STATION - SIMHADRI
UNIQUE REF :
SHEET 1 OF 6
SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:
SL.NO.
1
REF : NO
SL. NO.
AMPS:
CONTENTS
Documents required
PAGE NO.
2
General Inspection/Checks
Defects/Omissions
CONTRACTORS SIGNATURE
ERECTION
FQA
O&M
ELECTRICAL
UNIQUE REF :
DATE
STATION - SIMHADRI
SL.NO.
SHEET 2 OF 6
REF : NO
DOCUMENTATION REQUIRED
1.1
1.2
O & M Manuals
1.3
1.4
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
SL.NO.
2
SHEET 3 OF 6
REF : NO
2.1
2.2
2.3
2.4
2.5
2.6
Checked the size of Earth bus and found OK as per the specifications.
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
SL.NO.
3
SHEET 4 OF 6
REF : NO
3.1
Checked the insulation resistance of the breaker (Record values in sheet attached).
3.2
Checked the motor operated spring charging mechanism of the closing circuit.
3.3
Checked the manual operation of the breaker in 'TEST' and 'WITHDRAWN' positions
3.4
3.5
Checked the operation of the closing coil with supply voltage of 85% to 110%
of rated voltage.
3.6
Checked the operation of the tripping coil with supply voltage of 70% to 120%
of rated voltage.
3.7
3.8
4.1
4.2
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 415 V AC DISTRIBUTION BOARD
SL.NO.
5
5.1
6
6.1
SHEET 5 OF 6
REF : NO
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT :415 V AC DISTRIBUTION BOARD
SL.NO.
SHEET 6 OF 6
REF : NO
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD
SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:
SHEET 1 OF 8
REF : NO
SL. NO.
AMPS:
SL.NO.
1
CONTENTS
Documents required
PAGE NO.
2
Defects OR / Omissions
CONTRACTORS SIGNATURE
ERECTION
FQA
O&M
ELECTRICAL
UNIQUE REF :
DATE
SL.NO.
SHEET 2 OF 8
REF : NO
DOCUMENTATION REQUIRED
1.1
1.2
O & M Manuals
1.3
1.4
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD
SL.NO.
2
SHEET 3 OF 8
REF : NO
2.1
2.2
2.3
2.4
Checked the size of Earth bus and found OK as per the specifications.
2.5
Sequence checks across all modules as per the single line diagram attached
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD
SL.NO.
SHEET 4 OF 8
REF : NO
2.6
2.7
2.8
2.9
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT :DC DISTRIBUTION BOARD
SL.NO.
3
3.1
SHEET 5 OF 8
REF : NO
3.1.1
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)
(+VE)
(-VE)
3.1.2
Contact resistance
3.1.3
Fuse Rating
3.2
3.2.1
Battery Incomer - 1
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)
3.2.2
Contact resistance
(+VE)
(-VE)
3.2.3
Fuse rating
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD
SL.NO.
SHEET 6 OF 8
REF : NO
3.3
Charger Incomer - 2
3.3.1
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)
(+VE)
(-VE)
3.3.2
Contact resistance
3.3.3
Fuse Rating
3.4
3.4.1
Battery Incomer - 2
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)
3.4.2
Contact resistance
(+VE)
(-VE)
3.4.3
Fuse rating
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
SHEET 7 OF 8
SL.NO.
3.5
3.5.1
3.5.2
REF : NO
Contact resistance
(+VE)
(-VE)
4.1
Fuse rating
4.2
4.3
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD
SL.NO.
SHEET8 OF 8
REF : NO
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : AUXILIARY
TRANSFORMER
REF : NO
SUPPLIER :
MANUFACTURER
RATING:
SL.NO.
1
SHEET 1 OF 17
TRANSFORMER SL NO.
LOCATION :
IDENTIFICATION NO :
CONTENTS
PAGE NO.
Documents required
Specifications
General Inspection/Checks
Defects/Omissions
16
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
SHEET 2 OF 17
REF : NO
DOCUMENTATION REQUIRED
1.1
1.2
1.3
1.4
1.5
O & M Manuals
1.6
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
SHEET 3 OF 17
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
SPECIFICATIONS
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
Applicable standards
No. of Units
Type of cooling
MVA Rating(HV)
MVA Rating(LV)
No load Voltage(HV)
No load Voltage(LV)
Line current(HV)
Line current(LV)
No. of Phases
Frequency
Vector Group
Impedance (50 MVA Base)
HV-LV (Normal tap)
HV-LV ( tap1)
HV-LV ( tap5)
3
3.1
3.2
3.3
REF : NO
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
LV / HV side
TEMPERATURE RISES
Oil by thermometer
: 50 deg c
Ambient temperature
: 50 deg c
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
SHEET 4 OF 17
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
5
REF : NO
SPECIFICATIONS
INSULATION LEVELS
HV
LV
: 80 LI1425 AC 38
: LI 75 AC 38
WEIGHT (kg)
Core and winding
Weight of Oil
Total weight of Transformer with oil
OIL QUANTITY
: 17900
: 9790
: 40300
(LITRES)
: 11000
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
SHEET 5 OF 17
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
1
REF : NO
1.1
1.2
1.3
Measure the IR value of the bushing with a 2.5 KV/5 KV megger between
terminal and flange. It should not be less than 10,000 Mega Ohms.
(not less than 200 Mega Ohms if measured by 500 v/ 1 KV megger)
R- PHASE
Y-PHASE
B PHASE
HV
LV
NEUTRAL
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
2
SHEET 6 OF 17
SILICAGEL BREATHER
3.1
Ensure that silicagel is filled completely in the breather and in blue colour.
3.2
Ensure that brass oil cup with transformer oil to the indicated level.
