1 ?
C
-
1
L
C
-
2
C-1
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12135
COOLING WATER SUPPLY
TO DISTRIBUTION
246.025
3 . 2x50% PUMPS FOR TOTAL DESIGN FLOWRATE OF 6236 m3/h. HOLD
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
UG
HOLD
30"-CWS-282015-UAB
5 . ELECTRIC TRACE (ET 10) PUMPS AND INDIVIDUAL SUCTION & DISCHARGE PIPING
WITHIN BLOCK VALVES.
DESIGN CONDITIONS TO BE CONFIRMED.
HOA HOA
R/S
016
I
FROMHEADER
COOLING WATER SUPPLY
282.001
PP
I
R/S
PP
031
HIS
030
HIS
031A
HS
030A
HS
PP
I
016
I
6 . HIGH POINT VENT. HOLD
7 . PROVIDE 30NPS FLANGES TO ALLOWPROVISION OF 3RD FUTURE PUMP. HOLD
070
TW
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
D D
HOLDS:
AG
D
D
D
4 . DESIGN CONDITIONS ARE 1200 kPag @58 C AND ARE SUBJECT
TO CHANGE BASED ON COOLING WATER BOOSTER PUMP DATA (P-24611).
D
D
PUMP SIZING TO BE CONFIRMED PENDING SHELL COOLING WATER SURVEY &
FINAL HEAT EXCHANGER COOLING WATER FLOWRATES.
006
XZT
s
016
I
006
XHIS
O/C
A/S
D
030
JSLL
031
JSLL
PP
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLD
8 . IF POSSIBLE, LEAVE SPACE IN PLOT PLAN FOR FUTURE 3RD CWPUMP. HOLD
ET 10 N/A
3/4"
/B
2" 2"
6 6
6 6
2
"
2
"
SP
024A
SP
024B
7
5
3
0
7
8
5
3
C
-
1
5280764
C-1
C-1
5
3
0
7
8
5
3
N/A
3/4"
P-24611A
225.0 kW DRIVER:
INSULATION TYPE/THK:
CS CS
INTERNALS CASING
MATERIAL:
TRIM:
/
260 kPa DIFF. PR.:
RATED FLOW: 3118.0 m^3/hr
COOLING WATER BOOSTER PUMP
P-24611A
C
-
1 ?C
-
1
5
1
1
5
2
7
3
C
-
1
7
24"-CWS-246002-UAB
3
/4
"
ET 10
N/A
ET 10
4
2
4
"
24"-CWS-246006-UAB
30"-CWS-246004-UAB
30"-CWS-246007-UAB
30"x24"
30"-CWS-246001-UAB
3
/4
"
3/4"
30"-CWS-246001-UAB
1-1/2"
3
/4
"
CWS-246037-UAB
5
24"
XYI
006
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
4
.p
id
M
O
D
E
L
D
A
T
E
:7
/6
/2
0
1
1
1
0
:4
9
:2
5
P
M
B
Y
:m
u
k
2
2
2
9
6
G
COOLING WATER BOOSTER PUMPS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.024
CWS-246036-UAB
P-24611B
30"-CWS-246001-UAB
30"-CWS-246003-UAB
24"-CWS-246005-UAB
3
/4
"
XV
006
F
FO
24"
E
T
1
0
8
8
5115273
C-1
5115273
C-1
?
C-1
5
1
1
5
2
7
3
C
-
1 ?
C
-
1
5
1
1
5
2
7
3
5
1
1
5
2
7
3
C
-
1
5307853
C-1
5115273
7
E
T
1
0
8
8
C
-
1
5
1
1
5
2
7
3
C
-
1
5307853
C-1
5
2
8
0
7
6
4
C
-
1
5115273
C-2
ET 10
ET 10
88
ET 10
88
N/A
3/4"
3
/4
"
3/4"
N/A
3
4
4
ET 10
3/4"
3
/4
"
C
-
1
5115273
C-1
5
3
0
7
8
5
3
C
-
1
5
2
8
0
7
6
4
C
-
1
5115273
C-2
?
C-1
5115273
C-1 5
1
1
5
2
7
3
ET 10
N/A
HOLD
PUMP SELECTION, SIZING, TYPE, NUMBER AND LAYOUT FOR COOLING WATER
PUMPS.
TOTAL REQUIRED FLOWWILL NOT CHANGE.
DESIGN PRESSURE DESIGN PRESSURE
800 kPag UAB 1200 kPag UAB
C-1
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
1
2
2
7
1
2
4
6
.0
0
5
C
W
S
1
3
0
4
6
2
4
6
.0
0
9
C
W
R
3 . DESIGN CONDITIONS ARE 1200 kPa-g @58 C FOR ABOVE GROUND PIPING. DESIGN
CONDITIONS ARE SUBJECT TO CHANGE BASED ON COOLING WATER BOOSTER PUMP
(P-24611).
12321
247.003
CWR
12322
247.003
CWS
12119
246.021
CWR
12120
246.021
CWS
1
2
2
7
4
2
4
6
.0
0
5
C
W
R
12311
247.002
CWS
COOLING WATER RETURN
TO UTILITY/COGEN CWS
282.001
12363
247.001
CWS
12364
247.001
CWR
12433
246.028
CWR
001
AIT
001
AI
1
2
9
5
7
2
4
6
.0
0
8
C
W
R
12300
247.002
CWR
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
30"-CWR-282015-UAB
12345
247.004
CWS
075
TW
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
12351
247.005
CWR
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
ELECTRIC HEAT TRACING AND INSULATION REQUIREMENTS WILL BE EVALUATED
BASED ON COMPRESSOR INTERSTAGE COOLER LOCATION.
1
2
8
9
4
C
W
S
1
2
8
9
5
C
W
R
E-24601B
STRIPPER
OVERHEAD
CONDENSER
pH
1
2
8
9
8
2
4
6
.0
0
8
C
W
S
12135
COOLING WATER SUPPLY
FROMP-24611A/B
246.024
12352
247.005
CWS
12344
247.004
CWR
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
H
O
L
D
H
O
L
D
E-24705
COMPRESSOR
5TH STAGE
COOLER
E-24703
COMPRESSOR
3RD STAGE
COOLER
E-24704
COMPRESSOR
4TH STAGE
COOLER
12918
248.001
CWR
12919
248.001
CWS
1
2
8
9
9
2
4
6
.0
0
8
C
W
R
12434
246.028
CWS
E-24701
TEG COOLER
E-24702
COMPRESSOR
2ND STAGE
COOLER
E-24701
COMPRESSOR
1ST STAGE
COOLER
E-24605B
LEAN AMINE
TRIMCOOLER
E-24605A
LEAN AMINE
TRIMCOOLER
E-24607
CONDENSATE
COOLER
LCP-XXX
CONDENSATE
RECOVERY
SAMPLING
CWLINE SIZES TO BE CONFIRMED WHEN EXCHANGER CWFLOWS ARE FINALIZED.
CWDESIGN CONDITIONS TO BE CONFIRMED WHEN P-24611A/B IS FINALIZED.
C-24701
LUBE OIL
COOLING
1
3
0
4
9
2
4
6
.0
0
9
C
W
S
001
AE
1
3
0
4
7
2
4
6
.0
0
9
C
W
S
E-24601A
STRIPPER
OVERHEAD
CONDENSER
E-24604A/B
LEAN AMINE
COOLER
1
2
8
9
6
2
4
6
.0
0
8
C
W
S
1
3
0
4
8
2
4
6
.0
0
9
C
W
R
1
3
1
4
6
2
4
6
.0
0
5
C
W
S
1
3
1
4
7
2
4
6
.0
0
5
C
W
R
24"x18"
1
2
"
-
C
W
R
-2
4
6
0
0
3
-
U
A
B
1
2
"
-
C
W
R
-2
4
6
0
0
1
-
U
A
B
1
2
"
-
C
W
S
-2
4
6
0
2
0
-
U
A
B
1
8
"
x
1
2
"
1
8
"
x
1
2
"
1
8
"
x
1
2
"
1
8
"
x
1
2
"
ET 10
63
1
0
"
x
6
"
1
0
"
x
6
"
1
0
"
-
C
W
S
- 2
4
6
0
0
8
-
U
A
B
1
0
"
x
6
"
1
0
"
x
6
"
1
0
"
-
C
W
S
- 2
4
6
0
2
5
-
U
A
B
ET 10
50
ET 10
50
3"-CWR-248001-UAB
3"-CWS-246009-UAB
1
0
"
x
6
"
1
0
"
x
6
"
18"x6"
18"x6" 30"x24"
30"x24" 30"x16"
30"x16"
ET 10 N/A
1
2
"
-
C
W
S
- 2
4
6
0
1
8
-
U
A
B
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
5
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
5
.p
id
M
O
D
E
L
D
A
T
E
:7
/6
/2
0
1
1
1
1
:0
3
:0
9
P
M
B
Y
:m
u
k
2
2
2
9
6
G
COOLING WATER DISTRIBUTION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.025
24"x18"
16"-CWR-246017-UAB
16"-CWS-246008-UAB
6"-CWS-246010-UAB
ET 10
38
ET 10
38
5156140
C-3
6"-CWR-247001-UAB
6"-CWR-247002-UAB
6"-CWS-246011-UAB
6"-CWR-247005-UAB
6"-CWS-246014-UAB
6"-CWS-246013-UAB
1
2
"
-
C
W
S
- 2
4
6
0
2
9
-
U
A
B
1
2
"
-
C
W
R
- 2
4
6
0
1
1
-
U
A
B
6"-CWR-247004-UAB
6"-CWR-247006-UAB
N/A
246 282
AG UG
I N
S
T
2"
?
C-2
ET 10
63
ET 10
38
ET 10
38
ET 10
63
P
I P
I N
G
L
H
ET 10
N/A
ET 10
1
0
"
-
C
W
R
- 2
4
6
0
0
6
-
U
A
B
1
0
"
-
C
W
S
- 2
4
6
0
2
3
-
U
A
B
ET 10
63
ET 10
63
ET 10
63
1
2
"
-
C
W
R
- 2
4
6
0
1
2
-
U
A
B
1
2
"
-
C
W
S
- 2
4
6
0
3
0
-
U
A
B
4"
6
"
x
4
"
6
"
x
4
"
2"-CWR-246015-UAB
2"-CWS-246032-UAB
6"-CWS-246031-UAB
6"-CWR-246014-UAB
30"-CWR-246016-UAB
30"-CWS-246016-UAB
ET 10
63
ET 10
63
30"-CWS-246007-UAB
ET 10
63
ET 10
63
3
2
"
-
C
W
S
- 2
4
6
0
1
2
-
U
A
B
2
"
-
C
W
R
- 2
4
7
0
0
3
-
U
A
B
ET 10
N/A 1
2
"
x
6
"
1
2
"
x
6
"
1
6
"
x
1
2
"
1
6
"
x
1
2
"
1
0
"
x
6
"
1
0
"
x
6
"
ET 10
63
ET 10
50
6"-CWS-246015-UAB
ET 10
63
ET 10
63
4
"
ET 10
N/A
ET 10
N/A
ET 10
N/A
N/A
ET 10
ET 10
N/A
N/A
ET 10
ET 10
N/A
N/A
ET 10
ET 10
63
?
C-3
3/4"
S-1
ISSUED FOR ESTIMATE

080B
FE
005
AP
030
LI
080
TT
080
FQI
080
TI
080A
FE
030
LIT
080
FT
13011
VENT GAS
246.032
12474
VENT GAS
246.032
HOLDS:
PRELIMINARY DESIGN IS FOR VENT AT HIGH POINT STRUCTURE.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
SIZE:
5 . INSULATION AND EHT TO HLL.
FREE DRAINING
POSWS
TIP- 500 mmDIA x 2440 mmH
MATERIAL:
7 . INTERNAL 12 MPS PROJECTION WITH 45 LR ELBOW. PROVIDE 13 mm WEEP HOLE
AT LOWPOINT MINIMUMDISTANCE TO NOZZLE.
8 . ROUTE DRAIN LINE TO NEAREST POSWS MANHOLE.
VENT- 304 SS
DERRICK- CS
INSULATION/THK:
-80C MDMT:
RISER- 600 mmDIA x 3000 mmH
100C/50 kPag
BASE- 900 mmDIA x 13830 mmH
MW
6 . INSULATION AND EHT (ET10) TO 1000mmABOVE BOTTOMTAN LINE OF 900 mmDIA
VENT BASE.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
4 . COSTING BASED ON FLOWMEASUREMENT REQUIRED FOR REGULATORY (CEMS).
VENT SIZE LINE REQUIREMENTS FROMPIPELINE.
FREE DRAINING
3 . VENT STOCK FLOWMEASUREMENT REQUIRED TO EVALUATE UNIT CAPACITY DURING
INITIAL START-UP, AS PROPOSED TO THE GOVERMENT OF ALBERTA. TO BE LOCATED
NEAR GRADE.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
VENT STACK DISPERSION MODELLING.
DERRICK SUPPORT
STRUCTURE
3
ET 10
50
6
S-24603
P
J
B
CO2 VENT STACK
8"x6"
2"
6
8
3
7
6"-VA-247009-PJB(C)
NC
4
4
3"
2"
S-24603
24"-VA-247001-PJB(0.4)
VA-246030-PJB(C)
4"
2"-WP-246004-PJB
H
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
6
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
6
.p
id
M
O
D
E
L
D
A
T
E
:7
/6
/2
0
1
1
1
1
:0
9
:4
5
P
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 VENT STACK
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.026
6"
4
2"
2"
?
?
?
C-1
?
C-2
P
J
B
(
0
.4
)
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
P
J
B
(
C
)
P
J
B
(
C
)
DESIGN:
TRIM:
8"
24"
BOOT- 250 mm DIA x 500 mmH
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
3 . CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRED BY WWTU.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12430
RECOVERED CLEAN
CONDENSATE
TO AE-003
246.028
12294
WASTE WATER
FROMP-24607
246.013
INSTR.
12653
WASTE WATER
FROMP-24603A/B
246.006
12654
RECOVERED CLEAN
CONDENSATE
PROMP-24608A/B
246.021
12614
WASTE WATER
TO WWTP 271
246.101
12615
RECOVERED CLEAN
CONDENSATE
TO TK-25101
246.101
4 . START-UP PIPING REQUIRED FOR INITIAL AMINE FILL AND DILUTION WITH
CONDENSATE.
HOLD
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
316 SS TUBING
HOLDS:
NNF
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
PIPING
12126
CONDENSATE
TO V-24607
246.020
085
FI
085
FT
M
IN
START-UP
S
-
1
5
1
5
6
1
4
0
?
?
C
-
2
5
0
9
7
5
5
0
C
-
2
? C
-
1
? C
-
2
SP
025
3"-P-246026-PJB(0.4)
ET 10
38
4"x3"
6"-SC-246008-SAB
4"-WP-246002-PJB(0.4)
3
PP
25
ET 10 PP 25
OUTDOOR TUBING INDOOR TUBING
AP
003
3
/ 4
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
7
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
7
.p
id
M
O
D
E
L
D
A
T
E
:7
/4
/2
0
1
1
3
:0
0
:4
6
P
M
B
Y
:a
h
m
1
4
8
8
7
G
RECOVERED CLEAN CONDENSATE & WW COLLECTION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.027
PJB(0.4)
2"-WP-246003-DAB
ET 10
50
ET 10
38
6"-SC-246011-SAB
DAB
ET 10
50
6"-SC-246008-SAB
2
"
N
C
ET 10
38
2"
4
ET 10
50
C-2
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
F
I
0
9
1
HOLD
VENDOR
FLUOR
V
091
TG
ANALYZER INDICATION DESTINATION DRAWING NUMBERS TO BE CONFIRMED.
GRADE
V
E
N
D
O
R
F
I
0
9
3
003
AIT
002
AI
12433
246.025
CWR
12434
246.025
CWS
316 SS TUBING
RC
4 . INSTRUMENT SYMBOL DENOTES REAGENT ADDITION AND CONDITIONING.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
GRAB SAMPLE
SAMPLE SINK
TO SINK (TYP.)
TO SINK (TYP.)
TO SINK (TYP.)
pH
RC
V
E
N
D
O
R
CC
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
086
PG
F
L
U
O
R
FLUOR
F
I
0
9
2
003
AE
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
VENDOR PACKAGE DETAILS TO BE CONFIRMED.
pH
CC
TO SINK (TYP.)
V
3 . SELF CONTAINED MECHANICAL THERMAL SHUT OFF VALVE.
F
L
U
O
R
VENDOR
002
AE
002
AIT
003
AI
ANALYZER INDICATION
TO UNIT 251
251.XXX
TO UNIT 251
251.XXX
ANALYZER INDICATION
12430
RECOVERED CLEAN
CONDENSATE
FROMP-24608A/B
246.027
017
I
5 . FOR CONTAMINATED CONDENSATE SWITCHING VALVES. REFER TO DRAWING
251.0000.000.041.XXX.
HH
LL
5
5
1
1
5
2
7
3
?
5
1
1
5
2
7
3
?
?
?
PCV
085
3
4
SET@
69 kPa-g
PP
25
OUTDOOR INDOOR
ET 10
38
INDOOR
ET 10
38
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
8
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
8
.p
id
M
O
D
E
L
D
A
T
E
:7
/4
/2
0
1
1
1
:2
8
:2
8
P
M
B
Y
:a
h
m
1
4
8
8
7
G
CONDENSATE RECOVERY SAMPLING SYSTEM,LCP-XXX
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.028
NC
2"-CWS-246032-UAB
SET@
61 kPa-g
SET@
79 kPa-g
H
1
"
2"-CWR-246015-UAB
OUTDOOR
L
PCV
087
RV
035
1"-DO-246XXX-SAB
1
"
TCV
090
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12438
LP STEAM
FROMHEADER
246.101
U
/S
#
8
1
2
4
4
7
L
P
S
T
E
A
M
T
O
E
-2
4
7
0
8
A
/B
2
4
7
.0
0
7
12456
CONDENSATE
FROME-24709C/D
247.012
12610
LP STEAM
TO E-24709A/B
247.011
12611
CONDENSATE
FROME-24709A/B
247.011
U/S #6
12457
LP CONDENSATE
TO V-24607
246.020
U/S #5
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND
FIGURE 18-2 TO 18-5 FOR UTILITY STATION DETAILS.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12685
LP STEAM
TO E-24603A
246.003
U/S #7
1
2
6
6
1
C
O
N
D
E
N
S
A
T
E
F
R
O
M
T
K
-
2
4
6
0
1
2
4
6
.0
1
2
12665
LP STEAM
TO E-24603B
246.004
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
12694
STEAMOUT
TO V-24601
246.002
12695
CONDENSATE
FROMV-24601
246.002
1
2
8
8
4
L
P
S
T
E
A
M
T
O
T
K
-2
4
6
0
1
2
4
6
.0
1
2
U
/S
#
9
12449
LP STEAM
TO E-24709C/D
247.012
4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
BE VALVED.
