PLANILL

ITEMS

A.-

DESCRIPCIN

OBRA CONTRATADA
UNIDAD

CANTIDAD

TRANSPORTE DE MATERIAL PARA NUEVO CORREAGUA

M3-KM

36480.00

TRANSPORTE DE MATERIAL PARA LOS PECHICHES

M3-KM

70200.00

ACABADO DE OBRA BASICA

GLOBAL

1.00

REPLANTEO Y NIVELACIN

M2

81.60

EXCAVACIN EN CIMIENTOS

M3

50.76

RELLENO DE MEJORAMIENTO Y COMPACTADO

M3

49.08

RELLENO DE PIEDRA BOLA BAJO CIMIENTOS

M3

1.80

HORMIGN ARMADO PARA PLINTOS, CADENAS Y COLUMNAS

M3

5.34

HORMIGN SIMPLE FC M2 REPLANTILLO

M3

0.03

MURO DE HORMIGN CICLOPEO

M3

4.32

BORDILLO FC 210 KG/CM2 (0,40X0,12)

36.00

CONTRAPISO ALISADO ESPESOR 0,08 CM

M2

88.14

HORMIGN SIMPLE EN LOSA E=15CM FC 210 KG/CM2

M2

0.01

ENLUCIDO HORIZONTAL INTERIOR Y EXTERIOR

M2

29.64

MAMPOSTERIA DE LADRILLO MALETA

M2

72.89

ENLUCIDO VERTICAL

M2

189.14

ESTRUCTURA METLICA

KG

231.68

CUBIERTA DE DURATECHO

M2

81.60

ARIOSTRAMINTO DE HORMIGN

25.60

PINTURA DE CAUCHO INTERIOR Y EXTERIOR

M2

189.14

PUERTA DE TOLL (0,80 X 2,00)

1.00

PUERTA DE MADERA (0,70 X 2,00)

1.00

SUMINISTRO DE INODORO Y SANITARIO

TRANSPORTE

1
2
3
B.-

CASA COMUNAL AULA 9,00*6,00 SITIO EL JUNCO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

1.00

PLINTOS DE ILUMINACIN

PUNTOS

4.00

PUNTOS DE TOMACORRIENTE

PUNTOS

2.00

ACOMETIDA ELCTRICA

M2

10.00

TABLERO GENERAL

PUNTOS

1.00

PUNTOS DE AAPP

PUNTOS

4.00

PUNTOS DE AASS

PUNTOS

4.00

REJAS METLICAS

M2

3.46

ANTICIPO 50%
TOTAL EJECUTADO
AMORTIZACIN ESTE PERIODO 50%
LQUIDO A COBRAR

PLANILL
ITEMS

A.-

DESCRIPCIN

OBRA CONTRATADA
UNIDAD

CANTIDAD

TRANSPORTE DE MATERIAL PARA NUEVO CORREAGUA

M3-KM

36480.00

TRANSPORTE DE MATERIAL PARA LOS PECHICHES

M3-KM

70200.00

ACABADO DE OBRA BASICA

GLOBAL

1.00

REPLANTEO Y NIVELACIN

M2

81.60

EXCAVACIN EN CIMIENTOS

M3

50.76

RELLENO DE MEJORAMIENTO Y COMPACTADO

M3

49.08

RELLENO DE PIEDRA BOLA BAJO CIMIENTOS

M3

1.80

HORMIGN ARMADO PARA PLINTOS, CADENAS Y COLUMNAS

M3

5.34

HORMIGN SIMPLE FC M2 REPLANTILLO

M3

0.03

MURO DE HORMIGN CICLOPEO

M3

4.32

TRANSPORTE

1
2
3
B.-

CASA COMUNAL AULA 9,00*6,00 SITIO EL JUNCO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BORDILLO FC 210 KG/CM2 (0,40X0,12)

36.00

CONTRAPISO ALISADO ESPESOR 0,08 CM

M2

88.14

HORMIGN SIMPLE EN LOSA E=15CM FC 210 KG/CM2

M2

0.01

ENLUCIDO HORIZONTAL INTERIOR Y EXTERIOR

M2

29.64

MAMPOSTERIA DE LADRILLO MALETA

M2

72.89

ENLUCIDO VERTICAL

M2

189.14

ESTRUCTURA METLICA

KG

231.68

CUBIERTA DE DURATECHO

M2

81.60

ARIOSTRAMINTO DE HORMIGN

25.60

PINTURA DE CAUCHO INTERIOR Y EXTERIOR

M2

189.14

PUERTA DE TOLL (0,80 X 2,00)