Flag :-
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
5
SHEET 7 OF 17
REF : NO
5.1
5.2
Operating temperature
Reset temperature
Remote indication found OK.
BUCHHOLZ RELAY
7.1
Alarm Circuit : Slowly pump air in to the relay via the pet cock fitted at the
back of the relay and observe for alarm.
7.2
Trip Circuit : Suddenly apply air pressure and observe for tripping command.
8
8.1
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
SL.NO.
9
SHEET 8 OF 17
REF : NO
9.1
OTI alarm
9.2
WTI alarm
9.3
Buchholz alarm
9.4
9.5
9.6
OTI trip
9.7
WTI trip
9.8
Buchholz trip
9.9
10
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
11
SHEET 9 OF 17
11.1
11.2
12
12.1
Check the manual operation of the tap changer through the total operating
cycle.
12.2
REMARKS
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
SL.NO.
SHEET 10 OF 17
REF : NO
13
14
15
16
17
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
18
19
SHEET 11 OF 17
Main winding
a) HV/LV+E
b) LV/HV+E
c) HV/LV
Core - Earth
TIME:
MEGGER USED
TEMP:
IR VALUE
REMARKS
500 V
R-PHASE
Y-PHASE
B-PHASE
R- PHASE
Y- PHASE
B- PHASE
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
REF : NO
SL.NO.
20
SHEET 12 OF 17
WINDING
TAP NO.
1
2
3
4
5
HV
WINDING
R-PHASE
Y-PHASE
B-PHASE
TEMP
REMARKS
LV
WINDING
21
YNd11
Diagram of Connections
as required
Diagram of connections as
connected for test
1R, 2r
1R, 2r
2y
2y
2b
2b
1N
1N
1B
1B
1Y
1Y
VOLTAGE APPLIED
3-Phase voltage is applied to the H.V Side
1R-2b
1R-1N
1R & 2r shorted
1B-2b
2b-1Y
CONDITIONS TO BE PROVED
1
2
3
4
1B-2y
2y-1Y
ACTUAL VALUES
1R-2b+1N-2b = 1R-1N
1R-2y = 1R-2b = 2y-2b
1B-2y>1B-2b
1Y-2b = 1B-2b
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
22
RY
23
SHEET 13 OF 17
RN
PRIMARY
YB
YN
BR
RY
SECONDARY
YB
BR
MAGNETISATION CURRENT
a. Apply 3-Phase 415 Volt on HV Terminals and keep LV open.
Voltage applied
RY VOLTS
YB . VOLTS
RB . VOLTS
Current measured
R . m Amps
Y .. m Amps
B .. m Amps
Remarks
Current measured
R . m Amps
Y .. m Amps
B .. m Amps
Remarks
Voltage applied
RY VOLTS
YB . VOLTS
RB . VOLTS
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
24
SHEET 14 OF 17
25
L.V.CURRENT
TAN DELTA
LV/HV+TANK
EARTHED
26
FINAL IR CHECKINGS
The megger readings finally after the transformer is connnected to the system
Date :
Time:
Megger used
Windin gs
Temp:
HV/E
LV/E
HV/LV
27 SETTINGS
WTI Setting
Alarm
Trip
Proved
OTI Setting
Set for
Proved
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
REF : NO
SL.NO.
28
SHEET 15 OF 17
SET FOR
ALARM
TRIP
REMARKS
1
2
3
4
5
6
7
8
9
10
11
12
13
29
NEUTRAL CTs
INSULATION RESISTANCE
ACROSS TERMINALS
HV NEUTRAL
LV NEUTRAL
CORE1 - EARTH
CORE2 - EARTH
CORE1 -CORE 2
RATIO CHECK:
PRIMARY CURRENT IN AMPS
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
UNIQUE REF :
SL.NO.
SHEET 16 OF 17
REF : NO
HV NEUTRAL
LV NEUTRAL
HV NEUTRAL
LV NEUTRAL
POLARITY CHECKING
CORE
CORE 1
CORE 2
30
a)
b)
CT Ratio
OTI
WTI
Ambient
c)
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER
SL.NO.
UNIQUE REF :
SHEET 17 OF 17
REF : NO
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV CABLES
SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:
RATING:
SIZE:
SL.NO.
1
SHEET 1 OF 5
REF : NO
AMPS:
NO. OF CORES:
LOCATION
CONTENTS
PAGE NO.
Documents required
General Inspection/Checks
Defects/Omissions
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV CABLES
SL.NO.
SHEET 2 OF 5
REF : NO
DOCUMENTATION REQUIRED
1.1
O & M Manuals
1.2
1.3
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV CABLES
SL.NO.
SHEET 3 OF 5
REF : NO
2.1
Check the cable throughout the length for any defects or damage
2.2
2.3
2.4
Check that cable is given extra length at terminations to facilitage future maintainance work.
2.5
2.6
2.7
2.8
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV CABLES
REF : NO
SL.NO.
2.9
SHEET 4 OF 5
2.10
Insulation Resistance
Termibnals Value in M Ohms
R to Y
Y to B
B to R
R+Y+B to Gland
2.11
..
Voltage
AC/DC
for ..
Minute(s)
Current
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV CABLES
SL.NO.
SHEET 5 OF 5
REF : NO
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:
SL.NO.
1
UNIQUE REF :
SHEET 1 OF 9
REF : NO
SL. NO.
VOLTS:
AMPS:
CONTENTS
PAGE NO.
Documents required
General Inspection/Checks
Defects/Omissions
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV CABLES
SL.NO.
SHEET 2 OF 9
REF : NO
DOCUMENTATION REQUIRED
1.1
1.2
O & M Manuals
1.3
1.4
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
UNIQUE REF :
REF : NO
SL.NO.