1
2
4
5
5
C
O
N
D
E
N
S
A
T
E
F
R
O
M
E
-
2
4
7
0
8
A
/B
2
4
7
.0
0
7
U
/S
#
2
U
/S
#
4
U
/S
#
3
2
"
-
S
L
-2
4
6
0
1
3
-
S
A
B
2
"
x
1
"
2
"
-
S
C
L
- 2
4
6
0
1
4
-
S
A
B
24"-SL-246002-SAB
36"-SL-246001-SAB
2"-SCL-246011-SAB
2"-SL-246007-SAB
2"-SCL-246013-SAB
H
38
3"-SL-246004-SAB
1"-SCL-246010-SAB
2
"
x
1
"
2"x1"
3
"
-
S
C
L
- 2
4
6
0
0
9
-
S
A
B
2
"
-
S
C
L
- 2
4
7
0
0
2
-
S
A
B
E
T
1
0
3
8
E
T
1
0
3
8
2"x1"
H
38
2"x1"
H
38
E
T
1
0
3
8
2
"
x
1
"
24"-SL-246009-SAB
ET 10
38
ET 10
38
2"-SCL-246019-SAB
3
"
x
2
"
2"x1"
2"x1"
8"x3"
H3
8 H3
8
H3
8
2
"
-
S
C
L
- 2
4
6
0
1
6
-
S
A
B
2"x1"
H
38
E
T
1
0
3
8
2
"
-
S
C
L
- 2
4
6
0
1
7
-
S
A
B
2
"
-
S
L
- 2
4
6
0
1
0
-
S
A
B
H
50
H
38
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
2
9
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
2
9
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
9
:4
1
:0
4
P
M
B
Y
:m
u
k
2
2
2
9
6
G
LP STEAM DISTRIBUTION AND COND. COLLECTION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.029
2
"
-
S
L
- 2
4
6
0
1
1
-
S
A
B
H 5
0
2"-SCL-247008-SAB
2"-SCL-247005-SAB
3
"
x
2
"
2"-SL-246002-SAB
H
38
H 5
0
2"x1"
ET 10
38
2"-SL-246016-SAB
H
50
E
T
1
0
3
8
H
50
3
"
-
S
L
- 2
4
6
0
0
9
-
S
A
B
2"-SCL-246018-SAB
2"x1"
H
38
2"-SL-246014-SAB
2"x1"
ET 10
38
2
"
x
1
"
2
"
x
1
"
2"x1"
2
"
-
S
L
- 2
4
6
0
0
8
-
S
A
B
ET 10
38
ET 10
38
2
"
-
S
C
L
- 2
4
6
0
1
5
-
S
A
B
3"-SCL-246012-SAB
2"-SL-246018-SAB
1
0
"
x
8
"
3
6
"
x
1
0
"
ET 10
38
H 3
8
H 3
8
2"-SL-246006-SAB
3
"
x
2
"
ET 10
38
H 5
0
2"-SL-246015-SAB
2
"
x
1
"
H 3
8
3
"
-
S
L
- 2
4
6
0
1
4
-
S
A
B
3
6
"
x
2
4
"
3
6
"
x
2
4
"
H 38
H 50
U
/ S
#
1
0
U
/ S
#
1
1
U
/ S
#
1
2
2"-SL-246020-SAB
2"-SCL-246022-SAB
2"-SL-246021-SAB
2"-SCL-246023-SAB
2"-SL-246022-SAB
2"-SCL-246024-SAB
ET 10
38
ET 10
ET 10
ET 10
E
T
1
0
H 5
0
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12664
NITROGEN
TO V-24607
246.020
U/S #7
U
/S
#
8
U
/S
#
2
U
/S
#
3
4 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND
BE VALVED.
12808
NITROGEN
TO V-24701
247.001
U
/S
#
9
12459
INSTRUMENT AIR
FROMHEADER
246.101
12461
NITROGEN
TO V-24606
246.013
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
094
FT
12425
NITROGEN
TO V-24806
248.002
12697
NITROGEN
TO V-24601
246.002
12458
UTILITY AIR
FROMHEADER
246.101
12460
NITROGEN
FROMHEADER
246.101
U/S #5
12995
NITROGEN
TO E-24707
247.010
U/S #6
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"246' UNLESS OTHERWISE STATED.
5 . CONNECTION FOR TEMPORARY SUPPLY.
U
/S
#
4
094
FI
3 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND
FIGURE 18-2 TO 18-5 FOR UTILITY STATIONDETAILS.
2"-GI-246019-ULB
2"
1"-AU-246002-ULB
1
"
-
A
U
-2
4
6
0
0
5
-
U
L
B
1"-GI-246002-ULB
3
"
1"-GI-246004-ULB
2"
2
"
1
"
-
A
U
-2
4
6
0
0
6
-
U
L
B
1
"
-
G
I-
2
4
6
0
1
7
-
U
L
B
5
2"-GI-246005-ULB
2"-GI-246007-ULB
5
5
1"-AU-246009-ULB
1
"
-
G
I-
2
4
6
0
1
6
-
U
L
B
1"-AU-246008-ULB
2"-GI-246003-ULB
1"-AU-246004-ULB
2"
2"
1"-AU-246003-ULB
1
"
-
A
U
-2
4
6
0
0
7
-
U
L
B
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
3
0
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
0
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
9
:4
4
:0
3
P
M
B
Y
:m
u
k
2
2
2
9
6
G
INST. AIR, UTILITY AIR & NITROGEN DISTRIBUTION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.030
1"-GI-246022-ULB
1
"
-
G
I-
2
4
6
0
0
9
-
U
L
B
1"-GI-246021-ULB
2
"
3"-AI-246001-ULB
2"-AU-246001-ULB
2"-GI-246018-ULB
2
"
2"
2"-GI-246001-ULB
?
2"
?
?
?
?
? ??
?
?
?
?
?
?
?
?
?
C
-
2
C
-
2
5
1
7
8
7
8
0
C
-
2
1"-GI-246008-ULB
2
"
2"-GI-246020-ULB
?
?
C
-
2
?
C
-
2
?
C
-
2
2
"
-
A
I-
2
4
6
0
0
1
-
U
L
B
12729
NITROGEN
246.012
13142
NITROGEN
246.010
13141
NITROGEN
246.010
13159
NITROGEN
246.010
2"-GI-246013-ULB
2"-GI-246010-ULB
2"-GI-246014-ULB
2"-GI-246012-ULB
U
/S
#
1
0
U
/S
#
1
1
U
/S
#
1
2
1"-AU-246010-ULB
1"-GI-246023-ULB
1"-AU-246011-ULB
1"-GI-246024-ULB
1"-AU-246012-ULB
1"-GI-246025-ULB
2
"
-
G
I-
2
4
6
0
2
6
-
U
L
B
2
"
-
A
U
-2
4
6
0
1
3
-
U
L
B
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
4 . DEP 31.38.01.11 PIPING DESIGN GENERAL REQUIREMENTS SECTION 5.8 AND FIGURE
18-2 TO 18-5 FOR UTILITY STATION DETAILS.
5 . PIPING HEADER BRANCH CONNECTIONS SHALL BE MADE ON TOP OF PIPE AND BE
VALVED.
U/S #9
U/S #8
U/S #7 U/S #6
U/S #2
U/S #3
U/S #4
095
FAH
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
095
FSH
095
LSL
095
LAL
NUMBER AND LOCATIONS OF EYEWASH STATIONS & SAFETY SHOWERS TO BE
DETERMINED. 096
FSH
096
FAH
096
LAL
096
LSL
U/S #5
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
SOURCE OF POTABLE WATER.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . STANDALONE SAFETY SHOWER WITH INTEGRAL DELUGE TANK. ALARMED FOR LOW
LEVEL.
12470
UTILITY WATER
FROMHEADER
246.101
1
"
-
W
U
-
2
4
6
0
1
0
-
U
A
B
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
3
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
2
:5
1
:2
8
A
M
B
Y
:m
u
k
2
2
2
9
6
G
UTILITY WATER & SAFETY SHOWERS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.031
1"-WU-246003-UAB
1"-WU-246004-UAB
1
"
-
W
U
-
2
4
6
0
0
7
-
U
A
B
1
"
-
W
U
-
2
4
6
0
0
8
-
U
A
B
ET 10
38
3
SP
027
1"-WU-246005-UAB 1"-WU-246009-UAB
SP
026
1
"
-
W
U
-
2
4
6
0
0
6
-
U
A
B
3
2"-WU-246001-UAB
2
"
x
1
"
UA
ANTI-FOAMINJECTION AREA/
AMINE REGENERATION AREA
COMPRESSION AREA/
TEG DEHYDRATION AREA
UA
UA UA
U/S #10
U/S #11
U/S #12
1"-WU-246011-UAB
1"-WU-246012-UAB
1"-WU-246013-UAB
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
STATED.
3 . LOWPOINTS + DRAINS REQUIRE EHT AND INSULATION.
12327
CO2
FROMRV-247012 & PIPELINE
VENT
247.010
12809
CO2 RELIEF / VENT
FROMRV-247013
247.001
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
13011
VENT GAS
TO S-24603
246.026
DO NOT POCKET
12471
CO2 VENT
FROMPV-247001
247.001 12474
VENT GAS
TO S-24603
246.026
DO NOT POCKET
3
3
24"-VA-247001-PJB(0.4)
3
24"-VA-247001-PJB(0.4)
20"-VA-247002-PJB(0.4)
6"-VA-247009-PJB(C) 6"-VA-247009-PJB(C)
3
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
3
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/4
/2
0
1
1
5
:3
3
:1
9
P
M
B
Y
:a
h
m
1
4
8
8
7
G
VENT GAS COLLECTION
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.032
FREE DRAINING
FREE DRAINING
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FROMHV-246040
FROMP-24604
12387
246.010
DM
12390
246.010
DM
12687
246.010
DM
FROMFV-246020
FROMP-24602A/B/C
13151
246.011
DM
13152
246.011
DM
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12477
AMINE DRAINS
TO V-24606
246.013
12391
246.006
DM
12227
246.001
DM
12596
246.008
DM
12262
246.009
DM
12620
246.012
DM
FROMV-24608
FROMV-24604
FROMV-24609
13036
AMINE DRAINS
TO V-24606
246.013
13037
AMINE DRAINS
TO V-24606
246.013
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.
FROME-24605A
FROMP-24605B
FROME-24602A
13153
246.012
DM
13154
246.012
DM
13155
246.012
DM
FROME-24602B
13136
246.010
DM
13144
246.001
DM
ET 10
50
2"-DM-246057-DAB
2"-DM-246043-DAB
ET 10
50
2"-DM-246011-DAB
ET 10
50
2"-DM-246063-DAB
2"-DM-246065-DAB
ET 10
75
2"-DM-246004-DAB
2"-DM-246026-DAB
2"-DM-246024-DAB
2"-DM-246029-DAB
2"-DM-246030-DAB
ET 10
50
ET 10
50
ET 10
50
ET 10
50
ET 10
50
ET 10
50
ET 10
50
6"-DM-246006-DAB
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
3
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
3
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
4
:2
5
:0
2
P
M
B
Y
:a
h
m
1
4
8
8
7
G
AMINE DRAIN SYSTEM
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.033
6"-DM-246061-DAB
ET 10
75
6"-DM-246060-DAB
2"-DM-246022-DAB
2"-DM-246050-DAB
ET 10
50
2"-DM-246001-DAB
2"-DM-246055-DAB
2"-DM-246XXX-DAB
2"-DM-246056-DAB
2"-DM-246025-DAB
13134
246.010
DM
12240
246.010
DM
13150
246.009
DM
2"-DM-246062-DAB
2"-DM-246064-DAB
FROMP-24604
FROMP-24605
FROMRV-246002
FROMRV-246003
FROMRV-246021
FROMRV-246020
FROMP-24605
FROMP-24603A/B
FREE DRAINING
FREE DRAINING
FREE DRAINING
ET 10
75
13132
246.008
DM
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12463
FLUSHING CONDENSATE
TO V-24605
246.013
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12462
FLUSHING CONDENSATE
TO V-24604/V-24608/V-24609
246.010
12579
CONDENSATE
FROMP-24608A/B
246.021
ET 10
38
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.0
3
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
4
.p
id
M
O
D
E
L
D
A
T
E
:7
/4
/2
0
1
1
1
:2
7
:3
5
P
M
B
Y
:a
h
m
1
4
8
8
7
G
FLUSHING CONDENSATE
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.034
2"-SC-246012-SAB
2"-SC-246010-SAB
2"-SC-246013-SAB
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
I LI
I
I HS HS
LT
PP
ET 10
ISSUED FOR PHA III 07/11/11 G
2
4
6
.0
3
5
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.0
3
5
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
9
:5
7
:3
6
P
M
B
Y
:m
u
k
2
2
2
9
6
G
STORMWATER DRAINAGE & POTENTIALLY OILY SWS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.035
MH-246004
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
2. ELECTRIC TRACE 10C.
MH-246003
MH-246002
AMINE PUMP CATCHMENT
AMINE STRIPPING CATCHMENT
MH-246005
TEG/DEHYDRATION CATCHMENT
MH-246006
AMINE STORAGE CATCHMENT
D
P-246012
P-246012
0.30 kW@ DRIVER:
HEAT TRACE MEDIA/TEMP:
INSULATION TYPE/THK:
INTERNALS CASING
MATERIAL:
TRIM:
/
112.00 kPa DIFF. PR.:
RATED FLOW: 10.00 m^3/hr
STORM WATER PUMP
MH-246001
2"-WW-246001-UAB
H
L
H
L
R/S
TO HMU1/2 MH-006
STORMWATER
240.031
2.
3
/4
"
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
D
E
M
IN
W
A
T
E
R
F
R
O
M
H
E
A
D
E
R
2
8
5
.2
1
7
N
IT
R
O
G
E
N
F
R
O
M
H
E
A
D
E
R
2
8
5
.2
1
7
W
A
S
T
E
W
A
T
E
R
T
O
W
W
T
P
2
7
1
2
8
5
.2
1
7
IN
S
T
R
U
M
E
N
T
A
IR
F
R
O
M
H
E
A
D
E
R
2
8
5
.2
1
7
1
2
4
3
8
L
P
S
T
E
A
M
T
O
D
IS
T
R
IB
U
T
IO
N
2
4
6
.0
2
9
1
2
1
3
7
D
E
M
IN
W
A
T
E
R
T
O
P
-2
4
6
1
0
A
/B
2
4
6
.0
2
3
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE
NOTED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
L
P
S
T
E
A
M
F
R
O
M
H
E
A
D
E
R
2
8
5
.2
1
7
R
E
C
O
V
E
R
E
D
C
L
E
A
N
C
O
N
D
E
N
S
A
T
E
T
O
T
K
-2
5
1
0
1
2
8
5
.2
1
7
H
O
T
D
E
M
IN
W
A
T
E
R
T
O
T
K
-2
5
1
0
2
2
8
5
.2
1
7
R
IC
H
A
M
IN
E
F
R
O
M
V
-
4
4
1
1
8
2
8
5
.2
1
7
L
E
A
N
A
M
IN
E
T
O
V
-4
4
1
1
8
2
8
5
.2
1
7
D
T
1
2
6
8
1
H
O
T
D
E
M
I N
W
A
T
E
R
F
R
O
M
E
-
2
4
6
0
6
2
4
6
. 0
2
0
1
2
5
4
5
L
O
W
T
E
M
P
H
P
S
T
E
A
M
T
O
E
- 2
4
8
0
2
2
4
8
. 0
0
2
1
2
4
5
8
U
T
I L
I T
Y
A
I R
T
O
D
I S
T
R
I B
U
T
I O
N
2
4
6
. 0
3
0
1
2
4
5
9
I N
S
T
R
U
M
E
N
T
A
I R
T
O
D
I S
T
R
I B
U
T
I O
N
2
4
6
. 0
3
0
1
2
4
6
0
N
I T
R
O
G
E
N
T
O
D
I S
T
R
I B
U
T
I O
N
2
4
6
. 0
3
0
1
2
6
1
5
R
E
C
O
V
E
R
E
D
C
L
E
A
N
C
O
N
D
E
N
S
A
T
E
F
R
O
M
P
-
2
4
6
0
8
A
/ B
2
4
6
. 0
2
7
HOLDS:
VENT LINE SIZING FROMPIPELINE.
1
2
2
3
8
L
E
A
N
A
M
I N
E
F
R
O
M
P
-
2
4
6
0
2
A
/ B
/ C
2
4
6
. 0
1
1
T
D
1
2
6
1
4
W
A
S
T
E
W
A
T
E
R
F
R
O
M
P
-
2
4
6
0
8
A
/ B
2
4
6
. 0
2
7
1
2
6
8
6
R
I C
H
A
M
I N
E
T
O
E
- 2
4
6
0
2
A
/ B
2
4
6
. 0
0
1
U/S #1
1
2
4
7
0
U
T
I L
I T
Y
W
A
T
E
R
T
O
D
I S
T
R
I B
U
T
I O
N
2
4
6
. 0
3
1
D D D
U
T
I L
I T
Y
W
A
T
E
R
F
R
O
M
H
E
A
D
E
R
2
8
5
. 2
1
7
U
T
I L
I T
Y
A
I R
F
R
O
M
H
E
A
D
E
R
2
8
5
. 2
1
7
L
O
W
T
E
M
P
H
P
S
T
E
A
M
F
R
O
M
H
E
A
D
E
R
2
8
5
. 2
1
7
3 . BATTERY LIMIT ACCESS IS ON NORTH SIDE OF 9TH AVE, ACROSS THE ROAD FROM
UNIT 246. ALL LINES ARE DEDICATED TO SERVICING UNIT 246.
