Sunteți pe pagina 1din 16

CONTRACT NUMBER :

TP.01.03/U.DEP.IP

GENERAL

.SKG/1922/11/2014
DOCUMENT NUMBER :
16 PAGES

SLS-35-MEC-PR-022

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI


PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN
FAT PROCEDURE - FLARE PACKAGE
RANTAU PANJANG

21/05/14

Issued for Review

Rev.

Date

Status

MDY

MDY

HNK

Prep'd

Checked

Approved

PT KOTAMINYAK INTERNUSA

Checked

Approved

WIKA

PERTAGAS

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Date :
21/05/14

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Rev. A

Page 2 of 12

REVISION SHEET

REVISION
CODE

Page
A

REVISION
CODE

Page
D

REVISION
CODE

Page
D

Page
D

REVISION
CODE
A

Appe
ndix

REVISION
CODE
A

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 3 of 12

REVISION SHEET

Rev.
Code

Chapter

Page

Implementation
Comment (Yes/No)

Note

Remarks

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 4 of 12

Table of Content
1. General
2. References
3. Control Panel Test
3.1 Visual Inspection Test
3.2 Electrical System Power Up
3.3 PLC I/O
3.3.1. PLC Digital Input
3.3.2. PLC Digital Output
3.4 Function Test Process
3.4.1 Manual Operation
3.4.2 Auto Operation
4. Punch List
ATTACHMENT

5
5
5
5
6
6
6
8
6
6
10
11
12

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 5 of 12

1.GEN ERAL
Factory Acceptance Test (FAT) is the stage to justify, show and prove that all process and activities such
as fabrication, panel assembly, programming etc are in accordance with the documents specification and meet
the user requirements.
The Purpose of this document is to define the procedure of Factory Acceptance Test of the Process
Control of Pilot Flame Flare Ignition and Shutdown System. The test will also include Visual Inspection Test,
Electrical System Power Up, PLC I/O and Cause and Effect. HP/LP Flare local control panel.
2. R EFEREN CES
1

P&ID (WIKA-RPA-FI-PID-001)

Panel Layout (WIKA-RPA-FI-EE-001)

Wiring Diagram (WIKA-RPA-FI-EE-002)

General Arrangement (SLS-30-MEC-DW-009)

3.C ONTR OL PAN EL TEST


3.1 Vi su al In sp ection Test
NO

DESCRIPTION

DIMENSIONAL CHECK

ENCLOSURE DETAILS
-Flatness and Smoothness
-Panel Arrangement
-Dimension
-Enclosure doors
*Open and shut freely
*Lock securely
*Seal

COMPONENTS
Completeness and correctness of components
(comply with equipment List)

WIRING AND TERMINATION


-Color Code and Label
-Terminal Labeled

POINT TO POINT WIRING CHECK

ACCEPTABLE SIGNATURE

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 6 of 12

3.2 El ectri cal S yst em Pow er-Up


First of all, Power 220 VAC - 240 VAC is off, switch off all MCB and Fuses and switch off the toggle
switch in PLC Power Supply
Connect all equipment Input Signal
Connect all equipment Incoming Power
Connect 220 VAC - 240 VAC General Incoming Power to Main Terminal
Switch on power 220 VAC - 240 VAC and measure incoming voltage
Item to be check :
1. MCB
2. 24 VDC Power Supply
VISUAL POWER SYSTEM TEST
NO

ITEM TO BE INSPECTED

RESULT

CONFIRM

MAIN MCB 2P/ 10A


1

Main Power

Incoming terminal has 220 VAC 240VAC

DISTRIBUTION MCB
2

PLC

Power Supply Unit 24VDC

3.3 PLC I/O


Prior to performing loop verification, check the entire loop per loop diagram to ensure all wires are
connected
3.3.1. PLC Di git al Inp ut
Digital Input Loop Check by force each input and see the PLC data
TAG NAME
PLC
NO
P&ID TAG
DEFINITION
PROGRAM
ADDRESS
SYSTEM START
1
SYSTEM START
I1.0
Push Button Start
(PB-101)
SYSTEM STOP
2
SYSTEM STOP
I1.1
Push Button Stop
(PB-102)
RESET
3
RESET
I1.2
Push Button Reset
(PB-103)
LAMP TEST
4
LAMP TEST
I1.3
Push Button Lamp Test
(PB-104)
FFG MANUAL #01
Push Button FFG Manual
5
FFG MANUAL #01 I1.4
(PB-105)
#01