2
SHEET 3 OF 9
2.1
2.2
2.3
2.4
2.5
Y-Phase
B-Phase
Joint 1
Joint 2
2.6
2.7
Checked the size of Earth bus and found OK as per the specifications.
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
UNIQUE REF :
SL.NO.
3
SHEET 4 OF 9
REF : NO
3.1
Checked the insulation resistance of the breaker (Record values in sheet attached).
3.2
Checked the motor operated spring charging mechanism of the closing circuit.
3.3
Checked the manual operation of the breaker in 'TEST' and 'WITHDRAWN' positions
3.4
3.5
Checked the operation of the closing coil with supply voltage of 85% to 110% of rated voltage.
3.6
Checked the operation of the tripping coil with supply voltage of 70% to 120% of rated voltage.
3.7
R/Y/B =
3.8
R/Y/B =
3.9
R/Y/B =
R/Y/B =
3.10.
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
UNIQUE REF :
SL.NO.
4
SHEET 5 OF 9
REF : NO
4.1
4.2
4.3
4.4
Checked the insulation resistance of the PT (Values to be recorded in the format attatched).
5.1
5.2
FINAL IR CHECKS
Insulation resistance of the board has been checked with all modules inserted and with all breakers in
closed condition.
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
UNIQUE REF :
SHEET 6 OF 9
REF : NO
SL.NO.
Sl.No.
Between
Value
(Mohms)
Remarks
Sl.No.
Between
Value (Micro
ohms)
Remarks
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
UNIQUE REF :
EQUIPMENT : 33 KV
SWITCHGEAR
SHEET 7 OF 9
REF : NO
SL.NO.
TERMINALS
CT SL. NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
OF CURRENT TRANSFORMERS
DESIGNATION: INCOMER 1
Y-PHASE
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
BUS COUPLER
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
PANEL N0 :
R-PHASE
Y-PHASE
DESIGNATION:
B-PHASE
Remarks
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
UNIQUE REF :
SHEET 8 OF 9
REF : NO
SL.NO.
VT RATIO TEST
VT SL NO. Pri. Volts
Sec. Amps
Sec. Volts
Theo. Ratio
Actual Ratio
Remarks
Theo. Ratio
Actual Ratio
Remarks
B PHASE
B- E .M Ohms
B-B' .M Ohms
CB SL. NO:
CONDITION
CLOSE
OPEN
R PHASE
R- E .M Ohms
R- R' .M Ohms
Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms
B PHASE
B- E .M Ohms
B-B' .M Ohms
CB SL. NO:
CONDITION
CLOSE
OPEN
R PHASE
R- E .M Ohms
R- R' .M Ohms
Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms
B PHASE
B- E .M Ohms
B-B' .M Ohms
CB SL. NO:
CONDITION
CLOSE
OPEN
R PHASE
R- E .M Ohms
R- R' .M Ohms
Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms
B PHASE
B- E .M Ohms
B-B' .M Ohms
CB OPERATION TIMINGS
CB SL. NO
CONDITION
R PHASE
milli secs
CLOSE
milli secs
OPEN
milli secs
C- O TIME
Y PHASE
milli secs
milli secs
milli secs
B PHASE
milli secs
milli secs
milli secs
CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME
R PHASE
milli secs
milli secs
milli secs
Y PHASE
milli secs
milli secs
milli secs
B PHASE
milli secs
milli secs
milli secs
CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME
R PHASE
milli secs
milli secs
milli secs
Y PHASE
milli secs
milli secs
milli secs
B PHASE
milli secs
milli secs
milli secs
CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME
R PHASE
milli secs
milli secs
milli secs
Y PHASE
milli secs
milli secs
milli secs
B PHASE
milli secs
milli secs
milli secs
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR
SL.NO.
UNIQUE REF :
SHEET 9 OF 9
REF : NO
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
SHEET 1 OF 8
REF : NO
SUPPLIER :
AUXILIARY SUPPLY :
MANUFACTURER
LOCATION :
CONTRACT REF :
CIRCUIT :
TYPE :
IDENTIFICATION NO :
SL.NO :
RATED VOLTAGE :
RATED CURRENT :
SL.NO.
1
CONTENTS
Documents required
PAGE NO.
2
General Inspection/Checks
Defects/Omissions
Specifications
CONTRACTORS SIGNATURE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
SL.NO.
UNIQUE REF :
SHEET 2 OF 8
REF : NO
DOCUMENTATION REQUIRED
1.1
1.2
1.3
DATE
1.4
O & M Manuals
1.5
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
SHEET 3 OF 8
REF : NO
INITIAL CHARGING
4.
5.
6.
7.
1. TIME OF READING :
2. MODE OF CHARGE :
3. AMBIENT TEMP :
MAINS VOLTAGE :
CHARGER VOLTAGE :
CHARGER CURRENT :
NOMINAL VOLTAGE :
SG
Cell
No.
SG
Cell
No.
SG
CONTRACTORS SIGNATURE
ERECTION
FQA
O&M
UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
6.0
SHEET 4 OF 8
REF : NO
PROTECTIONS :
1
2
3
4
5
6
AC input MCCB
DC Input MCCB
Fast semiconductor fuses for rectifier bridge.
Over voltage cutback.
Charger over load.
Battery charging current limit.
DATE
7. 0
7
8
Blocking diode
Protection against current/voltage surges during auto/manual
OPERATIONAL TEST :
2
3
4
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
UNIQUE REF :
SHEET 5 OF 8
REF : NO
8.0
SL.NO.
