Sunteți pe pagina 1din 136

ELECTRICAL

STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

SHEET 1 OF 6

EQUIPMENT : 415 V AC DISTRIBUTION BOARD

SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:

SL.NO.
1

REF : NO

SL. NO.
AMPS:

CONTENTS
Documents required

PAGE NO.
2

General Inspection/Checks

Defects/Omissions

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

ERECTION
FQA
O&M

ELECTRICAL

UNIQUE REF :

DATE

STATION - SIMHADRI

STANDARD CHECK LIST

EQUIPMENT : 415 V AC DISTRIBUTION BOARD

SL.NO.

SHEET 2 OF 6
REF : NO

DOCUMENTATION REQUIRED

1.1

SLD of the equipment.

1.2

O & M Manuals

1.3

Manufacturers shop test result

1.4

Specifications and unpriced purchase order copies of bought out items.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 415 V AC DISTRIBUTION BOARD

SL.NO.
2

SHEET 3 OF 6
REF : NO

GENERAL INSPECTION AND CHECKS


BUSBARS :

2.1

Checked the insulation resistance of the bus bar


R-Phase
Y-Phase
B-Phase
Neutral

2.2

Checked the phase sequence and found OK

2.3

Checked the minimum clearences


R-Y
Y-B
B-N

2.4

Checked all the joints for tightness and found OK

2.5

Checked the size of neutral and found OK as per the specifications.

2.6

Checked the size of Earth bus and found OK as per the specifications.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 415 V AC DISTRIBUTION BOARD

SL.NO.
3

SHEET 4 OF 6
REF : NO

GENERAL INSPECTION AND CHECKS


CIRCUIT BREAKERS

3.1

Checked the insulation resistance of the breaker (Record values in sheet attached).

3.2

Checked the motor operated spring charging mechanism of the closing circuit.

3.3

Checked the manual operation of the breaker in 'TEST' and 'WITHDRAWN' positions

3.4

Checked the mechanical interlocks of the breaker

3.5

Checked the operation of the closing coil with supply voltage of 85% to 110%
of rated voltage.

3.6

Checked the operation of the tripping coil with supply voltage of 70% to 120%
of rated voltage.

3.7

Circuit breaker closing time is

3.8

Circuit Breaker opening time is

SWITCH FUSE UNITS

4.1

Door interlocks checked and found OK.

4.2

Provision to defeat door interlocks checked.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 415 V AC DISTRIBUTION BOARD

SL.NO.
5
5.1
6
6.1

SHEET 5 OF 6
REF : NO

GENERAL INSPECTION AND CHECKS


FUSES
Checked all the fuses for correct rating as per the drawings.
CURRENT TRANSFORMERS
Checked the insulation resistance of the CT
R-Phase
Y-Phase
B-Phase

All protection relays are checked for their healthiness

Verification of wiring as per the schematic drawing.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT :415 V AC DISTRIBUTION BOARD

SL.NO.

SHEET 6 OF 6
REF : NO

DEFECTS AND OMISSIONS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:

SHEET 1 OF 8
REF : NO

SL. NO.
AMPS:

SL.NO.
1

CONTENTS
Documents required

PAGE NO.
2

General Inspection and Checks

Defects OR / Omissions

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

ERECTION
FQA
O&M

ELECTRICAL

UNIQUE REF :

DATE

STANDARD CHECK LIST


STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.

SHEET 2 OF 8
REF : NO

DOCUMENTATION REQUIRED

1.1

SLD of the equipment.

1.2

O & M Manuals

1.3

Manufacturers shop test result

1.4

Specifications and unpriced purchase order copies of bought out items.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.
2

SHEET 3 OF 8
REF : NO

GENERAL INSPECTION AND CHECKS


BUSBARS :

2.1

Checked the insulation resistance of the bus bar


(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

2.2

Checked the minimum clearences


(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

2.3

Checked all the joints for tightness and found OK

2.4

Checked the size of Earth bus and found OK as per the specifications.

2.5

Sequence checks across all modules as per the single line diagram attached

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.

SHEET 4 OF 8
REF : NO

GENERAL INSPECTION AND CHECKS

2.6

Bus joint resistance check


from section switch-1 to section switch-2 (including B/C)
Upto section switch-1
Upto section switch-2
From battery charger -1 to B/C
From battery charger -2 to B/C

2.7

Bus joint torque thightness check at random

2.8

Earth fault relay operation check


Upto section switch-1
Upto section switch-2
From section switch -1 to section switch-2

2.9

Bus voltmeter and ammeter healthiness

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT :DC DISTRIBUTION BOARD

SL.NO.
3
3.1

SHEET 5 OF 8
REF : NO

GENERAL INSPECTION AND CHECKS


INCOMER AND BUS COUPLER UNIT CHECK
Charger Incomer - 1

3.1.1

Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

(+VE)
(-VE)

3.1.2

Contact resistance

3.1.3

Fuse Rating

3.2
3.2.1

Battery Incomer - 1
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

3.2.2

Contact resistance
(+VE)
(-VE)

3.2.3

Fuse rating

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.

SHEET 6 OF 8
REF : NO

DEFECTS AND OMISSIONS

3.3

Charger Incomer - 2

3.3.1

Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

(+VE)
(-VE)

3.3.2

Contact resistance

3.3.3

Fuse Rating

3.4
3.4.1

Battery Incomer - 2
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

3.4.2

Contact resistance
(+VE)
(-VE)

3.4.3

Fuse rating

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

SHEET 7 OF 8

EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.
3.5
3.5.1

3.5.2

REF : NO

DEFECTS AND OMISSIONS


BUS COUPLER
Insulation resistance
(+VE) TO E
(-VE) TO E
(+VE) TO (-VE)

Contact resistance
(+VE)
(-VE)

Feeder Module checks

4.1

Fuse rating

4.2

Fuse box insulation resistance

4.3

Space heater bus megger value :


Ph-E :
N-E
Ph-N :

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : DC DISTRIBUTION BOARD

SL.NO.

SHEET8 OF 8
REF : NO

DEFECTS AND OMISSIONS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : AUXILIARY
TRANSFORMER

REF : NO

SUPPLIER :
MANUFACTURER
RATING:

SL.NO.
1

SHEET 1 OF 17

TRANSFORMER SL NO.
LOCATION :
IDENTIFICATION NO :

CONTENTS

PAGE NO.

Documents required

Specifications

General Inspection/Checks

Defects/Omissions

16

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.

SHEET 2 OF 17
REF : NO

DOCUMENTATION REQUIRED

1.1

Verification that erection is completed

1.2

General Arrangement Drgs

1.3

IOM received from erection department that erection has been


completed

1.4

Manufacturers shop test result

1.5

O & M Manuals

1.6

Specification and vendor list with price catalogue for unquoted


items.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

SHEET 3 OF 17

EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.

SPECIFICATIONS

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

Applicable standards
No. of Units
Type of cooling
MVA Rating(HV)
MVA Rating(LV)
No load Voltage(HV)
No load Voltage(LV)
Line current(HV)
Line current(LV)
No. of Phases
Frequency
Vector Group
Impedance (50 MVA Base)
HV-LV (Normal tap)
HV-LV ( tap1)
HV-LV ( tap5)

3
3.1
3.2
3.3

OFF LOAD TAP CHANGER


Position of Tap :
No of Taps:
Percentage of voltage variation/tap:

REF : NO

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

LV / HV side

TEMPERATURE RISES
Oil by thermometer

: 50 deg c

Ambient temperature

: 50 deg c

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

SHEET 4 OF 17

EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.
5

REF : NO

SPECIFICATIONS
INSULATION LEVELS
HV
LV

: 80 LI1425 AC 38
: LI 75 AC 38

WEIGHT (kg)
Core and winding
Weight of Oil
Total weight of Transformer with oil
OIL QUANTITY

: 17900
: 9790
: 40300
(LITRES)

: 11000

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :

ELECTRICAL
STATION - SIMHADRI

STANDARD CHECK LIST

SHEET 5 OF 17

EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.
1

REF : NO

GENERAL INSPECTION AND CHECKS


BUSHINGS

1.1

Clean the complete porcelains and metal parts thoroughly

1.2

Check if there is any leakage for the radiators

1.3

Measure the IR value of the bushing with a 2.5 KV/5 KV megger between
terminal and flange. It should not be less than 10,000 Mega Ohms.
(not less than 200 Mega Ohms if measured by 500 v/ 1 KV megger)
R- PHASE
Y-PHASE
B PHASE
HV
LV

NEUTRAL

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
2

SHEET 6 OF 17

GENERAL INSPECTION AND CHECKS


HV side & LV side cables/cable entry box
1. Check that the cable boix is properly fixed and glanded.
2. Check that the cable terminations are proper
3. Check that the cable meggering is done
a. HV cable
M ohms
b. LV cable
M ohms

SILICAGEL BREATHER

3.1

Ensure that silicagel is filled completely in the breather and in blue colour.

3.2

Ensure that brass oil cup with transformer oil to the indicated level.

4 PRESSURE RELIEF VALVE


4.1

Lift switch operating rod by hand and ensure the following.


Switch : -

Contact will change over to " After Valve operation"

Flag :-

The indicating flag has to lift

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.
5

SHEET 7 OF 17
REF : NO

GENERAL INSPECTION AND CHECKS


WINDING TEMPERATURE INDICATOR

5.1

Check the polarity of CTs (for WTI)

5.2

Operating temperature
Reset temperature
Remote indication found OK.

OIL TEMPERATURE INDICATOR


Operating temperature
Reset temperature
Remote indication found OK.

BUCHHOLZ RELAY

7.1

Alarm Circuit : Slowly pump air in to the relay via the pet cock fitted at the
back of the relay and observe for alarm.

7.2

Trip Circuit : Suddenly apply air pressure and observe for tripping command.

