Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

MILESTONE
GENERAL
PROJECT CONTRACTUAL MILESTONE
GENERAL
MSTG000000 Milestone: BD-07 Issue Letter of Acceptance

100

29-DEC-04A

Milestone: BD-07 Issue Letter of Acceptance

MSTG000050 Milestone: Site Possession (Except Tower)

100

29-DEC-04A

Milestone: Site Possession (Except Tower)

MSTG000100 Milestone: Commencement Date

100

01-FEB-05A

MSTG000120 Milestone: Site Possession (Tower Raft)

100

05-MAR-05A

MSTG000500 Milestone: Hotel & Podium Handover (Section A)

-10

09-JAN-09

MSTG000800 Milestone: Above Level 42 Handover (Section B)

-2

18-AUG-09

Milestone: Above Level 42 Handover (Section B)

MSTG000900 Milestone: Completion for Whole of the Work

-2

18-AUG-09

Milestone: Completion for Whole of the Work

-3

18-MAR-09

GENERAL
MSTG000200 Milestone:Elec. Supply from 132kv Substation

10-NOV-07

MSTG000300 Milestone: Chilled Water Supply

27

07-JUL-07

GENERAL
MSTG000400 Permanent Electricity Power Required on Site

75

11-NOV-07

MSTG000410 Permanent Water Supply Required on Site

507

28-JUN-07

MSTG000420 Permanent Drainage Connect. Required on Site

507

28-JUN-07

MSTG000430 Permanent Irrigation Water Required on Site

42

19-NOV-08

MSTG000440 Permanent Telephone Connect. Required on Site

42

19-NOV-08

Permanent Telephone Connect. Required on Site

MSTG000450 Permanent Gas Connection Required on Site

42

19-NOV-08

Permanent Gas Connection Required on Site

MSTG000460 Permanent Fuel Oil Required on Site

42

19-NOV-08

Permanent Fuel Oil Required on Site

GENERAL
NSCG000100 Nominate MEP Sub. for Tower & Podium (S-01)

100

07-SEP-05A

NSCG000110 Nominate Conveying Systems Sub. (S-03)

100

08-MAR-05A

NSCG000120 Nominate Interior & Exterior Signage Sub. (S-04)

100

18-JAN-07A

Nominate Interior & Exterior Signage Sub. (S-04)

NSCG000130 Nominate Hotel &Serviced Apart. Finishes (S-05)

100

17-JAN-07A

Nominate Hotel &Serviced Apart. Finishes (S-05)

Milestone: Commencement Date


Milestone: Site Possession (Tower Raft)
Milestone: Hotel & Podium Handover (Section A)

OWNER'S MILESTONE
GENERAL
MS1G000600 Milestone: Hotel Grand Opening

Milestone: Hotel Grand Opening

INFRASTRUCTURE MILESTONE
OWNER'S MILESTONE
Milestone:Elec. Supply from 132kv Substation
Milestone: Chilled Water Supply

EXTERNAL UTILITY SERVICES


Permanent Electricity Power Required on Site
Permanent Water Supply Required on Site
Permanent Drainage Connect. Required on Site
Permanent Irrigation Water Required on Site

NSC AWARD MILESTONE


OWNER'S MILESTONE

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Nominate MEP Sub. for Tower & Podium (S-01)


Nominate Conveying Systems Sub. (S-03)

Sheet 1 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Nominate Apartments Finishes Sub. (S-06)

NSCG000140 Nominate Apartments Finishes Sub. (S-06)

100

26-JUL-06A

NSCG000150 Nominate Swimming Pool & Water Features (S-07)

100

02-MAY-06A

NSCG000160 Nominate Cladding Sub. for Tower (S-08)

100

20-MAR-05A

NSCG000170 Nominate Cladding Sub. for Podium/Annex (S-09)

100

22-JAN-06A

NSCG00017A Renominate Cladding Sub. for Podium/Annex (S-09)

100

30-MAR-06A

NSCG000180 Nominate Specialist ELV Systems Sub. (S-10)

100

15-JUN-06A

NSCG000190 Nominate of S-11 (Cancelled as per PMI # 488)

100

14-OCT-06A

NSCG000200 Nominate Podium Landscaping Sub. (S-14)

NSCG01020A Award External Work (S-14) - Structural Work

100

NSCG000210 Nominate Boutique Office Finishes Sub. (S-15)

241

31-MAR-07*

NSCG000220 Nominate Observatory Area Finishes Sub. (S-16)

117

31-MAY-07*

TOWER
MS0QB00000 Completion -Superstructure including Spire

30-NOV-08

MS0QB00010 Completion -Level 43-44 Sky Lobbies

76

15-DEC-08

MS0QB00020 Completion -Level 45-72 Residential Apartments

43

01-FEB-09

MS0QB00030 Completion -Level 76 Sky Lobby

51

09-FEB-09

Completion -Level 76 Sky Lobby

MS0QB00040 Completion -Level 77-108 Luxury Residential

13

09-FEB-09

Completion -Level 77-108 Luxury Residential

MS0QB00050 Completion -Level 155-156 MEP & BMU Floors

36

20-MAY-09

MS0QB00060 Completion -Level 112-135 Boutique Office

73

30-APR-09

Completion -Level 112-135 Boutique Office

MS0QB00070 Completion -Level 122 Residential / Hotel Club

83

20-APR-09

Completion -Level 122 Residential / Hotel Club

MS0QB00080 Completion -Level 123 Boutique Office Sky Lobby

78

25-APR-09

Completion -Level 123 Boutique Office Sky Lobby

MS0QB00090 Completion -Level 124 Observatory

134

14-MAR-09

Completion -Level 124 Observatory

MS0QB00100 Completion -Level 139-154 Boutique Office

87

21-MAY-09

Completion -Level 139-154 Boutique Office


Completion -Level 156-159 Communications

36

Nominate Swimming Pool & Water Features (S-07)


Nominate Cladding Sub. for Tower (S-08)
Nominate Cladding Sub. for Podium/Annex (S-09)
Renominate Cladding Sub. for Podium/Annex (S-09)
Nominate Specialist ELV Systems Sub. (S-10)
Nominate of S-11 (Cancelled as per PMI # 488)
Nominate Podium Landscaping Sub. (S-14)

30-JUN-07*

Award External Work (S-14) - Structural Work

28-AUG-06A

Nominate Boutique Office Finishes Sub. (S-15)


Nominate Observatory Area Finishes Sub. (S-16)

COMPLETION MILESTONE
OWNER'S MILESTONE
Completion -Superstructure including Spire
Completion -Level 43-44 Sky Lobbies
Completion -Level 45-72 Residential Apartments

Completion -Level 155-156 MEP & BMU Floors

MS0QB00110 Completion -Level 156-159 Communications

90

18-MAY-09

PODIUM
MS0PA00120 Completion -Podium (Except Access for Const.)

56

04-NOV-08

ANNEX
MS0R000130 Completion -Office Annex & Pool Annex

43

17-NOV-08

TOWER
MS0Q030000 Structural Completion - Tier 0 (Hotel)

100

30-AUG-06A

MS0Q030010 Structural Completion - Tier 1 (Hotel Resi.)

100

12-OCT-06A

MS0Q030020 Structural Completion - Tier 2 (Hotel Resi.)

100

18-NOV-06A

MS0Q030030 Structural Completion - Tier 3 (Hotel Resi.)

100

01-MAR-07A

Structural Completion - Tier 3 (Hotel Resi.)

MS0Q030040 Structural Completion - Tier 4 (Residential)

100

22-FEB-07A

Structural Completion - Tier 4 (Residential)

MS0Q030050 Structural Completion - Tier 5 (Residential)

319

11-APR-07

MS0Q030060 Structural Completion - Tier 6 (Residential)

305

27-JUN-07

Completion -Podium (Except Access for Const.)


Completion -Office Annex & Pool Annex

R.C. STRUCTURAL WORK COMPLETION


CONTRACTOR'S MILESTONE

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Structural Completion - Tier 0 (Hotel)


Structural Completion - Tier 1 (Hotel Resi.)
Structural Completion - Tier 2 (Hotel Resi.)

Structural Completion - Tier 5 (Residential)


Structural Completion - Tier 6 (Residential)
Sheet 2 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Structural Completion - Tier 7 (Lux. Resi.)

MS0Q030070 Structural Completion - Tier 7 (Lux. Resi.)

146

03-AUG-07

MS0Q030080 Structural Completion - Tier 8 (Lux. Resi.)

200

15-AUG-07

MS0Q030090 Structural Completion - Tier 9 (Lux. Resi.)

239

07-JUL-07

MS0Q030100 Structural Completion - Tier 10 (B. Office)

236

28-AUG-07

MS0Q030110 Structural Completion - Tier 11 (B. Office)

209

23-NOV-07

Structural Completion - Tier 10 (B. Office)


Structural Completion - Tier 11 (B. Office)

MS0Q030120 Structural Completion - Tier 12 (B. Office)

79

31-AUG-07

Structural Completion - Tier 12 (B. Office)

MS0Q030130 Structural Completion - Tier 13 (B. Office)

77

21-SEP-07

MS0Q030140 Structural Completion - Tier 14 (B. Office)

72

16-OCT-07

MS0Q030150 Structural Completion - Tier 15 (B. Office)

43

01-DEC-07

MS0Q030160 Structural Completion - Tier 16 (Communication)

19

19-JAN-08

MS0Q030170 Structural Completion - Tier 17 (Communication)

23

19-FEB-08

MS0Q030180 Structural Completion - Tier 18 (L160 Mezzanine)

20

20-MAR-08

MS0Q030190 Structural Completion - Tier 19 (Roof / Spire 1)

-5

31-OCT-08

MS0Q030200 Structural Completion - Tier 20 (Spire 2)

-3

04-OCT-08

MS0Q030210 Structural Completion - Tier 21 (Spire 3)

-3

04-OCT-08

Structural Completion - Tier 21 (Spire 3)

MS0Q030220 Structural Completion - Tier 22 (Final Low)

-3

04-OCT-08

Structural Completion - Tier 22 (Final Low)

MS0Q030230 Structural Completion - Tier 23 (Final High)

-3

04-OCT-08

Structural Completion - Tier 23 (Final High)

MS0Q030300 Concrete Work Completion (Tower)

38

03-JUL-08

MS0Q040400 Spire Work Completion (Tower)

-3

04-OCT-08

PODIUM
MS0P030000 Structural Completion - Tower Base (Up to L6)

121

06-MAY-07

236

15-APR-07

ANNEX
MS0R030700 Concrete Work Completion (Office Annex)

100

MS0R030800 Concrete Work Completion (Pool Annex)

TOWER
CD0Q000110 Issue Dwg - Tower Footprint (B2~Concourse)

100

06-FEB-05A

Issue Dwg - Tower Footprint (B2~Concourse)

CD0Q000120 Issue Dwg - Tower Footprint (Ground ~L4)

100

10-MAR-05A

Issue Dwg - Tower Footprint (Ground ~L4)

CD0Q000130 Issue Dwg - Tower Footprint (L5 - L8)

100

31-MAR-05A

Issue Dwg - Tower Footprint (L5 - L8)

CD0Q000140 Issue Dwg - Tower Footprint (L9 - L16)

100

31-MAR-05A

Issue Dwg - Tower Footprint (L9 - L16)

CD0Q000150 Issue Dwg - Tower Footprint (L17 - L18)

100

01-JUN-05A

Issue Dwg - Tower Footprint (L17 - L18)

CD0Q000160 Issue Dwg - Tower Footprint (L19 - L37)

100

01-JUN-05A

Issue Dwg - Tower Footprint (L19 - L37)

CD0Q000170 Issue Dwg - Tower Footprint (L38 - L40)

100

01-OCT-05A

CD0Q000180 Issue Dwg - Tower Footprint (L41 - L111)

100

25-OCT-05A

CD0Q000190 Issue Dwg - Tower Footprint (L112 - L154)

100

13-APR-06A

Issue Dwg - Tower Footprint (L112 - L154)

CD0Q000200 Issue Dwg - Tower Footprint (L155 - Pinnacle)

100

13-APR-06A

Issue Dwg - Tower Footprint (L155 - Pinnacle)

PODIUM
CD0P000210 Issue Dwg - Podium Outer - B2 (SW & N)

100

06-FEB-05A

MS0P030600 Concrete Work Completion (Podium)

Structural Completion - Tier 8 (Lux. Resi.)


Structural Completion - Tier 9 (Lux. Resi.)

Structural Completion - Tier 13 (B. Office)


Structural Completion - Tier 14 (B. Office)
Structural Completion - Tier 15 (B. Office)
Structural Completion - Tier 16 (Communication)
Structural Completion - Tier 17 (Communication)
Structural Completion - Tier 18 (L160 Mezzanine)
Structural Completion - Tier 19 (Roof / Spire 1)
Structural Completion - Tier 20 (Spire 2)

Concrete Work Completion (Tower)


Spire Work Completion (Tower)
Structural Completion - Tower Base (Up to L6)
Concrete Work Completion (Podium)
Concrete Work Completion (Office Annex)

03-FEB-07A
24

Concrete Work Completion (Pool Annex)

27-JUN-07

RELEASE DATES OF STRUC. DRAWING MILESTONE


OWNER'S MILESTONE

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Issue Dwg - Tower Footprint (L38 - L40)


Issue Dwg - Tower Footprint (L41 - L111)

Issue Dwg - Podium Outer - B2 (SW & N)


Sheet 3 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2009

Issue Dwg - Podium Outer - B1 (SW & N)

CD0P000220 Issue Dwg - Podium Outer - B1 (SW & N)

100

10-MAR-05A

CD0P000230 Issue Dwg - Podium Outer - Concourse (SW & N)

100

17-APR-05A

CD0P000240 Issue Dwg - Podium Outer - Ground (SW & N)

100

29-MAY-05A

CD0P000250 Issue Dwg - Podium Outer - L1 (SW & N)

100

12-JUN-05A

CD0P000260 Issue Dwg - Podium Inner & Outer - Pile (SE)

100

01-MAR-05A

CD0P000270 Issue Dwg - Podium Inner & Outer - B2 (SE)

100

17-APR-05A

Issue Dwg - Podium Inner & Outer - B2 (SE)

CD0P000280 Issue Dwg - Podium Inner & Outer - B1 (SE)

100

17-APR-05A

Issue Dwg - Podium Inner & Outer - B1 (SE)

CD0P000290 Issue Dwg - Podium Inner & Outer - Concourse (SE

100

17-APR-05A

Issue Dwg - Podium Inner & Outer - Concourse (SE

CD0P000300 Issue Dwg - Podium Inner & Outer - Ground (SE)

100

29-MAY-05A

CD0P000310 Issue Dwg - Podium Inner - B2 (SW & N)

100

06-FEB-05A

CD0P000320 Issue Dwg - Podium Inner - B1 (SW & N)

100

10-MAR-05A

CD0P000330 Issue Dwg - Podium Inner - Concourse (SW & N)

100

17-APR-05A

CD0P000340 Issue Dwg - Podium Inner - Ground (SW & N)

100

29-MAY-05A

CD0P000350 Issue Dwg - Podium Inner - L1 (SW & N)

100

12-JUN-05A

Issue Dwg - Podium Inner - L1 (SW & N)

CD0P000360 Issue Dwg - Podium Pedestals (L1 - L3)

100

12-JUN-05A

Issue Dwg - Podium Pedestals (L1 - L3)

CD0P000370 Issue Dwg - Podium Pedestals (L4 - L7)

100

06-OCT-05A

ANNEX
CD0R000380 Issue Dwg - Pool Pavilion Piles

2008

Issue Dwg - Podium Outer - Concourse (SW & N)


Issue Dwg - Podium Outer - Ground (SW & N)
Issue Dwg - Podium Outer - L1 (SW & N)
Issue Dwg - Podium Inner & Outer - Pile (SE)

Issue Dwg - Podium Inner & Outer - Ground (SE)


Issue Dwg - Podium Inner - B2 (SW & N)
Issue Dwg - Podium Inner - B1 (SW & N)
Issue Dwg - Podium Inner - Concourse (SW & N)
Issue Dwg - Podium Inner - Ground (SW & N)

Issue Dwg - Podium Pedestals (L4 - L7)


Issue Dwg - Pool Pavilion Piles

100

17-APR-05A

CD0R000390 Issue Dwg - Pool Pavilion Balance

100

30-NOV-05A

CD0R000400 Issue Dwg - Office Annex Piles

100

17-APR-05A

CD0R000410 Issue Dwg - Office Annex Balance

100

12-JUN-05A

39

21-NOV-08

11

05-AUG-09

TOWER
MS0Q05006A PMI #6 - Pile Cap Added for Podium

100

06-FEB-05A

MS0Q05009A PMI #8 - Raft~B2 Wall Height Changed& Pile A1~A4

100

01-MAR-05A

MS0Q05011A PMI #11 - 41 nos Podium Pile around Raft FDN

100

20-MAR-05A

MS0Q05020A PMI #20 - Changed Pile Q'ty D1,F1

100

17-APR-05A

MS0Q05021A PMI #56 for additional Link Beams

100

14-DEC-05A

PMI #56 for additional Link Beams

MS0Q05022A Add#53 and 54 for additional Link Beams

100

24-OCT-05A

Add#53 and 54 for additional Link Beams

MS0Q05023A Add#31,33,36 for additional Link Beams

100

01-MAR-05A

MS0Q05024A PMI #240 - Change in Welding Methodology

100

22-NOV-05A

MS0Q05025A PMI #366,378 - Add#58 & 59 - Spire Height

100

18-APR-06A

PMI #366,378 - Add#58 & 59 - Spire Height

MS0Q05026A PMI #367,383,RAS 88 - Outrigger Design (L40~43)

100

14-APR-06A

PMI #367,383,RAS 88 - Outrigger Design (L40~43)

MS0Q05027A PMI # 488 - Cancellation of S-11 Nomination

100

14-OCT-06A

Issue Dwg - Pool Pavilion Balance


Issue Dwg - Office Annex Piles
Issue Dwg - Office Annex Balance

EXTERNAL WORK
PROJECT CONTRACTUAL MILESTONE
GENERAL
S14G00010A External Work Completion for Section A
S14G00020A External Work Completion for Whole of the Work

External Work Completion for Section A


External Work Completion for Whole of the Work

VARIATION MILESTONES
PROJECT CONTRACTUAL MILESTONE

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

PMI #6 - Pile Cap Added for Podium


PMI #8 - Raft~B2 Wall Height Changed& Pile A1~A4
PMI #11 - 41 nos Podium Pile around Raft FDN
PMI #20 - Changed Pile Q'ty D1,F1

Add#31,33,36 for additional Link Beams


PMI #240 - Change in Welding Methodology

PMI # 488 - Cancellation of S-11 Nomination


Sheet 4 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

MS0Q05028A Add # 57 - Issue of MEP Drawings (L19~ 39)

100

08-APR-06A

Add # 57 - Issue of MEP Drawings (L19~ 39)

MS0Q05029A PMI #353 - Outrigger Design Change @ L17~19

100

03-APR-06A

PMI #353 - Outrigger Design Change @ L17~19

MS0Q05030A PMI #650 -External Work Order by TCI & Drawings

100

28-AUG-06A

PMI #650 -External Work Order by TCI & Drawings

MS0Q05031A PMI #660 - Ground Improvement Required

100

04-SEP-06A

PMI #660 - Ground Improvement Required

MS0Q05032A PMI #751- Re Issue of External Structure Dwgs

100

11-NOV-06A

MS0Q05033A PMI #846 - Issue Revised Loading Dock Tunnel

100

21-FEB-07A

MS0Q05035A PMI #571 - Metal Doors Specification

100

11-JUL-06A

MS0Q05036A Add #78,80 - Metal Doors Hardware Schedule

100

06-MAR-07A

TOWER
CD0Q00031A Issue MEP Dwg - Tower Footprint (B2~Concourse)

100

CD0Q00032A Issue MEP Dwg - Tower (L05-16, L38 & L39)

186

14-MAR-07*

CD0Q00033A Issue MEP Dwg - (Hotel Lobby & Public Areas)

393

14-MAR-07*

CD0Q00034A Issue MEP Dwg - Tower (L19 ~ L39)

100

CD0Q00035A Issue MEP Dwg - Tower (L40 ~ L93)

100

CD0Q00036A Issue MEP Dwg - Tower (L94 ~ L111)

302

14-MAR-07*

CD0Q00037A Issue MEP Dwg - Tower (L112 ~ L154)

371

14-MAR-07*

CD0Q00038A Issue MEP Dwg - Tower (L155 ~ Pinnacle)

100

CD0Q00039A Issue MEP Dwg - (Observatory incl. Tunnel)

CD0Q00040A Issue MEP Dwg - Podium

100

CD0Q00041A Issue MEP Dwg - Pool Annex

73

14-MAR-07*

Issue MEP Dwg - Pool Annex

CD0Q00042A Issue MEP Dwg - Office Annex

89

14-MAR-07*

Issue MEP Dwg - Office Annex

CD0Q00043A Issue MEP Dwg - External Services

296

14-MAR-07*

Issue MEP Dwg - External Services

GENERAL
BORG000030 Conduct Workshop Meeting (Logistics)

100

13-DEC-04A

13-DEC-04A

BORG000040 Conduct Workshop Meeting (Survey & Setting Out)

100

14-DEC-04A

14-DEC-04A

BORG000050 Conduct Workshop Meeting (Schedule)

100

20-DEC-04A

20-DEC-04A

BORG090090 Conduct Workshop Meeting (Concrete)

100

09-DEC-04A

09-DEC-04A

GENERAL
SMTG000010 Submit Summary Schedule

100

05-JAN-05A

Submit Summary Schedule

SMTG000030 Submit Draft Schedule & Const. Task Statements

100

13-JAN-05A

Submit Draft Schedule & Const. Task Statements

SMTG000035 Approval of Summary Schedule

100

29-JAN-05A

SMTG000050 Approval of Draft Complete Schedule

100

23-NOV-05A

Approval of Draft Complete Schedule

SMTG000055 Submit Final Complete Schedule

100

19-DEC-05A

Submit Final Complete Schedule

SMTG000057 Approval Final Complete Schedule

100

29-NOV-06A

2009

PMI #751- Re Issue of External Structure Dwgs


PMI #846 - Issue Revised Loading Dock Tunnel
PMI #571 - Metal Doors Specification
Add #78,80 - Metal Doors Hardware Schedule

MEP DRAWING RELEASE DATES


OWNER'S MILESTONE
Issue MEP Dwg - Tower Footprint (B2~Concourse)

24-SEP-05A

Issue MEP Dwg - Tower (L05-16, L38 & L39)


Issue MEP Dwg - (Hotel Lobby & Public Areas)
Issue MEP Dwg - Tower (L19 ~ L39)

08-APR-06A

Issue MEP Dwg - Tower (L40 ~ L93)

25-OCT-05A

Issue MEP Dwg - Tower (L94 ~ L111)


Issue MEP Dwg - Tower (L112 ~ L154)
Issue MEP Dwg - Tower (L155 ~ Pinnacle)

28-JAN-07A
427

Issue MEP Dwg - (Observatory incl. Tunnel)

14-MAR-07*
Issue MEP Dwg - Podium

25-OCT-05A

PRE-CONSTRUCTION
GENERAL
GENERAL ACTIVITIES

PRELIMINARY DOCUMENTATION

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Approval of Summary Schedule

Approval Final Complete Schedule


Sheet 5 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Submit Temp. Facilities Plan (1st Submission)

SMTG000090 Submit Temp. Facilities Plan (1st Submission)

100

18-JAN-05A

SMTG000110 Approval of Temp. Facilities Plan

100

07-MAR-05A

SMTG000120 Submit Submittal Schedule (Shop Dwg & Material)

100

05-APR-05A

SMTG000130 Approve Submittal Schedule (Shop Dwg & Material)

100

22-NOV-06A

SMTG000140 Submit Staffing Schedule

100

23-JAN-05A

SMTG000150 Approve Staffing Schedule

100

15-FEB-05A

SMTG000160 Submit Detailed Cash Flow

100

28-FEB-05A

SMTG000170 Approve Detailed Cash Flow

100

30-MAY-05A

Approve Detailed Cash Flow

SMTG000180 Submit Construction Method Statement

100

28-FEB-05A

Submit Construction Method Statement

SMTG000190 Approve Construction Method Statement

100

26-MAR-05A

SMTG000200 Submit Safety Management Program

100

01-FEB-05A

SMTG000210 Approve Safety Management Program

100

15-FEB-05A

SMTG000220 Submit Project Specific Quality Plan

100

26-JAN-05A

SMTG000225 Approval of Project Specific Quality Plan

100

05-MAY-05A

SMTG000310 Submit Insurances (Workman Compensation, etc.)

100

10-JAN-05A

SMTG000320 Submit Performance Bond

100

14-FEB-05A

SMTG000330 Submit Advance Payment Bond

100

15-FEB-05A

Submit Advance Payment Bond

SMTG000400 Appoint Security Service Provider

100

01-FEB-05A

Appoint Security Service Provider

SMTG000500 Complete Preliminary Document

100

22-NOV-06A

TOWER
MOBQ010020 Inspection & Investigation of Foundation & Pile

100

01-MAR-05A

09-APR-05A

MOBQ010030 Inspect Lightening Protection Jumper Test

100

16-MAR-05A

24-MAR-05A

Inspect Lightening Protection Jumper Test

MOBQ010040 Inspect Monitoring Instrument

100

19-MAR-05A

24-MAR-05A

Inspect Monitoring Instrument

MOBQ010050 Inspect Cathodic Protection

100

20-MAR-05A

24-MAR-05A

Inspect Cathodic Protection

PODIUM
SUMP900010 Site Inspection & Handover

Approval of Temp. Facilities Plan


Submit Submittal Schedule (Shop Dwg & Material)
Approve Submittal Schedule (Shop Dwg & Material)
Submit Staffing Schedule
Approve Staffing Schedule
Submit Detailed Cash Flow

Approve Construction Method Statement


Submit Safety Management Program
Approve Safety Management Program
Submit Project Specific Quality Plan
Approval of Project Specific Quality Plan
Submit Insurances (Workman Compensation, etc.)
Submit Performance Bond

Complete Preliminary Document

SITE SURVEY & INSPECTION


Inspection & Investigation of Foundation & Pile

Site Inspection & Handover

75*

100

18-JAN-05A

02-APR-05A

SMTP010060 Submit Preconstruction Photo for Site condition

100

18-JAN-05A

27-JAN-05A

MOBP010080 Inspection & Investigation of Pile

12

100

10-MAR-05A

17-MAR-05A

MOBP010090 Take Over Dewatering System

100

25-JAN-05A

01-FEB-05A

MOBP010100 Survey Bench Marking

12

100

26-FEB-05A

02-APR-05A

MOBP010110 Conduct Site Soil Test

12

100

21-FEB-05A

07-MAR-05A

153*

100

15-DEC-04A

16-MAY-05A

14

100

15-DEC-04A

28-DEC-04A Design Site Office Layout

MOBG010100 Approval of Site Office Layout

100

MOBG010110 Construct Site Contractor's Office

50

100

29-JAN-05A

06-APR-05A

MOBG010120 Construct Site PM Office

30

100

14-MAR-05A

04-MAY-05A

Construct Site PM Office

MOBG010140 Connect IT Service (SAHM)

100

01-MAY-05A

16-MAY-05A

Connect IT Service (SAHM)

Submit Preconstruction Photo for Site condition


Inspection & Investigation of Pile
Take Over Dewatering System
Survey Bench Marking
Conduct Site Soil Test

SITE MOBILIZATION
GENERAL
SUMG900020 Site Mobilization
MOBG010080 Design Site Office Layout

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

28-DEC-04A

Site Mobilization
Approval of Site Office Layout
Construct Site Contractor's Office

Sheet 6 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

MOBG010150 Connect Temp Electricity (DEWA)

100

03-JUN-06A

08-JUN-06A

MOBG010160 Connect Temp Water (DEWA)

100

29-MAR-05A

05-APR-05A

MOBG010170 Connect Temp Telephones (ETISALAT)

100

14-APR-05A

21-APR-05A

MOBG010180 Connect Temp Drainage & Sewerage (DM)

15-MAR-07*

22-MAR-07

MOBG010200 Construct Site Laboratory

14

100

26-MAR-05A

09-APR-05A

MOBG010210 Install Security System on Site Gate

12

100

21-FEB-05A

01-MAR-05A

MOBG010220 Complete Site Mobilization

100

MOBG010230 Management Personnel & Indirect Labours

1,694* 48

753

16-MAY-05A

2005

2006

2007

2008

2009

Connect Temp Electricity (DEWA)


Connect Temp Water (DEWA)
Connect Temp Telephones (ETISALAT)
Connect Temp Drainage & Sewerage (DM)
Construct Site Laboratory
Install Security System on Site Gate
Complete Site Mobilization

Ma

-2

29-DEC-04A

18-AUG-09

72

96

28-MAR-05A

19-DEC-07

1,217* 46

-4

05-SEP-05A

03-JAN-09

28-APR-05A

03-MAY-05A

14-MAR-05A

21-MAR-05A

Mat Foundation for TC (#T2)

24-FEB-05A

Submit Shop Dwg. & Data (T/C for #T1~T3)

10-MAR-05A

23-MAR-05A

Mat Foundation for TC (#T3)

TOWER CRANE
GENERAL
SUMG900030 Tower Crane for Tower (#T1,2,3)

997*

SUMG901030 Tower Crane for Tower (#M1,2,3)


TOWER
SMTQ010410 Submit Shop Dwg. & Data (T/C for #M1, M2, M3)

100

MOBQ010420 Mat Foundation for TC (#T1)

100

SMTQ010420 Approval of Submittals (T/C for #M1, M2, M3)

100

MOBQ010430 Mat Foundation for TC (#T2)

100

Tower Crane for Tower (#T1,2,3)

Tower Crane for T


Submit Shop Dwg. & Data (T/C for #M1, M2, M3)

24-JUL-05A

Mat Foundation for TC (#T1)


Approval of Submittals (T/C for #M1, M2, M3)

19-SEP-05A

SMTQ010430 Submit Shop Dwg. & Data (T/C for #T1~T3)

100

MOBQ010440 Mat Foundation for TC (#T3)

100

SMTQ010440 Approval of Submittals (T/C for #T1~T3)

100

15-MAR-05A

PFDQ010450 Purchase Order (#T1, T2, T3)

100

28-FEB-05A

PFDQ010460 Delivery on Site (#T1)

100

18-APR-05A

PFDQ010461 Delivery on Site (#T2)

100

24-MAR-05A

PFDQ010462 Delivery on Site (#T3)

100

24-MAR-05A

PFDQ010470 Purchase Order (T/C for #M1, M2, M3)

100

01-MAR-05A

PFDQ010480 Design & Fabricate Tower-Cranes for #M1, M2, M3

100

20-APR-05A

PFDQ010490 Delivery on Site (#M1, M2, M3)

100

25-AUG-05A

MOBQ010520 Install Tower Cranes for #T1

100

05-MAY-05A

18-MAY-05A

MOBQ010530 Install Tower Cranes for #T2

100

28-MAR-05A

03-APR-05A

MOBQ010540 Install Tower Cranes for #T3

100

06-APR-05A

16-APR-05A

MOBQ010710 Install Tower Cranes #M1

100

05-SEP-05A

13-SEP-05A

Install Tower Cranes #M1

MOBQ010720 Install Tower Cranes #M2

100

14-SEP-05A

21-SEP-05A

Install Tower Cranes #M2

MOBQ010730 Install Tower Cranes #M3

100

24-SEP-05A

04-OCT-05A

Install Tower Cranes #M3

MOBQ010740 Dismantle Tower Crane #T1

13-DEC-07

19-DEC-07

MOBQ010750 Dismantle Tower Crane #T2

100

28-JAN-06A

30-JAN-06A

MOBQ010770 Dismantle Tower Crane #T3

100

17-JAN-07A

22-JAN-07A

MOBQ010780 Dismantle Tower Crane #M1 (by #R1 & R2)

-3

24-DEC-08

03-JAN-09

MOBQ010790 Dismantle Tower Crane #M2 (by #M1)

12

21-JUN-08

25-JUN-08

MOBQ010800 Dismantle Tower Crane #M3, move to #R2 (by #M1)

83

08-DEC-07

12-DEC-07

MOBQ010810 Install Tower Crane #R1 @L159 (by #M2)

12

50

23-APR-08*

06-MAY-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

83

Approval of Submittals (T/C for #T1~T3)


Purchase Order (#T1, T2, T3)
Delivery on Site (#T1)
Delivery on Site (#T2)
Delivery on Site (#T3)
Purchase Order (T/C for #M1, M2, M3)
Design & Fabricate Tower-Cranes for #M1, M2, M3
Delivery on Site (#M1, M2, M3)
Install Tower Cranes for #T1
Install Tower Cranes for #T2
Install Tower Cranes for #T3

Dismantle Tower Crane #T1


Dismantle Tower Crane #T2
Dismantle Tower Crane #T3
Dismantle Tower Crane #M1 (by #R1 & R2)
Dismantle Tower Crane #M2 (by #M1)
Dismantle Tower Crane #M3, move to #R2 (by #M1)
Install Tower Crane #R1 @L159 (by #M2)
Sheet 7 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Install Tower Crane #R2 @L99 S (by #M2)

MOBQ010820 Install Tower Crane #R2 @L99 S (by #M2)

156

13-DEC-07

22-DEC-07

MOBQ010830 Install Tower Crane #R3 @L159 (by #R1)

-3

04-JAN-09

12-JAN-09

MOBQ01083A Re-Install Tower Crane #R3 @L64

-3

19-FEB-09

28-FEB-09

MOBQ010840 Dismantle Tower Crane #R1 @ L159 (by #R3)

-3

13-JAN-09

21-JAN-09

MOBQ010845 Dismantle Tower Crane #R1 @ L64 (by #R3)

-3

01-MAR-09

09-MAR-09

MOBQ010850 Dismantle Tower Crane #R2 (by #R1)

-3

10-FEB-09

18-FEB-09

MOBQ010860 Dismantle Tower Crane #R3 (by Manual)

-3

22-JAN-09

31-JAN-09

Dismantle Tower Crane #R3 (by Manual)

MOBQ01086A Dismantle Tower Crane #R3 @L64 (by Manual)

-3

10-MAR-09

18-MAR-09

Dismantle Tower Crane #R3 @L64 (by Manual)

MOBQ010870 Re-Install Tower Crane #R1 @L99 (by #R2)

-3

01-FEB-09

09-FEB-09

Re-Install Tower Crane #R1 @L99 (by #R2)

PODIUM
SMTP010030 Submit Shop Dwg. & Data (T/C for Podium)

100

24-FEB-05A

Submit Shop Dwg. & Data (T/C for Podium)

SMTP010080 Approval of Submittals (T/C for Podium)

100

24-MAR-05A

Approval of Submittals (T/C for Podium)

847*

85

PFDP010150 Purchase Order (T/C for Podium)

100

SUMP900140 Tower Crane for Podium (#P1 - #P7)

358

24-MAR-05A

Install Tower Crane #R3 @L159 (by #R1)


Re-Install Tower Crane #R3 @L64
Dismantle Tower Crane #R1 @ L159 (by #R3)
Dismantle Tower Crane #R1 @ L64 (by #R3)
Dismantle Tower Crane #R2 (by #R1)

Tower Crane for Podium (#P1 - #P7)

18-JUL-07
09-MAR-05A
23-MAR-05A

Purchase Order (T/C for Podium)


Delivery on Site (T/C for Podium)

PFDP010160 Delivery on Site (T/C for Podium)

100

MOBP013010 Mat Foundation for TC (#P1)

100

14-MAR-05A

22-MAR-05A

Mat Foundation for TC (#P1)

MOBP013020 Mat Foundation for TC (#P2)

100

07-MAR-05A

20-MAR-05A

Mat Foundation for TC (#P2)

MOBP013030 Mat Foundation for TC (#P3)

100

26-MAR-05A

04-APR-05A

MOBP013040 Mat Foundation for TC (#P4)

100

14-MAR-05A

20-MAR-05A

Mat Foundation for TC (#P4)

MOBP013050 Mat Foundation for TC (#P5)

100

14-MAR-05A

20-MAR-05A

Mat Foundation for TC (#P5)

MOBP013060 Mat Foundation for TC (#P6)

100

01-AUG-05A

13-AUG-05A

Mat Foundation for TC (#P6)

MOBP013070 Mat Foundation for TC (#P7)

100

27-JUL-05A

06-AUG-05A

Mat Foundation for TC (#P7)

MOBP014010 Install Tower Cranes for Podium (#P1)

100

02-APR-05A

07-APR-05A

Install Tower Cranes for Podium (#P1)

MOBP014020 Install Tower Cranes for Podium (#P2)

100

24-MAR-05A

31-MAR-05A

Install Tower Cranes for Podium (#P2)

MOBP014030 Install Tower Cranes for Podium (#P3)

100

11-APR-05A

17-APR-05A

MOBP014040 Install Tower Cranes for Podium (#P4)

100

30-JAN-06A

04-FEB-06A

MOBP014050 Install Tower Cranes for Podium (#P5)

100

27-DEC-05A

03-JAN-06A

MOBP014060 Install Tower Cranes for Podium (#P6)

100

17-AUG-05A

06-SEP-05A

MOBP014070 Install Tower Cranes for Podium (#P7)

100

22-SEP-05A

06-OCT-05A

MOBP015010 Dismantle Tower Cranes for Podium (#P1)

14-JUL-07

18-JUL-07

MOBP015020 Dismantle Tower Cranes for Podium (#P2)

100

25-DEC-05A

26-DEC-05A

MOBP015030 Dismantle Tower Cranes for Podium (#P3)

384

16-APR-07

21-APR-07

MOBP015040 Dismantle Tower Cranes for Podium (#P4)

179

14-MAY-07

19-MAY-07

Dismantle Tower Cranes for Podium (#P4)

MOBP015050 Dismantle Tower Cranes for Podium (#P5)

185

07-MAY-07

12-MAY-07

Dismantle Tower Cranes for Podium (#P5)

MOBP015060 Dismantle Tower Cranes for Podium (#P6)

381

MOBP015070 Dismantle Tower Cranes for Podium (#P7)

100

288

15-MAR-07

20-MAR-07

10-OCT-06A

19-OCT-06A

28-JUN-05A

30-AUG-08

Mat Foundation for TC (#P3)

Install Tower Cranes for Podium (#P3)


Install Tower Cranes for Podium (#P4)
Install Tower Cranes for Podium (#P5)
Install Tower Cranes for Podium (#P6)
Install Tower Cranes for Podium (#P7)
Dismantle Tower Cranes for Podium (#P1)
Dismantle Tower Cranes for Podium (#P2)
Dismantle Tower Cranes for Podium (#P3)

Dismantle Tower Cranes for Podium (#P6)


Dismantle Tower Cranes for Podium (#P7)

TEMPORARY HOIST
GENERAL
SUMG900050 Temporary Hoist (#H1 - #H7)

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

1,160* 54

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

18

Temporary Hoist (#H1 - #H

Sheet 8 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

TOWER
SMTQ010010 Submit Shop Dwg. & Data (Hoist-car for Tower)

100

16-JUN-05A

SMTQ010020 Approval of Submittals (Hoist-car for Tower)

100

18-JUL-05A

SMTQ010030 Submit Shop Dwg. & Data (Jump Hoist-car)

100

06-JUN-05A

Submit Shop Dwg. & Data (Jump Hoist-car)

SMTQ010040 Approval of Submittals (Jump Hoist-car)

100

09-JUN-05A

Approval of Submittals (Jump Hoist-car)

PFDQ010050 Purchase Order (Hoist-car for Tower)

100

10-AUG-05A

PFDQ010060 Fabricate & Delivery on Site (Hoist for Tower)

100

13-DEC-05A

PFDQ010070 Purchase Order (Jump Hoist-car)

100

26-MAR-05A

2008

2009

Submit Shop Dwg. & Data (Hoist-car for Tower)


Approval of Submittals (Hoist-car for Tower)

Purchase Order (Hoist-car for Tower)


Fabricate & Delivery on Site (Hoist for Tower)
Purchase Order (Jump Hoist-car)

PFDQ010080 Delivery on Site (Jump Hoist-car)

100

18-JUN-05A

Delivery on Site (Jump Hoist-car)

MOBQ010260 Inspection from Authorities (Jumping Hoist car)

100

06-JUL-05A

07-JUL-05A

Inspection from Authorities (Jumping Hoist car)

MOBQ011010 Install Hoist Car - HC#1 (Concourse- L113)

100

15-DEC-05A

15-JAN-06A

MOBQ011020 Install Hoist Car - HC#2 (Concourse- L113)

100

30-JAN-06A

08-MAR-06A

MOBQ011030 Install Hoist Car - HC#3 (Concourse- L100)

100

12-AUG-06A

19-OCT-06A

MOBQ011040 Install Hoist Car - HC#4 (Concourse- L100)

100

29-JAN-07A

11-FEB-07A

MOBQ011050 Install Hoist Car - HC#5 (L112-143)

81

15-SEP-07

19-SEP-07

MOBQ011060 Install Hoist Car - HC#6 (L112-160M)

106

20-SEP-07

25-SEP-07

MOBQ01107A Install Hoist Car - HC#7 (L159-Roof 2)

21-FEB-08

26-FEB-08

MOBQ011080 Install Hoist-car - Jumping HC#1 (B2-L124)

100

28-JUN-05A

06-JUL-05A

MOBQ011090 Install Hoist-car - Jumping HC#2 (B2-L155)

100

11-JUL-05A

18-JUL-05A

MOBQ011095 Install Hoist-car - Jumping HC#3 (B2-L143)

100

22-SEP-05A

28-SEP-05A

MOBQ012010 Dismantle Hoist Car - HC#1 (Concourse- L113)

05-MAY-08

14-MAY-08

MOBQ012020 Dismantle Hoist Car - HC#2 (Concourse- L113)

24-APR-08

04-MAY-08

Dismantle Hoist Car - HC#2 (Concourse- L113)

MOBQ012030 Dismantle Hoist Car - HC#3 (Concourse- L100)

14-APR-08

23-APR-08

Dismantle Hoist Car - HC#3 (Concourse- L100)

MOBQ012040 Dismantle Hoist Car - HC#4 (Concourse- L100)

03-APR-08

13-APR-08

Dismantle Hoist Car - HC#4 (Concourse- L100)

MOBQ012050 Dismantle Hoist Car - HC#5 (L112-144)

32

02-AUG-08

05-AUG-08

Dismantle Hoist Car - HC#5 (L112-144)

MOBQ012060 Dismantle Hoist Car - HC#6 (L112-160M)

16

25-AUG-08

30-AUG-08

Dismantle Hoist Car - HC#6 (L112-160M)

MOBQ01207A Dismantle Hoist Car - HC#7 (L159-Roof 2)

84

08-SEP-08

13-SEP-08

MOBQ012080 Dismantle Hoist Car - Jumping HC#1 (B2-L124)

81

20-SEP-07

24-SEP-07

MOBQ012090 Dismantle Hoist Car - Jumping HC#2 (B2-L155)

56

24-OCT-07

28-OCT-07

MOBQ012095 Dismantle Hoist Car - Jumping HC#3 (B2-L143)

136

18-AUG-07

21-AUG-07

-3

07-AUG-05A

04-NOV-07

Install Hoist Car - HC#1 (Concourse- L113)


Install Hoist Car - HC#2 (Concourse- L113)
Install Hoist Car - HC#3 (Concourse- L100)
Install Hoist Car - HC#4 (Concourse- L100)
Install Hoist Car - HC#5 (L112-143)
Install Hoist Car - HC#6 (L112-160M)
Install Hoist Car - HC#7 (L159-Roof 2)
Install Hoist-car - Jumping HC#1 (B2-L124)
Install Hoist-car - Jumping HC#2 (B2-L155)
Install Hoist-car - Jumping HC#3 (B2-L143)
Dismantle Hoist Car - HC#1 (Concourse- L113)

Dismantle Hoist Car - HC#7 (L159-Roof 2)


Dismantle Hoist Car - Jumping HC#1 (B2-L124)
Dismantle Hoist Car - Jumping HC#2 (B2-L155)
Dismantle Hoist Car - Jumping HC#3 (B2-L143)

CONCRETE PLACING BOOM


GENERAL
SUMG900060 Placing Boom (#CPB1 -#CPB4)

Placing Boom (#CPB1 -#CPB4)

820*

71

TOWER
PFDQ010350 Purchase Order (Con'c Placing Boom)

100

23-JUN-05A

PFDQ010360 Delivery on Site (Con'c Placing Boom)

100

01-AUG-05A

Delivery on Site (Con'c Placing Boom)

SMTQ010370 Submit Shop Dwg. & Data (Con'c Placing boom)

100

26-MAY-05A

Submit Shop Dwg. & Data (Con'c Placing boom)

SMTQ010380 Approval of Submittals (Con'c Placing boom)

100

MOBQ010600 Install Con'c Placing Boom (Temp #1)

100

09-JUN-05A

12-JUN-05A

MOBQ010610 Install Con'c Placing Boom (CPB #1)

100

07-AUG-05A

08-AUG-05A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Purchase Order (Con'c Placing Boom)

Approval of Submittals (Con'c Placing boom)

07-JUL-05A

Install Con'c Placing Boom (Temp #1)


Install Con'c Placing Boom (CPB #1)
Sheet 9 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

MOBQ010620 Install Con'c Placing Boom (CPB #2)

100

10-AUG-05A

11-AUG-05A

Install Con'c Placing Boom (CPB #2)

MOBQ010630 Install Con'c Placing Boom (CPB #3)

100

08-AUG-05A

09-AUG-05A

Install Con'c Placing Boom (CPB #3)

MOBQ010640 Install Con'c Placing Boom (CPB #4)

100

21-AUG-05A

23-AUG-05A

MOBQ011610 Dismantle Con'c Placing Boom (CPB #1)

03-NOV-07

04-NOV-07

MOBQ011620 Dismantle Con'c Placing Boom (CPB #2)

100

08-MAR-07A

12-MAR-07A

MOBQ011630 Dismantle Con'c Placing Boom (CPB #3)

100

01-FEB-07A

04-FEB-07A

MOBQ011640 Dismantle Con'c Placing Boom (CPB #4)

100

25-DEC-06A

28-DEC-06A

TOWER
PFDQ010310 Purchase Order (Pump for High-rise)

100

11-AUG-05A

PFDQ010320 Delivery on Site (Pump for High-rise)

100

28-JAN-06A

SMTQ010340 Submit Shop Dwg. & Data (Pump for High-rise)

100

10-AUG-05A

Submit Shop Dwg. & Data (Pump for High-rise)

SMTQ010350 Approval of Submittals (Pump for High-rise)

100

29-SEP-05A

Approval of Submittals (Pump for High-rise)

PFDQ010390 Install Concrete Pump for High-rise on Zone B

100

28-JAN-06A

09-FEB-06A

06-FEB-05A

01-SEP-05A

-2

2008

2009

Install Con'c Placing Boom (CPB #4)


Dismantle Con'c Placing Boom (CPB #1)
Dismantle Con'c Placing Boom (CPB #2)
Dismantle Con'c Placing Boom (CPB #3)
Dismantle Con'c Placing Boom (CPB #4)

CONCRETE PUMP
Purchase Order (Pump for High-rise)
Delivery on Site (Pump for High-rise)

Install Concrete Pump for High-rise on Zone B

FORM WORK
GENERAL
SUMG900080 Approve & Delivery Formwork Design (Tower)

208*

100

TOWER
SMTQ030140 Select Form Supplier (Core Form for Tower)

100

06-FEB-05A

SMTQ030150 Submit Shop Dwg & Data (Core Form for Tower)

100

14-MAR-05A

SMTQ03015A Submit Shop Dwg & Data (Core B2 Form)

100

16-APR-05A

SMTQ030160 Approval of Submittals (Core Form for Tower)

100

06-APR-05A

SMTQ03016A Approval of Submittals (Core B2 Form) : PMI #8

100

14-MAY-05A

SMTQ030170 Purchase Order (Core Form for Tower)

100

07-FEB-05A

SMTQ03017A Purchase Order (Core B2 Form)

100

15-MAY-05A

SMTQ030180 Fabricate & Delivery on Site (Core Form Tower)

100

03-APR-05A

SMTQ03018A Fab. & Del. on Site (Core B2 Form)

100

SMTQ030190 Site Pre-Assembly (Core wall Form- B2 Wall)

14

100

05-APR-05A

30-APR-05A

SMTQ030200 Site Pre-Assembly (Core wall Form- B1 Wall)

14

100

15-MAR-05A

24-MAR-05A

SMTQ030490 Select Form Supplier (Slab Form for B2-L6)

100

06-FEB-05A

SMTQ030500 Submit Shop Dwg & Data (Slab Form for B2-L6)

100

17-APR-05A

SMTQ030510 Approval of Submittals (Slab Form for B2-L6)

100

05-JUN-05A

SMTQ030520 Purchase Order (Slab Form for B2-L6)

100

17-APR-05A

SMTQ030530 Fabricate & Delivery on Site (Slab Form B2-L6)

100

SMTQ030540 Form Site Assembly (Slab Form for Tower)

18

100

22-JUN-05A

SMTQ030600 Select Form Supplier (Slab Form for Above L7)

100

04-JUL-05A

SMTQ030610 Submit Shop Dwg & Data (Slab Form for Above L7)

100

20-SEP-05A

SMTQ030620 Approval of Submittals (Slab Form for Above L7)

100

12-OCT-05A

SMTQ030630 Purchase Order (Slab Form for Above L7)

100

25-JUN-05A

SMTQ030640 Fabricate & Delivery on Site (Slab for Above L7)

100

01-SEP-05A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Approve & Delivery Formwork Design (Tower)


Select Form Supplier (Core Form for Tower)
Submit Shop Dwg & Data (Core Form for Tower)
Submit Shop Dwg & Data (Core B2 Form)

05-JUN-05A

Approval of Submittals (Core Form for Tower)


Approval of Submittals (Core B2 Form) : PMI #8
Purchase Order (Core Form for Tower)
Purchase Order (Core B2 Form)
Fabricate & Delivery on Site (Core Form Tower)
Fab. & Del. on Site (Core B2 Form)
Site Pre-Assembly (Core wall Form- B2 Wall)
Site Pre-Assembly (Core wall Form- B1 Wall)
Select Form Supplier (Slab Form for B2-L6)
Submit Shop Dwg & Data (Slab Form for B2-L6)

09-JUN-05A

Approval of Submittals (Slab Form for B2-L6)


Purchase Order (Slab Form for B2-L6)
Fabricate & Delivery on Site (Slab Form B2-L6)
Form Site Assembly (Slab Form for Tower)

21-JUL-05A

Select Form Supplier (Slab Form for Above L7)


Submit Shop Dwg & Data (Slab Form for Above L7)
Approval of Submittals (Slab Form for Above L7)
Purchase Order (Slab Form for Above L7)
Fabricate & Delivery on Site (Slab for Above L7)
Sheet 10 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

PODIUM
PFDP030170 Purchase Order (Form for Podium Wall & Slab)

100

20-APR-05A

SMTP030170 Submit Method Statement (for Podium_ Mat)

100

01-FEB-05A

Submit Method Statement (for Podium_ Mat)

SMTP030171 Submit Method Statement (for Podium)

100

17-MAR-05A

Submit Method Statement (for Podium)

SMTP030172 Approval of Method Statement for Podium

100

09-JUN-05A

Approval of Method Statement for Podium

SMTP030175 Select Form Supplier (Slab Form for Podium)

11

100

16-APR-05A

Select Form Supplier (Slab Form for Podium)

06-APR-05A

2009

Fabricate & Delivery on Site (Form for Podium)

PFDP030180 Fabricate & Delivery on Site (Form for Podium)

100

23-JUN-05A

100

09-JUN-05A

SMTP030181 Submit Shop Dwg & Data (Col & Slab for Podium)

18

100

GENERAL
SMTG030200 Select Rebar Supplier

100

23-JAN-05A

SMTG030210 Approval of Supplier by Employer (Rebar)

100

08-FEB-05A

SMTG030250 Submit layout for Rebar Shop Area

100

26-JUN-05A

Submit layout for Rebar Shop Area

SMTG030260 Approval of Layout for Rebar Shop Area

100

03-JUL-05A

Approval of Layout for Rebar Shop Area

MOBG030270 Install Jig for Rebar on Site on Podium Zone "A"

18

100

24-APR-06A

27-APR-06A

MOBG030280 Install Jig for Rebar on Site on Podium Zone "B"

18

100

29-JAN-06A

09-FEB-06A

05-JUL-05A

23-JUL-05A

06-JUN-05A

2008

Purchase Order (Form for Podium Wall & Slab)

SMTP030180 Approval of Form Shop Dwg (Podium Wall & Slab)

15-MAY-05A

2007

Approval of Form Shop Dwg (Podium Wall & Slab)


Submit Shop Dwg & Data (Col & Slab for Podium)

REBAR WORK
Select Rebar Supplier
Approval of Supplier by Employer (Rebar)

Install Jig for Rebar on Site on Podium Zone "A"


Install Jig for Rebar on Site on Podium Zone "B"
Install Jig for Rebar on Site on Podium Zone "C"

MOBG030290 Install Jig for Rebar on Site on Podium Zone "C"

18

100

TOWER
SMTQ030230 Submit Shop Dwg for Tower B2 (Rebar)

100

30-MAR-05A

Submit Shop Dwg for Tower B2 (Rebar)

SMTQ030240 Approval of Shop Dwg for Tower B2 (Rebar)

100

06-APR-05A

Approval of Shop Dwg for Tower B2 (Rebar)

PODIUM
SMTP030220 Delivery on Site (Rebar for Pile cap)

100

24-MAR-05A

SMTP030230 Submit Shop Dwg for Podium B2 (Rebar)

100

09-MAR-05A

Submit Shop Dwg for Podium B2 (Rebar)

SMTP030340 Approval of Shop Dwg for Podium B2 (Rebar)

100

16-MAR-05A

Approval of Shop Dwg for Podium B2 (Rebar)

PODIUM
SMTP020070 Submit Method Statement (Exca. & Breaking)

100

17-FEB-05A

SMTP020080 Approval of Method & Data (Exca. & Breaking)

100

07-MAR-05A

PFDP020110 Mobilization of All Excavation Machinery on site

100

07-MAY-05A

PODIUM
SMTP020090 Approval of Submittals ( B2 level Podium)

100

04-APR-05A

SMTP020120 Submit Shop Dwg. & Data (B2 level For Podium)

100

07-MAR-05A

PFDP020210 Purchase Order to Granular Supplier

100

20-APR-05A

Purchase Order to Granular Supplier

PFDP020220 Delivery of Granular Materials on site

100

01-MAY-05A

Delivery of Granular Materials on site

100

23-MAR-05A

Select Pile Subcontractor

100

31-MAR-05A

Mobilization of All Piling Machinery on site

Delivery on Site (Rebar for Pile cap)

EXCAVATION
Submit Method Statement (Exca. & Breaking)
Approval of Method & Data (Exca. & Breaking)
Mobilization of All Excavation Machinery on site

SITE WORK
Approval of Submittals ( B2 level Podium)
Submit Shop Dwg. & Data (B2 level For Podium)

PILE WORK & PILE TRIMMING


PODIUM
SMTP020010 Select Pile Subcontractor
PFDP020100 Mobilization of All Piling Machinery on site
Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 11 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

SMTP020100 Submit Shop Dwg. & Data (Piling Work For Podium)

100

31-MAR-05A

SMTP000110 Approval of Submittals(Shop Drawings)

100

19-APR-05A

TOWER
SMTQ050120 Submit Revised Design for R. C. Staircase

100

25-JUL-05A

SMTQ050130 Approval of Submittals - R.C. Staircase

100

29-SEP-05A

PODIUM
SMTP030100 Submit Shop Dwg. & Data (B2 level For Podium)

100

08-MAR-05A

SMTP030110 Approval of Submittals ( B2 level Podium)

100

04-APR-05A

2005

2006

2007

2008

2009

Submit Shop Dwg. & Data (Piling Work For Podium)


Approval of Submittals(Shop Drawings)

REINFORCED CONCRETE WORK


Submit Revised Design for R. C. Staircase
Approval of Submittals - R.C. Staircase

FOUNDATION WORK
Submit Shop Dwg. & Data (B2 level For Podium)
Approval of Submittals ( B2 level Podium)

CONCRETE MIX DESIGN


GENERAL
SUMG900070 Prepare, Submit, Approve Concrete Mix Design

29-DEC-04A

28-MAR-05A

Prepare, Submit, Approve Concrete Mix Design

90*

100

TOWER
SMTQ030005 Select Concrete Supplier

100

06-JAN-05A

SMTQ030010 Prepare Mix Design

30

100

29-DEC-04A

SMTQ030020 Submit Trial Mix Design Report (28 days)

100

16-MAR-05A

Submit Trial Mix Design Report (28 days)

SMTQ030030 Submit Trial Mix Concrete for Tower (C80, C60)

100

01-FEB-05A

Submit Trial Mix Concrete for Tower (C80, C60)

SMTQ030050 Submit Trial Mix Design Result (56 days)

100

13-APR-05A

SMTQ030070 Approval of Mix Design (for Tower)

100

28-MAR-05A

SMTQ030080 Pouring Site Mock-up for Test (Column, Wall)

100

09-MAR-05A

SMTQ030090 Submit Site Mock-up for Test Report

100

12-APR-05A

SMTQ030100 Start Creep & Shrinkage Test (CTL)

100

14-MAR-05A

PODIUM
SMTP030030 Submit Mix Design- Historical Data (for Podium)

100

01-FEB-05A

SMTP030040 Approval of Mix Design (for Podium)

100

26-FEB-05A

TOWER
SMTQ040110 Submit Shop Dwg & Data (Masonry)

100

27-MAR-06A

SMTQ040120 Approval of Submittals (Masonry)

100

13-APR-06A

PFDQ040200 Purchase Order (Masonry Work)

100

28-JAN-06A

PFDQ040210 Delivery on site (Masonry Blocks)

100

16-APR-06A

GENERAL
SMTG050010 Select Structural Steel Beam Supplier

100

SMTG050020 Approval of Steel Beam Supplier from Employer

18

14-MAR-07

Approval of Steel Beam Supplier from Employer

SMTG050030 Submit Method Statement for Steel Structure

57

05-APR-07

Submit Method Statement for Steel Structure

SMTG050040 Approval of Method Statements (Steel Structure)

57

26-APR-07

SMTG050060 Submit Material Sample for (Steel Beam)

23

14-MAR-07

SMTG050070 Approval of Material (Steel Beam)

23

04-APR-07

Select Concrete Supplier


01-FEB-05A

Prepare Mix Design

Submit Trial Mix Design Result (56 days)


Approval of Mix Design (for Tower)
Pouring Site Mock-up for Test (Column, Wall)
Submit Site Mock-up for Test Report
Start Creep & Shrinkage Test (CTL)
Submit Mix Design- Historical Data (for Podium)
Approval of Mix Design (for Podium)

MASONRY WORK
Submit Shop Dwg & Data (Masonry)
Approval of Submittals (Masonry)
Purchase Order (Masonry Work)
Delivery on site (Masonry Blocks)

STRUCTURAL STEEL

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Select Structural Steel Beam Supplier

04-FEB-07A

Approval of Method Statements (Steel Structure)


Submit Material Sample for (Steel Beam)
Approval of Material (Steel Beam)
Sheet 12 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Submit Shop Dwg & Data (Steel Beam)

SMTG050100 Submit Shop Dwg & Data (Steel Beam)

18

22-JUN-07

SMTG050110 Approval of Shop Dwg & Data (Steel Beam)

27

13-JUL-07

PFDG050120 Order Raw Materials (Steel Beam)

23

18-APR-07

PFDG050121 Fabricate & Assemble on Factory (Steel Beam)

60

23

PFDG050122 Delivery on Site (Struc. Steel)

23

22-SEP-07

SMTG050140 Submit Shop Dwg & Data (Steel Deck)

18

28-JUL-07

Submit Shop Dwg & Data (Steel Deck)

SMTG050150 Approval of Submittals (Steel Deck)

18

18-AUG-07

Approval of Submittals (Steel Deck)

PFDG050160 Fabricate & Delivery on Site (Steel Deck)

18

16-NOV-07

PFDG052000 Order Raw Materials (Steel Pipe)

22

18-APR-07

Order Raw Materials (Steel Pipe)

SMTG052010 Select Structural Steel Supplier (Steel Pipe)

100

04-FEB-07A

Select Structural Steel Supplier (Steel Pipe)

SMTG052020 Approval of Steel Pipe Supplier from Employer

14-MAR-07

Approval of Steel Pipe Supplier from Employer

SMTG052060 Submit Material Sample (Steel Pipe)

22

14-MAR-07

Submit Material Sample (Steel Pipe)

SMTG052070 Approval of Material (Steel Pipe)

22

04-APR-07

Approval of Material (Steel Pipe)

PFDG052100 Fabricate Steel Pipe #1 (8 nos)

60

SMTG052100 Submit Shop Dwg & Data (Steel Pipe)

18-JUL-07

02-SEP-07

15-SEP-07

Approval of Shop Dwg & Data (Steel Beam)


Order Raw Materials (Steel Beam)
Fabricate & Assemble on Factory (Steel Beam)
Delivery on Site (Struc. Steel)

Fabricate & Delivery on Site (Steel Deck)

Fabricate Steel Pipe #1 (8 nos)

31-OCT-07

Submit Shop Dwg & Data (Steel Pipe)


Delivery to Dubai Factory Steel Pipe #1 (8 nos)

12-JUL-07

PFDG052110 Delivery to Dubai Factory Steel Pipe #1 (8 nos)

60

SMTG052110 Approval of Shop Dwg. (Steel Pipe)

01-NOV-07

30-DEC-07

PFDG052120 Install Accessory & Thermal Coat (Steel Pipe #1)

45

PFDG052130 Delivery Pipe on Site Steel Pipe #1 (8 nos)

SMTG052170 Steel Pipe Mock-up Test

30

TOWER
SMTQ050100 Submit Shop Dwg & Data (Staircase Handrail)

100

29-SEP-05A

SMTQ050110 Approval of Submittals (Staircase Handrail)

100

18-JAN-06A

PFDQ050200 Purchase Order (Staircase Handrail)

100

04-JUN-05A

PFDQ050210 Fabricate & Delivery on site (Staircase H/R)

100

25-FEB-06A

SMTQ050500 Select Handrail Supplier

100

04-JUN-05A

TOWER
SMTQ070100 Select Fireproofing Supplier

214

14-MAR-07

SMTQ070110 Submit Shop Dwg & Data (Fire Proofing)

214

23-MAY-07

SMTQ070120 Approval of Shop Dwg & Data (Fire Proofing)

214

17-JUN-07

PFDQ070200 Fabricate & Delivery on site (Fire Proofing)

214

05-FEB-08

GENERAL
SMTG070020 Select Sub-contractor (Waterproofing)

100

13-JAN-05A

SMTG070030 Approval of Supplier by Employer (Waterproofing)

100

23-FEB-05A

Approval of Supplier by Employer (Waterproofing)

SMTG070100 Submit Method Statement (Waterproofing)

100

15-FEB-05A

Submit Method Statement (Waterproofing)

SMTG070110 Approval of Method Statement (Waterproofing)

100

23-FEB-05A

Approval of Method Statement (Waterproofing)

Approval of Shop Dwg. (Steel Pipe)


Install Accessory & Thermal Coat (Steel Pipe #1)

02-AUG-07
01-DEC-07

14-JAN-08

03-AUG-07

01-SEP-07

Delivery Pipe on Site Steel Pipe #1 (8 nos)

21-JAN-08

Steel Pipe Mock-up Test

HANDRAIL - STAIRE CASE


Submit Shop Dwg & Data (Staircase Handrail)
Approval of Submittals (Staircase Handrail)
Purchase Order (Staircase Handrail)
Fabricate & Delivery on site (Staircase H/R)
Select Handrail Supplier

FIRE PROOFING
Select Fireproofing Supplier
Submit Shop Dwg & Data (Fire Proofing)
Approval of Shop Dwg & Data (Fire Proofing)
Fabricate & Delivery on site (Fire Proofing)

WATERPROOFING

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Select Sub-contractor (Waterproofing)

Sheet 13 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

CLADDING for TOWER (S-08) -PROVISIONAL


TOWER
PFDQ080010 Purchase Order (Concrete Embedment)

100

SMTQ080010 Submit Shop Dwg. (Concrete Embedment)

24

100

02-JUL-05A

18-AUG-05A

Purchase Order (Concrete Embedment)

21-JUL-05A

Submit Shop Dwg. (Concrete Embedment)

PFDQ080020 Delivery on site (Concrete Embedment)

100

26-SEP-05A

SMTQ080020 Approval for Submittals (Concrete Embedment)

100

18-AUG-05A

PFDQ080200 Fabricate & Delivery on Site (C/W-Tier 0-3)

39

20-MAY-07

SMTQ08080A Install Visual Mockup in Dubai - F.E.

39

09-APR-07

SMTQ08081A Approval for Visual Mockup in Dubai - F.E.

14

39

SMTQ080900 Shop Dwg. for Visual Mock-up (C/W)

24

100

SMTQ08090A Submit Result for Mock-up (TTM3B) - F.E.

SMTQ080910 Approval for Visual Mock-up (C/W)

100

SMTQ080920 Install Visual Mock-up(C/W)

100

SMTQ080930 Shop Dwg. for Test Mock-up (C/W)

26

100

SMTQ080940 Approval for Test Mock-up (C/W)

100

SMTQ08094A Start to develop the Far East Design

100

05-MAY-07

20-MAY-07

27-APR-05A

27-AUG-05A

53

Delivery on site (Concrete Embedment)


Approval for Submittals (Concrete Embedment)
Fabricate & Delivery on Site (C/W-Tier 0-3)
Install Visual Mockup in Dubai - F.E.
Approval for Visual Mockup in Dubai - F.E.
Shop Dwg. for Visual Mock-up (C/W)
Submit Result for Mock-up (TTM3B) - F.E.

12-MAY-07
Approval for Visual Mock-up (C/W)

07-SEP-05A

Install Visual Mock-up(C/W)

25-OCT-06A
28-AUG-05A

Shop Dwg. for Test Mock-up (C/W)

20-SEP-05A

Approval for Test Mock-up (C/W)


Start to develop the Far East Design

19-DEC-06A

Install Tower Testing of Mock-up (C/W)

SMTQ080950 Install Tower Testing of Mock-up (C/W)

100

SMTQ08095A Install Tower Test Mockup (TTM1,3,4,5) - F.E.

100

22-MAR-06A

SMTQ08096A Testing for Mockups (TTM1,3,4,5) - F.E.

14

50

39

SMTQ080970 Approval of Report for Mock-up Test (C/W)

SMTQ08097A Submit Result for Mock-up (TTM1,3,4,5) - F.E.

SMTQ080980 Submit Shop Dwg. for Construction (C/W)

100

SMTQ08098A Install Test Mockup (TTM3B) in Dubai - F.E.

SMTQ080990 Approval of Shop Dwg. for Construction (C/W)

100

SMTQ08099A Testing for Mockups (TTM3B) in Dubai - F.E.

14

SMTQ081110 Submit BMU Machine Supplier

100

20-OCT-05A

SMTQ081120 Approval of BMU Machine Supplier

100

10-NOV-05A

SMTQ081130 Submit BMU Rail, Gates, Steel, Machine

100

27-JUL-06A

SMTQ081140 Approval of BMU Rail, Gates, Steel, Machine

100

26-AUG-06A

SMTQ081150 Fabricate & Delivery on Site (Steel Structure)

222

11-AUG-07

SMTQ081160 Fabricate & Delivery on Site (Rails)

349

16-APR-07

SMTQ081170 Fabricate & Delivery on Site (Gates)

228

08-OCT-07

SMTQ081180 Fabricate & Delivery on Site (Machine L40)

278

15-SEP-07

Fabricate & Delivery on Site (Machine L40)

SMTQ081190 Fabricate & Delivery on Site (Machine L73)

327

15-SEP-07

Fabricate & Delivery on Site (Machine L73)

SMTQ081200 Fabricate & Delivery on Site (Machine L109)

359

15-SEP-07

Fabricate & Delivery on Site (Machine L109)

SMTQ081210 Fabricate & Delivery on Site (Machine SP1)

391

15-SEP-07

Fabricate & Delivery on Site (Machine SP1)

56

Install Tower Test Mockup (TTM1,3,4,5) - F.E.

05-FEB-07A

05-MAR-07A

07-MAR-07A

22-MAR-07

Testing for Mockups (TTM1,3,4,5) - F.E.

89

14-MAR-07

Approval of Report for Mock-up Test (C/W)

75

08-APR-07

Submit Result for Mock-up (TTM1,3,4,5) - F.E.


Submit Shop Dwg. for Construction (C/W)

05-OCT-05A
53

Install Test Mockup (TTM3B) in Dubai - F.E.

09-APR-07

Approval of Shop Dwg. for Construction (C/W)

01-MAR-06A
53

10-APR-07

Testing for Mockups (TTM3B) in Dubai - F.E.

25-APR-07
Submit BMU Machine Supplier

Approval of BMU Machine Supplier


Submit BMU Rail, Gates, Steel, Machine
Approval of BMU Rail, Gates, Steel, Machine
Fabricate & Delivery on Site (Steel Structure)
Fabricate & Delivery on Site (Rails)
Fabricate & Delivery on Site (Gates)

CLADDING for PODIUM & ANNEX (S-09) -PROVISIONAL


PODIUM
SMTP080181 Submit Result report for Mock-up Test (C/W)

14

SMTP080901 Shop Dwg. for Visual Mock-up (C/W)

24

100

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

26-JUN-07

11-JUL-07

15-MAY-06A

31-JUL-06A

Submit Result report for Mock-up Test (C/W)


Shop Dwg. for Visual Mock-up (C/W)
Sheet 14 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Issue Letter of Intent to S-09 from BD-07

SMTP08090A Issue Letter of Intent to S-09 from BD-07

100

SMTP080911 Approval for Visual Mock-up (C/W)

21

13-APR-06A
14-MAR-07

SMTP080921 Install Visual Mock-up(C/W)

21

04-JUN-07

SMTP080931 Shop Dwg. for Test Mock-up (C/W)

26

100

SMTP080941 Approval for Test Mock-up (C/W)

-11

14-MAR-07

SMTP080951 Install Tower Testing of Mock-up (C/W)

-11

23-MAY-07

Install Tower Testing of Mock-up (C/W)

SMTP080961 Submit Result report for Mock-up Test - PTM1

14

-11

09-JUN-07

Submit Result report for Mock-up Test - PTM1

SMTP080971 Approval of Report for Mock-up Test (C/W)

-11

03-JUL-07

Approval of Report for Mock-up Test (C/W)

SMTP080981 Submit Shop Dwg. for Construction (C/W)

-11

11-JUL-07

Submit Shop Dwg. for Construction (C/W)

SMTP080991 Approval of Shop Dwg. for Construction (C/W)

-11

05-AUG-07

SMTP081111 Submit & Approval BMU Machine Supplier

100

SMTP081121 Submit BMU Machine Drawings & Data

164

08-APR-07

SMTP081131 Submit BMU Rail, Gates, Steel, Machine

164

05-JUN-07

PFDP081141 Fabricate &Delivery-BMU Rail,Gates,Steel,Machine

164

22-DEC-07

SMTP081141 Approval of Shop Dwg. for BMU Rail, Gates, Steel

164

30-JUN-07

PFDP081161 Fabricate & Delivery on Site (Cladding Material)

-11

27-SEP-07

SMTP08171 Submit Result report for Mock-up Test - PTM2

14

56

TOWER
SMTQ150010 Submit Shop Dwg & Data (MEP Embedment - MC)

100

05-APR-05A

Submit Shop Dwg & Data (MEP Embedment - MC)

SMTQ150020 Approval of Submittals (MEP Embedment - MC)

100

01-MAY-05A

Approval of Submittals (MEP Embedment - MC)

PFDQ150030 Purchasing Order (MEP Embedment - MC)

100

01-MAY-05A

Purchasing Order (MEP Embedment - MC)

PFDQ150040 Delivery on Site (MEP Embedment - MC)

100

21-MAY-05A

Delivery on Site (MEP Embedment - MC)

TOWER
SMTQ150100 Submit Shop Dwg & Data (MEP Embedment -Sub)

10

100

SMTQ150110 Approval of Submittals (AHU, Pump)

100

24-APR-06A

SMTQ150200 Approval of Submittals (MEP Embedment - Sub)

100

01-DEC-05A

Approval of Submittals (MEP Embedment - Sub)

PFDQ150300 Purchasing Order (MEP Embedment - Sub)

100

01-DEC-05A

Purchasing Order (MEP Embedment - Sub)

PFDQ150400 Delivery on Site (MEP Embedment - Sub)

100

21-DEC-05A

Delivery on Site (MEP Embedment - Sub)

SMTQ150900 Shop Dwg. for MEP Equipment (AHU, Pump)

80

100

SMTQ150910 Submit Tech. Data for Equipment (AHU, Pump)

100

SMTQ150920 Approval of Tech. data for Equipment (AHU, Pump)

100

25-JAN-06A

PFDQ150930 Purchasing Order for Equipment (AHU, Pump)

100

05-JUN-06A

PFDQ150940 Delivery in Site of Equipment (AHU, Pump)

100

23-JAN-07A

PFDQ150950 Purchasing Order for MEP (Duct, Pipe Riser)

100

30-NOV-05A

SMTQ150950 Shop Dwg. for MEP Work (Duct, Pipe Riser)

100

10-NOV-05A

PFDQ150960 Purchasing Order for MEP (Equip. & Devices)

100

05-JUN-06A

SMTQ150960 Approval of Submittal MEP Work(Duct, Pipe Riser)

100

15-DEC-05A

PFDQ150970 Delivery on site MEP (Duct, Pipe Riser Material)

100

29-AUG-06A

20-MAY-06A

24-MAY-07

Approval for Visual Mock-up (C/W)


Install Visual Mock-up(C/W)
Shop Dwg. for Test Mock-up (C/W)

31-JUL-06A

Approval for Test Mock-up (C/W)

Approval of Shop Dwg. for Construction (C/W)


Submit & Approval BMU Machine Supplier

03-MAY-07A

10-JUN-07

Submit BMU Machine Drawings & Data


Submit BMU Rail, Gates, Steel, Machine
Fabricate &Delivery-BMU Rail,Gates,Steel,Machine
Approval of Shop Dwg. for BMU Rail, Gates, Steel
Fabricate & Delivery on Site (Cladding Material)
Submit Result report for Mock-up Test - PTM2

25-JUN-07

MEP WORK (SBA) - PROVISIONAL


02-APR-05A

MEP WORKS (S-01) -PROVISIONAL

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

01-NOV-05A

08-NOV-05A

Submit Shop Dwg & Data (MEP Embedment -Sub)

10-NOV-05A

Approval of Submittals (AHU, Pump)

Shop Dwg. for MEP Equipment (AHU, Pump)

08-JUN-06A

Submit Tech. Data for Equipment (AHU, Pump)

08-NOV-05A

Approval of Tech. data for Equipment (AHU, Pump)


Purchasing Order for Equipment (AHU, Pump)
Delivery in Site of Equipment (AHU, Pump)
Purchasing Order for MEP (Duct, Pipe Riser)
Shop Dwg. for MEP Work (Duct, Pipe Riser)
Purchasing Order for MEP (Equip. & Devices)
Approval of Submittal MEP Work(Duct, Pipe Riser)
Delivery on site MEP (Duct, Pipe Riser Material)
Sheet 15 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

330

Early
Finish

2005

2006

2007

2008

2009

Delivery on site MEP (Equip.&Devices Material)

PFDQ150980 Delivery on site MEP (Equip.&Devices Material)

SMTQ15100A Issue of Add # 57 for MEP (L19 ~ 39)

100

14-MAR-07

SMTQ15110A Prepare & Submit Shop Drgs. : (L19 ~ 39)

60

100

15-JUN-06A

10-JUL-06A

SMTQ15120A Review & Approve Drawings : (L19 ~ 39)

21

100

10-JUL-06A

15-AUG-06A

PODIUM
SMTP150100 Shop Dwg. for MEP Eq. Podium (AHU, Pump)

80

100

08-NOV-05A

10-MAY-06A

SMTP150110 Approval of Submittals for MEP Podium (AHU,Pump)

100

01-JUN-06A

PFDP150200 Purchasing Order for Eq. for Podium (AHU, Pump)

100

07-SEP-06A

PFDP150210 Delivery in Site of Eq. for Podium (AHU, Pump)

158

14-MAR-07

Delivery in Site of Eq. for Podium (AHU, Pump)

TOWER
SMTQ130010 Submit Shop dwg.(First) for In& Ext Grap - Tower

339

19-MAR-07

Submit Shop dwg.(First) for In& Ext Grap - Tower

SMTQ130011 Approval Shop dwg.(First) for In&Ext Grap-Tower

339

12-APR-07

SMTQ130012 Submit Shop dwg.(Last) for In& Ext Grap - Tower

427

15-OCT-07

SMTQ130013 Approval Shop dwg.(Last) for In&Ext Grap-Tower

427

08-NOV-07

PFDQ130020 Purchase Order (first) to Int&Ext Material-Tower

339

06-MAY-07

PFDQ130021 Delivery of Int&Ext Materials (First) -Tower

339

23-SEP-07

PFDQ130022 Purchase Order (Last) to Int&Ext Material-Tower

467

06-MAY-07

Issue of Add # 57 for MEP (L19 ~ 39)

08-APR-06A

Prepare & Submit Shop Drgs. : (L19 ~ 39)


Review & Approve Drawings : (L19 ~ 39)
Shop Dwg. for MEP Eq. Podium (AHU, Pump)
Approval of Submittals for MEP Podium (AHU,Pump)
Purchasing Order for Eq. for Podium (AHU, Pump)

INT&EXT GRAPHICS & SIGNAGE (S-04) - PROVISIONAL

Approval Shop dwg.(First) for In&Ext Grap-Tower


Submit Shop dwg.(Last) for In& Ext Grap - Tower
Approval Shop dwg.(Last) for In&Ext Grap-Tower
Purchase Order (first) to Int&Ext Material-Tower
Delivery of Int&Ext Materials (First) -Tower
Purchase Order (Last) to Int&Ext Material-Tower
Delivery of Int&Ext Materials (Last) -Tower

PFDQ130023 Delivery of Int&Ext Materials (Last) -Tower

467

23-SEP-07

PODIUM
SMTP130100 Submit Shop dwg. for Int & Ext Graphics - Podium

303

19-MAR-07

Submit Shop dwg. for Int & Ext Graphics - Podium

SMTP130110 Approval Shop dwg. for Int & Ext Grap - Podium

303

12-APR-07

Approval Shop dwg. for Int & Ext Grap - Podium

PFDP130200 Purchase Order to Signage & Graph Matl-Podium

303

06-MAY-07

PFDP130210 Delivery of Int & Ext Materials on site-Podium

303

23-SEP-07

Purchase Order to Signage & Graph Matl-Podium


Delivery of Int & Ext Materials on site-Podium

FINISHES (S-05: HOTEL) -PROVISIONAL


GENERAL
007G090010 Submit Shop dwg. for Mock-up (L7)

Submit Shop dwg. for Mock-up (L7)

125

29-MAY-07

016G090010 Submit Shop dwg. for Mock-up (L16)

143

03-JUL-07

Submit Shop dwg. for Mock-up (L16)

007G090020 Approval of Shop dwg. for Mock-up (L7)

125

23-JUN-07

Approval of Shop dwg. for Mock-up (L7)

016G090020 Approval of Shop dwg. for Mock-up (L16)

143

007G090100 Mock-up Room for Hotel (L7)

70

115

007G09010A Issue Letter of Intent to S-05 by SBA JV

96

016G090100 Mock-up Room for Hotel (L16)

113

Mock-up Room for Hotel (L7)

20-MAR-07*

Issue Letter of Intent to S-05 by SBA JV

70

96

03-JUL-07

SMTQ090023 Submit Shop dwg.(Last) - Hotel Finishes

109

20-NOV-07

SMTQ090030 Approval of Shop dwg.(First) - Hotel Finishes

96

28-JUL-07

SMTQ090033 Approval of Shop dwg.(Last) - Hotel Finishes

109

15-DEC-07

PFDQ090040 Purchase Order (First) - Hotel Finishes

96

28-JUL-07

PFDQ090043 Purchase Order (Last) - Hotel Finishes

109

15-DEC-07

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

20-SEP-07

02-OCT-07

TOWER
SMTQ090020 Submit Shop dwg.(First) - Hotel Finishes

Start Date
Finish Date
Data Date

Approval of Shop dwg. for Mock-up (L16)

28-JUL-07
25-JUL-07

Mock-up Room for Hotel (L16)

28-NOV-07

Submit Shop dwg.(First) - Hotel Finishes


Submit Shop dwg.(Last) - Hotel Finishes
Approval of Shop dwg.(First) - Hotel Finishes
Approval of Shop dwg.(Last) - Hotel Finishes
Purchase Order (First) - Hotel Finishes
Purchase Order (Last) - Hotel Finishes
Sheet 16 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Delivery of Materials (First) - Hotel Finishes


Delivery of Materials (Last) - Hotel Finishes

PFDQ090050 Delivery of Materials (First) - Hotel Finishes

96

21-AUG-07

PFDQ090053 Delivery of Materials (Last) - Hotel Finishes

109

08-JAN-08

GENERAL
021G090010 Submit Shop dwg. for Mock-up (L21)

100

30-OCT-06A

048G090010 Submit Shop dwg. for Mock-up (L48)

100

01-MAR-07A

088G090010 Submit Shop dwg. for Mock-up (L88)

021G090020 Approval of Shop dwg. - Apartment Mack-Up (L21)

100

048G090020 Approval of Shop dwg. - Apartment Mack-Up (L48)

213

21-MAR-07

088G090020 Approval of Shop dwg. - Apartment Mack-Up (L88)

226

19-APR-07

Approval of Shop dwg. - Apartment Mack-Up (L88)

021G090100 Mock-Up Room For Apartment (L21)

70

29

152

09-FEB-07A

03-MAY-07

Mock-Up Room For Apartment (L21)

048G090100 Mock-Up Room For Apartment (L48)

70

30

28-NOV-07

05-FEB-08

Mock-Up Room For Apartment (L48)

088G090100 Mock-Up Room For Apartment (L88)

70

65

08-DEC-07

15-FEB-08

Mock-Up Room For Apartment (L88)

TOWER
SMTQ090021 Submit Shop dwg.(First) - Apartment Finishes

100

SMTQ090024 Submit Shop dwg.(Last) - Apartment Finishes

254

28-MAY-07

SMTQ090031 Approval of Shop dwg.(First) - Apart. Finishes

101

14-MAR-07

SMTQ090034 Approval of Shop dwg.(Last) - Apart. Finishes

254

21-JUN-07

PFDQ090041 Purchase Order(First) - Apart. Finishes

101

14-MAR-07

PFDQ090044 Purchase Order(Last) - Apart. Finishes

254

21-JUN-07

Purchase Order(Last) - Apart. Finishes

PFDQ090051 Delivery of Materials(First) - Apart. Finishes

101

08-APR-07

Delivery of Materials(First) - Apart. Finishes

PFDQ090054 Delivery of Materials(Last) - Apart. Finishes

254

16-JUL-07

TOWER
SMTQ090150 Submit Shop Dwg & Data (Drywall)

100

22-AUG-06A

SMTQ090160 Approval of Submittals (Drywall)

100

25-SEP-06A

PFDQ090250 Purchase Order (Drywall Materials)

100

15-OCT-06A

Purchase Order (Drywall Materials)

PFDQ090260 Delivery on site (Drywall Materials)

100

16-OCT-06A

Delivery on site (Drywall Materials)

TOWER
SMTQ090022 Submit Shop dwg.(First) - B. Office Finishes

208

28-JUN-07

SMTQ090025 Submit Shop dwg.(Last) - B. Office Finishes

208

20-DEC-07

SMTQ090032 Approval of Shop dwg.(First) - B.Office Finishes

260

23-JUL-07

SMTQ090035 Approval of Shop dwg.(Last) - B.Office Finishes

208

14-JAN-08

PFDQ090042 Purchase Order (First) - B. Office Finishes

260

23-JUL-07

PFDQ090045 Purchase Order (Last) - B. Office Finishes

208

14-JAN-08

PFDQ090052 Delivery of Material (First)-B. Office Finishes

260

16-AUG-07

PFDQ090055 Delivery of Material (Last) - B. Office Finishes

208

07-FEB-08

FINISHES (S-06: APARTMENT) -PROVISIONAL

263

Submit Shop dwg. for Mock-up (L21)


Submit Shop dwg. for Mock-up (L48)
Submit Shop dwg. for Mock-up (L88)

31-MAR-07

Approval of Shop dwg. - Apartment Mack-Up (L21)

08-FEB-07A

Approval of Shop dwg. - Apartment Mack-Up (L48)

Submit Shop dwg.(First) - Apartment Finishes

30-OCT-06A

Submit Shop dwg.(Last) - Apartment Finishes


Approval of Shop dwg.(First) - Apart. Finishes
Approval of Shop dwg.(Last) - Apart. Finishes
Purchase Order(First) - Apart. Finishes

Delivery of Materials(Last) - Apart. Finishes

DRYWALL - BACK OF HOUSE


Submit Shop Dwg & Data (Drywall)
Approval of Submittals (Drywall)

FINISHES (S-15: BOUTIQ OFFICE) -PROVISIONAL

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Submit Shop dwg.(First) - B. Office Finishes


Submit Shop dwg.(Last) - B. Office Finishes
Approval of Shop dwg.(First) - B.Office Finishes
Approval of Shop dwg.(Last) - B.Office Finishes
Purchase Order (First) - B. Office Finishes
Purchase Order (Last) - B. Office Finishes
Delivery of Material (First)-B. Office Finishes
Delivery of Material (Last) - B. Office Finishes

Sheet 17 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

FINISHES WORK (BACK OF HOUSE)


TOWER
SMTQ090010 Submit Shop dwg. for Finishes work - Tower

100

01-JUN-06A

SMTQ090011 Approval of Shop dwg. for Finishes work - Tower

100

17-SEP-06A

PFDQ090020 Purchase Order for Finishing Materials - Tower

100

29-AUG-06A
03-OCT-06A

Submit Shop dwg. for Finishes work - Tower


Approval of Shop dwg. for Finishes work - Tower
Purchase Order for Finishing Materials - Tower
Delivery on site for Finishing Materials - Tower

PFDQ090021 Delivery on site for Finishing Materials - Tower

100

PODIUM
SMTP090110 Submit Shop dwg. for Finishes work - Podium

100

01-JUN-06A

SMTP090130 Approval of Shop dwg. for Finishes work - Podium

100

17-SEP-06A

SMTP090210 Purchase Order for Finishing Materials - Podium

100

29-AUG-06A

Purchase Order for Finishing Materials - Podium

SMTP090230 Delivery of Finishing Item for Podium on site

100

03-OCT-06A

Delivery of Finishing Item for Podium on site

TOWER
SMTQ090170 Submit Shop Dwg & Data (Painting Work)

100

03-AUG-06A

SMTQ090180 Approval of Submittals (Painting Work)

100

12-DEC-06A

PFDQ090270 Purchase Order (Painting Materials)

237

14-MAR-07

PFDQ090280 Delivery on site (Painting Materials)

237

01-AUG-07

TOWER
PFDQ09110A Purchase Order for Observatory Finish Materials

117

19-SEP-07

Purchase Order for Observatory Finish Materials

SMTQ09110A Submit Shop dwg. - Observatory Area Finishes

117

29-AUG-07

Submit Shop dwg. - Observatory Area Finishes

PFDQ09210A Delivery of Observatory Finish Materials

117

18-DEC-07

SMTQ09210A Approval of Shop dwg.- Observatory Area Finishes

117

19-SEP-07

TOWER
SMTQ090100 Submit Shop Dwg & Material (Wall Finishes)

100

01-JUN-06A

SMTQ090110 Approval of Submittals (Wall Finishes)

100

21-DEC-06A

PFDQ090200 Purchase Order (Staircase Wall Finish Materials)

357

14-MAR-07

PFDQ090210 Delivery on site (Stair Wall Finish Materials)

357

23-MAY-07

TOWER
SMTQ090130 Submit Shop Dwg & Material (Floor Finishes)

426

14-MAR-07

SMTQ090140 Approval of Submittals (Floor Finishes)

426

08-APR-07

Approval of Submittals (Floor Finishes)

PFDQ090220 Purchase Order (Stair Floor Finish Materials)

426

08-APR-07

Purchase Order (Stair Floor Finish Materials)

PFDQ090230 Delivery on site (Stair Floor Finish Materials)

426

17-JUN-07

TOWER
PFDQ140010 Purchase Order (Concrete Embedment)

100

21-APR-05A

SMTQ140010 Submit Shop Dwg & Data (Concrete Embedment)

100

02-APR-05A

PFDQ140020 Delivery on site (Concrete Embedment)

100

18-MAY-05A

Submit Shop dwg. for Finishes work - Podium


Approval of Shop dwg. for Finishes work - Podium

PAINTING - BACK OF HOUSE


Submit Shop Dwg & Data (Painting Work)
Approval of Submittals (Painting Work)
Purchase Order (Painting Materials)
Delivery on site (Painting Materials)

OBSERVATORY AREA FINISHES (S-16)

Delivery of Observatory Finish Materials


Approval of Shop dwg.- Observatory Area Finishes

WALL FINISHES - STAIR CASE


Submit Shop Dwg & Material (Wall Finishes)
Approval of Submittals (Wall Finishes)
Purchase Order (Staircase Wall Finish Materials)
Delivery on site (Stair Wall Finish Materials)

FLOOR FINISHES - STAIR CASE


Submit Shop Dwg & Material (Floor Finishes)

Delivery on site (Stair Floor Finish Materials)

CONVEYING SYSTEM (S-03) -PROVISIONAL

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Purchase Order (Concrete Embedment)


Submit Shop Dwg & Data (Concrete Embedment)
Delivery on site (Concrete Embedment)
Sheet 18 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

SMTQ140020 Approval of Submittals (Concrete Embedment)


CONSTRUCTION USE ELEVATOR
SMTY140110 Submit Shop Dwg & Data (E/V for Const.)
PFDY140120 Manufacturing - Elevator (BS2)
SMTY140120 Approval of Submittals (E/V for Const.)
SMTY140130 Order Process to Factory (E/V for Const.)

% Total
Comp Float

100

100

600

95

100

Early
Start

Early
Finish
20-APR-05A

2005

06-FEB-06A

2007

2008

Submit Shop Dwg & Data (E/V for Const.)


Manufacturing - Elevator (BS2)

18-APR-07
25-OCT-05A

Approval of Submittals (E/V for Const.)

25-OCT-05A

Order Process to Factory (E/V for Const.)

100

PFDY140160 Manufacturing - Elevator (HA1~HA3)

225

100

21-NOV-05A

01-MAY-06A

Manufacturing - Elevator (HA1~HA3)

PFDY140200 Manufacturing - Elevator (HS1,HS2)

225

100

26-OCT-05A

01-MAY-06A

Manufacturing - Elevator (HS1,HS2)

PFDY140230 Manufacturing - Elevator (R1~R3)

225

100

25-DEC-05A

20-MAY-06A

Manufacturing - Elevator (R1~R3)

PFDY140240 Manufacturing - Elevator (R10,R11)

225

78

01-JUN-06A

12-MAY-07

PFDY140260 Manufacturing - Elevator (R4,R5)

600

100

25-JAN-06A

12-DEC-06A

PFDY140280 Manufacturing - Elevator (R7~R9)

225

100

24-APR-06A

21-FEB-07A

PFDY140400 Shipment - Elevator (HA1~HA3)

24

100

09-MAY-06A

07-JUN-06A

PFDY140420 Shipment - Elevator (BS2)

24

PFDY140500 Shipment - Elevator (HS1,HS2)

24

100

PFDY140530 Shipment - Elevator (R1~R3)

24

100

PFDY140540 Shipment - Elevator (R10,R11)

24

PFDY140560 Shipment - Elevator (R4,R5)

24

PFDY140580 Shipment - Elevator (R7~R9)


PFDY140700 Material Delivery at Site - Elevator (HA1~HA3)
PFDY140720 Material Delivery at Site - Elevator (BS2)

PFDY140800 Material Delivery at Site - Elevator (HS1,HS2)

100

PFDY140830 Material Delivery at Site - Elevator (R1~R3)

100

PFDY140840 Material Delivery at Site - Elevator (R10,R11)

PFDY140860 Material Delivery at Site - Elevator (R4,R5)

100

09-JAN-07A

PFDY140880 Material Delivery at Site - Elevator (R7~R9)

100

21-JAN-07A

NON CONSTRUCTION USE ELEVATOR


PFDX140110 Manufacturing - Elevator (BS1)
SMTX140110 Submit Shop Dwg & Data (E/V for Non-Const.)
SMTX140120 Approval of Submittals (E/V for Non-Const.)

147

Manufacturing - Elevator (R10,R11)


Manufacturing - Elevator (R4,R5)
Manufacturing - Elevator (R7~R9)
Shipment - Elevator (HA1~HA3)
Shipment - Elevator (BS2)

19-APR-07

16-MAY-07

09-MAY-06A

07-JUN-06A

Shipment - Elevator (HS1,HS2)

27-MAY-06A

26-JUN-06A

Shipment - Elevator (R1~R3)

13-MAY-07

09-JUN-07

100

10-DEC-06A

09-JAN-07A

24

100

14-OCT-06A

100

600

87

100

122

147

Shipment - Elevator (R10,R11)


Shipment - Elevator (R4,R5)
Shipment - Elevator (R7~R9)

21-JAN-07A

Material Delivery at Site - Elevator (HA1~HA3)

07-JUN-06A
122

58

Material Delivery at Site - Elevator (BS2)

16-MAY-07

147

07-JUN-06A

Material Delivery at Site - Elevator (HS1,HS2)

20-JUN-06A

Material Delivery at Site - Elevator (R1~R3)


Material Delivery at Site - Elevator (R10,R11)

09-JUN-07

06-FEB-06A

Material Delivery at Site - Elevator (R4,R5)


Material Delivery at Site - Elevator (R7~R9)
Manufacturing - Elevator (BS1)

13-JUN-07
14-JUN-05A

Submit Shop Dwg & Data (E/V for Non-Const.)

22-JUN-05A

Approval of Submittals (E/V for Non-Const.)

100

127

100

PFDX140140 Manufacturing - Elevator (BS5)

200

100

04-APR-06A

01-MAR-07A

PFDX140160 Manufacturing - Elevator (H1~H4)

225

100

29-OCT-05A

01-MAY-06A

PFDX140170 Manufacturing - Elevator (HB1,HB2)

175

100

06-OCT-05A

11-JUN-06A

Manufacturing - Elevator (HB1,HB2)

PFDX140190 Manufacturing - Elevator (HP1~HP4)

175

100

08-DEC-05A

11-JUN-06A

Manufacturing - Elevator (HP1~HP4)

PFDX140210 Manufacturing - Elevator (HS3~HS5)

175

100

08-DEC-05A

11-JUN-06A

Manufacturing - Elevator (HS3~HS5)

PFDX140220 Manufacturing - Elevator (OB1,OB2)

600

83

22-JAN-06A

15-JUL-07

PFDX140270 Manufacturing - Elevator (R6)

600

100

25-JAN-06A

12-DEC-06A

PFDX140290 Manufacturing - Elevator (RP1,RP2)

175

100

08-DEC-05A

29-JUL-06A

PFDX140130 Manufacturing - Elevator (BS4)


SMTX140130 Order Process to Factory (E/V for Non Const.)

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

214

15-MAR-07

281

Manufacturing - Elevator (BS4)

09-AUG-07
23-JUN-05A

2009

Approval of Submittals (Concrete Embedment)

05-OCT-05A
122

2006

Order Process to Factory (E/V for Non Const.)


Manufacturing - Elevator (BS5)
Manufacturing - Elevator (H1~H4)

Manufacturing - Elevator (OB1,OB2)


Manufacturing - Elevator (R6)
Manufacturing - Elevator (RP1,RP2)
Sheet 19 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Shipment - Elevator (BS1)

PFDX140410 Shipment - Elevator (BS1)

24

58

14-JUN-07

11-JUL-07

PFDX140430 Shipment - Elevator (BS4)

24

214

11-AUG-07

06-SEP-07

PFDX140440 Shipment - Elevator (BS5)

24

100

21-JAN-07A

15-MAR-07A

PFDX140460 Shipment - Elevator (H1~H4)

24

100

09-MAY-06A

07-JUN-06A

PFDX140470 Shipment - Elevator (HB1,HB2)

24

100

12-JUN-06A

22-JUL-06A

Shipment - Elevator (HB1,HB2)

PFDX140490 Shipment - Elevator (HP1~HP4)

24

100

12-JUN-06A

22-JUL-06A

Shipment - Elevator (HP1~HP4)

PFDX140510 Shipment - Elevator (HS3~HS5)

24

100

12-JUN-06A

22-JUL-06A

Shipment - Elevator (HS3~HS5)

PFDX140520 Shipment - Elevator (OB1,OB2)

24

16-JUL-07

12-AUG-07

PFDX140570 Shipment - Elevator (R6)

24

100

10-DEC-06A

09-JAN-07A

PFDX140590 Shipment - Elevator (RP1,RP2)

24

100

30-JUL-06A

12-SEP-06A

PFDX140710 Material Delivery at Site - Elevator (BS1)

58

11-JUL-07

PFDX140730 Material Delivery at Site - Elevator (BS4)

214

06-SEP-07

PFDX140740 Material Delivery at Site - Elevator (BS5)

100

PFDX140760 Material Delivery at Site - Elevator (H1~H4)

100

07-JUN-06A

07-JUN-06A

PFDX140770 Material Delivery at Site - Elevator (HB1,HB2)

100

22-JUL-06A

22-JUL-06A

PFDX140790 Material Delivery at Site - Elevator (HP1~HP4)

100

22-JUL-06A

Material Delivery at Site - Elevator (HP1~HP4)

PFDX140810 Material Delivery at Site - Elevator (HS3~HS5)

100

22-JUL-06A

Material Delivery at Site - Elevator (HS3~HS5)

PFDX140820 Material Delivery at Site - Elevator (OB1,OB2)

PFDX140870 Material Delivery at Site - Elevator (R6)

100

09-JAN-07A

PFDX140890 Material Delivery at Site - Elevator (RP1,RP2)

100

13-SEP-06A

TOWER
SMTQ130500 Co-ordination with Other Sub-Contractors

60

100

SMTQ131000 Submit Shop Drawings -S. Pool & Water Feature

100

15-AUG-06A

PFDQ131100 Purchase Order - S. Pool&Water Feature Materials

100

30-AUG-06A

Purchase Order - S. Pool&Water Feature Materials

SMTQ131100 Approval of Drawings - S. Pool & Water Feature

100

20-SEP-06A

Approval of Drawings - S. Pool & Water Feature

PFDQ131200 Delivery of S. Pool & Water Feature Materials

SMTQ131200 Submit Materials -S. Pool & Water Feature

100

04-JUL-06A

SMTQ131300 Approval of Materials - S. Pool & Water Feature

100

25-JUL-06A

GENERAL
SMTG300010 Submit Tenders for Kitchen Appliances to PM

-205

SMTG300011 Select Tender for Kitchen Appliances by PM

160

06-MAY-07

SMTG300012 Select Kitchen Appliances Supplier

160

30-MAY-07

SMTG300013 Submit Shop Dwg. & Design - Kitchen Appliances

60

160

31-MAY-07

08-AUG-07

SMTG300014 Approval of Dwg & Data - Kitchen Appliances

21

160

09-AUG-07

02-SEP-07

SMTG300015 Purchase Order for Material - Kitchen Appliances

160

SMTG300016 Maunf & Del. for Material - Kitchen Appliances

160

SMTG300020 Submit Tenders for Kitchen, Food Equip. to PM

100

SMTG300021 Select Tenders for Kitchen, Food Equip. by PM

100

281

Shipment - Elevator (BS4)


Shipment - Elevator (BS5)
Shipment - Elevator (H1~H4)

Shipment - Elevator (OB1,OB2)


Shipment - Elevator (R6)
Shipment - Elevator (RP1,RP2)
Material Delivery at Site - Elevator (BS1)
Material Delivery at Site - Elevator (BS4)
Material Delivery at Site - Elevator (BS5)

15-MAR-07A

281

2009

Material Delivery at Site - Elevator (H1~H4)


Material Delivery at Site - Elevator (HB1,HB2)

Material Delivery at Site - Elevator (OB1,OB2)

12-AUG-07

Material Delivery at Site - Elevator (R6)


Material Delivery at Site - Elevator (RP1,RP2)

POOL & WATER FEATURES (S-07) -PROVISIONAL


03-MAY-06A

249

Co-ordination with Other Sub-Contractors

30-JUL-06A

Submit Shop Drawings -S. Pool & Water Feature

Delivery of S. Pool & Water Feature Materials

14-MAR-07

Submit Materials -S. Pool & Water Feature


Approval of Materials - S. Pool & Water Feature

PROVISIONAL WORK

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Submit Tenders for Kitchen Appliances to PM

15-MAR-07*

02-SEP-07

Select Tender for Kitchen Appliances by PM


Select Kitchen Appliances Supplier
Submit Shop Dwg. & Design - Kitchen Appliances
Approval of Dwg & Data - Kitchen Appliances
Purchase Order for Material - Kitchen Appliances
Maunf & Del. for Material - Kitchen Appliances

18-FEB-08

Submit Tenders for Kitchen, Food Equip. to PM

20-APR-06A

Select Tenders for Kitchen, Food Equip. by PM

02-AUG-06A
Sheet 20 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Select Kitchen, Food Equip. Supplier

SMTG300022 Select Kitchen, Food Equip. Supplier

100

SMTG300023 Submit Spec., Materials - Kitchen, Food Equip.

30

100

02-SEP-06A

30-OCT-06A

SMTG300024 Approval of Data - Kitchen, Food Equip.

21

100

31-OCT-06A

23-NOV-06A

SMTG300025 Purchase Order for Material - Kitchen, Food Equi

100

SMTG300026 Delivery for Material - Kitchen, Food Equip.

315

SMTG300040 Submit Tenders for Atrium Steelwork to PM

-239

SMTG300041 Select Tenders for Atrium Steelwork by PM

47

06-MAY-07

SMTG300042 Select Atrium Steelwork Supplier

47

30-MAY-07

SMTG300043 Submit Shop Dwg. & Design - Atrium Steelwork

60

47

31-MAY-07

08-AUG-07

SMTG300044 Approval of Data - Atrium Steelwork

21

47

09-AUG-07

02-SEP-07

SMTG300045 Purchase Order for Material - Atrium Steelwork

47

SMTG300046 Delivery for Material - Atrium Steelwork

47

SMTG300050 Submit Tenders for Loading Dock to PM

100

SMTG300051 Select Tenders for Loading Dock by PM

100

23-MAY-06A

Select Tenders for Loading Dock by PM

SMTG300052 Select Loading Dock Supplier

100

25-MAY-06A

Select Loading Dock Supplier

SMTG300053 Submit Shop Dwg. & Design - Loading Dock

60

100

09-SEP-06A

27-DEC-06A

SMTG300054 Approval of Data - Loading Dock

21

100

28-DEC-06A

17-JAN-07A

Approval of Data - Loading Dock

SMTG300055 Purchase Order for Material - Loading Dock

100

19-JUL-06A

Purchase Order for Material - Loading Dock

SMTG300056 Delivery for Material - Loading Dock

SMTG300060 Submit Tenders for Traffic Coatings to PM

100

SMTG300061 Select Tenders for Traffic Coatings by PM

100

13-DEC-06A

Select Tenders for Traffic Coatings by PM

SMTG300062 Select Traffic Coatings Supplier

100

13-DEC-06A

Select Traffic Coatings Supplier

SMTG300063 Submit Shop Dwg. & Design - Traffic Coatings

60

100

01-JAN-07A

15-FEB-07A

SMTG300064 Approval of Data - Traffic Coatings

21

100

15-JAN-07A

21-FEB-07A

SMTG300065 Purchase Order for Material - Traffic Coatings

100

SMTG300066 Delivery for Material - Traffic Coatings

100

SMTG300070 Submit Tenders for Refuse Disposal to PM

100

SMTG300071 Select Tenders for Refuse Disposal by PM

11

14-MAR-07

SMTG300072 Select Refuse Disposal Supplier

11

08-APR-07

SMTG300073 Submit Shop Dwg. & Design - Refuse Disposal

60

11

09-APR-07

17-JUN-07

SMTG300074 Approval of Data - Refuse Disposal

21

11

18-JUN-07

11-JUL-07

SMTG300075 Purchase Order for Material - Refuse Disposal

11

11-JUL-07

SMTG300076 Delivery for Material - Refuse Disposal

11

28-NOV-07

SMTG300080 Submit Tenders for Steel Staircase to PM

-194

SMTG300081 Select Tenders for Steel Staircase by PM

133

06-MAY-07

SMTG300082 Select Steel Staircase Supplier

133

30-MAY-07

SMTG300083 Submit Shop Dwg. & Data - Steel Staircase

60

133

31-MAY-07

08-AUG-07

SMTG300084 Approval of Data - Steel Staircase

21

133

09-AUG-07

02-SEP-07

SMTG300085 Purchase Order for Material - Steel Staircase

133

02-SEP-07

SMTG300086 Delivery for Material - Steel Staircase

133

29-MAR-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

02-AUG-06A

Submit Spec., Materials - Kitchen, Food Equip.


Approval of Data - Kitchen, Food Equip.
Purchase Order for Material - Kitchen, Food Equi

20-SEP-06A

Delivery for Material - Kitchen, Food Equip.

18-APR-07

Submit Tenders for Atrium Steelwork to PM

15-MAR-07*

Select Tenders for Atrium Steelwork by PM


Select Atrium Steelwork Supplier
Submit Shop Dwg. & Design - Atrium Steelwork
Approval of Data - Atrium Steelwork
Purchase Order for Material - Atrium Steelwork

02-SEP-07

Delivery for Material - Atrium Steelwork

29-MAR-08

Submit Tenders for Loading Dock to PM

01-APR-06A

425

2009

Submit Shop Dwg. & Design - Loading Dock

Delivery for Material - Loading Dock

14-MAR-07

Submit Tenders for Traffic Coatings to PM

30-SEP-06A

Submit Shop Dwg. & Design - Traffic Coatings


Approval of Data - Traffic Coatings
Purchase Order for Material - Traffic Coatings

15-JAN-07A

Delivery for Material - Traffic Coatings

25-JAN-07A

Submit Tenders for Refuse Disposal to PM

20-APR-06A

Select Tenders for Refuse Disposal by PM


Select Refuse Disposal Supplier
Submit Shop Dwg. & Design - Refuse Disposal
Approval of Data - Refuse Disposal
Purchase Order for Material - Refuse Disposal
Delivery for Material - Refuse Disposal
Submit Tenders for Steel Staircase to PM

15-MAR-07*

Select Tenders for Steel Staircase by PM


Select Steel Staircase Supplier
Submit Shop Dwg. & Data - Steel Staircase
Approval of Data - Steel Staircase
Purchase Order for Material - Steel Staircase
Delivery for Material - Steel Staircase
Sheet 21 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

-194

SMTG300091 Select Tenders for Garage Doors by PM

96

06-MAY-07

SMTG300092 Select Garage Doors Supplier

96

30-MAY-07

SMTG300093 Submit Shop Dwg. & Design - Garage Doors

60

96

31-MAY-07

08-AUG-07

SMTG300094 Approval of Data - Garage Doors

21

96

09-AUG-07

02-SEP-07

SMTG300095 Purchase Order for Material - Garage Doors

96

02-SEP-07

SMTG300096 Delivery for Material - Garage Doors

96

23-FEB-08

SMTG300100 Submit Tenders for Hose Reel Cupboard to PM

-341

SMTG300101 Select Tenders for Hose Reel Cupboard by PM

15

06-MAY-07

SMTG300102 Select Hose Reel Cupboard Supplier

15

30-MAY-07

SMTG300103 Submit Shop Dwg. Data - Hose Reel Cupboard

60

15

31-MAY-07

08-AUG-07

SMTG300104 Approval of Data - Hose Reel Cupboard

21

15

09-AUG-07

02-SEP-07

SMTG300105 Purchase Order for Material - Hose Reel Cupboard

15

SMTG300106 Delivery for Material - Hose Reel Cupboards

15

SMTG300110 Submit Tenders for W/P to Tanks, Rooms to PM

100

SMTG300111 Select Tenders for W/P to Tanks, Rooms by PM

368

14-MAR-07

SMTG300112 Select W/P to Tanks, Rooms Supplier

368

08-APR-07

SMTG300113 Submit Shop Dwg. & Design - W/P to Tanks, Rooms

45

368

09-APR-07

30-MAY-07

SMTG300114 Approval of Data - W/P to Tanks, Rooms

21

368

31-MAY-07

24-JUN-07

SMTG300115 Purchase Order for Material - W/P to Tanks, Room

368

24-JUN-07

SMTG300116 Delivery for Material - W/P to Tanks, Rooms

368

29-JUL-07

SMTG300120 Submit Tenders for Spire Catwalk to PM

-194

SMTG300121 Select Tenders for Spire Catwalk by PM

40

06-MAY-07

SMTG300122 Select Spire Catwalk Supplier

40

30-MAY-07

SMTG300123 Submit Shop Dwg. & Design - Spire Catwalk

60

40

31-MAY-07

08-AUG-07

SMTG300124 Approval of Data - Spire Catwalk

21

40

09-AUG-07

02-SEP-07

SMTG300125 Purchase Order for Material - Spire Catwalk

40

02-SEP-07

SMTG300126 Delivery for Material - Spire Catwalk

40

29-MAR-08

SMTG300130 Submit Tenders for Parking Bollards to PM

-142

SMTG300131 Select Tenders for Parking Bollards by PM

177

06-MAY-07

SMTG300132 Select Parking Bollards Supplier

177

30-MAY-07

SMTG300133 Submit Shop Dwg. & Design - Parking Bollards

60

177

31-MAY-07

08-AUG-07

SMTG300134 Approval of Data - Parking Bollards

21

177

09-AUG-07

02-SEP-07

SMTG300135 Purchase Order for Material - Parking Bollards

177

02-SEP-07

SMTG300137 Delivery for Material - Parking Bollards

177

29-MAR-08

SMTG300140 Submit Tenders for Column Guards to PM

-167

SMTG300141 Select Tenders for Column Guards by PM

227

06-MAY-07

SMTG300142 Select Column Guards Supplier

227

30-MAY-07

SMTG300143 Submit Shop Dwg. & Design - Column Guards

60

227

31-MAY-07

08-AUG-07

SMTG300144 Approval of Data - Column Guards

21

227

09-AUG-07

02-SEP-07

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2006

2007

2008

2009

Submit Tenders for Garage Doors to PM

SMTG300090 Submit Tenders for Garage Doors to PM

Start Date
Finish Date
Data Date

2005

15-MAR-07*

Select Tenders for Garage Doors by PM


Select Garage Doors Supplier
Submit Shop Dwg. & Design - Garage Doors
Approval of Data - Garage Doors
Purchase Order for Material - Garage Doors
Delivery for Material - Garage Doors
Submit Tenders for Hose Reel Cupboard to PM

15-MAR-07*

02-SEP-07

Select Tenders for Hose Reel Cupboard by PM


Select Hose Reel Cupboard Supplier
Submit Shop Dwg. Data - Hose Reel Cupboard
Approval of Data - Hose Reel Cupboard
Purchase Order for Material - Hose Reel Cupboard
Delivery for Material - Hose Reel Cupboards

29-MAR-08

Submit Tenders for W/P to Tanks, Rooms to PM

08-JAN-06A

Select Tenders for W/P to Tanks, Rooms by PM


Select W/P to Tanks, Rooms Supplier
Submit Shop Dwg. & Design - W/P to Tanks, Rooms
Approval of Data - W/P to Tanks, Rooms
Purchase Order for Material - W/P to Tanks, Room
Delivery for Material - W/P to Tanks, Rooms
Submit Tenders for Spire Catwalk to PM

15-MAR-07*

Select Tenders for Spire Catwalk by PM


Select Spire Catwalk Supplier
Submit Shop Dwg. & Design - Spire Catwalk
Approval of Data - Spire Catwalk
Purchase Order for Material - Spire Catwalk
Delivery for Material - Spire Catwalk
Submit Tenders for Parking Bollards to PM

15-MAR-07*

Select Tenders for Parking Bollards by PM


Select Parking Bollards Supplier
Submit Shop Dwg. & Design - Parking Bollards
Approval of Data - Parking Bollards
Purchase Order for Material - Parking Bollards
Delivery for Material - Parking Bollards
Submit Tenders for Column Guards to PM

15-MAR-07*

Select Tenders for Column Guards by PM


Select Column Guards Supplier
Submit Shop Dwg. & Design - Column Guards
Approval of Data - Column Guards
Sheet 22 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Purchase Order for Material - Column Guards


Delivery for Material - Column Guards

SMTG300145 Purchase Order for Material - Column Guards

227

02-SEP-07

SMTG300146 Delivery for Material - Column Guards

227

20-JAN-08

SMTG300150 Submit Tenders for Linen Chute to PM

100

SMTG300151 Select Tenders for Linen Chute by PM

101

14-MAR-07

SMTG300152 Select Linen Chute Supplier

101

08-APR-07

SMTG300153 Submit Shop Dwg. & Design - Linen Chute

60

101

09-APR-07

17-JUN-07

SMTG300154 Approval of Data - Linen Chute

21

101

18-JUN-07

11-JUL-07

SMTG300155 Purchase Order for Material - Linen Chute

101

11-JUL-07

SMTG300156 Delivery for Material - Linen Chute

101

24-OCT-07

SMTG300160 Submit Tenders for Precast Wheel Stops to PM

-147

SMTG300161 Select Tenders for Precast Wheel Stops by PM

243

14-MAR-07

Select Tenders for Precast Wheel Stops by PM

SMTG300162 Select Precast Wheel Stops Supplier

243

14-MAR-07

Select Precast Wheel Stops Supplier

SMTG300163 Submit Shop Dwg. & Data - Precast Wheel Stops

60

243

15-MAR-07

23-MAY-07

SMTG300164 Approval of Data - Precast Wheel Stops

21

243

24-MAY-07

17-JUN-07

SMTG300165 Purchase Order for Material-Precast Wheel Stops

243

17-JUN-07

SMTG300166 Delivery for Material - Precast Wheel Stops

243

13-JAN-08

SMTG300170 Submit Tenders for Metal Doors to PM

100

SMTG300171 Select Tenders for Metal Doors by PM

100

23-MAY-06A

SMTG300172 Select Metal Doors Supplier

100

20-SEP-06A

SMTG300173 Submit Shop Dwg.&Data - Metal Doors

60

100

01-JUN-06A

18-JUN-06A

SMTG300174 Approval of Data - Metal Doors

21

100

19-JUN-06A

23-JUL-06A

SMTG300175 Purchase Order for Material - Metal Doors

100

SMTG300176 Delivery for Materials - Metal Doors

SMTG300180 Submit Tenders for Additional Acoustics to PM

100

SMTG300181 Select Tenders for Additional Acoustics by PM

131

14-MAR-07

SMTG300182 Select Additional Acoustics Supplier

131

08-APR-07

SMTG300183 Submit Shop Dwg.&Data - Additional Acoustics

60

131

09-APR-07

17-JUN-07

SMTG300184 Approval of Data - Additional Acoustics

21

131

18-JUN-07

11-JUL-07

SMTG300185 Purchase Order for Material -Additional Acoustic

131

11-JUL-07

SMTG300186 Delivery for Materials - Additional Acoustics

131

28-NOV-07

SMTG300190 Submit Tenders for Audio Visual Catwalk to PM

-325

SMTG300191 Select Tenders for Audio Visual Catwalk by PM

18

06-MAY-07

SMTG300192 Select Audio Visual Catwalk Supplier

18

30-MAY-07

SMTG300193 Submit Shop Dwg.&Data - Audio Visual Catwalk

60

18

31-MAY-07

08-AUG-07

SMTG300194 Approval of Data - Audio Visual Catwalk

21

18

09-AUG-07

02-SEP-07

SMTG300195 Purchase Order for Material-Audio Visual Catwalk

18

02-SEP-07

SMTG300196 Delivery for Materials - Audio Visual Catwalk

18

20-JAN-08

Delivery for Materials - Audio Visual Catwalk

SMTG300200 Submit Shop Dwg. & Data - Service Roads

77

07-JAN-08

Submit Shop Dwg. & Data - Service Roads

SMTG300201 Approval of Data - Service Roads

77

31-JAN-08

SMTG300202 Purchase Order for Materials - Service Roads

77

31-JAN-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Submit Tenders for Linen Chute to PM

09-JUL-06A

Select Tenders for Linen Chute by PM


Select Linen Chute Supplier
Submit Shop Dwg. & Design - Linen Chute
Approval of Data - Linen Chute
Purchase Order for Material - Linen Chute
Delivery for Material - Linen Chute
Submit Tenders for Precast Wheel Stops to PM

15-MAR-07*

Submit Shop Dwg. & Data - Precast Wheel Stops


Approval of Data - Precast Wheel Stops
Purchase Order for Material-Precast Wheel Stops
Delivery for Material - Precast Wheel Stops
Submit Tenders for Metal Doors to PM

18-JAN-06A

Select Tenders for Metal Doors by PM


Select Metal Doors Supplier
Submit Shop Dwg.&Data - Metal Doors
Approval of Data - Metal Doors
Purchase Order for Material - Metal Doors

23-JUL-06A
51

Delivery for Materials - Metal Doors

29-MAY-07

Submit Tenders for Additional Acoustics to PM

14-DEC-06A

Select Tenders for Additional Acoustics by PM


Select Additional Acoustics Supplier
Submit Shop Dwg.&Data - Additional Acoustics
Approval of Data - Additional Acoustics
Purchase Order for Material -Additional Acoustic
Delivery for Materials - Additional Acoustics
Submit Tenders for Audio Visual Catwalk to PM

15-MAR-07*

Select Tenders for Audio Visual Catwalk by PM


Select Audio Visual Catwalk Supplier
Submit Shop Dwg.&Data - Audio Visual Catwalk
Approval of Data - Audio Visual Catwalk
Purchase Order for Material-Audio Visual Catwalk

Approval of Data - Service Roads


Purchase Order for Materials - Service Roads
Sheet 23 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

SMTG300203 Delivery for Materials - Service Roads

77

SMTG300210 Submit Tenders for Secondary Steelwork to PM

-194

SMTG300211 Select Tenders for Secondary Steelwork by PM

207

06-MAY-07

SMTG300212 Select Secondary Steelwork Supplier

207

30-MAY-07

SMTG300213 Submit Shop Dwg.&Data - Secondary Steelwork

60

207

31-MAY-07

08-AUG-07

SMTG300214 Approval of Data - Secondary Steelwork

21

207

09-AUG-07

02-SEP-07

SMTG300215 Purchase Order for Material-Secondary Steelwork

207

SMTG300216 Delivery for Materials - Secondary Steelwork

207

SMTG300220 Submit Tenders for Miscellaneous Metalwork to PM

-221

SMTG300221 Select Tenders for Miscellaneous Metalwork by PM

57

06-MAY-07

SMTG300222 Select Miscellaneous Metalwork Supplier

57

30-MAY-07

SMTG300223 Submit Shop Dwg.&Data - Miscellaneous Metalwork

60

57

31-MAY-07

08-AUG-07

SMTG300224 Approval of Data - Miscellaneous Metalwork

21

57

09-AUG-07

02-SEP-07

SMTG300225 Purch. Order for Matl Miscellaneous Metalwork

57

SMTG300226 Delivery for Materials - Miscellaneous Metalwork

57

SMTG300230 Submit Tenders for Escape Stair Handrails to PM

-194

SMTG300231 Select Tenders for Escape Stair Handrails by PM

278

06-MAY-07

SMTG300232 Select Escape Stair Handrails Supplier

278

30-MAY-07

SMTG300233 Submit Shop Dwg.&Data - Escape Stair Handrails

60

278

31-MAY-07

08-AUG-07

SMTG300234 Approval of Data - Escape Stair Handrails

21

278

09-AUG-07

02-SEP-07

SMTG300235 Purch. Order for Material-Escape Stair Handrails

278

SMTG300236 Delivery for Materials - Escape Stair Handrails

278

SMTG300240 Submit Tenders - Miscellaneous Specialties to PM

-142

SMTG300241 Select Tenders - Miscellaneous Specialties by PM

177

06-MAY-07

SMTG300242 Select Miscellaneous Specialties Supplier

177

30-MAY-07

SMTG300243 Submit Shop Dwg.&Data -Miscellaneous Specialties

60

177

31-MAY-07

08-AUG-07

SMTG300244 Approval of Data - Miscellaneous Specialties

21

177

09-AUG-07

02-SEP-07

SMTG300245 Purch. Order for Material-Miscell. Specialties

177

02-SEP-07

SMTG300246 Delivery for Materials-Miscellaneous Specialties

177

20-JAN-08

SMTG30029A Drawing Issue - Finishing work (Hotel Lobby)

100

SMTG300300 Submit Tenders - Public Comn, Lobby Area to PM

76

SMTG300310 Select Tenders - Public Comn, Lobby Area by PM

76

06-MAY-07

SMTG300320 Approve Public Comn, Lobby Area Finishes Subcon

76

30-MAY-07

SMTG300330 Submit Shop Dwg.& Data -Public Comn, Lobby Area

60

108

31-MAY-07

08-AUG-07

SMTG300340 Approval of Data - Public Comn, Lobby Area

21

108

09-AUG-07

02-SEP-07

SMTG300350 Submit & Approve for Material-Public Comn, Lobby

76

SMTG300360 Delivery for Materials-Public Comn, Lobby Area

76

SMTG301110 Resubmit Shop Dwg.&Data - Metal Doors

14

51

15-MAR-07

31-MAR-07

SMTG301120 Reapproval of Data - Metal Doors

21

51

01-APR-07

24-APR-07

SMTG301130 Re-purchase Order for Material - Metal Doors

51

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2005

2006

2008

2009

Delivery for Materials - Service Roads

18-JUN-08

Submit Tenders for Secondary Steelwork to PM

15-MAR-07*

02-SEP-07

Select Tenders for Secondary Steelwork by PM


Select Secondary Steelwork Supplier
Submit Shop Dwg.&Data - Secondary Steelwork
Approval of Data - Secondary Steelwork
Purchase Order for Material-Secondary Steelwork
Delivery for Materials - Secondary Steelwork

20-JAN-08

Submit Tenders for Miscellaneous Metalwork to PM

15-MAR-07*

Select Tenders for Miscellaneous Metalwork by PM


Select Miscellaneous Metalwork Supplier
Submit Shop Dwg.&Data - Miscellaneous Metalwork
Approval of Data - Miscellaneous Metalwork
Purch. Order for Matl Miscellaneous Metalwork

02-SEP-07

Delivery for Materials - Miscellaneous Metalwork

20-JAN-08

Submit Tenders for Escape Stair Handrails to PM

15-MAR-07*

02-SEP-07

Select Tenders for Escape Stair Handrails by PM


Select Escape Stair Handrails Supplier
Submit Shop Dwg.&Data - Escape Stair Handrails
Approval of Data - Escape Stair Handrails
Purch. Order for Material-Escape Stair Handrails
Delivery for Materials - Escape Stair Handrails

20-JAN-08

Submit Tenders - Miscellaneous Specialties to PM

15-MAR-07*

05-OCT-06A

2007

Select Tenders - Miscellaneous Specialties by PM


Select Miscellaneous Specialties Supplier
Submit Shop Dwg.&Data -Miscellaneous Specialties
Approval of Data - Miscellaneous Specialties
Purch. Order for Material-Miscell. Specialties
Delivery for Materials-Miscellaneous Specialties
Drawing Issue - Finishing work (Hotel Lobby)

05-OCT-06A

Submit Tenders - Public Comn, Lobby Area to PM

15-MAR-07*

22-JUL-07

Select Tenders - Public Comn, Lobby Area by PM


Approve Public Comn, Lobby Area Finishes Subcon
Submit Shop Dwg.& Data -Public Comn, Lobby Area
Approval of Data - Public Comn, Lobby Area
Submit & Approve for Material-Public Comn, Lobby
Delivery for Materials-Public Comn, Lobby Area

26-AUG-07

Resubmit Shop Dwg.&Data - Metal Doors


Reapproval of Data - Metal Doors
Re-purchase Order for Material - Metal Doors

24-APR-07
Sheet 24 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

SMTG301140 Submision of Hardware Schedule

14

91

27-MAR-07

11-APR-07

Submision of Hardware Schedule

SMTG301150 Approval of Hardware Schedule

21

91

12-APR-07

06-MAY-07

Approval of Hardware Schedule

SMTG301160 Submit Shop Dwg & Data - Hardware Schedule

21

91

07-MAY-07

30-MAY-07

SMTG301170 Approval of Shop Dwg & Data - Hardware Schedule

21

91

31-MAY-07

24-JUN-07

SMTG301180 Purchase Oder for Hardware Materials

91

24-JUN-07

SMTG301190 Delivery of Materials - Door Hardware

91

07-OCT-07

2009

Submit Shop Dwg & Data - Hardware Schedule


Approval of Shop Dwg & Data - Hardware Schedule
Purchase Oder for Hardware Materials
Delivery of Materials - Door Hardware

SPECIALIST ELV SYSTEMS (S-10) -PROVISIONAL


GENERAL
PFDG180010 Purchase Order to Security System Equipments

100

150

40

188

PFDG180020 Delivery of Security System Equipments on Site

188

SMTG180020 Approval Dwg. for Security Management System

120

33

188

27-SEP-06A
07-AUG-06A

SMTG180010 Shop Dwg. for Security Management System

PFDG180110 Purchase Order For IT,/Telecom Materials


SMTG180110 Shop Dwg. for IT,/Telecom
PFDG180120 Delivery of IT,/Telecom Materials on site
SMTG180120 Approval Dwg. For IT,/Telecom
PFDG180310 Purchase Order for Master Clock System Equip.

100

150

97

242

240

120

77

240

27-SEP-06A

100
100

120

100

PFDG180410 Purchase Order to Hotel Guest Room Access Contro

100

SMTG180410 Shop Dwg. For Hotel Guest Room Access Control Sy

150

69

220

220

120

60

220

27-SEP-06A
07-AUG-06A

SMTG180320 Approval Dwg. For Master Clock System

PFDG180420 Delivery of Hotel Guest Room Access Contro


SMTG180420 Approval Dwg. For Hotel Guest Room Access Contro
PFDG180510 Purchase Order for Smart Home Automation System

07-AUG-06A
268

100
40

178

PFDG180520 Delivery of Smart Home Automation System on site

178

SMTG180520 Approval Dwg. For Smart Home Automation System

120

25

178

100

SMTG180610 Shop Dwg. For Audio-Visual System

Approval Dwg. for Security Management System


Purchase Order For IT,/Telecom Materials
Shop Dwg. for IT,/Telecom

20-MAR-07

Delivery of IT,/Telecom Materials on site


Approval Dwg. For IT,/Telecom

16-APR-07
18-SEP-06A

Purchase Order for Master Clock System Equip.