DEFECTS / OMISSIONS
REMARKS
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
9.0
UNIQUE REF :
SHEET 6 OF 8
REF : NO
SPECIFICATIONS :
SPECIFIED
ACTUAL
1.0 Manufacturer
2.0 Catalogue attached as Annexure No.
3.0 Charger rated output current
I. Tirckle charging mode
ii. Boost charging mode
4.0 Load limiter current setting range
(Trickle mode)
5.0 Automatic voltage regulator
I. Type
ii. Percentage stabilisation of the
output D.C voltage
iii. Voltage setting range
iv. Response time of automatic
Voltage regulator.
6.0
10.0
10.1
10.2
10.3
10.4
10.5
Rectifier assembly
Type of semiconductor material
Rated direct current
Rated direct voltage
Standard applicable
Catalogue attached as Annexure No.
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
UNIQUE REF :
SHEET 7 OF 8
REF : NO
SPECIFIED
ACTUAL
Contactors
Manufacturer
Type designation
Catalogue attached as Annexure No.
13.0
13.1
13.2
13.3
14.0
14.1
14.2
14.3
Fuses
Manufacturer
Type designation
Catalogue attached as Annexure No.
I. Auto
ii. Manual
I. Auto
ii. Manual
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
UNIQUE REF :
SHEET 8 OF 8
REF : NO
SPECIFIED
ACTUAL
10.0
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : NICKEL
CADMIUM BATTERIES
UNIQUE REF :
REF : NO
SUPPLIER :
MANUFACTURER
DC VOLTAGE:
LOCATION: 400 KV Switchyard
SL.NO.
1
REMARKS :-
SHEET 1 OF 5
TYPE :
NICKEL CADMIUM
SL. NO.:
CAPACITY:
IDENTIFICATION NO :
CONTENTS
Documents required
PAGE NO.
2
General Inspection/Checks
NTPC SIGNATURE
CONTRACTORS SIGNATURE
DATE
ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES
SL.NO.
UNIQUE REF :
SHEET 2 OF 5
REF : NO
DOCUMENTATION REQUIRED
1.1
Technical Specifications
1.2
O & M Manuals
1.3
1.4
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES
UNIQUE REF :
SHEET 3 OF 5
REF : NO
SL.NO.
General Inspection
1.1 Check battery rating
1.2 Check batteru case and terminals for any damages,
and for cleanliness of vent plugs
1.3 Check positive and negative terminals of cells are
placed correctly to build up complete battery
1.4 Check polarity of external cables from battery
charger to the battery bank
1.5 Check tightness of all connector strips,hardwares.
INITIAL CHARGING
3.1 Ensure that during any quick charging periods and
setting different levels,the DC distribution circuit is
isolated from the battery and rectifier equipment.
3.2 Ensure that maximum charging current does not exceed the rated current of the rectifier.
3.3 Check against the circuit diagram that the batteries
are connected correctly to the charging rectifier.
3.4 Ensure that Quick Charging voltages which exceed
110 % of the nominal voltages are blocked.
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES
SL.NO.
UNIQUE REF :
SHEET 4 OF 5
REF : NO
CONTRACTORS SIGNATURE
DATE
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES
SL.NO.
UNIQUE REF :
SHEET 5 OF 5
REF : NO
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS
SUPPLIER :
MANUFACTURER
RATING: VOLTAGE
CIRCUIT:
SL.NO.
1
SHEET 1 OF 4
REF : NO
TYPE :
SL. NO.:
CURRENT:
IDENTIFICATION NO :
CONTENTS
Documents required
PAGE NO.
2
General Inspection/Checks
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS
SL.NO.
SHEET 2 OF 4
REF : NO
DOCUMENTATION REQUIRED
1.1
Technical Specifications
1.2
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS
SHEET 3 OF 4
REF : NO
SL.NO.
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10.
1.11
1.12
1.13
1.14
1.15
1.16
1.17
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS
SL.NO.
SHEET 4 OF 4
REF : NO
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM
SUPPLIER :
MANUFACTURER
RATING: VOLTAGE
CIRCUIT:
SL.NO.
1
SHEET 1 OF 5
REF : NO
TYPE :
SL. NO.:
CURRENT:
IDENTIFICATION NO :
CONTENTS
Documents required
PAGE NO.
2
General Inspection/Checks
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM
SL.NO.
SHEET 2 OF 5
REF : NO
DOCUMENTATION REQUIRED
1.1
Technical Specifications
1.2
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM
SL.NO.
SHEET 3 OF 5
REF : NO
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10.
1.11
1.12
1.13
1.14
1.15
1.16
1.17
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM
SL.NO.
1.18
SHEET 4 OF 5
REF : NO
1.19
Resistance in Ohms
Sl .No of
pit
Resistance in Ohms
.Ohms
CONTRACTORS SIGNATURE
DATE
UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM
SL.NO.
SHEET 5 OF 5
REF : NO
CONTRACTORS SIGNATURE
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 9
CURRENT TRANSFORMER
SUPPLIER: BHEL
CONTRACT REF:
MANUFACT TYPE:
SL. NO:
IDENTIFICATION:
AVAILABLE RATIO:
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 9
CURRENT TRANSFORMER
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 9
CURRENT TRANSFORMER
GENERAL INSPECTION AND CHECKS
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF9
CURRENT TRANSFORMER
SL.NO.
M Ohms
CORE-2
M Ohms
CORE-3
M Ohms
CORE-4
M Ohms
CORE-5
M Ohms
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 9
CURRENT TRANSFORMER
SL.NO.
