Management
Page 1 of 146
Commitment Item
Fund
Fund centre
Funded Program
Grant
Functional Area
Budget Period
Funds management supports use of workflows while creation of budget and while posting
earmarked fund documents.
#
Basic settings-account
assignment elements
Page 2 of 146
Design
element
category
Solution
Requirement
Description
1.
Rule-Based Account
Assignment Distribution
Solution
Requirement
2.
Solution
Requirement
Business Add-Ins
3.
4.
Ranking order for selection of
generic entries
5.
Functional
Requirements
Data
#
Fund
Page 3 of 146
Design
element
category
Functional Data
Requirements
Description
6.
Funded Program
Functional Data
Requirements
7.
Allocations to account
assignments from other
components
Solution
Requirement
8.
9.
Solution
Requirement
Page 4 of 146
Design
element
category
Description
Solution
Requirement
Solution
Requirement
12.
Budget types
16.
Deactivation of account
assignment elements in
Controlling is also available if not
required.
Solution
Requirement
Solution
Requirement
Solution
Requirement
15.
14.
Document definition
Solution
Requirement
13.
Planner Profile
Page 5 of 146
Design
element
category
Description
default.
Activity Group
Solution
Requirement
17.
Settings for availability ledger
Solution
Requirement
18.
Page 6 of 146
Design
element
category
Description
postings.
19.
Solution
Requirement
20.
Page 7 of 146
Design
element
category
Description
Solution
Requirement
21.
Solution
Requirement
22.
Solution
Requirement
23.
Integration
Integration
24.
25.
Integration
Page 8 of 146
Design
element
category
Description
Management.
Set checks for CO plan version-it can
set the checks for planning functions in
Controlling
Integration with Procurement
Integration
26.
1.0
1.1
Related BPRs
N/A
General
Configuration
activity
across all BPRs
Related FRICEW
N/A General Configuration
activity across all FRICEW
elements
1.1.3
Page 9 of 146
As the FM module will be used in the Solution design the FM area has to be defined
and FM components and control objects have to be activated. The Solution FM data
objects (Fund, Fund Center, Functional Area, Commitment Item, and Budget Period)
will be utilized as a replacement for the current Customer IMIS BAC codes.
M - Module Specific
IMG > Public Sector Management > General settings for public sector management >
Basic settings: Account assignment elements > Activate account assignment elements
SPRO
1. Activate account assignment elements by checking boxes: Fund, Functional
area, Grant, Budget period and Funded program to enable the system to use
these functions.
Implementation
Steps
Page 10 of 146
Solution will not permit blank values for Solution Funds Management dimensions.
M - Module Specific
Type
IMG > Public Sector Management > General settings for public sector management >
Basic settings: Account assignment elements > Allow BLANK as Value for Account
Assignment Elements
Menu Path
SPRO
Transaction
Implementation
1. N/A
Steps
1.2
1.2.1
The Customer as a public sector organization, which operates based on a Fund Accounting principle. The
organization is required to ensure the funds entrusted to it by the General Assembly and Voluntary
Contributors are used for the purpose and nature for which the respective fund appropriations or donations
were authorized. To meet this objective the SAP Funds Management module will be utilized. Funds
Management Government refers to the Customizing settings in other components which are necessary for
integrated use with Funds Management.
1.2.2
i.
Page 11 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
The Customer will activate/deactivate specific functions in the system for the
component Management (PSM-FM).
IMG > Public Sector Management > Funds Management Government > Basic settings >
Activate Global Funds Management Functions (PSM-FM)
SPRO
1.
2.
3. Make sure you save your entries before you exit the transaction
ii.
Rationale for
configuration
and
configuration
change
In this IMG activity, we will activate the Budget Control System (BCS) as an operative
budgeting tool of the component Funds Management Government. In this step,
Solution will define a from-fiscal year for an FM area for this purpose. The Customer
will make a final determination as to the first fiscal year applicable for the Solution
implementation during the build phase.
M - Module Specific
Type
Menu Path
Transaction
Implementation
Steps
Page 12 of 146
IMG > Public Sector Management>Funds Management Government> Basic settings >
Activate global functions for budgeting
SPRO
iii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Page 13 of 146
In this IMG activity, Solution will activate the Multi-Year Budget Execution. IF The
Customer operates with two distinct financial periods consisting of a biennium (01
January even year through 31 December of the following odd year) and for Other
operations (01 July through 30 June of the subsequent year). To support this
requirement as noted by the Solution Steering Committee in the Key Design Decision
on the use of a single SAP Company Code it is required therefore use this
functionality in conjunction with the SAP FM dimension Budget Period .
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Basic settings >
Activate Multi-Year Budget Execution
SPRO
you must
complete configuration step 19 Actual and Commitment Update/Integration in
order to activate Multi-Year Budget)
2. Make sure you save your entries before you exit the transaction
Implementation
Steps
iv.
Rationale for
configuration
and
configuration
change
For each FM area, the parameters can be maintained differently as per the
requirement. FM area text, Budget profile, Fiscal year variant, number range, ranking
order (Here you enter the sequence of the objects funds center, commitment item, and
fund which are to be valid for an FM area when you select generic entries referring to
these objects. If you do not enter a value, the system uses sequence "1" (Funds
Center, Commitment Item, Fund).
The Customer considers each fund as a separate legal entity, managed through
respective organizationalunits (Funds Centers), and responsible for multiple nature of
expenses (Commitment Items). Based on this the ranking order for the Solution
implementation will be Fund, Funds Center, and Commitment Item.
Menu Path
Transaction
IMG > Public Sector Management > Funds Management Government > Basic settings >
Define Global Parameters
SPRO
Page 14 of 146
Implementation
1.
Steps
2.
3.
Enter FM Area 1000 or select from drop down menu to the right
4.
5.