07-JAN-07A

Shop Dwg. For Master Clock System


Delivery of Master Clock System Equip on site
Approval Dwg. For Master Clock System

29-JAN-07A

Purchase Order to Hotel Guest Room Access Contro

18-SEP-06A

PFDG180610 Purchase Order for Audio-Visual System

Delivery of Security System Equipments on Site

16-JUN-07

14-MAR-07
27-SEP-06A

150

SMTG180510 Shop Dwg. For Smart Home Automation System

16-JUN-07

16-APR-07

PFDG180320 Delivery of Master Clock System Equip on site

Shop Dwg. for Security Management System

27-JUN-07

18-OCT-06A

150

SMTG180310 Shop Dwg. For Master Clock System

Purchase Order to Security System Equipments

18-SEP-06A
07-AUG-06A

07-AUG-06A

Shop Dwg. For Hotel Guest Room Access Control Sy

07-MAY-07

Delivery of Hotel Guest Room Access Contro

09-MAY-07

Approval Dwg. For Hotel Guest Room Access Contro

09-MAY-07

Purchase Order for Smart Home Automation System

18-SEP-06A
27-JUN-07
27-SEP-06A

Shop Dwg. For Smart Home Automation System

27-JUN-07
Delivery of Smart Home Automation System on site

Approval Dwg. For Smart Home Automation System

27-JUN-07

Purchase Order for Audio-Visual System

18-SEP-06A

150

87

241

PFDG180620 Delivery of Audio-Visual System on site

241

SMTG180620 Approval Dwg. For Audio-Visual System

120

78

241

07-AUG-06A
27-SEP-06A

Shop Dwg. For Audio-Visual System

07-APR-07
15-APR-07

Delivery of Audio-Visual System on site

15-APR-07

Approval Dwg. For Audio-Visual System

EXTERNAL WORK
SITE MOBILIZATION
GENERAL
S14G01021A Mobilization (Shop Drawing) - MEP & Finishes

120

31

21-AUG-07

07-JAN-08

S14G01022A Mobilization (Shop Drawing) - Structural Work

90

61

49

08-FEB-07A

24-APR-07

S14G01023A Dismantle Concrete Pumping Station - Zone B1

10

138

19-MAR-08

30-MAR-08

Mobilization (Shop Drawing) - Structural Work


Dismantle Concrete Pumping Station - Zone B1

S14G01024A Dismantle Structural Steel Yard - Zone B2

10

09-AUG-08

19-AUG-08

Dismantle Structural Steel Yard - Zone B2

S14G01025A Dismantle Rebar Jig on Terrace- Zone B2

10

242

20-OCT-07

30-OCT-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Mobilization (Shop Drawing) - MEP & Finishes

Dismantle Rebar Jig on Terrace- Zone B2


Sheet 25 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

SMTG02050A Issue of LOI from SBA JV to S-14

14

31

01-JUL-07

16-JUL-07

SMTG02060A Co-ordination with other NSC's & Main Contractor

30

31

17-JUL-07

20-AUG-07

S14G01205A Issue Letter of Intent to S-14 from BD07

75

30-JUN-07

141

22-AUG-07

2005

2006

2007

2008

2009

Issue of LOI from SBA JV to S-14


Co-ordination with other NSC's & Main Contractor
Issue Letter of Intent to S-14 from BD07

CONSTRUCTION
GENERAL
WILD AIR SUPPLY MILESTONE
GENERAL
017G15500A Wild Air Supply - L5~16
040G15500A Wild Air Supply - L19~37

23

07-JUL-07

073G15500A Wild Air Supply - L43~70

243

22-AUG-07

109G15500A Wild Air Supply - L76~108

145

25-NOV-07

136G15500A Wild Air Supply - L112~137

36

01-JUN-08

155G15500A Wild Air Supply - L140~154

142

14-OCT-08

230

160

Wild Air Supply - L5~16


Wild Air Supply - L19~37
Wild Air Supply - L43~70
Wild Air Supply - L76~108
Wild Air Supply - L112~137
Wild Air Supply - L140~154

PROVISIONAL WORK
GENERAL
PVSG300040 Kitchen Appliances

19-FEB-08

Kitchen Appliances

12-NOV-08
Kitchen, Laundry and Food & Beverage Indust -(A)

PVSG300050 Kitchen, Laundry and Food & Beverage Indust -(A)

180

315

19-APR-07

14-NOV-07

PVSG300051 Kitchen, Laundry and Food & Beverage Indust -(B)

90

340

02-APR-08

15-JUL-08

Kitchen, Laundry and Food & Beverage Indust -(B)

PVSG300080 Entrance Atrium Secondary Steelwork

30

47

30-MAR-08

03-MAY-08

Entrance Atrium Secondary Steelwork

PVSG300110 Loading Dock

120

259

17-OCT-07

03-MAR-08

PVSG30011A R/I Finish - Loading Dock

60

234

18-OCT-07

03-JAN-08

PVSG300120 Movement of Furniture, Fittings & Equipment

150

93

15-MAY-08

05-NOV-08

PVSG300131 Traffic Coating (Section "B")

120

11

10-FEB-09

29-JUN-09

PVSG300170 Refuse Disposal incl. Wall Closing

360

11

29-NOV-07

20-JAN-09

PVSG300190 Steel Staircase to Emergency Exits & Spire

80

133

30-MAR-08

30-JUN-08

PVSG30020A Final Finish - Loading Dock

30

234

05-JAN-08

10-FEB-08

PVSG30021A Interior Finish - Loading Dock

30

234

11-FEB-08

16-MAR-08

PVSG300220 Garage Doors to Podium

120

96

09-MAR-08

26-JUL-08

PVSG300230 Hose Reel Cupboards

240

15

30-MAR-08

03-JAN-09

PVSG300240 Waterproofing to Tanks, Pits & MEP Rooms

358*

301

30-JUL-07

21-JUL-08

PVSG300241 W/P to Water Tanks (Zone-C)

46*

429

30-JUL-07

13-SEP-07

PVSG300242 W/P to MEP Plant Room - Office Annex

30

210

11-FEB-08

15-MAR-08

PVSG300244 W/P to Mech Floor Water Tank - L74

20

350

12-SEP-07

04-OCT-07

PVSG300245 W/P to Mech Floor Water Tank - L110

20

418

26-DEC-07

17-JAN-08

PVSG300246 W/P to Mech Floor Water Tank - L137

20

343

22-MAR-08

13-APR-08

PVSG300247 W/P to Mech Floor Water Tank - L160

20

160

29-JUN-08

21-JUL-08

PVSG300260 Spire Catwalk

80

15

28-APR-08

29-JUL-08

PVSG300270 Parking Bollards

60

177

30-MAR-08

07-JUN-08

PVSG300280 Column Guards

60

227

21-JAN-08*

29-MAR-08

PVSG300290 Linen Chute incl. Wall Closing

180

101

25-OCT-07

20-MAY-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Loading Dock
R/I Finish - Loading Dock
Movement of Furniture, Fittings & Equipment
Traffic Coating (Section "B")
Refuse Disposal incl. Wall Closing
Steel Staircase to Emergency Exits & Spire
Final Finish - Loading Dock
Interior Finish - Loading Dock
Garage Doors to Podium
Hose Reel Cupboards
Waterproofing to Tanks, Pits & MEP Rooms
W/P to Water Tanks (Zone-C)
W/P to MEP Plant Room - Office Annex
W/P to Mech Floor Water Tank - L74
W/P to Mech Floor Water Tank - L110
W/P to Mech Floor Water Tank - L137
W/P to Mech Floor Water Tank - L160
Spire Catwalk
Parking Bollards
Column Guards
Linen Chute incl. Wall Closing
Sheet 26 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

PVSG300300 Precast Concrete Wheel Stops

60

227

02-FEB-08

09-APR-08

Precast Concrete Wheel Stops

PVSG300310 Additional Acoustics

120

131

29-NOV-07

15-APR-08

Additional Acoustics

PVSG300340 Audio Visual Catwalks

90

18

21-JAN-08

03-MAY-08

PVSG300350 Service Roads

90

43

29-JUL-08

10-NOV-08

PVSG300370 Limited MEP Works at Lowest Levels

237*

100

02-APR-05A

24-NOV-05A

PVSG300380 Masonry Works

457*

65

582

22-MAY-06A

21-AUG-07

PVSG300390 Office Annex Work - Two Extra Floors

833*

53

185

29-DEC-05A

09-APR-08

PVSG300400 Pool Annex Work - One Extra Floor

824*

59

23

17-NOV-05A

18-FEB-08

PVSG300410 Secondary Steelwork (Covers Cladding&Spire work)

90

207

21-JAN-08

03-MAY-08

Secondary Steelwork (Covers Cladding&Spire work)

PVSG300420 Miscellaneous metalwork, Louvers (Car Parking)

240

57

21-JAN-08

25-OCT-08

Miscellaneous metalwork, Louvers (Car Parking)

PVSG300430 Escape Staircase Handrails & Balustrades

90

278

21-JAN-08

03-MAY-08

Escape Staircase Handrails & Balustrades

PVSG300440 Miscellaneous Specialties (Ground & Conc. Level)

120

177

21-JAN-08

07-JUN-08

Miscellaneous Specialties (Ground & Conc. Level)

PVSG07110A W/P to Mech Floor Water Tank - L41

20

388

30-JUL-07

21-AUG-07

W/P to Mech Floor Water Tank - L41

PVSG13110A Elastometric W/P to Water Tanks Cy-08 B2

20

368

30-JUL-07

21-AUG-07

Elastometric W/P to Water Tanks Cy-08 B2

PVSG13120A Elastometric W/P to Water Tanks Cy-10 B2

20

388

30-JUL-07

21-AUG-07

Elastometric W/P to Water Tanks Cy-10 B2

PVSG13130A Elastometric W/P to Water Tanks Cy-12 B2

20

388

30-JUL-07

21-AUG-07

Elastometric W/P to Water Tanks Cy-12 B2

PVSG13210A Elastometric W/P to Water Tanks Cy-08 B1

20

368

22-AUG-07

13-SEP-07

Audio Visual Catwalks


Service Roads
Limited MEP Works at Lowest Levels
Masonry Works

Office Annex Work - Two Extra Floo


Pool Annex Work - One Extra Floor

Elastometric W/P to Water Tanks Cy-08 B1

TOWER
REINFORCED CONCRETE WORK
CENTER CORE
-01T030030 R.C. Work - Core Wall & Link Beam B2 C-1

R.C. Work - Core Wall & Link Beam B2 C-1

13

100

02-APR-05A

16-APR-05A

-01T030031

R.C. Work - Core Wall & Link Beam B2 C-2

13

100

17-APR-05A

30-APR-05A

R.C. Work - Core Wall & Link Beam B2 C-2

-01T030032

R.C. Work - Core Wall & Link Beam B2 C-3

13

100

26-APR-05A

08-MAY-05A

R.C. Work - Core Wall & Link Beam B2 C-3

-02T030030

R.C. Work - Core Wall & Link Beam B1 C-1

11

100

23-APR-05A

25-MAY-05A

-02T030031

R.C. Work - Core Wall & Link Beam B1 C-2

11

100

14-MAY-05A

14-JUN-05A

-02T030032

R.C. Work - Core Wall & Link Beam B1 C-3

11

100

25-MAY-05A

19-JUN-05A

R.C. Work - Core Wall & Link Beam B1 C-3

-03T030030

R.C. Work - Core Wall & Link Beam Conc-1 C-1

100

02-JUN-05A

13-JUN-05A

R.C. Work - Core Wall & Link Beam Conc-1 C-1

-03T030031

R.C. Work - Core Wall & Link Beam Conc-1 C-2

100

16-JUN-05A

26-JUN-05A

R.C. Work - Core Wall & Link Beam Conc-1 C-2

-03T030032

R.C. Work - Core Wall & Link Beam Conc-1 C-3

100

21-JUN-05A

28-JUN-05A

R.C. Work - Core Wall & Link Beam Conc-1 C-3

-03T030033

R.C. Work - Core Wall & Link Beam Conc-2 C-1

100

14-JUN-05A

27-JUN-05A

R.C. Work - Core Wall & Link Beam Conc-2 C-1

-03T030034

R.C. Work - Core Wall & Link Beam Conc-2 C-2

100

27-JUN-05A

05-JUL-05A

R.C. Work - Core Wall & Link Beam Conc-2 C-2

-03T030035

R.C. Work - Core Wall & Link Beam Conc-2 C-3

100

30-JUN-05A

11-JUL-05A

R.C. Work - Core Wall & Link Beam Conc-2 C-3

-04T030030

R.C. Work - Core Wall & Link Beam Ground C-1

10

100

28-JUN-05A

07-JUL-05A

R.C. Work - Core Wall & Link Beam Ground C-1

-04T030031

R.C. Work - Core Wall & Link Beam Ground C-2

100

06-JUL-05A

14-JUL-05A

R.C. Work - Core Wall & Link Beam Ground C-2

-04T030032

R.C. Work - Core Wall & Link Beam Ground C-3

100

12-JUL-05A

23-JUL-05A

R.C. Work - Core Wall & Link Beam Ground C-3

001T030030 R.C. Work - Core Wall & Link Beam L1 C-1

100

08-JUL-05A

17-JUL-05A

R.C. Work - Core Wall & Link Beam L1 C-1

001T030031 R.C. Work - Core Wall & Link Beam L1 C-2

100

15-JUL-05A

24-JUL-05A

R.C. Work - Core Wall & Link Beam L1 C-2

001T030032 R.C. Work - Core Wall & Link Beam L1 C-3

100

24-JUL-05A

31-JUL-05A

R.C. Work - Core Wall & Link Beam L1 C-3

002T030030 R.C. Work - Core Wall & Link Beam L2 C-1

100

19-JUL-05A

28-JUL-05A

R.C. Work - Core Wall & Link Beam L2 C-1

002T030031 R.C. Work - Core Wall & Link Beam L2 C-2

100

25-JUL-05A

02-AUG-05A

R.C. Work - Core Wall & Link Beam L2 C-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Core Wall & Link Beam B1 C-1


R.C. Work - Core Wall & Link Beam B1 C-2

Sheet 27 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

002T030032 R.C. Work - Core Wall & Link Beam L2 C-3

100

02-AUG-05A

09-AUG-05A

R.C. Work - Core Wall & Link Beam L2 C-3

003T030030 R.C. Work - Core Wall & Link Beam L3 C-1

100

29-JUL-05A

06-AUG-05A

R.C. Work - Core Wall & Link Beam L3 C-1

003T030031 R.C. Work - Core Wall & Link Beam L3 C-2

100

03-AUG-05A

11-AUG-05A

R.C. Work - Core Wall & Link Beam L3 C-2

003T030032 R.C. Work - Core Wall & Link Beam L3 C-3

100

11-AUG-05A

18-AUG-05A

R.C. Work - Core Wall & Link Beam L3 C-3

004T030030 R.C. Work - Core Wall & Link Beam L4 C-1

100

07-AUG-05A

16-AUG-05A

R.C. Work - Core Wall & Link Beam L4 C-1

004T030031 R.C. Work - Core Wall & Link Beam L4 C-2

10

100

12-AUG-05A

21-AUG-05A

R.C. Work - Core Wall & Link Beam L4 C-2

004T030032 R.C. Work - Core Wall & Link Beam L4 C-3

10

100

19-AUG-05A

25-AUG-05A

R.C. Work - Core Wall & Link Beam L4 C-3

005T030030 R.C. Work - Core Wall & Link Beam L5 C-1

100

17-AUG-05A

23-AUG-05A

R.C. Work - Core Wall & Link Beam L5 C-1

005T030031 R.C. Work - Core Wall & Link Beam L5 C-2

10

100

22-AUG-05A

28-AUG-05A

R.C. Work - Core Wall & Link Beam L5 C-2

005T030032 R.C. Work - Core Wall & Link Beam L5 C-3

100

26-AUG-05A

31-AUG-05A

R.C. Work - Core Wall & Link Beam L5 C-3

006T030030 R.C. Work - Core Wall & Link Beam L6 C-1

100

25-AUG-05A

03-SEP-05A

R.C. Work - Core Wall & Link Beam L6 C-1

006T030031 R.C. Work - Core Wall & Link Beam L6 C-2

100

30-AUG-05A

04-SEP-05A

R.C. Work - Core Wall & Link Beam L6 C-2

006T030032 R.C. Work - Core Wall & Link Beam L6 C-3

100

01-SEP-05A

06-SEP-05A

R.C. Work - Core Wall & Link Beam L6 C-3

007T030030 R.C. Work - Core Wall & Link Beam L7 C-1

100

04-SEP-05A

08-SEP-05A

R.C. Work - Core Wall & Link Beam L7 C-1

007T030031 R.C. Work - Core Wall & Link Beam L7 C-2

100

05-SEP-05A

11-SEP-05A

R.C. Work - Core Wall & Link Beam L7 C-2

007T030032 R.C. Work - Core Wall & Link Beam L7 C-3

100

08-SEP-05A

11-SEP-05A

R.C. Work - Core Wall & Link Beam L7 C-3

008T030030 R.C. Work - Core Wall & Link Beam L8 C-1

100

09-SEP-05A

14-SEP-05A

R.C. Work - Core Wall & Link Beam L8 C-1

008T030031 R.C. Work - Core Wall & Link Beam L8 C-2

100

13-SEP-05A

18-SEP-05A

R.C. Work - Core Wall & Link Beam L8 C-2

008T030032 R.C. Work - Core Wall & Link Beam L8 C-3

100

13-SEP-05A

19-SEP-05A

R.C. Work - Core Wall & Link Beam L8 C-3

009T030030 R.C. Work - Core Wall & Link Beam L9 C-1

100

15-SEP-05A

20-SEP-05A

R.C. Work - Core Wall & Link Beam L9 C-1

009T030031 R.C. Work - Core Wall & Link Beam L9 C-2

100

19-SEP-05A

25-SEP-05A

R.C. Work - Core Wall & Link Beam L9 C-2

009T030032 R.C. Work - Core Wall & Link Beam L9 C-3

100

20-SEP-05A

25-SEP-05A

R.C. Work - Core Wall & Link Beam L9 C-3

010T030030 R.C. Work - Core Wall & Link Beam L10 C-1

100

22-SEP-05A

28-SEP-05A

R.C. Work - Core Wall & Link Beam L10 C-1

010T030031 R.C. Work - Core Wall & Link Beam L10 C-2

100

27-SEP-05A

09-OCT-05A

R.C. Work - Core Wall & Link Beam L10 C-2

010T030032 R.C. Work - Core Wall & Link Beam L10 C-3

100

27-SEP-05A

01-OCT-05A

R.C. Work - Core Wall & Link Beam L10 C-3

011T030030 R.C. Work - Core Wall & Link Beam L11 C-1

100

29-SEP-05A

16-OCT-05A

R.C. Work - Core Wall & Link Beam L11 C-1

011T030031 R.C. Work - Core Wall & Link Beam L11 C-2

100

09-OCT-05A

13-OCT-05A

R.C. Work - Core Wall & Link Beam L11 C-2

011T030032 R.C. Work - Core Wall & Link Beam L11 C-3

100

02-OCT-05A

06-OCT-05A

R.C. Work - Core Wall & Link Beam L11 C-3

012T030030 R.C. Work - Core Wall & Link Beam L12 C-1

100

18-OCT-05A

20-OCT-05A

R.C. Work - Core Wall & Link Beam L12 C-1

012T030031 R.C. Work - Core Wall & Link Beam L12 C-2

100

14-OCT-05A

18-OCT-05A

R.C. Work - Core Wall & Link Beam L12 C-2

012T030032 R.C. Work - Core Wall & Link Beam L12 C-3

100

07-OCT-05A

24-OCT-05A

R.C. Work - Core Wall & Link Beam L12 C-3

013T030030 R.C. Work - Core Wall & Link Beam L13 C-1

100

21-OCT-05A

27-OCT-05A

R.C. Work - Core Wall & Link Beam L13 C-1

013T030031 R.C. Work - Core Wall & Link Beam L13 C-2

100

19-OCT-05A

25-OCT-05A

R.C. Work - Core Wall & Link Beam L13 C-2

013T030032 R.C. Work - Core Wall & Link Beam L13 C-3

100

24-OCT-05A

30-OCT-05A

R.C. Work - Core Wall & Link Beam L13 C-3

014T030030 R.C. Work - Core Wall & Link Beam L14 C-1

100

28-OCT-05A

02-NOV-05A

R.C. Work - Core Wall & Link Beam L14 C-1

014T030031 R.C. Work - Core Wall & Link Beam L14 C-2

100

26-OCT-05A

30-OCT-05A

R.C. Work - Core Wall & Link Beam L14 C-2

014T030032 R.C. Work - Core Wall & Link Beam L14 C-3

100

30-OCT-05A

06-NOV-05A

R.C. Work - Core Wall & Link Beam L14 C-3

015T030030 R.C. Work - Core Wall & Link Beam L15 C-1

100

03-NOV-05A

08-NOV-05A

R.C. Work - Core Wall & Link Beam L15 C-1

015T030031 R.C. Work - Core Wall & Link Beam L15 C-2

100

01-NOV-05A

10-NOV-05A

R.C. Work - Core Wall & Link Beam L15 C-2

015T030032 R.C. Work - Core Wall & Link Beam L15 C-3

100

08-NOV-05A

10-NOV-05A

R.C. Work - Core Wall & Link Beam L15 C-3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 28 of 587

BURJ TOWER WORKING SCHEDULE

2008

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

016T030030 R.C. Work - Core Wall & Link Beam L16 C-1

100

10-NOV-05A

19-NOV-05A

R.C. Work - Core Wall & Link Beam L16 C-1

016T030031 R.C. Work - Core Wall & Link Beam L16 C-2

100

11-NOV-05A

13-NOV-05A

R.C. Work - Core Wall & Link Beam L16 C-2

016T030032 R.C. Work - Core Wall & Link Beam L16 C-3

100

11-NOV-05A

13-NOV-05A

R.C. Work - Core Wall & Link Beam L16 C-3

016T030033 R.C. Work - Core Wall & Link Beam L16~L17 C-1

100

20-NOV-05A

30-NOV-05A

R.C. Work - Core Wall & Link Beam L16~L17 C-1

016T030034 R.C. Work - Core Wall & Link Beam L16~L17 C-2

100

17-NOV-05A

24-NOV-05A

R.C. Work - Core Wall & Link Beam L16~L17 C-2

016T030035 R.C. Work - Core Wall & Link Beam L16~L17 C-3

100

17-NOV-05A

27-NOV-05A

R.C. Work - Core Wall & Link Beam L16~L17 C-3

017T030030 R.C. Work - Core Wall & Link Beam L17~L18 C-1

100

03-DEC-05A

08-DEC-05A

R.C. Work - Core Wall & Link Beam L17~L18 C-1

017T030031 R.C. Work - Core Wall & Link Beam L17~L18 C-2

100

25-NOV-05A

05-DEC-05A

R.C. Work - Core Wall & Link Beam L17~L18 C-2

017T030032 R.C. Work - Core Wall & Link Beam L17~L18 C-3

100

29-NOV-05A

06-DEC-05A

R.C. Work - Core Wall & Link Beam L17~L18 C-3

018T030030 R.C. Work - Core Wall & Link Beam L18 C-1

100

09-DEC-05A

17-DEC-05A

R.C. Work - Core Wall & Link Beam L18 C-1

018T030031 R.C. Work - Core Wall & Link Beam L18 C-2

100

06-DEC-05A

13-DEC-05A

R.C. Work - Core Wall & Link Beam L18 C-2

018T030032 R.C. Work - Core Wall & Link Beam L18 C-3

100

07-DEC-05A

15-DEC-05A

R.C. Work - Core Wall & Link Beam L18 C-3

019T030030 R.C. Work - Core Wall & Link Beam L19 C-1

100

18-DEC-05A

24-DEC-05A

R.C. Work - Core Wall & Link Beam L19 C-1

019T030031 R.C. Work - Core Wall & Link Beam L19 C-2

100

14-DEC-05A

19-DEC-05A

R.C. Work - Core Wall & Link Beam L19 C-2

019T030032 R.C. Work - Core Wall & Link Beam L19 C-3

100

16-DEC-05A

21-DEC-05A

R.C. Work - Core Wall & Link Beam L19 C-3

020T030030 R.C. Work - Core Wall & Link Beam L20 C-1

100

25-DEC-05A

29-DEC-05A

R.C. Work - Core Wall & Link Beam L20 C-1

020T030031 R.C. Work - Core Wall & Link Beam L20 C-2

100

20-DEC-05A

26-DEC-05A

R.C. Work - Core Wall & Link Beam L20 C-2

020T030032 R.C. Work - Core Wall & Link Beam L20 C-3

100

22-DEC-05A

27-DEC-05A

R.C. Work - Core Wall & Link Beam L20 C-3

021T030030 R.C. Work - Core Wall & Link Beam L21 C-1

100

30-DEC-05A

08-JAN-06A

R.C. Work - Core Wall & Link Beam L21 C-1

021T030031 R.C. Work - Core Wall & Link Beam L21 C-2

100

26-DEC-05A

02-JAN-06A

R.C. Work - Core Wall & Link Beam L21 C-2

021T030032 R.C. Work - Core Wall & Link Beam L21 C-3

100

28-DEC-05A

03-JAN-06A

R.C. Work - Core Wall & Link Beam L21 C-3

022T030030 R.C. Work - Core Wall & Link Beam L22 C-1

100

09-JAN-06A

14-JAN-06A

R.C. Work - Core Wall & Link Beam L22 C-1

022T030031 R.C. Work - Core Wall & Link Beam L22 C-2

100

03-JAN-06A

09-JAN-06A

R.C. Work - Core Wall & Link Beam L22 C-2

022T030032 R.C. Work - Core Wall & Link Beam L22 C-3

100

04-JAN-06A

12-JAN-06A

R.C. Work - Core Wall & Link Beam L22 C-3

023T030030 R.C. Work - Core Wall & Link Beam L23 C-1

100

15-JAN-06A

17-JAN-06A

R.C. Work - Core Wall & Link Beam L23 C-1

023T030031 R.C. Work - Core Wall & Link Beam L23 C-2

100

10-JAN-06A

15-JAN-06A

R.C. Work - Core Wall & Link Beam L23 C-2

023T030032 R.C. Work - Core Wall & Link Beam L23 C-3

100

13-JAN-06A

16-JAN-06A

R.C. Work - Core Wall & Link Beam L23 C-3

024T030030 R.C. Work - Core Wall & Link Beam L24 C-1

100

18-JAN-06A

23-JAN-06A

R.C. Work - Core Wall & Link Beam L24 C-1

024T030031 R.C. Work - Core Wall & Link Beam L24 C-2

100

16-JAN-06A

26-JAN-06A

R.C. Work - Core Wall & Link Beam L24 C-2

024T030032 R.C. Work - Core Wall & Link Beam L24 C-3

100

17-JAN-06A

22-JAN-06A

R.C. Work - Core Wall & Link Beam L24 C-3

025T030030 R.C. Work - Core Wall & Link Beam L25 C-1

100

24-JAN-06A

30-JAN-06A

R.C. Work - Core Wall & Link Beam L25 C-1

025T030031 R.C. Work - Core Wall & Link Beam L25 C-2

100

27-JAN-06A

30-JAN-06A

R.C. Work - Core Wall & Link Beam L25 C-2

025T030032 R.C. Work - Core Wall & Link Beam L25 C-3

100

23-JAN-06A

29-JAN-06A

R.C. Work - Core Wall & Link Beam L25 C-3

026T030030 R.C. Work - Core Wall & Link Beam L26 C-1

100

04-FEB-06A

08-FEB-06A

R.C. Work - Core Wall & Link Beam L26 C-1

026T030031 R.C. Work - Core Wall & Link Beam L26 C-2

100

04-FEB-06A

05-FEB-06A

R.C. Work - Core Wall & Link Beam L26 C-2

026T030032 R.C. Work - Core Wall & Link Beam L26 C-3

100

30-JAN-06A

06-FEB-06A

R.C. Work - Core Wall & Link Beam L26 C-3

027T030030 R.C. Work - Core Wall & Link Beam L27 C-1

100

09-FEB-06A

13-FEB-06A

R.C. Work - Core Wall & Link Beam L27 C-1

027T030031 R.C. Work - Core Wall & Link Beam L27 C-2

100

06-FEB-06A

11-FEB-06A

R.C. Work - Core Wall & Link Beam L27 C-2

027T030032 R.C. Work - Core Wall & Link Beam L27 C-3

100

07-FEB-06A

12-FEB-06A

R.C. Work - Core Wall & Link Beam L27 C-3

028T030030 R.C. Work - Core Wall & Link Beam L28 C-1

100

14-FEB-06A

19-FEB-06A

R.C. Work - Core Wall & Link Beam L28 C-1

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 29 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

028T030031 R.C. Work - Core Wall & Link Beam L28 C-2

100

12-FEB-06A

18-FEB-06A

R.C. Work - Core Wall & Link Beam L28 C-2

028T030032 R.C. Work - Core Wall & Link Beam L28 C-3

100

13-FEB-06A

16-FEB-06A

R.C. Work - Core Wall & Link Beam L28 C-3

029T030030 R.C. Work - Core Wall & Link Beam L29 C-1

100

20-FEB-06A

22-FEB-06A

R.C. Work - Core Wall & Link Beam L29 C-1

029T030031 R.C. Work - Core Wall & Link Beam L29 C-2

100

19-FEB-06A

25-FEB-06A

R.C. Work - Core Wall & Link Beam L29 C-2

029T030032 R.C. Work - Core Wall & Link Beam L29 C-3

100

17-FEB-06A

20-FEB-06A

R.C. Work - Core Wall & Link Beam L29 C-3

030T030030 R.C. Work - Core Wall & Link Beam L30 C-1

100

23-FEB-06A

01-MAR-06A

R.C. Work - Core Wall & Link Beam L30 C-1

030T030031 R.C. Work - Core Wall & Link Beam L30 C-2

100

26-FEB-06A

02-MAR-06A

R.C. Work - Core Wall & Link Beam L30 C-2

030T030032 R.C. Work - Core Wall & Link Beam L30 C-3

100

22-FEB-06A

27-FEB-06A

R.C. Work - Core Wall & Link Beam L30 C-3

031T030030 R.C. Work - Core Wall & Link Beam L31 C-1

100

02-MAR-06A

06-MAR-06A

R.C. Work - Core Wall & Link Beam L31 C-1

031T030031 R.C. Work - Core Wall & Link Beam L31 C-2

100

03-MAR-06A

08-MAR-06A

R.C. Work - Core Wall & Link Beam L31 C-2

031T030032 R.C. Work - Core Wall & Link Beam L31 C-3

100

28-FEB-06A

04-MAR-06A

R.C. Work - Core Wall & Link Beam L31 C-3

032T030030 R.C. Work - Core Wall & Link Beam L32 C-1

100

07-MAR-06A

11-MAR-06A

R.C. Work - Core Wall & Link Beam L32 C-1

032T030031 R.C. Work - Core Wall & Link Beam L32 C-2

100

09-MAR-06A

12-MAR-06A

R.C. Work - Core Wall & Link Beam L32 C-2

032T030032 R.C. Work - Core Wall & Link Beam L32 C-3

100

05-MAR-06A

09-MAR-06A

R.C. Work - Core Wall & Link Beam L32 C-3

033T030030 R.C. Work - Core Wall & Link Beam L33 C-1

100

12-MAR-06A

15-MAR-06A

R.C. Work - Core Wall & Link Beam L33 C-1

033T030031 R.C. Work - Core Wall & Link Beam L33 C-2

100

13-MAR-06A

15-MAR-06A

R.C. Work - Core Wall & Link Beam L33 C-2

033T030032 R.C. Work - Core Wall & Link Beam L33 C-3

100

10-MAR-06A

14-MAR-06A

R.C. Work - Core Wall & Link Beam L33 C-3

034T030030 R.C. Work - Core Wall & Link Beam L34 C-1

100

17-MAR-06A

20-MAR-06A

R.C. Work - Core Wall & Link Beam L34 C-1

034T030031 R.C. Work - Core Wall & Link Beam L34 C-2

100

17-MAR-06A

21-MAR-06A

R.C. Work - Core Wall & Link Beam L34 C-2

034T030032 R.C. Work - Core Wall & Link Beam L34 C-3

100

15-MAR-06A

19-MAR-06A

R.C. Work - Core Wall & Link Beam L34 C-3

035T030030 R.C. Work - Core Wall & Link Beam L35 C-1

100

21-MAR-06A

25-MAR-06A

R.C. Work - Core Wall & Link Beam L35 C-1

035T030031 R.C. Work - Core Wall & Link Beam L35 C-2

100

22-MAR-06A

26-MAR-06A

R.C. Work - Core Wall & Link Beam L35 C-2

035T030032 R.C. Work - Core Wall & Link Beam L35 C-3

100

20-MAR-06A

23-MAR-06A

R.C. Work - Core Wall & Link Beam L35 C-3

036T030030 R.C. Work - Core Wall & Link Beam L36 C-1

100

26-MAR-06A

29-MAR-06A

R.C. Work - Core Wall & Link Beam L36 C-1

036T030031 R.C. Work - Core Wall & Link Beam L36 C-2

100

27-MAR-06A

29-MAR-06A

R.C. Work - Core Wall & Link Beam L36 C-2

036T030032 R.C. Work - Core Wall & Link Beam L36 C-3

100

24-MAR-06A

28-MAR-06A

R.C. Work - Core Wall & Link Beam L36 C-3

037T030030 R.C. Work - Core Wall & Link Beam L37 C-1

100

31-MAR-06A

03-APR-06A

R.C. Work - Core Wall & Link Beam L37 C-1

037T030031 R.C. Work - Core Wall & Link Beam L37 C-2

100

31-MAR-06A

04-APR-06A

R.C. Work - Core Wall & Link Beam L37 C-2

037T030032 R.C. Work - Core Wall & Link Beam L37 C-3

100

29-MAR-06A

02-APR-06A

R.C. Work - Core Wall & Link Beam L37 C-3

038T030030 R.C. Work - Core Wall & Link Beam L38 C-1

100

04-APR-06A

11-APR-06A

R.C. Work - Core Wall & Link Beam L38 C-1

038T030031 R.C. Work - Core Wall & Link Beam L38 C-2

100

05-APR-06A

12-APR-06A

R.C. Work - Core Wall & Link Beam L38 C-2

038T030032 R.C. Work - Core Wall & Link Beam L38 C-3

100

03-APR-06A

09-APR-06A

R.C. Work - Core Wall & Link Beam L38 C-3

039T030030 R.C. Work - Core Wall & Link Beam L39 C-1

100

12-APR-06A

16-APR-06A

R.C. Work - Core Wall & Link Beam L39 C-1

039T030031 R.C. Work - Core Wall & Link Beam L39 C-2

100

13-APR-06A

17-APR-06A

R.C. Work - Core Wall & Link Beam L39 C-2

039T030032 R.C. Work - Core Wall & Link Beam L39 C-3

100

10-APR-06A

13-APR-06A

R.C. Work - Core Wall & Link Beam L39 C-3

040T030030 R.C. Work - Core Wall & Link Beam L40 C-1

100

17-APR-06A

24-APR-06A

R.C. Work - Core Wall & Link Beam L40 C-1

040T030031 R.C. Work - Core Wall & Link Beam L40 C-2

100

18-APR-06A

25-APR-06A

R.C. Work - Core Wall & Link Beam L40 C-2

040T030032 R.C. Work - Core Wall & Link Beam L40 C-3

100

15-APR-06A

22-APR-06A

R.C. Work - Core Wall & Link Beam L40 C-3

041T030030 R.C. Work - Core Wall & Link Beam L41 C-1

100

25-APR-06A

02-MAY-06A

R.C. Work - Core Wall & Link Beam L41 C-1

041T030031 R.C. Work - Core Wall & Link Beam L41 C-2

100

26-APR-06A

03-MAY-06A

R.C. Work - Core Wall & Link Beam L41 C-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 30 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

041T030032 R.C. Work - Core Wall & Link Beam L41 C-3

100

23-APR-06A

30-APR-06A

R.C. Work - Core Wall & Link Beam L41 C-3

042T030030 R.C. Work - Core Wall & Link Beam L42 C-1

100

03-MAY-06A

10-MAY-06A

R.C. Work - Core Wall & Link Beam L42 C-1

042T030031 R.C. Work - Core Wall & Link Beam L42 C-2

100

04-MAY-06A

11-MAY-06A

R.C. Work - Core Wall & Link Beam L42 C-2

042T030032 R.C. Work - Core Wall & Link Beam L42 C-3

100

02-MAY-06A

08-MAY-06A

R.C. Work - Core Wall & Link Beam L42 C-3

043T030030 R.C. Work - Core Wall & Link Beam L43 C-1

100

11-MAY-06A

16-MAY-06A

R.C. Work - Core Wall & Link Beam L43 C-1

043T030031 R.C. Work - Core Wall & Link Beam L43 C-2

100

12-MAY-06A

18-MAY-06A

R.C. Work - Core Wall & Link Beam L43 C-2

043T030032 R.C. Work - Core Wall & Link Beam L43 C-3

100

09-MAY-06A

14-MAY-06A

R.C. Work - Core Wall & Link Beam L43 C-3

044T030030 R.C. Work - Core Wall & Link Beam L44 C-1

100

17-MAY-06A

25-MAY-06A

R.C. Work - Core Wall & Link Beam L44 C-1

044T030031 R.C. Work - Core Wall & Link Beam L44 C-2

100

19-MAY-06A

27-MAY-06A

R.C. Work - Core Wall & Link Beam L44 C-2

044T030032 R.C. Work - Core Wall & Link Beam L44 C-3

100

16-MAY-06A

24-MAY-06A

R.C. Work - Core Wall & Link Beam L44 C-3

045T030030 R.C. Work - Core Wall & Link Beam L45 C-1

100

26-MAY-06A

31-MAY-06A

R.C. Work - Core Wall & Link Beam L45 C-1

045T030031 R.C. Work - Core Wall & Link Beam L45 C-2

100

28-MAY-06A

01-JUN-06A

R.C. Work - Core Wall & Link Beam L45 C-2

045T030032 R.C. Work - Core Wall & Link Beam L45 C-3

100

25-MAY-06A

28-MAY-06A

R.C. Work - Core Wall & Link Beam L45 C-3

046T030030 R.C. Work - Core Wall & Link Beam L46 C-1

100

01-JUN-06A

06-JUN-06A

R.C. Work - Core Wall & Link Beam L46 C-1

046T030031 R.C. Work - Core Wall & Link Beam L46 C-2

100

02-JUN-06A

04-JUN-06A

R.C. Work - Core Wall & Link Beam L46 C-2

046T030032 R.C. Work - Core Wall & Link Beam L46 C-3

100

30-MAY-06A

04-JUN-06A

R.C. Work - Core Wall & Link Beam L46 C-3

047T030030 R.C. Work - Core Wall & Link Beam L47 C-1

100

07-JUN-06A

11-JUN-06A

R.C. Work - Core Wall & Link Beam L47 C-1

047T030031 R.C. Work - Core Wall & Link Beam L47 C-2

100

06-JUN-06A

10-JUN-06A

R.C. Work - Core Wall & Link Beam L47 C-2

047T030032 R.C. Work - Core Wall & Link Beam L47 C-3

100

06-JUN-06A

11-JUN-06A

R.C. Work - Core Wall & Link Beam L47 C-3

048T030030 R.C. Work - Core Wall & Link Beam L48 C-1

100

13-JUN-06A

17-JUN-06A

R.C. Work - Core Wall & Link Beam L48 C-1

048T030031 R.C. Work - Core Wall & Link Beam L48 C-2

100

11-JUN-06A

14-JUN-06A

R.C. Work - Core Wall & Link Beam L48 C-2

048T030032 R.C. Work - Core Wall & Link Beam L48 C-3

100

13-JUN-06A

15-JUN-06A

R.C. Work - Core Wall & Link Beam L48 C-3

049T030030 R.C. Work - Core Wall & Link Beam L49 C-1

100

18-JUN-06A

21-JUN-06A

R.C. Work - Core Wall & Link Beam L49 C-1

049T030031 R.C. Work - Core Wall & Link Beam L49 C-2

100

15-JUN-06A

18-JUN-06A

R.C. Work - Core Wall & Link Beam L49 C-2

049T030032 R.C. Work - Core Wall & Link Beam L49 C-3

100

16-JUN-06A

20-JUN-06A

R.C. Work - Core Wall & Link Beam L49 C-3

050T030030 R.C. Work - Core Wall & Link Beam L50 C-1

100

21-JUN-06A

25-JUN-06A

R.C. Work - Core Wall & Link Beam L50 C-1

050T030031 R.C. Work - Core Wall & Link Beam L50 C-2

100

20-JUN-06A

24-JUN-06A

R.C. Work - Core Wall & Link Beam L50 C-2

050T030032 R.C. Work - Core Wall & Link Beam L50 C-3

100

21-JUN-06A

25-JUN-06A

R.C. Work - Core Wall & Link Beam L50 C-3

051T030030 R.C. Work - Core Wall & Link Beam L51 C-1

100

27-JUN-06A

01-JUL-06A

R.C. Work - Core Wall & Link Beam L51 C-1

051T030031 R.C. Work - Core Wall & Link Beam L51 C-2

100

25-JUN-06A

27-JUN-06A

R.C. Work - Core Wall & Link Beam L51 C-2

051T030032 R.C. Work - Core Wall & Link Beam L51 C-3

100

27-JUN-06A

29-JUN-06A

R.C. Work - Core Wall & Link Beam L51 C-3

052T030030 R.C. Work - Core Wall & Link Beam L52 C-1

100

02-JUL-06A

05-JUL-06A

R.C. Work - Core Wall & Link Beam L52 C-1

052T030031 R.C. Work - Core Wall & Link Beam L52 C-2

100

28-JUN-06A

02-JUL-06A

R.C. Work - Core Wall & Link Beam L52 C-2

052T030032 R.C. Work - Core Wall & Link Beam L52 C-3

100

30-JUN-06A

04-JUL-06A

R.C. Work - Core Wall & Link Beam L52 C-3

053T030030 R.C. Work - Core Wall & Link Beam L53 C-1

100

06-JUL-06A

09-JUL-06A

R.C. Work - Core Wall & Link Beam L53 C-1

053T030031 R.C. Work - Core Wall & Link Beam L53 C-2

100

04-JUL-06A

06-JUL-06A

R.C. Work - Core Wall & Link Beam L53 C-2

053T030032 R.C. Work - Core Wall & Link Beam L53 C-3

100

05-JUL-06A

09-JUL-06A

R.C. Work - Core Wall & Link Beam L53 C-3

054T030030 R.C. Work - Core Wall & Link Beam L54 C-1

100

11-JUL-06A

15-JUL-06A

R.C. Work - Core Wall & Link Beam L54 C-1

054T030031 R.C. Work - Core Wall & Link Beam L54 C-2

100

07-JUL-06A

12-JUL-06A

R.C. Work - Core Wall & Link Beam L54 C-2

054T030032 R.C. Work - Core Wall & Link Beam L54 C-3

100

11-JUL-06A

13-JUL-06A

R.C. Work - Core Wall & Link Beam L54 C-3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 31 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

055T030030 R.C. Work - Core Wall & Link Beam L55 C-1

100

16-JUL-06A

18-JUL-06A

R.C. Work - Core Wall & Link Beam L55 C-1

055T030031 R.C. Work - Core Wall & Link Beam L55 C-2

100

13-JUL-06A

16-JUL-06A

R.C. Work - Core Wall & Link Beam L55 C-2

055T030032 R.C. Work - Core Wall & Link Beam L55 C-3

100

14-JUL-06A

16-JUL-06A

R.C. Work - Core Wall & Link Beam L55 C-3

056T030030 R.C. Work - Core Wall & Link Beam L56 C-1

100

19-JUL-06A

22-JUL-06A

R.C. Work - Core Wall & Link Beam L56 C-1

056T030031 R.C. Work - Core Wall & Link Beam L56 C-2

100

18-JUL-06A

19-JUL-06A

R.C. Work - Core Wall & Link Beam L56 C-2

056T030032 R.C. Work - Core Wall & Link Beam L56 C-3

100

18-JUL-06A

20-JUL-06A

R.C. Work - Core Wall & Link Beam L56 C-3

057T030030 R.C. Work - Core Wall & Link Beam L57 C-1

100

23-JUL-06A

25-JUL-06A

R.C. Work - Core Wall & Link Beam L57 C-1

057T030031 R.C. Work - Core Wall & Link Beam L57 C-2

100

20-JUL-06A

23-JUL-06A

R.C. Work - Core Wall & Link Beam L57 C-2

057T030032 R.C. Work - Core Wall & Link Beam L57 C-3

100

21-JUL-06A

23-JUL-06A

R.C. Work - Core Wall & Link Beam L57 C-3

058T030030 R.C. Work - Core Wall & Link Beam L58 C-1

100

26-JUL-06A

29-JUL-06A

R.C. Work - Core Wall & Link Beam L58 C-1

058T030031 R.C. Work - Core Wall & Link Beam L58 C-2

100

25-JUL-06A

26-JUL-06A

R.C. Work - Core Wall & Link Beam L58 C-2

058T030032 R.C. Work - Core Wall & Link Beam L58 C-3

100

25-JUL-06A

27-JUL-06A

R.C. Work - Core Wall & Link Beam L58 C-3

059T030030 R.C. Work - Core Wall & Link Beam L59 C-1

100

30-JUL-06A

01-AUG-06A

R.C. Work - Core Wall & Link Beam L59 C-1

059T030031 R.C. Work - Core Wall & Link Beam L59 C-2

100

26-JUL-06A

30-JUL-06A

R.C. Work - Core Wall & Link Beam L59 C-2

059T030032 R.C. Work - Core Wall & Link Beam L59 C-3

100

28-JUL-06A

30-JUL-06A

R.C. Work - Core Wall & Link Beam L59 C-3

060T030030 R.C. Work - Core Wall & Link Beam L60 C-1

100

02-AUG-06A

05-AUG-06A

R.C. Work - Core Wall & Link Beam L60 C-1

060T030031 R.C. Work - Core Wall & Link Beam L60 C-2

100

01-AUG-06A

02-AUG-06A

R.C. Work - Core Wall & Link Beam L60 C-2

060T030032 R.C. Work - Core Wall & Link Beam L60 C-3

100

01-AUG-06A

03-AUG-06A

R.C. Work - Core Wall & Link Beam L60 C-3

061T030030 R.C. Work - Core Wall & Link Beam L61 C-1

100

06-AUG-06A

08-AUG-06A

R.C. Work - Core Wall & Link Beam L61 C-1

061T030031 R.C. Work - Core Wall & Link Beam L61 C-2

100

03-AUG-06A

06-AUG-06A

R.C. Work - Core Wall & Link Beam L61 C-2

061T030032 R.C. Work - Core Wall & Link Beam L61 C-3

100

04-AUG-06A

06-AUG-06A

R.C. Work - Core Wall & Link Beam L61 C-3

062T030030 R.C. Work - Core Wall & Link Beam L62 C-1

100

09-AUG-06A

12-AUG-06A

R.C. Work - Core Wall & Link Beam L62 C-1

062T030031 R.C. Work - Core Wall & Link Beam L62 C-2

100

08-AUG-06A

09-AUG-06A

R.C. Work - Core Wall & Link Beam L62 C-2

062T030032 R.C. Work - Core Wall & Link Beam L62 C-3

100

08-AUG-06A

10-AUG-06A

R.C. Work - Core Wall & Link Beam L62 C-3

063T030030 R.C. Work - Core Wall & Link Beam L63 C-1

100

13-AUG-06A

15-AUG-06A

R.C. Work - Core Wall & Link Beam L63 C-1

063T030031 R.C. Work - Core Wall & Link Beam L63 C-2

100

10-AUG-06A

13-AUG-06A

R.C. Work - Core Wall & Link Beam L63 C-2

063T030032 R.C. Work - Core Wall & Link Beam L63 C-3

100

11-AUG-06A

13-AUG-06A

R.C. Work - Core Wall & Link Beam L63 C-3

064T030030 R.C. Work - Core Wall & Link Beam L64 C-1

100

16-AUG-06A

19-AUG-06A

R.C. Work - Core Wall & Link Beam L64 C-1

064T030031 R.C. Work - Core Wall & Link Beam L64 C-2

100

15-AUG-06A

16-AUG-06A

R.C. Work - Core Wall & Link Beam L64 C-2

064T030032 R.C. Work - Core Wall & Link Beam L64 C-3

100

15-AUG-06A

17-AUG-06A

R.C. Work - Core Wall & Link Beam L64 C-3

065T030030 R.C. Work - Core Wall & Link Beam L65 C-1

100

20-AUG-06A

23-AUG-06A

R.C. Work - Core Wall & Link Beam L65 C-1

065T030031 R.C. Work - Core Wall & Link Beam L65 C-2

100

17-AUG-06A

20-AUG-06A

R.C. Work - Core Wall & Link Beam L65 C-2

065T030032 R.C. Work - Core Wall & Link Beam L65 C-3

100

18-AUG-06A

22-AUG-06A

R.C. Work - Core Wall & Link Beam L65 C-3

066T030030 R.C. Work - Core Wall & Link Beam L66 C-1

100

24-AUG-06A

27-AUG-06A

R.C. Work - Core Wall & Link Beam L66 C-1

066T030031 R.C. Work - Core Wall & Link Beam L66 C-2

100

22-AUG-06A

24-AUG-06A

R.C. Work - Core Wall & Link Beam L66 C-2

066T030032 R.C. Work - Core Wall & Link Beam L66 C-3

100

23-AUG-06A

26-AUG-06A

R.C. Work - Core Wall & Link Beam L66 C-3

067T030030 R.C. Work - Core Wall & Link Beam L67 C-1

100

29-AUG-06A

30-AUG-06A

R.C. Work - Core Wall & Link Beam L67 C-1

067T030031 R.C. Work - Core Wall & Link Beam L67 C-2

100

25-AUG-06A

27-AUG-06A

R.C. Work - Core Wall & Link Beam L67 C-2

067T030032 R.C. Work - Core Wall & Link Beam L67 C-3

100

27-AUG-06A

29-AUG-06A

R.C. Work - Core Wall & Link Beam L67 C-3

068T030030 R.C. Work - Core Wall & Link Beam L68 C-1

100

31-AUG-06A

03-SEP-06A

R.C. Work - Core Wall & Link Beam L68 C-1

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 32 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

068T030031 R.C. Work - Core Wall & Link Beam L68 C-2

100

29-AUG-06A

31-AUG-06A

R.C. Work - Core Wall & Link Beam L68 C-2

068T030032 R.C. Work - Core Wall & Link Beam L68 C-3

100

29-AUG-06A

02-SEP-06A

R.C. Work - Core Wall & Link Beam L68 C-3

069T030030 R.C. Work - Core Wall & Link Beam L69 C-1

100

04-SEP-06A

06-SEP-06A

R.C. Work - Core Wall & Link Beam L69 C-1

069T030031 R.C. Work - Core Wall & Link Beam L69 C-2

100

01-SEP-06A

04-SEP-06A

R.C. Work - Core Wall & Link Beam L69 C-2

069T030032 R.C. Work - Core Wall & Link Beam L69 C-3

100

03-SEP-06A

05-SEP-06A

R.C. Work - Core Wall & Link Beam L69 C-3

070T030030 R.C. Work - Core Wall & Link Beam L70 C-1

100

07-SEP-06A

10-SEP-06A

R.C. Work - Core Wall & Link Beam L70 C-1

070T030031 R.C. Work - Core Wall & Link Beam L70 C-2

100

05-SEP-06A

07-SEP-06A

R.C. Work - Core Wall & Link Beam L70 C-2

070T030032 R.C. Work - Core Wall & Link Beam L70 C-3

100

06-SEP-06A

09-SEP-06A

R.C. Work - Core Wall & Link Beam L70 C-3

071T030030 R.C. Work - Core Wall & Link Beam L71 C-1

100

13-SEP-06A

13-SEP-06A

R.C. Work - Core Wall & Link Beam L71 C-1

071T030031 R.C. Work - Core Wall & Link Beam L71 C-2

100

08-SEP-06A

10-SEP-06A

R.C. Work - Core Wall & Link Beam L71 C-2

071T030032 R.C. Work - Core Wall & Link Beam L71 C-3

100

10-SEP-06A

10-SEP-06A

R.C. Work - Core Wall & Link Beam L71 C-3

072T030030 R.C. Work - Core Wall & Link Beam L72 C-1

100

14-SEP-06A

17-SEP-06A

R.C. Work - Core Wall & Link Beam L72 C-1

072T030031 R.C. Work - Core Wall & Link Beam L72 C-2

100

13-SEP-06A

14-SEP-06A

R.C. Work - Core Wall & Link Beam L72 C-2

072T030032 R.C. Work - Core Wall & Link Beam L72 C-3

100

13-SEP-06A

16-SEP-06A

R.C. Work - Core Wall & Link Beam L72 C-3

073T030030 R.C. Work - Core Wall & Link Beam L73 C-1

100

18-SEP-06A

24-SEP-06A

R.C. Work - Core Wall & Link Beam L73 C-1

073T030031 R.C. Work - Core Wall & Link Beam L73 C-2

100

15-SEP-06A

20-SEP-06A

R.C. Work - Core Wall & Link Beam L73 C-2

073T030032 R.C. Work - Core Wall & Link Beam L73 C-3

100

17-SEP-06A

23-SEP-06A

R.C. Work - Core Wall & Link Beam L73 C-3

074T030030 R.C. Work - Core Wall & Link Beam L74 C-1

100

26-SEP-06A

03-OCT-06A

R.C. Work - Core Wall & Link Beam L74 C-1

074T030031 R.C. Work - Core Wall & Link Beam L74 C-2

100

21-SEP-06A

28-SEP-06A

R.C. Work - Core Wall & Link Beam L74 C-2

074T030032 R.C. Work - Core Wall & Link Beam L74 C-3

100

24-SEP-06A

01-OCT-06A

R.C. Work - Core Wall & Link Beam L74 C-3

075T030030 R.C. Work - Core Wall & Link Beam L75 C-1

100

04-OCT-06A

10-OCT-06A

R.C. Work - Core Wall & Link Beam L75 C-1

075T030031 R.C. Work - Core Wall & Link Beam L75 C-2

100

29-SEP-06A

05-OCT-06A

R.C. Work - Core Wall & Link Beam L75 C-2

075T030032 R.C. Work - Core Wall & Link Beam L75 C-3

100

02-OCT-06A

08-OCT-06A

R.C. Work - Core Wall & Link Beam L75 C-3

076T030030 R.C. Work - Core Wall & Link Beam L76 C-1

100

11-OCT-06A

17-OCT-06A

R.C. Work - Core Wall & Link Beam L76 C-1

076T030031 R.C. Work - Core Wall & Link Beam L76 C-2

100

06-OCT-06A

14-OCT-06A

R.C. Work - Core Wall & Link Beam L76 C-2

076T030032 R.C. Work - Core Wall & Link Beam L76 C-3

100

10-OCT-06A

15-OCT-06A

R.C. Work - Core Wall & Link Beam L76 C-3

077T030030 R.C. Work - Core Wall & Link Beam L77 C-1

100

19-OCT-06A

21-OCT-06A

R.C. Work - Core Wall & Link Beam L77 C-1

077T030031 R.C. Work - Core Wall & Link Beam L77 C-2

100

15-OCT-06A

17-OCT-06A

R.C. Work - Core Wall & Link Beam L77 C-2

077T030032 R.C. Work - Core Wall & Link Beam L77 C-3

100

16-OCT-06A

19-OCT-06A

R.C. Work - Core Wall & Link Beam L77 C-3

078T030030 R.C. Work - Core Wall & Link Beam L78 C-1

100

22-OCT-06A

28-OCT-06A

R.C. Work - Core Wall & Link Beam L78 C-1

078T030031 R.C. Work - Core Wall & Link Beam L78 C-2

100

19-OCT-06A

22-OCT-06A

R.C. Work - Core Wall & Link Beam L78 C-2

078T030032 R.C. Work - Core Wall & Link Beam L78 C-3

100

20-OCT-06A

24-OCT-06A

R.C. Work - Core Wall & Link Beam L78 C-3

079T030030 R.C. Work - Core Wall & Link Beam L79 C-1

100

29-OCT-06A

31-OCT-06A

R.C. Work - Core Wall & Link Beam L79 C-1

079T030031 R.C. Work - Core Wall & Link Beam L79 C-2

100

24-OCT-06A

29-OCT-06A

R.C. Work - Core Wall & Link Beam L79 C-2

079T030032 R.C. Work - Core Wall & Link Beam L79 C-3

100

26-OCT-06A

29-OCT-06A

R.C. Work - Core Wall & Link Beam L79 C-3

080T030030 R.C. Work - Core Wall & Link Beam L80 C-1

100

02-NOV-06A

02-NOV-06A

R.C. Work - Core Wall & Link Beam L80 C-1

080T030031 R.C. Work - Core Wall & Link Beam L80 C-2

100

31-OCT-06A

31-OCT-06A

R.C. Work - Core Wall & Link Beam L80 C-2

080T030032 R.C. Work - Core Wall & Link Beam L80 C-3

100

31-OCT-06A

04-NOV-06A

R.C. Work - Core Wall & Link Beam L80 C-3

081T030030 R.C. Work - Core Wall & Link Beam L81 C-1

100

03-NOV-06A

06-NOV-06A

R.C. Work - Core Wall & Link Beam L81 C-1

081T030031 R.C. Work - Core Wall & Link Beam L81 C-2

100

02-NOV-06A

05-NOV-06A

R.C. Work - Core Wall & Link Beam L81 C-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 33 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Wall & Link Beam L81 C-3

081T030032 R.C. Work - Core Wall & Link Beam L81 C-3

100

05-NOV-06A

07-NOV-06A

082T030030 R.C. Work - Core Wall & Link Beam L82 C-1

100

07-NOV-06A

08-NOV-06A

R.C. Work - Core Wall & Link Beam L82 C-1

082T030031 R.C. Work - Core Wall & Link Beam L82 C-2

100

06-NOV-06A

08-NOV-06A

R.C. Work - Core Wall & Link Beam L82 C-2

082T030032 R.C. Work - Core Wall & Link Beam L82 C-3

100

08-NOV-06A

09-NOV-06A

R.C. Work - Core Wall & Link Beam L82 C-3

083T030030 R.C. Work - Core Wall & Link Beam L83 C-1

100

09-NOV-06A

12-NOV-06A

R.C. Work - Core Wall & Link Beam L83 C-1

083T030031 R.C. Work - Core Wall & Link Beam L83 C-2

100

09-NOV-06A

11-NOV-06A

R.C. Work - Core Wall & Link Beam L83 C-2

083T030032 R.C. Work - Core Wall & Link Beam L83 C-3

100

10-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L83 C-3

084T030030 R.C. Work - Core Wall & Link Beam L84 C-1

100

13-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L84 C-1

084T030031 R.C. Work - Core Wall & Link Beam L84 C-2

100

12-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L84 C-2

084T030032 R.C. Work - Core Wall & Link Beam L84 C-3

100

16-NOV-06A

16-NOV-06A

R.C. Work - Core Wall & Link Beam L84 C-3

085T030030 R.C. Work - Core Wall & Link Beam L85 C-1

100

16-NOV-06A

18-NOV-06A

R.C. Work - Core Wall & Link Beam L85 C-1

085T030031 R.C. Work - Core Wall & Link Beam L85 C-2

100

16-NOV-06A

16-NOV-06A

R.C. Work - Core Wall & Link Beam L85 C-2

085T030032 R.C. Work - Core Wall & Link Beam L85 C-3

100

16-NOV-06A

19-NOV-06A

R.C. Work - Core Wall & Link Beam L85 C-3

086T030030 R.C. Work - Core Wall & Link Beam L86 C-1

100

19-NOV-06A

21-NOV-06A

R.C. Work - Core Wall & Link Beam L86 C-1

086T030031 R.C. Work - Core Wall & Link Beam L86 C-2

100

17-NOV-06A

20-NOV-06A

R.C. Work - Core Wall & Link Beam L86 C-2

086T030032 R.C. Work - Core Wall & Link Beam L86 C-3

100

20-NOV-06A

22-NOV-06A

R.C. Work - Core Wall & Link Beam L86 C-3

087T030030 R.C. Work - Core Wall & Link Beam L87 C-1

100

22-NOV-06A

23-NOV-06A

R.C. Work - Core Wall & Link Beam L87 C-1

087T030031 R.C. Work - Core Wall & Link Beam L87 C-2

100

21-NOV-06A

23-NOV-06A

R.C. Work - Core Wall & Link Beam L87 C-2

087T030032 R.C. Work - Core Wall & Link Beam L87 C-3

100

23-NOV-06A

25-NOV-06A

R.C. Work - Core Wall & Link Beam L87 C-3

088T030030 R.C. Work - Core Wall & Link Beam L88 C-1

100

24-NOV-06A

27-NOV-06A

R.C. Work - Core Wall & Link Beam L88 C-1

088T030031 R.C. Work - Core Wall & Link Beam L88 C-2

100

24-NOV-06A

26-NOV-06A

R.C. Work - Core Wall & Link Beam L88 C-2

088T030032 R.C. Work - Core Wall & Link Beam L88 C-3

100

26-NOV-06A

28-NOV-06A

R.C. Work - Core Wall & Link Beam L88 C-3

089T030030 R.C. Work - Core Wall & Link Beam L89 C-1

100

28-NOV-06A

29-NOV-06A

R.C. Work - Core Wall & Link Beam L89 C-1

089T030031 R.C. Work - Core Wall & Link Beam L89 C-2

100

27-NOV-06A

29-NOV-06A

R.C. Work - Core Wall & Link Beam L89 C-2

089T030032 R.C. Work - Core Wall & Link Beam L89 C-3

100

29-NOV-06A

30-NOV-06A

R.C. Work - Core Wall & Link Beam L89 C-3

090T030030 R.C. Work - Core Wall & Link Beam L90 C-1

100

30-NOV-06A

03-DEC-06A

R.C. Work - Core Wall & Link Beam L90 C-1

090T030031 R.C. Work - Core Wall & Link Beam L90 C-2

100

30-NOV-06A

04-DEC-06A

R.C. Work - Core Wall & Link Beam L90 C-2

090T030032 R.C. Work - Core Wall & Link Beam L90 C-3

100

01-DEC-06A

04-DEC-06A

R.C. Work - Core Wall & Link Beam L90 C-3

091T030030 R.C. Work - Core Wall & Link Beam L91 C-1

100

04-DEC-06A

04-DEC-06A

R.C. Work - Core Wall & Link Beam L91 C-1

091T030031 R.C. Work - Core Wall & Link Beam L91 C-2

100

04-DEC-06A

04-DEC-06A

R.C. Work - Core Wall & Link Beam L91 C-2

091T030032 R.C. Work - Core Wall & Link Beam L91 C-3

100

07-DEC-06A

07-DEC-06A

R.C. Work - Core Wall & Link Beam L91 C-3

092T030030 R.C. Work - Core Wall & Link Beam L92 C-1

100

07-DEC-06A

09-DEC-06A

R.C. Work - Core Wall & Link Beam L92 C-1

092T030031 R.C. Work - Core Wall & Link Beam L92 C-2

100

07-DEC-06A

07-DEC-06A

R.C. Work - Core Wall & Link Beam L92 C-2

092T030032 R.C. Work - Core Wall & Link Beam L92 C-3

100

08-DEC-06A

10-DEC-06A

R.C. Work - Core Wall & Link Beam L92 C-3

093T030030 R.C. Work - Core Wall & Link Beam L93 C-1

100

10-DEC-06A

11-DEC-06A

R.C. Work - Core Wall & Link Beam L93 C-1

093T030031 R.C. Work - Core Wall & Link Beam L93 C-2

100

08-DEC-06A

11-DEC-06A

R.C. Work - Core Wall & Link Beam L93 C-2

093T030032 R.C. Work - Core Wall & Link Beam L93 C-3

100

11-DEC-06A

12-DEC-06A

R.C. Work - Core Wall & Link Beam L93 C-3

094T030030 R.C. Work - Core Wall & Link Beam L94 C-1

100

12-DEC-06A

14-DEC-06A

R.C. Work - Core Wall & Link Beam L94 C-1

094T030031 R.C. Work - Core Wall & Link Beam L94 C-2

100

12-DEC-06A

13-DEC-06A

R.C. Work - Core Wall & Link Beam L94 C-2

094T030032 R.C. Work - Core Wall & Link Beam L94 C-3

100

13-DEC-06A

16-DEC-06A

R.C. Work - Core Wall & Link Beam L94 C-3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 34 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

095T030030 R.C. Work - Core Wall & Link Beam L95 C-1

100

15-DEC-06A

17-DEC-06A

R.C. Work - Core Wall & Link Beam L95 C-1

095T030031 R.C. Work - Core Wall & Link Beam L95 C-2

100

14-DEC-06A

17-DEC-06A

R.C. Work - Core Wall & Link Beam L95 C-2

095T030032 R.C. Work - Core Wall & Link Beam L95 C-3

100

17-DEC-06A

18-DEC-06A

R.C. Work - Core Wall & Link Beam L95 C-3

096T030030 R.C. Work - Core Wall & Link Beam L96 C-1

100

18-DEC-06A

20-DEC-06A

R.C. Work - Core Wall & Link Beam L96 C-1

096T030031 R.C. Work - Core Wall & Link Beam L96 C-2

100

18-DEC-06A

19-DEC-06A

R.C. Work - Core Wall & Link Beam L96 C-2

096T030032 R.C. Work - Core Wall & Link Beam L96 C-3

100

19-DEC-06A

21-DEC-06A

R.C. Work - Core Wall & Link Beam L96 C-3

097T030030 R.C. Work - Core Wall & Link Beam L97 C-1

100

21-DEC-06A

23-DEC-06A

R.C. Work - Core Wall & Link Beam L97 C-1

097T030031 R.C. Work - Core Wall & Link Beam L97 C-2

100

20-DEC-06A

23-DEC-06A

R.C. Work - Core Wall & Link Beam L97 C-2

097T030032 R.C. Work - Core Wall & Link Beam L97 C-3

100

22-DEC-06A

24-DEC-06A

R.C. Work - Core Wall & Link Beam L97 C-3

098T030030 R.C. Work - Core Wall & Link Beam L98 C-1

100

24-DEC-06A

26-DEC-06A

R.C. Work - Core Wall & Link Beam L98 C-1

098T030031 R.C. Work - Core Wall & Link Beam L98 C-2

100

24-DEC-06A

25-DEC-06A

R.C. Work - Core Wall & Link Beam L98 C-2

098T030032 R.C. Work - Core Wall & Link Beam L98 C-3

100

25-DEC-06A

27-DEC-06A

R.C. Work - Core Wall & Link Beam L98 C-3

099T030030 R.C. Work - Core Wall & Link Beam L99 C-1

100

27-DEC-06A

28-DEC-06A

R.C. Work - Core Wall & Link Beam L99 C-1

099T030031 R.C. Work - Core Wall & Link Beam L99 C-2

100

26-DEC-06A

28-DEC-06A

R.C. Work - Core Wall & Link Beam L99 C-2

099T030032 R.C. Work - Core Wall & Link Beam L99 C-3

100

28-DEC-06A

02-JAN-07A

R.C. Work - Core Wall & Link Beam L99 C-3

100T030030 R.C. Work - Core Wall & Link Beam L100 C-1

100

29-DEC-06A

04-JAN-07A

R.C. Work - Core Wall & Link Beam L100 C-1

100T030031 R.C. Work - Core Wall & Link Beam L100 C-2

100

29-DEC-06A

02-JAN-07A

R.C. Work - Core Wall & Link Beam L100 C-2

100T030032 R.C. Work - Core Wall & Link Beam L100 C-3

100

04-JAN-07A

06-JAN-07A

R.C. Work - Core Wall & Link Beam L100 C-3

101T030030 R.C. Work - Core Wall & Link Beam L101 C-1

100

05-JAN-07A

07-JAN-07A

R.C. Work - Core Wall & Link Beam L101 C-1

101T030031 R.C. Work - Core Wall & Link Beam L101 C-2

100

04-JAN-07A

07-JAN-07A

R.C. Work - Core Wall & Link Beam L101 C-2

101T030032 R.C. Work - Core Wall & Link Beam L101 C-3

100

07-JAN-07A

08-JAN-07A

R.C. Work - Core Wall & Link Beam L101 C-3

102T030030 R.C. Work - Core Wall & Link Beam L102 C-1

100

08-JAN-07A

10-JAN-07A

R.C. Work - Core Wall & Link Beam L102 C-1

102T030031 R.C. Work - Core Wall & Link Beam L102 C-2

100

08-JAN-07A

09-JAN-07A

R.C. Work - Core Wall & Link Beam L102 C-2

102T030032 R.C. Work - Core Wall & Link Beam L102 C-3

100

09-JAN-07A

11-JAN-07A

R.C. Work - Core Wall & Link Beam L102 C-3

103T030030 R.C. Work - Core Wall & Link Beam L103 C-1

100

11-JAN-07A

14-JAN-07A

R.C. Work - Core Wall & Link Beam L103 C-1

103T030031 R.C. Work - Core Wall & Link Beam L103 C-2

100

10-JAN-07A

13-JAN-07A

R.C. Work - Core Wall & Link Beam L103 C-2

103T030032 R.C. Work - Core Wall & Link Beam L103 C-3

100

12-JAN-07A

15-JAN-07A

R.C. Work - Core Wall & Link Beam L103 C-3

104T030030 R.C. Work - Core Wall & Link Beam L104 C-1

100

15-JAN-07A

16-JAN-07A

R.C. Work - Core Wall & Link Beam L104 C-1

104T030031 R.C. Work - Core Wall & Link Beam L104 C-2

100

14-JAN-07A

16-JAN-07A

R.C. Work - Core Wall & Link Beam L104 C-2

104T030032 R.C. Work - Core Wall & Link Beam L104 C-3

100

16-JAN-07A

17-JAN-07A

R.C. Work - Core Wall & Link Beam L104 C-3

105T030030 R.C. Work - Core Wall & Link Beam L105 C-1

100

17-JAN-07A

21-JAN-07A

R.C. Work - Core Wall & Link Beam L105 C-1

105T030031 R.C. Work - Core Wall & Link Beam L105 C-2

100

17-JAN-07A

18-JAN-07A

R.C. Work - Core Wall & Link Beam L105 C-2

105T030032 R.C. Work - Core Wall & Link Beam L105 C-3

100

18-JAN-07A

22-JAN-07A

R.C. Work - Core Wall & Link Beam L105 C-3

106T030030 R.C. Work - Core Wall & Link Beam L106 C-1

100

22-JAN-07A

23-JAN-07A

R.C. Work - Core Wall & Link Beam L106 C-1

106T030031 R.C. Work - Core Wall & Link Beam L106 C-2

100

19-JAN-07A

23-JAN-07A

R.C. Work - Core Wall & Link Beam L106 C-2

106T030032 R.C. Work - Core Wall & Link Beam L106 C-3

100

23-JAN-07A

24-JAN-07A

R.C. Work - Core Wall & Link Beam L106 C-3

107T030030 R.C. Work - Core Wall & Link Beam L107 C-1

100

24-JAN-07A

27-JAN-07A

R.C. Work - Core Wall & Link Beam L107 C-1

107T030031 R.C. Work - Core Wall & Link Beam L107 C-2

100

24-JAN-07A

25-JAN-07A

R.C. Work - Core Wall & Link Beam L107 C-2

107T030032 R.C. Work - Core Wall & Link Beam L107 C-3

100

25-JAN-07A

28-JAN-07A

R.C. Work - Core Wall & Link Beam L107 C-3

108T030030 R.C. Work - Core Wall & Link Beam L108 C-1

100

28-JAN-07A

30-JAN-07A

R.C. Work - Core Wall & Link Beam L108 C-1

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 35 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

108T030031 R.C. Work - Core Wall & Link Beam L108 C-2

100

26-JAN-07A

29-JAN-07A

R.C. Work - Core Wall & Link Beam L108 C-2

108T030032 R.C. Work - Core Wall & Link Beam L108 C-3

100

29-JAN-07A

30-JAN-07A

R.C. Work - Core Wall & Link Beam L108 C-3

109T030030 R.C. Work - Core Wall & Link Beam L109 C-1

10

100

03-FEB-07A

17-FEB-07A

R.C. Work - Core Wall & Link Beam L109 C-1

109T030031 R.C. Work - Core Wall & Link Beam L109 C-2

10

100

30-JAN-07A

08-FEB-07A

R.C. Work - Core Wall & Link Beam L109 C-2

109T030032 R.C. Work - Core Wall & Link Beam L109 C-3

10

100

03-FEB-07A

20-FEB-07A

R.C. Work - Core Wall & Link Beam L109 C-3

110T030030 R.C. Work - Core Wall & Link Beam L110 C-1

100

18-FEB-07A

24-FEB-07A

R.C. Work - Core Wall & Link Beam L110 C-1

110T030031 R.C. Work - Core Wall & Link Beam L110 C-2

100

09-FEB-07A

20-FEB-07A

R.C. Work - Core Wall & Link Beam L110 C-2

110T030032 R.C. Work - Core Wall & Link Beam L110 C-3

100

22-FEB-07A

26-FEB-07A

R.C. Work - Core Wall & Link Beam L110 C-3

111T030030 R.C. Work - Core Wall & Link Beam L111 C-1

100

25-FEB-07A

06-MAR-07A

R.C. Work - Core Wall & Link Beam L111 C-1

111T030031 R.C. Work - Core Wall & Link Beam L111 C-2

100

22-FEB-07A

04-MAR-07A

R.C. Work - Core Wall & Link Beam L111 C-2

111T030032 R.C. Work - Core Wall & Link Beam L111 C-3

100

27-FEB-07A

08-MAR-07A

R.C. Work - Core Wall & Link Beam L111 C-3

112T030030 R.C. Work - Core Wall & Link Beam L112 C-1

100

07-MAR-07A

12-MAR-07A

R.C. Work - Core Wall & Link Beam L112 C-1

112T030031 R.C. Work - Core Wall & Link Beam L112 C-2

100

05-MAR-07A

11-MAR-07A

R.C. Work - Core Wall & Link Beam L112 C-2

112T030032 R.C. Work - Core Wall & Link Beam L112 C-3

100

09-MAR-07A

14-MAR-07A

R.C. Work - Core Wall & Link Beam L112 C-3

113T030030 R.C. Work - Core Wall & Link Beam L113 C-1

67

-2

13-MAR-07A

15-MAR-07

R.C. Work - Core Wall & Link Beam L113 C-1

113T030031 R.C. Work - Core Wall & Link Beam L113 C-2

33

-1

12-MAR-07A

17-MAR-07

R.C. Work - Core Wall & Link Beam L113 C-2

113T030032 R.C. Work - Core Wall & Link Beam L113 C-3

-1

14-MAR-07A

18-MAR-07

R.C. Work - Core Wall & Link Beam L113 C-3

114T030030 R.C. Work - Core Wall & Link Beam L114 C-1

-2

17-MAR-07

19-MAR-07

R.C. Work - Core Wall & Link Beam L114 C-1

114T030031 R.C. Work - Core Wall & Link Beam L114 C-2

-1

18-MAR-07

20-MAR-07

R.C. Work - Core Wall & Link Beam L114 C-2

114T030032 R.C. Work - Core Wall & Link Beam L114 C-3

-1

19-MAR-07

21-MAR-07

R.C. Work - Core Wall & Link Beam L114 C-3

115T030030 R.C. Work - Core Wall & Link Beam L115 C-1

-2

21-MAR-07

23-MAR-07

R.C. Work - Core Wall & Link Beam L115 C-1

115T030031 R.C. Work - Core Wall & Link Beam L115 C-2

-1

21-MAR-07

23-MAR-07

R.C. Work - Core Wall & Link Beam L115 C-2

115T030032 R.C. Work - Core Wall & Link Beam L115 C-3

22-MAR-07

24-MAR-07

R.C. Work - Core Wall & Link Beam L115 C-3

116T030030 R.C. Work - Core Wall & Link Beam L116 C-1

-2

24-MAR-07

26-MAR-07

R.C. Work - Core Wall & Link Beam L116 C-1

116T030031 R.C. Work - Core Wall & Link Beam L116 C-2

-1

24-MAR-07

26-MAR-07

R.C. Work - Core Wall & Link Beam L116 C-2

116T030032 R.C. Work - Core Wall & Link Beam L116 C-3

25-MAR-07

27-MAR-07

R.C. Work - Core Wall & Link Beam L116 C-3

117T030030 R.C. Work - Core Wall & Link Beam L117 C-1

-2

27-MAR-07

29-MAR-07

R.C. Work - Core Wall & Link Beam L117 C-1

117T030031 R.C. Work - Core Wall & Link Beam L117 C-2

-1

27-MAR-07

29-MAR-07

R.C. Work - Core Wall & Link Beam L117 C-2

117T030032 R.C. Work - Core Wall & Link Beam L117 C-3

28-MAR-07

31-MAR-07

R.C. Work - Core Wall & Link Beam L117 C-3

118T030030 R.C. Work - Core Wall & Link Beam L118 C-1

-2

31-MAR-07

02-APR-07

R.C. Work - Core Wall & Link Beam L118 C-1

118T030031 R.C. Work - Core Wall & Link Beam L118 C-2

-1

31-MAR-07

02-APR-07

R.C. Work - Core Wall & Link Beam L118 C-2

118T030032 R.C. Work - Core Wall & Link Beam L118 C-3

-1

02-APR-07

04-APR-07

R.C. Work - Core Wall & Link Beam L118 C-3

119T030030 R.C. Work - Core Wall & Link Beam L119 C-1

-2

03-APR-07

05-APR-07

R.C. Work - Core Wall & Link Beam L119 C-1

119T030031 R.C. Work - Core Wall & Link Beam L119 C-2

-1

03-APR-07

05-APR-07

R.C. Work - Core Wall & Link Beam L119 C-2

119T030032 R.C. Work - Core Wall & Link Beam L119 C-3

-1

05-APR-07

07-APR-07

R.C. Work - Core Wall & Link Beam L119 C-3

120T030030 R.C. Work - Core Wall & Link Beam L120 C-1

-2

06-APR-07

08-APR-07

R.C. Work - Core Wall & Link Beam L120 C-1

120T030031 R.C. Work - Core Wall & Link Beam L120 C-2

-1

06-APR-07

08-APR-07

R.C. Work - Core Wall & Link Beam L120 C-2

120T030032 R.C. Work - Core Wall & Link Beam L120 C-3

-1

08-APR-07

11-APR-07

R.C. Work - Core Wall & Link Beam L120 C-3

121T030030 R.C. Work - Core Wall & Link Beam L121 C-1

-2

09-APR-07

12-APR-07

R.C. Work - Core Wall & Link Beam L121 C-1

121T030031 R.C. Work - Core Wall & Link Beam L121 C-2

-1

09-APR-07

12-APR-07

R.C. Work - Core Wall & Link Beam L121 C-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 36 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

121T030032 R.C. Work - Core Wall & Link Beam L121 C-3

-1

12-APR-07

14-APR-07

R.C. Work - Core Wall & Link Beam L121 C-3

121T030033 R.C. Work - Core Wall & Link Beam L121~L122 C-1

-2

13-APR-07

15-APR-07

R.C. Work - Core Wall & Link Beam L121~L122 C-1

121T030034 R.C. Work - Core Wall & Link Beam L121~L122 C-2

-1

13-APR-07

15-APR-07

R.C. Work - Core Wall & Link Beam L121~L122 C-2

121T030035 R.C. Work - Core Wall & Link Beam L121~L122 C-3

-1

15-APR-07

17-APR-07

R.C. Work - Core Wall & Link Beam L121~L122 C-3

122T030030 R.C. Work - Core Wall & Link Beam L122 C-1

-2

16-APR-07

19-APR-07

R.C. Work - Core Wall & Link Beam L122 C-1

122T030031 R.C. Work - Core Wall & Link Beam L122 C-2

-1

16-APR-07

19-APR-07

R.C. Work - Core Wall & Link Beam L122 C-2

122T030032 R.C. Work - Core Wall & Link Beam L122 C-3

-1

18-APR-07

21-APR-07

R.C. Work - Core Wall & Link Beam L122 C-3

123T030030 R.C. Work - Core Wall & Link Beam L123 C-1

-2

20-APR-07

23-APR-07

R.C. Work - Core Wall & Link Beam L123 C-1

123T030031 R.C. Work - Core Wall & Link Beam L123 C-2

-1

20-APR-07

23-APR-07

R.C. Work - Core Wall & Link Beam L123 C-2

123T030032 R.C. Work - Core Wall & Link Beam L123 C-3

-1

22-APR-07

26-APR-07

R.C. Work - Core Wall & Link Beam L123 C-3

123T030033 R.C. Work - Core Wall & Link Beam L123-L124 C-1

-2

25-APR-07

28-APR-07

R.C. Work - Core Wall & Link Beam L123-L124 C-1

123T030034 R.C. Work - Core Wall & Link Beam L123-L124 C-2

-1

25-APR-07

28-APR-07

R.C. Work - Core Wall & Link Beam L123-L124 C-2

123T030035 R.C. Work - Core Wall & Link Beam L123-L124 C-3

-1

27-APR-07

30-APR-07

R.C. Work - Core Wall & Link Beam L123-L124 C-3

124T030030 R.C. Work - Core Wall & Link Beam L124 C-1

-2

29-APR-07

03-MAY-07

R.C. Work - Core Wall & Link Beam L124 C-1

124T030031 R.C. Work - Core Wall & Link Beam L124 C-2

-1

29-APR-07

03-MAY-07

R.C. Work - Core Wall & Link Beam L124 C-2

124T030032 R.C. Work - Core Wall & Link Beam L124 C-3

-1

02-MAY-07

05-MAY-07

R.C. Work - Core Wall & Link Beam L124 C-3

125T030030 R.C. Work - Core Wall & Link Beam L125 C-1

-2

04-MAY-07

06-MAY-07

R.C. Work - Core Wall & Link Beam L125 C-1

125T030031 R.C. Work - Core Wall & Link Beam L125 C-2

-1

04-MAY-07

06-MAY-07

R.C. Work - Core Wall & Link Beam L125 C-2

125T030032 R.C. Work - Core Wall & Link Beam L125 C-3

-1

06-MAY-07

08-MAY-07

R.C. Work - Core Wall & Link Beam L125 C-3

126T030030 R.C. Work - Core Wall & Link Beam L126 C-1

-2

07-MAY-07

09-MAY-07

R.C. Work - Core Wall & Link Beam L126 C-1

126T030031 R.C. Work - Core Wall & Link Beam L126 C-2

-1

07-MAY-07

09-MAY-07

R.C. Work - Core Wall & Link Beam L126 C-2

126T030032 R.C. Work - Core Wall & Link Beam L126 C-3

-1

09-MAY-07

12-MAY-07

R.C. Work - Core Wall & Link Beam L126 C-3

127T030030 R.C. Work - Core Wall & Link Beam L127 C-1

-2

10-MAY-07

13-MAY-07

R.C. Work - Core Wall & Link Beam L127 C-1

127T030031 R.C. Work - Core Wall & Link Beam L127 C-2

-1

10-MAY-07

13-MAY-07

R.C. Work - Core Wall & Link Beam L127 C-2

127T030032 R.C. Work - Core Wall & Link Beam L127 C-3

-1

13-MAY-07

15-MAY-07

R.C. Work - Core Wall & Link Beam L127 C-3

128T030030 R.C. Work - Core Wall & Link Beam L128 C-1

-2

14-MAY-07

16-MAY-07

R.C. Work - Core Wall & Link Beam L128 C-1

128T030031 R.C. Work - Core Wall & Link Beam L128 C-2

-1

14-MAY-07

16-MAY-07

R.C. Work - Core Wall & Link Beam L128 C-2

128T030032 R.C. Work - Core Wall & Link Beam L128 C-3

-1

16-MAY-07

18-MAY-07

R.C. Work - Core Wall & Link Beam L128 C-3

129T030030 R.C. Work - Core Wall & Link Beam L129 C-1

-2

17-MAY-07

19-MAY-07

R.C. Work - Core Wall & Link Beam L129 C-1

129T030031 R.C. Work - Core Wall & Link Beam L129 C-2

-1

17-MAY-07

19-MAY-07

R.C. Work - Core Wall & Link Beam L129 C-2

129T030032 R.C. Work - Core Wall & Link Beam L129 C-3

-1

19-MAY-07

21-MAY-07

R.C. Work - Core Wall & Link Beam L129 C-3

130T030030 R.C. Work - Core Wall & Link Beam L130 C-1

-2

20-MAY-07

22-MAY-07

R.C. Work - Core Wall & Link Beam L130 C-1

130T030031 R.C. Work - Core Wall & Link Beam L130 C-2

-1

20-MAY-07

22-MAY-07

R.C. Work - Core Wall & Link Beam L130 C-2

130T030032 R.C. Work - Core Wall & Link Beam L130 C-3

-1

22-MAY-07

24-MAY-07

R.C. Work - Core Wall & Link Beam L130 C-3

131T030030 R.C. Work - Core Wall & Link Beam L131 C-1

-2

23-MAY-07

26-MAY-07

R.C. Work - Core Wall & Link Beam L131 C-1

131T030031 R.C. Work - Core Wall & Link Beam L131 C-2

-1

23-MAY-07

26-MAY-07

R.C. Work - Core Wall & Link Beam L131 C-2

131T030032 R.C. Work - Core Wall & Link Beam L131 C-3

-1

26-MAY-07

28-MAY-07

R.C. Work - Core Wall & Link Beam L131 C-3

132T030030 R.C. Work - Core Wall & Link Beam L132 C-1

-2

27-MAY-07

29-MAY-07

R.C. Work - Core Wall & Link Beam L132 C-1

132T030031 R.C. Work - Core Wall & Link Beam L132 C-2

-1

27-MAY-07

29-MAY-07

R.C. Work - Core Wall & Link Beam L132 C-2

132T030032 R.C. Work - Core Wall & Link Beam L132 C-3

-1

29-MAY-07

31-MAY-07

R.C. Work - Core Wall & Link Beam L132 C-3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 37 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

133T030030 R.C. Work - Core Wall & Link Beam L133 C-1

-2

30-MAY-07

01-JUN-07

R.C. Work - Core Wall & Link Beam L133 C-1

133T030031 R.C. Work - Core Wall & Link Beam L133 C-2

-1

30-MAY-07

01-JUN-07

R.C. Work - Core Wall & Link Beam L133 C-2

133T030032 R.C. Work - Core Wall & Link Beam L133 C-3

-1

01-JUN-07

03-JUN-07

R.C. Work - Core Wall & Link Beam L133 C-3

134T030030 R.C. Work - Core Wall & Link Beam L134 C-1

-2

02-JUN-07

05-JUN-07

R.C. Work - Core Wall & Link Beam L134 C-1

134T030031 R.C. Work - Core Wall & Link Beam L134 C-2

-1

02-JUN-07

05-JUN-07

R.C. Work - Core Wall & Link Beam L134 C-2

134T030032 R.C. Work - Core Wall & Link Beam L134 C-3

-1

05-JUN-07

07-JUN-07

R.C. Work - Core Wall & Link Beam L134 C-3

135T030030 R.C. Work - Core Wall & Link Beam L135 C-1

-2

06-JUN-07

09-JUN-07

R.C. Work - Core Wall & Link Beam L135 C-1

135T030031 R.C. Work - Core Wall & Link Beam L135 C-2

-1

06-JUN-07

09-JUN-07

R.C. Work - Core Wall & Link Beam L135 C-2

135T030032 R.C. Work - Core Wall & Link Beam L135 C-3

-1

08-JUN-07

12-JUN-07

R.C. Work - Core Wall & Link Beam L135 C-3

135T030033 R.C. Work - Core Wall & Link Beam L135~L136 C-1

-2

10-JUN-07

19-JUN-07

R.C. Work - Core Wall & Link Beam L135~L136 C-1

135T030034 R.C. Work - Core Wall & Link Beam L135~L136 C-2

-1

10-JUN-07

19-JUN-07

R.C. Work - Core Wall & Link Beam L135~L136 C-2

135T030035 R.C. Work - Core Wall & Link Beam L135~L136 C-3

-1

13-JUN-07

21-JUN-07

R.C. Work - Core Wall & Link Beam L135~L136 C-3

136T030030 R.C. Work - Core Wall & Link Beam L136 C-1

-2

20-JUN-07

26-JUN-07

R.C. Work - Core Wall & Link Beam L136 C-1

136T030031 R.C. Work - Core Wall & Link Beam L136 C-2

-1

20-JUN-07

26-JUN-07

R.C. Work - Core Wall & Link Beam L136 C-2

136T030032 R.C. Work - Core Wall & Link Beam L136 C-3

-1

22-JUN-07

28-JUN-07

R.C. Work - Core Wall & Link Beam L136 C-3

137T030030 R.C. Work - Core Wall & Link Beam L137 C-1

-2

27-JUN-07

01-JUL-07

R.C. Work - Core Wall & Link Beam L137 C-1

137T030031 R.C. Work - Core Wall & Link Beam L137 C-2

-1

27-JUN-07

01-JUL-07

R.C. Work - Core Wall & Link Beam L137 C-2

137T030032 R.C. Work - Core Wall & Link Beam L137 C-3

-1

29-JUN-07

04-JUL-07

137T030033 R.C. Work - Core Wall & Link Beam L137~L138 C-1

-2

03-JUL-07

08-JUL-07

R.C. Work - Core Wall & Link Beam L137~L138 C-1

137T030034 R.C. Work - Core Wall & Link Beam L137~L138 C-2

-1

03-JUL-07

08-JUL-07

R.C. Work - Core Wall & Link Beam L137~L138 C-2

137T030035 R.C. Work - Core Wall & Link Beam L137~L138 C-3

-1

05-JUL-07

11-JUL-07

R.C. Work - Core Wall & Link Beam L137~L138 C-3

138T030030 R.C. Work - Core Wall & Link Beam L138 C-1

-2

10-JUL-07

14-JUL-07

R.C. Work - Core Wall & Link Beam L138 C-1

138T030031 R.C. Work - Core Wall & Link Beam L138 C-2

-1

10-JUL-07

14-JUL-07

R.C. Work - Core Wall & Link Beam L138 C-2

138T030032 R.C. Work - Core Wall & Link Beam L138 C-3

-1

12-JUL-07

16-JUL-07

R.C. Work - Core Wall & Link Beam L138 C-3

139T030030 R.C. Work - Core Wall & Link Beam L139 C-1

-2

15-JUL-07

18-JUL-07

R.C. Work - Core Wall & Link Beam L139 C-1

139T030031 R.C. Work - Core Wall & Link Beam L139 C-2

-1

15-JUL-07

18-JUL-07

R.C. Work - Core Wall & Link Beam L139 C-2

139T030032 R.C. Work - Core Wall & Link Beam L139 C-3

-1

17-JUL-07

20-JUL-07

139T030033 R.C. Work - Core Wall & Link Beam L139~L140 C-1

-2

19-JUL-07

22-JUL-07

R.C. Work - Core Wall & Link Beam L139~L140 C-1

139T030034 R.C. Work - Core Wall & Link Beam L139~L140 C-2

-1

19-JUL-07

22-JUL-07

R.C. Work - Core Wall & Link Beam L139~L140 C-2

139T030035 R.C. Work - Core Wall & Link Beam L139~L140 C-3

-1

21-JUL-07

25-JUL-07

R.C. Work - Core Wall & Link Beam L139~L140 C-3

140T030030 R.C. Work - Core Wall & Link Beam L140 C-1

-2

24-JUL-07

26-JUL-07

R.C. Work - Core Wall & Link Beam L140 C-1

140T030031 R.C. Work - Core Wall & Link Beam L140 C-2

-1

24-JUL-07

26-JUL-07

R.C. Work - Core Wall & Link Beam L140 C-2

140T030032 R.C. Work - Core Wall & Link Beam L140 C-3

-1

26-JUL-07

28-JUL-07

R.C. Work - Core Wall & Link Beam L140 C-3

141T030030 R.C. Work - Core Wall & Link Beam L141 C-1

-2

27-JUL-07

31-JUL-07

R.C. Work - Core Wall & Link Beam L141 C-1

141T030031 R.C. Work - Core Wall & Link Beam L141 C-2

-1

27-JUL-07

31-JUL-07

R.C. Work - Core Wall & Link Beam L141 C-2

141T030032 R.C. Work - Core Wall & Link Beam L141 C-3

-1

29-JUL-07

02-AUG-07

141T030033 R.C. Work - Core Wall & Link Beam L141~L142 C-1

-2

01-AUG-07

03-AUG-07

R.C. Work - Core Wall & Link Beam L141~L142 C-1

141T030034 R.C. Work - Core Wall & Link Beam L141~L142 C-2

-1

01-AUG-07

03-AUG-07

R.C. Work - Core Wall & Link Beam L141~L142 C-2

141T030035 R.C. Work - Core Wall & Link Beam L141~L142 C-3

-1

03-AUG-07

05-AUG-07

R.C. Work - Core Wall & Link Beam L141~L142 C-3

142T030030 R.C. Work - Core Wall & Link Beam L142 C-1

-2

04-AUG-07

07-AUG-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Core Wall & Link Beam L137 C-3

R.C. Work - Core Wall & Link Beam L139 C-3

R.C. Work - Core Wall & Link Beam L141 C-3

R.C. Work - Core Wall & Link Beam L142 C-1


Sheet 38 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

142T030031 R.C. Work - Core Wall & Link Beam L142 C-2

-1

04-AUG-07

07-AUG-07

R.C. Work - Core Wall & Link Beam L142 C-2

142T030032 R.C. Work - Core Wall & Link Beam L142 C-3

-1

07-AUG-07

09-AUG-07

R.C. Work - Core Wall & Link Beam L142 C-3

143T030030 R.C. Work - Core Wall & Link Beam L143 C-1

-2

08-AUG-07

11-AUG-07

R.C. Work - Core Wall & Link Beam L143 C-1

143T030031 R.C. Work - Core Wall & Link Beam L143 C-2

-1

08-AUG-07

11-AUG-07

R.C. Work - Core Wall & Link Beam L143 C-2

143T030032 R.C. Work - Core Wall & Link Beam L143 C-3

-1

10-AUG-07

13-AUG-07

143T030033 R.C. Work - Core Wall & Link Beam L143~L144 C-1

-2

12-AUG-07

14-AUG-07

R.C. Work - Core Wall & Link Beam L143~L144 C-1

143T030034 R.C. Work - Core Wall & Link Beam L143~L144 C-2

-1

12-AUG-07

14-AUG-07

R.C. Work - Core Wall & Link Beam L143~L144 C-2

143T030035 R.C. Work - Core Wall & Link Beam L143~L144 C-3

-1

14-AUG-07

16-AUG-07

R.C. Work - Core Wall & Link Beam L143~L144 C-3

144T030030 R.C. Work - Core Wall & Link Beam L144 C-1

-2

15-AUG-07

17-AUG-07

R.C. Work - Core Wall & Link Beam L144 C-1

144T030031 R.C. Work - Core Wall & Link Beam L144 C-2

-1

15-AUG-07

17-AUG-07

R.C. Work - Core Wall & Link Beam L144 C-2

144T030032 R.C. Work - Core Wall & Link Beam L144 C-3

-1

17-AUG-07

19-AUG-07

R.C. Work - Core Wall & Link Beam L144 C-3

145T030030 R.C. Work - Core Wall & Link Beam L145 C-1

-2

18-AUG-07

22-AUG-07

R.C. Work - Core Wall & Link Beam L145 C-1

145T030031 R.C. Work - Core Wall & Link Beam L145 C-2

-1

18-AUG-07

22-AUG-07

R.C. Work - Core Wall & Link Beam L145 C-2

145T030032 R.C. Work - Core Wall & Link Beam L145 C-3

-1

21-AUG-07

24-AUG-07

145T030033 R.C. Work - Core Wall & Link Beam L145~L146 C-1

-2

23-AUG-07

25-AUG-07

R.C. Work - Core Wall & Link Beam L145~L146 C-1

145T030034 R.C. Work - Core Wall & Link Beam L145~L146 C-2

-1

23-AUG-07

25-AUG-07

R.C. Work - Core Wall & Link Beam L145~L146 C-2

145T030035 R.C. Work - Core Wall & Link Beam L145~L146 C-3

-1

25-AUG-07

28-AUG-07

R.C. Work - Core Wall & Link Beam L145~L146 C-3

146T030030 R.C. Work - Core Wall & Link Beam L146 C-1

-2

26-AUG-07

29-AUG-07

R.C. Work - Core Wall & Link Beam L146 C-1

146T030031 R.C. Work - Core Wall & Link Beam L146 C-2

-1

26-AUG-07

29-AUG-07

R.C. Work - Core Wall & Link Beam L146 C-2

146T030032 R.C. Work - Core Wall & Link Beam L146 C-3

-1

29-AUG-07

31-AUG-07

R.C. Work - Core Wall & Link Beam L146 C-3

147T030030 R.C. Work - Core Wall & Link Beam L147 C-1

-2

30-AUG-07

02-SEP-07

R.C. Work - Core Wall & Link Beam L147 C-1

147T030031 R.C. Work - Core Wall & Link Beam L147 C-2

-1

30-AUG-07

02-SEP-07

R.C. Work - Core Wall & Link Beam L147 C-2

147T030032 R.C. Work - Core Wall & Link Beam L147 C-3

-1

01-SEP-07

05-SEP-07

147T030033 R.C. Work - Core Wall & Link Beam L147~L148 C-1

-2

04-SEP-07

06-SEP-07

R.C. Work - Core Wall & Link Beam L147~L148 C-1

147T030034 R.C. Work - Core Wall & Link Beam L147~L148 C-2

-1

04-SEP-07

06-SEP-07

R.C. Work - Core Wall & Link Beam L147~L148 C-2

147T030035 R.C. Work - Core Wall & Link Beam L147~L148 C-3

-1

06-SEP-07

08-SEP-07

R.C. Work - Core Wall & Link Beam L147~L148 C-3

148T030030 R.C. Work - Core Wall & Link Beam L148 C-1

-2

07-SEP-07

09-SEP-07

R.C. Work - Core Wall & Link Beam L148 C-1

148T030031 R.C. Work - Core Wall & Link Beam L148 C-2

-1

07-SEP-07

09-SEP-07

R.C. Work - Core Wall & Link Beam L148 C-2

148T030032 R.C. Work - Core Wall & Link Beam L148 C-3

-1

09-SEP-07

11-SEP-07

R.C. Work - Core Wall & Link Beam L148 C-3

149T030030 R.C. Work - Core Wall & Link Beam L149 C-1

-2

10-SEP-07

14-SEP-07

R.C. Work - Core Wall & Link Beam L149 C-1

149T030031 R.C. Work - Core Wall & Link Beam L149 C-2

-1

10-SEP-07

14-SEP-07

R.C. Work - Core Wall & Link Beam L149 C-2

149T030032 R.C. Work - Core Wall & Link Beam L149 C-3

-1

13-SEP-07

16-SEP-07

149T030033 R.C. Work - Core Wall & Link Beam L149~L150 C-1

-2

15-SEP-07

17-SEP-07

R.C. Work - Core Wall & Link Beam L149~L150 C-1

149T030034 R.C. Work - Core Wall & Link Beam L149~L150 C-2

-1

15-SEP-07

17-SEP-07

R.C. Work - Core Wall & Link Beam L149~L150 C-2

149T030035 R.C. Work - Core Wall & Link Beam L149~L150 C-3

-1

17-SEP-07

19-SEP-07

R.C. Work - Core Wall & Link Beam L149~L150 C-3

150T030030 R.C. Work - Core Wall & Link Beam L150 C-1

-2

18-SEP-07

20-SEP-07

R.C. Work - Core Wall & Link Beam L150 C-1

150T030031 R.C. Work - Core Wall & Link Beam L150 C-2

-1

18-SEP-07

20-SEP-07

R.C. Work - Core Wall & Link Beam L150 C-2

150T030032 R.C. Work - Core Wall & Link Beam L150 C-3

-1

20-SEP-07

22-SEP-07

R.C. Work - Core Wall & Link Beam L150 C-3

151T030030 R.C. Work - Core Wall & Link Beam L151 C-1

-2

21-SEP-07

24-SEP-07

R.C. Work - Core Wall & Link Beam L151 C-1

151T030031 R.C. Work - Core Wall & Link Beam L151 C-2

-1

21-SEP-07

24-SEP-07

R.C. Work - Core Wall & Link Beam L151 C-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Core Wall & Link Beam L143 C-3

R.C. Work - Core Wall & Link Beam L145 C-3

R.C. Work - Core Wall & Link Beam L147 C-3

R.C. Work - Core Wall & Link Beam L149 C-3

Sheet 39 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Wall & Link Beam L151 C-3

151T030032 R.C. Work - Core Wall & Link Beam L151 C-3

-1

23-SEP-07

27-SEP-07

151T030033 R.C. Work - Core Wall & Link Beam L151~L152 C-1

-2

25-SEP-07

28-SEP-07

R.C. Work - Core Wall & Link Beam L151~L152 C-1

151T030034 R.C. Work - Core Wall & Link Beam L151~L152 C-2

-1

25-SEP-07

28-SEP-07

R.C. Work - Core Wall & Link Beam L151~L152 C-2

151T030035 R.C. Work - Core Wall & Link Beam L151~L152 C-3

-1

28-SEP-07

30-SEP-07

R.C. Work - Core Wall & Link Beam L151~L152 C-3

152T030030 R.C. Work - Core Wall & Link Beam L152 C-1

-2

29-SEP-07

01-OCT-07

R.C. Work - Core Wall & Link Beam L152 C-1

152T030031 R.C. Work - Core Wall & Link Beam L152 C-2

-1

29-SEP-07

01-OCT-07

R.C. Work - Core Wall & Link Beam L152 C-2

152T030032 R.C. Work - Core Wall & Link Beam L152 C-3

-1

01-OCT-07

03-OCT-07

R.C. Work - Core Wall & Link Beam L152 C-3

153T030030 R.C. Work - Core Wall & Link Beam L153 C-1

-2

02-OCT-07

08-OCT-07

R.C. Work - Core Wall & Link Beam L153 C-1

153T030031 R.C. Work - Core Wall & Link Beam L153 C-2

-2

03-OCT-07

09-OCT-07

R.C. Work - Core Wall & Link Beam L153 C-2

153T030032 R.C. Work - Core Wall & Link Beam L153 C-3

04-OCT-07

11-OCT-07

R.C. Work - Core Wall & Link Beam L153 C-3

154T03003A R.C. Work - Core Wall & Link Beam L154 C-3

12-OCT-07

18-OCT-07

R.C. Work - Core Wall & Link Beam L154 C-3

155T03003A R.C. Work - 950 Wall (2) L155 C

40

20-DEC-07

26-DEC-07

R.C. Work - 950 Wall (2) L155 C

156T03003A Dismantle Core Form (Outer Form)

40

17-NOV-07

25-NOV-07

Dismantle Core Form (Outer Form)

-01T030040

R.C. Work - Slab B2 C

17

100

07-JUL-05A

08-AUG-05A

-01T030041

R.C. Work - Core Outer Slab & Beam B2 C1

10

100

07-JUL-05A

20-JUL-05A

R.C. Work - Core Outer Slab & Beam B2 C1

-01T030042

R.C. Work - Core Outer Slab & Beam B2 C2

10

100

07-JUL-05A

17-JUL-05A

R.C. Work - Core Outer Slab & Beam B2 C2

-01T030043

R.C. Work - Core Outer Slab & Beam B2 C3

10

100

07-JUL-05A

17-JUL-05A

R.C. Work - Core Outer Slab & Beam B2 C3

-02T030040

R.C. Work - Slab B1 C

14

100

09-AUG-05A

20-AUG-05A

-02T030041

R.C. Work - Core Outer Slab & Beam B1 C1

100

21-JUL-05A

04-AUG-05A

R.C. Work - Core Outer Slab & Beam B1 C1

-02T030042

R.C. Work - Core Outer Slab & Beam B1 C2

100

19-JUL-05A

31-JUL-05A

R.C. Work - Core Outer Slab & Beam B1 C2

-02T030043

R.C. Work - Core Outer Slab & Beam B1 C3

100

19-JUL-05A

11-AUG-05A

-03T030040

R.C. Work - Slab Concourse C

12

100

21-AUG-05A

03-SEP-05A

-03T030041

R.C. Work - Core Outer Slab & Beam Conc C1

100

05-AUG-05A

14-AUG-05A

R.C. Work - Core Outer Slab & Beam Conc C1

-03T030042

R.C. Work - Core Outer Slab & Beam Conc C2

100

02-AUG-05A

16-AUG-05A

R.C. Work - Core Outer Slab & Beam Conc C2

-03T030043

R.C. Work - Core Outer Slab & Beam Conc C3

100

12-AUG-05A

20-AUG-05A

R.C. Work - Core Outer Slab & Beam Conc C3

-04T030040

R.C. Work - Slab Ground C

12

100

04-SEP-05A

20-SEP-05A

-04T030041

R.C. Work - Core Outer Slab & Beam Ground C1

100

16-AUG-05A

25-AUG-05A

R.C. Work - Core Outer Slab & Beam Ground C1

-04T030042

R.C. Work - Core Outer Slab & Beam Ground C2

100

17-AUG-05A

23-AUG-05A

R.C. Work - Core Outer Slab & Beam Ground C2

-04T030043

R.C. Work - Core Outer Slab & Beam Ground C3

100

21-AUG-05A

28-AUG-05A

R.C. Work - Core Outer Slab & Beam Ground C3

001T030040 R.C. Work - Slab L1 C

100

22-SEP-05A

27-SEP-05A

001T030041 R.C. Work - Core Outer Slab & Beam L1 C1

100

26-AUG-05A

30-AUG-05A

R.C. Work - Core Outer Slab & Beam L1 C1

001T030042 R.C. Work - Core Outer Slab & Beam L1 C2

100

25-AUG-05A

28-AUG-05A

R.C. Work - Core Outer Slab & Beam L1 C2

001T030043 R.C. Work - Core Outer Slab & Beam L1 C3

100

30-AUG-05A

05-SEP-05A

R.C. Work - Core Outer Slab & Beam L1 C3

002T030040 R.C. Work - Slab L2 C

10

100

28-SEP-05A

09-OCT-05A

002T030041 R.C. Work - Core Outer Slab (Open) L2 C1

100

30-AUG-05A

28-AUG-05A

R.C. Work - Core Outer Slab (Open) L2 C1

002T030042 R.C. Work - Core Outer Slab (Open) L2 C2

100

30-AUG-05A

28-AUG-05A

R.C. Work - Core Outer Slab (Open) L2 C2

002T030043 R.C. Work - Core Outer Slab (Open) L2 C3

100

05-SEP-05A

04-SEP-05A

R.C. Work - Core Outer Slab (Open) L2 C3

003T030040 R.C. Work - Slab L3 C

100

10-OCT-05A

16-OCT-05A

003T030041 R.C. Work - Core Outer Slab L3 C1

100

31-AUG-05A

06-SEP-05A

R.C. Work - Core Outer Slab L3 C1

003T030042 R.C. Work - Core Outer Slab L3 C2

100

30-AUG-05A

11-SEP-05A

R.C. Work - Core Outer Slab L3 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Slab B2 C

R.C. Work - Slab B1 C

R.C. Work - Core Outer Slab & Beam B1 C3


R.C. Work - Slab Concourse C

R.C. Work - Slab Ground C

R.C. Work - Slab L1 C

R.C. Work - Slab L2 C

R.C. Work - Slab L3 C

Sheet 40 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L3 C3

003T030043 R.C. Work - Core Outer Slab L3 C3

100

06-SEP-05A

10-SEP-05A

004T030040 R.C. Work - Slab L4 C

100

18-OCT-05A

27-OCT-05A

004T030041 R.C. Work - Core Outer Slab & Beam L4 C1

100

08-SEP-05A

24-SEP-05A

R.C. Work - Core Outer Slab & Beam L4 C1

004T030042 R.C. Work - Core Outer Slab & Beam L4 (Open) C2

100

13-SEP-05A

11-SEP-05A

R.C. Work - Core Outer Slab & Beam L4 (Open) C2

004T030043 R.C. Work - Core Outer Slab & Beam L4 C3

100

11-SEP-05A

17-SEP-05A

R.C. Work - Core Outer Slab & Beam L4 C3

005T030040 R.C. Work - Slab L5 C

100

28-OCT-05A

06-NOV-05A

005T030041 R.C. Work - Core Outer Slab L5 C1

100

25-SEP-05A

29-SEP-05A

R.C. Work - Core Outer Slab L5 C1

005T030042 R.C. Work - Core Outer Slab L5 C2

100

13-SEP-05A

20-SEP-05A

R.C. Work - Core Outer Slab L5 C2

005T030043 R.C. Work - Core Outer Slab L5 C3

100

18-SEP-05A

05-OCT-05A

006T030040 R.C. Work - Slab L6 C

100

08-NOV-05A

13-NOV-05A

006T030041 R.C. Work - Core Outer Slab L6 C1

100

30-SEP-05A

05-OCT-05A

R.C. Work - Core Outer Slab L6 C1

006T030042 R.C. Work - Core Outer Slab L6 C2

100

22-SEP-05A

25-SEP-05A

R.C. Work - Core Outer Slab L6 C2

006T030043 R.C. Work - Core Outer Slab L6 C3

100

06-OCT-05A

13-OCT-05A

007T030040 R.C. Work - Slab L7 C

100

17-NOV-05A

20-NOV-05A

007T030041 R.C. Work - Core Outer Slab L7 C1

100

06-OCT-05A

09-OCT-05A

R.C. Work - Core Outer Slab L7 C1

007T030042 R.C. Work - Core Outer Slab L7 C2

100

27-SEP-05A

06-OCT-05A

R.C. Work - Core Outer Slab L7 C2

007T030043 R.C. Work - Core Outer Slab L7 C3

100

14-OCT-05A

16-OCT-05A

R.C. Work - Core Outer Slab L7 C3

008T030040 R.C. Work - Slab L8 C

100

21-NOV-05A

26-NOV-05A

008T030041 R.C. Work - Core Outer Slab L8 C1

100

10-OCT-05A

16-OCT-05A

R.C. Work - Core Outer Slab L8 C1

008T030042 R.C. Work - Core Outer Slab L8 C2

100

07-OCT-05A

13-OCT-05A

R.C. Work - Core Outer Slab L8 C2

008T030043 R.C. Work - Core Outer Slab L8 C3

100

18-OCT-05A

22-OCT-05A

R.C. Work - Core Outer Slab L8 C3

009T030040 R.C. Work - Slab L9 C

100

27-NOV-05A

30-NOV-05A

009T030041 R.C. Work - Core Outer Slab L9 C1

100

18-OCT-05A

23-OCT-05A

R.C. Work - Core Outer Slab L9 C1

009T030042 R.C. Work - Core Outer Slab L9 C2

100

14-OCT-05A

19-OCT-05A

R.C. Work - Core Outer Slab L9 C2

009T030043 R.C. Work - Core Outer Slab L9 C3

100

23-OCT-05A

30-OCT-05A

R.C. Work - Core Outer Slab L9 C3

010T030040 R.C. Work - Slab L10 C

100

03-DEC-05A

06-DEC-05A

010T030041 R.C. Work - Core Outer Slab L10 C1

100

24-OCT-05A

29-OCT-05A

R.C. Work - Core Outer Slab L10 C1

010T030042 R.C. Work - Core Outer Slab L10 C2

100

20-OCT-05A

26-OCT-05A

R.C. Work - Core Outer Slab L10 C2

010T030043 R.C. Work - Core Outer Slab L10 C3

100

01-NOV-05A

08-NOV-05A

R.C. Work - Core Outer Slab L10 C3

011T030040 R.C. Work - Slab L11 C

100

07-DEC-05A

12-DEC-05A

011T030041 R.C. Work - Core Outer Slab L11 C1

100

30-OCT-05A

08-NOV-05A

R.C. Work - Core Outer Slab L11 C1

011T030042 R.C. Work - Core Outer Slab L11 C2

100

27-OCT-05A

30-OCT-05A

R.C. Work - Core Outer Slab L11 C2

011T030043 R.C. Work - Core Outer Slab L11 C3

100

10-NOV-05A

13-NOV-05A

012T030040 R.C. Work - Slab L12 C

100

13-DEC-05A

18-DEC-05A

012T030041 R.C. Work - Core Outer Slab L12 C1

100

10-NOV-05A

13-NOV-05A

R.C. Work - Core Outer Slab L12 C1

012T030042 R.C. Work - Core Outer Slab L12 C2

100

01-NOV-05A

08-NOV-05A

R.C. Work - Core Outer Slab L12 C2

012T030043 R.C. Work - Core Outer Slab L12 C3

100

17-NOV-05A

17-NOV-05A

R.C. Work - Core Outer Slab L12 C3

013T030040 R.C. Work - Slab L13 C

100

19-DEC-05A

24-DEC-05A

013T030041 R.C. Work - Core Outer Slab L13 C1

100

17-NOV-05A

19-NOV-05A

R.C. Work - Core Outer Slab L13 C1

013T030042 R.C. Work - Core Outer Slab L13 C2

100

10-NOV-05A

13-NOV-05A

R.C. Work - Core Outer Slab L13 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L4 C

R.C. Work - Slab L5 C

R.C. Work - Core Outer Slab L5 C3


R.C. Work - Slab L6 C

R.C. Work - Core Outer Slab L6 C3


R.C. Work - Slab L7 C

R.C. Work - Slab L8 C

R.C. Work - Slab L9 C

R.C. Work - Slab L10 C

R.C. Work - Slab L11 C

R.C. Work - Core Outer Slab L11 C3


R.C. Work - Slab L12 C

R.C. Work - Slab L13 C

Sheet 41 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L13 C3

013T030043 R.C. Work - Core Outer Slab L13 C3

100

18-NOV-05A

21-NOV-05A

014T030040 R.C. Work - Slab L14 C

100

25-DEC-05A

29-DEC-05A

014T030041 R.C. Work - Core Outer Slab L14 C1

100

20-NOV-05A

22-NOV-05A

R.C. Work - Core Outer Slab L14 C1

014T030042 R.C. Work - Core Outer Slab L14 C2

100

17-NOV-05A

20-NOV-05A

R.C. Work - Core Outer Slab L14 C2

014T030043 R.C. Work - Core Outer Slab L14 C3

100

22-NOV-05A

24-NOV-05A

R.C. Work - Core Outer Slab L14 C3

015T030040 R.C. Work - Slab L15 C

100

30-DEC-05A

08-JAN-06A

015T030041 R.C. Work - Core Outer Slab L15 C1

100

24-NOV-05A

04-DEC-05A

R.C. Work - Core Outer Slab L15 C1

015T030042 R.C. Work - Core Outer Slab L15 C2

100

21-NOV-05A

29-NOV-05A

R.C. Work - Core Outer Slab L15 C2

015T030043 R.C. Work - Core Outer Slab L15 C3

100

25-NOV-05A

30-NOV-05A

R.C. Work - Core Outer Slab L15 C3

016T030040 R.C. Work - Slab L16 C

100

09-JAN-06A

14-JAN-06A

016T030041 R.C. Work - Core Outer Slab L16 C1

100

05-DEC-05A

13-DEC-05A

R.C. Work - Core Outer Slab L16 C1

016T030042 R.C. Work - Core Outer Slab L16 C2

100

30-NOV-05A

10-DEC-05A

R.C. Work - Core Outer Slab L16 C2

016T030043 R.C. Work - Core Outer Slab L16 C3

100

03-DEC-05A

11-DEC-05A

R.C. Work - Core Outer Slab L16 C3

017T030040 R.C. Work - Slab L17 C

100

15-JAN-06A

21-JAN-06A

017T030041 R.C. Work - Core Outer Slab L17 C1

100

14-DEC-05A

26-DEC-05A

R.C. Work - Core Outer Slab L17 C1

017T030042 R.C. Work - Core Outer Slab & Beam L17 C2

100

11-DEC-05A

19-DEC-05A

R.C. Work - Core Outer Slab & Beam L17 C2

017T030043 R.C. Work - Core Outer Slab & Beam L17 C3

100

12-DEC-05A

20-DEC-05A

R.C. Work - Core Outer Slab & Beam L17 C3

018T030040 R.C. Work - Slab L18 C

100

22-JAN-06A

29-JAN-06A

R.C. Work - Slab L18 C

018T030041 R.C. Work - Core Outer Slab L18 C1

100

27-DEC-05A

17-JAN-06A

R.C. Work - Core Outer Slab L18 C1

018T030042 R.C. Work - Core Outer Slab L18 C2

100

20-DEC-05A

12-JAN-06A

R.C. Work - Core Outer Slab L18 C2

018T030043 R.C. Work - Core Outer Slab L18 C3

100

21-DEC-05A

15-JAN-06A

R.C. Work - Core Outer Slab L18 C3

019T030040 R.C. Work - Slab L19 C

100

04-FEB-06A

30-JAN-06A

019T030041 R.C. Work - Core Outer Slab L19 C1

100

18-JAN-06A

22-JAN-06A

R.C. Work - Core Outer Slab L19 C1

019T030042 R.C. Work - Core Outer Slab L19 C2

100

13-JAN-06A

19-JAN-06A

R.C. Work - Core Outer Slab L19 C2

019T030043 R.C. Work - Core Outer Slab L19 C3

100

16-JAN-06A

21-JAN-06A

R.C. Work - Core Outer Slab L19 C3

020T030040 R.C. Work - Slab L20 C

100

04-FEB-06A

07-FEB-06A

020T030041 R.C. Work - Core Outer Slab L20 C1

100

23-JAN-06A

26-JAN-06A

R.C. Work - Core Outer Slab L20 C1

020T030042 R.C. Work - Core Outer Slab L20 C2

100

20-JAN-06A

24-JAN-06A

R.C. Work - Core Outer Slab L20 C2

020T030043 R.C. Work - Core Outer Slab L20 C3

100

22-JAN-06A

25-JAN-06A

R.C. Work - Core Outer Slab L20 C3

021T030040 R.C. Work - Slab L21 C

100

08-FEB-06A

11-FEB-06A

R.C. Work - Slab L21 C

021T030041 R.C. Work - Core Outer Slab L21 C1

100

27-JAN-06A

30-JAN-06A

R.C. Work - Core Outer Slab L21 C1

021T030042 R.C. Work - Core Outer Slab L21 C2

100

25-JAN-06A

29-JAN-06A

R.C. Work - Core Outer Slab L21 C2

021T030043 R.C. Work - Core Outer Slab L21 C3

100

26-JAN-06A

30-JAN-06A

R.C. Work - Core Outer Slab L21 C3

022T030040 R.C. Work - Slab L22 C

100

12-FEB-06A

14-FEB-06A

R.C. Work - Slab L22 C

022T030041 R.C. Work - Core Outer Slab L22 C1

100

04-FEB-06A

07-FEB-06A

R.C. Work - Core Outer Slab L22 C1

022T030042 R.C. Work - Core Outer Slab L22 C2

100

30-JAN-06A

06-FEB-06A

R.C. Work - Core Outer Slab L22 C2

022T030043 R.C. Work - Core Outer Slab L22 C3

100

04-FEB-06A

05-FEB-06A

R.C. Work - Core Outer Slab L22 C3

023T030040 R.C. Work - Slab L23 C

100

15-FEB-06A

19-FEB-06A

R.C. Work - Slab L23 C

023T030041 R.C. Work - Core Outer Slab L23 C1

100

08-FEB-06A

12-FEB-06A

R.C. Work - Core Outer Slab L23 C1

023T030042 R.C. Work - Core Outer Slab L23 C2

100

07-FEB-06A

09-FEB-06A

R.C. Work - Core Outer Slab L23 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L14 C

R.C. Work - Slab L15 C

R.C. Work - Slab L16 C

R.C. Work - Slab L17 C

R.C. Work - Slab L19 C

R.C. Work - Slab L20 C

Sheet 42 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L23 C3

023T030043 R.C. Work - Core Outer Slab L23 C3

100

06-FEB-06A

09-FEB-06A

024T030040 R.C. Work - Slab L24 C

100

20-FEB-06A

20-FEB-06A

R.C. Work - Slab L24 C

024T030041 R.C. Work - Core Outer Slab L24 C1

100

13-FEB-06A

15-FEB-06A

R.C. Work - Core Outer Slab L24 C1

024T030042 R.C. Work - Core Outer Slab L24 C2

100

10-FEB-06A

14-FEB-06A

R.C. Work - Core Outer Slab L24 C2

024T030043 R.C. Work - Core Outer Slab L24 C3

100

10-FEB-06A

13-FEB-06A

R.C. Work - Core Outer Slab L24 C3

025T030040 R.C. Work - Slab L25 C

100

22-FEB-06A

25-FEB-06A

R.C. Work - Slab L25 C

025T030041 R.C. Work - Core Outer Slab L25 C1

100

16-FEB-06A

19-FEB-06A

R.C. Work - Core Outer Slab L25 C1

025T030042 R.C. Work - Core Outer Slab L25 C2

100

15-FEB-06A

18-FEB-06A

R.C. Work - Core Outer Slab L25 C2

025T030043 R.C. Work - Core Outer Slab L25 C3

100

14-FEB-06A

16-FEB-06A

R.C. Work - Core Outer Slab L25 C3

026T030040 R.C. Work - Slab L26 C

100

26-FEB-06A

28-FEB-06A

R.C. Work - Slab L26 C

026T030041 R.C. Work - Core Outer Slab L26 C1

100

20-FEB-06A

23-FEB-06A

R.C. Work - Core Outer Slab L26 C1

026T030042 R.C. Work - Core Outer Slab L26 C2

100

19-FEB-06A

25-FEB-06A

R.C. Work - Core Outer Slab L26 C2

026T030043 R.C. Work - Core Outer Slab L26 C3

100

17-FEB-06A

22-FEB-06A

R.C. Work - Core Outer Slab L26 C3

027T030040 R.C. Work - Slab L27 C

100

01-MAR-06A

06-MAR-06A

R.C. Work - Slab L27 C

027T030041 R.C. Work - Core Outer Slab L27 C1

100

24-FEB-06A

28-FEB-06A

R.C. Work - Core Outer Slab L27 C1

027T030042 R.C. Work - Core Outer Slab L27 C2

100

26-FEB-06A

05-MAR-06A

R.C. Work - Core Outer Slab L27 C2

027T030043 R.C. Work - Core Outer Slab L27 C3

100

23-FEB-06A

28-FEB-06A

R.C. Work - Core Outer Slab L27 C3

028T030040 R.C. Work - Slab L28 C

100

07-MAR-06A

12-MAR-06A

R.C. Work - Slab L28 C

028T030041 R.C. Work - Core Outer Slab L28 C1

100

01-MAR-06A

06-MAR-06A

R.C. Work - Core Outer Slab L28 C1

028T030042 R.C. Work - Core Outer Slab L28 C2

100

06-MAR-06A

08-MAR-06A

R.C. Work - Core Outer Slab L28 C2

028T030043 R.C. Work - Core Outer Slab L28 C3

100

01-MAR-06A

05-MAR-06A

R.C. Work - Core Outer Slab L28 C3

029T030040 R.C. Work - Slab L29 C

100

13-MAR-06A

15-MAR-06A

R.C. Work - Slab L29 C

029T030041 R.C. Work - Core Outer Slab L29 C1

100

07-MAR-06A

12-MAR-06A

R.C. Work - Core Outer Slab L29 C1

029T030042 R.C. Work - Core Outer Slab L29 C2

100

09-MAR-06A

13-MAR-06A

R.C. Work - Core Outer Slab L29 C2

029T030043 R.C. Work - Core Outer Slab L29 C3

100

06-MAR-06A

09-MAR-06A

R.C. Work - Core Outer Slab L29 C3

030T030040 R.C. Work - Slab L30 C

100

17-MAR-06A

20-MAR-06A

R.C. Work - Slab L30 C

030T030041 R.C. Work - Core Outer Slab L30 C1

100

13-MAR-06A

15-MAR-06A

R.C. Work - Core Outer Slab L30 C1

030T030042 R.C. Work - Core Outer Slab L30 C2

100

14-MAR-06A

19-MAR-06A

R.C. Work - Core Outer Slab L30 C2

030T030043 R.C. Work - Core Outer Slab L30 C3

100

10-MAR-06A

14-MAR-06A

R.C. Work - Core Outer Slab L30 C3

031T030040 R.C. Work - Slab L31 C

100

21-MAR-06A

26-MAR-06A

R.C. Work - Slab L31 C

031T030041 R.C. Work - Core Outer Slab L31 C1

100

17-MAR-06A

21-MAR-06A

R.C. Work - Core Outer Slab L31 C1

031T030042 R.C. Work - Core Outer Slab L31 C2

100

19-MAR-06A

22-MAR-06A

R.C. Work - Core Outer Slab L31 C2

031T030043 R.C. Work - Core Outer Slab L31 C3

100

15-MAR-06A

20-MAR-06A

R.C. Work - Core Outer Slab L31 C3

032T030040 R.C. Work - Slab L32 C

100

27-MAR-06A

29-MAR-06A

R.C. Work - Slab L32 C

032T030041 R.C. Work - Core Outer Slab L32 C1

100

22-MAR-06A

25-MAR-06A

R.C. Work - Core Outer Slab L32 C1

032T030042 R.C. Work - Core Outer Slab L32 C2

100

23-MAR-06A

26-MAR-06A

R.C. Work - Core Outer Slab L32 C2

032T030043 R.C. Work - Core Outer Slab L32 C3

100

21-MAR-06A

23-MAR-06A

R.C. Work - Core Outer Slab L32 C3

033T030040 R.C. Work - Slab L33 C

100

31-MAR-06A

04-APR-06A

R.C. Work - Slab L33 C

033T030041 R.C. Work - Core Outer Slab L33 C1

100

26-MAR-06A

29-MAR-06A

R.C. Work - Core Outer Slab L33 C1

033T030042 R.C. Work - Core Outer Slab L33 C2

100

27-MAR-06A

29-MAR-06A

R.C. Work - Core Outer Slab L33 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 43 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L33 C3

033T030043 R.C. Work - Core Outer Slab L33 C3

100

24-MAR-06A

29-MAR-06A

034T030040 R.C. Work - Slab L34 C

100

05-APR-06A

09-APR-06A

R.C. Work - Slab L34 C

034T030041 R.C. Work - Core Outer Slab L34 C1

100

31-MAR-06A

03-APR-06A

R.C. Work - Core Outer Slab L34 C1

034T030042 R.C. Work - Core Outer Slab L34 C2

100

31-MAR-06A

04-APR-06A

R.C. Work - Core Outer Slab L34 C2

034T030043 R.C. Work - Core Outer Slab L34 C3

100

31-MAR-06A

02-APR-06A

R.C. Work - Core Outer Slab L34 C3

035T030040 R.C. Work - Slab L35 C

100

10-APR-06A

15-APR-06A

R.C. Work - Slab L35 C

035T030041 R.C. Work - Core Outer Slab L35 C1

100

04-APR-06A

09-APR-06A

R.C. Work - Core Outer Slab L35 C1

035T030042 R.C. Work - Core Outer Slab L35 C2

100

05-APR-06A

12-APR-06A

R.C. Work - Core Outer Slab L35 C2

035T030043 R.C. Work - Core Outer Slab L35 C3

100

03-APR-06A

09-APR-06A

R.C. Work - Core Outer Slab L35 C3

036T030040 R.C. Work - Slab L36 C

100

16-APR-06A

22-APR-06A

R.C. Work - Slab L36 C

036T030041 R.C. Work - Core Outer Slab L36 C1

100

10-APR-06A

15-APR-06A

R.C. Work - Core Outer Slab L36 C1

036T030042 R.C. Work - Core Outer Slab L36 C2

100

13-APR-06A

17-APR-06A

R.C. Work - Core Outer Slab L36 C2

036T030043 R.C. Work - Core Outer Slab L36 C3

100

10-APR-06A

13-APR-06A

R.C. Work - Core Outer Slab L36 C3

037T030040 R.C. Work - Slab L37 C

100

23-APR-06A

29-APR-06A

R.C. Work - Slab L37 C

037T030041 R.C. Work - Core Outer Slab L37 C1

100

16-APR-06A

24-APR-06A

R.C. Work - Core Outer Slab L37 C1

037T030042 R.C. Work - Core Outer Slab L37 C2

100

18-APR-06A

26-APR-06A

R.C. Work - Core Outer Slab L37 C2

037T030043 R.C. Work - Core Outer Slab L37 C3

100

15-APR-06A

18-APR-06A

R.C. Work - Core Outer Slab L37 C3

038T030040 R.C. Work - Slab L38 C

100

30-APR-06A

04-MAY-06A

R.C. Work - Slab L38 C

038T030041 R.C. Work - Core Outer Slab L38 C1

100

25-APR-06A

02-MAY-06A

R.C. Work - Core Outer Slab L38 C1

038T030042 R.C. Work - Core Outer Slab L38 C2

100

27-APR-06A

30-APR-06A

R.C. Work - Core Outer Slab L38 C2

038T030043 R.C. Work - Core Outer Slab L38 C3

100

19-APR-06A

04-MAY-06A

R.C. Work - Core Outer Slab L38 C3

039T030040 R.C. Work - Slab L39 C

100

05-MAY-06A

21-MAY-06A

R.C. Work - Slab L39 C

039T030041 R.C. Work - Core Outer Slab L39 C1

100

03-MAY-06A

11-MAY-06A

R.C. Work - Core Outer Slab L39 C1

039T030042 R.C. Work - Core Outer Slab L39 C2

100

02-MAY-06A

07-MAY-06A

R.C. Work - Core Outer Slab L39 C2

039T030043 R.C. Work - Core Outer Slab L39 C3

100

05-MAY-06A

10-MAY-06A

R.C. Work - Core Outer Slab L39 C3

040T030040 R.C. Work - Slab L40 C

100

22-MAY-06A

28-MAY-06A

R.C. Work - Slab L40 C

040T030041 R.C. Work - Core Outer Slab L40 C1

100

12-MAY-06A

25-MAY-06A

R.C. Work - Core Outer Slab L40 C1

040T030042 R.C. Work - Core Outer Slab L40 C2

100

08-MAY-06A

30-MAY-06A

R.C. Work - Core Outer Slab L40 C2

040T030043 R.C. Work - Core Outer Slab L40 C3

100

11-MAY-06A

21-MAY-06A

R.C. Work - Core Outer Slab L40 C3

041T030040 R.C. Work - Slab (Open) L41 C

100

30-MAY-06A

28-MAY-06A

R.C. Work - Slab (Open) L41 C

041T030041 R.C. Work - Core Outer Slab (Open) L41 C1

100

26-MAY-06A

25-MAY-06A

R.C. Work - Core Outer Slab (Open) L41 C1

041T030042 R.C. Work - Core Outer Slab (Open) L41 C2

100

30-MAY-06A

28-MAY-06A

R.C. Work - Core Outer Slab (Open) L41 C2

041T030043 R.C. Work - Core Outer Slab (Open) L41 C3

100

22-MAY-06A

21-MAY-06A

R.C. Work - Core Outer Slab (Open) L41 C3

042T030040 R.C. Work - Slab L42 C

100

30-MAY-06A

06-JUN-06A

R.C. Work - Slab L42 C

042T030041 R.C. Work - Core Outer Slab & Beam L42 C1

100

09-JUN-06A

08-JUN-06A

R.C. Work - Core Outer Slab & Beam L42 C1

042T030042 R.C. Work - Core Outer Slab & Beam L42 C2

100

11-JUN-06A

10-JUN-06A

R.C. Work - Core Outer Slab & Beam L42 C2

042T030043 R.C. Work - Core Outer Slab L42 C3

100

08-JUN-06A

07-JUN-06A

R.C. Work - Core Outer Slab L42 C3

043T030040 R.C. Work - Slab L43 C

100

07-JUN-06A

15-JUN-06A

R.C. Work - Slab L43 C

043T030041 R.C. Work - Core Outer Slab L43 C1

100

26-MAY-06A

06-JUN-06A

R.C. Work - Core Outer Slab L43 C1

043T030042 R.C. Work - Core Outer Slab L43 C2

100

31-MAY-06A

08-JUN-06A

R.C. Work - Core Outer Slab L43 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 44 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L43 C3

043T030043 R.C. Work - Core Outer Slab L43 C3

100

22-MAY-06A

11-JUN-06A

044T030040 R.C. Work - Slab L44 C

100

16-JUN-06A

22-JUN-06A

R.C. Work - Slab L44 C

044T030041 R.C. Work - Core Outer Slab L44 C1

100

07-JUN-06A

13-JUN-06A

R.C. Work - Core Outer Slab L44 C1

044T030042 R.C. Work - Core Outer Slab L44 C2

100

09-JUN-06A

15-JUN-06A

R.C. Work - Core Outer Slab L44 C2

044T030043 R.C. Work - Core Outer Slab L44 C3

100

13-JUN-06A

15-JUN-06A

R.C. Work - Core Outer Slab L44 C3

045T030040 R.C. Work - Slab L45 C

100

23-JUN-06A

28-JUN-06A

R.C. Work - Slab L45 C

045T030041 R.C. Work - Core Outer Slab L45 C1

100

14-JUN-06A

17-JUN-06A

R.C. Work - Core Outer Slab L45 C1

045T030042 R.C. Work - Core Outer Slab L45 C2

100

16-JUN-06A

18-JUN-06A

R.C. Work - Core Outer Slab L45 C2

045T030043 R.C. Work - Core Outer Slab L45 C3

100

16-JUN-06A

18-JUN-06A

R.C. Work - Core Outer Slab L45 C3

046T030040 R.C. Work - Slab L46 C

100

29-JUN-06A

05-JUL-06A

R.C. Work - Slab L46 C

046T030041 R.C. Work - Core Outer Slab L46 C1

100

18-JUN-06A

24-JUN-06A

R.C. Work - Core Outer Slab L46 C1

046T030042 R.C. Work - Core Outer Slab L46 C2

100

20-JUN-06A

22-JUN-06A

R.C. Work - Core Outer Slab L46 C2

046T030043 R.C. Work - Core Outer Slab L46 C3

100

20-JUN-06A

22-JUN-06A

R.C. Work - Core Outer Slab L46 C3

047T030040 R.C. Work - Slab L47 C

100

06-JUL-06A

09-JUL-06A

047T030041 R.C. Work - Core Outer Slab L47 C1

100

25-JUN-06A

27-JUN-06A

R.C. Work - Core Outer Slab L47 C1

047T030042 R.C. Work - Core Outer Slab L47 C2

100

23-JUN-06A

25-JUN-06A

R.C. Work - Core Outer Slab L47 C2

047T030043 R.C. Work - Core Outer Slab L47 C3

100

23-JUN-06A

25-JUN-06A

R.C. Work - Core Outer Slab L47 C3

048T030040 R.C. Work - Slab L48 C

100

11-JUL-06A

12-JUL-06A

R.C. Work - Slab L48 C

048T030041 R.C. Work - Core Outer Slab L48 C1

100

28-JUN-06A

01-JUL-06A

R.C. Work - Core Outer Slab L48 C1

048T030042 R.C. Work - Core Outer Slab L48 C2

100

27-JUN-06A

01-JUL-06A

R.C. Work - Core Outer Slab L48 C2

048T030043 R.C. Work - Core Outer Slab L48 C3

100

27-JUN-06A

29-JUN-06A

R.C. Work - Core Outer Slab L48 C3

049T030040 R.C. Work - Slab L49 C

100

13-JUL-06A

16-JUL-06A

R.C. Work - Slab L49 C

049T030041 R.C. Work - Core Outer Slab L49 C1

100

02-JUL-06A

05-JUL-06A

R.C. Work - Core Outer Slab L49 C1

049T030042 R.C. Work - Core Outer Slab L49 C2

100

02-JUL-06A

02-JUL-06A

R.C. Work - Core Outer Slab L49 C2

049T030043 R.C. Work - Core Outer Slab L49 C3

100

02-JUL-06A

05-JUL-06A

R.C. Work - Core Outer Slab L49 C3

050T030040 R.C. Work - Slab L50 C

100

18-JUL-06A

19-JUL-06A

R.C. Work - Slab L50 C

050T030041 R.C. Work - Core Outer Slab L50 C1

100

05-JUL-06A

11-JUL-06A

R.C. Work - Core Outer Slab L50 C1

050T030042 R.C. Work - Core Outer Slab L50 C2

100

04-JUL-06A

08-JUL-06A

R.C. Work - Core Outer Slab L50 C2

050T030043 R.C. Work - Core Outer Slab L50 C3

100

06-JUL-06A

09-JUL-06A

R.C. Work - Core Outer Slab L50 C3

051T030040 R.C. Work - Slab L51 C

100

20-JUL-06A

23-JUL-06A

R.C. Work - Slab L51 C

051T030041 R.C. Work - Core Outer Slab L51 C1

100

12-JUL-06A

15-JUL-06A

R.C. Work - Core Outer Slab L51 C1

051T030042 R.C. Work - Core Outer Slab L51 C2

100

09-JUL-06A

12-JUL-06A

R.C. Work - Core Outer Slab L51 C2

051T030043 R.C. Work - Core Outer Slab L51 C3

100

11-JUL-06A

13-JUL-06A

R.C. Work - Core Outer Slab L51 C3

052T030040 R.C. Work - Slab L52 C

100

25-JUL-06A

26-JUL-06A

R.C. Work - Slab L52 C

052T030041 R.C. Work - Core Outer Slab L52 C1

100

16-JUL-06A

19-JUL-06A

R.C. Work - Core Outer Slab L52 C1

052T030042 R.C. Work - Core Outer Slab L52 C2

100

13-JUL-06A

16-JUL-06A

R.C. Work - Core Outer Slab L52 C2

052T030043 R.C. Work - Core Outer Slab L52 C3

100

14-JUL-06A

16-JUL-06A

R.C. Work - Core Outer Slab L52 C3

053T030040 R.C. Work - Slab L53 C

100

27-JUL-06A

29-JUL-06A

R.C. Work - Slab L53 C

053T030041 R.C. Work - Core Outer Slab L53 C1

100

20-JUL-06A

22-JUL-06A

R.C. Work - Core Outer Slab L53 C1

053T030042 R.C. Work - Core Outer Slab L53 C2

100

18-JUL-06A

19-JUL-06A

R.C. Work - Core Outer Slab L53 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L47 C

Sheet 45 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L53 C3

053T030043 R.C. Work - Core Outer Slab L53 C3

100

18-JUL-06A

20-JUL-06A

054T030040 R.C. Work - Slab L54 C

100

30-JUL-06A

02-AUG-06A

R.C. Work - Slab L54 C

054T030041 R.C. Work - Core Outer Slab L54 C1

100

23-JUL-06A

25-JUL-06A

R.C. Work - Core Outer Slab L54 C1

054T030042 R.C. Work - Core Outer Slab L54 C2

100

20-JUL-06A

23-JUL-06A

R.C. Work - Core Outer Slab L54 C2

054T030043 R.C. Work - Core Outer Slab L54 C3

100

21-JUL-06A

23-JUL-06A

R.C. Work - Core Outer Slab L54 C3

055T030040 R.C. Work - Slab L55 C

100

03-AUG-06A

06-AUG-06A

R.C. Work - Slab L55 C

055T030041 R.C. Work - Core Outer Slab L55 C1

100

26-JUL-06A

30-JUL-06A

R.C. Work - Core Outer Slab L55 C1

055T030042 R.C. Work - Core Outer Slab L55 C2

100

25-JUL-06A

26-JUL-06A

R.C. Work - Core Outer Slab L55 C2

055T030043 R.C. Work - Core Outer Slab L55 C3

100

25-JUL-06A

27-JUL-06A

R.C. Work - Core Outer Slab L55 C3

056T030040 R.C. Work - Slab L56 C

100

08-AUG-06A

09-AUG-06A

R.C. Work - Slab L56 C

056T030041 R.C. Work - Core Outer Slab L56 C1

100

01-AUG-06A

01-AUG-06A

R.C. Work - Core Outer Slab L56 C1

056T030042 R.C. Work - Core Outer Slab L56 C2

100

27-JUL-06A

30-JUL-06A

R.C. Work - Core Outer Slab L56 C2

056T030043 R.C. Work - Core Outer Slab L56 C3

100

28-JUL-06A

30-JUL-06A

R.C. Work - Core Outer Slab L56 C3

057T030040 R.C. Work - Slab L57 C

100

10-AUG-06A

12-AUG-06A

R.C. Work - Slab L57 C

057T030041 R.C. Work - Core Outer Slab L57 C1

100

02-AUG-06A

05-AUG-06A

R.C. Work - Core Outer Slab L57 C1

057T030042 R.C. Work - Core Outer Slab L57 C2

100

01-AUG-06A

02-AUG-06A

R.C. Work - Core Outer Slab L57 C2

057T030043 R.C. Work - Core Outer Slab L57 C3

100

01-AUG-06A

03-AUG-06A

R.C. Work - Core Outer Slab L57 C3

058T030040 R.C. Work - Slab L58 C

100

13-AUG-06A

16-AUG-06A

R.C. Work - Slab L58 C

058T030041 R.C. Work - Core Outer Slab L58 C1

100

06-AUG-06A

08-AUG-06A

R.C. Work - Core Outer Slab L58 C1

058T030042 R.C. Work - Core Outer Slab L58 C2

100

03-AUG-06A

06-AUG-06A

R.C. Work - Core Outer Slab L58 C2

058T030043 R.C. Work - Core Outer Slab L58 C3

100

04-AUG-06A

06-AUG-06A

R.C. Work - Core Outer Slab L58 C3

059T030040 R.C. Work - Slab L59 C

100

17-AUG-06A

20-AUG-06A

R.C. Work - Slab L59 C

059T030041 R.C. Work - Core Outer Slab L59 C1

100

09-AUG-06A

12-AUG-06A

R.C. Work - Core Outer Slab L59 C1

059T030042 R.C. Work - Core Outer Slab L59 C2

100

08-AUG-06A

09-AUG-06A

R.C. Work - Core Outer Slab L59 C2

059T030043 R.C. Work - Core Outer Slab L59 C3

100

08-AUG-06A

10-AUG-06A

R.C. Work - Core Outer Slab L59 C3

060T030040 R.C. Work - Slab L60 C

100

22-AUG-06A

24-AUG-06A

R.C. Work - Slab L60 C

060T030041 R.C. Work - Core Outer Slab L60 C1

100

13-AUG-06A

15-AUG-06A

R.C. Work - Core Outer Slab L60 C1

060T030042 R.C. Work - Core Outer Slab L60 C2

100

10-AUG-06A

13-AUG-06A

R.C. Work - Core Outer Slab L60 C2

060T030043 R.C. Work - Core Outer Slab L60 C3

100

11-AUG-06A

13-AUG-06A

R.C. Work - Core Outer Slab L60 C3

061T030040 R.C. Work - Slab L61 C

100

25-AUG-06A

27-AUG-06A

R.C. Work - Slab L61 C

061T030041 R.C. Work - Core Outer Slab L61 C1

100

16-AUG-06A

19-AUG-06A

R.C. Work - Core Outer Slab L61 C1

061T030042 R.C. Work - Core Outer Slab L61 C2

100

15-AUG-06A

16-AUG-06A

R.C. Work - Core Outer Slab L61 C2

061T030043 R.C. Work - Core Outer Slab L61 C3

100

15-AUG-06A

17-AUG-06A

R.C. Work - Core Outer Slab L61 C3

062T030040 R.C. Work - Slab L62 C

100

29-AUG-06A

31-AUG-06A

R.C. Work - Slab L62 C

062T030041 R.C. Work - Core Outer Slab L62 C1

100

20-AUG-06A

23-AUG-06A

R.C. Work - Core Outer Slab L62 C1

062T030042 R.C. Work - Core Outer Slab L62 C2

100

17-AUG-06A

20-AUG-06A

R.C. Work - Core Outer Slab L62 C2

062T030043 R.C. Work - Core Outer Slab L62 C3

100

18-AUG-06A

22-AUG-06A

R.C. Work - Core Outer Slab L62 C3

063T030040 R.C. Work - Slab L63 C

100

01-SEP-06A

04-SEP-06A

R.C. Work - Slab L63 C

063T030041 R.C. Work - Core Outer Slab L63 C1

100

24-AUG-06A

27-AUG-06A

R.C. Work - Core Outer Slab L63 C1

063T030042 R.C. Work - Core Outer Slab L63 C2

100

22-AUG-06A

24-AUG-06A

R.C. Work - Core Outer Slab L63 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 46 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L63 C3

063T030043 R.C. Work - Core Outer Slab L63 C3

100

23-AUG-06A

26-AUG-06A

064T030040 R.C. Work - Slab L64 C

100

05-SEP-06A

07-SEP-06A

R.C. Work - Slab L64 C

064T030041 R.C. Work - Core Outer Slab L64 C1

100

29-AUG-06A

30-AUG-06A

R.C. Work - Core Outer Slab L64 C1

064T030042 R.C. Work - Core Outer Slab L64 C2

100

25-AUG-06A

27-AUG-06A

R.C. Work - Core Outer Slab L64 C2

064T030043 R.C. Work - Core Outer Slab L64 C3

100

27-AUG-06A

29-AUG-06A

R.C. Work - Core Outer Slab L64 C3

065T030040 R.C. Work - Slab L65 C

100

08-SEP-06A

10-SEP-06A

R.C. Work - Slab L65 C

065T030041 R.C. Work - Core Outer Slab L65 C1

100

31-AUG-06A

03-SEP-06A

R.C. Work - Core Outer Slab L65 C1

065T030042 R.C. Work - Core Outer Slab L65 C2

100

29-AUG-06A

31-AUG-06A

R.C. Work - Core Outer Slab L65 C2

065T030043 R.C. Work - Core Outer Slab L65 C3

100

30-AUG-06A

02-SEP-06A

R.C. Work - Core Outer Slab L65 C3

066T030040 R.C. Work - Slab L66 C

100

13-SEP-06A

14-SEP-06A

R.C. Work - Slab L66 C

066T030041 R.C. Work - Core Outer Slab L66 C1

100

04-SEP-06A

06-SEP-06A

R.C. Work - Core Outer Slab L66 C1

066T030042 R.C. Work - Core Outer Slab L66 C2

100

01-SEP-06A

04-SEP-06A

R.C. Work - Core Outer Slab L66 C2

066T030043 R.C. Work - Core Outer Slab L66 C3

100

03-SEP-06A

05-SEP-06A

R.C. Work - Core Outer Slab L66 C3

067T030040 R.C. Work - Slab L67 C

100

15-SEP-06A

18-SEP-06A

R.C. Work - Slab L67 C

067T030041 R.C. Work - Core Outer Slab L67 C1

100

07-SEP-06A

10-SEP-06A

R.C. Work - Core Outer Slab L67 C1

067T030042 R.C. Work - Core Outer Slab L67 C2

100

05-SEP-06A

07-SEP-06A

R.C. Work - Core Outer Slab L67 C2

067T030043 R.C. Work - Core Outer Slab L67 C3

100

06-SEP-06A

09-SEP-06A

R.C. Work - Core Outer Slab L67 C3

068T030040 R.C. Work - Slab L68 C

100

19-SEP-06A

23-SEP-06A

R.C. Work - Slab L68 C

068T030041 R.C. Work - Core Outer Slab L68 C1

100

13-SEP-06A

13-SEP-06A

R.C. Work - Core Outer Slab L68 C1

068T030042 R.C. Work - Core Outer Slab L68 C2

100

08-SEP-06A

10-SEP-06A

R.C. Work - Core Outer Slab L68 C2

068T030043 R.C. Work - Core Outer Slab L68 C3

100

10-SEP-06A

10-SEP-06A

R.C. Work - Core Outer Slab L68 C3

069T030040 R.C. Work - Slab L69 C

100

24-SEP-06A

28-SEP-06A

R.C. Work - Slab L69 C

069T030041 R.C. Work - Core Outer Slab L69 C1

100

14-SEP-06A

17-SEP-06A

R.C. Work - Core Outer Slab L69 C1

069T030042 R.C. Work - Core Outer Slab L69 C2

100

13-SEP-06A

14-SEP-06A

R.C. Work - Core Outer Slab L69 C2

069T030043 R.C. Work - Core Outer Slab L69 C3

100

13-SEP-06A

16-SEP-06A

R.C. Work - Core Outer Slab L69 C3

070T030040 R.C. Work - Slab L70 C

100

29-SEP-06A

03-OCT-06A

070T030041 R.C. Work - Core Outer Slab L70 C1

100

18-SEP-06A

20-SEP-06A

R.C. Work - Core Outer Slab L70 C1

070T030042 R.C. Work - Core Outer Slab L70 C2

100

15-SEP-06A

18-SEP-06A

R.C. Work - Core Outer Slab L70 C2

070T030043 R.C. Work - Core Outer Slab L70 C3

100

17-SEP-06A

19-SEP-06A

R.C. Work - Core Outer Slab L70 C3

071T030040 R.C. Work - Slab L71 C

100

04-OCT-06A

08-OCT-06A

R.C. Work - Slab L71 C

071T030041 R.C. Work - Core Outer Slab L71 C1

100

21-SEP-06A

01-OCT-06A

R.C. Work - Core Outer Slab L71 C1

071T030042 R.C. Work - Core Outer Slab L71 C2

100

19-SEP-06A

24-SEP-06A

R.C. Work - Core Outer Slab L71 C2

071T030043 R.C. Work - Core Outer Slab L71 C3

100

20-SEP-06A

24-SEP-06A

R.C. Work - Core Outer Slab L71 C3

072T030040 R.C. Work - Slab L72 C

100

10-OCT-06A

19-OCT-06A

072T030041 R.C. Work - Core Outer Slab L72 C1

100

02-OCT-06A

03-OCT-06A

R.C. Work - Core Outer Slab L72 C1

072T030042 R.C. Work - Core Outer Slab L72 C2

100

26-SEP-06A

28-SEP-06A

R.C. Work - Core Outer Slab L72 C2

072T030043 R.C. Work - Core Outer Slab L72 C3

100

26-SEP-06A

28-SEP-06A

R.C. Work - Core Outer Slab L72 C3

073T030040 R.C. Work - Slab L73 C

100

20-OCT-06A

26-OCT-06A

R.C. Work - Slab L73 C

073T030041 R.C. Work - Core Outer Slab L73 C1

100

04-OCT-06A

16-OCT-06A

R.C. Work - Core Outer Slab L73 C1

073T030042 R.C. Work - Core Outer Slab L73 C2

100

29-SEP-06A

14-OCT-06A

R.C. Work - Core Outer Slab L73 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L70 C

R.C. Work - Slab L72 C

Sheet 47 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L73 C3

073T030043 R.C. Work - Core Outer Slab L73 C3

100

29-SEP-06A

17-OCT-06A

074T030040 R.C. Work - Slab (Open) L74 C

100

26-OCT-06A

26-OCT-06A

074T030041 R.C. Work - Core Outer Slab (Open) L74 C1

100

16-OCT-06A

15-OCT-06A

R.C. Work - Core Outer Slab (Open) L74 C1

074T030042 R.C. Work - Core Outer Slab (Open) L74 C2

100

14-OCT-06A

13-OCT-06A

R.C. Work - Core Outer Slab (Open) L74 C2

074T030043 R.C. Work - Core Outer Slab (Open) L74 C3

100

17-OCT-06A

16-OCT-06A

R.C. Work - Core Outer Slab (Open) L74 C3

075T030040 R.C. Work - Slab L75 C

100

27-OCT-06A

29-OCT-06A

R.C. Work - Slab L75 C

075T030041 R.C. Work - Core Outer Slab L75 C1

100

09-DEC-06A

12-DEC-06A

075T030042 R.C. Work - Core Outer Slab & Beam L75 C2

100

09-DEC-06A

31-JAN-07A

075T030043 R.C. Work - Core Outer Slab & Beam L75 C3

100

11-DEC-06A

11-FEB-07A

076T030040 R.C. Work - Slab L76 C

100

31-OCT-06A

05-NOV-06A

076T030041 R.C. Work - Core Outer Slab L76 C1

100

16-OCT-06A

31-OCT-06A

R.C. Work - Core Outer Slab L76 C1

076T030042 R.C. Work - Core Outer Slab L76 C2

100

15-OCT-06A

26-OCT-06A

R.C. Work - Core Outer Slab L76 C2

076T030043 R.C. Work - Core Outer Slab L76 C3

100

19-OCT-06A

28-OCT-06A

R.C. Work - Core Outer Slab L76 C3

077T030040 R.C. Work - Slab L77 C

100

06-NOV-06A

09-NOV-06A

R.C. Work - Slab L77 C

077T030041 R.C. Work - Core Outer Slab L77 C1

100

02-NOV-06A

02-NOV-06A

R.C. Work - Core Outer Slab L77 C1

077T030042 R.C. Work - Core Outer Slab L77 C2

100

27-OCT-06A

31-OCT-06A

R.C. Work - Core Outer Slab L77 C2

077T030043 R.C. Work - Core Outer Slab L77 C3

100

29-OCT-06A

05-NOV-06A

R.C. Work - Core Outer Slab L77 C3

078T030040 R.C. Work - Slab L78 C

100

10-NOV-06A

13-NOV-06A

R.C. Work - Slab L78 C

078T030041 R.C. Work - Core Outer Slab L78 C1

100

03-NOV-06A

06-NOV-06A

R.C. Work - Core Outer Slab L78 C1

078T030042 R.C. Work - Core Outer Slab L78 C2

100

02-NOV-06A

05-NOV-06A

R.C. Work - Core Outer Slab L78 C2

078T030043 R.C. Work - Core Outer Slab L78 C3

100

06-NOV-06A

07-NOV-06A

R.C. Work - Core Outer Slab L78 C3

079T030040 R.C. Work - Slab L79 C

100

16-NOV-06A

13-NOV-06A

R.C. Work - Slab L79 C

079T030041 R.C. Work - Core Outer Slab L79 C1

100

07-NOV-06A

09-NOV-06A

R.C. Work - Core Outer Slab L79 C1

079T030042 R.C. Work - Core Outer Slab L79 C2

100

06-NOV-06A

08-NOV-06A

R.C. Work - Core Outer Slab L79 C2

079T030043 R.C. Work - Core Outer Slab L79 C3

100

08-NOV-06A

09-NOV-06A

R.C. Work - Core Outer Slab L79 C3

080T030040 R.C. Work - Slab L80 C

100

16-NOV-06A

19-NOV-06A

R.C. Work - Slab L80 C

080T030041 R.C. Work - Core Outer Slab L80 C1

100

10-NOV-06A

12-NOV-06A

R.C. Work - Core Outer Slab L80 C1

080T030042 R.C. Work - Core Outer Slab L80 C2

100

09-NOV-06A

11-NOV-06A

R.C. Work - Core Outer Slab L80 C2

080T030043 R.C. Work - Core Outer Slab L80 C3

100

10-NOV-06A

13-NOV-06A

R.C. Work - Core Outer Slab L80 C3

081T030040 R.C. Work - Slab L81 C

100

20-NOV-06A

22-NOV-06A

R.C. Work - Slab L81 C

081T030041 R.C. Work - Core Outer Slab L81 C1

100

13-NOV-06A

13-NOV-06A

R.C. Work - Core Outer Slab L81 C1

081T030042 R.C. Work - Core Outer Slab L81 C2

100

12-NOV-06A

13-NOV-06A

R.C. Work - Core Outer Slab L81 C2

081T030043 R.C. Work - Core Outer Slab L81 C3

100

16-NOV-06A

16-NOV-06A

R.C. Work - Core Outer Slab L81 C3

082T030040 R.C. Work - Slab L82 C

100

23-NOV-06A

26-NOV-06A

R.C. Work - Slab L82 C

082T030041 R.C. Work - Core Outer Slab L82 C1

100

16-NOV-06A

18-NOV-06A

R.C. Work - Core Outer Slab L82 C1

082T030042 R.C. Work - Core Outer Slab L82 C2

100

16-NOV-06A

18-NOV-06A

R.C. Work - Core Outer Slab L82 C2

082T030043 R.C. Work - Core Outer Slab L82 C3

100

17-NOV-06A

19-NOV-06A

R.C. Work - Core Outer Slab L82 C3

083T030040 R.C. Work - Slab L83 C

100

27-NOV-06A

29-NOV-06A

R.C. Work - Slab L83 C

083T030041 R.C. Work - Core Outer Slab L83 C1

100

19-NOV-06A

20-NOV-06A

R.C. Work - Core Outer Slab L83 C1

083T030042 R.C. Work - Core Outer Slab L83 C2

100

19-NOV-06A

21-NOV-06A

R.C. Work - Core Outer Slab L83 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab (Open) L74 C

