Sunteți pe pagina 1din 39

MATERIALES

ITEM

DESCRIPCION

UNIDADMETRADO

P.UNITARIO
S/

1.00.00 INSTALACIONES ELECTRICAS

1.00 SALIDAS TOMACORRIENTES


Glb
u
u
u

1.00
1.00
1.00
1.00

M
M
M
M
M
M
M
M
M
UND
UND
UND
UND
UND
UND

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

58.00
0.00
0.00
32.99
17.11
82.50
0.00
46.10
23.60
94.30
52.80
27.38
0.00
0.00
0.00

u
u
kg
kg

1.00
1.00
1.00
1.00

0.30
0.50
6.00
2.00

4.00 TUBERIAS CONDUIT CON ROSCA


4.01 TUBERIA CONDUIT 100mm. DIAM. (MARCA COLMENA)
4.02 TUBERIA CONDUIT 80mm. DIAM. ( MARCA COLMENA)
4.03 TUBERIA CONDUIT 65mm. DIAM. (MARCA COLMENA)
4.04 TUBERIA CONDUIT 50mm. DIAM. (MARCA COLMENA)
4.05 TUBERIA CONDUIT 40mm. DIAM. (MARCA COLMENA)
4.06 TUBERIA CONDUIT 35mm. DIAM. (MARCA COLMENA)
4.07 TUBERIA CONDUIT 25mm. DIAM. (MARCA COLMENA)
TUBERIA CONDUIT 20mm. DIAM. (MARCA COLMENA)

M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

174.00
104.50
97.80
55.90
42.90
40.50
25.50
16.80

4.08 TUBERIA CONDUIT FLEXIBLE


4.09 TUBERIA CONDUIT FLEXIBLE
4.1 TUBERIA CONDUIT FLEXIBLE
4.11 TUBERIA CONDUIT FLEXIBLE
4.12 TUBERIA CONDUIT FLEXIBLE

M
M
M
M
M

1.00
1.00
1.00
1.00
1.00

116.94
83.20
79.32
36.37
28.51

1.01 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=1.20


1.02 SALIDA P/TOMACORR.TENS. NORMAL 2P+T EN CAJA CONDULET H=0.40
1.03 SALIDA TOMACORR. TIPO INDUST.3P+T GRADO IP67 CAJ. COND.H=1.20
1.04 SALIDA TOMACORR. TENS.NORMAL 2P+T A PRUEBA DE AGUA H=0.40
2.00 BANDEJAS DE ENERGIA LIZA CON TAPA
BANDEJA METALICA PORTACABLES C/TAPA ENERG. 1000x100mm.
2.01 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 900x150mm.
2.02 BANDEJA METALICA PORTACABLES C/TAPA ENERG. 600x150mm.
BANDEJA METALICA PORTACABLES C/TAPA ENERG. 500x100mm.
BANDEJA METALICA PORTACABLES C/TAPA ENERG. 200x100mm.
CODO METALICA PORTACABLES 90 C/TAPA ENERG. 1000x100mm.
CODO METALICA PORTACABLES 90 C/TAPA ENERG. 900x100mm.
CODO METALICA PORTACABLES 90 C/TAPA ENERG. 500x100mm.
CODO METALICA PORTACABLES 90 C/TAPA ENERG. 200x100mm.
TEE DE BANDEJA DE ENERGIA DE 1000x100mm
2.03 TEE DE BANDEJA DE ENERGIA DE 500x100mm
2.04 TEE DE BANDEJA DE ENERGIA DE 200x100mm
2.05 CURVA 45 DE BANDEJA DE ENERGIA DE 900x150mm.
2.06 CURVA VERTICAL DE ENERGIA DE 900x150mm.
2.07 JUNTA DE EXPANSION PARA BANDEJA

CLAVO DE DISPARO
FULMINANTE
ALAMBRE GALVANIZADO N16
PRENSAESTOPA

100mm DIAM.
80mm DIAM.
65mm DIAM.
50mm DIAM.
40mm DIAM.

PU.S/

M
M
M

1.00
1.00
1.00

18.09
11.40
9.50

M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00
4.86
8.51
13.54
16.67
22.46
0.00
42.65
61.34

6.50
10.17
12.33
19.50
25.60
32.50
64.33
64.33
64.33

M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.98
1.60
3.08
4.26
5.32
0.00
12.77
16.60

3.30

M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.98
1.60
2.94
3.44
4.90
0.00
14.06
18.93

5.60
3.80

M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00
7.17
10.95
13.55
15.76
23.13
0.00
81.09
130.06

0.00
6.50
9.00
0.00
26.50
33.00
33.00
33.00
0.00

CAJA CONDULET TIPO T, 15mm: 1/2"


CAJA CONDULET TIPO T, 20mm: 3/4"
CAJA CONDULET TIPO T, 25mm: 1"
CAJA CONDULET TIPO T 35mm: 1 1/4"
CAJA CONDULET TIPO T, 40mm: 1 1/2"
CAJA CONDULET TIPO T, 50mm: 2"
CAJA CONDULET TIPO T, 80mm: 3"

M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00
0.00
12.50
0.00
31.00
48.00
0.00

