Sunteți pe pagina 1din 24

XYZ Exploration Ltd

World
TENTATIVE GEO-TECHNICAL ORDER OF WELL NO : A-1
A-1

NAME OF RIG
TYPE OF THE RIG
WELL HEAD SET
TYPE OF B.O.P
ELEVATION K.B (m)

EXPLORATORY

LEGEND

SPOT SAMPLING

400

700

STAND PIPE
PRESSURE(PSI)

RPM

REMARKS
J-55, 106.5PPF
OMEGA

25-15

10

30"
PILING(1
DAY)

20

30

40

50

60

70

80

90

100

110

120

17 1/2" PILOT
HOLE(2 DAYS)

20"
Csg,
CMT.
IWH/BOP (4Days)

NC

600

TIME IN DAYS
Black Curve is Planned and Red Curve is Actual

20" Shoe
at 500m

Mud Loss

500

100-90

300

30" Shoe
at 110m

SPUD MUD

200

500

100

17 1/2"PILOT HOLE
ENLARGE TO 26"

KB
WATER

1200 DISCHARGE OF
PUMP (GPM)

DRILLING PROGRESS

1000

WT ON BIT X 1000
lbs

TYPE & SIZE OF BIT

METERAGE PER BIT

EXPECTED NOS OF
BIT

CASING POLICY &


RISE OF CEMENT

TYPE OF DRILLING

PH

DRILLING DATA

PERCENTAGE OF
SAND

STATIC FLOW
STRESS

FILTRATION (cc)

VISCOSITY (sec)

EXPECTED FMN
PRESS(Kg/cm2)

EXPECTED
FORMATION TEMP

EXPECTED MUD
LOSS/CAVING

EXPECTED OIL /
GAS SHOW

MUD PARAMETERS

ANGLE OF DIP

COLLECTION OF
CUTTINGS

ELECTROLOGGING

INTERVAL OF
CORING

LITHOLOGICAL
SECTION

AGE

FORMATION

MEASURE DEPTH
(m)

GEOLOGICAL DATA

TYPE OF WELL
CATEGORY OF WELL
OBJECTIVE

Alluvium
Mudstone
Sandstone
Shale
Clay stone
Coal bed
Thrust zone

MUD WEIGHT (ppg)

LOCATION
LATITUDE
LONGITUDE
STRUCTURE
PROJECTED DEPTH(m)
DATE OF SPUDDING

1300

N-80 / K-55, 68 / 54.5PPF


BTC

800

45-25

100-120

<1.0%

650

8.0-9.5

55-70
9.2 ppg

17 1/2"(1-1-5/1-3-4)

1200

Hydrostatic

900

1100

AIT-NGS-SONIC

OLIGOCENE

800

1000

17 1/2" phase
drilling (8Days)

1400

3500
3600
3700

OLIGOCENE

3400

3800
3900
4000
4100

600

30-20

100-110

430

P-110 / N-80, 43.5 PPF, BTC

8.5-9.5

< 1.0%

<5

12 1/4"(4-3-7/5-1-7)

ROTARY

55-70

4200

578 KSC
285F

N-80,26 PPF, BTC


P-110,26/29PPF BTC

400

30-20

8
DRILLING(
DAYS)

310F 660 KSC

330F 693 KSC

5" LINER Shoe


at 4230m

6"
DRILLING( 20
DAYS)