CONFIRM

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

6
7
8
9
10
11
12
13
14
15
16

FFG MANUAL #01


(PB-106)
FFG MANUAL #03
(PB-107)
AUTO
(HS-101)
MANUAL
(HS-101)
EMERGENCY
SHUTDOWN
(PB-108)
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

FFG MANUAL #02 I1.5


FFG MANUAL #03 I1.6

Date :
21/05/14
Page 7 of 12

Push Button FFG Manual


#02
Push Button FFG Manual
#03

AUTO

I1.7

Selector Switch AUTO

MANUAL

I1.8

Selector Switch MANUAL

ESD

I1.9

Push Button ESD

SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

I1.10
I1.11
I1.12
I1.13
I1.14
I1.15

Spare
Spare
Spare
Spare
Spare
Spare

3.3.2. PLC Di git al Out put


Digital Output Loop Check by force each output and see the PLC data
Digital Output 01
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

P&ID TAG
Manual (UI-102)
Auto (UI-103)
Pilots On (UI-104)
Pilot #1 Off (UI-105)
Pilot #2 Off (UI-106)
Pilot #3 Off (UI-107)
SV-001 Open (UI-108)
SV-002 Open (UI-109)
SV-003 Open (UI-110)
Ignition Chamber #1
Ignition Chamber #2
Ignition Chamber #3
Alarm Horn
Lamp Test
Spare
Spare

TAG NAME
PROGRAM
Manual Indicating
Auto
Pilots On
Pilot #1 Off
Pilot #2 Off
Pilot #3 Off
SV-001
SV-002
SV-003
Ignition Transformer #1
Ignition Transformer #2
Ignition Transformer #3
Horn
Lamp Test
Spare
Spare

PLC
ADDRESS
O1.0
O1.1
O1.2
O1.3
O1.4
O1.5
O1.6
O1.7
O1.8
O1.9
O1.10
O1.11
O1.12
O1.13
O1.14
O1.15

DEFINITION
Manual FFG Ignition
Auto FFG Ignition
All Pilots is On
Pilot #1 is Off
Pilot #2 is Off
Pilot #3 is Off
SOV 001 OPEN
SOV 002 OPEN
SOV 003 OPEN
Ignition on Chamber #1
Ignition on Chamber #2
Ignition on Chamber #3
Alarm Horn
Lamp Test
Spare
Spare

CONFIRM

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 8 of 12

Digital Output 02
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

P&ID TAG
Common Alarm (XA101)
Pilot Flame Failure (XA102)
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare

TAG NAME
PROGRAM

PLC
ADDRESS

DEFINITION

Common Alarm

O2.0

Common Alarm

Pilot Flame Failure

O2.1

Pilot Flame Failure

Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare

O2.2
O2.3
O2.4
O2.5
O2.6
O2.7
O2.8
O2.9
O2.10
O2.11
O2.12
O2.13
O2.14
O2.15

All Pilots is On
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare

CONFIRM

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 9 of 12

3.4 FUN CT ION TEST PROCES S


The Function Test is an operational checking for overall system including loop test, real pilot flame flare
ignition test with fuel gas (LPG) is introduced into the system up to produces flame on pilot TIP.
BEFORE TURNING THE SELECTOR SWITCH POWER OFF-ON
a) Make sure incoming power with multi meter tools, power supply 220-240VAC
TURN THE SELECTOR SWITCH FROM OFF TO ON POSITION
3.4.1 Manu al Op eratio n
MANUAL
The MANUAL mode provides manual ignition of the pilot burners.
TURN THE SELECTOR SWITCH AUTO/MANUAL
a) The system can operate with manual or auto condition
TURN THE SELECTOR SWITCH AUTO/MANUAL TO MANUAL POSITION
1. MANUAL/HS-101 will be ON
2. Open manual ball valve (VB-01) before and ball valve (VB-02) after pressure regulator valve (PCV001) at instrument air line.
3. Open manual ball valve (VB-03) before and ball valve (VB-04) after pressure regulator valve (PCV002) at fuel gas line.
4. Open manual ball valve (VB-05) & ball valve (VB-06) before and ball valve (VB-07) after pressure
regulator valve (PCV-003) at fuel gas line to pilot gas.
5. See pressure indicator (PI-001) at instrument air line, approx. 1.4 barg.
6. See pressure indicator (PI-002) at fuel gas line, approx.0.4 barg.
7. See pressure indicator (PI-003) at fuel gas line, approx. 1.5 barg.
8. Ignite For FFG #1 / Pilot #1
9. Open bypass ball valve (VB-08) for pilot #1
10. Press FFG MANUAL#1 to ignite chamber #1, see sight port to show fire ball, and fire ball will send to
Pilot #1. Closed ball valve (VB-08).
11. Ignite For FFG #2 / Pilot #2
12. Open bypass ball valve (VB-09) for pilot #2
13. Press FFG MANUAL#2 to ignite chamber #2, see sight port to show fire ball, and fire ball will send to
Pilot #2. Closed ball valve (VB-09)
14. Ignite For FFG #3 / Pilot #3
15. Open bypass ball valve (VB-10) for pilot #3
16. Press FFG MANUAL#3 to ignite chamber #3, see sight port to show fire ball, and fire ball will send to
Pilot #3. Closed ball valve (VB-10)
Please push momentary only, do not hold more than 3 seconds.

