SUSTITUCION Y MEJORAMIENTO DE LA INFRAESTRUCTURA DEL COLEGIO "SANTA ROSA" DISTRITO DE HUACHOCOLPA - TAYACAJA - HUANCAVELICA
Supervisor
ARQ. HUGO ABEL VILLAVERDE RAFAEL
HUACHOCOLPA - TAYACAJA - HUANCAVELICA
:
Residente
ING. CLIFOR HECTOR GARCIA CORZO
MUNICIPALIDAD DISTRITAL DE HUACHOCOLPA
:
S/. 4,778,053.33
Monto del Proyecto
GOBIERNO REGIONAL HUANCAVELICA
:
S/. 4,648,419.93
Costo Total de Obra
JULIO DEL 2013
:
S/. 4,414,607.93
Costo Directo de Obra
11.22%
:
S/. 129,633.40
Monto de Supervisin
:
DESCRIPCION
PRESUPUESTA
DO S/.
124,238.09
124,238.09
EJECUTADO ANTERIOR
S/.
13,435.15
13,435.15
MONTOS
EJECUTADO ACTUAL
10.81%
S/.
504.34
10.81%
504.34
EL AVANCE FISICO VALORIZADO ACUMULADO JULIO DEL 2013; ES DE SETECIENTOS SEIS MIL NOVECIENTOS OCHENTA Y OCHO CON 66/100 NUEVOS SOLES
EL MISMO QUE REPRESENTA UN AVANCE ACUMULADO DEL 11.22%
EJECUTADO ACUMULADO
0.41%
S/.
13,939.49
%
11.22%
0.41%
13,939.49
11.22%
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
01
01.01
ESTRUCTURAS
TRABAJOS PRELIMINARES
Costo
Parcial
(S/.)
Avance
Actual
Anterior
Metrado
Monto Valorizado
S/.
Metrado
13,435.15
504.34
13,939.49
11.22%
124,238.09
13,435.15
504.34
13,939.49
11.22%
57,147.96
13,435.15
504.34
13,939.49
24.39%
530.19
57.37
-
74.75%
01.01.01
M2
217.29
0.69
149.93
217.29
01.01.02
M2
217.29
0.87
189.04
217.29
189.04
01.01.03
M2
217.29
0.88
191.22
MOVIMIENTO DE TIERRAS
Monto
Valorizado S/.
8,628.10
65.19
6,591.86
551.11
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
124,238.09
338.97
149.93
01.02
Metrado
Saldo
Acumulado
Monto Valorizado
S/.
110,298.60
110,298.60
-
43,208.47
133.85
-
217.29
396.34
149.93
100.00%
217.29
189.04
100.00%
57.37
65.19
57.37
30.00%
152.10
133.85
2,020.04
-
16.20
-
6,608.06
551.11
76.59%
01.02.01
M3
19.91
27.68
551.11
19.91
01.02.02
M3
146.76
27.68
4,062.32
146.76
146.76
01.02.03
M3
2.35
27.68
65.05
0.00%
01.02.04
M3
0.18
27.68
4.98
0.00%
0.18
4.98
01.02.05
M3
92.95
8.30
771.49
0.00%
92.95
771.49
01.02.06
M2
214.45
1.46
313.10
0.00%
214.45
313.10
01.02.07
M2
214.45
3.96
849.22
0.00%
214.45
849.22
01.02.08
M3
95.30
20.76
1,978.43
95.30
1,978.43
100.00%
01.02.09
M3
95.30
0.34
32.40
16.20
47.65
16.20
50.00%
47.65
16.20
430.77
-
91.72
1,287.43
856.66
100.00%
5,387.37
-
01.03
CONCRETO SIMPLE
95.30
4,062.32
1,978.43
-
6,674.80
47.65
856.66
856.66
19.91
4,062.32
100.00%
100.00%
2.35
65.05
19.29%
01.03.01
M2
91.72
9.34
856.66
01.03.02
M3
27.67
41.50
1,148.31
430.77
10.38
430.77
37.51%
17.29
717.54
01.03.03
M3
3.91
69.17
270.45
0.00%
3.91
270.45
01.03.04
M2
52.18
18.17
948.11
0.00%
52.18
948.11
01.03.05
M2
160.65
9.57
1,537.42
0.00%
160.65
1,537.42
01.03.06
M2
53.80
17.39
935.58
0.00%
53.80
935.58
01.03.07
M2
16.27
16.51
268.62
0.00%
16.27
268.62
01.03.08
M3
3.88
87.04
337.72
0.00%
3.88
337.72
01.03.09
M2
31.02
11.99
371.93
0.00%
31.02
01.04
01.04.01
01.04.01.01
01.04.01.02
01.04.02
CONCRETO ARMADO
39,953.45
ZAPATAS
2,619.51
M3
56.49
27.86
1,573.81
56.49
KG
1,323.67
0.79
1,045.70
1,323.67
COLUMNAS
8,126.42
01.04.02.01
M3
24.14
69.63
1,680.87
01.04.02.02
M2
206.99
16.51
3,417.40
01.04.02.03
KG
3,833.10
0.79
3,028.15
01.04.03
91.72
PLACAS DE CONCRETO
5,647.66
0.00
2,619.51
1,573.81
0.00
-
1,045.70
3,028.15
-
3,833.10
1,028.67
10.38
3,028.15
0.00
56.49
1,323.67
0.00
-
0.00
3,833.10
5,647.66
14.14%
2,619.51
1,573.81
100.00%
100.00%
1,045.70
100.00%
3,028.15
3,028.15
0.00
371.93
34,305.79
0.00
-
37.26%
0.00%
24.14
5,098.27
1,680.87
0.00%
206.99
3,417.40
100.00%
0.00%
1,028.67
Pgina 2
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
Costo
Parcial
(S/.)
Avance
Actual
Anterior
Metrado
Monto Valorizado
S/.
Metrado
Acumulado
Monto
Valorizado S/.
Metrado
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
Saldo
Monto Valorizado
S/.
01.04.03.01
M3
2.33
139.26
324.48
0.00%
2.33
324.48
01.04.03.02
M2
23.30
24.76
576.91
0.00%
23.30
576.91
01.04.03.03
KG
161.11
0.79
127.28
0.00%
161.11
0.00
-
0.00%
01.04.04
VIGAS
127.28
01.04.04.01
M3
44.10
77.48
3,416.87
0.00
-
0.00
-
0.00%
44.10
13,807.16
3,416.87
01.04.04.02
M2
351.91
17.48
6,151.39
0.00%
351.91
6,151.39
01.04.04.03
KG
5,365.69
0.79
4,238.90
0.00%
5,365.69
0.00
-
0.00%
01.04.05
13,807.16
LOSAS ALIGERADAS
4,238.90
01.04.05.01
M3
30.95
59.94
1,855.14
0.00
-
0.00
-
0.00%
30.95
11,190.89
1,855.14
01.04.05.02
M2
208.72
7.20
1,502.78
0.00%
208.72
1,502.78
01.04.05.03
M2
156.10
7.20
1,123.92
0.00%
156.10
1,123.92
01.04.05.04
M2
364.82
14.68
5,355.56
0.00%
364.82
5,355.56
01.04.05.05
KG
1,713.28
0.79
1,353.49
0.00%
1,713.28
1,353.49
0.00
-
0.00%
01.04.06
11,190.89
LOSAS MACIZAS
01.04.06.01
M3
2.92
61.33
179.08
0.00
-
0.00
-
0.00%
2.92
685.94
179.08
01.04.06.02
M2
14.61
14.86
217.10
0.00%
14.61
217.10
01.04.06.03
KG
366.79
0.79
289.76
0.00%
366.79
289.76
809.94
0.00
-
0.00
-
0.00%
0.00
-
01.04.07
ESCALERAS
01.04.07.01
01.04.07.02
01.04.07.03
01.04.08
M3
01.04.08.02
01.04.08.03
56.72
47.64
M2
16.35
39.61
647.62
0.00%
16.35
647.62
KG
145.16
0.79
114.68
0.00%
145.16
114.68
968.66
0.84
0.00
-
0.00%
0.00
-
2.59
119.46
309.40
0.00
-
M2
19.80
28.30
560.34
KG
125.22
0.79
98.92
0.00
-
0.00
-
0.00%
0.00
-
0.00%
1.05
0.00%
23.65
669.30
0.00
-
0.00%
M3
DETALLES
716.26
01.04.09.01
M3
1.05
44.72
46.96
01.04.09.02
M2
23.65
28.30
669.30
01.05
0.00%
809.94
47.64
0.84
RAMPAS
01.04.08.01
01.04.09
685.94
968.66
309.40
0.00%
19.80
560.34
0.00%
125.22
98.92
716.26
46.96
01.05.01
ML
244.30
2.72
664.50
0.00
-
0.00
-
0.00%
244.30
1,361.42
664.50
01.05.02
M2
232.50
2.81
653.33
0.00%
232.50
653.33
01.05.03
ML
21.45
1.48
31.75
0.00%
21.45
31.75
01.05.04
ML
16.00
0.74
11.84
0.00%
16.00
56,359.67
0.00
0.00
0.00
0.00%
5,131.11
0.00
-
0.00
-
0.00
-
0.00%
02
02.01
02.01.01
1,361.42
2.59
0.00%
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO LADRILLO KING-KONG (9x12x24) SOGA J/1.5CM C:A/1:4
M2
305.06
16.82
5,131.11
0.00%
11.84
56,359.67
5,131.11
5,131.11
305.06
Pgina 3
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
02.02
Costo
Parcial
(S/.)
