TP.01.03/U.DEP.IP
GENERAL
.SKG/1922/11/2014
DOCUMENT NUMBER :
16 PAGES
SLS-35-MEC-PR-022
21/05/14
Rev.
Date
Status
MDY
MDY
HNK
Prep'd
Checked
Approved
PT KOTAMINYAK INTERNUSA
Checked
Approved
WIKA
PERTAGAS
Date :
21/05/14
Rev. A
Page 2 of 12
REVISION SHEET
REVISION
CODE
Page
A
REVISION
CODE
Page
D
REVISION
CODE
Page
D
Page
D
REVISION
CODE
A
Appe
ndix
REVISION
CODE
A
Rev. A
Date :
21/05/14
Page 3 of 12
REVISION SHEET
Rev.
Code
Chapter
Page
Implementation
Comment (Yes/No)
Note
Remarks
Rev. A
Date :
21/05/14
Page 4 of 12
Table of Content
1. General
2. References
3. Control Panel Test
3.1 Visual Inspection Test
3.2 Electrical System Power Up
3.3 PLC I/O
3.3.1. PLC Digital Input
3.3.2. PLC Digital Output
3.4 Function Test Process
3.4.1 Manual Operation
3.4.2 Auto Operation
4. Punch List
ATTACHMENT
5
5
5
5
6
6
6
8
6
6
10
11
12
Rev. A
Date :
21/05/14
Page 5 of 12
1.GEN ERAL
Factory Acceptance Test (FAT) is the stage to justify, show and prove that all process and activities such
as fabrication, panel assembly, programming etc are in accordance with the documents specification and meet
the user requirements.
The Purpose of this document is to define the procedure of Factory Acceptance Test of the Process
Control of Pilot Flame Flare Ignition and Shutdown System. The test will also include Visual Inspection Test,
Electrical System Power Up, PLC I/O and Cause and Effect. HP/LP Flare local control panel.
2. R EFEREN CES
1
P&ID (WIKA-RPA-FI-PID-001)
DESCRIPTION
DIMENSIONAL CHECK
ENCLOSURE DETAILS
-Flatness and Smoothness
-Panel Arrangement
-Dimension
-Enclosure doors
*Open and shut freely
*Lock securely
*Seal
COMPONENTS
Completeness and correctness of components
(comply with equipment List)
ACCEPTABLE SIGNATURE
Rev. A
Date :
21/05/14
Page 6 of 12
ITEM TO BE INSPECTED
RESULT
CONFIRM
Main Power
DISTRIBUTION MCB
2
PLC
CONFIRM
6
7
8
9
10
11
12
13
14
15
16
Rev. A
Date :
21/05/14
Page 7 of 12
AUTO
I1.7
MANUAL
I1.8
ESD
I1.9
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
I1.10
I1.11
I1.12
I1.13
I1.14
I1.15
Spare
Spare
Spare
Spare
Spare
Spare
P&ID TAG
Manual (UI-102)
Auto (UI-103)
Pilots On (UI-104)
Pilot #1 Off (UI-105)
Pilot #2 Off (UI-106)
Pilot #3 Off (UI-107)
SV-001 Open (UI-108)
SV-002 Open (UI-109)
SV-003 Open (UI-110)
Ignition Chamber #1
Ignition Chamber #2
Ignition Chamber #3
Alarm Horn
Lamp Test
Spare
Spare
TAG NAME
PROGRAM
Manual Indicating
Auto
Pilots On
Pilot #1 Off
Pilot #2 Off
Pilot #3 Off
SV-001
SV-002
SV-003
Ignition Transformer #1
Ignition Transformer #2
Ignition Transformer #3
Horn
Lamp Test
Spare
Spare
PLC
ADDRESS
O1.0
O1.1
O1.2
O1.3
O1.4
O1.5
O1.6
O1.7
O1.8
O1.9
O1.10
O1.11
O1.12
O1.13
O1.14
O1.15
DEFINITION
Manual FFG Ignition
Auto FFG Ignition
All Pilots is On
Pilot #1 is Off
Pilot #2 is Off
Pilot #3 is Off
SOV 001 OPEN
SOV 002 OPEN
SOV 003 OPEN
Ignition on Chamber #1
Ignition on Chamber #2
Ignition on Chamber #3
Alarm Horn
Lamp Test
Spare
Spare
CONFIRM
Rev. A
Date :
21/05/14
Page 8 of 12
Digital Output 02
NO
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
P&ID TAG
Common Alarm (XA101)
Pilot Flame Failure (XA102)
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
TAG NAME
PROGRAM
PLC
ADDRESS
DEFINITION
Common Alarm
O2.0
Common Alarm
O2.1
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
O2.2
O2.3
O2.4
O2.5
O2.6
O2.7
O2.8
O2.9
O2.10
O2.11
O2.12
O2.13
O2.14
O2.15
All Pilots is On
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
CONFIRM
Rev. A
Date :
21/05/14
Page 9 of 12
Rev. A
Date :
21/05/14
Page 10 of 12
TESTED BY
WITNESSED BY
WITNESSED BY
KMI
WIKA
PERTAMINA GAS
10
Rev. A
Date :
21/05/14
Page 11 of 12
4. PUNCH LIST
ITEM
VERIFICATION
DESCRIPTION
ACTION BY
11
RESULT
SIGN
Rev. A
ATTACHMENT
12
Date :
21/05/14
Page 12 of 12
LOGIC DIAGRAM
RANTAU PANJANG
NOTES
WIKA-RPA-FI-PID-001
P&ID
8 MAY 2014
DRAWING NO.