R.C. Work - Core Outer Slab L75 C1


R.C. Work - Core Outer Slab & Beam L75 C2
R.C. Work - Core Outer Slab & Beam L75 C3
R.C. Work - Slab L76 C

Sheet 48 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L83 C3

083T030043 R.C. Work - Core Outer Slab L83 C3

100

20-NOV-06A

21-NOV-06A

084T030040 R.C. Work - Slab L84 C

100

30-NOV-06A

03-DEC-06A

R.C. Work - Slab L84 C

084T030041 R.C. Work - Core Outer Slab L84 C1

100

21-NOV-06A

25-NOV-06A

R.C. Work - Core Outer Slab L84 C1

084T030042 R.C. Work - Core Outer Slab L84 C2

100

22-NOV-06A

23-NOV-06A

R.C. Work - Core Outer Slab L84 C2

084T030043 R.C. Work - Core Outer Slab L84 C3

100

22-NOV-06A

25-NOV-06A

R.C. Work - Core Outer Slab L84 C3

085T030040 R.C. Work - Slab L85 C

100

04-DEC-06A

04-DEC-06A

R.C. Work - Slab L85 C

085T030041 R.C. Work - Core Outer Slab L85 C1

100

26-NOV-06A

28-NOV-06A

R.C. Work - Core Outer Slab L85 C1

085T030042 R.C. Work - Core Outer Slab L85 C2

100

24-NOV-06A

26-NOV-06A

R.C. Work - Core Outer Slab L85 C2

085T030043 R.C. Work - Core Outer Slab L85 C3

100

26-NOV-06A

28-NOV-06A

R.C. Work - Core Outer Slab L85 C3

086T030040 R.C. Work - Slab L86 C

100

07-DEC-06A

09-DEC-06A

R.C. Work - Slab L86 C

086T030041 R.C. Work - Core Outer Slab L86 C1

100

29-NOV-06A

29-NOV-06A

R.C. Work - Core Outer Slab L86 C1

086T030042 R.C. Work - Core Outer Slab L86 C2

100

27-NOV-06A

29-NOV-06A

R.C. Work - Core Outer Slab L86 C2

086T030043 R.C. Work - Core Outer Slab L86 C3

100

29-NOV-06A

30-NOV-06A

R.C. Work - Core Outer Slab L86 C3

087T030040 R.C. Work - Slab L87 C

100

10-DEC-06A

11-DEC-06A

R.C. Work - Slab L87 C

087T030041 R.C. Work - Core Outer Slab L87 C1

100

30-NOV-06A

04-DEC-06A

R.C. Work - Core Outer Slab L87 C1

087T030042 R.C. Work - Core Outer Slab L87 C2

100

30-NOV-06A

03-DEC-06A

R.C. Work - Core Outer Slab L87 C2

087T030043 R.C. Work - Core Outer Slab L87 C3

100

01-DEC-06A

04-DEC-06A

R.C. Work - Core Outer Slab L87 C3

088T030040 R.C. Work - Slab L88 C

100

12-DEC-06A

13-DEC-06A

R.C. Work - Slab L88 C

088T030041 R.C. Work - Core Outer Slab L88 C1

100

07-DEC-06A

07-DEC-06A

R.C. Work - Core Outer Slab L88 C1

088T030042 R.C. Work - Core Outer Slab L88 C2

100

04-DEC-06A

04-DEC-06A

R.C. Work - Core Outer Slab L88 C2

088T030043 R.C. Work - Core Outer Slab L88 C3

100

07-DEC-06A

04-DEC-06A

R.C. Work - Core Outer Slab L88 C3

089T030040 R.C. Work - Slab L89 C

100

14-DEC-06A

16-DEC-06A

R.C. Work - Slab L89 C

089T030041 R.C. Work - Core Outer Slab L89 C1

100

08-DEC-06A

10-DEC-06A

R.C. Work - Core Outer Slab L89 C1

089T030042 R.C. Work - Core Outer Slab L89 C2

100

07-DEC-06A

07-DEC-06A

R.C. Work - Core Outer Slab L89 C2

089T030043 R.C. Work - Core Outer Slab L89 C3

100

07-DEC-06A

10-DEC-06A

R.C. Work - Core Outer Slab L89 C3

090T030040 R.C. Work - Slab L90 C

100

17-DEC-06A

18-DEC-06A

R.C. Work - Slab L90 C

090T030041 R.C. Work - Core Outer Slab L90 C1

100

11-DEC-06A

12-DEC-06A

R.C. Work - Core Outer Slab L90 C1

090T030042 R.C. Work - Core Outer Slab L90 C2

100

08-DEC-06A

11-DEC-06A

R.C. Work - Core Outer Slab L90 C2

090T030043 R.C. Work - Core Outer Slab L90 C3

100

11-DEC-06A

12-DEC-06A

R.C. Work - Core Outer Slab L90 C3

091T030040 R.C. Work - Slab L91 C

100

19-DEC-06A

20-DEC-06A

R.C. Work - Slab L91 C

091T030041 R.C. Work - Core Outer Slab L91 C1

100

13-DEC-06A

14-DEC-06A

R.C. Work - Core Outer Slab L91 C1

091T030042 R.C. Work - Core Outer Slab L91 C2

100

12-DEC-06A

14-DEC-06A

R.C. Work - Core Outer Slab L91 C2

091T030043 R.C. Work - Core Outer Slab L91 C3

100

13-DEC-06A

16-DEC-06A

R.C. Work - Core Outer Slab L91 C3

092T030040 R.C. Work - Slab L92 C

100

21-DEC-06A

23-DEC-06A

R.C. Work - Slab L92 C

092T030041 R.C. Work - Core Outer Slab L92 C1

100

15-DEC-06A

17-DEC-06A

R.C. Work - Core Outer Slab L92 C1

092T030042 R.C. Work - Core Outer Slab L92 C2

100

15-DEC-06A

17-DEC-06A

R.C. Work - Core Outer Slab L92 C2

092T030043 R.C. Work - Core Outer Slab L92 C3

100

17-DEC-06A

19-DEC-06A

R.C. Work - Core Outer Slab L92 C3

093T030040 R.C. Work - Slab L93 C

100

24-DEC-06A

25-DEC-06A

R.C. Work - Slab L93 C

093T030041 R.C. Work - Core Outer Slab L93 C1

100

18-DEC-06A

21-DEC-06A

R.C. Work - Core Outer Slab L93 C1

093T030042 R.C. Work - Core Outer Slab L93 C2

100

18-DEC-06A

19-DEC-06A

R.C. Work - Core Outer Slab L93 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 49 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Outer Slab L93 C3

093T030043 R.C. Work - Core Outer Slab L93 C3

100

20-DEC-06A

21-DEC-06A

094T030040 R.C. Work - Slab L94 C

100

26-DEC-06A

27-DEC-06A

R.C. Work - Slab L94 C

094T030041 R.C. Work - Core Outer Slab L94 C1

100

22-DEC-06A

24-DEC-06A

R.C. Work - Core Outer Slab L94 C1

094T030042 R.C. Work - Core Outer Slab L94 C2

100

20-DEC-06A

23-DEC-06A

R.C. Work - Core Outer Slab L94 C2

094T030043 R.C. Work - Core Outer Slab L94 C3

100

22-DEC-06A

24-DEC-06A

R.C. Work - Core Outer Slab L94 C3

095T030040 R.C. Work - Slab L95 C

100

28-DEC-06A

02-JAN-07A

R.C. Work - Slab L95 C

095T030041 R.C. Work - Core Outer Slab L95 C1

100

25-DEC-06A

26-DEC-06A

R.C. Work - Core Outer Slab L95 C1

095T030042 R.C. Work - Core Outer Slab L95 C2

100

24-DEC-06A

25-DEC-06A

R.C. Work - Core Outer Slab L95 C2

095T030043 R.C. Work - Core Outer Slab L95 C3

100

25-DEC-06A

26-DEC-06A

R.C. Work - Core Outer Slab L95 C3

096T030040 R.C. Work - Slab L96 C

100

04-JAN-07A

06-JAN-07A

R.C. Work - Slab L96 C

096T030041 R.C. Work - Core Outer Slab L96 C1

100

27-DEC-06A

28-DEC-06A

R.C. Work - Core Outer Slab L96 C1

096T030042 R.C. Work - Core Outer Slab L96 C2

100

26-DEC-06A

28-DEC-06A

R.C. Work - Core Outer Slab L96 C2

096T030043 R.C. Work - Core Outer Slab L96 C3

100

27-DEC-06A

02-JAN-07A

R.C. Work - Core Outer Slab L96 C3

097T030040 R.C. Work - Slab L97 C

100

07-JAN-07A

08-JAN-07A

R.C. Work - Slab L97 C

097T030041 R.C. Work - Core Outer Slab L97 C1

100

29-DEC-06A

04-JAN-07A

R.C. Work - Core Outer Slab L97 C1

097T030042 R.C. Work - Core Outer Slab L97 C2

100

29-DEC-06A

02-JAN-07A

R.C. Work - Core Outer Slab L97 C2

097T030043 R.C. Work - Core Outer Slab L97 C3

100

04-JAN-07A

04-JAN-07A

R.C. Work - Core Outer Slab L97 C3

098T030040 R.C. Work - Slab L98 C

100

09-JAN-07A

11-JAN-07A

R.C. Work - Slab L98 C

098T030041 R.C. Work - Core Outer Slab L98 C1

100

05-JAN-07A

07-JAN-07A

R.C. Work - Core Outer Slab L98 C1

098T030042 R.C. Work - Core Outer Slab L98 C2

100

04-JAN-07A

06-JAN-07A

R.C. Work - Core Outer Slab L98 C2

098T030043 R.C. Work - Core Outer Slab L98 C3

100

05-JAN-07A

07-JAN-07A

R.C. Work - Core Outer Slab L98 C3

099T030040 R.C. Work - Slab L99 C

100

12-JAN-07A

15-JAN-07A

R.C. Work - Slab L99 C

099T030041 R.C. Work - Core Outer Slab L99 C1

100

08-JAN-07A

09-JAN-07A

R.C. Work - Core Outer Slab L99 C1

099T030042 R.C. Work - Core Outer Slab L99 C2

100

07-JAN-07A

09-JAN-07A

R.C. Work - Core Outer Slab L99 C2

099T030043 R.C. Work - Core Outer Slab L99 C3

100

08-JAN-07A

10-JAN-07A

R.C. Work - Core Outer Slab L99 C3

100T030040 R.C. Work - Slab L100 C

100

16-JAN-07A

18-JAN-07A

R.C. Work - Slab L100 C

100T030041 R.C. Work - Core Outer Slab L100 C1

100

10-JAN-07A

13-JAN-07A

R.C. Work - Core Outer Slab L100 C1

100T030042 R.C. Work - Core Outer Slab L100 C2

100

10-JAN-07A

13-JAN-07A

R.C. Work - Core Outer Slab L100 C2

100T030043 R.C. Work - Core Outer Slab L100 C3

100

11-JAN-07A

14-JAN-07A

R.C. Work - Core Outer Slab L100 C3

101T030040 R.C. Work - Slab L101 C

100

19-JAN-07A

22-JAN-07A

R.C. Work - Slab L101 C

101T030041 R.C. Work - Core Outer Slab L101 C1

100

14-JAN-07A

16-JAN-07A

R.C. Work - Core Outer Slab L101 C1

101T030042 R.C. Work - Core Outer Slab L101 C2

100

14-JAN-07A

15-JAN-07A

R.C. Work - Core Outer Slab L101 C2

101T030043 R.C. Work - Core Outer Slab L101 C3

100

15-JAN-07A

17-JAN-07A

R.C. Work - Core Outer Slab L101 C3

102T030040 R.C. Work - Slab L102 C

100

23-JAN-07A

25-JAN-07A

R.C. Work - Slab L102 C

102T030041 R.C. Work - Core Outer Slab L102 C1

100

17-JAN-07A

21-JAN-07A

R.C. Work - Core Outer Slab L102 C1

102T030042 R.C. Work - Core Outer Slab L102 C2

100

16-JAN-07A

18-JAN-07A

R.C. Work - Core Outer Slab L102 C2

102T030043 R.C. Work - Core Outer Slab L102 C3

100

18-JAN-07A

22-JAN-07A

R.C. Work - Core Outer Slab L102 C3

103T030040 R.C. Work - Slab L103 C

100

26-JAN-07A

29-JAN-07A

R.C. Work - Slab L103 C

103T030041 R.C. Work - Core Outer Slab L103 C1

100

22-JAN-07A

23-JAN-07A

R.C. Work - Core Outer Slab L103 C1

103T030042 R.C. Work - Core Outer Slab L103 C2

100

19-JAN-07A

23-JAN-07A

R.C. Work - Core Outer Slab L103 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 50 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Outer Slab L103 C3

103T030043 R.C. Work - Core Outer Slab L103 C3

100

23-JAN-07A

25-JAN-07A

104T030040 R.C. Work - Slab L104 C

100

30-JAN-07A

30-JAN-07A

R.C. Work - Slab L104 C

104T030041 R.C. Work - Core Outer Slab L104 C1

100

24-JAN-07A

27-JAN-07A

R.C. Work - Core Outer Slab L104 C1

104T030042 R.C. Work - Core Outer Slab L104 C2

100

24-JAN-07A

27-JAN-07A

R.C. Work - Core Outer Slab L104 C2

104T030043 R.C. Work - Core Outer Slab L104 C3

100

26-JAN-07A

28-JAN-07A

R.C. Work - Core Outer Slab L104 C3

105T030040 R.C. Work - Slab L105 C

100

03-FEB-07A

04-FEB-07A

R.C. Work - Slab L105 C

105T030041 R.C. Work - Core Outer Slab L105 C1

100

28-JAN-07A

30-JAN-07A

R.C. Work - Core Outer Slab L105 C1

105T030042 R.C. Work - Core Outer Slab L105 C2

100

28-JAN-07A

29-JAN-07A

R.C. Work - Core Outer Slab L105 C2

105T030043 R.C. Work - Core Outer Slab L105 C3

100

29-JAN-07A

30-JAN-07A

R.C. Work - Core Outer Slab L105 C3

106T030040 R.C. Work - Slab L106 C

100

05-FEB-07A

20-FEB-07A

106T030041 R.C. Work - Core Outer Slab L106 C1

100

03-FEB-07A

03-FEB-07A

R.C. Work - Core Outer Slab L106 C1

106T030042 R.C. Work - Core Outer Slab L106 C2

100

30-JAN-07A

30-JAN-07A

R.C. Work - Core Outer Slab L106 C2

106T030043 R.C. Work - Core Outer Slab L106 C3

100

03-FEB-07A

03-FEB-07A

R.C. Work - Core Outer Slab L106 C3

107T030040 R.C. Work - Slab L107 C

100

22-FEB-07A

04-MAR-07A

107T030041 R.C. Work - Core Outer Slab L107 C1

100

04-FEB-07A

19-FEB-07A

R.C. Work - Core Outer Slab L107 C1

107T030042 R.C. Work - Core Outer Slab L107 C2

100

03-FEB-07A

17-FEB-07A

R.C. Work - Core Outer Slab L107 C2

107T030043 R.C. Work - Core Outer Slab L107 C3

100

04-FEB-07A

20-FEB-07A

R.C. Work - Core Outer Slab L107 C3

108T030040 R.C. Work - Slab L108 C

83

05-MAR-07A

15-MAR-07

108T030041 R.C. Work - Core Outer Slab L108 C1

100

20-FEB-07A

28-FEB-07A

R.C. Work - Core Outer Slab L108 C1

108T030042 R.C. Work - Core Outer Slab L108 C2

100

18-FEB-07A

24-FEB-07A

R.C. Work - Core Outer Slab L108 C2

108T030043 R.C. Work - Core Outer Slab L108 C3

100

22-FEB-07A

28-FEB-07A

R.C. Work - Core Outer Slab L108 C3

109T030040 R.C. Work - Slab L109 C

17-MAR-07

23-MAR-07

109T030041 R.C. Work - Core Outer Slab L109 C1

100

01-MAR-07A

13-MAR-07A

R.C. Work - Core Outer Slab L109 C1

109T030042 R.C. Work - Core Outer Slab L109 C2

100

25-FEB-07A

10-MAR-07A

R.C. Work - Core Outer Slab L109 C2

109T030043 R.C. Work - Core Outer Slab L109 C3

100

01-MAR-07A

15-MAR-07A

R.C. Work - Core Outer Slab L109 C3

110T030040 R.C. Work - Slab (Open) L110 C

24-MAR-07

23-MAR-07

110T030041 R.C. Work - Core Outer Slab (Open) L110 C1

100

14-MAR-07A

13-MAR-07A

R.C. Work - Core Outer Slab (Open) L110 C1

110T030042 R.C. Work - Core Outer Slab (Open) L110 C2

100

11-MAR-07A

10-MAR-07A

R.C. Work - Core Outer Slab (Open) L110 C2

110T030043 R.C. Work - Core Outer Slab (Open) L110 C3

100

15-MAR-07A

15-MAR-07A

R.C. Work - Core Outer Slab (Open) L110 C3

111T030040 R.C. Work - Slab L111 C

29

24-MAR-07

02-APR-07

R.C. Work - Slab L111 C

111T030041 R.C. Work - Core Outer Slab & Beam L111 C1

-2

14-MAR-07A

20-MAR-07

R.C. Work - Core Outer Slab & Beam L111 C1

111T030042 R.C. Work - Core Outer Slab & Beam L111 C2

25

-1

11-MAR-07A

20-MAR-07

R.C. Work - Core Outer Slab & Beam L111 C2

111T030043 R.C. Work - Core Outer Slab & Beam L111 C3

-1

19-MAR-07

22-MAR-07

R.C. Work - Core Outer Slab & Beam L111 C3

112T030040 R.C. Work - Slab L112 C

29

03-APR-07

06-APR-07

112T030041 R.C. Work - Core Outer Slab L112 C1

-2

21-MAR-07

23-MAR-07

R.C. Work - Core Outer Slab L112 C1

112T030042 R.C. Work - Core Outer Slab L112 C1

-1

21-MAR-07

23-MAR-07

R.C. Work - Core Outer Slab L112 C1

112T030043 R.C. Work - Core Outer Slab L112 C1

-1

23-MAR-07

25-MAR-07

R.C. Work - Core Outer Slab L112 C1

113T030040 R.C. Work - Slab L113 C

29

07-APR-07

09-APR-07

113T030041 R.C. Work - Core Outer Slab & Beam L113 C1

-2

24-MAR-07

26-MAR-07

R.C. Work - Core Outer Slab & Beam L113 C1

113T030042 R.C. Work - Core Outer Slab L113 C2

-1

24-MAR-07

26-MAR-07

R.C. Work - Core Outer Slab L113 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

29

29

29

R.C. Work - Slab L106 C

R.C. Work - Slab L107 C

R.C. Work - Slab L108 C

R.C. Work - Slab L109 C

R.C. Work - Slab (Open) L110 C

R.C. Work - Slab L112 C

R.C. Work - Slab L113 C

Sheet 51 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Outer Slab & Beam L113 C3

113T030043 R.C. Work - Core Outer Slab & Beam L113 C3

-1

26-MAR-07

28-MAR-07

114T030040 R.C. Work - Slab L114 C

29

11-APR-07

13-APR-07

114T030041 R.C. Work - Core Outer Slab & Beam L114 C1

-2

27-MAR-07

29-MAR-07

R.C. Work - Core Outer Slab & Beam L114 C1

114T030042 R.C. Work - Core Outer Slab L114 C2

-1

27-MAR-07

29-MAR-07

R.C. Work - Core Outer Slab L114 C2

114T030043 R.C. Work - Core Outer Slab & Beam L114 C3

-1

29-MAR-07

01-APR-07

R.C. Work - Core Outer Slab & Beam L114 C3

115T030040 R.C. Work - Slab L115 C

29

14-APR-07

16-APR-07

115T030041 R.C. Work - Core Outer Slab & Beam L115 C1

-2

31-MAR-07

02-APR-07

R.C. Work - Core Outer Slab & Beam L115 C1

115T030042 R.C. Work - Core Outer Slab L115 C2

31-MAR-07

02-APR-07

R.C. Work - Core Outer Slab L115 C2

115T030043 R.C. Work - Core Outer Slab & Beam L115 C3

02-APR-07

04-APR-07

R.C. Work - Core Outer Slab & Beam L115 C3

116T030040 R.C. Work - Slab L116 C

29

17-APR-07

19-APR-07

116T030041 R.C. Work - Core Outer Slab & Beam L116 C1

03-APR-07

05-APR-07

R.C. Work - Core Outer Slab & Beam L116 C1

116T030042 R.C. Work - Core Outer Slab L116 C2

03-APR-07

05-APR-07

R.C. Work - Core Outer Slab L116 C2

116T030043 R.C. Work - Core Outer Slab & Beam L116 C3

05-APR-07

07-APR-07

R.C. Work - Core Outer Slab & Beam L116 C3

117T030040 R.C. Work - Slab L117 C

29

20-APR-07

22-APR-07

117T030041 R.C. Work - Core Outer Slab & Beam L117 C1

06-APR-07

08-APR-07

R.C. Work - Core Outer Slab & Beam L117 C1

117T030042 R.C. Work - Core Outer Slab L117 C2

06-APR-07

08-APR-07

R.C. Work - Core Outer Slab L117 C2

117T030043 R.C. Work - Core Outer Slab & Beam L117 C3

08-APR-07

11-APR-07

R.C. Work - Core Outer Slab & Beam L117 C3

118T030040 R.C. Work - Slab L118 C

29

23-APR-07

26-APR-07

118T030041 R.C. Work - Core Outer Slab & Beam L118 C1

09-APR-07

12-APR-07

R.C. Work - Core Outer Slab & Beam L118 C1

118T030042 R.C. Work - Core Outer Slab L118 C2

09-APR-07

12-APR-07

R.C. Work - Core Outer Slab L118 C2

118T030043 R.C. Work - Core Outer Slab & Beam L118 C3

12-APR-07

14-APR-07

R.C. Work - Core Outer Slab & Beam L118 C3

119T030040 R.C. Work - Slab L119 C

29

27-APR-07

29-APR-07

R.C. Work - Slab L119 C

119T030041 R.C. Work - Core Outer Slab & Beam L119 C1

16-APR-07

18-APR-07

R.C. Work - Core Outer Slab & Beam L119 C1

119T030042 R.C. Work - Core Outer Slab L119 C2

16-APR-07

18-APR-07

R.C. Work - Core Outer Slab L119 C2

119T030043 R.C. Work - Core Outer Slab & Beam L119 C3

18-APR-07

20-APR-07

R.C. Work - Core Outer Slab & Beam L119 C3

120T030040 R.C. Work - Slab L120 C

29

30-APR-07

03-MAY-07

R.C. Work - Slab L120 C

120T030041 R.C. Work - Core Outer Slab & Beam L120 C1

20-APR-07

22-APR-07

R.C. Work - Core Outer Slab & Beam L120 C1

120T030042 R.C. Work - Core Outer Slab L120 C2

20-APR-07

22-APR-07

R.C. Work - Core Outer Slab L120 C2

120T030043 R.C. Work - Core Outer Slab & Beam L120 C3

22-APR-07

25-APR-07

R.C. Work - Core Outer Slab & Beam L120 C3

121T030040 R.C. Work - Slab L121 C

29

04-MAY-07

06-MAY-07

R.C. Work - Slab L121 C

121T030041 R.C. Work - Core Outer Slab & Beam L121 C1

-1

29-APR-07

02-MAY-07

R.C. Work - Core Outer Slab & Beam L121 C1

121T030042 R.C. Work - Core Outer Slab L121 C2

29-APR-07

02-MAY-07

R.C. Work - Core Outer Slab L121 C2

121T030043 R.C. Work - Core Outer Slab & Beam L121 C3

02-MAY-07

04-MAY-07

R.C. Work - Core Outer Slab & Beam L121 C3

122T030040 R.C. Work - Slab L122 C

29

07-MAY-07

09-MAY-07

R.C. Work - Slab L122 C

122T030041 R.C. Work - Core Outer Slab & Beam L122 C1

-2

04-MAY-07

06-MAY-07

R.C. Work - Core Outer Slab & Beam L122 C1

122T030042 R.C. Work - Core Outer Slab L122 C2

-1

04-MAY-07

06-MAY-07

R.C. Work - Core Outer Slab L122 C2

122T030043 R.C. Work - Core Outer Slab & Beam L122 C3

-1

06-MAY-07

08-MAY-07

R.C. Work - Core Outer Slab & Beam L122 C3

123T030040 R.C. Work - Slab L123 C

29

10-MAY-07

13-MAY-07

R.C. Work - Slab L123 C

123T030041 R.C. Work - Core Outer Slab & Beam L123 C1

-2

07-MAY-07

09-MAY-07

R.C. Work - Core Outer Slab & Beam L123 C1

123T030042 R.C. Work - Core Outer Slab L123 C2

-1

07-MAY-07

09-MAY-07

R.C. Work - Core Outer Slab L123 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Slab L114 C

R.C. Work - Slab L115 C

R.C. Work - Slab L116 C

R.C. Work - Slab L117 C

R.C. Work - Slab L118 C

Sheet 52 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Outer Slab & Beam L123 C3

123T030043 R.C. Work - Core Outer Slab & Beam L123 C3

-1

09-MAY-07

12-MAY-07

124T030040 R.C. Work - Slab L124 C

29

14-MAY-07

16-MAY-07

R.C. Work - Slab L124 C

124T030041 R.C. Work - Core Outer Slab & Beam L124 C1

-2

10-MAY-07

13-MAY-07

R.C. Work - Core Outer Slab & Beam L124 C1

124T030042 R.C. Work - Core Outer Slab L124 C2

-1

10-MAY-07

13-MAY-07

R.C. Work - Core Outer Slab L124 C2

124T030043 R.C. Work - Core Outer Slab & Beam L124 C3

-1

13-MAY-07

15-MAY-07

R.C. Work - Core Outer Slab & Beam L124 C3

125T030040 R.C. Work - Slab L125 C

29

17-MAY-07

19-MAY-07

R.C. Work - Slab L125 C

125T030041 R.C. Work - Core Outer Slab & Beam L125 C1

-2

14-MAY-07

16-MAY-07

R.C. Work - Core Outer Slab & Beam L125 C1

125T030042 R.C. Work - Core Outer Slab L125 C2

-1

14-MAY-07

16-MAY-07

R.C. Work - Core Outer Slab L125 C2

125T030043 R.C. Work - Core Outer Slab & Beam L125 C3

-1

16-MAY-07

18-MAY-07

R.C. Work - Core Outer Slab & Beam L125 C3

126T030040 R.C. Work - Slab L126 C

29

20-MAY-07

22-MAY-07

R.C. Work - Slab L126 C

126T030041 R.C. Work - Core Outer Slab & Beam L126 C1

-2

17-MAY-07

19-MAY-07

R.C. Work - Core Outer Slab & Beam L126 C1

126T030042 R.C. Work - Core Outer Slab L126 C2

-1

17-MAY-07

19-MAY-07

R.C. Work - Core Outer Slab L126 C2

126T030043 R.C. Work - Core Outer Slab & Beam L126 C3

-1

19-MAY-07

21-MAY-07

R.C. Work - Core Outer Slab & Beam L126 C3

127T030040 R.C. Work - Slab L127 C

29

23-MAY-07

26-MAY-07

R.C. Work - Slab L127 C

127T030041 R.C. Work - Core Outer Slab & Beam L127 C1

-2

20-MAY-07

22-MAY-07

R.C. Work - Core Outer Slab & Beam L127 C1

127T030042 R.C. Work - Core Outer Slab & Beam L127 C2

-1

20-MAY-07

22-MAY-07

R.C. Work - Core Outer Slab & Beam L127 C2

127T030043 R.C. Work - Core Outer Slab & Beam L127 C3

-1

22-MAY-07

24-MAY-07

R.C. Work - Core Outer Slab & Beam L127 C3

128T030040 R.C. Work - Slab L128 C

29

27-MAY-07

29-MAY-07

R.C. Work - Slab L128 C

128T030041 R.C. Work - Core Outer Slab & Beam L128 C1

-2

23-MAY-07

26-MAY-07

R.C. Work - Core Outer Slab & Beam L128 C1

128T030042 R.C. Work - Core Outer Slab & Beam L128 C2

-1

23-MAY-07

26-MAY-07

R.C. Work - Core Outer Slab & Beam L128 C2

128T030043 R.C. Work - Core Outer Slab & Beam L128 C3

-1

26-MAY-07

28-MAY-07

R.C. Work - Core Outer Slab & Beam L128 C3

129T030040 R.C. Work - Slab L129 C

29

30-MAY-07

01-JUN-07

R.C. Work - Slab L129 C

129T030041 R.C. Work - Core Outer Slab & Beam L129 C1

-2

27-MAY-07

29-MAY-07

R.C. Work - Core Outer Slab & Beam L129 C1

129T030042 R.C. Work - Core Outer Slab & Beam L129 C2

-1

27-MAY-07

29-MAY-07

R.C. Work - Core Outer Slab & Beam L129 C2

129T030043 R.C. Work - Core Outer Slab & Beam L129 C3

-1

29-MAY-07

31-MAY-07

R.C. Work - Core Outer Slab & Beam L129 C3

130T030040 R.C. Work - Slab L130 C

29

02-JUN-07

05-JUN-07

R.C. Work - Slab L130 C

130T030041 R.C. Work - Core Outer Slab & Beam L130 C1

-2

30-MAY-07

01-JUN-07

R.C. Work - Core Outer Slab & Beam L130 C1

130T030042 R.C. Work - Core Outer Slab & Beam L130 C2

-1

30-MAY-07

01-JUN-07

R.C. Work - Core Outer Slab & Beam L130 C2

130T030043 R.C. Work - Core Outer Slab & Beam L130 C3

11

01-JUN-07

03-JUN-07

R.C. Work - Core Outer Slab & Beam L130 C3

131T030040 R.C. Work - Slab L131 C

29

06-JUN-07

08-JUN-07

R.C. Work - Slab L131 C

131T030041 R.C. Work - Core Outer Slab & Beam L131 C1

-2

02-JUN-07

05-JUN-07

R.C. Work - Core Outer Slab & Beam L131 C1

131T030042 R.C. Work - Core Outer Slab & Beam L131 C2

19

02-JUN-07

05-JUN-07

R.C. Work - Core Outer Slab & Beam L131 C2

131T030043 R.C. Work - Core Outer Slab & Beam L131 C3

11

05-JUN-07

07-JUN-07

R.C. Work - Core Outer Slab & Beam L131 C3

132T030040 R.C. Work - Slab L132 C

29

09-JUN-07

12-JUN-07

R.C. Work - Slab L132 C

132T030041 R.C. Work - Core Outer Slab L132 & Beam C1

20

06-JUN-07

08-JUN-07

R.C. Work - Core Outer Slab L132 & Beam C1

132T030042 R.C. Work - Core Outer Slab L132 & Beam C2

19

06-JUN-07

08-JUN-07

R.C. Work - Core Outer Slab L132 & Beam C2

132T030043 R.C. Work - Core Outer Slab L132 & Beam C3

11

08-JUN-07

10-JUN-07

R.C. Work - Core Outer Slab L132 & Beam C3

133T030040 R.C. Work - Slab L133 C

29

13-JUN-07

15-JUN-07

R.C. Work - Slab L133 C

133T030041 R.C. Work - Core Outer Slab & Beam L133 C1

11

20-JUN-07

22-JUN-07

R.C. Work - Core Outer Slab & Beam L133 C1

133T030042 R.C. Work - Core Outer Slab & Beam L133 C2

10

20-JUN-07

22-JUN-07

R.C. Work - Core Outer Slab & Beam L133 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 53 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Outer Slab & Beam L133 C3

133T030043 R.C. Work - Core Outer Slab & Beam L133 C3

22-JUN-07

24-JUN-07

134T030040 R.C. Work - Slab L134 C

18

29-JUN-07

01-JUL-07

R.C. Work - Slab L134 C

134T030041 R.C. Work - Core Outer Slab & Beam L134 C1

27-JUN-07

29-JUN-07

R.C. Work - Core Outer Slab & Beam L134 C1

134T030042 R.C. Work - Core Outer Slab & Beam L134 C2

27-JUN-07

29-JUN-07

R.C. Work - Core Outer Slab & Beam L134 C2

134T030043 R.C. Work - Core Outer Slab & Beam L134 C3

14

29-JUN-07

01-JUL-07

R.C. Work - Core Outer Slab & Beam L134 C3

135T030040 R.C. Work - Slab L135 C

16

05-JUL-07

07-JUL-07

R.C. Work - Slab L135 C

135T030041 R.C. Work - Core Outer Slab & Beam L135 C1

10-JUL-07

12-JUL-07

R.C. Work - Core Outer Slab & Beam L135 C1

135T030042 R.C. Work - Core Outer Slab & Beam L135 C2

10

10-JUL-07

12-JUL-07

R.C. Work - Core Outer Slab & Beam L135 C2

135T030043 R.C. Work - Core Outer Slab & Beam L135 C3

12-JUL-07

14-JUL-07

R.C. Work - Core Outer Slab & Beam L135 C3

136T030040 R.C. Work - Slab L136 C

17-JUL-07

19-JUL-07

R.C. Work - Slab L136 C

136T030041 R.C. Work - Core Outer Slab & Beam L136 C1

15-JUL-07

17-JUL-07

R.C. Work - Core Outer Slab & Beam L136 C1

136T030042 R.C. Work - Core Outer Slab & Beam L136 C2

15-JUL-07

17-JUL-07

R.C. Work - Core Outer Slab & Beam L136 C2

136T030043 R.C. Work - Core Outer Slab & Beam L136 C3

17-JUL-07

19-JUL-07

R.C. Work - Core Outer Slab & Beam L136 C3

137T030040 R.C. Work - Slab L137 C

21-JUL-07

25-JUL-07

R.C. Work - Slab L137 C

137T030041 R.C. Work - Core Outer Slab & Beam L137 C1

24-JUL-07

26-JUL-07

R.C. Work - Core Outer Slab & Beam L137 C1

137T030042 R.C. Work - Core Outer Slab & Beam L137 C2

24-JUL-07

26-JUL-07

R.C. Work - Core Outer Slab & Beam L137 C2

137T030043 R.C. Work - Core Outer Slab & Beam L137 C3

26-JUL-07

28-JUL-07

R.C. Work - Core Outer Slab & Beam L137 C3

138T030040 R.C. Work - Slab L138 C

29-JUL-07

02-AUG-07

R.C. Work - Slab L138 C

138T030041 R.C. Work - Core Outer Slab & Beam L138 C1

27-JUL-07

29-JUL-07

R.C. Work - Core Outer Slab & Beam L138 C1

138T030042 R.C. Work - Core Outer Slab & Beam L138 C2

27-JUL-07

29-JUL-07

R.C. Work - Core Outer Slab & Beam L138 C2

138T030043 R.C. Work - Core Outer Slab & Beam L138 C3

29-JUL-07

01-AUG-07

R.C. Work - Core Outer Slab & Beam L138 C3

139T030040 R.C. Work - Slab L139 C

03-AUG-07

08-AUG-07

R.C. Work - Slab L139 C

139T030041 R.C. Work - Core Outer Slab & Beam L139 C1

-2

04-AUG-07

07-AUG-07

R.C. Work - Core Outer Slab & Beam L139 C1

139T030042 R.C. Work - Core Outer Slab & Beam L139 C2

04-AUG-07

07-AUG-07

R.C. Work - Core Outer Slab & Beam L139 C2

139T030043 R.C. Work - Core Outer Slab & Beam L139 C3

07-AUG-07

09-AUG-07

R.C. Work - Core Outer Slab & Beam L139 C3

140T030040 R.C. Work - Slab L140 C

10-AUG-07

14-AUG-07

R.C. Work - Slab L140 C

140T030041 R.C. Work - Core Outer Slab L140 C1

08-AUG-07

10-AUG-07

R.C. Work - Core Outer Slab L140 C1

140T030042 R.C. Work - Core Outer Slab L140 C2

08-AUG-07

10-AUG-07

R.C. Work - Core Outer Slab L140 C2

140T030043 R.C. Work - Core Outer Slab L140 C3

10-AUG-07

12-AUG-07

R.C. Work - Core Outer Slab L140 C3

141T030040 R.C. Work - Slab L141 C

15-AUG-07

19-AUG-07

R.C. Work - Slab L141 C

141T030041 R.C. Work - Core Outer Slab & Beam L141 C1

15-AUG-07

17-AUG-07

R.C. Work - Core Outer Slab & Beam L141 C1

141T030042 R.C. Work - Core Outer Slab & Beam L141 C2

-1

15-AUG-07

17-AUG-07

R.C. Work - Core Outer Slab & Beam L141 C2

141T030043 R.C. Work - Core Outer Slab & Beam L141 C3

-1

17-AUG-07

19-AUG-07

R.C. Work - Core Outer Slab & Beam L141 C3

142T030040 R.C. Work - Slab L142 C

66

21-AUG-07

25-AUG-07

R.C. Work - Slab L142 C

142T030041 R.C. Work - Core Outer Slab & Beam L142 C1

18-AUG-07

21-AUG-07

R.C. Work - Core Outer Slab & Beam L142 C1

142T030042 R.C. Work - Core Outer Slab & Beam L142 C2

18-AUG-07

21-AUG-07

R.C. Work - Core Outer Slab & Beam L142 C2

142T030043 R.C. Work - Core Outer Slab & Beam L142 C3

21-AUG-07

23-AUG-07

R.C. Work - Core Outer Slab & Beam L142 C3

143T030040 R.C. Work - Slab L143 C

66

26-AUG-07

31-AUG-07

R.C. Work - Slab L143 C

143T030041 R.C. Work - Core Outer Slab & Beam L143 C1

26-AUG-07

29-AUG-07

R.C. Work - Core Outer Slab & Beam L143 C1

143T030042 R.C. Work - Core Outer Slab & Beam L143 C2

26-AUG-07

29-AUG-07

R.C. Work - Core Outer Slab & Beam L143 C2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 54 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. Work - Core Outer Slab & Beam L143 C3

143T030043 R.C. Work - Core Outer Slab & Beam L143 C3

29-AUG-07

31-AUG-07

144T030040 R.C. Work - Slab L144 C

66

01-SEP-07

06-SEP-07

R.C. Work - Slab L144 C

144T030041 R.C. Work - Core Outer Slab & Beam L144 C1

30-AUG-07

01-SEP-07

R.C. Work - Core Outer Slab & Beam L144 C1

144T030042 R.C. Work - Core Outer Slab & Beam L144 C2

30-AUG-07

01-SEP-07

R.C. Work - Core Outer Slab & Beam L144 C2

144T030043 R.C. Work - Core Outer Slab & Beam L144 C3

01-SEP-07

04-SEP-07

R.C. Work - Core Outer Slab & Beam L144 C3

145T030040 R.C. Work - Slab L145 C

66

07-SEP-07

11-SEP-07

R.C. Work - Slab L145 C

145T030041 R.C. Work - Core Outer Slab & Beam L145 C1

07-SEP-07

09-SEP-07

R.C. Work - Core Outer Slab & Beam L145 C1

145T030042 R.C. Work - Core Outer Slab & Beam L145 C2

-1

07-SEP-07

09-SEP-07

R.C. Work - Core Outer Slab & Beam L145 C2

146T030040 R.C. Work - Slab L146 C

66

13-SEP-07

17-SEP-07

R.C. Work - Slab L146 C

146T030041 R.C. Work - Core Outer Slab & Beam L146 C1

10-SEP-07

13-SEP-07

R.C. Work - Core Outer Slab & Beam L146 C1

146T030042 R.C. Work - Core Outer Slab & Beam L146 C2

10-SEP-07

13-SEP-07

R.C. Work - Core Outer Slab & Beam L146 C2

147T030040 R.C. Work - Slab L147 C

62

17-SEP-07

21-SEP-07

R.C. Work - Slab L147 C

147T030041 R.C. Work - Core Outer Slab L147 C1

73

18-SEP-07

20-SEP-07

R.C. Work - Core Outer Slab L147 C1

147T030042 R.C. Work - Core Outer Slab L147 C2

18-SEP-07

20-SEP-07

R.C. Work - Core Outer Slab L147 C2

148T030040 R.C. Work - Slab L148 C

61

23-SEP-07

28-SEP-07

R.C. Work - Slab L148 C

148T030041 R.C. Work - Core Outer Slab L148 C1

73

21-SEP-07

23-SEP-07

R.C. Work - Core Outer Slab L148 C1

148T030042 R.C. Work - Core Outer Slab L148 C2

21-SEP-07

23-SEP-07

R.C. Work - Core Outer Slab L148 C2

149T030040 R.C. Work - Slab L149 C

61

29-SEP-07

03-OCT-07

R.C. Work - Slab L149 C

149T030041 R.C. Work - Core Outer Slab L149 C1

69

29-SEP-07

01-OCT-07

R.C. Work - Core Outer Slab L149 C1

150T030040 R.C. Work - Slab L150 C

61

04-OCT-07

08-OCT-07

R.C. Work - Slab L150 C

150T030041 R.C. Work - Core Outer Slab L150 C1

69

02-OCT-07

04-OCT-07

R.C. Work - Core Outer Slab L150 C1

151T030040 R.C. Work - Slab L151 C

59

12-OCT-07

16-OCT-07

R.C. Work - Slab L151 C

151T030041 R.C. Work - Core Outer Slab L151 C1

58

17-OCT-07

19-OCT-07

R.C. Work - Core Outer Slab L151 C1

152T030040 R.C. Work - Slab L152 C

46

03-NOV-07

09-NOV-07

152T030041 R.C. Work - Core Outer Slab L152 C1

58

20-OCT-07

23-OCT-07

153T030040 R.C. Work - Slab L153 C

46

10-NOV-07

17-NOV-07

154T030040 R.C. Work - Slab L154 C

40

26-NOV-07

01-DEC-07

154T03004A R.C. Work - Core Wall & Link Beam L154 C-1

-1

09-OCT-07

16-OCT-07

155T030040 R.C. Work - Slab L155 C

40

03-DEC-07

07-DEC-07

155T030041 R.C. Work - Slab L155 Mezz. C

40

15-DEC-07

19-DEC-07

155T03004A R.C. Work - Core Wall & Link Beam L155 C-1

20-OCT-07

28-OCT-07

R.C. Work - Slab L152 C


R.C. Work - Core Outer Slab L152 C1
R.C. Work - Slab L153 C
R.C. Work - Slab L154 C
R.C. Work - Core Wall & Link Beam L154 C-1
R.C. Work - Slab L155 C
R.C. Work - Slab L155 Mezz. C
R.C. Work - Core Wall & Link Beam L155 C-1
R.C. Work - Slab L156 C

156T030040 R.C. Work - Slab L156 C

40

27-DEC-07

02-JAN-08

156T03004A Dismantle Core Form (Inner Form)

-3

06-NOV-07

16-NOV-07

154T03005A R.C. Work - Core Wall & Link Beam L154 C-2

-2

11-OCT-07

17-OCT-07

155T03005A R.C. Work - Core Wall & Link Beam L155 C-2

-2

25-OCT-07

02-NOV-07

076T030060 R.C. Work - Stairs T09-10 L76 C

100

26-DEC-06A

04-JAN-07A

077T030060 R.C. Work - Stairs T09-10 L77 C

100

05-JAN-07A

17-JAN-07A

R.C. Work - Stairs T09-10 L77 C

078T030060 R.C. Work - Stairs T09-10 L78 C

100

12-JAN-07A

21-JAN-07A

R.C. Work - Stairs T09-10 L78 C

079T030060 R.C. Work - Stairs T09-10 L79 C

100

22-JAN-07A

25-JAN-07A

R.C. Work - Stairs T09-10 L79 C

080T030060 R.C. Work - Stairs T09-10 L80 C

100

26-JAN-07A

29-JAN-07A

R.C. Work - Stairs T09-10 L80 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Dismantle Core Form (Inner Form)


R.C. Work - Core Wall & Link Beam L154 C-2
R.C. Work - Core Wall & Link Beam L155 C-2
R.C. Work - Stairs T09-10 L76 C

Sheet 55 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

081T030060 R.C. Work - Stairs T09-10 L81 C

100

30-JAN-07A

30-JAN-07A

R.C. Work - Stairs T09-10 L81 C

082T030060 R.C. Work - Stairs T09-10 L82 C

100

03-FEB-07A

05-FEB-07A

R.C. Work - Stairs T09-10 L82 C

083T030060 R.C. Work - Stairs T09-10 L83 C

100

03-FEB-07A

07-FEB-07A

R.C. Work - Stairs T09-10 L83 C

084T030060 R.C. Work - Stairs T09-10 L84 C

100

08-FEB-07A

10-FEB-07A

R.C. Work - Stairs T09-10 L84 C

085T030060 R.C. Work - Stairs T09-10 L85 C

100

07-FEB-07A

13-FEB-07A

R.C. Work - Stairs T09-10 L85 C

086T030060 R.C. Work - Stairs T09-10 L86 C

100

09-FEB-07A

15-FEB-07A

R.C. Work - Stairs T09-10 L86 C

087T030060 R.C. Work - Stairs T09-10 L87 C

100

12-FEB-07A

18-FEB-07A

R.C. Work - Stairs T09-10 L87 C

088T030060 R.C. Work - Stairs T09-10 L88 C

100

14-FEB-07A

20-FEB-07A

R.C. Work - Stairs T09-10 L88 C

089T030060 R.C. Work - Stairs T09-10 L89 C

100

16-FEB-07A

22-FEB-07A

R.C. Work - Stairs T09-10 L89 C

090T030060 R.C. Work - Stairs T09-10 L90 C

100

19-FEB-07A

26-FEB-07A

R.C. Work - Stairs T09-10 L90 C

091T030060 R.C. Work - Stairs T09-10 L91 C

100

22-FEB-07A

01-MAR-07A

R.C. Work - Stairs T09-10 L91 C

092T030060 R.C. Work - Stairs T09-10 L92 C

100

23-FEB-07A

04-MAR-07A

R.C. Work - Stairs T09-10 L92 C

093T030060 R.C. Work - Stairs T09-10 L93 C

100

27-FEB-07A

06-MAR-07A

R.C. Work - Stairs T09-10 L93 C

094T030060 R.C. Work - Stairs T09-10 L94 C

100

02-MAR-07A

08-MAR-07A

R.C. Work - Stairs T09-10 L94 C

095T030060 R.C. Work - Stairs T09-10 L95 C

100

07-MAR-07A

11-MAR-07A

R.C. Work - Stairs T09-10 L95 C

096T030060 R.C. Work - Stairs T09-10 L96 C

100

12-MAR-07A

13-MAR-07A

R.C. Work - Stairs T09-10 L96 C

097T030060 R.C. Work - Stairs T09-10 L97 C

67

322

14-MAR-07A

15-MAR-07

R.C. Work - Stairs T09-10 L97 C

098T030060 R.C. Work - Stairs T09-10 L98 C

322

17-MAR-07

19-MAR-07

R.C. Work - Stairs T09-10 L98 C

099T030060 R.C. Work - Stairs T09-10 L99 C

322

20-MAR-07

22-MAR-07

R.C. Work - Stairs T09-10 L99 C

100T030060 R.C. Work - Stairs T09-10 L100 C

322

23-MAR-07

25-MAR-07

R.C. Work - Stairs T09-10 L100 C

101T030060 R.C. Work - Stairs T09-10 L101 C

322

26-MAR-07

28-MAR-07

R.C. Work - Stairs T09-10 L101 C

102T030060 R.C. Work - Stairs T09-10 L102 C

322

29-MAR-07

01-APR-07

R.C. Work - Stairs T09-10 L102 C

103T030060 R.C. Work - Stairs T09-10 L103 C

322

02-APR-07

04-APR-07

R.C. Work - Stairs T09-10 L103 C

104T030060 R.C. Work - Stairs T09-10 L104 C

322

05-APR-07

07-APR-07

R.C. Work - Stairs T09-10 L104 C

105T030060 R.C. Work - Stairs T09-10 L105 C

322

08-APR-07

11-APR-07

R.C. Work - Stairs T09-10 L105 C

106T030060 R.C. Work - Stairs T09-10 L106 C

322

12-APR-07

14-APR-07

R.C. Work - Stairs T09-10 L106 C

107T030060 R.C. Work - Stairs T09-10 L107 C

322

15-APR-07

17-APR-07

R.C. Work - Stairs T09-10 L107 C

108T030060 R.C. Work - Stairs T09-10 L108 C

322

18-APR-07

20-APR-07

R.C. Work - Stairs T09-10 L108 C

109T030060 R.C. Work - Stairs T09-10 L109 C

322

21-APR-07

23-APR-07

R.C. Work - Stairs T09-10 L109 C

110T030060 R.C. Work - Stairs T09-10 L110 C

322

25-APR-07

27-APR-07

R.C. Work - Stairs T09-10 L110 C

111T030060 R.C. Work - Stairs T09-10 L111 C

322

28-APR-07

30-APR-07

R.C. Work - Stairs T09-10 L111 C

112T030060 R.C. Work - Stairs T12-13 L112 C

322

02-MAY-07

04-MAY-07

R.C. Work - Stairs T12-13 L112 C

113T030060 R.C. Work - Stairs T12-13 L113 C

322

05-MAY-07

07-MAY-07

R.C. Work - Stairs T12-13 L113 C

114T030060 R.C. Work - Stairs T12-13 L114 C

322

08-MAY-07

10-MAY-07

R.C. Work - Stairs T12-13 L114 C

115T030060 R.C. Work - Stairs T12-13 L115 C

322

12-MAY-07

14-MAY-07

R.C. Work - Stairs T12-13 L115 C

116T030060 R.C. Work - Stairs T12-13 L116 C

322

15-MAY-07

17-MAY-07

R.C. Work - Stairs T12-13 L116 C

117T030060 R.C. Work - Stairs T12-13 L117 C

322

18-MAY-07

20-MAY-07

R.C. Work - Stairs T12-13 L117 C

118T030060 R.C. Work - Stairs T12-13 L118 C

322

21-MAY-07

23-MAY-07

R.C. Work - Stairs T12-13 L118 C

119T030060 R.C. Work - Stairs T12-13 L119 C

322

24-MAY-07

27-MAY-07

R.C. Work - Stairs T12-13 L119 C

120T030060 R.C. Work - Stairs T12-13 L120 C

322

28-MAY-07

30-MAY-07

R.C. Work - Stairs T12-13 L120 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 56 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

121T030060 R.C. Work - Stairs T12-13 L121 C

322

31-MAY-07

02-JUN-07

R.C. Work - Stairs T12-13 L121 C

122T030060 R.C. Work - Stairs T12-13 L122 C

322

03-JUN-07

06-JUN-07

R.C. Work - Stairs T12-13 L122 C

123T030060 R.C. Work - Stairs T12-13 L123 C

322

07-JUN-07

09-JUN-07

R.C. Work - Stairs T12-13 L123 C

124T030060 R.C. Work - Stairs T12-13 L124 C

322

10-JUN-07

13-JUN-07

R.C. Work - Stairs T12-13 L124 C

125T030060 R.C. Work - Stairs T12-13 L125 C

322

14-JUN-07

16-JUN-07

R.C. Work - Stairs T12-13 L125 C

126T030060 R.C. Work - Stairs T12-13 L126 C

322

17-JUN-07

20-JUN-07

R.C. Work - Stairs T12-13 L126 C

127T030060 R.C. Work - Stairs T12-13 L127 C

322

21-JUN-07

23-JUN-07

R.C. Work - Stairs T12-13 L127 C

128T030060 R.C. Work - Stairs T12-13 L128 C

322

24-JUN-07

27-JUN-07

R.C. Work - Stairs T12-13 L128 C

129T030060 R.C. Work - Stairs T12-13 L129 C

322

28-JUN-07

30-JUN-07

R.C. Work - Stairs T12-13 L129 C

130T030060 R.C. Work - Stairs T12-13 L130 C

322

01-JUL-07

04-JUL-07

R.C. Work - Stairs T12-13 L130 C

131T030060 R.C. Work - Stairs T12-13 L131 C

322

05-JUL-07

07-JUL-07

R.C. Work - Stairs T12-13 L131 C

132T030060 R.C. Work - Stairs T12-13 L132 C

322

08-JUL-07

11-JUL-07

R.C. Work - Stairs T12-13 L132 C

133T030060 R.C. Work - Stairs T12-13 L133 C

322

12-JUL-07

14-JUL-07

R.C. Work - Stairs T12-13 L133 C

134T030060 R.C. Work - Stairs T12-13 L134 C

322

15-JUL-07

17-JUL-07

R.C. Work - Stairs T12-13 L134 C

135T030060 R.C. Work - Stairs T12-13 L135 C

320

20-JUL-07

22-JUL-07

R.C. Work - Stairs T12-13 L135 C

136T030060 R.C. Work - Stairs T12-13 L136 C

318

26-JUL-07

28-JUL-07

R.C. Work - Stairs T12-13 L136 C

137T030060 R.C. Work - Stairs T12-13 L137 C

314

03-AUG-07

07-AUG-07

R.C. Work - Stairs T12-13 L137 C

138T030060 R.C. Work - Stairs T16-17 L138 C

313

09-AUG-07

12-AUG-07

R.C. Work - Stairs T16-17 L138 C

139T030060 R.C. Work - Stairs T16-17 L139 C

311

15-AUG-07

18-AUG-07

R.C. Work - Stairs T16-17 L139 C

140T030060 R.C. Work - Stairs T16-17 L140 C

310

21-AUG-07

24-AUG-07

R.C. Work - Stairs T16-17 L140 C

141T030060 R.C. Work - Stairs T16-17 L141 C

309

26-AUG-07

31-AUG-07

R.C. Work - Stairs T16-17 L141 C

142T030060 R.C. Work - Stairs T16-17 L142 C

309

01-SEP-07

07-SEP-07

R.C. Work - Stairs T16-17 L142 C

143T030060 R.C. Work - Stairs T16-17 L143 C

309

08-SEP-07

11-SEP-07

R.C. Work - Stairs T16-17 L143 C

144T030060 R.C. Work - Stairs T16-17 L144 C

309

13-SEP-07

18-SEP-07

R.C. Work - Stairs T16-17 L144 C

145T030060 R.C. Work - Stairs T16-17 L145 C

309

19-SEP-07

24-SEP-07

R.C. Work - Stairs T16-17 L145 C

146T030060 R.C. Work - Stairs T16-17 L146 C

309

25-SEP-07

01-OCT-07

R.C. Work - Stairs T16-17 L146 C

147T030060 R.C. Work - Stairs T16-17 L147 C

309

02-OCT-07

07-OCT-07

R.C. Work - Stairs T16-17 L147 C

148T030060 R.C. Work - Stairs T16-17 L148 C

309

08-OCT-07

12-OCT-07

R.C. Work - Stairs T16-17 L148 C

149T030060 R.C. Work - Stairs T16-17 L149 C

309

13-OCT-07

16-OCT-07

R.C. Work - Stairs T16-17 L149 C

150T030060 R.C. Work - Stairs T16-17 L150 C

309

17-OCT-07

20-OCT-07

R.C. Work - Stairs T16-17 L150 C

151T030060 R.C. Work - Stairs T16-17 L151 C

295

10-NOV-07

16-NOV-07

R.C. Work - Stairs T16-17 L151 C

152T030060 R.C. Work - Stairs T16-17 L152 C

294

18-NOV-07

23-NOV-07

R.C. Work - Stairs T16-17 L152 C

153T030060 R.C. Work - Stairs T16-17 L153 C

287

03-DEC-07

06-DEC-07

R.C. Work - Stairs T16-17 L153 C

154T030060 R.C. Work - Stairs T16-17 L154 C

286

08-DEC-07

11-DEC-07

R.C. Work - Stairs T16-17 L154 C

155T030060 R.C. Work - Stairs T16-17 L155 C

266

03-JAN-08

06-JAN-08

155T03006A R.C. Work - Core Wall & Link Beam L155 C-3

-1

23-OCT-07

01-NOV-07

156T030060 R.C. Work - Stairs T16-17 L156 C

266

07-JAN-08

10-JAN-08

157T030060 R.C. Work - Stairs T16-17 L157 C

257

20-JAN-08

23-JAN-08

158T030060 R.C. Work - Stairs T16-17 L158 C

246

07-FEB-08

10-FEB-08

159T030060 R.C. Work - Stairs T16-17 L159 C

217

12-MAR-08

16-MAR-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Stairs T16-17 L155 C


R.C. Work - Core Wall & Link Beam L155 C-3
R.C. Work - Stairs T16-17 L156 C
R.C. Work - Stairs T16-17 L157 C
R.C. Work - Stairs T16-17 L158 C
R.C. Work - Stairs T16-17 L159 C
Sheet 57 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

160T030060 R.C. Work - Stairs T16-17 L160 C

217

17-MAR-08

23-MAR-08

161T030060 Install Structural Steel Stairs L160M C

222

04-JUL-08

11-JUL-08

R.C. Work - Stairs T16-17 L160 C


Install Structural Steel Stairs L160M C

155T03007A Form Modification - C2

-2

18-OCT-07

23-OCT-07

Form Modification - C2

155T03008A R.C. Work - 950 Wall (1) L155 C

40

08-DEC-07

14-DEC-07

SOUTH WING
-01S030030 R.C. Work - Core Wall & Link Beam B2 S

R.C. Work - 950 Wall (1) L155 C


R.C. Work - Core Wall & Link Beam B2 S

18

100

12-MAY-05A

28-MAY-05A

-02S030030

R.C. Work - Core Wall & Link Beam B1 S

17

100

02-JUN-05A

12-JUL-05A

-03S030030

R.C. Work - Core Wall & Link Beam Concourse-1 S

10

100

11-JUL-05A

02-AUG-05A

-03S030031

R.C. Work - Core Wall & Link Beam Concourse-2 S

100

28-JUL-05A

14-AUG-05A

-04S030030

R.C. Work - Core Wall & Link Beam Ground S

12

100

11-AUG-05A

01-SEP-05A

R.C. Work - Core Wall & Link Beam Ground S

001S030030 R.C. Work - Core Wall & Link Beam L1 S

13

100

23-AUG-05A

13-SEP-05A

R.C. Work - Core Wall & Link Beam L1 S

002S030030 R.C. Work - Core Wall & Link Beam L2 S

11

100

08-SEP-05A

25-SEP-05A

R.C. Work - Core Wall & Link Beam L2 S

003S030030 R.C. Work - Core Wall & Link Beam L3 S

12

100

22-SEP-05A

02-OCT-05A

R.C. Work - Core Wall & Link Beam L3 S

004S030030 R.C. Work - Core Wall & Link Beam L4 S

10

100

02-OCT-05A

11-OCT-05A

R.C. Work - Core Wall & Link Beam L4 S

005S030030 R.C. Work - Core Wall & Link Beam L5 S

10

100

10-OCT-05A

19-OCT-05A

R.C. Work - Core Wall & Link Beam L5 S

006S030030 R.C. Work - Core Wall & Link Beam L6 S

11

100

18-OCT-05A

27-OCT-05A

R.C. Work - Core Wall & Link Beam L6 S

007S030030 R.C. Work - Core Wall & Link Beam L7 S

11

100

25-OCT-05A

05-NOV-05A

R.C. Work - Core Wall & Link Beam L7 S

008S030030 R.C. Work - Core Wall & Link Beam L8 S

10

100

01-NOV-05A

12-NOV-05A

R.C. Work - Core Wall & Link Beam L8 S

009S030030 R.C. Work - Core Wall & Link Beam L9 S

10

100

10-NOV-05A

22-NOV-05A

R.C. Work - Core Wall & Link Beam L9 S

010S030030 R.C. Work - Core Wall & Link Beam L10 S

100

22-NOV-05A

29-NOV-05A

R.C. Work - Core Wall & Link Beam L10 S

011S030030 R.C. Work - Core Wall & Link Beam L11 S

100

27-NOV-05A

05-DEC-05A

R.C. Work - Core Wall & Link Beam L11 S

012S030030 R.C. Work - Core Wall & Link Beam L12 S

100

03-DEC-05A

11-DEC-05A

R.C. Work - Core Wall & Link Beam L12 S

013S030030 R.C. Work - Core Wall & Link Beam L13 S

100

08-DEC-05A

15-DEC-05A

R.C. Work - Core Wall & Link Beam L13 S

014S030030 R.C. Work - Core Wall & Link Beam L14 S

100

16-DEC-05A

22-DEC-05A

R.C. Work - Core Wall & Link Beam L14 S

015S030030 R.C. Work - Core Wall & Link Beam L15 S

100

21-DEC-05A

28-DEC-05A

R.C. Work - Core Wall & Link Beam L15 S

016S030030 R.C. Work - Core Wall & Link Beam L16 S

12

100

27-DEC-05A

12-JAN-06A

016S030031 R.C. Work - Core Wall & Link Beam L16~L17 S

16

100

13-JAN-06A

07-FEB-06A

017S030030 R.C. Work - Core Wall & Link Beam L17~L18 S

11

100

08-FEB-06A

20-FEB-06A

018S030030 R.C. Work - Core Wall & Link Beam L18 S

13

100

16-FEB-06A

07-MAR-06A

019S030030 R.C. Work - Core Wall & Link Beam L19 S

100

03-MAR-06A

20-MAR-06A

R.C. Work - Core Wall & Link Beam L19 S

020S030030 R.C. Work - Core Wall & Link Beam L20 S

100

13-MAR-06A

27-MAR-06A

R.C. Work - Core Wall & Link Beam L20 S

021S030030 R.C. Work - Core Wall & Link Beam L21 S

100

23-MAR-06A

01-APR-06A

R.C. Work - Core Wall & Link Beam L21 S

022S030030 R.C. Work - Core Wall & Link Beam L22 S

100

29-MAR-06A

06-APR-06A

R.C. Work - Core Wall & Link Beam L22 S

023S030030 R.C. Work - Core Wall & Link Beam L23 S

100

05-APR-06A

13-APR-06A

R.C. Work - Core Wall & Link Beam L23 S

024S030030 R.C. Work - Core Wall & Link Beam L24 S

100

10-APR-06A

18-APR-06A

R.C. Work - Core Wall & Link Beam L24 S

025S030030 R.C. Work - Core Wall & Link Beam L25 S

100

17-APR-06A

24-APR-06A

R.C. Work - Core Wall & Link Beam L25 S

026S030030 R.C. Work - Core Wall & Link Beam L26 S

100

23-APR-06A

02-MAY-06A

R.C. Work - Core Wall & Link Beam L26 S

027S030030 R.C. Work - Core Wall & Link Beam L27 S

100

27-APR-06A

06-MAY-06A

R.C. Work - Core Wall & Link Beam L27 S

028S030030 R.C. Work - Core Wall & Link Beam L28 S

100

04-MAY-06A

10-MAY-06A

R.C. Work - Core Wall & Link Beam L28 S

029S030030 R.C. Work - Core Wall & Link Beam L29 S

100

10-MAY-06A

18-MAY-06A

R.C. Work - Core Wall & Link Beam L29 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Core Wall & Link Beam B1 S


R.C. Work - Core Wall & Link Beam Concourse-1 S
R.C. Work - Core Wall & Link Beam Concourse-2 S

R.C. Work - Core Wall & Link Beam L16 S


R.C. Work - Core Wall & Link Beam L16~L17 S
R.C. Work - Core Wall & Link Beam L17~L18 S
R.C. Work - Core Wall & Link Beam L18 S

Sheet 58 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

030S030030 R.C. Work - Core Wall & Link Beam L30 S

100

16-MAY-06A

23-MAY-06A

R.C. Work - Core Wall & Link Beam L30 S

031S030030 R.C. Work - Core Wall & Link Beam L31 S

100

23-MAY-06A

28-MAY-06A

R.C. Work - Core Wall & Link Beam L31 S

032S030030 R.C. Work - Core Wall & Link Beam L32 S

100

26-MAY-06A

31-MAY-06A

R.C. Work - Core Wall & Link Beam L32 S

033S030030 R.C. Work - Core Wall & Link Beam L33 S

100

31-MAY-06A

10-JUN-06A

R.C. Work - Core Wall & Link Beam L33 S

034S030030 R.C. Work - Core Wall & Link Beam L34 S

100

08-JUN-06A

14-JUN-06A

R.C. Work - Core Wall & Link Beam L34 S

035S030030 R.C. Work - Core Wall & Link Beam L35 S

100

13-JUN-06A

18-JUN-06A

R.C. Work - Core Wall & Link Beam L35 S

036S030030 R.C. Work - Core Wall & Link Beam L36 S

100

18-JUN-06A

22-JUN-06A

R.C. Work - Core Wall & Link Beam L36 S

037S030030 R.C. Work - Core Wall & Link Beam L37 S

100

23-JUN-06A

28-JUN-06A

R.C. Work - Core Wall & Link Beam L37 S

038S030030 R.C. Work - Core Wall & Link Beam L38 S

100

27-JUN-06A

05-JUL-06A

R.C. Work - Core Wall & Link Beam L38 S

039S030030 R.C. Work - Core Wall & Link Beam L39 S

100

04-JUL-06A

09-JUL-06A

R.C. Work - Core Wall & Link Beam L39 S

040S030030 R.C. Work - Core Wall & Link Beam L40 S

100

09-JUL-06A

20-JUL-06A

R.C. Work - Core Wall & Link Beam L40 S

041S030030 R.C. Work - Core Wall & Link Beam L41 S

100

18-JUL-06A

27-JUL-06A

R.C. Work - Core Wall & Link Beam L41 S

042S030030 R.C. Work - Core Wall & Link Beam L42 S

100

25-JUL-06A

02-AUG-06A

R.C. Work - Core Wall & Link Beam L42 S

043S030030 R.C. Work - Core Wall & Link Beam L43 S

100

02-AUG-06A

06-AUG-06A

R.C. Work - Core Wall & Link Beam L43 S

044S030030 R.C. Work - Core Wall & Link Beam L44 S

100

04-AUG-06A

16-AUG-06A

R.C. Work - Core Wall & Link Beam L44 S

045S030030 R.C. Work - Core Wall & Link Beam L45 S

100

09-AUG-06A

19-AUG-06A

R.C. Work - Core Wall & Link Beam L45 S

046S030030 R.C. Work - Core Wall & Link Beam L46 S

100

17-AUG-06A

26-AUG-06A

R.C. Work - Core Wall & Link Beam L46 S

047S030030 R.C. Work - Core Wall & Link Beam L47 S

100

22-AUG-06A

29-AUG-06A

R.C. Work - Core Wall & Link Beam L47 S

048S030030 R.C. Work - Core Wall & Link Beam L48 S

100

29-AUG-06A

02-SEP-06A

R.C. Work - Core Wall & Link Beam L48 S

049S030030 R.C. Work - Core Wall & Link Beam L49 S

100

31-AUG-06A

10-SEP-06A

R.C. Work - Core Wall & Link Beam L49 S

050S030030 R.C. Work - Core Wall & Link Beam L50 S

100

10-SEP-06A

14-SEP-06A

R.C. Work - Core Wall & Link Beam L50 S

051S030030 R.C. Work - Core Wall & Link Beam L51 S

100

15-SEP-06A

19-SEP-06A

R.C. Work - Core Wall & Link Beam L51 S

052S030030 R.C. Work - Core Wall & Link Beam L52 S

100

20-SEP-06A

24-SEP-06A

R.C. Work - Core Wall & Link Beam L52 S

053S030030 R.C. Work - Core Wall & Link Beam L53 S

100

26-SEP-06A

27-SEP-06A

R.C. Work - Core Wall & Link Beam L53 S

054S030030 R.C. Work - Core Wall & Link Beam L54 S

100

28-SEP-06A

01-OCT-06A

R.C. Work - Core Wall & Link Beam L54 S

055S030030 R.C. Work - Core Wall & Link Beam L55 S

100

02-OCT-06A

04-OCT-06A

R.C. Work - Core Wall & Link Beam L55 S

056S030030 R.C. Work - Core Wall & Link Beam L56 S

100

05-OCT-06A

08-OCT-06A

R.C. Work - Core Wall & Link Beam L56 S

057S030030 R.C. Work - Core Wall & Link Beam L57 S

100

10-OCT-06A

11-OCT-06A

R.C. Work - Core Wall & Link Beam L57 S

058S030030 R.C. Work - Core Wall & Link Beam L58 S

100

12-OCT-06A

15-OCT-06A

R.C. Work - Core Wall & Link Beam L58 S

059S030030 R.C. Work - Core Wall & Link Beam L59 S

100

16-OCT-06A

17-OCT-06A

R.C. Work - Core Wall & Link Beam L59 S

060S030030 R.C. Work - Core Wall & Link Beam L60 S

100

19-OCT-06A

21-OCT-06A

R.C. Work - Core Wall & Link Beam L60 S

061S030030 R.C. Work - Core Wall & Link Beam L61 S

100

22-OCT-06A

26-OCT-06A

R.C. Work - Core Wall & Link Beam L61 S

062S030030 R.C. Work - Core Wall & Link Beam L62 S

100

27-OCT-06A

29-OCT-06A

R.C. Work - Core Wall & Link Beam L62 S

063S030030 R.C. Work - Core Wall & Link Beam L63 S

100

31-OCT-06A

05-NOV-06A

R.C. Work - Core Wall & Link Beam L63 S

064S030030 R.C. Work - Core Wall & Link Beam L64 S

11

100

06-NOV-06A

07-NOV-06A

R.C. Work - Core Wall & Link Beam L64 S

065S030030 R.C. Work - Core Wall & Link Beam L65 S

100

08-NOV-06A

11-NOV-06A

R.C. Work - Core Wall & Link Beam L65 S

066S030030 R.C. Work - Core Wall & Link Beam L66 S

100

12-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L66 S

067S030030 R.C. Work - Core Wall & Link Beam L67 S

100

16-NOV-06A

16-NOV-06A

R.C. Work - Core Wall & Link Beam L67 S

068S030030 R.C. Work - Core Wall & Link Beam L68 S

100

17-NOV-06A

19-NOV-06A

R.C. Work - Core Wall & Link Beam L68 S

069S030030 R.C. Work - Core Wall & Link Beam L69 S

100

20-NOV-06A

21-NOV-06A

R.C. Work - Core Wall & Link Beam L69 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 59 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

070S030030 R.C. Work - Core Wall & Link Beam L70 S

100

22-NOV-06A

23-NOV-06A

R.C. Work - Core Wall & Link Beam L70 S

071S030030 R.C. Work - Core Wall & Link Beam L71 S

100

24-NOV-06A

27-NOV-06A

R.C. Work - Core Wall & Link Beam L71 S

072S030030 R.C. Work - Core Wall & Link Beam L72 S

100

28-NOV-06A

29-NOV-06A

R.C. Work - Core Wall & Link Beam L72 S

073S030030 R.C. Work - Core Wall & Link Beam L73 S

100

30-NOV-06A

10-DEC-06A

R.C. Work - Core Wall & Link Beam L73 S

074S030030 R.C. Work - Core Wall & Link Beam L74 S

100

11-DEC-06A

14-DEC-06A

R.C. Work - Core Wall & Link Beam L74 S

075S030030 R.C. Work - Core Wall & Link Beam L75 S

100

15-DEC-06A

20-DEC-06A

R.C. Work - Core Wall & Link Beam L75 S

076S030030 R.C. Work - Core Wall & Link Beam L76 S

100

21-DEC-06A

23-DEC-06A

R.C. Work - Core Wall & Link Beam L76 S

077S030030 R.C. Work - Core Wall & Link Beam L77 S

100

24-DEC-06A

26-DEC-06A

R.C. Work - Core Wall & Link Beam L77 S

078S030030 R.C. Work - Core Wall & Link Beam L78 S

100

27-DEC-06A

28-DEC-06A

R.C. Work - Core Wall & Link Beam L78 S

079S030030 R.C. Work - Core Wall & Link Beam L79 S

100

29-DEC-06A

02-JAN-07A

R.C. Work - Core Wall & Link Beam L79 S

080S030030 R.C. Work - Core Wall & Link Beam L80 S

100

04-JAN-07A

06-JAN-07A

R.C. Work - Core Wall & Link Beam L80 S

081S030030 R.C. Work - Core Wall & Link Beam L81 S

100

07-JAN-07A

08-JAN-07A

R.C. Work - Core Wall & Link Beam L81 S

082S030030 R.C. Work - Core Wall & Link Beam L82 S

100

09-JAN-07A

10-JAN-07A

R.C. Work - Core Wall & Link Beam L82 S

083S030030 R.C. Work - Core Wall & Link Beam L83 S

100

11-JAN-07A

14-JAN-07A

R.C. Work - Core Wall & Link Beam L83 S

084S030030 R.C. Work - Core Wall & Link Beam L84 S

100

15-JAN-07A

28-JAN-07A

R.C. Work - Core Wall & Link Beam L84 S

085S030030 R.C. Work - Core Wall & Link Beam L85 S

100

29-JAN-07A

30-JAN-07A

R.C. Work - Core Wall & Link Beam L85 S

086S030030 R.C. Work - Core Wall & Link Beam L86 S

100

03-FEB-07A

30-JAN-07A

R.C. Work - Core Wall & Link Beam L86 S

087S030030 R.C. Work - Core Wall & Link Beam L87 S

100

03-FEB-07A

04-FEB-07A

R.C. Work - Core Wall & Link Beam L87 S

088S030030 R.C. Work - Core Wall & Link Beam L88 S

100

05-FEB-07A

06-FEB-07A

R.C. Work - Core Wall & Link Beam L88 S

089S030030 R.C. Work - Core Wall & Link Beam L89 S

100

07-FEB-07A

08-FEB-07A

R.C. Work - Core Wall & Link Beam L89 S

090S030030 R.C. Work - Core Wall & Link Beam L90 S

100

09-FEB-07A

11-FEB-07A

R.C. Work - Core Wall & Link Beam L90 S

091S030030 R.C. Work - Core Wall & Link Beam L91 S

100

12-FEB-07A

13-FEB-07A

R.C. Work - Core Wall & Link Beam L91 S

092S030030 R.C. Work - Core Wall & Link Beam L92 S

100

14-FEB-07A

15-FEB-07A

R.C. Work - Core Wall & Link Beam L92 S

093S030030 R.C. Work - Core Wall & Link Beam L93 S

100

16-FEB-07A

18-FEB-07A

R.C. Work - Core Wall & Link Beam L93 S

094S030030 R.C. Work - Core Wall & Link Beam L94 S

100

19-FEB-07A

20-FEB-07A

R.C. Work - Core Wall & Link Beam L94 S

095S030030 R.C. Work - Core Wall & Link Beam L95 S

100

22-FEB-07A

26-FEB-07A

R.C. Work - Core Wall & Link Beam L95 S

096S030030 R.C. Work - Core Wall & Link Beam L96 S

100

27-FEB-07A

01-MAR-07A

R.C. Work - Core Wall & Link Beam L96 S

097S030030 R.C. Work - Core Wall & Link Beam L97 S

100

02-MAR-07A

04-MAR-07A

R.C. Work - Core Wall & Link Beam L97 S

098S030030 R.C. Work - Core Wall & Link Beam L98 S

100

05-MAR-07A

06-MAR-07A

R.C. Work - Core Wall & Link Beam L98 S

099S030030 Dismantle Core Form South Wing

14

100

07-MAR-07A

12-MAR-07A

-01S030040

R.C. Work - Slab B2 S-1

18

100

02-AUG-05A

23-AUG-05A

R.C. Work - Slab B2 S-1

-01S030041

R.C. Work - Slab B2 S-2

25

100

02-AUG-05A

28-AUG-05A

R.C. Work - Slab B2 S-2

-01S030042

R.C. Work - Slab B2 S-Nose 1

20

100

02-AUG-05A

28-AUG-05A

R.C. Work - Slab B2 S-Nose 1

-02S030040

R.C. Work - Slab B1 S-1

16

100

25-AUG-05A

17-SEP-05A

-02S030041

R.C. Work - Slab B1 S-2

16

100

28-AUG-05A

28-SEP-05A

R.C. Work - Slab B1 S-2

-02S030042

R.C. Work - Slab B1 S-Nose 1

16

100

28-AUG-05A

28-SEP-05A

R.C. Work - Slab B1 S-Nose 1

-03S030040

R.C. Work - Slab Concourse S-1

18

100

18-SEP-05A

11-OCT-05A

R.C. Work - Slab Concourse S-1

-03S030041

R.C. Work - Slab Concourse S-2

15

100

29-SEP-05A

19-OCT-05A

R.C. Work - Slab Concourse S-2

-03S030042

R.C. Work - Slab Concourse S-Nose 1

18

100

29-SEP-05A

06-NOV-05A

R.C. Work - Slab Concourse S-Nose 1

-04S030040

R.C. Work - Slab Ground S-1

19

100

11-FEB-06A

25-MAR-06A

R.C. Work - Slab Ground S-1

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Dismantle Core Form South Wing

R.C. Work - Slab B1 S-1

Sheet 60 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

-04S030041

R.C. Work - Slab Ground S-2

19

100

11-FEB-06A

25-MAR-06A

R.C. Work - Slab Ground S-2

-04S030042

R.C. Work - Slab Ground S-Nose 1

19

100

08-NOV-05A

18-DEC-05A

R.C. Work - Slab Ground S-Nose 1

001S030040 R.C. Work - Slab L1 S-1

12

100

13-OCT-05A

23-OCT-05A

001S030041 R.C. Work - Slab L1 S-2

10

100

13-OCT-05A

10-NOV-05A

001S030042 R.C. Work - Slab L1 S-Nose 1

12

100

19-DEC-05A

09-JAN-06A

R.C. Work - Slab L1 S-Nose 1

002S030040 R.C. Work - Slab L2 S-1

15

100

26-MAR-06A

17-APR-06A

R.C. Work - Slab L2 S-1

002S030041 R.C. Work - Slab L2 S-2

15

100

31-MAR-06A

24-APR-06A

R.C. Work - Slab L2 S-2

002S030042 R.C. Work - Slab L2 S-Nose 1

15

100

10-JAN-06A

22-JAN-06A

R.C. Work - Slab L2 S-Nose 1

003S030040 R.C. Work - Slab L3 S-1

14

100

30-OCT-05A

20-NOV-05A

R.C. Work - Slab L3 S-1

003S030041 R.C. Work - Slab L3 S-2

10

100

01-NOV-05A

21-NOV-05A

R.C. Work - Slab L3 S-2

003S030042 R.C. Work - Slab L3 S-Nose 1

14

100

23-JAN-06A

04-FEB-06A

004S030040 R.C. Work - Slab L4 S-1

14

100

21-NOV-05A

03-DEC-05A

R.C. Work - Slab L4 S-1

004S030041 R.C. Work - Slab L4 S-2

14

100

22-NOV-05A

06-DEC-05A

R.C. Work - Slab L4 S-2

004S030042 R.C. Work - Slab L4 S-Nose 1

14

100

05-FEB-06A

18-FEB-06A

005S030040 R.C. Work - Slab L5 S-1

12

100

06-DEC-05A

24-DEC-05A

R.C. Work - Slab L5 S-1

005S030041 R.C. Work - Slab L5 S-2

26

100

04-DEC-05A

17-DEC-05A

R.C. Work - Slab L5 S-2

005S030042 R.C. Work - Slab L5 S-Nose 1

12

100

19-FEB-06A

28-FEB-06A

006S030040 R.C. Work - Slab L6 S-1

100

21-DEC-05A

29-DEC-05A

R.C. Work - Slab L6 S-1

006S030041 R.C. Work - Slab L6 S-2

100

18-DEC-05A

25-DEC-05A

R.C. Work - Slab L6 S-2

006S030042 R.C. Work - Slab L6 S-Nose 1

100

28-FEB-06A

07-MAR-06A

007S030040 R.C. Work - Slab L7 S-1

100

02-JAN-06A

09-JAN-06A

R.C. Work - Slab L7 S-1

007S030041 R.C. Work - Slab L7 S-2

100

26-DEC-05A

30-DEC-05A

R.C. Work - Slab L7 S-2

007S030042 R.C. Work - Slab L7 S-Nose 1

100

08-MAR-06A

15-MAR-06A

008S030040 R.C. Work - Slab L8 S-1

100

08-JAN-06A

15-JAN-06A

R.C. Work - Slab L8 S-1

008S030041 R.C. Work - Slab L8 S-2

100

02-JAN-06A

12-JAN-06A

R.C. Work - Slab L8 S-2

008S030042 R.C. Work - Slab L8 S-Nose 1

100

17-MAR-06A

22-MAR-06A

009S030040 R.C. Work - Slab L9 S-1

100

16-JAN-06A

22-JAN-06A

R.C. Work - Slab L9 S-1

009S030041 R.C. Work - Slab L9 S-2

100

13-JAN-06A

19-JAN-06A

R.C. Work - Slab L9 S-2

009S030042 R.C. Work - Slab L9 S-Nose 1

100

23-MAR-06A

28-MAR-06A

010S030040 R.C. Work - Slab L10 S-1

100

23-JAN-06A

26-JAN-06A

R.C. Work - Slab L10 S-1

010S030041 R.C. Work - Slab L10 S-2

100

20-JAN-06A

24-JAN-06A

R.C. Work - Slab L10 S-2

010S030042 R.C. Work - Slab L10 S-Nose 1

100

29-MAR-06A

02-APR-06A

011S030040 R.C. Work - Slab L11 S-1

100

27-JAN-06A

05-FEB-06A

R.C. Work - Slab L11 S-1

011S030041 R.C. Work - Slab L11 S-2

100

25-JAN-06A

30-JAN-06A

R.C. Work - Slab L11 S-2

011S030042 R.C. Work - Slab L11 S-Nose 1

100

03-APR-06A

06-APR-06A

012S030040 R.C. Work - Slab L12 S-1

100

06-FEB-06A

09-FEB-06A

R.C. Work - Slab L12 S-1

012S030041 R.C. Work - Slab L12 S-2

100

04-FEB-06A

07-FEB-06A

R.C. Work - Slab L12 S-2

012S030042 R.C. Work - Slab L12 S-Nose 1

100

07-APR-06A

13-APR-06A

013S030040 R.C. Work - Slab L13 S-1

100

10-FEB-06A

15-FEB-06A

R.C. Work - Slab L13 S-1

013S030041 R.C. Work - Slab L13 S-2

100

08-FEB-06A

13-FEB-06A

R.C. Work - Slab L13 S-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2008

2009

R.C. Work - Slab L1 S-1


R.C. Work - Slab L1 S-2

R.C. Work - Slab L3 S-Nose 1

R.C. Work - Slab L4 S-Nose 1

R.C. Work - Slab L5 S-Nose 1

R.C. Work - Slab L6 S-Nose 1

R.C. Work - Slab L7 S-Nose 1

R.C. Work - Slab L8 S-Nose 1

R.C. Work - Slab L9 S-Nose 1

R.C. Work - Slab L10 S-Nose 1

R.C. Work - Slab L11 S-Nose 1

R.C. Work - Slab L12 S-Nose 1

Sheet 61 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

100

15-APR-06A

19-APR-06A

014S030040 R.C. Work - Slab L14 S-1

100

16-FEB-06A

22-FEB-06A

R.C. Work - Slab L14 S-1

014S030041 R.C. Work - Slab L14 S-2

100

14-FEB-06A

19-FEB-06A

R.C. Work - Slab L14 S-2

014S030042 R.C. Work - Slab L14 S-Nose 1

100

20-APR-06A

25-APR-06A

015S030040 R.C. Work - Slab L15 S-1

100

23-FEB-06A

27-FEB-06A

R.C. Work - Slab L15 S-1

015S030041 R.C. Work - Slab L15 S-2

100

20-FEB-06A

25-FEB-06A

R.C. Work - Slab L15 S-2

015S030042 R.C. Work - Slab L15 S-Nose 1

100

26-APR-06A

30-APR-06A

016S030040 R.C. Work - Slab L16 S-1

100

28-FEB-06A

07-MAR-06A

R.C. Work - Slab L16 S-1

016S030041 R.C. Work - Slab L16 S-2

100

26-FEB-06A

28-FEB-06A

R.C. Work - Slab L16 S-2

016S030042 R.C. Work - Slab L16 S-Nose 1

100

02-MAY-06A

08-MAY-06A

017S030040 R.C. Work - Slab L17 S-1

13

100

08-MAR-06A

15-MAR-06A

R.C. Work - Slab L17 S-1

017S030041 R.C. Work - Slab L17 S-2

13

100

01-MAR-06A

12-MAR-06A

R.C. Work - Slab L17 S-2

017S030042 R.C. Work - Slab L17 S-Nose 1

13

100

09-MAY-06A

04-JUN-06A

018S030040 R.C. Work - Slab L18 S-1

100

17-MAR-06A

06-APR-06A

R.C. Work - Slab L18 S-1

018S030041 R.C. Work - Slab L18 S-2

100

13-MAR-06A

29-MAR-06A

R.C. Work - Slab L18 S-2

018S030042 R.C. Work - Slab L18 S-Nose 1

12

100

06-JUN-06A

29-JUN-06A

019S030040 R.C. Work - Slab L19 S-1

100

07-APR-06A

13-APR-06A

R.C. Work - Slab L19 S-1

019S030041 R.C. Work - Slab L19 S-2

100

31-MAR-06A

10-APR-06A

R.C. Work - Slab L19 S-2

019S030042 R.C. Work - Slab L19 S-Nose 1

100

02-JUL-06A

16-AUG-06A

020S030040 R.C. Work - Slab L20 S-1

100

15-APR-06A

18-APR-06A

R.C. Work - Slab L20 S-1

020S030041 R.C. Work - Slab L20 S-2

100

11-APR-06A

16-APR-06A

R.C. Work - Slab L20 S-2

020S030042 R.C. Work - Slab L20 S-Nose 1

100

17-AUG-06A

27-AUG-06A

021S030040 R.C. Work - Slab L21 S-1

100

19-APR-06A

26-APR-06A

R.C. Work - Slab L21 S-1

021S030041 R.C. Work - Slab L21 S-2

100

17-APR-06A

24-APR-06A

R.C. Work - Slab L21 S-2

021S030042 R.C. Work - Slab L21 S-Nose 1

100

29-AUG-06A

04-SEP-06A

022S030040 R.C. Work - Slab L22 S-1

100

27-APR-06A

30-APR-06A

R.C. Work - Slab L22 S-1

022S030041 R.C. Work - Slab L22 S-2

100

25-APR-06A

29-APR-06A

R.C. Work - Slab L22 S-2

022S030042 R.C. Work - Slab L22 S-Nose 1

100

05-SEP-06A

10-SEP-06A

023S030040 R.C. Work - Slab L23 S-1

100

02-MAY-06A

04-MAY-06A

R.C. Work - Slab L23 S-1

023S030041 R.C. Work - Slab L23 S-2

100

30-APR-06A

02-MAY-06A

R.C. Work - Slab L23 S-2

023S030042 R.C. Work - Slab L23 S-Nose 1

100

13-SEP-06A

14-SEP-06A

024S030040 R.C. Work - Slab L24 S-1

100

05-MAY-06A

08-MAY-06A

R.C. Work - Slab L24 S-1

024S030041 R.C. Work - Slab L24 S-2

100

03-MAY-06A

07-MAY-06A

R.C. Work - Slab L24 S-2

024S030042 R.C. Work - Slab L24 S-Nose 1

100

15-SEP-06A

20-SEP-06A

025S030040 R.C. Work - Slab L25 S-1

100

09-MAY-06A

14-MAY-06A

R.C. Work - Slab L25 S-1

025S030041 R.C. Work - Slab L25 S-2

100

08-MAY-06A

13-MAY-06A

R.C. Work - Slab L25 S-2

025S030042 R.C. Work - Slab L25 S-Nose 1

100

21-SEP-06A

24-SEP-06A

026S030040 R.C. Work - Slab L26 S-1

100

16-MAY-06A

18-MAY-06A

R.C. Work - Slab L26 S-1

026S030041 R.C. Work - Slab L26 S-2

100

14-MAY-06A

18-MAY-06A

R.C. Work - Slab L26 S-2

026S030042 R.C. Work - Slab L26 S-Nose 1

100

26-SEP-06A

01-OCT-06A

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L13 S-Nose 1

013S030042 R.C. Work - Slab L13 S-Nose 1

Start Date
Finish Date
Data Date

2008

R.C. Work - Slab L14 S-Nose 1

R.C. Work - Slab L15 S-Nose 1

R.C. Work - Slab L16 S-Nose 1

R.C. Work - Slab L17 S-Nose 1

R.C. Work - Slab L18 S-Nose 1

R.C. Work - Slab L19 S-Nose 1

R.C. Work - Slab L20 S-Nose 1

R.C. Work - Slab L21 S-Nose 1

R.C. Work - Slab L22 S-Nose 1

R.C. Work - Slab L23 S-Nose 1

R.C. Work - Slab L24 S-Nose 1

R.C. Work - Slab L25 S-Nose 1

R.C. Work - Slab L26 S-Nose 1


Sheet 62 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

027S030040 R.C. Work - Slab L27 S-1

100

19-MAY-06A

23-MAY-06A

R.C. Work - Slab L27 S-1

027S030041 R.C. Work - Slab L27 S-2

100

19-MAY-06A

23-MAY-06A

R.C. Work - Slab L27 S-2

027S030042 R.C. Work - Slab L27 S-Nose 1

100

02-OCT-06A

08-OCT-06A

028S030040 R.C. Work - Slab L28 S-1

100

24-MAY-06A

27-MAY-06A

R.C. Work - Slab L28 S-1

028S030041 R.C. Work - Slab L28 S-2

100

24-MAY-06A

28-MAY-06A

R.C. Work - Slab L28 S-2

028S030042 R.C. Work - Slab L28 S-Nose 1

100

10-OCT-06A

16-OCT-06A

029S030040 R.C. Work - Slab L29 S-1

100

28-MAY-06A

31-MAY-06A

R.C. Work - Slab L29 S-1

029S030041 R.C. Work - Slab L29 S-2

100

30-MAY-06A

03-JUN-06A

R.C. Work - Slab L29 S-2

029S030042 R.C. Work - Slab L29 S-Nose 1

100

17-OCT-06A

21-OCT-06A

030S030040 R.C. Work - Slab L30 S-1

100

01-JUN-06A

04-JUN-06A

R.C. Work - Slab L30 S-1

030S030041 R.C. Work - Slab L30 S-2

100

04-JUN-06A

10-JUN-06A

R.C. Work - Slab L30 S-2

030S030042 R.C. Work - Slab L30 S-Nose 1

100

22-OCT-06A

29-OCT-06A

031S030040 R.C. Work - Slab L31 S-1

100

06-JUN-06A

14-JUN-06A

R.C. Work - Slab L31 S-1

031S030041 R.C. Work - Slab L31 S-2

100

11-JUN-06A

15-JUN-06A

R.C. Work - Slab L31 S-2

031S030042 R.C. Work - Slab L31 S-Nose 1

100

31-OCT-06A

02-NOV-06A

032S030040 R.C. Work - Slab L32 S-1

100

15-JUN-06A

18-JUN-06A

R.C. Work - Slab L32 S-1

032S030041 R.C. Work - Slab L32 S-2

100

16-JUN-06A

20-JUN-06A

R.C. Work - Slab L32 S-2

032S030042 R.C. Work - Slab L32 S-Nose 1

100

03-NOV-06A

07-NOV-06A

033S030040 R.C. Work - Slab L33 S-1

100

20-JUN-06A

23-JUN-06A

R.C. Work - Slab L33 S-1

033S030041 R.C. Work - Slab L33 S-2

100

21-JUN-06A

23-JUN-06A

R.C. Work - Slab L33 S-2

033S030042 R.C. Work - Slab L33 S-Nose 1

100

08-NOV-06A

12-NOV-06A

034S030040 R.C. Work - Slab L34 S-1

100

24-JUN-06A

29-JUN-06A

R.C. Work - Slab L34 S-1

034S030041 R.C. Work - Slab L34 S-2

100

25-JUN-06A

29-JUN-06A

R.C. Work - Slab L34 S-2

034S030042 R.C. Work - Slab L34 S-Nose 1 (Terrace)

100

13-NOV-06A

18-NOV-06A

035S030040 R.C. Work - Slab L35 S

100

30-JUN-06A

06-JUL-06A

035S030041 R.C. Work - Slab L35 S-Nose 2

100

18-JUL-06A

26-JUL-06A

036S030040 R.C. Work - Slab L36 S

100

04-JUL-06A

11-JUL-06A

036S030041 R.C. Work - Slab L36 S-Nose 2

100

27-JUL-06A

06-AUG-06A

037S030040 R.C. Work - Slab L37 S

100

09-JUL-06A

16-JUL-06A

037S030041 R.C. Work - Slab L37 S-Nose 2

100

08-AUG-06A

17-AUG-06A

038S030040 R.C. Work - Slab L38 S

100

16-JUL-06A

29-JUL-06A

038S030041 R.C. Work - Slab L38 S-Nose 2

100

18-AUG-06A

27-AUG-06A

039S030040 R.C. Work - Slab L39 S

100

23-JUL-06A

03-AUG-06A

039S030041 R.C. Work - Slab L39 S-Nose 2

100

29-AUG-06A

06-SEP-06A

040S030040 R.C. Work - Slab L40 S

100

01-AUG-06A

22-AUG-06A

040S030041 R.C. Work - Slab L40 S-Nose 2

100

07-SEP-06A

05-OCT-06A

041S030040 R.C. Work - Slab (Open) L41 S

100

22-AUG-06A

20-AUG-06A

042S030040 R.C. Work - Slab L42 S

12

100

15-AUG-06A

02-SEP-06A

042S030041 R.C. Work - Slab L42 S-Nose 2

13

100

05-OCT-06A

08-NOV-06A

043S030040 R.C. Work - Slab L43 S

100

03-SEP-06A

13-SEP-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2008

2009

R.C. Work - Slab L27 S-Nose 1

R.C. Work - Slab L28 S-Nose 1

R.C. Work - Slab L29 S-Nose 1

R.C. Work - Slab L30 S-Nose 1

R.C. Work - Slab L31 S-Nose 1

R.C. Work - Slab L32 S-Nose 1

R.C. Work - Slab L33 S-Nose 1

R.C. Work - Slab L34 S-Nose 1 (Terrace)


R.C. Work - Slab L35 S
R.C. Work - Slab L35 S-Nose 2
R.C. Work - Slab L36 S
R.C. Work - Slab L36 S-Nose 2
R.C. Work - Slab L37 S
R.C. Work - Slab L37 S-Nose 2
R.C. Work - Slab L38 S
R.C. Work - Slab L38 S-Nose 2
R.C. Work - Slab L39 S
R.C. Work - Slab L39 S-Nose 2
R.C. Work - Slab L40 S
R.C. Work - Slab L40 S-Nose 2
R.C. Work - Slab (Open) L41 S
R.C. Work - Slab L42 S
R.C. Work - Slab L42 S-Nose 2
R.C. Work - Slab L43 S
Sheet 63 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

043S030041 R.C. Work - Slab L43 S-Nose 2

100

09-NOV-06A

04-DEC-06A

044S030040 R.C. Work - Slab L44 S

100

08-SEP-06A

18-SEP-06A

044S030041 R.C. Work - Slab L44 S-Nose 2

100

07-DEC-06A

11-DEC-06A

045S030040 R.C. Work - Slab L45 S

100

13-SEP-06A

27-SEP-06A

045S030041 R.C. Work - Slab L45 S-Nose 2

100

12-DEC-06A

17-DEC-06A

046S030040 R.C. Work - Slab L46 S

100

16-SEP-06A

01-OCT-06A

046S030041 R.C. Work - Slab L46 S-Nose 2

100

18-DEC-06A

23-DEC-06A

047S030040 R.C. Work - Slab L47 S

100

20-SEP-06A

03-OCT-06A

047S030041 R.C. Work - Slab L47 S-Nose 2

100

24-DEC-06A

28-DEC-06A

048S030040 R.C. Work - Slab L48 S

100

24-SEP-06A

05-OCT-06A

048S030041 R.C. Work - Slab L48 S-Nose 2

100

29-DEC-06A

07-JAN-07A

049S030040 R.C. Work - Slab L49 S

100

26-SEP-06A

08-OCT-06A

049S030041 R.C. Work - Slab L49 S-Nose 2

100

08-JAN-07A

13-JAN-07A

050S030040 R.C. Work - Slab L50 S

100

28-SEP-06A

10-OCT-06A

050S030041 R.C. Work - Slab L50 S-Nose 2

100

14-JAN-07A

17-JAN-07A

051S030040 R.C. Work - Slab L51 S

100

01-OCT-06A

12-OCT-06A

051S030041 R.C. Work - Slab L51 S-Nose 2

100

18-JAN-07A

23-JAN-07A

052S030040 R.C. Work - Slab L52 S

100

05-OCT-06A

15-OCT-06A

052S030041 R.C. Work - Slab L52 S-Nose 2

100

24-JAN-07A

28-JAN-07A

053S030040 R.C. Work - Slab L53 S

100

08-OCT-06A

17-OCT-06A

053S030041 R.C. Work - Slab L53 S-Nose 2

100

29-JAN-07A

03-FEB-07A

054S030040 R.C. Work - Slab L54 S

100

11-OCT-06A

21-OCT-06A

054S030041 R.C. Work - Slab L54 S-Nose 2

100

04-FEB-07A

08-FEB-07A

055S030040 R.C. Work - Slab L55 S

100

13-OCT-06A

26-OCT-06A

055S030041 R.C. Work - Slab L55 S-Nose 2

100

09-FEB-07A

13-FEB-07A

056S030040 R.C. Work - Slab L56 S

100

16-OCT-06A

29-OCT-06A

056S030041 R.C. Work - Slab L56 S-Nose 2

100

14-FEB-07A

18-FEB-07A

057S030040 R.C. Work - Slab L57 S

100

20-OCT-06A

04-NOV-06A

057S030041 R.C. Work - Slab L57 S-Nose 2

100

19-FEB-07A

24-FEB-07A

058S030040 R.C. Work - Slab L58 S

100

24-OCT-06A

07-NOV-06A

058S030041 R.C. Work - Slab L58 S-Nose 2

100

25-FEB-07A

03-MAR-07A

059S030040 R.C. Work - Slab L59 S

100

28-OCT-06A

09-NOV-06A

059S030041 R.C. Work - Slab L59 S-Nose 2

100

04-MAR-07A

11-MAR-07A

060S030040 R.C. Work - Slab L60 S

100

31-OCT-06A

13-NOV-06A

060S030041 R.C. Work - Slab L60 S-Nose 2

40

061S030040 R.C. Work - Slab L61 S

100

061S030041 R.C. Work - Slab L61 S-Nose 2

062S030040 R.C. Work - Slab L62 S

100

062S030041 R.C. Work - Slab L62 S-Nose 2

063S030040 R.C. Work - Slab L63 S

100

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

281
281
281

12-MAR-07A

18-MAR-07

03-NOV-06A

13-NOV-06A

19-MAR-07

23-MAR-07

09-NOV-06A

18-NOV-06A

24-MAR-07

28-MAR-07

16-NOV-06A

22-NOV-06A

2005

2006

2007

2008

2009

R.C. Work - Slab L43 S-Nose 2


R.C. Work - Slab L44 S
R.C. Work - Slab L44 S-Nose 2
R.C. Work - Slab L45 S
R.C. Work - Slab L45 S-Nose 2
R.C. Work - Slab L46 S
R.C. Work - Slab L46 S-Nose 2
R.C. Work - Slab L47 S
R.C. Work - Slab L47 S-Nose 2
R.C. Work - Slab L48 S
R.C. Work - Slab L48 S-Nose 2
R.C. Work - Slab L49 S
R.C. Work - Slab L49 S-Nose 2
R.C. Work - Slab L50 S
R.C. Work - Slab L50 S-Nose 2
R.C. Work - Slab L51 S
R.C. Work - Slab L51 S-Nose 2
R.C. Work - Slab L52 S
R.C. Work - Slab L52 S-Nose 2
R.C. Work - Slab L53 S
R.C. Work - Slab L53 S-Nose 2
R.C. Work - Slab L54 S
R.C. Work - Slab L54 S-Nose 2
R.C. Work - Slab L55 S
R.C. Work - Slab L55 S-Nose 2
R.C. Work - Slab L56 S
R.C. Work - Slab L56 S-Nose 2
R.C. Work - Slab L57 S
R.C. Work - Slab L57 S-Nose 2
R.C. Work - Slab L58 S
R.C. Work - Slab L58 S-Nose 2
R.C. Work - Slab L59 S
R.C. Work - Slab L59 S-Nose 2
R.C. Work - Slab L60 S
R.C. Work - Slab L60 S-Nose 2
R.C. Work - Slab L61 S
R.C. Work - Slab L61 S-Nose 2
R.C. Work - Slab L62 S
R.C. Work - Slab L62 S-Nose 2
R.C. Work - Slab L63 S
Sheet 64 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Finish

063S030041 R.C. Work - Slab L63 S-Nose 2

064S030040 R.C. Work - Slab L64 S

100

064S030041 R.C. Work - Slab L64 S-Nose 2 (Terrace)

065S030040 R.C. Work - Slab L65 S

100

065S030041 R.C. Work - Slab L65 S-Nose 3

100

07-JAN-07A

14-JAN-07A

066S030040 R.C. Work - Slab L66 S

100

20-NOV-06A

03-DEC-06A

066S030041 R.C. Work - Slab L66 S-Nose 3

100

15-JAN-07A

21-JAN-07A

067S030040 R.C. Work - Slab L67 S

100

23-NOV-06A

04-DEC-06A

067S030041 R.C. Work - Slab L67 S-Nose 3

100

22-JAN-07A

27-JAN-07A

068S030040 R.C. Work - Slab L68 S

100

26-NOV-06A

11-DEC-06A

068S030041 R.C. Work - Slab L68 S-Nose 3

100

28-JAN-07A

03-FEB-07A

069S030040 R.C. Work - Slab L69 S

100

28-NOV-06A

14-DEC-06A

069S030041 R.C. Work - Slab L69 S-Nose 3

100

04-FEB-07A

08-FEB-07A

070S030040 R.C. Work - Slab L70 S

100

01-DEC-06A

18-DEC-06A

070S030041 R.C. Work - Slab L70 S-Nose 3

100

09-FEB-07A

14-FEB-07A

071S030040 R.C. Work - Slab L71 S

100

07-DEC-06A

25-DEC-06A

071S030041 R.C. Work - Slab L71 S-Nose 3

100

15-FEB-07A

20-FEB-07A

072S030040 R.C. Work - Slab L72 S

100

10-DEC-06A

28-DEC-06A

072S030041 R.C. Work - Slab L72 S-Nose 3

100

22-FEB-07A

25-FEB-07A

073S030040 R.C. Work - Slab L73 S

100

18-DEC-06A

08-JAN-07A

073S030041 R.C. Work - Slab L73 S-Nose 3

75

074S030040 R.C. Work - Slab (Open) L74 S

100

075S030040 R.C. Work - Slab L75 S

15

100

075S030041 R.C. Work - Slab L75 S-Nose 3

13

076S030040 R.C. Work - Slab L76 S

100

076S030041 R.C. Work - Slab L76 S-Nose 3

077S030040 R.C. Work - Slab L77 S

100

077S030041 R.C. Work - Slab L77 S-Nose 3

078S030040 R.C. Work - Slab L78 S

100

078S030041 R.C. Work - Slab L78 S-Nose 3

079S030040 R.C. Work - Slab L79 S

100

079S030041 R.C. Work - Slab L79 S-Nose 3

080S030040 R.C. Work - Slab L80 S

100

080S030041 R.C. Work - Slab L80 S-Nose 3

081S030040 R.C. Work - Slab L81 S

100

081S030041 R.C. Work - Slab L81 S-Nose 3

082S030040 R.C. Work - Slab L82 S

100

082S030041 R.C. Work - Slab L82 S-Nose 3

083S030040 R.C. Work - Slab L83 S

100

083S030041 R.C. Work - Slab L83 S-Nose 3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

281

Early
Start

281

171

171
171
171
171
171
171
171
171
171

29-MAR-07

03-APR-07

19-NOV-06A

26-NOV-06A

04-APR-07

11-APR-07

19-NOV-06A

29-NOV-06A

2005

2006

2007

2008

R.C. Work - Slab L63 S-Nose 2


R.C. Work - Slab L64 S
R.C. Work - Slab L64 S-Nose 2 (Terrace)
R.C. Work - Slab L65 S
R.C. Work - Slab L65 S-Nose 3
R.C. Work - Slab L66 S
R.C. Work - Slab L66 S-Nose 3
R.C. Work - Slab L67 S
R.C. Work - Slab L67 S-Nose 3
R.C. Work - Slab L68 S
R.C. Work - Slab L68 S-Nose 3
R.C. Work - Slab L69 S
R.C. Work - Slab L69 S-Nose 3
R.C. Work - Slab L70 S
R.C. Work - Slab L70 S-Nose 3
R.C. Work - Slab L71 S
R.C. Work - Slab L71 S-Nose 3
R.C. Work - Slab L72 S
R.C. Work - Slab L72 S-Nose 3
R.C. Work - Slab L73 S
R.C. Work - Slab L73 S-Nose 3

26-FEB-07A

17-MAR-07

08-JAN-07A

07-JAN-07A

R.C. Work - Slab (Open) L74 S

27-DEC-06A

16-JAN-07A

R.C. Work - Slab L75 S

21-MAR-07

03-APR-07

08-JAN-07A

24-JAN-07A

04-APR-07

09-APR-07

17-JAN-07A

27-JAN-07A

11-APR-07

16-APR-07

22-JAN-07A

29-JAN-07A

17-APR-07

22-APR-07

24-JAN-07A

30-JAN-07A

23-APR-07

27-APR-07

26-JAN-07A

03-FEB-07A

28-APR-07

02-MAY-07

29-JAN-07A

05-FEB-07A

03-MAY-07

06-MAY-07

03-FEB-07A

07-FEB-07A

07-MAY-07

10-MAY-07

03-FEB-07A

10-FEB-07A

12-MAY-07

15-MAY-07

2009

R.C. Work - Slab L75 S-Nose 3


R.C. Work - Slab L76 S
R.C. Work - Slab L76 S-Nose 3
R.C. Work - Slab L77 S
R.C. Work - Slab L77 S-Nose 3
R.C. Work - Slab L78 S
R.C. Work - Slab L78 S-Nose 3
R.C. Work - Slab L79 S
R.C. Work - Slab L79 S-Nose 3
R.C. Work - Slab L80 S
R.C. Work - Slab L80 S-Nose 3
R.C. Work - Slab L81 S
R.C. Work - Slab L81 S-Nose 3
R.C. Work - Slab L82 S
R.C. Work - Slab L82 S-Nose 3
R.C. Work - Slab L83 S
R.C. Work - Slab L83 S-Nose 3
Sheet 65 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

05-FEB-07A

12-FEB-07A

16-MAY-07

19-MAY-07

07-FEB-07A

14-FEB-07A

2005

2006

2007

2008

R.C. Work - Slab L84 S

084S030040 R.C. Work - Slab L84 S

100

084S030041 R.C. Work - Slab L84 S-Nose 3

085S030040 R.C. Work - Slab L85 S

100

085S030041 R.C. Work - Slab L85 S-Nose 3

086S030040 R.C. Work - Slab L86 S

100

086S030041 R.C. Work - Slab L86 S-Nose 3

087S030040 R.C. Work - Slab L87 S

100

087S030041 R.C. Work - Slab L87 S-Nose 3

088S030040 R.C. Work - Slab L88 S

100

088S030041 R.C. Work - Slab L88 S-Nose 3

089S030040 R.C. Work - Slab L89 S

100

089S030041 R.C. Work - Slab L89 S-Nose 3

090S030040 R.C. Work - Slab L90 S

100

090S030041 R.C. Work - Slab L90 S-Nose 3

091S030040 R.C. Work - Slab L91 S

100

091S030041 R.C. Work - Slab L91 S-Nose 3

092S030040 R.C. Work - Slab L92 S

100

092S030041 R.C. Work - Slab L92 S-Nose 3

093S030040 R.C. Work - Slab L93 S

100

093S030041 R.C. Work - Slab L93 S-Nose 3

094S030040 R.C. Work - Slab L94 S

100

094S030041 R.C. Work - Slab L94 S-Nose 3

095S030040 R.C. Work - Slab L95 S

100

095S030041 R.C. Work - Slab L95 S-Nose 3

175

05-JUL-07

08-JUL-07

096S030040 R.C. Work - Slab L96 S

33

192

13-MAR-07A

17-MAR-07

096S030041 R.C. Work - Slab L96 S-Nose 3

175

10-JUL-07

13-JUL-07

097S030040 R.C. Work - Slab L97 S

192

18-MAR-07

20-MAR-07

097S030041 R.C. Work - Slab L97 S-Nose 3

175

14-JUL-07

17-JUL-07

098S030040 R.C. Work - Slab L98 S

192

21-MAR-07

23-MAR-07

098S030041 R.C. Work - Slab L98 S-Nose 3

175

18-JUL-07

24-JUL-07

099S030040 R.C. Work - Slab L99 S

192

24-MAR-07

31-MAR-07

099S030041 R.C. Work - Slab L99 S-Nose 3 (Terrace)

20

175

25-JUL-07

15-AUG-07

100S030040 R.C. WorK - Slab L100 S - Nose 4

192

16-APR-07

22-APR-07

R.C. WorK - Slab L100 S - Nose 4

101S030040 R.C. WorK - Slab L101 S - Nose 4

192

23-APR-07

27-APR-07

R.C. WorK - Slab L101 S - Nose 4

102S030040 R.C. WorK - Slab L102 S - Nose 4

192

28-APR-07

02-MAY-07

R.C. WorK - Slab L102 S - Nose 4

103S030040 R.C. WorK - Slab L103 S - Nose 4

192

03-MAY-07

06-MAY-07

R.C. WorK - Slab L103 S - Nose 4

104S030040 R.C. WorK - Slab L104 S - Nose 4

192

07-MAY-07

10-MAY-07

R.C. WorK - Slab L104 S - Nose 4

105S030040 R.C. WorK - Slab L105 S - Nose 4

192

12-MAY-07

15-MAY-07

R.C. WorK - Slab L105 S - Nose 4

106S030040 R.C. WorK - Slab L106 S - Nose 4

192

16-MAY-07

19-MAY-07

R.C. WorK - Slab L106 S - Nose 4

107S030040 R.C. WorK - Slab L107 S - Nose 4

192

20-MAY-07

23-MAY-07

R.C. WorK - Slab L107 S - Nose 4

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

171
171
171
175
175
175
175
175
175
175
175

20-MAY-07

23-MAY-07

09-FEB-07A

17-FEB-07A

24-MAY-07

28-MAY-07

12-FEB-07A

19-FEB-07A

29-MAY-07

01-JUN-07

14-FEB-07A

25-FEB-07A

02-JUN-07

06-JUN-07

18-FEB-07A

27-FEB-07A

07-JUN-07

10-JUN-07

20-FEB-07A

01-MAR-07A

12-JUN-07

15-JUN-07

22-FEB-07A

04-MAR-07A

16-JUN-07

20-JUN-07

25-FEB-07A

06-MAR-07A

21-JUN-07

24-JUN-07

27-FEB-07A

08-MAR-07A

26-JUN-07

29-JUN-07

02-MAR-07A

11-MAR-07A

30-JUN-07

04-JUL-07

07-MAR-07A

13-MAR-07A

2009

R.C. Work - Slab L84 S-Nose 3


R.C. Work - Slab L85 S
R.C. Work - Slab L85 S-Nose 3
R.C. Work - Slab L86 S
R.C. Work - Slab L86 S-Nose 3
R.C. Work - Slab L87 S
R.C. Work - Slab L87 S-Nose 3
R.C. Work - Slab L88 S
R.C. Work - Slab L88 S-Nose 3
R.C. Work - Slab L89 S
R.C. Work - Slab L89 S-Nose 3
R.C. Work - Slab L90 S
R.C. Work - Slab L90 S-Nose 3
R.C. Work - Slab L91 S
R.C. Work - Slab L91 S-Nose 3
R.C. Work - Slab L92 S
R.C. Work - Slab L92 S-Nose 3
R.C. Work - Slab L93 S
R.C. Work - Slab L93 S-Nose 3
R.C. Work - Slab L94 S
R.C. Work - Slab L94 S-Nose 3
R.C. Work - Slab L95 S
R.C. Work - Slab L95 S-Nose 3
R.C. Work - Slab L96 S
R.C. Work - Slab L96 S-Nose 3
R.C. Work - Slab L97 S
R.C. Work - Slab L97 S-Nose 3
R.C. Work - Slab L98 S
R.C. Work - Slab L98 S-Nose 3
R.C. Work - Slab L99 S
R.C. Work - Slab L99 S-Nose 3 (Terrace)

Sheet 66 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

R.C. WorK - Slab L108 S - Nose 4

108S030040 R.C. WorK - Slab L108 S - Nose 4

192

24-MAY-07

30-MAY-07

109S030040 R.C. WorK - Slab L109 S - Nose 4

11

192

31-MAY-07

12-JUN-07

R.C. WorK - Slab L109 S - Nose 4

110S030040 R.C. Work - Slab (Open) L110 S - Nose 4

195

13-JUN-07

12-JUN-07

R.C. Work - Slab (Open) L110 S - Nose 4

111S030040 R.C. WorK - Slab L111 S - Nose 4

12

192

16-JUN-07

29-JUN-07

R.C. WorK - Slab L111 S - Nose 4

112S030040 R.C. WorK - Slab L112 S - Nose 4

192

30-JUN-07

06-JUL-07

R.C. WorK - Slab L112 S - Nose 4

113S030040 R.C. WorK - Slab L113 S - Nose 4

192

07-JUL-07

13-JUL-07

R.C. WorK - Slab L113 S - Nose 4

114S030040 R.C. WorK - Slab L114 S - Nose 4

192

14-JUL-07

17-JUL-07

R.C. WorK - Slab L114 S - Nose 4

115S030040 R.C. WorK - Slab L115 S - Nose 4

192

18-JUL-07

21-JUL-07

R.C. WorK - Slab L115 S - Nose 4

116S030040 R.C. WorK - Slab L116 S - Nose 4

192

22-JUL-07

26-JUL-07

R.C. WorK - Slab L116 S - Nose 4

117S030040 R.C. WorK - Slab L117 S - Nose 4

192

27-JUL-07

31-JUL-07

R.C. WorK - Slab L117 S - Nose 4

118S030040 R.C. WorK - Slab L118 S - Nose 4

192

01-AUG-07

04-AUG-07

R.C. WorK - Slab L118 S - Nose 4

119S030040 R.C. WorK - Slab L119 S - Nose 4

192

05-AUG-07

09-AUG-07

R.C. WorK - Slab L119 S - Nose 4

120S030040 R.C. WorK - Slab L120 S - Nose 4

192

10-AUG-07

13-AUG-07

R.C. WorK - Slab L120 S - Nose 4

121S030040 R.C. WorK - Slab L121 S - Nose 4

192

14-AUG-07

17-AUG-07

R.C. WorK - Slab L121 S - Nose 4

122S030040 R.C. WorK - Slab L122 S - Nose 4

192

18-AUG-07

22-AUG-07

R.C. WorK - Slab L122 S - Nose 4

123S030040 R.C. WorK - Slab L123 S - Nose 4

192

23-AUG-07

26-AUG-07

R.C. WorK - Slab L123 S - Nose 4

124S030040 R.C. WorK - Slab L124 S - Nose 4

192

28-AUG-07

31-AUG-07

R.C. WorK - Slab L124 S - Nose 4

125S030040 R.C. WorK - Slab L125 S - Nose 4

192

01-SEP-07

05-SEP-07

R.C. WorK - Slab L125 S - Nose 4

126S030040 R.C. WorK - Slab L126 S - Nose 4

192

06-SEP-07

09-SEP-07

R.C. WorK - Slab L126 S - Nose 4

127S030040 R.C. WorK - Slab L127 S - Nose 4

192

10-SEP-07

14-SEP-07

R.C. WorK - Slab L127 S - Nose 4

128S030040 R.C. WorK - Slab L128 S - Nose 4

192

15-SEP-07

18-SEP-07

R.C. WorK - Slab L128 S - Nose 4

129S030040 R.C. WorK - Slab L129 S - Nose 4

192

19-SEP-07

22-SEP-07

R.C. WorK - Slab L129 S - Nose 4

130S030040 R.C. WorK - Slab L130 S - Nose 4

192

23-SEP-07

27-SEP-07

R.C. WorK - Slab L130 S - Nose 4

131S030040 R.C. WorK - Slab L131 S - Nose 4

192

28-SEP-07

01-OCT-07

R.C. WorK - Slab L131 S - Nose 4

132S030040 R.C. WorK - Slab L132 S - Nose 4

192

02-OCT-07

05-OCT-07

R.C. WorK - Slab L132 S - Nose 4

133S030040 R.C. WorK - Slab L133 S - Nose 4

192

06-OCT-07

09-OCT-07

R.C. WorK - Slab L133 S - Nose 4

134S030040 R.C. WorK - Slab L134 S - Nose 4

192

11-OCT-07

14-OCT-07

R.C. WorK - Slab L134 S - Nose 4

135S030040 R.C. WorK - Slab L135 S - Nose 4

192

15-OCT-07

18-OCT-07

R.C. WorK - Slab L135 S - Nose 4

136S030040 R.C. WorK - Slab L136 S - Nose 4

192

19-OCT-07

23-OCT-07

R.C. WorK - Slab L136 S - Nose 4

137S030040 R.C. WorK - Slab L137 S - Nose 4

192

25-OCT-07

28-OCT-07

R.C. WorK - Slab L137 S - Nose 4

138S030040 R.C. WorK - Slab L138 S - Nose 4

192

30-OCT-07

03-NOV-07

R.C. WorK - Slab L138 S - Nose 4

139S030040 R.C. WorK - Slab L139 S - Nose 4

13

192

04-NOV-07

23-NOV-07

-00S030050

R.C. Work - South Wing Col. Below B2 S

100

29-JUL-05A

03-AUG-05A

-01S030050

R.C. Work - South Wing Column - S B2

100

02-SEP-05A

13-SEP-05A

-02S030050

R.C. Work - South Wing Column - S B1

100

30-SEP-05A

10-OCT-05A

-03S030050

R.C. Work - South Wing Column - S Concourse

100

08-NOV-05A

18-NOV-05A

-04S030050

R.C. Work - South Wing Column - S Ground

100

20-DEC-05A

27-DEC-05A

001S030050 R.C. Work - South Wing Column - S L1

100

10-JAN-06A

15-JAN-06A

R.C. Work - South Wing Column - S L1

002S030050 R.C. Work - South Wing Column - S L2

100

23-JAN-06A

26-JAN-06A

R.C. Work - South Wing Column - S L2

003S030050 R.C. Work - South Wing Column - S L3

100

05-FEB-06A

09-FEB-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. WorK - Slab L139 S - Nose 4


R.C. Work - South Wing Col. Below B2 S
R.C. Work - South Wing Column - S B2
R.C. Work - South Wing Column - S B1
R.C. Work - South Wing Column - S Concourse
R.C. Work - South Wing Column - S Ground

R.C. Work - South Wing Column - S L3


Sheet 67 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

004S030050 R.C. Work - South Wing Column - S L4

100

19-FEB-06A

22-FEB-06A

R.C. Work - South Wing Column - S L4

005S030050 R.C. Work - South Wing Column - S L5

100

28-FEB-06A

01-MAR-06A

R.C. Work - South Wing Column - S L5

006S030050 R.C. Work - South Wing Column - S L6

100

08-MAR-06A

09-MAR-06A

R.C. Work - South Wing Column - S L6

007S030050 R.C. Work - South Wing Column - S L7

100

15-MAR-06A

15-MAR-06A

R.C. Work - South Wing Column - S L7

008S030050 R.C. Work - South Wing Column - S L8

100

22-MAR-06A

23-MAR-06A

R.C. Work - South Wing Column - S L8

009S030050 R.C. Work - South Wing Column - S L9

100

28-MAR-06A

29-MAR-06A

R.C. Work - South Wing Column - S L9

010S030050 R.C. Work - South Wing Column - S L10

100

03-APR-06A

04-APR-06A

R.C. Work - South Wing Column - S L10

011S030050 R.C. Work - South Wing Column - S L11

100

07-APR-06A

11-APR-06A

R.C. Work - South Wing Column - S L11

012S030050 R.C. Work - South Wing Column - S L12

100

13-APR-06A

17-APR-06A

R.C. Work - South Wing Column - S L12

013S030050 R.C. Work - South Wing Column - S L13

100

20-APR-06A

22-APR-06A

R.C. Work - South Wing Column - S L13

014S030050 R.C. Work - South Wing Column - S L14

100

25-APR-06A

27-APR-06A

R.C. Work - South Wing Column - S L14

015S030050 R.C. Work - South Wing Column - S L15

100

02-MAY-06A

02-MAY-06A

R.C. Work - South Wing Column - S L15

016S030050 R.C. Work - South Wing Column - S L16

100

08-MAY-06A

09-MAY-06A

R.C. Work - South Wing Column - S L16

017S030050 R.C. Work - South Wing Column - S L17

100

06-JUN-06A

18-JUN-06A

018S030050 R.C. Work - South Wing Column - S L18

100

30-JUN-06A

02-JUL-06A

019S030050 R.C. Work - South Wing Column - S L19

100

18-JUL-06A

05-AUG-06A

020S030050 R.C. Work - South Wing Column - S L20

100

24-AUG-06A

29-AUG-06A

R.C. Work - South Wing Column - S L20

021S030050 R.C. Work - South Wing Column - S L21

100

04-SEP-06A

05-SEP-06A

R.C. Work - South Wing Column - S L21

022S030050 R.C. Work - South Wing Column - S L22

100

10-SEP-06A

10-SEP-06A

R.C. Work - South Wing Column - S L22

023S030050 R.C. Work - South Wing Column - S L23

100

14-SEP-06A

15-SEP-06A

R.C. Work - South Wing Column - S L23

024S030050 R.C. Work - South Wing Column - S L24

100

20-SEP-06A

21-SEP-06A

R.C. Work - South Wing Column - S L24

025S030050 R.C. Work - South Wing Column - S L25

100

26-SEP-06A

26-SEP-06A

R.C. Work - South Wing Column - S L25

026S030050 R.C. Work - South Wing Column - S L26

100

01-OCT-06A

03-OCT-06A

R.C. Work - South Wing Column - S L26

027S030050 R.C. Work - South Wing Column - S L27

100

10-OCT-06A

10-OCT-06A

R.C. Work - South Wing Column - S L27

028S030050 R.C. Work - South Wing Column - S L28

100

16-OCT-06A

17-OCT-06A

R.C. Work - South Wing Column - S L28

029S030050 R.C. Work - South Wing Column - S L29

100

21-OCT-06A

22-OCT-06A

R.C. Work - South Wing Column - S L29

030S030050 R.C. Work - South Wing Column - S L30

100

29-OCT-06A

29-OCT-06A

R.C. Work - South Wing Column - S L30

031S030050 R.C. Work - South Wing Column - S L31

100

02-NOV-06A

03-NOV-06A

R.C. Work - South Wing Column - S L31

032S030050 R.C. Work - South Wing Column - S L32

100

07-NOV-06A

08-NOV-06A

R.C. Work - South Wing Column - S L32

033S030050 R.C. Work - South Wing Column - S L33

100

13-NOV-06A

13-NOV-06A

034S030050 R.C. Work - South Wing Column - S L34

100

11-JUL-06A

15-JUL-06A

035S030050 R.C. Work - South Wing Column - S L35

100

27-JUL-06A

29-JUL-06A

R.C. Work - South Wing Column - S L35

036S030050 R.C. Work - South Wing Column - S L36

100

08-AUG-06A

09-AUG-06A

R.C. Work - South Wing Column - S L36

037S030050 R.C. Work - South Wing Column - S L37

100

18-AUG-06A

20-AUG-06A

R.C. Work - South Wing Column - S L37

038S030050 R.C. Work - South Wing Column - S L38

100

30-AUG-06A

31-AUG-06A

R.C. Work - South Wing Column - S L38

039S030050 R.C. Work - South Wing Column - S L39

100

06-SEP-06A

07-SEP-06A

R.C. Work - South Wing Column - S L39

040S030050 R.C. Work - South Wing Column - S L40

100

05-OCT-06A

16-OCT-06A

R.C. Work - South Wing Column - S L40

041S030050 R.C. Work - South Wing Column - S L41

100

05-OCT-06A

16-OCT-06A

R.C. Work - South Wing Column - S L41

042S030050 R.C. Work - South Wing Column - S L42

100

09-NOV-06A

23-NOV-06A

043S030050 R.C. Work - South Wing Column - S L43

100

07-DEC-06A

07-DEC-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - South Wing Column - S L17


R.C. Work - South Wing Column - S L18
R.C. Work - South Wing Column - S L19

R.C. Work - South Wing Column - S L33


R.C. Work - South Wing Column - S L34

R.C. Work - South Wing Column - S L42


R.C. Work - South Wing Column - S L43
Sheet 68 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

044S030050 R.C. Work - South Wing Column - S L44

100

12-DEC-06A

13-DEC-06A

R.C. Work - South Wing Column - S L44

045S030050 R.C. Work - South Wing Column - S L45

100

18-DEC-06A

19-DEC-06A

R.C. Work - South Wing Column - S L45

046S030050 R.C. Work - South Wing Column - S L46

100

23-DEC-06A

25-DEC-06A

R.C. Work - South Wing Column - S L46

047S030050 R.C. Work - South Wing Column - S L47

100

29-DEC-06A

04-JAN-07A

R.C. Work - South Wing Column - S L47

048S030050 R.C. Work - South Wing Column - S L48

100

08-JAN-07A

09-JAN-07A

R.C. Work - South Wing Column - S L48

049S030050 R.C. Work - South Wing Column - S L49

100

13-JAN-07A

15-JAN-07A

R.C. Work - South Wing Column - S L49

050S030050 R.C. Work - South Wing Column - S L50

100

17-JAN-07A

18-JAN-07A

R.C. Work - South Wing Column - S L50

051S030050 R.C. Work - South Wing Column - S L51

100

23-JAN-07A

25-JAN-07A

R.C. Work - South Wing Column - S L51

052S030050 R.C. Work - South Wing Column - S L52

100

28-JAN-07A

30-JAN-07A

R.C. Work - South Wing Column - S L52

053S030050 R.C. Work - South Wing Column - S L53

100

04-FEB-07A

06-FEB-07A

R.C. Work - South Wing Column - S L53

054S030050 R.C. Work - South Wing Column - S L54

100

08-FEB-07A

11-FEB-07A

R.C. Work - South Wing Column - S L54

055S030050 R.C. Work - South Wing Column - S L55

100

13-FEB-07A

15-FEB-07A

R.C. Work - South Wing Column - S L55

056S030050 R.C. Work - South Wing Column - S L56

100

18-FEB-07A

19-FEB-07A

R.C. Work - South Wing Column - S L56

057S030050 R.C. Work - South Wing Column - S L57

100

24-FEB-07A

26-FEB-07A

R.C. Work - South Wing Column - S L57

058S030050 R.C. Work - South Wing Column - S L58

100

03-MAR-07A

04-MAR-07A

R.C. Work - South Wing Column - S L58

059S030050 R.C. Work - South Wing Column - S L59

100

11-MAR-07A

12-MAR-07A

R.C. Work - South Wing Column - S L59

060S030050 R.C. Work - South Wing Column - S L60

281

19-MAR-07

21-MAR-07

R.C. Work - South Wing Column - S L60

061S030050 R.C. Work - South Wing Column - S L61

281

24-MAR-07

26-MAR-07

R.C. Work - South Wing Column - S L61

062S030050 R.C. Work - South Wing Column - S L62

281

29-MAR-07

01-APR-07

R.C. Work - South Wing Column - S L62

063S030050 R.C. Work - South Wing Column - S L63

281

04-APR-07

06-APR-07

064S030050 R.C. Work - South Wing Column - S L64

100

02-JAN-07A

06-JAN-07A

R.C. Work - South Wing Column - S L64

065S030050 R.C. Work - South Wing Column - S L65

100

14-JAN-07A

16-JAN-07A

R.C. Work - South Wing Column - S L65

066S030050 R.C. Work - South Wing Column - S L66

100

21-JAN-07A

23-JAN-07A

R.C. Work - South Wing Column - S L66

067S030050 R.C. Work - South Wing Column - S L67

100

27-JAN-07A

27-JAN-07A

R.C. Work - South Wing Column - S L67

068S030050 R.C. Work - South Wing Column - S L68

100

03-FEB-07A

05-FEB-07A

R.C. Work - South Wing Column - S L68

069S030050 R.C. Work - South Wing Column - S L69

100

08-FEB-07A

14-FEB-07A

R.C. Work - South Wing Column - S L69

070S030050 R.C. Work - South Wing Column - S L70

100

14-FEB-07A

15-FEB-07A

R.C. Work - South Wing Column - S L70

071S030050 R.C. Work - South Wing Column - S L71

100

20-FEB-07A

22-FEB-07A

R.C. Work - South Wing Column - S L71

072S030050 R.C. Work - South Wing Column - S L72

100

25-FEB-07A

28-FEB-07A

R.C. Work - South Wing Column - S L72

073S030050 R.C. Work - South Wing Column - S L73

171

18-MAR-07

20-MAR-07

R.C. Work - South Wing Column - S L73

074S030050 R.C. Work - South Wing Column - S L74

171

21-MAR-07

23-MAR-07

R.C. Work - South Wing Column - S L74

075S030050 R.C. Work - South Wing Column - S L75

171

04-APR-07

06-APR-07

R.C. Work - South Wing Column - S L75

076S030050 R.C. Work - South Wing Column - S L76

171

11-APR-07

13-APR-07

R.C. Work - South Wing Column - S L76

077S030050 R.C. Work - South Wing Column - S L77

171

17-APR-07

19-APR-07

R.C. Work - South Wing Column - S L77

078S030050 R.C. Work - South Wing Column - S L78

171

23-APR-07

26-APR-07

R.C. Work - South Wing Column - S L78

079S030050 R.C. Work - South Wing Column - S L79

171

28-APR-07

30-APR-07

R.C. Work - South Wing Column - S L79

080S030050 R.C. Work - South Wing Column - S L80

171

03-MAY-07

05-MAY-07

R.C. Work - South Wing Column - S L80

081S030050 R.C. Work - South Wing Column - S L81

171

07-MAY-07

09-MAY-07

R.C. Work - South Wing Column - S L81

082S030050 R.C. Work - South Wing Column - S L82

171

12-MAY-07

14-MAY-07

R.C. Work - South Wing Column - S L82

083S030050 R.C. Work - South Wing Column - S L83

171

16-MAY-07

18-MAY-07

R.C. Work - South Wing Column - S L83

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - South Wing Column - S L63

Sheet 69 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

084S030050 R.C. Work - South Wing Column - S L84

171

20-MAY-07

22-MAY-07

R.C. Work - South Wing Column - S L84

085S030050 R.C. Work - South Wing Column - S L85

171

24-MAY-07

27-MAY-07

R.C. Work - South Wing Column - S L85

086S030050 R.C. Work - South Wing Column - S L86

175

29-MAY-07

31-MAY-07

R.C. Work - South Wing Column - S L86

087S030050 R.C. Work - South Wing Column - S L87

175

02-JUN-07

05-JUN-07

R.C. Work - South Wing Column - S L87

088S030050 R.C. Work - South Wing Column - S L88

175

07-JUN-07

09-JUN-07

R.C. Work - South Wing Column - S L88

089S030050 R.C. Work - South Wing Column - S L89

175

12-JUN-07

14-JUN-07

R.C. Work - South Wing Column - S L89

090S030050 R.C. Work - South Wing Column - S L90

175

16-JUN-07

19-JUN-07

R.C. Work - South Wing Column - S L90

091S030050 R.C. Work - South Wing Column - S L91

175

21-JUN-07

23-JUN-07

R.C. Work - South Wing Column - S L91

092S030050 R.C. Work - South Wing Column - S L92

175

26-JUN-07

28-JUN-07

R.C. Work - South Wing Column - S L92

093S030050 R.C. Work - South Wing Column - S L93

175

30-JUN-07

03-JUL-07

R.C. Work - South Wing Column - S L93

094S030050 R.C. Work - South Wing Column - S L94

175

05-JUL-07

07-JUL-07

R.C. Work - South Wing Column - S L94

095S030050 R.C. Work - South Wing Column - S L95

175

10-JUL-07

12-JUL-07

R.C. Work - South Wing Column - S L95

096S030050 R.C. Work - South Wing Column - S L96

175

14-JUL-07

16-JUL-07

R.C. Work - South Wing Column - S L96

097S030050 R.C. Work - South Wing Column - S L97

175

18-JUL-07

20-JUL-07

R.C. Work - South Wing Column - S L97

098S030050 R.C. Work - South Wing Column - S L98

175

25-JUL-07

27-JUL-07

099S030050 R.C. Work - South Wing Column - S L99

192

16-APR-07

18-APR-07

R.C. Work - South Wing Column - S L99

100S030050 R.C. Work - South Wing Column - S L100

192

23-APR-07

26-APR-07

R.C. Work - South Wing Column - S L100

101S030050 R.C. Work - South Wing Column - S L101

192

28-APR-07

30-APR-07

R.C. Work - South Wing Column - S L101

102S030050 R.C. Work - South Wing Column - S L102

192

03-MAY-07

05-MAY-07

R.C. Work - South Wing Column - S L102

103S030050 R.C. Work - South Wing Column - S L103

192

07-MAY-07

09-MAY-07

R.C. Work - South Wing Column - S L103

104S030050 R.C. Work - South Wing Column - S L104

192

12-MAY-07

14-MAY-07

R.C. Work - South Wing Column - S L104

105S030050 R.C. Work - South Wing Column - S L105

192

16-MAY-07

18-MAY-07

R.C. Work - South Wing Column - S L105

106S030050 R.C. Work - South Wing Column - S L106

192

20-MAY-07

22-MAY-07

R.C. Work - South Wing Column - S L106

107S030050 R.C. Work - South Wing Column - S L107

192

24-MAY-07

27-MAY-07

R.C. Work - South Wing Column - S L107

108S030050 R.C. Work - South Wing Column - S L108

192

31-MAY-07

02-JUN-07

R.C. Work - South Wing Column - S L108

109S030050 R.C. Work - South Wing Column - S L109

192

13-JUN-07

15-JUN-07

R.C. Work - South Wing Column - S L109

110S030050 R.C. Work - South Wing Column - S L110

192

16-JUN-07

19-JUN-07

R.C. Work - South Wing Column - S L110

111S030050 R.C. Work - South Wing Column - S L111

192

30-JUN-07

03-JUL-07

R.C. Work - South Wing Column - S L111

112S030050 R.C. Work - South Wing Column - S L112

192

07-JUL-07

10-JUL-07

R.C. Work - South Wing Column - S L112

113S030050 R.C. Work - South Wing Column - S L113

192

14-JUL-07

16-JUL-07

R.C. Work - South Wing Column - S L113

114S030050 R.C. Work - South Wing Column - S L114

192

18-JUL-07

20-JUL-07

R.C. Work - South Wing Column - S L114

115S030050 R.C. Work - South Wing Column - S L115

192

22-JUL-07

25-JUL-07

R.C. Work - South Wing Column - S L115

116S030050 R.C. Work - South Wing Column - S L116

192

27-JUL-07

29-JUL-07

R.C. Work - South Wing Column - S L116

117S030050 R.C. Work - South Wing Column - S L117

192

01-AUG-07

03-AUG-07

R.C. Work - South Wing Column - S L117

118S030050 R.C. Work - South Wing Column - S L118

192

05-AUG-07

08-AUG-07

R.C. Work - South Wing Column - S L118

119S030050 R.C. Work - South Wing Column - S L119

192

10-AUG-07

12-AUG-07

R.C. Work - South Wing Column - S L119

120S030050 R.C. Work - South Wing Column - S L120

192

14-AUG-07

16-AUG-07

R.C. Work - South Wing Column - S L120

121S030050 R.C. Work - South Wing Column - S L121

192

18-AUG-07

21-AUG-07

R.C. Work - South Wing Column - S L121

122S030050 R.C. Work - South Wing Column - S L122

192

23-AUG-07

25-AUG-07

R.C. Work - South Wing Column - S L122

123S030050 R.C. Work - South Wing Column - S L123

192

28-AUG-07

30-AUG-07

R.C. Work - South Wing Column - S L123

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - South Wing Column - S L98

Sheet 70 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

124S030050 R.C. Work - South Wing Column - S L124

192

01-SEP-07

04-SEP-07

R.C. Work - South Wing Column - S L124

125S030050 R.C. Work - South Wing Column - S L125

192

06-SEP-07

08-SEP-07

R.C. Work - South Wing Column - S L125

126S030050 R.C. Work - South Wing Column - S L126

192

10-SEP-07

13-SEP-07

R.C. Work - South Wing Column - S L126

127S030050 R.C. Work - South Wing Column - S L127

192

15-SEP-07

17-SEP-07

R.C. Work - South Wing Column - S L127

128S030050 R.C. Work - South Wing Column - S L128

192

19-SEP-07

21-SEP-07

R.C. Work - South Wing Column - S L128

129S030050 R.C. Work - South Wing Column - S L129

192

23-SEP-07

25-SEP-07

R.C. Work - South Wing Column - S L129

130S030050 R.C. Work - South Wing Column - S L130

192

28-SEP-07

30-SEP-07

R.C. Work - South Wing Column - S L130

131S030050 R.C. Work - South Wing Column - S L131

192

02-OCT-07

04-OCT-07

R.C. Work - South Wing Column - S L131

132S030050 R.C. Work - South Wing Column - S L132

192

06-OCT-07

08-OCT-07

R.C. Work - South Wing Column - S L132

133S030050 R.C. Work - South Wing Column - S L133

192

11-OCT-07

13-OCT-07

R.C. Work - South Wing Column - S L133

134S030050 R.C. Work - South Wing Column - S L134

192

15-OCT-07

17-OCT-07

R.C. Work - South Wing Column - S L134

135S030050 R.C. Work - South Wing Column - S L135

192

19-OCT-07

21-OCT-07

R.C. Work - South Wing Column - S L135

136S030050 R.C. Work - South Wing Column - S L136

192

25-OCT-07

27-OCT-07

R.C. Work - South Wing Column - S L136

137S030050 R.C. Work - South Wing Column - S L137

192

30-OCT-07

02-NOV-07

R.C. Work - South Wing Column - S L137

138S030050 R.C. Work - South Wing Column - S L138

192

04-NOV-07

08-NOV-07

-01S030060

R.C. Work - Stair T03 B2 S

12

100

20-OCT-05A

06-NOV-05A

-02S030060

R.C. Work - Stair T03 B1 S

100

10-NOV-05A

22-NOV-05A

-03S030060

R.C. Work - Stair T03 Concourse S

100

24-NOV-05A

10-DEC-05A

R.C. Work - Stair T03 Concourse S

-04S030060

R.C. Work - Stair T03 Ground S

100

11-DEC-05A

20-DEC-05A

R.C. Work - Stair T03 Ground S

001S030060 R.C. Work - Stair T03 L1 S

100

21-DEC-05A

27-DEC-05A

R.C. Work - Stair T03 L1 S

002S030060 R.C. Work - Stair T03 L2 S

100

28-DEC-05A

08-JAN-06A

R.C. Work - Stair T03 L2 S

003S030060 R.C. Work - Stair T03 L3 S

100

09-JAN-06A

18-JAN-06A

R.C. Work - Stair T03 L3 S

004S030060 R.C. Work - Stair T03 L4 S

100

19-JAN-06A

24-JAN-06A

R.C. Work - Stair T03 L4 S

005S030060 R.C. Work - Stair T03 L5 S

100

25-JAN-06A

30-JAN-06A

R.C. Work - Stair T03 L5 S

006S030060 R.C. Work - Stair T03 L6 S

100

04-FEB-06A

08-FEB-06A

R.C. Work - Stair T03 L6 S

007S030060 R.C. Work - Stair T03 L7 S

100

09-FEB-06A

14-FEB-06A

R.C. Work - Stair T03 L7 S

008S030060 R.C. Work - Stair T03 L8 S

100

15-FEB-06A

26-FEB-06A

R.C. Work - Stair T03 L8 S

009S030060 R.C. Work - Stair T03 L9 S

100

27-FEB-06A

02-MAR-06A

R.C. Work - Stair T03 L9 S

010S030060 R.C. Work - Stair T03 L10 S

100

03-MAR-06A

14-MAR-06A

R.C. Work - Stair T03 L10 S

011S030060 R.C. Work - Stair T03 L11 S

100

15-MAR-06A

25-MAR-06A

R.C. Work - Stair T03 L11 S

012S030060 R.C. Work - Stair T03 L12 S

100

26-MAR-06A

01-APR-06A

R.C. Work - Stair T03 L12 S

013S030060 R.C. Work - Stair T03 L13 S

100

02-APR-06A

08-APR-06A

R.C. Work - Stair T03 L13 S

014S030060 R.C. Work - Stair T03 L14 S

100

09-APR-06A

13-APR-06A

R.C. Work - Stair T03 L14 S

015S030060 R.C. Work - Stair T03 L15 S

100

15-APR-06A

17-APR-06A

R.C. Work - Stair T03 L15 S

016S030060 R.C. Work - Stair T03 L16 S

100

18-APR-06A

03-MAY-06A

017S030060 R.C. Work - Stair T03 L17 S

100

04-MAY-06A

23-MAY-06A

R.C. Work - Stair T03 L17 S

018S030060 R.C. Work - Stair T03 L18 S

100

24-MAY-06A

01-JUN-06A

R.C. Work - Stair T03 L18 S

019S030060 R.C. Work - Stair T03 L19 S

100

02-JUN-06A

06-JUN-06A

R.C. Work - Stair T03 L19 S

020S030060 R.C. Work - Stair T03 L20 S

100

07-JUN-06A

11-JUN-06A

R.C. Work - Stair T03 L20 S

021S030060 R.C. Work - Stair T03 L21 S

100

13-JUN-06A

15-JUN-06A

R.C. Work - Stair T03 L21 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - South Wing Column - S L138