Anterior
Metrado
Metrado
Monto Valorizado
S/.
0.00
-
0.00%
0.00%
60.00
22,070.08
589.80
5,058.69
0.00%
411.61
5,058.69
2,672.83
0.00%
217.48
2,672.83
19.47
3,356.43
0.00%
172.39
3,356.43
359.42
21.41
7,695.18
0.00%
359.42
7,695.18
M2
17.31
18.32
317.12
0.00%
17.31
317.12
TARRAJEO C/IMPERMEABILIZANTE
M2
67.27
16.82
1,131.48
0.00%
67.27
1,131.48
ML
233.81
5.34
1,248.55
0.00%
233.81
1,248.55
5,377.45
0.00
-
0.00
-
0.00%
0.00
-
364.82
5,377.45
5,377.45
60.00
9.83
589.80
02.02.02
M2
411.61
12.29
02.02.03
M2
217.48
12.29
02.02.04
M2
172.39
02.02.05
M2
02.02.06
02.02.07
02.04
Monto
Valorizado S/.
Saldo
M2
02.03.01
Metrado
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
0.00
-
02.03
Monto Valorizado
S/.
Acumulado
0.00
-
22,070.08
02.02.01
02.02.08
Avance
Actual
CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
M2
364.82
14.74
PISOS Y PAVIMENTOS
5,377.45
0.00%
M2
230.20
9.08
2,090.22
0.00
-
0.00
-
0.00
-
0.00%
02.04.01
0.00%
230.20
8,722.43
2,090.22
02.04.02
M2
229.20
14.74
3,378.41
0.00%
229.20
3,378.41
02.04.03
M2
172.25
18.89
3,253.80
0.00%
172.25
3,253.80
2,117.40
0.00
-
0.00%
0.00
-
0.00%
60.00
2,117.40
737.40
831.66
02.05
8,722.43
ZOCALOS Y CONTRAZOCALOS
02.05.01
ZOCALO DE CERAMICO 20 x 30 CM
M2
60.00
12.29
737.40
0.00
-
02.05.02
ML
93.55
8.89
831.66
0.00%
93.55
02.05.03
ML
74.10
7.40
548.34
0.00%
74.10
548.34
0.00
-
0.00
-
0.00%
43.10
1,480.80
1,149.05
02.06
02.06.01
ML
43.10
26.66
1,149.05
0.00
-
02.06.02
M2
1.35
14.74
19.90
0.00%
1.35
19.90
02.06.03
M2
19.80
15.75
311.85
0.00%
19.80
311.85
231.58
7.98
29.02
0.00
-
0.00
-
0.00
-
0.00%
M2
7.98
231.58
231.58
0.00%
1,526.86
-
02.07
02.07.01
02.08
1,480.80
CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA (INC. PUERTA/M2)
CARPINTERIA METALICA Y HERRERIA
231.58
1,526.86
0.00
-
0.00
-
0.00
-
#DIV/0!
62.42
0.00
0.00
#DIV/0!
26.76
99.04
629.89
0.00%
6.36
629.89
0.00%
42.35
896.97
0.00
-
0.00%
0.00
-
0.00%
32.00
203.38
33.92
0.00%
3.00
63.54
VENTANA DE ALUMINIO C/TUBO 3 1/4" x 1 1/2" INC. NAVES, BRAZO, BURDETE Y CIERRE
M2
62.42
02.08.02
M2
26.76
02.08.03
M2
6.36
ML
42.35
21.18
896.97
203.38
02.09
0.00%
0.00
02.08.01
02.08.04
0.00%
0.00
CERRAJERIA
02.09.01
UN
32.00
1.06
33.92
0.00
-
02.09.02
UN
3.00
21.18
63.54
Pgina 4
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
02.09.03
02.10
UN
4.00
26.48
Costo
Parcial
(S/.)
Anterior
Metrado
105.92
2,331.07
02.10.01
M2
63.32
30.40
1,924.93
02.10.02
M2
26.72
15.20
406.14
02.11
PINTURA
Avance
Actual
Metrado
Monto
Valorizado S/.
Metrado
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
0.00%
0.00
-
0.00
-
0.00%
0.00
-
0.00
-
0.00
-
0.00%
Saldo
Monto Valorizado
S/.
4.00
105.92
0.00%
63.32
2,331.07
1,924.93
0.00%
26.72
406.14
6,619.17
1,546.84
02.11.01
M2
364.82
4.24
1,546.84
0.00
-
0.00%
364.82
02.11.02
M2
172.39
3.53
608.54
0.00%
172.39
608.54
02.11.03
M2
359.42
3.53
1,268.75
0.00%
359.42
1,268.75
02.11.04
M2
411.61
3.53
1,452.98
0.00%
411.61
1,452.98
02.11.05
M2
217.48
3.53
767.70
0.00%
217.48
767.70
02.11.06
ML
233.81
2.36
551.79
0.00%
233.81
551.79
02.11.07
ML
93.55
0.74
69.23
0.00%
93.55
69.23
02.11.08
M2
15.96
4.91
78.36
0.00%
15.96
78.36
02.11.09
M2
12.73
5.90
75.11
0.00%
12.73
75.11
02.11.10
ML
135.05
1.48
199.87
0.00%
135.05
199.87
548.34
ML
6.00
1.32
7.92
0.00
-
0.00
-
0.00
-
0.00%
02.12.02
SEALIZACION
UN
1.00
0.00
0.00
#DIV/0!
1.00
02.12.03
M3
14.22
18.89
268.62
0.00%
14.22
268.62
FLORES
UN
60.00
4.53
60.00
02.12
02.12.01
02.12.04
03
03.01
6,619.17
Monto Valorizado
S/.
Acumulado
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
03.01.01
03.01.02
03.01.03
3,520.70
0.00
0.00
560.69
0.00
-
0.00
-
271.80
0.00%
0.00
0.00%
0.00
-
0.00%
UN
2.00
49.15
98.30
UN
3.00
62.99
188.97
PZA
1.00
0.00
0.00
03.01.04
UN
2.00
62.99
125.98
03.01.05
UN
3.00
13.24
39.72
03.01.06
UN
2.00
47.24
94.48
03.01.07
UN
1.00
13.24
13.24
03.02
SISTEMA DE DESAGUE
1,658.82
0.00%
548.34
7.92
6.00
271.80
3,520.70
560.69
98.30
0.00%
2.00
0.00%
3.00
#DIV/0!
1.00
0.00%
2.00
125.98
0.00%
3.00
39.72
0.00%
2.00
94.48
0.00%
1.00
0.00
-
0.00
-
0.00%
188.97
13.24
03.02.01
PTO
2.00
47.24
94.48
0.00
-
0.00%
2.00
1,658.82
94.48
03.02.02
PTO
6.00
47.24
283.44
0.00%
6.00
283.44
03.02.03
PTO
2.00
47.24
94.48
0.00%
2.00
94.48
03.02.04
UN
3.00
24.57
73.71
0.00%
3.00
73.71
03.02.05
SUMIDEROS DE 2"
UN
5.00
24.57
122.85
0.00%
5.00
122.85
Pgina 5
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
Costo
Parcial
(S/.)
Avance
Actual
Anterior
Metrado
Monto Valorizado
S/.
