Documente Academic
Documente Profesional
Documente Cultură
JOB DESCRIPTION
DATE
CLIENTELE
X-FACTORY
(Boutique) @
Banilad Town
Center, Cebu City
Complete Electrical
Installation Works of lighting
fixtures, convenience outlets,
air conditioning and panel
board.
April
2005
EXS Factory
Store
FLORES 2-Storey
Residential Building
@ DECA Homes
Subdivision,
Mingllanilia, Cebu
Complete Electrical
Installation Works of lighting
fixtures, convenience outlets,
air conditioning, and
telephone and CATV system.
May
2006
Mr. Stephen
Flores
33.3 Export @
Maguikay, Mandaue
City Cebu
Complete installation of
electrical system and
auxiliaries
August
2007
Ms. Jenifer
Cruz and RBH
Engineering
Services
Welding Machine
Laboratory @ Sisters
of Mary School
Boystown,
Minglanilla
July 2012
Sisters of Mary
Soil Mechanics
Laboratory @ Civil
Engineering
Laboratory, CIT-U
July
2012
CIT University
Rehabilitation of
Residential @
Beverly Hills, Lahug
Cebu City
December
2012
Complete Wiring
Installation of a
Manufacturing firm
@ Consolacion, Cebu
Complete installation of
lightings, convenience outlets,
motor controls of the
assembly area, fabrication
and painting area
March
2013
March
2013
Mr. Rodolfo A.
Lizares, Jr.
Prozza Hiros
Manufacturing
Inc. with F&E
Electrical
Services and
Supply
CIT University
Installation of
Feeder lines of a
Manufacturing firm
@ Tunkop,
Mingllanilla, Cebu
April
2013
July
2013
July 2013
KFICI,
Mandaue Plant
August
2013
KFIPI, MEPZ1
Plant
Complete rehabilitation of
main and subpanel as well as
metering system
August
2013
Teofel Pension
house
October
2013
KFIPI, MEPZ I
Plant
November
2013
KFIPI,
Mandaue Plant
December.
2013
CIT University
Systems Study at
Kerry Food
Ingredients (Cebu),
Inc., Tabok Mandaue
City, Cebu
Systems Study at
Kerry Food
Ingredients
(Philippines), Inc.,
Mepza 1 pusok Lapu
lapu city
Electrical System
Rehabilitation at
Teofel Pension
House, Junquera
Ext., Cebu City
Grounding System
and Implementation
@ Kerry Food
Ingredients
(Philippines), Inc.,
MEPZ I, Lapulapu
City, Cebu
Grounding System
and Implementation
@ Kerry Food
Ingredients (Cebu),
Inc., Tabok Mandaue
City, Cebu
CIT University
Installation of 50kVA,
480-240V Dry Type
Transformer @ Kerry Complete installation and load
Food Ingredients
(Cebu), Inc., Tabok
Mandaue City, Cebu
Secondary Line
Installation of 3100kVA transformer
@ Kerry Food
Ingredients (Cebu),
Inc., Tabok Mandaue
City, Cebu
Grand Convention
Center @ Arch
Bishop Reyes Ave.
Cebu City
Transformer Pad &
Secondary Wiring 3167 KVA 240volts
@Koean
International
Language School
CotCot Liloan City,
Cebu
Wiring Installation of
MILL 4 @ Kerry Food
Ingredients
(Philippines), Inc.,
MEPZ1, Lapulapu
City, Cebu
Wiring of Supply
From Gen-Set to
MILL4 @ Kerry Food
Ingredients
(Philippines), Inc.,
MEPZ1, Lapulapu
City, Cebu
Rehabilitation of
Electrical System of
LD Advanced
Technologies, Inc.
December
2013
KFIPI,
Mandaue Plant
January
2014
KFIPI,
Mandaue Plant
January
2014
Sub-con of F&E
Electrical
Services and
Supply
January
2014
February
2014
KFIPI, MEPZ1
Plant
transfer
Complete
Wiring of Supply
From Gen-Set to MILL4 LVSG
February
2014
March
2014
Mrs. Rowena
Maningo
Production &
Engineering
Manager
Engr. Junjun
Creus, Gen.
Manager
Kerry Food
Ingredients
(TABOK), Inc.,
Tabok Mandaue City,
Cebu
Kerry Food
Ingredients
(TABOK), Inc.,
Tabok Mandaue City,
Cebu
Kerry Food
Ingredients
(Philippines), Inc.,
MEPZ1, Lapulapu
City, Cebu
HELPMATE Inc.
N.Bacalso Ave. Cebu
City
May
2014
Engr. Mark Li
Canete
Technician
Engr.
May
2014
Engr. Mark Li
Canete
Technician
Engr.
May
2014
August
2014
Engr. Arthur
Gerenia
Waiting
Sister Of Mary
Office
Complete Installation of
secondary wiring as well as
bunking transformer and
coordination of MECO for MILL
4 separate 460 volts main
supply.
Complete assembly and
supply Motor control Panel
with PLC function for
Ultrafiltration Water System
Processing.
Sister Of Mary
(Girls High)
Talisay City, Cebu
Sister Of Mary
(Boys High)
Tungkop Minglanilla,
City Cebu
Waiting
Sister Of Mary
Office
GRAND
RESIDENCIES
Banilad Cebu City
ON GOING
ASSEC
Office
ON GOING
Engr. Jess
Buenaventura
ON GOING
Derek Chua
/HVL
Engineering
Services
Buffet 101
Subangdako,
Mandaue, Cebu City
(Near Parkmall)
Loreta Project Ayala
Cebu Business Park,
Cebu City
Complete Design and Engineering works with major equipment involved such as
MDP w/ 1200A, 3-p, 480V, 50KAIC MCB and its branches. Three sets, 250kVA,
13.8kV 480V transformer bank, Motor Control Center, Substation Panel and
motors.
(September 2005)
Complete Design and Engineering works of the whole power plant including all the
Electrical Equipments and Instruments of 2-4MW, 4160V, 3-phase NIGATASHINKO ELECTRIC Co. Diesel Generator Sets and its Auxiliaries. Handled also Short
Circuit Calculation for setting of protective relay units. (December 2006)
3. 32MW
BASE-LOAD
DIESEL
POWER
PLANT
OF
FILMINERA
MINING
Power System Study that includes Short Circuit Calculation, Setting of Protective
Relays, Coordination Study and Orientation of Engineers and Technicians through
seminars and lecture of the actual system.