89 days

4300
4400
4500
4600
4700
4800
4900
REMARKS
1. 30' CONDUCTOR TO BE PILE DRIVEN TO THE POINT OF REFUSAL.OR RUN IN 36" HOLE
2. TECHNICAL DATA WILL BE CHANGED IF NECESSARY.
3. INCLINOMETER SURVEY BY TOTCO SHOULD BE TAKEN AS DEEMED NECESSARY.
4. HYDRAULICS MAY BE ALTERED IF REQUIRED ACCORDING TO BOTTOM HOLE CONDITIONS IN CONSULTATION WITH THE MUD ENGINEER.
5. CEMENT RISE BEHIND CASING SHOULD BE DECIDED AFTER LOGGING & AS PER BOTTOM HOLE CONDITIONS.
6. BOP STACK SHOULD BE PRESSURE TESTED AS PER PROCEDURE.
7. 100 TONNES OF BARYTES SHOULD ALWAYS BE STOCKED ON LOCATION FOR CONTINGENCY.
8. PRODUCTION CASING IS TO BE TESTED HERMITICALLY IN WATER UPTO 90% OF INTERNAL YIELD PRESSURE OF CASING OR THE ESTIMATED PRESSURE OF BOTTOMOST ZONE TO BE TESTED.
9. OBJECT REQUIRING MAXIMUM SURFACE PRESSURE EQUIVALENT UPTO 90% OF INTERNAL YIELD PRESSURE OF PRODUCTION CASING WILL ONLY BE TAKEN UP FOR PRODUCTION TESTING.
10. MUD POLICY AS INDICATED IS TENTATIVE WHICH WILL BE CHANGED IN CONSULTATION WITH MUD ENGINEER.
11. ADDITIONAL LOGGING AND CORING WILL BE CARRIED OUT AS AND WHEN REQUIRED BY THE WELL-SITE GEOLOGIST/SHIFT GEOLOGIST.
12. EFFORTS SHOULD BE MADE TO ENSURE MAXIMUM RECOVERY OF CORES.
13. EXACT CORING DEPTH WILL BE DECIDED BY WELL-SITE GEOLOGIST/SHIFT GEOLOGIST.
14. ALL HYDROCARBON BEARING ZONES SHOULD BE COMPLETELY CORED.
15. THIS WELL HAS BEEN CORRELATED WITH WELLNO C-37-1, 2 & 3, C-45-1, C-43-1 & 2, B-12-1 AND MT-3 FOR FORMATION PRESSURE AND OIL AND GAS SHOWS.
16. FINAL DEPTH OF WELL WILL BE DECIDED BY WELLSITE GEOLOGIST.
17. INCASE OF A NON-EXPENDABLE WELL (EPS SYSTEM) NECESSARY ARRANGEMENT SHOULD BE MADE WITH REGARDS TO PRODUCTION STRINGS.
18. THIS WELL HAS BEEN CORRELATED WITH WELLNO xxxx FOR FORMATION PRESSURE AND OIL AND GAS SHOWS.
19. A CONTINGENCY PROVISION HAS BEEN KEPT FOR DRILLING 6" HOLE AND RUNNING 5" LINER

CHIEF GEOLOGIST(OPS)

CHIEF ENGINEER(DRILL)

CHIEF GEOPHYSICIST(WELLS)

CHIEF ENGINEER(PROD)

1/2"
13

LOGGING, 7" LINER,


CMT, (8 DAYS)

7" LINER Shoe


at 3800m

N-80, 18 PPF

3300

90-100

3200

240

3100

462 KSC

257F 495 KSC

1+3+1

3000

LOGGING, 9 5/8" CSG, CMT,


WH, BOP(7 DAYS)

9 5/8" Shoe
at 2610m

432 KSC

8 1/2"(5-1-7/5-3-7/6-3-7)

2900

12
1/4"
phase
drilling 12 DAYS)

280 KSC
400 KSC

6"

2800

230F

8.5-9.5

2700

< 1.0%

2600

<5

2500

55-70

2400

243 KSC

XC-Polymer with K2SO4 +Sulphate Asphalt

2300

10.0ppg

2200

10.4

2000
2100

logging, 13 3/8" CSG, CMT,.


WH/BOP(5DAYS)

13 3/8" Shoe
at 1750m

AIT-MSFL-CAL-NGS-SP, LDL-CNL-SONIC,MDT(MAHUVA),
FMI, SWC, CBL-VDL

MIOCENE

1900

AIT-MSFL-CAL-NGS-SP, LDL-CNLSONIC,MDT, FMI, SWC, VSP, CBLVDL

1800

AIT-MSFL-CAL-NGS-SP, LDL-CNL-SONIC,MDT,
FMI, SWC, CBL-VDL

1700

LOW

1600

10m INTERVAL

1500

CHIEF CHEMIST

LOGGING , 5" LINER,


H/TEST( 9 DAYS)

130

For Advance Users only


GENERAL WELL PARAMETERS
WELL NO
LOCATION
LATITUDE
LONGITUDE
STATE
PROJECTED DEPTH
DATE OF SPUDDING
DATE OF COMPLETION
ELEVATION K.B
WATER DEPTH/SEA BED
NAME OF RIG
TYPE OF THE RIG
WELL HEAD SET
TYPE OF B.O.F
TYPE OF WELL
CATEGORY OF WELL
EXPENDABEL/NON EXPENDABLE
OBJECTIVE
SPHERIOD
GL
PARAMETER
FORMATION
FORMATION
FORMATION
FORMATION
FORMATION
FORMATION
FORMATION
FORMATION
FORMATION
AGE
AGE
AGE
AGE
AGE
AGE
AGE
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION

Section
Header Background
Geological Data (1-11)
Mud Parameters Hdr (12-17)
Drilling Data Hdr (18-28)
Drilling Progress
Drilling Progress Line Color

ALL
4230

Plan View Line Color

30
25
zaq
onshore

EXPLORATORY
B'
EXPENDABLE
To Test Wedge prospect
WGS-84
0
FROM DEPTH
0
30
55
1720
2260
2605
3165
3390
3590
0
1720
2260
2605
3165
3390
3590
0
30
55
500
800
1180
1190
1260
1270
1695

TO DEPTH
30
55
1720
2260
2605
3165
3390
3590
4230
1720
2260
2605
3165
3390
3590
4230
30
55
500
800
1180
1190
1260
1270
1695
1720

CAPTION

MIDDLE MIOCENE TO RECENT


LOWER MIOCENE
UPPER OLIGOCENE
LOWER OLIGOCENE
MID-UP EOCENE
MIDDLE EOCENE
PALAEOCENE TO LR. EOCENE
KB
WATER
CLAY
CLAY STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE

LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION

1720
1850
1860
2080
2090
2260
2270
2280
2290
2300
2310
2330
2345
2355
2370
2380
2400
2410
2430
2440
2460
2470
2480
2500
2510
2520
2540
2550
2560
2575
2605
2615
2630
2635
2645
2650
2665
2670
2680
2695
2710
2720
2730
2735
2745
2750
2760
2770
2780
2785
2790

1850
1860
2080
2090
2260
2270
2280
2290
2300
2310
2330
2345
2355
2370
2380
2400
2410
2430
2440
2460
2470
2480
2500
2510
2520
2540
2550
2560
2575
2605
2615
2635
2635
2645
2650
2665
2670
2680
2695
2710
2720
2730
2735
2745
2750
2760
2770
2780
2785
2790
2795

SHALE
SILT STONE
SHALE
SAND STONE
SHALE
SILT STONE
SHALE
SILT STONE
SAND STONE
SHALE
SAND STONE
SHALE
SAND STONE
SHALE
SILT STONE
SAND STONE
SHALE
SAND STONE
SILT STONE
SAND STONE
SHALE
SILT STONE
SAND STONE
SHALE
SILT STONE
SAND STONE
SHALE
SAND STONE
SILT STONE
SHALE
LIME STONE
SHALE
LIME STONE
SILT STONE
LIME STONE
SAND STONE
LIME STONE
SHALE
SAND STONE
SHALE
SAND STONE
SHALE
LIME STONE
SILT STONE
LIME STONE
SHALE
LIME STONE
SHALE
LIME STONE
SHALE
LIME STONE

LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LITHOLOGICAL SECTION
LAYER
LAYER
LAYER
LAYER
LAYER
LAYER
SURFACE
INTERVAL OF CORING
INTERVAL OF CORING
INTERVAL OF CORING
INTERVAL OF CORING
ELECTROLOGGING

2795
3050
3060
3165
3180
3250
3265
3390
3405
3500
3515
3570
3590
3600
3610
3625
3635
3650
3660
3685
3695
3710
3720
3750
3760
3800
3810
3850
3860
3910
3920
4000
4020
4050
4070
4100
4120
4160
4180
1720
2260
2340
2605
2795
3590
0
2310
2440
2650
3850
500

3050
3060
3165
3180
3250
3265
3390
3405
3500
3515
3570
3590
3600
3610
3625
3635
3650
3660
3685
3695
3710
3720
3750
3760
3800
3810
3850
3860
3910
3920
4000
4020
4050
4070
4100
4120
4160
4180
4230
1720
2260
2340
2605
2795
3590
0
2319
2449
2659
3859
1760

SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
LIME STONE
SHALE
COAL
SHALE
SILT STONE
SHALE
COAL
SHALE
COAL
SHALE
SAND STONE
SHALE
SILT STONE
SHALE
SAND STONE
SHALE
SAND STONE
SHALE
COAL
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
SILT STONE
SHALE
H1C
H3CGG
Wt
H3G
LMT
H4
CC#1
CC#2
CC#3
CC#4
AIT-NGS-SONIC