Metrado
Acumulado
Monto
Valorizado S/.
Metrado
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
Saldo
Monto Valorizado
S/.
03.02.06
ML
14.21
13.60
193.26
0.00%
14.21
193.26
03.02.07
ML
23.90
13.60
325.04
0.00%
23.90
325.04
03.02.08
PZA
1.00
13.24
13.24
0.00%
1.00
13.24
03.02.09
PZA
5.00
13.24
66.20
0.00%
5.00
66.20
03.02.10
PZA
2.00
13.24
26.48
0.00%
2.00
26.48
03.02.11
PZA
5.00
13.24
66.20
0.00%
5.00
66.20
03.02.12
PZA
2.00
13.24
26.48
0.00%
2.00
26.48
03.02.13
UN
2.00
13.24
26.48
0.00%
2.00
26.48
03.02.14
PZA
4.00
13.24
52.96
0.00%
4.00
52.96
03.02.15
UN
1.00
193.52
193.52
0.00%
1.00
193.52
671.64
8.00
36.86
294.88
0.00
-
0.00
-
0.00
-
0.00%
PTO
0.00%
8.00
671.64
294.88
03.03
03.03.01
03.03.02
ML
17.80
6.30
112.14
0.00%
17.80
112.14
03.03.03
UN
11.00
13.24
145.64
0.00%
11.00
145.64
03.03.04
UN
4.00
13.24
52.96
0.00%
4.00
52.96
03.03.05
UN
2.00
33.01
66.02
0.00%
2.00
66.02
0.00
-
0.00%
0.00
-
0.00%
41.40
629.55
391.23
0.00%
18.00
0.00
0.00%
03.04
03.04.01
ML
41.40
9.45
391.23
0.00
-
03.04.02
UN
18.00
13.24
238.32
7,209.76
0.00
0.00
2,240.53
04
04.01
629.55
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS Y MECANICAS
26.16
889.44
0.00
-
0.00
-
0.00
-
0.00%
34.00
PTO
3.00
41.04
123.12
PTO
18.00
26.71
480.78
PTO
9.00
6.62
59.58
04.01.05
PTO
3.00
6.62
19.86
04.01.06
PTO
21.00
26.71
560.91
PTO
4.00
26.71
04.01.01
PTO
04.01.02
04.01.03
04.01.04
04.01.07
04.02
04.02.01
04.03
04.03.01
04.03.02
04.04
04.04.01
106.84
1,284.12
ML
626.40
2.05
1,284.12
2,211.19
ML
338.40
3.53
1,194.55
ML
288.00
3.53
1,016.64
ARTEFACTOS ELECTRICOS
ARTEFACTO FLUORESCENTE 2/36W +CAJA C/REJILLA
910.44
UN
24.00
23.62
566.88
238.32
7,209.76
34.00
2,240.53
889.44
0.00%
3.00
123.12
0.00%
18.00
480.78
0.00%
9.00
59.58
0.00%
3.00
19.86
0.00%
21.00
560.91
0.00%
4.00
0.00%
0.00%
0.00
-
0.00
-
0.00
-
0.00
-
0.00
-
0.00%
0.00
-
0.00
-
0.00
-
106.84
626.40
1,284.12
1,284.12
0.00%
338.40
2,211.19
1,194.55
0.00%
288.00
1,016.64
0.00
-
0.00%
0.00%
0.00%
910.44
566.88
24.00
Pgina 6
Y ALMACEN GENERAL
240 DIAS
Financiamiento:
Fecha de Inicio :
Residente de Obra
Fecha de termino :
26 / DICIEMBRE / 2,013
Supervisor
Lugar :
HUACHOCOLPA
Fecha de la valorizacin
01 / AGOSTO / 2,013
Ejecuta :
Costo
tem
Partidas
Costo
Parcial
(S/.)
Avance
Actual
Anterior
Metrado
Monto Valorizado
S/.
Metrado
Acumulado
Monto
Valorizado S/.
Metrado
Porcentaje
(%)
Monto Valorizado
Metrado
S/.
Saldo
Monto Valorizado
S/.
04.04.02
UN
6.00
23.62
141.72
0.00%
6.00
141.72
04.04.03
UN
3.00
33.64
100.92
0.00%
3.00
100.92
04.04.04
UN
3.00
33.64
100.92
0.00%
3.00
100.92
0.00
-
0.00
-
0.00%
21.18
0.00
-
0.00%
1.00
21.18
0.00%
1.00
21.18
0.00
-
0.00
-
0.00%
0.00
-
2.00
521.12
521.12
04.05
TABLEROS DE DISTRIBUCION
42.36
04.05.01
TABLERO GENERAL 4
UN
1.00
21.18
04.05.02
TABLERO DISTRIBUCION 41
UN
1.00
21.18
04.06
04.06.01
521.12
UN
2.00
260.56
S/.
521.12
124,238.09
S/.
13,435.15
10.81%
Avance Anterior
S/.
504.34
0.41%
Avance Actual
S/.
13,939.49
0.00%
11.22%
S/.
42.36
21.18
110,298.60
11.22%
Avance acumulado
88.78%
Por ejecutar
Pgina 7
Ejecuta :
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
91,933.43
ESTRUCTURAS
01
TRABAJOS PRELIMINARES
01.01
LIMPIEZA DEL TERRENO MANUAL
01.01.01
TRAZO Y REPLANTEO PRELIMINAR
01.01.02
TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.01.03
MOVIMIENTO DE TIERRAS
01.02
EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO
01.02.01
EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
01.02.02
EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA
01.02.03
EXCAV. DE ZANJAS PARA ESCALERAS Y RAMPAS
01.02.04
RELLENO CON MATERIAL PROPIO
01.02.05
REFINE, NIVELACION Y COMPACTACION
01.02.06
RELLENO CON MATERIAL CLASIFICADO E=10 CM
01.02.07
ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M.
01.02.08
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km
01.02.09
CONCRETO SIMPLE
01.03
SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12
01.03.01
CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.03.02
SOBRECIMIENTO CONCRETO 1:8+25% PM
01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO HASTA 0.30 m
01.03.04
FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)
01.03.05
VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL
01.03.06
VEREDA ENCOFRADO Y DESENCOFRADO
01.03.07
SARDINELES CONCRETO FC=175 KG/CM2
01.03.08
SARDINELES ENCOFRADO Y DESENCOFRADO
01.03.09
CONCRETO ARMADO
01.04
ZAPATAS
01.04.01
ZAPATAS CONCRETO F'C=210 kg/cm2
01.04.01.01
ZAPATAS ACERO F'Y=4200 KG/CM2
01.04.01.02
COLUMNAS
01.04.02
COLUMNAS CONCRETO F'C=210 kg/cm2
01.04.02.01
COLUMNAS ENCOFRADO Y DESENCOFRADO
01.04.02.02
COLUMNAS ACERO F'C=4200 KG/CM2
01.04.02.03
PLACAS DE CONCRETO
01.04.03
PLACA DE CONCRETO F'c=210 Kg/Cm2
01.04.03.01
PLACA ENCOFRADO Y DESENCOFRADO
01.04.03.02
PLACA ACERO F'c=4200 Kg/Cm2
01.04.03.03
VIGAS
01.04.04
VIGAS CONCRETO F'C=210 kg/cm2
01.04.04.01
VIGAS ENCOFRADO Y DESENCOFRADO
01.04.04.02
VIGAS ACERO FY=4200 KG/CM2
01.04.04.03
LOSAS ALIGERADAS
01.04.05
LOSAS ALIGERADA CONCRETO f'c=210 kg/cm2
01.04.05.01
LOSA ALIGERADA LADRILLO ARCILLA 15X30X30 cm
01.04.05.02
LOSA ALIGERADA LADRILLO ARCILLA 12X30X30 cm
01.04.05.03
LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO
01.04.05.04
LOSA ALIGERADA ACERO FY=4200 KG/CM2
01.04.05.05
LOSAS MACIZAS
01.04.06
LOSA MACIZA CONCRETO f'c=210 kg/cm2