8
8.1

OIL LEVEL INDICATOR


Oil level low alarm is at 75 mm from bottom of conservator.
Alarm found OK.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

SL.NO.
9

SHEET 8 OF 17
REF : NO

GENERAL INSPECTION AND CHECKS


Check the following alarm and trip circuits for cooler control cabinet.
Alarm Contacts

9.1

OTI alarm

9.2

WTI alarm

9.3

Buchholz alarm

9.4

Low oil level alarm

9.5

PRV-1 & PRV-2 alarm


TRIP Contacts

9.6

OTI trip

9.7

WTI trip

9.8

Buchholz trip

9.9

PRV-1 & PRV-2 trip

10

Check the following Annunciation circuits

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
11

SHEET 9 OF 17

GENERAL INSPECTION AND CHECKS


Check the heater circuit
Heater E1 found Ok
Heater E2 found OK

11.1

ILLUMINATION circuit found OK

11.2

3 Pin socket found Ok.

12

ON LOAD TAP CHANGER (CHG TO OFF LOAD)

12.1

Check the manual operation of the tap changer through the total operating
cycle.

12.2

TAP CHANGING OPERATION:


TAP NO.
FROM
TO
1
2
2

REMARKS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

SL.NO.

STANDARD CHECK LIST

SHEET 10 OF 17
REF : NO

GENERAL INSPECTION AND CHECKS

13

Check the Earthing of main tank,Marshalling Box

14

Check the neutral earthing

15

Check the Earth resistance of Electrodes.

16

Check the earthing of HV/LV cable is earthed at one end only

17

Check oil leakages for 24 Hrs.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
18

19

SHEET 11 OF 17

GENERAL INSPECTION AND CHECKS


Insulation Resistance Measurement:
DATE:
DESCRIPTION
SL. NO.
1

Control winding(if any)

Main winding
a) HV/LV+E
b) LV/HV+E
c) HV/LV

Core - Earth

TIME:
MEGGER USED

TEMP:
IR VALUE

REMARKS

500 V

MAGNETIC BALANCE TEST


PHASE EXCITED

R-PHASE

Y-PHASE

B-PHASE

R- PHASE
Y- PHASE
B- PHASE

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

STANDARD CHECK LIST

REF : NO

SL.NO.
20

SHEET 12 OF 17

GENERAL INSPECTION AND CHECKS


MEASUREMENT OF WINDING RESISTANCE

WINDING

TAP NO.
1
2
3
4
5

HV
WINDING

R-PHASE

Y-PHASE

B-PHASE

TEMP

REMARKS

LV
WINDING
21

VECTOR GROUP CHECK


VECTOR GROUP

YNd11

Diagram of Connections
as required

Diagram of connections as
connected for test

1R, 2r

1R, 2r
2y

2y

2b

2b

1N

1N

1B

1B
1Y

1Y

VOLTAGE APPLIED
3-Phase voltage is applied to the H.V Side

1R-2b

1R-1N

1R & 2r shorted

1B-2b

2b-1Y

CONDITIONS TO BE PROVED
1
2
3
4

1B-2y

2y-1Y

ACTUAL VALUES
1R-2b+1N-2b = 1R-1N
1R-2y = 1R-2b = 2y-2b
1B-2y>1B-2b
1Y-2b = 1B-2b

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
22

GENERAL INSPECTION AND CHECKS


VOLTAGE RATIO TEST
Apply 3-Phase voltage to the hv side and measure the CORE-1ondary voltages in
each pahse

RY

23

SHEET 13 OF 17

RN

PRIMARY
YB

YN

BR

RY

SECONDARY
YB

BR

MAGNETISATION CURRENT
a. Apply 3-Phase 415 Volt on HV Terminals and keep LV open.

Voltage applied
RY VOLTS
YB . VOLTS
RB . VOLTS

Current measured
R . m Amps
Y .. m Amps
B .. m Amps

Remarks

Current measured
R . m Amps
Y .. m Amps
B .. m Amps

Remarks

b. Apply 3-Phase 415 Volt on LV Terminals and keepHV open.

Voltage applied
RY VOLTS
YB . VOLTS
RB . VOLTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
24

SHEET 14 OF 17

GENERAL INSPECTION AND CHECKS


SHORT CIRCUIT TEST
Short the LV side and apply low voltage on HV side.

H.V. VOLTAGE H.V.CURRENT

25

L.V.CURRENT

WINDING CAPACITANCE AND TAN DELTA


CONNECTION CAPACITANCE
HV/LV+TANK
EARTHED

TAN DELTA

LV/HV+TANK
EARTHED

26

FINAL IR CHECKINGS
The megger readings finally after the transformer is connnected to the system
Date :
Time:
Megger used

Windin gs

Temp:

Value obtained in Mega


ohms

HV/E
LV/E
HV/LV
27 SETTINGS
WTI Setting
Alarm
Trip

Proved

OTI Setting

Set for

Proved

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
28

SHEET 15 OF 17

GENERAL INSPECTION AND CHECKS


PROTECTION AND ALARMS
Prove the tripping of associated breakers by actual opertion of the various devices and relays.
SL. NO

SET FOR
ALARM
TRIP

REMARKS

1
2
3
4
5
6
7
8
9
10
11
12
13
29

NEUTRAL CTs
INSULATION RESISTANCE
ACROSS TERMINALS

HV NEUTRAL

LV NEUTRAL

CORE1 - EARTH
CORE2 - EARTH
CORE1 -CORE 2

RATIO CHECK:
PRIMARY CURRENT IN AMPS

SECONDARY CURREN MEASURED


HV NEUTRAL
LV NEUTRAL
CORE1
CORE2
CORE1
CORE2

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

UNIQUE REF :

SL.NO.

STANDARD CHECK LIST

SHEET 16 OF 17
REF : NO

GENERAL INSPECTION AND CHECKS


MAGNETISATION TEST
APPLIED VOLTAGE

HV NEUTRAL

LV NEUTRAL

HV NEUTRAL

LV NEUTRAL

POLARITY CHECKING
CORE
CORE 1
CORE 2

30

RECORD THE INITIAL VALUE OF THE FOLLOWING DURING FIRST CHARGING

a)

No load current at relay terminal


R Phase
A
Y phase
A
B Phase
A

b)

Temperature at the time of Charging

CT Ratio

OTI
WTI
Ambient
c)

Maximum temperature after 24 Hours

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : AUXILIARY
TRANSFORMER

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 17 OF 17
REF : NO

OMISSIONS AND DEFECTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV CABLES

SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:
RATING:
SIZE:

SL.NO.
1

SHEET 1 OF 5
REF : NO

CABLE IDENTIFICATION NO:


VOLTS

AMPS:
NO. OF CORES:
LOCATION

CONTENTS

PAGE NO.

Documents required

General Inspection/Checks

Defects/Omissions

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV CABLES

SL.NO.

SHEET 2 OF 5
REF : NO

DOCUMENTATION REQUIRED

1.1

O & M Manuals

1.2

Manufacturers shop test result

1.3

Specification and vendor list with price catalogue for unquoted

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV CABLES

SL.NO.

SHEET 3 OF 5
REF : NO

GENERAL INSPECTION AND CHECKS

2.1

Check the cable throughout the length for any defects or damage

2.2

Check the following are correct


a) Clamping and spacing
b) Cable identification tags at both terminals
c) Cable route as per the schedule
d) Cable bends as per the specification
e) Phasing of cables as per colour code.

2.3

In case of glanded cables,check that it hs got supporting clamps below.

2.4

Check that cable is given extra length at terminations to facilitage future maintainance work.

2.5

Check that cable glands are CORE-1ure and of correct size.

2.6

Check cable lug size and quality are as per specifications.

2.7

Check the earthing of the following


a) Cable glands and armour
b) Cable trays and junction boxes (Double earthing for 3 phase and single for one phase)
Check that all steel work used for cable tray supports and fixing are satisfactory.

2.8

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV CABLES

REF : NO

SL.NO.
2.9

SHEET 4 OF 5

GENERAL INSPECTION AND CHECKS


Phase sequence at both sending and receiving ends.

2.10

Insulation Resistance
Termibnals Value in M Ohms
R to Y
Y to B
B to R
R+Y+B to Gland

2.11

High Voltage test


Voltage applied
Terminals
R to Earth
Y to Earth
B to Earth

..
Voltage

AC/DC

for ..

Minute(s)

Current

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV CABLES

SL.NO.

SHEET 5 OF 5
REF : NO

OMISSSIONS AND DEFECTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

SUPPLIER :
MANUFACTURER:
A C SUPPLY:
TYPE:

SL.NO.
1

UNIQUE REF :

STANDARD CHECK LIST

SHEET 1 OF 9
REF : NO

SL. NO.
VOLTS:

AMPS:

CONTENTS

PAGE NO.

Documents required

General Inspection/Checks

Defects/Omissions

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV CABLES

SL.NO.

STANDARD CHECK LIST

SHEET 2 OF 9
REF : NO

DOCUMENTATION REQUIRED

1.1

SLD/GA/Schematic of the equipment

1.2

O & M Manuals

1.3

Manufacturers shop test result

1.4

Specification and vendor list with price catalogue for unquoted

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SL.NO.
2

SHEET 3 OF 9

GENERAL INSPECTION AND CHECKS


BUSBARS :

2.1

Checked the insulation resistance of the bus bar


R-Phase
Y-Phase
B-Phase
R-Y
Y-B
B-R

2.2

Checked th phase sequence and found OK

2.3

Checked the minimum clearences


R-Y
Y-B
B-R
R-E
Y-E
B-E

2.4

Checked all the joints for tightness and found OK

2.5

Checked the joint resistance for busbar joints


R-Phase

Y-Phase

B-Phase

Joint 1
Joint 2
2.6

Checked the size of neutral and found OK as per the specifications.