6.
7.
8.
Make sure you save your entries before you exit the transaction
1.3
1.3.1
i.
Page 15 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Assign the fiscal year variant defined above to the Project FM Area 1000 created
above.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Basic settings >
Fiscal Year Variant > Assign Fiscal year variant to FM area
SPRO
ii.
Page 16 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step, you define the ranking for the objects funds center, commitment item, and
fund in the generic search in an FM area.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Basic settings >
Define Ranking Order for Selection of Generic Entries
SPRO
3. Make sure you save your entries before you exit the transaction
iii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 17 of 146
The Funds Management message control settings will be determined during the
Solution build phase.
M Module Specific
IMG > Public Sector Management>Funds Management Government>Basic settings >
Change Message Control
SPRO
1. Click on New Entries icon
Page 18 of 146
5. Make sure you save your entries before you exit the transaction
Page 19 of 146
Page 20 of 146
1.4
Configuration Element 04: Commitment Item, Fund Center, Fund, and Field Status for FM
Master Data Elements
i.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 21 of 146
In this step, you create variants for maintaining commitment item hierarchies.
Commitment Items hierarchies will be used in availability control (AVC) to control
budget differently for different commitment item hierarchies by fund type.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Master
data > Account Assignment elements > Commitment Item > Create Variant in FM
Area/Fiscal Year
SPRO
1. Select Create Variant in FM Area/Fiscal Year node
2. Enter or Select FM Area 1000
Make sure you save your entries before you exit the transaction
ii.
Rationale for
configuration and
configuration
change
Page 22 of 146
Fund master data maintenance includes various master data processes such
as creation, change, and deleting or expiring of Fund master records.
Type
Menu Path
Transaction
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Master
data > Account Assignment elements > Fund > Create FM fund types
SPRO
Implementation
Steps
Enter FM Fund Type Number, Fund type text, and select the
Budget Scope Overall Budget per table below:
FM
Area
Fund
Type
1000
10
1000
20
Other Funds
1000
30
1000
40
1000
50
Budget Scope
Overall
Budget
Overall
Budget
Overall
Budget
Overall
Budget
Overall
Budget
Make sure you save your entries before you exit the
transaction
iii.
Page 23 of 146
Type
Menu Path
Transaction
Implementation
Steps
Page 24 of 146
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Master
data > Account Assignment elements > Edit Field Selection > Edit Field Selection
Strings
SPRO
1. Select Edit Field Selection String for Commitment Items and enter field
selection screen entry 1000 with selection string per screenshot:
Page 25 of 146
2. Select Edit Field Selection String for Funds Centers and enter field
selection screen entry 1000 with selection string per screenshot:
3. Select Edit Field Selection String for Funds and enter field selection
screen entry 1000 with selection string per screenshot:
Page 26 of 146
4. Select Edit Field Selection String for Budget Period and use existing
FMBY with selection string per screenshot:
5. Select Edit Field Selection String for Funded Programs and enter field
selection screen entry 1000 with selection string per screenshot:
6. Select Maintain Field Selection String for Functional Area and use existing
FMFA with selection string per screenshot:
Page 27 of 146
7. Select Assign Field Selection Screen and enter new entries 1000 for
each column
1.5
1.5.1
The Funded Program dimension usually is used to control and report on cost objects of definitive timeframe (CO Internal Orders or Project System Project activities) within SAP Funds Management. Please
note that;
Funded program is relevant for search functionality and in selection criteria for reporting and
processing.
The funded program type is used to categorize funded programs by common characteristics
such as common business processes.
When we are using the Funded Program in integrated postings, it is not possible to enter the funded
program directly. It must be derived, using rules specified in the FM derivation tool. After activation of
funded program, it will be displayed in Sales and Distribution (SD) orders, Plant Maintenance (PM) orders,
and in networks or network activities. It is not displayed in purchase requisitions, purchase orders, goods
receipts, or any other documents.
1.5.2
iv.
Page 28 of 146
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
IMG > Public Sector Management > Funds Management Government > Master data
> Account Assignment elements > Funded program > Create and maintain funded
program types
SPRO
1. Select New Entries icon
2. Enter Funded program type-4 digit alpha numeric as shown below:
Steps
FPT
AENS
ASWS
COEV
FCTS
ICTP
FPT Text
Associate Experts
(Non-Settlement)
Associate Experts (Settlement)
Conference & Events
Facilities Projects
ICT-Projects
5. Make sure you save your entries before you exit the transaction
1.6
Page 29 of 146
The account assignment derivation consists of a sequence of derivation steps - known as the derivation
strategy. It is used to sequentially derive the values for FM account assignments from other account
assignments.
Each derivation step describes how a number of target fields can be filled from a number of source fields.
Assign a company code to each strategy and each company code can only be assigned to one strategy.
If we do not specify a strategy on the selection screen, the standard SAP strategy is proposed by the
system.
For each business transaction relevant to Funds Management, account assignment derivation determines
values for the FM account assignment elements from other account assignment objects in the related SAP
modules. This includes for example FI (Financial Accounting) General Ledger Accounts to FM (Funds
Management) Commitment Items.
Define account assignment derivation/derivation strategy consists of a sequence of derivation steps. Each
derivation step consists of target fields and source fields as per the requirement.
1.6.2
i.
Rationale for
configuration and
configuration change
Type
Menu Path
Transaction
IMG > Public Sector Management > Funds Management Government > Master data >
Allocations to Account Assignments from Other Components > Define account
assignment derivation
SPRO
Page 30 of 146
FM Derive
Note: Derivation Rule Values are NOT absolute (only illustration/ examples)
This is a very powerful functionality and can be used with a number of permutations and combinations of Source
fields / Target Fields and sets of conditions.
The examples given below are only for demonstrating the wide variety of ways this functionality can be used.