1.00

PUERTA DE MADERA (0,70 X 2,00)

1.00

SUMINISTRO DE INODORO Y SANITARIO

1.00

PLINTOS DE ILUMINACIN

PUNTOS

4.00

PUNTOS DE TOMACORRIENTE

PUNTOS

2.00

M2

10.00

TABLERO GENERAL

PUNTOS

1.00

PUNTOS DE AAPP

PUNTOS

4.00

PUNTOS DE AASS

PUNTOS

4.00

REJAS METLICAS

M2

3.46

ACOMETIDA ELCTRICA

ANTICIPO 50%
TOTAL EJECUTADO
AMORTIZACIN ESTE PERIODO 50%
LQUIDO A COBRAR

PLANILL

ITEMS

A.-

DESCRIPCIN

OBRA CONTRATADA
UNIDAD

CANTIDAD

M3-KM

36480.00

TRANSPORTE DE MATERIAL PARA LOS PECHICHES

M3-KM

70200.00

ACABADO DE OBRA BASICA

GLOBAL

1.00

REPLANTEO Y NIVELACIN

M2

81.60

EXCAVACIN EN CIMIENTOS

M3

50.76

RELLENO DE MEJORAMIENTO Y COMPACTADO

M3

49.08

RELLENO DE PIEDRA BOLA BAJO CIMIENTOS

M3

1.80

HORMIGN ARMADO PARA PLINTOS, CADENAS Y COLUMNAS

M3

5.34

HORMIGN SIMPLE FC M2 REPLANTILLO

M3

0.03

MURO DE HORMIGN CICLOPEO

M3

4.32

BORDILLO FC 210 KG/CM2 (0,40X0,12)

36.00

CONTRAPISO ALISADO ESPESOR 0,08 CM

M2

88.14

HORMIGN SIMPLE EN LOSA E=15CM FC 210 KG/CM2

M2

0.01

ENLUCIDO HORIZONTAL INTERIOR Y EXTERIOR

M2

29.64

MAMPOSTERIA DE LADRILLO MALETA

M2

72.89

ENLUCIDO VERTICAL

M2

189.14

TRANSPORTE

1
2
3
B.-

TRANSPORTE DE MATERIAL PARA NUEVO CORREAGUA

CASA COMUNAL AULA 9,00*6,00 SITIO EL JUNCO

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

ESTRUCTURA METLICA

KG

231.68

CUBIERTA DE DURATECHO

M2

81.60

ARIOSTRAMINTO DE HORMIGN

25.60

PINTURA DE CAUCHO INTERIOR Y EXTERIOR

M2

189.14

PUERTA DE TOLL (0,80 X 2,00)

1.00

PUERTA DE MADERA (0,70 X 2,00)

