Ray Khan, Product Manager (LPCW), 5th September 2014

IEC 62305 3: Physical damage to


structures and life hazard
Maintenance & Inspection

Maintenance and Inspection of LPS


62305-3

BS6651 inspect/test annually (11 months)


Maximum period between inspections (62305-3)
Protection
level

ABB Group
September 7, 2014 | Slide 3

Visual
inspection
(year)

Complete
inspection
(year)

Critical
systems *
complete
inspection
(year)

I and II

III and IV

Inspection & maintenance of LPMS


62305-4

Aim:

LPMS complies with design

LPMS will perform according to design function

Additional protection measures correctly integrated

ABB Group
September 7, 2014 | Slide 4

Inspection & maintenance of LPMS

Inspection:
Check & update technical documentation
Visual inspection:
1.
Conductors & shields intact
2.
Line routeings maintained
3.
Any additions to installation should be protected
4.
SPDs reconnected after flash test
5.
Status indication checked

ABB Group
September 7, 2014 | Slide 5

Inspection & maintenance of LPMS


Inspections to be carried out:

During installation

After installation

Periodically thereafter

After alteration of components relevant to LPMS

After lightning strike to structure

ABB Group
September 7, 2014 | Slide 6