Check list for BTS

When we arrive at the BTS site, the following procedures must be checked.
No:

Need to be checked when arrived at the site ( Electrical Engineer)

GEN set condition/ Test run

Commercial power

AC transformer

Tower condition

Grounding Status

Lightning protection devices

Rectifier Battery condition

MCCB and MCB condition

Fluorescent Lamp and Bulb

10

Site cleaning

11

Fire extinguishers

12

Power Cable arrangement

No:

Need to be checked when arrived at the site( Telecom Engineer)

Aircom condition

Dehumidifier condition

BBU

Rectifier

RRU

RF Surge Protection Devices

Microwave IDU/ODU

PTN

FE and Fiber cable arrangement