CORE-1 TO EARTH
M Ohms
CORE-1 TO CORE-2
M Ohms
CORE-2 TO EARTH
M Ohms
CORE-1 TO CORE-3
M Ohms
CORE-3 TO EARTH
M Ohms
CORE-1 TO CORE-4
M Ohms
CORE-4 TO EARTH
M Ohms
CORE-1 TO CORE-5
M Ohms
CORE-5 TO EARTH
M Ohms
CORE-2 TO CORE-3
M Ohms
CORE-2 TO CORE-4
M Ohms
CORE-2 TO CORE-5
M Ohms
CORE-3 TO CORE-4
M Ohms
CORE-3 TO CORE-5
M Ohms
CORE-4 TO CORE-5
M Ohms
3.3 WINDING RESISTANCE AT AMBIENT TEMPERATURE
CORE-1
(1S1-1S2)
..
Ohms
CORE-2
(2S1-2S2)
Ohms
CORE-3
(3S1-3S2)
Ohms
CORE-4
(4S1-4S2)
Ohms
CORE-5
(5S1-5S2)
Ohms
DEG C
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 9
CURRENT TRANSFORMER
SL.NO.
1S1-1S2
1S1-1S3
2S1-2S2
2S1-2S3
3S1-3S2
3S1-3S3
4S1-4S2
4S1-4S3
5S1-5S2
5S1-5S3
POLARITY STATUS
CORE-1
OK / NOT OK
CORE-2
OK / NOT OK
CORE-3
OK / NOT OK
CORE-4
OK / NOT OK
CORE-5
OK / NOT OK
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 7 OF 9
CURRENT TRANSFORMER
SL.NO.
This test has to be done to all cores and secondary currents to be established.
CORE NO SY VOLTS
SY AMPS
SY VOLTS
SY AMPS
SY VOLTS
SY AMPS
1S1-1S2
2S1-2S2
3
4S1-4S2
5S1-5S2
APPLICATION
MAX EXCITING
CURRENT(mA) AT
KNEE POINT VOLTAGE
CORE-1
Bus/Tee Diff(Check)
CORE-2
Bus/Tee Diff(Main)
CORE-3
Metering
CORE-4
Tr./Line Protection
CORE-5
Tr./Line Protection
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 8 OF9
CURRENT TRANSFORMER
TESTS AND RESULTS
Kg/cm2
.
at 10 KV
at 10 KV
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 9 OF9
CURRENT TRANSFORMER
OMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 7
SUPPLIER: BHEL
CONTRACT REF:
MANUFACTURER :
TYPE:
SL. NO:
IDENTIFICATION:
TOTAL CAPACITANCE :
CAPACITANCE C1 :
CAPACITANCE C2 :
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
1. M/S.B H E L
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 7
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
CONTRACTOR SIG.
1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 7
REMARKS
2.1 Check that there is no damage to any porcelain part of the CVT
2.2 Check general tightness of the Bolts Clamps and terminals etc.
2.3 Check oil level.
2.4 Check any oil leakages from gaskets/joints
2.5 Check tightness of earth connection and continuity
2.6 Check terminal box is properly sealed and locking aerrangement is
provided
2.7 @ Ensure correctness of internal wiring and connection upto JB
2.8 $ Ensure primary side connections to be proper
2.9 Check Corona rings and corona shields that are provided are clean and
have no stain marks
2.10 Check all ferrule numbers
Ref Documents : -
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
1. M/S.B H E L
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 7
SL.NO.
M Ohms
M Ohms
CORE-2
M Ohms
CORE-3
M Ohms
AT 10 KV
C VALUE :
TAN DELTA:
REMARKS:
NTPC SIGNATURE
CONTRACTOR SIG.
1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 7
SL.NO.
M Ohms
CORE-2 TO EARTH
M Ohms
CORE-3 TO EARTH
M Ohms
CORE-1 TO CORE-2
M Ohms
CORE-1 TO CORE-3
M Ohms
CORE-2 TO CORE-3
M Ohms
Ohms
CORE-2
Ohms
CORE-3
REMARKS:
Ohms
NTPC SIGNATURE
CONTRACTOR SIG.
1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 7
SL.NO.
PRIMARY VOLTS
SECONDARY VOLTS
1
2
3
3.5 POLARITY TEST : Check polarity of each Secondary with respect to Primary
CORE NO.
POLARITY STATUS
OK/NOT OK
OK/NOT OK
OK/NOT OK
REMARKS:
NTPC SIGNATURE
CONTRACTOR SIG.
1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 7 OF 7
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 4
EARTHING SWITCH
SUPPLIER: BHEL
MANUFACTURER:
TYPE:
S& S CHENNAI
A.C. SUPPLY:
VOLTS:
CENTRE BREAK
SL. NO.:
AMPS:
LOCATION:
CIRCUIT:
IDENTIFICATION:
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 4
EARTHING SWITCH
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 4
EARTHING SWITCH
GENERAL INSPECTION AND CHECKS
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 4
EARTHING SWITCH
OMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 9
SUPPLIER:
BHEL
AUX SUPPLY:
MANUFACTURER:
BHEL
LOCATION:
CONTRACT REF:
CIRCUIT :
TYPE:
IDENTIFICATION NO:
3 AT 2
SL. NO:
RATED VOLTAGE:
420 KV
YEAR OF MANUFACTURE:
RATED CURRENT:
3150 AMPS
CONTROL VOLTAGE:
SL.NO
CONTENTS
220 V DC
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 9
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 9
REMARKS
2.1 Checked that breaker base is placed on structure as per the drg.
2.2 Checked for marking on support insulators, operating rods,
interrupters and match with marking on base frame.
2.3 Checked that desiccant bags are removed from inside the
interrupter chamber before installing.
2.4 Checked that length of operating rod is adjusted as per supplier's
Manual
2.5 Checked vacuum sealing of filter tin.
2.6 Checked that filter in is opened only after breaker assembly and prior
to vacuum pulling. Checked that filters are not in contact with air for
morethan one hour.