R.C. Work - Stair T03 B2 S
R.C. Work - Stair T03 B1 S

R.C. Work - Stair T03 L16 S

Sheet 71 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

022S030060 R.C. Work - Stair T03 L22 S

100

16-JUN-06A

23-JUN-06A

R.C. Work - Stair T03 L22 S

023S030060 R.C. Work - Stair T03 L23 S

100

24-JUN-06A

28-JUN-06A

R.C. Work - Stair T03 L23 S

024S030060 R.C. Work - Stair T03 L24 S

100

29-JUN-06A

02-JUL-06A

R.C. Work - Stair T03 L24 S

025S030060 R.C. Work - Stair T03 L25 S

100

04-JUL-06A

06-JUL-06A

R.C. Work - Stair T03 L25 S

026S030060 R.C. Work - Stair T03 L26 S

100

07-JUL-06A

12-JUL-06A

R.C. Work - Stair T03 L26 S

027S030060 R.C. Work - Stair T03 L27 S

100

13-JUL-06A

16-JUL-06A

R.C. Work - Stair T03 L27 S

028S030060 R.C. Work - Stair T03 L28 S

100

18-JUL-06A

23-JUL-06A

R.C. Work - Stair T03 L28 S

029S030060 R.C. Work - Stair T03 L29 S

100

25-JUL-06A

26-JUL-06A

R.C. Work - Stair T03 L29 S

030S030060 R.C. Work - Stair T03 L30 S

100

27-JUL-06A

30-JUL-06A

R.C. Work - Stair T03 L30 S

031S030060 R.C. Work - Stair T03 L31 S

100

01-AUG-06A

05-AUG-06A

R.C. Work - Stair T03 L31 S

032S030060 R.C. Work - Stair T03 L32 S

100

06-AUG-06A

08-AUG-06A

R.C. Work - Stair T03 L32 S

033S030060 R.C. Work - Stair T03 L33 S

100

09-AUG-06A

13-AUG-06A

R.C. Work - Stair T03 L33 S

034S030060 R.C. Work - Stair T03 L34 S

100

15-AUG-06A

17-AUG-06A

R.C. Work - Stair T03 L34 S

035S030060 R.C. Work - Stair T03 L35 S

100

18-AUG-06A

22-AUG-06A

R.C. Work - Stair T03 L35 S

036S030060 R.C. Work - Stair T03 L36 S

100

23-AUG-06A

31-AUG-06A

R.C. Work - Stair T03 L36 S

037S030060 R.C. Work - Stair T03 L37 S

100

01-SEP-06A

04-SEP-06A

R.C. Work - Stair T03 L37 S

038S030060 R.C. Work - Stair T03 L38 S

100

05-SEP-06A

07-SEP-06A

R.C. Work - Stair T03 L38 S

039S030060 R.C. Work - Stair T03 L39 S

100

08-SEP-06A

21-SEP-06A

040S030060 R.C. Work - Stair T03 L40 S

100

22-SEP-06A

10-OCT-06A

041S030060 R.C. Work - Stair T03 L41 S

100

11-OCT-06A

17-OCT-06A

042S030060 R.C. Work - Stair T03 L42 S

100

13-SEP-06A

20-SEP-06A

R.C. Work - Stair T03 L42 S

043S030060 R.C. Work - Stair T06 L43 S

100

21-SEP-06A

26-SEP-06A

R.C. Work - Stair T06 L43 S

044S030060 R.C. Work - Stair T06 L44 S

100

27-SEP-06A

02-OCT-06A

R.C. Work - Stair T06 L44 S

045S030060 R.C. Work - Stair T06 L45 S

100

03-OCT-06A

07-OCT-06A

R.C. Work - Stair T06 L45 S

046S030060 R.C. Work - Stair T06 L46 S

100

08-OCT-06A

12-OCT-06A

R.C. Work - Stair T06 L46 S

047S030060 R.C. Work - Stair T06 L47 S

100

13-OCT-06A

16-OCT-06A

R.C. Work - Stair T06 L47 S

048S030060 R.C. Work - Stair T06 L48 S

100

17-OCT-06A

19-OCT-06A

R.C. Work - Stair T06 L48 S

049S030060 R.C. Work - Stair T06 L49 S

100

20-OCT-06A

24-OCT-06A

R.C. Work - Stair T06 L49 S

050S030060 R.C. Work - Stair T06 L50 S

100

26-OCT-06A

29-OCT-06A

R.C. Work - Stair T06 L50 S

051S030060 R.C. Work - Stair T06 L51 S

100

31-OCT-06A

31-OCT-06A

R.C. Work - Stair T06 L51 S

052S030060 R.C. Work - Stair T06 L52 S

100

02-NOV-06A

02-NOV-06A

R.C. Work - Stair T06 L52 S

053S030060 R.C. Work - Stair T06 L53 S

100

03-NOV-06A

05-NOV-06A

R.C. Work - Stair T06 L53 S

054S030060 R.C. Work - Stair T06 L54 S

100

06-NOV-06A

07-NOV-06A

R.C. Work - Stair T06 L54 S

055S030060 R.C. Work - Stair T06 L55 S

100

08-NOV-06A

09-NOV-06A

R.C. Work - Stair T06 L55 S

056S030060 R.C. Work - Stair T06 L56 S

100

10-NOV-06A

12-NOV-06A

R.C. Work - Stair T06 L56 S

057S030060 R.C. Work - Stair T06 L57 S

100

13-NOV-06A

13-NOV-06A

R.C. Work - Stair T06 L57 S

058S030060 R.C. Work - Stair T06 L58 S

100

16-NOV-06A

16-NOV-06A

R.C. Work - Stair T06 L58 S

059S030060 R.C. Work - Stair T06 L59 S

100

17-NOV-06A

19-NOV-06A

R.C. Work - Stair T06 L59 S

060S030060 R.C. Work - Stair T06 L60 S

100

20-NOV-06A

21-NOV-06A

R.C. Work - Stair T06 L60 S

061S030060 R.C. Work - Stair T06 L61 S

100

22-NOV-06A

23-NOV-06A

R.C. Work - Stair T06 L61 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Stair T03 L39 S


R.C. Work - Stair T03 L40 S
R.C. Work - Stair T03 L41 S

Sheet 72 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

062S030060 R.C. Work - Stair T06 L62 S

100

24-NOV-06A

28-NOV-06A

R.C. Work - Stair T06 L62 S

063S030060 R.C. Work - Stair T06 L63 S

100

29-NOV-06A

30-NOV-06A

R.C. Work - Stair T06 L63 S

064S030060 R.C. Work - Stair T06 L64 S

100

01-DEC-06A

04-DEC-06A

R.C. Work - Stair T06 L64 S

065S030060 R.C. Work - Stair T06 L65 S

100

07-DEC-06A

04-DEC-06A

R.C. Work - Stair T06 L65 S

066S030060 R.C. Work - Stair T06 L66 S

100

07-DEC-06A

11-DEC-06A

R.C. Work - Stair T06 L66 S

067S030060 R.C. Work - Stair T06 L67 S

100

12-DEC-06A

16-DEC-06A

R.C. Work - Stair T06 L67 S

068S030060 R.C. Work - Stair T06 L68 S

100

17-DEC-06A

18-DEC-06A

R.C. Work - Stair T06 L68 S

069S030060 R.C. Work - Stair T06 L69 S

100

19-DEC-06A

20-DEC-06A

R.C. Work - Stair T06 L69 S

070S030060 R.C. Work - Stair T06 L70 S

100

21-DEC-06A

25-DEC-06A

R.C. Work - Stair T06 L70 S

071S030060 R.C. Work - Stair T06 L71 S

100

26-DEC-06A

28-DEC-06A

R.C. Work - Stair T06 L71 S

072S030060 R.C. Work - Stair T06 L72 S

100

29-DEC-06A

04-JAN-07A

R.C. Work - Stair T06 L72 S

073S030060 R.C. Work - Stair T06 L73 S

100

05-JAN-07A

09-JAN-07A

R.C. Work - Stair T06 L73 S

074S030060 R.C. Work - Stair T06 L74 S

100

10-JAN-07A

13-JAN-07A

R.C. Work - Stair T06 L74 S

075S030060 R.C. Work - Stair T06 L75 S

100

13-JAN-07A

15-JAN-07A

R.C. Work - Stair T06 L75 S

040S030070 R.C. Work - Wall & Beam L40-42 S

20

100

06-OCT-06A

23-NOV-06A

R.C. Work - Wall & Beam L40-42 S

073S030070 R.C. Work - Wall & Beam L73-75 S

20

30

335

26-FEB-07A

01-APR-07

109S030070 R.C. Work - Wall & Beam L109-111 S

20

259

07-JUL-07

28-JUL-07

136S030070 R.C. Work - Wall & Beam L136-138 S

20

331

24-NOV-07

15-DEC-07

R.C. Work - Wall & Beam L73-75 S


R.C. Work - Wall & Beam L109-111 S
R.C. Work - Wall & Beam L136-138 S

EAST WING
-01E030030

R.C. Work - Core Wall & Link Beam B2 E

18

100

16-MAY-05A

07-JUN-05A

-02E030030

R.C. Work - Core Wall & Link Beam B1 E

17

100

11-JUN-05A

20-JUL-05A

R.C. Work - Core Wall & Link Beam B1 E

-03E030030

R.C. Work - Core Wall & Link Beam Concourse-1 E

10

100

15-JUL-05A

30-JUL-05A

R.C. Work - Core Wall & Link Beam Concourse-1 E

-03E030031

R.C. Work - Core Wall & Link Beam Concourse-2 E

100

29-JUL-05A

09-AUG-05A

R.C. Work - Core Wall & Link Beam Concourse-2 E

-04E030030

R.C. Work - Core Wall & Link Beam Ground E

11

100

07-AUG-05A

25-AUG-05A

R.C. Work - Core Wall & Link Beam Ground E

001E030030 R.C. Work - Core Wall & Link Beam L1 E

12

100

22-AUG-05A

04-SEP-05A

R.C. Work - Core Wall & Link Beam L1 E

002E030030 R.C. Work - Core Wall & Link Beam L2 E

10

100

31-AUG-05A

13-SEP-05A

R.C. Work - Core Wall & Link Beam L2 E

003E030030 R.C. Work - Core Wall & Link Beam L3 E

12

100

13-SEP-05A

22-SEP-05A

R.C. Work - Core Wall & Link Beam L3 E

004E030030 R.C. Work - Core Wall & Link Beam L4 E

10

100

20-SEP-05A

29-SEP-05A

R.C. Work - Core Wall & Link Beam L4 E

005E030030 R.C. Work - Core Wall & Link Beam L5 E

10

100

29-SEP-05A

07-OCT-05A

R.C. Work - Core Wall & Link Beam L5 E

006E030030 R.C. Work - Core Wall & Link Beam L6 E

10

100

06-OCT-05A

13-OCT-05A

R.C. Work - Core Wall & Link Beam L6 E

007E030030 R.C. Work - Core Wall & Link Beam L7 E

10

100

13-OCT-05A

25-OCT-05A

R.C. Work - Core Wall & Link Beam L7 E

008E030030 R.C. Work - Core Wall & Link Beam L8 E

100

21-OCT-05A

06-NOV-05A

R.C. Work - Core Wall & Link Beam L8 E

009E030030 R.C. Work - Core Wall & Link Beam L9 E

10

100

01-NOV-05A

13-NOV-05A

R.C. Work - Core Wall & Link Beam L9 E

010E030030 R.C. Work - Core Wall & Link Beam L10 E

100

17-NOV-05A

21-NOV-05A

R.C. Work - Core Wall & Link Beam L10 E

011E030030 R.C. Work - Core Wall & Link Beam L11 E

100

22-NOV-05A

30-NOV-05A

R.C. Work - Core Wall & Link Beam L11 E

012E030030 R.C. Work - Core Wall & Link Beam L12 E

100

29-NOV-05A

08-DEC-05A

R.C. Work - Core Wall & Link Beam L12 E

013E030030 R.C. Work - Core Wall & Link Beam L13 E

100

07-DEC-05A

13-DEC-05A

R.C. Work - Core Wall & Link Beam L13 E

014E030030 R.C. Work - Core Wall & Link Beam L14 E

100

12-DEC-05A

19-DEC-05A

R.C. Work - Core Wall & Link Beam L14 E

015E030030 R.C. Work - Core Wall & Link Beam L15 E

10

100

18-DEC-05A

27-DEC-05A

R.C. Work - Core Wall & Link Beam L15 E

016E030030 R.C. Work - Core Wall & Link Beam L16 E

100

25-DEC-05A

14-JAN-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Core Wall & Link Beam B2 E

R.C. Work - Core Wall & Link Beam L16 E


Sheet 73 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - Core Wall & Link Beam L16~L17 E

016E030031 R.C. Work - Core Wall & Link Beam L16~L17 E

18

100

10-JAN-06A

30-JAN-06A

017E030030 R.C. Work - Core Wall & Link Beam L17~L18 E

13

100

04-FEB-06A

16-FEB-06A

018E030030 R.C. Work - Core Wall & Link Beam L18 E

100

13-FEB-06A

28-FEB-06A

R.C. Work - Core Wall & Link Beam L18 E

019E030030 R.C. Work - Core Wall & Link Beam L19 E

100

26-FEB-06A

07-MAR-06A

R.C. Work - Core Wall & Link Beam L19 E

020E030030 R.C. Work - Core Wall & Link Beam L20 E

100

08-MAR-06A

19-MAR-06A

R.C. Work - Core Wall & Link Beam L20 E

021E030030 R.C. Work - Core Wall & Link Beam L21 E

100

17-MAR-06A

25-MAR-06A

R.C. Work - Core Wall & Link Beam L21 E

022E030030 R.C. Work - Core Wall & Link Beam L22 E

100

24-MAR-06A

29-MAR-06A

R.C. Work - Core Wall & Link Beam L22 E

023E030030 R.C. Work - Core Wall & Link Beam L23 E

100

31-MAR-06A

08-APR-06A

R.C. Work - Core Wall & Link Beam L23 E

024E030030 R.C. Work - Core Wall & Link Beam L24 E

100

06-APR-06A

15-APR-06A

R.C. Work - Core Wall & Link Beam L24 E

025E030030 R.C. Work - Core Wall & Link Beam L25 E

100

13-APR-06A

23-APR-06A

R.C. Work - Core Wall & Link Beam L25 E

026E030030 R.C. Work - Core Wall & Link Beam L26 E

100

21-APR-06A

29-APR-06A

R.C. Work - Core Wall & Link Beam L26 E

027E030030 R.C. Work - Core Wall & Link Beam L27 E

100

29-APR-06A

03-MAY-06A

R.C. Work - Core Wall & Link Beam L27 E

028E030030 R.C. Work - Core Wall & Link Beam L28 E

100

03-MAY-06A

07-MAY-06A

R.C. Work - Core Wall & Link Beam L28 E

029E030030 R.C. Work - Core Wall & Link Beam L29 E

100

08-MAY-06A

11-MAY-06A

R.C. Work - Core Wall & Link Beam L29 E

030E030030 R.C. Work - Core Wall & Link Beam L30 E

100

11-MAY-06A

17-MAY-06A

R.C. Work - Core Wall & Link Beam L30 E

031E030030 R.C. Work - Core Wall & Link Beam L31 E

100

16-MAY-06A

21-MAY-06A

R.C. Work - Core Wall & Link Beam L31 E

032E030030 R.C. Work - Core Wall & Link Beam L32 E

100

21-MAY-06A

24-MAY-06A

R.C. Work - Core Wall & Link Beam L32 E

033E030030 R.C. Work - Core Wall & Link Beam L33 E

100

24-MAY-06A

28-MAY-06A

R.C. Work - Core Wall & Link Beam L33 E

034E030030 R.C. Work - Core Wall & Link Beam L34 E

100

28-MAY-06A

02-JUN-06A

R.C. Work - Core Wall & Link Beam L34 E

035E030030 R.C. Work - Core Wall & Link Beam L35 E

100

02-JUN-06A

06-JUN-06A

R.C. Work - Core Wall & Link Beam L35 E

036E030030 R.C. Work - Core Wall & Link Beam L36 E

100

06-JUN-06A

11-JUN-06A

R.C. Work - Core Wall & Link Beam L36 E

037E030030 R.C. Work - Core Wall & Link Beam L37 E

100

09-JUN-06A

15-JUN-06A

R.C. Work - Core Wall & Link Beam L37 E

038E030030 R.C. Work - Core Wall & Link Beam L38 E

100

14-JUN-06A

20-JUN-06A

R.C. Work - Core Wall & Link Beam L38 E

039E030030 R.C. Work - Core Wall & Link Beam L39 E

10

100

20-JUN-06A

25-JUN-06A

R.C. Work - Core Wall & Link Beam L39 E

040E030030 R.C. Work - Core Wall & Link Beam L40 E

100

27-JUN-06A

06-JUL-06A

R.C. Work - Core Wall & Link Beam L40 E

041E030030 R.C. Work - Core Wall & Link Beam L41 E

100

05-JUL-06A

13-JUL-06A

R.C. Work - Core Wall & Link Beam L41 E

042E030030 R.C. Work - Core Wall & Link Beam L42 E

100

11-JUL-06A

19-JUL-06A

R.C. Work - Core Wall & Link Beam L42 E

043E030030 R.C. Work - Core Wall & Link Beam L43 E

100

20-JUL-06A

25-JUL-06A

R.C. Work - Core Wall & Link Beam L43 E

044E030030 R.C. Work - Core Wall & Link Beam L44 E

100

23-JUL-06A

05-AUG-06A

R.C. Work - Core Wall & Link Beam L44 E

045E030030 R.C. Work - Core Wall & Link Beam L45 E

100

30-JUL-06A

08-AUG-06A

R.C. Work - Core Wall & Link Beam L45 E

046E030030 R.C. Work - Core Wall & Link Beam L46 E

100

08-AUG-06A

12-AUG-06A

R.C. Work - Core Wall & Link Beam L46 E

047E030030 R.C. Work - Core Wall & Link Beam L47 E

100

11-AUG-06A

15-AUG-06A

R.C. Work - Core Wall & Link Beam L47 E

048E030030 R.C. Work - Core Wall & Link Beam L48 E

100

16-AUG-06A

20-AUG-06A

R.C. Work - Core Wall & Link Beam L48 E

049E030030 R.C. Work - Core Wall & Link Beam L49 E

100

18-AUG-06A

27-AUG-06A

R.C. Work - Core Wall & Link Beam L49 E

050E030030 R.C. Work - Core Wall & Link Beam L50 E

100

29-AUG-06A

09-SEP-06A

R.C. Work - Core Wall & Link Beam L50 E

051E030030 R.C. Work - Core Wall & Link Beam L51 E

100

31-AUG-06A

13-SEP-06A

R.C. Work - Core Wall & Link Beam L51 E

052E030030 R.C. Work - Core Wall & Link Beam L52 E

100

13-SEP-06A

19-SEP-06A

R.C. Work - Core Wall & Link Beam L52 E

053E030030 R.C. Work - Core Wall & Link Beam L53 E

11

100

18-SEP-06A

23-SEP-06A

R.C. Work - Core Wall & Link Beam L53 E

054E030030 R.C. Work - Core Wall & Link Beam L54 E

100

24-SEP-06A

26-SEP-06A

R.C. Work - Core Wall & Link Beam L54 E

055E030030 R.C. Work - Core Wall & Link Beam L55 E

100

27-SEP-06A

28-SEP-06A

R.C. Work - Core Wall & Link Beam L55 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Core Wall & Link Beam L17~L18 E

Sheet 74 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

056E030030 R.C. Work - Core Wall & Link Beam L56 E

100

29-SEP-06A

03-OCT-06A

R.C. Work - Core Wall & Link Beam L56 E

057E030030 R.C. Work - Core Wall & Link Beam L57 E

100

04-OCT-06A

07-OCT-06A

R.C. Work - Core Wall & Link Beam L57 E

058E030030 R.C. Work - Core Wall & Link Beam L58 E

100

08-OCT-06A

10-OCT-06A

R.C. Work - Core Wall & Link Beam L58 E

059E030030 R.C. Work - Core Wall & Link Beam L59 E

100

11-OCT-06A

14-OCT-06A

R.C. Work - Core Wall & Link Beam L59 E

060E030030 R.C. Work - Core Wall & Link Beam L60 E

100

15-OCT-06A

17-OCT-06A

R.C. Work - Core Wall & Link Beam L60 E

061E030030 R.C. Work - Core Wall & Link Beam L61 E

100

19-OCT-06A

19-OCT-06A

R.C. Work - Core Wall & Link Beam L61 E

062E030030 R.C. Work - Core Wall & Link Beam L62 E

100

20-OCT-06A

26-OCT-06A

R.C. Work - Core Wall & Link Beam L62 E

063E030030 R.C. Work - Core Wall & Link Beam L63 E

100

27-OCT-06A

29-OCT-06A

R.C. Work - Core Wall & Link Beam L63 E

064E030030 R.C. Work - Core Wall & Link Beam L64 E

100

31-OCT-06A

31-OCT-06A

R.C. Work - Core Wall & Link Beam L64 E

065E030030 R.C. Work - Core Wall & Link Beam L65 E

100

02-NOV-06A

06-NOV-06A

R.C. Work - Core Wall & Link Beam L65 E

066E030030 R.C. Work - Core Wall & Link Beam L66 E

100

07-NOV-06A

08-NOV-06A

R.C. Work - Core Wall & Link Beam L66 E

067E030030 R.C. Work - Core Wall & Link Beam L67 E

100

09-NOV-06A

12-NOV-06A

R.C. Work - Core Wall & Link Beam L67 E

068E030030 R.C. Work - Core Wall & Link Beam L68 E

100

13-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L68 E

069E030030 R.C. Work - Core Wall & Link Beam L69 E

100

16-NOV-06A

18-NOV-06A

R.C. Work - Core Wall & Link Beam L69 E

070E030030 R.C. Work - Core Wall & Link Beam L70 E

100

19-NOV-06A

20-NOV-06A

R.C. Work - Core Wall & Link Beam L70 E

071E030030 R.C. Work - Core Wall & Link Beam L71 E

100

21-NOV-06A

22-NOV-06A

R.C. Work - Core Wall & Link Beam L71 E

072E030030 R.C. Work - Core Wall & Link Beam L72 E

100

23-NOV-06A

26-NOV-06A

R.C. Work - Core Wall & Link Beam L72 E

073E030030 R.C. Work - Core Wall & Link Beam L73 E

100

27-NOV-06A

04-DEC-06A

R.C. Work - Core Wall & Link Beam L73 E

074E030030 R.C. Work - Core Wall & Link Beam L74 E

100

07-DEC-06A

09-DEC-06A

R.C. Work - Core Wall & Link Beam L74 E

075E030030 R.C. Work - Core Wall & Link Beam L75 E

100

10-DEC-06A

16-DEC-06A

R.C. Work - Core Wall & Link Beam L75 E

076E030030 R.C. Work - Core Wall & Link Beam L76 E

100

17-DEC-06A

19-DEC-06A

R.C. Work - Core Wall & Link Beam L76 E

077E030030 R.C. Work - Core Wall & Link Beam L77 E

100

20-DEC-06A

21-DEC-06A

R.C. Work - Core Wall & Link Beam L77 E

078E030030 R.C. Work - Core Wall & Link Beam L78 E

100

22-DEC-06A

25-DEC-06A

R.C. Work - Core Wall & Link Beam L78 E

079E030030 R.C. Work - Core Wall & Link Beam L79 E

100

26-DEC-06A

27-DEC-06A

R.C. Work - Core Wall & Link Beam L79 E

080E030030 R.C. Work - Core Wall & Link Beam L80 E

100

28-DEC-06A

02-JAN-07A

R.C. Work - Core Wall & Link Beam L80 E

081E030030 R.C. Work - Core Wall & Link Beam L81 E

100

04-JAN-07A

04-JAN-07A

R.C. Work - Core Wall & Link Beam L81 E

082E030030 R.C. Work - Core Wall & Link Beam L82 E

100

05-JAN-07A

07-JAN-07A

R.C. Work - Core Wall & Link Beam L82 E

083E030030 R.C. Work - Core Wall & Link Beam L83 E

100

08-JAN-07A

09-JAN-07A

R.C. Work - Core Wall & Link Beam L83 E

084E030030 R.C. Work - Core Wall & Link Beam L84 E

100

10-JAN-07A

13-JAN-07A

R.C. Work - Core Wall & Link Beam L84 E

085E030030 R.C. Work - Core Wall & Link Beam L85 E

100

14-JAN-07A

25-JAN-07A

R.C. Work - Core Wall & Link Beam L85 E

086E030030 R.C. Work - Core Wall & Link Beam L86 E

100

26-JAN-07A

28-JAN-07A

R.C. Work - Core Wall & Link Beam L86 E

087E030030 Dismantle Core Form East Wing

14

100

29-JAN-07A

04-FEB-07A

-01E030040

R.C. Work - Slab B2 E-1

18

100

06-AUG-05A

31-AUG-05A

R.C. Work - Slab B2 E-1

-01E030041

R.C. Work - Slab B2 E-2

28

100

06-AUG-05A

08-SEP-05A

R.C. Work - Slab B2 E-2

-01E030042

R.C. Work - Slab B2 E-Nose 1

28

100

06-AUG-05A

08-SEP-05A

R.C. Work - Slab B2 E-Nose 1

-02E030040

R.C. Work - Slab B1 E-1

16

100

09-SEP-05A

27-SEP-05A

R.C. Work - Slab B1 E-1

-02E030041

R.C. Work - Slab B1 E-2

16

100

09-SEP-05A

06-OCT-05A

R.C. Work - Slab B1 E-2

-02E030042

R.C. Work - Slab B1 E-Nose 1

16

100

09-SEP-05A

06-OCT-05A

R.C. Work - Slab B1 E-Nose 1

-03E030040

R.C. Work - Slab Concourse E-1

18

100

28-SEP-05A

16-OCT-05A

R.C. Work - Slab Concourse E-1

-03E030041

R.C. Work - Slab Concourse E-2

15

100

28-SEP-05A

24-OCT-05A

R.C. Work - Slab Concourse E-2

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Dismantle Core Form East Wing

Sheet 75 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

-03E030042

R.C. Work - Slab Concourse E-Nose 1

18

100

28-SEP-05A

27-NOV-05A

-04E030040

R.C. Work - Slab Ground E-1

19

100

12-FEB-06A

28-MAR-06A

-04E030041

R.C. Work - Slab Ground E-2

19

100

13-FEB-06A

13-MAR-06A

-04E030042

R.C. Work - Slab Ground E-Nose 1

2005

2006

R.C. Work - Slab Ground E-1


R.C. Work - Slab Ground E-Nose 1

100

29-NOV-05A

03-JAN-06A

12

100

18-OCT-05A

12-NOV-05A

R.C. Work - Slab L1 E-1

001E030041 R.C. Work - Slab L1 E-2

10

100

18-OCT-05A

24-NOV-05A

R.C. Work - Slab L1 E-2

001E030042 R.C. Work - Slab L1 E-Nose 1

12

100

04-JAN-06A

17-JAN-06A

002E030040 R.C. Work - Slab L2 E-1

10

100

09-APR-06A

27-APR-06A

R.C. Work - Slab L2 E-1

002E030041 R.C. Work - Slab L2 E-2

15

100

09-APR-06A

23-APR-06A

R.C. Work - Slab L2 E-2

002E030042 R.C. Work - Slab L2 E-Nose 1

15

100

18-JAN-06A

30-JAN-06A

003E030040 R.C. Work - Slab L3 E-1

14

100

10-NOV-05A

27-NOV-05A

R.C. Work - Slab L3 E-1

003E030041 R.C. Work - Slab L3 E-2

14

100

18-NOV-05A

08-DEC-05A

R.C. Work - Slab L3 E-2

003E030042 R.C. Work - Slab L3 E-Nose 1

14

100

04-FEB-06A

20-FEB-06A

004E030040 R.C. Work - Slab L4 E-1

14

100

07-DEC-05A

21-DEC-05A

R.C. Work - Slab L4 E-1

004E030041 R.C. Work - Slab L4 E-2

14

100

25-NOV-05A

11-DEC-05A

R.C. Work - Slab L4 E-2

004E030042 R.C. Work - Slab L4 E-Nose 1

14

100

22-FEB-06A

05-MAR-06A

005E030040 R.C. Work - Slab L5 E-1

12

100

15-DEC-05A

03-JAN-06A

005E030041 R.C. Work - Slab L5 E-2

26

100

10-DEC-05A

22-DEC-05A

005E030042 R.C. Work - Slab L5 E-Nose 1

12

100

06-MAR-06A

14-MAR-06A

006E030040 R.C. Work - Slab L6 E-1

100

24-DEC-05A

09-JAN-06A

R.C. Work - Slab L6 E-1

006E030041 R.C. Work - Slab L6 E-2

100

20-DEC-05A

07-JAN-06A

R.C. Work - Slab L6 E-2

006E030042 R.C. Work - Slab L6 E-Nose 1

100

15-MAR-06A

20-MAR-06A

007E030040 R.C. Work - Slab L7 E-1

100

10-JAN-06A

14-JAN-06A

R.C. Work - Slab L7 E-1

007E030041 R.C. Work - Slab L7 E-2

100

08-JAN-06A

14-JAN-06A

R.C. Work - Slab L7 E-2

007E030042 R.C. Work - Slab L7 E-Nose 1

100

21-MAR-06A

27-MAR-06A

008E030040 R.C. Work - Slab L8 E-1

100

15-JAN-06A

24-JAN-06A

R.C. Work - Slab L8 E-1

008E030041 R.C. Work - Slab L8 E-2

100

15-JAN-06A

22-JAN-06A

R.C. Work - Slab L8 E-2

008E030042 R.C. Work - Slab L8 E-Nose 1

100

28-MAR-06A

29-MAR-06A

009E030040 R.C. Work - Slab L9 E-1

100

25-JAN-06A

04-FEB-06A

R.C. Work - Slab L9 E-1

009E030041 R.C. Work - Slab L9 E-2

100

23-JAN-06A

30-JAN-06A

R.C. Work - Slab L9 E-2

009E030042 R.C. Work - Slab L9 E-Nose 1

100

31-MAR-06A

05-APR-06A

010E030040 R.C. Work - Slab L10 E-1

100

05-FEB-06A

08-FEB-06A

R.C. Work - Slab L10 E-1

010E030041 R.C. Work - Slab L10 E-2

100

04-FEB-06A

06-FEB-06A

R.C. Work - Slab L10 E-2

010E030042 R.C. Work - Slab L10 E-Nose 1

100

06-APR-06A

09-APR-06A

011E030040 R.C. Work - Slab L11 E-1

100

10-FEB-06A

15-FEB-06A

R.C. Work - Slab L11 E-1

011E030041 R.C. Work - Slab L11 E-2

100

07-FEB-06A

11-FEB-06A

R.C. Work - Slab L11 E-2

011E030042 R.C. Work - Slab L11 E-Nose 1

100

10-APR-06A

18-APR-06A

012E030040 R.C. Work - Slab L12 E-1

100

16-FEB-06A

20-FEB-06A

R.C. Work - Slab L12 E-1

012E030041 R.C. Work - Slab L12 E-2

100

12-FEB-06A

18-FEB-06A

R.C. Work - Slab L12 E-2

012E030042 R.C. Work - Slab L12 E-Nose 1

100

19-APR-06A

23-APR-06A

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab Ground E-2

19

29-DEC-04
18-AUG-09
15-MAR-07

2008

R.C. Work - Slab Concourse E-Nose 1

001E030040 R.C. Work - Slab L1 E-1

Start Date
Finish Date
Data Date

2007

R.C. Work - Slab L1 E-Nose 1

R.C. Work - Slab L2 E-Nose 1

R.C. Work - Slab L3 E-Nose 1

R.C. Work - Slab L4 E-Nose 1


R.C. Work - Slab L5 E-1
R.C. Work - Slab L5 E-2
R.C. Work - Slab L5 E-Nose 1

R.C. Work - Slab L6 E-Nose 1

R.C. Work - Slab L7 E-Nose 1

R.C. Work - Slab L8 E-Nose 1

R.C. Work - Slab L9 E-Nose 1

R.C. Work - Slab L10 E-Nose 1

R.C. Work - Slab L11 E-Nose 1

R.C. Work - Slab L12 E-Nose 1


Sheet 76 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

013E030040 R.C. Work - Slab L13 E-1

100

22-FEB-06A

23-FEB-06A

R.C. Work - Slab L13 E-1

013E030041 R.C. Work - Slab L13 E-2

100

19-FEB-06A

20-FEB-06A

R.C. Work - Slab L13 E-2

013E030042 R.C. Work - Slab L13 E-Nose 1

100

24-APR-06A

29-APR-06A

014E030040 R.C. Work - Slab L14 E-1

100

24-FEB-06A

02-MAR-06A

R.C. Work - Slab L14 E-1

014E030041 R.C. Work - Slab L14 E-2

100

22-FEB-06A

26-FEB-06A

R.C. Work - Slab L14 E-2

014E030042 R.C. Work - Slab L14 E-Nose 1

100

30-APR-06A

04-MAY-06A

015E030040 R.C. Work - Slab L15 E-1

100

03-MAR-06A

06-MAR-06A

R.C. Work - Slab L15 E-1

015E030041 R.C. Work - Slab L15 E-2

100

27-FEB-06A

02-MAR-06A

R.C. Work - Slab L15 E-2

015E030042 R.C. Work - Slab L15 E-Nose 1

100

05-MAY-06A

10-MAY-06A

016E030040 R.C. Work - Slab L16 E-1

100

07-MAR-06A

12-MAR-06A

R.C. Work - Slab L16 E-1

016E030041 R.C. Work - Slab L16 E-2

100

03-MAR-06A

08-MAR-06A

R.C. Work - Slab L16 E-2

016E030042 R.C. Work - Slab L16 E-Nose 1

100

11-MAY-06A

18-MAY-06A

017E030040 R.C. Work - Slab L17 E-1

13

100

14-MAR-06A

20-MAR-06A

R.C. Work - Slab L17 E-1

017E030041 R.C. Work - Slab L17 E-2

13

100

09-MAR-06A

15-MAR-06A

R.C. Work - Slab L17 E-2

017E030042 R.C. Work - Slab L17 E-Nose 1

13

100

19-MAY-06A

21-JUN-06A

018E030040 R.C. Work - Slab L18 E-1

100

21-MAR-06A

27-MAR-06A

R.C. Work - Slab L18 E-1

018E030041 R.C. Work - Slab L18 E-2

100

17-MAR-06A

25-MAR-06A

R.C. Work - Slab L18 E-2

018E030042 R.C. Work - Slab L18 E-Nose 1

12

100

23-JUN-06A

27-JUL-06A

019E030040 R.C. Work - Slab L19 E-1

100

28-MAR-06A

09-APR-06A

R.C. Work - Slab L19 E-1

019E030041 R.C. Work - Slab L19 E-2

100

26-MAR-06A

02-APR-06A

R.C. Work - Slab L19 E-2

019E030042 R.C. Work - Slab L19 E-Nose 1

100

28-JUL-06A

30-AUG-06A

020E030040 R.C. Work - Slab L20 E-1

100

10-APR-06A

13-APR-06A

R.C. Work - Slab L20 E-1

020E030041 R.C. Work - Slab L20 E-2

100

03-APR-06A

12-APR-06A

R.C. Work - Slab L20 E-2

020E030042 R.C. Work - Slab L20 E-Nose 1

100

31-AUG-06A

06-SEP-06A

021E030040 R.C. Work - Slab L21 E-1

100

15-APR-06A

22-APR-06A

R.C. Work - Slab L21 E-1

021E030041 R.C. Work - Slab L21 E-2

100

13-APR-06A

19-APR-06A

R.C. Work - Slab L21 E-2

021E030042 R.C. Work - Slab L21 E-Nose 1

100

07-SEP-06A

13-SEP-06A

022E030040 R.C. Work - Slab L22 E-1

100

23-APR-06A

27-APR-06A

R.C. Work - Slab L22 E-1

022E030041 R.C. Work - Slab L22 E-2

100

20-APR-06A

27-APR-06A

R.C. Work - Slab L22 E-2

022E030042 R.C. Work - Slab L22 E-Nose 1

100

14-SEP-06A

18-SEP-06A

023E030040 R.C. Work - Slab L23 E-1

100

29-APR-06A

02-MAY-06A

R.C. Work - Slab L23 E-1

023E030041 R.C. Work - Slab L23 E-2

100

29-APR-06A

30-APR-06A

R.C. Work - Slab L23 E-2

023E030042 R.C. Work - Slab L23 E-Nose 1

100

19-SEP-06A

23-SEP-06A

024E030040 R.C. Work - Slab L24 E-1

100

03-MAY-06A

08-MAY-06A

R.C. Work - Slab L24 E-1

024E030041 R.C. Work - Slab L24 E-2

100

02-MAY-06A

06-MAY-06A

R.C. Work - Slab L24 E-2

024E030042 R.C. Work - Slab L24 E-Nose 1

100

24-SEP-06A

27-SEP-06A

025E030040 R.C. Work - Slab L25 E-1

100

09-MAY-06A

14-MAY-06A

R.C. Work - Slab L25 E-1

025E030041 R.C. Work - Slab L25 E-2

100

07-MAY-06A

10-MAY-06A

R.C. Work - Slab L25 E-2

025E030042 R.C. Work - Slab L25 E-Nose 1

100

28-SEP-06A

03-OCT-06A

026E030040 R.C. Work - Slab L26 E-1

100

16-MAY-06A

24-MAY-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2008

2009

R.C. Work - Slab L13 E-Nose 1

R.C. Work - Slab L14 E-Nose 1

R.C. Work - Slab L15 E-Nose 1

R.C. Work - Slab L16 E-Nose 1

R.C. Work - Slab L17 E-Nose 1

R.C. Work - Slab L18 E-Nose 1

R.C. Work - Slab L19 E-Nose 1

R.C. Work - Slab L20 E-Nose 1

R.C. Work - Slab L21 E-Nose 1

R.C. Work - Slab L22 E-Nose 1

R.C. Work - Slab L23 E-Nose 1

R.C. Work - Slab L24 E-Nose 1

R.C. Work - Slab L25 E-Nose 1


R.C. Work - Slab L26 E-1
Sheet 77 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

026E030041 R.C. Work - Slab L26 E-2

100

11-MAY-06A

17-MAY-06A

026E030042 R.C. Work - Slab L26 E-Nose 1 (Terrace)

100

04-OCT-06A

12-OCT-06A

027E030040 R.C. Work - Slab L27 E

100

18-MAY-06A

24-MAY-06A

027E030041 R.C. Work - Slab L27 E-Nose 2

100

25-MAY-06A

11-JUN-06A

028E030040 R.C. Work - Slab L28 E

100

25-MAY-06A

27-MAY-06A

028E030041 R.C. Work - Slab L28 E-Nose 2

100

13-JUN-06A

20-JUN-06A

029E030040 R.C. Work - Slab L29 E

100

28-MAY-06A

30-MAY-06A

029E030041 R.C. Work - Slab L29 E-Nose 2

100

21-JUN-06A

27-JUN-06A

030E030040 R.C. Work - Slab L30 E

100

31-MAY-06A

04-JUN-06A

030E030041 R.C. Work - Slab L30 E-Nose 2

100

28-JUN-06A

05-JUL-06A

031E030040 R.C. Work - Slab L31 E

100

06-JUN-06A

08-JUN-06A

031E030041 R.C. Work - Slab L31 E-Nose 2

100

06-JUL-06A

13-JUL-06A

032E030040 R.C. Work - Slab L32 E

100

09-JUN-06A

13-JUN-06A

032E030041 R.C. Work - Slab L32 E-Nose 2

100

18-JUL-06A

25-JUL-06A

033E030040 R.C. Work - Slab L33 E

100

13-JUN-06A

18-JUN-06A

033E030041 R.C. Work - Slab L33 E-Nose 2

100

26-JUL-06A

03-AUG-06A

034E030040 R.C. Work - Slab L34 E

100

15-JUN-06A

21-JUN-06A

034E030041 R.C. Work - Slab L34 E-Nose 2

100

04-AUG-06A

23-AUG-06A

035E030040 R.C. Work - Slab L35 E

100

20-JUN-06A

24-JUN-06A

035E030041 R.C. Work - Slab L35 E-Nose 2

100

24-AUG-06A

02-SEP-06A

036E030040 R.C. Work - Slab L36 E

100

25-JUN-06A

29-JUN-06A

036E030041 R.C. Work - Slab L36 E-Nose 2

100

03-SEP-06A

10-SEP-06A

037E030040 R.C. Work - Slab L37 E

100

29-JUN-06A

05-JUL-06A

037E030041 R.C. Work - Slab L37 E-Nose 2

100

13-SEP-06A

17-SEP-06A

038E030040 R.C. Work - Slab L38 E

100

04-JUL-06A

19-JUL-06A

038E030041 R.C. Work - Slab L38 E-Nose 2

100

18-SEP-06A

23-SEP-06A

039E030040 R.C. Work - Slab L39 E

100

16-JUL-06A

26-JUL-06A

039E030041 R.C. Work - Slab L39 E-Nose 2

100

24-SEP-06A

02-OCT-06A

040E030040 R.C. Work - Slab L40 E

100

27-JUL-06A

12-AUG-06A

040E030041 R.C. Work - Slab L40 E-Nose 2

100

03-OCT-06A

17-OCT-06A

041E030040 R.C. Work - Slab (Open) L41 E

100

12-AUG-06A

11-AUG-06A

042E030040 R.C. Work - Slab L42 E

100

08-AUG-06A

27-AUG-06A

042E030041 R.C. Work - Slab L42 E-Nose 2

13

100

19-OCT-06A

12-NOV-06A

043E030040 R.C. Work - Slab L43 E

100

27-AUG-06A

09-SEP-06A

043E030041 R.C. Work - Slab L43 E-Nose 2

100

13-NOV-06A

07-DEC-06A

044E030040 R.C. Work - Slab L44 E

100

05-SEP-06A

10-SEP-06A

044E030041 R.C. Work - Slab L44 E-Nose 2

100

08-DEC-06A

14-DEC-06A

045E030040 R.C. Work - Slab L45 E

100

13-SEP-06A

16-SEP-06A

045E030041 R.C. Work - Slab L45 E-Nose 2

100

15-DEC-06A

20-DEC-06A

046E030040 R.C. Work - Slab L46 E

100

14-SEP-06A

18-SEP-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2005

2006

2007

2008

2009

R.C. Work - Slab L26 E-2


R.C. Work - Slab L26 E-Nose 1 (Terrace)
R.C. Work - Slab L27 E
R.C. Work - Slab L27 E-Nose 2
R.C. Work - Slab L28 E
R.C. Work - Slab L28 E-Nose 2
R.C. Work - Slab L29 E
R.C. Work - Slab L29 E-Nose 2
R.C. Work - Slab L30 E
R.C. Work - Slab L30 E-Nose 2
R.C. Work - Slab L31 E
R.C. Work - Slab L31 E-Nose 2
R.C. Work - Slab L32 E
R.C. Work - Slab L32 E-Nose 2
R.C. Work - Slab L33 E
R.C. Work - Slab L33 E-Nose 2
R.C. Work - Slab L34 E
R.C. Work - Slab L34 E-Nose 2
R.C. Work - Slab L35 E
R.C. Work - Slab L35 E-Nose 2
R.C. Work - Slab L36 E
R.C. Work - Slab L36 E-Nose 2
R.C. Work - Slab L37 E
R.C. Work - Slab L37 E-Nose 2
R.C. Work - Slab L38 E
R.C. Work - Slab L38 E-Nose 2
R.C. Work - Slab L39 E
R.C. Work - Slab L39 E-Nose 2
R.C. Work - Slab L40 E
R.C. Work - Slab L40 E-Nose 2
R.C. Work - Slab (Open) L41 E
R.C. Work - Slab L42 E
R.C. Work - Slab L42 E-Nose 2
R.C. Work - Slab L43 E
R.C. Work - Slab L43 E-Nose 2
R.C. Work - Slab L44 E
R.C. Work - Slab L44 E-Nose 2
R.C. Work - Slab L45 E
R.C. Work - Slab L45 E-Nose 2
R.C. Work - Slab L46 E
Sheet 78 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

046E030041 R.C. Work - Slab L46 E-Nose 2

100

21-DEC-06A

26-DEC-06A

047E030040 R.C. Work - Slab L47 E

100

18-SEP-06A

21-SEP-06A

047E030041 R.C. Work - Slab L47 E-Nose 2

100

27-DEC-06A

04-JAN-07A

048E030040 R.C. Work - Slab L48 E

100

21-SEP-06A

26-SEP-06A

048E030041 R.C. Work - Slab L48 E-Nose 2

100

08-JAN-07A

15-JAN-07A

049E030040 R.C. Work - Slab L49 E

100

26-SEP-06A

28-SEP-06A

049E030041 R.C. Work - Slab L49 E-Nose 2

100

16-JAN-07A

18-JAN-07A

050E030040 R.C. Work - Slab L50 E

100

28-SEP-06A

01-OCT-06A

050E030041 R.C. Work - Slab L50 E-Nose 2

100

19-JAN-07A

24-JAN-07A

051E030040 R.C. Work - Slab L51 E

100

02-OCT-06A

04-OCT-06A

051E030041 R.C. Work - Slab L51 E-Nose 2

100

25-JAN-07A

29-JAN-07A

052E030040 R.C. Work - Slab L52 E

100

05-OCT-06A

07-OCT-06A

052E030041 R.C. Work - Slab L52 E-Nose 2

100

30-JAN-07A

03-FEB-07A

053E030040 R.C. Work - Slab L53 E

100

08-OCT-06A

28-OCT-06A

053E030041 R.C. Work - Slab L53 E-Nose 2 (Terrace)

100

04-FEB-07A

12-FEB-07A

054E030040 R.C. Work - Slab L54 E

100

10-OCT-06A

14-OCT-06A

054E030041 R.C. Work - Slab L54 E-Nose 3

100

29-DEC-06A

10-JAN-07A

055E030040 R.C. Work - Slab L55 E

100

11-OCT-06A

17-OCT-06A

055E030041 R.C. Work - Slab L55 E-Nose 3

100

11-JAN-07A

17-JAN-07A

056E030040 R.C. Work - Slab L56 E

100

13-OCT-06A

24-OCT-06A

056E030041 R.C. Work - Slab L56 E-Nose 3

100

18-JAN-07A

23-JAN-07A

057E030040 R.C. Work - Slab L57 E

100

24-OCT-06A

26-OCT-06A

057E030041 R.C. Work - Slab L57 E-Nose 3

100

25-JAN-07A

29-JAN-07A

058E030040 R.C. Work - Slab L58 E

100

27-OCT-06A

29-OCT-06A

058E030041 R.C. Work - Slab L58 E-Nose 3

100

30-JAN-07A

04-FEB-07A

059E030040 R.C. Work - Slab L59 E

100

31-OCT-06A

02-NOV-06A

059E030041 R.C. Work - Slab L59 E-Nose 3

100

05-FEB-07A

10-FEB-07A

060E030040 R.C. Work - Slab L60 E

100

02-NOV-06A

05-NOV-06A

060E030041 R.C. Work - Slab L60 E-Nose 3

100

11-FEB-07A

15-FEB-07A

061E030040 R.C. Work - Slab L61 E

100

05-NOV-06A

11-NOV-06A

061E030041 R.C. Work - Slab L61 E-Nose 3

100

16-FEB-07A

20-FEB-07A

062E030040 R.C. Work - Slab L62 E

100

08-NOV-06A

13-NOV-06A

062E030041 R.C. Work - Slab L62 E-Nose 3

100

22-FEB-07A

27-FEB-07A

063E030040 R.C. Work - Slab L63 E

100

10-NOV-06A

16-NOV-06A

063E030041 R.C. Work - Slab L63 E-Nose 3

100

28-FEB-07A

05-MAR-07A

064E030040 R.C. Work - Slab L64 E

100

13-NOV-06A

19-NOV-06A

064E030041 R.C. Work - Slab L64 E-Nose 3

100

06-MAR-07A

10-MAR-07A

065E030040 R.C. Work - Slab L65 E

100

16-NOV-06A

22-NOV-06A

065E030041 R.C. Work - Slab L65 E-Nose 3

75

066E030040 R.C. Work - Slab L66 E

100

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

126

11-MAR-07A

15-MAR-07

17-NOV-06A

26-NOV-06A

2005

2006

2007

2008

2009

R.C. Work - Slab L46 E-Nose 2


R.C. Work - Slab L47 E
R.C. Work - Slab L47 E-Nose 2
R.C. Work - Slab L48 E
R.C. Work - Slab L48 E-Nose 2
R.C. Work - Slab L49 E
R.C. Work - Slab L49 E-Nose 2
R.C. Work - Slab L50 E
R.C. Work - Slab L50 E-Nose 2
R.C. Work - Slab L51 E
R.C. Work - Slab L51 E-Nose 2
R.C. Work - Slab L52 E
R.C. Work - Slab L52 E-Nose 2
R.C. Work - Slab L53 E
R.C. Work - Slab L53 E-Nose 2 (Terrace)
R.C. Work - Slab L54 E
R.C. Work - Slab L54 E-Nose 3
R.C. Work - Slab L55 E
R.C. Work - Slab L55 E-Nose 3
R.C. Work - Slab L56 E
R.C. Work - Slab L56 E-Nose 3
R.C. Work - Slab L57 E
R.C. Work - Slab L57 E-Nose 3
R.C. Work - Slab L58 E
R.C. Work - Slab L58 E-Nose 3
R.C. Work - Slab L59 E
R.C. Work - Slab L59 E-Nose 3
R.C. Work - Slab L60 E
R.C. Work - Slab L60 E-Nose 3
R.C. Work - Slab L61 E
R.C. Work - Slab L61 E-Nose 3
R.C. Work - Slab L62 E
R.C. Work - Slab L62 E-Nose 3
R.C. Work - Slab L63 E
R.C. Work - Slab L63 E-Nose 3
R.C. Work - Slab L64 E
R.C. Work - Slab L64 E-Nose 3
R.C. Work - Slab L65 E
R.C. Work - Slab L65 E-Nose 3
R.C. Work - Slab L66 E
Sheet 79 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

066E030041 R.C. Work - Slab L66 E-Nose 3

067E030040 R.C. Work - Slab L67 E

100

067E030041 R.C. Work - Slab L67 E-Nose 3

068E030040 R.C. Work - Slab L68 E

100

068E030041 R.C. Work - Slab L68 E-Nose 3

069E030040 R.C. Work - Slab L69 E

100

069E030041 R.C. Work - Slab L69 E-Nose 3

070E030040 R.C. Work - Slab L70 E

100

070E030041 R.C. Work - Slab L70 E-Nose 3

071E030040 R.C. Work - Slab L71 E

100

071E030041 R.C. Work - Slab L71 E-Nose 3

072E030040 R.C. Work - Slab L72 E

100

072E030041 R.C. Work - Slab L72 E-Nose 3

073E030040 R.C. Work - Slab L73 E

100

073E030041 R.C. Work - Slab L73 E-Nose 3

074E030040 R.C. Work - Slab (Open) L74 E

100

075E030040 R.C. Work - Slab L75 E

15

100

075E030041 R.C. Work - Slab L75 E-Nose 3

13

076E030040 R.C. Work - Slab L76 E

100

076E030041 R.C. Work - Slab L76 E-Nose 3

077E030040 R.C. Work - Slab L77 E

100

077E030041 R.C. Work - Slab L77 E-Nose 3

078E030040 R.C. Work - Slab L78 E

100

078E030041 R.C. Work - Slab L78 E-Nose 3

079E030040 R.C. Work - Slab L79 E

100

079E030041 R.C. Work - Slab L79 E-Nose 3

080E030040 R.C. Work - Slab L80 E

100

080E030041 R.C. Work - Slab L80 E-Nose 3

081E030040 R.C. Work - Slab L81 E

100

081E030041 R.C. Work - Slab L81 E-Nose 3

082E030040 R.C. Work - Slab L82 E

100

082E030041 R.C. Work - Slab L82 E-Nose 3

083E030040 R.C. Work - Slab L83 E

100

083E030041 R.C. Work - Slab L83 E-Nose 3

084E030040 R.C. Work - Slab L84 E

100

084E030041 R.C. Work - Slab L84 E-Nose 3

085E030040 R.C. Work - Slab L85 E

100

085E030041 R.C. Work - Slab L85 E-Nose 3

086E030040 R.C. Work - Slab L86 E

100

086E030041 R.C. Work - Slab L86 E-Nose 3

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

126
126
126
126
126
126
126
126

126
126
126
126
126
126
126
126
126
126
126
126

Early
Start

Early
Finish

17-MAR-07

20-MAR-07

20-NOV-06A

04-DEC-06A

21-MAR-07

24-MAR-07

04-DEC-06A

07-DEC-06A

25-MAR-07

28-MAR-07

07-DEC-06A

11-DEC-06A

29-MAR-07

02-APR-07

12-DEC-06A

14-DEC-06A

03-APR-07

06-APR-07

14-DEC-06A

19-DEC-06A

07-APR-07

13-APR-07

17-DEC-06A

24-DEC-06A

14-APR-07

19-APR-07

19-DEC-06A

02-JAN-07A

2005

2006

2007

2008

R.C. Work - Slab L66 E-Nose 3


R.C. Work - Slab L67 E
R.C. Work - Slab L67 E-Nose 3
R.C. Work - Slab L68 E
R.C. Work - Slab L68 E-Nose 3
R.C. Work - Slab L69 E
R.C. Work - Slab L69 E-Nose 3
R.C. Work - Slab L70 E
R.C. Work - Slab L70 E-Nose 3
R.C. Work - Slab L71 E
R.C. Work - Slab L71 E-Nose 3
R.C. Work - Slab L72 E
R.C. Work - Slab L72 E-Nose 3
R.C. Work - Slab L73 E
R.C. Work - Slab L73 E-Nose 3

20-APR-07

28-APR-07

04-JAN-07A

02-JAN-07A

R.C. Work - Slab (Open) L74 E

24-DEC-06A

11-JAN-07A

R.C. Work - Slab L75 E

03-MAY-07

16-MAY-07

04-JAN-07A

18-JAN-07A

17-MAY-07

22-MAY-07

15-JAN-07A

22-JAN-07A

23-MAY-07

29-MAY-07

18-JAN-07A

24-JAN-07A

30-MAY-07

05-JUN-07

23-JAN-07A

27-JAN-07A

06-JUN-07

09-JUN-07

26-JAN-07A

29-JAN-07A

10-JUN-07

14-JUN-07

29-JAN-07A

30-JAN-07A

15-JUN-07

19-JUN-07

03-FEB-07A

03-FEB-07A

20-JUN-07

23-JUN-07

03-FEB-07A

05-FEB-07A

24-JUN-07

28-JUN-07

05-FEB-07A

07-FEB-07A

29-JUN-07

03-JUL-07

07-FEB-07A

10-FEB-07A

04-JUL-07

07-JUL-07

11-FEB-07A

14-FEB-07A

08-JUL-07

12-JUL-07

2009

R.C. Work - Slab L75 E-Nose 3


R.C. Work - Slab L76 E
R.C. Work - Slab L76 E-Nose 3
R.C. Work - Slab L77 E
R.C. Work - Slab L77 E-Nose 3
R.C. Work - Slab L78 E
R.C. Work - Slab L78 E-Nose 3
R.C. Work - Slab L79 E
R.C. Work - Slab L79 E-Nose 3
R.C. Work - Slab L80 E
R.C. Work - Slab L80 E-Nose 3
R.C. Work - Slab L81 E
R.C. Work - Slab L81 E-Nose 3
R.C. Work - Slab L82 E
R.C. Work - Slab L82 E-Nose 3
R.C. Work - Slab L83 E
R.C. Work - Slab L83 E-Nose 3
R.C. Work - Slab L84 E
R.C. Work - Slab L84 E-Nose 3
R.C. Work - Slab L85 E
R.C. Work - Slab L85 E-Nose 3
R.C. Work - Slab L86 E
R.C. Work - Slab L86 E-Nose 3
Sheet 80 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

13-FEB-07A

19-FEB-07A

13-JUL-07

03-AUG-07

23-FEB-07A

27-FEB-07A

R.C. Work - Slab L88 E - Nose 4

2005

2006

2007

2008

2009

R.C. Work - Slab L87 E

087E030040 R.C. Work - Slab L87 E

100

087E030041 R.C. Work - Slab L87 E-Nose 3 (Terrace)

20

088E030040 R.C. Work - Slab L88 E - Nose 4

100

089E030040 R.C. Work - Slab L89 E - Nose 4

100

28-FEB-07A

04-MAR-07A

R.C. Work - Slab L89 E - Nose 4

090E030040 R.C. Work - Slab L90 E - Nose 4

100

05-MAR-07A

08-MAR-07A

R.C. Work - Slab L90 E - Nose 4

091E030040 R.C. Work - Slab L91 E - Nose 4

100

09-MAR-07A

14-MAR-07A

R.C. Work - Slab L91 E - Nose 4

092E030040 R.C. Work - Slab L92 E - Nose 4

25

210

15-MAR-07A

18-MAR-07

R.C. Work - Slab L92 E - Nose 4

093E030040 R.C. Work - Slab L93 E - Nose 4

210

19-MAR-07

22-MAR-07

R.C. Work - Slab L93 E - Nose 4

094E030040 R.C. Work - Slab L94 E - Nose 4

210

23-MAR-07

26-MAR-07

R.C. Work - Slab L94 E - Nose 4

095E030040 R.C. Work - Slab L95 E - Nose 4

210

27-MAR-07

31-MAR-07

R.C. Work - Slab L95 E - Nose 4

096E030040 R.C. Work - Slab L96 E - Nose 4

210

01-APR-07

04-APR-07

R.C. Work - Slab L96 E - Nose 4

097E030040 R.C. Work - Slab L97 E - Nose 4

210

05-APR-07

08-APR-07

R.C. Work - Slab L97 E - Nose 4

098E030040 R.C. Work - Slab L98 E - Nose 4

210

09-APR-07

13-APR-07

R.C. Work - Slab L98 E - Nose 4

099E030040 R.C. Work - Slab L99 E - Nose 4

210

14-APR-07

17-APR-07

R.C. Work - Slab L99 E - Nose 4

100E030040 R.C. Work - Slab L100 E - Nose 4

210

18-APR-07

21-APR-07

R.C. Work - Slab L100 E - Nose 4

101E030040 R.C. Work - Slab L101 E - Nose 4

210

22-APR-07

26-APR-07

R.C. Work - Slab L101 E - Nose 4

102E030040 R.C. Work - Slab L102 E - Nose 4

210

27-APR-07

30-APR-07

R.C. Work - Slab L102 E - Nose 4

103E030040 R.C. Work - Slab L103 E - Nose 4

210

02-MAY-07

05-MAY-07

R.C. Work - Slab L103 E - Nose 4

104E030040 R.C. Work - Slab L104 E - Nose 4

210

06-MAY-07

09-MAY-07

R.C. Work - Slab L104 E - Nose 4

105E030040 R.C. Work - Slab L105 E - Nose 4

210

10-MAY-07

14-MAY-07

R.C. Work - Slab L105 E - Nose 4

106E030040 R.C. Work - Slab L106 E - Nose 4

210

15-MAY-07

18-MAY-07

R.C. Work - Slab L106 E - Nose 4

107E030040 R.C. Work - Slab L107 E - Nose 4

210

19-MAY-07

22-MAY-07

R.C. Work - Slab L107 E - Nose 4

108E030040 R.C. Work - Slab L108 E - Nose 4

210

23-MAY-07

29-MAY-07

R.C. Work - Slab L108 E - Nose 4

109E030040 R.C. Work - Slab L109 E - Nose 4

13

210

30-MAY-07

13-JUN-07

R.C. Work - Slab L109 E - Nose 4

110E030040 R.C. Work - Slab (Open) L110 E - Nose 4

213

14-JUN-07

13-JUN-07

R.C. Work - Slab (Open) L110 E - Nose 4

111E030040 R.C. Work - Slab L111 E - Nose 4

12

210

17-JUN-07

30-JUN-07

R.C. Work - Slab L111 E - Nose 4

112E030040 R.C. Work - Slab L112 E - Nose 4

210

01-JUL-07

07-JUL-07

R.C. Work - Slab L112 E - Nose 4

113E030040 R.C. Work - Slab L113 E - Nose 4

210

08-JUL-07

14-JUL-07

R.C. Work - Slab L113 E - Nose 4

114E030040 R.C. Work - Slab L114 E - Nose 4

210

15-JUL-07

18-JUL-07

R.C. Work - Slab L114 E - Nose 4

115E030040 R.C. Work - Slab L115 E - Nose 4

210

19-JUL-07

22-JUL-07

R.C. Work - Slab L115 E - Nose 4

116E030040 R.C. Work - Slab L116 E - Nose 4

210

24-JUL-07

27-JUL-07

R.C. Work - Slab L116 E - Nose 4

117E030040 R.C. Work - Slab L117 E - Nose 4

210

28-JUL-07

01-AUG-07

R.C. Work - Slab L117 E - Nose 4

118E030040 R.C. Work - Slab L118 E - Nose 4

210

02-AUG-07

05-AUG-07

R.C. Work - Slab L118 E - Nose 4

119E030040 R.C. Work - Slab L119 E - Nose 4

210

07-AUG-07

10-AUG-07

R.C. Work - Slab L119 E - Nose 4

120E030040 R.C. Work - Slab L120 E - Nose 4

210

11-AUG-07

14-AUG-07

R.C. Work - Slab L120 E - Nose 4

121E030040 R.C. Work - Slab L121 E - Nose 4

210

15-AUG-07

18-AUG-07

R.C. Work - Slab L121 E - Nose 4

122E030040 R.C. Work - Slab L122 E - Nose 4

210

19-AUG-07

23-AUG-07

R.C. Work - Slab L122 E - Nose 4

123E030040 R.C. Work - Slab L123 E - Nose 4

210

24-AUG-07

28-AUG-07

R.C. Work - Slab L123 E - Nose 4

124E030040 R.C. Work - Slab L124 E - Nose 4

210

29-AUG-07

05-SEP-07

-00E030050

100

01-AUG-05A

05-AUG-05A

Start Date
Finish Date
Data Date

RC Work - East Wing Column Below B2 E


29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

126

R.C. Work - Slab L87 E-Nose 3 (Terrace)

R.C. Work - Slab L124 E - Nose 4


RC Work - East Wing Column Below B2 E
Sheet 81 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

R.C. Work - East Wing Column - E B2

-01E030050

R.C. Work - East Wing Column - E B2

100

14-SEP-05A

22-SEP-05A

-02E030050

R.C. Work - East Wing Column - E B1

100

13-OCT-05A

27-OCT-05A

-03E030050

R.C. Work - East Wing Column - E Concourse

100

29-NOV-05A

18-DEC-05A

R.C. Work - East Wing Column - E Concourse

-04E030050

R.C. Work - East Wing Column - E Ground

100

04-JAN-06A

09-JAN-06A

R.C. Work - East Wing Column - E Ground

001E030050 R.C. Work - East Wing Column - E L1

100

18-JAN-06A

21-JAN-06A

002E030050 R.C. Work - East Wing Column - E L2

100

04-FEB-06A

05-FEB-06A

003E030050 R.C. Work - East Wing Column - E L3

100

22-FEB-06A

23-FEB-06A

R.C. Work - East Wing Column - E L3

004E030050 R.C. Work - East Wing Column - E L4

100

06-MAR-06A

08-MAR-06A

R.C. Work - East Wing Column - E L4

005E030050 R.C. Work - East Wing Column - E L5

100

14-MAR-06A

15-MAR-06A

R.C. Work - East Wing Column - E L5

006E030050 R.C. Work - East Wing Column - E L6

100

20-MAR-06A

22-MAR-06A

R.C. Work - East Wing Column - E L6

007E030050 R.C. Work - East Wing Column - E L7

100

27-MAR-06A

27-MAR-06A

R.C. Work - East Wing Column - E L7

008E030050 R.C. Work - East Wing Column - E L8

100

31-MAR-06A

01-APR-06A

R.C. Work - East Wing Column - E L8

009E030050 R.C. Work - East Wing Column - E L9

100

06-APR-06A

06-APR-06A

R.C. Work - East Wing Column - E L9

010E030050 R.C. Work - East Wing Column - E L10

100

09-APR-06A

15-APR-06A

R.C. Work - East Wing Column - E L10

011E030050 R.C. Work - East Wing Column - E L11

100

18-APR-06A

19-APR-06A

R.C. Work - East Wing Column - E L11

012E030050 R.C. Work - East Wing Column - E L12

100

23-APR-06A

26-APR-06A

R.C. Work - East Wing Column - E L12

013E030050 R.C. Work - East Wing Column - E L13

100

29-APR-06A

30-APR-06A

R.C. Work - East Wing Column - E L13

014E030050 R.C. Work - East Wing Column - E L14

100

04-MAY-06A

06-MAY-06A

R.C. Work - East Wing Column - E L14

015E030050 R.C. Work - East Wing Column - E L15

100

10-MAY-06A

11-MAY-06A

R.C. Work - East Wing Column - E L15

016E030050 R.C. Work - East Wing Column - E L16

100

18-MAY-06A

21-MAY-06A

R.C. Work - East Wing Column - E L16

017E030050 R.C. Work - East Wing Column - E L17

100

13-JUN-06A

20-JUN-06A

018E030050 R.C. Work - East Wing Column - E L18

100

30-JUN-06A

01-JUL-06A

019E030050 R.C. Work - East Wing Column - E L19

100

21-JUL-06A

23-AUG-06A

020E030050 R.C. Work - East Wing Column - E L20

100

06-SEP-06A

07-SEP-06A

R.C. Work - East Wing Column - E L20

021E030050 R.C. Work - East Wing Column - E L21

100

13-SEP-06A

14-SEP-06A

R.C. Work - East Wing Column - E L21

022E030050 R.C. Work - East Wing Column - E L22

100

18-SEP-06A

20-SEP-06A

R.C. Work - East Wing Column - E L22

023E030050 R.C. Work - East Wing Column - E L23

100

23-SEP-06A

24-SEP-06A

R.C. Work - East Wing Column - E L23

024E030050 R.C. Work - East Wing Column - E L24

100

27-SEP-06A

28-SEP-06A

R.C. Work - East Wing Column - E L24

025E030050 R.C. Work - East Wing Column - E L25

100

03-OCT-06A

05-OCT-06A

026E030050 R.C. Work - East Wing Column - E L26

100

24-MAY-06A

25-MAY-06A

027E030050 R.C. Work - East Wing Column - E L27

100

13-JUN-06A

14-JUN-06A

R.C. Work - East Wing Column - E L27

028E030050 R.C. Work - East Wing Column - E L28

100

15-JUN-06A

16-JUN-06A

R.C. Work - East Wing Column - E L28

029E030050 R.C. Work - East Wing Column - E L29

100

27-JUN-06A

29-JUN-06A

R.C. Work - East Wing Column - E L29

030E030050 R.C. Work - East Wing Column - E L30

100

04-JUL-06A

06-JUL-06A

R.C. Work - East Wing Column - E L30

031E030050 R.C. Work - East Wing Column - E L31

100

14-JUL-06A

16-JUL-06A

R.C. Work - East Wing Column - E L31

032E030050 R.C. Work - East Wing Column - E L32

100

26-JUL-06A

27-JUL-06A

033E030050 R.C. Work - East Wing Column - E L33

100

04-AUG-06A

10-AUG-06A

034E030050 R.C. Work - East Wing Column - E L34

100

24-AUG-06A

26-AUG-06A

R.C. Work - East Wing Column - E L34

035E030050 R.C. Work - East Wing Column - E L35

100

02-SEP-06A

03-SEP-06A

R.C. Work - East Wing Column - E L35

036E030050 R.C. Work - East Wing Column - E L36

100

10-SEP-06A

10-SEP-06A

R.C. Work - East Wing Column - E L36

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - East Wing Column - E B1

R.C. Work - East Wing Column - E L1


R.C. Work - East Wing Column - E L2

R.C. Work - East Wing Column - E L17


R.C. Work - East Wing Column - E L18
R.C. Work - East Wing Column - E L19

R.C. Work - East Wing Column - E L25


R.C. Work - East Wing Column - E L26

R.C. Work - East Wing Column - E L32


R.C. Work - East Wing Column - E L33

Sheet 82 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

037E030050 R.C. Work - East Wing Column - E L37

100

17-SEP-06A

19-SEP-06A

R.C. Work - East Wing Column - E L37

038E030050 R.C. Work - East Wing Column - E L38

100

23-SEP-06A

26-SEP-06A

R.C. Work - East Wing Column - E L38

039E030050 R.C. Work - East Wing Column - E L39

100

02-OCT-06A

04-OCT-06A

R.C. Work - East Wing Column - E L39

040E030050 R.C. Work - East Wing Column - E L40

100

19-OCT-06A

26-OCT-06A

R.C. Work - East Wing Column - E L40

041E030050 R.C. Work - East Wing Column - E L41

100

19-OCT-06A

26-OCT-06A

R.C. Work - East Wing Column - E L41

042E030050 R.C. Work - East Wing Column - E L42

100

13-NOV-06A

29-NOV-06A

043E030050 R.C. Work - East Wing Column - E L43

100

08-DEC-06A

10-DEC-06A

R.C. Work - East Wing Column - E L43

044E030050 R.C. Work - East Wing Column - E L44

100

15-DEC-06A

17-DEC-06A

R.C. Work - East Wing Column - E L44

045E030050 R.C. Work - East Wing Column - E L45

100

21-DEC-06A

23-DEC-06A

R.C. Work - East Wing Column - E L45

046E030050 R.C. Work - East Wing Column - E L46

100

27-DEC-06A

28-DEC-06A

R.C. Work - East Wing Column - E L46

047E030050 R.C. Work - East Wing Column - E L47

100

05-JAN-07A

06-JAN-07A

R.C. Work - East Wing Column - E L47

048E030050 R.C. Work - East Wing Column - E L48

100

15-JAN-07A

16-JAN-07A

R.C. Work - East Wing Column - E L48

049E030050 R.C. Work - East Wing Column - E L49

100

18-JAN-07A

21-JAN-07A

R.C. Work - East Wing Column - E L49

050E030050 R.C. Work - East Wing Column - E L50

100

24-JAN-07A

25-JAN-07A

R.C. Work - East Wing Column - E L50

051E030050 R.C. Work - East Wing Column - E L51

100

29-JAN-07A

30-JAN-07A

R.C. Work - East Wing Column - E L51

052E030050 R.C. Work - East Wing Column - E L52

100

03-FEB-07A

05-FEB-07A

053E030050 R.C. Work - East Wing Column - E L53

100

30-DEC-06A

02-JAN-07A

054E030050 R.C. Work - East Wing Column - E L54

100

11-JAN-07A

14-JAN-07A

R.C. Work - East Wing Column - E L54

055E030050 R.C. Work - East Wing Column - E L55

100

17-JAN-07A

18-JAN-07A

R.C. Work - East Wing Column - E L55

056E030050 R.C. Work - East Wing Column - E L56

100

23-JAN-07A

25-JAN-07A

R.C. Work - East Wing Column - E L56

057E030050 R.C. Work - East Wing Column - E L57

100

29-JAN-07A

30-JAN-07A

R.C. Work - East Wing Column - E L57

058E030050 R.C. Work - East Wing Column - E L58

100

04-FEB-07A

06-FEB-07A

R.C. Work - East Wing Column - E L58

059E030050 R.C. Work - East Wing Column - E L59

100

10-FEB-07A

11-FEB-07A

R.C. Work - East Wing Column - E L59

060E030050 R.C. Work - East Wing Column - E L60

100

15-FEB-07A

18-FEB-07A

R.C. Work - East Wing Column - E L60

061E030050 R.C. Work - East Wing Column - E L61

100

22-FEB-07A

24-FEB-07A

R.C. Work - East Wing Column - E L61

062E030050 R.C. Work - East Wing Column - E L62

100

27-FEB-07A

01-MAR-07A

R.C. Work - East Wing Column - E L62

063E030050 R.C. Work - East Wing Column - E L63

100

06-MAR-07A

08-MAR-07A

R.C. Work - East Wing Column - E L63

064E030050 R.C. Work - East Wing Column - E L64

100

10-MAR-07A

11-MAR-07A

R.C. Work - East Wing Column - E L64

065E030050 R.C. Work - East Wing Column - E L65

126

17-MAR-07

19-MAR-07

R.C. Work - East Wing Column - E L65

066E030050 R.C. Work - East Wing Column - E L66

126

21-MAR-07

23-MAR-07

R.C. Work - East Wing Column - E L66

067E030050 R.C. Work - East Wing Column - E L67

126

25-MAR-07

27-MAR-07

R.C. Work - East Wing Column - E L67

068E030050 R.C. Work - East Wing Column - E L68

126

29-MAR-07

01-APR-07

R.C. Work - East Wing Column - E L68

069E030050 R.C. Work - East Wing Column - E L69

126

03-APR-07

05-APR-07

R.C. Work - East Wing Column - E L69

070E030050 R.C. Work - East Wing Column - E L70

126

07-APR-07

09-APR-07

R.C. Work - East Wing Column - E L70

071E030050 R.C. Work - East Wing Column - E L71

126

14-APR-07

16-APR-07

R.C. Work - East Wing Column - E L71

072E030050 R.C. Work - East Wing Column - E L72

126

20-APR-07

22-APR-07

R.C. Work - East Wing Column - E L72

073E030050 R.C. Work - East Wing Column - E L73

126

29-APR-07

02-MAY-07

R.C. Work - East Wing Column - E L73

074E030050 R.C. Work - East Wing Column - E L74

126

03-MAY-07

05-MAY-07

R.C. Work - East Wing Column - E L74

075E030050 R.C. Work - East Wing Column - E L75

126

17-MAY-07

19-MAY-07

R.C. Work - East Wing Column - E L75

076E030050 R.C. Work - East Wing Column - E L76

126

23-MAY-07

26-MAY-07

R.C. Work - East Wing Column - E L76

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - East Wing Column - E L42

R.C. Work - East Wing Column - E L52


R.C. Work - East Wing Column - E L53

Sheet 83 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

077E030050 R.C. Work - East Wing Column - E L77

126

30-MAY-07

01-JUN-07

R.C. Work - East Wing Column - E L77

078E030050 R.C. Work - East Wing Column - E L78

126

06-JUN-07

08-JUN-07

R.C. Work - East Wing Column - E L78

079E030050 R.C. Work - East Wing Column - E L79

126

10-JUN-07

13-JUN-07

R.C. Work - East Wing Column - E L79

080E030050 R.C. Work - East Wing Column - E L80

126

15-JUN-07

17-JUN-07

R.C. Work - East Wing Column - E L80

081E030050 R.C. Work - East Wing Column - E L81

126

20-JUN-07

22-JUN-07

R.C. Work - East Wing Column - E L81

082E030050 R.C. Work - East Wing Column - E L82

126

24-JUN-07

27-JUN-07

R.C. Work - East Wing Column - E L82

083E030050 R.C. Work - East Wing Column - E L83

126

29-JUN-07

01-JUL-07

R.C. Work - East Wing Column - E L83

084E030050 R.C. Work - East Wing Column - E L84

126

04-JUL-07

06-JUL-07

R.C. Work - East Wing Column - E L84

085E030050 R.C. Work - East Wing Column - E L85

126

08-JUL-07

11-JUL-07

R.C. Work - East Wing Column - E L85

086E030050 R.C. Work - East Wing Column - E L86

126

13-JUL-07

15-JUL-07

087E030050 R.C. Work - East Wing Column - E L87

100

22-FEB-07A

25-FEB-07A

R.C. Work - East Wing Column - E L87

088E030050 R.C. Work - East Wing Column - E L88

100

27-FEB-07A

01-MAR-07A

R.C. Work - East Wing Column - E L88

089E030050 R.C. Work - East Wing Column - E L89

100

04-MAR-07A

06-MAR-07A

R.C. Work - East Wing Column - E L89

090E030050 R.C. Work - East Wing Column - E L90

100

08-MAR-07A

12-MAR-07A

R.C. Work - East Wing Column - E L90

091E030050 R.C. Work - East Wing Column - E L91

67

210

14-MAR-07A

15-MAR-07

R.C. Work - East Wing Column - E L91

092E030050 R.C. Work - East Wing Column - E L92

210

19-MAR-07

21-MAR-07

R.C. Work - East Wing Column - E L92

093E030050 R.C. Work - East Wing Column - E L93

210

23-MAR-07

25-MAR-07

R.C. Work - East Wing Column - E L93

094E030050 R.C. Work - East Wing Column - E L94

210

27-MAR-07

29-MAR-07

R.C. Work - East Wing Column - E L94

095E030050 R.C. Work - East Wing Column - E L95

210

01-APR-07

03-APR-07

R.C. Work - East Wing Column - E L95

096E030050 R.C. Work - East Wing Column - E L96

210

05-APR-07

07-APR-07

R.C. Work - East Wing Column - E L96

097E030050 R.C. Work - East Wing Column - E L97

210

09-APR-07

12-APR-07

R.C. Work - East Wing Column - E L97

098E030050 R.C. Work - East Wing Column - E L98

210

14-APR-07

16-APR-07

R.C. Work - East Wing Column - E L98

099E030050 R.C. Work - East Wing Column - E L99

210

18-APR-07

20-APR-07

R.C. Work - East Wing Column - E L99

100E030050 R.C. Work - East Wing Column - E L100

210

22-APR-07

25-APR-07

R.C. Work - East Wing Column - E L100

101E030050 R.C. Work - East Wing Column - E L101

210

27-APR-07

29-APR-07

R.C. Work - East Wing Column - E L101

102E030050 R.C. Work - East Wing Column - E L102

210

02-MAY-07

04-MAY-07

R.C. Work - East Wing Column - E L102

103E030050 R.C. Work - East Wing Column - E L103

210

06-MAY-07

08-MAY-07

R.C. Work - East Wing Column - E L103

104E030050 R.C. Work - East Wing Column - E L104

210

10-MAY-07

13-MAY-07

R.C. Work - East Wing Column - E L104

105E030050 R.C. Work - East Wing Column - E L105

210

15-MAY-07

17-MAY-07

R.C. Work - East Wing Column - E L105

106E030050 R.C. Work - East Wing Column - E L106

210

19-MAY-07

21-MAY-07

R.C. Work - East Wing Column - E L106

107E030050 R.C. Work - East Wing Column - E L107

210

23-MAY-07

26-MAY-07

R.C. Work - East Wing Column - E L107

108E030050 R.C. Work - East Wing Column - E L108

210

30-MAY-07

01-JUN-07

R.C. Work - East Wing Column - E L108

109E030050 R.C. Work - East Wing Column - E L109

210

14-JUN-07

16-JUN-07

R.C. Work - East Wing Column - E L109

110E030050 R.C. Work - East Wing Column - E L110

210

17-JUN-07

20-JUN-07

R.C. Work - East Wing Column - E L110

111E030050 R.C. Work - East Wing Column - E L111

210

01-JUL-07

04-JUL-07

R.C. Work - East Wing Column - E L111

112E030050 R.C. Work - East Wing Column - E L112

210

08-JUL-07

11-JUL-07

R.C. Work - East Wing Column - E L112

113E030050 R.C. Work - East Wing Column - E L113

210

15-JUL-07

17-JUL-07

R.C. Work - East Wing Column - E L113

114E030050 R.C. Work - East Wing Column - E L114

210

19-JUL-07

21-JUL-07

R.C. Work - East Wing Column - E L114

115E030050 R.C. Work - East Wing Column - E L115

210

24-JUL-07

26-JUL-07

R.C. Work - East Wing Column - E L115

116E030050 R.C. Work - East Wing Column - E L116

210

28-JUL-07

31-JUL-07

R.C. Work - East Wing Column - E L116

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - East Wing Column - E L86

Sheet 84 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

117E030050 R.C. Work - East Wing Column - E L117

210

02-AUG-07

04-AUG-07

R.C. Work - East Wing Column - E L117

118E030050 R.C. Work - East Wing Column - E L118

210

07-AUG-07

09-AUG-07

R.C. Work - East Wing Column - E L118

119E030050 R.C. Work - East Wing Column - E L119

210

11-AUG-07

13-AUG-07

R.C. Work - East Wing Column - E L119

120E030050 R.C. Work - East Wing Column - E L120

210

15-AUG-07

17-AUG-07

R.C. Work - East Wing Column - E L120

121E030050 R.C. Work - East Wing Column - E L121

210

19-AUG-07

22-AUG-07

R.C. Work - East Wing Column - E L121

122E030050 R.C. Work - East Wing Column - E L122

210

24-AUG-07

26-AUG-07

R.C. Work - East Wing Column - E L122

123E030050 R.C. Work - East Wing Column - E L123

210

29-AUG-07

31-AUG-07

-01E030060

R.C. Work - Stair T02 B2 E

12

100

26-OCT-05A

10-NOV-05A

-02E030060

R.C. Work - Stair T02 B1 E

100

11-NOV-05A

29-NOV-05A

-03E030060

R.C. Work - Stair T02 Concourse E

100

30-NOV-05A

18-DEC-05A

R.C. Work - Stair T02 Concourse E

-04E030060

R.C. Work - Stair T02 Ground E

100

19-DEC-05A

26-DEC-05A

R.C. Work - Stair T02 Ground E

001E030060 R.C. Work - Stair T02 L1 E

100

27-DEC-05A

08-JAN-06A

R.C. Work - Stair T02 L1 E

002E030060 R.C. Work - Stair T02 L2 E

100

09-JAN-06A

16-JAN-06A

R.C. Work - Stair T02 L2 E

003E030060 R.C. Work - Stair T02 L3 E

100

17-JAN-06A

23-JAN-06A

R.C. Work - Stair T02 L3 E

004E030060 R.C. Work - Stair T02 L4 E

100

24-JAN-06A

30-JAN-06A

R.C. Work - Stair T02 L4 E

005E030060 R.C. Work - Stair T02 L5 E

100

04-FEB-06A

05-FEB-06A

R.C. Work - Stair T02 L5 E

006E030060 R.C. Work - Stair T02 L6 E

100

06-FEB-06A

09-FEB-06A

R.C. Work - Stair T02 L6 E

007E030060 R.C. Work - Stair T02 L7 E

100

10-FEB-06A

18-FEB-06A

R.C. Work - Stair T02 L7 E

008E030060 R.C. Work - Stair T02 L8 E

100

19-FEB-06A

22-FEB-06A

R.C. Work - Stair T02 L8 E

009E030060 R.C. Work - Stair T02 L9 E

100

23-FEB-06A

26-FEB-06A

R.C. Work - Stair T02 L9 E

010E030060 R.C. Work - Stair T02 L10 E

100

27-FEB-06A

02-MAR-06A

R.C. Work - Stair T02 L10 E

011E030060 R.C. Work - Stair T02 L11 E

100

03-MAR-06A

06-MAR-06A

R.C. Work - Stair T02 L11 E

012E030060 R.C. Work - Stair T02 L12 E

100

07-MAR-06A

09-MAR-06A

R.C. Work - Stair T02 L12 E

013E030060 R.C. Work - Stair T02 L13 E

100

10-MAR-06A

13-MAR-06A

R.C. Work - Stair T02 L13 E

014E030060 R.C. Work - Stair T02 L14 E

100

14-MAR-06A

15-MAR-06A

R.C. Work - Stair T02 L14 E

015E030060 R.C. Work - Stair T02 L15 E

100

17-MAR-06A

20-MAR-06A

R.C. Work - Stair T02 L15 E

016E030060 R.C. Work - Stair T02 L16 E

100

21-MAR-06A

03-APR-06A

017E030060 R.C. Work - Stair T02 L17 E

100

04-APR-06A

27-APR-06A

R.C. Work - Stair T02 L17 E

018E030060 R.C. Work - Stair T02 L18 E

100

29-APR-06A

03-MAY-06A

R.C. Work - Stair T02 L18 E

019E030060 R.C. Work - Stair T02 L19 E

100

04-MAY-06A

09-MAY-06A

R.C. Work - Stair T02 L19 E

020E030060 R.C. Work - Stair T02 L20 E

100

10-MAY-06A

18-MAY-06A

R.C. Work - Stair T02 L20 E

021E030060 R.C. Work - Stair T02 L21 E

100

19-MAY-06A

24-MAY-06A

R.C. Work - Stair T02 L21 E

022E030060 R.C. Work - Stair T02 L22 E

100

25-MAY-06A

28-MAY-06A

R.C. Work - Stair T02 L22 E

023E030060 R.C. Work - Stair T02 L23 E

100

30-MAY-06A

03-JUN-06A

R.C. Work - Stair T02 L23 E

024E030060 R.C. Work - Stair T02 L24 E

100

04-JUN-06A

07-JUN-06A

R.C. Work - Stair T02 L24 E

025E030060 R.C. Work - Stair T02 L25 E

100

08-JUN-06A

14-JUN-06A

R.C. Work - Stair T02 L25 E

026E030060 R.C. Work - Stair T02 L26 E

100

15-JUN-06A

18-JUN-06A

R.C. Work - Stair T02 L26 E

027E030060 R.C. Work - Stair T02 L27 E

100

20-JUN-06A

25-JUN-06A

R.C. Work - Stair T02 L27 E

028E030060 R.C. Work - Stair T02 L28 E

100

27-JUN-06A

29-JUN-06A

R.C. Work - Stair T02 L28 E

029E030060 R.C. Work - Stair T02 L29 E

100

30-JUN-06A

02-JUL-06A

R.C. Work - Stair T02 L29 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - East Wing Column - E L123


R.C. Work - Stair T02 B2 E
R.C. Work - Stair T02 B1 E

R.C. Work - Stair T02 L16 E

Sheet 85 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

030E030060 R.C. Work - Stair T02 L30 E

100

04-JUL-06A

08-JUL-06A

R.C. Work - Stair T02 L30 E

031E030060 R.C. Work - Stair T02 L31 E

100

09-JUL-06A

13-JUL-06A

R.C. Work - Stair T02 L31 E

032E030060 R.C. Work - Stair T02 L32 E

100

14-JUL-06A

16-JUL-06A

R.C. Work - Stair T02 L32 E

033E030060 R.C. Work - Stair T02 L33 E

100

18-JUL-06A

22-JUL-06A

R.C. Work - Stair T02 L33 E

034E030060 R.C. Work - Stair T02 L34 E

100

23-JUL-06A

27-JUL-06A

R.C. Work - Stair T02 L34 E

035E030060 R.C. Work - Stair T02 L35 E

100

28-JUL-06A

30-JUL-06A

R.C. Work - Stair T02 L35 E

036E030060 R.C. Work - Stair T02 L36 E

100

01-AUG-06A

06-AUG-06A

R.C. Work - Stair T02 L36 E

037E030060 R.C. Work - Stair T02 L37 E

100

08-AUG-06A

12-AUG-06A

R.C. Work - Stair T02 L37 E

038E030060 R.C. Work - Stair T02 L38 E

100

13-AUG-06A

19-AUG-06A

R.C. Work - Stair T02 L38 E

039E030060 R.C. Work - Stair T02 L39 E

100

20-AUG-06A

29-AUG-06A

R.C. Work - Stair T02 L39 E

040E030060 R.C. Work - Stair T02 L40 E

100

30-AUG-06A

05-SEP-06A

R.C. Work - Stair T02 L40 E

041E030060 R.C. Work - Stair T02 L41 E

100

06-SEP-06A

10-SEP-06A

R.C. Work - Stair T02 L41 E

042E030060 R.C. Work - Stair T02 L42 E

100

13-SEP-06A

16-SEP-06A

R.C. Work - Stair T02 L42 E

043E030060 R.C. Work - Stair T05 L43 E

100

17-SEP-06A

21-SEP-06A

R.C. Work - Stair T05 L43 E

044E030060 R.C. Work - Stair T05 L44 E

100

22-SEP-06A

27-SEP-06A

R.C. Work - Stair T05 L44 E

045E030060 R.C. Work - Stair T05 L45 E

100

28-SEP-06A

07-OCT-06A

R.C. Work - Stair T05 L45 E

046E030060 R.C. Work - Stair T05 L46 E

100

08-OCT-06A

11-OCT-06A

R.C. Work - Stair T05 L46 E

047E030060 R.C. Work - Stair T05 L47 E

100

12-OCT-06A

15-OCT-06A

R.C. Work - Stair T05 L47 E

048E030060 R.C. Work - Stair T05 L48 E

100

16-OCT-06A

17-OCT-06A

R.C. Work - Stair T05 L48 E

049E030060 R.C. Work - Stair T05 L49 E

100

19-OCT-06A

24-OCT-06A

R.C. Work - Stair T05 L49 E

050E030060 R.C. Work - Stair T05 L50 E

100

26-OCT-06A

28-OCT-06A

R.C. Work - Stair T05 L50 E

051E030060 R.C. Work - Stair T05 L51 E

100

29-OCT-06A

31-OCT-06A

R.C. Work - Stair T05 L51 E

052E030060 R.C. Work - Stair T05 L52 E

100

02-NOV-06A

02-NOV-06A

R.C. Work - Stair T05 L52 E

053E030060 R.C. Work - Stair T05 L53 E

100

03-NOV-06A

04-NOV-06A

R.C. Work - Stair T05 L53 E

054E030060 R.C. Work - Stair T05 L54 E

100

05-NOV-06A

07-NOV-06A

R.C. Work - Stair T05 L54 E

055E030060 R.C. Work - Stair T05 L55 E

100

08-NOV-06A

09-NOV-06A

R.C. Work - Stair T05 L55 E

056E030060 R.C. Work - Stair T05 L56 E

100

10-NOV-06A

12-NOV-06A

R.C. Work - Stair T05 L56 E

057E030060 R.C. Work - Stair T05 L57 E

100

13-NOV-06A

13-NOV-06A

R.C. Work - Stair T05 L57 E

058E030060 R.C. Work - Stair T05 L58 E

100

16-NOV-06A

16-NOV-06A

R.C. Work - Stair T05 L58 E

059E030060 R.C. Work - Stair T05 L59 E

100

17-NOV-06A

19-NOV-06A

R.C. Work - Stair T05 L59 E

060E030060 R.C. Work - Stair T05 L60 E

100

20-NOV-06A

21-NOV-06A

R.C. Work - Stair T05 L60 E

061E030060 R.C. Work - Stair T05 L61 E

100

22-NOV-06A

23-NOV-06A

R.C. Work - Stair T05 L61 E

062E030060 R.C. Work - Stair T05 L62 E

100

24-NOV-06A

28-NOV-06A

R.C. Work - Stair T05 L62 E

063E030060 R.C. Work - Stair T05 L63 E

100

29-NOV-06A

30-NOV-06A

R.C. Work - Stair T05 L63 E

064E030060 R.C. Work - Stair T05 L64 E

100

01-DEC-06A

04-DEC-06A

R.C. Work - Stair T05 L64 E

065E030060 R.C. Work - Stair T05 L65 E

100

07-DEC-06A

04-DEC-06A

R.C. Work - Stair T05 L65 E

066E030060 R.C. Work - Stair T05 L66 E

100

07-DEC-06A

09-DEC-06A

R.C. Work - Stair T05 L66 E

067E030060 R.C. Work - Stair T05 L67 E

100

10-DEC-06A

12-DEC-06A

R.C. Work - Stair T05 L67 E

068E030060 R.C. Work - Stair T05 L68 E

100

13-DEC-06A

14-DEC-06A

R.C. Work - Stair T05 L68 E

069E030060 R.C. Work - Stair T05 L69 E

100

15-DEC-06A

20-DEC-06A

R.C. Work - Stair T05 L69 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 86 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

070E030060 R.C. Work - Stair T05 L70 E

100

21-DEC-06A

24-DEC-06A

R.C. Work - Stair T05 L70 E

071E030060 R.C. Work - Stair T05 L71 E

100

25-DEC-06A

27-DEC-06A

R.C. Work - Stair T05 L71 E

072E030060 R.C. Work - Stair T05 L72 E

100

28-DEC-06A

04-JAN-07A

R.C. Work - Stair T05 L72 E

073E030060 R.C. Work - Stair T05 L73 E

100

05-JAN-07A

08-JAN-07A

R.C. Work - Stair T05 L73 E

074E030060 R.C. Work - Stair T05 L74 E

100

09-JAN-07A

11-JAN-07A

R.C. Work - Stair T05 L74 E

075E030060 R.C. Work - Stair T05 L75 E

100

12-JAN-07A

14-JAN-07A

R.C. Work - Stair T05 L75 E

040E030070 R.C. Work - Wall & Beam L40-42 E

20

100

19-OCT-06A

29-NOV-06A

R.C. Work - Wall & Beam L40-42 E

073E030070 R.C. Work - Wall & Beam L73-75 E

20

288

23-MAY-07

14-JUN-07

109E030070 R.C. Work - Wall & Beam L109-111 E

20

259

29-JUL-07

19-AUG-07

WEST WING
-01W030030 R.C. Work - Core Wall & Link Beam B2 W

18

100

24-MAY-05A

16-JUN-05A

-02W030030 R.C. Work - Core Wall & Link Beam B1 W

17

100

22-JUN-05A

23-JUL-05A

-03W030030 R.C. Work - Core Wall & Link Beam Concourse-1 W

11

100

19-JUL-05A

14-AUG-05A

R.C. Work - Core Wall & Link Beam Concourse-1 W

-03W030031 R.C. Work - Core Wall & Link Beam Concourse-2 W

100

12-AUG-05A

23-AUG-05A

R.C. Work - Core Wall & Link Beam Concourse-2 W

-04W030030 R.C. Work - Core Wall & Link Beam Ground W

12

100

19-AUG-05A

05-SEP-05A

R.C. Work - Core Wall & Link Beam Ground W

001W030030 R.C. Work - Core Wall & Link Beam L1 W

12

100

30-AUG-05A

14-SEP-05A

R.C. Work - Core Wall & Link Beam L1 W

002W030030 R.C. Work - Core Wall & Link Beam L2 W

10

100

11-SEP-05A

22-SEP-05A

R.C. Work - Core Wall & Link Beam L2 W

003W030030 R.C. Work - Core Wall & Link Beam L3 W

11

100

20-SEP-05A

29-SEP-05A

R.C. Work - Core Wall & Link Beam L3 W

004W030030 R.C. Work - Core Wall & Link Beam L4 W

13

100

28-SEP-05A

08-OCT-05A

R.C. Work - Core Wall & Link Beam L4 W

005W030030 R.C. Work - Core Wall & Link Beam L5 W

10

100

06-OCT-05A

16-OCT-05A

R.C. Work - Core Wall & Link Beam L5 W

006W030030 R.C. Work - Core Wall & Link Beam L6 W

11

100

18-OCT-05A

29-OCT-05A

R.C. Work - Core Wall & Link Beam L6 W

007W030030 R.C. Work - Core Wall & Link Beam L7 W

12

100

27-OCT-05A

06-NOV-05A

R.C. Work - Core Wall & Link Beam L7 W

008W030030 R.C. Work - Core Wall & Link Beam L8 W

11

100

03-NOV-05A

10-NOV-05A

R.C. Work - Core Wall & Link Beam L8 W

009W030030 R.C. Work - Core Wall & Link Beam L9 W

10

100

10-NOV-05A

22-NOV-05A

R.C. Work - Core Wall & Link Beam L9 W

010W030030 R.C. Work - Core Wall & Link Beam L10 W

10

100

24-NOV-05A

27-NOV-05A

R.C. Work - Core Wall & Link Beam L10 W

011W030030 R.C. Work - Core Wall & Link Beam L11 W

10

100

27-NOV-05A

03-DEC-05A

R.C. Work - Core Wall & Link Beam L11 W

012W030030 R.C. Work - Core Wall & Link Beam L12 W

10

100

03-DEC-05A

10-DEC-05A

R.C. Work - Core Wall & Link Beam L12 W

013W030030 R.C. Work - Core Wall & Link Beam L13 W

10

100

09-DEC-05A

15-DEC-05A

R.C. Work - Core Wall & Link Beam L13 W

014W030030 R.C. Work - Core Wall & Link Beam L14 W

10

100

16-DEC-05A

22-DEC-05A

R.C. Work - Core Wall & Link Beam L14 W

015W030030 R.C. Work - Core Wall & Link Beam L15 W

10

100

21-DEC-05A

29-DEC-05A

R.C. Work - Core Wall & Link Beam L15 W

016W030030 R.C. Work - Core Wall & Link Beam L16 W

12

100

29-DEC-05A

16-JAN-06A

016W030031 R.C. Work - Core Wall & Link Beam L16~L17 W

17

100

17-JAN-06A

11-FEB-06A

017W030030 R.C. Work - Core Wall & Link Beam L17~L18 W

11

100

06-FEB-06A

23-FEB-06A

018W030030 R.C. Work - Core Wall & Link Beam L18 W

15

100

19-FEB-06A

09-MAR-06A

R.C. Work - Core Wall & Link Beam L18 W

019W030030 R.C. Work - Core Wall & Link Beam L19 W

10

100

07-MAR-06A

20-MAR-06A

R.C. Work - Core Wall & Link Beam L19 W

020W030030 R.C. Work - Core Wall & Link Beam L20 W

100

17-MAR-06A

26-MAR-06A

R.C. Work - Core Wall & Link Beam L20 W

021W030030 R.C. Work - Core Wall & Link Beam L21 W

100

24-MAR-06A

29-MAR-06A

R.C. Work - Core Wall & Link Beam L21 W

022W030030 R.C. Work - Core Wall & Link Beam L22 W

100

28-MAR-06A

05-APR-06A

R.C. Work - Core Wall & Link Beam L22 W

023W030030 R.C. Work - Core Wall & Link Beam L23 W

100

04-APR-06A

11-APR-06A

R.C. Work - Core Wall & Link Beam L23 W

024W030030 R.C. Work - Core Wall & Link Beam L24 W

100

10-APR-06A

17-APR-06A

R.C. Work - Core Wall & Link Beam L24 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Wall & Beam L73-75 E


R.C. Work - Wall & Beam L109-111 E
R.C. Work - Core Wall & Link Beam B2 W
R.C. Work - Core Wall & Link Beam B1 W

R.C. Work - Core Wall & Link Beam L16 W


R.C. Work - Core Wall & Link Beam L16~L17 W
R.C. Work - Core Wall & Link Beam L17~L18 W

Sheet 87 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

025W030030 R.C. Work - Core Wall & Link Beam L25 W

100

15-APR-06A

20-APR-06A

R.C. Work - Core Wall & Link Beam L25 W

026W030030 R.C. Work - Core Wall & Link Beam L26 W

100

20-APR-06A

25-APR-06A

R.C. Work - Core Wall & Link Beam L26 W

027W030030 R.C. Work - Core Wall & Link Beam L27 W

100

26-APR-06A

30-APR-06A

R.C. Work - Core Wall & Link Beam L27 W

028W030030 R.C. Work - Core Wall & Link Beam L28 W

100

02-MAY-06A

04-MAY-06A

R.C. Work - Core Wall & Link Beam L28 W

029W030030 R.C. Work - Core Wall & Link Beam L29 W

100

04-MAY-06A

09-MAY-06A

R.C. Work - Core Wall & Link Beam L29 W

030W030030 R.C. Work - Core Wall & Link Beam L30 W

100

09-MAY-06A

13-MAY-06A

R.C. Work - Core Wall & Link Beam L30 W

031W030030 R.C. Work - Core Wall & Link Beam L31 W

100

11-MAY-06A

18-MAY-06A

R.C. Work - Core Wall & Link Beam L31 W

032W030030 R.C. Work - Core Wall & Link Beam L32 W

100

17-MAY-06A

22-MAY-06A

R.C. Work - Core Wall & Link Beam L32 W

033W030030 R.C. Work - Core Wall & Link Beam L33 W

100

22-MAY-06A

27-MAY-06A

R.C. Work - Core Wall & Link Beam L33 W

034W030030 R.C. Work - Core Wall & Link Beam L34 W

100

25-MAY-06A

31-MAY-06A

R.C. Work - Core Wall & Link Beam L34 W

035W030030 R.C. Work - Core Wall & Link Beam L35 W

100

01-JUN-06A

04-JUN-06A

R.C. Work - Core Wall & Link Beam L35 W

036W030030 R.C. Work - Core Wall & Link Beam L36 W

100

06-JUN-06A

08-JUN-06A

R.C. Work - Core Wall & Link Beam L36 W

037W030030 R.C. Work - Core Wall & Link Beam L37 W

100

09-JUN-06A

13-JUN-06A

R.C. Work - Core Wall & Link Beam L37 W

038W030030 R.C. Work - Core Wall & Link Beam L38 W

100

13-JUN-06A

18-JUN-06A

R.C. Work - Core Wall & Link Beam L38 W

039W030030 R.C. Work - Core Wall & Link Beam L39 W

100

20-JUN-06A

23-JUN-06A

R.C. Work - Core Wall & Link Beam L39 W

040W030030 R.C. Work - Core Wall & Link Beam L40 W

100

24-JUN-06A

08-JUL-06A

R.C. Work - Core Wall & Link Beam L40 W

041W030030 R.C. Work - Core Wall & Link Beam L41 W

100

04-JUL-06A

15-JUL-06A

R.C. Work - Core Wall & Link Beam L41 W

042W030030 R.C. Work - Core Wall & Link Beam L42 W

100

12-JUL-06A

25-JUL-06A

R.C. Work - Core Wall & Link Beam L42 W

043W030030 R.C. Work - Core Wall & Link Beam L43 W

100

21-JUL-06A

30-JUL-06A

R.C. Work - Core Wall & Link Beam L43 W

044W030030 R.C. Work - Core Wall & Link Beam L44 W

100

30-JUL-06A

06-AUG-06A

R.C. Work - Core Wall & Link Beam L44 W

045W030030 R.C. Work - Core Wall & Link Beam L45 W

100

08-AUG-06A

10-AUG-06A

R.C. Work - Core Wall & Link Beam L45 W

046W030030 R.C. Work - Core Wall & Link Beam L46 W

100

11-AUG-06A

13-AUG-06A

R.C. Work - Core Wall & Link Beam L46 W

047W030030 R.C. Work - Core Wall & Link Beam L47 W

100

15-AUG-06A

17-AUG-06A

R.C. Work - Core Wall & Link Beam L47 W

048W030030 R.C. Work - Core Wall & Link Beam L48 W

100

18-AUG-06A

26-AUG-06A

R.C. Work - Core Wall & Link Beam L48 W

049W030030 R.C. Work - Core Wall & Link Beam L49 W

100

27-AUG-06A

29-AUG-06A

R.C. Work - Core Wall & Link Beam L49 W

050W030030 R.C. Work - Core Wall & Link Beam L50 W

100

30-AUG-06A

03-SEP-06A

R.C. Work - Core Wall & Link Beam L50 W

051W030030 R.C. Work - Core Wall & Link Beam L51 W

100

04-SEP-06A

17-SEP-06A

R.C. Work - Core Wall & Link Beam L51 W

052W030030 R.C. Work - Core Wall & Link Beam L52 W

100

18-SEP-06A

20-SEP-06A

R.C. Work - Core Wall & Link Beam L52 W

053W030030 R.C. Work - Core Wall & Link Beam L53 W

100

21-SEP-06A

24-SEP-06A

R.C. Work - Core Wall & Link Beam L53 W

054W030030 R.C. Work - Core Wall & Link Beam L54 W

100

26-SEP-06A

28-SEP-06A

R.C. Work - Core Wall & Link Beam L54 W

055W030030 R.C. Work - Core Wall & Link Beam L55 W

100

29-SEP-06A

02-OCT-06A

R.C. Work - Core Wall & Link Beam L55 W

056W030030 R.C. Work - Core Wall & Link Beam L56 W

100

03-OCT-06A

05-OCT-06A

R.C. Work - Core Wall & Link Beam L56 W

057W030030 R.C. Work - Core Wall & Link Beam L57 W

100

06-OCT-06A

08-OCT-06A

R.C. Work - Core Wall & Link Beam L57 W

058W030030 R.C. Work - Core Wall & Link Beam L58 W

100

10-OCT-06A

12-OCT-06A

R.C. Work - Core Wall & Link Beam L58 W

059W030030 R.C. Work - Core Wall & Link Beam L59 W

100

13-OCT-06A

16-OCT-06A

R.C. Work - Core Wall & Link Beam L59 W

060W030030 R.C. Work - Core Wall & Link Beam L60 W

100

17-OCT-06A

19-OCT-06A

R.C. Work - Core Wall & Link Beam L60 W

061W030030 R.C. Work - Core Wall & Link Beam L61 W

100

20-OCT-06A

24-OCT-06A

R.C. Work - Core Wall & Link Beam L61 W

062W030030 R.C. Work - Core Wall & Link Beam L62 W

100

26-OCT-06A

28-OCT-06A

R.C. Work - Core Wall & Link Beam L62 W

063W030030 R.C. Work - Core Wall & Link Beam L63 W

100

29-OCT-06A

31-OCT-06A

R.C. Work - Core Wall & Link Beam L63 W

064W030030 R.C. Work - Core Wall & Link Beam L64 W

100

02-NOV-06A

02-NOV-06A

R.C. Work - Core Wall & Link Beam L64 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 88 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

065W030030 R.C. Work - Core Wall & Link Beam L65 W

100

03-NOV-06A

06-NOV-06A

R.C. Work - Core Wall & Link Beam L65 W

066W030030 R.C. Work - Core Wall & Link Beam L66 W

100

07-NOV-06A

09-NOV-06A

R.C. Work - Core Wall & Link Beam L66 W

067W030030 R.C. Work - Core Wall & Link Beam L67 W

100

10-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L67 W

068W030030 R.C. Work - Core Wall & Link Beam L68 W

100

16-NOV-06A

13-NOV-06A

R.C. Work - Core Wall & Link Beam L68 W

069W030030 R.C. Work - Core Wall & Link Beam L69 W

100

16-NOV-06A

18-NOV-06A

R.C. Work - Core Wall & Link Beam L69 W

070W030030 R.C. Work - Core Wall & Link Beam L70 W

100

19-NOV-06A

21-NOV-06A

R.C. Work - Core Wall & Link Beam L70 W

071W030030 R.C. Work - Core Wall & Link Beam L71 W

100

22-NOV-06A

25-NOV-06A

R.C. Work - Core Wall & Link Beam L71 W

072W030030 R.C. Work - Core Wall & Link Beam L72 W

100

26-NOV-06A

28-NOV-06A

R.C. Work - Core Wall & Link Beam L72 W

073W030030 R.C. Work - Core Wall & Link Beam L73 W

100

29-NOV-06A

07-DEC-06A

R.C. Work - Core Wall & Link Beam L73 W

074W030030 R.C. Work - Core Wall & Link Beam L74 W

100

08-DEC-06A

13-DEC-06A

R.C. Work - Core Wall & Link Beam L74 W

075W030030 R.C. Work - Core Wall & Link Beam L75 W

100

14-DEC-06A

18-DEC-06A

R.C. Work - Core Wall & Link Beam L75 W

076W030030 Dismantle Core Form West Wing

12

100

19-DEC-06A

28-DEC-06A

-01W030040 R.C. Work - Slab B2 W-1

18

100

25-AUG-05A

08-SEP-05A

R.C. Work - Slab B2 W-1

-01W030041 R.C. Work - Slab B2 W-2

28

100

25-AUG-05A

17-SEP-05A

R.C. Work - Slab B2 W-2

-01W030042 R.C. Work - Slab B2 W-Nose 1

28

100

25-AUG-05A

17-SEP-05A

R.C. Work - Slab B2 W-Nose 1

-02W030040 R.C. Work - Slab B1 W-1

16

100

09-SEP-05A

28-SEP-05A

R.C. Work - Slab B1 W-1

-02W030041 R.C. Work - Slab B1 W-2

16

100

11-SEP-05A

11-OCT-05A

R.C. Work - Slab B1 W-2

-02W030042 R.C. Work - Slab B1 W-Nose 1

16

100

29-SEP-05A

11-OCT-05A

R.C. Work - Slab B1 W-Nose 1

-03W030040 R.C. Work - Slab Concourse W-1

18

100

29-SEP-05A

19-OCT-05A

R.C. Work - Slab Concourse W-1

-03W030041 R.C. Work - Slab Concourse W-2

18

100

29-SEP-05A

24-OCT-05A

R.C. Work - Slab Concourse W-2

-03W030042 R.C. Work - Slab Concourse W-Nose 1

15

100

13-OCT-05A

22-NOV-05A

-04W030040 R.C. Work - Slab Ground W-1

19

100

09-FEB-06A

13-MAR-06A

-04W030041 R.C. Work - Slab Ground W-2

19

100

11-FEB-06A

18-MAR-06A

R.C. Work - Slab Ground W-2

-04W030042 R.C. Work - Slab Ground W-Nose 1

19

100

24-NOV-05A

26-DEC-05A

R.C. Work - Slab Ground W-Nose 1

001W030040 R.C. Work - Slab L1 W-1

12

100

20-OCT-05A

12-NOV-05A

R.C. Work - Slab L1 W-1

001W030041 R.C. Work - Slab L1 W-2

12

100

20-OCT-05A

24-NOV-05A

R.C. Work - Slab L1 W-2

001W030042 R.C. Work - Slab L1 W-Nose 1

12

100

27-DEC-05A

14-JAN-06A

002W030040 R.C. Work - Slab L2 W-1

10

100

24-MAR-06A

05-APR-06A

002W030041 R.C. Work - Slab L2 W-2

17

100

24-MAR-06A

02-APR-06A

002W030042 R.C. Work - Slab L2 W-Nose 1

17

100

15-JAN-06A

30-JAN-06A

003W030040 R.C. Work - Slab L3 W-1

14

100

10-NOV-05A

26-NOV-05A

R.C. Work - Slab L3 W-1

003W030041 R.C. Work - Slab L3 W-2

10

100

17-NOV-05A

30-NOV-05A

R.C. Work - Slab L3 W-2

003W030042 R.C. Work - Slab L3 W-Nose 1

14

100

04-FEB-06A

12-FEB-06A

004W030040 R.C. Work - Slab L4 W-1

14

100

10-DEC-05A

15-DEC-05A

R.C. Work - Slab L4 W-1

004W030041 R.C. Work - Slab L4 W-2

14

100

30-NOV-05A

14-DEC-05A

R.C. Work - Slab L4 W-2

004W030042 R.C. Work - Slab L4 W-Nose 1

14

100

13-FEB-06A

12-FEB-06A

005W030040 R.C. Work - Slab L5 W-1

12

100

17-DEC-05A

02-JAN-06A

R.C. Work - Slab L5 W-1

005W030041 R.C. Work - Slab L5 W-2

26

100

15-DEC-05A

25-DEC-05A

R.C. Work - Slab L5 W-2

005W030042 R.C. Work - Slab L5 W-Nose 1

12

100

13-FEB-06A

02-MAR-06A

006W030040 R.C. Work - Slab L6 W-1

100

28-DEC-05A

17-JAN-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Dismantle Core Form West Wing

R.C. Work - Slab Concourse W-Nose 1


R.C. Work - Slab Ground W-1

R.C. Work - Slab L1 W-Nose 1


R.C. Work - Slab L2 W-1
R.C. Work - Slab L2 W-2
R.C. Work - Slab L2 W-Nose 1

R.C. Work - Slab L3 W-Nose 1

R.C. Work - Slab L4 W-Nose 1

R.C. Work - Slab L5 W-Nose 1


R.C. Work - Slab L6 W-1
Sheet 89 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

100

26-DEC-05A

09-JAN-06A

006W030042 R.C. Work - Slab L6 W-Nose 1

100

03-MAR-06A

09-MAR-06A

007W030040 R.C. Work - Slab L7 W-1

100

12-JAN-06A

22-JAN-06A

R.C. Work - Slab L7 W-1

007W030041 R.C. Work - Slab L7 W-2

100

10-JAN-06A

21-JAN-06A

R.C. Work - Slab L7 W-2

007W030042 R.C. Work - Slab L7 W-Nose 1

100

10-MAR-06A

18-MAR-06A

008W030040 R.C. Work - Slab L8 W-1

100

19-JAN-06A

30-JAN-06A

R.C. Work - Slab L8 W-1

008W030041 R.C. Work - Slab L8 W-2

100

19-JAN-06A

26-JAN-06A

R.C. Work - Slab L8 W-2

008W030042 R.C. Work - Slab L8 W-Nose 1

100

19-MAR-06A

23-MAR-06A

009W030040 R.C. Work - Slab L9 W-1

100

04-FEB-06A

05-FEB-06A

R.C. Work - Slab L9 W-1

009W030041 R.C. Work - Slab L9 W-2

100

27-JAN-06A

30-JAN-06A

R.C. Work - Slab L9 W-2

009W030042 R.C. Work - Slab L9 W-Nose 1

100

24-MAR-06A

29-MAR-06A

010W030040 R.C. Work - Slab L10 W-1

100

06-FEB-06A

09-FEB-06A

R.C. Work - Slab L10 W-1

010W030041 R.C. Work - Slab L10 W-2

100

04-FEB-06A

07-FEB-06A

R.C. Work - Slab L10 W-2

010W030042 R.C. Work - Slab L10 W-Nose 1

100

31-MAR-06A

05-APR-06A

011W030040 R.C. Work - Slab L11 W-1

100

10-FEB-06A

14-FEB-06A

R.C. Work - Slab L11 W-1

011W030041 R.C. Work - Slab L11 W-2

100

06-FEB-06A

13-FEB-06A

R.C. Work - Slab L11 W-2

011W030042 R.C. Work - Slab L11 W-Nose 1

100

06-APR-06A

11-APR-06A

012W030040 R.C. Work - Slab L12 W-1

100

15-FEB-06A

22-FEB-06A

R.C. Work - Slab L12 W-1

012W030041 R.C. Work - Slab L12 W-2

100

14-FEB-06A

20-FEB-06A

R.C. Work - Slab L12 W-2

012W030042 R.C. Work - Slab L12 W-Nose 1

100

12-APR-06A

16-APR-06A

013W030040 R.C. Work - Slab L13 W-1

100

23-FEB-06A

26-FEB-06A

R.C. Work - Slab L13 W-1

013W030041 R.C. Work - Slab L13 W-2

100

22-FEB-06A

25-FEB-06A

R.C. Work - Slab L13 W-2

013W030042 R.C. Work - Slab L13 W-Nose 1

100

17-APR-06A

22-APR-06A

014W030040 R.C. Work - Slab L14 W-1

100

27-FEB-06A

04-MAR-06A

R.C. Work - Slab L14 W-1

014W030041 R.C. Work - Slab L14 W-2

100

26-FEB-06A

02-MAR-06A

R.C. Work - Slab L14 W-2

014W030042 R.C. Work - Slab L14 W-Nose 1

100

23-APR-06A

27-APR-06A

015W030040 R.C. Work - Slab L15 W-1

100

05-MAR-06A

08-MAR-06A

R.C. Work - Slab L15 W-1

015W030041 R.C. Work - Slab L15 W-2

100

03-MAR-06A

06-MAR-06A

R.C. Work - Slab L15 W-2

015W030042 R.C. Work - Slab L15 W-Nose 1

100

29-APR-06A

06-MAY-06A

016W030040 R.C. Work - Slab L16 W-1

100

09-MAR-06A

13-MAR-06A

R.C. Work - Slab L16 W-1

016W030041 R.C. Work - Slab L16 W-2

100

07-MAR-06A

12-MAR-06A

R.C. Work - Slab L16 W-2

016W030042 R.C. Work - Slab L16 W-Nose 1

100

07-MAY-06A

11-MAY-06A

017W030040 R.C. Work - Slab L17 W-1

13

100

14-MAR-06A

28-MAR-06A

R.C. Work - Slab L17 W-1

017W030041 R.C. Work - Slab L17 W-2

13

100

13-MAR-06A

28-MAR-06A

R.C. Work - Slab L17 W-2

017W030042 R.C. Work - Slab L17 W-Nose 1

13

100

12-MAY-06A

13-JUN-06A

018W030040 R.C. Work - Slab L18 W-1

100

29-MAR-06A

06-APR-06A

R.C. Work - Slab L18 W-1

018W030041 R.C. Work - Slab L18 W-2

100

25-MAR-06A

04-APR-06A

R.C. Work - Slab L18 W-2

018W030042 R.C. Work - Slab L18 W-Nose 1

12

100

14-JUN-06A

02-JUL-06A

019W030040 R.C. Work - Slab L19 W-1

10

100

07-APR-06A

16-APR-06A

R.C. Work - Slab L19 W-1

019W030041 R.C. Work - Slab L19 W-2

10

100

05-APR-06A

13-APR-06A

R.C. Work - Slab L19 W-2

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - Slab L6 W-2

006W030041 R.C. Work - Slab L6 W-2

Start Date
Finish Date
Data Date

2008

R.C. Work - Slab L6 W-Nose 1

R.C. Work - Slab L7 W-Nose 1

R.C. Work - Slab L8 W-Nose 1

R.C. Work - Slab L9 W-Nose 1

R.C. Work - Slab L10 W-Nose 1

R.C. Work - Slab L11 W-Nose 1

R.C. Work - Slab L12 W-Nose 1

R.C. Work - Slab L13 W-Nose 1

R.C. Work - Slab L14 W-Nose 1

R.C. Work - Slab L15 W-Nose 1

R.C. Work - Slab L16 W-Nose 1

R.C. Work - Slab L17 W-Nose 1

R.C. Work - Slab L18 W-Nose 1

Sheet 90 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

019W030042 R.C. Work - Slab L19 W-Nose 1 (Terrace)

100

13-JUL-06A

24-AUG-06A

020W030040 R.C. Work - Slab L20 W

100

15-APR-06A

23-APR-06A

020W030041 R.C. Work - Slab L20 W-Nose 2

100

25-APR-06A

10-MAY-06A

021W030040 R.C. Work - Slab L21 W

100

17-APR-06A

29-APR-06A

021W030041 R.C. Work - Slab L21 W-Nose 2

100

11-MAY-06A

18-MAY-06A

022W030040 R.C. Work - Slab L22 W

100

30-APR-06A

03-MAY-06A

022W030041 R.C. Work - Slab L22 W-Nose 2

100

19-MAY-06A

27-MAY-06A

023W030040 R.C. Work - Slab L23 W

100

04-MAY-06A

08-MAY-06A

023W030041 R.C. Work - Slab L23 W-Nose 2

100

28-MAY-06A

04-JUN-06A

024W030040 R.C. Work - Slab L24 W

100

09-MAY-06A

11-MAY-06A

024W030041 R.C. Work - Slab L24 W-Nose 2

100

06-JUN-06A

11-JUN-06A

025W030040 R.C. Work - Slab L25 W

100

12-MAY-06A

14-MAY-06A

025W030041 R.C. Work - Slab L25 W-Nose 2

100

13-JUN-06A

18-JUN-06A

026W030040 R.C. Work - Slab L26 W

100

16-MAY-06A

21-MAY-06A

026W030041 R.C. Work - Slab L26 W-Nose 2

100

20-JUN-06A

23-JUN-06A

027W030040 R.C. Work - Slab L27 W

100

22-MAY-06A

25-MAY-06A

027W030041 R.C. Work - Slab L27 W-Nose 2

100

27-JUN-06A

28-JUN-06A

028W030040 R.C. Work - Slab L28 W

100

26-MAY-06A

28-MAY-06A

028W030041 R.C. Work - Slab L28 W-Nose 2

100

29-JUN-06A

06-JUL-06A

029W030040 R.C. Work - Slab L29 W

100

30-MAY-06A

31-MAY-06A

029W030041 R.C. Work - Slab L29 W-Nose 2

100

07-JUL-06A

13-JUL-06A

030W030040 R.C. Work - Slab L30 W

100

01-JUN-06A

04-JUN-06A

030W030041 R.C. Work - Slab L30 W-Nose 2

100

18-JUL-06A

25-JUL-06A

031W030040 R.C. Work - Slab L31 W

100

06-JUN-06A

08-JUN-06A

031W030041 R.C. Work - Slab L31 W-Nose 2

100

26-JUL-06A

01-AUG-06A

032W030040 R.C. Work - Slab L32 W

100

07-JUN-06A

11-JUN-06A

032W030041 R.C. Work - Slab L32 W-Nose 2

100

02-AUG-06A

08-AUG-06A

033W030040 R.C. Work - Slab L33 W

100

13-JUN-06A

15-JUN-06A

033W030041 R.C. Work - Slab L33 W-Nose 2

100

09-AUG-06A

20-AUG-06A

034W030040 R.C. Work - Slab L34 W

100

15-JUN-06A

20-JUN-06A

034W030041 R.C. Work - Slab L34 W-Nose 2

100

22-AUG-06A

30-AUG-06A

035W030040 R.C. Work - Slab L35 W

100

21-JUN-06A

25-JUN-06A

035W030041 R.C. Work - Slab L35 W-Nose 2

100

31-AUG-06A

09-SEP-06A

036W030040 R.C. Work - Slab L36 W

100

27-JUN-06A

01-JUL-06A

036W030041 R.C. Work - Slab L36 W-Nose 2

100

10-SEP-06A

13-SEP-06A

037W030040 R.C. Work - Slab L37 W

100

30-JUN-06A

06-JUL-06A

037W030041 R.C. Work - Slab L37 W-Nose 2

100

14-SEP-06A

19-SEP-06A

038W030040 R.C. Work - Slab L38 W

100

04-JUL-06A

19-JUL-06A

038W030041 R.C. Work - Slab L38 W-Nose 2

100

20-SEP-06A

26-SEP-06A

039W030040 R.C. Work - Slab L39 W

100

14-JUL-06A

23-JUL-06A

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2005

2006

2007

2008

2009

R.C. Work - Slab L19 W-Nose 1 (Terrace)


R.C. Work - Slab L20 W
R.C. Work - Slab L20 W-Nose 2
R.C. Work - Slab L21 W
R.C. Work - Slab L21 W-Nose 2
R.C. Work - Slab L22 W
R.C. Work - Slab L22 W-Nose 2
R.C. Work - Slab L23 W
R.C. Work - Slab L23 W-Nose 2
R.C. Work - Slab L24 W
R.C. Work - Slab L24 W-Nose 2
R.C. Work - Slab L25 W
R.C. Work - Slab L25 W-Nose 2
R.C. Work - Slab L26 W
R.C. Work - Slab L26 W-Nose 2
R.C. Work - Slab L27 W
R.C. Work - Slab L27 W-Nose 2
R.C. Work - Slab L28 W
R.C. Work - Slab L28 W-Nose 2
R.C. Work - Slab L29 W
R.C. Work - Slab L29 W-Nose 2
R.C. Work - Slab L30 W
R.C. Work - Slab L30 W-Nose 2
R.C. Work - Slab L31 W
R.C. Work - Slab L31 W-Nose 2
R.C. Work - Slab L32 W
R.C. Work - Slab L32 W-Nose 2
R.C. Work - Slab L33 W
R.C. Work - Slab L33 W-Nose 2
R.C. Work - Slab L34 W
R.C. Work - Slab L34 W-Nose 2
R.C. Work - Slab L35 W
R.C. Work - Slab L35 W-Nose 2
R.C. Work - Slab L36 W
R.C. Work - Slab L36 W-Nose 2
R.C. Work - Slab L37 W
R.C. Work - Slab L37 W-Nose 2
R.C. Work - Slab L38 W
R.C. Work - Slab L38 W-Nose 2
R.C. Work - Slab L39 W
Sheet 91 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

039W030041 R.C. Work - Slab L39 W-Nose 2

100

27-SEP-06A

04-OCT-06A

040W030040 R.C. Work - Slab L40 W

100

21-JUL-06A

23-AUG-06A

040W030041 R.C. Work - Slab L40 W-Nose 2

100

05-OCT-06A

24-OCT-06A

041W030040 R.C. Work - Slab (Open) L41 W

100

23-AUG-06A

22-AUG-06A

042W030040 R.C. Work - Slab L42 W

12

100

10-AUG-06A

24-SEP-06A

042W030041 R.C. Work - Slab L42 W-Nose 2

13

100

26-OCT-06A

27-NOV-06A

043W030040 R.C. Work - Slab L43 W

10

100

30-AUG-06A

10-DEC-06A

043W030041 R.C. Work - Slab L43 W-Nose 2 (Terrace)

11

100

28-NOV-06A

01-MAR-07A

044W030040 R.C. Work - Slab L44 W

11

100

07-SEP-06A

19-SEP-06A

044W030041 R.C. Work - Slab L44 W-Nose 3

100

16-DEC-06A

19-DEC-06A

045W030040 R.C. Work - Slab L45 W

100

10-SEP-06A

21-SEP-06A

045W030041 R.C. Work - Slab L45 W-Nose 3

100

20-DEC-06A

11-JAN-07A

046W030040 R.C. Work - Slab L46 W

100

13-SEP-06A

24-SEP-06A

046W030041 R.C. Work - Slab L46 W-Nose 3

100

12-JAN-07A

17-JAN-07A

047W030040 R.C. Work - Slab L47 W

100

19-SEP-06A

27-SEP-06A

047W030041 R.C. Work - Slab L47 W-Nose 3

100

18-JAN-07A

25-JAN-07A

048W030040 R.C. Work - Slab L48 W

100

21-SEP-06A

30-SEP-06A

048W030041 R.C. Work - Slab L48 W-Nose 3

100

26-JAN-07A

30-JAN-07A

049W030040 R.C. Work - Slab L49 W

100

24-SEP-06A

02-OCT-06A

049W030041 R.C. Work - Slab L49 W-Nose 3

100

03-FEB-07A

06-FEB-07A

050W030040 R.C. Work - Slab L50 W

100

26-SEP-06A

04-OCT-06A

050W030041 R.C. Work - Slab L50 W-Nose 3

100

07-FEB-07A

11-FEB-07A

051W030040 R.C. Work - Slab L51 W

100

28-SEP-06A

07-OCT-06A

051W030041 R.C. Work - Slab L51 W-Nose 3

100

12-FEB-07A

14-FEB-07A

052W030040 R.C. Work - Slab L52 W

100

02-OCT-06A

08-OCT-06A

052W030041 R.C. Work - Slab L52 W-Nose 3

100

15-FEB-07A

18-FEB-07A

053W030040 R.C. Work - Slab L53 W

100

04-OCT-06A

17-OCT-06A

053W030041 R.C. Work - Slab L53 W-Nose 3

100

19-FEB-07A

22-FEB-07A

054W030040 R.C. Work - Slab L54 W

100

10-OCT-06A

21-OCT-06A

054W030041 R.C. Work - Slab L54 W-Nose 3

100

23-FEB-07A

26-FEB-07A

055W030040 R.C. Work - Slab L55 W

100

11-OCT-06A

26-OCT-06A

055W030041 R.C. Work - Slab L55 W-Nose 3

100

27-FEB-07A

01-MAR-07A

056W030040 R.C. Work - Slab L56 W

100

15-OCT-06A

29-OCT-06A

056W030041 R.C. Work - Slab L56 W-Nose 3

100

02-MAR-07A

06-MAR-07A

057W030040 R.C. Work - Slab L57 W

100

17-OCT-06A

31-OCT-06A

057W030041 R.C. Work - Slab L57 W-Nose 3

100

07-MAR-07A

10-MAR-07A

058W030040 R.C. Work - Slab L58 W

100

20-OCT-06A

04-NOV-06A

058W030041 R.C. Work - Slab L58 W-Nose 3

100

11-MAR-07A

14-MAR-07A

059W030040 R.C. Work - Slab L59 W

100

26-OCT-06A

07-NOV-06A

059W030041 R.C. Work - Slab L59 W-Nose 3

25

15-MAR-07A

18-MAR-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

271

2005

2006

2007

2008

2009

R.C. Work - Slab L39 W-Nose 2


R.C. Work - Slab L40 W
R.C. Work - Slab L40 W-Nose 2
R.C. Work - Slab (Open) L41 W
R.C. Work - Slab L42 W
R.C. Work - Slab L42 W-Nose 2
R.C. Work - Slab L43 W
R.C. Work - Slab L43 W-Nose 2 (Terrace)
R.C. Work - Slab L44 W
R.C. Work - Slab L44 W-Nose 3
R.C. Work - Slab L45 W
R.C. Work - Slab L45 W-Nose 3
R.C. Work - Slab L46 W
R.C. Work - Slab L46 W-Nose 3
R.C. Work - Slab L47 W
R.C. Work - Slab L47 W-Nose 3
R.C. Work - Slab L48 W
R.C. Work - Slab L48 W-Nose 3
R.C. Work - Slab L49 W
R.C. Work - Slab L49 W-Nose 3
R.C. Work - Slab L50 W
R.C. Work - Slab L50 W-Nose 3
R.C. Work - Slab L51 W
R.C. Work - Slab L51 W-Nose 3
R.C. Work - Slab L52 W
R.C. Work - Slab L52 W-Nose 3
R.C. Work - Slab L53 W
R.C. Work - Slab L53 W-Nose 3
R.C. Work - Slab L54 W
R.C. Work - Slab L54 W-Nose 3
R.C. Work - Slab L55 W
R.C. Work - Slab L55 W-Nose 3
R.C. Work - Slab L56 W
R.C. Work - Slab L56 W-Nose 3
R.C. Work - Slab L57 W
R.C. Work - Slab L57 W-Nose 3
R.C. Work - Slab L58 W
R.C. Work - Slab L58 W-Nose 3
R.C. Work - Slab L59 W
R.C. Work - Slab L59 W-Nose 3
Sheet 92 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

31-OCT-06A

09-NOV-06A

19-MAR-07

22-MAR-07

02-NOV-06A

13-NOV-06A

2005

2006

2007

2008

R.C. Work - Slab L60 W

060W030040 R.C. Work - Slab L60 W

100

060W030041 R.C. Work - Slab L60 W-Nose 3

061W030040 R.C. Work - Slab L61 W

100

061W030041 R.C. Work - Slab L61 W-Nose 3

062W030040 R.C. Work - Slab L62 W

100

062W030041 R.C. Work - Slab L62 W-Nose 3

063W030040 R.C. Work - Slab L63 W

100

063W030041 R.C. Work - Slab L63 W-Nose 3

064W030040 R.C. Work - Slab L64 W

100

064W030041 R.C. Work - Slab L64 W-Nose 3

065W030040 R.C. Work - Slab L65 W

100

065W030041 R.C. Work - Slab L65 W-Nose 3

066W030040 R.C. Work - Slab L66 W

100

066W030041 R.C. Work - Slab L66 W-Nose 3

067W030040 R.C. Work - Slab L67 W

100

067W030041 R.C. Work - Slab L67 W-Nose 3

068W030040 R.C. Work - Slab L68 W

100

068W030041 R.C. Work - Slab L68 W-Nose 3

069W030040 R.C. Work - Slab L69 W

100

069W030041 R.C. Work - Slab L69 W-Nose 3

070W030040 R.C. Work - Slab L70 W

100

070W030041 R.C. Work - Slab L70 W-Nose 3

071W030040 R.C. Work - Slab L71 W

100

071W030041 R.C. Work - Slab L71 W-Nose 3

072W030040 R.C. Work - Slab L72 W

100

072W030041 R.C. Work - Slab L72 W-Nose 3

073W030040 R.C. Work - Slab L73 W

100

073W030041 R.C. Work - Slab L73 W-Nose 3

074W030040 R.C. Work - Slab (Open) L74 W

100

075W030040 R.C. Work - Slab L75 W

15

100

075W030041 R.C. Work - Slab L75 W-Nose 3

13

076W030040 R.C. Work - Slab L76 W

13

100

076W030041 R.C. Work - Slab L76 W-Nose 3 (Terrace)

11

15-JUN-07

27-JUN-07

077W030040 R.C. Work - Slab L77 W - Nose 4

12

100

26-JAN-07A

08-FEB-07A

R.C. Work - Slab L77 W - Nose 4

078W030040 R.C. Work - Slab L78 W - Nose 4

100

09-FEB-07A

14-FEB-07A

R.C. Work - Slab L78 W - Nose 4

079W030040 R.C. Work - Slab L79 W - Nose 4

100

15-FEB-07A

25-FEB-07A

R.C. Work - Slab L79 W - Nose 4

080W030040 R.C. Work - Slab L80 W - Nose 4

100

26-FEB-07A

03-MAR-07A

R.C. Work - Slab L80 W - Nose 4

081W030040 R.C. Work - Slab L81 W - Nose 4

100

04-MAR-07A

11-MAR-07A

R.C. Work - Slab L81 W - Nose 4

082W030040 R.C. Work - Slab L82 W - Nose 4

50

80

12-MAR-07A

17-MAR-07

R.C. Work - Slab L82 W - Nose 4

083W030040 R.C. Work - Slab L83 W - Nose 4

80

18-MAR-07

21-MAR-07

R.C. Work - Slab L83 W - Nose 4

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

271
271
271
271
271
271
271
271
271
271
271
271
271
271

271
271

23-MAR-07

26-MAR-07

03-NOV-06A

16-NOV-06A

27-MAR-07

31-MAR-07

07-NOV-06A

22-NOV-06A

01-APR-07

04-APR-07

10-NOV-06A

25-NOV-06A

05-APR-07

08-APR-07

16-NOV-06A

27-NOV-06A

09-APR-07

13-APR-07

16-NOV-06A

29-NOV-06A

14-APR-07

17-APR-07

19-NOV-06A

03-DEC-06A

18-APR-07

21-APR-07

21-NOV-06A

04-DEC-06A

22-APR-07

26-APR-07

24-NOV-06A

11-DEC-06A

27-APR-07

30-APR-07

28-NOV-06A

18-DEC-06A

02-MAY-07

05-MAY-07

07-DEC-06A

24-DEC-06A

06-MAY-07

12-MAY-07

13-DEC-06A

27-DEC-06A

13-MAY-07

18-MAY-07

18-DEC-06A

04-JAN-07A

2009

R.C. Work - Slab L60 W-Nose 3


R.C. Work - Slab L61 W
R.C. Work - Slab L61 W-Nose 3
R.C. Work - Slab L62 W
R.C. Work - Slab L62 W-Nose 3
R.C. Work - Slab L63 W
R.C. Work - Slab L63 W-Nose 3
R.C. Work - Slab L64 W
R.C. Work - Slab L64 W-Nose 3
R.C. Work - Slab L65 W
R.C. Work - Slab L65 W-Nose 3
R.C. Work - Slab L66 W
R.C. Work - Slab L66 W-Nose 3
R.C. Work - Slab L67 W
R.C. Work - Slab L67 W-Nose 3
R.C. Work - Slab L68 W
R.C. Work - Slab L68 W-Nose 3
R.C. Work - Slab L69 W
R.C. Work - Slab L69 W-Nose 3
R.C. Work - Slab L70 W
R.C. Work - Slab L70 W-Nose 3
R.C. Work - Slab L71 W
R.C. Work - Slab L71 W-Nose 3
R.C. Work - Slab L72 W
R.C. Work - Slab L72 W-Nose 3
R.C. Work - Slab L73 W
R.C. Work - Slab L73 W-Nose 3

19-MAY-07

27-MAY-07

04-JAN-07A

02-JAN-07A

R.C. Work - Slab (Open) L74 W

29-DEC-06A

15-JAN-07A

R.C. Work - Slab L75 W

31-MAY-07

14-JUN-07

12-JAN-07A

25-JAN-07A

R.C. Work - Slab L75 W-Nose 3


R.C. Work - Slab L76 W
R.C. Work - Slab L76 W-Nose 3 (Terrace)