5.10 CAJA CONDULET TIPO LB, 15mm: 1/2"


CAJA CONDULET TIPO LB, 20mm: 3/4"

M
M

1.00
1.00

0.00
0.00
12.50
0.00
31.00
48.00
0.00
0.00
0.00
0.00

4.13 TUBERIA CONDUIT FLEXIBLE 35mm DIAM.


4.14 TUBERIA CONDUIT FLEXIBLE 25mm DIAM.
TUBERIA CONDUIT FLEXIBLE 20mm DIAM.
5.00 TUBERIAS CONDUIT SIN ROSCA EMT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT
TUBERIA CONDUIT

EMT 15mm: 1/2" COLMENA, LIVIANA SIN ROSCA


EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA
EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA
EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA
EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA
EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA
EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA
EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA
EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA

UNION CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA


5.01 UNION CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA
5.02 UNION CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA
5.03 UNION CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA
5.04 UNION CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA
UNION CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA
UNION CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA
5.05 UNION CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA
5.06
CONECTOR RECTO CONDUIT EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA
CONECTOR RECTO CONDUIT EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA
CONECTOR RECTO CONDUIT EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA
CONECTOR RECTO CONDUIT EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA
CONECTOR RECTO CONDUIT EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA
CONECTOR RECTO CONDUIT EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA
5.07 CONECTOR RECTO CONDUIT EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA
5.08 CONECTOR RECTO CONDUIT EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT
CURVA CONDUIT

EMT 15mm: 1/2" COLMENA, LIVIANA SIN ROSCA


EMT 20mm: 3/4" COLMENA, LIVIANA SIN ROSCA
EMT 25mm: 1" COLMENA, LIVIANA SIN ROSCA
EMT 35mm: 1 1/4" COLMENA, LIVIANA SIN ROSCA
EMT 40mm: 1 1/2" COLMENA, LIVIANA SIN ROSCA
EMT 50mm: 2" COLMENA, LIVIANA SIN ROSCA
EMT 65mm: 2 1/2" COLMENA, LIVIANA SIN ROSCA
EMT 80mm: 3" COLMENA, LIVIANA SIN ROSCA
EMT 100mm: 4" COLMENA, LIVIANA SIN ROSCA

8.50
10.00
10.00
10.00

8.00
9.50
9.50
9.50

5.09

0.00
0.00

CAJA CONDULET TIPO LB, 25mm: 1"


CAJA CONDULET TIPO LB 35mm: 1 1/4"
CAJA CONDULET TIPO LB, 40mm: 1 1/2"
CAJA CONDULET TIPO LB, 50mm: 2"
CAJA CONDULET TIPO LB, 80mm: 3"
6.00 SALIDAS ALUMBRADO
6.01 SALIDAS PARA ARTEFACTOS DE ALUMBRADO TIPO INDUSTRIAL
6.02 SALIDAS PARA ARTEFACTOS DE ALUMBRADO, REFLECTORES
6.03 SALIDAS PARA ARTEFACTOS DE ALUMBRADO TTX
6.04 SALIDA PARA ALUMBRADO DE EMERGENCIA
6.05 SALIDA PARA ALUMBRADO SEALIZACION
7.00 SALIDAS FUERZA
7.01 SALIDA SE-1:2(3-1x150mm2 NYY + 1x16mm (PTE) - 100mm R GS)+50mm2 (T)
7.02 SALIDA SE-2:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.03 SALIDA SE-3:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.04 SALIDA PE-1:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 65mm R GS
7.05 SALIDA PE-2:3-1x95mm2 NYY + 1x16mm (PTE)+1x25mm2 (T), 80mm R GS
7.06 SALIDA PE-3:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS
7.07 SALIDA PE-4:3-1x35mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 50mm R GS
7.08 SALIDA RA-1:2(3-1x240mm2 NYY + 1x16mm (PTE) - 100mm R GS)+1x70mm2 (T)
7.09 SALIDA RA-2:3-1x70mm2 NYY + 1x16mm (PTE)+1x25mm2 (T), 65mm R GS
7.10 SALIDA RA-3:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 65mm R GS
7.11 SALIDA TH-1:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS
7.12 SALIDA TH-2:3-1x120mm2 NYY + 1x16mm (PTE)+1x35mm2 (T), 80mm R GS
7.13 SALIDA TH-3 2(3-1x95mm2 NYY + 1x16mm (PTE) - 80mm R GS)+1x50mm2 (T)
7.14 SALIDA TH-4:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.15 SALIDA TH-5:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.16 SALIDA TH-6:3-1x10mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.17 SALIDA TE-1:3-1x16mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 35mm R GS
7.18 SALIDA TE-2:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS
7.19 SALIDA TE-3:3-1x25mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 40mm R GS
7.20 SALIDA TE-4:3-1x35mm2 NYY + 1x16mm (PTE)+1x10mm2 (T), 50mm R GS
7.21 SALIDA TE-5:3-1x50mm2 NYY + 1x16mm (PTE)+1x16mm2 (T), 50mm R GS
8.00 ARTEFACTOS DE ALUMBRADO
ARTEFACTO DE TIPO INDUSTRIAL "HIGH BAY", CON LAMPARA HALOGENURO METALICO,
8.01
400W, HAZ ANGOSTO.
8.02 REFLECTOR PARA USO EXTERIOR, CON LAMPARA VAPOR DE SODIO, 250W, HAZ ANCHO.
ARTEFACTO TTX CON DOS LAMPARAS FLUORESCENTES DE 36W, BALASTO
8.03
ELECTRONICO.
ARTEFACTO PARA LUZ DE EMERGENCIA, CON DOS REFLECTORES DE 36W, AUTONOMIA
8.04
DE UNA HORA.
ARTEFACTO
DE ALUMBRADO DE SEALIZACION "ESCAPE", CON UNA LAMPARA
8.05
FLUORESCENTE 8W, AUTONOMIA DE UNA HORA.
9.00 SISTEMA DE PUESTA A TIERRA
9.01 MALLA DE SISTEMA DE PUESTA A TIERRA, CONDUCTOR 120mm2 Cu DESNUDO
9.02 PUESTA A TIERRA COLUMNAS METALICAS, CONDUCTOR 70mm2 Cu DESN.
9.03 POZOS DE PUESTA A TIERRA
9.04 MALLA DE SISTEMA DE PUESTA A TIERRA COMPUTO, CONDUCTOR 95mm2 Cu DESNUDO
9.05 POZOS DE PUESTA A TIERRA
9.06 TABLERO DE CONEXIN DE PUESTA A TIERRA
10.00 OTROS
10.01 MONTAJE E INSTALACION DE TABLEROS ELECTRICOS
10.02 BASE METALICA PARA MONTAJE DE TABLEROS ELECTRICOS
10.03 PRUEBAS Y PROTOCOLOS
1.00 TABLEROS ELECTRICOS

