Sunteți pe pagina 1din 5

1

2
3
4
5
7
7
7.1
7.2
7.3
7.4
7.5
8
8.1
9
9.1
9.2
10

IEC 61850 consists of the


following parts
IEC 61850-1
IEC 61850-2
IEC 61850-3
IEC 61850-4
IEC 61850-5
IEC 61850-6
IEC 61850-7
IEC 61850-7-1
IEC 61850-7-2
IEC 61850-7-3
IEC 61850-7-4
IEC 61850-7-10
IEC 61850-8
IEC 61850-8-1
IEC 61850-9
IEC 61850-9-1
IEC 61850-9-2
IEC 61850-10

Introduction and overview


Glossary
General requirements
System and project management - Ed.2
Communication requirements for functions and device models
Configuration language for communication in electrical substations related to IEDs - Ed.2
Basic communication structure for substation and feeder equipment
Principles and models - Ed.2
Abstract communication service interface (ACSI) - Ed.2
Common Data Classes - Ed.2
Compatible logical node classes and data classes - Ed.2
Communication networks and systems in power utility automation - Requirements for web-based and
structured access to the IEC 61850 information models [Approved new work]
Specific communication service mapping (SCSM)
Mappings toMMS(ISO/IEC9506-1 and ISO/IEC 9506-2) - Ed.2
Specific communication service mapping (SCSM)
Sampled values over serial unidirectional multidrop point to point link
Sampled values overISO/IEC 8802-3- Ed.2
Conformance testing

7200
4125
375
1500
376
13576

7200
4125
375
563
188
12451

7200
4125
375
0
188
11888

8775

8775

8775

4801

3676

3113

1125

563
1688

7200
4125
375
1500
188
13388

10800
14400
21600

8775
4613

162000
216000
324000

131625
203640

186765

178320

188
2820

200820

S-ar putea să vă placă și