Sheet 93 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

084W030040 R.C. Work - Slab L84 W - Nose 4

80

22-MAR-07

25-MAR-07

R.C. Work - Slab L84 W - Nose 4

085W030040 R.C. Work - Slab L85 W - Nose 4

80

26-MAR-07

29-MAR-07

R.C. Work - Slab L85 W - Nose 4

086W030040 R.C. Work - Slab L86 W - Nose 4

80

31-MAR-07

03-APR-07

R.C. Work - Slab L86 W - Nose 4

087W030040 R.C. Work - Slab L87 W - Nose 4

80

04-APR-07

07-APR-07

R.C. Work - Slab L87 W - Nose 4

088W030040 R.C. Work - Slab L88 W - Nose 4

80

08-APR-07

12-APR-07

R.C. Work - Slab L88 W - Nose 4

089W030040 R.C. Work - Slab L89 W - Nose 4

80

13-APR-07

16-APR-07

R.C. Work - Slab L89 W - Nose 4

090W030040 R.C. Work - Slab L90 W - Nose 4

80

17-APR-07

20-APR-07

R.C. Work - Slab L90 W - Nose 4

091W030040 R.C. Work - Slab L91 W - Nose 4

80

21-APR-07

25-APR-07

R.C. Work - Slab L91 W - Nose 4

092W030040 R.C. Work - Slab L92 W - Nose 4

80

26-APR-07

29-APR-07

R.C. Work - Slab L92 W - Nose 4

093W030040 R.C. Work - Slab L93 W - Nose 4

80

30-APR-07

04-MAY-07

R.C. Work - Slab L93 W - Nose 4

094W030040 R.C. Work - Slab L94 W - Nose 4

80

05-MAY-07

08-MAY-07

R.C. Work - Slab L94 W - Nose 4

095W030040 R.C. Work - Slab L95 W - Nose 4

80

09-MAY-07

13-MAY-07

R.C. Work - Slab L95 W - Nose 4

096W030040 R.C. Work - Slab L96 W - Nose 4

80

14-MAY-07

17-MAY-07

R.C. Work - Slab L96 W - Nose 4

097W030040 R.C. Work - Slab L97 W - Nose 4

80

18-MAY-07

21-MAY-07

R.C. Work - Slab L97 W - Nose 4

098W030040 R.C. Work - Slab L98 W - Nose 4

80

22-MAY-07

26-MAY-07

R.C. Work - Slab L98 W - Nose 4

099W030040 R.C. Work - Slab L99 W - Nose 4

80

27-MAY-07

30-MAY-07

R.C. Work - Slab L99 W - Nose 4

100W030040 R.C. Work - Slab L100 W - Nose 4

80

31-MAY-07

03-JUN-07

R.C. Work - Slab L100 W - Nose 4

101W030040 R.C. Work - Slab L101 W - Nose 4

80

05-JUN-07

08-JUN-07

R.C. Work - Slab L101 W - Nose 4

102W030040 R.C. Work - Slab L102 W - Nose 4

80

09-JUN-07

13-JUN-07

R.C. Work - Slab L102 W - Nose 4

103W030040 R.C. Work - Slab L103 W - Nose 4

80

14-JUN-07

17-JUN-07

R.C. Work - Slab L103 W - Nose 4

104W030040 R.C. Work - Slab L104 W - Nose 4

80

19-JUN-07

22-JUN-07

R.C. Work - Slab L104 W - Nose 4

105W030040 R.C. Work - Slab L105 W - Nose 4

80

23-JUN-07

27-JUN-07

R.C. Work - Slab L105 W - Nose 4

106W030040 R.C. Work - Slab L106 W - Nose 4

80

28-JUN-07

01-JUL-07

R.C. Work - Slab L106 W - Nose 4

107W030040 R.C. Work - Slab L107 W - Nose 4

80

03-JUL-07

06-JUL-07

R.C. Work - Slab L107 W - Nose 4

108W030040 R.C. Work - Slab L108 W - Nose 4

80

07-JUL-07

13-JUL-07

R.C. Work - Slab L108 W - Nose 4

109W030040 R.C. Work - Slab L109 W - Nose 4

13

80

14-JUL-07

27-JUL-07

R.C. Work - Slab L109 W - Nose 4

110W030040 R.C. Work - Slab (Open) L110 W - Nose 4

83

28-JUL-07

27-JUL-07

R.C. Work - Slab (Open) L110 W - Nose 4

111W030040 R.C. Work - Slab L111 W - Nose 4

12

80

01-AUG-07

13-AUG-07

112W030040 R.C. Work - Slab L112 W - Nose 4

80

14-AUG-07

21-AUG-07

-00W030050 RC Work - West Wing Column Below B2 W

100

15-AUG-05A

24-AUG-05A

RC Work - West Wing Column Below B2 W

-01W030050 R.C. Work - West Wing Column - W B2

100

23-SEP-05A

30-SEP-05A

R.C. Work - West Wing Column - W B2

-02W030050 R.C. Work - West Wing Column - W B1

100

18-OCT-05A

25-OCT-05A

-03W030050 R.C. Work - West Wing Column - W Concourse

100

24-NOV-05A

08-DEC-05A

R.C. Work - West Wing Column - W Concourse

-04W030050 R.C. Work - West Wing Column - W Ground

100

27-DEC-05A

29-DEC-05A

R.C. Work - West Wing Column - W Ground

001W030050 R.C. Work - West Wing Column - W L1

100

15-JAN-06A

17-JAN-06A

002W030050 R.C. Work - West Wing Column - W L2

100

04-FEB-06A

30-JAN-06A

R.C. Work - West Wing Column - W L2

003W030050 R.C. Work - West Wing Column - W L3

100

13-FEB-06A

13-FEB-06A

R.C. Work - West Wing Column - W L3

004W030050 R.C. Work - West Wing Column - W L4

100

13-FEB-06A

20-FEB-06A

R.C. Work - West Wing Column - W L4

005W030050 R.C. Work - West Wing Column - W L5

100

03-MAR-06A

04-MAR-06A

R.C. Work - West Wing Column - W L5

006W030050 R.C. Work - West Wing Column - W L6

100

10-MAR-06A

11-MAR-06A

R.C. Work - West Wing Column - W L6

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Slab L111 W - Nose 4


R.C. Work - Slab L112 W - Nose 4

R.C. Work - West Wing Column - W B1

R.C. Work - West Wing Column - W L1

Sheet 94 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

007W030050 R.C. Work - West Wing Column - W L7

100

18-MAR-06A

20-MAR-06A

R.C. Work - West Wing Column - W L7

008W030050 R.C. Work - West Wing Column - W L8

100

23-MAR-06A

24-MAR-06A

R.C. Work - West Wing Column - W L8

009W030050 R.C. Work - West Wing Column - W L9

100

29-MAR-06A

29-MAR-06A

R.C. Work - West Wing Column - W L9

010W030050 R.C. Work - West Wing Column - W L10

100

06-APR-06A

08-APR-06A

R.C. Work - West Wing Column - W L10

011W030050 R.C. Work - West Wing Column - W L11

100

11-APR-06A

12-APR-06A

R.C. Work - West Wing Column - W L11

012W030050 R.C. Work - West Wing Column - W L12

100

16-APR-06A

18-APR-06A

R.C. Work - West Wing Column - W L12

013W030050 R.C. Work - West Wing Column - W L13

100

22-APR-06A

23-APR-06A

R.C. Work - West Wing Column - W L13

014W030050 R.C. Work - West Wing Column - W L14

100

27-APR-06A

29-APR-06A

R.C. Work - West Wing Column - W L14

015W030050 R.C. Work - West Wing Column - W L15

100

04-MAY-06A

08-MAY-06A

R.C. Work - West Wing Column - W L15

016W030050 R.C. Work - West Wing Column - W L16

100

11-MAY-06A

14-MAY-06A

R.C. Work - West Wing Column - W L16

017W030050 R.C. Work - West Wing Column - W L17

100

12-MAY-06A

13-JUN-06A

018W030050 R.C. Work - West Wing Column - W L18

100

18-JUN-06A

18-JUN-06A

019W030050 R.C. Work - West Wing Column - W L19

100

27-APR-06A

30-APR-06A

R.C. Work - West Wing Column - W L19

020W030050 R.C. Work - West Wing Column - W L20

100

10-MAY-06A

11-MAY-06A

R.C. Work - West Wing Column - W L20

021W030050 R.C. Work - West Wing Column - W L21

100

18-MAY-06A

20-MAY-06A

R.C. Work - West Wing Column - W L21

022W030050 R.C. Work - West Wing Column - W L22

100

27-MAY-06A

28-MAY-06A

R.C. Work - West Wing Column - W L22

023W030050 R.C. Work - West Wing Column - W L23

100

04-JUN-06A

04-JUN-06A

R.C. Work - West Wing Column - W L23

024W030050 R.C. Work - West Wing Column - W L24

100

11-JUN-06A

11-JUN-06A

R.C. Work - West Wing Column - W L24

025W030050 R.C. Work - West Wing Column - W L25

100

13-JUN-06A

15-JUN-06A

R.C. Work - West Wing Column - W L25

026W030050 R.C. Work - West Wing Column - W L26

100

20-JUN-06A

21-JUN-06A

R.C. Work - West Wing Column - W L26

027W030050 R.C. Work - West Wing Column - W L27

100

29-JUN-06A

02-JUL-06A

R.C. Work - West Wing Column - W L27

028W030050 R.C. Work - West Wing Column - W L28

100

06-JUL-06A

09-JUL-06A

R.C. Work - West Wing Column - W L28

029W030050 R.C. Work - West Wing Column - W L29

100

13-JUL-06A

16-JUL-06A

R.C. Work - West Wing Column - W L29

030W030050 R.C. Work - West Wing Column - W L30

100

25-JUL-06A

26-JUL-06A

R.C. Work - West Wing Column - W L30

031W030050 R.C. Work - West Wing Column - W L31

100

01-AUG-06A

02-AUG-06A

R.C. Work - West Wing Column - W L31

032W030050 R.C. Work - West Wing Column - W L32

100

08-AUG-06A

10-AUG-06A

R.C. Work - West Wing Column - W L32

033W030050 R.C. Work - West Wing Column - W L33

100

22-AUG-06A

22-AUG-06A

R.C. Work - West Wing Column - W L33

034W030050 R.C. Work - West Wing Column - W L34

100

30-AUG-06A

31-AUG-06A

R.C. Work - West Wing Column - W L34

035W030050 R.C. Work - West Wing Column - W L35

100

09-SEP-06A

10-SEP-06A

R.C. Work - West Wing Column - W L35

036W030050 R.C. Work - West Wing Column - W L36

100

13-SEP-06A

14-SEP-06A

R.C. Work - West Wing Column - W L36

037W030050 R.C. Work - West Wing Column - W L37

100

19-SEP-06A

21-SEP-06A

R.C. Work - West Wing Column - W L37

038W030050 R.C. Work - West Wing Column - W L38

100

26-SEP-06A

27-SEP-06A

R.C. Work - West Wing Column - W L38

039W030050 R.C. Work - West Wing Column - W L39

100

04-OCT-06A

07-OCT-06A

R.C. Work - West Wing Column - W L39

040W030050 R.C. Work - West Wing Column - W L40

100

26-OCT-06A

06-NOV-06A

R.C. Work - West Wing Column - W L40

041W030050 R.C. Work - West Wing Column - W L41

100

26-OCT-06A

06-NOV-06A

R.C. Work - West Wing Column - W L41

042W030050 R.C. Work - West Wing Column - W L42

100

28-NOV-06A

14-DEC-06A

R.C. Work - West Wing Column - W L42

043W030050 R.C. Work - West Wing Column - W L43

100

11-DEC-06A

13-DEC-06A

R.C. Work - West Wing Column - W L43

044W030050 R.C. Work - West Wing Column - W L44

100

19-DEC-06A

27-DEC-06A

045W030050 R.C. Work - West Wing Column - W L45

100

11-JAN-07A

14-JAN-07A

R.C. Work - West Wing Column - W L45

046W030050 R.C. Work - West Wing Column - W L46

100

17-JAN-07A

21-JAN-07A

R.C. Work - West Wing Column - W L46

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

R.C. Work - West Wing Column - W L17


R.C. Work - West Wing Column - W L18

R.C. Work - West Wing Column - W L44

Sheet 95 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

047W030050 R.C. Work - West Wing Column - W L47

100

25-JAN-07A

27-JAN-07A

R.C. Work - West Wing Column - W L47

048W030050 R.C. Work - West Wing Column - W L48

100

03-FEB-07A

03-FEB-07A

R.C. Work - West Wing Column - W L48

049W030050 R.C. Work - West Wing Column - W L49

100

06-FEB-07A

07-FEB-07A

R.C. Work - West Wing Column - W L49

050W030050 R.C. Work - West Wing Column - W L50

100

11-FEB-07A

12-FEB-07A

R.C. Work - West Wing Column - W L50

051W030050 R.C. Work - West Wing Column - W L51

100

14-FEB-07A

15-FEB-07A

R.C. Work - West Wing Column - W L51

052W030050 R.C. Work - West Wing Column - W L52

100

18-FEB-07A

19-FEB-07A

R.C. Work - West Wing Column - W L52

053W030050 R.C. Work - West Wing Column - W L53

100

22-FEB-07A

23-FEB-07A

R.C. Work - West Wing Column - W L53

054W030050 R.C. Work - West Wing Column - W L54

100

26-FEB-07A

27-FEB-07A

R.C. Work - West Wing Column - W L54

055W030050 R.C. Work - West Wing Column - W L55

100

01-MAR-07A

02-MAR-07A

R.C. Work - West Wing Column - W L55

056W030050 R.C. Work - West Wing Column - W L56

100

06-MAR-07A

08-MAR-07A

R.C. Work - West Wing Column - W L56

057W030050 R.C. Work - West Wing Column - W L57

100

10-MAR-07A

11-MAR-07A

R.C. Work - West Wing Column - W L57

058W030050 R.C. Work - West Wing Column - W L58

67

271

14-MAR-07A

15-MAR-07

R.C. Work - West Wing Column - W L58

059W030050 R.C. Work - West Wing Column - W L59

271

19-MAR-07

21-MAR-07

R.C. Work - West Wing Column - W L59

060W030050 R.C. Work - West Wing Column - W L60

271

23-MAR-07

25-MAR-07

R.C. Work - West Wing Column - W L60

061W030050 R.C. Work - West Wing Column - W L61

271

27-MAR-07

29-MAR-07

R.C. Work - West Wing Column - W L61

062W030050 R.C. Work - West Wing Column - W L62

271

01-APR-07

03-APR-07

R.C. Work - West Wing Column - W L62

063W030050 R.C. Work - West Wing Column - W L63

271

05-APR-07

07-APR-07

R.C. Work - West Wing Column - W L63

064W030050 R.C. Work - West Wing Column - W L64

271

09-APR-07

12-APR-07

R.C. Work - West Wing Column - W L64

065W030050 R.C. Work - West Wing Column - W L65

271

14-APR-07

16-APR-07

R.C. Work - West Wing Column - W L65

066W030050 R.C. Work - West Wing Column - W L66

271

18-APR-07

20-APR-07

R.C. Work - West Wing Column - W L66

067W030050 R.C. Work - West Wing Column - W L67

271

22-APR-07

25-APR-07

R.C. Work - West Wing Column - W L67

068W030050 R.C. Work - West Wing Column - W L68

271

27-APR-07

29-APR-07

R.C. Work - West Wing Column - W L68

069W030050 R.C. Work - West Wing Column - W L69

271

02-MAY-07

04-MAY-07

R.C. Work - West Wing Column - W L69

070W030050 R.C. Work - West Wing Column - W L70

271

06-MAY-07

08-MAY-07

R.C. Work - West Wing Column - W L70

071W030050 R.C. Work - West Wing Column - W L71

271

13-MAY-07

15-MAY-07

R.C. Work - West Wing Column - W L71

072W030050 R.C. Work - West Wing Column - W L72

271

19-MAY-07

21-MAY-07

R.C. Work - West Wing Column - W L72

073W030050 R.C. Work - West Wing Column - W L73

271

28-MAY-07

30-MAY-07

R.C. Work - West Wing Column - W L73

074W030050 R.C. Work - West Wing Column - W L74

271

31-MAY-07

02-JUN-07

R.C. Work - West Wing Column - W L74

075W030050 R.C. Work - West Wing Column - W L75

271

15-JUN-07

17-JUN-07

076W030050 R.C. Work - West Wing Column - W L76

80

15-MAR-07

18-MAR-07

077W030050 R.C. Work - West Wing Column - W L77

100

08-FEB-07A

12-FEB-07A

R.C. Work - West Wing Column - W L77

078W030050 R.C. Work - West Wing Column - W L78

100

14-FEB-07A

15-FEB-07A

R.C. Work - West Wing Column - W L78

079W030050 R.C. Work - West Wing Column - W L79

100

25-FEB-07A

26-FEB-07A

R.C. Work - West Wing Column - W L79

080W030050 R.C. Work - West Wing Column - W L80

100

03-MAR-07A

05-MAR-07A

R.C. Work - West Wing Column - W L80

081W030050 R.C. Work - West Wing Column - W L81

100

11-MAR-07A

12-MAR-07A

R.C. Work - West Wing Column - W L81

082W030050 R.C. Work - West Wing Column - W L82

80

18-MAR-07

20-MAR-07

R.C. Work - West Wing Column - W L82

083W030050 R.C. Work - West Wing Column - W L83

80

22-MAR-07

24-MAR-07

R.C. Work - West Wing Column - W L83

084W030050 R.C. Work - West Wing Column - W L84

80

26-MAR-07

28-MAR-07

R.C. Work - West Wing Column - W L84

085W030050 R.C. Work - West Wing Column - W L85

80

31-MAR-07

02-APR-07

R.C. Work - West Wing Column - W L85

086W030050 R.C. Work - West Wing Column - W L86

80

04-APR-07

06-APR-07

R.C. Work - West Wing Column - W L86

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - West Wing Column - W L75


R.C. Work - West Wing Column - W L76

Sheet 96 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

087W030050 R.C. Work - West Wing Column - W L87

80

08-APR-07

11-APR-07

R.C. Work - West Wing Column - W L87

088W030050 R.C. Work - West Wing Column - W L88

80

13-APR-07

15-APR-07

R.C. Work - West Wing Column - W L88

089W030050 R.C. Work - West Wing Column - W L89

80

17-APR-07

19-APR-07

R.C. Work - West Wing Column - W L89

090W030050 R.C. Work - West Wing Column - W L90

80

21-APR-07

23-APR-07

R.C. Work - West Wing Column - W L90

091W030050 R.C. Work - West Wing Column - W L91

80

26-APR-07

28-APR-07

R.C. Work - West Wing Column - W L91

092W030050 R.C. Work - West Wing Column - W L92

80

30-APR-07

03-MAY-07

R.C. Work - West Wing Column - W L92

093W030050 R.C. Work - West Wing Column - W L93

80

05-MAY-07

07-MAY-07

R.C. Work - West Wing Column - W L93

094W030050 R.C. Work - West Wing Column - W L94

80

09-MAY-07

12-MAY-07

R.C. Work - West Wing Column - W L94

095W030050 R.C. Work - West Wing Column - W L95

80

14-MAY-07

16-MAY-07

R.C. Work - West Wing Column - W L95

096W030050 R.C. Work - West Wing Column - W L96

80

18-MAY-07

20-MAY-07

R.C. Work - West Wing Column - W L96

097W030050 R.C. Work - West Wing Column - W L97

80

22-MAY-07

24-MAY-07

R.C. Work - West Wing Column - W L97

098W030050 R.C. Work - West Wing Column - W L98

80

27-MAY-07

29-MAY-07

R.C. Work - West Wing Column - W L98

099W030050 R.C. Work - West Wing Column - W L99

80

31-MAY-07

02-JUN-07

R.C. Work - West Wing Column - W L99

100W030050 R.C. Work - West Wing Column - W L100

80

05-JUN-07

07-JUN-07

R.C. Work - West Wing Column - W L100

101W030050 R.C. Work - West Wing Column - W L101

80

09-JUN-07

12-JUN-07

R.C. Work - West Wing Column - W L101

102W030050 R.C. Work - West Wing Column - W L102

80

14-JUN-07

16-JUN-07

R.C. Work - West Wing Column - W L102

103W030050 R.C. Work - West Wing Column - W L103

80

19-JUN-07

21-JUN-07

R.C. Work - West Wing Column - W L103

104W030050 R.C. Work - West Wing Column - W L104

80

23-JUN-07

26-JUN-07

R.C. Work - West Wing Column - W L104

105W030050 R.C. Work - West Wing Column - W L105

80

28-JUN-07

30-JUN-07

R.C. Work - West Wing Column - W L105

106W030050 R.C. Work - West Wing Column - W L106

80

03-JUL-07

05-JUL-07

R.C. Work - West Wing Column - W L106

107W030050 R.C. Work - West Wing Column - W L107

80

07-JUL-07

10-JUL-07

R.C. Work - West Wing Column - W L107

108W030050 R.C. Work - West Wing Column - W L108

80

14-JUL-07

16-JUL-07

R.C. Work - West Wing Column - W L108

109W030050 R.C. Work - West Wing Column - W L109

80

28-JUL-07

31-JUL-07

R.C. Work - West Wing Column - W L109

110W030050 R.C. Work - West Wing Column - W L110

80

01-AUG-07

03-AUG-07

R.C. Work - West Wing Column - W L110

111W030050 R.C. Work - West Wing Column - W L111

80

14-AUG-07

16-AUG-07

-01W030060 R.C. Work - Stair T01 B2 W

12

100

22-OCT-05A

08-NOV-05A

-02W030060 R.C. Work - Stair T01 B1 W

100

10-NOV-05A

24-NOV-05A

-03W030060 R.C. Work - Stair T01 Concourse W

100

27-NOV-05A

13-DEC-05A

R.C. Work - Stair T01 Concourse W

-04W030060 R.C. Work - Stair T01 Ground W

100

14-DEC-05A

21-DEC-05A

R.C. Work - Stair T01 Ground W

001W030060 R.C. Work - Stair T01 L1 W

100

22-DEC-05A

29-DEC-05A

R.C. Work - Stair T01 L1 W

002W030060 R.C. Work - Stair T01 L2 W

100

30-DEC-05A

14-JAN-06A

R.C. Work - Stair T01 L2 W

003W030060 R.C. Work - Stair T01 L3 W

100

15-JAN-06A

22-JAN-06A

R.C. Work - Stair T01 L3 W

004W030060 R.C. Work - Stair T01 L4 W

100

23-JAN-06A

28-JAN-06A

R.C. Work - Stair T01 L4 W

005W030060 R.C. Work - Stair T01 L5 W

100

29-JAN-06A

30-JAN-06A

R.C. Work - Stair T01 L5 W

006W030060 R.C. Work - Stair T01 L6 W

100

04-FEB-06A

07-FEB-06A

R.C. Work - Stair T01 L6 W

007W030060 R.C. Work - Stair T01 L7 W

100

08-FEB-06A

11-FEB-06A

R.C. Work - Stair T01 L7 W

008W030060 R.C. Work - Stair T01 L8 W

100

12-FEB-06A

16-FEB-06A

R.C. Work - Stair T01 L8 W

009W030060 R.C. Work - Stair T01 L9 W

100

17-FEB-06A

22-FEB-06A

R.C. Work - Stair T01 L9 W

010W030060 R.C. Work - Stair T01 L10 W

100

23-FEB-06A

01-MAR-06A

R.C. Work - Stair T01 L10 W

011W030060 R.C. Work - Stair T01 L11 W

100

02-MAR-06A

05-MAR-06A

R.C. Work - Stair T01 L11 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - West Wing Column - W L111


R.C. Work - Stair T01 B2 W
R.C. Work - Stair T01 B1 W

Sheet 97 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

012W030060 R.C. Work - Stair T01 L12 W

100

06-MAR-06A

08-MAR-06A

R.C. Work - Stair T01 L12 W

013W030060 R.C. Work - Stair T01 L13 W

100

09-MAR-06A

12-MAR-06A

R.C. Work - Stair T01 L13 W

014W030060 R.C. Work - Stair T01 L14 W

100

13-MAR-06A

15-MAR-06A

R.C. Work - Stair T01 L14 W

015W030060 R.C. Work - Stair T01 L15 W

100

17-MAR-06A

19-MAR-06A

R.C. Work - Stair T01 L15 W

016W030060 R.C. Work - Stair T01 L16 W

100

20-MAR-06A

28-MAR-06A

R.C. Work - Stair T01 L16 W

017W030060 R.C. Work - Stair T01 L17 W

100

29-MAR-06A

19-APR-06A

R.C. Work - Stair T01 L17 W

018W030060 R.C. Work - Stair T01 L18 W

100

20-APR-06A

24-APR-06A

R.C. Work - Stair T01 L18 W

019W030060 R.C. Work - Stair T01 L19 W

100

25-APR-06A

02-MAY-06A

R.C. Work - Stair T01 L19 W

020W030060 R.C. Work - Stair T01 L20 W

100

03-MAY-06A

06-MAY-06A

R.C. Work - Stair T01 L20 W

021W030060 R.C. Work - Stair T01 L21 W

100

07-MAY-06A

13-MAY-06A

R.C. Work - Stair T01 L21 W

022W030060 R.C. Work - Stair T01 L22 W

100

14-MAY-06A

20-MAY-06A

R.C. Work - Stair T01 L22 W

023W030060 R.C. Work - Stair T01 L23 W

100

21-MAY-06A

25-MAY-06A

R.C. Work - Stair T01 L23 W

024W030060 R.C. Work - Stair T01 L24 W

100

26-MAY-06A

03-JUN-06A

R.C. Work - Stair T01 L24 W

025W030060 R.C. Work - Stair T01 L25 W

100

04-JUN-06A

08-JUN-06A

R.C. Work - Stair T01 L25 W

026W030060 R.C. Work - Stair T01 L26 W

100

09-JUN-06A

14-JUN-06A

R.C. Work - Stair T01 L26 W

027W030060 R.C. Work - Stair T01 L27 W

100

15-JUN-06A

18-JUN-06A

R.C. Work - Stair T01 L27 W

028W030060 R.C. Work - Stair T01 L28 W

100

20-JUN-06A

24-JUN-06A

R.C. Work - Stair T01 L28 W

029W030060 R.C. Work - Stair T01 L29 W

100

25-JUN-06A

28-JUN-06A

R.C. Work - Stair T01 L29 W

030W030060 R.C. Work - Stair T01 L30 W

100

29-JUN-06A

02-JUL-06A

R.C. Work - Stair T01 L30 W

031W030060 R.C. Work - Stair T01 L31 W

100

04-JUL-06A

06-JUL-06A

R.C. Work - Stair T01 L31 W

032W030060 R.C. Work - Stair T01 L32 W

100

07-JUL-06A

11-JUL-06A

R.C. Work - Stair T01 L32 W

033W030060 R.C. Work - Stair T01 L33 W

100

12-JUL-06A

16-JUL-06A

R.C. Work - Stair T01 L33 W

034W030060 R.C. Work - Stair T01 L34 W

100

18-JUL-06A

20-JUL-06A

R.C. Work - Stair T01 L34 W

035W030060 R.C. Work - Stair T01 L35 W

100

21-JUL-06A

23-JUL-06A

R.C. Work - Stair T01 L35 W

036W030060 R.C. Work - Stair T01 L36 W

100

25-JUL-06A

29-JUL-06A

R.C. Work - Stair T01 L36 W

037W030060 R.C. Work - Stair T01 L37 W

100

30-JUL-06A

02-AUG-06A

R.C. Work - Stair T01 L37 W

038W030060 R.C. Work - Stair T01 L38 W

100

03-AUG-06A

08-AUG-06A

R.C. Work - Stair T01 L38 W

039W030060 R.C. Work - Stair T01 L39 W

100

09-AUG-06A

22-AUG-06A

R.C. Work - Stair T01 L39 W

040W030060 R.C. Work - Stair T01 L40 W

100

23-AUG-06A

27-AUG-06A

R.C. Work - Stair T01 L40 W

041W030060 R.C. Work - Stair T01 L41 W

100

29-AUG-06A

31-AUG-06A

R.C. Work - Stair T01 L41 W

042W030060 R.C. Work - Stair T01 L42 W

100

13-SEP-06A

17-SEP-06A

R.C. Work - Stair T01 L42 W

043W030060 R.C. Work - Stair T04 L43 W

100

18-SEP-06A

24-SEP-06A

R.C. Work - Stair T04 L43 W

044W030060 R.C. Work - Stair T04 L44 W

100

26-SEP-06A

30-SEP-06A

R.C. Work - Stair T04 L44 W

045W030060 R.C. Work - Stair T04 L45 W

100

01-OCT-06A

04-OCT-06A

R.C. Work - Stair T04 L45 W

046W030060 R.C. Work - Stair T04 L46 W

100

05-OCT-06A

08-OCT-06A

R.C. Work - Stair T04 L46 W

047W030060 R.C. Work - Stair T04 L47 W

100

10-OCT-06A

15-OCT-06A

R.C. Work - Stair T04 L47 W

048W030060 R.C. Work - Stair T04 L48 W

100

16-OCT-06A

17-OCT-06A

R.C. Work - Stair T04 L48 W

049W030060 R.C. Work - Stair T04 L49 W

100

19-OCT-06A

24-OCT-06A

R.C. Work - Stair T04 L49 W

050W030060 R.C. Work - Stair T04 L50 W

100

26-OCT-06A

31-OCT-06A

R.C. Work - Stair T04 L50 W

051W030060 R.C. Work - Stair T04 L51 W

100

02-NOV-06A

04-NOV-06A

R.C. Work - Stair T04 L51 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 98 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

052W030060 R.C. Work - Stair T04 L52 W

100

05-NOV-06A

08-NOV-06A

R.C. Work - Stair T04 L52 W

053W030060 R.C. Work - Stair T04 L53 W

100

09-NOV-06A

11-NOV-06A

R.C. Work - Stair T04 L53 W

054W030060 R.C. Work - Stair T04 L54 W

100

12-NOV-06A

13-NOV-06A

R.C. Work - Stair T04 L54 W

055W030060 R.C. Work - Stair T04 L55 W

100

16-NOV-06A

13-NOV-06A

R.C. Work - Stair T04 L55 W

056W030060 R.C. Work - Stair T04 L56 W

100

16-NOV-06A

19-NOV-06A

R.C. Work - Stair T04 L56 W

057W030060 R.C. Work - Stair T04 L57 W

100

20-NOV-06A

21-NOV-06A

R.C. Work - Stair T04 L57 W

058W030060 R.C. Work - Stair T04 L58 W

100

22-NOV-06A

23-NOV-06A

R.C. Work - Stair T04 L58 W

059W030060 R.C. Work - Stair T04 L59 W

100

24-NOV-06A

25-NOV-06A

R.C. Work - Stair T04 L59 W

060W030060 R.C. Work - Stair T04 L60 W

100

26-NOV-06A

28-NOV-06A

R.C. Work - Stair T04 L60 W

061W030060 R.C. Work - Stair T04 L61 W

100

29-NOV-06A

30-NOV-06A

R.C. Work - Stair T04 L61 W

062W030060 R.C. Work - Stair T04 L62 W

100

01-DEC-06A

04-DEC-06A

R.C. Work - Stair T04 L62 W

063W030060 R.C. Work - Stair T04 L63 W

100

07-DEC-06A

04-DEC-06A

R.C. Work - Stair T04 L63 W

064W030060 R.C. Work - Stair T04 L64 W

100

07-DEC-06A

09-DEC-06A

R.C. Work - Stair T04 L64 W

065W030060 R.C. Work - Stair T04 L65 W

100

10-DEC-06A

12-DEC-06A

R.C. Work - Stair T04 L65 W

066W030060 R.C. Work - Stair T04 L66 W

100

13-DEC-06A

14-DEC-06A

R.C. Work - Stair T04 L66 W

067W030060 R.C. Work - Stair T04 L67 W

100

15-DEC-06A

17-DEC-06A

R.C. Work - Stair T04 L67 W

068W030060 R.C. Work - Stair T04 L68 W

100

18-DEC-06A

19-DEC-06A

R.C. Work - Stair T04 L68 W

069W030060 R.C. Work - Stair T04 L69 W

100

20-DEC-06A

23-DEC-06A

R.C. Work - Stair T04 L69 W

070W030060 R.C. Work - Stair T04 L70 W

100

24-DEC-06A

25-DEC-06A

R.C. Work - Stair T04 L70 W

071W030060 R.C. Work - Stair T04 L71 W

100

26-DEC-06A

28-DEC-06A

R.C. Work - Stair T04 L71 W

072W030060 R.C. Work - Stair T04 L72 W

100

29-DEC-06A

08-JAN-07A

R.C. Work - Stair T04 L72 W

073W030060 R.C. Work - Stair T04 L73 W

100

09-JAN-07A

11-JAN-07A

R.C. Work - Stair T04 L73 W

074W030060 R.C. Work - Stair T04 L74 W

100

12-JAN-07A

14-JAN-07A

R.C. Work - Stair T04 L74 W

075W030060 R.C. Work - Stair T04 L75 W

100

15-JAN-07A

17-JAN-07A

040W030070 R.C. Work - Wall & Beam L40-42 W

20

100

26-OCT-06A

14-DEC-06A

073W030070 R.C. Work - Wall & Beam L73-75 W

20

277

28-JUN-07

19-JUL-07

109W030070 R.C. Work - Wall & Beam L109-111 W

20

258

22-AUG-07

13-SEP-07

GENERAL
SUMG900180 R.C. Work - (B2~L6)

360*

100

02-APR-05A

27-MAR-06A

SUMG900190 R.C. Work - Hotel (L7~L42)

544*

100

04-SEP-05A

01-MAR-07A

SUMG900200 R.C. Work -Resi. Apt. (L43~L75)

415*

75

305

09-MAY-06A

27-JUN-07

SUMG900210 R.C. Work -Lux. Apt. (L76~L111)

320*

50

194

06-OCT-06A

21-AUG-07

SUMG900220 R.C. Work -Boutique Office (L112~L154)

898*

-2

05-MAR-07A

18-AUG-09

CENTER CORE
160T03110A Concrete Water Tank Work L160 C

30

160

18-MAR-08

21-APR-08

160T13110A Steel Lining to Water Tank L160 C

25

160

31-MAY-08

28-JUN-08

SOUTH WING
137S03110A Concrete Water Tank Work L137 S

30

343

11-DEC-07

14-JAN-08

137S13110A Steel Lining to Water Tank L137 S

25

343

21-FEB-08

20-MAR-08

2009

R.C. Work - Stair T04 L75 W


R.C. Work - Wall & Beam L40-42 W
R.C. Work - Wall & Beam L73-75 W
R.C. Work - Wall & Beam L109-111 W
R.C. Work - (B2~L6)
R.C. Work - Hotel (L7~L42)
R.C. Work -Resi. Apt. (L43~L75)
R.C. Work -Lux. Apt. (L76~L111)
R.C. Work -Boutique Office (L112~L154)

CONCRETE WATERTANKS

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Concrete Water Tank Work L160 C


Steel Lining to Water Tank L160 C
Concrete Water Tank Work L137 S
Steel Lining to Water Tank L137 S
Sheet 99 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

WEST WING
041W03110A Concrete Water Tank Work L41 W

30

100

28-NOV-06A

22-FEB-07A

041W13110A Steel Lining to Water Tank L41 W

25

464

03-APR-07

01-MAY-07

074W03110A Concrete Water Tank Work L74 W

30

350

02-JUN-07

05-JUL-07

074W13110A Steel Lining to Water Tank L74 W

25

350

14-AUG-07

11-SEP-07

110W03110A Concrete Water Tank Work L110 W

30

418

15-SEP-07

18-OCT-07

110W13110A Steel Lining to Water Tank L110 W

25

418

27-NOV-07

25-DEC-07

CENTER CORE
SUMT040010 Masonry Work B2 ~ L4

468*

68

314

29-APR-06A

09-AUG-07

SUMT040020 Masonry Work - Hotel (L5~39)

74*

263

15-MAR-07

27-MAY-07

SUMT040030 Masonry Work - Apartments (L43~108)

2005

2006

2007

2008

2009

Concrete Water Tank Work L41 W


Steel Lining to Water Tank L41 W
Concrete Water Tank Work L74 W
Steel Lining to Water Tank L74 W
Concrete Water Tank Work L110 W
Steel Lining to Water Tank L110 W

MASONRY WORK
Masonry Work B2 ~ L4
Masonry Work - Hotel (L5~39)
Masonry Work - Apartments (L43~108)

188*

30

292

18-JAN-07A

24-JUL-07

-01T040080

Masonry Work B2 C

35

86

170

29-APR-06A

20-MAR-07

Masonry Work B2 C

-02T040080

Masonry Work B1 C

35

77

170

05-AUG-06A

24-MAR-07

Masonry Work B1 C

-03T040080

Masonry Work Concourse C

35

74

170

09-AUG-06A

25-MAR-07

Masonry Work Concourse C

-04T040080

Masonry Work Ground C

35

170

15-MAR-07

24-APR-07

Masonry Work Ground C

SOUTH WING
-01S040080 Masonry Work B2 S

35

91

170

17-SEP-06A

18-MAR-07

Masonry Work B2 S

-02S040080

Masonry Work B1 S

35

91

170

25-DEC-06A

18-MAR-07

Masonry Work B1 S

-03S040080

Masonry Work Concourse S

35

51

170

03-FEB-07A

03-APR-07

Masonry Work Concourse S

-04S040080

Masonry Work Ground S

35

170

15-MAR-07

24-APR-07

Masonry Work Ground S

001S040080 Masonry Work L1 S

35

170

01-APR-07

10-MAY-07

002S040080 Masonry Work L2 S

35

170

17-APR-07

27-MAY-07

003S040080 Masonry Work L3 S

35

170

03-MAY-07

12-JUN-07

004S040080 Masonry Work L4 S

35

199

20-MAY-07

28-JUN-07

005S040080 Masonry Work L5 S

21

212

15-MAR-07

08-APR-07

Masonry Work L5 S

006S040080 Masonry Work L6 S

21

212

20-MAR-07

12-APR-07

Masonry Work L6 S

007S040080 Masonry Work L7 S

21

212

25-MAR-07

17-APR-07

Masonry Work L7 S

008S040080 Masonry Work L8 S

21

212

29-MAR-07

22-APR-07

Masonry Work L8 S

009S040080 Masonry Work L9 S

21

212

03-APR-07

26-APR-07

Masonry Work L9 S

010S040080 Masonry Work L10 S

21

213

08-APR-07

01-MAY-07

Masonry Work L10 S

011S040080 Masonry Work L11 S

21

213

12-APR-07

06-MAY-07

Masonry Work L11 S

012S040080 Masonry Work L12 S

21

213

17-APR-07

10-MAY-07

Masonry Work L12 S

013S040080 Masonry Work L13 S

21

213

22-APR-07

15-MAY-07

Masonry Work L13 S

014S040080 Masonry Work L14 S

21

213

26-APR-07

20-MAY-07

Masonry Work L14 S

015S040080 Masonry Work L15 S

21

213

01-MAY-07

24-MAY-07

Masonry Work L15 S

016S040080 Masonry Work L16 S

21

215

06-MAY-07

29-MAY-07

017S040080 Masonry Work L17 -18 S

35

31

402

08-FEB-07A

11-APR-07

019S040080 Masonry Work L19 S

21

67

122

23-DEC-06A

22-MAR-07

Masonry Work L19 S

020S040080 Masonry Work L20 S

21

38

126

27-DEC-06A

29-MAR-07

Masonry Work L20 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Masonry Work L1 S
Masonry Work L2 S
Masonry Work L3 S
Masonry Work L4 S

Masonry Work L16 S


Masonry Work L17 -18 S

Sheet 100 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

021S040080 Masonry Work L21 S

21

33

130

04-JAN-07A

31-MAR-07

Masonry Work L21 S

022S040080 Masonry Work L22 S

21

33

134

07-JAN-07A

31-MAR-07

Masonry Work L22 S

023S040080 Masonry Work L23 S

21

33

138

09-JAN-07A

31-MAR-07

Masonry Work L23 S

024S040080 Masonry Work L24 S

21

33

142

13-JAN-07A

31-MAR-07

Masonry Work L24 S

025S040080 Masonry Work L25 S

21

33

144

13-JAN-07A

31-MAR-07

Masonry Work L25 S

026S040080 Masonry Work L26 S

21

43

144

15-FEB-07A

28-MAR-07

Masonry Work L26 S

027S040080 Masonry Work L27 S

21

144

15-MAR-07

08-APR-07

Masonry Work L27 S

028S040080 Masonry Work L28 S

21

146

19-MAR-07

11-APR-07

Masonry Work L28 S

029S040080 Masonry Work L29 S

21

147

22-MAR-07

15-APR-07

Masonry Work L29 S

030S040080 Masonry Work L30 S

21

148

26-MAR-07

18-APR-07

Masonry Work L30 S

031S040080 Masonry Work L31 S

21

149

29-MAR-07

22-APR-07

Masonry Work L31 S

032S040080 Masonry Work L32 S

21

150

02-APR-07

25-APR-07

Masonry Work L32 S

033S040080 Masonry Work L33 S

21

151

05-APR-07

29-APR-07

Masonry Work L33 S

034S040080 Masonry Work L34 S

21

153

09-APR-07

02-MAY-07

Masonry Work L34 S

035S040080 Masonry Work L35 S

21

156

12-APR-07

06-MAY-07

Masonry Work L35 S

036S040080 Masonry Work L36 S

21

159

16-APR-07

09-MAY-07

Masonry Work L36 S

037S040080 Masonry Work L37 S

21

160

19-APR-07

13-MAY-07

Masonry Work L37 S

038S040080 Masonry Work L38 S

21

163

23-APR-07

16-MAY-07

Masonry Work L38 S

039S040080 Masonry Work L39 S

21

166

26-APR-07

20-MAY-07

Masonry Work L39 S

040S040080 Masonry Work L40-42 S

35

336

30-APR-07

09-JUN-07

043S040080 Masonry Work L43 S

21

52

209

18-JAN-07A

26-MAR-07

044S040080 Masonry Work L44 S

21

209

15-MAR-07

08-APR-07

045S040080 Masonry Work L45 S

21

57

222

23-JAN-07A

25-MAR-07

Masonry Work L45 S

046S040080 Masonry Work L46 S

21

57

227

29-JAN-07A

25-MAR-07

Masonry Work L46 S

047S040080 Masonry Work L47 S

21

57

231

29-JAN-07A

25-MAR-07

Masonry Work L47 S

048S040080 Masonry Work L48 S

21

57

235

29-JAN-07A

25-MAR-07

Masonry Work L48 S

049S040080 Masonry Work L49 S

21

57

239

30-JAN-07A

25-MAR-07

Masonry Work L49 S

050S040080 Masonry Work L50 S

21

57

243

30-JAN-07A

25-MAR-07

Masonry Work L50 S

051S040080 Masonry Work L51 S

21

57

247

31-JAN-07A

25-MAR-07

Masonry Work L51 S

052S040080 Masonry Work L52 S

21

57

252

31-JAN-07A

25-MAR-07

Masonry Work L52 S

053S040080 Masonry Work L53 S

21

62

256

21-FEB-07A

24-MAR-07

Masonry Work L53 S

054S040080 Masonry Work L54 S

21

62

260

21-FEB-07A

24-MAR-07

Masonry Work L54 S

055S040080 Masonry Work L55 S

21

62

264

25-FEB-07A

24-MAR-07

Masonry Work L55 S

056S040080 Masonry Work L56 S

21

62

268

26-FEB-07A

24-MAR-07

Masonry Work L56 S

057S040080 Masonry Work L57 S

21

62

272

28-FEB-07A

24-MAR-07

Masonry Work L57 S

058S040080 Masonry Work L58 S

21

62

278

01-MAR-07A

24-MAR-07

Masonry Work L58 S

059S040080 Masonry Work L59 S

21

62

280

06-MAR-07A

24-MAR-07

Masonry Work L59 S

060S040080 Masonry Work L60 S

21

62

280

11-MAR-07A

24-MAR-07

Masonry Work L60 S

061S040080 Masonry Work L61 S

21

62

285

11-MAR-07A

24-MAR-07

Masonry Work L61 S

062S040080 Masonry Work L62 S

21

285

15-MAR-07

08-APR-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L40-42 S


Masonry Work L43 S
Masonry Work L44 S

Masonry Work L62 S


Sheet 101 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

063S040080 Masonry Work L63 S

21

285

20-MAR-07

12-APR-07

Masonry Work L63 S

064S040080 Masonry Work L64 S

21

285

25-MAR-07

17-APR-07

Masonry Work L64 S

065S040080 Masonry Work L65 S

21

285

29-MAR-07

22-APR-07

Masonry Work L65 S

066S040080 Masonry Work L66 S

21

285

03-APR-07

26-APR-07

Masonry Work L66 S

067S040080 Masonry Work L67 S

21

285

08-APR-07

01-MAY-07

Masonry Work L67 S

068S040080 Masonry Work L68 S

21

285

12-APR-07

06-MAY-07

Masonry Work L68 S

069S040080 Masonry Work L69 S

21

285

17-APR-07

10-MAY-07

Masonry Work L69 S

070S040080 Masonry Work L70 S

21

285

22-APR-07

15-MAY-07

Masonry Work L70 S

071S040080 Masonry Work L71 S

21

285

26-APR-07

20-MAY-07

Masonry Work L71 S

072S040080 Masonry Work L72 S

21

285

01-MAY-07

24-MAY-07

Masonry Work L72 S

073S040080 Masonry Work L73-75 S

35

530

06-MAY-07

14-JUN-07

076S040080 Masonry Work L76 S

14

241

15-MAR-07

31-MAR-07

Masonry Work L76 S

077S040080 Masonry Work L77 S

14

241

19-MAR-07

03-APR-07

Masonry Work L77 S

078S040080 Masonry Work L78 S

14

241

22-MAR-07

07-APR-07

Masonry Work L78 S

079S040080 Masonry Work L79 S

14

242

26-MAR-07

10-APR-07

Masonry Work L79 S

080S040080 Masonry Work L80 S

14

243

29-MAR-07

14-APR-07

Masonry Work L80 S

081S040080 Masonry Work L81 S

14

244

02-APR-07

17-APR-07

Masonry Work L81 S

082S040080 Masonry Work L82 S

14

245

05-APR-07

21-APR-07

Masonry Work L82 S

083S040080 Masonry Work L83 S

14

248

09-APR-07

24-APR-07

Masonry Work L83 S

084S040080 Masonry Work L84 S

14

249

12-APR-07

28-APR-07

Masonry Work L84 S

085S040080 Masonry Work L85 S

14

250

16-APR-07

01-MAY-07

Masonry Work L85 S

086S040080 Masonry Work L86 S

14

252

19-APR-07

05-MAY-07

Masonry Work L86 S

087S040080 Masonry Work L87 S

14

253

23-APR-07

08-MAY-07

Masonry Work L87 S

088S040080 Masonry Work L88 S

14

253

26-APR-07

12-MAY-07

Masonry Work L88 S

089S040080 Masonry Work L89 S

14

253

30-APR-07

15-MAY-07

Masonry Work L89 S

090S040080 Masonry Work L90 S

14

253

03-MAY-07

19-MAY-07

Masonry Work L90 S

091S040080 Masonry Work L91 S

14

253

07-MAY-07

22-MAY-07

Masonry Work L91 S

092S040080 Masonry Work L92 S

14

253

10-MAY-07

26-MAY-07

Masonry Work L92 S

093S040080 Masonry Work L93 S

14

253

14-MAY-07

29-MAY-07

Masonry Work L93 S

094S040080 Masonry Work L94 S

14

253

17-MAY-07

02-JUN-07

Masonry Work L94 S

095S040080 Masonry Work L95 S

14

253

21-MAY-07

05-JUN-07

Masonry Work L95 S

096S040080 Masonry Work L96 S

14

253

24-MAY-07

09-JUN-07

Masonry Work L96 S

097S040080 Masonry Work L97 S

14

253

28-MAY-07

12-JUN-07

Masonry Work L97 S

098S040080 Masonry Work L98 S

14

253

31-MAY-07

16-JUN-07

Masonry Work L98 S

099S040080 Masonry Work L99 S

14

253

04-JUN-07

19-JUN-07

Masonry Work L99 S

100S040080 Masonry Work L100 S

14

253

07-JUN-07

23-JUN-07

Masonry Work L100 S

101S040080 Masonry Work L101 S

14

253

11-JUN-07

26-JUN-07

Masonry Work L101 S

102S040080 Masonry Work L102 S

14

253

14-JUN-07

30-JUN-07

Masonry Work L102 S

103S040080 Masonry Work L103 S

14

253

18-JUN-07

03-JUL-07

Masonry Work L103 S

104S040080 Masonry Work L104 S

14

253

21-JUN-07

07-JUL-07

Masonry Work L104 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L73-75 S

Sheet 102 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

105S040080 Masonry Work L105 S

14

253

25-JUN-07

10-JUL-07

Masonry Work L105 S

106S040080 Masonry Work L106 S

14

253

28-JUN-07

14-JUL-07

Masonry Work L106 S

107S040080 Masonry Work L107 S

14

254

02-JUL-07

17-JUL-07

Masonry Work L107 S

108S040080 Masonry Work L108 S

14

254

05-JUL-07

21-JUL-07

Masonry Work L108 S

109S040080 Masonry Work L109-111 S

35

482

09-JUL-07

18-AUG-07

Masonry Work L109-111 S

EAST WING
-01E040080

Masonry Work B2 E

35

91

174

19-SEP-06A

18-MAR-07

Masonry Work B2 E

-02E040080

Masonry Work B1 E

35

91

174

09-AUG-06A

18-MAR-07

Masonry Work B1 E

-03E040080

Masonry Work Concourse E

35

51

174

28-FEB-07A

03-APR-07

Masonry Work Concourse E

-04E040080

Masonry Work Ground E

35

174

25-MAR-07

03-MAY-07

Masonry Work Ground E

001E040080 Masonry Work L1 E

35

174

18-APR-07

28-MAY-07

002E040080 Masonry Work L2 E

35

174

13-MAY-07

21-JUN-07

003E040080 Masonry Work L3 E

35

174

06-JUN-07

16-JUL-07

004E040080 Masonry Work L4 E

35

270

01-JUL-07

09-AUG-07

005E040080 Masonry Work L5 E

21

202

15-MAR-07

08-APR-07

Masonry Work L5 E

006E040080 Masonry Work L6 E

21

213

19-MAR-07

11-APR-07

Masonry Work L6 E

007E040080 Masonry Work L7 E

21

213

24-MAR-07

16-APR-07

Masonry Work L7 E

008E040080 Masonry Work L8 E

21

214

27-MAR-07

19-APR-07

Masonry Work L8 E

009E040080 Masonry Work L9 E

21

215

31-MAR-07

23-APR-07

Masonry Work L9 E

010E040080 Masonry Work L10 E

21

217

03-APR-07

26-APR-07

Masonry Work L10 E

011E040080 Masonry Work L11 E

21

218

07-APR-07

30-APR-07

Masonry Work L11 E

012E040080 Masonry Work L12 E

21

219

10-APR-07

03-MAY-07

Masonry Work L12 E

013E040080 Masonry Work L13 E

21

220

14-APR-07

07-MAY-07

Masonry Work L13 E

014E040080 Masonry Work L14 E

21

221

17-APR-07

10-MAY-07

Masonry Work L14 E

015E040080 Masonry Work L15 E

21

222

21-APR-07

14-MAY-07

Masonry Work L15 E

016E040080 Masonry Work L16 E

21

225

24-APR-07

17-MAY-07

Masonry Work L16 E

017E040080 Masonry Work L17 -18 E

35

29

376

23-JAN-07A

12-APR-07

Masonry Work L17 -18 E

019E040080 Masonry Work L19 E

21

38

180

23-DEC-06A

29-MAR-07

Masonry Work L19 E

020E040080 Masonry Work L20 E

21

38

186

27-DEC-06A

29-MAR-07

Masonry Work L20 E

021E040080 Masonry Work L21 E

21

38

192

04-JAN-07A

29-MAR-07

Masonry Work L21 E

022E040080 Masonry Work L22 E

21

38

197

07-JAN-07A

29-MAR-07

Masonry Work L22 E

023E040080 Masonry Work L23 E

21

38

202

09-JAN-07A

29-MAR-07

Masonry Work L23 E

024E040080 Masonry Work L24 E

21

38

208

13-JAN-07A

29-MAR-07

Masonry Work L24 E

025E040080 Masonry Work L25 E

21

38

210

13-JAN-07A

29-MAR-07

Masonry Work L25 E

026E040080 Masonry Work L26 E

21

43

210

15-FEB-07A

28-MAR-07

Masonry Work L26 E

027E040080 Masonry Work L27 E

21

210

15-MAR-07

08-APR-07

Masonry Work L27 E

028E040080 Masonry Work L28 E

21

210

19-MAR-07

11-APR-07

Masonry Work L28 E

029E040080 Masonry Work L29 E

21

212

22-MAR-07

15-APR-07

Masonry Work L29 E

030E040080 Masonry Work L30 E

21

213

26-MAR-07

18-APR-07

Masonry Work L30 E

031E040080 Masonry Work L31 E

21

214

29-MAR-07

22-APR-07

Masonry Work L31 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L1 E
Masonry Work L2 E
Masonry Work L3 E
Masonry Work L4 E

Sheet 103 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

032E040080 Masonry Work L32 E

21

215

02-APR-07

25-APR-07

Masonry Work L32 E

033E040080 Masonry Work L33 E

21

216

05-APR-07

29-APR-07

Masonry Work L33 E

034E040080 Masonry Work L34 E

21

217

09-APR-07

02-MAY-07

Masonry Work L34 E

035E040080 Masonry Work L35 E

21

219

12-APR-07

06-MAY-07

Masonry Work L35 E

036E040080 Masonry Work L36 E

21

220

16-APR-07

09-MAY-07

Masonry Work L36 E

037E040080 Masonry Work L37 E

21

221

19-APR-07

13-MAY-07

Masonry Work L37 E

038E040080 Masonry Work L38 E

21

229

23-APR-07

16-MAY-07

Masonry Work L38 E

039E040080 Masonry Work L39 E

21

232

26-APR-07

20-MAY-07

Masonry Work L39 E

040E040080 Masonry Work L40-42 E

35

337

30-APR-07

09-JUN-07

043E040080 Masonry Work L43 E

21

228

15-MAR-07

08-APR-07

044E040080 Masonry Work L44 E

21

229

19-MAR-07

11-APR-07

045E040080 Masonry Work L45 E

21

52

246

23-JAN-07A

26-MAR-07

Masonry Work L45 E

046E040080 Masonry Work L46 E

21

52

251

01-FEB-07A

26-MAR-07

Masonry Work L46 E

047E040080 Masonry Work L47 E

21

52

255

01-FEB-07A

26-MAR-07

Masonry Work L47 E

048E040080 Masonry Work L48 E

21

52

259

03-FEB-07A

26-MAR-07

Masonry Work L48 E

049E040080 Masonry Work L49 E

21

52

263

06-FEB-07A

26-MAR-07

Masonry Work L49 E

050E040080 Masonry Work L50 E

21

52

267

08-FEB-07A

26-MAR-07

Masonry Work L50 E

051E040080 Masonry Work L51 E

21

52

271

08-FEB-07A

26-MAR-07

Masonry Work L51 E

052E040080 Masonry Work L52 E

21

52

276

18-FEB-07A

26-MAR-07

Masonry Work L52 E

053E040080 Masonry Work L53 E

21

33

281

21-FEB-07A

31-MAR-07

Masonry Work L53 E

054E040080 Masonry Work L54 E

21

33

285

21-FEB-07A

31-MAR-07

Masonry Work L54 E

055E040080 Masonry Work L55 E

21

33

290

25-FEB-07A

31-MAR-07

Masonry Work L55 E

056E040080 Masonry Work L56 E

21

33

294

26-FEB-07A

31-MAR-07

Masonry Work L56 E

057E040080 Masonry Work L57 E

21

33

298

28-FEB-07A

31-MAR-07

Masonry Work L57 E

058E040080 Masonry Work L58 E

21

33

302

01-MAR-07A

31-MAR-07

Masonry Work L58 E

059E040080 Masonry Work L59 E

21

33

304

06-MAR-07A

31-MAR-07

Masonry Work L59 E

060E040080 Masonry Work L60 E

21

19

304

11-MAR-07A

03-APR-07

Masonry Work L60 E

061E040080 Masonry Work L61 E

21

19

308

11-MAR-07A

03-APR-07

Masonry Work L61 E

062E040080 Masonry Work L62 E

21

308

15-MAR-07

08-APR-07

Masonry Work L62 E

063E040080 Masonry Work L63 E

21

309

19-MAR-07

11-APR-07

Masonry Work L63 E

064E040080 Masonry Work L64 E

21

310

22-MAR-07

15-APR-07

Masonry Work L64 E

065E040080 Masonry Work L65 E

21

311

26-MAR-07

18-APR-07

Masonry Work L65 E

066E040080 Masonry Work L66 E

21

312

29-MAR-07

22-APR-07

Masonry Work L66 E

067E040080 Masonry Work L67 E

21

313

02-APR-07

25-APR-07

Masonry Work L67 E

068E040080 Masonry Work L68 E

21

314

05-APR-07

29-APR-07

Masonry Work L68 E

069E040080 Masonry Work L69 E

21

315

09-APR-07

02-MAY-07

Masonry Work L69 E

070E040080 Masonry Work L70 E

21

316

12-APR-07

06-MAY-07

Masonry Work L70 E

071E040080 Masonry Work L71 E

21

317

16-APR-07

09-MAY-07

Masonry Work L71 E

072E040080 Masonry Work L72 E

21

319

19-APR-07

13-MAY-07

073E040080 Masonry Work L73-L75 E

35

237

15-MAR-07

24-APR-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L40-42 E


Masonry Work L43 E
Masonry Work L44 E

Masonry Work L72 E


Masonry Work L73-L75 E
Sheet 104 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

076E040080 Masonry Work L76 E

14

237

19-MAR-07

03-APR-07

Masonry Work L76 E

077E040080 Masonry Work L77 E

14

237

22-MAR-07

07-APR-07

Masonry Work L77 E

078E040080 Masonry Work L78 E

14

237

26-MAR-07

10-APR-07

Masonry Work L78 E

079E040080 Masonry Work L79 E

14

238

29-MAR-07

14-APR-07

Masonry Work L79 E

080E040080 Masonry Work L80 E

14

239

02-APR-07

17-APR-07

Masonry Work L80 E

081E040080 Masonry Work L81 E

14

240

05-APR-07

21-APR-07

Masonry Work L81 E

082E040080 Masonry Work L82 E

14

241

09-APR-07

24-APR-07

Masonry Work L82 E

083E040080 Masonry Work L83 E

14

244

12-APR-07

28-APR-07

Masonry Work L83 E

084E040080 Masonry Work L84 E

14

245

16-APR-07

01-MAY-07

Masonry Work L84 E

085E040080 Masonry Work L85 E

14

246

19-APR-07

05-MAY-07

Masonry Work L85 E

086E040080 Masonry Work L86 E

14

248

23-APR-07

08-MAY-07

Masonry Work L86 E

087E040080 Masonry Work L87 E

14

249

26-APR-07

12-MAY-07

Masonry Work L87 E

088E040080 Masonry Work L88 E

14

250

30-APR-07

15-MAY-07

Masonry Work L88 E

089E040080 Masonry Work L89 E

14

250

03-MAY-07

19-MAY-07

Masonry Work L89 E

090E040080 Masonry Work L90 E

14

250

07-MAY-07

22-MAY-07

Masonry Work L90 E

091E040080 Masonry Work L91 E

14

250

10-MAY-07

26-MAY-07

Masonry Work L91 E

092E040080 Masonry Work L92 E

14

250

14-MAY-07

29-MAY-07

Masonry Work L92 E

093E040080 Masonry Work L93 E

14

250

17-MAY-07

02-JUN-07

Masonry Work L93 E

094E040080 Masonry Work L94 E

14

250

21-MAY-07

05-JUN-07

Masonry Work L94 E

095E040080 Masonry Work L95 E

14

250

24-MAY-07

09-JUN-07

Masonry Work L95 E

096E040080 Masonry Work L96 E

14

250

28-MAY-07

12-JUN-07

Masonry Work L96 E

097E040080 Masonry Work L97 E

14

250

31-MAY-07

16-JUN-07

Masonry Work L97 E

098E040080 Masonry Work L98 E

14

250

04-JUN-07

19-JUN-07

Masonry Work L98 E

099E040080 Masonry Work L99 E

14

250

07-JUN-07

23-JUN-07

Masonry Work L99 E

100E040080 Masonry Work L100 E

14

250

11-JUN-07

26-JUN-07

Masonry Work L100 E

101E040080 Masonry Work L101 E

14

250

14-JUN-07

30-JUN-07

Masonry Work L101 E

102E040080 Masonry Work L102 E

14

250

18-JUN-07

03-JUL-07

Masonry Work L102 E

103E040080 Masonry Work L103 E

14

250

21-JUN-07

07-JUL-07

Masonry Work L103 E

104E040080 Masonry Work L104 E

14

250

25-JUN-07

10-JUL-07

Masonry Work L104 E

105E040080 Masonry Work L105 E

14

250

28-JUN-07

14-JUL-07

Masonry Work L105 E

106E040080 Masonry Work L106 E

14

250

02-JUL-07

17-JUL-07

Masonry Work L106 E

107E040080 Masonry Work L107 E

14

251

05-JUL-07

21-JUL-07

Masonry Work L107 E

108E040080 Masonry Work L108 E

14

251

09-JUL-07

24-JUL-07

Masonry Work L108 E

109E040080 Masonry Work L109-111 E

35

500

12-JUL-07

21-AUG-07

WEST WING
-01W040080 Masonry Work B2 W

35

91

149

23-SEP-06A

18-MAR-07

Masonry Work B2 W

-02W040080 Masonry Work B1 W

35

91

149

05-NOV-06A

18-MAR-07

Masonry Work B1 W

-03W040080 Masonry Work Concourse W

35

49

149

16-SEP-06A

04-APR-07

Masonry Work Concourse W

-04W040080 Masonry Work Ground W

35

149

15-MAR-07

24-APR-07

Masonry Work Ground W

001W040080 Masonry Work L1 W

35

149

09-APR-07

19-MAY-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L109-111 E

Masonry Work L1 W
Sheet 105 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Masonry Work L2 W

002W040080 Masonry Work L2 W

35

149

03-MAY-07

12-JUN-07

003W040080 Masonry Work L3 W

35

149

28-MAY-07

07-JUL-07

004W040080 Masonry Work L4 W

35

268

21-JUN-07

31-JUL-07

005W040080 Masonry Work L5 W

21

174

15-MAR-07

08-APR-07

Masonry Work L5 W

006W040080 Masonry Work L6 W

21

215

19-MAR-07

11-APR-07

Masonry Work L6 W

007W040080 Masonry Work L7 W

21

216

22-MAR-07

15-APR-07

Masonry Work L7 W

008W040080 Masonry Work L8 W

21

217

26-MAR-07

18-APR-07

Masonry Work L8 W

009W040080 Masonry Work L9 W

21

219

29-MAR-07

22-APR-07

Masonry Work L9 W

010W040080 Masonry Work L10 W

21

220

02-APR-07

25-APR-07

Masonry Work L10 W

011W040080 Masonry Work L11 W

21

221

05-APR-07

29-APR-07

Masonry Work L11 W

012W040080 Masonry Work L12 W

21

222

09-APR-07

02-MAY-07

Masonry Work L12 W

013W040080 Masonry Work L13 W

21

223

12-APR-07

06-MAY-07

Masonry Work L13 W

014W040080 Masonry Work L14 W

21

224

16-APR-07

09-MAY-07

Masonry Work L14 W

015W040080 Masonry Work L15 W

21

227

19-APR-07

13-MAY-07

Masonry Work L15 W

016W040080 Masonry Work L16 W

21

228

23-APR-07

16-MAY-07

Masonry Work L16 W

017W040080 Masonry Work L17-18 W

35

29

394

05-FEB-07A

12-APR-07

Masonry Work L17-18 W

019W040080 Masonry Work L19 W

21

71

172

23-DEC-06A

21-MAR-07

Masonry Work L19 W

020W040080 Masonry Work L20 W

21

38

176

27-DEC-06A

29-MAR-07

Masonry Work L20 W

021W040080 Masonry Work L21 W

21

33

180

04-JAN-07A

31-MAR-07

Masonry Work L21 W

022W040080 Masonry Work L22 W

21

19

186

07-JAN-07A

03-APR-07

Masonry Work L22 W

023W040080 Masonry Work L23 W

21

14

192

09-JAN-07A

04-APR-07

Masonry Work L23 W

024W040080 Masonry Work L24 W

21

14

192

13-JAN-07A

04-APR-07

Masonry Work L24 W

025W040080 Masonry Work L25 W

21

14

192

13-AUG-07A

04-APR-07

026W040080 Masonry Work L26 W

21

195

19-MAR-07

11-APR-07

Masonry Work L26 W

027W040080 Masonry Work L27 W

21

197

22-MAR-07

15-APR-07

Masonry Work L27 W

028W040080 Masonry Work L28 W

21

198

26-MAR-07

18-APR-07

Masonry Work L28 W

029W040080 Masonry Work L29 W

21

198

29-MAR-07

22-APR-07

Masonry Work L29 W

030W040080 Masonry Work L30 W

21

198

02-APR-07

25-APR-07

Masonry Work L30 W

031W040080 Masonry Work L31 W

21

200

05-APR-07

29-APR-07

Masonry Work L31 W

032W040080 Masonry Work L32 W

21

201

09-APR-07

02-MAY-07

Masonry Work L32 W

033W040080 Masonry Work L33 W

21

202

12-APR-07

06-MAY-07

Masonry Work L33 W

034W040080 Masonry Work L34 W

21

203

16-APR-07

09-MAY-07

Masonry Work L34 W

035W040080 Masonry Work L35 W

21

204

19-APR-07

13-MAY-07

Masonry Work L35 W

036W040080 Masonry Work L36 W

21

205

23-APR-07

16-MAY-07

Masonry Work L36 W

037W040080 Masonry Work L37 W

21

207

26-APR-07

20-MAY-07

Masonry Work L37 W

038W040080 Masonry Work L38 W

21

208

30-APR-07

23-MAY-07

Masonry Work L38 W

039W040080 Masonry Work L39 W

21

209

03-MAY-07

27-MAY-07

Masonry Work L39 W

040W040080 Masonry Work L40-42 W

35

368

15-MAR-07

24-APR-07

Masonry Work L40-42 W

043W040080 Masonry Work L43 W

21

228

15-MAR-07

08-APR-07

Masonry Work L43 W

044W040080 Masonry Work L44 W

21

229

19-MAR-07

11-APR-07

Masonry Work L44 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L3 W
Masonry Work L4 W

Masonry Work L25 W

Sheet 106 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

045W040080 Masonry Work L45 W

21

52

246

23-JAN-07A

26-MAR-07

Masonry Work L45 W

046W040080 Masonry Work L46 W

21

52

251

01-FEB-07A

26-MAR-07

Masonry Work L46 W

047W040080 Masonry Work L47 W

21

52

255

01-FEB-07A

26-MAR-07

Masonry Work L47 W

048W040080 Masonry Work L48 W

21

52

259

03-FEB-07A

26-MAR-07

Masonry Work L48 W

049W040080 Masonry Work L49 W

21

52

263

06-FEB-07A

26-MAR-07

Masonry Work L49 W

050W040080 Masonry Work L50 W

21

52

267

08-FEB-07A

26-MAR-07

Masonry Work L50 W

051W040080 Masonry Work L51 W

21

52

271

08-FEB-07A

26-MAR-07

Masonry Work L51 W

052W040080 Masonry Work L52 W

21

52

276

18-FEB-07A

26-MAR-07

Masonry Work L52 W

053W040080 Masonry Work L53 W

21

38

281

21-FEB-07A

29-MAR-07

Masonry Work L53 W

054W040080 Masonry Work L54 W

21

38

285

21-FEB-07A

29-MAR-07

Masonry Work L54 W

055W040080 Masonry Work L55 W

21

38

290

25-FEB-07A

29-MAR-07

Masonry Work L55 W

056W040080 Masonry Work L56 W

21

38

294

25-FEB-07A

29-MAR-07

Masonry Work L56 W

057W040080 Masonry Work L57 W

21

38

298

28-FEB-07A

29-MAR-07

Masonry Work L57 W

058W040080 Masonry Work L58 W

21

38

302

01-MAR-07A

29-MAR-07

Masonry Work L58 W

059W040080 Masonry Work L59 W

21

38

304

06-MAR-07A

29-MAR-07

Masonry Work L59 W

060W040080 Masonry Work L60 W

21

19

304

11-MAR-07A

03-APR-07

Masonry Work L60 W

061W040080 Masonry Work L61 W

21

19

308

11-MAR-07A

03-APR-07

Masonry Work L61 W

062W040080 Masonry Work L62 W

21

308

15-MAR-07

08-APR-07

Masonry Work L62 W

063W040080 Masonry Work L63 W

21

309

19-MAR-07

11-APR-07

Masonry Work L63 W

064W040080 Masonry Work L64 W

21

310

22-MAR-07

15-APR-07

Masonry Work L64 W

065W040080 Masonry Work L65 W

21

311

26-MAR-07

18-APR-07

Masonry Work L65 W

066W040080 Masonry Work L66 W

21

312

29-MAR-07

22-APR-07

Masonry Work L66 W

067W040080 Masonry Work L67 W

21

313

02-APR-07

25-APR-07

Masonry Work L67 W

068W040080 Masonry Work L68 W

21

314

05-APR-07

29-APR-07

Masonry Work L68 W

069W040080 Masonry Work L69 W

21

315

09-APR-07

02-MAY-07

Masonry Work L69 W

070W040080 Masonry Work L70 W

21

316

12-APR-07

06-MAY-07

Masonry Work L70 W

071W040080 Masonry Work L71 W

21

317

16-APR-07

09-MAY-07

Masonry Work L71 W

072W040080 Masonry Work L72 W

21

319

19-APR-07

13-MAY-07

073W040080 Masonry Work L73 - 75 W

35

237

15-MAR-07

24-APR-07

076W040080 Masonry Work L76 W

14

237

19-MAR-07

03-APR-07

Masonry Work L76 W

077W040080 Masonry Work L77 W

14

237

22-MAR-07

07-APR-07

Masonry Work L77 W

078W040080 Masonry Work L78 W

14

237

26-MAR-07

10-APR-07

Masonry Work L78 W

079W040080 Masonry Work L79 W

14

238

29-MAR-07

14-APR-07

Masonry Work L79 W

080W040080 Masonry Work L80 W

14

239

02-APR-07

17-APR-07

Masonry Work L80 W

081W040080 Masonry Work L81 W

14

240

05-APR-07

21-APR-07

Masonry Work L81 W

082W040080 Masonry Work L82 W

14

241

09-APR-07

24-APR-07

Masonry Work L82 W

083W040080 Masonry Work L83 W

14

244

12-APR-07

28-APR-07

Masonry Work L83 W

084W040080 Masonry Work L84 W

14

245

16-APR-07

01-MAY-07

Masonry Work L84 W

085W040080 Masonry Work L85 W

14

246

19-APR-07

05-MAY-07

Masonry Work L85 W

086W040080 Masonry Work L86 W

14

248

23-APR-07

08-MAY-07

Masonry Work L86 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Masonry Work L72 W


Masonry Work L73 - 75 W

Sheet 107 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

087W040080 Masonry Work L87 W

14

249

26-APR-07

12-MAY-07

Masonry Work L87 W

088W040080 Masonry Work L88 W

14

250

30-APR-07

15-MAY-07

Masonry Work L88 W

089W040080 Masonry Work L89 W

14

250

03-MAY-07

19-MAY-07

Masonry Work L89 W

090W040080 Masonry Work L90 W

14

250

07-MAY-07

22-MAY-07

Masonry Work L90 W

091W040080 Masonry Work L91 W

14

250

10-MAY-07

26-MAY-07

Masonry Work L91 W

092W040080 Masonry Work L92 W

14

250

14-MAY-07

29-MAY-07

Masonry Work L92 W

093W040080 Masonry Work L93 W

14

250

17-MAY-07

02-JUN-07

Masonry Work L93 W

094W040080 Masonry Work L94 W

14

250

21-MAY-07

05-JUN-07

Masonry Work L94 W

095W040080 Masonry Work L95 W

14

250

24-MAY-07

09-JUN-07

Masonry Work L95 W

096W040080 Masonry Work L96 W

14

250

28-MAY-07

12-JUN-07

Masonry Work L96 W

097W040080 Masonry Work L97 W

14

250

31-MAY-07

16-JUN-07

Masonry Work L97 W

098W040080 Masonry Work L98 W

14

250

04-JUN-07

19-JUN-07

Masonry Work L98 W

099W040080 Masonry Work L99 W

14

250

07-JUN-07

23-JUN-07

Masonry Work L99 W

100W040080 Masonry Work L100 W

14

250

11-JUN-07

26-JUN-07

Masonry Work L100 W

101W040080 Masonry Work L101 W

14

250

14-JUN-07

30-JUN-07

Masonry Work L101 W

102W040080 Masonry Work L102 W

14

250

18-JUN-07

03-JUL-07

Masonry Work L102 W

103W040080 Masonry Work L103 W

14

250

21-JUN-07

07-JUL-07

Masonry Work L103 W

104W040080 Masonry Work L104 W

14

250

25-JUN-07

10-JUL-07

Masonry Work L104 W

105W040080 Masonry Work L105 W

14

250

28-JUN-07

14-JUL-07

Masonry Work L105 W

106W040080 Masonry Work L106 W

14

250

02-JUL-07

17-JUL-07

Masonry Work L106 W

107W040080 Masonry Work L107 W

14

251

05-JUL-07

21-JUL-07

Masonry Work L107 W

108W040080 Masonry Work L108 W

14

251

09-JUL-07

24-JUL-07

Masonry Work L108 W

109W040080 Masonry Work L109-111 W

35

500

12-JUL-07

21-AUG-07

61

30-NOV-07

05-DEC-07

-1

17-OCT-07

21-OCT-07

156K050200 Erect Structural Steel (Tier 16) L156

-3

08-DEC-07

16-DEC-07

156K050210 Erect Struc Steel Base Beam L156

10

-3

17-NOV-07

29-NOV-07

157K050210 Erect Structural Steel (Tier 16) L157

13

-3

17-DEC-07

29-DEC-07

Erect Structural Steel (Tier 16) L157

156K050220 Install Temporary Working Stage L156

-3

30-NOV-07

07-DEC-07

Install Temporary Working Stage L156

158K050220 Erect Structural Steel (Tier 16) L158

12

-3

30-DEC-07

12-JAN-08

158K050230 Erect Structural Steel (Tier 16) L158-M

-3

13-JAN-08

18-JAN-08

159K050240 Erect Structural Steel (Tier 17) L159

12

-3

19-JAN-08

30-JAN-08

160K050250 Erect Structural Steel (Tier 17) L160

13

-3

03-FEB-08

15-FEB-08

161K05026A Erect Structural Steel (Tier 17) L160-M1

12

-3

16-FEB-08

28-FEB-08

161K05027A Erect Structural Steel (Tier 17) L160-M2

-3

29-FEB-08

07-MAR-08

Erect Structural Steel (Tier 17) L160-M2

161K05028A Erect Structural Steel (Tier 18) L160-M3

-3

08-MAR-08

16-MAR-08

Erect Structural Steel (Tier 18) L160-M3

161K05029A Erect Structural Steel (Tier 18A)

-3

17-MAR-08

24-MAR-08

Erect Structural Steel (Tier 18A)

161K05030A Erect Structural Steel (Tier 18B)

-3

25-MAR-08

02-APR-08

Erect Structural Steel (Tier 18B)

Masonry Work L109-111 W

STRUCTURAL STEEL
K
SP3K050030 Install Support Beam @156 Slab
155K050200 Erect Struc Steel Base Column (Tier 15) L155

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Support Beam @156 Slab


Erect Struc Steel Base Column (Tier 15) L155
Erect Structural Steel (Tier 16) L156
Erect Struc Steel Base Beam L156

Erect Structural Steel (Tier 16) L158


Erect Structural Steel (Tier 16) L158-M
Erect Structural Steel (Tier 17) L159
Erect Structural Steel (Tier 17) L160
Erect Structural Steel (Tier 17) L160-M1

Sheet 108 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

Early
Start

Early
Finish

162K05031A Erect Structural Steel (Tier 19) -Roof1

10

162K05032A Erect Structural Steel (Tier 19A)

-3

03-APR-08

13-APR-08

-3

14-APR-08

21-APR-08

162K05033A Erect Structural Steel (Tier 19B)

-3

23-APR-08

30-APR-08

162K05034A Erect Structural Steel (Tier 20) -Roof2


162K05035A Erect Structural Steel (Tier 20A)

-3

02-MAY-08

09-MAY-08

Erect Structural Steel (Tier 20) -Roof2

-3

10-MAY-08

17-MAY-08

Erect Structural Steel (Tier 20A)

162K05036A Erect Structural Steel (Tier 20B)

-3

18-MAY-08

25-MAY-08

Erect Structural Steel (Tier 20B)

162K05037A Erect Structural Steel (Tier 21) -Roof3

-3

26-MAY-08

04-JUN-08

Erect Structural Steel (Tier 21) -Roof3

162K05039A Erect Structural Steel (Tier 21A)

-3

05-JUN-08

11-JUN-08

Erect Structural Steel (Tier 21A)

162K05041A Erect Structural Steel (Tier 21B)

-3

12-JUN-08

20-JUN-08

Erect Structural Steel (Tier 21B)

SP1K05043A Erect Structural Steel (Tier 22) -Spire 1

-3

21-JUN-08

28-JUN-08

Erect Structural Steel (Tier 22) -Spire 1

SP1K05044A Erect Structural Steel (Tier 22A)

-3

29-JUN-08

01-JUL-08

Erect Structural Steel (Tier 22A)

SP1K05045A Erect Structural Steel (Tier 22B)

-3

03-JUL-08

05-JUL-08

Erect Structural Steel (Tier 22B)

SP2K05046A Erect Structural Steel (Tier 23) -Spire 2

-3

06-JUL-08

08-JUL-08

Erect Structural Steel (Tier 23) -Spire 2

SP2K05047A Erect Structural Steel (Tier 23A)

-3

10-JUL-08

12-JUL-08

Erect Structural Steel (Tier 23A)

SP2K05048A Erect Structural Steel (Tier 23B)

-3

13-JUL-08

16-JUL-08

SP3K05053A Install Jack Support Beam @Tier 21D

23

21-JUN-08

27-JUN-08

SP3K05054A Install Guide Roller @Tier 18B

115

29-FEB-08

05-MAR-08

SP3K05055A Install Guide Roller @Tier 19B

63

02-MAY-08

07-MAY-08

SP3K05060A Install Jack & Strand @Tier 21D

17

23

28-JUN-08

17-JUL-08

SP3K05101A Install 2100 Dia Pipe #01 (THK. 60mm)

04-FEB-08

12-FEB-08

Install 2100 Dia Pipe #01 (THK. 60mm)

SP3K05102A Install 2100 Dia Pipe #02 (THK. 60mm)

13-FEB-08

19-FEB-08

Install 2100 Dia Pipe #02 (THK. 60mm)

SP3K05103A Install 2100 Dia Pipe #03 (THK. 60mm)

20-FEB-08

27-FEB-08

Install 2100 Dia Pipe #03 (THK. 60mm)

SP3K05104A Install 2100 Dia Pipe #04 (THK. 60mm)

28-FEB-08

05-MAR-08

Install 2100 Dia Pipe #04 (THK. 60mm)

SP3K05105A Install 2100 Dia Pipe #05 (THK. 60mm)

06-MAR-08

12-MAR-08

Install 2100 Dia Pipe #05 (THK. 60mm)

SP3K05106A Install 2100 Dia Pipe #06 (THK. 60mm)

13-MAR-08

20-MAR-08

Install 2100 Dia Pipe #06 (THK. 60mm)

SP3K05107A Install 2100 Dia Pipe #07 (THK. 60mm)

21-MAR-08

27-MAR-08

Install 2100 Dia Pipe #07 (THK. 60mm)

SP3K05108A Install 2100 Dia Pipe #08 (THK. 60mm)

29-MAR-08

04-APR-08

Install 2100 Dia Pipe #08 (THK. 60mm)

SP3K05109A Install 2100 Dia Pipe #09 (THK. 60mm)

05-APR-08

12-APR-08

Install 2100 Dia Pipe #09 (THK. 60mm)

SP3K05110A Install 2100 Dia Pipe #10 (THK. 60mm)

13-APR-08

19-APR-08

Install 2100 Dia Pipe #10 (THK. 60mm)

SP3K05111A Install 2100 Dia Pipe #11 (THK. 55mm)

20-APR-08

27-APR-08

Install 2100 Dia Pipe #11 (THK. 55mm)

SP3K05113A Install 2100 Dia Pipe #12 (THK. 55mm)

28-APR-08

05-MAY-08

Install 2100 Dia Pipe #12 (THK. 55mm)

SP3K05114A Install 2100 Dia Pipe #13 (THK. 55mm)

06-MAY-08

12-MAY-08

Install 2100 Dia Pipe #13 (THK. 55mm)

SP3K05115A Install 2100 Dia Pipe #14 (THK. 55mm)

13-MAY-08

20-MAY-08

Install 2100 Dia Pipe #14 (THK. 55mm)

SP3K05116A Install 2100 Dia Pipe #15 (THK. 55mm)

21-MAY-08

26-MAY-08

Install 2100 Dia Pipe #15 (THK. 55mm)

SP3K05117A Install 2100 Dia Pipe #16 (THK. 50mm)

27-MAY-08

03-JUN-08

Install 2100 Dia Pipe #16 (THK. 50mm)

SP3K05118A Install 2100 Dia Pipe #17 (THK. 50mm)

04-JUN-08

09-JUN-08

Install 2100 Dia Pipe #17 (THK. 50mm)

SP3K05119A Install 2100 Dia Pipe #18 (THK. 50mm)

10-JUN-08

15-JUN-08

Install 2100 Dia Pipe #18 (THK. 50mm)

SP3K05120A Install 2100 Dia Pipe #19 (THK. 50mm)

17-JUN-08

22-JUN-08

Install 2100 Dia Pipe #19 (THK. 50mm)

SP3K05131A Install 2100 Dia Pipe #20 (THK. 50mm)

24-JUN-08

29-JUN-08

Install 2100 Dia Pipe #20 (THK. 50mm)

SP3K05132A Install 2100 Dia Pipe #21 (THK. 50mm)

30-JUN-08

05-JUL-08

Install 2100 Dia Pipe #21 (THK. 50mm)

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

% Total
Comp Float

BDW1

2005

2006

2007

2008

2009

Erect Structural Steel (Tier 19) -Roof1


Erect Structural Steel (Tier 19A)
Erect Structural Steel (Tier 19B)

Erect Structural Steel (Tier 23B)


Install Jack Support Beam @Tier 21D
Install Guide Roller @Tier 18B
Install Guide Roller @Tier 19B
Install Jack & Strand @Tier 21D

Sheet 109 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

SP3K05133A Install 2100 Dia Pipe #22 (THK. 50mm)

-3

17-JUL-08

21-JUL-08

Install 2100 Dia Pipe #22 (THK. 50mm)

SP3K05134A Install 2100 Dia Pipe #23 (THK. 40mm)

-3

22-JUL-08

26-JUL-08

Install 2100 Dia Pipe #23 (THK. 40mm)

SP3K051350 Install 2100 Dia Pipe #24 (THK. 40mm)

-3

28-JUL-08

02-AUG-08

Install 2100 Dia Pipe #24 (THK. 40mm)

SP3K05136A Install 2100 Dia Pipe #25 (THK. 40mm)

-3

03-AUG-08

08-AUG-08

Install 2100 Dia Pipe #25 (THK. 40mm)

SP3K05140A Connection Area Final Paint

-3

09-AUG-08

16-AUG-08

Connection Area Final Paint

SP3K05201A 1st. Lift-up & Spire Fin Connection

-3

17-AUG-08

22-AUG-08

1st. Lift-up & Spire Fin Connection

SP3K05202A 2nd. Lift-up & Spire Fin Connection

-3

23-AUG-08

28-AUG-08

2nd. Lift-up & Spire Fin Connection

SP3K05203A 3rd. Lift-up & Spire Fin Connection

-3

29-AUG-08

05-SEP-08

3rd. Lift-up & Spire Fin Connection

SP3K05204A 4th. Lift-up

-3

06-SEP-08

07-SEP-08

SP3K05205A 5th. Lift-up

-3

20-SEP-08

21-SEP-08

SP3K05206A Positioning Jack & Strand

22-SEP-08

29-SEP-08

SP3K05207A 6th. Lift-up

-3

03-OCT-08

04-OCT-08

SP3K05208A Load Transfer

-3

01-NOV-08

04-NOV-08

SP3K05209A Connection to Pipe & Steel Frame (Tier 21 - 2

21

-3

05-OCT-08

31-OCT-08

162K03210A Erect Structural Steel Leave-Out (L156-Tier 20)

20

-2

04-JAN-09

23-JAN-09

SP3K052100 Connection Tier 22 & 23

18

-3

06-NOV-08

30-NOV-08

CENTER CORE
157T030140 R.C. Work - Slab on Deck L157

26

30-DEC-07

04-JAN-08

R.C. Work - Slab on Deck L157

158T030140 R.C. Work - Slab on Deck L158

18

13-JAN-08

16-JAN-08

R.C. Work - Slab on Deck L158

158T03014A R.C. Work - Slab on Deck L158M

17

19-JAN-08

19-JAN-08

R.C. Work - Slab on Deck L158M

159T030140 R.C. Work - Slab on Deck L159

03-FEB-08

06-FEB-08

R.C. Work - Slab on Deck L159

160T030140 R.C. Work - Slab on Deck L160

22

16-FEB-08

19-FEB-08

160T03014A R.C. Work - Slab on Deck L160 Intermediate

217

08-MAR-08

11-MAR-08

161T030140 R.C. Work - Slab on Deck L160 Mezzanine (1)

30

29-FEB-08

03-MAR-08

R.C. Work - Slab on Deck L160 Mezzanine (1)

161T030141 R.C. Work - Slab on Deck L160 Mezzanine (2)

23

08-MAR-08

08-MAR-08

R.C. Work - Slab on Deck L160 Mezzanine (2)

161T030142 R.C. Work - Slab on Deck L160 Mezzanine (3)

18

17-MAR-08

20-MAR-08

R.C. Work - Slab on Deck L160 Mezzanine (3)

162T030140 R.C. Work - Slab on Deck Roof / Spire 1

30

04-MAR-08

07-MAR-08

162T03014A R.C. Work - Slab on Deck Leave-Out (L157-Roof

14

-2

17-JAN-09

30-JAN-09

SP1T050140 Install Roof Metal Deck Spire 2

33

04-JUL-08

13-JUL-08

SP2T050140 Install Roof Metal Deck Spire 3

33

15-JUL-08

23-JUL-08

162T03015A R.C. Work - Slab on Deck Roof 1 (Tier 19)

90

14-APR-08

17-APR-08

162T03016A R.C. Work - Slab on Deck Roof 2 (Tier 20)

55

26-MAY-08

29-MAY-08

R.C. Work - Slab on Deck Roof 2 (Tier 20)

162T03017A R.C. Work - Slab on Deck Roof 3 (Tier 21)

51

05-JUN-08

08-JUN-08

R.C. Work - Slab on Deck Roof 3 (Tier 21)

162T03018A R.C. Work - Slab on Deck Spire 1 (Tier 22)

33

29-JUN-08

03-JUL-08

161T03019A R.C. Work - Slab on Deck Spire 2 (Tier 23)

-3

01-DEC-08

05-DEC-08

162T03019A R.C. Work - Slab on Deck Opening (L156-L158M)

12

65

29-AUG-08

10-SEP-08

161T03020A R.C. Work - Slab on Deck Spire 3 (Tier 24)

-3

06-DEC-08

09-DEC-08

162T03021A R.C. Work - Slab on Deck Opening (L159-L160M)

12

58

06-SEP-08

19-SEP-08

4th. Lift-up
5th. Lift-up
Positioning Jack & Strand
6th. Lift-up
Load Transfer
Connection to Pipe & Steel Frame (Tier 21 - 2
Erect Structural Steel Leave-Out (L156-Tier 20)
Connection Tier 22 & 23

R.C. DECK SLAB

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

R.C. Work - Slab on Deck L160


R.C. Work - Slab on Deck L160 Intermediate

R.C. Work - Slab on Deck Roof / Spire 1


R.C. Work - Slab on Deck Leave-Out (L157-Roof
Install Roof Metal Deck Spire 2
Install Roof Metal Deck Spire 3
R.C. Work - Slab on Deck Roof 1 (Tier 19)

R.C. Work - Slab on Deck Spire 1 (Tier 22)


R.C. Work - Slab on Deck Spire 2 (Tier 23)
R.C. Work - Slab on Deck Opening (L156-L158M)
R.C. Work - Slab on Deck Spire 3 (Tier 24)
R.C. Work - Slab on Deck Opening (L159-L160M)

Sheet 110 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

GENERAL
SUMG900330 Composite Deck Slab Work (L157-Spire)

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Composite Deck Slab Work (L157-Spire)

346*

-3

30-DEC-07

09-DEC-08

GENERAL
122G05110A Fab. & Installation of Communicating Stair- L122

60

203

24-JAN-08

05-APR-08

Fab. & Installation of Communicating Stair- L122

123G05110A Fab. & Installation of Communicating Stair- L123

60

199

29-JAN-08

09-APR-08

Fab. & Installation of Communicating Stair- L123

CENTER CORE
SUMT090200 Handrails - Stair Case (B2 - L160)

903*

42

252

28-FEB-06A

18-AUG-08

076T050300 Install Handrail - Stair Case L76 C

237

20-MAY-07

23-MAY-07

Install Handrail - Stair Case L76 C

077T050300 Install Handrail - Stair Case L77 C

237

24-MAY-07

28-MAY-07

Install Handrail - Stair Case L77 C

078T050300 Install Handrail - Stair Case L78 C

237

29-MAY-07

02-JUN-07

Install Handrail - Stair Case L78 C

079T050300 Install Handrail - Stair Case L79 C

237

03-JUN-07

06-JUN-07

Install Handrail - Stair Case L79 C

080T050300 Install Handrail - Stair Case L80 C

237

07-JUN-07

11-JUN-07

Install Handrail - Stair Case L80 C

081T050300 Install Handrail - Stair Case L81 C

237

12-JUN-07

16-JUN-07

Install Handrail - Stair Case L81 C

082T050300 Install Handrail - Stair Case L82 C

237

17-JUN-07

20-JUN-07

Install Handrail - Stair Case L82 C

083T050300 Install Handrail - Stair Case L83 C

237

21-JUN-07

25-JUN-07

Install Handrail - Stair Case L83 C

084T050300 Install Handrail - Stair Case L84 C

237

26-JUN-07

30-JUN-07

Install Handrail - Stair Case L84 C

085T050300 Install Handrail - Stair Case L85 C

237

01-JUL-07

04-JUL-07

Install Handrail - Stair Case L85 C

086T050300 Install Handrail - Stair Case L86 C

237

05-JUL-07

09-JUL-07

Install Handrail - Stair Case L86 C

087T050300 Install Handrail - Stair Case L87 C

237

10-JUL-07

14-JUL-07

Install Handrail - Stair Case L87 C

088T050300 Install Handrail - Stair Case L88 C

237

15-JUL-07

18-JUL-07

Install Handrail - Stair Case L88 C

089T050300 Install Handrail - Stair Case L89 C

237

19-JUL-07

23-JUL-07

Install Handrail - Stair Case L89 C

090T050300 Install Handrail - Stair Case L90 C

237

24-JUL-07

28-JUL-07

Install Handrail - Stair Case L90 C

091T050300 Install Handrail - Stair Case L91 C

237

29-JUL-07

01-AUG-07

Install Handrail - Stair Case L91 C

092T050300 Install Handrail - Stair Case L92 C

237

02-AUG-07

06-AUG-07

Install Handrail - Stair Case L92 C

093T050300 Install Handrail - Stair Case L93 C

237

07-AUG-07

11-AUG-07

Install Handrail - Stair Case L93 C

094T050300 Install Handrail - Stair Case L94 C

237

12-AUG-07

15-AUG-07

Install Handrail - Stair Case L94 C

095T050300 Install Handrail - Stair Case L95 C

237

16-AUG-07

20-AUG-07

Install Handrail - Stair Case L95 C

096T050300 Install Handrail - Stair Case L96 C

237

21-AUG-07

25-AUG-07

Install Handrail - Stair Case L96 C

097T050300 Install Handrail - Stair Case L97 C

237

26-AUG-07

29-AUG-07

Install Handrail - Stair Case L97 C

098T050300 Install Handrail - Stair Case L98 C

237

30-AUG-07

03-SEP-07

Install Handrail - Stair Case L98 C

099T050300 Install Handrail - Stair Case L99 C

237

04-SEP-07

08-SEP-07

Install Handrail - Stair Case L99 C

100T050300 Install Handrail - Stair Case L100 C

237

09-SEP-07

12-SEP-07

Install Handrail - Stair Case L100 C

101T050300 Install Handrail - Stair Case L101 C

237

13-SEP-07

17-SEP-07

Install Handrail - Stair Case L101 C

102T050300 Install Handrail - Stair Case L102 C

237

18-SEP-07

22-SEP-07

Install Handrail - Stair Case L102 C

103T050300 Install Handrail - Stair Case L103 C

237

23-SEP-07

26-SEP-07

Install Handrail - Stair Case L103 C

104T050300 Install Handrail - Stair Case L104 C

237

27-SEP-07

01-OCT-07

Install Handrail - Stair Case L104 C

105T050300 Install Handrail - Stair Case L105 C

237

02-OCT-07

06-OCT-07

Install Handrail - Stair Case L105 C

106T050300 Install Handrail - Stair Case L106 C

237

07-OCT-07

10-OCT-07

Install Handrail - Stair Case L106 C

METAL FABRICATION

HANDRAIL - STAIRE CASE

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Handrails - Stair Case (B2

Sheet 111 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

107T050300 Install Handrail - Stair Case L107 C

237

11-OCT-07

15-OCT-07

Install Handrail - Stair Case L107 C

108T050300 Install Handrail - Stair Case L108 C

237

16-OCT-07

20-OCT-07

Install Handrail - Stair Case L108 C

109T050300 Install Handrail - Stair Case L109 C

237

21-OCT-07

24-OCT-07

Install Handrail - Stair Case L109 C

110T050300 Install Handrail - Stair Case L110 C

237

25-OCT-07

29-OCT-07

Install Handrail - Stair Case L110 C

111T050300 Install Handrail - Stair Case L111 C

237

30-OCT-07

03-NOV-07

Install Handrail - Stair Case L111 C

112T050300 Install Handrail - Stair Case L112 C

237

04-NOV-07

07-NOV-07

Install Handrail - Stair Case L112 C

113T050300 Install Handrail - Stair Case L113 C

237

08-NOV-07

12-NOV-07

Install Handrail - Stair Case L113 C

114T050300 Install Handrail - Stair Case L114 C

237

13-NOV-07

17-NOV-07

Install Handrail - Stair Case L114 C

115T050300 Install Handrail - Stair Case L115 C

237

18-NOV-07

21-NOV-07

Install Handrail - Stair Case L115 C

116T050300 Install Handrail - Stair Case L116 C

237

22-NOV-07

26-NOV-07

Install Handrail - Stair Case L116 C

117T050300 Install Handrail - Stair Case L117 C

237

27-NOV-07

01-DEC-07

Install Handrail - Stair Case L117 C

118T050300 Install Handrail - Stair Case L118 C

237

02-DEC-07

05-DEC-07

Install Handrail - Stair Case L118 C

119T050300 Install Handrail - Stair Case L119 C

237

06-DEC-07

10-DEC-07

Install Handrail - Stair Case L119 C

120T050300 Install Handrail - Stair Case L120 C

237

11-DEC-07

15-DEC-07

Install Handrail - Stair Case L120 C

121T050300 Install Handrail - Stair Case L121 C

237

16-DEC-07

19-DEC-07

Install Handrail - Stair Case L121 C

122T050300 Install Handrail - Stair Case L122 C

237

20-DEC-07

24-DEC-07

Install Handrail - Stair Case L122 C

123T050300 Install Handrail - Stair Case L123 C

237

25-DEC-07

29-DEC-07

Install Handrail - Stair Case L123 C

124T050300 Install Handrail - Stair Case L124 C

237

30-DEC-07

02-JAN-08

Install Handrail - Stair Case L124 C

125T050300 Install Handrail - Stair Case L125 C

237

03-JAN-08

07-JAN-08

Install Handrail - Stair Case L125 C

126T050300 Install Handrail - Stair Case L126 C

237

08-JAN-08

12-JAN-08

Install Handrail - Stair Case L126 C

127T050300 Install Handrail - Stair Case L127 C

237

13-JAN-08

16-JAN-08

Install Handrail - Stair Case L127 C

128T050300 Install Handrail - Stair Case L128 C

237

17-JAN-08

21-JAN-08

Install Handrail - Stair Case L128 C

129T050300 Install Handrail - Stair Case L129 C

237

22-JAN-08

26-JAN-08

Install Handrail - Stair Case L129 C

130T050300 Install Handrail - Stair Case L130 C

237

27-JAN-08

30-JAN-08

Install Handrail - Stair Case L130 C

131T050300 Install Handrail - Stair Case L131 C

237

31-JAN-08

04-FEB-08

Install Handrail - Stair Case L131 C

132T050300 Install Handrail - Stair Case L132 C

237

05-FEB-08

09-FEB-08

Install Handrail - Stair Case L132 C

133T050300 Install Handrail - Stair Case L133 C

237

10-FEB-08

13-FEB-08

Install Handrail - Stair Case L133 C

134T050300 Install Handrail - Stair Case L134 C

237

14-FEB-08

17-FEB-08

Install Handrail - Stair Case L134 C

135T050300 Install Handrail - Stair Case L135 C

237

18-FEB-08

21-FEB-08

Install Handrail - Stair Case L135 C

136T050300 Install Handrail - Stair Case L136 C

237

23-FEB-08

26-FEB-08

Install Handrail - Stair Case L136 C

137T050300 Install Handrail - Stair Case L137 C

237

27-FEB-08

02-MAR-08

Install Handrail - Stair Case L137 C

138T050300 Install Handrail - Stair Case L138 C

237

03-MAR-08

06-MAR-08

139T050300 Install Handrail - Stair Case L139 C

237

08-MAR-08

11-MAR-08

Install Handrail - Stair Case L139 C

140T050300 Install Handrail - Stair Case L140 C

237

12-MAR-08

16-MAR-08

Install Handrail - Stair Case L140 C

141T050300 Install Handrail - Stair Case L141 C

237

17-MAR-08

20-MAR-08

Install Handrail - Stair Case L141 C

142T050300 Install Handrail - Stair Case L142 C

237

22-MAR-08

25-MAR-08

Install Handrail - Stair Case L142 C

143T050300 Install Handrail - Stair Case L143 C

237

26-MAR-08

30-MAR-08

Install Handrail - Stair Case L143 C

144T050300 Install Handrail - Stair Case L144 C

237

31-MAR-08

03-APR-08

Install Handrail - Stair Case L144 C

145T050300 Install Handrail - Stair Case L145 C

237

05-APR-08

08-APR-08

Install Handrail - Stair Case L145 C

146T050300 Install Handrail - Stair Case L146 C

237

09-APR-08

13-APR-08

Install Handrail - Stair Case L146 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Handrail - Stair Case L138 C

Sheet 112 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

147T050300 Install Handrail - Stair Case L147 C

237

14-APR-08

17-APR-08

Install Handrail - Stair Case L147 C

148T050300 Install Handrail - Stair Case L148 C

237

19-APR-08

22-APR-08

Install Handrail - Stair Case L148 C

149T050300 Install Handrail - Stair Case L149 C

237

23-APR-08

27-APR-08

Install Handrail - Stair Case L149 C

150T050300 Install Handrail - Stair Case L150 C

237

28-APR-08

01-MAY-08

Install Handrail - Stair Case L150 C

151T050300 Install Handrail - Stair Case L151 C

237

03-MAY-08

06-MAY-08

Install Handrail - Stair Case L151 C

152T050300 Install Handrail - Stair Case L152 C

237

07-MAY-08

11-MAY-08

Install Handrail - Stair Case L152 C

153T050300 Install Handrail - Stair Case L153 C

237

12-MAY-08

15-MAY-08

Install Handrail - Stair Case L153 C

154T050300 Install Handrail - Stair Case L154 C

237

17-MAY-08

20-MAY-08

Install Handrail - Stair Case L154 C

155T050300 Install Handrail - Stair Case L155 C

241

21-MAY-08

25-MAY-08

Install Handrail - Stair Case L155 C

156T050300 Install Handrail - Stair Case L156 C

245

26-MAY-08

29-MAY-08

Install Handrail - Stair Case L156 C

157T050300 Install Handrail - Stair Case L157 C

249

31-MAY-08

03-JUN-08

Install Handrail - Stair Case L157 C

158T050300 Install Handrail - Stair Case L158 C

253

04-JUN-08

08-JUN-08

Install Handrail - Stair Case L158 C

159T050300 Install Handrail - Stair Case L159 C

257

09-JUN-08

12-JUN-08

Install Handrail - Stair Case L159 C

160T050300 Install Handrail - Stair Case L160 C

261

14-JUN-08

17-JUN-08

Install Handrail - Stair Case L160 C

161T050300 Install Handrail - Stair Case L161 C

216

14-AUG-08

18-AUG-08

SOUTH WING
-01S050300 Install Handrail - Stair T03 B2 S

Install Handrail - Stair Case L161 C

100

28-FEB-06A

15-APR-06A

Install Handrail - Stair T03 B2 S

-02S050300

Install Handrail - Stair T03 B1 S

100

16-APR-06A

17-APR-06A

Install Handrail - Stair T03 B1 S

-03S050300

Install Handrail - Stair T03 Concourse S

100

17-APR-06A

18-APR-06A

Install Handrail - Stair T03 Concourse S

-04S050300

Install Handrail - Stair T03 Ground S

100

18-APR-06A

22-APR-06A

Install Handrail - Stair T03 Ground S

001S050300 Install Handrail - Stair T03 L1 S

100

30-APR-06A

01-MAY-06A

Install Handrail - Stair T03 L1 S

002S050300 Install Handrail - Stair T03 L2 S

100

30-APR-06A

01-MAY-06A

Install Handrail - Stair T03 L2 S

003S050300 Install Handrail - Stair T03 L3 S

100

01-MAY-06A

02-MAY-06A

Install Handrail - Stair T03 L3 S

004S050300 Install Handrail - Stair T03 L4 S

100

02-MAY-06A

07-MAY-06A

Install Handrail - Stair T03 L4 S

005S050300 Install Handrail - Stair T03 L5 S

100

08-MAY-06A

11-MAY-06A

Install Handrail - Stair T03 L5 S

006S050300 Install Handrail - Stair T03 L6 S

100

13-MAY-06A

20-MAY-06A

Install Handrail - Stair T03 L6 S

007S050300 Install Handrail - Stair T03 L7 S

100

20-MAY-06A

22-MAY-06A

Install Handrail - Stair T03 L7 S

008S050300 Install Handrail - Stair T03 L8 S

100

22-MAY-06A

23-MAY-06A

Install Handrail - Stair T03 L8 S

009S050300 Install Handrail - Stair T03 L9 S

100

24-MAY-06A

23-JUL-06A

Install Handrail - Stair T03 L9 S

010S050300 Install Handrail - Stair T03 L10 S

100

08-JUL-06A

23-JUL-06A

Install Handrail - Stair T03 L10 S

011S050300 Install Handrail - Stair T03 L11 S

100

23-JUL-06A

25-JUL-06A

Install Handrail - Stair T03 L11 S

012S050300 Install Handrail - Stair T03 L12 S

100

24-JUL-06A

25-JUL-06A

Install Handrail - Stair T03 L12 S

013S050300 Install Handrail - Stair T03 L13 S

100

24-JUL-06A

25-JUL-06A

Install Handrail - Stair T03 L13 S

014S050300 Install Handrail - Stair T03 L14 S

100

25-JUL-06A

27-JUL-06A

Install Handrail - Stair T03 L14 S

015S050300 Install Handrail - Stair T03 L15 S

100

25-JUL-06A

27-JUL-06A

Install Handrail - Stair T03 L15 S

016S050300 Install Handrail - Stair T03 L16 S

100

29-JUL-06A

02-AUG-06A

Install Handrail - Stair T03 L16 S

017S050300 Install Handrail - Stair T03 L17 S

100

29-JUL-06A

02-AUG-06A

Install Handrail - Stair T03 L17 S

018S050300 Install Handrail - Stair T03 L18 S

100

03-AUG-06A

08-AUG-06A

Install Handrail - Stair T03 L18 S

019S050300 Install Handrail - Stair T03 L19 S

100

03-AUG-06A

08-AUG-06A

Install Handrail - Stair T03 L19 S

020S050300 Install Handrail - Stair T03 L20 S

100

05-AUG-06A

08-AUG-06A

Install Handrail - Stair T03 L20 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Sheet 113 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

021S050300 Install Handrail - Stair T03 L21 S

100

07-AUG-06A

10-AUG-06A

Install Handrail - Stair T03 L21 S

022S050300 Install Handrail - Stair T03 L22 S

100

07-AUG-06A

10-AUG-06A

Install Handrail - Stair T03 L22 S

023S050300 Install Handrail - Stair T03 L23 S

100

10-AUG-06A

13-AUG-06A

Install Handrail - Stair T03 L23 S

024S050300 Install Handrail - Stair T03 L24 S

100

10-AUG-06A

13-AUG-06A

Install Handrail - Stair T03 L24 S

025S050300 Install Handrail - Stair T03 L25 S

100

10-AUG-06A

13-AUG-06A

Install Handrail - Stair T03 L25 S

026S050300 Install Handrail - Stair T03 L26 S

100

12-AUG-06A

13-AUG-06A

Install Handrail - Stair T03 L26 S

027S050300 Install Handrail - Stair T03 L27 S

100

13-AUG-06A

16-AUG-06A

Install Handrail - Stair T03 L27 S

028S050300 Install Handrail - Stair T03 L28 S

100

13-AUG-06A

16-AUG-06A

Install Handrail - Stair T03 L28 S

029S050300 Install Handrail - Stair T03 L29 S

100

17-AUG-06A

20-AUG-06A

Install Handrail - Stair T03 L29 S

030S050300 Install Handrail - Stair T03 L30 S

100

20-AUG-06A

23-AUG-06A

Install Handrail - Stair T03 L30 S

031S050300 Install Handrail - Stair T03 L31 S

100

21-AUG-06A

23-AUG-06A

Install Handrail - Stair T03 L31 S

032S050300 Install Handrail - Stair T03 L32 S

100

23-AUG-06A

24-AUG-06A

Install Handrail - Stair T03 L32 S

033S050300 Install Handrail - Stair T03 L33 S

100

26-AUG-06A

28-AUG-06A

Install Handrail - Stair T03 L33 S

034S050300 Install Handrail - Stair T03 L34 S

100

27-AUG-06A

28-AUG-06A

Install Handrail - Stair T03 L34 S

035S050300 Install Handrail - Stair T03 L35 S

100

28-AUG-06A

02-SEP-06A

Install Handrail - Stair T03 L35 S

036S050300 Install Handrail - Stair T03 L36 S

100

03-SEP-06A

15-OCT-06A

Install Handrail - Stair T03 L36 S

037S050300 Install Handrail - Stair T03 L37 S

100

16-OCT-06A

18-OCT-06A

Install Handrail - Stair T03 L37 S

038S050300 Install Handrail - Stair T03 L38 S

100

19-OCT-06A

25-OCT-06A

Install Handrail - Stair T03 L38 S

039S050300 Install Handrail - Stair T03 L39 S

100

26-OCT-06A

14-DEC-06A

Install Handrail - Stair T03 L39 S

040S050300 Install Handrail - Stair T03 L40 S

100

14-DEC-06A

16-DEC-06A

Install Handrail - Stair T03 L40 S

041S050300 Install Handrail - Stair T03 L41 S

100

14-DEC-06A

16-DEC-06A

Install Handrail - Stair T03 L41 S

042S050300 Install Handrail - Stair T03 L42 S

100

14-DEC-06A

16-DEC-06A

Install Handrail - Stair T03 L42 S

043S050300 Install Handrail - Stair T06 L43 S

100

17-DEC-06A

10-JAN-07A

Install Handrail - Stair T06 L43 S

044S050300 Install Handrail - Stair T06 L44 S

100

09-JAN-07A

10-JAN-07A

Install Handrail - Stair T06 L44 S

045S050300 Install Handrail - Stair T06 L45 S

100

09-JAN-07A

10-JAN-07A

Install Handrail - Stair T06 L45 S

046S050300 Install Handrail - Stair T06 L46 S

100

10-JAN-07A

11-JAN-07A

Install Handrail - Stair T06 L46 S

047S050300 Install Handrail - Stair T06 L47 S

100

10-JAN-07A

11-JAN-07A

Install Handrail - Stair T06 L47 S

048S050300 Install Handrail - Stair T06 L48 S

100

10-JAN-07A

11-JAN-07A

Install Handrail - Stair T06 L48 S

049S050300 Install Handrail - Stair T06 L49 S

100

11-JAN-07A

15-JAN-07A

Install Handrail - Stair T06 L49 S

050S050300 Install Handrail - Stair T06 L50 S

100

29-JAN-07A

29-JAN-07A

051S050300 Install Handrail - Stair T06 L51 S

100

30-JAN-07A

20-FEB-07A

Install Handrail - Stair T06 L51 S

052S050300 Install Handrail - Stair T06 L52 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L52 S

053S050300 Install Handrail - Stair T06 L53 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L53 S

054S050300 Install Handrail - Stair T06 L54 S

100

19-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L54 S

055S050300 Install Handrail - Stair T06 L55 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L55 S

056S050300 Install Handrail - Stair T06 L56 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L56 S

057S050300 Install Handrail - Stair T06 L57 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L57 S

058S050300 Install Handrail - Stair T06 L58 S

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T06 L58 S

059S050300 Install Handrail - Stair T06 L59 S

100

21-FEB-07A

27-FEB-07A

Install Handrail - Stair T06 L59 S

060S050300 Install Handrail - Stair T06 L60 S

100

06-MAR-07A

08-MAR-07A

Install Handrail - Stair T06 L60 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Handrail - Stair T06 L50 S

Sheet 114 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

061S050300 Install Handrail - Stair T06 L61 S

100

06-MAR-07A

08-MAR-07A

Install Handrail - Stair T06 L61 S

062S050300 Install Handrail - Stair T06 L62 S

237

15-MAR-07

19-MAR-07

Install Handrail - Stair T06 L62 S

063S050300 Install Handrail - Stair T06 L63 S

237

20-MAR-07

24-MAR-07

Install Handrail - Stair T06 L63 S

064S050300 Install Handrail - Stair T06 L64 S

237

25-MAR-07

28-MAR-07

Install Handrail - Stair T06 L64 S

065S050300 Install Handrail - Stair T06 L65 S

237

29-MAR-07

02-APR-07

Install Handrail - Stair T06 L65 S

066S050300 Install Handrail - Stair T06 L66 S

237

03-APR-07

07-APR-07

Install Handrail - Stair T06 L66 S

067S050300 Install Handrail - Stair T06 L67 S

237

08-APR-07

11-APR-07

Install Handrail - Stair T06 L67 S

068S050300 Install Handrail - Stair T06 L68 S

237

12-APR-07

16-APR-07

Install Handrail - Stair T06 L68 S

069S050300 Install Handrail - Stair T06 L69 S

237

17-APR-07

21-APR-07

Install Handrail - Stair T06 L69 S

070S050300 Install Handrail - Stair T06 L70 S

237

22-APR-07

25-APR-07

Install Handrail - Stair T06 L70 S

071S050300 Install Handrail - Stair T06 L71 S

237

26-APR-07

30-APR-07

Install Handrail - Stair T06 L71 S

072S050300 Install Handrail - Stair T06 L72 S

237

01-MAY-07

05-MAY-07

Install Handrail - Stair T06 L72 S

073S050300 Install Handrail - Stair T06 L73 S

237

06-MAY-07

09-MAY-07

Install Handrail - Stair T06 L73 S

074S050300 Install Handrail - Stair T06 L74 S

237

10-MAY-07

14-MAY-07

Install Handrail - Stair T06 L74 S

075S050300 Install Handrail - Stair T06 L75 S

237

15-MAY-07

19-MAY-07

Install Handrail - Stair T06 L75 S

EAST WING
-01E050300

Install Handrail - Stair T02 B2 E

100

21-MAR-06A

22-MAR-06A

-02E050300

Install Handrail - Stair T02 B1 E

100

05-APR-06A

13-APR-06A

Install Handrail - Stair T02 B1 E

-03E050300

Install Handrail - Stair T02 Concourse E

100

15-APR-06A

17-APR-06A

Install Handrail - Stair T02 Concourse E

-04E050300

Install Handrail - Stair T02 Ground E

100

17-APR-06A

23-APR-06A

Install Handrail - Stair T02 Ground E

001E050300 Install Handrail - Stair T02 L1 E

100

24-APR-06A

25-APR-06A

Install Handrail - Stair T02 L1 E

002E050300 Install Handrail - Stair T02 L2 E

100

25-APR-06A

26-APR-06A

Install Handrail - Stair T02 L2 E

003E050300 Install Handrail - Stair T02 L3 E

100

26-APR-06A

27-APR-06A

Install Handrail - Stair T02 L3 E

004E050300 Install Handrail - Stair T02 L4 E

100

29-APR-06A

07-MAY-06A

Install Handrail - Stair T02 L4 E

005E050300 Install Handrail - Stair T02 L5 E

100

08-MAY-06A

11-MAY-06A

Install Handrail - Stair T02 L5 E

006E050300 Install Handrail - Stair T02 L6 E

100

13-MAY-06A

17-MAY-06A

Install Handrail - Stair T02 L6 E

007E050300 Install Handrail - Stair T02 L7 E

100

17-MAY-06A

21-MAY-06A

Install Handrail - Stair T02 L7 E

008E050300 Install Handrail - Stair T02 L8 E

100

21-MAY-06A

22-MAY-06A

Install Handrail - Stair T02 L8 E

009E050300 Install Handrail - Stair T02 L9 E

100

22-MAY-06A

22-MAY-06A

Install Handrail - Stair T02 L9 E

010E050300 Install Handrail - Stair T02 L10 E

100

23-MAY-06A

09-JUL-06A

Install Handrail - Stair T02 L10 E

011E050300 Install Handrail - Stair T02 L11 E

100

10-JUL-06A

13-JUL-06A

Install Handrail - Stair T02 L11 E

012E050300 Install Handrail - Stair T02 L12 E

100

10-JUL-06A

13-JUL-06A

Install Handrail - Stair T02 L12 E

013E050300 Install Handrail - Stair T02 L13 E

100

15-JUL-06A

18-JUL-06A

Install Handrail - Stair T02 L13 E

014E050300 Install Handrail - Stair T02 L14 E

100

19-JUL-06A

22-JUL-06A

Install Handrail - Stair T02 L14 E

015E050300 Install Handrail - Stair T02 L15 E

100

23-JUL-06A

01-AUG-06A

Install Handrail - Stair T02 L15 E

016E050300 Install Handrail - Stair T02 L16 E

100

26-JUL-06A

02-AUG-06A

Install Handrail - Stair T02 L16 E

017E050300 Install Handrail - Stair T02 L17 E

100

01-AUG-06A

02-AUG-06A

Install Handrail - Stair T02 L17 E

018E050300 Install Handrail - Stair T02 L18 E

100

03-AUG-06A

08-AUG-06A

Install Handrail - Stair T02 L18 E

019E050300 Install Handrail - Stair T02 L19 E

100

05-AUG-06A

08-AUG-06A

Install Handrail - Stair T02 L19 E

020E050300 Install Handrail - Stair T02 L20 E

100

05-AUG-06A

08-AUG-06A

Install Handrail - Stair T02 L20 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Handrail - Stair T02 B2 E

Sheet 115 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

021E050300 Install Handrail - Stair T02 L21 E

100

08-AUG-06A

10-AUG-06A

Install Handrail - Stair T02 L21 E

022E050300 Install Handrail - Stair T02 L22 E

100

08-AUG-06A

10-AUG-06A

Install Handrail - Stair T02 L22 E

023E050300 Install Handrail - Stair T02 L23 E

100

10-AUG-06A

13-AUG-06A

Install Handrail - Stair T02 L23 E

024E050300 Install Handrail - Stair T02 L24 E

100

12-AUG-06A

13-AUG-06A

Install Handrail - Stair T02 L24 E

025E050300 Install Handrail - Stair T02 L25 E

100

12-AUG-06A

13-AUG-06A

Install Handrail - Stair T02 L25 E

026E050300 Install Handrail - Stair T02 L26 E

100

12-AUG-06A

13-AUG-06A

Install Handrail - Stair T02 L26 E

027E050300 Install Handrail - Stair T02 L27 E

100

13-AUG-06A

16-AUG-06A

Install Handrail - Stair T02 L27 E

028E050300 Install Handrail - Stair T02 L28 E

100

13-AUG-06A

16-AUG-06A

Install Handrail - Stair T02 L28 E

029E050300 Install Handrail - Stair T02 L29 E

100

16-AUG-06A

19-AUG-06A

Install Handrail - Stair T02 L29 E

030E050300 Install Handrail - Stair T02 L30 E

100

17-AUG-06A

19-AUG-06A

Install Handrail - Stair T02 L30 E

031E050300 Install Handrail - Stair T02 L31 E

100

19-AUG-06A

20-AUG-06A

Install Handrail - Stair T02 L31 E

032E050300 Install Handrail - Stair T02 L32 E

100

19-AUG-06A

20-AUG-06A

Install Handrail - Stair T02 L32 E

033E050300 Install Handrail - Stair T02 L33 E

100

20-AUG-06A

22-AUG-06A

Install Handrail - Stair T02 L33 E

034E050300 Install Handrail - Stair T02 L34 E

100

20-AUG-06A

22-AUG-06A

Install Handrail - Stair T02 L34 E

035E050300 Install Handrail - Stair T02 L35 E

100

21-AUG-06A

22-AUG-06A

Install Handrail - Stair T02 L35 E

036E050300 Install Handrail - Stair T02 L36 E

100

22-AUG-06A

24-AUG-06A

Install Handrail - Stair T02 L36 E

037E050300 Install Handrail - Stair T02 L37 E

100

26-AUG-06A

27-AUG-06A

Install Handrail - Stair T02 L37 E

038E050300 Install Handrail - Stair T02 L38 E

100

27-AUG-06A

30-AUG-06A

Install Handrail - Stair T02 L38 E

039E050300 Install Handrail - Stair T02 L39 E

100

29-AUG-06A

13-DEC-06A

Install Handrail - Stair T02 L39 E

040E050300 Install Handrail - Stair T02 L40 E

100

10-DEC-06A

13-DEC-06A

Install Handrail - Stair T02 L40 E

041E050300 Install Handrail - Stair T02 L41 E

100

11-DEC-06A

14-DEC-06A

Install Handrail - Stair T02 L41 E

042E050300 Install Handrail - Stair T02 L42 E

100

12-DEC-06A

14-DEC-06A

Install Handrail - Stair T02 L42 E

043E050300 Install Handrail - Stair T05 L43 E

100

16-DEC-06A

06-JAN-07A

Install Handrail - Stair T05 L43 E

044E050300 Install Handrail - Stair T05 L44 E

100

04-JAN-07A

06-JAN-07A

Install Handrail - Stair T05 L44 E

045E050300 Install Handrail - Stair T05 L45 E

100

04-JAN-07A

06-JAN-07A

Install Handrail - Stair T05 L45 E

046E050300 Install Handrail - Stair T05 L46 E

100

04-JAN-07A

07-JAN-07A

Install Handrail - Stair T05 L46 E

047E050300 Install Handrail - Stair T05 L47 E

100

06-JAN-07A

07-JAN-07A

Install Handrail - Stair T05 L47 E

048E050300 Install Handrail - Stair T05 L48 E

100

06-JAN-07A

07-JAN-07A

Install Handrail - Stair T05 L48 E

049E050300 Install Handrail - Stair T05 L49 E

100

08-JAN-07A

16-JAN-07A

Install Handrail - Stair T05 L49 E

050E050300 Install Handrail - Stair T05 L50 E

100

14-JAN-07A

16-JAN-07A

Install Handrail - Stair T05 L50 E

051E050300 Install Handrail - Stair T05 L51 E

100

14-JAN-07A

16-JAN-07A

Install Handrail - Stair T05 L51 E

052E050300 Install Handrail - Stair T05 L52 E

100

27-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L52 E

053E050300 Install Handrail - Stair T05 L53 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L53 E

054E050300 Install Handrail - Stair T05 L54 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L54 E

055E050300 Install Handrail - Stair T05 L55 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L55 E

056E050300 Install Handrail - Stair T05 L56 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L56 E

057E050300 Install Handrail - Stair T05 L57 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L57 E

058E050300 Install Handrail - Stair T05 L58 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L58 E

059E050300 Install Handrail - Stair T05 L59 E

100

29-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L59 E

060E050300 Install Handrail - Stair T05 L60 E

100

27-JAN-07A

30-JAN-07A

Install Handrail - Stair T05 L60 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 116 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

061E050300 Install Handrail - Stair T05 L61 E

100

05-MAR-07A

08-MAR-07A

Install Handrail - Stair T05 L61 E

062E050300 Install Handrail - Stair T05 L62 E

100

05-MAR-07A

08-MAR-07A

Install Handrail - Stair T05 L62 E

063E050300 Install Handrail - Stair T05 L63 E

100

05-MAR-07A

08-MAR-07A

Install Handrail - Stair T05 L63 E

064E050300 Install Handrail - Stair T05 L64 E

100

05-MAR-07A

08-MAR-07A

Install Handrail - Stair T05 L64 E

065E050300 Install Handrail - Stair T05 L65 E

100

08-MAR-07A

10-MAR-07A

Install Handrail - Stair T05 L65 E

066E050300 Install Handrail - Stair T05 L66 E

100

08-MAR-07A

10-MAR-07A

Install Handrail - Stair T05 L66 E

067E050300 Install Handrail - Stair T05 L67 E

257

15-MAR-07

19-MAR-07

Install Handrail - Stair T05 L67 E

068E050300 Install Handrail - Stair T05 L68 E

257

20-MAR-07

24-MAR-07

Install Handrail - Stair T05 L68 E

069E050300 Install Handrail - Stair T05 L69 E

257

25-MAR-07

28-MAR-07

Install Handrail - Stair T05 L69 E

070E050300 Install Handrail - Stair T05 L70 E

257

29-MAR-07

02-APR-07

Install Handrail - Stair T05 L70 E

071E050300 Install Handrail - Stair T05 L71 E

257

03-APR-07

07-APR-07

Install Handrail - Stair T05 L71 E

072E050300 Install Handrail - Stair T05 L72 E

257

08-APR-07

11-APR-07

Install Handrail - Stair T05 L72 E

073E050300 Install Handrail - Stair T05 L73 E

257

12-APR-07

16-APR-07

Install Handrail - Stair T05 L73 E

074E050300 Install Handrail - Stair T05 L74 E

257

17-APR-07

21-APR-07

Install Handrail - Stair T05 L74 E

075E050300 Install Handrail - Stair T05 L75 E

257

22-APR-07

25-APR-07

Install Handrail - Stair T05 L75 E

WEST WING
-01W050300 Install Handrail - Stair T01 B2 W

100

28-FEB-06A

13-APR-06A

Install Handrail - Stair T01 B2 W

-02W050300 Install Handrail - Stair T01 B1 W

100

12-APR-06A

13-APR-06A

Install Handrail - Stair T01 B1 W

-03W050300 Install Handrail - Stair T01 Concourse W

100

12-APR-06A

15-APR-06A

Install Handrail - Stair T01 Concourse W

-04W050300 Install Handrail - Stair T01 Ground W

100

15-APR-06A

24-APR-06A

Install Handrail - Stair T01 Ground W

001W050300 Install Handrail - Stair T01 L1 W

100

24-APR-06A

25-APR-06A

Install Handrail - Stair T01 L1 W

002W050300 Install Handrail - Stair T01 L2 W

100

26-APR-06A

30-APR-06A

Install Handrail - Stair T01 L2 W

003W050300 Install Handrail - Stair T01 L3 W

100

29-APR-06A

30-APR-06A

Install Handrail - Stair T01 L3 W

004W050300 Install Handrail - Stair T01 L4 W

100

30-APR-06A

07-MAY-06A

Install Handrail - Stair T01 L4 W

005W050300 Install Handrail - Stair T01 L5 W

100

08-MAY-06A

11-MAY-06A

Install Handrail - Stair T01 L5 W

006W050300 Install Handrail - Stair T01 L6 W

100

13-MAY-06A

17-MAY-06A

Install Handrail - Stair T01 L6 W

007W050300 Install Handrail - Stair T01 L7 W

100

17-MAY-06A

21-MAY-06A

Install Handrail - Stair T01 L7 W

008W050300 Install Handrail - Stair T01 L8 W

100

21-MAY-06A

23-MAY-06A

Install Handrail - Stair T01 L8 W

009W050300 Install Handrail - Stair T01 L9 W

100

21-MAY-06A

23-MAY-06A

Install Handrail - Stair T01 L9 W

010W050300 Install Handrail - Stair T01 L10 W

100

24-MAY-06A

09-JUL-06A

Install Handrail - Stair T01 L10 W

011W050300 Install Handrail - Stair T01 L11 W

100

10-JUL-06A

13-JUL-06A

Install Handrail - Stair T01 L11 W

012W050300 Install Handrail - Stair T01 L12 W

100

10-JUL-06A

13-JUL-06A

Install Handrail - Stair T01 L12 W

013W050300 Install Handrail - Stair T01 L13 W

100

15-JUL-06A

18-JUL-06A

Install Handrail - Stair T01 L13 W

014W050300 Install Handrail - Stair T01 L14 W

100

19-JUL-06A

22-JUL-06A

Install Handrail - Stair T01 L14 W

015W050300 Install Handrail - Stair T01 L15 W

100

23-JUL-06A

24-JUL-06A

Install Handrail - Stair T01 L15 W

016W050300 Install Handrail - Stair T01 L16 W

100

24-JUL-06A

27-JUL-06A

Install Handrail - Stair T01 L16 W

017W050300 Install Handrail - Stair T01 L17 W

100

26-JUL-06A

27-JUL-06A

Install Handrail - Stair T01 L17 W

018W050300 Install Handrail - Stair T01 L18 W

100

26-JUL-06A

27-JUL-06A

Install Handrail - Stair T01 L18 W

019W050300 Install Handrail - Stair T01 L19 W

100

29-JUL-06A

01-AUG-06A

Install Handrail - Stair T01 L19 W

020W050300 Install Handrail - Stair T01 L20 W

100

29-JUL-06A

01-AUG-06A

Install Handrail - Stair T01 L20 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 117 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

021W050300 Install Handrail - Stair T01 L21 W

100

29-JUL-06A

01-AUG-06A

Install Handrail - Stair T01 L21 W

022W050300 Install Handrail - Stair T01 L22 W

100

30-JUL-06A

01-AUG-06A

Install Handrail - Stair T01 L22 W

023W050300 Install Handrail - Stair T01 L23 W

100

01-AUG-06A

02-AUG-06A

Install Handrail - Stair T01 L23 W

024W050300 Install Handrail - Stair T01 L24 W

100

01-AUG-06A

02-AUG-06A

Install Handrail - Stair T01 L24 W

025W050300 Install Handrail - Stair T01 L25 W

100

01-AUG-06A

02-AUG-06A

Install Handrail - Stair T01 L25 W

026W050300 Install Handrail - Stair T01 L26 W

100

02-AUG-06A

05-AUG-06A

Install Handrail - Stair T01 L26 W

027W050300 Install Handrail - Stair T01 L27 W

100

03-AUG-06A

05-AUG-06A

Install Handrail - Stair T01 L27 W

028W050300 Install Handrail - Stair T01 L28 W

100

03-AUG-06A

05-AUG-06A

Install Handrail - Stair T01 L28 W

029W050300 Install Handrail - Stair T01 L29 W

100

03-AUG-06A

05-AUG-06A

Install Handrail - Stair T01 L29 W

030W050300 Install Handrail - Stair T01 L30 W

100

06-AUG-06A

08-AUG-06A

Install Handrail - Stair T01 L30 W

031W050300 Install Handrail - Stair T01 L31 W

100

09-AUG-06A

10-AUG-06A

Install Handrail - Stair T01 L31 W

032W050300 Install Handrail - Stair T01 L32 W

100

10-AUG-06A

10-AUG-06A

Install Handrail - Stair T01 L32 W

033W050300 Install Handrail - Stair T01 L33 W

100

12-AUG-06A

17-AUG-06A

Install Handrail - Stair T01 L33 W

034W050300 Install Handrail - Stair T01 L34 W

100

19-AUG-06A

22-AUG-06A

Install Handrail - Stair T01 L34 W

035W050300 Install Handrail - Stair T01 L35 W

100

22-AUG-06A

24-AUG-06A

Install Handrail - Stair T01 L35 W

036W050300 Install Handrail - Stair T01 L36 W

100

26-AUG-06A

28-AUG-06A

Install Handrail - Stair T01 L36 W

037W050300 Install Handrail - Stair T01 L37 W

100

29-AUG-06A

02-SEP-06A

Install Handrail - Stair T01 L37 W

038W050300 Install Handrail - Stair T01 L38 W

100

06-SEP-06A

09-SEP-06A

Install Handrail - Stair T01 L38 W

039W050300 Install Handrail - Stair T01 L39 W

100

10-SEP-06A

12-OCT-06A

Install Handrail - Stair T01 L39 W

040W050300 Install Handrail - Stair T01 L40 W

100

14-OCT-06A

15-OCT-06A

Install Handrail - Stair T01 L40 W

041W050300 Install Handrail - Stair T01 L41 W

100

16-OCT-06A

17-DEC-06A

Install Handrail - Stair T01 L41 W

042W050300 Install Handrail - Stair T01 L42 W

100

17-DEC-06A

18-DEC-06A

Install Handrail - Stair T01 L42 W

043W050300 Install Handrail - Stair T04 L43 W

100

17-DEC-06A

18-DEC-06A

Install Handrail - Stair T04 L43 W

044W050300 Install Handrail - Stair T04 L44 W

100

17-DEC-06A

18-DEC-06A

Install Handrail - Stair T04 L44 W

045W050300 Install Handrail - Stair T04 L45 W

100

19-DEC-06A

27-DEC-06A

Install Handrail - Stair T04 L45 W

046W050300 Install Handrail - Stair T04 L46 W

100

26-DEC-06A

27-DEC-06A

Install Handrail - Stair T04 L46 W

047W050300 Install Handrail - Stair T04 L47 W

100

27-DEC-06A

28-DEC-06A

Install Handrail - Stair T04 L47 W

048W050300 Install Handrail - Stair T04 L48 W

100

27-DEC-06A

28-DEC-06A

Install Handrail - Stair T04 L48 W

049W050300 Install Handrail - Stair T04 L49 W

100

01-JAN-07A

02-JAN-07A

Install Handrail - Stair T04 L49 W

050W050300 Install Handrail - Stair T04 L50 W

100

01-JAN-07A

02-JAN-07A

Install Handrail - Stair T04 L50 W

051W050300 Install Handrail - Stair T04 L51 W

100

01-JAN-07A

03-JAN-07A

Install Handrail - Stair T04 L51 W

052W050300 Install Handrail - Stair T04 L52 W

100

02-JAN-07A

03-JAN-07A

Install Handrail - Stair T04 L52 W

053W050300 Install Handrail - Stair T04 L53 W

100

02-JAN-07A

03-JAN-07A

Install Handrail - Stair T04 L53 W

054W050300 Install Handrail - Stair T04 L54 W

100

03-JAN-07A

04-JAN-07A

Install Handrail - Stair T04 L54 W

055W050300 Install Handrail - Stair T04 L55 W

100

03-JAN-07A

04-JAN-07A

Install Handrail - Stair T04 L55 W

056W050300 Install Handrail - Stair T04 L56 W

100

03-JAN-07A

04-JAN-07A

Install Handrail - Stair T04 L56 W

057W050300 Install Handrail - Stair T04 L57 W

100

04-JAN-07A

20-FEB-07A

Install Handrail - Stair T04 L57 W

058W050300 Install Handrail - Stair T04 L58 W

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T04 L58 W

059W050300 Install Handrail - Stair T04 L59 W

100

18-FEB-07A

20-FEB-07A

Install Handrail - Stair T04 L59 W

060W050300 Install Handrail - Stair T04 L60 W

100

19-FEB-07A

20-FEB-07A

Install Handrail - Stair T04 L60 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 118 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

061W050300 Install Handrail - Stair T04 L61 W

100

05-MAR-07A

07-MAR-07A

Install Handrail - Stair T04 L61 W

062W050300 Install Handrail - Stair T04 L62 W

100

05-MAR-07A

07-MAR-07A

Install Handrail - Stair T04 L62 W

063W050300 Install Handrail - Stair T04 L63 W

100

05-MAR-07A

07-MAR-07A

Install Handrail - Stair T04 L63 W

064W050300 Install Handrail - Stair T04 L64 W

100

05-MAR-07A

07-MAR-07A

Install Handrail - Stair T04 L64 W

065W050300 Install Handrail - Stair T04 L65 W

100

05-MAR-07A

07-MAR-07A

Install Handrail - Stair T04 L65 W

066W050300 Install Handrail - Stair T04 L66 W

253

15-MAR-07

19-MAR-07

Install Handrail - Stair T04 L66 W

067W050300 Install Handrail - Stair T04 L67 W

253

20-MAR-07

24-MAR-07

Install Handrail - Stair T04 L67 W

068W050300 Install Handrail - Stair T04 L68 W

253

25-MAR-07

28-MAR-07

Install Handrail - Stair T04 L68 W

069W050300 Install Handrail - Stair T04 L69 W

253

29-MAR-07

02-APR-07

Install Handrail - Stair T04 L69 W

070W050300 Install Handrail - Stair T04 L70 W

253

03-APR-07

07-APR-07

Install Handrail - Stair T04 L70 W

071W050300 Install Handrail - Stair T04 L71 W

253

08-APR-07

11-APR-07

Install Handrail - Stair T04 L71 W

072W050300 Install Handrail - Stair T04 L72 W

253

12-APR-07

16-APR-07

Install Handrail - Stair T04 L72 W

073W050300 Install Handrail - Stair T04 L73 W

253

17-APR-07

21-APR-07

Install Handrail - Stair T04 L73 W

074W050300 Install Handrail - Stair T04 L74 W

253

22-APR-07

25-APR-07

Install Handrail - Stair T04 L74 W

075W050300 Install Handrail - Stair T04 L75 W

253

26-APR-07

30-APR-07

Install Handrail - Stair T04 L75 W

CENTER CORE
157T070050 Spray Fireproofing L157 C

10

77

16-JUL-08

25-JUL-08

158T070050 Spray Fireproofing L158 C

10

76

28-JUL-08

08-AUG-08

Spray Fireproofing L158 C

158T07005A Spray Fireproofing L158M C

10

76

28-JUL-08

08-AUG-08

Spray Fireproofing L158M C

159T070050 Spray Fireproofing L159 C

10

75

10-AUG-08

21-AUG-08

160T070050 Spray Fireproofing L160 C

10

75

22-AUG-08

01-SEP-08

160T07005A Spray Fireproofing L160 Intermediate C

10

75

02-SEP-08

13-SEP-08

2009

FIRE PROOFING
Spray Fireproofing L157 C

Spray Fireproofing L159 C


Spray Fireproofing L160 C
Spray Fireproofing L160 Intermediate C
Spray Fireproofing L160 Mezzanine

161T070050 Spray Fireproofing L160 Mezzanine

10

75

14-SEP-08

25-SEP-08

161T07005A Spray Fireproofing Roof 3

10

136

18-OCT-08

31-OCT-08

162T070050 Spray Fireproofing Roof / Spire 1

75

26-SEP-08

02-OCT-08

Spray Fireproofing Roof / Spire 1

162T07005A Spray Fireproofing Leave-Out (L157-Roof 3)

20

16

17-MAR-09

06-APR-09

Spray Fireproofing Leave-Out (L157-Roof 3)

161T07006A Spray Fireproofing Roof 1

10

136

26-SEP-08

05-OCT-08

161T07007A Spray Fireproofing Roof 2

10

136

06-OCT-08

17-OCT-08

SUMT900350 Spray Fireproofing (L157-Roof)

79*

92

16-JUL-08

02-OCT-08

Spray Fireproofing (L157-Roof)

CENTER CORE
144T07110A Waterproofing on Terrace at L144 C3

15

139

26-OCT-08

13-NOV-08

Waterproofing on Terrace at L144 C3

148T07110A Waterproofing on Terrace at L148 C2

15

65

08-FEB-09

23-FEB-09

152T07110A Waterproofing on Terrace at L152 C1

15

65

24-FEB-09

10-MAR-09

156T07110A Waterproofing on Terrace from L156 ~ Spire Top

75

65

11-MAR-09

31-MAY-09

SOUTH WING
034S07110A Waterproofing on Terrace at L34 S

15

260

04-JAN-08

18-JAN-08

064S07110A Waterproofing on Terrace at L64 S

15

260

22-FEB-08

07-MAR-08

099S07110A Waterproofing on Terrace at L99 S

15

139

04-SEP-08

20-SEP-08

Spray Fireproofing Roof 3

Spray Fireproofing Roof 1


Spray Fireproofing Roof 2

WATERPROOFING

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Waterproofing on Terrace at L148 C2


Waterproofing on Terrace at L152 C1
Waterproofing on Terrace from L156 ~ Spire Top
Waterproofing on Terrace at L34 S
Waterproofing on Terrace at L64 S
Waterproofing on Terrace at L99 S
Sheet 119 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

139S07110A Waterproofing on Terrace at L139 S

% Total
Comp Float

Early
Start

Early
Finish
25-OCT-08

15

139

07-OCT-08

EAST WING
026E07110A Waterproofing on Terrace at L26 E

15

260

18-DEC-07

03-JAN-08

053E07110A Waterproofing on Terrace at L53 E

15

260

06-FEB-08

20-FEB-08

087E07110A Waterproofing on Terrace at L87 E

15

243

21-APR-08

07-MAY-08

124E07110A Waterproofing on Terrace at L124 E

21-SEP-08

06-OCT-08

2005

2006

2007

2008

2009

Waterproofing on Terrace at L139 S


Waterproofing on Terrace at L26 E
Waterproofing on Terrace at L53 E
Waterproofing on Terrace at L87 E
Waterproofing on Terrace at L124 E

15

139

WEST WING
P03W070110 Waterproofing on Petal Terrace at L3 W

30

475

03-JUN-07

07-JUL-07

019W07110A Waterproofing on Terrace at L19 W

15

260

03-DEC-07

17-DEC-07

043W07110A Waterproofing for Terrace at L43 W

15

260

19-JAN-08

05-FEB-08

076W07110A Waterproofing for Terrace at L76 W

15

243

05-APR-08

20-APR-08

112W07110A Waterproofing for Terrace at L112 W

15

564

28-OCT-07

18-NOV-07

CENTER CORE
147T080900 Install Curtain Wall L147

150

07-MAR-08

09-MAR-08

Install Curtain Wall L147

148T080900 Install Curtain Wall L148

150

10-MAR-08

12-MAR-08

Install Curtain Wall L148

149T080900 Install Curtain Wall L149

150

13-MAR-08

16-MAR-08

Install Curtain Wall L149

150T080900 Install Curtain Wall L150

150

17-MAR-08

19-MAR-08

Install Curtain Wall L150

151T080900 Install Curtain Wall L151

150

20-MAR-08

22-MAR-08

Install Curtain Wall L151

152T080900 Install Curtain Wall L152

150

23-MAR-08

25-MAR-08

Install Curtain Wall L152

153T080900 Install Curtain Wall L153

150

26-MAR-08

29-MAR-08

Install Curtain Wall L153

154T080900 Install Curtain Wall L154

150

30-MAR-08

01-APR-08

Install Curtain Wall L154

155T080900 Install Curtain Wall L155

150

02-APR-08

03-APR-08

Install Curtain Wall L155

156T080900 Install Curtain Wall L156

12

75

26-JUN-08

08-JUL-08

Install Curtain Wall L156

157T080900 Install Curtain Wall L157

75

10-JUL-08

15-JUL-08

Install Curtain Wall L157

158T080900 Install Curtain Wall L158

11

75

16-JUL-08

26-JUL-08

Install Curtain Wall L158

159T080900 Install Curtain Wall L159

11

75

28-JUL-08

09-AUG-08

160T080900 Install Curtain Wall L160

10

75

10-AUG-08

21-AUG-08

161T080900 Install Curtain Wall L160 Mezzanine

10

85

22-AUG-08

01-SEP-08

161T08090A Install Curtain Wall Spire 2 (Tier 23)

10

131

18-JUL-08

28-JUL-08

007T080910 Deli & Install Embed for Cladding (T) for T1

100

019T080910 Deli & Install Embed for Cladding (T) for T2

100

24-JAN-06A

026T080910 Deli & Install Embed for Cladding (T) for T3

100

25-FEB-06A

034T080910 Deli & Install Embed for Cladding (T) for T4

100

05-APR-06A

043T080910 Deli & Install Embed for Cladding (T) for T5

100

09-JUN-06A

053T080910 Deli & Install Embed for Cladding (T) for T6

100

23-JUL-06A

064T080910 Deli & Install Embed for Cladding (T) for T7

100

31-AUG-06A

076T080910 Deli & Install Embed for Cladding (T) for T8

100

02-NOV-06A

087T080910 Deli & Install Embed for Cladding (T) for T9

100

03-DEC-06A

099T080910 Deli & Install Embed for Cladding (T) for T10

Waterproofing on Petal Terrace at L3 W


Waterproofing on Terrace at L19 W
Waterproofing for Terrace at L43 W
Waterproofing for Terrace at L76 W
Waterproofing for Terrace at L112 W

CLADDING for TOWER (S-08) -PROVISIONAL

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall L159


Install Curtain Wall L160
Install Curtain Wall L160 Mezzanine
Install Curtain Wall Spire 2 (Tier 23)
Deli & Install Embed for Cladding (T) for T1

27-SEP-05A

-2

Deli & Install Embed for Cladding (T) for T2


Deli & Install Embed for Cladding (T) for T3
Deli & Install Embed for Cladding (T) for T4
Deli & Install Embed for Cladding (T) for T5
Deli & Install Embed for Cladding (T) for T6
Deli & Install Embed for Cladding (T) for T7
Deli & Install Embed for Cladding (T) for T8
Deli & Install Embed for Cladding (T) for T9
Deli & Install Embed for Cladding (T) for T10

15-MAR-07
Sheet 120 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

112T080910 Deli & Install Embed for Cladding (T) for T11

-1

23-MAR-07

124T080910 Deli & Install Embed for Cladding (T) for T12

-1

13-MAY-07

139T080910 Deli & Install Embed for Cladding (T) for T13

07-AUG-07

144T080910 Deli & Install Embed for Cladding (T) for T14

01-SEP-07

148T080910 Deli & Install Embed for Cladding (T) for T15

76

21-SEP-07

161T08091A Install Curtain Wall Roof 1 (Tier 19)

10

94

02-SEP-08

161T08092A Install Curtain Wall Roof 2 (Tier 20)

10

94

161T08093A Install Curtain Wall Roof 3 (Tier 21)

10

94

161T08094A Install Curtain Wall Spire 1 (Tier 22) - Start

10

SOUTH WING
005S080900 Install Curtain Wall L5 S - Start

Early
Finish

2005

2006

2007

2008

Deli & Install Embed for Cladding (T) for T11


Deli & Install Embed for Cladding (T) for T12
Deli & Install Embed for Cladding (T) for T13
Deli & Install Embed for Cladding (T) for T14
13-SEP-08

Deli & Install Embed for Cladding (T) for T15


Install Curtain Wall Roof 1 (Tier 19)

14-SEP-08

25-SEP-08

Install Curtain Wall Roof 2 (Tier 20)

26-SEP-08

05-OCT-08

131

06-JUL-08

17-JUL-08

Install Curtain Wall Roof 3 (Tier 21)


Install Curtain Wall Spire 1 (Tier 22) - Start

93

15-JUN-07

22-JUN-07

Install Curtain Wall L5 S - Start

006S080900 Install Curtain Wall L6 S

100

23-JUN-07

30-JUN-07

Install Curtain Wall L6 S

007S080900 Install Curtain Wall L7 S

100

01-JUL-07

08-JUL-07

Install Curtain Wall L7 S

008S080900 Install Curtain Wall L8 S

100

10-JUL-07

16-JUL-07

Install Curtain Wall L8 S

009S080900 Install Curtain Wall L9 S

100

17-JUL-07

22-JUL-07

Install Curtain Wall L9 S

010S080900 Install Curtain Wall L10 S

100

24-JUL-07

29-JUL-07

Install Curtain Wall L10 S

011S080900 Install Curtain Wall L11 S

100

31-JUL-07

05-AUG-07

Install Curtain Wall L11 S

012S080900 Install Curtain Wall L12 S

100

07-AUG-07

12-AUG-07

Install Curtain Wall L12 S

013S080900 Install Curtain Wall L13 S

100

13-AUG-07

17-AUG-07

Install Curtain Wall L13 S

014S080900 Install Curtain Wall L14 S

100

18-AUG-07

23-AUG-07

Install Curtain Wall L14 S

015S080900 Install Curtain Wall L15 S

100

24-AUG-07

29-AUG-07

Install Curtain Wall L15 S

016S080900 Install Curtain Wall L16 S

100

30-AUG-07

04-SEP-07

Install Curtain Wall L16 S

017S080900 Install Curtain Wall L17 S

13

100

05-SEP-07

18-SEP-07

018S080900 Install Curtain Wall L18 S

13

100

19-SEP-07

02-OCT-07

019S080900 Install Curtain Wall L19 S

10

100

03-OCT-07

13-OCT-07

020S080900 Install Curtain Wall L20 S

10

100

14-OCT-07

25-OCT-07

021S080900 Install Curtain Wall L21 S - Start

23

08-JUN-07

15-JUN-07

Install Curtain Wall L21 S - Start

022S080900 Install Curtain Wall L22 S

23

16-JUN-07

23-JUN-07

Install Curtain Wall L22 S

023S080900 Install Curtain Wall L23 S

23

24-JUN-07

01-JUL-07

Install Curtain Wall L23 S

024S080900 Install Curtain Wall L24 S

23

03-JUL-07

07-JUL-07

Install Curtain Wall L24 S

025S080900 Install Curtain Wall L25 S

23

08-JUL-07

13-JUL-07

Install Curtain Wall L25 S

026S080900 Install Curtain Wall L26 S

23

14-JUL-07

18-JUL-07

Install Curtain Wall L26 S

027S080900 Install Curtain Wall L27 S

23

19-JUL-07

24-JUL-07

Install Curtain Wall L27 S

028S080900 Install Curtain Wall L28 S

23

25-JUL-07

29-JUL-07

Install Curtain Wall L28 S

029S080900 Install Curtain Wall L29 S

23

31-JUL-07

04-AUG-07

Install Curtain Wall L29 S

030S080900 Install Curtain Wall L30 S

23

05-AUG-07

10-AUG-07

Install Curtain Wall L30 S

031S080900 Install Curtain Wall L31 S

23

11-AUG-07

14-AUG-07

Install Curtain Wall L31 S

032S080900 Install Curtain Wall L32 S

23

15-AUG-07

18-AUG-07

Install Curtain Wall L32 S

033S080900 Install Curtain Wall L33 S

23

19-AUG-07

23-AUG-07

Install Curtain Wall L33 S

034S080900 Install Curtain Wall L34 S

23

24-AUG-07

28-AUG-07

Install Curtain Wall L34 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Curtain Wall L17 S