1.01 Tablero General TG-D


1.02 Tablero STG-1

M
M
M
M
M

1.00
1.00
1.00
1.00
1.00

12.00
0.00
29.50
46.50
0.00
0.00

U
U
U
U
U

1.00
1.00
1.00
1.00
1.00

3.00
3.00
3.00
3.00
3.00

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

U
U
U
U
U

1.00
1.00
1.00
1.00
1.00

363.87
298.56
363.87
363.00
121.29

M
U
U
M
U
U

1.00
1.00
1.00
1.00
1.00
1.00

0.00
0.00
0.00
0.00
0.00
0.00

GLB
GLB
GLB

1.00
1.00
1.00

1,000.00
750.00
600.00

UND
UND

1.00
1.00

51,915.79
9,590.09

12.00
0.00
29.50
46.50
0.00

1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28

Tablero STG-2
Tablero STG-3
Banco de condensadores 1
Banco de condensadores 2
Banco de condensadores 3
Banco de condensadores 4
Tablero STD-BACI
Tablero STD-AL P
Tablero STD-CAR
Tablero STD-UG 1
Tablero STD-UG 2
Tablero STD-UG 3
Tablero STD-UG 4
Tablero STD-AL 1
Tablero STD-AL 2
Tablero STD-AL 3
Tablero STD-AL 4
Tablero STD-ALM
Tablero STD-AA 1
Tablero STD-AA 3
Tablero STD-AA 4
Tablero STD-ES 1
Tablero STD-ES 2
Tablero STD-ES 3
Tablero STD-ES 4
Tablero EST-UPS 3

ACCESORIOS Y SOPORTERIA
2.00 INTERRUPTORES Y TOMACORRIENTES
2.01 INTERRUPTOR SIMPLE
2.02 INTERRUPTOR DOBLE
2.03 INTERRUPTOR TRIPLE
2.04 INTERRUPTOR CONMUTACION
2.05 TOMACORRIENTE NORMAL
2.06 TOMACORRIENTE ESTABILIZADA
2.07 TOMA EN PISO
2.08
2.09

UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1,655.04
53,405.76
28,368.65
28,368.65
5,906.96
12,220.96
394.75
213.84
513.78
804.92
731.96
1,061.02
869.35
326.05
203.90
232.08
280.24
271.34
577.44
424.31
243.06
537.66
391.10
391.10
391.10
715.16
15.00

M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.00
7.00
9.00
5.00
5.00
11.00
43.00

U
U
U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

2.87
4.56
6.31
7.97
11.55
0.00
25.99
35.30
63.92

U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00

0.67
1.10
1.35
1.75
2.28
0.00

B
CURVA CONDUIT 3/4" 20mm

CURVA CONDUIT 1" 25mm


CURVA CONDUIT 1 1/4" 35mm
CURVA CONDUIT 1 1/2" 40mm
CURVA CONDUIT 2" 50mm
CURVA CONDUIT 2 1/4" 65mm
CURVA CONDUIT 2 1/2" 65mm
CURVA CONDUIT 3" 80mm
CURVA CONDUIT 4" 100mm

UNION CONDUIT 3/4" 20mm


UNION CONDUIT 1" 25mm
UNION CONDUIT 1 1/4" 35mm
UNION CONDUIT 1 1/2" 40mm
UNION CONDUIT 2" 50mm
UNION CONDUIT 2 1/4" 65mm