ELECTROLOGGING
ELECTROLOGGING
ELECTROLOGGING
COLLECTION OF CUTTINGS
COLLECTION OF CUTTINGS
COLLECTION OF CUTTINGS
ANGLE OF DIP
EXPECTED OIL / GAS SHOW
EXPECTED OIL / GAS SHOW
EXPECTED FORMATION TEMP
EXPECTED FORMATION TEMP
EXPECTED FORMATION TEMP
EXPECTED FORMATION TEMP
EXPECTED FORMATION TEMP
EXPECTED FORMATION TEMP
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED FMN PRESS(Kg/cm2)
EXPECTED MUD LOSS/CAVING
MUD WEIGHT (ppg)
MUD WEIGHT (ppg)
MUD WEIGHT (ppg)
MUD WEIGHT (ppg)
MUD WEIGHT (ppg)
MUD WEIGHT (ppg)
VISCOSITY (sec)
VISCOSITY (sec)
VISCOSITY (sec)
VISCOSITY (sec)
VISCOSITY (sec)
FILTRATION (cc)
FILTRATION (cc)
FILTRATION (cc)
FILTRATION (cc)
FILTRATION (cc)
FILTRATION (cc)
STATIC FLOW STRESS
STATIC FLOW STRESS
STATIC FLOW STRESS
STATIC FLOW STRESS
STATIC FLOW STRESS
PERCENTAGE OF SAND
PERCENTAGE OF SAND
PERCENTAGE OF SAND

1760
2600
3630
0
1200
2200
0
2260
3595
2240
2630
3030
3600
4030
4230
0
2330
2570
2610
2730
2830
3030
3530
4030
4230
55
55
500
1750
2400
2610
3800
55
500
1500
2610
3800
0
1500
1750
2100
2610
3800
0
500
1500
1750
2610
55
500
1750

2600
3630
4230
1200
2200
4230
4230
2800
4230
2240
2630
3030
3600
4030
4230
2030
2330
2570
2610
2730
2830
3030
3530
4030
4230
1250
500
1750
2400
2610
3800
4230
500
1500
2610
3800
4230
1500
1750
2100
2610
3800
4230
500
1500
1750
2610
4230
500
1750
4230

AIT-MSFL-CAL-NGS-SP, LDL-CNL-SONIC,MDT
AIT-MSFL-CAL-NGS-SP, LDL-CNL-SONIC,MDT
AIT-MSFL-CAL-NGS-SP, LDL-CNL-SONIC,MDT,
SPOT SAMPLING
10m INTERVAL
5m INTERVAL
LOW
OIL/GAS
OIL/GAS
205F
230F
257F
285F
310F
330F
Hydrostatic
243 KSC
280 KSC
400 KSC
432 KSC
462 KSC
495 KSC
578 KSC
660 KSC
693 KSC
Mud Loss
9.5-8.6
9.2-9.5 (CIN TO 10.0)
11.0-10.0
12.0-11.0
15.0-14.3
15.5( CIN)-15.0
38.0-42.0
38.0-42.0
45.0-50.0
55.0-50.0
55.0-50.0
NC
12.0-15.0
10.0-12.0
6.0-8.0
6.0-8.0
6.0-8.0
SPUD MUD
RAW MUD
LIGNITE MUD
CL-CLS
CL-CLS-RESINEX
<2%
<1%
TRACES

PH
PH
PH
PH
CASING
CEMENT RISE
CASING
CEMENT RISE
CASING
CEMENT RISE
CASING
CEMENT RISE
CASING
CEMENT RISE
CASING
CEMENT RISE
TYPE OF DRILLING
TYPE & SIZE OF BIT
TYPE & SIZE OF BIT
TYPE & SIZE OF BIT
TYPE & SIZE OF BIT
TYPE & SIZE OF BIT
EXPECTED NOS OF BIT
EXPECTED NOS OF BIT
EXPECTED NOS OF BIT
EXPECTED NOS OF BIT
METERAGE PER BIT
METERAGE PER BIT
METERAGE PER BIT
METERAGE PER BIT
WT ON BIT X 1000 lbs
WT ON BIT X 1000 lbs
WT ON BIT X 1000 lbs
WT ON BIT X 1000 lbs
WT ON BIT X 1000 lbs
RPM
RPM
RPM
RPM
DISCHARGE OF PUMP (GPM)
DISCHARGE OF PUMP (GPM)
DISCHARGE OF PUMP (GPM)
DISCHARGE OF PUMP (GPM)
STAND PIPE PRESSURE(PSI)
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
DRILLING PROGRESS
From Day