2.7

Checked the size of Earth bus and found OK as per the specifications.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

UNIQUE REF :

SL.NO.
3

STANDARD CHECK LIST

SHEET 4 OF 9
REF : NO

GENERAL INSPECTION AND CHECKS


CIRCUIT BREAKERS

3.1

Checked the insulation resistance of the breaker (Record values in sheet attached).

3.2

Checked the motor operated spring charging mechanism of the closing circuit.

3.3

Checked the manual operation of the breaker in 'TEST' and 'WITHDRAWN' positions

3.4

Checked the mechanical interlocks of the breaker

3.5

Checked the operation of the closing coil with supply voltage of 85% to 110% of rated voltage.

3.6

Checked the operation of the tripping coil with supply voltage of 70% to 120% of rated voltage.

3.7

Circuit breaker closing time is

R/Y/B =

3.8

Circuit Breaker opening time is

R/Y/B =

3.9

Circuit Breaker CO time is

R/Y/B =

Circuit Breaker contact resistance is

R/Y/B =

3.10.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

UNIQUE REF :

STANDARD CHECK LIST

SL.NO.
4

SHEET 5 OF 9
REF : NO

GENERAL INSPECTION AND CHECKS


CURRENT TRANSFORMERS

4.1

Checked the insulation resistance of the CT

4.2

Checked the Ratio of CT and found OK

4.3

Checked the polarity of CT and found OK

4.4

Checked the magnetising current of CT


POTENTIAL TRANSFORMER

Checked the insulation resistance of the PT (Values to be recorded in the format attatched).

5.1

Checked the ratio of BUS and LINE PT and found OK.

5.2

Checked the CORE-1ondary resistance of the BUS PT, R/Y/B =

All protection relays are checked for their healthiness.

Verification of wiring as per the schematic drawing.

FINAL IR CHECKS
Insulation resistance of the board has been checked with all modules inserted and with all breakers in
closed condition.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

UNIQUE REF :

STANDARD CHECK LIST

SHEET 6 OF 9
REF : NO

SL.NO.

GENERAL INSPECTION AND CHECKS


IR VALUE MEASUREMENT

Sl.No.

Between

Value

(Mohms)

Remarks

Contact Resistance Measurement

Sl.No.

Between

Value (Micro
ohms)

Remarks

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI

UNIQUE REF :

STANDARD CHECK LIST

EQUIPMENT : 33 KV
SWITCHGEAR

SHEET 7 OF 9
REF : NO

SL.NO.

GENERAL INSPECTION AND CHECKS


IR VALUE MEASUREMENT
PANEL N0 :
TERMINALS
R-PHASE
CT SL NO.
PR - E
CORE1-E
COR2-E
CORE3-E
CORE1-2
CORE2-3
CORE3-1

TERMINALS
CT SL. NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E
PR - CORE-1
TERMINALS
CT SL NO.
PR - E
CORE1-E

OF CURRENT TRANSFORMERS
DESIGNATION: INCOMER 1
Y-PHASE
B-PHASE
Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

BUS COUPLER
Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

PANEL N0 :
R-PHASE

Y-PHASE

DESIGNATION:
B-PHASE

Remarks

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

UNIQUE REF :

STANDARD CHECK LIST

SHEET 8 OF 9
REF : NO

SL.NO.

GENERAL INSPECTION AND CHECKS


CT RATIO TEST
CT SL. NO.
Pri. Amps

VT RATIO TEST
VT SL NO. Pri. Volts

Sec. Amps

Sec. Volts

Theo. Ratio

Actual Ratio

Remarks

Theo. Ratio

Actual Ratio

Remarks

IR VALUES MEASUREMENT OF CIRCUIT BREAKER


CB SL. NO:
Y PHASE
CONDITION
R PHASE
R- E .M Ohms
Y- E .M Ohms
CLOSE
R- R' .M Ohms
Y-Y' .M Ohms
OPEN

B PHASE
B- E .M Ohms
B-B' .M Ohms

CB SL. NO:
CONDITION
CLOSE
OPEN

R PHASE
R- E .M Ohms
R- R' .M Ohms

Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms

B PHASE
B- E .M Ohms
B-B' .M Ohms

CB SL. NO:
CONDITION
CLOSE
OPEN

R PHASE
R- E .M Ohms
R- R' .M Ohms

Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms

B PHASE
B- E .M Ohms
B-B' .M Ohms

CB SL. NO:
CONDITION
CLOSE
OPEN

R PHASE
R- E .M Ohms
R- R' .M Ohms

Y PHASE
Y- E .M Ohms
Y-Y' .M Ohms

B PHASE
B- E .M Ohms
B-B' .M Ohms

CB OPERATION TIMINGS
CB SL. NO
CONDITION
R PHASE
milli secs
CLOSE
milli secs
OPEN
milli secs
C- O TIME

Y PHASE
milli secs
milli secs
milli secs

B PHASE
milli secs
milli secs
milli secs

CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME

R PHASE
milli secs
milli secs
milli secs

Y PHASE
milli secs
milli secs
milli secs

B PHASE
milli secs
milli secs
milli secs

CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME

R PHASE
milli secs
milli secs
milli secs

Y PHASE
milli secs
milli secs
milli secs

B PHASE
milli secs
milli secs
milli secs

CB SL. NO
CONDITION
CLOSE
OPEN
C- O TIME

R PHASE
milli secs
milli secs
milli secs

Y PHASE
milli secs
milli secs
milli secs

B PHASE
milli secs
milli secs
milli secs

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : 33 KV
SWITCHGEAR

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 9 OF 9
REF : NO

DEFECTS AND OMISSIONS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :

ELECTRICAL
STATION - SIMHADRI

STANDARD CHECK LIST

PLANT ITEM :
BATTERY CHARGER

SHEET 1 OF 8
REF : NO

SUPPLIER :

AUXILIARY SUPPLY :

MANUFACTURER

LOCATION :

CONTRACT REF :

CIRCUIT :

TYPE :

IDENTIFICATION NO :

SL.NO :
RATED VOLTAGE :
RATED CURRENT :

SL.NO.
1

CONTENTS
Documents required

PAGE NO.
2

General Inspection/Checks

Defects/Omissions

Specifications

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 2 OF 8
REF : NO

DOCUMENTATION REQUIRED

1.1

Certificate of completion of erection

1.2

General Arrangement Drgs for lightning Arrester

1.3

Manufacturers Test results

DATE

1.4

O & M Manuals

1.5

Specifications and unpriced purchase order copies of


bought out items.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

STANDARD CHECK LIST

SHEET 3 OF 8
REF : NO

INITIAL CHARGING
4.
5.
6.
7.

1. TIME OF READING :
2. MODE OF CHARGE :
3. AMBIENT TEMP :

MAINS VOLTAGE :
CHARGER VOLTAGE :
CHARGER CURRENT :
NOMINAL VOLTAGE :

L = Level of Electrolyte, V = Voltage of Cell, SG = Specific Gravity of electrolyte, T= Temp.of Cell


Cell
No.

SG

Cell
No.

SG

Cell
No.

SG

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

ERECTION
FQA
O&M

UNIQUE REF :

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

6.0

STANDARD CHECK LIST

SHEET 4 OF 8
REF : NO

PROTECTIONS :
1
2
3
4
5
6

AC input MCCB
DC Input MCCB
Fast semiconductor fuses for rectifier bridge.
Over voltage cutback.
Charger over load.
Battery charging current limit.

DATE

7. 0

7
8

Blocking diode
Protection against current/voltage surges during auto/manual

Checked operation of all control and selector switches


mounted on the panels and ensured correct functioning
checked DC correct interlocking.
Checked operation of Alarm & Annunciation (where applicable)
for correct functioning.
Checked operating of Float and Boost charging to the Battery
DCDB.
Set all relays as per recommended setttings. (During initial
charging some of these should be changed to recommended
values after charging.)

OPERATIONAL TEST :

2
3
4

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

UNIQUE REF :

STANDARD CHECK LIST

SHEET 5 OF 8
REF : NO

8.0
SL.NO.

DEFECTS / OMISSIONS

REMARKS

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER
9.0

UNIQUE REF :

STANDARD CHECK LIST

SHEET 6 OF 8
REF : NO

SPECIFICATIONS :

SL.NO & DESCRIPTION

SPECIFIED

ACTUAL

1.0 Manufacturer
2.0 Catalogue attached as Annexure No.
3.0 Charger rated output current
I. Tirckle charging mode
ii. Boost charging mode
4.0 Load limiter current setting range
(Trickle mode)
5.0 Automatic voltage regulator
I. Type
ii. Percentage stabilisation of the
output D.C voltage
iii. Voltage setting range
iv. Response time of automatic
Voltage regulator.
6.0

Manual Voltage Regulator


I. Type
ii. Voltage setting range

7.0 Boost charging current setting range


8.0 Boost charging voltage limit setting
range
9.0

Degree of protection for charger IP42/


IP3X For A.C area

10.0
10.1
10.2
10.3
10.4
10.5

Rectifier assembly
Type of semiconductor material
Rated direct current
Rated direct voltage
Standard applicable
Catalogue attached as Annexure No.

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M
ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

UNIQUE REF :

STANDARD CHECK LIST

SHEET 7 OF 8
REF : NO

SL.NO & DESCRIPTION

SPECIFIED

ACTUAL

11.0 Rectifier transformer


11.1 Type
11.2 Rated MVA
11.3 Standard applicable.
12.0
12.1
12.2
12.3

Contactors
Manufacturer
Type designation
Catalogue attached as Annexure No.

13.0
13.1
13.2
13.3

Air break Switches


Manufacturer
Type designation
Catalogue attached as Annexure NO.

14.0
14.1
14.2
14.3

Fuses
Manufacturer
Type designation
Catalogue attached as Annexure No.