D D D D D
D
L
P
C
O
N
D
E
N
S
A
T
E
F
R
O
M
H
E
A
D
E
R
T
R
A
P
S
2
8
5
. 2
1
7
?
C
-
1
?
C-2
?
3/4"
E
T
1
0
5
0
E
T
1
0
3
8
1
0
"
-
P
- 2
8
5
1
5
6
-
D
J
E
(
0
. 4
)
2"-AU-285149-ULB
2"
2"-GI-285069-ULB
?
C-3
?
?
ET 10
3
/ 4
"
6
"
-
W
I - 2
4
6
0
0
7
-
U
J
B
(
0
. 4
)
6
"
-
S
C
- 2
4
6
0
0
8
-
S
A
B
E
T
1
0
3
8
2
"
-
S
C
L
- 2
8
5
0
0
1
-
S
A
B
C
-
3
?
?
5
1
1
5
2
2
7
C
-
3
E
T
1
0
3
8
E
T
1
0
5
0
?
C-3
?
C-2
?
C-2
5
2
4
2
5
2
5
C
-
1
5
1
5
6
1
4
0
C
-
1
?
C
-
1
1
0
"
-
P
- 2
4
6
0
0
2
-
D
J
E
(
0
. 4
)
3
6
"
-
S
L
-
2
8
5
1
4
5
-
S
A
B
2
"
-
A
U
- 2
8
5
1
4
8
-
U
L
B
3
"
-
A
I -
2
8
5
1
5
0
-
U
L
B
3/4"
4
"
-
W
P
-
2
8
5
0
3
4
-
P
J
B
( 0
. 4
)
2"
H
6
"
?
C-3
?
C-3
E
T
1
0
5
0
ET 10
38
3
6
"
-
S
L
-
2
4
6
0
0
1
-
S
A
B
2
"
-
A
U
- 2
4
6
0
0
1
-
U
L
B
2
"
-
S
S
- 2
4
8
0
0
1
-
S
A
G
3
"
-
A
I -
2
4
6
0
0
1
-
U
L
B
6
"
-
W
I - 2
8
5
0
0
3
-
U
J
B
(
0
. 4
)
6
"
-
S
C
- 2
8
5
2
1
0
-
S
A
B
2
"
-
S
S
- 2
8
5
0
5
8
-
S
A
G
2
"
-
G
I -
2
4
6
0
0
1
-
U
L
B
6
"
-
W
I - 2
4
6
0
0
1
-
U
J
B
(
0
. 4
)
E
T
1
0
7
5
E
T
1
0
6
3
1
4
"
-
P
- 2
4
6
0
8
1
-
D
A
G
2"
285
246
285
248
285
246
1"-SCL-285002-SAB
6
"
-
W
I - 2
8
5
0
0
2
-
U
J
B
(
0
. 4
)
H
H5
0
E
T
1
0
3
8
E
T
1
0
5
0
E
T
1
0
3
8
1
4
"
-
P
- 2
8
5
1
5
5
-
D
A
G
H5
0
E
T
1
0
5
0
E
T
1
0
5
0
E
T
1
0
5
0
2
"
-
W
U
-
2
4
6
0
0
1
-
U
A
B
E
T
1
0
5
0
3/4"
ET 10
ET 10
38
H5
0
2
"
3/4"
2
"
6
"
2
"
2
"
3
"
2"
4
"
2"
6
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
6
.1
0
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
6
\2
4
6
.1
0
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
1
:1
6
:4
6
A
M
B
Y
:a
h
m
1
4
8
8
7
G
NORTH BATTERY LIMITS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.101
4
"
-
W
P
-
2
4
6
0
0
2
-
P
J
B
( 0
. 4
)
3
2
"
H5
0
3/4"
3
/ 4
"
2
"
-
W
U
-
2
8
5
0
4
1
-
U
A
B
2
"
-
G
I -
2
8
5
0
6
8
-
U
L
B
C-2
?
C-2
?
C-2
?
C-2
?
C-2
5
2
4
2
5
2
5
C
-
1
?
5
2
4
2
5
2
5
5
1
7
8
7
8
0
? ?
C
-
1
C
-
1
C
-
1
C
-
1
C
-
1
SAB SAG
3/4"
5115277
?
?
?
1
"
-
S
C
L
- 2
8
5
0
0
3
-
S
A
B
?
?
?
?
1" 1"
3
/ 4
"
3
/ 4
"
2
"
x
1
"
?
?
3/4"
5
1
1
5
2
2
7
ISSUED FOR ESTIMATE

MW
021
PI
004
PT
003
TI
001
E
001
E
002
LTE 004
PI
002
PTE
PP
001
PT
I
001
E
001
I
029
PDT
001A
UC
029
PDI
002
TI
023
PZTE
023
PV
003
PI
001
LG
001
E
001
LC
001
LT
052
TW
002
TT
001
HSE
001
E
001
PC
001
HIS
034
PT
003
TT
001
TTE
001
UQI
022
HC
003
PT
034
PC
023
PC
PERFORMANCE
CONTROLLER
059
TT
024
PT
024
PI
059
TI
057
TI
001B
UC
001B
UY
R
S
T.S.
R
S
R
S
R
S
13160
CASING DRAIN
FROMC-24701B/C/D
247.002
12809
CO2 RELIEF / VENT
TO S-24603
246.032
12808
246.030
GI 12326
ANTI SURGE SPILL BACK
FROMC-24701H
247.010
12331
TT SIGNAL
FROMTT-057
247.010
12569
PT SIGNAL
FROMPT-021
247.010
12368
CO2
FROMV-24602
246.006
12471
CO2 VENT
TO S-24603
246.032
12367
FLASHED CO2
FROMV-24803
248.003
12363
246.025
CWS
12626
KO LIQUIDS
TO V-24606
246.013
12578
UC SIGNAL
TOUV-003
247.010
12364
246.025
CWR
12571
UC SIGNAL
TOUV-001
247.010
13165
ANALYZER FAST LOOP
FROMAX-001
247.009
12305
CO2
TO V-24702
247.002
POWER
FAILURE
POWER
FAILURE
FREE DRAINING
HOLDS:
TWO PHASE FLOW NNF
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
THE NEED TO TRIP THE COMPRESSOR ON EXCESSIVE SURGE CYCLE WILL BE
DETERMINED IN DETAILED ENGINEERING.
D
(V)
(V)
DO NOT POCKET
FREE DRAINING
5 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
V
GAP
BACK FLUSH
(V)
(V)
START/STOP
DO NOT POCKET
D
MAG
NNF
D
O
N
O
T
P
O
C
K
E
T
4 . ELECTRIC TRACE TO HLL (ET 10).
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
N
N
F
FREE DRAINING
EMERGENCY STOP
V
MCC
TWO PHASE FLOW
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
V
SURGE
COUNTER
O
N
/O
F
F
M
IN
7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
AUTO/MAN
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
D
O
N
O
T
P
O
C
K
E
T
D
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
DO NOT POCKET
GWR
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
S
-
4
8 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
9 . THE ADDITION AL INSTRUMENTS ARE REQUIRED FOR ON-SITE COMPRESSOR
PERFORMANCE TESTING (PTC-10).
10. GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
V
FREE DRAINING
V
F
R
E
E
D
R
A
IN
IN
G
MIN
MASS FLOWLIMITER
3/4" TUBING (FAST LOOP)
TO GRADE AT
SAFE LOCATION
3/4"
SP
002
1-1/2"
9
9
HH
2"
36"
30"-GC-247006-PJB(0.4)
CSO
1
0
"
-
G
C
-2
4
7
0
3
2
-
P
J
B
(
0
.4
)
3
/ 4
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
4
:3
3
:2
0
A
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 COMPRESSOR 1ST STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.001
3/4"
N
C
36"
C-24701A
LL
L
2"
3
/ 4
"
ET 40
OUTSIDE INSIDE
ET 10
PJB(0.4)
2"x1-1/2"
36"
ET 10
N/A
H
H
24"-GC-247045-PJB(0.4)
24"
HH
2
"
-
G
C
-
2
4
7
0
0
2
-
P
J
B
( 0
. 4
)
OUTSIDE
HH
36"-GC-246001-PJB(0.4)
2
4
"
L
6
"
3
0
"
-
G
C
- 2
4
7
0
0
5
-
P
J
B
(
0
. 4
)
3/4"
3"
3
/ 4
"
4"
2"
INSIDE
ET 10
63
H
3/4"
3"x2"
4
E
T
1
0
7
5
3
/ 4
"
N/A
ET 10
N/A
N
C
3/4"
6"
ET 10
38
LLL=250 mm
3
"
2"
3
/ 4
"
3/4"
3"-GC-248004-PJB(0.4)
2
"
HHLL=800 mm
6"-CWR-247001-UAB
HLL=700 mm
6"-CWS-246010-UAB
1-1/2"
1-1/2"
3/4"
3/4"
E
T
1
0
3
8
2"
N/A
24"-VA-247001-PJB(0.4)
F
O
PV
001
24" 30"x24" 30"x24"
36"-GC-247004-PJB(0.4)
P
P
N/A
ET 10
3/4"
24"
30"x24" 30"x24"
H
38
N
/ A RV
013B
5
1
3
4
2
8
9
C
-
2
?
C
-
2
C-2
5134289
5134289
C-2
C-2
5134289
C-2
?
C
-
2
?
C
-
2
5134289
C-2
?
1
8
"
-
V
A
- 2
4
7
0
1
3
-
P
J
B
(
0
. 4
)
12"x10"
20"x18"
20"-VA-247002-PJB(0.4)
12"-GC-247003-PJB(0.4)
?
C
-
2
5
2
4
2
5
2
6
C
-
1
5
2
4
2
5
2
5
?
C-2
?
?
C-2
C-2
C
-
1
?
C
-
1
C-1
5
0
9
7
5
5
0
18"x10"
1
0
"
x
8
"
RV
013A SET@
385 kPa-g
8T10
1
0
"
x
8
"
SET@
385 kPa-g
8T10
18"x10"
24"
2"
C-1
?
E-24701
COMPRESSOR 1st STAGE COOLER
2.5 MW
BXU TEMA TYPE:
H / /
130 C / 150 C
CS + 3 mm304L SS CLAD
385 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1200 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
317.0 m^2
C
-
2
1
0
"
?
C
S
C
5
H
25
ET 10
75
2
"
N/A
?
C
-
2
?
C-1
5
2
4
2
8
9
3
C
-
2
5097550
C-2
?
C-1
?
3
"
3/4"
SP
001
ET 10
50
3
/ 4
"
3/4"
?
C-2
?
C
-
2
?
5156140
C-2
?
C-2
5
1
3
4
2
8
9
C
-
2
N
/ A
2
"
V-24701
COMPRESSOR SUCTION KO DRUM
3500 mmID x 3500 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD/ 316L SS MATERIAL(VESSEL/INTERNALS):
385 kPa-g @150 C DESIGN PR. & TEMP:
SIZE:
E-24701
2"x1-1/2"
V-24701
?
? ?
C-2
C-2
2
"
1-1/2"
3
/ 4
"
FC
5
2"
2
"
LV
001
/ FV @150 C
3"
6
7
GC-247070-PJB(0.4)
H
GC-247072-PJB(0.4) CWR-247010-UAB
GC-247071-PJB(0.4)
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701A
CO2 COMPRESSOR 1st STAGE
3/4"
2"-GI-246020-ULB
3
ET 10
N/A
36"
2"
L
3
"
3"-DM-247001-PJB(0.4)
1-1/2"
1-1/2"
2
4
"
-
G
C
- 2
4
7
0
0
1
-
P
J
B
(
0
. 4
)
2"-DM-247002-PJB(0.4)
C-2
C-2
C
-
3
?
C-2
?
C
-
2
5307521
C-2
C
-
2
C
-
2
?
5
1
1
5
2
7
3
C
-
2
5
3
0
7
5
2
1
H
ULB
N/A
ET 10
1
0
"
-
V
A
- 2
4
7
0
1
2
-
P
J
B
(
0
. 4
)
ET 40
88
24"
H
L
?
C-2
20"
CSO
?
C-1
3
/ 4
"
?
C
-
1 E
T
1
0
E
T
1
0
?
C
-
1
3
/ 4
"
12"
?
C-1
CSO
8
H
3
/ 4
"
?
C
-
2
INSIDE OUTSIDE
3"-WP-247001-PJB(0.4)
3
/ 4
"
3
/ 4
"
? ?
C
-
1
C
-
1
C-1
C
-
1
C-1
C-1
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
10
3"
3"
ISSUED FOR ESTIMATE

004
TTE
001
E
003
LG
003
LT
005
TT
006
PI
006
TI
005
PT
005
TI
001
E
003
LC
053
TW
006
PT
006
TT
004
LTE
005
PI
PP
R
S
R
S
R
S
R
S
T
.S
.
13160
CASING DRAIN
TO SAFE LOCATION
247.001
12244
KO LIQUIDS
TO V-24602
246.006
12300
246.025
CWR
12305
CO2
FROME-24701
247.001
12310
CO2
TO V-24703
247.003
12311
246.025
CWS
12304
CASING DRAIN
FROMC-24701C/D
247.003
4 . ELECTRIC TRACE TO HLL (ET 10).
MW
D
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
BACK FLUSH
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
FREE DRAINING
V
D
/ HV @150 C
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
V
TWO PHASE FLOW
M
IN
MAG
O
N
/O
F
F
FREE DRAINING
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
GAP
GWR
TWO PHASE FLOW
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
F
R
E
E
D
R
A
IN
IN
G
D
O
N
O
T
P
O
C
K
E
T
V
TWO PHASE FLOW
E-24702
COMPRESSOR 2nd STAGE COOLER
3.1 MW
BJU TEMA TYPE:
PP / /
130 C / 150 C
CS + 3 mm304L SS CLAD
530 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1200 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
507.0 m^2
HH
3
/4
"
3
/4
"
H
L
HHLL=800 mm
HLL=700 mm
3
"
6"-CWS-246011-UAB
C
-
2
5
1
3
4
2
8
9
6
"
3/4"
3"-WP-247001-PJB(0.4)
C-1
2" 2"
LV
003
FC
2"
H
38
HH
4"
C
-
2
5134289
C-2
5
1
3
4
2
8
9
C
-
2
?
C-2 C-2
2"
2
"
2"-P-247002-PJB(0.4)
26"
?
? ?
?
C-2
C-2 C-2
C-2
?
C
-
3
?
C-2
?
C
-
2
5
3
0
7
5
2
1
C
-
2
?
ET 45
2"
3
/ 4
"
E-24702
5
1
3
4
2
8
9
P
P
5
1
3
4
2
8
9
C
-
2
?
GC-247073-PJB(0.4)
6"-CWR-247002-UAB
C
S
O
1-1/2"
1-1/2"
1-1/2"
24"
2"
3"
OUTSIDE
30"-GC-247006-PJB(0.4)
6
"
3
"
GC-247075-PJB(0.4)
GC-247074-PJB(0.4)
3
ET 10
50
OUTSIDE
N/A
ET 45
88
3"x2"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
3
:5
5
:3
5
A
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 COMPRESSOR 2ND STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.002
V-24702
3
/ 4
"
3/4"
CWR-247011-UAB
3/4"
30"
30"
INSIDE
2
4
"
-
G
C
- 2
4
7
0
0
8
-
P
J
B
(
0
. 4
)
24"-GC-247009-PJB(0.4)
3"
ET 10
38
H
2"
?
C
-
2
5156140
?
C-1 C-1 C
-
2
5
2
4
2
8
9
3
5
2
4
2
8
9
3
C-2
5
3
0
7
5
2
1
C
-
2
C
-
2
30"
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701B
CO2 COMPRESSOR 2nd STAGE
2"
C-24701B
LLL=250 mm
V-24702
COMPRESSOR 2nd STAGE KO DRUM
3000 mmID x 3100 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD/ 316L SS MATERIAL(VESSEL/INTERNALS):
385 kPa-g @115 C DESIGN PR. & TEMP:
SIZE:
INSIDE
1-1/2"
2
4
"
x
2
0
"
2
4
"
x
2
0
"
H
38
ET 10
50
2
"
2
"
20"
20"
2
6
"
x
2
4
"
ET 45
88
4
3"-P-247002-PJB(0.4)
30"-GC-247007-PJB(0.4)
SP
004
3/4"
3
/ 4
"
5
6
3
/ 4
"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
? ?
C
-
1
C
-
1
3"-WP-247001-PJB(0.4)
?
C-2
3"
3"
ISSUED FOR ESTIMATE

007
TTE
005
LT
009
TI
009
TT
008
TT
008
PT
001
E
007
PI
054
TW
008
TI
005
LC
008
PI
007
PT
001
E
006
LTE
005
LG
PP
R
S
R
S
R
S
R
S
T
.S
.
12310
CO2
FROME-24702
247.002
12321
246.025
CWR
12322
246.025
CWS
12320
CO2
TO V-24704
247.004
12304
CASING DRAIN
TO SAFE LOCATION
247.002 13161
CASING DRAIN
FROMC-24701D
247.004
13033
KO LIQUIDS
TO V-24602
246.006
F
R
E
E
D
R
A
IN
IN
G
TWO PHASE FLOW
D
O
N
O
T
P
O
C
K
E
T
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
MW
4 . ELECTRIC TRACE TO HLL (ET 10).