01.04.06.01
LOSA MACIZA ENCOFRADO Y DESENCOFRADO
01.04.06.02
LOSA MACIZA ACERO FY=4200 KG/CM2
01.04.06.03
ESCALERAS
01.04.07
ESCALERAS CONCRETO f'c=210 kg/cm2
01.04.07.01
ESCALERAS ENCOFRADO Y DESENCOFRADO
01.04.07.02
ESCALERA ACERO FY=4200 KG/CM2
01.04.07.03
RAMPAS
01.04.08
RAMPAS CONCRETO FC=210 KG/CM2
01.04.08.01
RAMPAS ENCOFRADO Y DESENCOFRADO
01.04.08.02
RAMPAS ACERO FY=4200 KG/CM2
01.04.08.03
DETALLES
01.04.09
M2
M2
M2
217.29
217.29
217.29
M3
M3
M3
M3
M3
M2
M2
M3
M3
19.91
146.76
2.35
0.18
92.95
214.45
214.45
95.30
95.30
M2
M3
M3
M2
M2
M2
M2
M3
M2
91.72
27.67
3.91
52.18
160.65
53.80
16.27
3.88
31.02
M3
KG
56.49
1,323.67
M3
M2
KG
24.14
206.99
3,833.10
69.63
16.51
M3
M2
KG
2.33
23.30
161.11
139.26
24.76
0.79
M3
M2
KG
44.10
351.91
5,365.69
77.48
17.48
0.79
M3
M2
M2
M2
KG
30.95
208.72
156.10
364.82
1,713.28
59.94
7.20
7.20
14.68
0.79
M3
M2
KG
2.92
14.61
366.79
61.33
14.86
0.79
M3
M2
KG
0.84
16.35
145.16
56.72
39.61
0.79
M3
M2
KG
2.59
19.80
125.22
119.46
28.30
0.79
27.68
27.68
69.17
18.17
9.57
17.39
16.51
87.04
11.99
91,933.43
40,407.07
0.00
0.00
0.00
0.00
70.03
0.00
0.00
65.05
4.98
0.00
0.00
0.00
0.00
0.00
4,669.83
0.00
0.00
270.45
948.11
1,537.42
935.58
268.62
337.72
371.93
34,305.79
0.00
0.00
0.00
5,098.27
1,680.87
3,417.40
0.00
1,028.67
324.48
576.91
127.28
13,807.16
3,416.87
6,151.39
4,238.90
11,190.89
1,855.14
1,502.78
1,123.92
5,355.56
1,353.49
685.94
179.08
217.10
289.76
809.94
47.64
647.62
114.68
968.66
309.40
560.34
98.92
716.26
Pgina 8
Ejecuta :
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
M3
M2
1.05
23.65
44.72
28.30
ML
M2
ML
ML
244.30
232.50
21.45
16.00
2.72
2.81
1.48
0.74
M2
305.06
16.82
M2
M2
M2
M2
M2
M2
M2
ML
60.00
411.61
217.48
172.39
359.42
17.31
67.27
233.81
9.83
12.29
12.29
19.47
21.41
18.32
16.82
5.34
M2
364.82
14.74
M2
M2
M2
230.20
229.20
172.25
9.08
14.74
18.89
M2
ML
ML
60.00
93.55
74.10
12.29
8.89
7.40
ML
M2
M2
43.10
1.35
19.80
26.66
14.74
15.75
M2
7.98
M2
M2
M2
ML
62.42
26.76
6.36
42.35
UN
UN
UN
32.00
3.00
4.00
M2
M2
63.32
26.72
M2
M2
M2
M2
M2
ML
ML
M2
M2
ML
364.82
172.39
359.42
411.61
217.48
233.81
93.55
15.96
12.73
135.05
4.24
3.53
3.53
3.53
3.53
2.36
0.74
4.91
5.90
1.48
ML
UN
M3
6.00
1.00
14.22
1.32
Costo
Parcial
(S/.)
46.96
669.30
1,361.42
664.50
653.33
31.75
11.84
51,526.36
5,131.11
5,131.11
22,070.08
589.80
5,058.69
2,672.83
3,356.43
7,695.18
317.12
1,131.48
1,248.55
5,377.45
5,377.45
8,722.43
2,090.22
3,378.41
3,253.80
2,117.40
737.40
831.66
548.34
1,480.80
1,149.05
19.90
311.85
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6,619.17
1,546.84
608.54
1,268.75
1,452.98
767.70
551.79
69.23
78.36
75.11
199.87
7.92
7.92
0.00
0.00
Pgina 9
Ejecuta :
Financiamiento:
Residente de Obra
Supervisor
tem
02.12.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.02.09
03.02.10
03.02.11
03.02.12
03.02.13
03.02.14
03.02.15
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.04
03.04.01
03.04.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.05
04.05.01
04.05.02
04.06
04.06.01
Partidas
Und.
FLORES
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
INODORO TOP PICCE C/FLUXOMETRO
LAVATORIO DE LOZA BLANCA 20"X16"
URINARIOS DE LOZA DE PICO BLANCO
LAVADERO DE ACERO INOXIDABLE, 01 P0ZA C/ESCURRIDERO+ACCES.
LLAVE CROMADO 1/2" PARA LAVATORIO
LLAVE TIPO CUELLO DE CISNE CROMADO DE 1/2"
LLAVE CROMADO PARA URINARIO
SISTEMA DE DESAGUE
SALIDA DE DESAGUE PVC D=4"
SALIDA DE DESAGUE PVC D=2"
SALIDA DE VENTILACION PVC D=2"
REGISTROS DE BRONCE 4"
SUMIDEROS DE 2"
TUBERIA DE PVC SAL 4"
TUBERIA DE PVC SAL 2"
YEE PVC SAL 4"
YEE PVC SAL 2"
YEE PVC SAL 4" x 2"
TEE PVC SAL 2"
CODO PVC SAL 2"X45
CODO PVC SAL 4" x 45
REDUCCION PVC SAL 4" A 2"
CAJA DE REGISTRO DE 12" X 24"
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA DE 1/2"
TUBERIA PVC CLASE 10 DE 1/2"
CODO PVC SAP 1/2" x 90
TEE PVC SAP 1/2"
VALVULAS DE COMPUERTA DE BRONCE DE 1/2"
SISTEMA DE AGUA DE LLUVIA
TUBERIA PVC SAL 4" D/PLUVIAL
CODO PVC SAL 4" x 90
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS Y MECANICAS
SALIDA PARA CENTRO DE LUZ
SALIDA DE PARED (BRAQUETES) CON PVC
SALIDA P/TOMACORRIENTE SIMPLE PARA LUZ DE EMERGENCIA
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR DOBLE
SALIDA P/TOMACORRIENTE DOBLE, CON LINEA TIERRA
SALIDA P/TOMACORRIENTE DOBLE, C/ LINEA TIERRA P/AGUA
CANALIZACIONES, CONDUCTOS O TUBERIAS
TUBO 20MM D' PVC SEL
CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
CABLE NH - 80 2 x 4 + 1x4 MM2
CABLE NH - 80 2 x 2.5 MM2
ARTEFACTOS ELECTRICOS
ARTEFACTO FLUORESCENTE 2/36W +CAJA C/REJILLA
ARTEFACTO FLUORESCENTE 4 x 18 W C/EQ
ARTEFACTO BRAQUET GLOBO
ARTEFACTO SPOT-LIGHT C/DOBLE LAMPARA AHORRADOR
TABLEROS DE DISTRIBUCION
TABLERO GENERAL 4
TABLERO DISTRIBUCION 41
EQUIPOS ELECTRICOS Y MECANICOS
POZO A TIERRA C/C CU 16MM2 CC
COSTO DIRECTO TOTAL
Metrado
UN
60.00
UN
UN
PZA
UN
UN
UN
UN
2.00
3.00
1.00
2.00
3.00
2.00
1.00
PTO
PTO
PTO
UN
UN
ML
ML
PZA
PZA
PZA
PZA
PZA
UN
PZA
UN
2.00
6.00
2.00
3.00
5.00
14.21
23.90
1.00
5.00
2.00
5.00
2.00
2.00
4.00
1.00
PTO
ML
UN
UN
UN
8.00
17.80
11.00
4.00
2.00
ML
UN
41.40
18.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
34.00
3.00
18.00
9.00
3.00
21.00
4.00
ML
626.40
ML
ML
338.40
288.00
UN
UN
UN
UN
24.00
6.00
3.00
3.00
UN
UN
1.00
1.00
UN
2.00
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
S/.