DESCRIPTION
REV
DATE
REFERENCE DRAWING
RASH
MDY
HNK
WIKA
DESCRIPTION
DRW
CHK
APP
CUST
DATE
DRAWING NUMBER
SHEET
APP
8 MAY 2014
WIKA-PBR-FI-EE-003
1 FROM 4
REVISION
DESIGN OFFICE
SYMBOL
MEANING
Prosess
Decission
Controll Transfer
Terminator
On Page-reference
Y
yes
no
Pilot
not Pilot
T DN
Alarm On
NOTES
WIKA-RPA-FI-PID-001
P&ID
8 MAY 2014
DRAWING NO.
DESCRIPTION
REV
DATE
REFERENCE DRAWING
RASH
MDY
HNK
WIKA
DESCRIPTION
DRW
CHK
APP
CUST
DATE
DRAWING NUMBER
SHEET
APP
8 MAY 2014
WIKA-PBR-FI-EE-003
2 FROM 4
REVISION
DESIGN OFFICE
POWER ON
AUTO
Y
N
System Start
Y
Y
Y
PILOT 1 OFF
Y
N
Process A
PILOT 1 OFF
System Reset
Y
Y
PILOT 2 OFF
Process B
PILOT 2 OFF
N
ALL SOV
CLOSED
(001,002,003)
ALL IGN
STOP(1,2,3)
ALARM ON
Y
PILOT 3 OFF
Process C
PILOT 3 OFF
N
N
System Stop
Y
Pilot Flame
Failure
PILOTS ON
CLIENT :
Standby Mode
PROJECT :
FLARE STACK PACKAGE AND FLARE IGNITION PACKAGE
PROYEK JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN SKG RANTAU PANJANG DAN SKG PANGKALAN
BRANDAN
DRW TITLE :
WIKA-RPA-FI-PID-001
P&ID
8 MAY 2014
DRAWING NO.
DESCRIPTION
REV
DATE
REFERENCE DRAWING
RASH
MDY
HNK
WIKA
DESCRIPTION
DRW
CHK
APP
CUST
DATE
DRAWING NUMBER
SHEET
APP
8 MAY 2014
WIKA-PBR-FI-EE-003
3 FROM 4
REVISION
DESIGN OFFICE
MANUAL
Ignition TRF 2
OFF
Ignition TRF 1
OFF
FFG MANUAL 1
FFG MANUAL 2
FFG MANUAL 3
Y
Ignition TRF 2 ON
Ignition TRF 1 ON
FFG MANUAL 1
Ignition TRF 3
OFF
FFG MANUAL 2
Ignition TRF 3 ON
FFG MANUAL 3
NOTES
DRW TITLE :
LOGIC DIAGRAM RANTAU PANJANG
WIKA-RPA-FI-PID-001
P&ID
8 MAY 2014
RASH
MDY
HNK
WIKA
DRAWING NO.
DESCRIPTION
REV
DATE
DESCRIPTION
DRW
CHK
APP
CUST
DATE
DRAWING NUMBER
SHEET
APP
8 MAY 2014
WIKA-PBR-FI-EE-003
4 FROM 4
REFERENCE DRAWING
REVISION
DESIGN OFFICE