TWO PHASE FLOW
V
D
V
FIRE
/ HV @150 C
BACK
FLUSH
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
O
N
/O
F
F
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
1/2" WEEP HOLE
M
IN
D
GWR
GAP
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TWO PHASE FLOW
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
F
R
E
E
D
R
A
IN
IN
G
V
TO ATMOSPHERE
AT SAFE LOCATION
MAG
V
FREE DRAINING
D
C-1
2
"
2
"
2
2
"
x
2
0
"
22"
H
2"-P-247003-PJB(0.4)
ET 10
38
3
/ 4
"
3
/ 4
"
C-1
C-1
3/4"
HHLL=800 mm
1-1/2"
6"-CWR-247004-UAB
24"
24"-GC-247009-PJB(0.4)
HLL=700 mm
ET 10
50
3/4"
3
/ 4
"
CWR-247012-UAB
2"
1-1/2"
2"-VA-247004-PJB(0.4)
2"
2"
LV
005
2"
C-24701C
3
/ 4
"
2"
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5134289
5134289
2"
HH
3
/ 4
"
2"
FC
24"
2" 2"
V-24703
COMPRESSOR 3rd STAGE KO DRUM
2600 mmID x 2700 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
530 kPa-g @100 C DESIGN PR. & TEMP:
SIZE:
OUTSIDE
24"-GC-247011-PJB(0.4)
N/A
3/4"
6"-CWS-246013-UAB
20"-GC-247013-PJB(0.4)
H
GC-247077-PJB(0.4)
3
RV
004
P
P
SET@
530 kPa-g
1D2
2
"
x
1
"
ET 10
38
?
C-2
ET 10
38
C-2
3/4"
4
?
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701C
CO2 COMPRESSOR 3rd STAGE
3/4"
C
-
3
?
C
-
2 ?
C
-
2
? 22"
ET 10
50
2
2
"
x
2
0
"
3
/ 4
"
24"
2
"
1-1/2"
C
S
O
N/A
2"-GC-247010-PJB(0.4)
OUTSIDE
C-2
C-2
C-2
?
L
6
"
6
"
H
38
LLL=250 mm
?
5156140
C-2
5
3
0
7
5
2
1
C
-
2
5
3
0
7
5
2
1
?
ET 10
C
-
2
C-2
C
-
2
ET 45
INSIDE
C
S
O
GC-247078-PJB(0.4)
1-1/2"
ET 45
88
?
?
2
"
2
"
5
1
3
4
2
8
9
C
-
2
?
?
C-2
C-2
E-24703
2"
2
"
V-24703
HH
24"
H
4"
C-1
5
1
3
4
2
8
9
C
-
2
E-24703
COMPRESSOR 3rd STAGE COOLER
3.0 MW
BEU TEMA TYPE:
PP / /
130 C / 150 C
CS + 3 mm304 L SS CLAD
1200 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1200 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
425.0 m^2
2"
GC-247076-PJB(0.4)
SP
006
6
5
3"-WP-247001-PJB(0.4)
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
3
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
3
:2
7
:1
3
P
M
B
Y
:a
h
m
1
4
8
8
7
G
CO2 COMPRESSOR 3RD STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.003
2
0
"
-
G
C
- 2
4
7
0
1
2
-
P
J
B
(
0
. 4
)
INSIDE
?
C-1 ?
C-2
?
C
-
1
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
?
C-2
? ? C
-
1
C
-
1
3"-WP-247001-PJB(0.4)
3"
3" ISSUED FOR ESTIMATE

011
TI
007
LG
010
PT
009
PI
001
E
009
PT
010
TTE
012
TT
007
LC
007
LT
011
TT
001
E
055
TW
010
PI
012
TI
008
LTE
R
S
R
S
R
S
R
S
T
.S
.
12372
KO LIQUID
FROMV-24707
247.009
12320
CO2
FROME-24703
247.003
12348
CO2
TO V-24705
247.005
12344
246.025
CWR
12346
KO LIQUIDS
FROMV-24705
247.005
12353
KO LIQUID
FROMV-24706
247.006
12345
246.025
CWS
13032
KO LIQUIDS
TO V-24602
246.006
MW
V
4 . ELECTRIC TRACE TO HLL (ET 10).
D
O
N
O
T
P
O
C
K
E
T
/ HV @150 C
FREE DRAINING
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
BACK
FLUSH
TWO PHASE FLOW
FREE DRAINING TWO PHASE FLOW
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TWO PHASE FLOW
HOLDS:
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
GAP
TWO PHASE FLOW
1/2" WEEP HOLE
V
GWR
M
IN
D
MAG
TWO PHASE FLOW
O
N
/O
F
F
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
F
R
E
E
D
R
A
IN
IN
G
D
CONTROL VALVE
FAILURE
V V
D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
TO ATMOSPHERE
AT SAFE LOCATION
6
6"-CWS-246014-UAB
3
/4
"
3
/4
"
3"
ET 10
38
2"
3
/4
"
3
/4
"
2"
6
"
V-24704
N/A
?
C-2
5134289
C-1
5
1
3
4
2
8
9
INSIDE
HH
3
/4
"
2"x1-1/2"
2
"
24"
2"
16"-GC-247017-PJE(0.4)
ET 10
38
6"-CWR-247005-UAB
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701D
CO2 COMPRESSOR 4th STAGE
2"-P-247010-PJB(0.4)
4
2"
2"-P-247005-PJB(0.4)
2"
HH
2"
ET 10
38
OUTSIDE
H
INSIDE
P
P
CWR-247013-UAB
20"-GC-247015-PJB(0.4)
1-1/2"
L
20"
20"-GC-247013-PJB(0.4)
1
6
"
-
G
C
-2
4
7
0
1
6
-
P
J
E
(
0
.4
)
3/4"
3
4"
ET 10
50
GC-247080-PJE(0.4)
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
4
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
3
:0
8
:4
4
A
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 COMPRESSOR 4TH STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.004
2"
ET 45
88
C
S
O
C
S
O
PJE(0.4)
?
C
-
3
? ?
C-1 C-1
?
C
-
2
?
C
-
2?
?
C
-
2
C
-
2
C-2
C
-
2
?
C-2
?
C-2
?
?
C
-
2
E-24704
COMPRESSOR 4th STAGE COOLER
2.9 MW
BEU TEMA TYPE:
PP / /
130 C / 150 C
CS + 3 mm304L SS CLAD
2200 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
1700 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
343.0 m^2
2
"
H
HLL=700 mm
20"
HHLL=800 mm
ET 45
1-1/2"
ET 10
50
N/A
OUTSIDE
GC-247079-PJB(0.4)
PJB(0.4)
C-2
C-2
5
2
4
2
8
9
3
C
-
1
C
-
2
5
1
3
4
2
8
9
GC-247081-PJE(0.4)
3/4"
V-24704
COMPRESSOR 4th STAGE KO DRUM
2300 mmID x 3400 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
1200 kPa-g @110 C DESIGN PR. & TEMP:
SIZE:
6
"
1-1/2"
H
2"
LV
007
FC
3
/ 4
"
10"
1-1/2"
C
-
2
5
1
3
4
2
8
9
C
-
2
3
"
5
1
3
4
2
8
9
C
-
2
5134289
C-2
?
C
-
2
2
"
2
"
2
"
ET 10
38
SET@
1200 kPa-g
3L4
6"x4" ET 10
50
6"-VA-247005-PJB(0.4)
1-1/2"
2"x1-1/2"
3
"
-
G
C
-
2
4
7
0
1
4
-
P
J
B
( 0
. 4
)
LLL=250 mm
2"
3/4"
C-24701D
E-24704
ET 10
5
3
0
7
5
2
1
C-2
5
3
0
7
5
2
1
1
8
"
x
1
6
"
2"-P-247006-PJB(0.4)
ET 10
38
2"-P-247004-PJB(0.4)
RV
006
1
8
"
x
1
6
"
H
?
18"
5156140
18"
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
SP
007
PP 3/4"
13161
CASING DRAIN
TO SAFE LOCATION
247.003
3"-WP-247001-PJB(0.4)
PJB(0.4)
PJE(0.4) 3
/ 4
"
3
/ 4
"
C-1
C-1
5
?
C-2
?
C-1
?
C-1
3"
3"
ISSUED FOR ESTIMATE

C
-
2
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
TWO PHASE FLOW
015
TT
1/2" WEEP HOLE
R
S
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
056
TW
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
TWO PHASE FLOW
BACK
FLUSH
O
N
/O
F
F
013
PI
12348
CO2
FROME-24704
247.004
TO ATMOSPHERE
AT SAFE LOCATION
FREE DRAINING
D
012
PT
015
TI
M
IN
009
LT
12350
CO2
TO V-24706
247.006
12351
246.025
CWR
12352
246.025
CWS
V
MW
R
S
001
E
013
PT
014
TI
D
014
TT
12346
KO LIQUIDS
TO V-24704
247.004
013
TTE
010
LTE
GWR
MAG
4 . ELECTRIC TRACE TO HLL (ET 25).
R
S
TWO PHASE FLOW
/ HV @150 C
R
S
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
V
FREE DRAINING
009
LC
012
PI
009
LG
D
O
N
O
T
P
O
C
K
E
T
D
V
FIRE
001
E
GAP
E-24705
COMPRESSOR 5th STAGE COOLER
3.0 MW
BEU TEMA TYPE:
PP / /
130 C / 150 C
CS + 3 mm304L SS CLAD
4200 kPa-g / HV
DUPLEX 2205 + 0.38 mmCA
58 C /
3300 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
281.0 m^2
ET 10
50
1-1/2"
ET 10
50
3
1-1/2"
CWR-247014-PJE(0.4)
N/A
1-1/2"
OUTSIDE
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701E
CO2 COMPRESSOR 5th STAGE
LLL=250 mm
4"
H
10"
LV
009
3/4"
N/A
3
/4
"
2"
24"
GC-247084-PJG(0.4)
2"
1-1/2"
2"x1-1/2"
FC
2"
P
J
B
(
0
.4
)
P
J
E
(
0
.4
)
2"-P-247007-PJE(0.4)
16"-GC-247017-PJE(0.4)
L
2"
C-24701E
2"
E-24705
14"-GC-247021-PJG(0.4)
2
"
V-24705
HH
3
/4
"
2"x1-1/2"
H
HLL=700 mm
HHLL=800 mm
INSIDE
P
P
6
"
6
"
6"-CWS-246015-UAB
6"-CWR-247006-UAB
16"
H
ET 45
75
ET 45
3
/ 4
"
C
S
O
16"-GC-247019-PJE(0.4)
H
16"
C-1 C-1
?
?
C-2
C-2
C-2
C-2
?
C
-
3
?
C
-
1
?
?
5
3
0
7
5
2
1
?
2"-VA-247006-PJB(0.4)
3/4"
3
/ 4
"
3
/ 4
"
HH
1
4
"
-
G
C
- 2
4
7
0
2
0
-
P
J
G
(
0
. 4
)
2"
2
"
-
G
C
-
2
4
7
0
1
8
-
P
J
E
( 0
. 4
)
E
T
2
5
E
T
1
0
3
/ 4
"
1-1/2"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
5
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
5
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:3
9
:4
8
A
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 COMPRESSOR 5TH STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.005
C
S
O
2
"
3/4"
ET 10
GC-247082-PJE(0.4)
GC-247083-PJG(0.4)
2"
2"
ET 25
38
V-24705
COMPRESSOR 5th STAGE KO DRUM
2000 mmID x 2200 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
2200 kPa-g @100 C DESIGN PR. & TEMP:
SIZE:
2
"
4
OUTSIDE
INSIDE
2"
2
"
ET 25
38
? ?
?
C
-
2
5134289
C-1
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
5
3
0
7
5
2
1 5156140
C-2
C
-
2
C
-
2
C
-
2
C-2
C
-
2
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
C-2
?
?
C-2
ET 10
ET 10
38
PJB(0.4)
PJE(0.4)
2"-P-247006-PJB(0.4)
RV
008
SET@
2200 kPa-g
1D2
ET 10
38
2
"
x
1
"
14"
2
"
14"
5134289
3/4"
5 . MAXIMIZE LENGH OF PIPING THAT FREE DRAINS TO KO DRUM.
6 . GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
F
R
E
E
D
R
A
I N
I N
G
5
6
PP
UAB
PJE(0.4)
PJE(0.4)
UAB
PJB(0.4)
PJG(0.4)
TO GRADE AT
SAFE LOCATION
13163
CASING DRAIN
FROMC-24701F/G/H
247.006
3"-WP-247002-PJB(0.4)
3
/ 4
"
3
/ 4
"
PJG(0.4)
PJE(0.4)
INSIDE OUTSIDE
3/4"
2"
3
/ 4
"
3
/ 4
"
2"
2"
2"
3
/ 4
"
3
/ 4
"
ET 25
C-1
C-2
C
-
2
?
?
C-2
C-2
C-2
C
-
2
C-2
C-2
C-1
? ?
? ?
?
?
C-1 C-1
?
? ?
?
?
C-2
T
.S
.
SP.
008
3"
3"
ISSUED FOR ESTIMATE

015
PI
011
LT
016
PT
001
E
012
LTE
001
E
016
TTE
017
TI
011
LC
011
LG
015
PT
018
TT
017
TT
018
TI
016
PI
PP
R
S
R
S
T
. S
.
12313
CO2
TO E-24706
247.007
12353
KO LIQUID
TO V-24704
247.004
12350
CO2
FROME-24705
247.005
D
O
N
O
T
P
O
C
K
E
T
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
4 . ELECTRIC TRACE TO HLL (ET 25).
M
IN
V
MW
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
GAP
5 . MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
V
MAG
1/2" WEEP HOLE
GWR
FREE DRAINING
D D
6 . GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
F
R
E
E
D
R
A
IN
IN
G
TWO PHASE
FLOW
TO ATMOSPHERE AT
SAFE LOCATION
/ HV @150 C
O
N
/O
F
F
TWO PHASE FLOW
FIRE
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
3/4"
P
J
G
(
0
.4
)
INSIDE
N/A
1-1/2"
E
T
1
0
2"
4
L
OUTSIDE
3/4" 3/4"
2"
2"
2"-P-247009-PJG(0.4) P
J
B
(
0
. 4
)
14"
ET 10
38
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
ET 10
ET 45
75
ET 45
ET 10
38
2" 2"
10"
H
2"
ET 25
38
?
C
-
2
?
C-2
C-2
?
C-2
C-2
C
-
1
C
-
3
?
LLL=250 mm
HLL=700 mm
HHLL=800 mm
H
?
PP
PJB(0.4)
PJG(0.4)
HH
3/4"
2"
2"
3
/ 4
"
3
/ 4
"
3
C-24701F
14"-GC-247021-PJG(0.4)
3
/ 4
"
2"
2"
HH
2
"
3
/ 4
"
V-24706
2"
P
P
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMARY REVIEW B
2
4
7
.0
0
6
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
6
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:5
7
:2
5
P
M
B
Y
:a
h
m
1
4
8
8
7
G
CO2 COMPRESSOR 6TH STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.006
2
"
-
G
C
-
2
4
7
0
2
2
-
P
J
G
( 0
. 4
)
1-1/2"
GC-247085-PJG(0.4)
2
"
x
1
"
2"-P-247005-PJB(0.4)
?
C-1
?
C-1
?
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
OUTSIDE INSIDE
5134289
C-1
2"x1" 2"x1"
FC
1"
H
C
S
O
2
"
V-24706
COMPRESSOR 6th STAGE KO DRUM
1700 mmID x 2000 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
4200 kPa-g @105 C DESIGN PR. & TEMP:
SIZE:
N/A
2"
E
T
2
5
ET 25
38
GC-247086-PJG(0.4)
3
/ 4
"
2"-VA-247007-PJB(0.4)
2
"
24"
LV
011
14"
12"-GC-247024-PJG(0.4)
3
/ 4
"
1-1/2"
3
/ 4
"
3
/ 4
"
3
/ 4
"
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701F
CO2 COMPRESSOR 6th STAGE
3
/ 4
"
ET 10
RV
010
SET@
4200 kPa-g
1D2
C
-
2
C
-
2
C
-
2
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5134289
ET 25
C
-
2
?
C-2
?
C-2
?
C-2
?
C-2
?
C-2
?
C-2
?
14"-GC-247023-PJG(0.4)
SP
009
3/4" 3/4"
5
6
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
PJB(0.4)
PJG(0.4)
13162
CASING DRAIN
FROMC-24701G/H
247.009 13163
CASING DRAIN
TO SAFE LOCATION
247.005
3"-WP-247002-PJB(0.4)
C-1
3
/ 4
"
3
/ 4
"
?
?
? ?
C-1 C-1
3"-WP-247002-PJB(0.4)
C-1
ISSUED FOR ESTIMATE

SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
021A
TI
V
12314
CO2
TO V-24707
247.009
R/S
R/S
HOA HOA
R/S
021B
TT
001
I
021A
TT
FREE DRAINING
001
I
4 . MINIMUM VFD SETTING IS 30% SPEED.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
I
(V)
VFD
001
SI
002
XL
002
XA
042
TW
043
TW
021D
TX
VFD
021
TC
I
002
HIS
004
HS
AVG RTD SENSOR (V)
002A
HS
FAN NO. 2
MANUAL
003
XL
019
TC
12447
LP STEAM
FROMHEADER
246.029
003
XA
3 . SWITCH LOCATED AT PLATFORMLEVEL.
12455
CONDENSATE
TO HEADER
246.029
005
HS
MANUAL
HOLDS:
NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
DURING DETAILED ENGINEERING.