Step XX:
Page 31 of 146
Page 32 of 146
Step XX:
Step XX:
Page 33 of 146
Step XX:
Page 34 of 146
Step XX:
Step XX:
Page 35 of 146
Page 36 of 146
1.7
1.7.1
Page 37 of 146
The Customer Solution implementation will activate BAdis to provide access to data elements in other
modules not delivered through standard configuration and to reduce user inputs / data errors to data
elements in other modules that can be auto created.
1.7.2
ii.
BAdI for Automatic Generation of FM Master Data: WBS Element for Funded Program
Rationale for
configuration
and
configuration
change
Type
Page 38 of 146
To ensure the proper relationship between the Project System and Funds
Management modules of the SAP Solution implementation this BAdi is being
implemented to auto create a Funded Program upon the creation of a Project System
Work-Breakdown Structure Element (WBSE).
It has been determined that this BADi has been replaced by SAP with T-Code
FMDDAUTO, therefore the BADi will not need to be activated.
M - Module Specific
IMG > Public Sector Management>Funds Management Government>
Master data> Allocations to Account Assignments from Other
Components>Business Add-Ins (BAdIs)>BAdI for Automatic Generation
of FM Master Data: WBS Element for Funded Program
Menu Path
SPRO
Transaction
Implementation
Steps
1.8
With the account assignment derivation, the values of the new FM account assignment are determined
automatically from previous account assignments. Several target account assignments can be determined
for some closing operations that allow amounts to be split over several target account assignments and
partial amounts to be included.
The account assignment derivation consists of a sequence of derivation steps - the reassignment
derivation strategy through the values from FM account assignments are derived from other account
assignments. Each derivation step describes how a number of target fields can be filled by a number of
source fields. Assign strategy for reassignment to FM Area for closing operations.
1.8.1
i.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 39 of 146
The Solution implementation given its reliance on the Budget Period to ensure proper
control of resources apppropriated or donated to a particular fund for a specific
Customer financial period will need to ensure that during reassignment the spender
and receiver Commitment Item retain the original budget period.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Master data
> Derivation strategy for Reassignment > Define derivation strategy for reassignment
SPRO
1.
2.
3.
4.
Highlight line
5.
6.
7.
8.
Enter the step description, source fields and target fields per screen shot below:
9.
Click Save
10.
11.
Click Save
Page 40 of 146
i.
Page 41 of 146
Rationale for
configuration
and
configuration
change
M - Module Specific
Type
IMG > Public Sector Management > Funds Management Government > Master data >
Derivation strategy for Reassignment > Assign Strategy for Reassignment to FM Area
Menu Path
SPRO
Transaction
1.
Implementation
Steps
2.
1.9
1.9.1
A status profile is created by the user in general status management. In a status profile the user can define
the sequence in which user statuses can be activated, define initial statuses and allow or prohibit certain
business transactions.
i.
Page 42 of 146
Type
IMG > Public Sector Management > Funds Management Government > Master Data >
Status Management > Define Status Profile
Menu Path
SPRO
Transaction
Implementation
Steps
1.
2.
3.
4.
Page 43 of 146
This configuration will allow activating relevant FM master data for SAP Budget Control System
(BCS). As BCS is the standard delivered tool for Public Sector budgeting, FM account assignment
elements needs to be specifically activated before being used in BCS transactions.
4.10.3
i.
Type
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Basic Settings > Use of Master Data > Activate
Account Assignment Elements in Budgeting
Menu Path
SPRO
Transaction
Implementation
1.
Steps
Mandatory
Optional
2.
Complete the selections for FM Area 1000 per the screenshot below, please note
will need to use the right arrow to make all selections.
o
3.
4.12
Page 44 of 146
4.12.1
The characteristics of Budget category differentiates between Commitment budget and Payment budget.
4.12.2
4.12.2
i.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you determine the budget categories you want to use for an FM
area in your organization. The following are budget categories: Commitment budget,
Payment budget and Financial budget.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting> Basic Settings > Definition of Budget Data>
Define Budget Categories
SPRO
1.
2.
3.
4.
5.
ii.
Page 45 of 146
Edit Version
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
In this IMG activity, you stipulate the versions you want to use for budgeting in your
FM area. When managing different budget data, you can work with several operational
versions at the same time when using the budget control system in Funds
Management.
M Module Specific
IMG > Public Sector Management>Funds Management Government > Budget Control
System (BCS) > Budgeting > Basic Settings > Definition of Budget Data > Edit
Versions
SPRO
1.
2.
Steps
4.13
Page 46 of 146
ationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 47 of 146
The budget types to differentiate between types of budget postings for documents
and reporting. Will be defined as per customer requirement.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Basic Settings > Definition of Budget Data >
Budget Types > Define Budget Types
SPRO
1.
2.
3.
Please complete the table per ,matrix below and Assign Processes
Budget
Type
Long Description
Processes
APRI
ALLT
SALT
MSBL
Appropriation Received
Appropriation Ready for Issue
Allotment
Sub Allotment
Member State Balance
AALT
Advance Allotment
Enter, Return
CATH
CARI
CAWA
CARI
Commitment Authority
Commitment Authority Ready for Issue
Commitment Authority with Appropriation
Commitment Authority Ready for Issue
AREV
ARRI
GMEN
GMSP
GMTR
GMRT
APRO
4.
5.
Page 48 of 146
12.
4.14
Save
Page 49 of 146
and exit.
4.14.1
Overview of configuration element
BCS Budget Control System includes functions for budget planning, budget monitoring, budget reporting
and availability control. The Customer Solution implementation will utilize all functionalities except budget
planning. The full Solution Enterprise implementation plans for its budget planning requirements to be
provided by a SAP new dimension application.