U
U
U

1.00
1.00
1.00

5.62
8.21
12.08

U
U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.10
4.31
0.00
10.69
16.55
0.00
0.00
0.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

12.50
14.88

UNION UNIVERSAL DE 4" 100mm

U
U
U
U
U
U
U
U

Conector Hermetico Curvo Liquid Tight de 3/4" de


Conector Hermetico Curvo Liquid Tight de 1" de
Conector Hermetico Curvo Liquid Tight de 1 1/4" de
Conector Hermetico Curvo Liquid Tight de 1 1/2" de
Conector Hermetico Curvo Liquid Tight de 2" de
Conector Hermetico Curvo Liquid Tight de 2 1/4" de
Conector Hermetico Curvo Liquid Tight de 3" de
Conector Hermetico Curvo Liquid Tight de 4" de

U
U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

14.88
14.88
20.38
28.61
39.06
85.39
109.97
201.53

Conector Hermetico Recto Liquid Tight de 1" de


Conector Hermetico Recto Liquid Tight de 1 1/4" de
Conector Hermetico Recto Liquid Tight de 1 1/2" de
Conector Hermetico Recto Liquid Tight de 2" de
Conector Hermetico Recto Liquid Tight de 2 1/4" de
Conector Hermetico Recto Liquid Tight de 3" de
Conector Hermetico Recto Liquid Tight de 4" de

U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00

5.22
9.18
12.69
15.18
61.16
75.40
102.01

Contratuerca Bushing Conduit de 3/4" de


Contratuerca Bushing Conduit de 1" de
Contratuerca Bushing Conduit de 1 1/4" de
Contratuerca Bushing Conduit de 1 1/2" de
Contratuerca Bushing Conduit de 2" de
Contratuerca Bushing Conduit de 2 1/4" de
Contratuerca Bushing Conduit de 3" de
Contratuerca Bushing Conduit de 4" de

U
U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.32
0.32
0.47
0.50
0.62
1.54
1.95
2.95

Abrazaderas Unistrut de 3/4" de con Pernos de Ajuste


Abrazaderas Unistrut de 1" de con Pernos de Ajuste
Abrazaderas Unistrut de 1 1/4" de con Pernos de Ajuste
Abrazaderas Unistrut de 1 1/2" de con Pernos de Ajuste
Abrazaderas Unistrut de 2" de con Pernos de Ajuste
Abrazaderas Unistrut de 2 1/4" de con Pernos de Ajuste

U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00

0.52
0.59
0.00
0.83
1.07
0.00

UNION CONDUIT 2 1/2" 65mm


UNION CONDUIT 3" 80mm
UNION CONDUIT 4" 100mm

CAJA CONDULET TIPO T 3/4" 20mm


CAJA CONDULET TIPO T 1" 25mm
CAJA CONDULET TIPO T 1 1/4" 35mm

D
E

CAJA CONDULET TIPO T 1 1/2" 40mm


CAJA CONDULET TIPO T 2" 50mm
CAJA CONDULET TIPO T 2 1/4" 65mm
CAJA CONDULET TIPO T 3" 80mm
CAJA CONDULET TIPO T 4" 100mm

UNION UNIVERSAL DE 3/4" 20mm


UNION UNIVERSAL DE 1" 25mm
UNION UNIVERSAL DE 1 1/4" 35mm
UNION UNIVERSAL DE 1 1/2" 40mm
UNION UNIVERSAL DE 2" 50mm
UNION UNIVERSAL DE 2 1/4" 65mm
UNION UNIVERSAL DE 3" 80mm

9.00
12.50
31.00
48.00

1.50
1.70
2.40
3.10

Abrazaderas Unistrut de 3" de con Pernos de Ajuste


Abrazaderas Unistrut de 4" de con Pernos de Ajuste

U
U

1.00
1.00

Reduccin bushing de FE de 4" - 3" de


Reduccin bushing de FE de 3" - 2" de
Reduccin bushing de FE de 2" - 1" de
Reduccin bushing de FE de 2" - 1 1/2" de
Reduccin bushing de FE de 2" - 1 1/4" de
Reduccin bushing de FE de 2 1/2" - 1" de
Reduccin bushing de FE de 1" - 3/4" de

U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00

Riel unistrut P4100 X 2.4 mt, RANURADO, CHATO


Riel unistrut P4100 X 2.4 mt, RANURADO, ALTO

U
U

1.00
1.00

12.41
26.90

VARILLA ROSCADA DE 1/2"


VARILLA ROSCADA DE 3/8"

U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
3.00
1.00
1.00
3.00
2.00
4.00

1.00
1.00

1.00
1.00

U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

46.58
31.54
23.21
15.92
14.42
12.26
10.23
6.40
5.66
3.71

M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.24
0.11
0.27
0.08
1.55
0.14
0.36
0.08

TUERCAS DE 1/2"
TUERCAS DE 3/8"

Tuerca tipo resorte 1/2"


Arandela
Arandela tipo Ua
cintillos
mangas
Taco Hulti de 1/2"
perno con tuera y arandela
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TERMINAL DE COMPRESION
TUBO PVC SAP 3/4
UNION
CURVA
CONECTOR
TUBO PVC SAP 1
UNION
CURVA
CONECTOR