1.00

SUMINISTRO DE INODORO Y SANITARIO

1.00

PLINTOS DE ILUMINACIN

PUNTOS

4.00

PUNTOS DE TOMACORRIENTE

PUNTOS

2.00

ACOMETIDA ELCTRICA

M2

10.00

TABLERO GENERAL

PUNTOS

1.00

PUNTOS DE AAPP

PUNTOS

4.00

PUNTOS DE AASS

PUNTOS

4.00

REJAS METLICAS

M2

3.46

ANTICIPO 50%
TOTAL EJECUTADO
AMORTIZACIN ESTE PERIODO 50%
LQUIDO A COBRAR

PLANILLA # 1
OBRA CONTRATADA

CANTIDAD EJECUTADA

VALORES

P. UNITARIO

P. TOTAL

ANTERIOR

ESTA PLANILLA

ACUMULADA

ANTERIOR

ESTA PLANILLA

0.165

6019.20

0.00

36480.00

36480.00

0.00

6019.20

0.165

11583.00

0.00

70200.00

70200.00

0.00

11583.00

533.60

533.60

0.00

1.00

1.00

0.00

533.60

0.51

41.62

0.00

81.60

81.60

0.00

41.62

4.52

229.44

0.00

50.76

50.76

0.00

229.44

18.50

907.98

0.00

49.08

49.08

0.00

907.98

32.50

58.50

0.00

1.80

1.80

0.00

58.50

408.07

2179.09

0.00

5.34

5.34

0.00

2179.09

165.78

4.97

0.00

0.03

0.03

0.00

4.97

155.20

670.46

0.00

4.32

4.32

0.00

670.46

13.05

469.80

0.00

0.00

0.00

0.00

0.00

14.42

1270.98

0.00

0.00

0.00

0.00

0.00

42.50

0.43

0.00

0.00

0.00

0.00

0.00

8.62

255.50

0.00

0.00

0.00

0.00

0.00

9.81

715.05

0.00

0.00

0.00

0.00

0.00

8.51

1609.58

0.00

0.00

0.00

0.00

0.00

3.36

778.44

0.00

0.00

0.00

0.00

0.00

14.53

1185.65

0.00

0.00

0.00

0.00

0.00

8.20

209.92

0.00

0.00

0.00

0.00

0.00

3.70

699.82

0.00

0.00

0.00

0.00

0.00

175.00

175.00

0.00

0.00

0.00

0.00

0.00

158.00

158.00

0.00

0.00

0.00

0.00

0.00

220.00

220.00

0.00

0.00

0.00

0.00

0.00

29.50

118.00

0.00

0.00

0.00

0.00

0.00

29.12

58.24

0.00

0.00

0.00

0.00

0.00

8.50

85.00

0.00

0.00

0.00

0.00

0.00

94.70

94.70

0.00

0.00

0.00

0.00

0.00

30.00

120.00

0.00

0.00

0.00

0.00

0.00

32.05

128.20

0.00

0.00

0.00

0.00

0.00

72.80

251.89

0.00

0.00

0.00

0.00

0.00

TOTAL

30832.05

TOTAL

22227.86

NTICIPO 50%
AL EJECUTADO
N ESTE PERIODO 50%
IDO A COBRAR

15416.03
22227.86
11113.93
11113.93

DETALLE DE AMORTIZACIN DEL ANTICIPO


AMORTIZACIN DEL ANTICIPO ANTERIOR
TOTAL DE ANTICIPO AMORTIZADO
ANTICIPO POR AMORTIZAR

PLANILLA # 2
OBRA CONTRATADA
P. UNITARIO

CANTIDAD EJECUTADA

VALORES

P. TOTAL

ANTERIOR

ESTA PLANILLA

ACUMULADA

ANTERIOR

ESTA PLANILLA

0.165

6019.20

36480.00

0.00

36480.00

0.00

0.00

0.165

11583.00

70200.00

0.00

70200.00

0.00

0.00

533.60

533.60

1.00

0.00

1.00

0.00

0.00

0.51

41.62

81.60

0.00

81.60

0.00

0.00

4.52

229.44

50.76

0.00

50.76

0.00

0.00

18.50

907.98

49.08

0.00

49.08

0.00

0.00

32.50

58.50

1.80

0.00

1.80

0.00

0.00

408.07

2179.09

5.34

0.00

5.34

0.00

0.00

165.78

4.97

0.03

0.00

0.03

0.00

0.00

155.20

670.46

4.32

0.00

4.32

0.00

0.00

13.05

469.80

0.00

36.00

36.00

0.00

469.80

14.42

1270.98

0.00

88.14

88.14

0.00

1270.98

42.50

0.43

0.00

0.01

0.01

0.00

0.43

8.62

255.50

0.00

29.64

29.64

0.00

255.50

9.81

715.05

0.00

72.89

72.89

0.00

715.05

8.51

1609.58

0.00

189.14

189.14

0.00

1609.58

0.00

3.36

778.44

0.00

0.00

0.00

0.00

0.00

14.53

1185.65

0.00

0.00

0.00

0.00

0.00

8.20

209.92

0.00

0.00

0.00

0.00

0.00

3.70

699.82

0.00

0.00

0.00

0.00

0.00

175.00

175.00

0.00

0.00

0.00

0.00

0.00

158.00

158.00

0.00

0.00

0.00

0.00

0.00

220.00

220.00

0.00

0.00

0.00

0.00

0.00

29.50

118.00

0.00

0.00

0.00

0.00

0.00

29.12

58.24

0.00

0.00

0.00

0.00

0.00

8.50

85.00

0.00

0.00

0.00

0.00

