DATE
ITEM
MONTH
WEEK
START
100
DRAWING PREP.
ENGINEERING DESIGN
90
PERT/CPM
40 DAYS
LANDSCAPING WORKS
15
52 DAYS
40 DAYS
80
CHB LAYING 150MM THK & 100MM THK. AND PLASTERING WORKS
CONCRETING
CONCRETING
OF FOOTING
OF PEDESTAL
28 DAYS
18 DAYS
MOVE - IN
10 DAYS
20 DAYS
INSTALLATION OF FTG.
METAL
DECKING
GRAVEL BEDDING
8 DAYS
8 DAYS
8
3 DAYS
SURVEY WORKS
9
5 DAYS
11
5 DAYS
CONC. OF
13
6 DAYS
14 DAYS
16
8 DAYS
17
14 DAYS
6 DAYS
18
14 DAYS
19 DAYS
16 DAYS
DEMOBILIZATION
19
20 DAYS
10 DAYS
20
CONSTRUCTION OF
PAINTING WORKS
28 DAYS
FABRICATION OF STRUCTURAL STEEL
70
20 DAYS
CONSTRUCTION OF SMOKER'S LOUNGE
8 DAYS
SOIL POISONING
20 DAYS
20 DAYS
12
20 DAYS
14
20 DAYS
60
17 DAYS
20 DAYS
SANITARY / PLUMBING WORKS
39 DAYS
ELECTRICAL WORKS
39 DAYS
OF FOOTING
FRAMINGWORKS
GRAVEL BEDDING
CONCRETING
OF FOOTING
FRAMINGWORKS
CONCRETING OF PEDESTAL
EXCAVATION
INSTALLATION OF FTG.
&DISPOSAL
7 DAYS
5 DAYS
7 DAYS
5
3 DAYS
3 DAYS
10 DAYS
13 DAYS
15 DAYS
AND COMPT'N
13 DAYS
INSTALLATION OF FTG.
& DISPOSAL
10
7 DAYS
11
5 DAYS
12
7 DAYS
ENGINEERED FILL
EXCAVATION
7 DAYS
12 DAYS
METAL ROOFING
SOIL POISONING
CONCRETING OF PEDESTAL
50
13
14
3 DAYS
13 DAYS
PAINTING WORKS
FORMWORKS
28 DAYS
12 DAYS
3 DAYS
SOIL POISONING
19
PAINTING WORKS
AND COMPT'N
13 DAYS
13 DAYS
14 DAYS
ENGINEERED FILL
40
18
9 DAYS
7 DAYS
12 DAYS
METAL ROOFING
18 DAYS
8 DAYS
30
12 DAYS
CHB LAYING 150MM THK & 100MM THK. AND PLASTERING WORKS
CHB LAYING 150MM THK & 100MM THK. AND PLASTERING WORKS
21 DAYS
28 DAYS
16
17
CONCRETING
OF FOOTING
FRAMINGWORKS
CONCRETING OF PEDESTAL
EXCAVATION
INSTALLATION OF FTG.
&DISPOSAL
7 DAYS
5 DAYS
7 DAYS
42
3 DAYS
SOIL POISONING
7 DAYS
FABRICATION OF STRUCTURAL STEEL
W/ ACCESSORIES
BACKFILLING
AND COMPT'N
FRAMINGWORKS
13 DAYS
INSTALLATION OF FTG.
& DISPOSAL
10
7 DAYS
15 DAYS
13 DAYS
INSTALL DOWNSPOUTS
15 DAYS
13 DAYS
PAINTING WORKS
11 5 DAYS
12
7 DAYS
13
3 DAYS
SEPTIC TANK
13 DAYS
OF FOOTING
20
CONCRETING OF PEDESTAL
EXCAVATION
CONCRETING
13 DAYS
ENGINEERED FILL
GRAVEL BEDDING
METAL ROOFING
10 DAYS
23 DAYS
14
3 DAYS
SOIL POISONING
7 DAYS
FABRICATION OF STRUCTURAL STEEL
13 DAYS
METAL ROOFING
18
13 DAYS
14 DAYS
7 DAYS
10
INSTALL DOWNSPOUT
14 DAYS
8 DAYS
19
13 DAYS
PAINTING WORKS
28 DAYS
18 DAYS
CHB LAYING 150MM THK & 100MM THK. AND PLASTERING WORKS
CHB LAYING 150MM THK & 100MM THK. AND PLASTERING WORKS
21 DAYS
28 DAYS
0
Projected Monthly Accomp (PESO)
(% )
Cummulative Monthly Accomp (PESO)
(%)
Submitted By:
12.50
20.00
27.50
27.50
12.50
12.50
32.50
60.00
87.50
100.00