55
500
1500
1750
0
0
0
0
0
1200
0
2000
2560
2560
3700
3700
55
55
500
1750
2610
3800
55
500
1750
2610
55
500
1750
2610
55
500
1750
2610
3800
55
500
1750
2610
55
500
1750
2610
0
0
500
1750
2610
3800
TO Day

500
1500
1750
4230
110
0
500
500
1750
1750
2610
2610
3800
3800
4230
4230
4230
500
1750
2610
3800
4230
500
1750
2610
3800
500
1750
2610
3800
500
1750
2610
3800
4230
500
1750
2610
3800
500
1750
2610
3800
0
500
1750
2610
3800
4230
Depth

8.0
8.0
9.5-10.0
9.0-9.5
30"
20"
20"
13 3/8"
13 3/8"
9 5/8"
9 5/8"
7" LINER
7" LINER
5" LINER
5" LINER
ROTARY
17 1/2"PILOT HOLE ENLARGE TO 26"
17 1/2"(1-1-5/1-3-4)
12 1/4"(4-3-7/5-1-7)
8 1/2"(5-1-7/5-3-7/6-3-7)
6"
1
2
2
1+3+1
500
650
430
240
25-15
45-25
30-20
30-20
100-90
100-120
100-110
90-100
900
850
650
350
X-52, 94 PPF
P-110, 68 PPF
P-110, 47 PPF, BTC
P-110,29 PPF, BTC
L-80, 18 PPF
Activity

0
1
3
7
15
20
32
39
52
60
80
DRILLING PROGRESS ACTUAL
From Day

1
3
7
15
20
32
39
52
60
80
89
TO Day

110
500
500
1750
1750
2610
2610
3800
3800
4230
4230
Depth

30" PILING(1 DAY)


17 1/2" PILOT HOLE(2 DAYS)
20" Csg, CMT. IWH/BOP (4Days)
17 1/2" phase drilling (8Days)
logging, 13 3/8" CSG, CMT,. WH/BOP(5DAYS)
12 1/4" phase drilling 12 DAYS)
LOGGING, 9 5/8" CSG, CMT, WH, BOP(7 DAYS
8 1/2" DRILLING( 13 DAYS)
LOGGING, 7" LINER, CMT, (8 DAYS)
6" DRILLING( 20 DAYS)
LOGGING , 5" LINER, H/TEST( 9 DAYS)

Activity
110 30" Condutor (2 Days)

REMARKS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

30' CONDUCTOR TO BE PILE DRIVEN TO THE POINT OF REFUSAL.


TECHNICAL DATA WILL BE CHANGED IF NECESSARY.
INCLINOMETER SURVEY BY TOTCO SHOULD BE TAKEN AS DEEMED NECES
HYDRAULICS MAY BE ALTERED IF REQUIRED ACCORDING TO BOTTOM HOL
CEMENT RISE BEHIND CASING SHOULD BE DECIDED AFTER LOGGING & AS
BOP STACK SHOULD BE PRESSURE TESTED AS PER PROCEDURE.
100 TONNES OF BARYTES SHOULD ALWAYS BE PRESERVED IN SILOS OR O
PRODUCTION CASING IS TO BE TESTED HERMITICALLY IN WATER UPTO 90%
OBJECT REQUIRING MAXIMUM SURFACE PRESSURE EQUIVALENT UPTO 90
MUD POLICY AS INDICATED IS TENTATIVE WHICH WILL BE CHANGED IN CON
ADDITIONAL LOGGING AND CORING WILL BE CARRIED OUT AS AND WHEN R
EFFORTS SHOULD BE MADE TO ENSURE MAXIMUM RECOVERY OF CORES.
EXACT CORING DEPTH WILL BE DECIDED BY WELL-SITE GEOLOGIST/SHIFT
ALL HYDROCARBON BEARING ZONES SHOULD BE COMPLETELY CORED.
THIS WELL HAS BEEN CORRELATED WITH WELLNO C-37-1, 2 & 3, C-45-1, CFINAL DEPTH OF WELL WILL BE DECIDED BY WELLSITE GEOLOGIST.
30' CONDUCTOR TO BE PILE DRIVEN TO THE POINT OF REFUSAL.
INCLINOMETER SURVEY BY TOTCO SHOULD BE TAKEN IN EVERY BIT CHAN
INCASE OF A NON-EXPENDABLE WELL (EPS SYSTEM) NECESSARY ARRANG
THIS WELL HAS BEEN CORRELATED WITH WELLNO xxxx FOR FORMATION P