T
F
R
E
E
D
R
A
IN
IN
G
FAULT LOCAL/
REMOTE
V
021B
TI
150 C
D
021
TX
001
E
(A)
(B)
(V)
D
003
HIS
AVG RTD SENSOR (V)
019
TT
002
SI
T
021C
TX
(V)
(V)
FAULT LOCAL/
REMOTE
TWO PHASE FLOW
PP
TRIM:
001
E
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
003A
HS
021A
TX
021B
TX
TWO PHASE FLOW MIN 10D
12313
CO2
FROMC-24701F
247.006
R/S
FAN NO. 1
/ HV @
-SL-247002-SAB
H3
/4
"
3
/4
"
3 3
4
3
/ 4
"
3
/ 4
"
H
L
12"-GC-247024-PJG(0.4)
2"-SL-246011-SAB
E-24708A
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
7
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
7
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:2
4
:2
6
P
M
B
Y
:a
h
m
1
4
8
8
7
G
COMPRESSOR 6TH STAGE COOLER
UNIT 247 - COMPRESSION
247.0000.000.041.007
H
12"-GC-247031-PJG(0.4)
2"
FC
4
TV
021D
FC
TV
021B
2"-SCL-247002-SAB
3
/ 4
"
8"
-
S
C
L
-
2
4
7
0
0
1
-
S
A
B
-
S
L
-
2
4
7
0
0
3
-
S
A
B
-
S
L
-
2
4
7
0
0
4
-
S
A
B
PP
2"
1-1/2"
1-1/2"
FO
3
/ 4
"
H
E-24708A
304 SS MATERIAL:
TYPE:
RATED DUTY:
COMPRESSOR 6th STAGE COOLER SPACE HEATERS
L
1-1/2"
TV
021C
TV
021A
E
T
1
0
FC
E-24708B
ET 10
38
SCL-247020-SAB
SCL-247021-SAB
/B
?
C-2
? ?
?
C-2 C-2
C-2
?
?
C
-
2
C-2
E-24706
8"
8"
8"
GC-247087-PJG(0.4)
?
C
-
2
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
5
1
1
5
2
2
7
C
-
2
C
-
2
E-24706
INSULATION TYPE/THK: /
TRIM:
22.0 kW& 2 DRIVER & Nos.:
304L SS + 0.38 mmCA TUBE MATERIAL:
TYPE 3, MODE C WINTERIZATION:
6500 kPa-g @130 C
9596.0 m^2
TUBE DESIGN PR. & TEMP:
SURFACE AREA [FINNED]:
RATED DUTY: 3.9 MW
COMPRESSOR 6th STAGE COOLER
C-1
C-1
C-1
C-1
-SL-247001-SAB
FREE DRAINING
ISSUED FOR ESTIMATE
11 Jul 2011
P
P
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12325
CO2
TO C-24701H
247.010
12373
KO TEG
TO V-24803
248.003
12375
CO2
FROMV-24801
248.001
12376
CO2
TO V-24801
248.001
013
LT
O
N
/O
F
F
GAP
MAG
GAP
001
E
016
LTE
DO NOT POCKET
MW
/HV @150C
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
TWO PHASE FLOW
O
N
/O
F
F
MW
FREE DRAINING
FACILITIES ARE TO BE DETERMINED FOR CLEANING AND WATER PURGE FROMTHE
COMPRESSOR PIPING DOWNSTREAM OF THE WATER ANALYZER (IN ORDER TO
PREVENT CONTAMINATION OF THE PIPELINE DURING COMMISSIONING AND
START-UP).
026
TT
D
O
N
O
T
P
O
C
K
E
T
025
TTE
015
LG
019
PT
015
LT
T
.S
.
R
S
001
E
019
PI
015
LC
013
LC
MAG
M
I N
V
027
TI
013
LG
D
018
PT
4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
/HV @150C
TWO PHASE FLOW
D
6 . DEHYDRATION UNIT BYPASS.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
TO ATMOSPHERE AT
SAFE LOCATION
8 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
7 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
INSIDE
D
V
V
NNF
D
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
PP
GWR
TWO PHASE FLOW
027
TT
1/2" WEEP HOLE
OUTSIDE
S-4A
s
015
LZTE
003
E
V
5 . ELECTRIC TRACE TO HLL (ET 25).
M
I N
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
V
12372
KO LIQUID
TO V-24704
247.004
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
9 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
12314
CO2
FROME-24706
247.007
017
LT
GWR
017
LI
V-24708
HH
3/4"
2"
2"-KP-247001-PJG(0.4)
N
/ A
H
3/4"
1-1/2"
3
/ 4
"
2"
1
0
"
12"
12"
3
/ 4
"
12"
12"
5
2"
3
/ 4
"
V-24707
TEG INLET SCRUBBER
900 mmID x 3400 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
6500 kPa-g @105 C DESIGN PR. & TEMP:
SIZE:
V-24708
COMPRESSOR 7th STAGE KO DRUM
900 mmID x 3400 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
6500 kPa-g @105 C DESIGN PR. & TEMP:
SIZE:
3/4"
1-1/2"
3
/ 4
"
LLL=250 mm
H
3/4"
PJG(0.4) PJB(0.4)
2"-P-247011-PJG(0.4)
PJB(0.4)
PJG(0.4)
3/4"
ET 10
3
/ 4
"
SO
2"
10" 10"
4
ET 10
4
2"
12"
2"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
0
9
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
0
9
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:1
3
:0
3
A
M
B
Y
:m
u
k
2
2
2
9
6
G
TEG INLET SCRUBBER & CO2 COMP. 7TH STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.009
12"-GC-247040-PJG(0.4)
24"
2"
N/A
HLL=700 mm
3
/ 4
"
5
H
GC-247089-PJG(0.4)
C
S
C
NO
2
"
C-24701G
12"-GC-247038-PJG(0.4)
2"
ET 45
75
CSO
E
T
2
5
ET 25
N
/ A
E
T
2
5
3/4"
FC FC
LV
015
3
/ 4
"
2"x1" 2"x1" 2"x1" 2"x1"
2" 2"
24"
H
V-24707
2"-P-247010-PJB(0.4)
3
/ 4
"
3
/ 4
"
12"
12"
H
L
LLL=250 mm
2"
12"
L
HLL=800 mm
1"
10"-GC-247041-PJL(C)
2"-KP-247002-PJB(0.4)
HH
ET 45
HHLL=800 mm
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701G
CO2 COMPRESSOR 7th STAGE
ET 25
2"
2"
2"
3
/ 4
"
ET 25
3
/ 4
"
3
/ 4
"
3
/ 4
"
2"
GC-247090-PJG(0.4)
GC-247091-PJL(C)
ET 10
38
PJG(0.4)
PJL(C)
6
2
"
12"-GC-247031-PJG(0.4)
2
"
3
/ 4
"
1-1/2"
3
/ 4
"
E
T
2
5
LV
013
2"
3
2
"
2" 2"
1"
12"-GC-248001-PJG(0.4)
8
C-2
?
C-1
?
?
C
-
3
5
1
3
4
2
8
9
C
-
3
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
3
C
-
3
3/4"
?
C-2
?
C-2 C-2
?
?
C-2
?
C-2
? ?
LYE
015
3
/ 4
"
2"
2"
3/4" 3/4"
H
75
CSO
NO
SP
005
C-1
5242964
C-1
5
2
4
2
9
6
3
C
-
1
?
C-1
ET 25
38
?
C
-
2
?
C-2
?
C-2
3
/ 4
"
2"
3
/ 4
"
H
?
C-2
?
C-2
? ?
C-2 C-2
?
C-2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
C
-
2
C
-
2
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
C
-
2
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5134289
5
1
3
4
2
8
9
C
-
2
C
-
2
C
-
2
C-2 C-2
? ?
C-2 C-2
?
?
?
C-2 C-2
?
C-2
?
C
-
2
ET 25
38
C
-
2
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2 C-1
?
C-1
?
C
-
3
5242964
C-1
5242964
C-1
5242964
9
9
3
/ 4
"
3
/ 4
"
2"
FIRE
N/A
2
"
-
G
C
-
2
4
7
0
3
9
-
P
J
G
( 0
. 4
)
2"-VA-247008-PJB(0.4)
V
5134289
TO ATMOSPHERE AT
SAFE LOCATION
C-1
?
C
-
1
1/2" WEEP HOLE
PJB(0.4) ET 10
RV
011
SET@
6500 kPa-g
1D2
2
"
x
1
"
ET 10
2
"
3/4"
C
S
O
11. MAXIMIZE LENGTH OF PIPING THAT FREE DRAINS TO KO DRUM.
10. SAMPLE PROBE INCLUDES A DOUBLE BLOCK AND BLEED VALVE ASSEMBLY.
12. THE FLOWMEASUREMENTS AND ADDITIONAL INSTRUMENTS ARE REQUIRED FOR
ON-SITE COMPRESSOR PERFORMANCE TESTING (PTC-10).
13. GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
006
FT
005
FT
006
FI
005
FI 13
12 12
R
S
R
S
F
R
E
E
D
R
A
I N
I N
G
ET 10
38
E
T
2
5
3
8
2"
ET 25 PJG(0.4)
026
TI
H
SP
010
018
PI
13
11
060
TT
060
TI
1-1/2"
026
PT
026
PI
3/4" 3/4"
C-2
?
C-2
12
12
003
E
LL
3/4"
001
AP
001
AX
001A
AE
001A
AT
001B
AE
001B
AT
001A
AI
001B
AI
H
L
H2O CO2 PURITY
2"
TO ATMOSPHERE AT
SAFE LOCATION
TO ATMOSPHERE AT
SAFE LOCATION
10
3/4" TUBING (FAST LOOP)
13162
CASING DRAIN
TO SAFE LOCATION
247.006
13165
ANALYZER FAST LOOP
TO C-24701A SUCTION
247.001
3"-WP-247002-PJB(0.4)
13166
CASING DRAIN
FROMC-24701H
247.010
ET 10
38
3
/ 4
"
3
/ 4
"
PJB(0.4)
PJL(C)
? ?
C-1 C-1
C-1
?
C-2
?
C-1 C-1
C-1
3"
3"
7
3"-WP-247002-PJB(0.4)
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
P
S
022
PC
12332
CO2
TO E-24707A/B
247.011
PJL(C)
s
12325
CO2
FROMC-24701G
247.009
12326
ANTI SURGE SPILL BACK
TO V-24701
247.001
001
XZTE
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12569
PT SIGNAL
TOUC-001A/B
247.001
028
PG
001
UYE
12327
CO2 RELIEF / VENT
TO S-24603
246.032
001
E
4 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
3 . DRIVER POWER AND DIFFERENTIAL PRESSURE DEPICTED ARE THE TOTAL FOR
THE COMPRESSOR.
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
029
TTE
020
PTE
002
E
R
S
057
TT
001
E
001
E
022
PT
D
O
N
O
T
P
O
C
K
E
T
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
001
UZTE
021
PT
V
12995
246.030
GI
6 . NON-SLAMCHECK VALVE.
A/S
MIN
5 . TWO CHECK VALVES IN SERIES SEPARATED BY AT LEAST 500MM.
HOLDS:
FO
V
7 . START-UP BYPASS VALVE TO BE LOCATED AT PIPING HIGH POINT WITH PIPING
FREE DRAINING INTO THE MAIN PIPING.
001
E
002
E
BLOCKED DISCHARGE
3K6
VISIBLE
PP
4
N/A
2"
10"
PJB(0.4)
ET 120
C-24701H
1-1/2"
3
/4
"
N/A
E
T
1
2
0
7
5
4
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
1
0
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
1
0
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:2
0
:0
7
P
M
B
Y
:a
h
m
1
4
8
8
7
G
CO2 COMPRESSOR 8TH STAGE
UNIT 247 - COMPRESSION
247.0000.000.041.010
3
/ 4
"
DO NOT POCKET
3
/ 4
" 8
"
-
G
C
-
2
4
7
0
4
4
-
P
J
L
(
C
)
5
4
PP
6"-VA-247009-PJB(C)
10"
3
/ 4
"
ET 120
4
"
-
G
C
-
2
4
7
0
4
6
-
P
J
L
(
C
)
PJB(C)
SP
003A
4
10"
4
FO
1
0
"
-
G
C
- 2
4
7
0
4
2
-
P
J
L
(
C
)
NC
FO
24"-GC-247045-PJB(0.4)
RV
012
10"-GC-247041-PJL(C)
FC
GC-247092-PJL(C)
3
/ 4
"
3
/ 4
"
HH
24"x8"
4
2"
3
/ 4
"
3
/ 4
"
10"-GC-247043-PJL(C)
3
/ 4
"
FREE DRAINING
1-1/2"
SP
003B
8"
10"
2"-GI-246019-ULB
2"
L
UV
001
HH
L
3
/ 4
"
XYE
001
3
304 SS MATERIAL :
INSULATION TYPE/THK: PP /
16500 kW DRIVER :
TRIM:
9163 kPa DIFF. PR.:
RATED CAPACITY: 79877 Nm^3/hr
C-24701H
CO2 COMPRESSOR 8th STAGE
7
2
"
SET@
14790 kPa-g
4
"
x
3
"
6"
2
"
4
"
C
S
O
?
C
-
3
5349475
C-1
5343525
C-1
?
C
-
2
?
C
-
2
? ? ?
C
-
2 ?
?
C-2 ?
C-2
?
5
3
4
9
4
7
0
C-1
C
-
1
C
-
2
5
1
1
9
1
6
0
C
-
2
C
-
2
C
-
2
6"-VA-247010-PJB(C)
5351323 5351323
C-1 C-1
13039
CO2 VENT
FROMBATTERY LIMIT
PIPIELINE
247.014
8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
9 . ANTI-SURGE SPILLBACK VALVE UV-247001 TO BE LOCATED AT PIPING HIGH
POINT WITH PIPING FREE DRAINING INTO THE MAIN PIPING.
10. GTAWROOT PASS WELD IS MANDATORY ON THIS LINE.
8
XV
001
6 6
3
/ 4
"
5
1
3
6
4
0
7
C
-
3
PP
OUTSIDE INSIDE
FREE DRAINING
12571
UC SIGNAL
FROMUC-001A
247.001
12578
UC SIGNAL
FROMUC-001B
247.001
FREE DRAINING
ET 120
75
PP
ET 120
12331
TT SIGNAL
TOUC-001A/B
247.001
MIN
10
13166
CASING DRAIN
TO SAFE LOCATION
247.009
PJB(0.4)
PJL(C) 3
/ 4
"
3
/ 4
" ?
C-1
?
C-1
5136407
C-1
3/4"
S FO
003
UYE
UV
003
F
O
001
E
034
PX
3
/ 4
"
?
C
-
1
V
6"
?
C-1
C-1
C-1
C
-
1
C-1
E
T
1
2
0
1
0
0
ET 120
PJL(C)
3"-WP-247002-PJB(0.4)
9
DO NOT POCKET
V
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
007
XL
005
SI
006
SI
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
032
TX
VFD
030
TC
030
TT
012
HS
(V)
MANUAL
12556
CO2
TO CO2 METERING STATION
247.014
12558
CO2
TO E-24707B
247.012
FAULT FAULT
R/S
010
HIS
I
AVG RTD SENSOR (V)
032
TC
047
TW
(V)
F
R
E
E
D
R
A
IN
IN
G
007
XA
I
FAN NO. 1
011
HIS
FAN NO. 2
R/S
(V)
(V)
001
I
R/S
AVG RTD SENSOR (V)
HOA
006
XL
011A
HS
1. SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
013
HS
12611
CONDENSATE
TO HEADER
246.029 T
032A
TI
LOCAL/
REMOTE
010A
HS
3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
032A
TX
032B
TX
006
XA
12610
LP STEAM
FROMHEADER
246.029
4 . SWITCH LOCATED AT PLATFORMLEVEL.
HOLDS:
D
PP
(B)
(A)
V
TWO PHASE FLOW
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
MANUAL
032C
TX
MIN 10D
BAY A
D
R/S
V
032B
TI
12332
CO2
FROMC-24701H
247.010
T
5 . MINIMUM VFD SETTING IS 30% SPEED.
VFD
046
TW
032D
TX
032A
TT
001
I
032B
TT
LOCAL/
REMOTE
12557
TC SIGNAL
FROMTC-031
247.014
HOA
NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
DURING DETAILED ENGINEERING.
TRIM:
1-1/2"
6
2"-SL-246015-SAB
4
6
4
FO
TV
032B
-
S
L
-
2
4
7
0
1
1
-
S
A
B
3
/4
"
FC
6"
6"
6" 6"
TV
032C
FC
TV
032A
FC
TV
032D
-SL-247012-SAB
3
/4
"
H
PP
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
1
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
1
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
:5
4
:4
6
P
M
B
Y
:a
h
m
1
4
8
8
7
G
CO2 COMPRESSOR AFTERCOOLER-BAY A
UNIT 247 - COMPRESSION
247.0000.000.041.011
E
T
1
0
3
/4
"
2"-SCL-247005-SAB
2
"
-
S
C
L
-2
4
7
0
0
6
-
S
A
B
E-24709A
304 SS MATERIAL:
TYPE:
RATED DUTY:
CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS
SP
H
5
5
2"
3
/4
"
10"-GC-247043-PJL(C)
6"-GC-247055-PJL(C)
1-1/2"
E-24709A
ET 10
38
H
SCL-247024-SAB
SCL-247025-SAB
2"
3
3
/ 4
"
3
/ 4
"
6
/B
PP
L
E-24709B
L
1-1/2"
?
C-2
?
C-2
? ?
C-2 C-2
?
C
-
2
?
C-2
E-24707A
E-24707A
INSULATION TYPE/THK: /
TRIM:
22.0 kW& 2 DRIVER & Nos.:
304L SS + 0.38 mmCA TUBE MATERIAL:
TYPE 3, MODE C WINTERIZATION:
14790 kPa-g @175 C
1385.0 m^2
TUBE DESIGN PR. & TEMP:
SURFACE AREA [FINNED]:
RATED DUTY: 10.3 MW
CO2 COMPRESSOR AFTERCOOLER
GC-247093-PJL(C)
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
C
-
2
?
C
-
2
001
E
001
E
C-1
C-1
C-1 C-1
2"-SL-247010-SAB
10"-GC-247043-PJL(C)
-SL-247009-SAB
FREE DRAINING
ISSUED FOR ESTIMATE
11 Jul 2011
035B
TX
015A
HS
HOA
035A
TI
008
XL
033
TC
008
XA
035D
TX
I VFD
001
I
014
HIS
I
035A
TX
035
TX
009
XA
049
TW
048
TW
035A
TT
VFD
009
XL
017
HS
001
I
R/S
035B
TT
007
SI
035C
TX
014A
HS
016
HS
035B
TI
033
TT
015
HIS
035
TC
008
SI
001
E
001
E
T
T 12456
CONDENSATE
TO HEADER
246.029
12558
CO2
FROMC-24701H
247.011
12449
LP STEAM
FROMHEADER
246.029
12561
TC SIGNAL
FROMTC-031
247.014
12560
CO2
TO CO2 METERING STATION
247.014
F
R
E
E
D
R
A
IN
IN
G
5 . MINIMUM VFD SETTING IS 30% SPEED.