0.00

94.70

94.70

0.00

0.00

0.00

0.00

0.00

30.00

120.00

0.00

0.00

0.00

0.00

0.00

32.05

128.20

0.00

0.00

0.00

0.00

0.00

72.80

251.89

0.00

0.00

0.00

0.00

0.00

TOTAL

30832.05

TOTAL

4321.33

15416.03
4321.33
2160.67
2160.67

AMORTIZACIN DEL ANTICIPO ANTERIOR


TOTAL DE ANTICIPO AMORTIZADO
ANTICIPO POR AMORTIZAR

NTICIPO 50%
AL EJECUTADO
N ESTE PERIODO 50%
IDO A COBRAR

PLANILLA # 3

DETALLE DE AMORTIZACIN DEL ANTICIPO

OBRA CONTRATADA

CANTIDAD EJECUTADA

VALORES

P. UNITARIO

P. TOTAL

ANTERIOR

ESTA PLANILLA

ACUMULADA

ANTERIOR

ESTA PLANILLA

0.165

6019.20

36480.00

0.00

36480.00

0.00

0.00

0.165

11583.00

70200.00

0.00

70200.00

0.00

0.00

533.60

533.60

1.00

0.00

1.00

0.00

0.00

0.00
0.51

41.62

81.60

0.00

81.60

0.00

0.00

4.52

229.44

50.76

0.00

50.76

0.00

0.00

18.50

907.98

49.08

0.00

49.08

0.00

0.00

32.50

58.50

1.80

0.00

1.80

0.00

0.00

408.07

2179.09

5.34

0.00

5.34

0.00

0.00

165.78

4.97

0.03

0.00

0.03

0.00

0.00

155.20

670.46

4.32

0.00

4.32

0.00

0.00

13.05

469.80

36.00

0.00

36.00

0.00

0.00

14.42

1270.98

88.14

0.00

88.14

0.00

0.00

42.50

0.43

0.01

0.00

0.01

0.00

0.00

8.62

255.50

29.64

0.00

29.64

0.00

0.00

9.81

715.05

72.89

0.00

72.89

0.00

0.00

8.51

1609.58

189.14

0.00

189.14

0.00

0.00

3.36

778.44

0.00

231.68

231.68

0.00

778.44

14.53

1185.65

0.00

81.60

81.60

0.00

1185.65

8.20

209.92

0.00

25.60

25.60

0.00

209.92

3.70

699.82

0.00

189.14

189.14

0.00

699.82

175.00

175.00

0.00

1.00

1.00

0.00

175.00

158.00

158.00

0.00

1.00

1.00

0.00

158.00

220.00

220.00

0.00

1.00

1.00

0.00

220.00

29.50

118.00

0.00

4.00

4.00

0.00

118.00

29.12

58.24

0.00

2.00

2.00

0.00

58.24

8.50

85.00

0.00

10.00

10.00

0.00

85.00

94.70

94.70

0.00

1.00

1.00

0.00

94.70

30.00

120.00

0.00

4.00

4.00

0.00

120.00

32.05

128.20

0.00

4.00

4.00

0.00

128.20

72.80

251.89

0.00

3.46

3.46

0.00

251.89

TOTAL

30832.05

TOTAL

4282.86

15416.03
4282.86
2141.43
2141.43

AMORTIZACIN DEL ANTICIPO ANTERIOR


TOTAL DE ANTICIPO AMORTIZADO
ANTICIPO POR AMORTIZAR

NTICIPO 50%
AL EJECUTADO
N ESTE PERIODO 50%
IDO A COBRAR

DETALLE DE AMORTIZACIN DEL ANTICIPO

VALORES

% CADA ITEMS
ACUMULADA

PARCIAL (%)

ACUMULADA (%)

6019.20

100.00

100.00

11583.00

100.00

100.00

533.60

100.00

100.00

41.62

100.00

100.00

229.44

100.00

100.00

907.98

100.00

100.00

58.50

100.00

100.00

2179.09

100.00

100.00

4.97

100.00

100.00

670.46

100.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CIN DEL ANTICIPO


0.00
11113.93
4302.10

VALORES

% CADA ITEMS
ACUMULADA

PARCIAL (%)

ACUMULADA (%)

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

469.80

100.00

100.00

1270.98

100.00

100.00

0.43

100.00

100.00

255.50

100.00

100.00

715.05

100.00

100.00

1609.58

100.00

100.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CIN DEL ANTICIPO


11113.93
13274.60
2141.43

VALORES

% CADA ITEMS
ACUMULADA

PARCIAL (%)

ACUMULADA (%)

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

0.00

0.00

100.00

778.44

100.00

100.00

1185.65

100.00

100.00

209.92

100.00

100.00

699.82

100.00

100.00

175.00

100.00

100.00

158.00

100.00

100.00

220.00

100.00

100.00

118.00

100.00

100.00

58.24

100.00

100.00

85.00

100.00

100.00

94.70

100.00

100.00

120.00

100.00

100.00

128.20

100.00

100.00

251.89

100.00

100.00

CIN DEL ANTICIPO


13274.60