UND
METRADO
P.U.
m2
m2
9.00
9.00
186.79
186.79
m2
ml
150.00
220.00
2.90
2.85
m3
m3
m3
44.00
15.00
35.00
35.00
14.00
30.00
m3
m3
m2
44.00
13.20
176.00
198.90
380.50
35.00
ml
unid
220.00
57.00
58.90
8.00
unid
unid
57.00
57.00
57.60
15.00
UND
METRADO
P.U.
9.00
9.00
186.79
186.79
150.00
220.00
2.90
2.85
118.00
30.00
120.00
35.00
14.00
30.00
3.00
110.00
13.20
176.00
280.60
198.90
280.60
35.00
12.60
2014.60
233.00
380.00
5.20
35.00
630.00
83.50
210.00
220.00
28.00
28.00
OS ILO
1681.11
1681.11
435.00
627.00
1540.00
210.00
1050.00
8751.60
5022.60
6160.00
12958.00
456.00
3283.20
855.00
44710.62
7600.81
52311.43
9416.06
61727.48
PARTIDA
1,00 OBRAS PROVISIONALES
1,01 Caseta de guardian y almacen
1,02 oficina de de supervision
2,00 TRABAJOS PRELIMINARES
2,01 Limpieza de la zona de trabajo
2,02 Trazo y replanteo
3,00 MOVIMIENTO DE TIERRAS
3,01 Zanja de 0.40 x 0.40
UND
METRADO
m2
m2
9.00
9.00
m2
ml
150.00
220.00
m3
44.00
m3
11.68
ml
unid
ml
396.00
73.00
660.00
unid
unid
73.00
73.00
ISTA
1,681.11
1,681.11
0.00
435.00
627.00
0.00
4,130.00
420.00
3,600.00
0.00
841.80
21,879.00
3,703.92
6,160.00
0.00
0.00
4,788.00
10,475.92
8,155.00
0.00
52,605.00
0.00
5,880.00
6,160.00
133,222.86
22,647.89
155,870.75
28,056.73
183,927.48
PARTIDA
1,00 OBRAS PROVISIONALES
1,01 Caseta de guardian y almacen
1,02 oficina de de supervision
2,00 TRABAJOS PRELIMINARES
2,01 Limpieza de la zona de trabajo
2,02 Trazo y replanteo
3,00 MOVIMIENTO DE TIERRAS
3,01 Zanja de 0,40 X 0,50
3,02 relleno con material propio
3,03 eliminacion de material excedente
4,00 CONCRETO SIMPLE
UND
METRADO
m2
m2
9.00
9.00
m3
m3
150.00
220.00
m3
m3
m3
61.60
11.00
65.78
44.00
14.86
198.10
7.88
1054.85
105.12
376.39
96.36
79.24
DE MALLA
P.U.
PARCIAL
186.79
186.79
1,681.11
1,681.11
2.90
2.85
435.00
627.00
35.00
1,540.00
198.90
2,323.15
21.81
8.00
1.00
8,638.67
584.00
660.00
72.00
15.00
5,256.00
1,095.00
24,521.04
4,168.58
28,689.62
5,164.13
33,853.75
ILLO CARAVISTA
P.U.
PARCIAL
186.79
186.79
1,681.11
1,681.11
2.90
2.85
435.00
627.00
35.00
14.00
30.00
2,156.00
154.00
1,973.40
198.90
280.60
35.00
8,751.60
4,169.01
6,933.50
380.00
5.20
35.00
2,995.92
5,485.22
3,679.20
83.50
31,428.57
28.00
28.00
2,698.08
2,218.72
77,067.44
13,101.46
90,168.90
16,230.40
106,399.31
Hay 73 columnas
Concreto
Encofrado
Acero
4 fierros de 1/2"
21 Estribos por columna
Tarrajeo columnas
Sobrecimiento
Concreto
Encofrado
Tarrajeo sobrecimientos
Excavacin
Cimiento concreto
Sobrecimiento concreto
Encofrado sobrec.
Relleno
Excedentes
Muro de soga
Certco con malla
Excavacin
Cimiento postes
Malla
Costo de malla por m
73.00
73.00
2.40
2.40
0.30
0.30
0.15
2.00
7.88
105.12
73.00
73.00
73.00
4.00
13.00
0.30
2.80
1.00
2.20
1.00
0.25
2.00
817.60
237.25
96.36
220.00
-21.90
0.50
1.00
0.15
198.10
198.10
0.40
198.10
198.10
79.24 m
220.00
220.00
198.10
198.10
220.00
50.60
0.70
0.50
0.50
1.00
0.05
1.30
0.40
0.40
0.15
198.10 m
11.00 m
65.78 m
198.1
1.90
376.39 m
73.00
73.00
220.00
58.90
0.40
0.40
1.80
2.70
0.40
0.40
396.00 m
21.81 m
61.60 m
44.00 m
14.86 m
11.68 m
11.68
m
m
1,054.85 Kg
m
14.86 m
m