15.0 Float Voltage - I. Auto


ii. Manual
16.0 Boost Voltage - I. Auto
ii. Manual
17.0 Current Limiter function- I. Auto
ii. Manual
18.0 AC over load

I. Auto
ii. Manual

19.0 DC over load

I. Auto
ii. Manual

20.0 Full load throw off voltage - I. Auto


ii. Manual
REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
PLANT ITEM :
BATTERY CHARGER

UNIQUE REF :

STANDARD CHECK LIST

SL.NO & DESCRIPTION


21.0 Ripple contents - I. Auto
ii. Manual

SHEET 8 OF 8
REF : NO

SPECIFIED

ACTUAL

22.0 Alarm checks - I. Auto


ii. Manual

23.0 Type test report enclosed as Anneuxre No

10.0

FINAL DOCUMENT REVIEW :

Inspection record of Installation & equipment checked for


Completeness & approval.

REMARKS :NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT : NICKEL
CADMIUM BATTERIES

UNIQUE REF :

STANDARD CHECK LIST

REF : NO

SUPPLIER :
MANUFACTURER
DC VOLTAGE:
LOCATION: 400 KV Switchyard

SL.NO.
1

REMARKS :-

SHEET 1 OF 5

TYPE :
NICKEL CADMIUM
SL. NO.:
CAPACITY:
IDENTIFICATION NO :

CONTENTS
Documents required

PAGE NO.
2

General Inspection/Checks

Defects and/or Omissions

NTPC SIGNATURE

CONTRACTORS SIGNATURE

DATE

ERECTION
FQA
O&M

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 2 OF 5
REF : NO

DOCUMENTATION REQUIRED

1.1

Technical Specifications

1.2

O & M Manuals

1.3

Manufacturer Shop Test result

1.4

Specifications and unpriced purchase order copies of


bought out items.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES

UNIQUE REF :

STANDARD CHECK LIST

SHEET 3 OF 5
REF : NO

SL.NO.

GENERAL INSPECTION & CHECKS

General Inspection
1.1 Check battery rating
1.2 Check batteru case and terminals for any damages,
and for cleanliness of vent plugs
1.3 Check positive and negative terminals of cells are
placed correctly to build up complete battery
1.4 Check polarity of external cables from battery
charger to the battery bank
1.5 Check tightness of all connector strips,hardwares.

INITIAL FILLING OF ELECTROLYETE


2.1 Check the density of the electrolyte. Verification of
Grade/Composition(visual) as per manufacturers practice
2.2 Ensure tjhat the cells are filled with electrolyte to a
level that is 10-15 mm above lower level mark of the
cells

INITIAL CHARGING
3.1 Ensure that during any quick charging periods and
setting different levels,the DC distribution circuit is
isolated from the battery and rectifier equipment.
3.2 Ensure that maximum charging current does not exceed the rated current of the rectifier.
3.3 Check against the circuit diagram that the batteries
are connected correctly to the charging rectifier.
3.4 Ensure that Quick Charging voltages which exceed
110 % of the nominal voltages are blocked.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 4 OF 5
REF : NO

GENERAL INSPECTION & CHECKS


3.5 Ensure that during Quick charging II battery and rectifier are
isolated from the other parts.
3.6 Record the results of specific gravity,temp and voltage of
each cell as given in enclosed tables after float charging of
24 hours.
3.7 Ensure that the termperature of the electrolyte does not
rise beyond 40 deg for lead acid batteries and beyond 45
deg for alkaline batteries during charging.

CAPACITY TEST OR DISCHARGE TEST


4.1 Check level of the electrolyte.
4.2 Check that the load resistor is positioned atleast 10 mtrs
from the battery
4.3 Ensure that during discharge, current is held constant to
within +/- 3 %
RECHARGE
5.1 Ensure that after discharge test termination,rectifier is
connected in float charging for a period of 2 hrs and
thereafter the battery is quick charged(Quick Charging II)
for 1 hr.
5.2 Ensure that after completion of quick charging rectifier
switched to float charging at least one day
5.3 Check electrolyte level,cell voltage and electrolyte density
of each cell after float charging

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

ELECTRICAL
STATION - SIMHADRI
EQUIPMENT: NICKEL
CADMIUM BATTERIES

SL.NO.

UNIQUE REF :

STANDARD CHECK LIST

SHEET 5 OF 5
REF : NO

OMISSIONS AND/OR DEFECTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS

SUPPLIER :
MANUFACTURER
RATING: VOLTAGE
CIRCUIT:

SL.NO.
1

SHEET 1 OF 4
REF : NO

TYPE :
SL. NO.:
CURRENT:
IDENTIFICATION NO :

CONTENTS
Documents required

PAGE NO.
2

General Inspection/Checks

Defects and/or Omissions

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS

SL.NO.

SHEET 2 OF 4
REF : NO

DOCUMENTATION REQUIRED

1.1

Technical Specifications

1.2

Manufacturer Shop Test result

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS

SHEET 3 OF 4
REF : NO

SL.NO.

GENERAL INSPECTION & CHECKS

1.1

Checked cleanliness of insulators and checked hardwares

1.2

Ensured that after assembly of discs,split pins are split


fully. Vertical downward pull loading of the beams should
be avaoided during stringing.

1.3

Check that insulators are not chipped or cracked

1.4

Checked that arcing horns and grading rings have been


fitted, as specified.

1.5

Checked that arcing horns are adjusted for proper


orientation and correct gap.

1.6

Checked that buckles are fitted in locations as specified.

1.7

Checked use of suitable crimping tool, where applicable.

1.8

Checked mounting of sag compensator, turn buckles/


tie-rods as per drawings.

1.9

Checked that the conductors are cut only after ensuring


correct tension or sag at ambient temp.

1.10.

Checked that suitable length of conductor is used for


joining the Bus bars of adjacent spans to avoid swing
pull.

1.11

Checked that dropper connections are neither too loose


nor tight to avoid swing/pull on equipment or bus bards
which they are connecting.

1.12

Checked for correctness and tightness of clamp/


connector and hardwares.

1.13

Checked that deoxidising grease is ued on conductors


and clamps before connection & bimetalic strip/tubes
used, where applicable.

1.14

Checked that spacers are used where more than one


conductor is used in parallel.

1.15

Checked that corona rings/spheres and arcing horns are


properly mounted.

1.16

Checked phase to phase and phase to earth clearances


in critical places.

1.17

Checked tension for conductor & proper tightning.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV MAIN BUS

SL.NO.

SHEET 4 OF 4
REF : NO

OMISSIONS AND/OR DEFECTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM

SUPPLIER :
MANUFACTURER
RATING: VOLTAGE
CIRCUIT:

SL.NO.
1

SHEET 1 OF 5
REF : NO

TYPE :
SL. NO.:
CURRENT:
IDENTIFICATION NO :

CONTENTS
Documents required

PAGE NO.
2

General Inspection/Checks

Defects and/or Omissions

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM

SL.NO.

SHEET 2 OF 5
REF : NO

DOCUMENTATION REQUIRED

1.1

Technical Specifications

1.2

Manufacturer Shop Test result

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM

SL.NO.

SHEET 3 OF 5
REF : NO

GENERAL INSPECTION & CHECKS

1.1

Checked burial depth of earth mat

1.2

Checked overlap of joints

1.3

Ensured use of proper electrodes for welding

1.4

Checked for proper application of protective paint

1.5

Checked that in case of road,trench etc.,buried pipes


crossing the earthing rod/strip is taken below the crossing

1.6

Checked that earthpits are properly prepared for electrodes

1.7

Checked earting of structure

1.8

Checked clamping/support of earth flats

1.9

Checked earthing of cable supports

1.10.

Checked earthing of fence and gates

1.11

Checked earting of all equipment strtucture and equipment

1.12

Checked earthing of rail tracks

1.13

Checked earth ring inside building

1.14

Checked that all equipment/panels insided the building are


connected to the earthing ring.

1.15

Checked that corona rings/spheres and arcing horns are


properly mounted.

1.16

Checked phase to phase and phase to earth clearances


in critical places.

1.17

Checked tension for conductor & proper tightning.

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM

SL.NO.
1.18

SHEET 4 OF 5
REF : NO

GENERAL INSPECTION AND CHECKS


EARTH ELECTRODE RESISTANCE MEASUREMENT
measured and recorded the earth resistance value of each
earth electrode by earth resistance Megger
Sl
.No
of pit

1.19

Resistance in Ohms

Sl .No of
pit

Resistance in Ohms

Measure the earth resistance of Main earth mat


Resistance:

.Ohms

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

UNIQUE REF :
ELECTRICAL
STANDARD CHECK LIST
STATION - SIMHADRI
EQUIPMENT : 400 KV SWITCHYARD EARTHING SYSTEM

SL.NO.