2.7 Checked that desiccant bags are removed from the filter sumps and
the sumps are cleaned before filling them with filter materials.
2.8 Checked for vacuum pulling and SF6 gas filling at specified pressure
as per the procedure given in suppliers manual.
2.9 Checked for any leakage of SF6 gas from joints using leak deterctor
or soap solution.
Checked SF6 gas pressure daily for few weeks to ensure that there is
no leakage of SF6 gas pressure at the pressure of 2 bars. Both
pressure and temperature readings taken preferably at the same time
of the day.
2.11 Checked and ensured proper fucntioning of pressure and SF6 density
monitors.
2.10
2.12 Checked for filling of oil tank with hydraulic oil of Manufacturer's
specification only. Ensured opening of vent and pressure release system
and filling of oil to proper level.
2.13 Ensured venting of oil system is carried out as per the procedure
given in supplier's manual.
2.14 Ensured topping up of oil tank, closing of pressure release valve and
raising oil pressure to specified value.
2.15 Checked that there is no oil leakage.
2.16 Checked that earthing of support structure, breaker frame and MOM
boxes is carried out properly.
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 9
2.17 Checked that cables have been terminated in MOM boxes of breaker as per the cable
schedule and equipment wiring diagram. Checked proper glanding of cables and ensured
plugging of unused cable entries of MOM boxes. Sealing and locking of MOM boxes against
water entry.
2.18 Checked insulators, interrupter bushings for any breakages/damages subsequent to
installation.
2.19 Checked earthing of circuit breaker structure and local control cabine at prescribed points.
2.20 Checked correctness of hydraulic oil level nad SF6 gas pressure.
2.21 Checked supply polarity to closing and tripping coils.
2.22 Checked rating of fuses as per scheme/wiring diagram and soundness of fuses and links.
2.23 Checked availability of AC/DC auxiliary supply to breaker.
2.24 Checked correctness of auxiliary switch contacts position in 'OPEN' and 'CLOSE' condition
of breaker.
2.25 Checked closing and opening operation electrically in local mode.
2.26 Checked indications for closing and tripping operation at remote end.
2.27 Checked tripping of breaker by simulating tripping relay in the circuit.
2.28 Checked operation of breaker alrk and Indications by simulation.
2.29 Checked correctness of hydraulic oil level.
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 9
SL.NO.
Sl.No.
Initial
Pressure
Bar
310
310
310
310
Operation
0
C
C0
0C0
Final
Pressure
Bar
295
302
285
270
Final
pressure
Bar
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 9
SL.NO.
200
Observed Value
N.A
N.A
R-Phase
Y-Phase
B-Phase
Closing Time
Opening time
Expected Measured Expected Measured
100 Max
22 Max
100 Max
22 Max
100 Max
22 Max
Close - Open
Expected Measured
CURRENT
TC-2
CURRENT
CC
CURRENT
R-Phase
Y-Phase
B-Phase
3.8 GRADING CAPACITORS CAPACITANCE AND TAN DELTA
Capacitance in pF
R-Phase
Y-Phase
B-Phase
Tan Delta
REMARKS :
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 7 OF 9
4.1 Checked all internal interlocks of circuit breaker (like loss of SF6, low oil pressure etc.)
4.2 Checked operation of Circuit Breaker from all points.
4.3 Checked termination of all power and control cables in the local control
Cabinet as per cable schedule and checked plugging of all unsued cable entry
holes and termination of unused cores on spare TBs.
4.4 Checked for pole discrepency protection of the breaker.
4.5 Checked for the Anti-pumping protection of the breaker.(A7/A13)
4.6 Oil Pressure monitor :
I. Pump ON/OFF-B1(A1) bar ii. Pump running time in Sec.
4.7 Auto reclose lockout (oil)
Pressure contact B2(A4) make/break
4.8 Closing lockout(oil)
Pressure contact B2(A2/A12)make/break
4.9 General lockout(oil)
Pressure contact B2(A3/A10) make/break
4.10 a
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 8 OF 9
SL.NO.
Caution : Isolate necessary Dc for trip coil-1 and trip coil-2, closing coil before megerring.
COIL DETAILS
R-PHASE TRIP COIL - I
R-PHASE TRIP COIL - II
R-PHASE CLOSE COIL
Y-PHASE TRIP COIL - I
Y-PHASE TRIP COIL - II
Y-PHASE TRIP COIL
B-PHASE TRIP COIL -I
B-PHASE TRIP COIL-II
B-PHASE CLOSE COIL
MEASUREMENT VALUE
MEASUREMENT VALUE
R-PHASE
Y-PHASE
B-PHASE
IR Value with respect to earth with breaker closed earth switch and isolator open :
(Using 5000v megger - minimum value 1000 M OHM)
BETWEEN
R-PHASE & EARTH
Y-PHASE & EARTH
B-PHASE & EARTH
MEASUREMENT VALUE
Final Checking :
1
2
3
4
5
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 9 OF 9
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 6
LIGHTNING ARRESTOR
SUPPLIER: BHEL
AUX SUPPLY:
MANUFACTURER:
LOCATION:
CONTACT REF:
CIRCUIT:
TYPE:
IDENTIFICATION NO.
SL. NO:
RATED VOLTAGE:
RATED CURRENT:
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
SPECIFICATIONS
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 6
LIGHTNING ARRESTOR
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 6
LIGHTNING ARRESTOR
SL.NO.
SPECIFICATIONS
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 6
LIGHTNING ARRESTOR
GENERAL INSPECTION AND CHECKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 6
LIGHTNING ARRESTOR
SL.NO.
(In M Ohms)
Megger used. 5 KV
Serial NO.