4.14.2
i.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
In this IMG activity, you define the document types you want to use for budget postings
in Funds Management. . By using different document types, you can classify budget
entry documents according to your user-specific criteria, by assigning meaningful names
to the individual document types used within your organization. To facilitate integration
with Grants Management the design includes detailed GM document types that roll up to
GM01 to be in sync with Grants Management.
M Module Specific
IMG
> Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Budget Entry > Document Definition > Define
Document Types
SPRO
1. Enter Document Type, Text Type, and Number Ranges and select the remaining
fields per the embredded file below:
Steps
ii.
Page 50 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 51 of 146
This step defines the number range interval for budget entry documents of an FM area
for each fiscal year for the industry-specific component Funds Management.
Additionally, we have included the detailed GM number range intervals as well to be in
the 4 series.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget Control
System (BCS) > Budgeting > Budget Entry > Budget Entry Documents > Document
Definition > Maintain Number Range Intervals for Entry Documents
FMEDNR
1. Enter FM Area 1000
2. Select
one
of
the
following:
Intervals
(eyeglasses
icon-Display)
5. Insert the following to create number ranges: Number, Year, From number (10
digit number), To number (10 digit number), Number Range Status (10 digit
number) per embedded file in previous step;
6. Checkmark should be left checked as the Customer will utilize internal number
ranges.
7. Make sure to save your entries
iii.
Page 52 of 146
Rationale for
configuration
and
configuration
change
In this IMG activity, you define the number range interval of budget change documents in
an FM area for each fiscal year in the component Funds Management.
Change documents are always generated, when changes are made to the totals records
for existing budget values. Change documents provide a complete history of the
changes made to budget values.
The Customer Office of Programm Planning, Budgeting and Accounts (OPPBA) agreed
to one continuous number range.
There is an outstanding consideration to have an external range for Customer Budget
Informaiton System (BIS) appropriations and allotment advices to be transferred to
Solution via an interface and possibly a second external range to support conversion.
Type
Menu Path
Transaction
iv.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget Control
System (BCS) > Budgeting > Budget Entry > Budget Entry Documents > Document
Definition > Maintain Number Range Intervals for Budget Change Documents
SPRO
Rationale for
configuration and
configuration
change
Page 53 of 146
In this IMG activity, you define the number range interval to assign document family
numbers. Several budget entry documents are grouped togetherder one document
family which is created at the same time in a mass activity. This will be used in the
Customer implementation to support mass upload of allotments at the beginning of
a budget period.
The document family number references all the budget entry documents generated
at the same time in a mass rCustomerand makes drilldown reporting and further
processing easier (such as a mass reversal with the program Reverse documents).
In this way, an entry document also gets a document family number as well as the
individual budget entry-document number. The respective document family is
displayed in the budgeting workbench in the header data of a budget entry
document. For entry documents without a family document, the Document Family
field in the budgeting workbench is hidden.
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget
Control System (BCS) > Budgeting > Budget Entry > Budget Entry Documents >
Document Definition > Define Number Range Interval for Document Family
SPRO
1. Enter FM Area 1000
2. Select one of the following: Intervals (eyeglasses icon-Display)
Steps
, Status (pencil icon-Change)
or Intervals (pencil icon-Change)
3. Select Intervals (pencil icon-Change)
4. Click on Insert Interval icon
5. Insert the following to create number ranges: Number, Year, From number (10
digit number), To number (10 digit number), Current Number (10 digit
number)
7.
v.
Page 54 of 146
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Page 55 of 146
In the budgeting workbench, you can define whether a specific input field appears
in the header area of the budgeting workbench.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Budget Entry > Budget Entry Documents
> Document Definition > Define Layout for Budgeting Workbench
SPRO
1. You will see the following screen with standard SAP budget workbench
layouts:
Steps
Page 56 of 146
4. Enter the following Layout Variant Z0001 and Description Customer All
Account Assignment Elements in Line Item.
5. Select from the drop-down menu the fields and enter the respective
column position number as shown in the screenshot below:
vi.
Page 57 of 146
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Page 58 of 146
In this IMG activity, you can create and delete field status variants for Budget Control
System (BCS). A field status variant enables you to control whether the fields your users
see when they create budget entry documents are hidden, displayed, optional, or
mandatory.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Budget Entry > Budget Entry Documents >
Field Control for Budget Entry Documents > Field Status
SPRO
1. Select Define Field Status Variant node
2. Define Field Status Variant ZZ01
Steps
Doc Types by
Process for Field Status Group.xlsx
Page 59 of 146
vii.
Page 60 of 146
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Page 61 of 146
In this IMG activity, you define a profile of changeable fields for your pre-posted and
posted budget documents.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Budget Entry > Budget Entry Documents >
Field Control for Budget Entry Documents > Changeable Fields in Budget Docs
SPRO
12. Select Define Profile of Changeable Fields in Budget Docs node
13. Define Profile 1000 for Changeable Fields per screenshot below
Steps
14. Select Edit Profile for Preposted documents and define changeable fields
per screenshot below
4. Select Edit Profile for Posted documents and define changeable fields per
screenshot below
Page 62 of 146
17. Select Activate Change Log for Preposted Budget Documents node
18. Activate change history per screenshot below
viii.
Page 63 of 146
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 64 of 146
In the budgeting workbench, you can create additional budget lines to post
automatically via the derivation strategies in this configuration node.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Budget Entry > Budget Entry Documents >
Additional Budget Line Items > Define Derivation Strategy for Additional Budget
Line Items
SPRO
Page 65 of 146
Page 66 of 146
Page 67 of 146
Page 68 of 146
Page 69 of 146
Page 70 of 146
1.
