Und. Metrado
Precio S/.
Parcial S/.
CONSTRUCCIONES PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA 2.40m x 4.80m
CASETA P/GUARDIANIA Y ALMACEN
und
m2
1.0000
20.0000
1,274.25
67.87
1,274.25
1,357.40
m2
680.8000
13.0000
8,850.4000
m2
405.5500
17.9900
7,295.8445
m2
553.0000
30.0000
16,590.0000
DEMOLICION DE SOBRECIMIENTO
m3
11.4700
52.0100
596.5547
DEMOLICION DE CIMIENTOS
m3
145.1600
49.5700
7,195.5812
m3
108.7300
89.1600
9,694.3668
m2
2,199.6000
10.2000
22,435.9200
GLB
m3
m2
m2
GLB
1.0000
1,660.7815
2,199.6000
2,199.6000
1.0000
5,500.00
74.31
2.53
2.08
1,300.00
5,500.00
123,412.67
5,564.99
4,575.17
1,300.00
m3
m2
m3
336.0000
1,344.0000
191.9700
13.43
9.93
74.31
m2
m2
m3
m2
m
1,116.2400
57.0000
1.2200
1,344.0000
236.0000
50.81
37.37
261.49
4.83
2.07
und
und
und
und
2.0000
8.0000
2.0000
2.0000
31.82
31.82
1,973.02
413.30
m
m
80.2400
300.8100
12.40
3.32
m3
m3
48.3800
58.0600
35.82
74.31
DEMOLICION
TRABAJOS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS PARA LA OBRA
ELIMINACION DE MATERIAL EXEDENTE DE DEMOLICION
CORTE EN TERRENO NATURAL E=0.10m
TRAZO Y REPLANTEO
LIMPIEZA DE TERRENO MANUAL
21,672.84
4,512.48
13,345.92
3,814.44
66,145.30
56,716.15
2,130.09
319.02
6,491.52
488.52
5,090.84
63.64
254.56
3,946.04
826.60
1,993.67
994.98
998.69
TRIBUNAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CIMIENTOS
ELIMINACION DE MATERIAL EXEDENTE
CONCRETO SIMPLE
CIMIENTO CORRIDO
CONCRETO CICLOPEO 1:8 + 30% DE P.G.
SOLADO F'C=100 KG/CM2
TRIBUNAS
CONCRETO CICLOPEO 1:8 + 25% DE P.G.
ENCOFRADO Y DESENCOFRADO DE TRIBUNAS
REVOQUES
REVESTIMIENTO PULIDO EN GRADAS
PINTURA
PINTURA EN TRIBUNAS
COBERTURAS
PROVISION E INSTALACION DE CUBIERTA PARA TRIBUNAS
6,047.41
1,732.97
4,314.44
23,782.41
m3
m2
48.3800
6.9100
207.53
34.42
m3
m2
59.8100
35.6800
207.80
30.15
m2
135.2000
29.92
m2
135.2000
8.69
30.3000
633.01
51.1000
184.35
m3
m3
32.6720
45.7408
35.82
74.31
10,278.14
10,040.30
237.84
13,504.27
12,428.52
1,075.75
4,045.18
4,045.18
1,174.89
1,174.89
19,180.20
19,180.20
CERCO PERIMETRICO
CERCO METALICO
CERCO PERI METRICO DE MURO DE ALBAILERIA