500MM2 =
300MM2 = 500MCM
240MM2 = 400MCM
185MM2 = 300MCM
150MM2 = 250MCM
120MM2 = 4/0
95MM2 = 3/0
70MM2 = 2/0
50MM2 = 1
35MM2 = 2
25MM2 = 4
16MM2 = 6
10MM2 = 8
6MM2 = 10
4MM2 = 12
2.5MM2 = 14

0.00
0.00

22.89
10.14
10.15
7.26

36.00
78.00

2.83
1.904
1.666
1.428
1.31
1.19
1.16
0.32
0.75
0.21
1.45
0.38
1.00
0.23

1x500mm2 NYY
1x300mm2 NYY
1x240mm2 NYY
1x185mm2 NYY
1x150mm2 NYY
1x120mm2 NYY
1x95mm2 NYY
1x70mm2 NYY
1x50mm2 NYY
1x35mm2 NYY
1x25mm2 NYY
1x16mm2 NYY
1x10mm2 NYY
1x6mm2 NYY

M
M
M
M
M
M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

64.01
38.41
30.79
23.42
18.77
15.29
12.17
8.82
6.17
4.61
3.41
2.18
1.42
0.93

1x500mm2 THW
1x300mm2 THW
1x240mm2 THW
1x185mm2 THW
1x150mm2 THW
1x120mm2 THW
1x95mm2 THW
1x70mm2 THW
1x50mm2 THW
1x35mm2 THW
1x25mm2 THW
1x16mm2 THW
1x10mm2 THW
1x6mm2 THW
1x4mm2 THW

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

0.00
0.00
28.93
22.15
17.86
14.51
11.45
8.34
5.87
4.25
3.10
1.99
1.18
0.72
0.48

1x240mm2 TW
1x185mm2 TW
1x150mm2 TW
1x120mm2 TW
1x95mm2 TW
1X70mm2 TW (T)
1X50mm2 TW (T)
1X35mm2 TW (T)
1X25mm2 TW (T)
1X16mm2 TW (T)
1X10mm2 TW (T)
1X6mm2 TW (T)

M
M
M
M
M
M
M
M
M
M
M
M

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

28.17
21.50
17.56
14.02
11.12
8.01
5.57
4.09
2.97
1.94
1.16
0.70

1X4mm2 TW (T)

1.00

0.47

1X2.5mm2 TW (T)

1.00

0.30

Cobre desnudo de 120mm2


Cobre desnudo de 95mm2
Cobre desnudo de 70mm2

1.00

46.06

1.00

36.43

1.00

26.19

Cobre desnudo de 50mm2


Cobre desnudo de 35mm2
Cobre desnudo de 25mm2
Cobre desnudo de 16mm2
Cobre desnudo de 10mm2

1.00

18.19

1.00

13.44

1.00

9.67

1.00

6.11

1.00

3.86

3-1x500mm2 XHHW

1.00

182.08

3-1x300mm2 XHHW

1.00

109.63

3-1x240mm2 XHHW

1.00

96.21

3-1x185mm2 XHHW

1.00

69.27

3-1x150mm2 XHHW

1.00

57.76

3-1x120mm2 XHHW

1.00

45.38

3-1x95mm2 XHHW

1.00

35.70

3-1x70mm2 XHHW

1.00

27.36

3-1x50mm2 XHHW

1.00

18.88

3-1x35mm2 XHHW

1.00

13.91

3-1x25mm2 XHHW

1.00

10.16

3-1x16mm2 XHHW

1.00

6.59

3-1x10mm2 XHHW

1.00

4.31

3-1x6mm2 XHHW

1.00

2.80

3-1x4mm2 XHHW

1.00

2.08

1x500mm2 XHHW

1.00

60.69

1x300mm2 XHHW

1.00

36.54

1x240mm2 XHHW

1.00

32.07

1x185mm2 XHHW

1.00

23.09

1x150mm2 XHHW

1.00

19.25

1x120mm2 XHHW

1.00

15.13

1x95mm2 XHHW

1.00

11.90

1x70mm2 XHHW

1.00

9.12

1x50mm2 XHHW

1.00

6.29

1x35mm2 XHHW

1.00

4.64

1x25mm2 XHHW

1.00

3.39

1x16mm2 XHHW

1.00

2.20

1x10mm2 XHHW

1.00

1.44

1x6mm2 XHHW

1.00

0.93

1x4mm2 XHHW

1.00

0.69

CONECTOR U BOLT

1.00

2.50

ACERO DE REFUERZO
ENCOFRADO
CONCRETO FC= 280KG/CM2
TAPA DE FIERRO FUNDIDO

kg
m2
m3
u

1.00

5.87

1.00

15.55

1.00

466.50

1.00

500.00

DUCTO DE CONCRETO 2 VIAS


CINTILLOS DE AMARRE

u
u

1.00

16.00

1.00

30.00

PRUEBAS ELECTRICAS

1.00

800.00

BUZON DE CONCRETO

1.00

700.00

OFICINA DE CAMPO

1.00

1,200.00

ALMACEN DE CAMPO

1.00

1,000.00

LIMPIEZA

1.00

60.00

REMOSION MATERIALES

1.00

200.00

POZO MENOR DE 25

1.00

400.00

POZO MENOR DE 5
POZO MENOR DE 10

1.00

2,500.00

1.00

1,300.00

CABLE 1X4MM2 NH-80

CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80
CB/NH-80

TIPO
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)
(0.45/0.75Kv.)