4.15.1
In the Solution environment, the Customer seeks to restrict access to post budgetary documents
to open periods within the FM Area fiscal year (January December). To achieve this control the
system requires the activation of period control for budgeting. The Customer intends todertake
Budget Formulation outside of the SAP Funds Management (FM) module, therefore only one
status definition all is required. Additionally, based on the system configuration of Multi-Year
Budget Execution (MYBE) and Budget Period and the Customer definition of a Fund Balance at
the end of a period, it is required to establish a Key Figure to calculate the Fund Balance.
4.15.2
i.
Page 71 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
ii.
The Customer requires the ability to control posting of budget documents only to
open periods.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Control Budgeting Flow > Activate Period
Control
SPRO
1.
2.
3.
4.
5.
6.
Edit Status
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 72 of 146
The Customer will apply budget period control to all phases: budget entry, budget
consumption, changes to the approved budget, including transfers, reductions /
supplements, and to budget blocks, of the budgetary process that are in scope.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Control Budgeting Flow > Edit Status
SPRO
1. Select New Entries icon
2. Select FM area 1000 from drop down menu
3. Enter Status all
4. Enter description (S) 6 character length short description
5. Enter description (L) 35 character length long description
6. The result is shown in the screen shot below, please note FM Area 0001 is a
standard SAP delivered FM Area and is not applicable to the Solution
implementation.
9. Add New Entries by Budget Type & Process per embedded spreadsheet. Note:
Budget Category = Payment and Authorization Group = blank for all values
iii.
Page 73 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Page 74 of 146
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting> Control Budgeting Flow > Define Key
Figures
FMKF_DEF
1.
Implementation
Steps
Page 75 of 146
Page 76 of 146
Page 77 of 146
17.
iv.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
By defining a distribution key, you can distribute plan totals over individual plan
periods. The Project implementation will require the ability to post an Allotment
Advice (Spending Authority) to the specific month the document is approved without
distribution.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Budget
Control System (BCS) > Budgeting > Control Budgeting Flow > Define Distribution
Key
GP30
Implementation
Steps
Page 78 of 146
4. Click checkmark
5. Under the Distribution factors tab complete per screenshot below:
6. Click save
and complete the pop-up window shown below according to
Project Transport Request standards:
7. Repeat the above to create distribution keys for periods 2 12. Please note
the format of distribution factors per the screenshot below for period Z010.
Each of the subsequent distribution keys will be added to the same
Transport Request.
Page 79 of 146
4.15.3
Overview of configuration element
In this step you define budget availability control settings for the budget control system.
4.15.4
i.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Page 80 of 146
All posting procedures relevant for availability control are divided into activity
groups. You can enter various availability control tolerance limits for each activity
group.
In addition to the activity groups delivered by SAP, you can create your own
activity groups and define the combination of the posting procedures contained in
them.
In this IMG activity, you can subdivide postings according to their posting
procedures.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget
Control System (BCS) > Availability Control> Activity Groups>Edit Derivation
Strategy for Activity Groups
FMAVCDERIVACTG
1. Select the Change/Display icon (eyeglasses & pencil)
standard delivered by SAP
These are
Page 81 of 146
ii.
Page 82 of 146
Rationale for
configuration
and
configuration
change
Page 83 of 146
In this IMG activity, you define the tolerance profile for the active availability
control in the budgeting of Funds Management (FM).
For each tolerance profile, you define whether you only want to work with
percentage usage rates or also with maximum permissible absolute differences. If
you allow absolute variances as tolerance limits, you must assign a currency to
the tolerance profile - this currency must match your FM area currency.
In a tolerance profile you group together the tolerance limits for the different
activity groups. You can define one or more tolerance limits for each activity
group by specifying different usage rates or also absolute variances. You also
define the check sequence of the different tolerance limits. Assign a message
type to each of these defined check events. As message type, an error message,
a warning, or information can be issued.
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG > Public Sector Management>Funds Management
Government> Budget Control System (BCS) > Availability
Control>Edit Tolerance Profiles
SPRO
1. Select
Steps
2.
Select Maintain Tolerance Limits and configure each profile per screenshots
below:
1. Tolerance Profile Customer (Maintain Tolerance Limits):
Page 84 of 146
i.
Page 85 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step you define the blocking reasons for the earmarked funds and value
adjustment documents. With these blocking reasons you can block a document or
document item for manual processing.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Define
Blocking Reasons
SPRO
1. Select New Entries
2. Enter Block Number, two digit alphanumeric characters
3. Enter Block Description and Reason, fifty digit alphanumeric characters
4. Save your work
ii.
Page 86 of 146
Rationale for
configuration
and
configuration
change
M - Module Specific
Type
Menu Path
Transaction
Implementation
Steps
4.16
In this step you define the messages the users will see when tolerance limits are
invoked.
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Change
Message Control
SPRO
1. Select New Entries
2. Add messages as shown below
iii.
Page 87 of 146
Rationale for
configuration and
configuration
change
In this IMG activity, you activate the Funds Management (FM) account assignment
derivation and update of documents from the feeder components for FM
M Module Specific
Type
Menu Path
Transaction
Implementation
Steps
4.20.1
i.
ii.
4.20.2
Document Relationship Entities
Note: these relationships might be established in Solution Manager
Page 88 of 146
____________________________________________________________________________________
4.22 Configuration Element 22: Integration with Cost and Project Controlling and Materials Management
4.22.1
i.
Page 89 of 146
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you select the Controlling business transactions for an FM area
which are to be reflected in Funds Management.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update/Integration > Integration>Integration with Cost and Project
Controlling > Activate Integration Costs and Project Controlling
SPRO
1. Select Display/Change
2. Changes can be made to CO Integr., Active HR from and No Checks:
Page 90 of 146
Maintain Customer-Specific Check for Availability Check (Assign Tolerance Profile & Strategy
for Control Objects)
4.23.2
i.
Page 91 of 146
Rationale for
configuration
and
configuration
change
In this IMG activity, you maintain the list of availability control ledgers (AVC ledgers).