Ambient Temp.
Make
R-Phase
Y-Phase
B-Phase
Y ph
At
V,Current
. m A
Y ph
At
V,Current
. m A
B ph
At
V,Current
. m A
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
B ph
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 6
LIGHTNING ARRESTOR
DEFECTS AND/OR OMMISSIONS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 6
ISOLATOR
SUPPLIER: BHEL
MANUFACTURER:
AUX SUPPLY:
S& S CHENNAI
220 V DC - Control
415 V AC - Motor
LOCATION:
CONTACT REF:
CIRCUIT:
TYPE:
IDENTIFICATION NO.
RATED VOLTAGE:
RATED CURRENT:
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 6
ISOLATOR
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 6
ISOLATOR
GENERAL INSPECTION AND CHECKS
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 6
ISOLATOR
SL.NO.
GENERAL INSPECTION AND CHECKS
2.13 Ensure double earthing at:
1. Channel Base
2. Operating Box Mechanism
3. Earthing Blade
4. Isolator Structure Base
2.14 Check coupling with motor operating mechanism.
2.15 Check mechanical interlock provided with earth switch.
2.16 Check motor operating mechanism
2.17 Check remote/local indicator for correct status.
2.18 Check working of local/remote switches.
2.19 Check all auxiliary contacts for correct functioning
2.20 Operating Time:
Opening
Closing
R ph
Y ph
B ph
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 6
ISOLATOR
GENERAL INSPECTION AND CHECKS
(In M Ohms)
Megger used. 5 KV
Serial NO.
Ambient Temp.
Make
(Line side)
(Closed condition)
R-E
Y-E
B-E
2.22 Contact Resistance:
Measure and record contact resistance by passing 300 A of DC from welding generator
and measuring the voltage drop across contact.
Contact resistance in Ohms
R ph
Y ph
B ph
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 6
ISOLATOR
DEFECTS AND/OR OMMISSIONS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 1 OF 8
SUPPLIER: BHEL
CONTRACT REF:
MANUFACTURER:
SL. NO:
LOCATION:
CIRCUIT:
TYPE:
IDENTIFICATION NO.:
RATED VOLTAGE:
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 2 OF 8
SL.NO.
DOCUMENTS REQUIRED
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 3 OF 8
REMARKS
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 4 OF 8
SL.NO.
(BUS - 1) NO
R
R1
Y
Y1
B
B1
R
R2
Y
Y2
B
B2
R
R3
Y
Y3
B
B3
R
R4
Y
Y4
B
B4
R
R5
Y
Y5
B
B5
R
R6
Y
Y6
B
B6
R13
M OHM
Y13
(BUS - 1) NO
M OHM
R
R7
Y
Y7
B
B7
R
R8
Y
Y8
B
B8
R
R9
Y
Y9
B
B9
R
R10
Y
Y10
B
B10
R
R11
Y
Y11
B
B11
R
R12
Y
Y12
B
B12
B
B13
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 5 OF 8
SL.NO.
(BUS - 2) NO
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
M OHM
(BUS - 2) NO
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
B
M OHM
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 6 OF 8
SL.NO.
(L3- L4
TIE)
R
Y
B
R
Y
B
(L1-L2
TIE)
R
Y
B
R
Y
B
NO
M OHM
NO
M OHM
(ST-GT1
TIE)
R
Y
B
R
Y
B
NO
M OHM
(ST TRF) NO
R
Y
B
R
Y
B
M OHM
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 7 OF 8
SL.NO.
(GT2
TIE)
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
NO
M OHM
(GT1
TRF)
R
Y
B
R
Y
B
NO
M OHM
(GT2 TRF) NO
R
Y
B
R
Y
B
M OHM
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :NTPC,SMPP
REF NO.
SHEET 8 OF 8
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 1 OF 12
DISTURBANCE RECORDER
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
OMMISSIONS/DEFECTS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
12
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 2 OF 12
DISTURBANCE RECORDER
SL.NO.
DOCUMENTS REQUIRED
1 .0
2 .0
O&M MANUALS
3 .0
4 .0
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
REMARKS
DATE
STATION :SMPP
REF NO.
SHEET 3 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 4 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
Flags =
Ref.Offset = 0
Template = xx:dd:oo:yy:xx:hh:mm:ss:xx
Request = D
COM2 use = 1-650Com
Baudreate = 19200Bps. Parity = even, RTS-use = Hdx
Record = 0.1 s/0.2.. 1.0s/0.1s
Bfr. End = Over
N.Freq. = 50Hz
S-Rate + 1440/s
Limit - Filter = 2 Per
Compr.Band = 30
System parameter ok {y} ? N.. (within 10 second)
Node type {Mstr,Siv) (cr=M) = M
Modify Sys. Pars enable {y/n) = Y : y
Modify U-jumprs enable
Modify TR-Corr. Enable {y/n} = N:n
Long Rocords enable {y/n}
X1-11Auto-Corr. Enable{y/n) = Y:y
Test -Output enable {y/n}
Start. No {1..250}
Clock type {TimeMstr1..5,Slv} = M1 : 1
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 5 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
Pot.nodes = 1
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 6 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 7 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
Record = 0.1s/0.2..1.0s/0.1s
Bfr.End = Stop
N.freq. = 50Hz
S-Rate = 1200/s
Limit - filter-2 Per.