CABLE
1.5mm
2.5mm
4mm
6mm
10mm
16mm
25mm
35mm
50mm
70mm
95mm
120mm
150mm
185mm
240mm
300mm

0.63 1.77

COLOR
PRECIO US$
0.2400

0.67

Todos 0.3771
Todos 0.5772
Todos 0.8714
Negro 1.4254
Negro 2.0745
Negro 3.2323
Negro 4.4409
Negro 6.1206
Negro 8.7027
Negro 11.9648
Negro 15.1540
Negro 18.6517
Negro 23.1523
Negro 30.2549
Negro 37.9336

1.06
1.62
2.44
3.99
5.81
9.05
12.43
17.14
24.37
33.50
42.43
52.22
64.83
84.71
106.21

N2XH
TIPO CABLE
CB/N2XH (0.6/1Kv.) 2.5mm
CB/N2XH (0.6/1Kv.) 4mm
CB/N2XH (0.6/1Kv.) 6mm
CB/N2XH (0.6/1Kv.) 10mm
CB/N2XH (0.6/1Kv.) 16mm

COLOR
PRECIO US$

0.585

1.64

0.5549

1.55

0.8374

2.34

1.3682

3.83

1.9181

5.37

CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH

CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH
CB/N2XH

(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)
(0.6/1Kv.)

2
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x

25mm
35mm
50mm
70mm
95mm
120mm
150mm
185mm
240mm
300mm
400mm
500mm

TIPO CABLE
6mm
6mm
10mm
16mm
25mm
35mm
50mm
70mm
95mm
120mm
150mm
185mm
240mm
300mm
400mm
500mm

2.9877

8.37

4.1046

11.49

5.6577

15.84

8.0432

22.52

11.0591

30.97

14.0066

39.22

17.2385

48.27

21.3984

59.92

27.9639

78.30

35.0612

98.17

51.2078

143.38

65.4384

183.23

COLOR
PRECIO US$
1.9993

5.60

2.6730

7.48

4.1337

11.57

6.2136

17.40

9.6205

26.94

13.0546

36.55

17.5562

49.16

24.9249

69.79

34.2569

95.92

42.9647

120.30

52.6887

147.53

66.3937

185.90

87.7036

245.57

109.5816

306.83

141.3574

395.80

180.2055

504.58

S/.
Caja de paso 100x100x55mm ( espesor 1.5mm2 )
Caja de paso 100x100x50mm
Caja de paso 150x150x100mm
Caja de paso 200x200x100mm
Caja de paso 250x250x150mm
Caja de paso 300x300x120mm
Caja de paso 400x400x200mm
Caja de paso 500x500x200mm
Caja de paso 600x600x200mm

7.93
7.68
18.17
24.99
42.28
51.46
96.1
132.61
160.48

Ductobarra de Fuerza tipo Sndwich Modelo


SCP, Aluminio, 3F+N+T, IP55, 1600A
desde Tablero TNBT-T1. Incluye
curvas,accesorios y CAJAS DE DERIVACION

1927.05

Ductobarra de Fuerza tipo Sndwich, Modelo


SCP,Aluminio, 3F+N+T, IP55, 1600A
desde Tablero TNBT-T2. Incluye curvas ,
accesorios y CAJAS DE DERIVACION

1927.05

Ductobarra "A2" tipo Sndwich Modelo MR,


3F+N+T,IP55,ALUMINIO, 630A. Desde
tablero TTA-5 ,Incluye curvas , accesorios y
CAJAS DE DERIVACION

1022.05

Ductobarra "A2" tipo Sndwich Modelo MR,


3F+N+T,IP55,ALUMINIO, 630A. Desde
tablero TTA-6 ,Incluye curvas , accesorios y
CAJAS DE DERIVACION

1022.05

TUBERIA PVC SAP 3/4"


CURVA PVC SAP 3/4"
UNION PVC SAP 3/4"
CONETOR PVC SAP 3/4"
TOMACORRIENTE BTICINO MAGIC
PLACA
Varilla de Cu de 3/4"x2.40m
Ventonita
Thor gel
Tierra de Chacra incluye zarandeo
Caja de registro
Excavacion
Eliminacion desmonte al punto de acopio
Relleno del pozo
Conexionado ( Sodadura exotermica )
Protocolo

1.8
0.238
0.102
0.086

35
120
55
34
80
35
33
12
15
80
65

ADICIONAL
5% $

S/.