MANUAL MANUAL
(D)
(C) TRIM:
6 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
3 . COOLER DUTY DEPICTED IS THE TOTAL FOR ALL BAYS.
(V)
D
D
TWO PHASE FLOW
V
V
(V)
4 . SWITCH LOCATED AT PLATFORMLEVEL.
R/S
LOCAL/
REMOTE
FAN NO. 1 FAN NO. 2
LOCAL/
REMOTE
FAULT
AVG RTD SENSOR (V)
(V)
AVG RTD SENSOR (V)
R/S
R/S
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
(V)
NUMBER OF BAYS, CONNECTIONS AND CONNECTION SIZES TO BE CONFIRMED
DURING DETAILED ENGINEERING.
MIN 10D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
BAY B
FAULT
HOA
HOLDS:
C-2
E-24707B
INSULATION TYPE/THK: /
TRIM:
22.0 kW& 2 DRIVER & Nos.:
304L SS + 0.38 mmCA TUBE MATERIAL:
TYPE 3, MODE C WINTERIZATION:
14790 kPa-g @175 C
1385.0 m^2
TUBE DESIGN PR. & TEMP:
SURFACE AREA [FINNED]:
RATED DUTY: 10.3 MW
CO2 COMPRESSOR AFTERCOOLER
GC-247094-PJL(C)
E-24707B
5
1
1
5
2
2
7
C
-
2
?
C-2
?
C-2
?
C-2
5
1
1
5
2
2
7
C
-
2
5
1
1
5
2
2
7
C
-
2
C-2
?
?
C
-
2
?
L
6"
2"
-
S
C
L
-
2
4
7
0
0
7
-
S
A
B
FC
TV
035D
3
/4
"
C-1
C-1
C-1
1-1/2"
H
6
FC
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
1
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
1
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
5
:5
2
:4
2
A
M
B
Y
:m
u
k
2
2
2
9
6
G
CO2 COMPRESSOR AFTERCOOLER-BAY B
UNIT 247 - COMPRESSION
247.0000.000.041.012
6
5
3
/4
"
TV
035A
E-24709C
SP
SCL-247026-SAB
4
6
6"
6"
L
H
6"
-
S
L
-
2
4
7
0
1
5
-
S
A
B
-SL-247013-SAB
-
S
L
-
2
4
7
0
1
6
-
S
A
B
E
T
1
0
3
/4
"
TV
035C
FO
TV
035B
FC
3
2"
1-1/2" 1-1/2"
PP
3
/4
"
6"-GC-247058-PJL(C)
2"-SL-246016-SAB
10"-GC-247043-PJL(C)
-SL-247014-SAB
ET 10
38
2"-SCL-247008-SAB
/D E-24709C
304 SS MATERIAL:
TYPE:
RATED DUTY:
CO2 COMPRESSOR AFTERCOOLER SPACE HEATERS
E-24709D
SCL-247027-SAB
H
38
5
4
5
1
1
5
2
2
7
C
-
2
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FREE DRAINING
C-1
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
3 . ELASTOMERS SHALL NOT BE USED FOR DENSE PHASE CO2 SERVICE.
031
TT
12556
CO2
FROME-24707A
247.011
031
TC
MIN 5D
4 . CONNECTIONS FOR METER PROVING AT SAFE ACCESSIBLE LOCATION.
5 . SCOPE BREAK WITH PIPELINE FACILITIES.
004
FQI
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
004
FI
025
PT
004
FT
025
PI
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "247" UNLESS OTHERWISE
STATED.
12560
CO2
FROME-24707B
247.012
12561
TC SIGNAL
TOTC-033
247.012
002
E
V
MIN
V
HOLDS:
FP
MIN 10D
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
12557
TC SIGNAL
TOTC-030
247.011
V
12993
CO2
TO PIPELINE
13039
CO2 VENT
TO S-24603
247.010
041
TTE
6 . CHECK VALVE TO REDUCE CONSEQUENCES OF POTENTIAL AIR COOLER TUBE
RUPTURE.
7 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
3
/4
"
8"x4"
H
6"-GC-247055-PJL(C)
8"-GC-247059-PJL(C)
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
7
.0
1
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
7
\2
4
7
.0
1
4
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
1
:2
1
:5
4
A
M
B
Y
:a
h
m
1
4
8
8
7
G
CO2 METERING STATION
UNIT 247 - COMPRESSION
247.0000.000.041.014
8"
PJL(C)
4
HH
4
"
8"
5
1-1/2"
4
8"
3
/4
"
4
"
N
C
N
C
N
C
N
C
4
"
4
"
8"x4"
3
/4
"
1-1/2"
6"-GC-247058-PJL(C)
3
3
3
5349475
C-1
5349475
C-1
5351323
C-1
5
3
4
9
4
7
0
C
-
1
5349475
C-1
5
3
4
9
4
7
0
5
3
4
9
4
7
0
C
-
1
C
-
1
6"-VA-247010-PJB(C)
L
6
7 3
"7
5
3
4
9
4
7
0
C
-
1
5
3
4
9
4
7
0
C
-
1
?
C
-
2
?
C
-
3
058
TT
058
TC
3
"
6
"
3
"
3
"
F
C
6
"
x
3
"
N
C
N
C
N
C
1-1/2"
N
C
PJB(C)
PJL(C)
5
1
3
6
4
0
7
C
-
3
3
/4
"
TV
058
5136407
C-1
3/4"
5136407
C-1
3/4"
8 . VALVE TO BE LOCATED AT SAFE ACCESSIBLE LOCATION.
C
-
1
C
-
1
C
-
1
C
-
1
C
-
1
8
3"
?
?
?
?
3
"
-
G
C
-
2
4
7
0
2
7
-
P
J
L
(
C
)
DO NOT POCKET
ISSUED FOR ESTIMATE
11 Jul 2011
S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12379
RICH TEG
TO E-24801
248.002
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
010
TC
12616
LEAN TEG
FROMP-24801A/B
248.004
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
002
PDI
12376
CO2
FROMV-24707
247.009
010
TT
HV
002
LG
002
LT
12375
CO2
TO V-24708
247.009
D
M
IN
001
LTE
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
003
E
3 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE VERTICAL
POSITION, SEPARATED BY AT LEAST 500 MM.
S-4A
5 . FT-003 TO BE INSTALLED VERTICALLY WITH FLOWUPWARD.
6 . SAMPLE TAKE-OFF POINT TO BE ACCESSIBLE.
7 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
V
1/2" WEEP HOLE
DO NOT POCKET
TO ATMOSPHERE
AT SAFE LOCATION
D
TWO PHASE FLOW
SO
MW
002
PDT
4 . ELECTRIC TRACE TO HLL (ET10).
011
TW
RS
12918
246.025
CWR
D
V
RS
12919
246.025
CWS
003
E
TO ATMOSPHERE
AT SAFE LOCATION
1/2" WEEP HOLE
BACK
FLUSH
RS
002
LC
MW
RS
RS
FT
003
RS
D
RS
RS
RS
RS
003
FI
FIRE
E-24804E
2"
2"
2"
2"
2"
2"
2"
E-24804D
2"
2"
2"-KP-248021-PAN
/C/D/E
ET 25
E
T
2
5
2
"
3
/4
"
C
S
O
ET 25
E
T
1
0
1-1/2" 1-1/2"
2"
2"
ET 10
38
ET 25
38
SP
001
C-2
? ?
? ?
C
-
2
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
1
?
C
-
1
?
CSC
/B
6
C
-
2
C-2
?
C
-
2
?
?
C
-
1
2"
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
3
C-2
C-2 C-2
5242963 5242963
5242963
C-2
C-2 C-2
? ?
? ?
C-2
?
C-2
C-2
C-2
5134289
C-2
5
1
3
4
2
8
9
5242963
5063244 5063244
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
C-2 C-2
C-2 C-2
2"
2"
2
"
C
S
C
3"x2"
2
"
x
1
"
3"x2"
?
C
-
2
? ? ? ?
5096787
C-1 C-1 C-1 C-1
C-1
5156863
C-2
5156863
2"
E-24804B
2"
2"
2"
E-24804C
H
ET 10
38
3"x2"
E
T
1
0
3
8
E
T
1
0
3
8
E
T
1
0
3
8
E
T
1
0
3
8
H
L
7
5
1
3
4
2
8
9
C-1
C
-
2
?
5134289
2"
1-1/2"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
8
.0
0
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
8
\2
4
8
.0
0
1
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
5
:1
4
:0
8
A
M
B
Y
:m
u
k
2
2
2
9
6
G
TEG ABSORBER
UNIT 248 - DEHYDRATION
248.0000.000.041.001
N/A
2"
RV
004
SET@
6500 kPa-g
1E2
12"
1-1/2"
H
L
HLL=1050 mm
LV
002
3"-KP-248002-PJG(0.4)
2
"
-
G
C
-
2
4
8
0
0
2
-
P
J
G
( 0
. 4
)
P
J
G
(
0
. 4
)
E-24804A
LEAN TEG COOLER
190 kW
DOUBLE PIPE TEMA TYPE:
/ /
210 C / 150 C
CS
7200 kPa-g /
CS
58 C /
1200 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
74.0 m^2
GC-248010-PJG(0.4)
ET 10
38
CWR-248002-UAB
6"x3"
6"x2"
2
"
3/4"
N/A
ET 10
1-1/2"
3"-VA-248002-PJB(0.4)
P
J
B
(
0
. 4
)
3"-KP-248001-PJG(0.4)
3/4"
3
/ 4
"
3
/ 4
"
C
-
1
CSO
2"-KP-248016-PAN
12"-GC-247038-PJG(0.4)
12"-GC-248001-PJG(0.4)
1-1/2"
4
3"
12"
3"
MAG
2
"
2"
PJB(0.4)
PJG(0.4)
ET 10
38
6"x2"
3
/ 4
"
HHLL=1450 mm
ET 10
V-24801
TEG ABSORBER
1400 mmID x 9700 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
6500 kPa-g @105 C DESIGN PR. & TEMP:
SIZE:
3
3"
2"
2"
2"
2"
2"
GWR
3
/ 4
"
3"x1-1/2"
2"
6"x3"
24"
H
2
"
3
/ 4
"
3
/ 4
"
3"
3
/ 4
"
LL 3
/ 4
"
1-1/2"
3
/ 4
"
3
/ 4
"
ET 25
3"
ET 10
38
2"
2"
H
38
V-24801
FC
NLL=880 mm
LLL=700 mm
LLLL=300 mm
24"
2"
3"-CWS-246009-UAB
KP-248025-PAN
1-1/2"
3"x1-1/2"
3
/ 4
"
3
/ 4
"
3/4"-VA-248001-PJG(0.4)
ET 25
2
"
E
T
2
5
3
8
C
S
C
3" 3"
3"
3
/ 4
"
2"
2"
LYE
002
2"
3"-CWR-248001-UAB
3"
E-24804A
N/A
/ HV @150 C
ET 10
38
ET 10
38
TV
010
2
"
-
K
P
- 2
4
8
0
2
4
-
P
A
N
FC
2"x1" 2"x1"
3
/ 4
"
3
/ 4
"
2" 2"
D D
1"
C-1
C-1
C-1 C
-
2
C-2
C-1
C-1
E
T
1
0
3
8
5
?
? ?
?
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
TEG STRIPPER CONDENSER
RATED DUTY: 92 kW
SURFACE AREA:
TEMA TYPE:
SHELL TUBE
DESIGN PRESS: 1400 kPa-g / FV 350 kPa-g / HV
DESIGN TEMP: 105C / 105C 230C / 150C
MATERIAL: CS + 3 mm316 CLAD 316L SS + 0.38 mmCA
INSULATION TYPE / THK: H
TRIM:
E-24801
TEG STRIPPER
V-24802
SIZE (COLUMN): 500 mmID x 3500 mm T/T
DESIGN PRESS. & TEMP.: 350 kPa-g @230 C /
008
LG
INSULATION TYPE/THK: H
003
LC
12328
LC SIGNAL
TOLV-004
248.003
TO ATMOSPHERE
AT SAFE LOCATION
016
PT
016
PI
001
TT
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
004
LC
V
D
SIZE (STRIPPER): 400 mmID x 2400 mmT/T
HOLDS:
TWO PHASE FLOW
TWO PHASE FLOW
D
D
12380
RICH TEG
TO V-24803
248.003
001
FC
002
TT
12427
HP CONDENSATE
TO V-24607
246.020
004
LT
004
LG
TWO PHASE FLOW
V
FREE DRAINING
TO ATMOSPHERE
AT SAFE LOCATION
001
TC
12385
RICH TEG
FROME-24803
248.003
12386
LEAN TEG
TO E-24803
248.003
D
HH
V
D
TWO PHASE FLOW
HH
HH
12545
LOWTEMP HP STEAM
FROMHEADER
246.101
010
LTE
FT
001
4 . ELECTRIC TRACE TO HLL (ET 10).
002
E
S-24801
/ HV @150 C
TRIM:
E-24802
MW
V
D
003
TT
V
004
PTE
001
E
SO
S-24801
TEG REGENERATION PACKAGE
004
FT
004
FI
12379
RICH TEG
FROMV-24801
248.001
3 . CONDENSATE LINES SHOULD BE SUPPORTED FOR VIBRATING SLUGGING SERVICE.
RATED DUTY: 396 kW
SURFACE AREA:
TEMA TYPE:
SHELL TUBE
DESIGN PRESS: 350 kPa-g / HV 5170 kPa-g / FV
DESIGN TEMP: 230C / 150C 415C / 415C
MATERIAL: CS + 3 mm316 CLAD 316L SS
INSULATION TYPE / THK: H
TRIM:
002
TC
12425
246.030
GI
002
E
008
PT
s
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
003
LG
1/2" WEEP HOLE
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
D
M
IN
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
/ FV @415C
TEG STRIPPER REBOILER
MATERIAL (COLUMN / INTERNAL): CS + 3 mm316L SS CLAD / 316L SS
MATERIAL (STRIPPER): 316L SS + 3 mm CA
5 . FT-001 TO BE INSTALLED VERTICALLY WITH FLOWUPWARD.
008
PI
D
FIRE
1D2
D
D
TWO PHASE FLOW
V
MIN. 10D
7
0
0
0
m
m
M
IN
.
003
TI
003
LT
H
5
1"
NC
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
1
5
2
7
7
C
-
2
5115277
C-1
5134289
C-2
5
1
1
5
2
7
7
5
1
1
5
2
7
7
5
1
1
5
2
7
7
5
1
1
5
2
7
7
C
-
2
1"
CSC
4"x3"
3
/4
"
L
2"
2"
E
T
1
0
3
8
2
"
-
S
S
- 2
4
8
0
0
2
-
S
A
G
ET 10
38
E
T
1
0
3
8
2
"
2"
1"
CSO
3/4"
HH
2"
E
T
1
0
3
8
2"x1"
3
/ 4
"
FC
1"
2"
3
/ 4
"
MAG
N/A
3
/ 4
"
3"x1-1/2"
3
/ 4
"
2"
3
/ 4
"
1-1/2"
1"
2"
2"x1" 2"x1" 2"
RV
001
LV
003
8"
KP-248028-PJB(0.4)
3/4"
2
"
2"
2
"
V-24805
LLL=260 mm
HLL=1120 mm
3
/ 4
"
L
H
2"-GI-246018-ULB
V-24806
2"x1"
V-24805
TEG STRIPPER REBOILER CONDENSATE POT
600 mmID x 1800 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS +3 mm CA MATERIAL(VESSEL/INTERNALS):
5170 kPa-g @415 C DESIGN PR. & TEMP:
SIZE:
V-24806
TEG SURGE DRUM
1300 mmID x 3900 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm316L SS CLAD MATERIAL(VESSEL/INTERNALS):
350 kPa-g @230 C DESIGN PR. & TEMP:
SIZE:
2"
2"x1"
1"
2"
2"
E-24801
1
"
-
S
S
- 2
4
8
0
0
3
-
S
A
G
L
ET 10
38
KP-248029-PJB(0.4)
FC
ET 10
FV
001
4"
H
2"
2"-SCH-248002-SAG
ET 10
38
FC
24"
2
"
KP-248026-PJB(0.4)
HLL=880 mm
LLL=290 mm
LLLL=150 mm
NLL=700 mm
FO
1-1/2"
H
2"
2"
PJB(0.4) PJG(0.4)
3
/ 4
"
2"-SS-248001-SAG
MAG
2
"
x
3
/ 4
"
PJG(0.4) PJB(0.4)
3
"
-
K
P
- 2
4
8
0
0
3
-
P
J
G
( 0
. 4
)
3
/ 4
"
SAB SAG
2
"
-
V
A
- 2
4
8
0
0
4
-
S
A
B
3
/ 4
"
2"
NLL=690 mm
3
/ 4
"
2"
1"
2"
2"x1"
10"
2"
8"
8"
1-1/2" 1-1/2"
2"
3
/ 4
"
3"-KP-248004-PJB(0.4)
3"x1-1/2"
TV
002A
FO
TV
002B
PCV
009
ET 10
TV
001
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
8
.0
0
2
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
8
\2
4
8
.0
0
2
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
2
:3
4
:2
6
P
M
B
Y
:a
h
m
1
4
8
8
7
G
TEG STRIPPER, REBOILER & CONDENSATE POT
UNIT 248 - DEHYDRATION
248.0000.000.041.002
3"-KP-248023-PJB(0.4)
3"-KP-248005-PJB(0.4)
H
8"-VA-248003-PJB(0.4)
3"-KP-248008-PJB(0.4)
3"
8"
3" 3"x1-1/2"
3"-KP-248002-PJG(0.4)
2"
2"x1"
2"
3
/ 4
"
H
50
ET 10
38
SET@
5170 kPa-g
2"
2
"
3
/ 4
"
LL
2"
E-24802
V-24802
H
2"-SCH-248001-SAG
3
L
3
/ 4
"
H
HHLL=1000 mm
2"
1-1/2" 1-1/2"
E
T
1
0
3
8
E
T
1
0
3
8
4
ET 10
38
ET 10
38
TYE
001
3"x1-1/2"
3
/ 4
"
2
"
x
3
/ 4
"
3
/ 4
"
MAG
SCH-248005-SAG KP-248027-PJB(0.4)
SCH-248006-SAG
P
J
B
(
0
.4
)
U
L
B
1-1/2"
2"
6"x3" 6"x3"
2"
4
2" 2" 2"x1"
? ?