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS Y ZAPATAS
ELIMINACION DE MATERIAL EXEDENTE
OBRAS DE CONCRETO SIMPLE
CIMIENTOS
SOLADO F'C=100 KG/CM2
9,420.29
104,758.14
4,569.31
1,170.31
3,399.00
15,832.20
m2
37.0000
34.42
8,921.29
1,273.54
6.2.2.1.2
6.2.2.2
6.2.2.2.1
6.2.2.2.2
6.2.3
6.2.3.1
6.2.3.1.1
6.2.3.1.2
6.2.3.1.3
6.2.3.2
6.2.3.2.1
6.2.3.2.2
6.2.3.2.3
6.2.4
6.2.4.1
6.2.4.2
6.2.5
6.2.5.1
6.2.5.2
7
7.1
7.1.1
7.2
7.2.1
7.3
7.3.1
7.4
7.4.1
7.5
7.5.1
7.5.2
7.6
7.6.1
8
8.1
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
8.1.6
8.1.7
8.2
8.2.1
8.2.1.1
8.2.1.2
8.2.2
8.2.2.1
8.2.2.2
8.2.3
8.2.3.1
8.2.3.2
8.2.3.3
8.2.3.4
8.3
8.3.1
8.3.1.1
8.3.1.2
8.3.1.3
8.3.2
8.3.2.1
8.3.2.2
8.3.2.3
8.3.3
8.3.3.1
8.3.3.2
8.3.3.3
8.3.4
8.3.4.1
8.3.4.2
8.3.4.3
8.3.4.4
8.4
m3
29.6000
258.37
m3
m2
13.8750
92.5000
260.15
35.69
7,647.75
6,910.91
3,609.58
3,301.33
49,438.46
m3
kg
m2
8.0000
2,292.1000
270.0000
336.87
5.21
54.10
m3
m2
kg
11.1000
148.0000
1,138.6600
345.82
70.43
5.21
m2
kg
555.0000
99.0000
53.08
5.06
m2
m2
185.0000
36.2300
22.24
23.28
und
4.0000
1,270.53
29,243.80
2,694.96
11,941.84
14,607.00
20,194.66
3,838.60
10,423.64
5,932.42
29,960.34
29,459.40
500.94
4,957.83
4,114.40
843.43
und
m
und
8.0000
130.0000
1.0000
856.62
39.54
503.27
GLB
GLB
1.0000
1.0000
200.00
250.00
und
1.0000
813.30
m3
m3
m3
m2
m2
m3
m3
55.0000
34.9100
13.0000
129.9500
23.7800
24.9100
34.9100
6.92
35.82
26.87
6.13
11.68
18.13
74.31
5,082.12
5,082.12
6,852.96
6,852.96
5,140.20
5,140.20
503.27
503.27
450.00
200.00
250.00
813.30
813.30
AMBIENTES ADMINISTRATIVOS
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO PARA OBTENER EL NIVEL REQUERIDO
EXCAVACION DE ZANJAS Y ZAPATAS
RELLENO MANUAL CON MATERIAL PROPIO
NIVELACION INTERIOR Y APISONADO PARA FALSO PISO Y VEREDA
AFIRMADO e=4" COMPACTADO PARA VEREDAS
ACARREO INTERNO DE MATERIAL PROCEDENTE DE EXCAVACIONES
ELIMINACION DE MATERIAL EXEDENTE
OBRAS DE CONCRETO SIMPLE
CIMIENTOS
SOLADO F'C=100 KG/CM2
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO + HORMIGON 30% DE P.G.
SOBRECIMIENTOS
CONCRETO SOBRECIMIENTO DE 1:8 C.H. + 25% DE P.M.