0.00
0.00
0.00
0.00
58.00
0.00
0.00
32.99
17.11
82.50
0.00
46.10
23.60
94.30
52.80
27.38
0.00
0.00
0.00
0.00
0.30
0.50
6.00
2.00

174.00
104.50
97.80
55.90
42.90
40.50
25.50
16.80
116.94
83.20
79.32
36.37
28.51

18.09
11.40
9.50

0.00
4.86
8.51
13.54
16.67
22.46
0.00
42.65
61.34
0.98
1.60
3.08
4.26
5.32
0.00
12.77
16.60
0.00
0.98
1.60
2.94
3.44
4.90
0.00
14.06
18.93
0.00
7.17
10.95
13.55
15.76
23.13
0.00
81.09
130.06
0.00
0.00
12.50
0.00
31.00
48.00
0.00
0.00
0.00

tc=2.8
5.32 14.896
9.12 25.536
14.51 40.628
17.86 50.008
24.062 67.3736
0
45.7 127.96
65.72 184.016
0.35
0.57
1.1
1.52
1.9

0.98
1.596
3.08
4.256
5.32

4.56
5.93

12.768
16.604

0.35
0.57
1.05
1.23
1.75

0.98
1.596
2.94
3.444
4.9
0
14.056
18.928

5.02
6.76
2.56
3.91
4.84
5.63
8.26
28.96
46.45

7.168
10.948
13.552
15.764
23.128
0
81.088
130.06

11/3/2011
4.97 promelsa
8.51 promelsa
13.54 promelsa
16.67 promelsa
22.46 promelsa
0.00 promelsa
42.65 promelsa
61.34 promelsa
0.98 promelsa
1.60 promelsa
3.08 promelsa
4.26 promelsa
5.32 promelsa
0.00 promelsa
12.77 promelsa
16.60 promelsa
0.98 promelsa
1.60 promelsa
2.94 promelsa
3.44 promelsa
4.90 promelsa
0.00 promelsa
14.06 promelsa
18.93 promelsa
promelsa
promelsa
7.17 promelsa
10.95 promelsa
13.55 promelsa
15.76 promelsa
23.13 promelsa
0.00 promelsa
81.09 promelsa
130.06 promelsa

12.00
0.00
29.50
46.50
0.00

3.00
3.00
3.00
3.00
3.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
363.87
298.56
363.87
363.00
121.29
0.00
0.00
0.00
0.00
0.00
0.00
1,000.00
750.00
600.00
51,915.79
9,590.09

1,655.04
53,405.76
28,368.65
28,368.65
5,906.96
12,220.96
394.75
213.84
513.78
804.92
731.96
1,061.02
869.35
326.05
203.90
232.08
280.24
271.34
577.44
424.31
243.06
537.66
391.10
391.10
391.10
715.16
15.00
5.00
7.00
9.00
5.00
5.00
11.00
43.00

2.87
4.56
6.31
7.97
11.55
0.00
25.99
35.30
63.92
0.67
1.10
1.35
1.75
2.28
0.00

5.62
8.21
12.08
3.10
4.31
0.00
10.69
16.55
0.00
0.00
0.00
12.50
14.88
0.00
0.00
0.00
0.00
0.00
0.00
14.88
14.88
20.38
28.61
39.06
85.39
109.97
201.53
5.22
9.18
12.69
15.18
61.16
75.40
102.01
0.32
0.32
0.47
0.50
0.62
1.54
1.95
2.95
0.52
0.59
0.00
0.83
1.07
0.00

0.00
0.00
0.00
22.89
10.14
10.15
7.26
0.00
0.00
12.41
26.90
3.00
3.00
1.00
1.00
3.00
2.00
4.00
25.00
4.00
1.50
1.00
46.58
31.54
23.21
15.92
14.42
12.26
10.23
6.40
5.66
3.71
2.83
1.90
1.67
1.43
1.31
1.19
0.23
0.06
0.15
0.04
0.29
0.08
0.20
0.05

1.39
0.38
0.89
0.25
1.74
0.45
1.19
0.27

TALMA

64.01
38.41
30.79
23.42
18.77
15.29
12.17
8.82
6.17
4.61
3.41
2.18
1.42
0.93
0.00
0.00
28.93
22.15
17.86
14.51
11.45
8.34
5.87
4.25
3.10
1.99
1.18
0.72
0.48
28.17
21.50
17.56
14.02
11.12
8.01
5.57
4.09
2.97
1.94
1.16
0.70
0.47
0.30
46.06
36.43
26.19

18.19
13.44
9.67
6.11
3.86
182.08
109.63
96.21
69.27
57.76
45.38
35.70
27.36
18.88
13.91
10.16
6.59
4.31
2.80
2.08
60.69
36.54
32.07
23.09
19.25
15.13
11.90
9.12
6.29
4.64
3.39
2.20
1.44
0.93
0.69