C
-
3
? ?
C-2 C-2
? ?
C-2 C-2
?
C
-
2 ? ?
C-1 C-1
?
C-1 C-2
C-1
?
C-2
C-2
?
C-2
?
?
C-1
?
C-2
?
C-2
?
C
-
2
?
C
-
2
5
1
1
9
1
6
0
C
-
2
C
-
3
C-2
?
C-2
5097550 ? ? ?
5069816
C-1 C-1
C-1
?
C-1
? ?
C-1 C-1
?
?
C
-
2
?
C
-
2
C
-
2
C
-
2
5
1
1
5
2
7
7
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
5
1
3
4
2
8
9
C
-
2
? ?
C
-
2
C
-
2
5
1
3
4
2
8
9
5
1
3
4
2
8
9
C
-
2
C
-
2
?
5062543
C-1
C-1
C-1
6 . 316/316L STAINLESS STEEL PIPING COMPONENTS ARE REQUIRED FOR THIS LINE.
6
C-1
C-1
C-1
C-1
C-1
C-1 C-1
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
004
TT
004
TI
005
LT
12373
KO TEG
FROMV-24708
247.009
MAG
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
MW
005
LI
12367
FLASHED CO2
TO V-24701
247.001
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
12380
RICH TEG
FROME-24801
248.002
12378
LEAN TEG
TO P-24801A/B
248.004
D
006
TI
005
TT
12385
RICH TEG
TO V-24802
248.002
005
PT
005
PC
TWO PHASE FLOW
D
TWO PHASE FLOW
TWO PHASE FLOW
T
W
O
P
H
A
S
E
F
L
O
W
V
V
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
HOLDS:
/ FV @105C
005
LG
INTERMITTENT
DO NOT POCKET
12386
LEAN TEG
FROMV-24806
248.002
4 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
3 . ELECTRIC TRACE TO HLL (ET 10).
006
TT
12328
LC SIGNAL
FROMLC-004
248.002
12831
MAKE-UP TEG
FROMP-24802 (S-24802)
248.005
005
TI
CONTROL VALVE FAILURE
TO GRADE WITHIN
TEG CONTAINMENT AREA
TO ATMOSPHERE
AT SAFE LOCATION
M
IN
1
0
D
004
E
S-3
M
IN
NNF
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
1-1/2"
1-1/2"
3
ET 10
38
H
3
/4
"
8"-VA-248005-PJB(0.4)
ET 10
38
E-24803
LEAN/RICH TEG EXCHANGER
0.6 MW
/ /
230 C / 150 C
PLATES: 304L SS
400 kPa-g / HV
FRAME: CS
210 C / 210 C
520 kPa-g / FV
COLD
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
HOT
SURFACE AREA:
RATED DUTY:
KP-248030-PJB(0.4)
6"x3" 3"x1-1/2"
3"-KP-248006-PJB(0.4)
3"
3"
3"
SET@
480 kPa-g
3"x1-1/2"
3"
ET 10
38
ET 10
38
3
"
-
K
P
-2
4
8
0
0
7
-
P
J
B
(
0
.4
)
E-24803
6"x3"
L
H
LLLL=250 mm
6"x3"
2"x1"
1-1/2"
3"-KP-248023-PJB(0.4)
HHLL=1100 mm
HLL=750 mm
NLL=710 mm
LLL=350 mm
V-24803
TEG FLASH DRUM
1900 mmID x 4800 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS +3 mm 304L SS CLAD/ 316L SS MATERIAL(VESSEL/INTERNALS):
480 kPa-g @105 C DESIGN PR. & TEMP:
SIZE:
RV
002
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
8
.0
0
3
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
8
\2
4
8
.0
0
3
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
2
:0
8
:2
2
P
M
B
Y
:a
h
m
1
4
8
8
7
G
TEG FLASH DRUM & LEAN/RICH EXCHANGER
UNIT 248 - DEHYDRATION
248.0000.000.041.003
ET 10
38
6"x3" 6"x3" 6"x3"
2"-KP-247002-PJB(0.4)
3"-KP-248008-PJB(0.4)
PV
005
1"
1-1/2" 1-1/2"
2
"
3"-KP-248005-PJB(0.4)
3
/4
" FO
2"-KP-248022-PAB
3/4"
C
S
O
8
"
-
G
C
-
2
4
8
0
0
5
-
P
J
B
(0
.4
)
3"x1"
3"-KP-248009-PAB
2"
ET 10
38
2"
?
C-2
?
C-2
5
2
4
2
5
2
5
3/4"
ET 10
N/A
KP-248031-PJB(0.4)
3
/4
"
NC
1"
LV
004
3
/4
"
3
/4
"
3
/4
"
SP
002
5 4
3
/4
"
3
/4
"
3
/4
"
3
/4
"
8"
8
"
8
"
x
6
"
5
1
3
4
2
8
9
C
-
2
?
C-1
?
C-1 ?
C
-
2
?
C
-
2
?
C-2
5063244
C-2
C
-
1
? 5242893
5096787
C-1
C-1 C-1
3
/4
"
ET 10
38
2"
4"
2" 10"
2
"
C
-
2
5
1
3
4
2
8
9
C
-
2
? ?
C
-
1
C
-
1
5
1
3
4
2
8
9
C
-
2
FC
3
/4
"
2"
2"
24"
3"
ET 10
38
1-1/2"
SO
V-24803
2
"
-
G
C
-
2
4
8
0
0
3
-
P
J
B
(0
.4
)
3"
3"-GC-248004-PJB(0.4)
4"x3"
H
25
?
C
-
2
5134289
C-1
?
C
-
3
5
1
3
4
2
8
9
C
-
2
?
TEMA TYPE: COMPABLOC
PAB PJB(0.4)
6Q8
P
J
B
(
0
.4
)
P
A
B
HH
C-1
C-1
C-1
ISSUED FOR ESTIMATE
11 Jul 2011
D
PARTICLE RETENTION SIZE:
D
12616
LEAN TEG
TO E-24804
248.001
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
007
PDI
6 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
D
D D
D
D D
D
/ HV @150C
5 MICRONS
005
HIS
R/S
005
FT
005
FC
01
E
013
PG
01
I
V
016
PDC
12378
LEAN TEG
FROME-24803
248.003
3 . POSITIVE DISPLACEMENT PUMP.
D
HOLDS:
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
D
D
015
PDC
D
PP
D
V
015
PDT
PARTICLE RETENTION SIZE:
PP
005A
HS
HOA
I
006A
HS
HOA
01
E
R/S
006
HIS
01
I
7 . ELECTRIC TRACE (ET 10).
D
4 . STANDBY PUMP WILL START AUTOMATICALLY ON MAIN PUMP FAILURE.
007
HS
PUMP DUTY
SELECTOR
012
PG
V
005
FX
V
5 MICRONS
016
PDT
PP
D
007
PDT
/ HV @150C
PP
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
BLOCKED
DISCHARGE
BLOCKED
DISCHARGE
/ HV @150C
I
S-9
003
PT
003
PI
RS RS
RS RS
RS RS RS RS
E
T
1
0
3
8
3
/4
"
3"-KP-248011-PAN
P
A
B
P-24801B
3
/4
"
3"-KP-248009-PAB
3/4"
3
/4
"
V-24808
7
3/4"
7
2"x1"
3
/4
"
2"-KP-248016-PAN
2"-KP-248019-PAN
2"
KP-248036-PAN
3
3
3
/4
"
1
"
3
/4
"
3
/4
"
3"
ET 10
38
P-24801A
10.0 kW DRIVER:
INSULATION TYPE/THK:
CS CS
INTERNALS CASING
MATERIAL:
TRIM:
/
5742 kPa DIFF. PR.:
RATED FLOW: 6.2 m^3/hr
LEAN TEG PUMPS
2
"
-
K
P
-2
4
8
0
1
5
-
P
A
N
3
/4
"
KP-248034-PAN
2"
3/4"
7
2" 2"
FV
005
2
"
-
K
P
-2
4
8
0
1
8
-
P
A
N
E
T
1
0
3
8
3
/4
"
2
"
3
/4
"
3"
2
"
KP-248035-PAN
3/4"
V-24807
NC NC
P-24801A
2
"
P
A
N
3/4"
E
T
1
0
3
8
H
3
/4
"
3
/4
"
5
3
/4
"
2"
3
/4
"
3
/4
"
2"
3
/4
"
3
/4
"
3
/4
"
H
3
/4
"
6
P
A
N
3
/4
"
3
/4
"
3
/4
"
3
/4
"
3
/4
"
2
"
-
K
P
-2
4
8
0
1
4
-
P
A
N
3
/4
"
P
A
B
2
"
-
K
P
-2
4
8
0
1
2
-
P
A
N
2"x1"
KP-248037-PAN
KP-248032-PAN
1
"
3
/4
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
8
.0
0
4
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
8
\2
4
8
.0
0
4
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
4
:3
0
:4
9
P
M
B
Y
:a
h
m
1
4
8
8
7
G
LEAN TEG PUMPS & FILTERS
UNIT 248 - DEHYDRATION
248.0000.000.041.004
2
"
-
K
P
-2
4
8
0
1
7
-
P
A
N
3"-KP-248010-PAN
V-24804A
6 m^3/hr
LEAN TEG FILTER
INSULATION TYPE/THK: /
/ PRESSURE DROP (CLEAN/DIRTY):
mm ID x mmT/T x SIZE:
7200 kPa-g @210 C DESIGN PR. &TEMP:
TRIM:
304L SS + 0.4 mmCA MATERIAL:
RATED FLOW:
/B
3
/4
"
2"
3
/4
"
V-24804B
V-24804A
2
"
-
K
P
-2
4
8
0
2
0
-
P
A
N
2"
/B
KP-248033-PAN
FO
H
3/4"
RV
008
RV
007
SP
004
3
/4
"
RV
003
SET@
7200 kPa-g
1D2
2
"
-
K
P
-2
4
8
0
4
1
-
P
A
N
1"-KP-248040-PAN
ET 10
38
1-1/2"
NC
1"
RV
009
3
/4
"
C
-
2
C
-
1
RV
005
SET@
7200 kPa-g
1D2
2
"
-
K
P
-2
4
8
0
4
3
-
P
A
N
2
"
-
K
P
-2
4
8
0
1
3
-
P
A
N
1"-KP-248042-PAN
SP
003B
3
/4
"
SP
003A
V-24807
1 m^3/hr
LEAN TEG CARBON FILTER
INSULATION TYPE/THK: /
/ PRESSURE DROP (CLEAN/DIRTY):
mm ID x mmT/T x SIZE:
7200 kPa-g @210 C DESIGN PR. &TEMP:
TRIM:
304L SS + 0.4 mmCA MATERIAL:
RATED FLOW:
3
/4
"
3
/4
"
H
4 4
V-24808
1 m^3/hr
LEAN TEG POST FILTER
INSULATION TYPE/THK: /
/ PRESSURE DROP (CLEAN/DIRTY):
mm ID x mmT/T x SIZE:
7200 kPa-g @210 C DESIGN PR. &TEMP:
TRIM:
304L SS + 0.4 mmCA MATERIAL:
RATED FLOW:
?
C
-
1
?
C
-
2
5
1
1
5
2
7
3
2
"
ET 10
63
C
-
2
?
C
-
2
?
C
-
2?
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
C
-
2
?
5
1
1
5
2
7
3
C
-
1
C
-
1
?
C
-
2
3
/4
"
2
"
3
/4
"
2
"
??
?
C
-
2
5
0
6
3
2
4
4
C-2
?
C-1
C
-
1
?
C-1
?
C-2
?
?
?
C-2
C
-
2
5
1
1
5
2
7
3
?
C-2
?
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
5
1
1
5
2
7
3
C
-
2
C
-
2
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
C
-
2
5115273
C-1
?
C-2
?
C
-
2
5
1
1
5
2
7
3
5
1
1
5
2
7
3
C
-
1
C
-
1
C-1
5115273
C
-
2
?
C-2
?
C-2 ?
C-2
?
C-2
?
C-2
? ?
5062541
C-1 C-1
C-1
5
1
1
5
2
7
3
C
-
2
5
1
1
5
2
7
3
C
-
2
?
C
-
2
5
0
6
3
2
4
4
C
-
1
?
C
-
1
?
C
-
1
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
TO SAFE LOCATION
TO SAFE
LOCATION
E
T
1
0
3
8
E
T
1
0
3
8
PAB PAN
1
"
-
V
A
-2
4
8
0
0
9
-
P
A
B
3
/4
"
-
K
P
-
2
4
8
0
4
4
-
P
A
N
SET@
7200 kPa-g
3/4
1"-VA-248010-PAB
PAB PAN
3/4"-KP-248038-PAN
TO SAFE LOCATION
3/4"-KP-248039-PAN
1"-VA-248011-PAB
SET@
7200 kPa-g
3/4
PAN PAB
VFD VFD
012
HIC
002
XA
002
XL
002
SI
001
XA
001
XL
001
SI
LOCAL/
REMOTE
VFD
FAULT
VFD
FAULT
LOCAL/
REMOTE
C-1
C-1
C-1
C-1
C-1
C-1
SET@
7200 kPa-g
3/4
FIRE
3/4"x1"
FIRE
3/4"x1"
FIRE
3/4"x1"
ISSUED FOR ESTIMATE
11 Jul 2011
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
011
PI
002
I
HOSE
02
I
011
LI
S-24802
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "248" UNLESS OTHERWISE
STATED.
011
PT
12831
MAKE-UP TEG
TO V-24803
248.003
CURB
HOA
008
HIS
1000L
TOTE TANK
(REMOVABLE)
(BY SHELL)
1000 L
TOTE TANK
(OPERATING)
X 2
I
D
D
011
LG
PP
011
LT
3 . POSITIVE DISPLACEMENT PUMP WITH ADJUSTABLE STROKE.
008A
HS
HOSE
H
O
S
E
6" FILL CAP
6" FILL CAP
HOLDS:
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
R/S
4 . GRADUATED GLASS COLUMN FOR CONTINUOUS TOTE TANK LEVEL AND INJECTION
PUMP CALIBRATION.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
D
INSTRUMENT SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
D
010
PG
MAG
CURB
H
O
S
E
D
2
"
2"
2"-KP-248022-PAB
P-24802
2"
3
/4
"
3
/4
"
2"x1"
2"
P-24802
1.00 kW DRIVER:
INSULATION TYPE/THK:
CS CS
INTERNALS CASING
MATERIAL:
TRIM:
/
380 kPa DIFF. PR.:
RATED FLOW: 620 L/hr
TEG MAKE-UP PUMP
2"
LG
009
3
RV
006
L
2"
S- 24802
IN
S
ID
E
2
"
x
1
"
2"
1
"
1
-
1
/2
"
x
3
/4
"
4
2"x1"
2"x1"
TEG MAKE-UP PACKAGE
1
"
-
V
A
-2
4
8
0
0
8
-
P
A
B
1
"
-
V
A
-2
4
8
0
0
6
-
P
A
B
ET 10
38
OUTSIDE
SET@
530 kPa-g
3/4"-VA-248007-PAB
1
-
1
/2
"
x
3
/4
"
2"
2"
N/A
2"
1
"
3/4"
O
U
T
S
ID
E
3
/4
"
3
/4
"
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
2
4
8
.0
0
5
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\C
O
2
\2
4
8
\2
4
8
.0
0
5
.p
id
M
O
D
E
L
D
A
T
E
:7
/7
/2
0
1
1
1
2
:0
9
:3
5
P
M
B
Y
:a
h
m
1
4
8
8
7
G
TEG MAKE-UP TANK & PUMP
UNIT 248 - DEHYDRATION
248.0000.000.041.005
ET 10
2
"
2" 2"
3
/4
"
2"
INSIDE
3
/4
"
3
/4
"
SP
006
SP
005
3
/4
"
3
/4
"
? ?
? ?
?
?
?
?
004
E
C-1 C-1
C
-
2
C
-
2
C-1
C
-
2
C
-
1
C
-
2
C-1
C
-
2
C
-
2
ISSUED FOR ESTIMATE
11 Jul 2011
S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION
ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
R
S
12721
COOLING WATER SUPPLY
TO E-44129
441.031
V
076
FC
010
TW
BACK FLUSH
009
TT
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
R
S
BFWFOR WASH WATER
FROMHEADER
440.021
PROCESS SIDE:
COOLING WATER SIDE:
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY"440' UNLESS OTHERWISE
STATED.
3 . ELECTRIC TRACE (ET10) E-44014.
008
TW
(TOTAL)
453
E
12113
WASH WATER
TO V-44119
441.030
076
FT
D
D
12722
COOLING WATER RETURN
FROME-44129
441.031
4 . OPEN PATH (NO BLOCK VALVES) REQUIRED FROME-44014 (FV-440076) TO V-44119
TO MEET SAD LINE SPECIFICATION REQUIREMENTS.
COOLING WATER RETURN
TO HEADER
440.012
COOLING WATER SUPPLY
FROMHEADER
440.012
009
TI
FYE
076
FO
1"
?
3
/4
"
?
H
?
?
? ?
? 5062543
?
? ?
?
8"-CWR-440045-UAB
ISSUED FOR PHA III 07/11/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRILIMINARY REVIEW B
4
4
0
.0
4
8
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\4
4
0
\4
4
0
.0
4
8
.p
id
M
O
D
E
L
D
A
T
E
:7
/1
0
/2
0
1
1
1
0
:2
6
:0
2
P
M
B
Y
:m
u
k
2
2
2
9
6
G
WATER MAKE-UP COOLER
UNIT 440 - HYDROGEN MANUFACTURING UNIT
440.0000.000.041.048
8"x3"
2"-WB-440011-SAD
8"-CWS-440075-UAB
?