SHEET 5 OF 5
REF : NO

OMISSIONS AND/OR DEFECTS

REMARKS :NTPC SIGNATURE


ERECTION
FQA
O&M

CONTRACTORS SIGNATURE

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SUPPLIER: BHEL

CONTRACT REF:

MANUFACT TYPE:

SL. NO:

IDENTIFICATION:

AVAILABLE RATIO:

NORMAL SYSTEM VOLTAGE:

DYNAMIC WITHSTAND AMPS:

SHORT TIME THERMAL RATING:


NO OF CORES:
SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

TEST RESULTS AT SITE

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 RELEVANT DRGS AND DATA SHEETS


1.2 TEST RESULTS LIKE RATIO TEST,KNEE PT TEST,MAG
CURRENT TEST etc.
1.3 O & M MAUALS
1.4 SPECS AND UNPRICED PURCHASED ORDER COPIES OF
BOUGHT OUT ITEMS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

CURRENT TRANSFORMER
GENERAL INSPECTION AND CHECKS

REMARKS

2.1 Check that there is no damage to any porcelain part of the CT


2.2 Check general tightness of the Bolts Clamps and terminals etc.
2.3 Check oil level.
2.4 Check any oil leakages from gaskets/joints
2.5 Check tightness of earth connection and continuity
2.6 Check corona ring for cleanliness and any damages like stain marks
2.7 @ Ensure correctness of internal wiring and connection upto JB
2.8 $ Ensure primary side connections to be proper
2.9 Check ferrule numbers
2.10 Check if the Power Factor testing terminal is earthed
2.11 Check if the spark Gap setting is as specified(6mm)
Ref Documents : @ Wiring Diagram No.:$ Schematic Drawing No:-

3 562 006 0296

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.1 INSULATION RESISTANCE BY 5 KV MEGGER AND RECORD


THE VALUES
Primary and Earth :
Primary and Secondary:
CORE-1

M Ohms

CORE-2

M Ohms

CORE-3

M Ohms

CORE-4

M Ohms

CORE-5

M Ohms

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.2 INSULATION RESISTANCE BY 500 V MEGGER AND RECORD


THE VALUES BETWEEN SECONDARIES

CORE-1 TO EARTH

M Ohms

CORE-1 TO CORE-2

M Ohms

CORE-2 TO EARTH

M Ohms

CORE-1 TO CORE-3

M Ohms

CORE-3 TO EARTH

M Ohms

CORE-1 TO CORE-4

M Ohms

CORE-4 TO EARTH

M Ohms

CORE-1 TO CORE-5

M Ohms

CORE-5 TO EARTH

M Ohms

CORE-2 TO CORE-3

M Ohms

CORE-2 TO CORE-4

M Ohms

CORE-2 TO CORE-5

M Ohms

CORE-3 TO CORE-4

M Ohms

CORE-3 TO CORE-5

M Ohms

CORE-4 TO CORE-5

M Ohms
3.3 WINDING RESISTANCE AT AMBIENT TEMPERATURE
CORE-1

(1S1-1S2)

..

Ohms

CORE-2

(2S1-2S2)

Ohms

CORE-3

(3S1-3S2)

Ohms

CORE-4

(4S1-4S2)

Ohms

CORE-5

(5S1-5S2)

Ohms

DEG C

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.4 PRIMARY INJECTION:


Primary injection kit of 400 Amp to be used in primary in steps and measure secondary current and record
to establish the ratio in each core.
CORE NO PRIMARY TERMINALS
1

1S1-1S2
1S1-1S3

2S1-2S2
2S1-2S3

3S1-3S2
3S1-3S3

4S1-4S2
4S1-4S3

5S1-5S2
5S1-5S3

3.5 POLARITY TEST


CORE NO

SECONDARY CURRENT (mA)

POLARITY STATUS

CORE-1

OK / NOT OK

CORE-2

OK / NOT OK

CORE-3

OK / NOT OK

CORE-4

OK / NOT OK

CORE-5

OK / NOT OK

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 7 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CURRENT TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.6 MAGNETISATION CHARACTERISTICS:

This test has to be done to all cores and secondary currents to be established.
CORE NO SY VOLTS

SY AMPS

SY VOLTS

SY AMPS

SY VOLTS

SY AMPS

1S1-1S2
2S1-2S2
3
4S1-4S2
5S1-5S2

3.7 KNEE POINT TEST OF THE C.T.


CORE NO

APPLICATION

MAX EXCITING
CURRENT(mA) AT
KNEE POINT VOLTAGE

CORE-1

Bus/Tee Diff(Check)

CORE-2

Bus/Tee Diff(Main)

CORE-3

Metering

CORE-4

Tr./Line Protection

CORE-5

Tr./Line Protection

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 8 OF9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

CURRENT TRANSFORMER
TESTS AND RESULTS

3.8 Nitrogen Pressure:


3.9 Tan Delta :
3.10 Capacitance :

Kg/cm2
.

at 10 KV

at 10 KV

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 9 OF9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

CURRENT TRANSFORMER
OMISSIONS/DEFECTS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CAPACITANCE VOLTAGE TRANSFORMER

SUPPLIER: BHEL

CONTRACT REF:

MANUFACTURER :

TYPE:

SL. NO:

IDENTIFICATION:

RATED VALUE : (Ph to Neutral)

TOTAL CAPACITANCE :

CAPACITANCE C1 :

CAPACITANCE C2 :

NOMINAL INTERMEDIATE VOLTAGE


(P to E)
VOLTAGE FACTOR :

TRANS ADJUSTMENT RANGE


SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

TEST RESULTS AT SITE

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.
1. M/S.B H E L

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CAPACITANCE VOLTAGE TRANSFORMER

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 RELEVANT DRGS AND DATA SHEETS


1.2 TEST RESULTS LIKE INSULATION RESISTANCE,RATIO TEST
, POLARITY TEST etc.
1.3 O & M MAUALS
1.4 SPECS AND UNPRICED PURCHASED ORDER COPIES OF
BOUGHT OUT ITEMS

REMARKS:

NTPC SIGNATURE

CONTRACTOR SIG.

1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

CAPACITANCE VOLTAGE TRANSFORMER


GENERAL INSPECTION AND CHECKS

REMARKS

2.1 Check that there is no damage to any porcelain part of the CVT
2.2 Check general tightness of the Bolts Clamps and terminals etc.
2.3 Check oil level.
2.4 Check any oil leakages from gaskets/joints
2.5 Check tightness of earth connection and continuity
2.6 Check terminal box is properly sealed and locking aerrangement is
provided
2.7 @ Ensure correctness of internal wiring and connection upto JB
2.8 $ Ensure primary side connections to be proper
2.9 Check Corona rings and corona shields that are provided are clean and
have no stain marks
2.10 Check all ferrule numbers

Ref Documents : -

@ Wiring Diagram No.:$ Schematic Drawing No:-

3 562 006 0296

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.
1. M/S.B H E L

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CAPACITANCE VOLTAGE TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.1 INSULATION RESISTANCE BY 5 KV MEGGER AND RECORD


THE VALUES
Primary and Earth :

M Ohms

Primary and Secondary:


CORE-1

M Ohms

CORE-2

M Ohms

CORE-3

M Ohms

AT 10 KV
C VALUE :
TAN DELTA:

REMARKS:

NTPC SIGNATURE

CONTRACTOR SIG.

1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CAPACITANCE VOLTAGE TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.2 INSULATION RESISTANCE BY 500V MEGGER AND RECORD


THE VALUES BETWEEN SECONDARIES AND EARTH
Primary and Secondary:
CORE-1 TO EARTH

M Ohms

CORE-2 TO EARTH

M Ohms

CORE-3 TO EARTH

M Ohms

CORE-1 TO CORE-2

M Ohms

CORE-1 TO CORE-3

M Ohms

CORE-2 TO CORE-3

M Ohms

3.3 WINDING RESISTANCE OF SECONDARIES


CORE-1

Ohms

CORE-2

Ohms

CORE-3
REMARKS:

Ohms

NTPC SIGNATURE

CONTRACTOR SIG.

1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

CAPACITANCE VOLTAGE TRANSFORMER

SL.NO.

TESTS AND RESULTS

3.4 RATIO TESTS:


Check ratio of primary to Secondary volts buy applying a voltage at H.T Terminal and
measure by use of P.T and measure the Sy, voltage at all the cores and record to establish the ratio in
each core.
CORE NO.

PRIMARY VOLTS

SECONDARY VOLTS

1
2
3
3.5 POLARITY TEST : Check polarity of each Secondary with respect to Primary
CORE NO.

POLARITY STATUS

OK/NOT OK

OK/NOT OK

OK/NOT OK

REMARKS:

NTPC SIGNATURE

CONTRACTOR SIG.

1. NTPC ERECTION
1. M/S.B H E L
2. F Q A DEPT
3. NTPC O&M

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 7 OF 7

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

CAPACITANCE VOLTAGE TRANSFORMER


OMISSIONS/DEFECTS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EARTHING SWITCH

SUPPLIER: BHEL
MANUFACTURER:

TYPE:
S& S CHENNAI

A.C. SUPPLY:

VOLTS:

CENTRE BREAK

SL. NO.:
AMPS:

LOCATION:
CIRCUIT:
IDENTIFICATION:
SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EARTHING SWITCH

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 SLD of the equipments

1.2 O & M Manuals

1.3 Manufacturer shop test result

1.4 Specifications & unpriced purchase order of bought out items

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

EARTHING SWITCH
GENERAL INSPECTION AND CHECKS

REMARKS

1 Check that erection work is complete


2 Check alignment of earthing arm and contact. Blade distance to contact axis
shall not be more than 10 mm.
3 Check play of earthing arm to stop is nil when the switch is in on position.
4 Check operating mechanism alignment
5 Check operating linkage for group drive alignment & play (where applicable)
6 Check all switches operate at the same time.
7

1. Check thermal ov erload relay for motor and record results on


standard for ON
2. Check lubrication of moving parts
3. Prove all electrical interlocks with reference to drawings.
4. Check Coupling to drive rod.
5. Measure winding resistance of operator drive motor.
6. Switch on A.C. supplies from switchyard MCC. Check voltage
and phase sequence at operating mechanism only.

8 Record motor operating time for :


Switch ON
Switch OFF
9 Repeat items 1 to 8 for other 2 Poles.