You can define new (customer-defined) availability control ledgers, modify some of
their attributes, or delete ledgers, providing some conditions are fulfilled. SAP
provides standard AVC ledgers, 9H FM PB (Payment Budget) and 9I FM CB
(Commitment Budget) Availability Control.
The Customer requires three AVC control ledgers within FM, which will be
supplemented by the SAP Grants Management Grantee Module for Sponsored
Program and Sponsored Class AVC based on Donor Agreements. The three
ledgers will provide the following control:
Ledger 9H will provide availability control based on all SAP FM dimensions,
however payroll transactions will be exempt from AVC;
Ledger Z1 will provide a hard-stop based on the SAP FM Fund dimension for all
transactions, except payroll once 100% of the budget has been consumed;
Ledger Z2 will provide a warning when payroll transactions exceed the Fund Center
released budget amount.
When creating a new AVC ledger, you can have most of its attributes copied from a
reference ledger taken as template. The following settings and assignments are
copied from the reference ledger:
Type
M Module Specific
Menu Path
Transaction
Implementation
Steps
Page 92 of 146
IMG > Public Sector Management>Funds Management Government > Budget Control
System (BCS) > Availability Control> Settings for Availability Control Ledger >
Maintain Customer-Specific Ledger for Availability Check
SPRO
1. Select the Change/Display icon (eyeglasses & pencil)
2. New Entries
allows the user to create new Ledgers
3. Enter a two digit alphanumeric character for Ledger
4. Enter a Ledger Name, 26 digit alphanumeric character length
5. Select from the menu drop down for Data Source for Consumed Amount the
following are the selections available: FM (Commitment budget (CB), FM
Financial Budget, FM Payment Budget (PB), FM CB Commitment/Actual Data
and FM PB Commitment/Actual Data
6. Select from the menu drop down for Data Source for Consumable Budget
the following are the selections: FM Commitment Budget (CB), FM Financial
Budget and FM Payment budget (PB)
ii.
Page 93 of 146
i.
Rationale for
configuration and
configuration
change
In this IMG activity, you define which budget values should be included in active
availability control.
You generally define the total consumable budget against which consumable
budget (commitment or actual values) is checked using the AVC filter settings.
You define this in the activity Define the Consumable Budget.
You also have the option of creating your own availability control ledger in which
you check budget values against the consumable budget instead of consumed
amounts.
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget
Control System (BCS) > Availability Control> Settings for Availability Control
Ledger>Define Filter Settings for Budget Values
SPRO
1. Choose an activity by double-clicking on the activity line:
Steps
Z1 - Ledger
Z2 - Ledger
Page 94 of 146
iii.
Page 95 of 146
ii.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
In this IMG activity, you define the actual and commitment values that should be
excluded from active availability control.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget Control
System (BCS) > Availability Control> Settings for Availability Control Ledger>Define
Derivation Strategy for Commitment/Actual Values
SPRO
1. Select
Steps
2. Select Exclude Value Types and exclude value types for each ledger
per screenshots below:
Page 96 of 146
iv.
Page 97 of 146
iii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
Each FM account assignment in which you create budget or to which you post
budget consumption is assigned an account assignment in the availability control
ledger. In this IMG activity, you define the logic on how the account assignments
of the availability control ledger ( availability control object) should derive the
budget addresses and posting addresses.
The derivation strategy that you define in this IMG activity controls the assignment
of the control object to one or more budget addresses. For a budget posting, the
corresponding control object is determined on the basis of this derivation strategy.
Budget postings are updated in the AVC in a single step. In comparison,
actual/commitment postings are updated in two steps in the AVC, using two
consecutive derivation strategies. First the corresponding budget address is
determined from the posting address - this occurs with the derivation strategy of
the budget structure (IMG activity Define Derivation Strategy for Budget
Addresses). The control object is then derived from the respective budget
address in the same way as the budget posting.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget
Control System (BCS) > Availability Control> Settings for Availability Control
Ledger>Define Derivation Strategy for Control Objects
ABADO
1. Select
below:
Page 98 of 146
Page 99 of 146
v.
1. Select
below:
ZZ
vi.
1. Select
below:
vii.
1. Select
Steps
viii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you activate availability control by assigning an activity status
for each ledger and fiscal year (from year).
There are currently five activation statuses available for each availability control
ledger: Ledger not active, Active without availability checks, Active with usual
check logic, Active with soft check logic, Active with strict check logic for
document chains and Active with strict check logic.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Budget
Control System (BCS) > Availability Control> >Define Activation of Availability
Control
SPRO
1. Select
checked
4.24.1
iii.
Rationale for
configuration and
configuration
change
In this step you can activate or deactivate specific functions for Earmarked
funds.
Check in Local Currency
If this function is active, a check in Local currency takes place when reducing
earmarked funds with other documents.
Value adjustment required
If this function is active, no amount changes may be performed on an earmarked
funds document. An additional document, a value adjustment document, must
be entered in order to change the amount of earmarked funds.
Type
Menu Path
Transaction
Implementation
Steps
M Module Specific
SPRO
IMG > Public Sector Management>Funds Management Government> Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Maintain
Global Settings
1. Checkmark: Check in local Curr. or Value adjustment docs required
2. Save your work
4.24.2
iv.
Rationale for
configuration
and
configuration
change
In this step you assign a define a field status variant for earmarked funds documents
M Module Specific
Type
Menu Path
Transaction
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Field Control
for Earmarked Funds and Funds Transfers > Define Field Status Variant
SPRO
1. Select the New Entries icon:
2. Enter FMRE per screenshot below:
Implementation
Steps
v.
Rationale for
configuration
and
configuration
change
Type
Menu Path
In this step you assign a field status variant to your company codes. You can assign a
field status variant to as many company codes as you want.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Field Control
for Earmarked Funds and Funds Transfers > Assign Field Status Variant to Company
Code
Transaction
SPRO
4.