91,933.43
Pgina 10
Ejecuta :
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Pgina 11
Pgina 12
Pgina 13
Pgina 14
Pgina 15
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
65,691.98
ESTRUCTURAS
01
TRABAJOS PRELIMINARES
01.01
LIMPIEZA DEL TERRENO MANUAL
01.01.01
TRAZO Y REPLANTEO PRELIMINAR
01.01.02
TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.01.03
MOVIMIENTO DE TIERRAS
01.02
EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO
01.02.01
EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
01.02.02
EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA
01.02.03
EXCAV. DE ZANJAS PARA ESCALERAS Y RAMPAS
01.02.04
RELLENO CON MATERIAL PROPIO
01.02.05
REFINE, NIVELACION Y COMPACTACION
01.02.06
RELLENO CON MATERIAL CLASIFICADO E=10 CM
01.02.07
ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M.
01.02.08
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km
01.02.09
CONCRETO SIMPLE
01.03
SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12
01.03.01
CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.03.02
SOBRECIMIENTO CONCRETO 1:8+25% PM
01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO HASTA 0.30 m
01.03.04
FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)
01.03.05
VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL
01.03.06
VEREDA ENCOFRADO Y DESENCOFRADO
01.03.07
SARDINELES CONCRETO FC=175 KG/CM2
01.03.08
SARDINELES ENCOFRADO Y DESENCOFRADO
01.03.09
CONCRETO ARMADO
01.04
ZAPATAS
01.04.01
ZAPATAS CONCRETO F'C=210 kg/cm2
01.04.01.01
ZAPATAS ACERO F'Y=4200 KG/CM2
01.04.01.02
COLUMNAS
01.04.02
COLUMNAS CONCRETO F'C=210 kg/cm2
01.04.02.01
COLUMNAS ENCOFRADO Y DESENCOFRADO
01.04.02.02
COLUMNAS ACERO F'C=4200 KG/CM2
01.04.02.03
PLACAS DE CONCRETO
01.04.03
PLACA DE CONCRETO F'c=210 Kg/Cm2
01.04.03.01
PLACA ENCOFRADO Y DESENCOFRADO
01.04.03.02
PLACA ACERO F'c=4200 Kg/Cm2
01.04.03.03
VIGAS
01.04.04
VIGAS CONCRETO F'C=210 kg/cm2
01.04.04.01
VIGAS ENCOFRADO Y DESENCOFRADO
01.04.04.02
VIGAS ACERO FY=4200 KG/CM2
01.04.04.03
LOSAS ALIGERADAS
01.04.05
LOSAS ALIGERADA CONCRETO f'c=210 kg/cm2
01.04.05.01
LOSA ALIGERADA LADRILLO ARCILLA 15X30X30 cm
01.04.05.02
LOSA ALIGERADA LADRILLO ARCILLA 12X30X30 cm
01.04.05.03
LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO
01.04.05.04
LOSA ALIGERADA ACERO FY=4200 KG/CM2
01.04.05.05
LOSAS MACIZAS
01.04.06
LOSA MACIZA CONCRETO f'c=210 kg/cm2
01.04.06.01
LOSA MACIZA ENCOFRADO Y DESENCOFRADO
01.04.06.02
LOSA MACIZA ACERO FY=4200 KG/CM2
01.04.06.03
ESCALERAS
01.04.07
ESCALERAS CONCRETO f'c=210 kg/cm2
01.04.07.01
ESCALERAS ENCOFRADO Y DESENCOFRADO
01.04.07.02
ESCALERA ACERO FY=4200 KG/CM2
01.04.07.03
RAMPAS
01.04.08
RAMPAS CONCRETO FC=210 KG/CM2
01.04.08.01
RAMPAS ENCOFRADO Y DESENCOFRADO
01.04.08.02
RAMPAS ACERO FY=4200 KG/CM2
01.04.08.03
DETALLES
01.04.09
Mano de obra 77 %
M2
M2
M2
217.29
217.29
217.29
M3
M3
M3
M3
M3
M2
M2
M3
M3
19.91
146.76
2.35
0.18
92.95
214.45
214.45
95.30
95.30
M2
M3
M3
M2
M2
M2
M2
M3
M2
91.72
27.67
3.91
52.18
160.65
53.80
16.27
3.88
31.02
M3
KG
56.49
1,323.67
M3
M2
KG
24.14
206.99
3,833.10
53.62
12.71
M3
M2
KG
2.33
23.30
161.11
107.23
19.07
0.61
M3
M2
KG
44.10
351.91
5,365.69
59.66
13.46
0.61
M3
M2
M2
M2
KG
30.95
208.72
156.10
364.82
1,713.28
46.15
5.54
5.54
11.30
0.61
M3
M2
KG
2.92
14.61
366.79
47.22
11.44
0.61
M3
M2
KG
0.84
16.35
145.16
43.67
30.50
0.61
M3
M2
KG
2.59
19.80
125.22
91.98
21.79
0.61
21.31
21.31
53.26
13.99
7.37
13.39
12.71
67.02
9.23
65,691.98
31,113.46
0.00
0.00
0.00
0.00
53.93
0.00
0.00
50.09
3.84
0.00
0.00
0.00
0.00
0.00
3,595.78
0.00
0.00
208.25
730.05
1,183.81
720.40
206.84
260.04
286.39
26,415.47
0.00
0.00
0.00
3,925.67
1,294.27
2,631.40
0.00
792.07
249.85
444.22
98.00
10,631.51
2,630.99
4,736.57
3,263.95
8,616.99
1,428.46
1,157.14
865.42
4,123.78
1,042.19
528.18
137.89
167.17
223.12
623.66
36.69
498.67
88.30
745.87
238.24
431.46
76.17
551.52
Pgina 16
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Mano de obra 77 %
Metrado
Costo
Unitario
(S/.)
M3
M2
1.05
23.65
34.43
21.79
ML
M2
ML
ML
244.30
232.50
21.45
16.00
2.09
2.16
1.14
0.57
M2
305.06
12.95
M2
M2
M2
M2
M2
M2
M2
ML
60.00
411.61
217.48
172.39
359.42
17.31
67.27
233.81
7.57
9.46
9.46
14.99
16.49
14.11
12.95
4.11
M2
364.82
11.35
M2
M2
M2
230.20
229.20
172.25
6.99
11.35
14.55
M2
ML
ML
60.00
93.55
74.10
9.46
6.85
5.70
ML
M2
M2
43.10
1.35
19.80
20.53
11.35
12.13
ML
UN
M3
UN
6.00
1.00
14.22
60.00
1.02
S/.
Costo
Parcial
(S/.)
36.16
515.36
1,048.28
511.66
503.06
24.44
9.12
34,578.52
3,950.95
3,950.95
16,993.96
454.15
3,895.19
2,058.08
2,584.45
5,925.29
244.18
871.24
961.38
4,140.63
4,140.63
6,716.27
1,609.47
2,601.37
2,505.43
1,630.40
567.80
640.38
422.22
1,140.21
884.77
15.32
240.12
6.10
6.10
0.00
0.00
0.00
65,691.98
Pgina 17
Mano de obra 77 %
Pgina 18
Mano de obra 77 %
Pgina 19
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
67,954.11
ESTRUCTURAS
01
TRABAJOS PRELIMINARES
01.01
LIMPIEZA DEL TERRENO MANUAL
01.01.01
TRAZO Y REPLANTEO PRELIMINAR
01.01.02
TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.01.03
MOVIMIENTO DE TIERRAS
01.02
EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO
01.02.01
EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
01.02.02
EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA
01.02.03
EXCAV. DE ZANJAS PARA ESCALERAS Y RAMPAS
01.02.04
RELLENO CON MATERIAL PROPIO
01.02.05
REFINE, NIVELACION Y COMPACTACION
01.02.06
RELLENO CON MATERIAL CLASIFICADO E=10 CM
01.02.07
ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M.