Install Curtain Wall L18 S
Install Curtain Wall L19 S
Install Curtain Wall L20 S

Sheet 121 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

035S080900 Install Curtain Wall L35 S

23

29-AUG-07

01-SEP-07

Install Curtain Wall L35 S

036S080900 Install Curtain Wall L36 S

23

02-SEP-07

06-SEP-07

Install Curtain Wall L36 S

037S080900 Install Curtain Wall L37 S

23

07-SEP-07

10-SEP-07

Install Curtain Wall L37 S

038S080900 Install Curtain Wall L38 S

23

11-SEP-07

15-SEP-07

Install Curtain Wall L38 S

039S080900 Install Curtain Wall L39 S

23

16-SEP-07

19-SEP-07

Install Curtain Wall L39 S

040S080900 Install Curtain Wall L40 S

23

20-SEP-07

28-SEP-07

Install Curtain Wall L40 S

041S080900 Install Curtain Wall L41 S

23

29-SEP-07

06-OCT-07

Install Curtain Wall L41 S

042S080900 Install Curtain Wall L42 S

23

07-OCT-07

15-OCT-07

Install Curtain Wall L42 S

043S080900 Install Curtain Wall L43 S

23

16-OCT-07

18-OCT-07

Install Curtain Wall L43 S

044S080900 Install Curtain Wall L44 S

35

19-OCT-07

21-OCT-07

Install Curtain Wall L44 S

045S080900 Install Curtain Wall L45 S

35

23-OCT-07

26-OCT-07

Install Curtain Wall L45 S

046S080900 Install Curtain Wall L46 S

35

27-OCT-07

30-OCT-07

Install Curtain Wall L46 S

047S080900 Install Curtain Wall L47 S

35

01-NOV-07

03-NOV-07

Install Curtain Wall L47 S

048S080900 Install Curtain Wall L48 S

35

04-NOV-07

08-NOV-07

Install Curtain Wall L48 S

049S080900 Install Curtain Wall L49 S

74

09-NOV-07

11-NOV-07

Install Curtain Wall L49 S

050S080900 Install Curtain Wall L50 S

74

13-NOV-07

17-NOV-07

Install Curtain Wall L50 S

051S080900 Install Curtain Wall L51 S

74

18-NOV-07

22-NOV-07

Install Curtain Wall L51 S

052S080900 Install Curtain Wall L52 S

74

23-NOV-07

25-NOV-07

Install Curtain Wall L52 S

053S080900 Install Curtain Wall L53 S

74

26-NOV-07

29-NOV-07

Install Curtain Wall L53 S

054S080900 Install Curtain Wall L54 S

74

30-NOV-07

03-DEC-07

Install Curtain Wall L54 S

055S080900 Install Curtain Wall L55 S

74

04-DEC-07

06-DEC-07

Install Curtain Wall L55 S

056S080900 Install Curtain Wall L56 S

74

07-DEC-07

09-DEC-07

Install Curtain Wall L56 S

057S080900 Install Curtain Wall L57 S

74

10-DEC-07

12-DEC-07

Install Curtain Wall L57 S

058S080900 Install Curtain Wall L58 S

74

13-DEC-07

15-DEC-07

Install Curtain Wall L58 S

059S080900 Install Curtain Wall L59 S

74

16-DEC-07

18-DEC-07

Install Curtain Wall L59 S

060S080900 Install Curtain Wall L60 S

74

19-DEC-07

21-DEC-07

Install Curtain Wall L60 S

061S080900 Install Curtain Wall L61 S

74

22-DEC-07

24-DEC-07

Install Curtain Wall L61 S

062S080900 Install Curtain Wall L62 S

74

25-DEC-07

27-DEC-07

Install Curtain Wall L62 S

063S080900 Install Curtain Wall L63 S

74

28-DEC-07

30-DEC-07

Install Curtain Wall L63 S

064S080900 Install Curtain Wall L64 S

74

02-JAN-08

04-JAN-08

Install Curtain Wall L64 S

065S080900 Install Curtain Wall L65 S

74

05-JAN-08

07-JAN-08

Install Curtain Wall L65 S

066S080900 Install Curtain Wall L66 S

74

08-JAN-08

10-JAN-08

Install Curtain Wall L66 S

067S080900 Install Curtain Wall L67 S

74

11-JAN-08

13-JAN-08

Install Curtain Wall L67 S

068S080900 Install Curtain Wall L68 S

74

14-JAN-08

16-JAN-08

Install Curtain Wall L68 S

069S080900 Install Curtain Wall L69 S

74

17-JAN-08

19-JAN-08

Install Curtain Wall L69 S

070S080900 Install Curtain Wall L70 S

74

20-JAN-08

22-JAN-08

Install Curtain Wall L70 S

071S080900 Install Curtain Wall L71 S

74

23-JAN-08

25-JAN-08

Install Curtain Wall L71 S

072S080900 Install Curtain Wall L72 S

74

26-JAN-08

28-JAN-08

Install Curtain Wall L72 S

073S080900 Install Curtain Wall L73 S

74

29-JAN-08

06-FEB-08

Install Curtain Wall L73 S

074S080900 Install Curtain Wall L74 S

74

07-FEB-08

12-FEB-08

Install Curtain Wall L74 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 122 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

075S080900 Install Curtain Wall L75 S

74

13-FEB-08

18-FEB-08

Install Curtain Wall L75 S

076S080900 Install Curtain Wall L76 S

74

19-FEB-08

25-FEB-08

Install Curtain Wall L76 S

077S080900 Install Curtain Wall L77 S

74

26-FEB-08

02-MAR-08

078S080900 Install Curtain Wall L78 S - Start

60

01-OCT-07*

07-OCT-07

Install Curtain Wall L78 S - Start

079S080900 Install Curtain Wall L79 S

88

08-OCT-07

12-OCT-07

Install Curtain Wall L79 S

080S080900 Install Curtain Wall L80 S

88

13-OCT-07

16-OCT-07

Install Curtain Wall L80 S

081S080900 Install Curtain Wall L81 S

88

17-OCT-07

20-OCT-07

Install Curtain Wall L81 S

082S080900 Install Curtain Wall L82 S

88

21-OCT-07

25-OCT-07

Install Curtain Wall L82 S

083S080900 Install Curtain Wall L83 S

88

26-OCT-07

28-OCT-07

Install Curtain Wall L83 S

084S080900 Install Curtain Wall L84 S

88

30-OCT-07

02-NOV-07

Install Curtain Wall L84 S

085S080900 Install Curtain Wall L85 S

88

03-NOV-07

06-NOV-07

Install Curtain Wall L85 S

086S080900 Install Curtain Wall L86 S

88

08-NOV-07

10-NOV-07

Install Curtain Wall L86 S

087S080900 Install Curtain Wall L87 S

88

11-NOV-07

16-NOV-07

Install Curtain Wall L87 S

088S080900 Install Curtain Wall L88 S

88

17-NOV-07

20-NOV-07

Install Curtain Wall L88 S

089S080900 Install Curtain Wall L89 S

88

22-NOV-07

24-NOV-07

Install Curtain Wall L89 S

090S080900 Install Curtain Wall L90 S

88

25-NOV-07

27-NOV-07

Install Curtain Wall L90 S

091S080900 Install Curtain Wall L91 S

88

29-NOV-07

01-DEC-07

Install Curtain Wall L91 S

092S080900 Install Curtain Wall L92 S

88

03-DEC-07

05-DEC-07

Install Curtain Wall L92 S

093S080900 Install Curtain Wall L93 S

88

06-DEC-07

08-DEC-07

Install Curtain Wall L93 S

094S080900 Install Curtain Wall L94 S

88

09-DEC-07

11-DEC-07

Install Curtain Wall L94 S

095S080900 Install Curtain Wall L95 S

88

12-DEC-07

14-DEC-07

Install Curtain Wall L95 S

096S080900 Install Curtain Wall L96 S

88

15-DEC-07

17-DEC-07

Install Curtain Wall L96 S

097S080900 Install Curtain Wall L97 S

88

18-DEC-07

20-DEC-07

Install Curtain Wall L97 S

098S080900 Install Curtain Wall L98 S

88

21-DEC-07

23-DEC-07

Install Curtain Wall L98 S

099S080900 Install Curtain Wall L99 S

88

24-DEC-07

26-DEC-07

Install Curtain Wall L99 S

100S080900 Install Curtain Wall L100 S

88

27-DEC-07

29-DEC-07

Install Curtain Wall L100 S

101S080900 Install Curtain Wall L101 S

88

30-DEC-07

03-JAN-08

Install Curtain Wall L101 S

102S080900 Install Curtain Wall L102 S

88

04-JAN-08

06-JAN-08

Install Curtain Wall L102 S

103S080900 Install Curtain Wall L103 S

88

07-JAN-08

09-JAN-08

Install Curtain Wall L103 S

104S080900 Install Curtain Wall L104 S

88

10-JAN-08

12-JAN-08

Install Curtain Wall L104 S

105S080900 Install Curtain Wall L105 S

88

13-JAN-08

15-JAN-08

Install Curtain Wall L105 S

106S080900 Install Curtain Wall L106 S

88

16-JAN-08

18-JAN-08

Install Curtain Wall L106 S

107S080900 Install Curtain Wall L107 S

88

19-JAN-08

21-JAN-08

Install Curtain Wall L107 S

108S080900 Install Curtain Wall L108 S

88

22-JAN-08

24-JAN-08

Install Curtain Wall L108 S

109S080900 Install Curtain Wall L109 S

88

25-JAN-08

28-JAN-08

Install Curtain Wall L109 S

110S080900 Install Curtain Wall L110 S

88

29-JAN-08

04-FEB-08

Install Curtain Wall L110 S

111S080900 Install Curtain Wall L111 S

88

05-FEB-08

08-FEB-08

Install Curtain Wall L111 S

112S080900 Install Curtain Wall L112 S

10

88

09-FEB-08

18-FEB-08

Install Curtain Wall L112 S

113S080900 Install Curtain Wall L113 S

10

88

19-FEB-08

29-FEB-08

Install Curtain Wall L113 S

114S080900 Install Curtain Wall L114 S - Start

150

01-NOV-07*

09-NOV-07

Install Curtain Wall L114 S - Start

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall L77 S

Sheet 123 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

115S080900 Install Curtain Wall L115 S

150

10-NOV-07

16-NOV-07

Install Curtain Wall L115 S

116S080900 Install Curtain Wall L116 S

150

17-NOV-07

22-NOV-07

Install Curtain Wall L116 S

117S080900 Install Curtain Wall L117 S

150

23-NOV-07

26-NOV-07

Install Curtain Wall L117 S

118S080900 Install Curtain Wall L118 S

150

27-NOV-07

30-NOV-07

Install Curtain Wall L118 S

119S080900 Install Curtain Wall L119 S

150

01-DEC-07

04-DEC-07

Install Curtain Wall L119 S

120S080900 Install Curtain Wall L120 S

150

05-DEC-07

07-DEC-07

Install Curtain Wall L120 S

121S080900 Install Curtain Wall L121 S

150

08-DEC-07

10-DEC-07

Install Curtain Wall L121 S

122S080900 Install Curtain Wall L122 S

150

11-DEC-07

13-DEC-07

Install Curtain Wall L122 S

123S080900 Install Curtain Wall L123 S

150

14-DEC-07

16-DEC-07

Install Curtain Wall L123 S

124S080900 Install Curtain Wall L124 S

150

17-DEC-07

19-DEC-07

Install Curtain Wall L124 S

125S080900 Install Curtain Wall L125 S

150

20-DEC-07

22-DEC-07

Install Curtain Wall L125 S

126S080900 Install Curtain Wall L126 S

150

23-DEC-07

25-DEC-07

Install Curtain Wall L126 S

127S080900 Install Curtain Wall L127 S

150

26-DEC-07

28-DEC-07

Install Curtain Wall L127 S

128S080900 Install Curtain Wall L128 S

150

29-DEC-07

02-JAN-08

Install Curtain Wall L128 S

129S080900 Install Curtain Wall L129 S

150

03-JAN-08

05-JAN-08

Install Curtain Wall L129 S

130S080900 Install Curtain Wall L130 S

150

06-JAN-08

08-JAN-08

Install Curtain Wall L130 S

131S080900 Install Curtain Wall L131 S

150

09-JAN-08

11-JAN-08

Install Curtain Wall L131 S

132S080900 Install Curtain Wall L132 S

150

12-JAN-08

14-JAN-08

Install Curtain Wall L132 S

133S080900 Install Curtain Wall L133 S

150

15-JAN-08

17-JAN-08

Install Curtain Wall L133 S

134S080900 Install Curtain Wall L134 S

150

18-JAN-08

20-JAN-08

Install Curtain Wall L134 S

135S080900 Install Curtain Wall L135 S

150

21-JAN-08

23-JAN-08

Install Curtain Wall L135 S

136S080900 Install Curtain Wall L136 S

150

24-JAN-08

28-JAN-08

Install Curtain Wall L136 S

137S080900 Install Curtain Wall L137 S

150

29-JAN-08

05-FEB-08

Install Curtain Wall L137 S

138S080900 Install Curtain Wall L138 S

150

06-FEB-08

10-FEB-08

Install Curtain Wall L138 S

139S080900 Install Curtain Wall L139 S

150

11-FEB-08

13-FEB-08

Install Curtain Wall L139 S

140S080900 Install Curtain Wall L140 S

150

14-FEB-08

16-FEB-08

Install Curtain Wall L140 S

141S080900 Install Curtain Wall L141 S

150

17-FEB-08

19-FEB-08

Install Curtain Wall L141 S

142S080900 Install Curtain Wall L142 S

150

20-FEB-08

23-FEB-08

Install Curtain Wall L142 S

143S080900 Install Curtain Wall L143 S

150

24-FEB-08

26-FEB-08

Install Curtain Wall L143 S

144S080900 Install Curtain Wall L144 S

150

27-FEB-08

29-FEB-08

Install Curtain Wall L144 S

145S080900 Install Curtain Wall L145 S

150

01-MAR-08

03-MAR-08

Install Curtain Wall L145 S

146S080900 Install Curtain Wall L146 S

150

04-MAR-08

06-MAR-08

Install Curtain Wall L146 S

147S080900 Install Curtain Wall L147 S

150

07-MAR-08

09-MAR-08

Install Curtain Wall L147 S

148S080900 Install Curtain Wall L148 S

150

10-MAR-08

12-MAR-08

Install Curtain Wall L148 S

149S080900 Install Curtain Wall L149 S

150

13-MAR-08

16-MAR-08

Install Curtain Wall L149 S

150S080900 Install Curtain Wall L150 S

150

17-MAR-08

19-MAR-08

Install Curtain Wall L150 S

151S080900 Install Curtain Wall L151 S

150

20-MAR-08

22-MAR-08

Install Curtain Wall L151 S

152S080900 Install Curtain Wall L152 S

150

23-MAR-08

25-MAR-08

Install Curtain Wall L152 S

153S080900 Install Curtain Wall L153 S

150

26-MAR-08

29-MAR-08

Install Curtain Wall L153 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 124 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

EAST WING
005E080900 Install Curtain Wall L5 E - Start

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

93

15-JUN-07

22-JUN-07

Install Curtain Wall L5 E - Start

006E080900 Install Curtain Wall L6 E

100

23-JUN-07

30-JUN-07

Install Curtain Wall L6 E

007E080900 Install Curtain Wall L7 E

100

01-JUL-07

08-JUL-07

Install Curtain Wall L7 E

008E080900 Install Curtain Wall L8 E

100

10-JUL-07

16-JUL-07

Install Curtain Wall L8 E

009E080900 Install Curtain Wall L9 E

100

17-JUL-07

22-JUL-07

Install Curtain Wall L9 E

010E080900 Install Curtain Wall L10 E

100

24-JUL-07

29-JUL-07

Install Curtain Wall L10 E

011E080900 Install Curtain Wall L11 E

100

31-JUL-07

05-AUG-07

Install Curtain Wall L11 E

012E080900 Install Curtain Wall L12 E

100

07-AUG-07

12-AUG-07

Install Curtain Wall L12 E

013E080900 Install Curtain Wall L13 E

100

13-AUG-07

17-AUG-07

Install Curtain Wall L13 E

014E080900 Install Curtain Wall L14 E

100

18-AUG-07

23-AUG-07

Install Curtain Wall L14 E

015E080900 Install Curtain Wall L15 E

100

24-AUG-07

29-AUG-07

Install Curtain Wall L15 E

016E080900 Install Curtain Wall L16 E

100

30-AUG-07

04-SEP-07

Install Curtain Wall L16 E

017E080900 Install Curtain Wall L17 E

13

100

05-SEP-07

18-SEP-07

018E080900 Install Curtain Wall L18 E

13

100

19-SEP-07

02-OCT-07

019E080900 Install Curtain Wall L19 E

10

100

03-OCT-07

13-OCT-07

020E080900 Install Curtain Wall L20 E

10

100

14-OCT-07

25-OCT-07

021E080900 Install Curtain Wall L21 E - Start

28

08-JUN-07

15-JUN-07

Install Curtain Wall L21 E - Start

022E080900 Install Curtain Wall L22 E

47

16-JUN-07

23-JUN-07

Install Curtain Wall L22 E

023E080900 Install Curtain Wall L23 E

47

24-JUN-07

01-JUL-07

Install Curtain Wall L23 E

024E080900 Install Curtain Wall L24 E

47

03-JUL-07

07-JUL-07

Install Curtain Wall L24 E

025E080900 Install Curtain Wall L25 E

47

08-JUL-07

13-JUL-07

Install Curtain Wall L25 E

026E080900 Install Curtain Wall L26 E

47

14-JUL-07

18-JUL-07

Install Curtain Wall L26 E

027E080900 Install Curtain Wall L27 E

47

19-JUL-07

24-JUL-07

Install Curtain Wall L27 E

028E080900 Install Curtain Wall L28 E

47

25-JUL-07

29-JUL-07

Install Curtain Wall L28 E

029E080900 Install Curtain Wall L29 E

47

31-JUL-07

04-AUG-07

Install Curtain Wall L29 E

030E080900 Install Curtain Wall L30 E

47

05-AUG-07

10-AUG-07

Install Curtain Wall L30 E

031E080900 Install Curtain Wall L31 E

47

11-AUG-07

14-AUG-07

Install Curtain Wall L31 E

032E080900 Install Curtain Wall L32 E

47

15-AUG-07

18-AUG-07

Install Curtain Wall L32 E

033E080900 Install Curtain Wall L33 E

47

19-AUG-07

23-AUG-07

Install Curtain Wall L33 E

034E080900 Install Curtain Wall L34 E

47

24-AUG-07

28-AUG-07

Install Curtain Wall L34 E

035E080900 Install Curtain Wall L35 E

47

29-AUG-07

01-SEP-07

Install Curtain Wall L35 E

036E080900 Install Curtain Wall L36 E

47

02-SEP-07

06-SEP-07

Install Curtain Wall L36 E

037E080900 Install Curtain Wall L37 E

47

07-SEP-07

10-SEP-07

Install Curtain Wall L37 E

038E080900 Install Curtain Wall L38 E

47

11-SEP-07

15-SEP-07

Install Curtain Wall L38 E

039E080900 Install Curtain Wall L39 E

47

16-SEP-07

19-SEP-07

Install Curtain Wall L39 E

040E080900 Install Curtain Wall L40 E

47

20-SEP-07

28-SEP-07

Install Curtain Wall L40 E

041E080900 Install Curtain Wall L41 E

47

29-SEP-07

06-OCT-07

Install Curtain Wall L41 E

042E080900 Install Curtain Wall L42 E

47

07-OCT-07

15-OCT-07

Install Curtain Wall L42 E

043E080900 Install Curtain Wall L43 E

47

16-OCT-07

18-OCT-07

Install Curtain Wall L43 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Curtain Wall L17 E


Install Curtain Wall L18 E
Install Curtain Wall L19 E
Install Curtain Wall L20 E

Sheet 125 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

044E080900 Install Curtain Wall L44 E

97

19-OCT-07

21-OCT-07

Install Curtain Wall L44 E

045E080900 Install Curtain Wall L45 E

97

23-OCT-07

26-OCT-07

Install Curtain Wall L45 E

046E080900 Install Curtain Wall L46 E

97

27-OCT-07

30-OCT-07

Install Curtain Wall L46 E

047E080900 Install Curtain Wall L47 E

97

01-NOV-07

03-NOV-07

Install Curtain Wall L47 E

048E080900 Install Curtain Wall L48 E

97

04-NOV-07

08-NOV-07

Install Curtain Wall L48 E

049E080900 Install Curtain Wall L49 E

97

09-NOV-07

11-NOV-07

Install Curtain Wall L49 E

050E080900 Install Curtain Wall L50 E

97

13-NOV-07

17-NOV-07

Install Curtain Wall L50 E

051E080900 Install Curtain Wall L51 E

97

18-NOV-07

22-NOV-07

Install Curtain Wall L51 E

052E080900 Install Curtain Wall L52 E

97

23-NOV-07

25-NOV-07

Install Curtain Wall L52 E

053E080900 Install Curtain Wall L53 E

97

26-NOV-07

29-NOV-07

Install Curtain Wall L53 E

054E080900 Install Curtain Wall L54 E

97

30-NOV-07

03-DEC-07

Install Curtain Wall L54 E

055E080900 Install Curtain Wall L55 E

97

04-DEC-07

06-DEC-07

Install Curtain Wall L55 E

056E080900 Install Curtain Wall L56 E

97

07-DEC-07

09-DEC-07

Install Curtain Wall L56 E

057E080900 Install Curtain Wall L57 E

97

10-DEC-07

12-DEC-07

Install Curtain Wall L57 E

058E080900 Install Curtain Wall L58 E

97

13-DEC-07

15-DEC-07

Install Curtain Wall L58 E

059E080900 Install Curtain Wall L59 E

97

16-DEC-07

18-DEC-07

Install Curtain Wall L59 E

060E080900 Install Curtain Wall L60 E

97

19-DEC-07

21-DEC-07

Install Curtain Wall L60 E

061E080900 Install Curtain Wall L61 E

97

22-DEC-07

24-DEC-07

Install Curtain Wall L61 E

062E080900 Install Curtain Wall L62 E

97

25-DEC-07

27-DEC-07

Install Curtain Wall L62 E

063E080900 Install Curtain Wall L63 E

97

28-DEC-07

30-DEC-07

Install Curtain Wall L63 E

064E080900 Install Curtain Wall L64 E

97

02-JAN-08

04-JAN-08

Install Curtain Wall L64 E

065E080900 Install Curtain Wall L65 E

97

05-JAN-08

07-JAN-08

Install Curtain Wall L65 E

066E080900 Install Curtain Wall L66 E

97

08-JAN-08

10-JAN-08

Install Curtain Wall L66 E

067E080900 Install Curtain Wall L67 E

97

11-JAN-08

13-JAN-08

Install Curtain Wall L67 E

068E080900 Install Curtain Wall L68 E

97

14-JAN-08

16-JAN-08

Install Curtain Wall L68 E

069E080900 Install Curtain Wall L69 E

97

17-JAN-08

19-JAN-08

Install Curtain Wall L69 E

070E080900 Install Curtain Wall L70 E

97

20-JAN-08

22-JAN-08

Install Curtain Wall L70 E

071E080900 Install Curtain Wall L71 E

97

23-JAN-08

25-JAN-08

Install Curtain Wall L71 E

072E080900 Install Curtain Wall L72 E

97

26-JAN-08

28-JAN-08

Install Curtain Wall L72 E

073E080900 Install Curtain Wall L73 E

97

29-JAN-08

06-FEB-08

Install Curtain Wall L73 E

074E080900 Install Curtain Wall L74 E

97

07-FEB-08

12-FEB-08

Install Curtain Wall L74 E

075E080900 Install Curtain Wall L75 E

97

13-FEB-08

18-FEB-08

Install Curtain Wall L75 E

076E080900 Install Curtain Wall L76 E

97

19-FEB-08

25-FEB-08

Install Curtain Wall L76 E

077E080900 Install Curtain Wall L77 E

97

26-FEB-08

02-MAR-08

078E080900 Install Curtain Wall L78 E - Start

60

01-OCT-07

07-OCT-07

Install Curtain Wall L78 E - Start

079E080900 Install Curtain Wall L79 E

67

08-OCT-07

12-OCT-07

Install Curtain Wall L79 E

080E080900 Install Curtain Wall L80 E

67

13-OCT-07

16-OCT-07

Install Curtain Wall L80 E

081E080900 Install Curtain Wall L81 E

67

17-OCT-07

20-OCT-07

Install Curtain Wall L81 E

082E080900 Install Curtain Wall L82 E

67

21-OCT-07

25-OCT-07

Install Curtain Wall L82 E

083E080900 Install Curtain Wall L83 E

67

26-OCT-07

28-OCT-07

Install Curtain Wall L83 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall L77 E

Sheet 126 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

084E080900 Install Curtain Wall L84 E

67

30-OCT-07

02-NOV-07

Install Curtain Wall L84 E

085E080900 Install Curtain Wall L85 E

67

03-NOV-07

06-NOV-07

Install Curtain Wall L85 E

086E080900 Install Curtain Wall L86 E

67

08-NOV-07

10-NOV-07

Install Curtain Wall L86 E

087E080900 Install Curtain Wall L87 E

67

11-NOV-07

16-NOV-07

Install Curtain Wall L87 E

088E080900 Install Curtain Wall L88 E

67

17-NOV-07

20-NOV-07

Install Curtain Wall L88 E

089E080900 Install Curtain Wall L89 E

99

22-NOV-07

24-NOV-07

Install Curtain Wall L89 E

090E080900 Install Curtain Wall L90 E

99

25-NOV-07

27-NOV-07

Install Curtain Wall L90 E

091E080900 Install Curtain Wall L91 E

99

29-NOV-07

01-DEC-07

Install Curtain Wall L91 E

092E080900 Install Curtain Wall L92 E

99

03-DEC-07

05-DEC-07

Install Curtain Wall L92 E

093E080900 Install Curtain Wall L93 E

99

06-DEC-07

08-DEC-07

Install Curtain Wall L93 E

094E080900 Install Curtain Wall L94 E

99

09-DEC-07

11-DEC-07

Install Curtain Wall L94 E

095E080900 Install Curtain Wall L95 E

99

12-DEC-07

14-DEC-07

Install Curtain Wall L95 E

096E080900 Install Curtain Wall L96 E

99

15-DEC-07

17-DEC-07

Install Curtain Wall L96 E

097E080900 Install Curtain Wall L97 E

99

18-DEC-07

20-DEC-07

Install Curtain Wall L97 E

098E080900 Install Curtain Wall L98 E

99

21-DEC-07

23-DEC-07

Install Curtain Wall L98 E

099E080900 Install Curtain Wall L99 E

99

24-DEC-07

26-DEC-07

Install Curtain Wall L99 E

100E080900 Install Curtain Wall L100 E

99

27-DEC-07

29-DEC-07

Install Curtain Wall L100 E

101E080900 Install Curtain Wall L101 E

99

30-DEC-07

03-JAN-08

Install Curtain Wall L101 E

102E080900 Install Curtain Wall L102 E

99

04-JAN-08

06-JAN-08

Install Curtain Wall L102 E

103E080900 Install Curtain Wall L103 E

99

07-JAN-08

09-JAN-08

Install Curtain Wall L103 E

104E080900 Install Curtain Wall L104 E

99

10-JAN-08

12-JAN-08

Install Curtain Wall L104 E

105E080900 Install Curtain Wall L105 E

99

13-JAN-08

15-JAN-08

Install Curtain Wall L105 E

106E080900 Install Curtain Wall L106 E

99

16-JAN-08

18-JAN-08

Install Curtain Wall L106 E

107E080900 Install Curtain Wall L107 E

99

19-JAN-08

21-JAN-08

Install Curtain Wall L107 E

108E080900 Install Curtain Wall L108 E

99

22-JAN-08

24-JAN-08

Install Curtain Wall L108 E

109E080900 Install Curtain Wall L109 E

99

25-JAN-08

28-JAN-08

Install Curtain Wall L109 E

110E080900 Install Curtain Wall L110 E

99

29-JAN-08

04-FEB-08

Install Curtain Wall L110 E

111E080900 Install Curtain Wall L111 E

99

05-FEB-08

08-FEB-08

Install Curtain Wall L111 E

112E080900 Install Curtain Wall L112 E

99

09-FEB-08

12-FEB-08

Install Curtain Wall L112 E

113E080900 Install Curtain Wall L113 E

100

13-FEB-08

16-FEB-08

Install Curtain Wall L113 E

114E080900 Install Curtain Wall L114 E - Start

150

01-NOV-07

09-NOV-07

Install Curtain Wall L114 E - Start

115E080900 Install Curtain Wall L115 E

150

10-NOV-07

16-NOV-07

Install Curtain Wall L115 E

116E080900 Install Curtain Wall L116 E

150

17-NOV-07

22-NOV-07

Install Curtain Wall L116 E

117E080900 Install Curtain Wall L117 E

150

23-NOV-07

26-NOV-07

Install Curtain Wall L117 E

118E080900 Install Curtain Wall L118 E

150

27-NOV-07

30-NOV-07

Install Curtain Wall L118 E

119E080900 Install Curtain Wall L119 E

150

01-DEC-07

04-DEC-07

Install Curtain Wall L119 E

120E080900 Install Curtain Wall L120 E

150

05-DEC-07

07-DEC-07

Install Curtain Wall L120 E

121E080900 Install Curtain Wall L121 E

150

08-DEC-07

10-DEC-07

Install Curtain Wall L121 E

122E080900 Install Curtain Wall L122 E

150

11-DEC-07

13-DEC-07

Install Curtain Wall L122 E

123E080900 Install Curtain Wall L123 E

150

14-DEC-07

16-DEC-07

Install Curtain Wall L123 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 127 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

124E080900 Install Curtain Wall L124 E

150

17-DEC-07

19-DEC-07

Install Curtain Wall L124 E

125E080900 Install Curtain Wall L125 E

150

20-DEC-07

22-DEC-07

Install Curtain Wall L125 E

126E080900 Install Curtain Wall L126 E

150

23-DEC-07

25-DEC-07

Install Curtain Wall L126 E

127E080900 Install Curtain Wall L127 E

150

26-DEC-07

28-DEC-07

Install Curtain Wall L127 E

128E080900 Install Curtain Wall L128 E

150

29-DEC-07

02-JAN-08

Install Curtain Wall L128 E

129E080900 Install Curtain Wall L129 E

150

03-JAN-08

05-JAN-08

Install Curtain Wall L129 E

130E080900 Install Curtain Wall L130 E

150

06-JAN-08

08-JAN-08

Install Curtain Wall L130 E

131E080900 Install Curtain Wall L131 E

150

09-JAN-08

11-JAN-08

Install Curtain Wall L131 E

132E080900 Install Curtain Wall L132 E

150

12-JAN-08

14-JAN-08

Install Curtain Wall L132 E

133E080900 Install Curtain Wall L133 E

150

15-JAN-08

17-JAN-08

Install Curtain Wall L133 E

134E080900 Install Curtain Wall L134 E

150

18-JAN-08

20-JAN-08

Install Curtain Wall L134 E

135E080900 Install Curtain Wall L135 E

150

21-JAN-08

23-JAN-08

Install Curtain Wall L135 E

136E080900 Install Curtain Wall L136 E

150

24-JAN-08

28-JAN-08

Install Curtain Wall L136 E

137E080900 Install Curtain Wall L137 E

150

29-JAN-08

05-FEB-08

Install Curtain Wall L137 E

138E080900 Install Curtain Wall L138 E

150

06-FEB-08

10-FEB-08

Install Curtain Wall L138 E

139E080900 Install Curtain Wall L139 E

150

11-FEB-08

13-FEB-08

Install Curtain Wall L139 E

140E080900 Install Curtain Wall L140 E

150

14-FEB-08

16-FEB-08

Install Curtain Wall L140 E

141E080900 Install Curtain Wall L141 E

150

17-FEB-08

19-FEB-08

Install Curtain Wall L141 E

142E080900 Install Curtain Wall L142 E

150

20-FEB-08

23-FEB-08

Install Curtain Wall L142 E

143E080900 Install Curtain Wall L143 E

150

24-FEB-08

26-FEB-08

Install Curtain Wall L143 E

144E080900 Install Curtain Wall L144 E

150

27-FEB-08

29-FEB-08

Install Curtain Wall L144 E

145E080900 Install Curtain Wall L145 E

150

01-MAR-08

03-MAR-08

Install Curtain Wall L145 E

146E080900 Install Curtain Wall L146 E

150

04-MAR-08

06-MAR-08

Install Curtain Wall L146 E

147E080900 Install Curtain Wall L147 E

166

07-MAR-08

09-MAR-08

Install Curtain Wall L147 E

148E080900 Install Curtain Wall L148 E

168

10-MAR-08

12-MAR-08

Install Curtain Wall L148 E

WEST WING
005W080900 Install Curtain Wall L5 W - Start

93

23-JUN-07

30-JUN-07

Install Curtain Wall L5 W - Start

006W080900 Install Curtain Wall L6 W

93

01-JUL-07

08-JUL-07

Install Curtain Wall L6 W

007W080900 Install Curtain Wall L7 W

93

10-JUL-07

16-JUL-07

Install Curtain Wall L7 W

008W080900 Install Curtain Wall L8 W

93

17-JUL-07

24-JUL-07

Install Curtain Wall L8 W

009W080900 Install Curtain Wall L9 W

93

25-JUL-07

31-JUL-07

Install Curtain Wall L9 W

010W080900 Install Curtain Wall L10 W

93

01-AUG-07

07-AUG-07

Install Curtain Wall L10 W

011W080900 Install Curtain Wall L11 W

93

08-AUG-07

13-AUG-07

Install Curtain Wall L11 W

012W080900 Install Curtain Wall L12 W

93

14-AUG-07

19-AUG-07

Install Curtain Wall L12 W

013W080900 Install Curtain Wall L13 W

93

21-AUG-07

25-AUG-07

Install Curtain Wall L13 W

014W080900 Install Curtain Wall L14 W

93

26-AUG-07

31-AUG-07

Install Curtain Wall L14 W

015W080900 Install Curtain Wall L15 W

93

01-SEP-07

06-SEP-07

Install Curtain Wall L15 W

016W080900 Install Curtain Wall L16 W

93

07-SEP-07

11-SEP-07

Install Curtain Wall L16 W

017W080900 Install Curtain Wall L17 W

13

93

13-SEP-07

25-SEP-07

018W080900 Install Curtain Wall L18 W

13

93

27-SEP-07

09-OCT-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall L17 W


Install Curtain Wall L18 W
Sheet 128 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008
Install Curtain Wall L19 W

019W080900 Install Curtain Wall L19 W

10

93

11-OCT-07

20-OCT-07

020W080900 Install Curtain Wall L20 W

10

93

21-OCT-07

03-NOV-07

021W080900 Install Curtain Wall L21 W - Start

28

16-JUN-07

23-JUN-07

Install Curtain Wall L21 W - Start

022W080900 Install Curtain Wall L22 W

28

24-JUN-07

01-JUL-07

Install Curtain Wall L22 W

023W080900 Install Curtain Wall L23 W

28

03-JUL-07

10-JUL-07

Install Curtain Wall L23 W

024W080900 Install Curtain Wall L24 W

28

11-JUL-07

15-JUL-07

Install Curtain Wall L24 W

025W080900 Install Curtain Wall L25 W

28

16-JUL-07

20-JUL-07

Install Curtain Wall L25 W

026W080900 Install Curtain Wall L26 W

28

21-JUL-07

26-JUL-07

Install Curtain Wall L26 W

027W080900 Install Curtain Wall L27 W

28

27-JUL-07

01-AUG-07

Install Curtain Wall L27 W

028W080900 Install Curtain Wall L28 W

28

02-AUG-07

07-AUG-07

Install Curtain Wall L28 W

029W080900 Install Curtain Wall L29 W

28

08-AUG-07

12-AUG-07

Install Curtain Wall L29 W

030W080900 Install Curtain Wall L30 W

28

13-AUG-07

17-AUG-07

Install Curtain Wall L30 W

031W080900 Install Curtain Wall L31 W

28

18-AUG-07

22-AUG-07

Install Curtain Wall L31 W

032W080900 Install Curtain Wall L32 W

28

23-AUG-07

26-AUG-07

Install Curtain Wall L32 W

033W080900 Install Curtain Wall L33 W

28

28-AUG-07

31-AUG-07

Install Curtain Wall L33 W

034W080900 Install Curtain Wall L34 W

28

01-SEP-07

05-SEP-07

Install Curtain Wall L34 W

035W080900 Install Curtain Wall L35 W

28

06-SEP-07

09-SEP-07

Install Curtain Wall L35 W

036W080900 Install Curtain Wall L36 W

28

10-SEP-07

14-SEP-07

Install Curtain Wall L36 W

037W080900 Install Curtain Wall L37 W

28

15-SEP-07

18-SEP-07

Install Curtain Wall L37 W

038W080900 Install Curtain Wall L38 W

28

19-SEP-07

22-SEP-07

Install Curtain Wall L38 W

039W080900 Install Curtain Wall L39 W

28

23-SEP-07

27-SEP-07

Install Curtain Wall L39 W

040W080900 Install Curtain Wall L40 W

28

28-SEP-07

05-OCT-07

Install Curtain Wall L40 W

041W080900 Install Curtain Wall L41 W

28

06-OCT-07

14-OCT-07

Install Curtain Wall L41 W

042W080900 Install Curtain Wall L42 W

28

15-OCT-07

23-OCT-07

Install Curtain Wall L42 W

043W080900 Install Curtain Wall L43 W

28

25-OCT-07

27-OCT-07

Install Curtain Wall L43 W

044W080900 Install Curtain Wall L44 W

28

28-OCT-07

01-NOV-07

Install Curtain Wall L44 W

045W080900 Install Curtain Wall L45 W

28

02-NOV-07

04-NOV-07

Install Curtain Wall L45 W

046W080900 Install Curtain Wall L46 W

28

06-NOV-07

09-NOV-07

Install Curtain Wall L46 W

047W080900 Install Curtain Wall L47 W

28

10-NOV-07

13-NOV-07

Install Curtain Wall L47 W

048W080900 Install Curtain Wall L48 W

28

16-NOV-07

18-NOV-07

Install Curtain Wall L48 W

049W080900 Install Curtain Wall L49 W

90

20-NOV-07

23-NOV-07

Install Curtain Wall L49 W

050W080900 Install Curtain Wall L50 W

90

24-NOV-07

26-NOV-07

Install Curtain Wall L50 W

051W080900 Install Curtain Wall L51 W

90

27-NOV-07

30-NOV-07

Install Curtain Wall L51 W

052W080900 Install Curtain Wall L52 W

90

01-DEC-07

04-DEC-07

Install Curtain Wall L52 W

053W080900 Install Curtain Wall L53 W

90

05-DEC-07

07-DEC-07

Install Curtain Wall L53 W

054W080900 Install Curtain Wall L54 W

90

08-DEC-07

10-DEC-07

Install Curtain Wall L54 W

055W080900 Install Curtain Wall L55 W

90

11-DEC-07

13-DEC-07

Install Curtain Wall L55 W

056W080900 Install Curtain Wall L56 W

90

14-DEC-07

16-DEC-07

Install Curtain Wall L56 W

057W080900 Install Curtain Wall L57 W

90

17-DEC-07

19-DEC-07

Install Curtain Wall L57 W

058W080900 Install Curtain Wall L58 W

90

20-DEC-07

22-DEC-07

Install Curtain Wall L58 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Curtain Wall L20 W

Sheet 129 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

059W080900 Install Curtain Wall L59 W

90

23-DEC-07

25-DEC-07

Install Curtain Wall L59 W

060W080900 Install Curtain Wall L60 W

90

26-DEC-07

28-DEC-07

Install Curtain Wall L60 W

061W080900 Install Curtain Wall L61 W

90

29-DEC-07

02-JAN-08

Install Curtain Wall L61 W

062W080900 Install Curtain Wall L62 W

90

03-JAN-08

05-JAN-08

Install Curtain Wall L62 W

063W080900 Install Curtain Wall L63 W

90

06-JAN-08

08-JAN-08

Install Curtain Wall L63 W

064W080900 Install Curtain Wall L64 W

90

09-JAN-08

11-JAN-08

Install Curtain Wall L64 W

065W080900 Install Curtain Wall L65 W

90

12-JAN-08

14-JAN-08

Install Curtain Wall L65 W

066W080900 Install Curtain Wall L66 W

90

15-JAN-08

17-JAN-08

Install Curtain Wall L66 W

067W080900 Install Curtain Wall L67 W

90

18-JAN-08

20-JAN-08

Install Curtain Wall L67 W

068W080900 Install Curtain Wall L68 W

90

21-JAN-08

23-JAN-08

Install Curtain Wall L68 W

069W080900 Install Curtain Wall L69 W

90

24-JAN-08

26-JAN-08

Install Curtain Wall L69 W

070W080900 Install Curtain Wall L70 W

90

27-JAN-08

29-JAN-08

Install Curtain Wall L70 W

071W080900 Install Curtain Wall L71 W

90

30-JAN-08

04-FEB-08

Install Curtain Wall L71 W

072W080900 Install Curtain Wall L72 W

90

05-FEB-08

07-FEB-08

Install Curtain Wall L72 W

073W080900 Install Curtain Wall L73 W

90

08-FEB-08

13-FEB-08

Install Curtain Wall L73 W

074W080900 Install Curtain Wall L74 W

90

14-FEB-08

19-FEB-08

Install Curtain Wall L74 W

075W080900 Install Curtain Wall L75 W

90

20-FEB-08

26-FEB-08

Install Curtain Wall L75 W

076W080900 Install Curtain Wall L76 W

90

27-FEB-08

03-MAR-08

Install Curtain Wall L76 W

077W080900 Install Curtain Wall L77 W

90

04-MAR-08

09-MAR-08

078W080900 Install Curtain Wall L78 W - Start

60

08-OCT-07

15-OCT-07

Install Curtain Wall L78 W - Start

079W080900 Install Curtain Wall L79 W

60

16-OCT-07

19-OCT-07

Install Curtain Wall L79 W

080W080900 Install Curtain Wall L80 W

60

20-OCT-07

25-OCT-07

Install Curtain Wall L80 W

081W080900 Install Curtain Wall L81 W

60

26-OCT-07

30-OCT-07

Install Curtain Wall L81 W

082W080900 Install Curtain Wall L82 W

60

01-NOV-07

03-NOV-07

Install Curtain Wall L82 W

083W080900 Install Curtain Wall L83 W

60

04-NOV-07

08-NOV-07

Install Curtain Wall L83 W

084W080900 Install Curtain Wall L84 W

60

09-NOV-07

11-NOV-07

Install Curtain Wall L84 W

085W080900 Install Curtain Wall L85 W

60

13-NOV-07

17-NOV-07

Install Curtain Wall L85 W

086W080900 Install Curtain Wall L86 W

60

18-NOV-07

22-NOV-07

Install Curtain Wall L86 W

087W080900 Install Curtain Wall L87 W

60

23-NOV-07

25-NOV-07

Install Curtain Wall L87 W

088W080900 Install Curtain Wall L88 W

60

26-NOV-07

29-NOV-07

Install Curtain Wall L88 W

089W080900 Install Curtain Wall L89 W

92

30-NOV-07

03-DEC-07

Install Curtain Wall L89 W

090W080900 Install Curtain Wall L90 W

92

04-DEC-07

06-DEC-07

Install Curtain Wall L90 W

091W080900 Install Curtain Wall L91 W

92

07-DEC-07

09-DEC-07

Install Curtain Wall L91 W

092W080900 Install Curtain Wall L92 W

92

10-DEC-07

12-DEC-07

Install Curtain Wall L92 W

093W080900 Install Curtain Wall L93 W

92

13-DEC-07

15-DEC-07

Install Curtain Wall L93 W

094W080900 Install Curtain Wall L94 W

92

16-DEC-07

18-DEC-07

Install Curtain Wall L94 W

095W080900 Install Curtain Wall L95 W

92

19-DEC-07

21-DEC-07

Install Curtain Wall L95 W

096W080900 Install Curtain Wall L96 W

92

22-DEC-07

24-DEC-07

Install Curtain Wall L96 W

097W080900 Install Curtain Wall L97 W

92

25-DEC-07

27-DEC-07

Install Curtain Wall L97 W

098W080900 Install Curtain Wall L98 W

92

28-DEC-07

30-DEC-07

Install Curtain Wall L98 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall L77 W

Sheet 130 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

099W080900 Install Curtain Wall L99 W

92

02-JAN-08

04-JAN-08

Install Curtain Wall L99 W

100W080900 Install Curtain Wall L100 W

92

05-JAN-08

07-JAN-08

Install Curtain Wall L100 W

101W080900 Install Curtain Wall L101 W

92

08-JAN-08

10-JAN-08

Install Curtain Wall L101 W

102W080900 Install Curtain Wall L102 W

92

11-JAN-08

13-JAN-08

Install Curtain Wall L102 W

103W080900 Install Curtain Wall L103 W

92

14-JAN-08

16-JAN-08

Install Curtain Wall L103 W

104W080900 Install Curtain Wall L104 W

92

17-JAN-08

19-JAN-08

Install Curtain Wall L104 W

105W080900 Install Curtain Wall L105 W

92

20-JAN-08

22-JAN-08

Install Curtain Wall L105 W

106W080900 Install Curtain Wall L106 W

92

23-JAN-08

25-JAN-08

Install Curtain Wall L106 W

107W080900 Install Curtain Wall L107 W

92

26-JAN-08

28-JAN-08

Install Curtain Wall L107 W

108W080900 Install Curtain Wall L108 W

92

29-JAN-08

03-FEB-08

Install Curtain Wall L108 W

109W080900 Install Curtain Wall L109 W

92

04-FEB-08

07-FEB-08

Install Curtain Wall L109 W

110W080900 Install Curtain Wall L110 W

92

08-FEB-08

11-FEB-08

Install Curtain Wall L110 W

111W080900 Install Curtain Wall L111 W

92

12-FEB-08

15-FEB-08

Install Curtain Wall L111 W

112W080900 Install Curtain Wall L112 W

92

16-FEB-08

19-FEB-08

Install Curtain Wall L112 W

113W080900 Install Curtain Wall L113 W

93

20-FEB-08

24-FEB-08

Install Curtain Wall L113 W

114W080900 Install Curtain Wall L114 W - Start

151

10-NOV-07

20-NOV-07

Install Curtain Wall L114 W - Start

115W080900 Install Curtain Wall L115 W

151

22-NOV-07

25-NOV-07

Install Curtain Wall L115 W

116W080900 Install Curtain Wall L116 W

151

26-NOV-07

30-NOV-07

Install Curtain Wall L116 W

117W080900 Install Curtain Wall L117 W

151

01-DEC-07

05-DEC-07

Install Curtain Wall L117 W

118W080900 Install Curtain Wall L118 W

151

06-DEC-07

08-DEC-07

Install Curtain Wall L118 W

119W080900 Install Curtain Wall L119 W

151

09-DEC-07

11-DEC-07

Install Curtain Wall L119 W

120W080900 Install Curtain Wall L120 W

151

12-DEC-07

14-DEC-07

Install Curtain Wall L120 W

121W080900 Install Curtain Wall L121 W

151

15-DEC-07

17-DEC-07

Install Curtain Wall L121 W

122W080900 Install Curtain Wall L122 W

151

18-DEC-07

20-DEC-07

Install Curtain Wall L122 W

123W080900 Install Curtain Wall L123 W

151

21-DEC-07

23-DEC-07

Install Curtain Wall L123 W

124W080900 Install Curtain Wall L124 W

151

24-DEC-07

26-DEC-07

Install Curtain Wall L124 W

125W080900 Install Curtain Wall L125 W

151

27-DEC-07

29-DEC-07

Install Curtain Wall L125 W

126W080900 Install Curtain Wall L126 W

151

30-DEC-07

03-JAN-08

Install Curtain Wall L126 W

127W080900 Install Curtain Wall L127 W

151

04-JAN-08

06-JAN-08

Install Curtain Wall L127 W

128W080900 Install Curtain Wall L128 W

151

07-JAN-08

09-JAN-08

Install Curtain Wall L128 W

129W080900 Install Curtain Wall L129 W

151

10-JAN-08

12-JAN-08

Install Curtain Wall L129 W

130W080900 Install Curtain Wall L130 W

151

13-JAN-08

15-JAN-08

Install Curtain Wall L130 W

131W080900 Install Curtain Wall L131 W

151

16-JAN-08

18-JAN-08

Install Curtain Wall L131 W

132W080900 Install Curtain Wall L132 W

151

19-JAN-08

21-JAN-08

Install Curtain Wall L132 W

133W080900 Install Curtain Wall L133 W

151

22-JAN-08

24-JAN-08

Install Curtain Wall L133 W

134W080900 Install Curtain Wall L134 W

151

25-JAN-08

27-JAN-08

Install Curtain Wall L134 W

135W080900 Install Curtain Wall L135 W

151

28-JAN-08

30-JAN-08

Install Curtain Wall L135 W

136W080900 Install Curtain Wall L136 W

151

03-FEB-08

07-FEB-08

Install Curtain Wall L136 W

137W080900 Install Curtain Wall L137 W

151

08-FEB-08

12-FEB-08

Install Curtain Wall L137 W

138W080900 Install Curtain Wall L138 W

151

13-FEB-08

17-FEB-08

Install Curtain Wall L138 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 131 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

139W080900 Install Curtain Wall L139 W

151

18-FEB-08

20-FEB-08

Install Curtain Wall L139 W

140W080900 Install Curtain Wall L140 W

152

22-FEB-08

24-FEB-08

Install Curtain Wall L140 W

141W080900 Install Curtain Wall L141 W

152

25-FEB-08

27-FEB-08

Install Curtain Wall L141 W

142W080900 Install Curtain Wall L142 W

152

28-FEB-08

01-MAR-08

Install Curtain Wall L142 W

143W080900 Install Curtain Wall L143 W

152

02-MAR-08

04-MAR-08

Install Curtain Wall L143 W

GENERAL
SUMG900360 Install Curtain Wall -Hotel (L5~L42)

131*

52

15-JUN-07

23-OCT-07

SUMG900370 Install Curtain Wall -Resi. Apt. (L43~L75)

134*

98

16-OCT-07

26-FEB-08

SUMG900380 Install Curtain Wall -Lux. Apt. (L76~L111)

0*

96

19-FEB-08

18-FEB-08

Install Curtain Wall -Lux. Apt. (L76~L111)

SUMG900390 Install Curtain Wall -B. Office (L112~L154)

53*

170

09-FEB-08

01-APR-08

Install Curtain Wall -B. Office (L112~L154)

SUMG900400 Install Curtain Wall -Communication (L155~L160

153*

104

02-APR-08

01-SEP-08

Install Curtain Wall -Communication (L155~L160

0*

120

02-SEP-08

01-SEP-08

SUMG900420 Install Curtain Wall -Leave Out (L5~L100)

115*

40

15-MAY-08

06-SEP-08

SUMG900430 Install Curtain Wall -Leave Out (L100~SP2)

174*

23

31-AUG-08

20-FEB-09

SUMG900440 Install BMU Systems

263*

259

12-AUG-07

30-APR-08

042G080910 Install Curtain Wall - Leave Out (L1-L42)

40

15-MAY-08

28-JUN-08

076G080910 Install Curtain Wall - Leave Out (L43-76)

30

30

29-JUN-08

02-AUG-08

100G080910 Install Curtain Wall - Leave Out (L76-112)

30

35

03-AUG-08

06-SEP-08

Install Curtain Wall - Leave Out (L76-112)

142G080910 Install Curtain Wall - Leave Out (L112-138)

40

15

31-AUG-08

14-OCT-08

Install Curtain Wall - Leave Out (L112-138)

142G08091A Install Curtain Wall - Leave Out (L139-160M)

35

28

16-OCT-08

01-DEC-08

SP3G080910 Install Curtain Wall - Leave Out (Spire)

40

21

09-JAN-09

20-FEB-09

100G080950 Washdown Curtain Wall (L5-100)

120

45

07-SEP-08

24-JAN-09

Washdown Curtain Wall (L5-100)

142G080950 Washdown Curtain Wall (L101-142)

60

111

31-AUG-08

09-NOV-08

Washdown Curtain Wall (L101-142)

161G080950 Washdown Curtain Wall (L143-SP3)

45

51

03-DEC-08

18-JAN-09

042G081010 Install BMU Rail Substructure L40

30

228

12-AUG-07

14-SEP-07

042G081020 Install BMU Rail L40

30

228

15-SEP-07

16-OCT-07

042G081030 Install BMU Gates L40

30

228

17-OCT-07

26-NOV-07

042G081040 Install BMU Machine L40

30

228

27-NOV-07

28-DEC-07

Install BMU Machine L40

073G081050 Install BMU Rail Substructure L73

30

247

15-SEP-07

16-OCT-07

Install BMU Rail Substructure L73

073G081060 Install BMU Rail L73

30

247

17-OCT-07

26-NOV-07

073G081070 Install BMU Gates L73

30

247

27-NOV-07

28-DEC-07

073G081080 Install BMU Machine L73

30

247

29-DEC-07

29-JAN-08

109G081090 Install BMU Rail Substructure L109

30

247

17-OCT-07

26-NOV-07

109G081100 Install BMU Rail L109

30

247

27-NOV-07

28-DEC-07

109G081110 Install BMU Gates L109

30

247

29-DEC-07

29-JAN-08

109G081120 Install BMU Machine L109

30

247

30-JAN-08

03-MAR-08

SUMG900410 Install Curtain Wall -Spire (Roof~Top of Final)

K
SP3K08091A Install C/Wall - Leave Out (154 ~ Tier 20)

40

-2

03-FEB-09

16-MAR-09

SP3K08092A Install C/Wall - 2 (Tier 24 ~ 26)

10

-3

08-SEP-08

19-SEP-08

SP3K08093A Install C/Wall - 2 (Tier 23 ~ 25)

10

-3

22-SEP-08

02-OCT-08

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Curtain Wall -Hotel (L5~L42)


Install Curtain Wall -Resi. Apt. (L43~L75)

Install Curtain Wall -Spire (Roof~Top of Final)


Install Curtain Wall -Leave Out (L5~L100)
Install Curtain Wall -Leave Out (L100~SP2)
Install BMU Systems
Install Curtain Wall - Leave Out (L1-L42)
Install Curtain Wall - Leave Out (L43-76)

Install Curtain Wall - Leave Out (L139-160M)


Install Curtain Wall - Leave Out (Spire)

Washdown Curtain Wall (L143-SP3)


Install BMU Rail Substructure L40
Install BMU Rail L40
Install BMU Gates L40

Install BMU Rail L73


Install BMU Gates L73
Install BMU Machine L73
Install BMU Rail Substructure L109
Install BMU Rail L109
Install BMU Gates L109
Install BMU Machine L109
Install C/Wall - Leave Out (154 ~ Tier 20)
Install C/Wall - 2 (Tier 24 ~ 26)
Install C/Wall - 2 (Tier 23 ~ 25)
Sheet 132 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

SP3K08094A Install C/Wall - Spire (2) (Tier 22 ~ 23)

14

-3

10-DEC-08

23-DEC-08

161K08113A Install BMU Rail Roof 3

20

108

13-JUL-08

04-AUG-08

SP1K081130 Install BMU Rail SP1

20

223

08-MAR-08

29-MAR-08
08-SEP-08

2005

2006

2007

2008

2009

Install C/Wall - Spire (2) (Tier 22 ~ 23)


Install BMU Rail Roof 3
Install BMU Rail SP1
Install BMU Machine Roof 3

161K081146 Install BMU Machine Roof 3

30

108

05-AUG-08

161K08114A Install BMU Rail Roof 1

20

155

21-MAY-08

11-JUN-08

Install BMU Rail Roof 1

SP1K081140 Install BMU Machine SP1

30

223

30-MAR-08

30-APR-08

Install BMU Machine SP1

161K08115A Install BMU Rail Roof 2

20

116

04-JUL-08

25-JUL-08

161K08116A Install BMU Machine Roof 1

30

155

12-JUN-08

16-JUL-08

161K08117A Install BMU Machine Roof 2

30

116

26-JUL-08

30-AUG-08

GENERAL
-01G080100 Install Steel Door Frame B2 C

21

51

30-MAY-07

23-JUN-07

Install Steel Door Frame B2 C

-02G080100 Install Steel Door Frame B1 C

21

58

07-JUN-07

01-JUL-07

Install Steel Door Frame B1 C

-03G080100 Install Steel Door Frame Concourse C

21

65

16-JUN-07

09-JUL-07

Install Steel Door Frame Concourse C

-04G080100 Install Steel Door Frame Ground C

21

84

24-JUN-07

17-JUL-07

Install Steel Door Frame Ground C

001G080100 Install Steel Door Frame L1 C

14

98

02-JUL-07

17-JUL-07

Install Steel Door Frame L1 C

002G080100 Install Steel Door Frame L2 C

14

105

10-JUL-07

25-JUL-07

Install Steel Door Frame L2 C

003G080100 Install Steel Door Frame L3 C

14

112

18-JUL-07

02-AUG-07

Install Steel Door Frame L3 C

004G080100 Install Steel Door Frame L4 C

14

182

26-JUL-07

11-AUG-07

005G080100 Install Steel Door Frame L5 C

239

30-MAY-07

06-JUN-07

Install Steel Door Frame L5 C

006G080100 Install Steel Door Frame L6 C

239

04-JUN-07

11-JUN-07

Install Steel Door Frame L6 C

007G080100 Install Steel Door Frame L7 C

239

09-JUN-07

16-JUN-07

Install Steel Door Frame L7 C

008G080100 Install Steel Door Frame L8 C

239

13-JUN-07

20-JUN-07

Install Steel Door Frame L8 C

009G080100 Install Steel Door Frame L9 C

239

18-JUN-07

25-JUN-07

Install Steel Door Frame L9 C

010G080100 Install Steel Door Frame L10 C

239

23-JUN-07

30-JUN-07

Install Steel Door Frame L10 C

011G080100 Install Steel Door Frame L11 C

239

27-JUN-07

04-JUL-07

Install Steel Door Frame L11 C

012G080100 Install Steel Door Frame L12 C

239

02-JUL-07

09-JUL-07

Install Steel Door Frame L12 C

013G080100 Install Steel Door Frame L13 C

239

07-JUL-07

14-JUL-07

Install Steel Door Frame L13 C

014G080100 Install Steel Door Frame L14 C

239

11-JUL-07

18-JUL-07

Install Steel Door Frame L14 C

015G080100 Install Steel Door Frame L15 C

239

16-JUL-07

23-JUL-07

Install Steel Door Frame L15 C

016G080100 Install Steel Door Frame L16 C

239

21-JUL-07

28-JUL-07

Install Steel Door Frame L16 C

017G080100 Install Steel Door Frame L17 C

21

239

25-JUL-07

18-AUG-07

018G080100 Install Steel Door Frame L18 C

21

239

25-JUL-07

18-AUG-07

019G080100 Install Steel Door Frame L19 C

195

30-MAY-07

06-JUN-07

Install Steel Door Frame L19 C

020G080100 Install Steel Door Frame L20 C

195

04-JUN-07

11-JUN-07

Install Steel Door Frame L20 C

021G080100 Install Steel Door Frame L21 C

195

09-JUN-07

16-JUN-07

Install Steel Door Frame L21 C

022G080100 Install Steel Door Frame L22 C

195

13-JUN-07

20-JUN-07

Install Steel Door Frame L22 C

023G080100 Install Steel Door Frame L23 C

195

18-JUN-07

25-JUN-07

Install Steel Door Frame L23 C

024G080100 Install Steel Door Frame L24 C

195

23-JUN-07

30-JUN-07

Install Steel Door Frame L24 C

025G080100 Install Steel Door Frame L25 C

195

27-JUN-07

04-JUL-07

Install Steel Door Frame L25 C

Install BMU Rail Roof 2


Install BMU Machine Roof 1
Install BMU Machine Roof 2

DOOR FRAME & SHUTTER (BACK OF HOUSE)

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Steel Door Frame L4 C

Install Steel Door Frame L17 C


Install Steel Door Frame L18 C

Sheet 133 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

026G080100 Install Steel Door Frame L26 C

195

02-JUL-07

09-JUL-07

Install Steel Door Frame L26 C

027G080100 Install Steel Door Frame L27 C

195

07-JUL-07

14-JUL-07

Install Steel Door Frame L27 C

028G080100 Install Steel Door Frame L28 C

195

11-JUL-07

18-JUL-07

Install Steel Door Frame L28 C

029G080100 Install Steel Door Frame L29 C

195

16-JUL-07

23-JUL-07

Install Steel Door Frame L29 C

030G080100 Install Steel Door Frame L30 C

195

21-JUL-07

28-JUL-07

Install Steel Door Frame L30 C

031G080100 Install Steel Door Frame L31 C

195

25-JUL-07

01-AUG-07

Install Steel Door Frame L31 C

032G080100 Install Steel Door Frame L32 C

195

30-JUL-07

06-AUG-07

Install Steel Door Frame L32 C

033G080100 Install Steel Door Frame L33 C

195

04-AUG-07

11-AUG-07

Install Steel Door Frame L33 C

034G080100 Install Steel Door Frame L34 C

195

08-AUG-07

15-AUG-07

Install Steel Door Frame L34 C

035G080100 Install Steel Door Frame L35 C

195

13-AUG-07

20-AUG-07

Install Steel Door Frame L35 C

036G080100 Install Steel Door Frame L36 C

195

18-AUG-07

25-AUG-07

Install Steel Door Frame L36 C

037G080100 Install Steel Door Frame L37 C

195

22-AUG-07

29-AUG-07

Install Steel Door Frame L37 C

038G080100 Install Steel Door Frame L38 C

195

27-AUG-07

03-SEP-07

Install Steel Door Frame L38 C

039G080100 Install Steel Door Frame L39 C

195

01-SEP-07

08-SEP-07

Install Steel Door Frame L39 C

040G080100 Install Steel Door Frame L40 C

21

195

05-SEP-07

29-SEP-07

Install Steel Door Frame L40 C

041G080100 Install Steel Door Frame L41 C

21

312

10-SEP-07

03-OCT-07

Install Steel Door Frame L41 C

042G080100 Install Steel Door Frame L42 C

21

315

15-SEP-07

08-OCT-07

043G080100 Install Steel Door Frame L43 C

278

30-MAY-07

04-JUN-07

Install Steel Door Frame L43 C

044G080100 Install Steel Door Frame L44 C

278

02-JUN-07

06-JUN-07

Install Steel Door Frame L44 C

045G080100 Install Steel Door Frame L45 C

278

04-JUN-07

09-JUN-07

Install Steel Door Frame L45 C

046G080100 Install Steel Door Frame L46 C

278

06-JUN-07

11-JUN-07

Install Steel Door Frame L46 C

047G080100 Install Steel Door Frame L47 C

278

09-JUN-07

13-JUN-07

Install Steel Door Frame L47 C

048G080100 Install Steel Door Frame L48 C

278

11-JUN-07

16-JUN-07

Install Steel Door Frame L48 C

049G080100 Install Steel Door Frame L49 C

278

13-JUN-07

18-JUN-07

Install Steel Door Frame L49 C

050G080100 Install Steel Door Frame L50 C

278

16-JUN-07

20-JUN-07

Install Steel Door Frame L50 C

051G080100 Install Steel Door Frame L51 C

278

18-JUN-07

23-JUN-07

Install Steel Door Frame L51 C

052G080100 Install Steel Door Frame L52 C

278

20-JUN-07

25-JUN-07

Install Steel Door Frame L52 C

053G080100 Install Steel Door Frame L53 C

278

23-JUN-07

27-JUN-07

Install Steel Door Frame L53 C

054G080100 Install Steel Door Frame L54 C

278

25-JUN-07

30-JUN-07

Install Steel Door Frame L54 C

055G080100 Install Steel Door Frame L55 C

278

27-JUN-07

02-JUL-07

Install Steel Door Frame L55 C

056G080100 Install Steel Door Frame L56 C

278

30-JUN-07

04-JUL-07

Install Steel Door Frame L56 C

057G080100 Install Steel Door Frame L57 C

278

02-JUL-07

07-JUL-07

Install Steel Door Frame L57 C

058G080100 Install Steel Door Frame L58 C

278

04-JUL-07

09-JUL-07

Install Steel Door Frame L58 C

059G080100 Install Steel Door Frame L59 C

278

07-JUL-07

11-JUL-07

Install Steel Door Frame L59 C

060G080100 Install Steel Door Frame L60 C

278

09-JUL-07

14-JUL-07

Install Steel Door Frame L60 C

061G080100 Install Steel Door Frame L61 C

278

11-JUL-07

16-JUL-07

Install Steel Door Frame L61 C

062G080100 Install Steel Door Frame L62 C

278

14-JUL-07

18-JUL-07

Install Steel Door Frame L62 C

063G080100 Install Steel Door Frame L63 C

278

16-JUL-07

21-JUL-07

Install Steel Door Frame L63 C

064G080100 Install Steel Door Frame L64 C

278

18-JUL-07

23-JUL-07

Install Steel Door Frame L64 C

065G080100 Install Steel Door Frame L65 C

278

21-JUL-07

25-JUL-07

Install Steel Door Frame L65 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Steel Door Frame L42 C

Sheet 134 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

066G080100 Install Steel Door Frame L66 C

278

23-JUL-07

28-JUL-07

Install Steel Door Frame L66 C

067G080100 Install Steel Door Frame L67 C

278

25-JUL-07

30-JUL-07

Install Steel Door Frame L67 C

068G080100 Install Steel Door Frame L68 C

278

28-JUL-07

01-AUG-07

Install Steel Door Frame L68 C

069G080100 Install Steel Door Frame L69 C

278

30-JUL-07

04-AUG-07

Install Steel Door Frame L69 C

070G080100 Install Steel Door Frame L70 C

278

01-AUG-07

06-AUG-07

Install Steel Door Frame L70 C

071G080100 Install Steel Door Frame L71 C

278

04-AUG-07

08-AUG-07

Install Steel Door Frame L71 C

072G080100 Install Steel Door Frame L72 C

278

06-AUG-07

11-AUG-07

Install Steel Door Frame L72 C

073G080100 Install Steel Door Frame L73 C

21

278

08-AUG-07

01-SEP-07

Install Steel Door Frame L73 C

074G080100 Install Steel Door Frame L74 C

21

278

08-AUG-07

01-SEP-07

Install Steel Door Frame L74 C

075G080100 Install Steel Door Frame L75 C

21

278

13-AUG-07

05-SEP-07

076G080100 Install Steel Door Frame L76 C

345

28-JUN-07

03-JUL-07

Install Steel Door Frame L76 C

077G080100 Install Steel Door Frame L77 C

347

01-JUL-07

05-JUL-07

Install Steel Door Frame L77 C

078G080100 Install Steel Door Frame L78 C

349

03-JUL-07

08-JUL-07

Install Steel Door Frame L78 C

079G080100 Install Steel Door Frame L79 C

351

05-JUL-07

10-JUL-07

Install Steel Door Frame L79 C

080G080100 Install Steel Door Frame L80 C

353

08-JUL-07

12-JUL-07

Install Steel Door Frame L80 C

081G080100 Install Steel Door Frame L81 C

355

10-JUL-07

15-JUL-07

Install Steel Door Frame L81 C

082G080100 Install Steel Door Frame L82 C

357

12-JUL-07

17-JUL-07

Install Steel Door Frame L82 C

083G080100 Install Steel Door Frame L83 C

359

15-JUL-07

19-JUL-07

Install Steel Door Frame L83 C

084G080100 Install Steel Door Frame L84 C

361

17-JUL-07

22-JUL-07

Install Steel Door Frame L84 C

085G080100 Install Steel Door Frame L85 C

363

19-JUL-07

24-JUL-07

Install Steel Door Frame L85 C

086G080100 Install Steel Door Frame L86 C

365

22-JUL-07

26-JUL-07

Install Steel Door Frame L86 C

087G080100 Install Steel Door Frame L87 C

367

24-JUL-07

29-JUL-07

Install Steel Door Frame L87 C

088G080100 Install Steel Door Frame L88 C

369

26-JUL-07

31-JUL-07

Install Steel Door Frame L88 C

089G080100 Install Steel Door Frame L89 C

371

29-JUL-07

02-AUG-07

Install Steel Door Frame L89 C

090G080100 Install Steel Door Frame L90 C

373

31-JUL-07

05-AUG-07

Install Steel Door Frame L90 C

091G080100 Install Steel Door Frame L91 C

375

02-AUG-07

07-AUG-07

Install Steel Door Frame L91 C

092G080100 Install Steel Door Frame L92 C

377

05-AUG-07

09-AUG-07

Install Steel Door Frame L92 C

093G080100 Install Steel Door Frame L93 C

379

07-AUG-07

12-AUG-07

Install Steel Door Frame L93 C

094G080100 Install Steel Door Frame L94 C

381

09-AUG-07

14-AUG-07

Install Steel Door Frame L94 C

095G080100 Install Steel Door Frame L95 C

383

12-AUG-07

16-AUG-07

Install Steel Door Frame L95 C

096G080100 Install Steel Door Frame L96 C

385

14-AUG-07

19-AUG-07

Install Steel Door Frame L96 C

097G080100 Install Steel Door Frame L97 C

387

16-AUG-07

21-AUG-07

Install Steel Door Frame L97 C

098G080100 Install Steel Door Frame L98 C

389

19-AUG-07

23-AUG-07

Install Steel Door Frame L98 C

099G080100 Install Steel Door Frame L99 C

391

21-AUG-07

26-AUG-07

Install Steel Door Frame L99 C

100G080100 Install Steel Door Frame L100 C

393

23-AUG-07

28-AUG-07

Install Steel Door Frame L100 C

101G080100 Install Steel Door Frame L101 C

395

26-AUG-07

30-AUG-07

Install Steel Door Frame L101 C

102G080100 Install Steel Door Frame L102 C

397

28-AUG-07

02-SEP-07

Install Steel Door Frame L102 C

103G080100 Install Steel Door Frame L103 C

399

30-AUG-07

04-SEP-07

Install Steel Door Frame L103 C

104G080100 Install Steel Door Frame L104 C

401

02-SEP-07

06-SEP-07

Install Steel Door Frame L104 C

105G080100 Install Steel Door Frame L105 C

403

04-SEP-07

09-SEP-07

Install Steel Door Frame L105 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Steel Door Frame L75 C

Sheet 135 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

106G080100 Install Steel Door Frame L106 C

405

06-SEP-07

11-SEP-07

Install Steel Door Frame L106 C

107G080100 Install Steel Door Frame L107 C

407

09-SEP-07

13-SEP-07

Install Steel Door Frame L107 C

108G080100 Install Steel Door Frame L108 C

411

11-SEP-07

16-SEP-07

Install Steel Door Frame L108 C

109G080100 Install Steel Door Frame L109 C

21

411

13-SEP-07

07-OCT-07

Install Steel Door Frame L109 C

110G080100 Install Steel Door Frame L110 C

21

409

16-SEP-07

09-OCT-07

Install Steel Door Frame L110 C

111G080100 Install Steel Door Frame L111 C

21

407

18-SEP-07

11-OCT-07

112G080100 Install Steel Door Frame L112 C

208

20-SEP-07

24-SEP-07

Install Steel Door Frame L112 C

113G080100 Install Steel Door Frame L113 C

208

23-SEP-07

26-SEP-07

Install Steel Door Frame L113 C

114G080100 Install Steel Door Frame L114 C

208

25-SEP-07

29-SEP-07

Install Steel Door Frame L114 C

115G080100 Install Steel Door Frame L115 C

208

27-SEP-07

01-OCT-07

Install Steel Door Frame L115 C

116G080100 Install Steel Door Frame L116 C

208

30-SEP-07

03-OCT-07

Install Steel Door Frame L116 C

117G080100 Install Steel Door Frame L117 C

208

02-OCT-07

06-OCT-07

Install Steel Door Frame L117 C

118G080100 Install Steel Door Frame L118 C

208

04-OCT-07

08-OCT-07

Install Steel Door Frame L118 C

119G080100 Install Steel Door Frame L119 C

208

07-OCT-07

10-OCT-07

Install Steel Door Frame L119 C

120G080100 Install Steel Door Frame L120 C

208

09-OCT-07

13-OCT-07

Install Steel Door Frame L120 C

121G080100 Install Steel Door Frame L121 C

208

11-OCT-07

15-OCT-07

Install Steel Door Frame L121 C

122G080100 Install Steel Door Frame L122 C

208

14-OCT-07

17-OCT-07

Install Steel Door Frame L122 C

123G080100 Install Steel Door Frame L123 C

208

16-OCT-07

20-OCT-07

Install Steel Door Frame L123 C

124G080100 Install Steel Door Frame L124 C

208

18-OCT-07

22-OCT-07

Install Steel Door Frame L124 C

125G080100 Install Steel Door Frame L125 C

208

21-OCT-07

24-OCT-07

Install Steel Door Frame L125 C

126G080100 Install Steel Door Frame L126 C

208

23-OCT-07

27-OCT-07

Install Steel Door Frame L126 C

127G080100 Install Steel Door Frame L127 C

208

25-OCT-07

29-OCT-07

Install Steel Door Frame L127 C

128G080100 Install Steel Door Frame L128 C

208

28-OCT-07

31-OCT-07

Install Steel Door Frame L128 C

129G080100 Install Steel Door Frame L129 C

208

30-OCT-07

03-NOV-07

Install Steel Door Frame L129 C

130G080100 Install Steel Door Frame L130 C

208

01-NOV-07

05-NOV-07

Install Steel Door Frame L130 C

131G080100 Install Steel Door Frame L131 C

208

04-NOV-07

07-NOV-07

Install Steel Door Frame L131 C

132G080100 Install Steel Door Frame L132 C

208

06-NOV-07

10-NOV-07

Install Steel Door Frame L132 C

133G080100 Install Steel Door Frame L133 C

208

08-NOV-07

12-NOV-07

Install Steel Door Frame L133 C

134G080100 Install Steel Door Frame L134 C

208

11-NOV-07

14-NOV-07

Install Steel Door Frame L134 C

135G080100 Install Steel Door Frame L135 C

208

13-NOV-07

17-NOV-07

Install Steel Door Frame L135 C

136G080100 Install Steel Door Frame L136 C

21

300

15-NOV-07

09-DEC-07

Install Steel Door Frame L136 C

137G080100 Install Steel Door Frame L137 C

21

298

18-NOV-07

11-DEC-07

Install Steel Door Frame L137 C

138G080100 Install Steel Door Frame L138 C

21

286

02-DEC-07

25-DEC-07

139G080100 Install Steel Door Frame L139 C

201

08-DEC-07

11-DEC-07

Install Steel Door Frame L139 C

140G080100 Install Steel Door Frame L140 C

300

10-DEC-07

13-DEC-07

Install Steel Door Frame L140 C

141G080100 Install Steel Door Frame L141 C

300

12-DEC-07

16-DEC-07

Install Steel Door Frame L141 C

142G080100 Install Steel Door Frame L142 C

300

15-DEC-07

18-DEC-07

Install Steel Door Frame L142 C

143G080100 Install Steel Door Frame L143 C

300

17-DEC-07

20-DEC-07

Install Steel Door Frame L143 C

144G080100 Install Steel Door Frame L144 C

300

19-DEC-07

23-DEC-07

Install Steel Door Frame L144 C

145G080100 Install Steel Door Frame L145 C

300

22-DEC-07

25-DEC-07

Install Steel Door Frame L145 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Steel Door Frame L111 C

Install Steel Door Frame L138 C

Sheet 136 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

146G080100 Install Steel Door Frame L146 C

300

24-DEC-07

27-DEC-07

Install Steel Door Frame L146 C

147G080100 Install Steel Door Frame L147 C

300

26-DEC-07

30-DEC-07

Install Steel Door Frame L147 C

148G080100 Install Steel Door Frame L148 C

300

29-DEC-07

01-JAN-08

Install Steel Door Frame L148 C

149G080100 Install Steel Door Frame L149 C

300

31-DEC-07

03-JAN-08

Install Steel Door Frame L149 C

150G080100 Install Steel Door Frame L150 C

300

02-JAN-08

06-JAN-08

Install Steel Door Frame L150 C

151G080100 Install Steel Door Frame L151 C

300

05-JAN-08

08-JAN-08

Install Steel Door Frame L151 C

152G080100 Install Steel Door Frame L152 C

300

07-JAN-08

10-JAN-08

Install Steel Door Frame L152 C

153G080100 Install Steel Door Frame L153 C

300

09-JAN-08

13-JAN-08

Install Steel Door Frame L153 C

154G080100 Install Steel Door Frame L154 C

300

12-JAN-08

15-JAN-08

Install Steel Door Frame L154 C

155G080100 Install Steel Door Frame L155 C

21

310

14-JAN-08

06-FEB-08

156G080100 Install Steel Door Frame L156 C

21

308

16-JAN-08

09-FEB-08

157G080100 Install Steel Door Frame L157 C

308

19-JAN-08

22-JAN-08

Install Steel Door Frame L157 C

158G080100 Install Steel Door Frame L158 C

317

21-JAN-08

24-JAN-08

Install Steel Door Frame L158 C

159G080100 Install Steel Door Frame L159 C

317

23-JAN-08

27-JAN-08

Install Steel Door Frame L159 C

160G080100 Install Steel Door Frame L160 C

317

26-JAN-08

29-JAN-08

Install Steel Door Frame L160 C

161G080100 Install Steel Door Frame L160-M C

317

28-JAN-08

31-JAN-08

-01G080110 Install Steel Door Leaf & Hardware B2 C

21

202

10-JAN-08

03-FEB-08

-02G080110 Install Steel Door Leaf & Hardware B1 C

21

200

10-JAN-08

03-FEB-08

-03G080110 Install Steel Door Leaf & Hardware Concourse C

21

200

19-JAN-08

11-FEB-08

Install Steel Door Leaf & Hardware Concourse C

Install Steel Door Frame L155 C


Install Steel Door Frame L156 C

Install Steel Door Frame L160-M C


Install Steel Door Leaf & Hardware B2 C
Install Steel Door Leaf & Hardware B1 C

-04G080110 Install Steel Door Leaf & Hardware Ground C

21

200

27-JAN-08

18-FEB-08

Install Steel Door Leaf & Hardware Ground C

001G080110 Install Steel Door Leaf & Hardware L1 C

14

204

04-FEB-08

18-FEB-08

Install Steel Door Leaf & Hardware L1 C

002G080110 Install Steel Door Leaf & Hardware L2 C

14

264

01-DEC-07

16-DEC-07

003G080110 Install Steel Door Leaf & Hardware L3 C

14

207

10-FEB-08

24-FEB-08

Install Steel Door Leaf & Hardware L2 C


Install Steel Door Leaf & Hardware L3 C

004G080110 Install Steel Door Leaf & Hardware L4 C

14

241

06-JAN-08

21-JAN-08

005G080110 Install Steel Door Leaf & Hardware L5 C

220

23-JAN-08

30-JAN-08

Install Steel Door Leaf & Hardware L5 C

006G080110 Install Steel Door Leaf & Hardware L6 C

217

31-JAN-08

07-FEB-08

Install Steel Door Leaf & Hardware L6 C

007G080110 Install Steel Door Leaf & Hardware L7 C

218

04-FEB-08

11-FEB-08

Install Steel Door Leaf & Hardware L7 C

008G080110 Install Steel Door Leaf & Hardware L8 C

218

09-FEB-08

15-FEB-08

Install Steel Door Leaf & Hardware L8 C

009G080110 Install Steel Door Leaf & Hardware L9 C

218

13-FEB-08

19-FEB-08

Install Steel Door Leaf & Hardware L9 C

010G080110 Install Steel Door Leaf & Hardware L10 C

217

18-FEB-08

25-FEB-08

Install Steel Door Leaf & Hardware L10 C

011G080110 Install Steel Door Leaf & Hardware L11 C

217

23-FEB-08

01-MAR-08

Install Steel Door Leaf & Hardware L11 C

012G080110 Install Steel Door Leaf & Hardware L12 C

217

27-FEB-08

05-MAR-08

Install Steel Door Leaf & Hardware L12 C

013G080110 Install Steel Door Leaf & Hardware L13 C

217

03-MAR-08

10-MAR-08

Install Steel Door Leaf & Hardware L13 C

014G080110 Install Steel Door Leaf & Hardware L14 C

217

08-MAR-08

15-MAR-08

Install Steel Door Leaf & Hardware L14 C

015G080110 Install Steel Door Leaf & Hardware L15 C

217

12-MAR-08

19-MAR-08

Install Steel Door Leaf & Hardware L15 C

016G080110 Install Steel Door Leaf & Hardware L16 C

195

18-MAR-08

25-MAR-08

Install Steel Door Leaf & Hardware L16 C

017G080110 Install Steel Door Leaf & Hardware L17 C

21

192

26-MAR-08

19-APR-08

Install Steel Door Leaf & Hardware L17 C

018G080110 Install Steel Door Leaf & Hardware L18 C

21

192

03-APR-08

27-APR-08

019G080110 Install Steel Door Leaf & Hardware L19 C

132

17-FEB-08

24-FEB-08

Install Steel Door Leaf & Hardware L19 C

020G080110 Install Steel Door Leaf & Hardware L20 C

127

27-FEB-08

05-MAR-08

Install Steel Door Leaf & Hardware L20 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Steel Door Leaf & Hardware L4 C

Install Steel Door Leaf & Hardware L18 C

Sheet 137 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

021G080110 Install Steel Door Leaf & Hardware L21 C

251

11-OCT-07

18-OCT-07

Install Steel Door Leaf & Hardware L21 C

022G080110 Install Steel Door Leaf & Hardware L22 C

246

22-OCT-07

29-OCT-07

Install Steel Door Leaf & Hardware L22 C

023G080110 Install Steel Door Leaf & Hardware L23 C

239

04-NOV-07

11-NOV-07

Install Steel Door Leaf & Hardware L23 C

024G080110 Install Steel Door Leaf & Hardware L24 C

237

11-NOV-07

18-NOV-07

Install Steel Door Leaf & Hardware L24 C

025G080110 Install Steel Door Leaf & Hardware L25 C

235

18-NOV-07

25-NOV-07

Install Steel Door Leaf & Hardware L25 C

026G080110 Install Steel Door Leaf & Hardware L26 C

234

24-NOV-07

01-DEC-07

Install Steel Door Leaf & Hardware L26 C

027G080110 Install Steel Door Leaf & Hardware L27 C

233

29-NOV-07

06-DEC-07

028G080110 Install Steel Door Leaf & Hardware L28 C

232

05-DEC-07

12-DEC-07

Install Steel Door Leaf & Hardware L27 C


Install Steel Door Leaf & Hardware L28 C

029G080110 Install Steel Door Leaf & Hardware L29 C

232

10-DEC-07

17-DEC-07

Install Steel Door Leaf & Hardware L29 C

030G080110 Install Steel Door Leaf & Hardware L30 C

232

15-DEC-07

22-DEC-07

Install Steel Door Leaf & Hardware L30 C

031G080110 Install Steel Door Leaf & Hardware L31 C

231

20-DEC-07

27-DEC-07

Install Steel Door Leaf & Hardware L31 C

032G080110 Install Steel Door Leaf & Hardware L32 C

232

24-DEC-07

31-DEC-07

Install Steel Door Leaf & Hardware L32 C

033G080110 Install Steel Door Leaf & Hardware L33 C

232

29-DEC-07

05-JAN-08

Install Steel Door Leaf & Hardware L33 C

034G080110 Install Steel Door Leaf & Hardware L34 C

230

05-JAN-08

12-JAN-08

Install Steel Door Leaf & Hardware L34 C

035G080110 Install Steel Door Leaf & Hardware L35 C

231

08-JAN-08

15-JAN-08

Install Steel Door Leaf & Hardware L35 C

036G080110 Install Steel Door Leaf & Hardware L36 C

232

12-JAN-08

19-JAN-08

Install Steel Door Leaf & Hardware L36 C

037G080110 Install Steel Door Leaf & Hardware L37 C

232

16-JAN-08

23-JAN-08

Install Steel Door Leaf & Hardware L37 C

038G080110 Install Steel Door Leaf & Hardware L38 C

191

05-FEB-08

12-FEB-08

Install Steel Door Leaf & Hardware L38 C

039G080110 Install Steel Door Leaf & Hardware L39 C

191

10-FEB-08

16-FEB-08

Install Steel Door Leaf & Hardware L39 C

040G080110 Install Steel Door Leaf & Hardware L40 C

21

191

14-FEB-08

08-MAR-08

Install Steel Door Leaf & Hardware L40 C

041G080110 Install Steel Door Leaf & Hardware L41 C

21

191

21-FEB-08

16-MAR-08

Install Steel Door Leaf & Hardware L41 C

042G080110 Install Steel Door Leaf & Hardware L42 C

21

191

01-MAR-08

24-MAR-08

Install Steel Door Leaf & Hardware L42 C

043G080110 Install Steel Door Leaf & Hardware L43 C

170

15-MAR-08

19-MAR-08

Install Steel Door Leaf & Hardware L43 C

044G080110 Install Steel Door Leaf & Hardware L44 C

170

19-MAR-08

24-MAR-08

Install Steel Door Leaf & Hardware L44 C

045G080110 Install Steel Door Leaf & Hardware L45 C

170

24-MAR-08

29-MAR-08

Install Steel Door Leaf & Hardware L45 C

046G080110 Install Steel Door Leaf & Hardware L46 C

170

29-MAR-08

02-APR-08

Install Steel Door Leaf & Hardware L46 C

047G080110 Install Steel Door Leaf & Hardware L47 C

170

02-APR-08

07-APR-08

Install Steel Door Leaf & Hardware L47 C

048G080110 Install Steel Door Leaf & Hardware L48 C

154

26-APR-08

30-APR-08

Install Steel Door Leaf & Hardware L48 C

049G080110 Install Steel Door Leaf & Hardware L49 C

154

30-APR-08

05-MAY-08

Install Steel Door Leaf & Hardware L49 C

050G080110 Install Steel Door Leaf & Hardware L50 C

153

06-MAY-08

11-MAY-08

Install Steel Door Leaf & Hardware L50 C

051G080110 Install Steel Door Leaf & Hardware L51 C

153

11-MAY-08

15-MAY-08

Install Steel Door Leaf & Hardware L51 C

052G080110 Install Steel Door Leaf & Hardware L52 C

153

15-MAY-08

20-MAY-08

Install Steel Door Leaf & Hardware L52 C

053G080110 Install Steel Door Leaf & Hardware L53 C

153

20-MAY-08

25-MAY-08

Install Steel Door Leaf & Hardware L53 C

054G080110 Install Steel Door Leaf & Hardware L54 C

153

25-MAY-08

29-MAY-08

Install Steel Door Leaf & Hardware L54 C

055G080110 Install Steel Door Leaf & Hardware L55 C

153

29-MAY-08

03-JUN-08

Install Steel Door Leaf & Hardware L55 C

056G080110 Install Steel Door Leaf & Hardware L56 C

154

02-JUN-08

07-JUN-08

Install Steel Door Leaf & Hardware L56 C

057G080110 Install Steel Door Leaf & Hardware L57 C

154

07-JUN-08

11-JUN-08

Install Steel Door Leaf & Hardware L57 C

058G080110 Install Steel Door Leaf & Hardware L58 C

154

11-JUN-08

16-JUN-08

Install Steel Door Leaf & Hardware L58 C

059G080110 Install Steel Door Leaf & Hardware L59 C

154

16-JUN-08

21-JUN-08

Install Steel Door Leaf & Hardware L59 C

060G080110 Install Steel Door Leaf & Hardware L60 C

154

21-JUN-08

25-JUN-08

Install Steel Door Leaf & Hardware L60 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 138 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

061G080110 Install Steel Door Leaf & Hardware L61 C

154

25-JUN-08

30-JUN-08

Install Steel Door Leaf & Hardware L61 C

062G080110 Install Steel Door Leaf & Hardware L62 C

154

30-JUN-08

05-JUL-08

Install Steel Door Leaf & Hardware L62 C

063G080110 Install Steel Door Leaf & Hardware L63 C

154

05-JUL-08

09-JUL-08

Install Steel Door Leaf & Hardware L63 C

064G080110 Install Steel Door Leaf & Hardware L64 C

154

09-JUL-08

14-JUL-08

Install Steel Door Leaf & Hardware L64 C

065G080110 Install Steel Door Leaf & Hardware L65 C

154

14-JUL-08

19-JUL-08

Install Steel Door Leaf & Hardware L65 C

066G080110 Install Steel Door Leaf & Hardware L66 C

154

19-JUL-08

23-JUL-08

Install Steel Door Leaf & Hardware L66 C

067G080110 Install Steel Door Leaf & Hardware L67 C

154

23-JUL-08

28-JUL-08

Install Steel Door Leaf & Hardware L67 C

068G080110 Install Steel Door Leaf & Hardware L68 C

154

28-JUL-08

02-AUG-08

Install Steel Door Leaf & Hardware L68 C

069G080110 Install Steel Door Leaf & Hardware L69 C

154

02-AUG-08

06-AUG-08

Install Steel Door Leaf & Hardware L69 C

070G080110 Install Steel Door Leaf & Hardware L70 C

154

06-AUG-08

11-AUG-08

Install Steel Door Leaf & Hardware L70 C

071G080110 Install Steel Door Leaf & Hardware L71 C

154

11-AUG-08

16-AUG-08

Install Steel Door Leaf & Hardware L71 C

072G080110 Install Steel Door Leaf & Hardware L72 C

151

19-AUG-08

24-AUG-08

Install Steel Door Leaf & Hardware L72 C

073G080110 Install Steel Door Leaf & Hardware L73 C

21

249

27-AUG-08

20-SEP-08

Install Steel Door Leaf & Hardware L73 C

074G080110 Install Steel Door Leaf & Hardware L74 C

21

249

04-SEP-08

28-SEP-08

Install Steel Door Leaf & Hardware L74 C

075G080110 Install Steel Door Leaf & Hardware L75 C

21

249

13-SEP-08

06-OCT-08

076G080110 Install Steel Door Leaf & Hardware L76 C

28

30-JUL-08

04-AUG-08

077G080110 Install Steel Door Leaf & Hardware L77 C

28

04-AUG-08

09-AUG-08

078G080110 Install Steel Door Leaf & Hardware L78 C

164

03-MAR-08

08-MAR-08

Install Steel Door Leaf & Hardware L78 C

079G080110 Install Steel Door Leaf & Hardware L79 C

164

08-MAR-08

12-MAR-08

Install Steel Door Leaf & Hardware L79 C

080G080110 Install Steel Door Leaf & Hardware L80 C

164

12-MAR-08

17-MAR-08

Install Steel Door Leaf & Hardware L80 C

081G080110 Install Steel Door Leaf & Hardware L81 C

164

17-MAR-08

22-MAR-08

Install Steel Door Leaf & Hardware L81 C

082G080110 Install Steel Door Leaf & Hardware L82 C

164

22-MAR-08

26-MAR-08

Install Steel Door Leaf & Hardware L82 C

083G080110 Install Steel Door Leaf & Hardware L83 C

164

26-MAR-08

31-MAR-08

Install Steel Door Leaf & Hardware L83 C

084G080110 Install Steel Door Leaf & Hardware L84 C

164

31-MAR-08

05-APR-08

Install Steel Door Leaf & Hardware L84 C

085G080110 Install Steel Door Leaf & Hardware L85 C

164

05-APR-08

09-APR-08

Install Steel Door Leaf & Hardware L85 C

086G080110 Install Steel Door Leaf & Hardware L86 C

164

09-APR-08

14-APR-08

Install Steel Door Leaf & Hardware L86 C

087G080110 Install Steel Door Leaf & Hardware L87 C

164

14-APR-08

19-APR-08

Install Steel Door Leaf & Hardware L87 C

088G080110 Install Steel Door Leaf & Hardware L88 C

146

10-MAY-08

14-MAY-08

Install Steel Door Leaf & Hardware L88 C

089G080110 Install Steel Door Leaf & Hardware L89 C

147

13-MAY-08

18-MAY-08

Install Steel Door Leaf & Hardware L89 C

090G080110 Install Steel Door Leaf & Hardware L90 C

148

17-MAY-08

21-MAY-08

Install Steel Door Leaf & Hardware L90 C

091G080110 Install Steel Door Leaf & Hardware L91 C

149

20-MAY-08

25-MAY-08

Install Steel Door Leaf & Hardware L91 C

092G080110 Install Steel Door Leaf & Hardware L92 C

150

24-MAY-08

28-MAY-08

Install Steel Door Leaf & Hardware L92 C

093G080110 Install Steel Door Leaf & Hardware L93 C

151

27-MAY-08

01-JUN-08

Install Steel Door Leaf & Hardware L93 C

094G080110 Install Steel Door Leaf & Hardware L94 C

152

31-MAY-08

04-JUN-08

Install Steel Door Leaf & Hardware L94 C

095G080110 Install Steel Door Leaf & Hardware L95 C

154

02-JUN-08

07-JUN-08

Install Steel Door Leaf & Hardware L95 C

096G080110 Install Steel Door Leaf & Hardware L96 C

155

05-JUN-08

10-JUN-08

Install Steel Door Leaf & Hardware L96 C

097G080110 Install Steel Door Leaf & Hardware L97 C

156

09-JUN-08

14-JUN-08

Install Steel Door Leaf & Hardware L97 C

098G080110 Install Steel Door Leaf & Hardware L98 C

157

12-JUN-08

17-JUN-08

Install Steel Door Leaf & Hardware L98 C

099G080110 Install Steel Door Leaf & Hardware L99 C

159

15-JUN-08

19-JUN-08

Install Steel Door Leaf & Hardware L99 C

100G080110 Install Steel Door Leaf & Hardware L100 C

160

18-JUN-08

23-JUN-08

Install Steel Door Leaf & Hardware L100 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Steel Door Leaf & Hardware L75 C


Install Steel Door Leaf & Hardware L76 C
Install Steel Door Leaf & Hardware L77 C

Sheet 139 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

101G080110 Install Steel Door Leaf & Hardware L101 C

161

22-JUN-08

26-JUN-08

Install Steel Door Leaf & Hardware L101 C

102G080110 Install Steel Door Leaf & Hardware L102 C

162

25-JUN-08

30-JUN-08

Install Steel Door Leaf & Hardware L102 C

103G080110 Install Steel Door Leaf & Hardware L103 C

163

29-JUN-08

03-JUL-08

Install Steel Door Leaf & Hardware L103 C

104G080110 Install Steel Door Leaf & Hardware L104 C

164

02-JUL-08

07-JUL-08

Install Steel Door Leaf & Hardware L104 C

105G080110 Install Steel Door Leaf & Hardware L105 C

165

06-JUL-08

10-JUL-08

Install Steel Door Leaf & Hardware L105 C

106G080110 Install Steel Door Leaf & Hardware L106 C

166

09-JUL-08

14-JUL-08

Install Steel Door Leaf & Hardware L106 C

107G080110 Install Steel Door Leaf & Hardware L107 C

167

13-JUL-08

17-JUL-08

Install Steel Door Leaf & Hardware L107 C

108G080110 Install Steel Door Leaf & Hardware L108 C

168

16-JUL-08

21-JUL-08

Install Steel Door Leaf & Hardware L108 C

109G080110 Install Steel Door Leaf & Hardware L109 C

21

246

24-JUL-08

17-AUG-08

Install Steel Door Leaf & Hardware L109 C

110G080110 Install Steel Door Leaf & Hardware L110 C

21

246

18-AUG-08

10-SEP-08

111G080110 Install Steel Door Leaf & Hardware L111 C

21

246

16-SEP-08

09-OCT-08

112G080110 Install Steel Door Leaf & Hardware L112 C

228

10-AUG-08

13-AUG-08

113G080110 Install Steel Door Leaf & Hardware L113 C

270

22-JUN-08

25-JUN-08

114G080110 Install Steel Door Leaf & Hardware L114 C

351

19-MAR-08

23-MAR-08

Install Steel Door Leaf & Hardware L114 C

115G080110 Install Steel Door Leaf & Hardware L115 C

347

24-MAR-08

27-MAR-08

Install Steel Door Leaf & Hardware L115 C

116G080110 Install Steel Door Leaf & Hardware L116 C

343

29-MAR-08

01-APR-08

Install Steel Door Leaf & Hardware L116 C

117G080110 Install Steel Door Leaf & Hardware L117 C

339

02-APR-08

06-APR-08

Install Steel Door Leaf & Hardware L117 C

118G080110 Install Steel Door Leaf & Hardware L118 C

335

07-APR-08

10-APR-08

Install Steel Door Leaf & Hardware L118 C

119G080110 Install Steel Door Leaf & Hardware L119 C

331

12-APR-08

15-APR-08

Install Steel Door Leaf & Hardware L119 C

120G080110 Install Steel Door Leaf & Hardware L120 C

327

16-APR-08

20-APR-08

Install Steel Door Leaf & Hardware L120 C

121G080110 Install Steel Door Leaf & Hardware L121 C

323

21-APR-08

24-APR-08

Install Steel Door Leaf & Hardware L121 C

122G080110 Install Steel Door Leaf & Hardware L122 C

321

23-APR-08

27-APR-08

Install Steel Door Leaf & Hardware L122 C

123G080110 Install Steel Door Leaf & Hardware L123 C

317

28-APR-08

01-MAY-08

Install Steel Door Leaf & Hardware L123 C

124G080110 Install Steel Door Leaf & Hardware L124 C

322

22-APR-08

26-APR-08

Install Steel Door Leaf & Hardware L124 C

125G080110 Install Steel Door Leaf & Hardware L125 C

198

26-APR-08

29-APR-08

Install Steel Door Leaf & Hardware L125 C

126G080110 Install Steel Door Leaf & Hardware L126 C

198

30-APR-08

04-MAY-08

Install Steel Door Leaf & Hardware L126 C

127G080110 Install Steel Door Leaf & Hardware L127 C

197

06-MAY-08

10-MAY-08

Install Steel Door Leaf & Hardware L127 C

128G080110 Install Steel Door Leaf & Hardware L128 C

197

11-MAY-08

14-MAY-08

Install Steel Door Leaf & Hardware L128 C

129G080110 Install Steel Door Leaf & Hardware L129 C

197

15-MAY-08

19-MAY-08

Install Steel Door Leaf & Hardware L129 C

130G080110 Install Steel Door Leaf & Hardware L130 C

197

20-MAY-08

24-MAY-08

Install Steel Door Leaf & Hardware L130 C

131G080110 Install Steel Door Leaf & Hardware L131 C

197

25-MAY-08

28-MAY-08

Install Steel Door Leaf & Hardware L131 C

132G080110 Install Steel Door Leaf & Hardware L132 C

197

29-MAY-08

02-JUN-08

Install Steel Door Leaf & Hardware L132 C

133G080110 Install Steel Door Leaf & Hardware L133 C

198

02-JUN-08

05-JUN-08

Install Steel Door Leaf & Hardware L133 C

134G080110 Install Steel Door Leaf & Hardware L134 C

198

07-JUN-08

10-JUN-08

Install Steel Door Leaf & Hardware L134 C

135G080110 Install Steel Door Leaf & Hardware L135 C

198

11-JUN-08

15-JUN-08

Install Steel Door Leaf & Hardware L135 C

136G080110 Install Steel Door Leaf & Hardware L136 C

21

241

19-JUN-08

13-JUL-08

Install Steel Door Leaf & Hardware L136 C

137G080110 Install Steel Door Leaf & Hardware L137 C

21

241

28-JUN-08

21-JUL-08

Install Steel Door Leaf & Hardware L137 C

138G080110 Install Steel Door Leaf & Hardware L138 C

21

241

06-JUL-08

29-JUL-08

Install Steel Door Leaf & Hardware L138 C

139G080110 Install Steel Door Leaf & Hardware L139 C

67

06-DEC-08

09-DEC-08

Install Steel Door Leaf & Hardware L139 C

140G080110 Install Steel Door Leaf & Hardware L140 C

67

10-DEC-08

14-DEC-08

Install Steel Door Leaf & Hardware L140 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Steel Door Leaf & Hardware L110 C


Install Steel Door Leaf & Hardware L111 C
Install Steel Door Leaf & Hardware L112 C
Install Steel Door Leaf & Hardware L113 C

Sheet 140 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

141G080110 Install Steel Door Leaf & Hardware L141 C

67

15-DEC-08

18-DEC-08

Install Steel Door Leaf & Hardware L141 C

142G080110 Install Steel Door Leaf & Hardware L142 C

67

20-DEC-08

23-DEC-08

Install Steel Door Leaf & Hardware L142 C

143G080110 Install Steel Door Leaf & Hardware L143 C

67

24-DEC-08

28-DEC-08

Install Steel Door Leaf & Hardware L143 C

144G080110 Install Steel Door Leaf & Hardware L144 C

67

29-DEC-08

01-JAN-09

Install Steel Door Leaf & Hardware L144 C

145G080110 Install Steel Door Leaf & Hardware L145 C

66

04-JAN-09

07-JAN-09

Install Steel Door Leaf & Hardware L145 C

146G080110 Install Steel Door Leaf & Hardware L146 C

66

08-JAN-09

12-JAN-09

Install Steel Door Leaf & Hardware L146 C

147G080110 Install Steel Door Leaf & Hardware L147 C

66

13-JAN-09

17-JAN-09

Install Steel Door Leaf & Hardware L147 C

148G080110 Install Steel Door Leaf & Hardware L148 C

66

18-JAN-09

21-JAN-09

Install Steel Door Leaf & Hardware L148 C

149G080110 Install Steel Door Leaf & Hardware L149 C

66

22-JAN-09

26-JAN-09

Install Steel Door Leaf & Hardware L149 C

150G080110 Install Steel Door Leaf & Hardware L150 C

66

27-JAN-09

31-JAN-09

Install Steel Door Leaf & Hardware L150 C

151G080110 Install Steel Door Leaf & Hardware L151 C

63

04-FEB-09

08-FEB-09

Install Steel Door Leaf & Hardware L151 C

152G080110 Install Steel Door Leaf & Hardware L152 C

49

25-FEB-09

01-MAR-09

Install Steel Door Leaf & Hardware L152 C

153G080110 Install Steel Door Leaf & Hardware L153 C

46

05-MAR-09

09-MAR-09

Install Steel Door Leaf & Hardware L153 C

154G080110 Install Steel Door Leaf & Hardware L154 C

43

14-MAR-09

17-MAR-09

155G080110 Install Steel Door Leaf & Hardware L155 C

21

10

03-MAR-09

26-MAR-09

Install Steel Door Leaf & Hardware L155 C

156G080110 Install Steel Door Leaf & Hardware L156 C

21

10

08-MAR-09

31-MAR-09

Install Steel Door Leaf & Hardware L156 C

157G080110 Install Steel Door Leaf & Hardware L157 C

11

06-APR-09

09-APR-09

158G080110 Install Steel Door Leaf & Hardware L158 C

-1

20-APR-09

23-APR-09

Install Steel Door Leaf & Hardware L158 C

159G080110 Install Steel Door Leaf & Hardware L159 C

15-APR-09

19-APR-09

Install Steel Door Leaf & Hardware L159 C

160G080110 Install Steel Door Leaf & Hardware L160 C

23-APR-09

27-APR-09

Install Steel Door Leaf & Hardware L160 C

161G080110 Install Steel Door Leaf & Hardware L160-M C

02-MAY-09

05-MAY-09

Install Steel Door Leaf & Hardware L160-M C

-01G080200 Install Wooden Door Frame B2 C

61

30-MAY-07

06-JUN-07

Install Wooden Door Frame B2 C

-02G080200 Install Wooden Door Frame B1 C

58

07-JUN-07

14-JUN-07

Install Wooden Door Frame B1 C

-03G080200 Install Wooden Door Frame Concourse C

79

16-JUN-07

23-JUN-07

Install Wooden Door Frame Concourse C

-04G080200 Install Wooden Door Frame Ground C

98

24-JUN-07

01-JUL-07

Install Wooden Door Frame Ground C

001G080200 Install Wooden Door Frame L1 C

108

28-JUN-07

05-JUL-07

Install Wooden Door Frame L1 C

002G080200 Install Wooden Door Frame L2 C

118

03-JUL-07

10-JUL-07

Install Wooden Door Frame L2 C

003G080200 Install Wooden Door Frame L3 C

128

08-JUL-07

15-JUL-07

Install Wooden Door Frame L3 C

004G080200 Install Wooden Door Frame L4 C

201

12-JUL-07

19-JUL-07

005G080200 Install Wooden Door Frame L5 C

239

30-MAY-07

06-JUN-07

Install Wooden Door Frame L5 C

006G080200 Install Wooden Door Frame L6 C

239

04-JUN-07

11-JUN-07

Install Wooden Door Frame L6 C

007G080200 Install Wooden Door Frame L7 C

239

09-JUN-07

16-JUN-07

Install Wooden Door Frame L7 C

008G080200 Install Wooden Door Frame L8 C

239

13-JUN-07

20-JUN-07

Install Wooden Door Frame L8 C

009G080200 Install Wooden Door Frame L9 C

239

18-JUN-07

25-JUN-07

Install Wooden Door Frame L9 C

010G080200 Install Wooden Door Frame L10 C

239

23-JUN-07

30-JUN-07

Install Wooden Door Frame L10 C

011G080200 Install Wooden Door Frame L11 C

239

27-JUN-07

04-JUL-07

Install Wooden Door Frame L11 C

012G080200 Install Wooden Door Frame L12 C

239

02-JUL-07

09-JUL-07

Install Wooden Door Frame L12 C

013G080200 Install Wooden Door Frame L13 C

239

07-JUL-07

14-JUL-07

Install Wooden Door Frame L13 C

014G080200 Install Wooden Door Frame L14 C

239

11-JUL-07

18-JUL-07

Install Wooden Door Frame L14 C

015G080200 Install Wooden Door Frame L15 C

239

16-JUL-07

23-JUL-07

Install Wooden Door Frame L15 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Steel Door Leaf & Hardware L154 C

Install Steel Door Leaf & Hardware L157 C

Install Wooden Door Frame L4 C

Sheet 141 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Install Wooden Door Frame L16 C

016G080200 Install Wooden Door Frame L16 C

239

21-JUL-07

28-JUL-07

017G080200 Install Wooden Door Frame L17 C

21

239

25-JUL-07

18-AUG-07

018G080200 Install Wooden Door Frame L18 C

21

382

02-AUG-07

26-AUG-07

019G080200 Install Wooden Door Frame L19 C

290

30-MAY-07

06-JUN-07

Install Wooden Door Frame L19 C

020G080200 Install Wooden Door Frame L20 C

290

04-JUN-07

11-JUN-07

Install Wooden Door Frame L20 C

021G080200 Install Wooden Door Frame L21 C

290

09-JUN-07

16-JUN-07

Install Wooden Door Frame L21 C

022G080200 Install Wooden Door Frame L22 C

290

13-JUN-07

20-JUN-07

Install Wooden Door Frame L22 C

023G080200 Install Wooden Door Frame L23 C

290

18-JUN-07

25-JUN-07

Install Wooden Door Frame L23 C

024G080200 Install Wooden Door Frame L24 C

290

23-JUN-07

30-JUN-07

Install Wooden Door Frame L24 C

025G080200 Install Wooden Door Frame L25 C

290

27-JUN-07

04-JUL-07

Install Wooden Door Frame L25 C

026G080200 Install Wooden Door Frame L26 C

290

02-JUL-07

09-JUL-07

Install Wooden Door Frame L26 C

027G080200 Install Wooden Door Frame L27 C

290

07-JUL-07

14-JUL-07

Install Wooden Door Frame L27 C

028G080200 Install Wooden Door Frame L28 C

290

11-JUL-07

18-JUL-07

Install Wooden Door Frame L28 C

029G080200 Install Wooden Door Frame L29 C

290

16-JUL-07

23-JUL-07

Install Wooden Door Frame L29 C

030G080200 Install Wooden Door Frame L30 C

290

21-JUL-07

28-JUL-07

Install Wooden Door Frame L30 C

031G080200 Install Wooden Door Frame L31 C

290

25-JUL-07

01-AUG-07

Install Wooden Door Frame L31 C

032G080200 Install Wooden Door Frame L32 C

290

30-JUL-07

06-AUG-07

Install Wooden Door Frame L32 C

033G080200 Install Wooden Door Frame L33 C

290

04-AUG-07

11-AUG-07

Install Wooden Door Frame L33 C

034G080200 Install Wooden Door Frame L34 C

290

08-AUG-07

15-AUG-07

Install Wooden Door Frame L34 C

035G080200 Install Wooden Door Frame L35 C

290

13-AUG-07

20-AUG-07

Install Wooden Door Frame L35 C

036G080200 Install Wooden Door Frame L36 C

290

18-AUG-07

25-AUG-07

Install Wooden Door Frame L36 C

037G080200 Install Wooden Door Frame L37 C

290

22-AUG-07

29-AUG-07

Install Wooden Door Frame L37 C

038G080200 Install Wooden Door Frame L38 C

290

27-AUG-07

03-SEP-07

Install Wooden Door Frame L38 C

039G080200 Install Wooden Door Frame L39 C

290

01-SEP-07

08-SEP-07

040G080200 Install Wooden Door Frame L40 C

21

326

05-APR-07

29-APR-07

Install Wooden Door Frame L40 C

041G080200 Install Wooden Door Frame L41 C

21

440

14-APR-07

07-MAY-07

Install Wooden Door Frame L41 C

042G080200 Install Wooden Door Frame L42 C

21

440

22-APR-07

15-MAY-07

Install Wooden Door Frame L42 C

043G080200 Install Wooden Door Frame L43 C

282

30-MAY-07

04-JUN-07

Install Wooden Door Frame L43 C

044G080200 Install Wooden Door Frame L44 C

282

02-JUN-07

06-JUN-07

Install Wooden Door Frame L44 C

045G080200 Install Wooden Door Frame L45 C

282

04-JUN-07

09-JUN-07

Install Wooden Door Frame L45 C

046G080200 Install Wooden Door Frame L46 C

282

06-JUN-07

11-JUN-07

Install Wooden Door Frame L46 C

047G080200 Install Wooden Door Frame L47 C

282

09-JUN-07

13-JUN-07

Install Wooden Door Frame L47 C

048G080200 Install Wooden Door Frame L48 C

282

11-JUN-07

16-JUN-07

Install Wooden Door Frame L48 C

049G080200 Install Wooden Door Frame L49 C

282

13-JUN-07

18-JUN-07

Install Wooden Door Frame L49 C

050G080200 Install Wooden Door Frame L50 C

282

16-JUN-07

20-JUN-07

Install Wooden Door Frame L50 C

051G080200 Install Wooden Door Frame L51 C

282

18-JUN-07

23-JUN-07

Install Wooden Door Frame L51 C

052G080200 Install Wooden Door Frame L52 C

282

20-JUN-07

25-JUN-07

Install Wooden Door Frame L52 C

053G080200 Install Wooden Door Frame L53 C

282

23-JUN-07

27-JUN-07

Install Wooden Door Frame L53 C

054G080200 Install Wooden Door Frame L54 C

282

25-JUN-07

30-JUN-07

Install Wooden Door Frame L54 C

055G080200 Install Wooden Door Frame L55 C

282

27-JUN-07

02-JUL-07

Install Wooden Door Frame L55 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Wooden Door Frame L17 C


Install Wooden Door Frame L18 C

Install Wooden Door Frame L39 C

Sheet 142 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

056G080200 Install Wooden Door Frame L56 C

282

30-JUN-07

04-JUL-07

Install Wooden Door Frame L56 C

057G080200 Install Wooden Door Frame L57 C

282

02-JUL-07

07-JUL-07

Install Wooden Door Frame L57 C

058G080200 Install Wooden Door Frame L58 C

282

04-JUL-07

09-JUL-07

Install Wooden Door Frame L58 C

059G080200 Install Wooden Door Frame L59 C

282

07-JUL-07

11-JUL-07

Install Wooden Door Frame L59 C

060G080200 Install Wooden Door Frame L60 C

282

09-JUL-07

14-JUL-07

Install Wooden Door Frame L60 C

061G080200 Install Wooden Door Frame L61 C

282

11-JUL-07

16-JUL-07

Install Wooden Door Frame L61 C

062G080200 Install Wooden Door Frame L62 C

282

14-JUL-07

18-JUL-07

Install Wooden Door Frame L62 C

063G080200 Install Wooden Door Frame L63 C

282

16-JUL-07

21-JUL-07

Install Wooden Door Frame L63 C

064G080200 Install Wooden Door Frame L64 C

282

18-JUL-07

23-JUL-07

Install Wooden Door Frame L64 C

065G080200 Install Wooden Door Frame L65 C

282

21-JUL-07

25-JUL-07

Install Wooden Door Frame L65 C

066G080200 Install Wooden Door Frame L66 C

282

23-JUL-07

28-JUL-07

Install Wooden Door Frame L66 C

067G080200 Install Wooden Door Frame L67 C

282

25-JUL-07

30-JUL-07

Install Wooden Door Frame L67 C

068G080200 Install Wooden Door Frame L68 C

282

28-JUL-07

01-AUG-07

Install Wooden Door Frame L68 C

069G080200 Install Wooden Door Frame L69 C

282

30-JUL-07

04-AUG-07

Install Wooden Door Frame L69 C

070G080200 Install Wooden Door Frame L70 C

282

01-AUG-07

06-AUG-07

Install Wooden Door Frame L70 C

071G080200 Install Wooden Door Frame L71 C

282

04-AUG-07

08-AUG-07

Install Wooden Door Frame L71 C

072G080200 Install Wooden Door Frame L72 C

282

06-AUG-07

11-AUG-07

Install Wooden Door Frame L72 C

073G080200 Install Wooden Door Frame L73 C

21

282

08-AUG-07

01-SEP-07

Install Wooden Door Frame L73 C

074G080200 Install Wooden Door Frame L74 C

21

559

16-AUG-07

09-SEP-07

Install Wooden Door Frame L74 C

075G080200 Install Wooden Door Frame L75 C

21

559

25-AUG-07

17-SEP-07

076G080200 Install Wooden Door Frame L76 C

345

28-JUN-07

03-JUL-07

Install Wooden Door Frame L76 C

077G080200 Install Wooden Door Frame L77 C

347

01-JUL-07

05-JUL-07

Install Wooden Door Frame L77 C

078G080200 Install Wooden Door Frame L78 C

349

03-JUL-07

08-JUL-07

Install Wooden Door Frame L78 C

079G080200 Install Wooden Door Frame L79 C

351

05-JUL-07

10-JUL-07

Install Wooden Door Frame L79 C

080G080200 Install Wooden Door Frame L80 C

353

08-JUL-07

12-JUL-07

Install Wooden Door Frame L80 C

081G080200 Install Wooden Door Frame L81 C

355

10-JUL-07

15-JUL-07

Install Wooden Door Frame L81 C

082G080200 Install Wooden Door Frame L82 C

357

12-JUL-07

17-JUL-07

Install Wooden Door Frame L82 C

083G080200 Install Wooden Door Frame L83 C

359

15-JUL-07

19-JUL-07

Install Wooden Door Frame L83 C

084G080200 Install Wooden Door Frame L84 C

361

17-JUL-07

22-JUL-07

Install Wooden Door Frame L84 C

085G080200 Install Wooden Door Frame L85 C

363

19-JUL-07

24-JUL-07

Install Wooden Door Frame L85 C

086G080200 Install Wooden Door Frame L86 C

365

22-JUL-07

26-JUL-07

Install Wooden Door Frame L86 C

087G080200 Install Wooden Door Frame L87 C

367

24-JUL-07

29-JUL-07

Install Wooden Door Frame L87 C

088G080200 Install Wooden Door Frame L88 C

369

26-JUL-07

31-JUL-07

Install Wooden Door Frame L88 C

089G080200 Install Wooden Door Frame L89 C

371

29-JUL-07

02-AUG-07

Install Wooden Door Frame L89 C

090G080200 Install Wooden Door Frame L90 C

373

31-JUL-07

05-AUG-07

Install Wooden Door Frame L90 C

091G080200 Install Wooden Door Frame L91 C

375

02-AUG-07

07-AUG-07

Install Wooden Door Frame L91 C

092G080200 Install Wooden Door Frame L92 C

377

05-AUG-07

09-AUG-07

Install Wooden Door Frame L92 C

093G080200 Install Wooden Door Frame L93 C

379

07-AUG-07

12-AUG-07

Install Wooden Door Frame L93 C

094G080200 Install Wooden Door Frame L94 C

381

09-AUG-07

14-AUG-07

Install Wooden Door Frame L94 C

095G080200 Install Wooden Door Frame L95 C

383

12-AUG-07

16-AUG-07

Install Wooden Door Frame L95 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Wooden Door Frame L75 C

Sheet 143 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

096G080200 Install Wooden Door Frame L96 C

385

14-AUG-07

19-AUG-07

Install Wooden Door Frame L96 C

097G080200 Install Wooden Door Frame L97 C

387

16-AUG-07

21-AUG-07

Install Wooden Door Frame L97 C

098G080200 Install Wooden Door Frame L98 C

389

19-AUG-07

23-AUG-07

Install Wooden Door Frame L98 C

099G080200 Install Wooden Door Frame L99 C

391

21-AUG-07

26-AUG-07

Install Wooden Door Frame L99 C

100G080200 Install Wooden Door Frame L100 C

393

23-AUG-07

28-AUG-07

Install Wooden Door Frame L100 C

101G080200 Install Wooden Door Frame L101 C

395

26-AUG-07

30-AUG-07

Install Wooden Door Frame L101 C

102G080200 Install Wooden Door Frame L102 C

397

28-AUG-07

02-SEP-07

Install Wooden Door Frame L102 C

103G080200 Install Wooden Door Frame L103 C

397

30-AUG-07

04-SEP-07

Install Wooden Door Frame L103 C

104G080200 Install Wooden Door Frame L104 C

397

02-SEP-07

06-SEP-07

Install Wooden Door Frame L104 C

105G080200 Install Wooden Door Frame L105 C

397

04-SEP-07

09-SEP-07

Install Wooden Door Frame L105 C

106G080200 Install Wooden Door Frame L106 C

397

06-SEP-07

11-SEP-07

Install Wooden Door Frame L106 C

107G080200 Install Wooden Door Frame L107 C

397

09-SEP-07

13-SEP-07

Install Wooden Door Frame L107 C

108G080200 Install Wooden Door Frame L108 C

397

11-SEP-07

16-SEP-07

Install Wooden Door Frame L108 C

109G080200 Install Wooden Door Frame L109 C

21

397

13-SEP-07

07-OCT-07

Install Wooden Door Frame L109 C

110G080200 Install Wooden Door Frame L110 C

21

397

22-SEP-07

15-OCT-07

Install Wooden Door Frame L110 C

111G080200 Install Wooden Door Frame L111 C

21

397

30-SEP-07

23-OCT-07

112G080200 Install Wooden Door Frame L112 C

208

20-SEP-07

24-SEP-07

Install Wooden Door Frame L112 C

113G080200 Install Wooden Door Frame L113 C

208

23-SEP-07

26-SEP-07

Install Wooden Door Frame L113 C

114G080200 Install Wooden Door Frame L114 C

208

25-SEP-07

29-SEP-07

Install Wooden Door Frame L114 C

115G080200 Install Wooden Door Frame L115 C

208

27-SEP-07

01-OCT-07

Install Wooden Door Frame L115 C

116G080200 Install Wooden Door Frame L116 C

208

30-SEP-07

03-OCT-07

Install Wooden Door Frame L116 C

117G080200 Install Wooden Door Frame L117 C

208

02-OCT-07

06-OCT-07

Install Wooden Door Frame L117 C

118G080200 Install Wooden Door Frame L118 C

208

04-OCT-07

08-OCT-07

Install Wooden Door Frame L118 C

119G080200 Install Wooden Door Frame L119 C

208

07-OCT-07

10-OCT-07

Install Wooden Door Frame L119 C

120G080200 Install Wooden Door Frame L120 C

208

09-OCT-07

13-OCT-07

Install Wooden Door Frame L120 C

121G080200 Install Wooden Door Frame L121 C

208

11-OCT-07

15-OCT-07

Install Wooden Door Frame L121 C

122G080200 Install Wooden Door Frame L122 C

208

14-OCT-07

17-OCT-07

Install Wooden Door Frame L122 C

123G080200 Install Wooden Door Frame L123 C

208

16-OCT-07

20-OCT-07

Install Wooden Door Frame L123 C

124G080200 Install Wooden Door Frame L124 C

208

18-OCT-07

22-OCT-07

Install Wooden Door Frame L124 C

125G080200 Install Wooden Door Frame L125 C

208

21-OCT-07

24-OCT-07

Install Wooden Door Frame L125 C

126G080200 Install Wooden Door Frame L126 C

208

23-OCT-07

27-OCT-07

Install Wooden Door Frame L126 C

127G080200 Install Wooden Door Frame L127 C

208

25-OCT-07

29-OCT-07

Install Wooden Door Frame L127 C

128G080200 Install Wooden Door Frame L128 C

208

28-OCT-07

31-OCT-07

Install Wooden Door Frame L128 C

129G080200 Install Wooden Door Frame L129 C

208

30-OCT-07

03-NOV-07

Install Wooden Door Frame L129 C

130G080200 Install Wooden Door Frame L130 C

208

01-NOV-07

05-NOV-07

Install Wooden Door Frame L130 C

131G080200 Install Wooden Door Frame L131 C

208

04-NOV-07

07-NOV-07

Install Wooden Door Frame L131 C

132G080200 Install Wooden Door Frame L132 C

208

06-NOV-07

10-NOV-07

Install Wooden Door Frame L132 C

133G080200 Install Wooden Door Frame L133 C

208

08-NOV-07

12-NOV-07

Install Wooden Door Frame L133 C

134G080200 Install Wooden Door Frame L134 C

208

11-NOV-07

14-NOV-07

Install Wooden Door Frame L134 C

135G080200 Install Wooden Door Frame L135 C

208

13-NOV-07

17-NOV-07

Install Wooden Door Frame L135 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Wooden Door Frame L111 C

Sheet 144 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

136G080200 Install Wooden Door Frame L136 C

21

286

15-NOV-07

09-DEC-07

Install Wooden Door Frame L136 C

137G080200 Install Wooden Door Frame L137 C

21

286

24-NOV-07

17-DEC-07

Install Wooden Door Frame L137 C

138G080200 Install Wooden Door Frame L138 C

21

286

02-DEC-07

25-DEC-07

139G080200 Install Wooden Door Frame L139 C

201

08-DEC-07

11-DEC-07

Install Wooden Door Frame L139 C

140G080200 Install Wooden Door Frame L140 C

300

10-DEC-07

13-DEC-07

Install Wooden Door Frame L140 C

141G080200 Install Wooden Door Frame L141 C

300

12-DEC-07

16-DEC-07

Install Wooden Door Frame L141 C

142G080200 Install Wooden Door Frame L142 C

300

15-DEC-07

18-DEC-07

Install Wooden Door Frame L142 C

143G080200 Install Wooden Door Frame L143 C

300

17-DEC-07

20-DEC-07

Install Wooden Door Frame L143 C

144G080200 Install Wooden Door Frame L144 C

300

19-DEC-07

23-DEC-07

Install Wooden Door Frame L144 C

145G080200 Install Wooden Door Frame L145 C

300

22-DEC-07

25-DEC-07

Install Wooden Door Frame L145 C

146G080200 Install Wooden Door Frame L146 C

300

24-DEC-07

27-DEC-07

Install Wooden Door Frame L146 C

147G080200 Install Wooden Door Frame L147 C

300

26-DEC-07

30-DEC-07

Install Wooden Door Frame L147 C

148G080200 Install Wooden Door Frame L148 C

300

29-DEC-07

01-JAN-08

Install Wooden Door Frame L148 C

149G080200 Install Wooden Door Frame L149 C

300

31-DEC-07

03-JAN-08

Install Wooden Door Frame L149 C

150G080200 Install Wooden Door Frame L150 C

300

02-JAN-08

06-JAN-08

Install Wooden Door Frame L150 C

151G080200 Install Wooden Door Frame L151 C

300

05-JAN-08

08-JAN-08

Install Wooden Door Frame L151 C

152G080200 Install Wooden Door Frame L152 C

300

07-JAN-08

10-JAN-08

Install Wooden Door Frame L152 C

153G080200 Install Wooden Door Frame L153 C

300

09-JAN-08

13-JAN-08

Install Wooden Door Frame L153 C

154G080200 Install Wooden Door Frame L154 C

300

12-JAN-08

15-JAN-08

Install Wooden Door Frame L154 C

155G080200 Install Wooden Door Frame L155 C

21

305

14-JAN-08

06-FEB-08

156G080200 Install Wooden Door Frame L156 C

21

305

22-JAN-08

14-FEB-08

157G080200 Install Wooden Door Frame L157 C

305

22-JAN-08

26-JAN-08

Install Wooden Door Frame L157 C

158G080200 Install Wooden Door Frame L158 C

314

24-JAN-08

28-JAN-08

Install Wooden Door Frame L158 C

159G080200 Install Wooden Door Frame L159 C

314

27-JAN-08

30-JAN-08

Install Wooden Door Frame L159 C

160G080200 Install Wooden Door Frame L160 C

314

29-JAN-08

02-FEB-08

161G080200 Install Wooden Door Frame L160-M C

314

31-JAN-08

04-FEB-08

-01G080210 Install Wooden Door Leaf & Hardware B2 C

216

10-JAN-08

17-JAN-08

-02G080210 Install Wooden Door Leaf & Hardware B1 C

220

10-JAN-08

17-JAN-08

-03G080210 Install Wooden Door Leaf & Hardware Concourse C

255

05-DEC-07

12-DEC-07

Install Wooden Door Frame L138 C

Install Wooden Door Frame L155 C


Install Wooden Door Frame L156 C

Install Wooden Door Frame L160 C


Install Wooden Door Frame L160-M C
Install Wooden Door Leaf & Hardware B2 C
Install Wooden Door Leaf & Hardware B1 C
Install Wooden Door Leaf & Hardware Concourse C
Install Wooden Door Leaf & Hardware Ground C

-04G080210 Install Wooden Door Leaf & Hardware Ground C

244

23-DEC-07

30-DEC-07

001G080210 Install Wooden Door Leaf & Hardware L1 C

233

09-JAN-08

16-JAN-08

002G080210 Install Wooden Door Leaf & Hardware L2 C

271

01-DEC-07

08-DEC-07

003G080210 Install Wooden Door Leaf & Hardware L3 C

214

10-FEB-08

16-FEB-08

004G080210 Install Wooden Door Leaf & Hardware L4 C

248

06-JAN-08

13-JAN-08

005G080210 Install Wooden Door Leaf & Hardware L5 C

220

23-JAN-08

30-JAN-08

Install Wooden Door Leaf & Hardware L5 C

006G080210 Install Wooden Door Leaf & Hardware L6 C

217

31-JAN-08

07-FEB-08

Install Wooden Door Leaf & Hardware L6 C

007G080210 Install Wooden Door Leaf & Hardware L7 C

218

04-FEB-08

11-FEB-08

Install Wooden Door Leaf & Hardware L7 C

008G080210 Install Wooden Door Leaf & Hardware L8 C

218

09-FEB-08

15-FEB-08

Install Wooden Door Leaf & Hardware L8 C

009G080210 Install Wooden Door Leaf & Hardware L9 C

218

13-FEB-08

19-FEB-08

Install Wooden Door Leaf & Hardware L9 C

010G080210 Install Wooden Door Leaf & Hardware L10 C

217

18-FEB-08

25-FEB-08

Install Wooden Door Leaf & Hardware L10 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Install Wooden Door Leaf & Hardware L1 C


Install Wooden Door Leaf & Hardware L2 C
Install Wooden Door Leaf & Hardware L3 C
Install Wooden Door Leaf & Hardware L4 C

Sheet 145 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

011G080210 Install Wooden Door Leaf & Hardware L11 C

217

23-FEB-08

01-MAR-08

Install Wooden Door Leaf & Hardware L11 C

012G080210 Install Wooden Door Leaf & Hardware L12 C

217

27-FEB-08

05-MAR-08

Install Wooden Door Leaf & Hardware L12 C

013G080210 Install Wooden Door Leaf & Hardware L13 C

217

03-MAR-08

10-MAR-08

Install Wooden Door Leaf & Hardware L13 C

014G080210 Install Wooden Door Leaf & Hardware L14 C

217

08-MAR-08

15-MAR-08

Install Wooden Door Leaf & Hardware L14 C

015G080210 Install Wooden Door Leaf & Hardware L15 C

217

12-MAR-08

19-MAR-08

Install Wooden Door Leaf & Hardware L15 C

016G080210 Install Wooden Door Leaf & Hardware L16 C

216

18-MAR-08

25-MAR-08

Install Wooden Door Leaf & Hardware L16 C

017G080210 Install Wooden Door Leaf & Hardware L17 C

21

192

26-MAR-08

19-APR-08

Install Wooden Door Leaf & Hardware L17 C

018G080210 Install Wooden Door Leaf & Hardware L18 C

21

192

03-APR-08

27-APR-08

019G080210 Install Wooden Door Leaf & Hardware L19 C

132

17-FEB-08

24-FEB-08

Install Wooden Door Leaf & Hardware L19 C

020G080210 Install Wooden Door Leaf & Hardware L20 C

127

27-FEB-08

05-MAR-08

Install Wooden Door Leaf & Hardware L20 C

021G080210 Install Wooden Door Leaf & Hardware L21 C

251

11-OCT-07

18-OCT-07

022G080210 Install Wooden Door Leaf & Hardware L22 C

246

22-OCT-07

29-OCT-07

023G080210 Install Wooden Door Leaf & Hardware L23 C

239

04-NOV-07

11-NOV-07

Install Wooden Door Leaf & Hardware L23 C

024G080210 Install Wooden Door Leaf & Hardware L24 C

237

11-NOV-07

18-NOV-07

Install Wooden Door Leaf & Hardware L24 C

025G080210 Install Wooden Door Leaf & Hardware L25 C

235

18-NOV-07

25-NOV-07

Install Wooden Door Leaf & Hardware L25 C

026G080210 Install Wooden Door Leaf & Hardware L26 C

234

24-NOV-07

01-DEC-07

Install Wooden Door Leaf & Hardware L26 C

027G080210 Install Wooden Door Leaf & Hardware L27 C

233

29-NOV-07

06-DEC-07

Install Wooden Door Leaf & Hardware L27 C

028G080210 Install Wooden Door Leaf & Hardware L28 C

232

05-DEC-07

12-DEC-07

Install Wooden Door Leaf & Hardware L28 C

029G080210 Install Wooden Door Leaf & Hardware L29 C

232

10-DEC-07

17-DEC-07

Install Wooden Door Leaf & Hardware L29 C

030G080210 Install Wooden Door Leaf & Hardware L30 C

232

15-DEC-07

22-DEC-07

Install Wooden Door Leaf & Hardware L30 C

031G080210 Install Wooden Door Leaf & Hardware L31 C

231

20-DEC-07

27-DEC-07

Install Wooden Door Leaf & Hardware L31 C

032G080210 Install Wooden Door Leaf & Hardware L32 C

232

24-DEC-07

31-DEC-07

Install Wooden Door Leaf & Hardware L32 C

033G080210 Install Wooden Door Leaf & Hardware L33 C

232

29-DEC-07

05-JAN-08

Install Wooden Door Leaf & Hardware L33 C

034G080210 Install Wooden Door Leaf & Hardware L34 C

230

05-JAN-08

12-JAN-08

Install Wooden Door Leaf & Hardware L34 C

035G080210 Install Wooden Door Leaf & Hardware L35 C

231

08-JAN-08

15-JAN-08

Install Wooden Door Leaf & Hardware L35 C

036G080210 Install Wooden Door Leaf & Hardware L36 C

232

12-JAN-08

19-JAN-08

Install Wooden Door Leaf & Hardware L36 C

037G080210 Install Wooden Door Leaf & Hardware L37 C

232

16-JAN-08

23-JAN-08

Install Wooden Door Leaf & Hardware L37 C

038G080210 Install Wooden Door Leaf & Hardware L38 C

219

05-FEB-08

12-FEB-08

Install Wooden Door Leaf & Hardware L38 C

039G080210 Install Wooden Door Leaf & Hardware L39 C

223

05-FEB-08

12-FEB-08

Install Wooden Door Leaf & Hardware L39 C

040G080210 Install Wooden Door Leaf & Hardware L40 C

21

192

13-FEB-08

06-MAR-08

Install Wooden Door Leaf & Hardware L40 C

041G080210 Install Wooden Door Leaf & Hardware L41 C

21

192

20-FEB-08

15-MAR-08

Install Wooden Door Leaf & Hardware L41 C

042G080210 Install Wooden Door Leaf & Hardware L42 C

21

192

28-FEB-08

23-MAR-08

Install Wooden Door Leaf & Hardware L42 C

043G080210 Install Wooden Door Leaf & Hardware L43 C

170

15-MAR-08

19-MAR-08

Install Wooden Door Leaf & Hardware L43 C

044G080210 Install Wooden Door Leaf & Hardware L44 C

170

19-MAR-08

24-MAR-08

Install Wooden Door Leaf & Hardware L44 C

045G080210 Install Wooden Door Leaf & Hardware L45 C

170

24-MAR-08

29-MAR-08

Install Wooden Door Leaf & Hardware L45 C

046G080210 Install Wooden Door Leaf & Hardware L46 C

170

29-MAR-08

02-APR-08

Install Wooden Door Leaf & Hardware L46 C

047G080210 Install Wooden Door Leaf & Hardware L47 C

170

02-APR-08

07-APR-08

Install Wooden Door Leaf & Hardware L47 C

048G080210 Install Wooden Door Leaf & Hardware L48 C

154

26-APR-08

30-APR-08

Install Wooden Door Leaf & Hardware L48 C

049G080210 Install Wooden Door Leaf & Hardware L49 C

154

30-APR-08

05-MAY-08

Install Wooden Door Leaf & Hardware L49 C

050G080210 Install Wooden Door Leaf & Hardware L50 C

153

06-MAY-08

11-MAY-08

Install Wooden Door Leaf & Hardware L50 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Wooden Door Leaf & Hardware L18 C

Install Wooden Door Leaf & Hardware L21 C


Install Wooden Door Leaf & Hardware L22 C

Sheet 146 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

051G080210 Install Wooden Door Leaf & Hardware L51 C

153

11-MAY-08

15-MAY-08

Install Wooden Door Leaf & Hardware L51 C

052G080210 Install Wooden Door Leaf & Hardware L52 C

153

15-MAY-08

20-MAY-08

Install Wooden Door Leaf & Hardware L52 C

053G080210 Install Wooden Door Leaf & Hardware L53 C

153

20-MAY-08

25-MAY-08

Install Wooden Door Leaf & Hardware L53 C

054G080210 Install Wooden Door Leaf & Hardware L54 C

153

25-MAY-08

29-MAY-08

Install Wooden Door Leaf & Hardware L54 C

055G080210 Install Wooden Door Leaf & Hardware L55 C

153

29-MAY-08

03-JUN-08

Install Wooden Door Leaf & Hardware L55 C

056G080210 Install Wooden Door Leaf & Hardware L56 C

154

02-JUN-08

07-JUN-08

Install Wooden Door Leaf & Hardware L56 C

057G080210 Install Wooden Door Leaf & Hardware L57 C

154

07-JUN-08

11-JUN-08

Install Wooden Door Leaf & Hardware L57 C

058G080210 Install Wooden Door Leaf & Hardware L58 C

154

11-JUN-08

16-JUN-08

Install Wooden Door Leaf & Hardware L58 C

059G080210 Install Wooden Door Leaf & Hardware L59 C

154

16-JUN-08

21-JUN-08

Install Wooden Door Leaf & Hardware L59 C

060G080210 Install Wooden Door Leaf & Hardware L60 C

154

21-JUN-08

25-JUN-08

Install Wooden Door Leaf & Hardware L60 C

061G080210 Install Wooden Door Leaf & Hardware L61 C

154

25-JUN-08

30-JUN-08

Install Wooden Door Leaf & Hardware L61 C

062G080210 Install Wooden Door Leaf & Hardware L62 C

154

30-JUN-08

05-JUL-08

Install Wooden Door Leaf & Hardware L62 C

063G080210 Install Wooden Door Leaf & Hardware L63 C

154

05-JUL-08

09-JUL-08

Install Wooden Door Leaf & Hardware L63 C

064G080210 Install Wooden Door Leaf & Hardware L64 C

154

09-JUL-08

14-JUL-08

Install Wooden Door Leaf & Hardware L64 C

065G080210 Install Wooden Door Leaf & Hardware L65 C

154

14-JUL-08

19-JUL-08

Install Wooden Door Leaf & Hardware L65 C

066G080210 Install Wooden Door Leaf & Hardware L66 C

154

19-JUL-08

23-JUL-08

Install Wooden Door Leaf & Hardware L66 C

067G080210 Install Wooden Door Leaf & Hardware L67 C

154

23-JUL-08

28-JUL-08

Install Wooden Door Leaf & Hardware L67 C

068G080210 Install Wooden Door Leaf & Hardware L68 C

154

28-JUL-08

02-AUG-08

Install Wooden Door Leaf & Hardware L68 C

069G080210 Install Wooden Door Leaf & Hardware L69 C

154

02-AUG-08

06-AUG-08

Install Wooden Door Leaf & Hardware L69 C

070G080210 Install Wooden Door Leaf & Hardware L70 C

154

06-AUG-08

11-AUG-08

Install Wooden Door Leaf & Hardware L70 C

071G080210 Install Wooden Door Leaf & Hardware L71 C

154

11-AUG-08

16-AUG-08

Install Wooden Door Leaf & Hardware L71 C

072G080210 Install Wooden Door Leaf & Hardware L72 C

151

19-AUG-08

24-AUG-08

Install Wooden Door Leaf & Hardware L72 C

073G080210 Install Wooden Door Leaf & Hardware L73 C

21

249

27-AUG-08

20-SEP-08

Install Wooden Door Leaf & Hardware L73 C

074G080210 Install Wooden Door Leaf & Hardware L74 C

21

249

04-SEP-08

28-SEP-08

Install Wooden Door Leaf & Hardware L74 C

075G080210 Install Wooden Door Leaf & Hardware L75 C

21

249

13-SEP-08

06-OCT-08

076G080210 Install Wooden Door Leaf & Hardware L76 C

28

30-JUL-08

04-AUG-08

077G080210 Install Wooden Door Leaf & Hardware L77 C

28

04-AUG-08

09-AUG-08

078G080210 Install Wooden Door Leaf & Hardware L78 C

164

03-MAR-08

08-MAR-08

Install Wooden Door Leaf & Hardware L78 C

079G080210 Install Wooden Door Leaf & Hardware L79 C

164

08-MAR-08

12-MAR-08

Install Wooden Door Leaf & Hardware L79 C

080G080210 Install Wooden Door Leaf & Hardware L80 C

164

12-MAR-08

17-MAR-08

Install Wooden Door Leaf & Hardware L80 C

081G080210 Install Wooden Door Leaf & Hardware L81 C

164

17-MAR-08

22-MAR-08

Install Wooden Door Leaf & Hardware L81 C

082G080210 Install Wooden Door Leaf & Hardware L82 C

164

22-MAR-08

26-MAR-08

Install Wooden Door Leaf & Hardware L82 C

083G080210 Install Wooden Door Leaf & Hardware L83 C

164

26-MAR-08

31-MAR-08

Install Wooden Door Leaf & Hardware L83 C

084G080210 Install Wooden Door Leaf & Hardware L84 C

164

31-MAR-08

05-APR-08

Install Wooden Door Leaf & Hardware L84 C

085G080210 Install Wooden Door Leaf & Hardware L85 C

164

05-APR-08

09-APR-08

Install Wooden Door Leaf & Hardware L85 C

086G080210 Install Wooden Door Leaf & Hardware L86 C

164

09-APR-08

14-APR-08

Install Wooden Door Leaf & Hardware L86 C

087G080210 Install Wooden Door Leaf & Hardware L87 C

164

14-APR-08

19-APR-08

Install Wooden Door Leaf & Hardware L87 C

088G080210 Install Wooden Door Leaf & Hardware L88 C

146

10-MAY-08

14-MAY-08

Install Wooden Door Leaf & Hardware L88 C

089G080210 Install Wooden Door Leaf & Hardware L89 C

147

13-MAY-08

18-MAY-08

Install Wooden Door Leaf & Hardware L89 C

090G080210 Install Wooden Door Leaf & Hardware L90 C

148

17-MAY-08

21-MAY-08

Install Wooden Door Leaf & Hardware L90 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Wooden Door Leaf & Hardware L75 C