5.
6.
7.
Implementation
Steps
vi.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step, you define field status groups. You must assign the field status
groups, along with a field status variant, to a field selection string, and enter
them when defining document types.
By defining the field selection string, you determine which fields are optional,
required or hidden when you enter documents. The document types classify the
business transactions (such as funds blocking and funds commitments) in Funds
Management.
You can define separate field status groups for the various business transactions
and control document entry by defining the field selection and document type
accordingly
M Module Specific
IMG > Public Sector Management>Funds Management Government> Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Field
Control for Earmarked Funds and Funds Transfers>Define Field Status Groups
FMU5
1. Select the New Entries icon:
2. Enter Field Status Group, a four digit alphanumeric character
vii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step, you can define the field selection strings - that is, you can specify
which fields are ready for entry, required or hidden during Earmarked funds and
transfers. In another step, you must assign a field status variant and field status
group to the field selection string.
Temporary Note: Customer to date has decided to define the field selection
string configuration by FM Area (1000)
M Module Specific
IMG > Public Sector Management>Funds Management Government> Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Field
Control for Earmarked Funds and Funds Transfers>Define Field Selection String
o SPRO
1. Select the New Entries icon:
2. Enter Field Selection string, eleven digit alphanumeric characters
3. Enter Name, nineteen digit alphanumeric characters
4.
Save your work
viii.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step, you can define the field selection strings - that is, you can specify
which fields are ready for entry, required or hidden during Earmarked funds and
transfers. In another step, you must assign a field status variant and field status
group to the field selection string.
M Module Specific
IMG > Public Sector Management>Funds Management Government> Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Field
Control for Earmarked Funds and Funds Transfers>Assign Field Selection String
FMUN
1.
2.
3.
4.
ix.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step, you define the tolerance levels for earmarked funds documents
M Module Specific
IMG > Public Sector Management>Funds Management Government> Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Define
Tolerance Keys
SPRO
1. Select the New Entries icon:
2. Enter Z01 tolerance limit
x.
Rationale for
configuration and
configuration
change
In this step, you define the tolerance levels for earmarked funds documents
M Module Specific
Type
Menu Path
Transaction
Implementation
Steps
xi.
Rationale for
configuration
and
configuration
change
In this IMG activity, you create the document types for the documents in Funds
Management. Document types are used to classify the documents. You can define
characteristics for each document type which control how the document is entered or
they may be recorded in the document itself. For each document type, you must
specify:
A number range interval
A field status group.
The field status group, together with the field status variant, determines, by way of its
assignment to a field selection string, which fields are optional, required or hidden
when you post documents in your FM area.
M Module Specific
Type
Menu Path
Transaction
Implementation
Steps
EF DocumentTypes
and Number Ranges.xls
Start Workflow
Negative Values
Derive G/Lacc.
Add. Redctn Logic of Earmarked Funds
Smart Forms
PDF-Based Forms
13. Select a Name from the drop down menu of the SAP Smart Forms
14. Save your work
xii.
Rationale for
configuration
and
configuration
In this IMG activity, these settings are used to ensure that each follow-on document
in earmarked funds documents gets the account assignment from the previous
document.
change
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG > Public Sector Management>Funds Management Government>Funds
Management-Specific Postings>Earmarked Funds and Funds Transfer > Account
Assignment Transfer > Define Account Assignment Transfer
FMU1
1. Select New Entries:
Steps
2. Select Maintain Fields to be Transferred and select active items as per below
xiii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this step you define the blocking reasons for the earmarked funds and value
adjustment documents. With these blocking reasons you can block a document or
document item for manual processing.
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Define
Blocking Reasons
SPRO
5. Select New Entries
6. Enter Block Number, two digit alphanumeric characters
7. Enter Block Description and Reason, fifty digit alphanumeric characters
8. Save your work
xiv.
Rationale for
configuration
and
configuration
change
M - Module Specific
Type
Menu Path
Transaction
Implementation
Steps
4.25
In this step you define the messages the users will see when tolerance limits are
invoked.
IMG > Public Sector Management > Funds Management Government > Funds
Management-Specific Postings > Earmarked Funds and Funds Transfer > Change
Message Control
SPRO
3. Select New Entries
4. Add messages as shown below
4.25.1
Overview of configuration element
i.
For a given FM Area, set the Update profile, which discerns which budget categories to use, which
document date to use to assign the period in FM, and whether commitments/budgets are to be carried
over at year-end
ii.
For a given FM Area, override the update profile to track PBET
iii.
For a given FM Area, update the controls
4.25.2
ii.
Rationale for
configuration and
configuration
change
Payment budget
Customer
Type
Menu Path
Transaction
Implementation
Steps
M Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update / Integration > General Settings > Assign Update Profile to FM
Area
OF37
1. Select Display/Change
2. Enter FM Area
3. Enter Name of FM Area
4. Enter the Update Profile, 000101
5. Save your work
Type
Menu Path
Transaction
Implementation
Steps
M - Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update/Integration > General Settings > Override Update Profile
SPRO
1. Select line with Update Profile 000101
2. Select the folder -> By Update Profile
3. Encumbrance Tracking radio buttons should be set as follows:
iv.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG>Public Sector Management>Funds Management Government>Actual and
Commitment Update/Integration>General Settings>Make Other Settings
OFUP
1. Select New Entries
Steps
2. Enter FM Area, 1000
3. Next select from the options below: Ensure Only Use Real CO Objects
selected
v.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you can define which fields are available for input and/or
display on down payments and down payment requests. It also defines the
automatic down payment clearing by document type.
