Pile raft is a combination of two foundation techniques i.e. it combines the bearing
effect of Pile + Raft foundation
Therefore its applied when the soil is loose and simply raft or pile is not feasible. The
bearing capacity is gained mainly by skin friction by piles and end bearing by raft.
Raft also decreases the overall settlement.
Case Analysis
The design of the raft assumed that the walls of two level basement car parks would
act with the raft over the piles to transmit the shear and bending forces to the outer
piles. The walls of the basement had almost full height opening, placed one above
the other, and contained only nominal reinforcement.
Original Design
The combined strength these walls plus the 1.5m thick slab was quite inadequate to
transmit the loads. The mistake was discovered whilst the tower block was being
constructed
Remedial Work
The remedial work could be summarised with the following figure (it was a
combination of the laid down factors) :