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

EARTHING SWITCH
OMISSIONS/DEFECTS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

SF6 CIRCUIT BREAKER

SUPPLIER:

BHEL

AUX SUPPLY:

MANUFACTURER:

BHEL

LOCATION:

CONTRACT REF:

CIRCUIT :

TYPE:

IDENTIFICATION NO:

3 AT 2

SL. NO:
RATED VOLTAGE:

420 KV

YEAR OF MANUFACTURE:

RATED CURRENT:

3150 AMPS

CONTROL VOLTAGE:

SL.NO

CONTENTS

220 V DC
PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

SF6 CIRCUIT BREAKER

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 RELEVANT DRGS AND DATA SHEETS


1.2 MANUFACTURER'S TEST REPORTS

1.3 O & M MAUALS


1.4 SPECS AND UNPRICED PURCHASED ORDER COPIES OF
BOUGHT OUT ITEMS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

SF6 CIRCUIT BREAKER


GENERAL INSPECTION AND CHECKS

REMARKS

2.1 Checked that breaker base is placed on structure as per the drg.
2.2 Checked for marking on support insulators, operating rods,
interrupters and match with marking on base frame.
2.3 Checked that desiccant bags are removed from inside the
interrupter chamber before installing.
2.4 Checked that length of operating rod is adjusted as per supplier's
Manual
2.5 Checked vacuum sealing of filter tin.
2.6 Checked that filter in is opened only after breaker assembly and prior
to vacuum pulling. Checked that filters are not in contact with air for
morethan one hour.
2.7 Checked that desiccant bags are removed from the filter sumps and
the sumps are cleaned before filling them with filter materials.
2.8 Checked for vacuum pulling and SF6 gas filling at specified pressure
as per the procedure given in suppliers manual.
2.9 Checked for any leakage of SF6 gas from joints using leak deterctor
or soap solution.
Checked SF6 gas pressure daily for few weeks to ensure that there is
no leakage of SF6 gas pressure at the pressure of 2 bars. Both
pressure and temperature readings taken preferably at the same time
of the day.
2.11 Checked and ensured proper fucntioning of pressure and SF6 density
monitors.
2.10

2.12 Checked for filling of oil tank with hydraulic oil of Manufacturer's
specification only. Ensured opening of vent and pressure release system
and filling of oil to proper level.
2.13 Ensured venting of oil system is carried out as per the procedure
given in supplier's manual.
2.14 Ensured topping up of oil tank, closing of pressure release valve and
raising oil pressure to specified value.
2.15 Checked that there is no oil leakage.
2.16 Checked that earthing of support structure, breaker frame and MOM
boxes is carried out properly.
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

SF6 CIRCUIT BREAKER


GENERAL INSPECTION AND CHECKS

2.17 Checked that cables have been terminated in MOM boxes of breaker as per the cable
schedule and equipment wiring diagram. Checked proper glanding of cables and ensured
plugging of unused cable entries of MOM boxes. Sealing and locking of MOM boxes against
water entry.
2.18 Checked insulators, interrupter bushings for any breakages/damages subsequent to
installation.
2.19 Checked earthing of circuit breaker structure and local control cabine at prescribed points.
2.20 Checked correctness of hydraulic oil level nad SF6 gas pressure.
2.21 Checked supply polarity to closing and tripping coils.
2.22 Checked rating of fuses as per scheme/wiring diagram and soundness of fuses and links.
2.23 Checked availability of AC/DC auxiliary supply to breaker.
2.24 Checked correctness of auxiliary switch contacts position in 'OPEN' and 'CLOSE' condition
of breaker.
2.25 Checked closing and opening operation electrically in local mode.
2.26 Checked indications for closing and tripping operation at remote end.
2.27 Checked tripping of breaker by simulating tripping relay in the circuit.
2.28 Checked operation of breaker alrk and Indications by simulation.
2.29 Checked correctness of hydraulic oil level.
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

SF6 CIRCUIT BREAKER

SL.NO.

GENERAL INSPECTION AND CHECKS

3.1 SF6 DENSITY MONITOR


Make / Model :

Sl.No.

SF6 PRESSURES at 34 Deg.C in BAR


Observed Value
RATED
7.5
ALARM 6.7+/-0.1
LOCKOUT 6.5+/-0.05
3.2 HYDRAULIC PRESSURE MONITORING
Observed Value
Setting of PRV
350 Bar
Pump "ON"
313 +/-3
Pump "OFF"
325+/-3
Auto reclose lockout
303+/-3
Closing lockout
273+/-3
General lockout
253+/-3
3.3 PRESSURE DROPPINGS

Initial
Pressure
Bar
310
310
310
310

Operation
0
C
C0
0C0

Final
Pressure
Bar
295
302
285
270

Lock out devices


operated

Final
pressure
Bar

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

SF6 CIRCUIT BREAKER

SL.NO.

GENERAL INSPECTION AND CHECKS

3.4 N2 LOCK OUT - N.A.


RATED
LOCKOUT

200

Observed Value
N.A
N.A

3.5 Breaker operating timings

R-Phase
Y-Phase
B-Phase

Closing Time
Opening time
Expected Measured Expected Measured
100 Max
22 Max
100 Max
22 Max
100 Max
22 Max

Close - Open
Expected Measured

3.6 CONTACT RESISTANCE


R-Phase
Y-Phase
B-Phase

3.7 Trip coils, Closing coil resistance and currents


TC-1
R

CURRENT

TC-2
CURRENT

CC
CURRENT

R-Phase
Y-Phase
B-Phase
3.8 GRADING CAPACITORS CAPACITANCE AND TAN DELTA
Capacitance in pF
R-Phase
Y-Phase
B-Phase

Tan Delta

REMARKS :
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 7 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

SF6 CIRCUIT BREAKER


GENERAL INSPECTION AND CHECKS

4.1 Checked all internal interlocks of circuit breaker (like loss of SF6, low oil pressure etc.)
4.2 Checked operation of Circuit Breaker from all points.
4.3 Checked termination of all power and control cables in the local control
Cabinet as per cable schedule and checked plugging of all unsued cable entry
holes and termination of unused cores on spare TBs.
4.4 Checked for pole discrepency protection of the breaker.
4.5 Checked for the Anti-pumping protection of the breaker.(A7/A13)
4.6 Oil Pressure monitor :
I. Pump ON/OFF-B1(A1) bar ii. Pump running time in Sec.
4.7 Auto reclose lockout (oil)
Pressure contact B2(A4) make/break
4.8 Closing lockout(oil)
Pressure contact B2(A2/A12)make/break
4.9 General lockout(oil)
Pressure contact B2(A3/A10) make/break
4.10 a

Checking loss of Nitrogen pressure contact


B1(A8/A10/A12) make/break

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 8 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

SF6 CIRCUIT BREAKER

SL.NO.

GENERAL INSPECTION AND CHECKS


IR VALUE OF CONTROL CIRCUIT :

(Using 500V megger-minimum value 2M OHM)

Caution : Isolate necessary Dc for trip coil-1 and trip coil-2, closing coil before megerring.

COIL DETAILS
R-PHASE TRIP COIL - I
R-PHASE TRIP COIL - II
R-PHASE CLOSE COIL
Y-PHASE TRIP COIL - I
Y-PHASE TRIP COIL - II
Y-PHASE TRIP COIL
B-PHASE TRIP COIL -I
B-PHASE TRIP COIL-II
B-PHASE CLOSE COIL

MEASUREMENT VALUE

IR VALUE WITH BREAKER OPEN :


BETWEEN

MEASUREMENT VALUE

R-PHASE
Y-PHASE
B-PHASE

IR Value with respect to earth with breaker closed earth switch and isolator open :
(Using 5000v megger - minimum value 1000 M OHM)
BETWEEN
R-PHASE & EARTH
Y-PHASE & EARTH
B-PHASE & EARTH

MEASUREMENT VALUE

Final Checking :
1
2
3
4
5
REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

Tightness of all bolts and nuts


Final SF6 pressure at Deg.C
Hydraulic oil level.
Tightness of pressure relief screw.
Final counter readings.

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 9 OF 9

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

SF6 CIRCUIT BREAKER


OMISSIONS/DEFECTS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

LIGHTNING ARRESTOR

SUPPLIER: BHEL

AUX SUPPLY:

MANUFACTURER:

LOCATION:

CONTACT REF:

CIRCUIT:

TYPE:

IDENTIFICATION NO.

SL. NO:
RATED VOLTAGE:
RATED CURRENT:
SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

SPECIFICATIONS

GENERAL INSPECTION AND CHECKS

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

LIGHTNING ARRESTOR

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 Verification that construction/erection is completed


1.2 General Arrangement drawings for lightning arrestor
(Metal Oxide Arrestor)
1.3 IOM received from erection department that erection has been
completed
1.4 Manufactureres shop test result
1.5 O & M manuals
1.6 Specification and vendor list with price catalogue for unquoted items.

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

LIGHTNING ARRESTOR

SL.NO.

SPECIFICATIONS

REMARKS

2.1 Arrestor class & type :


2.2 Rated Arrestor Voltage:
2.3 Rated Frequency:
2.4 Nominal discharge current:
2.5 Minimum discharge capability:
2.6 Minimum switching surge spark over Voltage:
2.7 Maximum front of ware spark over Voltage:
2.8 One minute power frequency withstand voltage:
2.9 1.2/50 micro second impulse withstand voltage:
2.10 Pressure relief class:

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

LIGHTNING ARRESTOR
GENERAL INSPECTION AND CHECKS

3.1 Check that there is no damage to any part of L.A


3.2 Check tightness of the bolts,clamps and terminals
3.3 Check insulator is clean and free from dust
3.4 Check corona ring fittings and rings are clean,free from strains.
3.5 Check discharge counter and note initial reading
3.6 Check pressure relief divice,obtain factory test result certificate.
3.7 Check insulating bases and live terminal connections satisfactory.
3.8 Check ground terminal connections of L.A and surge Counter are O.K.

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

LIGHTNING ARRESTOR

SL.NO.

GENERAL INSPECTION AND CHECKS

3.9 INSULATION RESISTANCE

(In M Ohms)

Megger used. 5 KV

Serial NO.

Ambient Temp.