Compr.-Band - 30
system Parameter ok [y]?y
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 8 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
REMARKS
TECHNICAL SPECIFICATIONS
Current and Voltage inputs
Resolution:
16bit
Number:
9,as current or voltage input respectively
Current inputs:
1 A or 5A
Voltage transformer 100V, 100V/sqrt.(3),200v,200v/sqrt(3)
Digital inputs
Number:
16
Contract voltage
48V to 250VDC
Contact Power:
0.25W
Recording times
Preamble:
0.is to 0.5 s, can be adjusted in steps
of 0.1a
Post anble:
0.5s, fixed
Event :
0.1s to 30s, can be ajustable in steps
of 0.1s
Memory capacity
On-board memory:
100K words per channel, total 2 Mbytes
Total recording time can be calculated by:
100,000/scanning frequency
Synchronisation and
clock
Internal clock:
< 50ppm (<20ppm typical)
External sync.:
Optional (e.g. GPS< GEOS, DCF-77-77)
1 minitue pulse ( control input, 24V)
Intermediate Units:
< + or - 10 micro sec.
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 9 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
Trigger criteria
Digital inputs
Analogue inputs
External trigger:
Output:
Power supply
Voltage:
Power consumption
Power back up :
Interfaces
Communication bus
CB 10 :
Serival interfaces :
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
REMARKS
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 10 OF 12
DISTURBANCE RECORDER
SL.NO.
2. 0
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2 .10
REMARKS
Turn ON the device with the switch (S-03 on the PS -10 moodule)
Check the RUN LED status on XI - 10 and CI - 10
Check that "C" LED on the CI - 10 blinks once every second
Check the DR communication with the evalution station.
Set the D.R station time and connect the time synchronisation
cable.
Check that D.R is synchronised with the G.P.S. clock
Check that all 9 analog inputs and 16 digital input are wired to
the D.R.
Ensure that status of the input signals is displayed
on the screen.
Set the trigger limits for signals.
Generate the test event and receive it.
View the test event from WinEve software
Create a distrubance and see the D.R has recorded the disturbance
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 11 OF 12
DISTURBANCE RECORDER
SL.NO.
GENERAL INSPECTION AND CHECKS
2.11 Check the communication between Evaluation station and all
four Disturbance Recorders.
REMARKS
2.12 Check that station time of each D.R is exactly matching with
the GPS time.
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 12 OF 12
DISTURBANCE RECORDER
SL.NO.
0.1
OMMISSIONS/DEFECTS
REMARKS
0.2
0.3
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 1 OF 4
TIME SYNCHRONISER
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
COMMISSIONS/DEFECTS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 2 OF 4
TIME SYNCHRONISER
SL.NO.
DOCUMENTS REQUIRED
1 .0
2 .0
O&M MANUALS
3 .0
4 .0
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
REMARKS
DATE
STATION :SMPP
REF NO.
SHEET 3 OF 4
TIME SYNCHRONISER
SL.NO.
DOCUMENTS REQUIRED
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2. 10
2 .11
REMARKS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 4 OF 4
TIME SYNCHRONISER
SL.NO.
DEFECTS /OMMISSIONS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
REMARKS
DATE
STATION :SMPP
REF NO.
SHEET 1 OF 6
EVENT LOGGER
SL.NO
CONTENTS
PAGENO
DOCUMENTS REQUIRED
COMMISSIONS/DEFECTS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
12
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 2 OF 6
EVENT LOGGER
SL.NO.
DOCUMENTS REQUIRED
1 .0
2 .0
O&M MANUALS
3 .0
4 .0
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
REMARKS
DATE
STATION :SMPP
REF NO.
SHEET 3 OF 6
EVENT LOGGER
SL.NO.
DOCUMENTS REQUIRED
2 .0
REMARKS
TECHNICAL SPECIFICATIONS
Digital inputs:
. No.:
32 per module, potential - free
. Connection:
land half pole
. Device power supply 48V to 250 VDC (+or - 25%)
.Contact voltage
48V to 250 VDC (+or - 25%)
.Contact current
approx. 5 mA with contact closed
.Power consumption: Tupically 8 W, max. 10W
. Insulation:
2.0KVrns
Analouge inputs:
. Resolution
11Bit with presign
. No.:
16, each as current and voltage input
Synchronisation and
clock
Internal clock
<50ppm (<20ppm typical)
. External
1 minitue pluse (control input 48 V)
synchronisation:
Recording criteria
.Digital inputs:
Positive or negative flanks
. Analouge inpputs
Upper limit exceeded (2 values )
Lower limit exceeded (2values)
Calculated mean value (1 per second)
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 4 OF 6
EVENT LOGGER
SL.NO.
DOCUMENTS REQUIRED
2 .0
Control inputs
.Binary inputs, isolated with
optocouplers:
optocouplers:
Power supply
. Voltage
Interfaces
Serial interface:
. Connection for :
Processing statilon (minimum)
Requirements)
. Processor:
REMARKS
. RAM:
. Free space ob Hard disk:
. Monitor:
. Floppy disk:
1 GB
17"recommended
1.44 MB 3 and half for programm
installation
. Printer:
Matrix printer with automatic
line feed,
capapble of operation under
windows
The following are also required for intallation and parameter
adjustment:
. 1PC, IBM compatible (486 or Pentium) with a free Rs. 232
serial interface
. 1 installed terminal emulation program or MS Windows 3. X
or higher
Windows includea terminal emulator.
. 1 installed indactic software package Arc425, Vis45 and the
relevant operting manuals.
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 5 OF 6
EVENT LOGGER
SL.NO.
2 .1
2.2
2.3
REMARKS
2.4
2.5
2.6
2.7
2.8
2.9
2 .10
2.11
2.12
2.13
2.14
2.15
2.16
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
DATE
STATION :SMPP
REF NO.
SHEET 6 OF 6
EVENT LOGGER
SL.NO.
DEFECTS /OMMISSIONS
NTPC SIGNATURE
NTPC ERECTION
NTPC O&M
CONTRACTOR SIG.
REMARKS
DATE