01.02.08
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km
01.02.09
CONCRETO SIMPLE
01.03
SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12
01.03.01
CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.03.02
SOBRECIMIENTO CONCRETO 1:8+25% PM
01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO HASTA 0.30 m
01.03.04
FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)
01.03.05
VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL
01.03.06
VEREDA ENCOFRADO Y DESENCOFRADO
01.03.07
SARDINELES CONCRETO FC=175 KG/CM2
01.03.08
SARDINELES ENCOFRADO Y DESENCOFRADO
01.03.09
CONCRETO ARMADO
01.04
ZAPATAS
01.04.01
ZAPATAS CONCRETO F'C=210 kg/cm2
01.04.01.01
ZAPATAS ACERO F'Y=4200 KG/CM2
01.04.01.02
COLUMNAS
01.04.02
COLUMNAS CONCRETO F'C=210 kg/cm2
01.04.02.01
COLUMNAS ENCOFRADO Y DESENCOFRADO
01.04.02.02
COLUMNAS ACERO F'C=4200 KG/CM2
01.04.02.03
PLACAS DE CONCRETO
01.04.03
PLACA DE CONCRETO F'c=210 Kg/Cm2
01.04.03.01
PLACA ENCOFRADO Y DESENCOFRADO
01.04.03.02
PLACA ACERO F'c=4200 Kg/Cm2
01.04.03.03
VIGAS
01.04.04
VIGAS CONCRETO F'C=210 kg/cm2
01.04.04.01
VIGAS ENCOFRADO Y DESENCOFRADO
01.04.04.02
VIGAS ACERO FY=4200 KG/CM2
01.04.04.03
LOSAS ALIGERADAS
01.04.05
LOSAS ALIGERADA CONCRETO f'c=210 kg/cm2
01.04.05.01
LOSA ALIGERADA LADRILLO ARCILLA 15X30X30 cm
01.04.05.02
LOSA ALIGERADA LADRILLO ARCILLA 12X30X30 cm
01.04.05.03
LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO
01.04.05.04
LOSA ALIGERADA ACERO FY=4200 KG/CM2
01.04.05.05
LOSAS MACIZAS
01.04.06
LOSA MACIZA CONCRETO f'c=210 kg/cm2
01.04.06.01
LOSA MACIZA ENCOFRADO Y DESENCOFRADO
01.04.06.02
LOSA MACIZA ACERO FY=4200 KG/CM2
01.04.06.03
ESCALERAS
01.04.07
ESCALERAS CONCRETO f'c=210 kg/cm2
01.04.07.01
ESCALERAS ENCOFRADO Y DESENCOFRADO
01.04.07.02
ESCALERA ACERO FY=4200 KG/CM2
01.04.07.03
RAMPAS
01.04.08
RAMPAS CONCRETO FC=210 KG/CM2
01.04.08.01
RAMPAS ENCOFRADO Y DESENCOFRADO
01.04.08.02
RAMPAS ACERO FY=4200 KG/CM2
01.04.08.03
DETALLES
01.04.09
M2
M2
M2
217.29
217.29
217.29
M3
M3
M3
M3
M3
M2
M2
M3
M3
19.91
146.76
2.35
0.18
92.95
214.45
214.45
95.30
95.30
M2
M3
M3
M2
M2
M2
M2
M3
M2
91.72
27.67
3.91
52.18
160.65
53.80
16.27
3.88
31.02
M3
KG
56.49
1,323.67
M3
M2
KG
24.14
206.99
3,833.10
53.62
15.00
M3
M2
KG
2.33
23.30
161.11
107.23
19.07
0.61
M3
M2
KG
44.10
351.91
5,365.69
59.66
13.46
0.61
M3
M2
M2
M2
KG
30.95
208.72
156.10
364.82
1,713.28
46.15
5.54
5.54
11.30
0.61
M3
M2
KG
2.92
14.61
366.79
47.22
10.00
0.61
M3
M2
KG
0.84
16.35
145.16
43.67
30.50
0.80
M3
M2
KG
2.59
19.80
125.22
91.98
20.00
0.61
21.31
21.31
53.26
13.99
6.00
13.39
12.71
67.02
9.23
67,954.11
31,338.30
0.00
0.00
0.00
0.00
53.93
0.00
0.00
50.09
3.84
0.00
0.00
0.00
0.00
0.00
3,375.87
0.00
0.00
208.25
730.05
963.90
720.40
206.84
260.04
286.39
26,860.22
0.00
0.00
0.00
4,399.12
1,294.27
3,104.85
0.00
792.07
249.85
444.22
98.00
10,631.51
2,630.99
4,736.57
3,263.95
8,616.99
1,428.46
1,157.14
865.42
4,123.78
1,042.19
507.11
137.89
146.10
223.12
651.49
36.69
498.67
116.13
710.41
238.24
396.00
76.17
551.52
Pgina 20
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
M3
M2
1.05
23.65
34.43
21.79
ML
M2
ML
ML
244.30
232.50
21.45
16.00
2.09
2.16
1.14
0.57
M2
305.06
12.95
M2
M2
M2
M2
M2
M2
M2
ML
60.00
411.61
217.48
172.39
359.42
17.31
67.27
233.81
7.57
12.00
12.00
14.99
16.49
14.11
12.95
6.00
M2
364.82
11.35
M2
M2
M2
230.20
229.20
172.25
6.99
11.35
14.55
M2
ML
ML
60.00
93.55
74.10
9.46
6.85
5.70
ML
M2
M2
43.10
1.35
19.80
20.53
11.35
12.13
ML
UN
M3
UN
6.00
1.00
14.22
60.00
1.02
S/.
Costo
Parcial
(S/.)
36.16
515.36
1,048.28
511.66
503.06
24.44
9.12
36,615.81
3,950.95
3,950.95
19,031.25
454.15
4,939.32
2,609.76
2,584.45
5,925.29
244.18
871.24
1,402.86
4,140.63
4,140.63
6,716.27
1,609.47
2,601.37
2,505.43
1,630.40
567.80
640.38
422.22
1,140.21
884.77
15.32
240.12
6.10
6.10
0.00
0.00
0.00
67,954.11
Pgina 21
Pgina 22
Pgina 23
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrado
Costo
Unitario
(S/.)
67,954.11
ESTRUCTURAS
01
TRABAJOS PRELIMINARES
01.01
LIMPIEZA DEL TERRENO MANUAL
01.01.01
M2
TRAZO Y REPLANTEO PRELIMINAR
01.01.02
M2
TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.01.03
M2
MOVIMIENTO DE TIERRAS
01.02
EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO
01.02.01
M3
EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
01.02.02
M3
EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA
01.02.03
M3
EXCAV. DE ZANJAS PARA ESCALERAS Y RAMPAS
01.02.04
M3
RELLENO CON MATERIAL PROPIO
01.02.05
M3
REFINE, NIVELACION Y COMPACTACION
01.02.06
M2
RELLENO CON MATERIAL CLASIFICADO E=10 CM
01.02.07
M2
ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M.