Install Wooden Door Leaf & Hardware L76 C
Install Wooden Door Leaf & Hardware L77 C

Sheet 147 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

091G080210 Install Wooden Door Leaf & Hardware L91 C

149

20-MAY-08

25-MAY-08

Install Wooden Door Leaf & Hardware L91 C

092G080210 Install Wooden Door Leaf & Hardware L92 C

150

24-MAY-08

28-MAY-08

Install Wooden Door Leaf & Hardware L92 C

093G080210 Install Wooden Door Leaf & Hardware L93 C

151

27-MAY-08

01-JUN-08

Install Wooden Door Leaf & Hardware L93 C

094G080210 Install Wooden Door Leaf & Hardware L94 C

152

31-MAY-08

04-JUN-08

Install Wooden Door Leaf & Hardware L94 C

095G080210 Install Wooden Door Leaf & Hardware L95 C

154

02-JUN-08

07-JUN-08

Install Wooden Door Leaf & Hardware L95 C

096G080210 Install Wooden Door Leaf & Hardware L96 C

155

05-JUN-08

10-JUN-08

Install Wooden Door Leaf & Hardware L96 C

097G080210 Install Wooden Door Leaf & Hardware L97 C

156

09-JUN-08

14-JUN-08

Install Wooden Door Leaf & Hardware L97 C

098G080210 Install Wooden Door Leaf & Hardware L98 C

157

12-JUN-08

17-JUN-08

Install Wooden Door Leaf & Hardware L98 C

099G080210 Install Wooden Door Leaf & Hardware L99 C

159

15-JUN-08

19-JUN-08

Install Wooden Door Leaf & Hardware L99 C

100G080210 Install Wooden Door Leaf & Hardware L100 C

160

18-JUN-08

23-JUN-08

Install Wooden Door Leaf & Hardware L100 C

101G080210 Install Wooden Door Leaf & Hardware L101 C

161

22-JUN-08

26-JUN-08

Install Wooden Door Leaf & Hardware L101 C

102G080210 Install Wooden Door Leaf & Hardware L102 C

162

25-JUN-08

30-JUN-08

Install Wooden Door Leaf & Hardware L102 C

103G080210 Install Wooden Door Leaf & Hardware L103 C

163

29-JUN-08

03-JUL-08

Install Wooden Door Leaf & Hardware L103 C

104G080210 Install Wooden Door Leaf & Hardware L104 C

164

02-JUL-08

07-JUL-08

Install Wooden Door Leaf & Hardware L104 C

105G080210 Install Wooden Door Leaf & Hardware L105 C

165

06-JUL-08

10-JUL-08

Install Wooden Door Leaf & Hardware L105 C

106G080210 Install Wooden Door Leaf & Hardware L106 C

166

09-JUL-08

14-JUL-08

Install Wooden Door Leaf & Hardware L106 C

107G080210 Install Wooden Door Leaf & Hardware L107 C

167

13-JUL-08

17-JUL-08

Install Wooden Door Leaf & Hardware L107 C

108G080210 Install Wooden Door Leaf & Hardware L108 C

168

16-JUL-08

21-JUL-08

Install Wooden Door Leaf & Hardware L108 C

109G080210 Install Wooden Door Leaf & Hardware L109 C

21

278

24-JUL-08

17-AUG-08

Install Wooden Door Leaf & Hardware L109 C

110G080210 Install Wooden Door Leaf & Hardware L110 C

21

278

02-AUG-08

25-AUG-08

Install Wooden Door Leaf & Hardware L110 C

111G080210 Install Wooden Door Leaf & Hardware L111 C

21

278

10-AUG-08

02-SEP-08

Install Wooden Door Leaf & Hardware L111 C

112G080210 Install Wooden Door Leaf & Hardware L112 C

228

10-AUG-08

13-AUG-08

113G080210 Install Wooden Door Leaf & Hardware L113 C

270

22-JUN-08

25-JUN-08

114G080210 Install Wooden Door Leaf & Hardware L114 C

351

19-MAR-08

23-MAR-08

Install Wooden Door Leaf & Hardware L114 C

115G080210 Install Wooden Door Leaf & Hardware L115 C

347

24-MAR-08

27-MAR-08

Install Wooden Door Leaf & Hardware L115 C

116G080210 Install Wooden Door Leaf & Hardware L116 C

343

29-MAR-08

01-APR-08

Install Wooden Door Leaf & Hardware L116 C

117G080210 Install Wooden Door Leaf & Hardware L117 C

339

02-APR-08

06-APR-08

Install Wooden Door Leaf & Hardware L117 C

118G080210 Install Wooden Door Leaf & Hardware L118 C

335

07-APR-08

10-APR-08

Install Wooden Door Leaf & Hardware L118 C

119G080210 Install Wooden Door Leaf & Hardware L119 C

331

12-APR-08

15-APR-08

Install Wooden Door Leaf & Hardware L119 C

120G080210 Install Wooden Door Leaf & Hardware L120 C

327

16-APR-08

20-APR-08

Install Wooden Door Leaf & Hardware L120 C

121G080210 Install Wooden Door Leaf & Hardware L121 C

323

21-APR-08

24-APR-08

Install Wooden Door Leaf & Hardware L121 C

122G080210 Install Wooden Door Leaf & Hardware L122 C

321

23-APR-08

27-APR-08

Install Wooden Door Leaf & Hardware L122 C

123G080210 Install Wooden Door Leaf & Hardware L123 C

317

28-APR-08

01-MAY-08

Install Wooden Door Leaf & Hardware L123 C

124G080210 Install Wooden Door Leaf & Hardware L124 C

322

22-APR-08

26-APR-08

Install Wooden Door Leaf & Hardware L124 C

125G080210 Install Wooden Door Leaf & Hardware L125 C

198

26-APR-08

29-APR-08

Install Wooden Door Leaf & Hardware L125 C

126G080210 Install Wooden Door Leaf & Hardware L126 C

198

30-APR-08

04-MAY-08

Install Wooden Door Leaf & Hardware L126 C

127G080210 Install Wooden Door Leaf & Hardware L127 C

197

06-MAY-08

10-MAY-08

Install Wooden Door Leaf & Hardware L127 C

128G080210 Install Wooden Door Leaf & Hardware L128 C

197

11-MAY-08

14-MAY-08

Install Wooden Door Leaf & Hardware L128 C

129G080210 Install Wooden Door Leaf & Hardware L129 C

197

15-MAY-08

19-MAY-08

Install Wooden Door Leaf & Hardware L129 C

130G080210 Install Wooden Door Leaf & Hardware L130 C

197

20-MAY-08

24-MAY-08

Install Wooden Door Leaf & Hardware L130 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Install Wooden Door Leaf & Hardware L112 C


Install Wooden Door Leaf & Hardware L113 C

Sheet 148 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

131G080210 Install Wooden Door Leaf & Hardware L131 C

197

25-MAY-08

28-MAY-08

Install Wooden Door Leaf & Hardware L131 C

132G080210 Install Wooden Door Leaf & Hardware L132 C

197

29-MAY-08

02-JUN-08

Install Wooden Door Leaf & Hardware L132 C

133G080210 Install Wooden Door Leaf & Hardware L133 C

198

02-JUN-08

05-JUN-08

Install Wooden Door Leaf & Hardware L133 C

134G080210 Install Wooden Door Leaf & Hardware L134 C

198

07-JUN-08

10-JUN-08

Install Wooden Door Leaf & Hardware L134 C

135G080210 Install Wooden Door Leaf & Hardware L135 C

198

11-JUN-08

15-JUN-08

Install Wooden Door Leaf & Hardware L135 C

136G080210 Install Wooden Door Leaf & Hardware L136 C

21

194

07-JUN-08

30-JUN-08

Install Wooden Door Leaf & Hardware L136 C

137G080210 Install Wooden Door Leaf & Hardware L137 C

21

194

11-JUN-08

05-JUL-08

Install Wooden Door Leaf & Hardware L137 C

138G080210 Install Wooden Door Leaf & Hardware L138 C

21

194

16-JUN-08

09-JUL-08

Install Wooden Door Leaf & Hardware L138 C

139G080210 Install Wooden Door Leaf & Hardware L139 C

67

06-DEC-08

09-DEC-08

Install Wooden Door Leaf & Hardware L139 C

140G080210 Install Wooden Door Leaf & Hardware L140 C

67

10-DEC-08

14-DEC-08

Install Wooden Door Leaf & Hardware L140 C

141G080210 Install Wooden Door Leaf & Hardware L141 C

67

15-DEC-08

18-DEC-08

Install Wooden Door Leaf & Hardware L141 C

142G080210 Install Wooden Door Leaf & Hardware L142 C

67

20-DEC-08

23-DEC-08

Install Wooden Door Leaf & Hardware L142 C

143G080210 Install Wooden Door Leaf & Hardware L143 C

67

24-DEC-08

28-DEC-08

Install Wooden Door Leaf & Hardware L143 C

144G080210 Install Wooden Door Leaf & Hardware L144 C

67

29-DEC-08

01-JAN-09

Install Wooden Door Leaf & Hardware L144 C

145G080210 Install Wooden Door Leaf & Hardware L145 C

66

04-JAN-09

07-JAN-09

Install Wooden Door Leaf & Hardware L145 C

146G080210 Install Wooden Door Leaf & Hardware L146 C

66

08-JAN-09

12-JAN-09

Install Wooden Door Leaf & Hardware L146 C

147G080210 Install Wooden Door Leaf & Hardware L147 C

66

13-JAN-09

17-JAN-09

Install Wooden Door Leaf & Hardware L147 C

148G080210 Install Wooden Door Leaf & Hardware L148 C

66

18-JAN-09

21-JAN-09

Install Wooden Door Leaf & Hardware L148 C

149G080210 Install Wooden Door Leaf & Hardware L149 C

66

22-JAN-09

26-JAN-09

Install Wooden Door Leaf & Hardware L149 C

150G080210 Install Wooden Door Leaf & Hardware L150 C

66

27-JAN-09

31-JAN-09

Install Wooden Door Leaf & Hardware L150 C

151G080210 Install Wooden Door Leaf & Hardware L151 C

63

04-FEB-09

08-FEB-09

Install Wooden Door Leaf & Hardware L151 C

152G080210 Install Wooden Door Leaf & Hardware L152 C

49

25-FEB-09

01-MAR-09

Install Wooden Door Leaf & Hardware L152 C

153G080210 Install Wooden Door Leaf & Hardware L153 C

46

05-MAR-09

09-MAR-09

Install Wooden Door Leaf & Hardware L153 C

154G080210 Install Wooden Door Leaf & Hardware L154 C

43

14-MAR-09

17-MAR-09

Install Wooden Door Leaf & Hardware L154 C

155G080210 Install Wooden Door Leaf & Hardware L155 C

21

15-MAR-09

07-APR-09

Install Wooden Door Leaf & Hardware L155 C

156G080210 Install Wooden Door Leaf & Hardware L156 C

21

15-MAR-09

07-APR-09

Install Wooden Door Leaf & Hardware L156 C

157G080210 Install Wooden Door Leaf & Hardware L157 C

16-APR-09

20-APR-09

158G080210 Install Wooden Door Leaf & Hardware L158 C

17

30-MAR-09

02-APR-09

Install Wooden Door Leaf & Hardware L158 C

159G080210 Install Wooden Door Leaf & Hardware L159 C

14

07-APR-09

11-APR-09

Install Wooden Door Leaf & Hardware L159 C

160G080210 Install Wooden Door Leaf & Hardware L160 C

11

15-APR-09

19-APR-09

Install Wooden Door Leaf & Hardware L160 C

161G080210 Install Wooden Door Leaf & Hardware L160-M C

23-APR-09

27-APR-09

Install Wooden Door Leaf & Hardware L160-M C

CENTER CORE
002T15110A HVAC - Vertical Riser L2 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L2 C

004T15110A HVAC - Vertical Riser L4 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L4 C

005T15110A HVAC - Vertical Riser L05 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L05 C

006T15110A HVAC - Vertical Riser L06 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L06 C

007T15110A HVAC - Vertical Riser L07 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L07 C

008T15110A HVAC - Vertical Riser L08 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L08 C

009T15110A HVAC - Vertical Riser L09 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L09 C

Install Wooden Door Leaf & Hardware L157 C

MEP - FIRST FIX

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 149 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

010T15110A HVAC - Vertical Riser L10 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L10 C

011T15110A HVAC - Vertical Riser L11 C

35

75

23

25-MAR-06A

25-MAR-07

HVAC - Vertical Riser L11 C

012T15110A HVAC - Vertical Riser L12 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L12 C

013T15110A HVAC - Vertical Riser L13 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L13 C

014T15110A HVAC - Vertical Riser L14 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L14 C

015T15110A HVAC - Vertical Riser L15 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L15 C

016T15110A HVAC - Vertical Riser L16 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L16 C

017T15110A HVAC - Vertical Riser L17~18 C

35

75

23

01-APR-06A

25-MAR-07

HVAC - Vertical Riser L17~18 C

019T15110A HVAC - Vertical Riser L19 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L19 C

020T15110A HVAC - Vertical Riser L20 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L20 C

021T15110A HVAC - Vertical Riser L21 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L21 C

022T15110A HVAC - Vertical Riser L22 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L22 C

023T15110A HVAC - Vertical Riser L23 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L23 C

024T15110A HVAC - Vertical Riser L24 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L24 C

025T15110A HVAC - Vertical Riser L25 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L25 C

026T15110A HVAC - Vertical Riser L26 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L26 C

027T15110A HVAC - Vertical Riser L27 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L27 C

028T15110A HVAC - Vertical Riser L28 C

35

71

23

28-MAY-06A

26-MAR-07

HVAC - Vertical Riser L28 C

029T15110A HVAC - Vertical Riser L29 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L29 C

030T15110A HVAC - Vertical Riser L30 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L30 C

031T15110A HVAC - Vertical Riser L31 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L31 C

032T15110A HVAC - Vertical Riser L32 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L32 C

033T15110A HVAC - Vertical Riser L33 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L33 C

034T15110A HVAC - Vertical Riser L34 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L34 C

035T15110A HVAC - Vertical Riser L35 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L35 C

036T15110A HVAC - Vertical Riser L36 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L36 C

037T15110A HVAC - Vertical Riser L37 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L37 C

038T15110A HVAC - Vertical Riser L38 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L38 C

039T15110A HVAC - Vertical Riser L39 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L39 C

040T15110A HVAC - Vertical Riser L40~42 C

35

70

23

26-JUL-06A

27-MAR-07

HVAC - Vertical Riser L40~42 C

043T15110A HVAC - Vertical Riser L43 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L43 C

044T15110A HVAC - Vertical Riser L44 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L44 C

045T15110A HVAC - Vertical Riser L45 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L45 C

046T15110A HVAC - Vertical Riser L46 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L46 C

047T15110A HVAC - Vertical Riser L47 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L47 C

048T15110A HVAC - Vertical Riser L48 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L48 C

049T15110A HVAC - Vertical Riser L49 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L49 C

050T15110A HVAC - Vertical Riser L50 C

28

60

23

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L50 C

051T15110A HVAC - Vertical Riser L51 C

28

60

198

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L51 C

052T15110A HVAC - Vertical Riser L52 C

28

60

198

18-OCT-06A

27-MAR-07

HVAC - Vertical Riser L52 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 150 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

053T15110A HVAC - Vertical Riser L53 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L53 C

054T15110A HVAC - Vertical Riser L54 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L54 C

055T15110A HVAC - Vertical Riser L55 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L55 C

056T15110A HVAC - Vertical Riser L56 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L56 C

057T15110A HVAC - Vertical Riser L57 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L57 C

058T15110A HVAC - Vertical Riser L58 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L58 C

059T15110A HVAC - Vertical Riser L59 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L59 C

060T15110A HVAC - Vertical Riser L60 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L60 C

061T15110A HVAC - Vertical Riser L61 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L61 C

062T15110A HVAC - Vertical Riser L62 C

28

60

198

05-NOV-06A

27-MAR-07

HVAC - Vertical Riser L62 C

063T15110A HVAC - Vertical Riser L63 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L63 C

064T15110A HVAC - Vertical Riser L64 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L64 C

065T15110A HVAC - Vertical Riser L65 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L65 C

066T15110A HVAC - Vertical Riser L66 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L66 C

067T15110A HVAC - Vertical Riser L67 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L67 C

068T15110A HVAC - Vertical Riser L68 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L68 C

069T15110A HVAC - Vertical Riser L69 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L69 C

070T15110A HVAC - Vertical Riser L70 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L70 C

071T15110A HVAC - Vertical Riser L71 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L71 C

072T15110A HVAC - Vertical Riser L72 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L72 C

073T15110A HVAC - Vertical Riser L73~75 C

28

10

198

16-DEC-06A

12-APR-07

HVAC - Vertical Riser L73~75 C

109T15110A HVAC - Vertical Riser L109~111 C

28

155

31-MAY-07

02-JUL-07

112T15110A HVAC - Vertical Riser L112 C

28

289

13-JUN-07

15-JUL-07

HVAC - Vertical Riser L112 C

113T15110A HVAC - Vertical Riser L113 C

28

292

18-JUN-07

19-JUL-07

HVAC - Vertical Riser L113 C

114T15110A HVAC - Vertical Riser L114 C

28

284

02-JUL-07

02-AUG-07

HVAC - Vertical Riser L114 C

115T15110A HVAC - Vertical Riser L115 C

28

283

08-JUL-07

08-AUG-07

HVAC - Vertical Riser L115 C

116T15110A HVAC - Vertical Riser L116 C

28

276

21-JUL-07

21-AUG-07

HVAC - Vertical Riser L116 C

117T15110A HVAC - Vertical Riser L117 C

28

275

26-JUL-07

27-AUG-07

HVAC - Vertical Riser L117 C

118T15110A HVAC - Vertical Riser L118 C

28

272

04-AUG-07

04-SEP-07

HVAC - Vertical Riser L118 C

119T15110A HVAC - Vertical Riser L119 C

28

271

09-AUG-07

10-SEP-07

HVAC - Vertical Riser L119 C

120T15110A HVAC - Vertical Riser L120 C

28

270

15-AUG-07

16-SEP-07

HVAC - Vertical Riser L120 C

121T15110A HVAC - Vertical Riser L121 C

28

270

20-AUG-07

20-SEP-07

HVAC - Vertical Riser L121 C

122T15110A HVAC - Vertical Riser L122 C

28

200

26-AUG-07

26-SEP-07

HVAC - Vertical Riser L122 C

123T15110A HVAC - Vertical Riser L123 C

28

199

01-SEP-07

02-OCT-07

HVAC - Vertical Riser L123 C

124T15110A HVAC - Vertical Riser L124 C

28

197

08-SEP-07

09-OCT-07

HVAC - Vertical Riser L124 C

125T15110A HVAC - Vertical Riser L125 C

28

197

12-SEP-07

14-OCT-07

HVAC - Vertical Riser L125 C

126T15110A HVAC - Vertical Riser L126 C

28

196

18-SEP-07

20-OCT-07

HVAC - Vertical Riser L126 C

127T15110A HVAC - Vertical Riser L127 C

28

196

23-SEP-07

24-OCT-07

HVAC - Vertical Riser L127 C

128T15110A HVAC - Vertical Riser L128 C

28

195

29-SEP-07

30-OCT-07

HVAC - Vertical Riser L128 C

129T15110A HVAC - Vertical Riser L129 C

28

194

04-OCT-07

05-NOV-07

HVAC - Vertical Riser L129 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Vertical Riser L109~111 C

Sheet 151 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

130T15110A HVAC - Vertical Riser L130 C

28

194

09-OCT-07

10-NOV-07

HVAC - Vertical Riser L130 C

131T15110A HVAC - Vertical Riser L131 C

28

191

17-OCT-07

18-NOV-07

HVAC - Vertical Riser L131 C

132T15110A HVAC - Vertical Riser L132 C

28

175

10-NOV-07

11-DEC-07

HVAC - Vertical Riser L132 C

133T15110A HVAC - Vertical Riser L133 C

28

172

18-NOV-07

19-DEC-07

HVAC - Vertical Riser L133 C

134T15110A HVAC - Vertical Riser L134 C

28

164

02-DEC-07

02-JAN-08

HVAC - Vertical Riser L134 C

135T15110A HVAC - Vertical Riser L135 C

28

163

08-DEC-07

08-JAN-08

HVAC - Vertical Riser L135 C

136T15110A HVAC - Vertical Riser L136~138 C

35

37

03-JAN-08

12-FEB-08

139T15110A HVAC - Vertical Riser L139 C

28

173

12-DEC-07

13-JAN-08

HVAC - Vertical Riser L139 C

140T15110A HVAC - Vertical Riser L140 C

28

178

17-DEC-07

17-JAN-08

HVAC - Vertical Riser L140 C

141T15110A HVAC - Vertical Riser L141 C

28

178

22-DEC-07

22-JAN-08

HVAC - Vertical Riser L141 C

142T15110A HVAC - Vertical Riser L142 C

28

178

26-DEC-07

27-JAN-08

HVAC - Vertical Riser L142 C

143T15110A HVAC - Vertical Riser L143 C

28

178

31-DEC-07

31-JAN-08

HVAC - Vertical Riser L143 C

144T15110A HVAC - Vertical Riser L144 C

28

178

05-JAN-08

05-FEB-08

HVAC - Vertical Riser L144 C

145T15110A HVAC - Vertical Riser L145 C

28

178

09-JAN-08

10-FEB-08

HVAC - Vertical Riser L145 C

146T15110A HVAC - Vertical Riser L146 C

28

178

14-JAN-08

14-FEB-08

HVAC - Vertical Riser L146 C

147T15110A HVAC - Vertical Riser L147 C

28

178

19-JAN-08

18-FEB-08

148T15110A HVAC - Vertical Riser L148 C

28

15

30-JUL-08

31-AUG-08

HVAC - Vertical Riser L147 C


HVAC - Vertical Riser L148 C

149T15110A HVAC - Vertical Riser L149 C

28

15

04-AUG-08

04-SEP-08

HVAC - Vertical Riser L149 C

150T15110A HVAC - Vertical Riser L150 C

28

15

09-AUG-08

09-SEP-08

HVAC - Vertical Riser L150 C

151T15110A HVAC - Vertical Riser L151 C

28

15

13-AUG-08

14-SEP-08

HVAC - Vertical Riser L151 C

152T15110A HVAC - Vertical Riser L152 C

28

15

18-AUG-08

18-SEP-08

HVAC - Vertical Riser L152 C

153T15110A HVAC - Vertical Riser L153 C

28

79

23-AUG-08

23-SEP-08

HVAC - Vertical Riser L153 C

154T15110A HVAC - Vertical Riser L154 C

28

79

27-AUG-08

28-SEP-08

155T15110A HVAC - Vertical Riser L155~156 C

14

110

11-SEP-08

27-SEP-08

002T15120A Fire - Vertical Riser L2 C

35

116

15-MAR-07

24-APR-07

Fire - Vertical Riser L2 C

004T15120A Fire - Vertical Riser L4 C

35

205

18-MAR-07

26-APR-07

Fire - Vertical Riser L4 C

005T15120A Fire - Vertical Riser L05 C

35

205

20-MAR-07

29-APR-07

Fire - Vertical Riser L05 C

006T15120A Fire - Vertical Riser L06 C

35

205

22-MAR-07

01-MAY-07

Fire - Vertical Riser L06 C

007T15120A Fire - Vertical Riser L07 C

35

205

25-MAR-07

03-MAY-07

Fire - Vertical Riser L07 C

008T15120A Fire - Vertical Riser L08 C

35

205

27-MAR-07

06-MAY-07

Fire - Vertical Riser L08 C

009T15120A Fire - Vertical Riser L09 C

35

205

29-MAR-07

08-MAY-07

Fire - Vertical Riser L09 C

010T15120A Fire - Vertical Riser L10 C

35

205

01-APR-07

10-MAY-07

Fire - Vertical Riser L10 C

011T15120A Fire - Vertical Riser L11 C

35

205

03-APR-07

13-MAY-07

Fire - Vertical Riser L11 C

012T15120A Fire - Vertical Riser L12 C

35

205

05-APR-07

15-MAY-07

Fire - Vertical Riser L12 C

013T15120A Fire - Vertical Riser L13 C

35

205

08-APR-07

17-MAY-07

Fire - Vertical Riser L13 C

014T15120A Fire - Vertical Riser L14 C

35

205

10-APR-07

20-MAY-07

Fire - Vertical Riser L14 C

015T15120A Fire - Vertical Riser L15 C

35

205

12-APR-07

22-MAY-07

Fire - Vertical Riser L15 C

016T15120A Fire - Vertical Riser L16 C

35

205

15-APR-07

24-MAY-07

Fire - Vertical Riser L16 C

017T15120A Fire - Vertical Riser L17~18 C

35

205

17-APR-07

27-MAY-07

Fire - Vertical Riser L17~18 C

019T15120A Fire - Vertical Riser L19 C

35

205

19-APR-07

29-MAY-07

Fire - Vertical Riser L19 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

HVAC - Vertical Riser L136~138 C

HVAC - Vertical Riser L154 C


HVAC - Vertical Riser L155~156 C

Sheet 152 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

020T15120A Fire - Vertical Riser L20 C

35

205

22-APR-07

31-MAY-07

Fire - Vertical Riser L20 C

021T15120A Fire - Vertical Riser L21 C

35

205

24-APR-07

03-JUN-07

Fire - Vertical Riser L21 C

022T15120A Fire - Vertical Riser L22 C

35

205

26-APR-07

05-JUN-07

Fire - Vertical Riser L22 C

023T15120A Fire - Vertical Riser L23 C

35

205

29-APR-07

07-JUN-07

Fire - Vertical Riser L23 C

024T15120A Fire - Vertical Riser L24 C

35

205

01-MAY-07

10-JUN-07

Fire - Vertical Riser L24 C

025T15120A Fire - Vertical Riser L25 C

35

205

03-MAY-07

12-JUN-07

Fire - Vertical Riser L25 C

026T15120A Fire - Vertical Riser L26 C

35

205

06-MAY-07

14-JUN-07

Fire - Vertical Riser L26 C

027T15120A Fire - Vertical Riser L27 C

35

205

08-MAY-07

17-JUN-07

Fire - Vertical Riser L27 C

028T15120A Fire - Vertical Riser L28 C

35

205

10-MAY-07

19-JUN-07

Fire - Vertical Riser L28 C

029T15120A Fire - Vertical Riser L29 C

35

205

13-MAY-07

21-JUN-07

Fire - Vertical Riser L29 C

030T15120A Fire - Vertical Riser L30 C

35

205

15-MAY-07

24-JUN-07

Fire - Vertical Riser L30 C

031T15120A Fire - Vertical Riser L31 C

35

205

17-MAY-07

26-JUN-07

Fire - Vertical Riser L31 C

032T15120A Fire - Vertical Riser L32 C

35

205

20-MAY-07

28-JUN-07

Fire - Vertical Riser L32 C

033T15120A Fire - Vertical Riser L33 C

35

205

22-MAY-07

01-JUL-07

Fire - Vertical Riser L33 C

034T15120A Fire - Vertical Riser L34 C

35

205

24-MAY-07

03-JUL-07

Fire - Vertical Riser L34 C

035T15120A Fire - Vertical Riser L35 C

35

205

27-MAY-07

05-JUL-07

Fire - Vertical Riser L35 C

036T15120A Fire - Vertical Riser L36 C

35

205

29-MAY-07

08-JUL-07

Fire - Vertical Riser L36 C

037T15120A Fire - Vertical Riser L37 C

35

205

31-MAY-07

10-JUL-07

Fire - Vertical Riser L37 C

038T15120A Fire - Vertical Riser L38 C

35

205

03-JUN-07

12-JUL-07

Fire - Vertical Riser L38 C

039T15120A Fire - Vertical Riser L39 C

35

205

05-JUN-07

15-JUL-07

Fire - Vertical Riser L39 C

040T15120A Fire - Vertical Riser L40~42 C

35

205

07-JUN-07

17-JUL-07

Fire - Vertical Riser L40~42 C

043T15120A Fire - Vertical Riser L43 C

28

205

10-JUN-07

11-JUL-07

Fire - Vertical Riser L43 C

044T15120A Fire - Vertical Riser L44 C

28

205

12-JUN-07

14-JUL-07

Fire - Vertical Riser L44 C

045T15120A Fire - Vertical Riser L45 C

28

205

14-JUN-07

16-JUL-07

Fire - Vertical Riser L45 C

046T15120A Fire - Vertical Riser L46 C

28

205

17-JUN-07

18-JUL-07

Fire - Vertical Riser L46 C

047T15120A Fire - Vertical Riser L47 C

28

205

19-JUN-07

21-JUL-07

Fire - Vertical Riser L47 C

048T15120A Fire - Vertical Riser L48 C

28

205

21-JUN-07

23-JUL-07

Fire - Vertical Riser L48 C

049T15120A Fire - Vertical Riser L49 C

28

205

24-JUN-07

25-JUL-07

Fire - Vertical Riser L49 C

050T15120A Fire - Vertical Riser L50 C

28

205

26-JUN-07

28-JUL-07

Fire - Vertical Riser L50 C

051T15120A Fire - Vertical Riser L51 C

28

205

28-JUN-07

30-JUL-07

Fire - Vertical Riser L51 C

052T15120A Fire - Vertical Riser L52 C

28

205

01-JUL-07

01-AUG-07

Fire - Vertical Riser L52 C

053T15120A Fire - Vertical Riser L53 C

28

205

03-JUL-07

04-AUG-07

Fire - Vertical Riser L53 C

054T15120A Fire - Vertical Riser L54 C

28

205

05-JUL-07

06-AUG-07

Fire - Vertical Riser L54 C

055T15120A Fire - Vertical Riser L55 C

28

205

08-JUL-07

08-AUG-07

Fire - Vertical Riser L55 C

056T15120A Fire - Vertical Riser L56 C

28

205

10-JUL-07

11-AUG-07

Fire - Vertical Riser L56 C

057T15120A Fire - Vertical Riser L57 C

28

205

12-JUL-07

13-AUG-07

Fire - Vertical Riser L57 C

058T15120A Fire - Vertical Riser L58 C

28

205

15-JUL-07

15-AUG-07

Fire - Vertical Riser L58 C

059T15120A Fire - Vertical Riser L59 C

28

205

17-JUL-07

18-AUG-07

Fire - Vertical Riser L59 C

060T15120A Fire - Vertical Riser L60 C

28

205

19-JUL-07

20-AUG-07

Fire - Vertical Riser L60 C

061T15120A Fire - Vertical Riser L61 C

28

205

22-JUL-07

22-AUG-07

Fire - Vertical Riser L61 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 153 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

062T15120A Fire - Vertical Riser L62 C

28

205

24-JUL-07

25-AUG-07

Fire - Vertical Riser L62 C

063T15120A Fire - Vertical Riser L63 C

28

205

26-JUL-07

27-AUG-07

Fire - Vertical Riser L63 C

064T15120A Fire - Vertical Riser L64 C

28

205

29-JUL-07

29-AUG-07

Fire - Vertical Riser L64 C

065T15120A Fire - Vertical Riser L65 C

28

205

31-JUL-07

01-SEP-07

Fire - Vertical Riser L65 C

066T15120A Fire - Vertical Riser L66 C

28

205

02-AUG-07

03-SEP-07

Fire - Vertical Riser L66 C

067T15120A Fire - Vertical Riser L67 C

28

205

05-AUG-07

05-SEP-07

Fire - Vertical Riser L67 C

068T15120A Fire - Vertical Riser L68 C

28

205

07-AUG-07

08-SEP-07

Fire - Vertical Riser L68 C

069T15120A Fire - Vertical Riser L69 C

28

205

09-AUG-07

10-SEP-07

Fire - Vertical Riser L69 C

070T15120A Fire - Vertical Riser L70 C

28

205

12-AUG-07

12-SEP-07

Fire - Vertical Riser L70 C

071T15120A Fire - Vertical Riser L71 C

28

205

14-AUG-07

15-SEP-07

Fire - Vertical Riser L71 C

072T15120A Fire - Vertical Riser L72 C

28

205

16-AUG-07

17-SEP-07

Fire - Vertical Riser L72 C

073T15120A Fire - Vertical Riser L73~75 C

28

205

19-AUG-07

19-SEP-07

Fire - Vertical Riser L73~75 C

109T15120A Fire - Vertical Riser L109~111 C

28

205

29-SEP-07

30-OCT-07

Fire - Vertical Riser L109~111 C

112T15120A Fire - Vertical Riser L112 C

28

205

30-SEP-07

31-OCT-07

Fire - Vertical Riser L112 C

113T15120A Fire - Vertical Riser L113 C

28

205

04-OCT-07

05-NOV-07

Fire - Vertical Riser L113 C

114T15120A Fire - Vertical Riser L114 C

28

205

09-OCT-07

10-NOV-07

Fire - Vertical Riser L114 C

115T15120A Fire - Vertical Riser L115 C

28

205

14-OCT-07

14-NOV-07

Fire - Vertical Riser L115 C

116T15120A Fire - Vertical Riser L116 C

28

205

18-OCT-07

19-NOV-07

Fire - Vertical Riser L116 C

117T15120A Fire - Vertical Riser L117 C

28

205

23-OCT-07

24-NOV-07

Fire - Vertical Riser L117 C

118T15120A Fire - Vertical Riser L118 C

28

205

28-OCT-07

28-NOV-07

Fire - Vertical Riser L118 C

119T15120A Fire - Vertical Riser L119 C

28

205

01-NOV-07

03-DEC-07

Fire - Vertical Riser L119 C

120T15120A Fire - Vertical Riser L120 C

28

205

06-NOV-07

08-DEC-07

Fire - Vertical Riser L120 C

121T15120A Fire - Vertical Riser L121 C

28

205

11-NOV-07

12-DEC-07

122T15120A Fire - Vertical Riser L122 C

28

196

26-AUG-07

26-SEP-07

Fire - Vertical Riser L122 C

123T15120A Fire - Vertical Riser L123 C

28

195

01-SEP-07

02-OCT-07

Fire - Vertical Riser L123 C

124T15120A Fire - Vertical Riser L124 C

28

193

08-SEP-07

09-OCT-07

Fire - Vertical Riser L124 C

125T15120A Fire - Vertical Riser L125 C

28

193

12-SEP-07

14-OCT-07

Fire - Vertical Riser L125 C

126T15120A Fire - Vertical Riser L126 C

28

192

18-SEP-07

20-OCT-07

Fire - Vertical Riser L126 C

127T15120A Fire - Vertical Riser L127 C

28

192

23-SEP-07

24-OCT-07

Fire - Vertical Riser L127 C

128T15120A Fire - Vertical Riser L128 C

28

191

29-SEP-07

30-OCT-07

Fire - Vertical Riser L128 C

129T15120A Fire - Vertical Riser L129 C

28

190

04-OCT-07

05-NOV-07

Fire - Vertical Riser L129 C

130T15120A Fire - Vertical Riser L130 C

28

190

09-OCT-07

10-NOV-07

Fire - Vertical Riser L130 C

131T15120A Fire - Vertical Riser L131 C

28

191

17-OCT-07

18-NOV-07

Fire - Vertical Riser L131 C

132T15120A Fire - Vertical Riser L132 C

28

175

10-NOV-07

11-DEC-07

Fire - Vertical Riser L132 C

133T15120A Fire - Vertical Riser L133 C

28

172

18-NOV-07

19-DEC-07

Fire - Vertical Riser L133 C

134T15120A Fire - Vertical Riser L134 C

28

164

02-DEC-07

02-JAN-08

Fire - Vertical Riser L134 C

135T15120A Fire - Vertical Riser L135 C

28

163

08-DEC-07

08-JAN-08

Fire - Vertical Riser L135 C

136T15120A Fire - Vertical Riser L136~138 C

35

244

03-JAN-08

12-FEB-08

139T15120A Fire - Vertical Riser L139 C

28

173

12-DEC-07

13-JAN-08

Fire - Vertical Riser L139 C

140T15120A Fire - Vertical Riser L140 C

28

242

17-DEC-07

17-JAN-08

Fire - Vertical Riser L140 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Fire - Vertical Riser L121 C

Fire - Vertical Riser L136~138 C

Sheet 154 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

141T15120A Fire - Vertical Riser L141 C

28

242

22-DEC-07

22-JAN-08

Fire - Vertical Riser L141 C

142T15120A Fire - Vertical Riser L142 C

28

242

26-DEC-07

27-JAN-08

Fire - Vertical Riser L142 C

143T15120A Fire - Vertical Riser L143 C

28

242

31-DEC-07

31-JAN-08

Fire - Vertical Riser L143 C

144T15120A Fire - Vertical Riser L144 C

28

242

05-JAN-08

05-FEB-08

Fire - Vertical Riser L144 C

145T15120A Fire - Vertical Riser L145 C

28

242

09-JAN-08

10-FEB-08

Fire - Vertical Riser L145 C

146T15120A Fire - Vertical Riser L146 C

28

242

14-JAN-08

14-FEB-08

Fire - Vertical Riser L146 C

147T15120A Fire - Vertical Riser L147 C

28

242

19-JAN-08

18-FEB-08

Fire - Vertical Riser L147 C

148T15120A Fire - Vertical Riser L148 C

28

242

23-JAN-08

23-FEB-08

Fire - Vertical Riser L148 C

149T15120A Fire - Vertical Riser L149 C

28

242

28-JAN-08

27-FEB-08

Fire - Vertical Riser L149 C

150T15120A Fire - Vertical Riser L150 C

28

242

02-FEB-08

03-MAR-08

Fire - Vertical Riser L150 C

151T15120A Fire - Vertical Riser L151 C

28

242

06-FEB-08

08-MAR-08

Fire - Vertical Riser L151 C

152T15120A Fire - Vertical Riser L152 C

28

242

11-FEB-08

12-MAR-08

Fire - Vertical Riser L152 C

153T15120A Fire - Vertical Riser L153 C

28

242

15-FEB-08

17-MAR-08

Fire - Vertical Riser L153 C

154T15120A Fire - Vertical Riser L154 C

28

242

19-FEB-08

22-MAR-08

155T15120A Fire - Vertical Riser L155~156 C

14

110

11-SEP-08

27-SEP-08

Fire - Vertical Riser L154 C


Fire - Vertical Riser L155~156 C

002T16130A Electrical - Vertical Riser L2 C

35

184

15-MAR-07

24-APR-07

Electrical - Vertical Riser L2 C

004T16130A Electrical - Vertical Riser L4 C

35

200

18-MAR-07

26-APR-07

Electrical - Vertical Riser L4 C

005T16130A Electrical - Vertical Riser L05 C

35

200

20-MAR-07

29-APR-07

Electrical - Vertical Riser L05 C

006T16130A Electrical - Vertical Riser L06 C

35

200

22-MAR-07

01-MAY-07

Electrical - Vertical Riser L06 C

007T16130A Electrical - Vertical Riser L07 C

35

200

25-MAR-07

03-MAY-07

Electrical - Vertical Riser L07 C

008T16130A Electrical - Vertical Riser L08 C

35

200

27-MAR-07

06-MAY-07

Electrical - Vertical Riser L08 C

009T16130A Electrical - Vertical Riser L09 C

35

200

29-MAR-07

08-MAY-07

Electrical - Vertical Riser L09 C

010T16130A Electrical - Vertical Riser L10 C

35

200

01-APR-07

10-MAY-07

Electrical - Vertical Riser L10 C

011T16130A Electrical - Vertical Riser L11 C

35

200

03-APR-07

13-MAY-07

Electrical - Vertical Riser L11 C

012T16130A Electrical - Vertical Riser L12 C

35

200

05-APR-07

15-MAY-07

Electrical - Vertical Riser L12 C

013T16130A Electrical - Vertical Riser L13 C

35

200

08-APR-07

17-MAY-07

Electrical - Vertical Riser L13 C

014T16130A Electrical - Vertical Riser L14 C

35

200

10-APR-07

20-MAY-07

Electrical - Vertical Riser L14 C

015T16130A Electrical - Vertical Riser L15 C

35

200

12-APR-07

22-MAY-07

Electrical - Vertical Riser L15 C

016T16130A Electrical - Vertical Riser L16 C

35

200

15-APR-07

24-MAY-07

Electrical - Vertical Riser L16 C

017T16130A Electrical - Vertical Riser L17~18 C

35

200

17-APR-07

27-MAY-07

Electrical - Vertical Riser L17~18 C

019T16130A Electrical - Vertical Riser L19 C

35

200

19-APR-07

29-MAY-07

Electrical - Vertical Riser L19 C

020T16130A Electrical - Vertical Riser L20 C

35

200

22-APR-07

31-MAY-07

Electrical - Vertical Riser L20 C

021T16130A Electrical - Vertical Riser L21 C

35

200

24-APR-07

03-JUN-07

Electrical - Vertical Riser L21 C

022T16130A Electrical - Vertical Riser L22 C

35

200

26-APR-07

05-JUN-07

Electrical - Vertical Riser L22 C

023T16130A Electrical - Vertical Riser L23 C

35

200

29-APR-07

07-JUN-07

Electrical - Vertical Riser L23 C

024T16130A Electrical - Vertical Riser L24 C

35

200

01-MAY-07

10-JUN-07

Electrical - Vertical Riser L24 C

025T16130A Electrical - Vertical Riser L25 C

35

200

03-MAY-07

12-JUN-07

Electrical - Vertical Riser L25 C

026T16130A Electrical - Vertical Riser L26 C

35

200

06-MAY-07

14-JUN-07

Electrical - Vertical Riser L26 C

027T16130A Electrical - Vertical Riser L27 C

35

200

08-MAY-07

17-JUN-07

Electrical - Vertical Riser L27 C

028T16130A Electrical - Vertical Riser L28 C

35

200

10-MAY-07

19-JUN-07

Electrical - Vertical Riser L28 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 155 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

029T16130A Electrical - Vertical Riser L29 C

35

200

13-MAY-07

21-JUN-07

Electrical - Vertical Riser L29 C

030T16130A Electrical - Vertical Riser L30 C

35

200

15-MAY-07

24-JUN-07

Electrical - Vertical Riser L30 C

031T16130A Electrical - Vertical Riser L31 C

35

200

17-MAY-07

26-JUN-07

Electrical - Vertical Riser L31 C

032T16130A Electrical - Vertical Riser L32 C

35

200

20-MAY-07

28-JUN-07

Electrical - Vertical Riser L32 C

033T16130A Electrical - Vertical Riser L33 C

35

200

22-MAY-07

01-JUL-07

Electrical - Vertical Riser L33 C

034T16130A Electrical - Vertical Riser L34 C

35

200

24-MAY-07

03-JUL-07

Electrical - Vertical Riser L34 C

035T16130A Electrical - Vertical Riser L35 C

35

200

27-MAY-07

05-JUL-07

Electrical - Vertical Riser L35 C

036T16130A Electrical - Vertical Riser L36 C

35

200

29-MAY-07

08-JUL-07

Electrical - Vertical Riser L36 C

037T16130A Electrical - Vertical Riser L37 C

35

200

31-MAY-07

10-JUL-07

Electrical - Vertical Riser L37 C

038T16130A Electrical - Vertical Riser L38 C

35

200

03-JUN-07

12-JUL-07

Electrical - Vertical Riser L38 C

039T16130A Electrical - Vertical Riser L39 C

35

200

05-JUN-07

15-JUL-07

Electrical - Vertical Riser L39 C

040T16130A Electrical - Vertical Riser L40~42 C

35

200

07-JUN-07

17-JUL-07

Electrical - Vertical Riser L40~42 C

043T16130A Electrical - Vertical Riser L43 C

28

200

10-JUN-07

11-JUL-07

Electrical - Vertical Riser L43 C

044T16130A Electrical - Vertical Riser L44 C

28

200

12-JUN-07

14-JUL-07

Electrical - Vertical Riser L44 C

045T16130A Electrical - Vertical Riser L45 C

28

200

14-JUN-07

16-JUL-07

Electrical - Vertical Riser L45 C

046T16130A Electrical - Vertical Riser L46 C

28

200

17-JUN-07

18-JUL-07

Electrical - Vertical Riser L46 C

047T16130A Electrical - Vertical Riser L47 C

28

200

19-JUN-07

21-JUL-07

Electrical - Vertical Riser L47 C

048T16130A Electrical - Vertical Riser L48 C

28

200

21-JUN-07

23-JUL-07

Electrical - Vertical Riser L48 C

049T16130A Electrical - Vertical Riser L49 C

28

200

24-JUN-07

25-JUL-07

Electrical - Vertical Riser L49 C

050T16130A Electrical - Vertical Riser L50 C

28

200

26-JUN-07

28-JUL-07

Electrical - Vertical Riser L50 C

051T16130A Electrical - Vertical Riser L51 C

28

200

28-JUN-07

30-JUL-07

Electrical - Vertical Riser L51 C

052T16130A Electrical - Vertical Riser L52 C

28

200

01-JUL-07

01-AUG-07

Electrical - Vertical Riser L52 C

053T16130A Electrical - Vertical Riser L53 C

28

200

03-JUL-07

04-AUG-07

Electrical - Vertical Riser L53 C

054T16130A Electrical - Vertical Riser L54 C

28

200

05-JUL-07

06-AUG-07

Electrical - Vertical Riser L54 C

055T16130A Electrical - Vertical Riser L55 C

28

200

08-JUL-07

08-AUG-07

Electrical - Vertical Riser L55 C

056T16130A Electrical - Vertical Riser L56 C

28

200

10-JUL-07

11-AUG-07

Electrical - Vertical Riser L56 C

057T16130A Electrical - Vertical Riser L57 C

28

200

12-JUL-07

13-AUG-07

Electrical - Vertical Riser L57 C

058T16130A Electrical - Vertical Riser L58 C

28

200

15-JUL-07

15-AUG-07

Electrical - Vertical Riser L58 C

059T16130A Electrical - Vertical Riser L59 C

28

200

17-JUL-07

18-AUG-07

Electrical - Vertical Riser L59 C

060T16130A Electrical - Vertical Riser L60 C

28

200

19-JUL-07

20-AUG-07

Electrical - Vertical Riser L60 C

061T16130A Electrical - Vertical Riser L61 C

28

200

22-JUL-07

22-AUG-07

Electrical - Vertical Riser L61 C

062T16130A Electrical - Vertical Riser L62 C

28

200

24-JUL-07

25-AUG-07

Electrical - Vertical Riser L62 C

063T16130A Electrical - Vertical Riser L63 C

28

200

26-JUL-07

27-AUG-07

Electrical - Vertical Riser L63 C

064T16130A Electrical - Vertical Riser L64 C

28

200

29-JUL-07

29-AUG-07

Electrical - Vertical Riser L64 C

065T16130A Electrical - Vertical Riser L65 C

28

200

31-JUL-07

01-SEP-07

Electrical - Vertical Riser L65 C

066T16130A Electrical - Vertical Riser L66 C

28

200

02-AUG-07

03-SEP-07

Electrical - Vertical Riser L66 C

067T16130A Electrical - Vertical Riser L67 C

28

200

05-AUG-07

05-SEP-07

Electrical - Vertical Riser L67 C

068T16130A Electrical - Vertical Riser L68 C

28

200

07-AUG-07

08-SEP-07

Electrical - Vertical Riser L68 C

069T16130A Electrical - Vertical Riser L69 C

28

200

09-AUG-07

10-SEP-07

Electrical - Vertical Riser L69 C

070T16130A Electrical - Vertical Riser L70 C

28

200

12-AUG-07

12-SEP-07

Electrical - Vertical Riser L70 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 156 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

071T16130A Electrical - Vertical Riser L71 C

28

200

14-AUG-07

15-SEP-07

Electrical - Vertical Riser L71 C

072T16130A Electrical - Vertical Riser L72 C

28

200

16-AUG-07

17-SEP-07

Electrical - Vertical Riser L72 C

073T16130A Electrical - Vertical Riser L73~75 C

28

200

19-AUG-07

19-SEP-07

Electrical - Vertical Riser L73~75 C

109T16130A Electrical - Vertical Riser L109~111 C

28

200

27-SEP-07

29-OCT-07

112T16130A Electrical - Vertical Riser L112 C

28

200

29-SEP-07

30-OCT-07

113T16130A Electrical - Vertical Riser L113 C

28

292

18-JUN-07

19-JUL-07

114T16130A Electrical - Vertical Riser L114 C

28

284

02-JUL-07

02-AUG-07

Electrical - Vertical Riser L114 C

115T16130A Electrical - Vertical Riser L115 C

28

283

08-JUL-07

08-AUG-07

Electrical - Vertical Riser L115 C

116T16130A Electrical - Vertical Riser L116 C

28

276

21-JUL-07

21-AUG-07

Electrical - Vertical Riser L116 C

117T16130A Electrical - Vertical Riser L117 C

28

275

26-JUL-07

27-AUG-07

Electrical - Vertical Riser L117 C

118T16130A Electrical - Vertical Riser L118 C

28

272

04-AUG-07

04-SEP-07

Electrical - Vertical Riser L118 C

119T16130A Electrical - Vertical Riser L119 C

28

271

09-AUG-07

10-SEP-07

Electrical - Vertical Riser L119 C

120T16130A Electrical - Vertical Riser L120 C

28

270

15-AUG-07

16-SEP-07

Electrical - Vertical Riser L120 C

121T16130A Electrical - Vertical Riser L121 C

28

270

20-AUG-07

20-SEP-07

Electrical - Vertical Riser L121 C

122T16130A Electrical - Vertical Riser L122 C

28

268

26-AUG-07

26-SEP-07

Electrical - Vertical Riser L122 C

123T16130A Electrical - Vertical Riser L123 C

28

270

01-SEP-07

02-OCT-07

Electrical - Vertical Riser L123 C

124T16130A Electrical - Vertical Riser L124 C

28

270

08-SEP-07

09-OCT-07

Electrical - Vertical Riser L124 C

125T16130A Electrical - Vertical Riser L125 C

28

264

12-SEP-07

14-OCT-07

Electrical - Vertical Riser L125 C

126T16130A Electrical - Vertical Riser L126 C

28

263

18-SEP-07

20-OCT-07

Electrical - Vertical Riser L126 C

127T16130A Electrical - Vertical Riser L127 C

28

263

23-SEP-07

24-OCT-07

Electrical - Vertical Riser L127 C

128T16130A Electrical - Vertical Riser L128 C

28

262

29-SEP-07

30-OCT-07

Electrical - Vertical Riser L128 C

129T16130A Electrical - Vertical Riser L129 C

28

261

04-OCT-07

05-NOV-07

Electrical - Vertical Riser L129 C

130T16130A Electrical - Vertical Riser L130 C

28

261

09-OCT-07

10-NOV-07

Electrical - Vertical Riser L130 C

131T16130A Electrical - Vertical Riser L131 C

28

259

17-OCT-07

18-NOV-07

Electrical - Vertical Riser L131 C

132T16130A Electrical - Vertical Riser L132 C

28

242

10-NOV-07

11-DEC-07

Electrical - Vertical Riser L132 C

133T16130A Electrical - Vertical Riser L133 C

28

239

18-NOV-07

19-DEC-07

Electrical - Vertical Riser L133 C

134T16130A Electrical - Vertical Riser L134 C

28

231

02-DEC-07

02-JAN-08

135T16130A Electrical - Vertical Riser L135 C

28

163

08-DEC-07

08-JAN-08

136T16130A Electrical - Vertical Riser L136~138 C

35

244

03-JAN-08

12-FEB-08

139T16130A Electrical - Vertical Riser L139 C

28

173

12-DEC-07

13-JAN-08

Electrical - Vertical Riser L139 C

140T16130A Electrical - Vertical Riser L140 C

28

327

17-DEC-07

17-JAN-08

Electrical - Vertical Riser L140 C

141T16130A Electrical - Vertical Riser L141 C

28

327

22-DEC-07

22-JAN-08

Electrical - Vertical Riser L141 C

142T16130A Electrical - Vertical Riser L142 C

28

327

26-DEC-07

27-JAN-08

Electrical - Vertical Riser L142 C

143T16130A Electrical - Vertical Riser L143 C

28

327

31-DEC-07

31-JAN-08

Electrical - Vertical Riser L143 C

144T16130A Electrical - Vertical Riser L144 C

28

327

05-JAN-08

05-FEB-08

Electrical - Vertical Riser L144 C

145T16130A Electrical - Vertical Riser L145 C

28

327

09-JAN-08

10-FEB-08

Electrical - Vertical Riser L145 C

146T16130A Electrical - Vertical Riser L146 C

28

327

14-JAN-08

14-FEB-08

Electrical - Vertical Riser L146 C

147T16130A Electrical - Vertical Riser L147 C

28

327

19-JAN-08

18-FEB-08

148T16130A Electrical - Vertical Riser L148 C

28

164

30-JUL-08

31-AUG-08

Electrical - Vertical Riser L147 C


Electrical - Vertical Riser L148 C

149T16130A Electrical - Vertical Riser L149 C

28

164

04-AUG-08

04-SEP-08

Electrical - Vertical Riser L149 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Electrical - Vertical Riser L109~111 C


Electrical - Vertical Riser L112 C
Electrical - Vertical Riser L113 C

Electrical - Vertical Riser L134 C


Electrical - Vertical Riser L135 C
Electrical - Vertical Riser L136~138 C

Sheet 157 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

150T16130A Electrical - Vertical Riser L150 C

28

164

09-AUG-08

09-SEP-08

Electrical - Vertical Riser L150 C

151T16130A Electrical - Vertical Riser L151 C

28

164

13-AUG-08

14-SEP-08

Electrical - Vertical Riser L151 C

152T16130A Electrical - Vertical Riser L152 C

28

158

18-AUG-08

18-SEP-08

Electrical - Vertical Riser L152 C

153T16130A Electrical - Vertical Riser L153 C

28

161

23-AUG-08

23-SEP-08

Electrical - Vertical Riser L153 C

154T16130A Electrical - Vertical Riser L154 C

28

79

27-AUG-08

28-SEP-08

155T16130A Electrical - Vertical Riser L155~156 C

14

110

11-SEP-08

27-SEP-08

Electrical - Vertical Riser L155~156 C

002T15140A Drainage - Vertical Riser L2 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L2 C

004T15140A Drainage - Vertical Riser L4 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L4 C

005T15140A Drainage - Vertical Riser L05 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L05 C

006T15140A Drainage - Vertical Riser L06 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L06 C

007T15140A Drainage - Vertical Riser L07 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L07 C

008T15140A Drainage - Vertical Riser L08 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L08 C

009T15140A Drainage - Vertical Riser L09 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L09 C

010T15140A Drainage - Vertical Riser L10 C

35

30

142

20-JUN-06A

12-APR-07

Drainage - Vertical Riser L10 C

011T15140A Drainage - Vertical Riser L11 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L11 C

012T15140A Drainage - Vertical Riser L12 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L12 C

013T15140A Drainage - Vertical Riser L13 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L13 C

014T15140A Drainage - Vertical Riser L14 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L14 C

015T15140A Drainage - Vertical Riser L15 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L15 C

016T15140A Drainage - Vertical Riser L16 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L16 C

017T15140A Drainage - Vertical Riser L17~18 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L17~18 C

019T15140A Drainage - Vertical Riser L19 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L19 C

020T15140A Drainage - Vertical Riser L20 C

35

30

142

03-JUL-06A

12-APR-07

Drainage - Vertical Riser L20 C

021T15140A Drainage - Vertical Riser L21 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L21 C

022T15140A Drainage - Vertical Riser L22 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L22 C

023T15140A Drainage - Vertical Riser L23 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L23 C

024T15140A Drainage - Vertical Riser L24 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L24 C

025T15140A Drainage - Vertical Riser L25 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L25 C

026T15140A Drainage - Vertical Riser L26 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L26 C

027T15140A Drainage - Vertical Riser L27 C

35

30

142

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L27 C

028T15140A Drainage - Vertical Riser L28 C

35

30

280

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L28 C

029T15140A Drainage - Vertical Riser L29 C

35

30

280

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L29 C

030T15140A Drainage - Vertical Riser L30 C

35

30

280

10-JUL-06A

12-APR-07

Drainage - Vertical Riser L30 C

031T15140A Drainage - Vertical Riser L31 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L31 C

032T15140A Drainage - Vertical Riser L32 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L32 C

033T15140A Drainage - Vertical Riser L33 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L33 C

034T15140A Drainage - Vertical Riser L34 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L34 C

035T15140A Drainage - Vertical Riser L35 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L35 C

036T15140A Drainage - Vertical Riser L36 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L36 C

037T15140A Drainage - Vertical Riser L37 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L37 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Vertical Riser L154 C

Sheet 158 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

038T15140A Drainage - Vertical Riser L38 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L38 C

039T15140A Drainage - Vertical Riser L39 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L39 C

040T15140A Drainage - Vertical Riser L40~42 C

35

15

280

20-AUG-06A

18-APR-07

Drainage - Vertical Riser L40~42 C

043T15140A Drainage - Vertical Riser L43 C

28

280

15-MAR-07

16-APR-07

Drainage - Vertical Riser L43 C

044T15140A Drainage - Vertical Riser L44 C

28

280

18-MAR-07

18-APR-07

Drainage - Vertical Riser L44 C

045T15140A Drainage - Vertical Riser L45 C

28

280

20-MAR-07

21-APR-07

Drainage - Vertical Riser L45 C

046T15140A Drainage - Vertical Riser L46 C

28

280

22-MAR-07

23-APR-07

Drainage - Vertical Riser L46 C

047T15140A Drainage - Vertical Riser L47 C

28

280

25-MAR-07

25-APR-07

Drainage - Vertical Riser L47 C

048T15140A Drainage - Vertical Riser L48 C

28

280

27-MAR-07

28-APR-07

Drainage - Vertical Riser L48 C

049T15140A Drainage - Vertical Riser L49 C

28

280

29-MAR-07

30-APR-07

Drainage - Vertical Riser L49 C

050T15140A Drainage - Vertical Riser L50 C

28

280

01-APR-07

02-MAY-07

Drainage - Vertical Riser L50 C

051T15140A Drainage - Vertical Riser L51 C

28

280

03-APR-07

05-MAY-07

Drainage - Vertical Riser L51 C

052T15140A Drainage - Vertical Riser L52 C

28

280

05-APR-07

07-MAY-07

Drainage - Vertical Riser L52 C

053T15140A Drainage - Vertical Riser L53 C

28

280

08-APR-07

09-MAY-07

Drainage - Vertical Riser L53 C

054T15140A Drainage - Vertical Riser L54 C

28

280

10-APR-07

12-MAY-07

Drainage - Vertical Riser L54 C

055T15140A Drainage - Vertical Riser L55 C

28

280

12-APR-07

14-MAY-07

Drainage - Vertical Riser L55 C

056T15140A Drainage - Vertical Riser L56 C

28

280

15-APR-07

16-MAY-07

Drainage - Vertical Riser L56 C

057T15140A Drainage - Vertical Riser L57 C

28

280

17-APR-07

19-MAY-07

Drainage - Vertical Riser L57 C

058T15140A Drainage - Vertical Riser L58 C

28

280

19-APR-07

21-MAY-07

Drainage - Vertical Riser L58 C

059T15140A Drainage - Vertical Riser L59 C

28

280

22-APR-07

23-MAY-07

Drainage - Vertical Riser L59 C

060T15140A Drainage - Vertical Riser L60 C

28

280

24-APR-07

26-MAY-07

Drainage - Vertical Riser L60 C

061T15140A Drainage - Vertical Riser L61 C

28

280

26-APR-07

28-MAY-07

Drainage - Vertical Riser L61 C

062T15140A Drainage - Vertical Riser L62 C

28

280

29-APR-07

30-MAY-07

Drainage - Vertical Riser L62 C

063T15140A Drainage - Vertical Riser L63 C

28

280

01-MAY-07

02-JUN-07

Drainage - Vertical Riser L63 C

064T15140A Drainage - Vertical Riser L64 C

28

280

03-MAY-07

04-JUN-07

Drainage - Vertical Riser L64 C

065T15140A Drainage - Vertical Riser L65 C

28

280

06-MAY-07

06-JUN-07

Drainage - Vertical Riser L65 C

066T15140A Drainage - Vertical Riser L66 C

28

280

08-MAY-07

09-JUN-07

Drainage - Vertical Riser L66 C

067T15140A Drainage - Vertical Riser L67 C

28

280

10-MAY-07

11-JUN-07

Drainage - Vertical Riser L67 C

068T15140A Drainage - Vertical Riser L68 C

28

280

13-MAY-07

13-JUN-07

Drainage - Vertical Riser L68 C

069T15140A Drainage - Vertical Riser L69 C

28

280

15-MAY-07

16-JUN-07

Drainage - Vertical Riser L69 C

070T15140A Drainage - Vertical Riser L70 C

28

280

17-MAY-07

18-JUN-07

Drainage - Vertical Riser L70 C

071T15140A Drainage - Vertical Riser L71 C

28

280

20-MAY-07

20-JUN-07

Drainage - Vertical Riser L71 C

072T15140A Drainage - Vertical Riser L72 C

28

280

22-MAY-07

23-JUN-07

Drainage - Vertical Riser L72 C

073T15140A Drainage - Vertical Riser L73~75 C

28

280

24-MAY-07

25-JUN-07

Drainage - Vertical Riser L73~75 C

109T15140A Drainage - Vertical Riser L109~111 C

28

280

03-JUL-07

04-AUG-07

Drainage - Vertical Riser L109~111 C

112T15140A Drainage - Vertical Riser L112 C

28

205

30-SEP-07

31-OCT-07

Drainage - Vertical Riser L112 C

113T15140A Drainage - Vertical Riser L113 C

28

205

04-OCT-07

05-NOV-07

Drainage - Vertical Riser L113 C

114T15140A Drainage - Vertical Riser L114 C

28

205

09-OCT-07

10-NOV-07

Drainage - Vertical Riser L114 C

115T15140A Drainage - Vertical Riser L115 C

28

205

14-OCT-07

14-NOV-07

Drainage - Vertical Riser L115 C

116T15140A Drainage - Vertical Riser L116 C

28

205

18-OCT-07

19-NOV-07

Drainage - Vertical Riser L116 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 159 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

117T15140A Drainage - Vertical Riser L117 C

28

205

23-OCT-07

24-NOV-07

Drainage - Vertical Riser L117 C

118T15140A Drainage - Vertical Riser L118 C

28

205

28-OCT-07

28-NOV-07

Drainage - Vertical Riser L118 C

119T15140A Drainage - Vertical Riser L119 C

28

205

01-NOV-07

03-DEC-07

Drainage - Vertical Riser L119 C

120T15140A Drainage - Vertical Riser L120 C

28

205

06-NOV-07

08-DEC-07

Drainage - Vertical Riser L120 C

121T15140A Drainage - Vertical Riser L121 C

28

205

11-NOV-07

12-DEC-07

122T15140A Drainage - Vertical Riser L122 C

28

268

26-AUG-07

26-SEP-07

Drainage - Vertical Riser L122 C

123T15140A Drainage - Vertical Riser L123 C

28

270

01-SEP-07

02-OCT-07

Drainage - Vertical Riser L123 C

124T15140A Drainage - Vertical Riser L124 C

28

276

08-SEP-07

09-OCT-07

Drainage - Vertical Riser L124 C

125T15140A Drainage - Vertical Riser L125 C

28

270

12-SEP-07

14-OCT-07

Drainage - Vertical Riser L125 C

126T15140A Drainage - Vertical Riser L126 C

28

269

18-SEP-07

20-OCT-07

Drainage - Vertical Riser L126 C

127T15140A Drainage - Vertical Riser L127 C

28

269

23-SEP-07

24-OCT-07

Drainage - Vertical Riser L127 C

128T15140A Drainage - Vertical Riser L128 C

28

268

29-SEP-07

30-OCT-07

Drainage - Vertical Riser L128 C

129T15140A Drainage - Vertical Riser L129 C

28

268

04-OCT-07

05-NOV-07

Drainage - Vertical Riser L129 C

130T15140A Drainage - Vertical Riser L130 C

28

190

09-OCT-07

10-NOV-07

Drainage - Vertical Riser L130 C

131T15140A Drainage - Vertical Riser L131 C

28

265

17-OCT-07

18-NOV-07

Drainage - Vertical Riser L131 C

132T15140A Drainage - Vertical Riser L132 C

28

248

10-NOV-07

11-DEC-07

Drainage - Vertical Riser L132 C

133T15140A Drainage - Vertical Riser L133 C

28

245

18-NOV-07

19-DEC-07

Drainage - Vertical Riser L133 C

134T15140A Drainage - Vertical Riser L134 C

28

237

02-DEC-07

02-JAN-08

135T15140A Drainage - Vertical Riser L135 C

28

163

08-DEC-07

08-JAN-08

136T15140A Drainage - Vertical Riser L136~138 C

35

244

03-JAN-08

12-FEB-08

139T15140A Drainage - Vertical Riser L139 C

28

173

12-DEC-07

13-JAN-08

Drainage - Vertical Riser L139 C

140T15140A Drainage - Vertical Riser L140 C

28

327

17-DEC-07

17-JAN-08

Drainage - Vertical Riser L140 C

141T15140A Drainage - Vertical Riser L141 C

28

327

22-DEC-07

22-JAN-08

Drainage - Vertical Riser L141 C

142T15140A Drainage - Vertical Riser L142 C

28

327

26-DEC-07

27-JAN-08

Drainage - Vertical Riser L142 C

143T15140A Drainage - Vertical Riser L143 C

28

327

31-DEC-07

31-JAN-08

Drainage - Vertical Riser L143 C

144T15140A Drainage - Vertical Riser L144 C

28

327

05-JAN-08

05-FEB-08

Drainage - Vertical Riser L144 C

145T15140A Drainage - Vertical Riser L145 C

28

327

09-JAN-08

10-FEB-08

Drainage - Vertical Riser L145 C

146T15140A Drainage - Vertical Riser L146 C

28

327

14-JAN-08

14-FEB-08

Drainage - Vertical Riser L146 C

147T15140A Drainage - Vertical Riser L147 C

28

327

19-JAN-08

18-FEB-08

Drainage - Vertical Riser L147 C

148T15140A Drainage - Vertical Riser L148 C

28

327

23-JAN-08

23-FEB-08

Drainage - Vertical Riser L148 C

149T15140A Drainage - Vertical Riser L149 C

28

327

28-JAN-08

27-FEB-08

Drainage - Vertical Riser L149 C

150T15140A Drainage - Vertical Riser L150 C

28

327

02-FEB-08

03-MAR-08

Drainage - Vertical Riser L150 C

151T15140A Drainage - Vertical Riser L151 C

28

327

06-FEB-08

08-MAR-08

Drainage - Vertical Riser L151 C

152T15140A Drainage - Vertical Riser L152 C

28

321

11-FEB-08

12-MAR-08

Drainage - Vertical Riser L152 C

153T15140A Drainage - Vertical Riser L153 C

28

324

15-FEB-08

17-MAR-08

Drainage - Vertical Riser L153 C

154T15140A Drainage - Vertical Riser L154 C

28

242

19-FEB-08

22-MAR-08

155T15140A Drainage - Vertical Riser L155~156 C

14

110

11-SEP-08

27-SEP-08

Drainage - Vertical Riser L154 C


Drainage - Vertical Riser L155~156 C

002T15150A Plumbing - Vertical Riser L2 C

35

30

194

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L2 C

004T15150A Plumbing - Vertical Riser L4 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L4 C

005T15150A Plumbing - Vertical Riser L05 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L05 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Drainage - Vertical Riser L121 C

Drainage - Vertical Riser L134 C


Drainage - Vertical Riser L135 C
Drainage - Vertical Riser L136~138 C

Sheet 160 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

006T15150A Plumbing - Vertical Riser L06 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L06 C

007T15150A Plumbing - Vertical Riser L07 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L07 C

008T15150A Plumbing - Vertical Riser L08 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L08 C

009T15150A Plumbing - Vertical Riser L09 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L09 C

010T15150A Plumbing - Vertical Riser L10 C

35

30

280

20-JUN-06A

12-APR-07

Plumbing - Vertical Riser L10 C

011T15150A Plumbing - Vertical Riser L11 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L11 C

012T15150A Plumbing - Vertical Riser L12 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L12 C

013T15150A Plumbing - Vertical Riser L13 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L13 C

014T15150A Plumbing - Vertical Riser L14 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L14 C

015T15150A Plumbing - Vertical Riser L15 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L15 C

016T15150A Plumbing - Vertical Riser L16 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L16 C

017T15150A Plumbing - Vertical Riser L17~18 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L17~18 C

019T15150A Plumbing - Vertical Riser L19 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L19 C

020T15150A Plumbing - Vertical Riser L20 C

35

30

280

03-JUL-06A

12-APR-07

Plumbing - Vertical Riser L20 C

021T15150A Plumbing - Vertical Riser L21 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L21 C

022T15150A Plumbing - Vertical Riser L22 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L22 C

023T15150A Plumbing - Vertical Riser L23 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L23 C

024T15150A Plumbing - Vertical Riser L24 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L24 C

025T15150A Plumbing - Vertical Riser L25 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L25 C

026T15150A Plumbing - Vertical Riser L26 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L26 C

027T15150A Plumbing - Vertical Riser L27 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L27 C

028T15150A Plumbing - Vertical Riser L28 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L28 C

029T15150A Plumbing - Vertical Riser L29 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L29 C

030T15150A Plumbing - Vertical Riser L30 C

35

30

280

10-JUL-06A

12-APR-07

Plumbing - Vertical Riser L30 C

031T15150A Plumbing - Vertical Riser L31 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L31 C

032T15150A Plumbing - Vertical Riser L32 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L32 C

033T15150A Plumbing - Vertical Riser L33 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L33 C

034T15150A Plumbing - Vertical Riser L34 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L34 C

035T15150A Plumbing - Vertical Riser L35 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L35 C

036T15150A Plumbing - Vertical Riser L36 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L36 C

037T15150A Plumbing - Vertical Riser L37 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L37 C

038T15150A Plumbing - Vertical Riser L38 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L38 C

039T15150A Plumbing - Vertical Riser L39 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L39 C

040T15150A Plumbing - Vertical Riser L40~42 C

35

15

280

20-AUG-06A

18-APR-07

Plumbing - Vertical Riser L40~42 C

043T15150A Plumbing - Vertical Riser L43 C

28

280

15-MAR-07

16-APR-07

Plumbing - Vertical Riser L43 C

044T15150A Plumbing - Vertical Riser L44 C

28

280

18-MAR-07

18-APR-07

Plumbing - Vertical Riser L44 C

045T15150A Plumbing - Vertical Riser L45 C

28

280

20-MAR-07

21-APR-07

Plumbing - Vertical Riser L45 C

046T15150A Plumbing - Vertical Riser L46 C

28

280

22-MAR-07

23-APR-07

Plumbing - Vertical Riser L46 C

047T15150A Plumbing - Vertical Riser L47 C

28

280

25-MAR-07

25-APR-07

Plumbing - Vertical Riser L47 C

048T15150A Plumbing - Vertical Riser L48 C

28

280

27-MAR-07

28-APR-07

Plumbing - Vertical Riser L48 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 161 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

049T15150A Plumbing - Vertical Riser L49 C

28

280

29-MAR-07

30-APR-07

Plumbing - Vertical Riser L49 C

050T15150A Plumbing - Vertical Riser L50 C

28

280

01-APR-07

02-MAY-07

Plumbing - Vertical Riser L50 C

051T15150A Plumbing - Vertical Riser L51 C

28

280

03-APR-07

05-MAY-07

Plumbing - Vertical Riser L51 C

052T15150A Plumbing - Vertical Riser L52 C

28

280

05-APR-07

07-MAY-07

Plumbing - Vertical Riser L52 C

053T15150A Plumbing - Vertical Riser L53 C

28

280

08-APR-07

09-MAY-07

Plumbing - Vertical Riser L53 C

054T15150A Plumbing - Vertical Riser L54 C

28

280

10-APR-07

12-MAY-07

Plumbing - Vertical Riser L54 C

055T15150A Plumbing - Vertical Riser L55 C

28

280

12-APR-07

14-MAY-07

Plumbing - Vertical Riser L55 C

056T15150A Plumbing - Vertical Riser L56 C

28

280

15-APR-07

16-MAY-07

Plumbing - Vertical Riser L56 C

057T15150A Plumbing - Vertical Riser L57 C

28

280

17-APR-07

19-MAY-07

Plumbing - Vertical Riser L57 C

058T15150A Plumbing - Vertical Riser L58 C

28

280

19-APR-07

21-MAY-07

Plumbing - Vertical Riser L58 C

059T15150A Plumbing - Vertical Riser L59 C

28

280

22-APR-07

23-MAY-07

Plumbing - Vertical Riser L59 C

060T15150A Plumbing - Vertical Riser L60 C

28

280

24-APR-07

26-MAY-07

Plumbing - Vertical Riser L60 C

061T15150A Plumbing - Vertical Riser L61 C

28

280

26-APR-07

28-MAY-07

Plumbing - Vertical Riser L61 C

062T15150A Plumbing - Vertical Riser L62 C

28

280

29-APR-07

30-MAY-07

Plumbing - Vertical Riser L62 C

063T15150A Plumbing - Vertical Riser L63 C

28

280

01-MAY-07

02-JUN-07

Plumbing - Vertical Riser L63 C

064T15150A Plumbing - Vertical Riser L64 C

28

280

03-MAY-07

04-JUN-07

Plumbing - Vertical Riser L64 C

065T15150A Plumbing - Vertical Riser L65 C

28

280

06-MAY-07

06-JUN-07

Plumbing - Vertical Riser L65 C

066T15150A Plumbing - Vertical Riser L66 C

28

280

08-MAY-07

09-JUN-07

Plumbing - Vertical Riser L66 C

067T15150A Plumbing - Vertical Riser L67 C

28

280

10-MAY-07

11-JUN-07

Plumbing - Vertical Riser L67 C

068T15150A Plumbing - Vertical Riser L68 C

28

280

13-MAY-07

13-JUN-07

Plumbing - Vertical Riser L68 C

069T15150A Plumbing - Vertical Riser L69 C

28

280

15-MAY-07

16-JUN-07

Plumbing - Vertical Riser L69 C

070T15150A Plumbing - Vertical Riser L70 C

28

280

17-MAY-07

18-JUN-07

Plumbing - Vertical Riser L70 C

071T15150A Plumbing - Vertical Riser L71 C

28

280

20-MAY-07

20-JUN-07

Plumbing - Vertical Riser L71 C

072T15150A Plumbing - Vertical Riser L72 C

28

280

22-MAY-07

23-JUN-07

Plumbing - Vertical Riser L72 C

073T15150A Plumbing - Vertical Riser L73~75 C

28

280

24-MAY-07

25-JUN-07

Plumbing - Vertical Riser L73~75 C

109T15150A Plumbing - Vertical Riser L109~111 C

28

280

03-JUL-07

04-AUG-07

112T15150A Plumbing - Vertical Riser L112 C

28

280

04-JUL-07

05-AUG-07

113T15150A Plumbing - Vertical Riser L113 C

28

298

18-JUN-07

19-JUL-07

114T15150A Plumbing - Vertical Riser L114 C

28

290

02-JUL-07

02-AUG-07

Plumbing - Vertical Riser L114 C

115T15150A Plumbing - Vertical Riser L115 C

28

289

08-JUL-07

08-AUG-07

Plumbing - Vertical Riser L115 C

116T15150A Plumbing - Vertical Riser L116 C

28

282

21-JUL-07

21-AUG-07

Plumbing - Vertical Riser L116 C

117T15150A Plumbing - Vertical Riser L117 C

28

281

26-JUL-07

27-AUG-07

Plumbing - Vertical Riser L117 C

118T15150A Plumbing - Vertical Riser L118 C

28

278

04-AUG-07

04-SEP-07

Plumbing - Vertical Riser L118 C

119T15150A Plumbing - Vertical Riser L119 C

28

277

09-AUG-07

10-SEP-07

Plumbing - Vertical Riser L119 C

120T15150A Plumbing - Vertical Riser L120 C

28

276

15-AUG-07

16-SEP-07

Plumbing - Vertical Riser L120 C

121T15150A Plumbing - Vertical Riser L121 C

28

276

20-AUG-07

20-SEP-07

Plumbing - Vertical Riser L121 C

122T15150A Plumbing - Vertical Riser L122 C

28

268

26-AUG-07

26-SEP-07

Plumbing - Vertical Riser L122 C

123T15150A Plumbing - Vertical Riser L123 C

28

270

01-SEP-07

02-OCT-07

Plumbing - Vertical Riser L123 C

124T15150A Plumbing - Vertical Riser L124 C

28

276

08-SEP-07

09-OCT-07

Plumbing - Vertical Riser L124 C

125T15150A Plumbing - Vertical Riser L125 C

28

270

12-SEP-07

14-OCT-07

Plumbing - Vertical Riser L125 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Plumbing - Vertical Riser L109~111 C


Plumbing - Vertical Riser L112 C
Plumbing - Vertical Riser L113 C

Sheet 162 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

126T15150A Plumbing - Vertical Riser L126 C

28

269

18-SEP-07

20-OCT-07

Plumbing - Vertical Riser L126 C

127T15150A Plumbing - Vertical Riser L127 C

28

269

23-SEP-07

24-OCT-07

Plumbing - Vertical Riser L127 C

128T15150A Plumbing - Vertical Riser L128 C

28

268

29-SEP-07

30-OCT-07

Plumbing - Vertical Riser L128 C

129T15150A Plumbing - Vertical Riser L129 C

28

268

04-OCT-07

05-NOV-07

Plumbing - Vertical Riser L129 C

130T15150A Plumbing - Vertical Riser L130 C

28

268

09-OCT-07

10-NOV-07

Plumbing - Vertical Riser L130 C

131T15150A Plumbing - Vertical Riser L131 C

28

265

17-OCT-07

18-NOV-07

Plumbing - Vertical Riser L131 C

132T15150A Plumbing - Vertical Riser L132 C

28

248

10-NOV-07

11-DEC-07

Plumbing - Vertical Riser L132 C

133T15150A Plumbing - Vertical Riser L133 C

28

245

18-NOV-07

19-DEC-07

Plumbing - Vertical Riser L133 C

134T15150A Plumbing - Vertical Riser L134 C

28

237

02-DEC-07

02-JAN-08

135T15150A Plumbing - Vertical Riser L135 C

28

163

08-DEC-07

08-JAN-08

136T15150A Plumbing - Vertical Riser L136~138 C

35

244

03-JAN-08

12-FEB-08

139T15150A Plumbing - Vertical Riser L139 C

28

173

12-DEC-07

13-JAN-08

Plumbing - Vertical Riser L139 C

140T15150A Plumbing - Vertical Riser L140 C

28

327

17-DEC-07

17-JAN-08

Plumbing - Vertical Riser L140 C

141T15150A Plumbing - Vertical Riser L141 C

28

327

22-DEC-07

22-JAN-08

Plumbing - Vertical Riser L141 C

142T15150A Plumbing - Vertical Riser L142 C

28

327

26-DEC-07

27-JAN-08

Plumbing - Vertical Riser L142 C

143T15150A Plumbing - Vertical Riser L143 C

28

327

31-DEC-07

31-JAN-08

Plumbing - Vertical Riser L143 C

144T15150A Plumbing - Vertical Riser L144 C

28

327

05-JAN-08

05-FEB-08

Plumbing - Vertical Riser L144 C

145T15150A Plumbing - Vertical Riser L145 C

28

327

09-JAN-08

10-FEB-08

Plumbing - Vertical Riser L145 C

146T15150A Plumbing - Vertical Riser L146 C

28

327

14-JAN-08

14-FEB-08

Plumbing - Vertical Riser L146 C

147T15150A Plumbing - Vertical Riser L147 C

28

327

19-JAN-08

18-FEB-08

148T15150A Plumbing - Vertical Riser L148 C

28

164

30-JUL-08

31-AUG-08

Plumbing - Vertical Riser L147 C


Plumbing - Vertical Riser L148 C

149T15150A Plumbing - Vertical Riser L149 C

28

164

04-AUG-08

04-SEP-08

Plumbing - Vertical Riser L149 C

150T15150A Plumbing - Vertical Riser L150 C

28

164

09-AUG-08

09-SEP-08

Plumbing - Vertical Riser L150 C

151T15150A Plumbing - Vertical Riser L151 C

28

164

13-AUG-08

14-SEP-08

Plumbing - Vertical Riser L151 C

152T15150A Plumbing - Vertical Riser L152 C

28

158

18-AUG-08

18-SEP-08

Plumbing - Vertical Riser L152 C

153T15150A Plumbing - Vertical Riser L153 C

28

161

23-AUG-08

23-SEP-08

Plumbing - Vertical Riser L153 C

154T15150A Plumbing - Vertical Riser L154 C

28

79

27-AUG-08

28-SEP-08

155T15150A Plumbing - Vertical Riser L155~156 C

14

110

11-SEP-08

27-SEP-08

Plumbing - Vertical Riser L155~156 C

CENTER CORE
002T15210A HVAC - Horizontal Conduits L2 C

18

303

15-MAR-07

04-APR-07

HVAC - Horizontal Conduits L2 C

004T15210A HVAC - Horizontal Conduits L4 C

18

303

19-MAR-07

08-APR-07

HVAC - Horizontal Conduits L4 C

005T15210A HVAC - Horizontal Conduits L05 C

18

353

02-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L05 C

006T15210A HVAC - Horizontal Conduits L06 C

18

364

22-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L06 C

007T15210A HVAC - Horizontal Conduits L07 C

18

364

25-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L07 C

008T15210A HVAC - Horizontal Conduits L08 C

18

393

27-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L08 C

009T15210A HVAC - Horizontal Conduits L09 C

18

10

393

26-NOV-06A

02-APR-07

HVAC - Horizontal Conduits L09 C

010T15210A HVAC - Horizontal Conduits L10 C

18

393

22-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L10 C

011T15210A HVAC - Horizontal Conduits L11 C

18

393

03-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L11 C

012T15210A HVAC - Horizontal Conduits L12 C

18

393

10-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L12 C

Plumbing - Vertical Riser L134 C


Plumbing - Vertical Riser L135 C
Plumbing - Vertical Riser L136~138 C

Plumbing - Vertical Riser L154 C

MEP - SECOND FIX

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 163 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

013T15210A HVAC - Horizontal Conduits L13 C

18

393

25-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L13 C

014T15210A HVAC - Horizontal Conduits L14 C

18

393

08-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L14 C

015T15210A HVAC - Horizontal Conduits L15 C

18

393

26-NOV-06A

03-APR-07

HVAC - Horizontal Conduits L15 C

016T15210A HVAC - Horizontal Conduits L16 C

18

393

27-SEP-06A

03-APR-07

HVAC - Horizontal Conduits L16 C

017T15210A HVAC -CHW Pipes & DUCT, FCU Work L17~18

95

377

11-NOV-06A

15-APR-07

019T15210A HVAC - Horizontal Conduits L19 C

18

13

357

15-AUG-06A

02-APR-07

020T15210A HVAC - Horizontal Conduits L20 C

18

357

15-AUG-06A

03-APR-07

HVAC - Horizontal Conduits L20 C

021T15210A HVAC - Horizontal Conduits L21 C

18

14

357

16-NOV-06A

01-APR-07

HVAC - Horizontal Conduits L21 C

022T15210A HVAC - Horizontal Conduits L22 C

18

14

357

17-OCT-06A

01-APR-07

HVAC - Horizontal Conduits L22 C

023T15210A HVAC - Horizontal Conduits L23 C

18

10

357

10-DEC-06A

02-APR-07

HVAC - Horizontal Conduits L23 C

024T15210A HVAC - Horizontal Conduits L24 C

18

14

357

17-OCT-06A

01-APR-07

HVAC - Horizontal Conduits L24 C

025T15210A HVAC - Horizontal Conduits L25 C

18

19

357

12-DEC-06A

01-APR-07

HVAC - Horizontal Conduits L25 C

026T15210A HVAC - Horizontal Conduits L26 C

18

10

357

10-DEC-06A

02-APR-07

HVAC - Horizontal Conduits L26 C

027T15210A HVAC - Horizontal Conduits L27 C

18

10

357

10-DEC-06A

02-APR-07

HVAC - Horizontal Conduits L27 C

028T15210A HVAC - Horizontal Conduits L28 C

18

357

06-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L28 C

029T15210A HVAC - Horizontal Conduits L29 C

18

357

06-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L29 C

030T15210A HVAC - Horizontal Conduits L30 C

18

357

04-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L30 C

031T15210A HVAC - Horizontal Conduits L31 C

18

357

28-DEC-06A

03-APR-07

HVAC - Horizontal Conduits L31 C

032T15210A HVAC - Horizontal Conduits L32 C

18

357

28-DEC-06A

03-APR-07

HVAC - Horizontal Conduits L32 C

033T15210A HVAC - Horizontal Conduits L33 C

18

10

357

26-NOV-06A

02-APR-07

HVAC - Horizontal Conduits L33 C

034T15210A HVAC - Horizontal Conduits L34 C

18

357

02-JAN-07A

03-APR-07

HVAC - Horizontal Conduits L34 C

035T15210A HVAC - Horizontal Conduits L35 C

18

357

23-DEC-06A

03-APR-07

HVAC - Horizontal Conduits L35 C

036T15210A HVAC - Horizontal Conduits L36 C

18

357

23-DEC-06A

03-APR-07

HVAC - Horizontal Conduits L36 C

037T15210A HVAC - Horizontal Conduits L37 C

18

10

357

16-DEC-06A

02-APR-07

HVAC - Horizontal Conduits L37 C

038T15210A HVAC - Horizontal Conduits L38 C

18

357

15-MAR-07

04-APR-07

HVAC - Horizontal Conduits L38 C

039T15210A HVAC - Horizontal Conduits L39 C

18

365

10-DEC-06A

08-APR-07

HVAC - Horizontal Conduits L39 C

040T15210A HVAC -CHW Pipes & DUCT, FCU Work L40~42

70

325

07-APR-07

27-JUN-07

043T15210A HVAC - Horizontal Conduits L43 C

18

287

15-MAR-07

04-APR-07

HVAC - Horizontal Conduits L43 C

044T15210A HVAC - Horizontal Conduits L44 C

18

287

20-MAR-07

09-APR-07

HVAC - Horizontal Conduits L44 C

045T15210A HVAC - Horizontal Conduits L45 C

18

287

25-MAR-07

14-APR-07

HVAC - Horizontal Conduits L45 C

046T15210A HVAC - Horizontal Conduits L46 C

18

287

29-MAR-07

18-APR-07

HVAC - Horizontal Conduits L46 C

047T15210A HVAC - Horizontal Conduits L47 C

18

287

03-APR-07

23-APR-07

HVAC - Horizontal Conduits L47 C

048T15210A HVAC - Horizontal Conduits L48 C

18

287

08-APR-07

28-APR-07

HVAC - Horizontal Conduits L48 C

049T15210A HVAC - Horizontal Conduits L49 C

18

287

12-APR-07

03-MAY-07

HVAC - Horizontal Conduits L49 C

050T15210A HVAC - Horizontal Conduits L50 C

18

287

17-APR-07

08-MAY-07

HVAC - Horizontal Conduits L50 C

051T15210A HVAC - Horizontal Conduits L51 C

18

287

22-APR-07

13-MAY-07

HVAC - Horizontal Conduits L51 C

052T15210A HVAC - Horizontal Conduits L52 C

18

287

26-APR-07

17-MAY-07

HVAC - Horizontal Conduits L52 C

053T15210A HVAC - Horizontal Conduits L53 C

18

287

02-MAY-07

22-MAY-07

HVAC - Horizontal Conduits L53 C

054T15210A HVAC - Horizontal Conduits L54 C

18

287

07-MAY-07

27-MAY-07

HVAC - Horizontal Conduits L54 C

055T15210A HVAC - Horizontal Conduits L55 C

18

287

12-MAY-07

31-MAY-07

HVAC - Horizontal Conduits L55 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC -CHW Pipes & DUCT, FCU Work L17~18


HVAC - Horizontal Conduits L19 C

HVAC -CHW Pipes & DUCT, FCU Work L40~42

Sheet 164 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

056T15210A HVAC - Horizontal Conduits L56 C

18

287

16-MAY-07

05-JUN-07

HVAC - Horizontal Conduits L56 C

057T15210A HVAC - Horizontal Conduits L57 C

18

287

21-MAY-07

10-JUN-07

HVAC - Horizontal Conduits L57 C

058T15210A HVAC - Horizontal Conduits L58 C

18

287

26-MAY-07

14-JUN-07

HVAC - Horizontal Conduits L58 C

059T15210A HVAC - Horizontal Conduits L59 C

18

287

30-MAY-07

19-JUN-07

HVAC - Horizontal Conduits L59 C

060T15210A HVAC - Horizontal Conduits L60 C

18

287

04-JUN-07

24-JUN-07

HVAC - Horizontal Conduits L60 C

061T15210A HVAC - Horizontal Conduits L61 C

18

287

09-JUN-07

28-JUN-07

HVAC - Horizontal Conduits L61 C

062T15210A HVAC - Horizontal Conduits L62 C

18

287

13-JUN-07

03-JUL-07

HVAC - Horizontal Conduits L62 C

063T15210A HVAC - Horizontal Conduits L63 C

18

287

18-JUN-07

08-JUL-07

HVAC - Horizontal Conduits L63 C

064T15210A HVAC - Horizontal Conduits L64 C

18

287

23-JUN-07

12-JUL-07

HVAC - Horizontal Conduits L64 C

065T15210A HVAC - Horizontal Conduits L65 C

18

287

27-JUN-07

17-JUL-07

HVAC - Horizontal Conduits L65 C

066T15210A HVAC - Horizontal Conduits L66 C

18

287

02-JUL-07

22-JUL-07

HVAC - Horizontal Conduits L66 C

067T15210A HVAC - Horizontal Conduits L67 C

18

287

07-JUL-07

26-JUL-07

HVAC - Horizontal Conduits L67 C

068T15210A HVAC - Horizontal Conduits L68 C

18

287

11-JUL-07

31-JUL-07

HVAC - Horizontal Conduits L68 C

069T15210A HVAC - Horizontal Conduits L69 C

18

287

16-JUL-07

05-AUG-07

HVAC - Horizontal Conduits L69 C

070T15210A HVAC - Horizontal Conduits L70 C

18

287

21-JUL-07

09-AUG-07

HVAC - Horizontal Conduits L70 C

071T15210A HVAC - Horizontal Conduits L71 C

18

287

25-JUL-07

14-AUG-07

HVAC - Horizontal Conduits L71 C

072T15210A HVAC - Horizontal Conduits L72 C

18

287

30-JUL-07

19-AUG-07

073T15210A HVAC - CHW Pipes & DUCT, FCU Work L73~75

60

287

04-AUG-07

13-OCT-07

HVAC - CHW Pipes & DUCT, FCU Work L73~75

109T15210A HVAC - CHW Pipes & DUCT, FCU Work L109~111

60

393

15-SEP-07

01-DEC-07

HVAC - CHW Pipes & DUCT, FCU Work L109~111

112T15210A HVAC - Horizontal Conduits L112 C

18

276

18-JUL-07

07-AUG-07

HVAC - Horizontal Conduits L112 C

113T15210A HVAC - Horizontal Conduits L113 C

18

276

23-JUL-07

12-AUG-07

HVAC - Horizontal Conduits L113 C

114T15210A HVAC - Horizontal Conduits L114 C

18

276

28-JUL-07

16-AUG-07

HVAC - Horizontal Conduits L114 C

115T15210A HVAC - Horizontal Conduits L115 C

18

276

01-AUG-07

21-AUG-07

HVAC - Horizontal Conduits L115 C

116T15210A HVAC - Horizontal Conduits L116 C

18

276

06-AUG-07

26-AUG-07

HVAC - Horizontal Conduits L116 C

117T15210A HVAC - Horizontal Conduits L117 C

18

276

11-AUG-07

30-AUG-07

HVAC - Horizontal Conduits L117 C

118T15210A HVAC - Horizontal Conduits L118 C

18

276

15-AUG-07

04-SEP-07

HVAC - Horizontal Conduits L118 C

119T15210A HVAC - Horizontal Conduits L119 C

18

276

20-AUG-07

09-SEP-07

HVAC - Horizontal Conduits L119 C

120T15210A HVAC - Horizontal Conduits L120 C

18

276

25-AUG-07

15-SEP-07

HVAC - Horizontal Conduits L120 C

121T15210A HVAC - Horizontal Conduits L121 C

18

276

29-AUG-07

19-SEP-07

HVAC - Horizontal Conduits L121 C

122T15210A HVAC - Horizontal Conduits L122 C

18

276

03-SEP-07

24-SEP-07

HVAC - Horizontal Conduits L122 C

123T15210A HVAC - Horizontal Conduits L123 C

18

276

08-SEP-07

29-SEP-07

HVAC - Horizontal Conduits L123 C

124T15210A HVAC - Horizontal Conduits L124 C

18

276

13-SEP-07

03-OCT-07

HVAC - Horizontal Conduits L124 C

125T15210A HVAC - Horizontal Conduits L125 C

18

276

18-SEP-07

08-OCT-07

HVAC - Horizontal Conduits L125 C

126T15210A HVAC - Horizontal Conduits L126 C

18

276

23-SEP-07

13-OCT-07

HVAC - Horizontal Conduits L126 C

127T15210A HVAC - Horizontal Conduits L127 C

18

276

27-SEP-07

20-OCT-07

HVAC - Horizontal Conduits L127 C

128T15210A HVAC - Horizontal Conduits L128 C

18

276

02-OCT-07

27-OCT-07

HVAC - Horizontal Conduits L128 C

129T15210A HVAC - Horizontal Conduits L129 C

18

276

07-OCT-07

01-NOV-07

HVAC - Horizontal Conduits L129 C

130T15210A HVAC - Horizontal Conduits L130 C

18

276

11-OCT-07

08-NOV-07

HVAC - Horizontal Conduits L130 C

131T15210A HVAC - Horizontal Conduits L131 C

18

276

18-OCT-07

16-NOV-07

HVAC - Horizontal Conduits L131 C

132T15210A HVAC - Horizontal Conduits L132 C

18

276

25-OCT-07

20-NOV-07

HVAC - Horizontal Conduits L132 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

HVAC - Horizontal Conduits L72 C

Sheet 165 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

133T15210A HVAC - Horizontal Conduits L133 C

18

276

31-OCT-07

24-NOV-07

HVAC - Horizontal Conduits L133 C

134T15210A HVAC - Horizontal Conduits L134 C

18

276

06-NOV-07

28-NOV-07

HVAC - Horizontal Conduits L134 C

135T15210A HVAC - Horizontal Conduits L135 C

18

276

13-NOV-07

03-DEC-07

136T15210A HVAC - CHW Pipes & DUCT, FCU Work L136~138

60

308

19-NOV-07

27-JAN-08

139T15210A HVAC - Second Fix L139 C

21

196

16-JAN-08

11-FEB-08

HVAC - Second Fix L139 C

140T15210A HVAC - Second Fix L140 C

21

197

20-JAN-08

14-FEB-08

HVAC - Second Fix L140 C

141T15210A HVAC - Second Fix L141 C

21

198

23-JAN-08

18-FEB-08

HVAC - Second Fix L141 C

142T15210A HVAC - Second Fix L142 C

21

199

27-JAN-08

21-FEB-08

HVAC - Second Fix L142 C

143T15210A HVAC - Second Fix L143 C

21

199

31-JAN-08

25-FEB-08

HVAC - Second Fix L143 C

144T15210A HVAC - Second Fix L144 C

21

199

05-FEB-08

28-FEB-08

HVAC - Second Fix L144 C

145T15210A HVAC - Second Fix L145 C

21

199

09-FEB-08

03-MAR-08

HVAC - Second Fix L145 C

146T15210A HVAC - Second Fix L146 C

21

199

12-FEB-08

06-MAR-08

HVAC - Second Fix L146 C

147T15210A HVAC - Second Fix L147 C

21

199

16-FEB-08

10-MAR-08

HVAC - Second Fix L147 C

148T15210A HVAC - Second Fix L148 C

21

199

19-FEB-08

13-MAR-08

HVAC - Second Fix L148 C

149T15210A HVAC - Second Fix L149 C

21

199

23-FEB-08

17-MAR-08

HVAC - Second Fix L149 C

150T15210A HVAC - Second Fix L150 C

21

199

26-FEB-08

20-MAR-08

HVAC - Second Fix L150 C

151T15210A HVAC - Second Fix L151 C

21

199

01-MAR-08

24-MAR-08

HVAC - Second Fix L151 C

152T15210A HVAC - Second Fix L152 C

21

199

04-MAR-08

27-MAR-08

HVAC - Second Fix L152 C

153T15210A HVAC - Second Fix L153 C

21

200

08-MAR-08

31-MAR-08

HVAC - Second Fix L153 C

154T15210A HVAC - Second Fix L154 C

21

201

11-MAR-08

03-APR-08

155T15210A HVAC - Second Fix L155~156 C

14

121

28-SEP-08

14-OCT-08

HVAC - Second Fix L154 C


HVAC - Second Fix L155~156 C

002T15220A Fire - Horizontal Conduits L2 C

18

303

15-MAR-07

04-APR-07

004T15220A Fire - Horizontal Conduits L4 C

18

303

19-MAR-07

08-APR-07

Fire - Horizontal Conduits L4 C

005T15220A Fire - Horizontal Conduits L05 C

18

17

353

02-SEP-06A

01-APR-07

Fire - Horizontal Conduits L05 C

006T15220A Fire - Horizontal Conduits L06 C

18

17

364

02-SEP-06A

01-APR-07

Fire - Horizontal Conduits L06 C

007T15220A Fire - Horizontal Conduits L07 C

18

17

364

02-SEP-06A

01-APR-07

Fire - Horizontal Conduits L07 C

008T15220A Fire - Horizontal Conduits L08 C

18

17

393

02-SEP-06A

01-APR-07

Fire - Horizontal Conduits L08 C

009T15220A Fire - Horizontal Conduits L09 C

18

17

393

02-SEP-06A

01-APR-07

Fire - Horizontal Conduits L09 C

010T15220A Fire - Horizontal Conduits L10 C

18

17

393

03-DEC-06A

01-APR-07

Fire - Horizontal Conduits L10 C

011T15220A Fire - Horizontal Conduits L11 C

18

17

393

03-DEC-06A

01-APR-07

Fire - Horizontal Conduits L11 C

012T15220A Fire - Horizontal Conduits L12 C

18

17

393

05-SEP-06A

01-APR-07

Fire - Horizontal Conduits L12 C

013T15220A Fire - Horizontal Conduits L13 C

18

17

393

03-DEC-06A

01-APR-07

Fire - Horizontal Conduits L13 C

014T15220A Fire - Horizontal Conduits L14 C

18

22

393

03-DEC-06A

31-MAR-07

Fire - Horizontal Conduits L14 C

015T15220A Fire - Horizontal Conduits L15 C

18

17

393

03-DEC-06A

01-APR-07

Fire - Horizontal Conduits L15 C

016T15220A Fire - Horizontal Conduits L16 C

18

17

393

03-DEC-06A

01-APR-07

Fire - Horizontal Conduits L16 C

017T15220A FIRE -Headers & Second Fix Work L17~18

90

280

28-MAY-07

09-SEP-07

019T15220A Fire - Horizontal Conduits L19 C

18

22

283

02-SEP-06A

31-MAR-07

Fire - Horizontal Conduits L19 C

020T15220A Fire - Horizontal Conduits L20 C

18

22

283

06-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L20 C

021T15220A Fire - Horizontal Conduits L21 C

18

22

283

06-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L21 C

022T15220A Fire - Horizontal Conduits L22 C

18

22

283

06-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L22 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

HVAC - Horizontal Conduits L135 C


HVAC - CHW Pipes & DUCT, FCU Work L136~138

Fire - Horizontal Conduits L2 C

FIRE -Headers & Second Fix Work L17~18

Sheet 166 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

023T15220A Fire - Horizontal Conduits L23 C

18

22

283

06-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L23 C

024T15220A Fire - Horizontal Conduits L24 C

18

22

283

06-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L24 C

025T15220A Fire - Horizontal Conduits L25 C

18

17

283

15-AUG-06A

01-APR-07

Fire - Horizontal Conduits L25 C

026T15220A Fire - Horizontal Conduits L26 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L26 C

027T15220A Fire - Horizontal Conduits L27 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L27 C

028T15220A Fire - Horizontal Conduits L28 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L28 C

029T15220A Fire - Horizontal Conduits L29 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L29 C

030T15220A Fire - Horizontal Conduits L30 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L30 C

031T15220A Fire - Horizontal Conduits L31 C

18

22

283

15-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L31 C

032T15220A Fire - Horizontal Conduits L32 C

18

17

283

15-AUG-06A

01-APR-07

Fire - Horizontal Conduits L32 C

033T15220A Fire - Horizontal Conduits L33 C

18

17

283

15-AUG-06A

01-APR-07

Fire - Horizontal Conduits L33 C

034T15220A Fire - Horizontal Conduits L34 C

18

17

283

20-AUG-06A

01-APR-07

Fire - Horizontal Conduits L34 C

035T15220A Fire - Horizontal Conduits L35 C

18

22

283

20-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L35 C

036T15220A Fire - Horizontal Conduits L36 C

18

22

283

20-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L36 C

037T15220A Fire - Horizontal Conduits L37 C

18

22

283

20-AUG-06A

31-MAR-07

Fire - Horizontal Conduits L37 C

038T15220A Fire - Horizontal Conduits L38 C

18

22

283

10-OCT-06A

31-MAR-07

Fire - Horizontal Conduits L38 C

039T15220A Fire - Horizontal Conduits L39 C

18

22

283

14-OCT-06A

31-MAR-07

Fire - Horizontal Conduits L39 C

040T15220A FIRE -Headers & Second Fix Work L40~42

75

283

15-MAR-07

11-JUN-07

043T15220A Fire - Horizontal Conduits L43 C

18

283

20-MAR-07

09-APR-07

Fire - Horizontal Conduits L43 C

044T15220A Fire - Horizontal Conduits L44 C

18

283

25-MAR-07

14-APR-07

Fire - Horizontal Conduits L44 C

045T15220A Fire - Horizontal Conduits L45 C

18

283

29-MAR-07

18-APR-07

Fire - Horizontal Conduits L45 C

046T15220A Fire - Horizontal Conduits L46 C

18

283

03-APR-07

23-APR-07

Fire - Horizontal Conduits L46 C

047T15220A Fire - Horizontal Conduits L47 C

18

283

08-APR-07

28-APR-07

Fire - Horizontal Conduits L47 C

048T15220A Fire - Horizontal Conduits L48 C

18

283

12-APR-07

03-MAY-07

Fire - Horizontal Conduits L48 C

049T15220A Fire - Horizontal Conduits L49 C

18

283

17-APR-07

08-MAY-07

Fire - Horizontal Conduits L49 C

050T15220A Fire - Horizontal Conduits L50 C

18

283

22-APR-07

13-MAY-07

Fire - Horizontal Conduits L50 C

051T15220A Fire - Horizontal Conduits L51 C

18

283

26-APR-07

17-MAY-07

Fire - Horizontal Conduits L51 C

052T15220A Fire - Horizontal Conduits L52 C

18

283

02-MAY-07

22-MAY-07

Fire - Horizontal Conduits L52 C

053T15220A Fire - Horizontal Conduits L53 C

18

283

07-MAY-07

27-MAY-07

Fire - Horizontal Conduits L53 C

054T15220A Fire - Horizontal Conduits L54 C

18

283

12-MAY-07

31-MAY-07

Fire - Horizontal Conduits L54 C

055T15220A Fire - Horizontal Conduits L55 C

18

283

16-MAY-07

05-JUN-07

Fire - Horizontal Conduits L55 C

056T15220A Fire - Horizontal Conduits L56 C

18

283

21-MAY-07

10-JUN-07

Fire - Horizontal Conduits L56 C

057T15220A Fire - Horizontal Conduits L57 C

18

283

26-MAY-07

14-JUN-07

Fire - Horizontal Conduits L57 C

058T15220A Fire - Horizontal Conduits L58 C

18

283

30-MAY-07

19-JUN-07

Fire - Horizontal Conduits L58 C

059T15220A Fire - Horizontal Conduits L59 C

18

283

04-JUN-07

24-JUN-07

Fire - Horizontal Conduits L59 C

060T15220A Fire - Horizontal Conduits L60 C

18

283

09-JUN-07

28-JUN-07

Fire - Horizontal Conduits L60 C

061T15220A Fire - Horizontal Conduits L61 C

18

283

13-JUN-07

03-JUL-07

Fire - Horizontal Conduits L61 C

062T15220A Fire - Horizontal Conduits L62 C

18

283

18-JUN-07

08-JUL-07

Fire - Horizontal Conduits L62 C

063T15220A Fire - Horizontal Conduits L63 C

18

283

23-JUN-07

12-JUL-07

Fire - Horizontal Conduits L63 C

064T15220A Fire - Horizontal Conduits L64 C

18

283

27-JUN-07

17-JUL-07

Fire - Horizontal Conduits L64 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

FIRE -Headers & Second Fix Work L40~42

Sheet 167 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

065T15220A Fire - Horizontal Conduits L65 C

18

283

02-JUL-07

22-JUL-07

Fire - Horizontal Conduits L65 C

066T15220A Fire - Horizontal Conduits L66 C

18

283

07-JUL-07

26-JUL-07

Fire - Horizontal Conduits L66 C

067T15220A Fire - Horizontal Conduits L67 C

18

283

11-JUL-07

31-JUL-07

Fire - Horizontal Conduits L67 C

068T15220A Fire - Horizontal Conduits L68 C

18

283

16-JUL-07

05-AUG-07

Fire - Horizontal Conduits L68 C

069T15220A Fire - Horizontal Conduits L69 C

18

283

21-JUL-07

09-AUG-07

Fire - Horizontal Conduits L69 C

070T15220A Fire - Horizontal Conduits L70 C

18

283

25-JUL-07

14-AUG-07

Fire - Horizontal Conduits L70 C

071T15220A Fire - Horizontal Conduits L71 C

18

283

30-JUL-07

19-AUG-07

Fire - Horizontal Conduits L71 C

072T15220A Fire - Horizontal Conduits L72 C

18

283

04-AUG-07

23-AUG-07

073T15220A Fire - Headers & Second Fix Work L73~75 C

65

283

08-AUG-07

28-OCT-07

109T15220A Fire - Headers & Second Fix Work L109~111

65

320

15-SEP-07

08-DEC-07

112T15220A Fire - Horizontal Conduits L112 C

18

317

18-JUL-07

07-AUG-07

Fire - Horizontal Conduits L112 C

113T15220A Fire - Horizontal Conduits L113 C

18

317

23-JUL-07

12-AUG-07

Fire - Horizontal Conduits L113 C

114T15220A Fire - Horizontal Conduits L114 C

18

317

28-JUL-07

16-AUG-07

Fire - Horizontal Conduits L114 C

115T15220A Fire - Horizontal Conduits L115 C

18

317

01-AUG-07

21-AUG-07

Fire - Horizontal Conduits L115 C

116T15220A Fire - Horizontal Conduits L116 C

18

317

06-AUG-07

26-AUG-07

Fire - Horizontal Conduits L116 C

117T15220A Fire - Horizontal Conduits L117 C

18

317

11-AUG-07

30-AUG-07

Fire - Horizontal Conduits L117 C

118T15220A Fire - Horizontal Conduits L118 C

18

317

15-AUG-07

04-SEP-07

Fire - Horizontal Conduits L118 C

119T15220A Fire - Horizontal Conduits L119 C

18

317

20-AUG-07

09-SEP-07

Fire - Horizontal Conduits L119 C

120T15220A Fire - Horizontal Conduits L120 C

18

317

25-AUG-07

15-SEP-07

Fire - Horizontal Conduits L120 C

121T15220A Fire - Horizontal Conduits L121 C

18

317

29-AUG-07

19-SEP-07

Fire - Horizontal Conduits L121 C

122T15220A Fire - Horizontal Conduits L122 C

18

317

03-SEP-07

24-SEP-07

Fire - Horizontal Conduits L122 C

123T15220A Fire - Horizontal Conduits L123 C

18

317

08-SEP-07

29-SEP-07

Fire - Horizontal Conduits L123 C

124T15220A Fire - Horizontal Conduits L124 C

18

317

13-SEP-07

03-OCT-07

Fire - Horizontal Conduits L124 C

125T15220A Fire - Horizontal Conduits L125 C

18

317

18-SEP-07

08-OCT-07

Fire - Horizontal Conduits L125 C

126T15220A Fire - Horizontal Conduits L126 C

18

317

23-SEP-07

13-OCT-07

Fire - Horizontal Conduits L126 C

127T15220A Fire - Horizontal Conduits L127 C

18

317

27-SEP-07

20-OCT-07

Fire - Horizontal Conduits L127 C

128T15220A Fire - Horizontal Conduits L128 C

18

317

02-OCT-07

27-OCT-07

Fire - Horizontal Conduits L128 C

129T15220A Fire - Horizontal Conduits L129 C

18

317

07-OCT-07

01-NOV-07

Fire - Horizontal Conduits L129 C

130T15220A Fire - Horizontal Conduits L130 C

18

317

11-OCT-07

08-NOV-07

Fire - Horizontal Conduits L130 C

131T15220A Fire - Horizontal Conduits L131 C

18

317

18-OCT-07

16-NOV-07

Fire - Horizontal Conduits L131 C

132T15220A Fire - Horizontal Conduits L132 C

18

317

25-OCT-07

20-NOV-07

Fire - Horizontal Conduits L132 C

133T15220A Fire - Horizontal Conduits L133 C

18

317

31-OCT-07

24-NOV-07

Fire - Horizontal Conduits L133 C

134T15220A Fire - Horizontal Conduits L134 C

18

317

06-NOV-07

28-NOV-07

Fire - Horizontal Conduits L134 C

135T15220A Fire - Horizontal Conduits L135 C

18

276

13-NOV-07

03-DEC-07

136T15220A Fire - Headers & Second Fix Work LL136~138

65

276

19-NOV-07

04-FEB-08

139T15220A Fire - Second Fix L139 C

21

196

16-JAN-08

11-FEB-08

Fire - Second Fix L139 C

140T15220A Fire - Second Fix L140 C

21

197

20-JAN-08

14-FEB-08

Fire - Second Fix L140 C

141T15220A Fire - Second Fix L141 C

21

198

23-JAN-08

18-FEB-08

Fire - Second Fix L141 C

142T15220A Fire - Second Fix L142 C

21

199

27-JAN-08

21-FEB-08

Fire - Second Fix L142 C

143T15220A Fire - Second Fix L143 C

21

199

31-JAN-08

25-FEB-08

Fire - Second Fix L143 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Fire - Horizontal Conduits L72 C


Fire - Headers & Second Fix Work L73~75 C
Fire - Headers & Second Fix Work L109~111

Fire - Horizontal Conduits L135 C


Fire - Headers & Second Fix Work LL136~138

Sheet 168 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

144T15220A Fire - Second Fix L144 C

21

199

05-FEB-08

28-FEB-08

Fire - Second Fix L144 C

145T15220A Fire - Second Fix L145 C

21

199

09-FEB-08

03-MAR-08

Fire - Second Fix L145 C

146T15220A Fire - Second Fix L146 C

21

199

12-FEB-08

06-MAR-08

Fire - Second Fix L146 C

147T15220A Fire - Second Fix L147 C

21

199

16-FEB-08

10-MAR-08

Fire - Second Fix L147 C

148T15220A Fire - Second Fix L148 C

21

199

19-FEB-08

13-MAR-08

Fire - Second Fix L148 C

149T15220A Fire - Second Fix L149 C

21

199

23-FEB-08

17-MAR-08

Fire - Second Fix L149 C

150T15220A Fire - Second Fix L150 C

21

199

26-FEB-08

20-MAR-08

Fire - Second Fix L150 C

151T15220A Fire - Second Fix L151 C

21

199

01-MAR-08

24-MAR-08

Fire - Second Fix L151 C

152T15220A Fire - Second Fix L152 C

21

199

04-MAR-08

27-MAR-08

Fire - Second Fix L152 C

153T15220A Fire - Second Fix L153 C

21

200

08-MAR-08

31-MAR-08

Fire - Second Fix L153 C

154T15220A Fire - Second Fix L154 C

21

201

11-MAR-08

03-APR-08

155T15220A Fire - Second Fix L155~156 C

14

121

28-SEP-08

14-OCT-08

Fire - Second Fix L154 C


Fire - Second Fix L155~156 C

002T16230A Electrical - Horizontal Conduits L2 C

18

302

15-MAR-07

04-APR-07

004T16230A Electrical - Horizontal Conduits L4 C

18

302

20-MAR-07

09-APR-07

Electrical - Horizontal Conduits L4 C

005T16230A Electrical - Horizontal Conduits L05 C

18

11

296

05-DEC-06A

02-APR-07

Electrical - Horizontal Conduits L05 C

006T16230A Electrical - Horizontal Conduits L06 C

18

11

296

10-DEC-06A

02-APR-07

Electrical - Horizontal Conduits L06 C

007T16230A Electrical - Horizontal Conduits L07 C

18

11

296

09-DEC-06A

02-APR-07

Electrical - Horizontal Conduits L07 C

008T16230A Electrical - Horizontal Conduits L08 C

18

296

02-JAN-07A

03-APR-07

Electrical - Horizontal Conduits L08 C

009T16230A Electrical - Horizontal Conduits L09 C

18

11

296

01-AUG-06A

02-APR-07

Electrical - Horizontal Conduits L09 C

010T16230A Electrical - Horizontal Conduits L10 C

18

17

296

05-AUG-06A

01-APR-07

Electrical - Horizontal Conduits L10 C

011T16230A Electrical - Horizontal Conduits L11 C

18

17

296

05-AUG-06A

01-APR-07

Electrical - Horizontal Conduits L11 C

012T16230A Electrical - Horizontal Conduits L12 C

18

17

296

05-AUG-06A

01-APR-07

Electrical - Horizontal Conduits L12 C

013T16230A Electrical - Horizontal Conduits L13 C

18

296

08-JAN-07A

03-APR-07

Electrical - Horizontal Conduits L13 C

014T16230A Electrical - Horizontal Conduits L14 C

18

11

296

13-JAN-07A

02-APR-07

Electrical - Horizontal Conduits L14 C

015T16230A Electrical - Horizontal Conduits L15 C

18

11

296

13-JAN-07A

02-APR-07

Electrical - Horizontal Conduits L15 C

016T16230A Electrical - Horizontal Conduits L16 C

18

296

15-MAR-07

04-APR-07

Electrical - Horizontal Conduits L16 C

017T16230A Electrical -Conduits, Cables & Wiring L17~18

105

295

15-MAR-07

16-JUL-07

019T16230A Electrical - Horizontal Conduits L19 C

18

22

294

05-AUG-06A

31-MAR-07

Electrical - Horizontal Conduits L19 C

020T16230A Electrical - Horizontal Conduits L20 C

18

22

294

05-AUG-06A

31-MAR-07

Electrical - Horizontal Conduits L20 C

021T16230A Electrical - Horizontal Conduits L21 C

18

17

294

05-AUG-06A

01-APR-07

Electrical - Horizontal Conduits L21 C

022T16230A Electrical - Horizontal Conduits L22 C

18

17

294

08-AUG-06A

01-APR-07

Electrical - Horizontal Conduits L22 C

023T16230A Electrical - Horizontal Conduits L23 C

18

22

294

08-AUG-06A

31-MAR-07

Electrical - Horizontal Conduits L23 C

024T16230A Electrical - Horizontal Conduits L24 C

18

17

294

19-DEC-06A

01-APR-07

Electrical - Horizontal Conduits L24 C

025T16230A Electrical - Horizontal Conduits L25 C

18

294

15-MAR-07

04-APR-07

Electrical - Horizontal Conduits L25 C

026T16230A Electrical - Horizontal Conduits L26 C

18

17

294

06-AUG-06A

05-APR-07

Electrical - Horizontal Conduits L26 C

027T16230A Electrical - Horizontal Conduits L27 C

18

17

294

06-AUG-06A

05-APR-07

Electrical - Horizontal Conduits L27 C

028T16230A Electrical - Horizontal Conduits L28 C

18

17

294

06-AUG-06A

05-APR-07

Electrical - Horizontal Conduits L28 C

029T16230A Electrical - Horizontal Conduits L29 C

18

17

294

10-SEP-06A

05-APR-07

Electrical - Horizontal Conduits L29 C

030T16230A Electrical - Horizontal Conduits L30 C

18

17

294

10-SEP-06A

05-APR-07

Electrical - Horizontal Conduits L30 C

031T16230A Electrical - Horizontal Conduits L31 C

18

294

20-MAR-07

09-APR-07

Electrical - Horizontal Conduits L31 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Electrical - Horizontal Conduits L2 C

Electrical -Conduits, Cables & Wiring L17~18

Sheet 169 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

Early
Start

Early
Finish

032T16230A Electrical - Horizontal Conduits L32 C

18

11

033T16230A Electrical - Horizontal Conduits L33 C

18

11

294

10-SEP-06A

11-APR-07

Electrical - Horizontal Conduits L32 C

294

10-SEP-06A

11-APR-07

034T16230A Electrical - Horizontal Conduits L34 C

18

Electrical - Horizontal Conduits L33 C

11

294

10-SEP-06A

11-APR-07

035T16230A Electrical - Horizontal Conduits L35 C

Electrical - Horizontal Conduits L34 C

18

294

25-MAR-07

14-APR-07

Electrical - Horizontal Conduits L35 C

036T16230A Electrical - Horizontal Conduits L36 C

18

294

29-DEC-07A

17-APR-07

037T16230A Electrical - Horizontal Conduits L37 C

18

22

294

02-OCT-06A

18-APR-07

Electrical - Horizontal Conduits L37 C

038T16230A Electrical - Horizontal Conduits L38 C

18

17

294

10-OCT-06A

19-APR-07

Electrical - Horizontal Conduits L38 C

039T16230A Electrical - Horizontal Conduits L39 C

18

17

294

12-OCT-06A

19-APR-07

Electrical - Horizontal Conduits L39 C

040T16230A Electrical -Conduits, Cables & Wiring L40~42

90

294

03-APR-07

17-JUL-07

043T16230A Electrical - Horizontal Conduits L43 C

18

316

15-MAR-07

04-APR-07

Electrical - Horizontal Conduits L43 C

044T16230A Electrical - Horizontal Conduits L44 C

18

316

20-MAR-07

09-APR-07

Electrical - Horizontal Conduits L44 C

045T16230A Electrical - Horizontal Conduits L45 C

18

316

25-MAR-07

14-APR-07

Electrical - Horizontal Conduits L45 C

046T16230A Electrical - Horizontal Conduits L46 C

18

316

02-JAN-07A

17-APR-07

Electrical - Horizontal Conduits L46 C

047T16230A Electrical - Horizontal Conduits L47 C

18

316

09-JAN-07A

17-APR-07

Electrical - Horizontal Conduits L47 C

048T16230A Electrical - Horizontal Conduits L48 C

18

11

316

04-JAN-07A

16-APR-07

Electrical - Horizontal Conduits L48 C

049T16230A Electrical - Horizontal Conduits L49 C

18

11

316

06-JAN-07A

16-APR-07

Electrical - Horizontal Conduits L49 C

050T16230A Electrical - Horizontal Conduits L50 C

18

11

316

03-JAN-07A

16-APR-07

Electrical - Horizontal Conduits L50 C

051T16230A Electrical - Horizontal Conduits L51 C

18

316

06-JAN-07A

17-APR-07

Electrical - Horizontal Conduits L51 C

052T16230A Electrical - Horizontal Conduits L52 C

18

316

14-JAN-07A

17-APR-07

Electrical - Horizontal Conduits L52 C

053T16230A Electrical - Horizontal Conduits L53 C

18

316

09-JAN-07A

17-APR-07

Electrical - Horizontal Conduits L53 C

054T16230A Electrical - Horizontal Conduits L54 C

18

316

29-MAR-07

18-APR-07

Electrical - Horizontal Conduits L54 C

055T16230A Electrical - Horizontal Conduits L55 C

18

316

13-JAN-07A

22-APR-07

Electrical - Horizontal Conduits L55 C

056T16230A Electrical - Horizontal Conduits L56 C

18

316

03-APR-07

23-APR-07

Electrical - Horizontal Conduits L56 C

057T16230A Electrical - Horizontal Conduits L57 C

18

316

08-APR-07

28-APR-07

Electrical - Horizontal Conduits L57 C

058T16230A Electrical - Horizontal Conduits L58 C

18

316

12-APR-07

03-MAY-07

Electrical - Horizontal Conduits L58 C

059T16230A Electrical - Horizontal Conduits L59 C

18

316

17-APR-07

08-MAY-07

Electrical - Horizontal Conduits L59 C

060T16230A Electrical - Horizontal Conduits L60 C

18

316

22-APR-07

13-MAY-07

Electrical - Horizontal Conduits L60 C

061T16230A Electrical - Horizontal Conduits L61 C

18

316

26-APR-07

17-MAY-07

Electrical - Horizontal Conduits L61 C

062T16230A Electrical - Horizontal Conduits L62 C

18

316

02-MAY-07

22-MAY-07

Electrical - Horizontal Conduits L62 C

063T16230A Electrical - Horizontal Conduits L63 C

18

316

07-MAY-07

27-MAY-07

Electrical - Horizontal Conduits L63 C

064T16230A Electrical - Horizontal Conduits L64 C

18

316

12-MAY-07

31-MAY-07

Electrical - Horizontal Conduits L64 C

065T16230A Electrical - Horizontal Conduits L65 C

18

316

16-MAY-07

05-JUN-07

Electrical - Horizontal Conduits L65 C

066T16230A Electrical - Horizontal Conduits L66 C

18

316

21-MAY-07

10-JUN-07

Electrical - Horizontal Conduits L66 C

067T16230A Electrical - Horizontal Conduits L67 C

18

316

26-MAY-07

14-JUN-07

Electrical - Horizontal Conduits L67 C

068T16230A Electrical - Horizontal Conduits L68 C

18

316

30-MAY-07

19-JUN-07

Electrical - Horizontal Conduits L68 C

069T16230A Electrical - Horizontal Conduits L69 C

18

316

04-JUN-07

24-JUN-07

Electrical - Horizontal Conduits L69 C

070T16230A Electrical - Horizontal Conduits L70 C

18

316

09-JUN-07

28-JUN-07

Electrical - Horizontal Conduits L70 C

071T16230A Electrical - Horizontal Conduits L71 C

18

316

13-JUN-07

03-JUL-07

Electrical - Horizontal Conduits L71 C

072T16230A Electrical - Horizontal Conduits L72 C

18

316

18-JUN-07

08-JUL-07

Electrical - Horizontal Conduits L72 C

073T16230A Electrical - Conduits, Cables & Wiring L73~75

75

316

23-JUN-07

18-SEP-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

% Total
Comp Float

BDW1

2005

2006

2007

2008

2009

Electrical - Horizontal Conduits L36 C

Electrical -Conduits, Cables & Wiring L40~42

Electrical - Conduits, Cables & Wiring L73~75


Sheet 170 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

Electrical -Conduits, Cables & Wiring L109~111

109T16230A Electrical -Conduits, Cables & Wiring L109~111

75

285

02-OCT-07

07-JAN-08

112T16230A Electrical - Horizontal Conduits L112 C

18

317

18-JUL-07

07-AUG-07

Electrical - Horizontal Conduits L112 C

113T16230A Electrical - Horizontal Conduits L113 C

18

317

23-JUL-07

12-AUG-07

Electrical - Horizontal Conduits L113 C

114T16230A Electrical - Horizontal Conduits L114 C

18

317

28-JUL-07

16-AUG-07

Electrical - Horizontal Conduits L114 C

115T16230A Electrical - Horizontal Conduits L115 C

18

317

01-AUG-07

21-AUG-07

Electrical - Horizontal Conduits L115 C

116T16230A Electrical - Horizontal Conduits L116 C

18

317

06-AUG-07

26-AUG-07

Electrical - Horizontal Conduits L116 C

117T16230A Electrical - Horizontal Conduits L117 C

18

317

11-AUG-07

30-AUG-07

Electrical - Horizontal Conduits L117 C

118T16230A Electrical - Horizontal Conduits L118 C

18

317

15-AUG-07

04-SEP-07

Electrical - Horizontal Conduits L118 C

119T16230A Electrical - Horizontal Conduits L119 C

18

317

20-AUG-07

09-SEP-07

Electrical - Horizontal Conduits L119 C

120T16230A Electrical - Horizontal Conduits L120 C

18

317

25-AUG-07

15-SEP-07

Electrical - Horizontal Conduits L120 C

121T16230A Electrical - Horizontal Conduits L121 C

18

317

29-AUG-07

19-SEP-07

Electrical - Horizontal Conduits L121 C

122T16230A Electrical - Horizontal Conduits L122 C

18

317

03-SEP-07

24-SEP-07

Electrical - Horizontal Conduits L122 C

123T16230A Electrical - Horizontal Conduits L123 C

18

317

08-SEP-07

29-SEP-07

Electrical - Horizontal Conduits L123 C

124T16230A Electrical - Horizontal Conduits L124 C

18

317

13-SEP-07

03-OCT-07

Electrical - Horizontal Conduits L124 C

125T16230A Electrical - Horizontal Conduits L125 C

18

317

18-SEP-07

08-OCT-07

Electrical - Horizontal Conduits L125 C

126T16230A Electrical - Horizontal Conduits L126 C

18

317

23-SEP-07

13-OCT-07

Electrical - Horizontal Conduits L126 C

127T16230A Electrical - Horizontal Conduits L127 C

18

317

27-SEP-07

20-OCT-07

Electrical - Horizontal Conduits L127 C

128T16230A Electrical - Horizontal Conduits L128 C

18

317

02-OCT-07

27-OCT-07

Electrical - Horizontal Conduits L128 C

129T16230A Electrical - Horizontal Conduits L129 C

18

317

07-OCT-07

01-NOV-07

Electrical - Horizontal Conduits L129 C

130T16230A Electrical - Horizontal Conduits L130 C

18

317

11-OCT-07

08-NOV-07

Electrical - Horizontal Conduits L130 C

131T16230A Electrical - Horizontal Conduits L131 C

18

317

18-OCT-07

16-NOV-07

Electrical - Horizontal Conduits L131 C

132T16230A Electrical - Horizontal Conduits L132 C

18

317

25-OCT-07

20-NOV-07

Electrical - Horizontal Conduits L132 C

133T16230A Electrical - Horizontal Conduits L133 C

18

317

31-OCT-07

24-NOV-07

Electrical - Horizontal Conduits L133 C

134T16230A Electrical - Horizontal Conduits L134 C

18

317

06-NOV-07

28-NOV-07

Electrical - Horizontal Conduits L134 C

135T16230A Electrical - Horizontal Conduits L135 C

18

308

13-NOV-07

03-DEC-07

136T16230A Electrical -Conduits, Cables & Wiring L136~138

75

308

19-NOV-07

16-FEB-08

139T16230A Electrical - Second Fix L139 C

14

190

16-JAN-08

03-FEB-08

Electrical - Second Fix L139 C

140T16230A Electrical - Second Fix L140 C

14

191

20-JAN-08

06-FEB-08

Electrical - Second Fix L140 C

141T16230A Electrical - Second Fix L141 C

14

192

23-JAN-08

10-FEB-08

Electrical - Second Fix L141 C

142T16230A Electrical - Second Fix L142 C

14

193

27-JAN-08

13-FEB-08

Electrical - Second Fix L142 C

143T16230A Electrical - Second Fix L143 C

14

193

31-JAN-08

17-FEB-08

Electrical - Second Fix L143 C

144T16230A Electrical - Second Fix L144 C

14

193

05-FEB-08

20-FEB-08

Electrical - Second Fix L144 C

145T16230A Electrical - Second Fix L145 C

14

193

09-FEB-08

24-FEB-08

Electrical - Second Fix L145 C

146T16230A Electrical - Second Fix L146 C

14

193

12-FEB-08

27-FEB-08

Electrical - Second Fix L146 C

147T16230A Electrical - Second Fix L147 C

14

193

16-FEB-08

02-MAR-08

Electrical - Second Fix L147 C

148T16230A Electrical - Second Fix L148 C

14

193

19-FEB-08

05-MAR-08

Electrical - Second Fix L148 C

149T16230A Electrical - Second Fix L149 C

14

193

23-FEB-08

09-MAR-08

Electrical - Second Fix L149 C

150T16230A Electrical - Second Fix L150 C

14

193

26-FEB-08

12-MAR-08

Electrical - Second Fix L150 C

151T16230A Electrical - Second Fix L151 C

14

193

01-MAR-08

16-MAR-08

Electrical - Second Fix L151 C

152T16230A Electrical - Second Fix L152 C

14

193

04-MAR-08

19-MAR-08

Electrical - Second Fix L152 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Electrical - Horizontal Conduits L135 C


Electrical -Conduits, Cables & Wiring L136~138

Sheet 171 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

153T16230A Electrical - Second Fix L153 C

14

194

08-MAR-08

23-MAR-08

Electrical - Second Fix L153 C

154T16230A Electrical - Second Fix L154 C

14

195

11-MAR-08

26-MAR-08

155T16230A Electrical - Second Fix L155~156 C

14

119

28-SEP-08

14-OCT-08

Electrical - Second Fix L154 C


Electrical - Second Fix L155~156 C

002T15240A Drainage - Horizontal Conduits L2 C

18

302

15-MAR-07

04-APR-07

Drainage - Horizontal Conduits L2 C

004T15240A Drainage - Horizontal Conduits L4 C

18

302

20-MAR-07

09-APR-07

Drainage - Horizontal Conduits L4 C

005T15240A Drainage - Horizontal Conduits L05 C

18

279

14-MAY-07

03-JUN-07

Drainage - Horizontal Conduits L05 C

006T15240A Drainage - Horizontal Conduits L06 C

18

279

19-MAY-07

07-JUN-07

Drainage - Horizontal Conduits L06 C

007T15240A Drainage - Horizontal Conduits L07 C

18

279

23-MAY-07

12-JUN-07

Drainage - Horizontal Conduits L07 C

008T15240A Drainage - Horizontal Conduits L08 C

18

279

28-MAY-07

17-JUN-07

Drainage - Horizontal Conduits L08 C

009T15240A Drainage - Horizontal Conduits L09 C

18

279

02-JUN-07

21-JUN-07

Drainage - Horizontal Conduits L09 C

010T15240A Drainage - Horizontal Conduits L10 C

18

279

06-JUN-07

26-JUN-07

Drainage - Horizontal Conduits L10 C

011T15240A Drainage - Horizontal Conduits L11 C

18

279

11-JUN-07

01-JUL-07

Drainage - Horizontal Conduits L11 C

012T15240A Drainage - Horizontal Conduits L12 C

18

279

16-JUN-07

05-JUL-07

Drainage - Horizontal Conduits L12 C

013T15240A Drainage - Horizontal Conduits L13 C

18

279

20-JUN-07

10-JUL-07

Drainage - Horizontal Conduits L13 C

014T15240A Drainage - Horizontal Conduits L14 C

18

279

25-JUN-07

15-JUL-07

Drainage - Horizontal Conduits L14 C

015T15240A Drainage - Horizontal Conduits L15 C

18

279

30-JUN-07

19-JUL-07

Drainage - Horizontal Conduits L15 C

016T15240A Drainage - Horizontal Conduits L16 C

18

279

04-JUL-07

24-JUL-07

017T15240A Drainage -Piping, Insulation & Testing L17~18

50

279

11-AUG-07

08-OCT-07

Drainage - Horizontal Conduits L16 C


Drainage -Piping, Insulation & Testing L17~18

019T15240A Drainage - Horizontal Conduits L19 C

18

277

15-MAR-07

04-APR-07

Drainage - Horizontal Conduits L19 C

020T15240A Drainage - Horizontal Conduits L20 C

18

277

20-MAR-07

09-APR-07

Drainage - Horizontal Conduits L20 C

021T15240A Drainage - Horizontal Conduits L21 C

18

277

25-MAR-07

14-APR-07

Drainage - Horizontal Conduits L21 C

022T15240A Drainage - Horizontal Conduits L22 C

18

277

29-MAR-07

18-APR-07

Drainage - Horizontal Conduits L22 C

023T15240A Drainage - Horizontal Conduits L23 C

18

277

03-APR-07

23-APR-07

Drainage - Horizontal Conduits L23 C

024T15240A Drainage - Horizontal Conduits L24 C

18

277

08-APR-07

28-APR-07

Drainage - Horizontal Conduits L24 C

025T15240A Drainage - Horizontal Conduits L25 C

18

277

12-APR-07

03-MAY-07

Drainage - Horizontal Conduits L25 C

026T15240A Drainage - Horizontal Conduits L26 C

18

277

17-APR-07

08-MAY-07

Drainage - Horizontal Conduits L26 C

027T15240A Drainage - Horizontal Conduits L27 C

18

277

22-APR-07

13-MAY-07

Drainage - Horizontal Conduits L27 C

028T15240A Drainage - Horizontal Conduits L28 C

18

277

26-APR-07

17-MAY-07

Drainage - Horizontal Conduits L28 C

029T15240A Drainage - Horizontal Conduits L29 C

18

277

02-MAY-07

22-MAY-07

Drainage - Horizontal Conduits L29 C

030T15240A Drainage - Horizontal Conduits L30 C

18

277

07-MAY-07

27-MAY-07

Drainage - Horizontal Conduits L30 C

031T15240A Drainage - Horizontal Conduits L31 C

18

277

12-MAY-07

31-MAY-07

Drainage - Horizontal Conduits L31 C

032T15240A Drainage - Horizontal Conduits L32 C

18

277

16-MAY-07

05-JUN-07

Drainage - Horizontal Conduits L32 C

033T15240A Drainage - Horizontal Conduits L33 C

18

277

21-MAY-07

10-JUN-07

Drainage - Horizontal Conduits L33 C

034T15240A Drainage - Horizontal Conduits L34 C

18

277

26-MAY-07

14-JUN-07

Drainage - Horizontal Conduits L34 C

035T15240A Drainage - Horizontal Conduits L35 C

18

277

30-MAY-07

19-JUN-07

Drainage - Horizontal Conduits L35 C

036T15240A Drainage - Horizontal Conduits L36 C

18

277

04-JUN-07

24-JUN-07

Drainage - Horizontal Conduits L36 C

037T15240A Drainage - Horizontal Conduits L37 C

18

277

09-JUN-07

28-JUN-07

Drainage - Horizontal Conduits L37 C

038T15240A Drainage - Horizontal Conduits L38 C

18

277

13-JUN-07

03-JUL-07

Drainage - Horizontal Conduits L38 C

039T15240A Drainage - Horizontal Conduits L39 C

18

277

18-JUN-07

08-JUL-07

Drainage - Horizontal Conduits L39 C

040T15240A Drainage -Piping, Insulation & Testing L40~42

50

321

23-JUN-07

19-AUG-07

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Drainage -Piping, Insulation & Testing L40~42


Sheet 172 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

Early
Start

Early
Finish

043T15240A Drainage - Horizontal Conduits L43 C

18

044T15240A Drainage - Horizontal Conduits L44 C

18

300

15-MAR-07

04-APR-07

Drainage - Horizontal Conduits L43 C

300

20-MAR-07

09-APR-07

045T15240A Drainage - Horizontal Conduits L45 C

18

Drainage - Horizontal Conduits L44 C

300

25-MAR-07

14-APR-07

046T15240A Drainage - Horizontal Conduits L46 C

Drainage - Horizontal Conduits L45 C

18

300

29-MAR-07

18-APR-07

Drainage - Horizontal Conduits L46 C

047T15240A Drainage - Horizontal Conduits L47 C

18

300

03-APR-07

23-APR-07

Drainage - Horizontal Conduits L47 C

048T15240A Drainage - Horizontal Conduits L48 C

18

300

08-APR-07

28-APR-07

Drainage - Horizontal Conduits L48 C

049T15240A Drainage - Horizontal Conduits L49 C

18

300

12-APR-07

03-MAY-07

Drainage - Horizontal Conduits L49 C

050T15240A Drainage - Horizontal Conduits L50 C

18

300

17-APR-07

08-MAY-07

Drainage - Horizontal Conduits L50 C

051T15240A Drainage - Horizontal Conduits L51 C

18

300

22-APR-07

13-MAY-07

Drainage - Horizontal Conduits L51 C

052T15240A Drainage - Horizontal Conduits L52 C

18

300

26-APR-07

17-MAY-07

Drainage - Horizontal Conduits L52 C

053T15240A Drainage - Horizontal Conduits L53 C

18

300

02-MAY-07

22-MAY-07

Drainage - Horizontal Conduits L53 C

054T15240A Drainage - Horizontal Conduits L54 C

18

300

07-MAY-07

27-MAY-07

Drainage - Horizontal Conduits L54 C

055T15240A Drainage - Horizontal Conduits L55 C

18

300

12-MAY-07

31-MAY-07

Drainage - Horizontal Conduits L55 C

056T15240A Drainage - Horizontal Conduits L56 C

18

300

16-MAY-07

05-JUN-07

Drainage - Horizontal Conduits L56 C

057T15240A Drainage - Horizontal Conduits L57 C

18

300

21-MAY-07

10-JUN-07

Drainage - Horizontal Conduits L57 C

058T15240A Drainage - Horizontal Conduits L58 C

18

300

26-MAY-07

14-JUN-07

Drainage - Horizontal Conduits L58 C

059T15240A Drainage - Horizontal Conduits L59 C

18

300

30-MAY-07

19-JUN-07

Drainage - Horizontal Conduits L59 C

060T15240A Drainage - Horizontal Conduits L60 C

18

300

04-JUN-07

24-JUN-07

Drainage - Horizontal Conduits L60 C

061T15240A Drainage - Horizontal Conduits L61 C

18

300

09-JUN-07

28-JUN-07

Drainage - Horizontal Conduits L61 C

062T15240A Drainage - Horizontal Conduits L62 C

18

300

13-JUN-07

03-JUL-07

Drainage - Horizontal Conduits L62 C

063T15240A Drainage - Horizontal Conduits L63 C

18

300

18-JUN-07

08-JUL-07

Drainage - Horizontal Conduits L63 C

064T15240A Drainage - Horizontal Conduits L64 C

18

300

23-JUN-07

12-JUL-07

Drainage - Horizontal Conduits L64 C

065T15240A Drainage - Horizontal Conduits L65 C

18

300

27-JUN-07

17-JUL-07

Drainage - Horizontal Conduits L65 C

066T15240A Drainage - Horizontal Conduits L66 C

18

300

02-JUL-07

22-JUL-07

Drainage - Horizontal Conduits L66 C

067T15240A Drainage - Horizontal Conduits L67 C

18

300

07-JUL-07

26-JUL-07

Drainage - Horizontal Conduits L67 C

068T15240A Drainage - Horizontal Conduits L68 C

18

300

11-JUL-07

31-JUL-07

Drainage - Horizontal Conduits L68 C

069T15240A Drainage - Horizontal Conduits L69 C

18

300

16-JUL-07

05-AUG-07

Drainage - Horizontal Conduits L69 C

070T15240A Drainage - Horizontal Conduits L70 C

18

300

21-JUL-07

09-AUG-07

Drainage - Horizontal Conduits L70 C

071T15240A Drainage - Horizontal Conduits L71 C

18

300

25-JUL-07

14-AUG-07

Drainage - Horizontal Conduits L71 C

072T15240A Drainage - Horizontal Conduits L72 C

18

300

30-JUL-07

19-AUG-07

073T15240A Drainage - Piping, Insulation & Testing L73~75

50

340

04-AUG-07

01-OCT-07

109T15240A Drainage - Piping, Insulation & Testing L109~111

50

345

02-OCT-07

08-DEC-07

112T15240A Drainage - Horizontal Conduits L112 C

18

317

18-JUL-07

07-AUG-07

Drainage - Horizontal Conduits L112 C

113T15240A Drainage - Horizontal Conduits L113 C

18

317

23-JUL-07

12-AUG-07

Drainage - Horizontal Conduits L113 C

114T15240A Drainage - Horizontal Conduits L114 C

18

317

28-JUL-07

16-AUG-07

Drainage - Horizontal Conduits L114 C

115T15240A Drainage - Horizontal Conduits L115 C

18

317

01-AUG-07

21-AUG-07

Drainage - Horizontal Conduits L115 C

116T15240A Drainage - Horizontal Conduits L116 C

18

317

06-AUG-07

26-AUG-07

Drainage - Horizontal Conduits L116 C

117T15240A Drainage - Horizontal Conduits L117 C

18

317

11-AUG-07

30-AUG-07

Drainage - Horizontal Conduits L117 C

118T15240A Drainage - Horizontal Conduits L118 C

18

317

15-AUG-07

04-SEP-07

Drainage - Horizontal Conduits L118 C

119T15240A Drainage - Horizontal Conduits L119 C

18

317

20-AUG-07

09-SEP-07

Drainage - Horizontal Conduits L119 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

% Total
Comp Float

BDW1

2005

2006

2007

2008

2009

Drainage - Horizontal Conduits L72 C


Drainage - Piping, Insulation & Testing L73~75
Drainage - Piping, Insulation & Testing L109~111