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 10 of 12

3.4.2 Auto Oper ation


TURN THE SELECTOR SWITCH AUTO/MANUAL HS-101 TO AUTO POSITION
1. AUTO/HS-101 will be ON
2. Open manual ball valve (VB-01) before and ball valve (VB-02) after pressure regulator valve (PCV001) at instrument air line.
3. Open manual ball valve (VB-03) before and ball valve (VB-04) after pressure regulator valve (PCV002) at fuel gas line.
4. Open manual ball valve (VB-05) & ball valve (VB-06) before and ball valve (VB-07) after pressure
regulator valve (PCV-003) at fuel gas line to pilot gas.
5. See pressure indicator (PI-001) at instrument air line, approx. 1.4 barg.
6. See pressure indicator (PI-002) at fuel gas line, approx.0.4 barg.
7. See pressure indicator (PI-003) at fuel gas line, approx. 1.5 barg.
8. Press SYSTEM START (PB-101) to produce spark plug at ignition chamber.
9. Shut off Valve for pilot #1 (SV-001), pilot #2 (SV-002), pilot #3 (SV-003) will control automatically
from PLC
10. Sequence of ignition begin. See logic diagram for detail
11. See sight port at spark plug to show fire ball (Ignition Chamber)
12. Fire ball will send to pilot and ignition successful.
13. Pilot fuel gas line will maintain fire at pilot gas line.
14. After FFG Pilot show the temperature till 300 C, all lamp pilot off is off , if each of the pilot fail to
ignite till 5 minute, the alarm will be ON (Fail Status).
Note :
1. This process depend on the pilot condition, where pilot detection temperature below 300 OC, it will work
for that line, but only one line permissive to open due to operation procedure.
2. Make sure all bypass ball valve is closed.
3. See attached flow chart and cause and effect for your reference.

TESTED BY

WITNESSED BY

WITNESSED BY

KMI

WIKA

PERTAMINA GAS

10

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

Date :
21/05/14
Page 11 of 12

4. PUNCH LIST
ITEM

VERIFICATION

DESCRIPTION

ACTION BY

11

RESULT

SIGN

PAKET 1 : JASA PERANCANGAN, PENGADAAN DAN


KONSTRUKSI PEMBANGUNAN SKG RANTAU
PANJANG DAN SKG PANGKALAN BRANDAN
SLS-35-MEC-PR-022

Rev. A

FAT PROCEDURE FLARE PACKAGE


RANTAU PANJANG

ATTACHMENT

12

Date :
21/05/14
Page 12 of 12

LOGIC DIAGRAM
RANTAU PANJANG

KOTA MINYAK INTERNUSA


CLIENT :
PT. PERTAMINA GAS
CONTRACTOR :
PT. WIJAYA KARYA
PROJECT :
FLARE STACK PACKAGE AND FLARE IGNITION PACKAGE
PROYEK JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN
DRW TITLE :

NOTES

WIKA-RPA-FI-PID-001

P&ID

8 MAY 2014

DRAWING NO.

DESCRIPTION

REV

DATE

REFERENCE DRAWING

LOGIC DIAGRAM RANTAU PANJANG

ISSUED FOR APPROVAL

RASH

MDY

HNK

WIKA

DESCRIPTION

DRW

CHK

APP

CUST

DATE

DRAWING NUMBER

SHEET

APP

8 MAY 2014

WIKA-PBR-FI-EE-003

1 FROM 4

REVISION

DESIGN OFFICE

SYMBOL

MEANING
Prosess
Decission
Controll Transfer

Terminator
On Page-reference
Y

yes

no

Pilot

not Pilot

T DN

Timer Finish Counting

Alarm On

Alarm Horn On & General Alarm On

KOTA MINYAK INTERNUSA


CLIENT :
PT. PERTAMINA GAS
CONTRACTOR :
PT. WIJAYA KARYA
PROJECT :
FLARE STACK PACKAGE AND FLARE IGNITION PACKAGE
PROYEK JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN
DRW TITLE :

NOTES

WIKA-RPA-FI-PID-001

P&ID

8 MAY 2014

DRAWING NO.

