Documente Academic
Documente Profesional
Documente Cultură
7/22/2005
Building Size
Width
Length
Height
40
75
10
230
2,300
$25.00
Total Cost
$57,500.00
Time Required to Build With Standard Block (cmu) Man Days
13.22
Quantity
Material (each)
Total Material
Labor (each)
Total Labor
Total
2,584
$2.85
$7,365
$3.00
$7,753
$15,118
30
$2.85
$86
$3.00
$90
$176
30
------------------2,644
$2.85
$86
$3.00
$90
$176
---------------Total Material
$15,469
Lump Sum
Ready-Mix Concrete
Miscellaneous
60,000.00
$2,000
29.37
110
3,230
Lump Sum
-------------------
1
----------------
$1,000
----------------
$3,230
------------------
Standard CMU
50,000.00
Azar Block
40,000.00
30,000.00
Saving
20,000.00
$1,000
------------------- ----------------Total Cost
$21,699
Saving/Profit
$35,801
Percentage Profit
62.26%
========================================
10,000.00
$9
$16
4.41
8.81
0.00
1
$25.00
$22.00
$19.00
$16.00
$15.57
$12.57
$9.57
$6.57
COST COMPARISON
7/22/2005
Fence Size
Height
6
Linear Feet
98
$12.00
Total Cost
$7,056.00
4.23
Material
Total Material
Labor
Total Labor
Total
486
$2.85
$1,385
$3.00
$1,458
$2,843
140
$2.85
$399
$3.00
$420
$819
112
$2.85
$319
$3.00
$336
$655
54
$2.85
$154
$3.00
$162
$316
54
$2.85
------------------- ------------------846
$162
$316
------------------------------------$2,538
$4,949
63
$3.00
189.00
$3.00
189.00
$2.85
19.95
$3.00
21.00
41
---------------Total Material
5,368
846
-------------------
$0.15
----------------
127
---------------- ------------------
127
------------------- -----------------
SRW Adhesive
$154
$3.00
------------------- ------------------$2,411
Total Cost
Standard CMU
$8,000
Azar Block
$6,000
$4,000
Saving
378
5,495
Saving
1,561
Percentage Profit
28.41%
========================================
9.35
2.65
1.41
2.82
$2,000
$1
$10.00
$12.00
$14.00
$16.00
$0.65
$2.65
$4.65
$6.65
COST COMPARISON
28-Feb-06
Width
Length
Height
40
75
10
230
2,300
$25.00
Total Cost
$57,500.00
Time Required to Build With Standard Block (cmu) Man Days
13.22
Labor (each)
Total Labor
Total
2,584
2.85
7,365.17
3.00
7,752.81
$15,118
30
2.85
85.50
3.00
90.00
$176
30
------------------Total Blocks
2,644
Re-bar
Lump Sum
Ready-Mix Concrete
30.05
Shipping from Sacramento to Phoenix
2.85
85.50
3.00
90.00
120.00
3,605.82
$176
---------------Total Material & Labor
$15,469
$4,000
88.00
2,644.27
$6,250
1.16
3,067.35
$3,067
============
Azar Block
Saving
Saving Foot
Azar Block,
57,500.00
Saving Foot,
$12
28,786.42
28,713.58
12.48 CMU,
Total
$28,786
Saving/Profit
$28,714
Percentage Profit
49.94%
===========
$12.52
$12.48
4.41
8.81
$57,500
$28,786
$25.00
$22.00
$19.00
$16.00
$12.48
$9.48
$6.48
$3.48
COST COMPARISON
2/28/2006
Fence Size
Height
6
Linear Feet
98
$18.00
Total Cost
$10,584.00
Time Required to Build With Standard Block - CMU (Man Days)
4.37
Material
Total Material
Labor
Total Labor
Total
486
$2.85
$1,385
$3.00
$1,458
$2,843
140
$2.85
$399
$3.00
$420
$819
140
$2.85
$399
$3.00
$420
$819
54
$2.85
$154
$3.00
$162
$316
54
$2.85
------------------- ------------------874
$154
$3.00
------------------- ------------------$2,491
$162
$316
------------------- -----------------$2,622
$5,113
63
$2.85
179.55
$3.00
189.00
369
$30.00
$0.15
210.00
131
$30.00
0.00
1.16
210.00
0
1,012
420
131
1,012
--------------1,931
---------------
Total Other
Saving
Total Cost
7,044
7,044
Saving
3,540
3,540
Percentage Profit
33.45%
===========
Standard
CMU $10,584
Azar Block
$7,044
11.98
6.02
2
2.62
$18.00
$20.00
$25.00
$30.00
$6.02
$8.02
$13.02
$18.02
IT PAYS TO COMPARE!
Here is an example that shows how economical AZAR Mortarless Building Systems really are!
EXAMPLE #1
6Ft. x 100 Linear Ft. Privacy Fence
(600 Square Feet of Wall Surface)
National Average
Material
Labor
Total
$3,200.00
$ 3,200.00
$975.00
Total Cost
Cost per Square Foot
$4,175.00
$
6.96
$2,400.00
975.00
$ 2,400.00
$810.00
810.00
$202.50
202.50
Total Cost
Cost per Square Foot
$3,412.50
$
5.69
$1,687.50
$ 101.25
0
$ 1,687.50
$ 101.25
Total Cost
Cost per Square Foot
$1,788.75
$
2.98
www.azarblock.com
EXAMPLE #1
6Ft. x 100 Linear Ft. Privacy Fence
(600 Square Feet of Wall Surface)
National Average
Material
Labor
Total
$______
$______
$_____
$______
Total Cost
Cost per Square Foot
$______
$______
$______
$______
$_____
$______
$_____
$______
Total Cost
Cost per Square Foot
$______
$______
$_____
$_____
0
$______
$______
Total Cost
Cost per Square Foot
$______
$______
www.azarblock.com 11
IT PAYS TO COMPARE!
Here is another example that shows how economical AZAR Mortarless Building Systems really are!
EXAMPLE #2
Foundation of typical raised ranch side entrance and one car attached garage
(200 Linear ft. of foundation wall, 4 ft. high, 800 sq. ft. of wall surface area)
National Average
Material
Labor
Total
$3,200.00
$ 3,200.00
$1,300.00
$ 1,300.00
Total Cost
Cost per Sq. Ft.
$3,200.00
$4,500.00
$
5.63
$ 3,200.00
$1, 080.00
$ 1,080.00
$ 270.00
$ 270.00
Total Cost
Cost per Sq. Ft.
$4,550.00
$
5.69
$0
$2,250.00
$ 2,250.00
$ 585.00
Total Cost
Cost per Sq. Ft.
585.00
$2,835.00
$
3.54
www.azarblock.com
EXAMPLE #2
Foundation of typical raised ranch side entrance and one car attached garage
(200 Linear ft. of foundation wall, 4 ft. high, 800 sq. ft. of wall surface area)
National Average
Material
Labor
Total
$______
$______
$_____
$______
Total Cost
Cost per Sq. Ft.
$______
$______
$______
$______
$______
$______
$______
$______
Total Cost
Cost per Sq. Ft.
$______
$______
$0
$______
$______
$______
$______
Total Cost
Cost per Sq. Ft.
$______
$______
www.azarblock.com 13