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO
VEREDAS DE COMCRETO
VEREDA DE CONCRETO F'C=140 KG/CM2. E=0.10m, PASTA 1:2
ENCOFRADO Y DESENCOFRADO DE VEREDAS
JUNTAS ASFALTICAS DE 1"
JUNTAS DE 1" ESPUMA PLASTICA
OBRAS DE CONCRETO ARMADO
ZAPATAS
SOLADO F'C=100 KG/CM2
CONCRETO F'C=175 KG/CM2, ZAPATAS
ACERO fy=4200 kg/cm2, ZAPATAS
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS
ENCOFRADO Y DESENCOFRADO DE COLUMNA
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE VIGAS
ACERO GRADO 60 EN VIGAS
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE LOSA ALIGERADA
ACERO GRADO 60 EN LOSAS ALIGERADAS
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
MUROS Y TABIQUES DE ALBAILERIA
6,100.51
380.60
1,250.48
349.31
796.59
277.75
451.62
2,594.16
9,058.70
6,461.64
m2
m3
30.0200
21.0100
34.42
258.37
m3
m2
3.1100
20.7000
260.15
35.69
m2
m2
m
m
23.7800
1.7400
4.5000
4.5000
37.89
36.80
2.59
16.11
1,033.29
5,428.35
1,547.85
809.07
738.78
1,049.21
901.02
64.03
11.66
72.50
53,371.81
3,326.73
m2
m3
kg
12.4600
8.7200
46.2000
34.42
304.72
5.21
m3
kg
m2
4.0900
35.5800
558.9400
336.87
5.21
54.10
m3
m2
kg
5.8200
39.5700
662.0300
345.82
70.43
5.21
m3
m2
kg
und
9.3000
113.3300
271.3800
113.3300
304.57
47.94
5.21
2.78
428.87
2,657.16
240.70
31,801.82
1,377.80
185.37
30,238.65
8,248.76
2,012.67
2,786.92
3,449.18
9,994.49
2,832.50
5,433.04
1,413.89
315.06
8,753.36
8.4.1
8.4.2
8.5
8.5.1
8.5.2
8.5.3
8.5.4
8.5.5
8.5.6
8.6
8.6.1
8.6.2
8.6.3
8.7
8.7.1
8.8
8.8.1
8.8.1.1
8.9
8.9.1
8.9.2
8.1O
8.10.1
8.10.2
8.10.3
8.11
8.11.1
8.12
8.12.1
8.12.2
8.12.3
8.13
8.13.1
8.14
8.14.1
8.14.1.1
8.14.1.2
8.14.1.3
8.14.2
8.14.2.1
8.14.2.2
8.14.3
8.14.3.1
8.14.3.2
8.14.3.3
8.14.4
8.14.4.1
8.14.4.2
8.14.4.3
8.14.5
8.14.5.1
8.15
8.15.1
8.15.1.1
8.15.1.2
8.15.1.3
8.15.1.4
8.15.1.5
8.15.1.6
8.15.1.7
8.15.2
8.15.2.1
8.15.2.2
8.15.3
8.15.3.1
8.15.3.2
8.15.3.3
8.15.3.4
8.15.3.5
8.15.3.6
8.15.4
8.15.4.1
8.15.4.2
8.15.4.3
m2
kg
162.1500
28.9400
53.08
5.06
m2
m2
m2
m2
m
m2
48.0700
100.4400
95.3300
453.3100
84.8000
48.0700
21.96
22.24
23.28
28.65
10.74
49.23
m2
m2
m2
237.2000
26.9300
237.2000
27.10
35.24
53.69
71.2000
8.95
8,606.92
146.44
21,773.25
1,055.62
2,233.79
2,219.28
12,987.33
910.75
2,366.49
20,112.40
6,428.12
949.01
12,735.27
637.24
637.24
11,386.15
m2
14.0700
809.25
m2
und
11.3600
2.0000
232.41
4,500.00
pza
pza
pza
21.0000
9.0000
8.0000
28.82
96.63
76.63
p2
122.2800
17.54
m2
m2
m2
100.4400
95.3300
453.3100
10.58
11.79
11.90
m2
7.2000
809.25
11,386.15
11,386.15
11,640.18
2,640.18
9,000.00
2,087.93
605.22
869.67
613.04
2,144.79
2,144.79
7,580.98
1,062.66
1,123.94
5,394.39
5,826.60
5,826.60
10,042.11
