Project Information

Traffic Generation

Traffic 100

No

No need
for TIS

Yes
TIS Required
Define
- Study Area
- Horizon Year
- Acceptable Condition
Existing Year
- Field Survey
- Traffic Count & Balance
- Control Characteristics

Capacity Analysis of
the Existing Condition

Check with
Field Data

Calibrate Model
Parameter

No

Yes
Future (Horizon) Year
- Road Network Information
- Estimated Traffic Volume
- Other Developments

Capacity Analysis of the


Background Condition
(Future Year without Project)

Acceptable
Condition

Mitigation
Measures

No

Yes
Future Year with Project
- Background Flow +
- Estimated Project Traffic
(from Demand Forecasting)

Capacity Analysis of the


Future Year with Project
Condition

Acceptable
Condition

Mitigation
Measures

No

Yes
Project Approval
(Traffic Impact Aspect Only)

Traffic Impact Study Framework