Documente Academic
Documente Profesional
Documente Cultură
De p t .
: P RO CE S S
Deliverable
No.
Off
Total
Manhours
Sr.
No.
Man hours
per
Deliverable
E n q . No . :
Title
:
Sr.
No.
Description
02
100
200
A
1
01
--
150
Scope of Work
Review of in
puts and additional data requirement
Piping & Instrumentation Diagrams
40
280
01
02
--
100
60
50
As Built Drawings
30
--
B.
1
Exclusions
Performance guarantees
C.
3
4
5
6
7
Total
840
Resource Requirement:
Manpower Required
Available
Nos.
Name
Category
Duration
(Weeks)
Sr
No.
Required Software
Chief Engineer
MS Office
Sr. Engineer
Design Engineer
Pipenet Latest
version
CAD WORX
Dman
AUTOCAD
I confirm that required resources are sufficient for the subject enquiry
Head of Dept. :
Sign :
Date :
Page 1 of 1