Documente Academic
Documente Profesional
Documente Cultură
Traffic Generation
Traffic 100
No
No need
for TIS
Yes
TIS Required
Define
- Study Area
- Horizon Year
- Acceptable Condition
Existing Year
- Field Survey
- Traffic Count & Balance
- Control Characteristics
Capacity Analysis of
the Existing Condition
Check with
Field Data
Calibrate Model
Parameter
No
Yes
Future (Horizon) Year
- Road Network Information
- Estimated Traffic Volume
- Other Developments
Acceptable
Condition
Mitigation
Measures
No
Yes
Future Year with Project
- Background Flow +
- Estimated Project Traffic
(from Demand Forecasting)
Acceptable
Condition
Mitigation
Measures
No
Yes
Project Approval
(Traffic Impact Aspect Only)