Make
R-Phase

Y-Phase

B-Phase

Top & Earth


5 th Stack & Earth
4 th Stack & Earth
3 rd Stack & Earth
2 nd Stack & Earth
1 st Stack & Earth
Stool & Earth
3.10 EARTH RESISTANCE
R ph

Y ph

Record Value of earth resistance offered in L.A. discharge Path


3.11 Leakage Current meter to be check for correctness by current injection.
R ph

At

V,Current

. m A

Y ph

At

V,Current

. m A

B ph

At

V,Current

. m A

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

B ph

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

LIGHTNING ARRESTOR
DEFECTS AND/OR OMMISSIONS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

ISOLATOR

SUPPLIER: BHEL
MANUFACTURER:

AUX SUPPLY:
S& S CHENNAI

220 V DC - Control
415 V AC - Motor

LOCATION:

CONTACT REF:

CIRCUIT:

TYPE:

IDENTIFICATION NO.

HORIZONTAL CENTRE BREAK

RATED VOLTAGE:
RATED CURRENT:
SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

ISOLATOR

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 O & M Manuals,Drawings,Schematics

1.2 Factory test Result

1.3 Specifications & unpriced purchase order of bought out items

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

ISOLATOR
GENERAL INSPECTION AND CHECKS

REMARKS

2.1 Check that erection work is complete and erection


completion certification available.
2.2 Check availability of 220 V DC control supply and 230 V AC supply.
2.3 Check that foundation bolts are tight.
2.3a Check that the pole labelling and identification

2.4 Check proper alignment of 3 phases.


2.5 Check that support insulator bolts are tight
2.6 Inspection insulator for damage or dirt
2.7 Check corona rings are provided and are securely fixed
2.8 Check clearance in contacts are as per manufacturers
specifications.
2.9 Check contacts are properly greased.
2.10 Check stopper for On/Off position
2.11 Check all 3 poles operation simultaneously.
2.12 Check lubrication of all moving parts.

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

ISOLATOR

SL.NO.
GENERAL INSPECTION AND CHECKS
2.13 Ensure double earthing at:
1. Channel Base
2. Operating Box Mechanism
3. Earthing Blade
4. Isolator Structure Base
2.14 Check coupling with motor operating mechanism.
2.15 Check mechanical interlock provided with earth switch.
2.16 Check motor operating mechanism
2.17 Check remote/local indicator for correct status.
2.18 Check working of local/remote switches.
2.19 Check all auxiliary contacts for correct functioning
2.20 Operating Time:
Opening

Closing

R ph
Y ph
B ph

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.
2.21 Insulation Resistance

ISOLATOR
GENERAL INSPECTION AND CHECKS
(In M Ohms)

Megger used. 5 KV

Serial NO.

Ambient Temp.

Make

(Between Line - Earth In open condition)


(Bus side)

(Line side)

(Closed condition)

R-E
Y-E
B-E
2.22 Contact Resistance:
Measure and record contact resistance by passing 300 A of DC from welding generator
and measuring the voltage drop across contact.
Contact resistance in Ohms
R ph
Y ph
B ph

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

ISOLATOR
DEFECTS AND/OR OMMISSIONS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 1 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SUPPLIER: BHEL

CONTRACT REF:

MANUFACTURER:

SL. NO:

LOCATION:

CIRCUIT:

TYPE:

IDENTIFICATION NO.:

RATED VOLTAGE:
SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

TESTS AND RESULTS

OMMISSIONS/DEFECTS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 2 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SL.NO.

DOCUMENTS REQUIRED

REMARKS

1.1 O & M MANUALS

1.2 FACTORY TEST RESULT

1.3 SPECS AND UNPRICED PURCHASED ORDER COPIES OF


BOUGHT OUT ITEMS

REMARKS:

NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 3 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

BUS POST INSULATOR


GENERAL INSPECTION AND CHECKS

REMARKS

2.1 Check that erection work is complete and erection completion


certification available
2.2 Check that foundation bolts are tight
2.3 Check that the pole labelling and identification
2.4 Check that support insulator bolts are tight
2.5 Inspection insulator for damage or dirt
2.6 Check whether the thread for the clamp(on the top) is OK>

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 4 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SL.NO.

TESTS AND RESULTS

3.1 INSULATION RESISTANCE BY 5 KV MEGGER AND RECORD


THE VALUES

(BUS - 1) NO
R
R1
Y
Y1
B
B1
R
R2
Y
Y2
B
B2
R
R3
Y
Y3
B
B3
R
R4
Y
Y4
B
B4
R
R5
Y
Y5
B
B5
R
R6
Y
Y6
B
B6
R13

M OHM

Y13

(BUS - 1) NO
M OHM
R
R7
Y
Y7
B
B7
R
R8
Y
Y8
B
B8
R
R9
Y
Y9
B
B9
R
R10
Y
Y10
B
B10
R
R11
Y
Y11
B
B11
R
R12
Y
Y12
B
B12
B
B13

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 5 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SL.NO.

TESTS AND RESULTS

(BUS - 2) NO
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R

M OHM

(BUS - 2) NO
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B
B

M OHM

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 6 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SL.NO.

TESTS AND RESULTS

(L3- L4
TIE)
R
Y
B
R
Y
B
(L1-L2
TIE)
R
Y
B
R
Y
B

NO

M OHM

NO

M OHM

(ST-GT1
TIE)
R
Y
B
R
Y
B

NO

M OHM

(ST TRF) NO
R
Y
B
R
Y
B

M OHM

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 7 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

BUS POST INSULATOR

SL.NO.

TESTS AND RESULTS

(GT2
TIE)
R
Y
B
R
Y
B
R
Y
B
R
Y
B
R
Y
B

NO

M OHM

(GT1
TRF)
R
Y
B
R
Y
B

NO

M OHM

(GT2 TRF) NO
R
Y
B
R
Y
B

M OHM

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :NTPC,SMPP

REF NO.

SHEET 8 OF 8

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:
SL.NO.

BUS POST INSULATOR


OMISSIONS/DEFECTS

REMARKS:
NTPC SIGNATURE
1. NTPC ERECTION
2. F Q A DEPT
3. NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 1 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST

DISTURBANCE RECORDER

SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

OMMISSIONS/DEFECTS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

12

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 2 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

DOCUMENTS REQUIRED

1 .0

SLD/GA/SCHEMATIC OF THE EQUIPMENT

2 .0

O&M MANUALS

3 .0

MANUFATURERS SHOP TEST RESULTS

4 .0

SPECIFICATIONS AND UNPRICED P.O


COPPPIES OF BOUGHT OUT ITEMS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

REMARKS

DATE

STATION :SMPP

REF NO.

SHEET 3 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

Start hypeprterminal and switch ON the indiatic 650 Restart by


power up
? X . (wiith in 5 seconds)
system parameter
FW-Rel. + V03.5, 19-NOV-1998 12-00-00
Node type = Mater, X1-11
Extras : Modify Sys. Pars = enablled X1 - 11 Auto - Corr.=ebabled
Sync. Type = TimeMstr 1
Start.No = 10
Main node = 1
Pot. Nodes = 1
Act. Nodes = 1
SyncPuldenp = Min.
COM 1 use = Ext - C1ck
Baudrate = 9600Bps. Data-Bits=7,Stop-Bits=1,Parity=none, RTS
Hdx
Flags =
Ref. Offset = .0
Template = xx:dd:oo:yy:xx:hh:mm:ss:xx
Request = D
COM 2 use = 1-650Com
Baudrate = 19200Bps. Parity = even, RTS-use=Hdx

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 4 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

Flags =
Ref.Offset = 0
Template = xx:dd:oo:yy:xx:hh:mm:ss:xx
Request = D
COM2 use = 1-650Com
Baudreate = 19200Bps. Parity = even, RTS-use = Hdx
Record = 0.1 s/0.2.. 1.0s/0.1s
Bfr. End = Over
N.Freq. = 50Hz
S-Rate + 1440/s
Limit - Filter = 2 Per
Compr.Band = 30
System parameter ok {y} ? N.. (within 10 second)
Node type {Mstr,Siv) (cr=M) = M
Modify Sys. Pars enable {y/n) = Y : y
Modify U-jumprs enable
Modify TR-Corr. Enable {y/n} = N:n
Long Rocords enable {y/n}
X1-11Auto-Corr. Enable{y/n) = Y:y
Test -Output enable {y/n}
Start. No {1..250}
Clock type {TimeMstr1..5,Slv} = M1 : 1

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 5 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

Pot.nodes = 1

Routing node [0..79] = 0 : 0


SyncPulseInp [None, Min, Tel] = Min. : M
COM 1 use = Ext -C1ck
ComUse[None,Test, Ext-Clock] : E
Baudrate[50..115200(=0) = 9600 : 9600
DataBits [5..8] = 7 : 7
StopBits [1 ..2] = 1:1
Parity [n,E,O] = none : N
RTS -use [On,Hdx, Flow] = Hdx : H
Ref. Offset (ms) = 0 : 0
Format Template
= xx:dd:oo:yy:xx:hh:mm:ss:xx
:#
Format Request
:#
COM 2 use = 1-650Com
Baudrate [50..115200(=0)] = 19200 : 19200
Parity [n,E,O]
RST - use [On,Hdx, Flow] = Hdx : H

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 6 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

Preamble [0.1 .. 0.5]s = 0.1 : 0.1


Min - Rec. [0.1..30.0]s = 0.2 : 0.2
Max - Rec.[0.2..30.0]s =1.0
Postamble [0.1 ..0.5]s = 0.1 : 0.1
Bfr,End[Over, Stop] = Over : S
N.freq.[16, 50, 60 ] Hz = 60 : 50
S-Rate [360 .. 5760 ] /s = 1440 : 1200
Limit - filter [1..9] Per. = 2:2
Compre.- Band[0..250] 30:30
FW-Rel. = V03.5, 19-Nov-1998 12-00-00
Node Type = Master, X1-10
Extras:Modify Sys.Pars = enable X1 -11 auto-Corr. = enabled
Sync. Type = TimeMstr 1
Start.No = 10
Mainnode =1
Pot. Nodes = 1
Act. Nodes - 1
SyncPulseInp = Min.
COM 1 use = Ext - C1ck
Baudrate = 9600 Bps, Data-Bits=7, Stop-Bits=1, Parity=none,
RTS-use=Hdx
Flag =
Ref. Offset = 0
Template = #
Request = #
COM 2 use = 1-650Com
Baudrate = 19200Bps, Parity = even, RTS-use = Hdx