M Module Specific
IMG>Public Sector Management>Funds Management Government>Actual and
Commitment Update/Integration> Integration > Financial Accounting Integration (new)
> Down Payment for Earmarked Funds
SPRO
1. Select Define Field Selection Screen node and select New Entries
2. Enter Z001 Customer DP Variant and enter Down Payments and Down
Payments Request field per requirement (as demonstrated in the
screenshots below)
EF Doc Type
10
20
30
40
KA
KR
KA
KA
KA
KR
KR
KR
vi.
Rationale for
configuration and
configuration
change
In this IMG activity, you activate the Funds Management (FM) account assignment
derivation and update of documents from the feeder components for FM
M Module Specific
Type
Menu Path
Transaction
Implementation
Steps
4.21.1
i.
ii.
4.21.2
i.
Rationale for
configuration
and
configuration
change
You can define as many number ranges as you want for each FM area.
However, one number range is usually enough. If you define more than one
number range, make sure that they do not overlap.
Type
Menu Path
Transaction
Implementation
M Module Specific
IMG>Public Sector Management>Funds Management Government>Actual and
Commitment Update/Integration>Basic Settings>FM Line Items>Define Number
Ranges for Actual Transactions
OF19
Initial screen looks like this:
Steps
1. User has the option to select Display or Change by clicking on the icons
2. Enter Name of FM Area
3. Display Intervals
4. Change Intervals
5. Change Status
, user can add status profiles by
clicking on the icon in the upper left +Interval as shown below:
ii.
Rationale for
configuration and
configuration
change
After you define the number ranges (intervals) in the first step, this is where you
store the number range intervals for each FM area for the actual data documents
M Module Specific
Type
Menu Path
Transaction
Implementation
Steps
4.22.1
In order for data from other components to be updated in Funds Management, you must specify the Funds
Management account assignment elements when making a posting to another component (additional
account assignment).
4.22.2
i.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
M Module Specific
IMG > Public Sector Management > Funds Management Government >
Actual and Commitment Update/Integration > Integration > Maintain Field
Status for Assigning FM Account Assignments
SPRO
1. Enter FM Area, 1000
2. Complete the screen as shown below.
ii.
____________________________________________________________________________________
4.23 Configuration Element 22: Integration with Cost and Project Controlling and Materials Management
4.22.2
4.22.3
i.
Rationale for
configuration
and
configuration
change
In this step, you create, per FM area, the number ranges for the actual data
documents in Funds Management which are created due to Controlling
business transactions.
Enter the following for each number range:
Transaction
Implementation
Steps
M Module Specific
IMG>Public Sector Management>Funds Management Government>Actual and
Commitment
Update/Integration>Integration
with
Cost
and
Project
Controlling>Define Number Ranges for Posting Integration with Controlling
OFC2
Initial screen looks like this:
3. Display Intervals
4. Change Intervals
user can add intervals by
clicking on the icon in the upper left +Interval as shown below
5. Change Status
user can add status profiles
by clicking on the icon in the upper left +Interval as shown below
iii.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you select the Controlling business transactions for a FM area
which are to be reflected in Funds Management
M Module Specific
IMG>Public Sector Management>Funds Management Government>Actual and
Commitment Update/Integration> Integration >Integration with Cost and Project
Controlling>Choose Business Transactions for Integration
SPRO
1. Select New Entries,
2. Enter FM Area, 1000
3. Select Transactions from the menu drop down list, as shown below:
All Transactions
Order Settlement
Repost Costs
Revenue Repostings
Template Allocation
iv.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this IMG activity, you select the Controlling business transactions for an FM area
which are to be reflected in Funds Management.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update/Integration > Integration>Integration with Cost and Project
Controlling > Activate Integration Costs and Project Controlling
SPRO
4. Select Display/Change
5. Changes can be made to CO Integr., Active HR from and No Checks:
v.
Rationale for
configuration
and
configuration
change
In this IMG activity, you can set the checks for planning functions in Controlling.
If you use Controlling integrated with Funds Management, a check takes place
on each period for the derivation of FM account assignment elements.
To improve performance, you can define how the derivation of account
assignment elements and a check should occur for each plan version.
Type
Menu Path
Transaction
Implementation
Steps
Unrestricted Check
No check
M Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update/Integration>Integration > Integration with Cost and Project
Controlling > Set Checks for CO Plan Version
SPRO
1. Select New Entries,
2. Enter FM Area, 1000
3. Select Controlling Area, from among the menu drop down list,Customer
uses 1000
4. Select a version from the menu drop down list as shown below:
5. Select Check Mode from among the menu drop down list, choices are as
follows:
Full Check
No check
vi.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
In this IMG activity, you can set the tolerance profiles to ensure materials
management documents check/update funds management properly with no
tolerance so actuals cannot exceed budget in FM.
M Module Specific
IMG > Public Sector Management > Funds Management Government > Actual and
Commitment Update/Integration>Integration > Integration Materials Management >
Tolerance Between Documents
SPRO
7. Select new entries and enter Tolerance Key Z001
Steps
9. Select Tolerance Key Document Type Association and enter values list as
shown below:
vii.
Rationale for
configuration and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
This setting ensures the account assignment on the Purchase Order is maintained
and consistent on follow-on documents (i.e. Good Receipts, Invoice Receipts)
M Module Specific
N/A
SM30
1. Enter table FM01X and select Maintain button
4.23.1
4.23.2
i.
Rationale for
configuration
and
configuration
change
Type
Menu Path
Transaction
Implementation
Steps
In this activity, you activate the individual procurement functions of mySAP SRM
for the public sector.
This function is not active by default in the standard system.
I Integration
IMG>Public Sector Management > Procurement for Public Sector > Activate
Functions for Procurement for Public Sector
SPRO
1. Click on the New Entries icon:
2. Enter GovPrcFct, select from drop down menu selection
3. Checkmark/activate GPF act.
4. Save your work