Sunteți pe pagina 1din 2

Kencana HL Sdn. Bhd.

C11/028-PSP-PRD-0015
Appendix I
Page 1 Of 2

Blasting & Painting Inspection Report

Client
Project
Location
Description

:
:
:
:

Bechtel International Inc.


ISBL Module Fabrication For Wheatstone Project LNG Plant
KHL Fabrication Yard,Lumut
Pipe Spools

Contract No
Report No
Date
System

: 25657-140-HC3-UB00-00044
: 101EA/BP/WP001-B/PIP/1ST/004
: 06/02/2014
: J3

A PRE-SURFACE PREPARATION
Surface Defect
Solvent Cleaning (SP 1)
Masking / Protection
Blotter Test

:
:
:
:

Yes
Yes
Yes
Yes

No
No
No
No

N/A
N/A
N/A

B SURFACE PREPARATION
Substrate
Surface Profile Height Range (Mic)
Surface Cleanliness
Cleaning Method
Dust Level

:
:
:
:
:

C/S
65m -80m
Sa2 (SP10)
Manual Blast
Rating 2

S/S

Other Specified
Abrasive Manufacturer
Abrasive Sieve Size
Abrasive Type

:
:
:
:
:
:
:
:

Inorganic Zinc Primer / Resist 86


1st Coat
Part A : NM 014655616
Max 5%
Good
8 - 12 Hours
Part A : 6 months at 23C
N/A

:
:
:
:

N/A
MBN
30/60
Garnet

C PAINT APPLICATION
Generic Type / Product Name
Application Stage
Batch & Curing Agent No.
Paint / Thinner Dilution %
Condition of Paint Container
Paint Pot Life
Paint Shelf Life
Paint Induction Time
Method of
Application:

Airless
Spray

Thinner No : No. 25
Colour
: Greenish Grey
Part B
: NM 024656228
Paint Manufacturer
Part B

Conventional
Spray

Jotun Paint

: 4 years at 23C

Brush/
Roller

D AMBIENT CONDITION
Time
Dry Bulb Temp. (oC)
Wet Bulb Temp.(oC)
Steel Temp.(oC)
Relative Humidity (%)
(oC)
Dew point (oC)
Weather

Start Blasting
1015 HRS
27
24
29.5
78%
23
Fine

During
1130 HRS
33
27
48
63%
25
Fine

Start Painting
1530
34
27
42
58%
23
Fine

After
1700HRS
32
27
40
68%
25
Fine

E INSPECTION
Min/Max

Coating Defects if
yes please specify

Others please specify

100m - 150m
90m - 95m
4 HRS at 23C
N/A

N/A

N/A

Film Thickness
Wet Film Thickness Range (Mic)
Total Dry Film Thickness Range (Mic)
Recoat Time
Holiday Test ( If Required)
Remarks
Detail refer as per attachment.

INSPECTED BY
KHL QC INSPECTOR

NAME : ZULFUSARIN AMIR


DATE : 07/02/14

WITNESSED BY
PAINT MANUFACTURER REP.

NAME:
DATE :

WITNESSED / REVIEWED BY
BECHTEL REPRESENTATIVE

NAME :
DATE :

C11/028-PSP-PRD-0015
Appendix I
Page 2 of 2

Kencana HL Sdn. Bhd.


PAINTING REPORT ATTACHMENT
CONTRACT NO : 25657-140-HC3-UB00-00044
PROJECT
: ISBL Module Fabrication For Wheatstone Project LNG Plant

ITEM
NO

REPORT NO : 101EA/BP/WP001-B/PIP/1ST/004

BLASTING / PAINTING STAGE

PIECE NO/
SPOOL NO

AVERAGE
DFT 1st COAT

Pipe Spools
Flare (Warm Liquid)
1

101EA - 1BW-19010-01-3

99

86

83

74

69

82

101EA - 1BW-19010-02-6

89

100

99

96

98

96

89

100

99

96

98

96

Hot Oil
1

101EA-1HO-12614-01-4

INSPECTED BY

WITNESSED BY

WITNESSED / REVIEWED BY

KHL QC INSPECTOR

PAINT MANUFACTURER REP

BECHTEL REPRESENTATIVE

NAME : ZULFUSARIN AMIR

NAME :

NAME :

DATE : 07/02/14

DATE :

DATE :

S-ar putea să vă placă și