Sheet 173 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

120T15240A Drainage - Horizontal Conduits L120 C

18

317

25-AUG-07

15-SEP-07

Drainage - Horizontal Conduits L120 C

121T15240A Drainage - Horizontal Conduits L121 C

18

317

29-AUG-07

19-SEP-07

Drainage - Horizontal Conduits L121 C

122T15240A Drainage - Horizontal Conduits L122 C

18

317

03-SEP-07

24-SEP-07

Drainage - Horizontal Conduits L122 C

123T15240A Drainage - Horizontal Conduits L123 C

18

317

08-SEP-07

29-SEP-07

Drainage - Horizontal Conduits L123 C

124T15240A Drainage - Horizontal Conduits L124 C

18

317

13-SEP-07

03-OCT-07

Drainage - Horizontal Conduits L124 C

125T15240A Drainage - Horizontal Conduits L125 C

18

317

18-SEP-07

08-OCT-07

Drainage - Horizontal Conduits L125 C

126T15240A Drainage - Horizontal Conduits L126 C

18

317

23-SEP-07

13-OCT-07

Drainage - Horizontal Conduits L126 C

127T15240A Drainage - Horizontal Conduits L127 C

18

317

27-SEP-07

20-OCT-07

Drainage - Horizontal Conduits L127 C

128T15240A Drainage - Horizontal Conduits L128 C

18

317

02-OCT-07

27-OCT-07

Drainage - Horizontal Conduits L128 C

129T15240A Drainage - Horizontal Conduits L129 C

18

317

07-OCT-07

01-NOV-07

Drainage - Horizontal Conduits L129 C

130T15240A Drainage - Horizontal Conduits L130 C

18

317

11-OCT-07

08-NOV-07

Drainage - Horizontal Conduits L130 C

131T15240A Drainage - Horizontal Conduits L131 C

18

317

18-OCT-07

16-NOV-07

Drainage - Horizontal Conduits L131 C

132T15240A Drainage - Horizontal Conduits L132 C

18

317

25-OCT-07

20-NOV-07

Drainage - Horizontal Conduits L132 C

133T15240A Drainage - Horizontal Conduits L133 C

18

317

31-OCT-07

24-NOV-07

Drainage - Horizontal Conduits L133 C

134T15240A Drainage - Horizontal Conduits L134 C

18

317

06-NOV-07

28-NOV-07

Drainage - Horizontal Conduits L134 C

135T15240A Drainage - Horizontal Conduits L135 C

18

291

13-NOV-07

03-DEC-07

136T15240A Drainage - Piping, Insulation & Testing L136~138

50

291

19-NOV-07

15-JAN-08

139T15240A Drainage - Second Fix L139 C

14

196

16-JAN-08

03-FEB-08

Drainage - Second Fix L139 C

140T15240A Drainage - Second Fix L140 C

14

197

20-JAN-08

06-FEB-08

Drainage - Second Fix L140 C

141T15240A Drainage - Second Fix L141 C

14

198

23-JAN-08

10-FEB-08

Drainage - Second Fix L141 C

142T15240A Drainage - Second Fix L142 C

14

199

27-JAN-08

13-FEB-08

Drainage - Second Fix L142 C

143T15240A Drainage - Second Fix L143 C

14

199

31-JAN-08

17-FEB-08

Drainage - Second Fix L143 C

144T15240A Drainage - Second Fix L144 C

14

199

05-FEB-08

20-FEB-08

Drainage - Second Fix L144 C

145T15240A Drainage - Second Fix L145 C

14

199

09-FEB-08

24-FEB-08

Drainage - Second Fix L145 C

146T15240A Drainage - Second Fix L146 C

14

199

12-FEB-08

27-FEB-08

Drainage - Second Fix L146 C

147T15240A Drainage - Second Fix L147 C

14

199

16-FEB-08

02-MAR-08

Drainage - Second Fix L147 C

148T15240A Drainage - Second Fix L148 C

14

199

19-FEB-08

05-MAR-08

Drainage - Second Fix L148 C

149T15240A Drainage - Second Fix L149 C

14

199

23-FEB-08

09-MAR-08

Drainage - Second Fix L149 C

150T15240A Drainage - Second Fix L150 C

14

199

26-FEB-08

12-MAR-08

Drainage - Second Fix L150 C

151T15240A Drainage - Second Fix L151 C

14

199

01-MAR-08

16-MAR-08

Drainage - Second Fix L151 C

152T15240A Drainage - Second Fix L152 C

14

199

04-MAR-08

19-MAR-08

Drainage - Second Fix L152 C

153T15240A Drainage - Second Fix L153 C

14

200

08-MAR-08

23-MAR-08

Drainage - Second Fix L153 C

154T15240A Drainage - Second Fix L154 C

14

201

11-MAR-08

26-MAR-08

155T15240A Drainage - Second Fix L155~156 C

14

121

28-SEP-08

14-OCT-08

Drainage - Second Fix L154 C


Drainage - Second Fix L155~156 C

002T15250A Plumbing - Horizontal Conduits L2 C

18

302

15-MAR-07

04-APR-07

Plumbing - Horizontal Conduits L2 C

004T15250A Plumbing - Horizontal Conduits L4 C

18

302

20-MAR-07

09-APR-07

Plumbing - Horizontal Conduits L4 C

005T15250A Plumbing - Horizontal Conduits L05 C

18

279

14-MAY-07

03-JUN-07

Plumbing - Horizontal Conduits L05 C

006T15250A Plumbing - Horizontal Conduits L06 C

18

279

19-MAY-07

07-JUN-07

Plumbing - Horizontal Conduits L06 C

007T15250A Plumbing - Horizontal Conduits L07 C

18

279

23-MAY-07

12-JUN-07

Plumbing - Horizontal Conduits L07 C

008T15250A Plumbing - Horizontal Conduits L08 C

18

279

28-MAY-07

17-JUN-07

Plumbing - Horizontal Conduits L08 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Drainage - Horizontal Conduits L135 C


Drainage - Piping, Insulation & Testing L136~138

Sheet 174 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

Early
Start

Early
Finish

009T15250A Plumbing - Horizontal Conduits L09 C

18

010T15250A Plumbing - Horizontal Conduits L10 C

18

279

02-JUN-07

21-JUN-07

Plumbing - Horizontal Conduits L09 C

279

06-JUN-07

26-JUN-07

011T15250A Plumbing - Horizontal Conduits L11 C

18

Plumbing - Horizontal Conduits L10 C

279

11-JUN-07

01-JUL-07

012T15250A Plumbing - Horizontal Conduits L12 C

Plumbing - Horizontal Conduits L11 C

18

279

16-JUN-07

05-JUL-07

Plumbing - Horizontal Conduits L12 C

013T15250A Plumbing - Horizontal Conduits L13 C

18

279

20-JUN-07

10-JUL-07

Plumbing - Horizontal Conduits L13 C

014T15250A Plumbing - Horizontal Conduits L14 C

18

279

25-JUN-07

15-JUL-07

Plumbing - Horizontal Conduits L14 C

015T15250A Plumbing - Horizontal Conduits L15 C

18

279

30-JUN-07

19-JUL-07

Plumbing - Horizontal Conduits L15 C

016T15250A Plumbing - Horizontal Conduits L16 C

18

279

04-JUL-07

24-JUL-07

017T15250A Plumbing - Piping, Insulation & Testing L17~18

65

292

09-JUL-07

23-SEP-07

019T15250A Plumbing - Horizontal Conduits L19 C

18

277

15-MAR-07

04-APR-07

Plumbing - Horizontal Conduits L19 C

020T15250A Plumbing - Horizontal Conduits L20 C

18

277

20-MAR-07

09-APR-07

Plumbing - Horizontal Conduits L20 C

021T15250A Plumbing - Horizontal Conduits L21 C

18

277

25-MAR-07

14-APR-07

Plumbing - Horizontal Conduits L21 C

022T15250A Plumbing - Horizontal Conduits L22 C

18

277

29-MAR-07

18-APR-07

Plumbing - Horizontal Conduits L22 C

023T15250A Plumbing - Horizontal Conduits L23 C

18

277

03-APR-07

23-APR-07

Plumbing - Horizontal Conduits L23 C

024T15250A Plumbing - Horizontal Conduits L24 C

18

277

08-APR-07

28-APR-07

Plumbing - Horizontal Conduits L24 C

025T15250A Plumbing - Horizontal Conduits L25 C

18

277

12-APR-07

03-MAY-07

Plumbing - Horizontal Conduits L25 C

026T15250A Plumbing - Horizontal Conduits L26 C

18

277

17-APR-07

08-MAY-07

Plumbing - Horizontal Conduits L26 C

027T15250A Plumbing - Horizontal Conduits L27 C

18

277

22-APR-07

13-MAY-07

Plumbing - Horizontal Conduits L27 C

028T15250A Plumbing - Horizontal Conduits L28 C

18

277

26-APR-07

17-MAY-07

Plumbing - Horizontal Conduits L28 C

029T15250A Plumbing - Horizontal Conduits L29 C

18

277

02-MAY-07

22-MAY-07

Plumbing - Horizontal Conduits L29 C

030T15250A Plumbing - Horizontal Conduits L30 C

18

277

07-MAY-07

27-MAY-07

Plumbing - Horizontal Conduits L30 C

031T15250A Plumbing - Horizontal Conduits L31 C

18

277

12-MAY-07

31-MAY-07

Plumbing - Horizontal Conduits L31 C

032T15250A Plumbing - Horizontal Conduits L32 C

18

277

16-MAY-07

05-JUN-07

Plumbing - Horizontal Conduits L32 C

033T15250A Plumbing - Horizontal Conduits L33 C

18

277

21-MAY-07

10-JUN-07

Plumbing - Horizontal Conduits L33 C

034T15250A Plumbing - Horizontal Conduits L34 C

18

277

26-MAY-07

14-JUN-07

Plumbing - Horizontal Conduits L34 C

035T15250A Plumbing - Horizontal Conduits L35 C

18

277

30-MAY-07

19-JUN-07

Plumbing - Horizontal Conduits L35 C

036T15250A Plumbing - Horizontal Conduits L36 C

18

277

04-JUN-07

24-JUN-07

Plumbing - Horizontal Conduits L36 C

037T15250A Plumbing - Horizontal Conduits L37 C

18

277

09-JUN-07

28-JUN-07

Plumbing - Horizontal Conduits L37 C

038T15250A Plumbing - Horizontal Conduits L38 C

18

277

13-JUN-07

03-JUL-07

Plumbing - Horizontal Conduits L38 C

039T15250A Plumbing - Horizontal Conduits L39 C

18

277

18-JUN-07

08-JUL-07

Plumbing - Horizontal Conduits L39 C

040T15250A Plumbing - Piping, Insulation & Testing L40~42

65

306

23-JUN-07

05-SEP-07

043T15250A Plumbing - Horizontal Conduits L43 C

18

300

15-MAR-07

04-APR-07

Plumbing - Horizontal Conduits L43 C

044T15250A Plumbing - Horizontal Conduits L44 C

18

300

20-MAR-07

09-APR-07

Plumbing - Horizontal Conduits L44 C

045T15250A Plumbing - Horizontal Conduits L45 C

18

300

25-MAR-07

14-APR-07

Plumbing - Horizontal Conduits L45 C

046T15250A Plumbing - Horizontal Conduits L46 C

18

300

29-MAR-07

18-APR-07

Plumbing - Horizontal Conduits L46 C

047T15250A Plumbing - Horizontal Conduits L47 C

18

300

03-APR-07

23-APR-07

Plumbing - Horizontal Conduits L47 C

048T15250A Plumbing - Horizontal Conduits L48 C

18

300

08-APR-07

28-APR-07

Plumbing - Horizontal Conduits L48 C

049T15250A Plumbing - Horizontal Conduits L49 C

18

300

12-APR-07

03-MAY-07

Plumbing - Horizontal Conduits L49 C

050T15250A Plumbing - Horizontal Conduits L50 C

18

300

17-APR-07

08-MAY-07

Plumbing - Horizontal Conduits L50 C

051T15250A Plumbing - Horizontal Conduits L51 C

18

300

22-APR-07

13-MAY-07

Plumbing - Horizontal Conduits L51 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

% Total
Comp Float

BDW1

2005

2006

2007

2008

2009

Plumbing - Horizontal Conduits L16 C


Plumbing - Piping, Insulation & Testing L17~18

Plumbing - Piping, Insulation & Testing L40~42

Sheet 175 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

Early
Start

Early
Finish

052T15250A Plumbing - Horizontal Conduits L52 C

18

053T15250A Plumbing - Horizontal Conduits L53 C

18

300

26-APR-07

17-MAY-07

Plumbing - Horizontal Conduits L52 C

300

02-MAY-07

22-MAY-07

054T15250A Plumbing - Horizontal Conduits L54 C

18

Plumbing - Horizontal Conduits L53 C

300

07-MAY-07

27-MAY-07

055T15250A Plumbing - Horizontal Conduits L55 C

Plumbing - Horizontal Conduits L54 C

18

300

12-MAY-07

31-MAY-07

Plumbing - Horizontal Conduits L55 C

056T15250A Plumbing - Horizontal Conduits L56 C

18

300

16-MAY-07

05-JUN-07

Plumbing - Horizontal Conduits L56 C

057T15250A Plumbing - Horizontal Conduits L57 C

18

300

21-MAY-07

10-JUN-07

Plumbing - Horizontal Conduits L57 C

058T15250A Plumbing - Horizontal Conduits L58 C

18

300

26-MAY-07

14-JUN-07

Plumbing - Horizontal Conduits L58 C

059T15250A Plumbing - Horizontal Conduits L59 C

18

300

30-MAY-07

19-JUN-07

Plumbing - Horizontal Conduits L59 C

060T15250A Plumbing - Horizontal Conduits L60 C

18

300

04-JUN-07

24-JUN-07

Plumbing - Horizontal Conduits L60 C

061T15250A Plumbing - Horizontal Conduits L61 C

18

300

09-JUN-07

28-JUN-07

Plumbing - Horizontal Conduits L61 C

062T15250A Plumbing - Horizontal Conduits L62 C

18

300

13-JUN-07

03-JUL-07

Plumbing - Horizontal Conduits L62 C

063T15250A Plumbing - Horizontal Conduits L63 C

18

300

18-JUN-07

08-JUL-07

Plumbing - Horizontal Conduits L63 C

064T15250A Plumbing - Horizontal Conduits L64 C

18

300

23-JUN-07

12-JUL-07

Plumbing - Horizontal Conduits L64 C

065T15250A Plumbing - Horizontal Conduits L65 C

18

300

27-JUN-07

17-JUL-07

Plumbing - Horizontal Conduits L65 C

066T15250A Plumbing - Horizontal Conduits L66 C

18

300

02-JUL-07

22-JUL-07

Plumbing - Horizontal Conduits L66 C

067T15250A Plumbing - Horizontal Conduits L67 C

18

300

07-JUL-07

26-JUL-07

Plumbing - Horizontal Conduits L67 C

068T15250A Plumbing - Horizontal Conduits L68 C

18

300

11-JUL-07

31-JUL-07

Plumbing - Horizontal Conduits L68 C

069T15250A Plumbing - Horizontal Conduits L69 C

18

300

16-JUL-07

05-AUG-07

Plumbing - Horizontal Conduits L69 C

070T15250A Plumbing - Horizontal Conduits L70 C

18

300

21-JUL-07

09-AUG-07

Plumbing - Horizontal Conduits L70 C

071T15250A Plumbing - Horizontal Conduits L71 C

18

300

25-JUL-07

14-AUG-07

Plumbing - Horizontal Conduits L71 C

072T15250A Plumbing - Horizontal Conduits L72 C

18

300

30-JUL-07

19-AUG-07

073T15250A Plumbing - Piping, Insulation & Testing L73~75

65

325

04-AUG-07

21-OCT-07

109T15250A Plumbing - Piping, Insulation & Testing L109~111

65

330

02-OCT-07

25-DEC-07

112T15250A Plumbing - Horizontal Conduits L112 C

18

317

18-JUL-07

07-AUG-07

Plumbing - Horizontal Conduits L112 C

113T15250A Plumbing - Horizontal Conduits L113 C

18

317

23-JUL-07

12-AUG-07

Plumbing - Horizontal Conduits L113 C

114T15250A Plumbing - Horizontal Conduits L114 C

18

317

28-JUL-07

16-AUG-07

Plumbing - Horizontal Conduits L114 C

115T15250A Plumbing - Horizontal Conduits L115 C

18

317

01-AUG-07

21-AUG-07

Plumbing - Horizontal Conduits L115 C

116T15250A Plumbing - Horizontal Conduits L116 C

18

317

06-AUG-07

26-AUG-07

Plumbing - Horizontal Conduits L116 C

117T15250A Plumbing - Horizontal Conduits L117 C

18

317

11-AUG-07

30-AUG-07

Plumbing - Horizontal Conduits L117 C

118T15250A Plumbing - Horizontal Conduits L118 C

18

317

15-AUG-07

04-SEP-07

Plumbing - Horizontal Conduits L118 C

119T15250A Plumbing - Horizontal Conduits L119 C

18

317

20-AUG-07

09-SEP-07

Plumbing - Horizontal Conduits L119 C

120T15250A Plumbing - Horizontal Conduits L120 C

18

317

25-AUG-07

15-SEP-07

Plumbing - Horizontal Conduits L120 C

121T15250A Plumbing - Horizontal Conduits L121 C

18

317

29-AUG-07

19-SEP-07

Plumbing - Horizontal Conduits L121 C

122T15250A Plumbing - Horizontal Conduits L122 C

18

317

03-SEP-07

24-SEP-07

Plumbing - Horizontal Conduits L122 C

123T15250A Plumbing - Horizontal Conduits L123 C

18

317

08-SEP-07

29-SEP-07

Plumbing - Horizontal Conduits L123 C

124T15250A Plumbing - Horizontal Conduits L124 C

18

317

13-SEP-07

03-OCT-07

Plumbing - Horizontal Conduits L124 C

125T15250A Plumbing - Horizontal Conduits L125 C

18

317

18-SEP-07

08-OCT-07

Plumbing - Horizontal Conduits L125 C

126T15250A Plumbing - Horizontal Conduits L126 C

18

317

23-SEP-07

13-OCT-07

Plumbing - Horizontal Conduits L126 C

127T15250A Plumbing - Horizontal Conduits L127 C

18

317

27-SEP-07

20-OCT-07

Plumbing - Horizontal Conduits L127 C

128T15250A Plumbing - Horizontal Conduits L128 C

18

317

02-OCT-07

27-OCT-07

Plumbing - Horizontal Conduits L128 C

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

% Total
Comp Float

BDW1

2005

2006

2007

2008

2009

Plumbing - Horizontal Conduits L72 C


Plumbing - Piping, Insulation & Testing L73~75
Plumbing - Piping, Insulation & Testing L109~111

Sheet 176 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

2009

129T15250A Plumbing - Horizontal Conduits L129 C

18

317

07-OCT-07

01-NOV-07

Plumbing - Horizontal Conduits L129 C

130T15250A Plumbing - Horizontal Conduits L130 C

18

317

11-OCT-07

08-NOV-07

Plumbing - Horizontal Conduits L130 C

131T15250A Plumbing - Horizontal Conduits L131 C

18

317

18-OCT-07

16-NOV-07

Plumbing - Horizontal Conduits L131 C

132T15250A Plumbing - Horizontal Conduits L132 C

18

317

25-OCT-07

20-NOV-07

Plumbing - Horizontal Conduits L132 C

133T15250A Plumbing - Horizontal Conduits L133 C

18

317

31-OCT-07

24-NOV-07

Plumbing - Horizontal Conduits L133 C

134T15250A Plumbing - Horizontal Conduits L134 C

18

317

06-NOV-07

28-NOV-07

Plumbing - Horizontal Conduits L134 C

135T15250A Plumbing - Horizontal Conduits L135 C

18

291

13-NOV-07

03-DEC-07

136T15250A Plumbing - Piping, Insulation & Testing L136~138

65

291

19-NOV-07

04-FEB-08

139T15250A Plumbing - Second Fix L139 C

14

196

16-JAN-08

03-FEB-08

Plumbing - Second Fix L139 C

140T15250A Plumbing - Second Fix L140 C

14

197

20-JAN-08

06-FEB-08

Plumbing - Second Fix L140 C

141T15250A Plumbing - Second Fix L141 C

14

198

23-JAN-08

10-FEB-08

Plumbing - Second Fix L141 C

142T15250A Plumbing - Second Fix L142 C

14

199

27-JAN-08

13-FEB-08

Plumbing - Second Fix L142 C

143T15250A Plumbing - Second Fix L143 C

14

199

31-JAN-08

17-FEB-08

Plumbing - Second Fix L143 C

144T15250A Plumbing - Second Fix L144 C

14

199

05-FEB-08

20-FEB-08

Plumbing - Second Fix L144 C

145T15250A Plumbing - Second Fix L145 C

14

199

09-FEB-08

24-FEB-08

Plumbing - Second Fix L145 C

146T15250A Plumbing - Second Fix L146 C

14

199

12-FEB-08

27-FEB-08

Plumbing - Second Fix L146 C

147T15250A Plumbing - Second Fix L147 C

14

199

16-FEB-08

02-MAR-08

Plumbing - Second Fix L147 C

148T15250A Plumbing - Second Fix L148 C

14

199

19-FEB-08

05-MAR-08

Plumbing - Second Fix L148 C

149T15250A Plumbing - Second Fix L149 C

14

199

23-FEB-08

09-MAR-08

Plumbing - Second Fix L149 C

150T15250A Plumbing - Second Fix L150 C

14

199

26-FEB-08

12-MAR-08

Plumbing - Second Fix L150 C

151T15250A Plumbing - Second Fix L151 C

14

199

01-MAR-08

16-MAR-08

Plumbing - Second Fix L151 C

152T15250A Plumbing - Second Fix L152 C

14

199

04-MAR-08

19-MAR-08

Plumbing - Second Fix L152 C

153T15250A Plumbing - Second Fix L153 C

14

200

08-MAR-08

23-MAR-08

Plumbing - Second Fix L153 C

154T15250A Plumbing - Second Fix L154 C

14

201

11-MAR-08

26-MAR-08

155T15250A Plumbing - Second Fix L155~156 C

14

152

28-SEP-08

14-OCT-08

Plumbing - Second Fix L154 C


Plumbing - Second Fix L155~156 C

SOUTH WING
002S15210A HVAC - Second Fix L2 S

28

282

15-MAR-07

16-APR-07

HVAC - Second Fix L2 S

004S15210A HVAC - Second Fix L4 S

28

282

15-MAR-07

16-APR-07

HVAC - Second Fix L4 S

005S15210A HVAC - Second Fix L05 S

28

297

02-NOV-06A

14-APR-07

HVAC - Second Fix L05 S

006S15210A HVAC - Second Fix L06 S

28

297

24-DEC-06A

14-APR-07

HVAC - Second Fix L06 S

007S15210A HVAC - Second Fix L07 S

28

297

10-JAN-07A

15-APR-07

HVAC - Second Fix L07 S

008S15210A HVAC - Second Fix L08 S

28

297

15-MAR-07

16-APR-07

HVAC - Second Fix L08 S

009S15210A HVAC - Second Fix L09 S

28

297

16-SEP-06A

18-APR-07

HVAC - Second Fix L09 S

010S15210A HVAC - Second Fix L10 S

28

297

16-SEP-06A

18-APR-07

HVAC - Second Fix L10 S

011S15210A HVAC - Second Fix L11 S

28

297

16-SEP-06A

18-APR-07

HVAC - Second Fix L11 S

012S15210A HVAC - Second Fix L12 S

28

297

16-SEP-06A

18-APR-07

HVAC - Second Fix L12 S

013S15210A HVAC - Second Fix L13 S

28

297

20-SEP-06A

18-APR-07

HVAC - Second Fix L13 S

014S15210A HVAC - Second Fix L14 S

28

297

20-SEP-06A

18-APR-07

HVAC - Second Fix L14 S

015S15210A HVAC - Second Fix L15 S

28

297

27-SEP-06A

18-APR-07

HVAC - Second Fix L15 S

016S15210A HVAC - Second Fix L16 S

28

297

20-MAR-07

21-APR-07

HVAC - Second Fix L16 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Plumbing - Horizontal Conduits L135 C


Plumbing - Piping, Insulation & Testing L136~138

Sheet 177 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

019S15210A HVAC - Second Fix L19 S

28

10

174

15-AUG-06A

12-APR-07

HVAC - Second Fix L19 S

020S15210A HVAC - Second Fix L20 S

28

15

295

15-AUG-06A

11-APR-07

HVAC - Second Fix L20 S

021S15210A HVAC - Second Fix L21 S

28

10

295

24-AUG-06A

12-APR-07

HVAC - Second Fix L21 S

022S15210A HVAC - Second Fix L22 S

28

10

295

24-AUG-06A

12-APR-07

HVAC - Second Fix L22 S

023S15210A HVAC - Second Fix L23 S

28

10

295

16-SEP-06A

12-APR-07

HVAC - Second Fix L23 S

024S15210A HVAC - Second Fix L24 S

28

10

295

16-SEP-06A

12-APR-07

HVAC - Second Fix L24 S

025S15210A HVAC - Second Fix L25 S

28

295

24-DEC-06A

15-APR-07

HVAC - Second Fix L25 S

026S15210A HVAC - Second Fix L26 S

28

10

295

24-OCT-06A

12-APR-07

HVAC - Second Fix L26 S

027S15210A HVAC - Second Fix L27 S

28

10

295

05-NOV-06A

12-APR-07

HVAC - Second Fix L27 S

028S15210A HVAC - Second Fix L28 S

28

10

295

25-NOV-06A

12-APR-07

HVAC - Second Fix L28 S

029S15210A HVAC - Second Fix L29 S

28

10

295

18-NOV-06A

12-APR-07

HVAC - Second Fix L29 S

030S15210A HVAC - Second Fix L30 S

28

10

295

07-OCT-06A

12-APR-07

HVAC - Second Fix L30 S

031S15210A HVAC - Second Fix L31 S

28

10

295

12-NOV-06A

12-APR-07

HVAC - Second Fix L31 S

032S15210A HVAC - Second Fix L32 S

28

295

18-DEC-06A

15-APR-07

HVAC - Second Fix L32 S

033S15210A HVAC - Second Fix L33 S

28

295

26-DEC-06A

15-APR-07

HVAC - Second Fix L33 S

034S15210A HVAC - Second Fix L34 S

28

295

09-JAN-07A

15-APR-07

HVAC - Second Fix L34 S

035S15210A HVAC - Second Fix L35 S

28

295

16-JAN-07A

15-APR-07

HVAC - Second Fix L35 S

036S15210A HVAC - Second Fix L36 S

28

295

16-JAN-07A

15-APR-07

HVAC - Second Fix L36 S

037S15210A HVAC - Second Fix L37 S

28

295

17-JAN-07A

15-APR-07

HVAC - Second Fix L37 S

038S15210A HVAC - Second Fix L38 S

28

295

15-MAR-07

16-APR-07

HVAC - Second Fix L38 S

039S15210A HVAC - Second Fix L39 S

28

295

20-MAR-07

21-APR-07

043S15210A HVAC - Second Fix L43 S

21

245

15-MAR-07

08-APR-07

HVAC - Second Fix L43 S

044S15210A HVAC - Second Fix L44 S

21

271

20-MAR-07

12-APR-07

HVAC - Second Fix L44 S

045S15210A HVAC - Second Fix L45 S

21

271

25-MAR-07

17-APR-07

HVAC - Second Fix L45 S

046S15210A HVAC - Second Fix L46 S

21

271

29-MAR-07

22-APR-07

HVAC - Second Fix L46 S

047S15210A HVAC - Second Fix L47 S

21

271

03-APR-07

26-APR-07

HVAC - Second Fix L47 S

048S15210A HVAC - Second Fix L48 S

21

271

08-APR-07

02-MAY-07

HVAC - Second Fix L48 S

049S15210A HVAC - Second Fix L49 S

21

271

12-APR-07

07-MAY-07

HVAC - Second Fix L49 S

050S15210A HVAC - Second Fix L50 S

21

271

17-APR-07

12-MAY-07

HVAC - Second Fix L50 S

051S15210A HVAC - Second Fix L51 S

21

271

22-APR-07

16-MAY-07

HVAC - Second Fix L51 S

052S15210A HVAC - Second Fix L52 S

21

271

26-APR-07

21-MAY-07

HVAC - Second Fix L52 S

053S15210A HVAC - Second Fix L53 S

21

271

02-MAY-07

26-MAY-07

HVAC - Second Fix L53 S

054S15210A HVAC - Second Fix L54 S

21

271

07-MAY-07

30-MAY-07

HVAC - Second Fix L54 S

055S15210A HVAC - Second Fix L55 S

21

271

12-MAY-07

04-JUN-07

HVAC - Second Fix L55 S

056S15210A HVAC - Second Fix L56 S

21

271

16-MAY-07

09-JUN-07

HVAC - Second Fix L56 S

057S15210A HVAC - Second Fix L57 S

21

271

21-MAY-07

13-JUN-07

HVAC - Second Fix L57 S

058S15210A HVAC - Second Fix L58 S

21

271

26-MAY-07

18-JUN-07

HVAC - Second Fix L58 S

059S15210A HVAC - Second Fix L59 S

21

271

30-MAY-07

23-JUN-07

HVAC - Second Fix L59 S

060S15210A HVAC - Second Fix L60 S

21

271

04-JUN-07

27-JUN-07

HVAC - Second Fix L60 S

061S15210A HVAC - Second Fix L61 S

21

271

09-JUN-07

02-JUL-07

HVAC - Second Fix L61 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L39 S

Sheet 178 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

062S15210A HVAC - Second Fix L62 S

21

271

13-JUN-07

07-JUL-07

HVAC - Second Fix L62 S

063S15210A HVAC - Second Fix L63 S

21

271

18-JUN-07

11-JUL-07

HVAC - Second Fix L63 S

064S15210A HVAC - Second Fix L64 S

21

271

23-JUN-07

16-JUL-07

HVAC - Second Fix L64 S

065S15210A HVAC - Second Fix L65 S

21

271

27-JUN-07

21-JUL-07

HVAC - Second Fix L65 S

066S15210A HVAC - Second Fix L66 S

21

271

02-JUL-07

25-JUL-07

HVAC - Second Fix L66 S

067S15210A HVAC - Second Fix L67 S

21

271

07-JUL-07

30-JUL-07

HVAC - Second Fix L67 S

068S15210A HVAC - Second Fix L68 S

21

271

11-JUL-07

04-AUG-07

HVAC - Second Fix L68 S

069S15210A HVAC - Second Fix L69 S

21

271

16-JUL-07

08-AUG-07

HVAC - Second Fix L69 S

070S15210A HVAC - Second Fix L70 S

21

271

21-JUL-07

13-AUG-07

HVAC - Second Fix L70 S

071S15210A HVAC - Second Fix L71 S

21

271

25-JUL-07

18-AUG-07

HVAC - Second Fix L71 S

072S15210A HVAC - Second Fix L72 S

21

271

30-JUL-07

22-AUG-07

002S15220A Fire - Second Fix L2 S

28

252

19-APR-07

22-MAY-07

004S15220A Fire - Second Fix L4 S

28

250

22-APR-07

24-MAY-07

005S15220A Fire - Second Fix L05 S

28

11

298

02-SEP-06A

12-APR-07

Fire - Second Fix L05 S

006S15220A Fire - Second Fix L06 S

28

11

309

02-SEP-06A

12-APR-07

Fire - Second Fix L06 S

007S15220A Fire - Second Fix L07 S

28

11

309

02-SEP-06A

12-APR-07

Fire - Second Fix L07 S

008S15220A Fire - Second Fix L08 S

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L08 S

009S15220A Fire - Second Fix L09 S

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L09 S

010S15220A Fire - Second Fix L10 S

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L10 S

011S15220A Fire - Second Fix L11 S

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L11 S

012S15220A Fire - Second Fix L12 S

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L12 S

013S15220A Fire - Second Fix L13 S

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L13 S

014S15220A Fire - Second Fix L14 S

28

18

316

05-SEP-06A

10-APR-07

Fire - Second Fix L14 S

015S15220A Fire - Second Fix L15 S

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L15 S

016S15220A Fire - Second Fix L16 S

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L16 S

019S15220A Fire - Second Fix L19 S

28

18

299

02-SEP-06A

10-APR-07

Fire - Second Fix L19 S

020S15220A Fire - Second Fix L20 S

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L20 S

021S15220A Fire - Second Fix L21 S

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L21 S

022S15220A Fire - Second Fix L22 S

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L22 S

023S15220A Fire - Second Fix L23 S

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L23 S

024S15220A Fire - Second Fix L24 S

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L24 S

025S15220A Fire - Second Fix L25 S

28

14

299

15-AUG-06A

11-APR-07

Fire - Second Fix L25 S

026S15220A Fire - Second Fix L26 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L26 S

027S15220A Fire - Second Fix L27 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L27 S

028S15220A Fire - Second Fix L28 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L28 S

029S15220A Fire - Second Fix L29 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L29 S

030S15220A Fire - Second Fix L30 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L30 S

031S15220A Fire - Second Fix L31 S

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L31 S

032S15220A Fire - Second Fix L32 S

28

14

299

15-AUG-06A

11-APR-07

Fire - Second Fix L32 S

033S15220A Fire - Second Fix L33 S

28

14

299

15-AUG-06A

11-APR-07

Fire - Second Fix L33 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L72 S


Fire - Second Fix L2 S
Fire - Second Fix L4 S

Sheet 179 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

034S15220A Fire - Second Fix L34 S

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L34 S

035S15220A Fire - Second Fix L35 S

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L35 S

036S15220A Fire - Second Fix L36 S

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L36 S

037S15220A Fire - Second Fix L37 S

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L37 S

038S15220A Fire - Second Fix L38 S

28

18

314

10-OCT-06A

10-APR-07

Fire - Second Fix L38 S

039S15220A Fire - Second Fix L39 S

28

18

314

14-OCT-06A

10-APR-07

Fire - Second Fix L39 S

043S15220A Fire - Second Fix L43 S

21

245

12-NOV-06A

07-APR-07

Fire - Second Fix L43 S

044S15220A Fire - Second Fix L44 S

21

299

12-NOV-06A

07-APR-07

Fire - Second Fix L44 S

045S15220A Fire - Second Fix L45 S

21

299

16-NOV-06A

07-APR-07

Fire - Second Fix L45 S

046S15220A Fire - Second Fix L46 S

21

299

20-NOV-06A

07-APR-07

Fire - Second Fix L46 S

047S15220A Fire - Second Fix L47 S

21

299

23-NOV-06A

07-APR-07

Fire - Second Fix L47 S

048S15220A Fire - Second Fix L48 S

21

299

25-NOV-06A

07-APR-07

Fire - Second Fix L48 S

049S15220A Fire - Second Fix L49 S

21

299

28-NOV-06A

07-APR-07

Fire - Second Fix L49 S

050S15220A Fire - Second Fix L50 S

21

299

15-MAR-07

08-APR-07

Fire - Second Fix L50 S

051S15220A Fire - Second Fix L51 S

21

299

20-MAR-07

12-APR-07

Fire - Second Fix L51 S

052S15220A Fire - Second Fix L52 S

21

299

25-MAR-07

17-APR-07

Fire - Second Fix L52 S

053S15220A Fire - Second Fix L53 S

21

299

29-MAR-07

22-APR-07

Fire - Second Fix L53 S

054S15220A Fire - Second Fix L54 S

21

299

03-APR-07

26-APR-07

Fire - Second Fix L54 S

055S15220A Fire - Second Fix L55 S

21

299

08-APR-07

02-MAY-07

Fire - Second Fix L55 S

056S15220A Fire - Second Fix L56 S

21

299

12-APR-07

07-MAY-07

Fire - Second Fix L56 S

057S15220A Fire - Second Fix L57 S

21

299

17-APR-07

12-MAY-07

Fire - Second Fix L57 S

058S15220A Fire - Second Fix L58 S

21

299

22-APR-07

16-MAY-07

Fire - Second Fix L58 S

059S15220A Fire - Second Fix L59 S

21

299

26-APR-07

21-MAY-07

Fire - Second Fix L59 S

060S15220A Fire - Second Fix L60 S

21

299

02-MAY-07

26-MAY-07

Fire - Second Fix L60 S

061S15220A Fire - Second Fix L61 S

21

299

07-MAY-07

30-MAY-07

Fire - Second Fix L61 S

062S15220A Fire - Second Fix L62 S

21

299

12-MAY-07

04-JUN-07

Fire - Second Fix L62 S

063S15220A Fire - Second Fix L63 S

21

299

16-MAY-07

09-JUN-07

Fire - Second Fix L63 S

064S15220A Fire - Second Fix L64 S

21

299

21-MAY-07

13-JUN-07

Fire - Second Fix L64 S

065S15220A Fire - Second Fix L65 S

21

299

26-MAY-07

18-JUN-07

Fire - Second Fix L65 S

066S15220A Fire - Second Fix L66 S

21

299

30-MAY-07

23-JUN-07

Fire - Second Fix L66 S

067S15220A Fire - Second Fix L67 S

21

299

04-JUN-07

27-JUN-07

Fire - Second Fix L67 S

068S15220A Fire - Second Fix L68 S

21

299

09-JUN-07

02-JUL-07

Fire - Second Fix L68 S

069S15220A Fire - Second Fix L69 S

21

299

13-JUN-07

07-JUL-07

Fire - Second Fix L69 S

070S15220A Fire - Second Fix L70 S

21

299

18-JUN-07

11-JUL-07

Fire - Second Fix L70 S

071S15220A Fire - Second Fix L71 S

21

299

23-JUN-07

16-JUL-07

Fire - Second Fix L71 S

072S15220A Fire - Second Fix L72 S

21

299

27-JUN-07

21-JUL-07

Fire - Second Fix L72 S

002S16230A Electrical - Second Fix L2 S

28

329

19-APR-07

22-MAY-07

Electrical - Second Fix L2 S

004S16230A Electrical - Second Fix L4 S

28

327

22-APR-07

24-MAY-07

005S16230A Electrical - Second Fix L05 S

28

11

257

11-NOV-06A

12-APR-07

Electrical - Second Fix L05 S

006S16230A Electrical - Second Fix L06 S

28

11

268

18-NOV-06A

12-APR-07

Electrical - Second Fix L06 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L4 S

Sheet 180 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

007S16230A Electrical - Second Fix L07 S

28

11

268

18-NOV-06A

12-APR-07

Electrical - Second Fix L07 S

008S16230A Electrical - Second Fix L08 S

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L08 S

009S16230A Electrical - Second Fix L09 S

28

18

275

01-AUG-06A

10-APR-07

Electrical - Second Fix L09 S

010S16230A Electrical - Second Fix L10 S

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L10 S

011S16230A Electrical - Second Fix L11 S

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L11 S

012S16230A Electrical - Second Fix L12 S

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L12 S

013S16230A Electrical - Second Fix L13 S

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L13 S

014S16230A Electrical - Second Fix L14 S

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L14 S

015S16230A Electrical - Second Fix L15 S

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L15 S

016S16230A Electrical - Second Fix L16 S

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L16 S

019S16230A Electrical - Second Fix L19 S

28

11

238

05-AUG-06A

12-APR-07

Electrical - Second Fix L19 S

020S16230A Electrical - Second Fix L20 S

28

14

238

05-AUG-06A

11-APR-07

Electrical - Second Fix L20 S

021S16230A Electrical - Second Fix L21 S

28

14

238

05-AUG-06A

11-APR-07

Electrical - Second Fix L21 S

022S16230A Electrical - Second Fix L22 S

28

18

238

08-AUG-06A

10-APR-07

Electrical - Second Fix L22 S

023S16230A Electrical - Second Fix L23 S

28

14

238

08-AUG-06A

11-APR-07

Electrical - Second Fix L23 S

024S16230A Electrical - Second Fix L24 S

28

11

238

12-AUG-06A

12-APR-07

Electrical - Second Fix L24 S

025S16230A Electrical - Second Fix L25 S

28

238

15-MAR-07

16-APR-07

Electrical - Second Fix L25 S

026S16230A Electrical - Second Fix L26 S

28

11

238

06-AUG-06A

17-APR-07

Electrical - Second Fix L26 S

027S16230A Electrical - Second Fix L27 S

28

11

238

06-AUG-06A

17-APR-07

Electrical - Second Fix L27 S

028S16230A Electrical - Second Fix L28 S

28

11

238

06-AUG-06A

17-APR-07

Electrical - Second Fix L28 S

029S16230A Electrical - Second Fix L29 S

28

11

238

10-SEP-06A

17-APR-07

Electrical - Second Fix L29 S

030S16230A Electrical - Second Fix L30 S

28

238

20-MAR-07

21-APR-07

Electrical - Second Fix L30 S

031S16230A Electrical - Second Fix L31 S

28

238

25-MAR-07

25-APR-07

Electrical - Second Fix L31 S

032S16230A Electrical - Second Fix L32 S

28

11

238

10-SEP-06A

26-APR-07

Electrical - Second Fix L32 S

033S16230A Electrical - Second Fix L33 S

28

11

238

10-SEP-06A

26-APR-07

Electrical - Second Fix L33 S

034S16230A Electrical - Second Fix L34 S

28

11

238

10-SEP-06A

26-APR-07

Electrical - Second Fix L34 S

035S16230A Electrical - Second Fix L35 S

28

238

29-MAR-07

30-APR-07

Electrical - Second Fix L35 S

036S16230A Electrical - Second Fix L36 S

28

238

03-APR-07

06-MAY-07

Electrical - Second Fix L36 S

037S16230A Electrical - Second Fix L37 S

28

18

238

02-OCT-06A

05-MAY-07

Electrical - Second Fix L37 S

038S16230A Electrical - Second Fix L38 S

28

11

253

10-OCT-06A

07-MAY-07

Electrical - Second Fix L38 S

039S16230A Electrical - Second Fix L39 S

28

11

253

12-OCT-06A

07-MAY-07

043S16230A Electrical - Second Fix L43 S

21

285

15-MAR-07

08-APR-07

Electrical - Second Fix L43 S

044S16230A Electrical - Second Fix L44 S

21

285

09-DEC-06A

11-APR-07

Electrical - Second Fix L44 S

045S16230A Electrical - Second Fix L45 S

21

285

20-DEC-06A

11-APR-07

Electrical - Second Fix L45 S

046S16230A Electrical - Second Fix L46 S

21

285

20-MAR-07

12-APR-07

Electrical - Second Fix L46 S

047S16230A Electrical - Second Fix L47 S

21

285

25-MAR-07

17-APR-07

Electrical - Second Fix L47 S

048S16230A Electrical - Second Fix L48 S

21

10

285

04-JAN-07A

19-APR-07

Electrical - Second Fix L48 S

049S16230A Electrical - Second Fix L49 S

21

10

285

06-JAN-07A

19-APR-07

Electrical - Second Fix L49 S

050S16230A Electrical - Second Fix L50 S

21

10

285

03-JAN-07A

19-APR-07

Electrical - Second Fix L50 S

051S16230A Electrical - Second Fix L51 S

21

10

285

08-JAN-07A

19-APR-07

Electrical - Second Fix L51 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L39 S

Sheet 181 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

052S16230A Electrical - Second Fix L52 S

21

285

14-JAN-07A

21-APR-07

Electrical - Second Fix L52 S

053S16230A Electrical - Second Fix L53 S

21

285

09-JAN-07A

21-APR-07

Electrical - Second Fix L53 S

054S16230A Electrical - Second Fix L54 S

21

285

29-MAR-07

22-APR-07

Electrical - Second Fix L54 S

055S16230A Electrical - Second Fix L55 S

21

285

13-JAN-07A

25-APR-07

Electrical - Second Fix L55 S

056S16230A Electrical - Second Fix L56 S

21

285

18-JAN-07A

25-APR-07

Electrical - Second Fix L56 S

057S16230A Electrical - Second Fix L57 S

21

285

03-APR-07

26-APR-07

Electrical - Second Fix L57 S

058S16230A Electrical - Second Fix L58 S

21

285

08-APR-07

02-MAY-07

Electrical - Second Fix L58 S

059S16230A Electrical - Second Fix L59 S

21

285

12-APR-07

07-MAY-07

Electrical - Second Fix L59 S

060S16230A Electrical - Second Fix L60 S

21

285

17-APR-07

12-MAY-07

Electrical - Second Fix L60 S

061S16230A Electrical - Second Fix L61 S

21

285

22-APR-07

16-MAY-07

Electrical - Second Fix L61 S

062S16230A Electrical - Second Fix L62 S

21

285

26-APR-07

21-MAY-07

Electrical - Second Fix L62 S

063S16230A Electrical - Second Fix L63 S

21

285

02-MAY-07

26-MAY-07

Electrical - Second Fix L63 S

064S16230A Electrical - Second Fix L64 S

21

285

07-MAY-07

30-MAY-07

Electrical - Second Fix L64 S

065S16230A Electrical - Second Fix L65 S

21

285

12-MAY-07

04-JUN-07

Electrical - Second Fix L65 S

066S16230A Electrical - Second Fix L66 S

21

285

16-MAY-07

09-JUN-07

Electrical - Second Fix L66 S

067S16230A Electrical - Second Fix L67 S

21

285

21-MAY-07

13-JUN-07

Electrical - Second Fix L67 S

068S16230A Electrical - Second Fix L68 S

21

285

26-MAY-07

18-JUN-07

Electrical - Second Fix L68 S

069S16230A Electrical - Second Fix L69 S

21

285

30-MAY-07

23-JUN-07

Electrical - Second Fix L69 S

070S16230A Electrical - Second Fix L70 S

21

285

04-JUN-07

27-JUN-07

Electrical - Second Fix L70 S

071S16230A Electrical - Second Fix L71 S

21

285

09-JUN-07

02-JUL-07

Electrical - Second Fix L71 S

072S16230A Electrical - Second Fix L72 S

21

285

13-JUN-07

07-JUL-07

002S15240A Drainage - Second Fix L2 S

28

282

15-MAR-07

16-APR-07

Drainage - Second Fix L2 S

004S15240A Drainage - Second Fix L4 S

28

282

15-MAR-07

16-APR-07

Drainage - Second Fix L4 S

005S15240A Drainage - Second Fix L05 S

28

149

14-MAY-07

14-JUN-07

Drainage - Second Fix L05 S

006S15240A Drainage - Second Fix L06 S

28

149

19-MAY-07

19-JUN-07

Drainage - Second Fix L06 S

007S15240A Drainage - Second Fix L07 S

28

149

23-MAY-07

24-JUN-07

Drainage - Second Fix L07 S

008S15240A Drainage - Second Fix L08 S

28

149

28-MAY-07

28-JUN-07

Drainage - Second Fix L08 S

009S15240A Drainage - Second Fix L09 S

28

149

02-JUN-07

03-JUL-07

Drainage - Second Fix L09 S

010S15240A Drainage - Second Fix L10 S

28

149

06-JUN-07

08-JUL-07

Drainage - Second Fix L10 S

011S15240A Drainage - Second Fix L11 S

28

149

11-JUN-07

12-JUL-07

Drainage - Second Fix L11 S

012S15240A Drainage - Second Fix L12 S

28

149

16-JUN-07

17-JUL-07

Drainage - Second Fix L12 S

013S15240A Drainage - Second Fix L13 S

28

149

20-JUN-07

22-JUL-07

Drainage - Second Fix L13 S

014S15240A Drainage - Second Fix L14 S

28

149

28-JUL-07

28-AUG-07

Drainage - Second Fix L14 S

015S15240A Drainage - Second Fix L15 S

28

149

01-AUG-07

02-SEP-07

Drainage - Second Fix L15 S

016S15240A Drainage - Second Fix L16 S

28

149

06-AUG-07

06-SEP-07

019S15240A Drainage - Second Fix L19 S

28

182

15-MAR-07

16-APR-07

Drainage - Second Fix L19 S

020S15240A Drainage - Second Fix L20 S

28

182

20-MAR-07

21-APR-07

Drainage - Second Fix L20 S

021S15240A Drainage - Second Fix L21 S

28

182

25-MAR-07

25-APR-07

Drainage - Second Fix L21 S

022S15240A Drainage - Second Fix L22 S

28

182

29-MAR-07

30-APR-07

Drainage - Second Fix L22 S

023S15240A Drainage - Second Fix L23 S

28

182

03-APR-07

06-MAY-07

Drainage - Second Fix L23 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L72 S

Drainage - Second Fix L16 S

Sheet 182 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

024S15240A Drainage - Second Fix L24 S

28

182

08-APR-07

10-MAY-07

Drainage - Second Fix L24 S

025S15240A Drainage - Second Fix L25 S

28

182

12-APR-07

15-MAY-07

Drainage - Second Fix L25 S

026S15240A Drainage - Second Fix L26 S

28

182

17-APR-07

20-MAY-07

Drainage - Second Fix L26 S

027S15240A Drainage - Second Fix L27 S

28

182

22-APR-07

24-MAY-07

Drainage - Second Fix L27 S

028S15240A Drainage - Second Fix L28 S

28

182

26-APR-07

29-MAY-07

Drainage - Second Fix L28 S

029S15240A Drainage - Second Fix L29 S

28

182

02-MAY-07

03-JUN-07

Drainage - Second Fix L29 S

030S15240A Drainage - Second Fix L30 S

28

182

07-MAY-07

07-JUN-07

Drainage - Second Fix L30 S

031S15240A Drainage - Second Fix L31 S

28

182

12-MAY-07

12-JUN-07

Drainage - Second Fix L31 S

032S15240A Drainage - Second Fix L32 S

28

182

16-MAY-07

17-JUN-07

Drainage - Second Fix L32 S

033S15240A Drainage - Second Fix L33 S

28

182

21-MAY-07

21-JUN-07

Drainage - Second Fix L33 S

034S15240A Drainage - Second Fix L34 S

28

182

26-MAY-07

26-JUN-07

Drainage - Second Fix L34 S

035S15240A Drainage - Second Fix L35 S

28

182

30-MAY-07

01-JUL-07

Drainage - Second Fix L35 S

036S15240A Drainage - Second Fix L36 S

28

182

04-JUN-07

05-JUL-07

Drainage - Second Fix L36 S

037S15240A Drainage - Second Fix L37 S

28

182

09-JUN-07

10-JUL-07

Drainage - Second Fix L37 S

038S15240A Drainage - Second Fix L38 S

28

189

13-JUN-07

15-JUL-07

Drainage - Second Fix L38 S

039S15240A Drainage - Second Fix L39 S

28

189

18-JUN-07

19-JUL-07

043S15240A Drainage - Second Fix L43 S

21

245

15-MAR-07

08-APR-07

Drainage - Second Fix L43 S

044S15240A Drainage - Second Fix L44 S

21

245

20-MAR-07

12-APR-07

Drainage - Second Fix L44 S

045S15240A Drainage - Second Fix L45 S

21

245

25-MAR-07

17-APR-07

Drainage - Second Fix L45 S

046S15240A Drainage - Second Fix L46 S

21

245

29-MAR-07

22-APR-07

Drainage - Second Fix L46 S

047S15240A Drainage - Second Fix L47 S

21

245

03-APR-07

26-APR-07

Drainage - Second Fix L47 S

048S15240A Drainage - Second Fix L48 S

21

245

08-APR-07

02-MAY-07

Drainage - Second Fix L48 S

049S15240A Drainage - Second Fix L49 S

21

245

12-APR-07

07-MAY-07

Drainage - Second Fix L49 S

050S15240A Drainage - Second Fix L50 S

21

245

17-APR-07

12-MAY-07

Drainage - Second Fix L50 S

051S15240A Drainage - Second Fix L51 S

21

245

22-APR-07

16-MAY-07

Drainage - Second Fix L51 S

052S15240A Drainage - Second Fix L52 S

21

245

26-APR-07

21-MAY-07

Drainage - Second Fix L52 S

053S15240A Drainage - Second Fix L53 S

21

245

02-MAY-07

26-MAY-07

Drainage - Second Fix L53 S

054S15240A Drainage - Second Fix L54 S

21

245

07-MAY-07

30-MAY-07

Drainage - Second Fix L54 S

055S15240A Drainage - Second Fix L55 S

21

245

12-MAY-07

04-JUN-07

Drainage - Second Fix L55 S

056S15240A Drainage - Second Fix L56 S

21

245

16-MAY-07

09-JUN-07

Drainage - Second Fix L56 S

057S15240A Drainage - Second Fix L57 S

21

245

21-MAY-07

13-JUN-07

Drainage - Second Fix L57 S

058S15240A Drainage - Second Fix L58 S

21

245

26-MAY-07

18-JUN-07

Drainage - Second Fix L58 S

059S15240A Drainage - Second Fix L59 S

21

245

30-MAY-07

23-JUN-07

Drainage - Second Fix L59 S

060S15240A Drainage - Second Fix L60 S

21

245

04-JUN-07

27-JUN-07

Drainage - Second Fix L60 S

061S15240A Drainage - Second Fix L61 S

21

245

09-JUN-07

02-JUL-07

Drainage - Second Fix L61 S

062S15240A Drainage - Second Fix L62 S

21

245

13-JUN-07

07-JUL-07

Drainage - Second Fix L62 S

063S15240A Drainage - Second Fix L63 S

21

245

18-JUN-07

11-JUL-07

Drainage - Second Fix L63 S

064S15240A Drainage - Second Fix L64 S

21

245

23-JUN-07

16-JUL-07

Drainage - Second Fix L64 S

065S15240A Drainage - Second Fix L65 S

21

245

27-JUN-07

21-JUL-07

Drainage - Second Fix L65 S

066S15240A Drainage - Second Fix L66 S

21

245

02-JUL-07

25-JUL-07

Drainage - Second Fix L66 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L39 S

Sheet 183 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

067S15240A Drainage - Second Fix L67 S

21

245

07-JUL-07

30-JUL-07

Drainage - Second Fix L67 S

068S15240A Drainage - Second Fix L68 S

21

245

11-JUL-07

04-AUG-07

Drainage - Second Fix L68 S

069S15240A Drainage - Second Fix L69 S

21

245

16-JUL-07

08-AUG-07

Drainage - Second Fix L69 S

070S15240A Drainage - Second Fix L70 S

21

245

21-JUL-07

13-AUG-07

Drainage - Second Fix L70 S

071S15240A Drainage - Second Fix L71 S

21

245

25-JUL-07

18-AUG-07

Drainage - Second Fix L71 S

072S15240A Drainage - Second Fix L72 S

21

245

30-JUL-07

22-AUG-07

002S15250A Plumbing - Second Fix L2 S

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L2 S

004S15250A Plumbing - Second Fix L4 S

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L4 S

005S15250A Plumbing - Second Fix L05 S

28

177

14-MAY-07

14-JUN-07

Plumbing - Second Fix L05 S

006S15250A Plumbing - Second Fix L06 S

28

177

19-MAY-07

19-JUN-07

Plumbing - Second Fix L06 S

007S15250A Plumbing - Second Fix L07 S

28

177

23-MAY-07

24-JUN-07

Plumbing - Second Fix L07 S

008S15250A Plumbing - Second Fix L08 S

28

177

28-MAY-07

28-JUN-07

Plumbing - Second Fix L08 S

009S15250A Plumbing - Second Fix L09 S

28

177

02-JUN-07

03-JUL-07

Plumbing - Second Fix L09 S

010S15250A Plumbing - Second Fix L10 S

28

177

06-JUN-07

08-JUL-07

Plumbing - Second Fix L10 S

011S15250A Plumbing - Second Fix L11 S

28

177

11-JUN-07

12-JUL-07

Plumbing - Second Fix L11 S

012S15250A Plumbing - Second Fix L12 S

28

177

16-JUN-07

17-JUL-07

Plumbing - Second Fix L12 S

013S15250A Plumbing - Second Fix L13 S

28

177

20-JUN-07

22-JUL-07

Plumbing - Second Fix L13 S

014S15250A Plumbing - Second Fix L14 S

28

177

25-JUN-07

26-JUL-07

Plumbing - Second Fix L14 S

015S15250A Plumbing - Second Fix L15 S

28

177

30-JUN-07

31-JUL-07

Plumbing - Second Fix L15 S

016S15250A Plumbing - Second Fix L16 S

28

177

04-JUL-07

05-AUG-07

019S15250A Plumbing - Second Fix L19 S

28

182

15-MAR-07

16-APR-07

Plumbing - Second Fix L19 S

020S15250A Plumbing - Second Fix L20 S

28

182

20-MAR-07

21-APR-07

Plumbing - Second Fix L20 S

021S15250A Plumbing - Second Fix L21 S

28

182

25-MAR-07

25-APR-07

Plumbing - Second Fix L21 S

022S15250A Plumbing - Second Fix L22 S

28

182

29-MAR-07

30-APR-07

Plumbing - Second Fix L22 S

023S15250A Plumbing - Second Fix L23 S

28

182

03-APR-07

06-MAY-07

Plumbing - Second Fix L23 S

024S15250A Plumbing - Second Fix L24 S

28

182

08-APR-07

10-MAY-07

Plumbing - Second Fix L24 S

025S15250A Plumbing - Second Fix L25 S

28

182

12-APR-07

15-MAY-07

Plumbing - Second Fix L25 S

026S15250A Plumbing - Second Fix L26 S

28

182

17-APR-07

20-MAY-07

Plumbing - Second Fix L26 S

027S15250A Plumbing - Second Fix L27 S

28

182

22-APR-07

24-MAY-07

Plumbing - Second Fix L27 S

028S15250A Plumbing - Second Fix L28 S

28

182

26-APR-07

29-MAY-07

Plumbing - Second Fix L28 S

029S15250A Plumbing - Second Fix L29 S

28

182

02-MAY-07

03-JUN-07

Plumbing - Second Fix L29 S

030S15250A Plumbing - Second Fix L30 S

28

182

07-MAY-07

07-JUN-07

Plumbing - Second Fix L30 S

031S15250A Plumbing - Second Fix L31 S

28

182

12-MAY-07

12-JUN-07

Plumbing - Second Fix L31 S

032S15250A Plumbing - Second Fix L32 S

28

182

16-MAY-07

17-JUN-07

Plumbing - Second Fix L32 S

033S15250A Plumbing - Second Fix L33 S

28

182

21-MAY-07

21-JUN-07

Plumbing - Second Fix L33 S

034S15250A Plumbing - Second Fix L34 S

28

182

26-MAY-07

26-JUN-07

Plumbing - Second Fix L34 S

035S15250A Plumbing - Second Fix L35 S

28

182

30-MAY-07

01-JUL-07

Plumbing - Second Fix L35 S

036S15250A Plumbing - Second Fix L36 S

28

182

04-JUN-07

05-JUL-07

Plumbing - Second Fix L36 S

037S15250A Plumbing - Second Fix L37 S

28

182

09-JUN-07

10-JUL-07

Plumbing - Second Fix L37 S

038S15250A Plumbing - Second Fix L38 S

28

189

13-JUN-07

15-JUL-07

Plumbing - Second Fix L38 S

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L72 S

Plumbing - Second Fix L16 S

Sheet 184 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Plumbing - Second Fix L39 S

039S15250A Plumbing - Second Fix L39 S

28

189

18-JUN-07

19-JUL-07

043S15250A Plumbing - Second Fix L43 S

21

245

15-MAR-07

08-APR-07

Plumbing - Second Fix L43 S

044S15250A Plumbing - Second Fix L44 S

21

245

20-MAR-07

12-APR-07

Plumbing - Second Fix L44 S

045S15250A Plumbing - Second Fix L45 S

21

245

25-MAR-07

17-APR-07

Plumbing - Second Fix L45 S

046S15250A Plumbing - Second Fix L46 S

21

245

29-MAR-07

22-APR-07

Plumbing - Second Fix L46 S

047S15250A Plumbing - Second Fix L47 S

21

245

03-APR-07

26-APR-07

Plumbing - Second Fix L47 S

048S15250A Plumbing - Second Fix L48 S

21

245

08-APR-07

02-MAY-07

Plumbing - Second Fix L48 S

049S15250A Plumbing - Second Fix L49 S

21

245

12-APR-07

07-MAY-07

Plumbing - Second Fix L49 S

050S15250A Plumbing - Second Fix L50 S

21

245

17-APR-07

12-MAY-07

Plumbing - Second Fix L50 S

051S15250A Plumbing - Second Fix L51 S

21

245

22-APR-07

16-MAY-07

Plumbing - Second Fix L51 S

052S15250A Plumbing - Second Fix L52 S

21

245

26-APR-07

21-MAY-07

Plumbing - Second Fix L52 S

053S15250A Plumbing - Second Fix L53 S

21

245

02-MAY-07

26-MAY-07

Plumbing - Second Fix L53 S

054S15250A Plumbing - Second Fix L54 S

21

245

07-MAY-07

30-MAY-07

Plumbing - Second Fix L54 S

055S15250A Plumbing - Second Fix L55 S

21

245

12-MAY-07

04-JUN-07

Plumbing - Second Fix L55 S

056S15250A Plumbing - Second Fix L56 S

21

245

16-MAY-07

09-JUN-07

Plumbing - Second Fix L56 S

057S15250A Plumbing - Second Fix L57 S

21

245

21-MAY-07

13-JUN-07

Plumbing - Second Fix L57 S

058S15250A Plumbing - Second Fix L58 S

21

245

26-MAY-07

18-JUN-07

Plumbing - Second Fix L58 S

059S15250A Plumbing - Second Fix L59 S

21

245

30-MAY-07

23-JUN-07

Plumbing - Second Fix L59 S

060S15250A Plumbing - Second Fix L60 S

21

245

04-JUN-07

27-JUN-07

Plumbing - Second Fix L60 S

061S15250A Plumbing - Second Fix L61 S

21

245

09-JUN-07

02-JUL-07

Plumbing - Second Fix L61 S

062S15250A Plumbing - Second Fix L62 S

21

245

13-JUN-07

07-JUL-07

Plumbing - Second Fix L62 S

063S15250A Plumbing - Second Fix L63 S

21

245

18-JUN-07

11-JUL-07

Plumbing - Second Fix L63 S

064S15250A Plumbing - Second Fix L64 S

21

245

23-JUN-07

16-JUL-07

Plumbing - Second Fix L64 S

065S15250A Plumbing - Second Fix L65 S

21

245

27-JUN-07

21-JUL-07

Plumbing - Second Fix L65 S

066S15250A Plumbing - Second Fix L66 S

21

245

02-JUL-07

25-JUL-07

Plumbing - Second Fix L66 S

067S15250A Plumbing - Second Fix L67 S

21

245

07-JUL-07

30-JUL-07

Plumbing - Second Fix L67 S

068S15250A Plumbing - Second Fix L68 S

21

245

11-JUL-07

04-AUG-07

Plumbing - Second Fix L68 S

069S15250A Plumbing - Second Fix L69 S

21

245

16-JUL-07

08-AUG-07

Plumbing - Second Fix L69 S

070S15250A Plumbing - Second Fix L70 S

21

245

21-JUL-07

13-AUG-07

Plumbing - Second Fix L70 S

071S15250A Plumbing - Second Fix L71 S

21

245

25-JUL-07

18-AUG-07

Plumbing - Second Fix L71 S

072S15250A Plumbing - Second Fix L72 S

21

245

30-JUL-07

22-AUG-07

Plumbing - Second Fix L72 S

EAST WING
002E15210A HVAC - Second Fix L2 E

28

355

15-MAR-07

16-APR-07

004E15210A HVAC - Second Fix L4 E

28

355

15-MAR-07

16-APR-07

HVAC - Second Fix L4 E

005E15210A HVAC - Second Fix L05 E

28

10

297

02-NOV-06A

12-APR-07

HVAC - Second Fix L05 E

006E15210A HVAC - Second Fix L06 E

28

297

24-DEC-06A

15-APR-07

HVAC - Second Fix L06 E

007E15210A HVAC - Second Fix L07 E

28

297

10-JAN-07A

15-APR-07

HVAC - Second Fix L07 E

008E15210A HVAC - Second Fix L08 E

28

297

15-MAR-07

16-APR-07

HVAC - Second Fix L08 E

009E15210A HVAC - Second Fix L09 E

28

10

297

16-SEP-06A

17-APR-07

HVAC - Second Fix L09 E

010E15210A HVAC - Second Fix L10 E

28

15

297

16-SEP-06A

16-APR-07

HVAC - Second Fix L10 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L2 E

Sheet 185 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

011E15210A HVAC - Second Fix L11 E

28

15

297

16-SEP-06A

16-APR-07

HVAC - Second Fix L11 E

012E15210A HVAC - Second Fix L12 E

28

15

297

16-SEP-06A

16-APR-07

HVAC - Second Fix L12 E

013E15210A HVAC - Second Fix L13 E

28

10

297

20-SEP-06A

17-APR-07

HVAC - Second Fix L13 E

014E15210A HVAC - Second Fix L14 E

28

10

297

20-SEP-06A

17-APR-07

HVAC - Second Fix L14 E

015E15210A HVAC - Second Fix L15 E

28

10

297

27-SEP-06A

17-APR-07

HVAC - Second Fix L15 E

016E15210A HVAC - Second Fix L16 E

28

297

20-MAR-07

21-APR-07

HVAC - Second Fix L16 E

019E15210A HVAC - Second Fix L19 E

28

10

182

15-AUG-06A

12-APR-07

HVAC - Second Fix L19 E

020E15210A HVAC - Second Fix L20 E

28

20

280

15-AUG-06A

09-APR-07

HVAC - Second Fix L20 E

021E15210A HVAC - Second Fix L21 E

28

15

280

26-AUG-06A

11-APR-07

HVAC - Second Fix L21 E

022E15210A HVAC - Second Fix L22 E

28

10

280

24-AUG-06A

12-APR-07

HVAC - Second Fix L22 E

023E15210A HVAC - Second Fix L23 E

28

10

280

16-SEP-06A

12-APR-07

HVAC - Second Fix L23 E

024E15210A HVAC - Second Fix L24 E

28

10

280

16-SEP-06A

12-APR-07

HVAC - Second Fix L24 E

025E15210A HVAC - Second Fix L25 E

28

280

15-MAR-07

16-APR-07

HVAC - Second Fix L25 E

026E15210A HVAC - Second Fix L26 E

28

10

280

24-OCT-06A

17-APR-07

HVAC - Second Fix L26 E

027E15210A HVAC - Second Fix L27 E

28

10

280

05-NOV-06A

17-APR-07

HVAC - Second Fix L27 E

028E15210A HVAC - Second Fix L28 E

28

280

20-MAR-07

21-APR-07

HVAC - Second Fix L28 E

029E15210A HVAC - Second Fix L29 E

28

10

287

18-NOV-06A

22-APR-07

HVAC - Second Fix L29 E

030E15210A HVAC - Second Fix L30 E

28

10

287

14-OCT-06A

22-APR-07

HVAC - Second Fix L30 E

031E15210A HVAC - Second Fix L31 E

28

10

287

16-NOV-06A

22-APR-07

HVAC - Second Fix L31 E

032E15210A HVAC - Second Fix L32 E

28

287

18-DEC-06A

24-APR-07

HVAC - Second Fix L32 E

033E15210A HVAC - Second Fix L33 E

28

287

16-JAN-07A

24-APR-07

HVAC - Second Fix L33 E

034E15210A HVAC - Second Fix L34 E

28

287

09-JAN-07A

24-APR-07

HVAC - Second Fix L34 E

035E15210A HVAC - Second Fix L35 E

28

287

16-JAN-07A

24-APR-07

HVAC - Second Fix L35 E

036E15210A HVAC - Second Fix L36 E

28

287

16-JAN-07A

24-APR-07

HVAC - Second Fix L36 E

037E15210A HVAC - Second Fix L37 E

28

287

17-JAN-07A

24-APR-07

HVAC - Second Fix L37 E

038E15210A HVAC - Second Fix L38 E

28

287

25-MAR-07

25-APR-07

HVAC - Second Fix L38 E

039E15210A HVAC - Second Fix L39 E

28

287

29-MAR-07

30-APR-07

043E15210A HVAC - Second Fix L43 E

21

271

15-MAR-07

08-APR-07

HVAC - Second Fix L43 E

044E15210A HVAC - Second Fix L44 E

21

271

20-MAR-07

12-APR-07

HVAC - Second Fix L44 E

045E15210A HVAC - Second Fix L45 E

21

271

25-MAR-07

17-APR-07

HVAC - Second Fix L45 E

046E15210A HVAC - Second Fix L46 E

21

271

29-MAR-07

22-APR-07

HVAC - Second Fix L46 E

047E15210A HVAC - Second Fix L47 E

21

271

03-APR-07

26-APR-07

HVAC - Second Fix L47 E

048E15210A HVAC - Second Fix L48 E

21

271

08-APR-07

02-MAY-07

HVAC - Second Fix L48 E

049E15210A HVAC - Second Fix L49 E

21

271

12-APR-07

07-MAY-07

HVAC - Second Fix L49 E

050E15210A HVAC - Second Fix L50 E

21

271

17-APR-07

12-MAY-07

HVAC - Second Fix L50 E

051E15210A HVAC - Second Fix L51 E

21

271

22-APR-07

16-MAY-07

HVAC - Second Fix L51 E

052E15210A HVAC - Second Fix L52 E

21

271

26-APR-07

21-MAY-07

HVAC - Second Fix L52 E

053E15210A HVAC - Second Fix L53 E

21

271

02-MAY-07

26-MAY-07

HVAC - Second Fix L53 E

054E15210A HVAC - Second Fix L54 E

21

271

07-MAY-07

30-MAY-07

HVAC - Second Fix L54 E

055E15210A HVAC - Second Fix L55 E

21

271

12-MAY-07

04-JUN-07

HVAC - Second Fix L55 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L39 E

Sheet 186 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

056E15210A HVAC - Second Fix L56 E

21

271

16-MAY-07

09-JUN-07

HVAC - Second Fix L56 E

057E15210A HVAC - Second Fix L57 E

21

271

21-MAY-07

13-JUN-07

HVAC - Second Fix L57 E

058E15210A HVAC - Second Fix L58 E

21

271

26-MAY-07

18-JUN-07

HVAC - Second Fix L58 E

059E15210A HVAC - Second Fix L59 E

21

271

30-MAY-07

23-JUN-07

HVAC - Second Fix L59 E

060E15210A HVAC - Second Fix L60 E

21

271

04-JUN-07

27-JUN-07

HVAC - Second Fix L60 E

061E15210A HVAC - Second Fix L61 E

21

271

09-JUN-07

02-JUL-07

HVAC - Second Fix L61 E

062E15210A HVAC - Second Fix L62 E

21

271

13-JUN-07

07-JUL-07

HVAC - Second Fix L62 E

063E15210A HVAC - Second Fix L63 E

21

271

18-JUN-07

11-JUL-07

HVAC - Second Fix L63 E

064E15210A HVAC - Second Fix L64 E

21

271

23-JUN-07

16-JUL-07

HVAC - Second Fix L64 E

065E15210A HVAC - Second Fix L65 E

21

271

27-JUN-07

21-JUL-07

HVAC - Second Fix L65 E

066E15210A HVAC - Second Fix L66 E

21

271

02-JUL-07

25-JUL-07

HVAC - Second Fix L66 E

067E15210A HVAC - Second Fix L67 E

21

271

07-JUL-07

30-JUL-07

HVAC - Second Fix L67 E

068E15210A HVAC - Second Fix L68 E

21

271

11-JUL-07

04-AUG-07

HVAC - Second Fix L68 E

069E15210A HVAC - Second Fix L69 E

21

271

16-JUL-07

08-AUG-07

HVAC - Second Fix L69 E

070E15210A HVAC - Second Fix L70 E

21

271

21-JUL-07

13-AUG-07

HVAC - Second Fix L70 E

071E15210A HVAC - Second Fix L71 E

21

271

25-JUL-07

18-AUG-07

HVAC - Second Fix L71 E

072E15210A HVAC - Second Fix L72 E

21

271

30-JUL-07

22-AUG-07

002E15220A Fire - Second Fix L2 E

28

315

07-MAY-07

07-JUN-07

004E15220A Fire - Second Fix L4 E

28

328

09-MAY-07

10-JUN-07

005E15220A Fire - Second Fix L05 E

28

11

298

02-SEP-06A

12-APR-07

Fire - Second Fix L05 E

006E15220A Fire - Second Fix L06 E

28

11

309

02-SEP-06A

12-APR-07

Fire - Second Fix L06 E

007E15220A Fire - Second Fix L07 E

28

11

309

02-SEP-06A

12-APR-07

Fire - Second Fix L07 E

008E15220A Fire - Second Fix L08 E

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L08 E

009E15220A Fire - Second Fix L09 E

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L09 E

010E15220A Fire - Second Fix L10 E

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L10 E

011E15220A Fire - Second Fix L11 E

28

11

316

02-SEP-06A

12-APR-07

Fire - Second Fix L11 E

012E15220A Fire - Second Fix L12 E

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L12 E

013E15220A Fire - Second Fix L13 E

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L13 E

014E15220A Fire - Second Fix L14 E

28

18

316

05-SEP-06A

10-APR-07

Fire - Second Fix L14 E

015E15220A Fire - Second Fix L15 E

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L15 E

016E15220A Fire - Second Fix L16 E

28

11

316

05-SEP-06A

12-APR-07

Fire - Second Fix L16 E

019E15220A Fire - Second Fix L19 E

28

18

299

02-SEP-06A

10-APR-07

Fire - Second Fix L19 E

020E15220A Fire - Second Fix L20 E

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L20 E

021E15220A Fire - Second Fix L21 E

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L21 E

022E15220A Fire - Second Fix L22 E

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L22 E

023E15220A Fire - Second Fix L23 E

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L23 E

024E15220A Fire - Second Fix L24 E

28

18

299

06-AUG-06A

10-APR-07

Fire - Second Fix L24 E

025E15220A Fire - Second Fix L25 E

28

14

299

15-AUG-06A

11-APR-07

Fire - Second Fix L25 E

026E15220A Fire - Second Fix L26 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L26 E

027E15220A Fire - Second Fix L27 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L27 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L72 E


Fire - Second Fix L2 E
Fire - Second Fix L4 E

Sheet 187 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

028E15220A Fire - Second Fix L28 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L28 E

029E15220A Fire - Second Fix L29 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L29 E

030E15220A Fire - Second Fix L30 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L30 E

031E15220A Fire - Second Fix L31 E

28

18

299

15-AUG-06A

10-APR-07

Fire - Second Fix L31 E

032E15220A Fire - Second Fix L32 E

28

14

299

15-AUG-06A

11-APR-07

Fire - Second Fix L32 E

033E15220A Fire - Second Fix L33 E

28

14

299

10-OCT-06A

11-APR-07

Fire - Second Fix L33 E

034E15220A Fire - Second Fix L34 E

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L34 E

035E15220A Fire - Second Fix L35 E

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L35 E

036E15220A Fire - Second Fix L36 E

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L36 E

037E15220A Fire - Second Fix L37 E

28

18

299

20-AUG-06A

10-APR-07

Fire - Second Fix L37 E

038E15220A Fire - Second Fix L38 E

28

18

314

10-OCT-06A

10-APR-07

Fire - Second Fix L38 E

039E15220A Fire - Second Fix L39 E

28

18

314

14-OCT-06A

10-APR-07

Fire - Second Fix L39 E

043E15220A Fire - Second Fix L43 E

21

10

299

12-NOV-06A

05-APR-07

Fire - Second Fix L43 E

044E15220A Fire - Second Fix L44 E

21

10

299

12-NOV-06A

05-APR-07

Fire - Second Fix L44 E

045E15220A Fire - Second Fix L45 E

21

10

299

16-NOV-06A

05-APR-07

Fire - Second Fix L45 E

046E15220A Fire - Second Fix L46 E

21

10

299

20-NOV-06A

05-APR-07

Fire - Second Fix L46 E

047E15220A Fire - Second Fix L47 E

21

10

299

23-NOV-06A

05-APR-07

Fire - Second Fix L47 E

048E15220A Fire - Second Fix L48 E

21

299

25-NOV-06A

07-APR-07

Fire - Second Fix L48 E

049E15220A Fire - Second Fix L49 E

21

299

28-NOV-06A

07-APR-07

Fire - Second Fix L49 E

050E15220A Fire - Second Fix L50 E

21

299

15-MAR-07

08-APR-07

Fire - Second Fix L50 E

051E15220A Fire - Second Fix L51 E

21

299

20-MAR-07

12-APR-07

Fire - Second Fix L51 E

052E15220A Fire - Second Fix L52 E

21

299

25-MAR-07

17-APR-07

Fire - Second Fix L52 E

053E15220A Fire - Second Fix L53 E

21

299

29-MAR-07

22-APR-07

Fire - Second Fix L53 E

054E15220A Fire - Second Fix L54 E

21

299

03-APR-07

26-APR-07

Fire - Second Fix L54 E

055E15220A Fire - Second Fix L55 E

21

299

08-APR-07

02-MAY-07

Fire - Second Fix L55 E

056E15220A Fire - Second Fix L56 E

21

299

12-APR-07

07-MAY-07

Fire - Second Fix L56 E

057E15220A Fire - Second Fix L57 E

21

299

17-APR-07

12-MAY-07

Fire - Second Fix L57 E

058E15220A Fire - Second Fix L58 E

21

299

22-APR-07

16-MAY-07

Fire - Second Fix L58 E

059E15220A Fire - Second Fix L59 E

21

299

26-APR-07

21-MAY-07

Fire - Second Fix L59 E

060E15220A Fire - Second Fix L60 E

21

299

02-MAY-07

26-MAY-07

Fire - Second Fix L60 E

061E15220A Fire - Second Fix L61 E

21

299

07-MAY-07

30-MAY-07

Fire - Second Fix L61 E

062E15220A Fire - Second Fix L62 E

21

299

12-MAY-07

04-JUN-07

Fire - Second Fix L62 E

063E15220A Fire - Second Fix L63 E

21

299

16-MAY-07

09-JUN-07

Fire - Second Fix L63 E

064E15220A Fire - Second Fix L64 E

21

299

21-MAY-07

13-JUN-07

Fire - Second Fix L64 E

065E15220A Fire - Second Fix L65 E

21

299

26-MAY-07

18-JUN-07

Fire - Second Fix L65 E

066E15220A Fire - Second Fix L66 E

21

299

30-MAY-07

23-JUN-07

Fire - Second Fix L66 E

067E15220A Fire - Second Fix L67 E

21

299

04-JUN-07

27-JUN-07

Fire - Second Fix L67 E

068E15220A Fire - Second Fix L68 E

21

299

09-JUN-07

02-JUL-07

Fire - Second Fix L68 E

069E15220A Fire - Second Fix L69 E

21

299

13-JUN-07

07-JUL-07

Fire - Second Fix L69 E

070E15220A Fire - Second Fix L70 E

21

299

18-JUN-07

11-JUL-07

Fire - Second Fix L70 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 188 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Fire - Second Fix L71 E

071E15220A Fire - Second Fix L71 E

21

299

23-JUN-07

16-JUL-07

072E15220A Fire - Second Fix L72 E

21

299

27-JUN-07

21-JUL-07

Fire - Second Fix L72 E

002E16230A Electrical - Second Fix L2 E

28

315

07-MAY-07

07-JUN-07

Electrical - Second Fix L2 E

004E16230A Electrical - Second Fix L4 E

28

313

09-MAY-07

10-JUN-07

005E16230A Electrical - Second Fix L05 E

28

11

257

11-NOV-06A

12-APR-07

Electrical - Second Fix L05 E

006E16230A Electrical - Second Fix L06 E

28

11

268

18-NOV-06A

12-APR-07

Electrical - Second Fix L06 E

007E16230A Electrical - Second Fix L07 E

28

11

268

18-NOV-06A

12-APR-07

Electrical - Second Fix L07 E

008E16230A Electrical - Second Fix L08 E

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L08 E

009E16230A Electrical - Second Fix L09 E

28

14

275

01-AUG-06A

11-APR-07

Electrical - Second Fix L09 E

010E16230A Electrical - Second Fix L10 E

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L10 E

011E16230A Electrical - Second Fix L11 E

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L11 E

012E16230A Electrical - Second Fix L12 E

28

14

275

05-AUG-06A

11-APR-07

Electrical - Second Fix L12 E

013E16230A Electrical - Second Fix L13 E

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L13 E

014E16230A Electrical - Second Fix L14 E

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L14 E

015E16230A Electrical - Second Fix L15 E

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L15 E

016E16230A Electrical - Second Fix L16 E

28

14

275

19-OCT-06A

11-APR-07

Electrical - Second Fix L16 E

019E16230A Electrical - Second Fix L19 E

28

21

254

05-AUG-06A

09-APR-07

Electrical - Second Fix L19 E

020E16230A Electrical - Second Fix L20 E

28

14

254

05-AUG-06A

11-APR-07

Electrical - Second Fix L20 E

021E16230A Electrical - Second Fix L21 E

28

14

254

05-AUG-06A

11-APR-07

Electrical - Second Fix L21 E

022E16230A Electrical - Second Fix L22 E

28

14

254

08-AUG-06A

11-APR-07

Electrical - Second Fix L22 E

023E16230A Electrical - Second Fix L23 E

28

14

254

08-AUG-06A

11-APR-07

Electrical - Second Fix L23 E

024E16230A Electrical - Second Fix L24 E

28

11

254

12-AUG-06A

12-APR-07

Electrical - Second Fix L24 E

025E16230A Electrical - Second Fix L25 E

28

254

15-MAR-07

16-APR-07

Electrical - Second Fix L25 E

026E16230A Electrical - Second Fix L26 E

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L26 E

027E16230A Electrical - Second Fix L27 E

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L27 E

028E16230A Electrical - Second Fix L28 E

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L28 E

029E16230A Electrical - Second Fix L29 E

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L29 E

030E16230A Electrical - Second Fix L30 E

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L30 E

031E16230A Electrical - Second Fix L31 E

28

18

254

10-SEP-06A

15-APR-07

Electrical - Second Fix L31 E

032E16230A Electrical - Second Fix L32 E

28

14

254

10-SEP-06A

16-APR-07

Electrical - Second Fix L32 E

033E16230A Electrical - Second Fix L33 E

28

15

254

10-SEP-06A

16-APR-07

Electrical - Second Fix L33 E

034E16230A Electrical - Second Fix L34 E

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L34 E

035E16230A Electrical - Second Fix L35 E

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L35 E

036E16230A Electrical - Second Fix L36 E

28

254

10-SEP-06A

18-APR-07

Electrical - Second Fix L36 E

037E16230A Electrical - Second Fix L37 E

28

254

02-OCT-06A

19-APR-07

Electrical - Second Fix L37 E

038E16230A Electrical - Second Fix L38 E

28

10

269

10-OCT-06A

17-APR-07

Electrical - Second Fix L38 E

039E16230A Electrical - Second Fix L39 E

28

10

269

12-OCT-06A

17-APR-07

Electrical - Second Fix L39 E

043E16230A Electrical - Second Fix L43 E

21

289

15-MAR-07

08-APR-07

Electrical - Second Fix L43 E

044E16230A Electrical - Second Fix L44 E

21

10

289

09-DEC-06A

10-APR-07

Electrical - Second Fix L44 E

045E16230A Electrical - Second Fix L45 E

21

10

289

20-DEC-06A

10-APR-07

Electrical - Second Fix L45 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L4 E

Sheet 189 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Electrical - Second Fix L46 E

046E16230A Electrical - Second Fix L46 E

21

10

289

29-DEC-07A

10-APR-07

047E16230A Electrical - Second Fix L47 E

21

10

289

06-JAN-07A

15-APR-07

Electrical - Second Fix L47 E

048E16230A Electrical - Second Fix L48 E

21

10

289

04-JAN-07A

15-APR-07

Electrical - Second Fix L48 E

049E16230A Electrical - Second Fix L49 E

21

10

289

06-JAN-07A

15-APR-07

Electrical - Second Fix L49 E

050E16230A Electrical - Second Fix L50 E

21

289

03-JAN-07A

16-APR-07

Electrical - Second Fix L50 E

051E16230A Electrical - Second Fix L51 E

21

289

09-JAN-07A

16-APR-07

Electrical - Second Fix L51 E

052E16230A Electrical - Second Fix L52 E

21

289

14-JAN-07A

16-APR-07

Electrical - Second Fix L52 E

053E16230A Electrical - Second Fix L53 E

21

289

09-JAN-07A

16-APR-07

Electrical - Second Fix L53 E

054E16230A Electrical - Second Fix L54 E

21

289

25-MAR-07

17-APR-07

Electrical - Second Fix L54 E

055E16230A Electrical - Second Fix L55 E

21

289

13-JAN-07A

21-APR-07

Electrical - Second Fix L55 E

056E16230A Electrical - Second Fix L56 E

21

289

18-JAN-07A

21-APR-07

Electrical - Second Fix L56 E

057E16230A Electrical - Second Fix L57 E

21

289

29-MAR-07

22-APR-07

Electrical - Second Fix L57 E

058E16230A Electrical - Second Fix L58 E

21

289

03-APR-07

26-APR-07

Electrical - Second Fix L58 E

059E16230A Electrical - Second Fix L59 E

21

289

08-APR-07

02-MAY-07

Electrical - Second Fix L59 E

060E16230A Electrical - Second Fix L60 E

21

289

12-APR-07

07-MAY-07

Electrical - Second Fix L60 E

061E16230A Electrical - Second Fix L61 E

21

289

17-APR-07

12-MAY-07

Electrical - Second Fix L61 E

062E16230A Electrical - Second Fix L62 E

21

289

22-APR-07

16-MAY-07

Electrical - Second Fix L62 E

063E16230A Electrical - Second Fix L63 E

21

289

26-APR-07

21-MAY-07

Electrical - Second Fix L63 E

064E16230A Electrical - Second Fix L64 E

21

289

02-MAY-07

26-MAY-07

Electrical - Second Fix L64 E

065E16230A Electrical - Second Fix L65 E

21

289

07-MAY-07

30-MAY-07

Electrical - Second Fix L65 E

066E16230A Electrical - Second Fix L66 E

21

289

12-MAY-07

04-JUN-07

Electrical - Second Fix L66 E

067E16230A Electrical - Second Fix L67 E

21

289

16-MAY-07

09-JUN-07

Electrical - Second Fix L67 E

068E16230A Electrical - Second Fix L68 E

21

289

21-MAY-07

13-JUN-07

Electrical - Second Fix L68 E

069E16230A Electrical - Second Fix L69 E

21

289

26-MAY-07

18-JUN-07

Electrical - Second Fix L69 E

070E16230A Electrical - Second Fix L70 E

21

289

30-MAY-07

23-JUN-07

Electrical - Second Fix L70 E

071E16230A Electrical - Second Fix L71 E

21

289

04-JUN-07

27-JUN-07

Electrical - Second Fix L71 E

072E16230A Electrical - Second Fix L72 E

21

289

09-JUN-07

02-JUL-07

002E15240A Drainage - Second Fix L2 E

28

330

14-APR-07

16-MAY-07

Drainage - Second Fix L2 E

004E15240A Drainage - Second Fix L4 E

28

330

14-APR-07

16-MAY-07

Drainage - Second Fix L4 E

005E15240A Drainage - Second Fix L05 E

28

177

14-MAY-07

14-JUN-07

Drainage - Second Fix L05 E

006E15240A Drainage - Second Fix L06 E

28

177

19-MAY-07

19-JUN-07

Drainage - Second Fix L06 E

007E15240A Drainage - Second Fix L07 E

28

177

23-MAY-07

24-JUN-07

Drainage - Second Fix L07 E

008E15240A Drainage - Second Fix L08 E

28

177

28-MAY-07

28-JUN-07

Drainage - Second Fix L08 E

009E15240A Drainage - Second Fix L09 E

28

177

02-JUN-07

03-JUL-07

Drainage - Second Fix L09 E

010E15240A Drainage - Second Fix L10 E

28

177

06-JUN-07

08-JUL-07

Drainage - Second Fix L10 E

011E15240A Drainage - Second Fix L11 E

28

177

11-JUN-07

12-JUL-07

Drainage - Second Fix L11 E

012E15240A Drainage - Second Fix L12 E

28

177

16-JUN-07

17-JUL-07

Drainage - Second Fix L12 E

013E15240A Drainage - Second Fix L13 E

28

177

20-JUN-07

22-JUL-07

Drainage - Second Fix L13 E

014E15240A Drainage - Second Fix L14 E

28

177

25-JUN-07

26-JUL-07

Drainage - Second Fix L14 E

015E15240A Drainage - Second Fix L15 E

28

177

30-JUN-07

31-JUL-07

Drainage - Second Fix L15 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L72 E

Sheet 190 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

Drainage - Second Fix L16 E

016E15240A Drainage - Second Fix L16 E

28

177

04-JUL-07

05-AUG-07

019E15240A Drainage - Second Fix L19 E

28

182

15-MAR-07

16-APR-07

Drainage - Second Fix L19 E

020E15240A Drainage - Second Fix L20 E

28

182

20-MAR-07

21-APR-07

Drainage - Second Fix L20 E

021E15240A Drainage - Second Fix L21 E

28

182

25-MAR-07

25-APR-07

Drainage - Second Fix L21 E

022E15240A Drainage - Second Fix L22 E

28

182

29-MAR-07

30-APR-07

Drainage - Second Fix L22 E

023E15240A Drainage - Second Fix L23 E

28

182

03-APR-07

06-MAY-07

Drainage - Second Fix L23 E

024E15240A Drainage - Second Fix L24 E

28

182

08-APR-07

10-MAY-07

Drainage - Second Fix L24 E

025E15240A Drainage - Second Fix L25 E

28

182

12-APR-07

15-MAY-07

Drainage - Second Fix L25 E

026E15240A Drainage - Second Fix L26 E

28

182

17-APR-07

20-MAY-07

Drainage - Second Fix L26 E

027E15240A Drainage - Second Fix L27 E

28

182

22-APR-07

24-MAY-07

Drainage - Second Fix L27 E

028E15240A Drainage - Second Fix L28 E

28

182

26-APR-07

29-MAY-07

Drainage - Second Fix L28 E

029E15240A Drainage - Second Fix L29 E

28

182

02-MAY-07

03-JUN-07

Drainage - Second Fix L29 E

030E15240A Drainage - Second Fix L30 E

28

182

07-MAY-07

07-JUN-07

Drainage - Second Fix L30 E

031E15240A Drainage - Second Fix L31 E

28

182

12-MAY-07

12-JUN-07

Drainage - Second Fix L31 E

032E15240A Drainage - Second Fix L32 E

28

182

16-MAY-07

17-JUN-07

Drainage - Second Fix L32 E

033E15240A Drainage - Second Fix L33 E

28

182

21-MAY-07

21-JUN-07

Drainage - Second Fix L33 E

034E15240A Drainage - Second Fix L34 E

28

182

26-MAY-07

26-JUN-07

Drainage - Second Fix L34 E

035E15240A Drainage - Second Fix L35 E

28

182

30-MAY-07

01-JUL-07

Drainage - Second Fix L35 E

036E15240A Drainage - Second Fix L36 E

28

182

04-JUN-07

05-JUL-07

Drainage - Second Fix L36 E

037E15240A Drainage - Second Fix L37 E

28

182

09-JUN-07

10-JUL-07

Drainage - Second Fix L37 E

038E15240A Drainage - Second Fix L38 E

28

189

13-JUN-07

15-JUL-07

Drainage - Second Fix L38 E

039E15240A Drainage - Second Fix L39 E

28

189

18-JUN-07

19-JUL-07

043E15240A Drainage - Second Fix L43 E

21

245

15-MAR-07

08-APR-07

Drainage - Second Fix L43 E

044E15240A Drainage - Second Fix L44 E

21

245

20-MAR-07

12-APR-07

Drainage - Second Fix L44 E

045E15240A Drainage - Second Fix L45 E

21

245

25-MAR-07

17-APR-07

Drainage - Second Fix L45 E

046E15240A Drainage - Second Fix L46 E

21

245

29-MAR-07

22-APR-07

Drainage - Second Fix L46 E

047E15240A Drainage - Second Fix L47 E

21

245

03-APR-07

26-APR-07

Drainage - Second Fix L47 E

048E15240A Drainage - Second Fix L48 E

21

245

08-APR-07

02-MAY-07

Drainage - Second Fix L48 E

049E15240A Drainage - Second Fix L49 E

21

245

12-APR-07

07-MAY-07

Drainage - Second Fix L49 E

050E15240A Drainage - Second Fix L50 E

21

245

17-APR-07

12-MAY-07

Drainage - Second Fix L50 E

051E15240A Drainage - Second Fix L51 E

21

245

22-APR-07

16-MAY-07

Drainage - Second Fix L51 E

052E15240A Drainage - Second Fix L52 E

21

245

26-APR-07

21-MAY-07

Drainage - Second Fix L52 E

053E15240A Drainage - Second Fix L53 E

21

245

02-MAY-07

26-MAY-07

Drainage - Second Fix L53 E

054E15240A Drainage - Second Fix L54 E

21

245

07-MAY-07

30-MAY-07

Drainage - Second Fix L54 E

055E15240A Drainage - Second Fix L55 E

21

245

12-MAY-07

04-JUN-07

Drainage - Second Fix L55 E

056E15240A Drainage - Second Fix L56 E

21

245

16-MAY-07

09-JUN-07

Drainage - Second Fix L56 E

057E15240A Drainage - Second Fix L57 E

21

245

21-MAY-07

13-JUN-07

Drainage - Second Fix L57 E

058E15240A Drainage - Second Fix L58 E

21

245

26-MAY-07

18-JUN-07

Drainage - Second Fix L58 E

059E15240A Drainage - Second Fix L59 E

21

245

30-MAY-07

23-JUN-07

Drainage - Second Fix L59 E

060E15240A Drainage - Second Fix L60 E

21

245

04-JUN-07

27-JUN-07

Drainage - Second Fix L60 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L39 E

Sheet 191 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

061E15240A Drainage - Second Fix L61 E

21

245

09-JUN-07

02-JUL-07

Drainage - Second Fix L61 E

062E15240A Drainage - Second Fix L62 E

21

245

13-JUN-07

07-JUL-07

Drainage - Second Fix L62 E

063E15240A Drainage - Second Fix L63 E

21

245

18-JUN-07

11-JUL-07

Drainage - Second Fix L63 E

064E15240A Drainage - Second Fix L64 E

21

245

23-JUN-07

16-JUL-07

Drainage - Second Fix L64 E

065E15240A Drainage - Second Fix L65 E

21

245

27-JUN-07

21-JUL-07

Drainage - Second Fix L65 E

066E15240A Drainage - Second Fix L66 E

21

245

02-JUL-07

25-JUL-07

Drainage - Second Fix L66 E

067E15240A Drainage - Second Fix L67 E

21

245

07-JUL-07

30-JUL-07

Drainage - Second Fix L67 E

068E15240A Drainage - Second Fix L68 E

21

245

11-JUL-07

04-AUG-07

Drainage - Second Fix L68 E

069E15240A Drainage - Second Fix L69 E

21

245

16-JUL-07

08-AUG-07

Drainage - Second Fix L69 E

070E15240A Drainage - Second Fix L70 E

21

245

21-JUL-07

13-AUG-07

Drainage - Second Fix L70 E

071E15240A Drainage - Second Fix L71 E

21

245

25-JUL-07

18-AUG-07

Drainage - Second Fix L71 E

072E15240A Drainage - Second Fix L72 E

21

245

30-JUL-07

22-AUG-07

002E15250A Plumbing - Second Fix L2 E

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L2 E

004E15250A Plumbing - Second Fix L4 E

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L4 E

005E15250A Plumbing - Second Fix L05 E

28

177

14-MAY-07

14-JUN-07

Plumbing - Second Fix L05 E

006E15250A Plumbing - Second Fix L06 E

28

177

19-MAY-07

19-JUN-07

Plumbing - Second Fix L06 E

007E15250A Plumbing - Second Fix L07 E

28

177

23-MAY-07

24-JUN-07

Plumbing - Second Fix L07 E

008E15250A Plumbing - Second Fix L08 E

28

177

28-MAY-07

28-JUN-07

Plumbing - Second Fix L08 E

009E15250A Plumbing - Second Fix L09 E

28

177

02-JUN-07

03-JUL-07

Plumbing - Second Fix L09 E

010E15250A Plumbing - Second Fix L10 E

28

177

06-JUN-07

08-JUL-07

Plumbing - Second Fix L10 E

011E15250A Plumbing - Second Fix L11 E

28

177

11-JUN-07

12-JUL-07

Plumbing - Second Fix L11 E

012E15250A Plumbing - Second Fix L12 E

28

177

16-JUN-07

17-JUL-07

Plumbing - Second Fix L12 E

013E15250A Plumbing - Second Fix L13 E

28

177

20-JUN-07

22-JUL-07

Plumbing - Second Fix L13 E

014E15250A Plumbing - Second Fix L14 E

28

177

25-JUN-07

26-JUL-07

Plumbing - Second Fix L14 E

015E15250A Plumbing - Second Fix L15 E

28

177

30-JUN-07

31-JUL-07

Plumbing - Second Fix L15 E

016E15250A Plumbing - Second Fix L16 E

28

177

04-JUL-07

05-AUG-07

019E15250A Plumbing - Second Fix L19 E

28

182

15-MAR-07

16-APR-07

Plumbing - Second Fix L19 E

020E15250A Plumbing - Second Fix L20 E

28

182

20-MAR-07

21-APR-07

Plumbing - Second Fix L20 E

021E15250A Plumbing - Second Fix L21 E

28

182

25-MAR-07

25-APR-07

Plumbing - Second Fix L21 E

022E15250A Plumbing - Second Fix L22 E

28

182

29-MAR-07

30-APR-07

Plumbing - Second Fix L22 E

023E15250A Plumbing - Second Fix L23 E

28

182

03-APR-07

06-MAY-07

Plumbing - Second Fix L23 E

024E15250A Plumbing - Second Fix L24 E

28

182

08-APR-07

10-MAY-07

Plumbing - Second Fix L24 E

025E15250A Plumbing - Second Fix L25 E

28

182

12-APR-07

15-MAY-07

Plumbing - Second Fix L25 E

026E15250A Plumbing - Second Fix L26 E

28

182

17-APR-07

20-MAY-07

Plumbing - Second Fix L26 E

027E15250A Plumbing - Second Fix L27 E

28

182

22-APR-07

24-MAY-07

Plumbing - Second Fix L27 E

028E15250A Plumbing - Second Fix L28 E

28

182

26-APR-07

29-MAY-07

Plumbing - Second Fix L28 E

029E15250A Plumbing - Second Fix L29 E

28

182

02-MAY-07

03-JUN-07

Plumbing - Second Fix L29 E

030E15250A Plumbing - Second Fix L30 E

28

182

07-MAY-07

07-JUN-07

Plumbing - Second Fix L30 E

031E15250A Plumbing - Second Fix L31 E

28

182

12-MAY-07

12-JUN-07

Plumbing - Second Fix L31 E

032E15250A Plumbing - Second Fix L32 E

28

182

16-MAY-07

17-JUN-07

Plumbing - Second Fix L32 E

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L72 E

Plumbing - Second Fix L16 E

Sheet 192 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

033E15250A Plumbing - Second Fix L33 E

28

182

21-MAY-07

21-JUN-07

Plumbing - Second Fix L33 E

034E15250A Plumbing - Second Fix L34 E

28

182

26-MAY-07

26-JUN-07

Plumbing - Second Fix L34 E

035E15250A Plumbing - Second Fix L35 E

28

182

30-MAY-07

01-JUL-07

Plumbing - Second Fix L35 E

036E15250A Plumbing - Second Fix L36 E

28

182

04-JUN-07

05-JUL-07

Plumbing - Second Fix L36 E

037E15250A Plumbing - Second Fix L37 E

28

182

09-JUN-07

10-JUL-07

Plumbing - Second Fix L37 E

038E15250A Plumbing - Second Fix L38 E

28

189

13-JUN-07

15-JUL-07

Plumbing - Second Fix L38 E

039E15250A Plumbing - Second Fix L39 E

28

189

18-JUN-07

19-JUL-07

043E15250A Plumbing - Second Fix L43 E

21

245

15-MAR-07

08-APR-07

Plumbing - Second Fix L43 E

044E15250A Plumbing - Second Fix L44 E

21

245

20-MAR-07

12-APR-07

Plumbing - Second Fix L44 E

045E15250A Plumbing - Second Fix L45 E

21

245

25-MAR-07

17-APR-07

Plumbing - Second Fix L45 E

046E15250A Plumbing - Second Fix L46 E

21

245

29-MAR-07

22-APR-07

Plumbing - Second Fix L46 E

047E15250A Plumbing - Second Fix L47 E

21

245

03-APR-07

26-APR-07

Plumbing - Second Fix L47 E

048E15250A Plumbing - Second Fix L48 E

21

245

08-APR-07

02-MAY-07

Plumbing - Second Fix L48 E

049E15250A Plumbing - Second Fix L49 E

21

245

12-APR-07

07-MAY-07

Plumbing - Second Fix L49 E

050E15250A Plumbing - Second Fix L50 E

21

245

17-APR-07

12-MAY-07

Plumbing - Second Fix L50 E

051E15250A Plumbing - Second Fix L51 E

21

245

22-APR-07

16-MAY-07

Plumbing - Second Fix L51 E

052E15250A Plumbing - Second Fix L52 E

21

245

26-APR-07

21-MAY-07

Plumbing - Second Fix L52 E

053E15250A Plumbing - Second Fix L53 E

21

245

02-MAY-07

26-MAY-07

Plumbing - Second Fix L53 E

054E15250A Plumbing - Second Fix L54 E

21

245

07-MAY-07

30-MAY-07

Plumbing - Second Fix L54 E

055E15250A Plumbing - Second Fix L55 E

21

245

12-MAY-07

04-JUN-07

Plumbing - Second Fix L55 E

056E15250A Plumbing - Second Fix L56 E

21

245

16-MAY-07

09-JUN-07

Plumbing - Second Fix L56 E

057E15250A Plumbing - Second Fix L57 E

21

245

21-MAY-07

13-JUN-07

Plumbing - Second Fix L57 E

058E15250A Plumbing - Second Fix L58 E

21

245

26-MAY-07

18-JUN-07

Plumbing - Second Fix L58 E

059E15250A Plumbing - Second Fix L59 E

21

245

30-MAY-07

23-JUN-07

Plumbing - Second Fix L59 E

060E15250A Plumbing - Second Fix L60 E

21

245

04-JUN-07

27-JUN-07

Plumbing - Second Fix L60 E

061E15250A Plumbing - Second Fix L61 E

21

245

09-JUN-07

02-JUL-07

Plumbing - Second Fix L61 E

062E15250A Plumbing - Second Fix L62 E

21

245

13-JUN-07

07-JUL-07

Plumbing - Second Fix L62 E

063E15250A Plumbing - Second Fix L63 E

21

245

18-JUN-07

11-JUL-07

Plumbing - Second Fix L63 E

064E15250A Plumbing - Second Fix L64 E

21

245

23-JUN-07

16-JUL-07

Plumbing - Second Fix L64 E

065E15250A Plumbing - Second Fix L65 E

21

245

27-JUN-07

21-JUL-07

Plumbing - Second Fix L65 E

066E15250A Plumbing - Second Fix L66 E

21

245

02-JUL-07

25-JUL-07

Plumbing - Second Fix L66 E

067E15250A Plumbing - Second Fix L67 E

21

245

07-JUL-07

30-JUL-07

Plumbing - Second Fix L67 E

068E15250A Plumbing - Second Fix L68 E

21

245

11-JUL-07

04-AUG-07

Plumbing - Second Fix L68 E

069E15250A Plumbing - Second Fix L69 E

21

245

16-JUL-07

08-AUG-07

Plumbing - Second Fix L69 E

070E15250A Plumbing - Second Fix L70 E

21

245

21-JUL-07

13-AUG-07

Plumbing - Second Fix L70 E

071E15250A Plumbing - Second Fix L71 E

21

245

25-JUL-07

18-AUG-07

Plumbing - Second Fix L71 E

072E15250A Plumbing - Second Fix L72 E

21

245

30-JUL-07

22-AUG-07

Plumbing - Second Fix L72 E

WEST WING
002W15210A HVAC - Second Fix L2 W

28

271

11-JUN-07

12-JUL-07

HVAC - Second Fix L2 W

004W15210A HVAC - Second Fix L4 W

28

269

13-JUN-07

15-JUL-07

HVAC - Second Fix L4 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Plumbing - Second Fix L39 E

Sheet 193 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

005W15210A HVAC - Second Fix L05 W

28

14

299

02-NOV-06A

11-APR-07

HVAC - Second Fix L05 W

006W15210A HVAC - Second Fix L06 W

28

299

24-DEC-06A

15-APR-07

HVAC - Second Fix L06 W

007W15210A HVAC - Second Fix L07 W

28

299

11-JAN-07A

15-APR-07

HVAC - Second Fix L07 W

008W15210A HVAC - Second Fix L08 W

28

299

15-MAR-07

16-APR-07

HVAC - Second Fix L08 W

009W15210A HVAC - Second Fix L09 W

28

14

299

16-SEP-06A

16-APR-07

HVAC - Second Fix L09 W

010W15210A HVAC - Second Fix L10 W

28

14

299

16-SEP-06A

16-APR-07

HVAC - Second Fix L10 W

011W15210A HVAC - Second Fix L11 W

28

14

299

16-SEP-06A

16-APR-07

HVAC - Second Fix L11 W

012W15210A HVAC - Second Fix L12 W

28

14

299

16-SEP-06A

16-APR-07

HVAC - Second Fix L12 W

013W15210A HVAC - Second Fix L13 W

28

14

299

20-SEP-06A

16-APR-07

HVAC - Second Fix L13 W

014W15210A HVAC - Second Fix L14 W

28

14

299

20-SEP-06A

16-APR-07

HVAC - Second Fix L14 W

015W15210A HVAC - Second Fix L15 W

28

14

299

28-SEP-06A

16-APR-07

HVAC - Second Fix L15 W

016W15210A HVAC - Second Fix L16 W

28

299

20-MAR-07

21-APR-07

HVAC - Second Fix L16 W

019W15210A HVAC - Second Fix L19 W

28

10

174

05-SEP-06A

12-APR-07

HVAC - Second Fix L19 W

020W15210A HVAC - Second Fix L20 W

28

20

276

15-AUG-06A

09-APR-07

HVAC - Second Fix L20 W

021W15210A HVAC - Second Fix L21 W

28

11

276

24-AUG-06A

12-APR-07

HVAC - Second Fix L21 W

022W15210A HVAC - Second Fix L22 W

28

11

276

24-AUG-06A

12-APR-07

HVAC - Second Fix L22 W

023W15210A HVAC - Second Fix L23 W

28

10

276

27-DEC-06A

12-APR-07

HVAC - Second Fix L23 W

024W15210A HVAC - Second Fix L24 W

28

11

276

16-SEP-06A

12-APR-07

HVAC - Second Fix L24 W

025W15210A HVAC - Second Fix L25 W

28

276

19-DEC-06A

14-APR-07

HVAC - Second Fix L25 W

026W15210A HVAC - Second Fix L26 W

28

15

276

16-SEP-06A

11-APR-07

HVAC - Second Fix L26 W

027W15210A HVAC - Second Fix L27 W

28

15

276

16-SEP-06A

11-APR-07

HVAC - Second Fix L27 W

028W15210A HVAC - Second Fix L28 W

28

15

276

16-SEP-06A

11-APR-07

HVAC - Second Fix L28 W

029W15210A HVAC - Second Fix L29 W

28

15

276

16-SEP-06A

11-APR-07

HVAC - Second Fix L29 W

030W15210A HVAC - Second Fix L30 W

28

11

276

07-OCT-06A

12-APR-07

HVAC - Second Fix L30 W

031W15210A HVAC - Second Fix L31 W

28

11

276

09-DEC-06A

12-APR-07

HVAC - Second Fix L31 W

032W15210A HVAC - Second Fix L32 W

28

11

276

18-DEC-06A

12-APR-07

HVAC - Second Fix L32 W

033W15210A HVAC - Second Fix L33 W

28

276

15-MAR-07

16-APR-07

HVAC - Second Fix L33 W

034W15210A HVAC - Second Fix L34 W

28

276

09-JAN-07A

18-APR-07

HVAC - Second Fix L34 W

035W15210A HVAC - Second Fix L35 W

28

276

16-JAN-07A

19-APR-07

HVAC - Second Fix L35 W

036W15210A HVAC - Second Fix L36 W

28

276

16-JAN-07A

19-APR-07

HVAC - Second Fix L36 W

037W15210A HVAC - Second Fix L37 W

28

276

17-JAN-07A

19-APR-07

HVAC - Second Fix L37 W

038W15210A HVAC - Second Fix L38 W

28

276

20-MAR-07

21-APR-07

HVAC - Second Fix L38 W

039W15210A HVAC - Second Fix L39 W

28

276

25-MAR-07

25-APR-07

043W15210A HVAC - Second Fix L43 W

21

245

15-MAR-07

08-APR-07

HVAC - Second Fix L43 W

044W15210A HVAC - Second Fix L44 W

21

271

20-MAR-07

12-APR-07

HVAC - Second Fix L44 W

045W15210A HVAC - Second Fix L45 W

21

271

25-MAR-07

17-APR-07

HVAC - Second Fix L45 W

046W15210A HVAC - Second Fix L46 W

21

271

29-MAR-07

22-APR-07

HVAC - Second Fix L46 W

047W15210A HVAC - Second Fix L47 W

21

271

03-APR-07

26-APR-07

HVAC - Second Fix L47 W

048W15210A HVAC - Second Fix L48 W

21

271

08-APR-07

02-MAY-07

HVAC - Second Fix L48 W

049W15210A HVAC - Second Fix L49 W

21

271

12-APR-07

07-MAY-07

HVAC - Second Fix L49 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L39 W

Sheet 194 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

050W15210A HVAC - Second Fix L50 W

21

271

17-APR-07

12-MAY-07

HVAC - Second Fix L50 W

051W15210A HVAC - Second Fix L51 W

21

271

22-APR-07

16-MAY-07

HVAC - Second Fix L51 W

052W15210A HVAC - Second Fix L52 W

21

271

26-APR-07

21-MAY-07

HVAC - Second Fix L52 W

053W15210A HVAC - Second Fix L53 W

21

271

02-MAY-07

26-MAY-07

HVAC - Second Fix L53 W

054W15210A HVAC - Second Fix L54 W

21

271

07-MAY-07

30-MAY-07

HVAC - Second Fix L54 W

055W15210A HVAC - Second Fix L55 W

21

271

12-MAY-07

04-JUN-07

HVAC - Second Fix L55 W

056W15210A HVAC - Second Fix L56 W

21

271

16-MAY-07

09-JUN-07

HVAC - Second Fix L56 W

057W15210A HVAC - Second Fix L57 W

21

271

21-MAY-07

13-JUN-07

HVAC - Second Fix L57 W

058W15210A HVAC - Second Fix L58 W

21

271

26-MAY-07

18-JUN-07

HVAC - Second Fix L58 W

059W15210A HVAC - Second Fix L59 W

21

271

30-MAY-07

23-JUN-07

HVAC - Second Fix L59 W

060W15210A HVAC - Second Fix L60 W

21

271

04-JUN-07

27-JUN-07

HVAC - Second Fix L60 W

061W15210A HVAC - Second Fix L61 W

21

271

09-JUN-07

02-JUL-07

HVAC - Second Fix L61 W

062W15210A HVAC - Second Fix L62 W

21

271

13-JUN-07

07-JUL-07

HVAC - Second Fix L62 W

063W15210A HVAC - Second Fix L63 W

21

271

18-JUN-07

11-JUL-07

HVAC - Second Fix L63 W

064W15210A HVAC - Second Fix L64 W

21

271

23-JUN-07

16-JUL-07

HVAC - Second Fix L64 W

065W15210A HVAC - Second Fix L65 W

21

271

27-JUN-07

21-JUL-07

HVAC - Second Fix L65 W

066W15210A HVAC - Second Fix L66 W

21

271

02-JUL-07

25-JUL-07

HVAC - Second Fix L66 W

067W15210A HVAC - Second Fix L67 W

21

271

07-JUL-07

30-JUL-07

HVAC - Second Fix L67 W

068W15210A HVAC - Second Fix L68 W

21

271

11-JUL-07

04-AUG-07

HVAC - Second Fix L68 W

069W15210A HVAC - Second Fix L69 W

21

271

16-JUL-07

08-AUG-07

HVAC - Second Fix L69 W

070W15210A HVAC - Second Fix L70 W

21

271

21-JUL-07

13-AUG-07

HVAC - Second Fix L70 W

071W15210A HVAC - Second Fix L71 W

21

271

25-JUL-07

18-AUG-07

HVAC - Second Fix L71 W

072W15210A HVAC - Second Fix L72 W

21

271

30-JUL-07

22-AUG-07

002W15220A Fire - Second Fix L2 W

28

338

11-JUN-07

12-JUL-07

004W15220A Fire - Second Fix L4 W

28

336

13-JUN-07

15-JUL-07

005W15220A Fire - Second Fix L05 W

28

10

300

02-SEP-06A

12-APR-07

Fire - Second Fix L05 W

006W15220A Fire - Second Fix L06 W

28

11

311

02-SEP-06A

12-APR-07

Fire - Second Fix L06 W

007W15220A Fire - Second Fix L07 W

28

11

311

02-SEP-06A

12-APR-07

Fire - Second Fix L07 W

008W15220A Fire - Second Fix L08 W

28

11

318

02-SEP-06A

12-APR-07

Fire - Second Fix L08 W

009W15220A Fire - Second Fix L09 W

28

11

318

02-SEP-06A

12-APR-07

Fire - Second Fix L09 W

010W15220A Fire - Second Fix L10 W

28

11

318

02-SEP-06A

12-APR-07

Fire - Second Fix L10 W

011W15220A Fire - Second Fix L11 W

28

11

318

02-SEP-06A

12-APR-07

Fire - Second Fix L11 W

012W15220A Fire - Second Fix L12 W

28

11

318

05-SEP-06A

12-APR-07

Fire - Second Fix L12 W

013W15220A Fire - Second Fix L13 W

28

11

318

05-SEP-06A

12-APR-07

Fire - Second Fix L13 W

014W15220A Fire - Second Fix L14 W

28

18

318

05-SEP-06A

10-APR-07

Fire - Second Fix L14 W

015W15220A Fire - Second Fix L15 W

28

11

318

05-SEP-06A

12-APR-07

Fire - Second Fix L15 W

016W15220A Fire - Second Fix L16 W

28

11

318

05-SEP-06A

12-APR-07

Fire - Second Fix L16 W

019W15220A Fire - Second Fix L19 W

28

20

299

02-SEP-06A

08-APR-07

Fire - Second Fix L19 W

020W15220A Fire - Second Fix L20 W

28

20

299

06-AUG-06A

08-APR-07

Fire - Second Fix L20 W

021W15220A Fire - Second Fix L21 W

28

20

299

06-AUG-06A

08-APR-07

Fire - Second Fix L21 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

HVAC - Second Fix L72 W


Fire - Second Fix L2 W
Fire - Second Fix L4 W

Sheet 195 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

022W15220A Fire - Second Fix L22 W

28

20

299

06-AUG-06A

08-APR-07

Fire - Second Fix L22 W

023W15220A Fire - Second Fix L23 W

28

20

299

06-AUG-06A

08-APR-07

Fire - Second Fix L23 W

024W15220A Fire - Second Fix L24 W

28

20

299

06-AUG-06A

08-APR-07

Fire - Second Fix L24 W

025W15220A Fire - Second Fix L25 W

28

15

299

15-AUG-06A

14-APR-07

Fire - Second Fix L25 W

026W15220A Fire - Second Fix L26 W

28

20

299

15-AUG-06A

08-APR-07

Fire - Second Fix L26 W

027W15220A Fire - Second Fix L27 W

28

20

299

15-AUG-06A

08-APR-07

Fire - Second Fix L27 W

028W15220A Fire - Second Fix L28 W

28

20

299

15-AUG-06A

08-APR-07

Fire - Second Fix L28 W

029W15220A Fire - Second Fix L29 W

28

20

299

15-AUG-06A

08-APR-07

Fire - Second Fix L29 W

030W15220A Fire - Second Fix L30 W

28

20

299

15-AUG-06A

08-APR-07

Fire - Second Fix L30 W

031W15220A Fire - Second Fix L31 W

28

20

299

15-AUG-06A

10-APR-07

Fire - Second Fix L31 W

032W15220A Fire - Second Fix L32 W

28

15

299

15-AUG-06A

11-APR-07

Fire - Second Fix L32 W

033W15220A Fire - Second Fix L33 W

28

15

299

15-AUG-06A

11-APR-07

Fire - Second Fix L33 W

034W15220A Fire - Second Fix L34 W

28

20

299

20-AUG-06A

08-APR-07

Fire - Second Fix L34 W

035W15220A Fire - Second Fix L35 W

28

20

299

20-AUG-06A

08-APR-07

Fire - Second Fix L35 W

036W15220A Fire - Second Fix L36 W

28

20

299

20-AUG-06A

08-APR-07

Fire - Second Fix L36 W

037W15220A Fire - Second Fix L37 W

28

20

299

20-AUG-06A

08-APR-07

Fire - Second Fix L37 W

038W15220A Fire - Second Fix L38 W

28

20

299

10-OCT-06A

08-APR-07

Fire - Second Fix L38 W

039W15220A Fire - Second Fix L39 W

28

20

299

14-OCT-06A

08-APR-07

Fire - Second Fix L39 W

043W15220A Fire - Second Fix L43 W

21

245

12-NOV-06A

07-APR-07

Fire - Second Fix L43 W

044W15220A Fire - Second Fix L44 W

21

299

12-NOV-06A

07-APR-07

Fire - Second Fix L44 W

045W15220A Fire - Second Fix L45 W

21

299

16-NOV-06A

07-APR-07

Fire - Second Fix L45 W

046W15220A Fire - Second Fix L46 W

21

299

20-NOV-06A

07-APR-07

Fire - Second Fix L46 W

047W15220A Fire - Second Fix L47 W

21

299

23-NOV-06A

07-APR-07

Fire - Second Fix L47 W

048W15220A Fire - Second Fix L48 W

21

299

25-NOV-06A

07-APR-07

Fire - Second Fix L48 W

049W15220A Fire - Second Fix L49 W

21

299

28-NOV-06A

07-APR-07

Fire - Second Fix L49 W

050W15220A Fire - Second Fix L50 W

21

299

15-MAR-07

08-APR-07

Fire - Second Fix L50 W

051W15220A Fire - Second Fix L51 W

21

299

20-MAR-07

12-APR-07

Fire - Second Fix L51 W

052W15220A Fire - Second Fix L52 W

21

299

25-MAR-07

17-APR-07

Fire - Second Fix L52 W

053W15220A Fire - Second Fix L53 W

21

299

29-MAR-07

22-APR-07

Fire - Second Fix L53 W

054W15220A Fire - Second Fix L54 W

21

299

03-APR-07

26-APR-07

Fire - Second Fix L54 W

055W15220A Fire - Second Fix L55 W

21

299

08-APR-07

02-MAY-07

Fire - Second Fix L55 W

056W15220A Fire - Second Fix L56 W

21

299

12-APR-07

07-MAY-07

Fire - Second Fix L56 W

057W15220A Fire - Second Fix L57 W

21

299

17-APR-07

12-MAY-07

Fire - Second Fix L57 W

058W15220A Fire - Second Fix L58 W

21

299

22-APR-07

16-MAY-07

Fire - Second Fix L58 W

059W15220A Fire - Second Fix L59 W

21

299

26-APR-07

21-MAY-07

Fire - Second Fix L59 W

060W15220A Fire - Second Fix L60 W

21

299

02-MAY-07

26-MAY-07

Fire - Second Fix L60 W

061W15220A Fire - Second Fix L61 W

21

299

07-MAY-07

30-MAY-07

Fire - Second Fix L61 W

062W15220A Fire - Second Fix L62 W

21

299

12-MAY-07

04-JUN-07

Fire - Second Fix L62 W

063W15220A Fire - Second Fix L63 W

21

299

16-MAY-07

09-JUN-07

Fire - Second Fix L63 W

064W15220A Fire - Second Fix L64 W

21

299

21-MAY-07

13-JUN-07

Fire - Second Fix L64 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

Sheet 196 of 587

BURJ TOWER WORKING SCHEDULE

2009

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

065W15220A Fire - Second Fix L65 W

21

299

26-MAY-07

18-JUN-07

Fire - Second Fix L65 W

066W15220A Fire - Second Fix L66 W

21

299

30-MAY-07

23-JUN-07

Fire - Second Fix L66 W

067W15220A Fire - Second Fix L67 W

21

299

04-JUN-07

27-JUN-07

Fire - Second Fix L67 W

068W15220A Fire - Second Fix L68 W

21

299

09-JUN-07

02-JUL-07

Fire - Second Fix L68 W

069W15220A Fire - Second Fix L69 W

21

299

13-JUN-07

07-JUL-07

Fire - Second Fix L69 W

070W15220A Fire - Second Fix L70 W

21

299

18-JUN-07

11-JUL-07

Fire - Second Fix L70 W

071W15220A Fire - Second Fix L71 W

21

299

23-JUN-07

16-JUL-07

Fire - Second Fix L71 W

072W15220A Fire - Second Fix L72 W

21

299

27-JUN-07

21-JUL-07

Fire - Second Fix L72 W

002W16230A Electrical - Second Fix L2 W

28

285

11-JUN-07

12-JUL-07

Electrical - Second Fix L2 W

004W16230A Electrical - Second Fix L4 W

28

283

13-JUN-07

15-JUL-07

005W16230A Electrical - Second Fix L05 W

28

11

259

11-NOV-06A

12-APR-07

Electrical - Second Fix L05 W

006W16230A Electrical - Second Fix L06 W

28

11

270

18-NOV-06A

12-APR-07

Electrical - Second Fix L06 W

007W16230A Electrical - Second Fix L07 W

28

11

270

18-NOV-06A

12-APR-07

Electrical - Second Fix L07 W

008W16230A Electrical - Second Fix L08 W

28

21

277

19-OCT-06A

09-APR-07

Electrical - Second Fix L08 W

009W16230A Electrical - Second Fix L09 W

28

21

277

01-AUG-06A

09-APR-07

Electrical - Second Fix L09 W

010W16230A Electrical - Second Fix L10 W

28

14

277

05-AUG-06A

11-APR-07

Electrical - Second Fix L10 W

011W16230A Electrical - Second Fix L11 W

28

14

277

05-AUG-06A

11-APR-07

Electrical - Second Fix L11 W

012W16230A Electrical - Second Fix L12 W

28

14

277

05-AUG-06A

11-APR-07

Electrical - Second Fix L12 W

013W16230A Electrical - Second Fix L13 W

28

14

277

19-OCT-06A

11-APR-07

Electrical - Second Fix L13 W

014W16230A Electrical - Second Fix L14 W

28

14

277

19-OCT-06A

11-APR-07

Electrical - Second Fix L14 W

015W16230A Electrical - Second Fix L15 W

28

15

277

19-OCT-06A

11-APR-07

Electrical - Second Fix L15 W

016W16230A Electrical - Second Fix L16 W

28

14

277

19-OCT-06A

11-APR-07

Electrical - Second Fix L16 W

019W16230A Electrical - Second Fix L19 W

28

21

254

05-AUG-06A

09-APR-07

Electrical - Second Fix L19 W

020W16230A Electrical - Second Fix L20 W

28

14

254

05-AUG-06A

11-APR-07

Electrical - Second Fix L20 W

021W16230A Electrical - Second Fix L21 W

28

14

254

05-AUG-06A

11-APR-07

Electrical - Second Fix L21 W

022W16230A Electrical - Second Fix L22 W

28

14

254

08-AUG-06A

11-APR-07

Electrical - Second Fix L22 W

023W16230A Electrical - Second Fix L23 W

28

14

254

08-AUG-06A

11-APR-07

Electrical - Second Fix L23 W

024W16230A Electrical - Second Fix L24 W

28

11

254

12-AUG-06A

12-APR-07

Electrical - Second Fix L24 W

025W16230A Electrical - Second Fix L25 W

28

254

15-MAR-07

16-APR-07

Electrical - Second Fix L25 W

026W16230A Electrical - Second Fix L26 W

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L26 W

027W16230A Electrical - Second Fix L27 W

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L27 W

028W16230A Electrical - Second Fix L28 W

28

11

254

06-AUG-06A

17-APR-07

Electrical - Second Fix L28 W

029W16230A Electrical - Second Fix L29 W

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L29 W

030W16230A Electrical - Second Fix L30 W

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L30 W

031W16230A Electrical - Second Fix L31 W

28

14

254

10-SEP-06A

16-APR-07

Electrical - Second Fix L31 W

032W16230A Electrical - Second Fix L32 W

28

14

254

10-SEP-06A

16-APR-07

Electrical - Second Fix L32 W

033W16230A Electrical - Second Fix L33 W

28

14

254

10-SEP-06A

16-APR-07

Electrical - Second Fix L33 W

034W16230A Electrical - Second Fix L34 W

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L34 W

035W16230A Electrical - Second Fix L35 W

28

11

254

10-SEP-06A

17-APR-07

Electrical - Second Fix L35 W

036W16230A Electrical - Second Fix L36 W

28

254

10-SEP-06A

18-APR-07

Electrical - Second Fix L36 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L4 W

Sheet 197 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

037W16230A Electrical - Second Fix L37 W

28

254

02-OCT-06A

18-APR-07

Electrical - Second Fix L37 W

038W16230A Electrical - Second Fix L38 W

28

11

254

10-OCT-06A

17-APR-07

Electrical - Second Fix L38 W

039W16230A Electrical - Second Fix L39 W

28

11

254

12-OCT-06A

17-APR-07

Electrical - Second Fix L39 W

043W16230A Electrical - Second Fix L43 W

21

285

15-MAR-07

08-APR-07

Electrical - Second Fix L43 W

044W16230A Electrical - Second Fix L44 W

21

10

285

09-DEC-06A

10-APR-07

Electrical - Second Fix L44 W

045W16230A Electrical - Second Fix L45 W

21

10

285

20-DEC-06A

10-APR-07

Electrical - Second Fix L45 W

046W16230A Electrical - Second Fix L46 W

21

285

20-MAR-07

12-APR-07

Electrical - Second Fix L46 W

047W16230A Electrical - Second Fix L47 W

21

285

25-MAR-07

17-APR-07

Electrical - Second Fix L47 W

048W16230A Electrical - Second Fix L48 W

21

10

285

04-JAN-07A

19-APR-07

Electrical - Second Fix L48 W

049W16230A Electrical - Second Fix L49 W

21

10

285

06-JAN-07A

19-APR-07

Electrical - Second Fix L49 W

050W16230A Electrical - Second Fix L50 W

21

10

285

03-JAN-07A

19-APR-07

Electrical - Second Fix L50 W

051W16230A Electrical - Second Fix L51 W

21

10

285

09-JAN-07A

19-APR-07

Electrical - Second Fix L51 W

052W16230A Electrical - Second Fix L52 W

21

285

14-JAN-07A

21-APR-07

Electrical - Second Fix L52 W

053W16230A Electrical - Second Fix L53 W

21

285

09-JAN-07A

21-APR-07

Electrical - Second Fix L53 W

054W16230A Electrical - Second Fix L54 W

21

285

29-MAR-07

22-APR-07

Electrical - Second Fix L54 W

055W16230A Electrical - Second Fix L55 W

21

285

13-JAN-07A

25-APR-07

Electrical - Second Fix L55 W

056W16230A Electrical - Second Fix L56 W

21

285

18-JAN-07A

25-APR-07

Electrical - Second Fix L56 W

057W16230A Electrical - Second Fix L57 W

21

285

03-APR-07

26-APR-07

Electrical - Second Fix L57 W

058W16230A Electrical - Second Fix L58 W

21

285

08-APR-07

02-MAY-07

Electrical - Second Fix L58 W

059W16230A Electrical - Second Fix L59 W

21

285

12-APR-07

07-MAY-07

Electrical - Second Fix L59 W

060W16230A Electrical - Second Fix L60 W

21

285

17-APR-07

12-MAY-07

Electrical - Second Fix L60 W

061W16230A Electrical - Second Fix L61 W

21

285

22-APR-07

16-MAY-07

Electrical - Second Fix L61 W

062W16230A Electrical - Second Fix L62 W

21

285

26-APR-07

21-MAY-07

Electrical - Second Fix L62 W

063W16230A Electrical - Second Fix L63 W

21

285

02-MAY-07

26-MAY-07

Electrical - Second Fix L63 W

064W16230A Electrical - Second Fix L64 W

21

285

07-MAY-07

30-MAY-07

Electrical - Second Fix L64 W

065W16230A Electrical - Second Fix L65 W

21

285

12-MAY-07

04-JUN-07

Electrical - Second Fix L65 W

066W16230A Electrical - Second Fix L66 W

21

285

16-MAY-07

09-JUN-07

Electrical - Second Fix L66 W

067W16230A Electrical - Second Fix L67 W

21

285

21-MAY-07

13-JUN-07

Electrical - Second Fix L67 W

068W16230A Electrical - Second Fix L68 W

21

285

26-MAY-07

18-JUN-07

Electrical - Second Fix L68 W

069W16230A Electrical - Second Fix L69 W

21

285

30-MAY-07

23-JUN-07

Electrical - Second Fix L69 W

070W16230A Electrical - Second Fix L70 W

21

285

04-JUN-07

27-JUN-07

Electrical - Second Fix L70 W

071W16230A Electrical - Second Fix L71 W

21

285

09-JUN-07

02-JUL-07

Electrical - Second Fix L71 W

072W16230A Electrical - Second Fix L72 W

21

285

13-JUN-07

07-JUL-07

002W15240A Drainage - Second Fix L2 W

28

412

15-MAR-07

16-APR-07

Drainage - Second Fix L2 W

004W15240A Drainage - Second Fix L4 W

28

412

15-MAR-07

16-APR-07

Drainage - Second Fix L4 W

005W15240A Drainage - Second Fix L05 W

28

179

14-MAY-07

14-JUN-07

Drainage - Second Fix L05 W

006W15240A Drainage - Second Fix L06 W

28

179

19-MAY-07

19-JUN-07

Drainage - Second Fix L06 W

007W15240A Drainage - Second Fix L07 W

28

179

23-MAY-07

24-JUN-07

Drainage - Second Fix L07 W

008W15240A Drainage - Second Fix L08 W

28

179

28-MAY-07

28-JUN-07

Drainage - Second Fix L08 W

009W15240A Drainage - Second Fix L09 W

28

179

02-JUN-07

03-JUL-07

Drainage - Second Fix L09 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Electrical - Second Fix L72 W

Sheet 198 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

010W15240A Drainage - Second Fix L10 W

28

179

06-JUN-07

08-JUL-07

Drainage - Second Fix L10 W

011W15240A Drainage - Second Fix L11 W

28

179

11-JUN-07

12-JUL-07

Drainage - Second Fix L11 W

012W15240A Drainage - Second Fix L12 W

28

179

16-JUN-07

17-JUL-07

Drainage - Second Fix L12 W

013W15240A Drainage - Second Fix L13 W

28

179

20-JUN-07

22-JUL-07

Drainage - Second Fix L13 W

014W15240A Drainage - Second Fix L14 W

28

179

25-JUN-07

26-JUL-07

Drainage - Second Fix L14 W

015W15240A Drainage - Second Fix L15 W

28

179

30-JUN-07

31-JUL-07

Drainage - Second Fix L15 W

016W15240A Drainage - Second Fix L16 W

28

179

04-JUL-07

05-AUG-07

019W15240A Drainage - Second Fix L19 W

28

174

15-MAR-07

16-APR-07

Drainage - Second Fix L19 W

020W15240A Drainage - Second Fix L20 W

28

174

20-MAR-07

21-APR-07

Drainage - Second Fix L20 W

021W15240A Drainage - Second Fix L21 W

28

174

25-MAR-07

25-APR-07

Drainage - Second Fix L21 W

022W15240A Drainage - Second Fix L22 W

28

174

29-MAR-07

30-APR-07

Drainage - Second Fix L22 W

023W15240A Drainage - Second Fix L23 W

28

174

03-APR-07

06-MAY-07

Drainage - Second Fix L23 W

024W15240A Drainage - Second Fix L24 W

28

174

08-APR-07

10-MAY-07

Drainage - Second Fix L24 W

025W15240A Drainage - Second Fix L25 W

28

174

12-APR-07

15-MAY-07

Drainage - Second Fix L25 W

026W15240A Drainage - Second Fix L26 W

28

174

17-APR-07

20-MAY-07

Drainage - Second Fix L26 W

027W15240A Drainage - Second Fix L27 W

28

174

22-APR-07

24-MAY-07

Drainage - Second Fix L27 W

028W15240A Drainage - Second Fix L28 W

28

174

26-APR-07

29-MAY-07

Drainage - Second Fix L28 W

029W15240A Drainage - Second Fix L29 W

28

174

02-MAY-07

03-JUN-07

Drainage - Second Fix L29 W

030W15240A Drainage - Second Fix L30 W

28

174

07-MAY-07

07-JUN-07

Drainage - Second Fix L30 W

031W15240A Drainage - Second Fix L31 W

28

174

12-MAY-07

12-JUN-07

Drainage - Second Fix L31 W

032W15240A Drainage - Second Fix L32 W

28

174

16-MAY-07

17-JUN-07

Drainage - Second Fix L32 W

033W15240A Drainage - Second Fix L33 W

28

174

21-MAY-07

21-JUN-07

Drainage - Second Fix L33 W

034W15240A Drainage - Second Fix L34 W

28

174

26-MAY-07

26-JUN-07

Drainage - Second Fix L34 W

035W15240A Drainage - Second Fix L35 W

28

174

30-MAY-07

01-JUL-07

Drainage - Second Fix L35 W

036W15240A Drainage - Second Fix L36 W

28

174

04-JUN-07

05-JUL-07

Drainage - Second Fix L36 W

037W15240A Drainage - Second Fix L37 W

28

174

09-JUN-07

10-JUL-07

Drainage - Second Fix L37 W

038W15240A Drainage - Second Fix L38 W

28

174

13-JUN-07

15-JUL-07

Drainage - Second Fix L38 W

039W15240A Drainage - Second Fix L39 W

28

174

18-JUN-07

19-JUL-07

043W15240A Drainage - Second Fix L43 W

21

245

15-MAR-07

08-APR-07

Drainage - Second Fix L43 W

044W15240A Drainage - Second Fix L44 W

21

245

20-MAR-07

12-APR-07

Drainage - Second Fix L44 W

045W15240A Drainage - Second Fix L45 W

21

245

25-MAR-07

17-APR-07

Drainage - Second Fix L45 W

046W15240A Drainage - Second Fix L46 W

21

245

29-MAR-07

22-APR-07

Drainage - Second Fix L46 W

047W15240A Drainage - Second Fix L47 W

21

245

03-APR-07

26-APR-07

Drainage - Second Fix L47 W

048W15240A Drainage - Second Fix L48 W

21

245

08-APR-07

02-MAY-07

Drainage - Second Fix L48 W

049W15240A Drainage - Second Fix L49 W

21

245

12-APR-07

07-MAY-07

Drainage - Second Fix L49 W

050W15240A Drainage - Second Fix L50 W

21

245

17-APR-07

12-MAY-07

Drainage - Second Fix L50 W

051W15240A Drainage - Second Fix L51 W

21

245

22-APR-07

16-MAY-07

Drainage - Second Fix L51 W

052W15240A Drainage - Second Fix L52 W

21

245

26-APR-07

21-MAY-07

Drainage - Second Fix L52 W

053W15240A Drainage - Second Fix L53 W

21

245

02-MAY-07

26-MAY-07

Drainage - Second Fix L53 W

054W15240A Drainage - Second Fix L54 W

21

245

07-MAY-07

30-MAY-07

Drainage - Second Fix L54 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L16 W

Drainage - Second Fix L39 W

Sheet 199 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved

Activity
ID

Activity
Description

OD

% Total
Comp Float

Early
Start

Early
Finish

2005

2006

2007

2008

055W15240A Drainage - Second Fix L55 W

21

245

12-MAY-07

04-JUN-07

Drainage - Second Fix L55 W

056W15240A Drainage - Second Fix L56 W

21

245

16-MAY-07

09-JUN-07

Drainage - Second Fix L56 W

057W15240A Drainage - Second Fix L57 W

21

245

21-MAY-07

13-JUN-07

Drainage - Second Fix L57 W

058W15240A Drainage - Second Fix L58 W

21

245

26-MAY-07

18-JUN-07

Drainage - Second Fix L58 W

059W15240A Drainage - Second Fix L59 W

21

245

30-MAY-07

23-JUN-07

Drainage - Second Fix L59 W

060W15240A Drainage - Second Fix L60 W

21

245

04-JUN-07

27-JUN-07

Drainage - Second Fix L60 W

061W15240A Drainage - Second Fix L61 W

21

245

09-JUN-07

02-JUL-07

Drainage - Second Fix L61 W

062W15240A Drainage - Second Fix L62 W

21

245

13-JUN-07

07-JUL-07

Drainage - Second Fix L62 W

063W15240A Drainage - Second Fix L63 W

21

245

18-JUN-07

11-JUL-07

Drainage - Second Fix L63 W

064W15240A Drainage - Second Fix L64 W

21

245

23-JUN-07

16-JUL-07

Drainage - Second Fix L64 W

065W15240A Drainage - Second Fix L65 W

21

245

27-JUN-07

21-JUL-07

Drainage - Second Fix L65 W

066W15240A Drainage - Second Fix L66 W

21

245

02-JUL-07

25-JUL-07

Drainage - Second Fix L66 W

067W15240A Drainage - Second Fix L67 W

21

245

07-JUL-07

30-JUL-07

Drainage - Second Fix L67 W

068W15240A Drainage - Second Fix L68 W

21

245

11-JUL-07

04-AUG-07

Drainage - Second Fix L68 W

069W15240A Drainage - Second Fix L69 W

21

245

16-JUL-07

08-AUG-07

Drainage - Second Fix L69 W

070W15240A Drainage - Second Fix L70 W

21

245

21-JUL-07

13-AUG-07

Drainage - Second Fix L70 W

071W15240A Drainage - Second Fix L71 W

21

245

25-JUL-07

18-AUG-07

Drainage - Second Fix L71 W

072W15240A Drainage - Second Fix L72 W

21

245

30-JUL-07

22-AUG-07

002W15250A Plumbing - Second Fix L2 W

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L2 W

004W15250A Plumbing - Second Fix L4 W

28

427

15-MAR-07

16-APR-07

Plumbing - Second Fix L4 W

005W15250A Plumbing - Second Fix L05 W

28

179

14-MAY-07

14-JUN-07

Plumbing - Second Fix L05 W

006W15250A Plumbing - Second Fix L06 W

28

179

19-MAY-07

19-JUN-07

Plumbing - Second Fix L06 W

007W15250A Plumbing - Second Fix L07 W

28

179

23-MAY-07

24-JUN-07

Plumbing - Second Fix L07 W

008W15250A Plumbing - Second Fix L08 W

28

179

28-MAY-07

28-JUN-07

Plumbing - Second Fix L08 W

009W15250A Plumbing - Second Fix L09 W

28

179

02-JUN-07

03-JUL-07

Plumbing - Second Fix L09 W

010W15250A Plumbing - Second Fix L10 W

28

179

06-JUN-07

08-JUL-07

Plumbing - Second Fix L10 W

011W15250A Plumbing - Second Fix L11 W

28

179

11-JUN-07

12-JUL-07

Plumbing - Second Fix L11 W

012W15250A Plumbing - Second Fix L12 W

28

179

16-JUN-07

17-JUL-07

Plumbing - Second Fix L12 W

013W15250A Plumbing - Second Fix L13 W

28

179

20-JUN-07

22-JUL-07

Plumbing - Second Fix L13 W

014W15250A Plumbing - Second Fix L14 W

28

179

25-JUN-07

26-JUL-07

Plumbing - Second Fix L14 W

015W15250A Plumbing - Second Fix L15 W

28

179

30-JUN-07

31-JUL-07

Plumbing - Second Fix L15 W

016W15250A Plumbing - Second Fix L16 W

28

179

04-JUL-07

05-AUG-07

019W15250A Plumbing - Second Fix L19 W

28

174

15-MAR-07

16-APR-07

Plumbing - Second Fix L19 W

020W15250A Plumbing - Second Fix L20 W

28

174

20-MAR-07

21-APR-07

Plumbing - Second Fix L20 W

021W15250A Plumbing - Second Fix L21 W

28

174

25-MAR-07

25-APR-07

Plumbing - Second Fix L21 W

022W15250A Plumbing - Second Fix L22 W

28

174

29-MAR-07

30-APR-07

Plumbing - Second Fix L22 W

023W15250A Plumbing - Second Fix L23 W

28

174

03-APR-07

06-MAY-07

Plumbing - Second Fix L23 W

024W15250A Plumbing - Second Fix L24 W

28

174

08-APR-07

10-MAY-07

Plumbing - Second Fix L24 W

025W15250A Plumbing - Second Fix L25 W

28

174

12-APR-07

15-MAY-07

Plumbing - Second Fix L25 W

026W15250A Plumbing - Second Fix L26 W

28

174

17-APR-07

20-MAY-07

Plumbing - Second Fix L26 W

Start Date
Finish Date
Data Date

29-DEC-04
18-AUG-09
15-MAR-07

Early Bar
Progress Bar
Critical Activity

Primavera Systems, Inc.

BDW1

2009

Drainage - Second Fix L72 W

Plumbing - Second Fix L16 W

Sheet 200 of 587

BURJ TOWER WORKING SCHEDULE

Working Schedule
Date
Revision
18-MAR-07 Revision 0 (BDW1)

Checked

Approved