01.02.08
M3
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 kmM3
01.02.09
CONCRETO SIMPLE
01.03
SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12
01.03.01
M2
CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.03.02
M3
SOBRECIMIENTO CONCRETO 1:8+25% PM
01.03.03
M3
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO HASTA 0.30 m M2
01.03.04
FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)
01.03.05
M2
VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL
01.03.06
M2
VEREDA ENCOFRADO Y DESENCOFRADO
01.03.07
M2
SARDINELES CONCRETO FC=175 KG/CM2
01.03.08
M3
SARDINELES ENCOFRADO Y DESENCOFRADO
01.03.09
M2
CONCRETO ARMADO
01.04
ZAPATAS
01.04.01
ZAPATAS CONCRETO F'C=210 kg/cm2
01.04.01.01
M3
ZAPATAS ACERO F'Y=4200 KG/CM2
01.04.01.02
KG
COLUMNAS
01.04.02
COLUMNAS CONCRETO F'C=210 kg/cm2
01.04.02.01
M3
COLUMNAS ENCOFRADO Y DESENCOFRADO
01.04.02.02
M2
COLUMNAS ACERO F'C=4200 KG/CM2
01.04.02.03
KG
PLACAS DE CONCRETO
01.04.03
PLACA DE CONCRETO F'c=210 Kg/Cm2
01.04.03.01
M3
PLACA ENCOFRADO Y DESENCOFRADO
01.04.03.02
M2
PLACA ACERO F'c=4200 Kg/Cm2
01.04.03.03
KG
VIGAS
01.04.04
VIGAS CONCRETO F'C=210 kg/cm2
01.04.04.01
M3
VIGAS ENCOFRADO Y DESENCOFRADO
01.04.04.02
M2
VIGAS ACERO FY=4200 KG/CM2
01.04.04.03
KG
LOSAS ALIGERADAS
01.04.05
LOSAS ALIGERADA CONCRETO f'c=210 kg/cm2
01.04.05.01
M3
LOSA ALIGERADA LADRILLO ARCILLA 15X30X30 cm
01.04.05.02
M2
LOSA ALIGERADA LADRILLO ARCILLA 12X30X30 cm
01.04.05.03
M2
LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO
01.04.05.04
M2
LOSA ALIGERADA ACERO FY=4200 KG/CM2
01.04.05.05
KG
LOSAS MACIZAS
01.04.06
LOSA MACIZA CONCRETO f'c=210 kg/cm2
01.04.06.01
M3
LOSA MACIZA ENCOFRADO Y DESENCOFRADO
01.04.06.02
M2
LOSA MACIZA ACERO FY=4200 KG/CM2
01.04.06.03
KG
ESCALERAS
01.04.07
ESCALERAS CONCRETO f'c=210 kg/cm2
01.04.07.01
M3
ESCALERAS ENCOFRADO Y DESENCOFRADO
01.04.07.02
M2
ESCALERA ACERO FY=4200 KG/CM2
01.04.07.03
KG
RAMPAS
01.04.08
RAMPAS CONCRETO FC=210 KG/CM2
01.04.08.01
M3
RAMPAS ENCOFRADO Y DESENCOFRADO
01.04.08.02
M2
RAMPAS ACERO FY=4200 KG/CM2
01.04.08.03
KG
DETALLES
01.04.09
217.29
217.29
217.29
19.91
146.76
2.35
0.18
92.95
214.45
214.45
95.30
95.30
91.72
27.67
3.91
52.18
160.65
53.80
16.27
3.88
31.02
21.31
21.31
53.26
13.99
6.00
13.39
12.71
67.02
9.23
56.49
1,323.67
24.14
206.99
3,833.10
53.62
15.00
2.33
23.30
161.11
107.23
19.07
0.61
44.10
351.91
5,365.69
59.66
13.46
0.61
30.95
208.72
156.10
364.82
1,713.28
46.15
5.54
5.54
11.30
0.61
2.92
14.61
366.79
47.22
10.00
0.61
0.84
16.35
145.16
43.67
30.50
0.80
2.59
19.80
125.22
91.98
20.00
0.61
67,954.11
31,338.30
0.00
0.00
0.00
0.00
53.93
0.00
0.00
50.09
3.84
0.00
0.00
0.00
0.00
0.00
3,375.87
0.00
0.00
208.25
730.05
963.90
720.40
206.84
260.04
286.39
26,860.22
0.00
0.00
0.00
4,399.12
1,294.27
3,104.85
0.00
792.07
249.85
444.22
98.00
10,631.51
2,630.99
4,736.57
3,263.95
8,616.99
1,428.46
1,157.14
865.42
4,123.78
1,042.19
507.11
137.89
146.10
223.12
651.49
36.69
498.67
116.13
710.41
238.24
396.00
76.17
551.52
21.31
21.31
3.91
52.18
160.65
53.26
13.99
6.00
13.39
12.71
67.02
9.23
16.10
157.08
53.62
15.00
107.23
19.07
0.61
16.57
132.24
2,606.30
59.66
13.46
0.61
208.72
1,150.53
46.15
5.54
5.54
11.30
0.61
14.61
367.19
47.22
10.00
0.61
208.72
43.67
30.50
0.80
91.98
20.00
0.61
Pgina 24
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrado
Costo
Unitario
(S/.)
M3
M2
1.05
23.65
34.43
21.79
ML
M2
ML
ML
244.30
232.50
21.45
16.00
2.09
2.16
1.14
0.57
M2
305.06
12.95
M2
M2
M2
M2
M2
M2
M2
ML
60.00
411.61
217.48
172.39
359.42
17.31
67.27
233.81
7.57
12.00
12.00
14.99
16.49
14.11
12.95
6.00
M2
364.82
11.35
M2
M2
M2
230.20
229.20
172.25
6.99
11.35
14.55
M2
ML
ML
60.00
93.55
74.10
9.46
6.85
5.70
ML
M2
M2
43.10
1.35
19.80
20.53
11.35
12.13
ML
UN
M3
UN
6.00
1.00
14.22
60.00
1.02
S/.
Costo
Parcial
(S/.)
36.16
515.36
1,048.28
511.66
503.06
24.44
9.12
36,615.81
3,950.95
3,950.95
19,031.25
454.15
4,939.32
2,609.76
2,584.45
5,925.29
244.18
871.24
1,402.86
4,140.63
4,140.63
6,716.27
1,609.47
2,601.37
2,505.43
1,630.40
567.80
640.38
422.22
1,140.21
884.77
15.32
240.12
6.10
6.10
0.00
0.00
0.00
67,954.11
Metrado
Costo
Unitario
(S/.)
34.43
21.79
2.09
2.16
1.14
0.57
141.76
12.95
7.57
12.00
12.00
14.99
16.49
14.11
12.95
6.00
11.35
6.99
11.35
14.55
9.46
6.85
5.70
20.53
11.35
12.13
1.02
S/.
Pgina 25
N GENERAL
Costo
Parcial
(S/.)
15,897.22
15,897.22
14,061.23
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,902.20
0.00
0.00
208.25
730.05
963.90
0.00
0.00
0.00
0.00
12,159.03
0.00
0.00
0.00
3,219.40
863.20
2,356.20
0.00
0.00
0.00
0.00
0.00
4,353.87
988.56
1,779.90
1,585.41
4,216.30
0.00
1,157.14
0.00
2,359.29
699.87
369.46
0.00
146.10
223.36
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
COLUMNAS
COLUMNAS CONCRETO F'C=210 kg/cm2
COLUMNAS ENCOFRADO Y DESENCOFRADO
COLUMNETAS
COLUMNETAS CONCRETO F'C=210 kg/cm2
COLUMNETAS ENCOFRADO Y DESENCOFRADO
13.24
119.28
2.86
37.80
16.10
157.08
Pgina 26
N GENERAL
Costo
Parcial
(S/.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,835.99
1,835.99
1,835.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
15,897.22
Pgina 27
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
ESTRUCTURAS
01
TRABAJOS PRELIMINARES
01.01
LIMPIEZA DEL TERRENO MANUAL
01.01.01
TRAZO Y REPLANTEO PRELIMINAR
01.01.02
TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO
01.01.03
MOVIMIENTO DE TIERRAS
01.02
EXCAV. MANUAL DE ZANJAS EN MATERIAL SUELTO
01.02.01
EXCAV. MANUAL DE ZANJAS HASTA 1.40 M
01.02.02
EXCAV. MANUAL DE ZANJAS P/SARDINELES DE VEREDA
01.02.03
EXCAV. DE ZANJAS PARA ESCALERAS Y RAMPAS
01.02.04
RELLENO CON MATERIAL PROPIO
01.02.05
REFINE, NIVELACION Y COMPACTACION
01.02.06
RELLENO CON MATERIAL CLASIFICADO E=10 CM
01.02.07
ELIMIN. DE MATERIAL -MANUAL DIST. PROMD. D=30M.