Default Color

SIESMIC IMAGE PATH


MAP IMAGE PATH
COLOR

C:\GTO\Images\clay.bmp
C:\GTO\Images\claystone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp

C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp

C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\limestone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\coal.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\coal.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\coal.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\sandstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\coal.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp
C:\GTO\Images\siltstone.bmp
C:\GTO\Images\shale.bmp

-SP, LDL-CNL-SONIC,MDT, FMI, SWC, CBL-VDL


-SP, LDL-CNL-SONIC,MDT(MAHUVA), FMI, SWC, CBL-VDL
SP, LDL-CNL-SONIC,MDT, FMI, SWC, VSP, CBL-VDL

ENLARGE TO 26"

CMT,. WH/BOP(5DAYS)

G, CMT, WH, BOP(7 DAYS)


CMT, (8 DAYS)

, H/TEST( 9 DAYS)

T OF REFUSAL.

KEN AS DEEMED NECESSARY.


ORDING TO BOTTOM HOLE CONDITIONS IN CONSULTATION WITH THE CHEMIST.
ED AFTER LOGGING & AS PER BOTTOM HOLE CONDITIONS.
R PROCEDURE.
ESERVED IN SILOS OR ON BOARD.
ALLY IN WATER UPTO 90% OF INTERNAL YIELD PRESSURE OF CASING OR THE ESTIMATED PRESSURE OF BOTTOMOST ZONE
RE EQUIVALENT UPTO 90% OF INTERNAL YIELD PRESSURE OF PRODUCTION CASING WILL ONLY BE TAKEN UP FOR PRODUCT
WILL BE CHANGED IN CONSULTATION WITH MUD CHEMIST.
IED OUT AS AND WHEN REQUIRED BY THE WELL-SITE GEOLOGIST/SHIFT GEOLOGIST.
M RECOVERY OF CORES.
-SITE GEOLOGIST/SHIFT GEOLOGIST.
COMPLETELY CORED.
O C-37-1, 2 & 3, C-45-1, C-43-1 & 2, B-12-1 AND MT-3 FOR FORMATION PRESSURE AND OIL AND GAS SHOWS.
SITE GEOLOGIST.
T OF REFUSAL.
KEN IN EVERY BIT CHANGE OR AS AND WHEN DEEMED NECESSARY.
M) NECESSARY ARRANGEMENT SHOULD BE MADE WITH REGARDS TO PRODUCTION STRINGS.
O xxxx FOR FORMATION PRESSURE AND OIL AND GAS SHOWS.

RESSURE OF BOTTOMOST ZONE TO BE TESTED.


LY BE TAKEN UP FOR PRODUCTION TESTING.

GAS SHOWS.

INCLINOMETERSU
SL.
NO.
1

MD
(MSL)
(m)
0.00

Angle

Azimuth

CL

Av.
Angle

Av.
Azimuth

TVD1

(Deg)
0.00

(Deg)
0.00

0.00

0.00

0.00

0.00

TVD
MSL
(m)
0.00

HD
(m)
0.00

INCLINOMETERSURVEYOFWellNo:
EW
Coord

NS
Coord

0.00

0.00

Cumm
EW
(m)
0.00

Cumm
NS
(m)
0.00

Net
Drift
(m)
0.00

Net
MD
Direction
(KB)
(Deg)wrt"N(m)
0.00
0.00

VSV
PV
TVD1
(KB)
(m)

NetDriftVsTVD
CumEWVsCumNS
TVD
(KB)
(m)

INCLINOMETERSURVEYOFWellNo:
SL.
NO.
1

MD
(MSL)
(m)
0.00

Angle

Azimuth CL

(Deg)
0.00

(Deg)
0.00

0.00

Av.
Angle
0.00

Av.
TVD
Azimuth MSL
(m)
0.00
0.00

Cumm
EW
(m)
0.00

(Actual)
Cumm
NS
(m)
0.00

Net
Drift
(m)
0.00

Net
Direction
(Deg)wrt"N"
0.00

MD
(KB)
(m)

TVD1
(KB)
(m)

TVD
(KB)
(m)

S-ar putea să vă placă și