SECTI ON SHOWI NG PLI NTH PROTECTI ON

15MMTHK PLASTER FOR WALL 1:4


(1 CEMENT, 4 FINE SAND)
10-12 MMTOP LAYER
TILE FLOORING
SECTI ON SHOWI NG
FLOORI NG DETAI LS
12MMTHK PLASTER FOR WALL 1:4
(1 CEMENT, 4 FINE SAND)
CEILING PLASTER 6 MMTHK 1:3
(1 CEMENT : 3 FINE SAND)
6MMGROOVE ALL AROUND
THE CEILING
75
230
750
BRICK ON EDGE
1
1
5
PLINTH PROTECTION
SLOPE 1:50
20 MMCEMENT PLASTER 1:4
25 MMCEMENT CONCRETE
(1:3:6)
DRY BRICK BALLAST
GROUTED
1
0
0
1
0
0
ANTI TERMITE TREATMENT
RAMMEDEARTH
100 MMSANDFILLING
30 MMBASE LAYER OF
CEMENT MORTAR
SECTI ON SHOWI NG TERRACI NG & COPI NG DETAI LS
BRICK BATS LAIDWITH
1:4 CEM. MORTAR
20 MMTHK CEMENT MORTAR 1:4
(1 CEM,4 COARSE SAND)
TOP LAYER CEMENT MORTAR
10 MMTHK ( 1 CEM, 3 COARSE
SAND) ROUGH FINISH
40 MMTHK P.C.C. 1:2:4 FINISHED
NEAT WITH CEMENT SLURRY
75 X 75 GOLA IN 1:2:4 (1 CEM,
2 COARSE SAND, 4 STONE AGG)
12 MMPLASTER 1:3 WITH
ACRYLIC WATER PROOFING
COMPOUND(1 CEM, 3 FINE SAND),
@2 %WEIGHT OF CEMENT
4
3
5 6MMBEARING PLASTER 1:3
(1CEM, 3 FINE SAND) FINISHED
WITH A FLOATING COAT OF NEAT
CEMENT &A COATOF LIME
ONTOP OF WALLS, WHEN DRY
24 S.W.G. CHICKEN MESH AT
EVERY CONC. &BK. J UNCTION
GAP 15-25 MMFILLED&GROUTED
WITH CEMENT MORTAR 1:4
(1 CEM, 4 COARSE SAND)
50
7
5
15MMTHK CEMENT PLASTER 1:4
(1 CEMENT, 4 COARSE SAND)
230
20 MMTHK CEMENT MORTAR
( 1 CEMENT, 3 COARSE SAND)
1
0
0
100 THK. SANDFILLING
WITH BRICK BLAST
P.C.C SKIRTING
TYPI CAL DETAI L
OF CHAJ J A
15 MMTHK. PLASTER 1:4
1 CEM: 3 FINE SAND,
1 COARSE SAND
DETAI L AT ' B'
SHOWI NGPLASTER I N SHAFT
CEMJ ALI/ BK WALL 115
THK. TO BE CONSTRUCTED
AFTER INSTALLING PIPE
1
5
1
1
5
15 MMTHK. PLASTER 1:4
1 CEM: 3 FINE SAND,
1 COARSE SAND
I NTERNAL SURFACE
WORKSHOP
12 MMTHK. PLASTER 1:4
1 CEM: 4 FINE SAND
115
a
s
/s
tr.
20
6
1
2
RC.C. SUNSHADE
15 MMPLASTER
DRIP COURSE
6 MMCEM. PLASTER
ON SOFFIT OF CHAJ J A
CEMENT PLASTER 1:3
WITH WHITE WASHED
LAIDTO SLOPE
PLAN
J UNCTI ON OF R.C.C./BRI CK WALL
SECTI ONAL ELEVATI ON
J UNCTI ON OF R.C.C./BRI CK WALL
R.C.C. SLAB
1
0
0
40 X 2MMALUMINIUMSTRIP
FLOORING AS/ SPECS.
8
0
1
0
40 MMFLOORING
1
2
5
4
0
2
0
0
ROOM FL.
2
0
0
2
0
0
BEAM
PLINTH BEAM
4
3
5
1
0
0
1
0
04
0
100 THK. P.C.C. (1:5:10)
RCC COLUMN
230X450MM
PLINTH BEAM
3
2
5
TYPI CAL DROP DETAI L
TOI LET FL.
TOI LET/ KI TCHEN ROOM
a
s
/s
tr.
4
0
24 S.W.G. CHICKEN MESH AT
EVERY CONC. &BK. J UNCTION
TYPI CAL FL.
G.F.F.L
1
3
5
0
4
0
100 THK. SANDFILLING
WITH BRICK BLAST
P.C.C SKIRTING
40MMFLOOR FINISH
100 THK. P.C.C. (1:5:10)
BRICK WALL
GRASS
COLUMN
1
5
15mmlayer of
cem. plaster.
I NSI DE
OUTSI DE
200
2
3
0
1
2
200
24 s.w.g. chicken mesh at
every conc. &bk. junction
24 s.w.g. chicken mesh at
every conc. &bk. junction
200 200
115MMBRK. WALL
75MMPCC 1:5:10 FILLING
6
20x6MM
I NSI DE
OUTSI DE
3
0
0
4
5
0
230
1
2
1
5
100 MMHIGH SKIRTING
100 MMDIA.
R.W.H PIPE
SHAFT OPENING
DOOR
1
5
15 15
STRUCTURAL COLUMN/
230 MMBRICK WALL
6mmgroove between
asbestos sheet &ext. finish.
150mmasbestos sheet fixed
at one end to wall/col.
15mmlayer of
cem. plaster.
INSIDE
HOSTEL
BEDROOM
OUTSIDE
HOSTEL CORRIDOR
6mmgroove between
asbestos sheet &ext. finish.
free end
50
150
EXPANSI ON J OI NT
(ver t i c al t r eat ment )
AT LOCATI ON ' A'
EXPANSI ON J OI NT
TYP.FLOOR LOCATI ON-1
10-12 MMTILE FLOORING
CEM.MORTAR BASE
POLYSULPHIDE IN 10MMJ OINT
LOBBY FL.
4
0
0
8
0
LOBBY BEDROOM
ALT-2
AC SHEET3MM
THK.150MMWIDE
FIXEDEND
FREE END
EXPANSI ON J OI NT
TYP.FLOOR LOCATI ON-1
10-12 MMTILE FLOORING
CEM.MORTAR BASE
50 MMTH. BITUMEN
IMPREGNATEDFIBRE
BOARD
50X20MMPOLYSULPHIDE
SEALANT 75 TECHSEAL
POLYSULPHIDE IN 10MMJ OINT
LOBBY FL.
4
0
0
8
0
LOBBY
HOSTEL
BEDROOM
ALT-1
W3
W3'
W3'
D1/W2 D1/W2
EXPANSI ON J OI NT
AT TERRACE AT LOCATI ON ' A'
1
0
0
600
8
0
1
2
5
1
0
0
12 230 230 12
12mmcem. mortar.
3
0
free end fixed end
o
r
a
s
/s
ite
4
5
0
TERRACE SLAB
HOSTEL
BEDROOM
HOSTEL
CORRIDOR
50
KEY PLAN
HOSTEL BUI LDI NG
'A'
W1 W1 W1

W4/V4 W4/V4 W4/V4 W4/V4 W4/V4 W4/V4
'B'

KEY PLAN
I NSTI TUTE WORKSHOP
1
0
0
10-12 MMTOP LAYER
TILE FLOORING
30 MMBASE LAYER OF
CEMENT MORTAR