DESCRIPTION

REV

DATE

REFERENCE DRAWING

LOGIC DIAGRAM RANTAU PANJANG

ISSUED FOR APPROVAL

RASH

MDY

HNK

WIKA

DESCRIPTION

DRW

CHK

APP

CUST

DATE

DRAWING NUMBER

SHEET

APP

8 MAY 2014

WIKA-PBR-FI-EE-003

2 FROM 4

REVISION

DESIGN OFFICE

POWER ON

AUTO

Y
N

System Start

Y
Y
Y

PILOT 1 OFF
Y
N

Process A

PILOT 1 OFF

System Reset
Y
Y

PILOT 2 OFF

Process B

PILOT 2 OFF
N

ALL SOV
CLOSED
(001,002,003)
ALL IGN
STOP(1,2,3)
ALARM ON

Y
PILOT 3 OFF

Process C

PILOT 3 OFF

KOTA MINYAK INTERNUSA

N
N

System Stop
Y

Pilot Flame
Failure

PILOTS ON

CLIENT :

Standby Mode

PT. PERTAMINA GAS


CONTRACTOR :

PT. WIJAYA KARYA


- PILOT 1 OFF if TE-117A <= 300 OC
- PILOT 2 OFF if TE-117B <= 300 OC
- PILOT 3 OFF if TE-117C <= 300 OC
- PILOTS ON = PILOT 1 OFF & PILOT
2 OFF & PILOT 3 OFF
- PILOT FLAME FAILURE if after 5
minutes after start ALL PILOTS NOT
ON (Only for Auto Mode)
- Standby Mode = immediately reignite the pilot if one/all the pilots
turned off
NOTES

PROJECT :
FLARE STACK PACKAGE AND FLARE IGNITION PACKAGE
PROYEK JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN
DRW TITLE :
WIKA-RPA-FI-PID-001

P&ID

8 MAY 2014

DRAWING NO.

DESCRIPTION

REV

DATE

REFERENCE DRAWING

LOGIC DIAGRAM RANTAU PANJANG

ISSUED FOR APPROVAL

RASH

MDY

HNK

WIKA

DESCRIPTION

DRW

CHK

APP

CUST

DATE

DRAWING NUMBER

SHEET

APP

8 MAY 2014

WIKA-PBR-FI-EE-003

3 FROM 4

REVISION

DESIGN OFFICE

MANUAL

Ignition TRF 2
OFF

Ignition TRF 1
OFF

FFG MANUAL 1

FFG MANUAL 2

FFG MANUAL 3
Y

Ignition TRF 2 ON

Ignition TRF 1 ON

FFG MANUAL 1

Ignition TRF 3
OFF

FFG MANUAL 2

Ignition TRF 3 ON

FFG MANUAL 3

KOTA MINYAK INTERNUSA


CLIENT :
PT. PERTAMINA GAS
CONTRACTOR :
PT. WIJAYA KARYA
PROJECT :
FLARE STACK PACKAGE AND FLARE IGNITION PACKAGE
PROYEK JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN

- PILOT 1 OFF if TE-117A <= 300 OC


- PILOT 2 OFF if TE-117B <= 300 OC
- PILOT 3 OFF if TE-117C <= 300 OC
- PILOTS ON = PILOT 1 OFF & PILOT
2 OFF & PILOT 3 OFF

NOTES

DRW TITLE :
LOGIC DIAGRAM RANTAU PANJANG

WIKA-RPA-FI-PID-001

P&ID

8 MAY 2014

ISSUED FOR APPROVAL

RASH

MDY

HNK

WIKA

DRAWING NO.

DESCRIPTION

REV

DATE

DESCRIPTION

DRW

CHK

APP

CUST

DATE

DRAWING NUMBER

SHEET

APP

8 MAY 2014

WIKA-PBR-FI-EE-003

4 FROM 4

REFERENCE DRAWING

REVISION

DESIGN OFFICE

S-ar putea să vă placă și