1,834.23
pto
pto
pto
18.0000
21.0000
3.0000
38.00
48.47
44.12
m
m
202.3500
25.0000
9.76
11.40
m
m
m
260.8800
245.0000
62.5000
2.20
7.58
8.86
pza
pza
GLB
2.0000
6.0000
1.0000
194.62
35.51
700.00
und
18.0000
92.27
684.00
1,017.87
132.36
2,259.94
1,974.94
285.00
2,984.79
573.94
1,857.10
553.75
1,302.30
389.24
213.06
700.00
1,660.86
1,660.86
14,195.17
3,819.24
pto
pto
pto
m
m
pza
pza
13.0000
8.0000
4.0000
33.5000
35.0000
4.0000
1.0000
84.52
92.59
84.52
17.82
20.31
51.33
128.54
pto
m
28.0000
78.0000
96.10
12.63
und
und
und
und
und
und
7.0000
1.0000
14.0000
2.0000
1.0000
1.0000
55.09
63.95
17.17
18.17
187.44
49.73
pza
und
pza
3.0000
8.0000
6.0000
183.64
223.68
365.88
1,098.76
740.72
338.08
596.97
710.85
205.32
128.54
3,675.94
2,690.80
985.14
963.47
385.63
63.95
240.38
36.34
187.44
49.73
5,736.52
550.92
1,789.44
2,195.28
8.15.4.4
9
9.1
9.1.1
9.1.1.1
9.1.1.2
9.1.1.3
9.1.2
9.1.2.1
9.1.2.2
9.1.2.3
9.2
9.1
10
10.1
10.2
10,2,3
10.2.3
10.3
10.3.1
10.3.2
10.4
10.5
10.6
10.7
pza
17.0000
70.64
1,200.88
COBERTURA
OBRAS DE CONCRETO ARMADO
ZAPATAS
SOLADO F'C=100 KG/CM2
CONCRETO F'C=175 KG/CM2, ZAPATAS
ACERO fy=4200 kg/cm2, ZAPATAS
COLUMNETAS PARA COBERTURA
CONCRETO COLUMNAS (Fc=210 kg/cm2)
ACERO CORRUGADO Fy= 4200 kg/cm2 GRADO 60
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ESTRUCTURA METALICA Y COBERTURAS
CUBIERTA DE CALAMINA ONDULADA
26,710.94
5,815.5620
m2
m3
kg
12.9600
14.2560
196.8120
34.4200
304.7200
5.2100
m3
kg
m2
29.8200
1,059.2602
102.4800
358.50
4.40
54.10
m2
2,263.8300
85.94
und
153.0600
24.58
m2
m2
4.0000
3.0000
193.21
120.36
m2
m2
GLB
m2
m
und
5.0000
6.0000
1.0000
48.0000
64.0000
12.0000
193.21
120.36
4,000.00
57.28
39.09
3,000.00
446.0832
4,344.0883
1,025.3905
20,895.3827
10,690.47
4,660.74
5,544.17
194,553.55
194,553.55
VARIOS
SEMBRADO DE CESPED
CONEXION DE AGUA
ROTURA,E.D.Y REPOSICION: PAVIM.MIXTO ASF.2"+CONCR.6"(PARCHE)
ROTURA,E.D.Y REPOSICION: VEREDA F'C=140 KG/CM2 X10CM (PARCHE
CONEXION DEDESAGUE
ROTURA,E.D.Y REPOSICION: PAVIM.MIXTO ASF.2"+CONCR.6"(PARCHE)
ROTURA,E.D.Y REPOSICION: VEREDA F'C=140 KG/CM2 X10CM (PARCHE
ESCALERA DE MADERA (INCLUYE INSTALACION)
COBERTURA FIBRABLOCK (SEGUNDO PISO)
SISTEMA DE DRENAJE (DESAGUE)
TALLARES DE CAPACITACION Y DIFUSION
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 7%
SUB TOTAL 01
IMPUESTO (IGV) 18%
SUB TOTAL 02
SUPERVISION
TOTAL PRESUPUESTO
3,762.21
1,133.92
772.84
361.08
1,688.21
966.05
722.16
4,000.00
2,749.44
2,501.76
36,000.00
2631.65
72,658.67
140,352.83
94902.65
54230.10
114178.43
18841.85
184711.19
221264.49
51835.54
955607.40
95,560.74
66,892.52
1,118,060.66
201,250.92
1,319,311.58
18,000.00
1,337,311.58