?
?
? 3
"
8"x3" ET 10
38
5
1
1
5
2
7
7
5
1
1
5
2
7
7
5
1
1
5
2
7
7
?
? ?
FC
L
SAG
1-1/2"
FV
076
5115277
?
5
1
1
5
2
7
7
?
3
/4
"
HH
3
3
CWS-440077-SAD
6"-CWS-440076-UAB
6"-CWR-441045-UAB
3/4"
ET 10
38
2"-WB-440010-SAG
1-1/2"
WB-440012-SAD
1-1/2"
1-1/2"
1"
3
/4
"
SAD
3
/4
"
2" 2"x1-1/2" 2"x1-1/2" 2"x1-1/2"
1-1/2"
1-1/2" 2"x1-1/2" ET 10
38
CSC
E-44014
WASH WATER MAKE-UP COOLER
0.7 MW
BEU TEMA TYPE:
/ /
58 C /
CS + 3 mmCA
3100 kPa-g /
CS + 0.38 mmCA
150 C / 150 C
4025 kPa-g / FV
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
31.8 m^2
3"
CSO
3"
4
4
4
SAD
UAB
SAD
UAB
ET 10
38
441
E-44014
ISSUED FOR ESTIMATE
11 Jul 2011
S
S
S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
014
HIC
8 . LOCALIZED DEGASSINGOF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES,
ETC. RESULTING IN LOCALIZED TWO-PHASE FLOWAND VIBRATION.
12074
H2 RAWGAS
TO V-44119
441.030
12076
RICH AMINE
TOE-24602A/B
485.213
12077
H2 RAWGAS
FROMHMU 3
441.016
NUMBER OF RVs AND SIZING TO BE CONFIRMED DURING DETAILED ENGINEERING.
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
HOLDS:
12110
H2 RAWGAS
TO HMU 3 PSA
441.030
13014
440.046
GI
12072
LEAN AMINE
FROMP-24602A/B/C
485.213
D
V
7 . ELECTRIC TRACE TO HLL (ET 10).
SWING
ELBOW
12405
SET POINT
FROMLX-246001
246.002
D
MW
MW
D
12777
440.049
FL
D TWOPHASE FLOW
155
LHS
1
D
FREE DRAINING
155B
LT
4
5
0
0
m
m
V
FREE DRAINING
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES AND CONNECTION DETAILS.
24"
MW
START-UP
155
LG
VACUUMTRUCK
25
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
E
450
064
PDT
V
MIN
DP
F
R
E
E
D
R
A
IN
IN
G
/ HV @150 C
031
TT
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
5 . FOR PIPING DETAILS OF SAMPLE STATION, SEE DRAWING 200.0000.000.041.012.
6 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
155
LC
030
TI
031
TI
030
TT
PP
3 . BOTTOMOF COLUMN IS PACKED WITH 600 mmOF #2 RASCHIGRINGS.
064
PDI
B
020
XZTE
155B
LI
BYPASS
020
XZI
075
FT
075
FC
015
HIC
12723
SCL
12724
SL
155A
LI
A/S
T
MIN
155A
LT
SWING
ELBOW
154
LTE
440.018
440.018
D
D
12983
LEAN AMINE FLOWSIGNAL
TO UC-246002
246.011
D
D
V-44118
AMINE ABSORBER 3
4270 mmID x 23500 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD/ 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @95 C DESIGN PR. & TEMP:
SIZE:
14"-P-441103-DJE(0.4)
14"-P-441102-DAE
1"-SCL-441XXX-SAB
3
/4
"
2"-P-441105-DJE(0.4)
24"
36"
3"
20"-P-441095-HJE(0.4)
ULB
ET 35
88
ET 35
88
HJE(0.4)
DAG
3
/4
"
8
HH
FO
HYE
014
FYE
075
16"
FC
FC FC
3
/4
"
3
/4
"
4
"
3
/4
"
3/4"
FO
12"
FV
075
CSO
3/4"
24"
3
/4
" 2
"
20"
6
3
/4
"
3
/4
"
3"
3"
7
1-1/2"
24"x20"
3"-SL-440XXX-SAB
3
/4
"
14"-P-441101-DAG
3"
20"x12"
20"-P-441094-HJE(0.4)
2"
V-44118
6
"
DAE
2"-GI-440072-ULB
DJE(0.4)
H
L
4"-P-441097-HJE(0.4)
10"
2"
10"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
4
4
1
.0
2
9
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\4
4
1
\4
4
1
.0
2
9
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:4
2
P
M
B
Y
:b
e
s2
9
4
5
1
G
AMINE ABSORBER 3
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
441.0000.000.041.029
NLL=2550 mm
HV
015
3
/4
"
3
/4
"
3
/4
"
2"
2" 2" 2"
3
/4
"
HV
014
4
HJE(0.4)
3/4"
E
T
1
0
DAE
FO
18"x14"
3
/4
"
10"-P-441104-DJE(0.4)
4
"
N/A
3
/4
"
H
2"
C
S
O
C
S
C
2"x3/4"
FO
LLLL=300 mm
6"-FL-441035-PAC
HLL=3300 mm
LLL=1800 mm
16"-P-441096-HJE(0.4)
HHLL=4000 mm
5
2"
1-1/2"
3"
FC
20"-P-441095-HJE(0.4)
P-441121-HJE(0.4)
3"
2"
3
/4
"
HYE
015
3/4"
4"-P-441106-DJE(0.4)
10"
8"
LV
155
1"-SL-441XXX-SAB
18"
MAG
XV
020
3
/4
"
L
LL
3"
3"
GWR
SO
3
ET 10
10"-P-441104-DJE(0.4)
M
453
E
450
E
450
E
451
E
102
I
014
HZTE
450
E
015
HZTE
451
E
9 . 316 SS HARDFACED TRIMMATERIAL IS REQUIRED FOR THIS CHECK VALVE.
10. INADVERTANT SIMULTANEOUS CLOSING OF BOTH HV-014 AND HV-015 PREVENTED
BY INTERLOCK I-102.
11. VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS ADDED
FOR QUEST.
s
102
I
103
I
104
I
104
I
D
FIRE
S
- 4
(TOP)
(BTM)
S-9
3"
H HH
ET 10
H
9
10
16"
3
/4
"
3
/4
"
CSC
14"x10" 14"x10"
CSC
10
10"x8"
XYE
020
11
10"x8"
3
/4
"
11
3
/4
"
6"x3"
4
" x
1
- 1
/2
"
3
/4
"
3
/4
"
3
/4
"
SP.
050
5
6
7
P-441120-DJE(0.4)
FO
3"
20"x16" 20"x16"
SP.
051
M
IN
MIN
SP
052
SP
053
ET 10
PAC
RV
023
SET@
kPa-g
1-1/2H3
12. TOP CONNECTION.
12
3/4"
453
E
12"x10"
20"x12"
20"x12"
ISSUED FOR HAZOP

14
067
PC
032
TT
159
LI
066
PDI
016
AI
453
E
157A
LHS
016
AIT
PP
157B
LI
074B
FI
157A
LT
157B
LT
DP
074B
FX
016
AE
074A
FX
f(x)
065
PI
074
FT
066
PDT
067
PT
453
E
S
074
FHS
016C
AP
016B
AP
101
I
452
E
074A
FI
157
LG
156
LTE
157A
LI
065
PT
156
LI
019
XZTE
032
TI
159
LTE
450
E
12074
H2 RAWGAS
FROMV-44118
441.029
12110
H2 RAWGAS
FROMHMU 3
441.029
12113
WASH WATER
FROME-44014
440.048
12111
H2 RAWGAS
TO HMU 3 PSA
441.016
12414
CIRCULATINGWATER
TOP-44108A/B
441.031
12415
CIRCULATINGWATER
FROME-44129
441.031
12775
440.049
FL
12864
SET POINT
TO HMU 3 PSA SKID
443.003
12912
440.049
FL
12416
LC SIGNAL
TO LC-157
441.031
12714
FC SIGNAL
FROMFC-377
441.016
A/S
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
FREE DRAINING
CO2 LEAN
GWR
MIN
D
6
24"
MW
MAG
7
8
6
0
m
m
CO2
BYPASS
5 . ELECTRIC TRACE TOHLL (ET 10).
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
DP
24"
MW
V
HOLDS:
FREE DRAINING
SCOPE FOR SIGNAL TRANSFER TO PSA PLC TO BE DETERMINED.
7 . HAND SWITCH TOSEND FLOWSETPOINT FROMFC-377 TO PSA WHEN QUEST IS
ISOLATED.
FREE DRAINING
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
3 . CALCULATE AMOUNT OF CO2 REMOVED FROMRAWH2 GAS.
CO2 RICH
4 . H2 RAWGAS BYPASS REQUIRED FOR SYSTEMPURGE AND PRESSURIZATION AT
START-UP.
24"
MW
7
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
D
6 . EITHER LTE-441156 OR LTE-441159 SHALL BE SELECTABLE AS THE INPUT TO
SAFETY INTERLOCKS E-452 AND E-453. A DEVIATION ALARMTO MONITOR THE
TWOINSTRUMENTS SHALL BE PROVIDED AT THE DCS.
9
24"
MW
F
R
E
E
D
R
A
IN
IN
G
1
D
INST
DETAIL "B"
DETAIL "B"
PIPING
HOLD
8 . TWO CHECK VALVES IN SERIES, ONE IN THE HORIZONTAL AND ONE IN THE
VERTICAL POSITION, SEPARATED BY AT LEAST 500 mm.
INTERLOCK I-101 ACTIONS, IF ANY, TO BE CONFIRMED.
4"-P-441113-PJE(0.4)
1-1/2"
3"
16"-P-441096-HJE(0.4)
H
3
/4
"
3
/4
"
E
T
3
8
8
8
HJE(0.4)
L
10"x6"
20"-P-441098-HJE(0.4)
16"
2"
XV
019
HHLL=2550 mm
XYE
019
ET 35
88
3"
ET 10
NLL=1070 mm
3
8"x6"
V-44119
ABSORBER 3 WASH WATER VESSEL
2100 mmID x 11100 mmT/T
TRIM:
H / INSULATION TYPE/THK:
CS + 3 mm304L SS CLAD / 316L SS MATERIAL(VESSEL/INTERNALS):
3500 kPa-g @60 C DESIGN PR. & TEMP:
SIZE:
3"
2"
3"
H
3"
HLL=2380 mm
LLLL=300 mm
H
3
"
3"
FC
3
/4
"
LLL=910 mm
3/4"
20"x16"
ET 10
3
/4
"
3"
2"
3
/4
"
20"-P-441095-HJE(0.4)
18"
ET 35
88
3
/4
"
18"x16"
2"
3
/4
"
3
/4
"
2"
3
/4
"
3
/4
"
3/4"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
4
4
1
.0
3
0
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\4
4
1
\4
4
1
.0
3
0
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
2
:1
7
:5
9
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 3 WASH WATER VESSEL
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
441.0000.000.041.030
3
"
FO
4
2"
2"
H
2"
3
"
3
/4
"
P-441126-HJE(0.4)
3/4"
16"
H
H
PV
067
3"
3
/4
"
3"
L
3
/4
"
6
SAD
3"
6"x4"
3"
HJE(0.4)
6"
2"-WB-440011-SAD
PAC
3
/4
"
6
" - P
- 4
4
1
0
9
9
- H
J
E
( 0
.4
)
3
/4
"
3
/4
"
2"
5
3
/4
"
6"-P-441107-PJE(0.4)
10"-FL-441036-PAC
3"
8"
3
/4
"
SO
2"
3
/4
" FC
7
V-44119
LL
HH
3
/4
"
3
/4
"
AP
016A
8
5
8
8 8
ET 10
TSO
6
6"
CSC
3/4"
3/4"
3"x2"
/ HV @150 C
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
FLOW
INST
PIPING
PJE(0.4) HJE(0.4)
ISSUED FOR HAZOP

FV
S
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV
DATE
DESCRIPTION ISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
CLIENT
APP
PEM APE MC PDP CS PRS CKD BY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAM
QUEST CCS PROJECT
R
12722
COOLINGWATER RETURN
TOHEADER
440.048
452
E
100
I
157
LC
PURGE WATER
TO V-44111
441.013
FO
D
017
HIS
017A
HS
452
E
100
I
V
V
I
PP
8 . VALVES ARE FOR BATTERY LIMIT ISOLATION OF UNIT.
033
TG
6 . ELECTRIC TRACE (ET 10).
016
HIS
PP
157B
LHS
016A
HS
5 . SAMPLE TAKE-OFF POINTS TO BE ACCESSIBLE.
I
4 . CV OF CONTROL VALVE TO BE MINIMUM.
7 . AUTO-START STAND-BY PUMP ON RUN FAILURE OF PRIMARY PUMP.
077
FT
D
D
035
TW
A/S
452
E
D
12415
CIRCULATINGWATER
TO V-44119
441.030
12416
LC SIGNAL
FROMLHS-157A
441.030
D
077
FC
PP
D
D
TO
GRADE
M
IN
.
D
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION
GENERAL NOTES & CONNECTION DETAILS.
3 . FOR PIPING DETAILS OF SAMPLE STATION SEE DRAWING 200.0000.000.041.012.
TO
GRADE
D
R
S
034
TG
D
12414
CIRCULATINGWATER
FROMV-44119
441.030
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "441" UNLESS OTHERWISE
STATED.
070
PI
070
PT
BACK FLUSH
R
S
PP
M
IN
.
103
I
S-8
CONFIRMAVAILABILITY OF DCS AND SIS INTERLOCK SEQUENCE NUMBERS
ADDED FOR QUEST.
018
XZI
HOLDS:
D
018
XZTE
INSTRUMENT SIZINGTOBE CONFIRMED DURINGDETAILED ENGINEERING.
VFD
SI
016
XL
016
XA
VFD
FAULT
LOCAL/
REMOTE
LOCAL/
REMOTE
VFD
FAULT
017
XA
017
XL
SI
VFD
12721
COOLINGWATER SUPPLY
FROMHEADER
440.048
D
D
V
HS SEL
3
/4
"
2
"
P-44108A
5.6 kW DRIVER:
INSULATION TYPE/THK:
316 SS 316 SS
INTERNALS CASING
MATERIAL:
TRIM:
/
233 kPa DIFF. PR.:
RATED FLOW: 56.5 m^3/hr
ABSORBER 3 CIRCULATING WATER WASH PUMPS
XYE
018
P-441123-PJE(0.4)
ET 10
50
P-44108A
3/4"
FC
3/4"
/B
4"-P-441113-PJE(0.4)
6"-P-441107-PJE(0.4)
4"-P-441112-PJE(0.4)
1-1/2" 3
/4
"
N
C
LV
157A
FC
P-44108B
E
T
E
T
3
/4
"
6"x4"
ISSUED FOR PHA III 06/13/11 G
ISSUED FOR ESTIMATE 04/20/11 F
ISSUED FOR PHA II 03/01/11 E
ISSUED FOR CLIENT REVIEW 01/10/11 D
ISSUED FOR INTERNAL REVIEW 12/02/10 C
ISSUED FOR PRELIMINARY REVIEW B
4
4
1
.0
3
1
F
IL
E
:\\F
:\1
0
2
5
\D
R
A
W
IN
G
S
\H
M
U
\4
4
1
\4
4
1
.0
3
1
.p
id
M
O
D
E
L
D
A
T
E
:6
/1
4
/2
0
1
1
1
:1
7
:4
6
P
M
B
Y
:b
e
s2
9
4
5
1
G
ABSORBER 3 WASH WATER COOLER
UNIT 441 - HYDROGEN MANUFACTURING UNIT TRAIN 3
441.0000.000.041.031
E-44129
R/S
4
" - P
- 4
4
1
1
1
0
- P
J
E
( 0
.4
)
HOA
3/4"
4
" - P
- 4
4
1
1
1
1
- P
J
E
( 0
.4
)
5
3/4"
R/S HOA
H
CWR-441XXX-PJE(0.4)
L
6"-CWR-441045-UAB
6
" - P
- 4
4
1
1
0
9
- P
J
E
( 0
.4
)
6
" - P
- 4
4
1
1
0
8
- P
J
E
( 0
.4
)
3
/4
"
E
T
1
0
5
0
ET 10
50
CSO
L
3
/4
"
3
/4
"
1-1/2"
3/4"
3/4"
3
/4
"
6"x4"
3
/4
"
4
2"-P-441116-PJE(0.4)
P-441122-PJE(0.4)
XV
018
E
T
1
0
LV
157B
E
T
1
0
FC
4
"
3
/4
"
3
/4
"
3/4"
1-1/2"
3
/4
"
6"x4"
3/4"
4
6
6"-CWS-440076-UAB
E
T
1
0
5
0
3
3/4"
6"x4"
3
/4
"
4"-P-441113-PJE(0.4)
4
" - P
- 4
4
1
X
X
X
- P
J
E
( 0
.4
)
7
SP
054
2"x1"
2"x1"
2"x1"
1"
1"
3/4"
2"x1"
6 6
LL
ET 10
50
SP
055
SP
055
6
7
7
ET 10
38
2
" - P
- 4
4
1
1
1
5
- P
J
E
( 0
.4
)
8
ET 10
38
3
/4
"
4"x3" 4"x3"
E
T
1
0
5
0
E-44129
ABSORBER 3 CIRCULATING WATER COOLER
0.3 MW
BEU TEMA TYPE:
/ /
60 C / 150 C
CS + 3 mm304L SS CLAD
3800 kPa-g / HV
SUPER DUPLEX 2507 + 0.38 mmCA
58 C /
2950 kPa-g /
TUBE
TRIM:
INSULATION TYPE/THK:
MATERIAL:
DESIGN TEMP:
DESIGN PRESS:
SHELL
SURFACE AREA:
RATED DUTY:
49.3 m^2
UAB
UAB
PJE(0.4)
PJE(0.4)
ISSUED FOR HAZOP

S-ar putea să vă placă și