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 7 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

Record = 0.1s/0.2..1.0s/0.1s
Bfr.End = Stop
N.freq. = 50Hz
S-Rate = 1200/s
Limit - filter-2 Per.
Compr.-Band - 30
system Parameter ok [y]?y

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 8 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

REMARKS

TECHNICAL SPECIFICATIONS
Current and Voltage inputs
Resolution:
16bit
Number:
9,as current or voltage input respectively
Current inputs:
1 A or 5A
Voltage transformer 100V, 100V/sqrt.(3),200v,200v/sqrt(3)
Digital inputs
Number:
16
Contract voltage
48V to 250VDC
Contact Power:
0.25W
Recording times
Preamble:
0.is to 0.5 s, can be adjusted in steps
of 0.1a
Post anble:
0.5s, fixed
Event :
0.1s to 30s, can be ajustable in steps
of 0.1s
Memory capacity
On-board memory:
100K words per channel, total 2 Mbytes
Total recording time can be calculated by:
100,000/scanning frequency
Synchronisation and
clock
Internal clock:
< 50ppm (<20ppm typical)
External sync.:
Optional (e.g. GPS< GEOS, DCF-77-77)
1 minitue pulse ( control input, 24V)
Intermediate Units:
< + or - 10 micro sec.

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 9 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

Trigger criteria
Digital inputs
Analogue inputs

External trigger:
Output:

Power supply
Voltage:
Power consumption
Power back up :

Interfaces
Communication bus
CB 10 :

Serival interfaces :

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

REMARKS

Positive or negative edges


Upper limit value exceeded
Value below lower limit value
Gradients exceeded
Control input
Fault (ALARM)
Event registered
Event memeory filled 80%
Recording in progress (trigger output signal)
110V (-15%)to 240V (+10%)AC50/60Hz
<15W
0.5s, without interruption of function
12 hours without loss of data

1.5 Mbaud for exchange of data between


units coax (inculding redundat connection )
and / or
Optical cable (mixed confiugration also
possible)
2* RS 232 up to 115 kbaud

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 10 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.

GENERAL INSPECTION AND CHECKS

2. 0

2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2 .10

REMARKS

Turn ON the device with the switch (S-03 on the PS -10 moodule)
Check the RUN LED status on XI - 10 and CI - 10
Check that "C" LED on the CI - 10 blinks once every second
Check the DR communication with the evalution station.
Set the D.R station time and connect the time synchronisation
cable.
Check that D.R is synchronised with the G.P.S. clock
Check that all 9 analog inputs and 16 digital input are wired to
the D.R.
Ensure that status of the input signals is displayed
on the screen.
Set the trigger limits for signals.
Generate the test event and receive it.
View the test event from WinEve software
Create a distrubance and see the D.R has recorded the disturbance

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 11 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.
GENERAL INSPECTION AND CHECKS
2.11 Check the communication between Evaluation station and all
four Disturbance Recorders.

REMARKS

2.12 Check that station time of each D.R is exactly matching with
the GPS time.

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 12 OF 12

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

DISTURBANCE RECORDER

SL.NO.
0.1

OMMISSIONS/DEFECTS

REMARKS

0.2

0.3

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 1 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

TIME SYNCHRONISER

SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

COMMISSIONS/DEFECTS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 2 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

TIME SYNCHRONISER

SL.NO.

DOCUMENTS REQUIRED

1 .0

SLD/GA/SCHEMATIC OF THE EQUIPMENT

2 .0

O&M MANUALS

3 .0

MANUFATURERS SHOP TEST RESULTS

4 .0

SPECIFICATIONS AND UNPRICED P.O


COPPPIES OF BOUGHT OUT ITEMS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

REMARKS

DATE

STATION :SMPP

REF NO.

SHEET 3 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

TIME SYNCHRONISER

SL.NO.

DOCUMENTS REQUIRED

2.1

Ensure that GPS antenna is erected properly and placed securely

2.2

Check the interconnection between anteena and Time


synchroniser unit
Place the display unit of the clock on the contorl panel and fix it.

2.3
2.4
2.5
2.6
2.7
2.8
2.9
2. 10
2 .11

REMARKS

Connect DC supply at the inpput terminals


switch on the unit and wait for 10-15 minutes.
See the time display on the screen
Match the GPS time with GPS time in POWER GRID
Chek the PM output of the Time synchroniser unit.
(Measure volgare and endure that it is 50V)
Check the various time displaymodes of the Time synchroniser
Check the status of the unit whether locked or unlocked
Check the various output displayparameters of the unit

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 4 OF 4

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

TIME SYNCHRONISER

SL.NO.

DEFECTS /OMMISSIONS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

REMARKS

DATE

STATION :SMPP

REF NO.

SHEET 1 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO

CONTENTS

PAGENO

DOCUMENTS REQUIRED

GENERAL INSPECTION AND CHECKS

COMMISSIONS/DEFECTS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

12

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 2 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO.

DOCUMENTS REQUIRED

1 .0

SLD/GA/SCHEMATIC OF THE EQUIPMENT

2 .0

O&M MANUALS

3 .0

MANUFATURERS SHOP TEST RESULTS

4 .0

SPECIFICATIONS AND UNPRICED P.O


COPPIES OF BOUGHT OUT ITEMS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

REMARKS

DATE

STATION :SMPP

REF NO.

SHEET 3 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO.

DOCUMENTS REQUIRED

2 .0

REMARKS

TECHNICAL SPECIFICATIONS
Digital inputs:
. No.:
32 per module, potential - free
. Connection:
land half pole
. Device power supply 48V to 250 VDC (+or - 25%)
.Contact voltage
48V to 250 VDC (+or - 25%)
.Contact current
approx. 5 mA with contact closed
.Power consumption: Tupically 8 W, max. 10W
. Insulation:
2.0KVrns
Analouge inputs:
. Resolution
11Bit with presign
. No.:
16, each as current and voltage input
Synchronisation and
clock
Internal clock
<50ppm (<20ppm typical)
. External
1 minitue pluse (control input 48 V)
synchronisation:
Recording criteria
.Digital inputs:
Positive or negative flanks
. Analouge inpputs
Upper limit exceeded (2 values )
Lower limit exceeded (2values)
Calculated mean value (1 per second)

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 4 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO.

DOCUMENTS REQUIRED

2 .0

Control inputs
.Binary inputs, isolated with
optocouplers:
optocouplers:
Power supply
. Voltage
Interfaces
Serial interface:
. Connection for :
Processing statilon (minimum)
Requirements)
. Processor:

REMARKS

External test input (48V)


External synchronisation signal
(1minute pluse, 48 V)
110V (-15%) to 240 V (+10%)
AC 50 Hz

2* RS 232 upto to 115 Kbaud


service kit (PC)

IBMcompatible PV, 486


or Pentium,
with Windows 3. X

. RAM:
. Free space ob Hard disk:
. Monitor:
. Floppy disk:

1 GB
17"recommended
1.44 MB 3 and half for programm
installation
. Printer:
Matrix printer with automatic
line feed,
capapble of operation under
windows
The following are also required for intallation and parameter
adjustment:
. 1PC, IBM compatible (486 or Pentium) with a free Rs. 232
serial interface
. 1 installed terminal emulation program or MS Windows 3. X
or higher
Windows includea terminal emulator.
. 1 installed indactic software package Arc425, Vis45 and the
relevant operting manuals.

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 5 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO.

GENERAL INSPECTION AND CHECKS

2 .1
2.2
2.3

REMARKS

Check that event logger is prolperly placed in the panel.


Check the interconnection between E.L A and ELB is completed
Check that event logger evaluation station is set up andloaded
with the Vis 425 and Arc 425 software along with Windows.
Check that time sychroniser input from Time Sychroniser is
connected as pep the circuit diagram.
Check that all digital input singnals are wired as per the drawing
Connect rated DC supply at appropriate incoming terminals
in the E.L. Panel.
Connect 240 V AC supply to PC, Monitor and Printer
Switch ON PC, Monitor , Printer
Switch ON 1425 Mater and Slave units.
Open system file (simhadri.zsf) through VIS 425 software.
Sychronise the time as under:

2.4
2.5
2.6
2.7
2.8
2.9
2 .10
2.11

2.12
2.13
2.14
2.15
2.16

a.Select Station - time


b. Edit Station Time to a deviation less than 30 seconds w.r.t.
GPS time
c. Set time all and close
d. Wait for some time, 3 to 4 minutes say
e. again goto Station- Time
f.Check - station time . It should be same oas the GPS time
Under file - print setup, enable the Line Printer
Select line printer 1 to Print Actual Events - OK
Open view on menu and select Actual Events.
Start ARC425 Initial system messages will apperar on the
screen and printer
Simulate digital events on the panel terminals blocks one at a
time, at The appropriate terminals and observe the following
a. Glow of corresponding LED on the front of Digital input Module
b.Display of event, with time stampin, on the PC screen
c. Print of event, with time stamping on the printer

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

DATE

STATION :SMPP

REF NO.

SHEET 6 OF 6

PLANT AREA:400KV SWITCHYARD


STANDARD CHECK LIST:

EVENT LOGGER

SL.NO.

DEFECTS /OMMISSIONS

NTPC SIGNATURE
NTPC ERECTION
NTPC O&M

CONTRACTOR SIG.

REMARKS

DATE

S-ar putea să vă placă și