01.02.08
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km
01.02.09
CONCRETO SIMPLE
01.03
SOLADOS PARA ZAPATAS E=4" CONCRETO 1:12
01.03.01
CIMIENTO CORRIDO CONCRETO 1:10 + 30% P G
01.03.02
SOBRECIMIENTO CONCRETO 1:8+25% PM
01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO HASTA 0.30 m
01.03.04
FALSO PISO E=4" (MEZCLA 1:10 CEMENTO HORMIGON)
01.03.05
VEREDA CONCRETO FC=175 KG/CM E= 4" + SARDINEL
01.03.06
VEREDA ENCOFRADO Y DESENCOFRADO
01.03.07
SARDINELES CONCRETO FC=175 KG/CM2
01.03.08
SARDINELES ENCOFRADO Y DESENCOFRADO
01.03.09
CONCRETO ARMADO
01.04
ZAPATAS
01.04.01
ZAPATAS CONCRETO F'C=210 kg/cm2
01.04.01.01
ZAPATAS ACERO F'Y=4200 KG/CM2
01.04.01.02
COLUMNAS
01.04.02
COLUMNAS CONCRETO F'C=210 kg/cm2
01.04.02.01
COLUMNAS ENCOFRADO Y DESENCOFRADO
01.04.02.02
COLUMNAS ACERO F'C=4200 KG/CM2
01.04.02.03
PLACAS DE CONCRETO
01.04.03
PLACA DE CONCRETO F'c=210 Kg/Cm2
01.04.03.01
PLACA ENCOFRADO Y DESENCOFRADO
01.04.03.02
PLACA ACERO F'c=4200 Kg/Cm2
01.04.03.03
VIGAS
01.04.04
VIGAS CONCRETO F'C=210 kg/cm2
01.04.04.01
VIGAS ENCOFRADO Y DESENCOFRADO
01.04.04.02
VIGAS ACERO FY=4200 KG/CM2
01.04.04.03
LOSAS ALIGERADAS
01.04.05
LOSAS ALIGERADA CONCRETO f'c=210 kg/cm2
01.04.05.01
LOSA ALIGERADA LADRILLO ARCILLA 15X30X30 cm
01.04.05.02
LOSA ALIGERADA LADRILLO ARCILLA 12X30X30 cm
01.04.05.03
LOSA ALIGERADA ENCOFRADO Y DESENCOFRADO
01.04.05.04
LOSA ALIGERADA ACERO FY=4200 KG/CM2
01.04.05.05
LOSAS MACIZAS
01.04.06
LOSA MACIZA CONCRETO f'c=210 kg/cm2
01.04.06.01
LOSA MACIZA ENCOFRADO Y DESENCOFRADO
01.04.06.02
LOSA MACIZA ACERO FY=4200 KG/CM2
01.04.06.03
ESCALERAS
01.04.07
ESCALERAS CONCRETO f'c=210 kg/cm2
01.04.07.01
ESCALERAS ENCOFRADO Y DESENCOFRADO
01.04.07.02
ESCALERA ACERO FY=4200 KG/CM2
01.04.07.03
RAMPAS
01.04.08
RAMPAS CONCRETO FC=210 KG/CM2
01.04.08.01
RAMPAS ENCOFRADO Y DESENCOFRADO
01.04.08.02
RAMPAS ACERO FY=4200 KG/CM2
01.04.08.03
DETALLES
01.04.09
Metrados
Metrado
M2
M2
M2
217.29
217.29
217.29
M3
M3
M3
M3
M3
M2
M2
M3
M3
19.91
146.76
2.35
0.18
92.95
214.45
214.45
95.30
95.30
M2
M3
M3
M2
M2
M2
M2
M3
M2
91.72
27.67
3.91
52.18
160.65
53.80
16.27
3.88
31.02
M3
KG
56.49
1,323.67
M3
M2
KG
24.14
206.99
3,833.10
M3
M2
KG
2.33
23.30
161.11
M3
M2
KG
44.10
351.91
5,365.69
M3
M2
M2
M2
KG
30.95
208.72
156.10
364.82
1,713.28
M3
M2
KG
2.92
14.61
366.79
M3
M2
KG
0.84
16.35
145.16
M3
M2
KG
2.59
19.80
125.22
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Pgina 28
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrados
Metrado
M3
M2
1.05
23.65
ML
M2
ML
ML
244.30
232.50
21.45
16.00
M2
305.06
M2
M2
M2
M2
M2
M2
M2
ML
60.00
411.61
217.48
172.39
359.42
17.31
67.27
233.81
M2
364.82
M2
M2
M2
230.20
229.20
172.25
M2
ML
ML
60.00
93.55
74.10
ML
M2
M2
43.10
1.35
19.80
M2
7.98
M2
M2
M2
ML
62.42
26.76
6.36
42.35
UN
UN
UN
32.00
3.00
4.00
M2
M2
63.32
26.72
M2
M2
M2
M2
M2
ML
ML
M2
M2
ML
364.82
172.39
359.42
411.61
217.48
233.81
93.55
15.96
12.73
135.05
ML
UN
M3
6.00
1.00
14.22
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Pgina 29
Ejecuta :
Financiamiento:
Residente de Obra
Supervisor
tem
02.12.04
03
03.01
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.02.06
03.02.07
03.02.08
03.02.09
03.02.10
03.02.11
03.02.12
03.02.13
03.02.14
03.02.15
03.03
03.03.01
03.03.02
03.03.03
03.03.04
03.03.05
03.04
03.04.01
03.04.02
04
04.01
04.01.01
04.01.02
04.01.03
04.01.04
04.01.05
04.01.06
04.01.07
04.02
04.02.01
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.02
04.04.03
04.04.04
04.05
04.05.01
04.05.02
04.06
04.06.01
Partidas
Und.
FLORES
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
INODORO TOP PICCE C/FLUXOMETRO
LAVATORIO DE LOZA BLANCA 20"X16"
URINARIOS DE LOZA DE PICO BLANCO
LAVADERO DE ACERO INOXIDABLE, 01 P0ZA C/ESCURRIDERO+ACCES.
LLAVE CROMADO 1/2" PARA LAVATORIO
LLAVE TIPO CUELLO DE CISNE CROMADO DE 1/2"
LLAVE CROMADO PARA URINARIO
SISTEMA DE DESAGUE
SALIDA DE DESAGUE PVC D=4"
SALIDA DE DESAGUE PVC D=2"
SALIDA DE VENTILACION PVC D=2"
REGISTROS DE BRONCE 4"
SUMIDEROS DE 2"
TUBERIA DE PVC SAL 4"
TUBERIA DE PVC SAL 2"
YEE PVC SAL 4"
YEE PVC SAL 2"
YEE PVC SAL 4" x 2"
TEE PVC SAL 2"
CODO PVC SAL 2"X45
CODO PVC SAL 4" x 45
REDUCCION PVC SAL 4" A 2"
CAJA DE REGISTRO DE 12" X 24"
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA DE 1/2"
TUBERIA PVC CLASE 10 DE 1/2"
CODO PVC SAP 1/2" x 90
TEE PVC SAP 1/2"
VALVULAS DE COMPUERTA DE BRONCE DE 1/2"
SISTEMA DE AGUA DE LLUVIA
TUBERIA PVC SAL 4" D/PLUVIAL
CODO PVC SAL 4" x 90
INSTALACIONES ELECTRICAS
INSTALACIONES ELECTRICAS Y MECANICAS
SALIDA PARA CENTRO DE LUZ
SALIDA DE PARED (BRAQUETES) CON PVC
SALIDA P/TOMACORRIENTE SIMPLE PARA LUZ DE EMERGENCIA
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA INTERRUPTOR DOBLE
SALIDA P/TOMACORRIENTE DOBLE, CON LINEA TIERRA
SALIDA P/TOMACORRIENTE DOBLE, C/ LINEA TIERRA P/AGUA
CANALIZACIONES, CONDUCTOS O TUBERIAS
TUBO 20MM D' PVC SEL
CONDUCTORES Y CABLES DE ENERGIA EN TUBERIAS
CABLE NH - 80 2 x 4 + 1x4 MM2
CABLE NH - 80 2 x 2.5 MM2
ARTEFACTOS ELECTRICOS
ARTEFACTO FLUORESCENTE 2/36W +CAJA C/REJILLA
ARTEFACTO FLUORESCENTE 4 x 18 W C/EQ
ARTEFACTO BRAQUET GLOBO
ARTEFACTO SPOT-LIGHT C/DOBLE LAMPARA AHORRADOR
TABLEROS DE DISTRIBUCION
TABLERO GENERAL 4
TABLERO DISTRIBUCION 41
EQUIPOS ELECTRICOS Y MECANICOS
POZO A TIERRA C/C CU 16MM2 CC
Metrado
UN
60.00
UN
UN
PZA
UN
UN
UN
UN
2.00
3.00
1.00
2.00
3.00
2.00
1.00
PTO
PTO
PTO
UN
UN
ML
ML
PZA
PZA
PZA
PZA
PZA
UN
PZA
UN
2.00
6.00
2.00
3.00
5.00
14.21
23.90
1.00
5.00
2.00
5.00
2.00
2.00
4.00
1.00
PTO
ML
UN
UN
UN
8.00
17.80
11.00
4.00
2.00
ML
UN
41.40
18.00
PTO
PTO
PTO
PTO
PTO
PTO
PTO
34.00
3.00
18.00
9.00
3.00
21.00
4.00
ML
626.40
ML
ML
338.40
288.00
UN
UN
UN
UN
24.00
6.00
3.00
3.00
UN
UN
1.00
1.00
UN
2.00
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Metrados
Pgina 30
Financiamiento:
Residente de Obra
Supervisor
tem
Partidas
Und.
Metrados
Metrado
Costo
Unitario
(S/.)
Costo
Parcial
(S/.)
Pgina 31
Metrados
Pgina 32
Metrados
Pgina 33
Metrados
Pgina 34
Metrados
Pgina 35