RUBBLE PACKING

1.1.0

SCOPE :
Shall
cover
r ubble
packing
under
fl oors
and
foundations. This does not include r ubble packing
for road works.

1.2.0

MATERIAL :
Stones used shall be hard, angular in shape and
none of the stones shall be less than 100mm t hick.
Stones shall not exceed in length or breadt h thr ice
its thickness.

1.3.0

L AYING :
The subgrade shall be leveled and clean and got
approved by Engineer-in-Charge before t he packing is
commenced. The stones shall be laid to the required
thickness wit h broad side as base. All interstices
shall be fi lled with stone chips or cr ushed stone
dust. This shall then be properly lamped and fl ooded
with water over night to make sure t hat all fi ne
par ticles are washed down in between t he interstices.
Any soft place or holes found shall be fi lled up with
sand and the sur faces properly rammed until the
desired grade and proper consolidation is obtained.
Before concreting is commenced over the soling, the
soling shall be got approved by t he Engineer-inCharge.

1.4.0

MEASUREMENT :
Measurement shall be in area (square metres). The
length and breadt h shall be measured cor rectly upto
the nearest centimeter. Generally, the t hickness shall
be specifi ed and if not specifi ed, measurement shall
be in volume (cubic metres) and t hickness shall be
measured upto nearest 5mm.