2.50
5.87
15.55
466.50
500.00
16.00
30.00

800.00
700.00
1,200.00
1,000.00
60.00
200.00

400.00
2,500.00
1,300.00

1.77
tc=

2.8

0.13

0.81

2.8

0.21

1.27

2.8

0.32

1.94

2.8

0.49

2.93

2.8

0.80

4.79

2.8

1.16

6.97

2.8

1.81

10.86

2.8

2.49

14.92

2.8

3.43

20.57

2.8

4.87

29.24

2.8

6.70

40.20

2.8

8.49

50.92

2.8

10.44

62.67

2.8

12.97

77.79

2.8

16.94

101.66

2.8

21.24

127.46

2.8

0.33

1.96

2.8

0.31

1.86

2.8

0.47

2.81

2.8

0.77

4.60

2.8

1.07

6.44

2.8

0.672

1.67

10.04

2.8

2.30

13.79

2.8

3.17

19.01

2.8

4.50

27.03

2.8

6.19

37.16

2.8

7.84

47.06

2.8

9.65

57.92

2.8

11.98

71.90

2.8

15.66

93.96

2.8

19.63

117.81

2.8

28.68

172.06

2.8

36.65

219.87

2.8

1.12

4.48

2.8

1.50

8.98

2.8

2.31

13.89

2.8

3.48

20.88

2.8

5.39

32.32

2.8

7.31

43.86

2.8

9.83

58.99

2.8

13.96

83.75

2.8

19.18

115.10

2.8

24.06

144.36

2.8

29.51

177.03

2.8

37.18

223.08

2.8

49.11

294.68

2.8

61.37

368.19

2.8

79.16

474.96

2.8

100.92

605.49

2.8

7.93
7.68
18.17
24.99
42.28
51.46
96.1
132.61
160.48

1927.05

1927.05

1022.05

1022.05
1.65
0.6545
0.2805
0.2365
65
45

24
11
6.8
16
7
6.6
2.4
3
16
13

144
66
40.8
96
42
39.6
14.4
18
96
78

PRESUPUESTO
INSTALACIONES ELECTRICAS
ITEM

DESCRIPCION

para Control Presurizacion de escaleras


Salida para seal de variador de frecuencia del piso 4 al techo, PVC-SAP
01.01.01 20mm
Salida para seal de variador de frecuencia del piso 5 al techo, PVC-SAP
01.01.02 20mm
Salida para seal de variador de frecuencia del sotano 3 al sotano 1,
01.01.03 PVC-SAP 20mm
01.02.00 Vias para Seal de Equipos UE
01.02.01 Salida para seal de equipos conduit 20mm, piso 1
01.02.02 Enlace a equipo de azotea UC1-01, conduit 20mm
01.02.04 Enlace a equipo de azotea UC2-01, PVC-SAP 20mm
01.02.06 Enlace a equipo de azotea UC3-01, PVC-SAP 20mm
01.04.00 Salida Sistema de intrusion
01.04.01 Salida para pir sotano 1 al 6, conduit 25mm
01.04.02 Salida para pulsador de panico piso 1, conduit 20mm
01.04.03 Salida para pir piso 1, conduit 20mm
01.04.04 Salida para teclado LCD piso 1, conduit 20mm
01.04.07 Salida para panel piso 2, pvc-sap 20mm

UNIDAD

METRADO

01.01.00 Vias

pto

1.00

pto

1.00

pto

1.00

pto

3.00

pto

1.00

pto

1.00

pto

1.00

pto

6.00

pto

1.00

pto

6.00

pto

1.00

pto

1.00

COSTO RIRECTO

PRESUPUESTO SIN IGV

STO

SIN IGV

P.UNITARIO
S/.

P.PARCIAL S/.

227.00

227.00

219.50

219.50

212.00

212.00

300.23

900.70

417.92

417.92

296.53

296.53

245.75

245.75

418.28

2,509.66

299.30

299.30

299.30

1,795.80

299.30

299.30

203.88

203.88

SUBTOTAL
S/.

7,627.35

S/.
Comprensora Neumatica

93 335-375pcm

2500

22.5

70.78

93.28

Vibrador de concreto

4 18(1.5")

2.42

4.02

6.44

Mezcladora de concreto tipo trompo

8 9P3

500

3.35

2.41

5.76

38 20KW

500

6.36

3.44

9.8

20,000

79.78

106.12

200

2450

9.46

47.34

56.8

10,000

46.23

73.73

119.96

Grupo Electrogeno
Grua Hidraulica

225 18T-9mt

Camioneta Pick Up 4x4

107 1000kl

Camion

122 6ton

TIRFORD 3TN

9.92

WINCHE DE 2TN

4.01

TEODOLITO

7.43

MIRAS Y JALONES

0.88

TECLE 1TN

1.15

POLEA PA TENDIDO DE CONDUCTORES

2.86

TALADROS

10.00

ESMERIL

7.50

PISTOLA DE DISPARO

8.75

DOBLADORA DE TUBOS

6.25

ANDAMIOS

8.75

ESCALERAS

5.63

MEGOMETRO

5.63

PINZA AMPERIMETRICA

4.38

TELUROMETRO

5.63

CIZALLA CORTACABLE

5.00

PRENSA TERMINAL MANUAL

8.50

PRENSA TERMINAL HIDRAULICA

11.88

Grua Hidraulica

225 18T-9mt

Camioneta Pick Up 2x4

107 1000kl

20,000

79.78

106.12

250.00

2450

9.46

47.34

71.00

UU$
1
93.28
6.44
5.76
9.8
200
56.8
119.96
0
9.92
4.01
7.43
0.88
1.15
2.86
10
7.5
8.75
6.25
8.75
5.625
5.625
4.375
5.625
5
8.5
11.875
250
71

12.5
9.375
10.9375
7.8125
10.9375
7.03125
7.03125
5.46875
7.03125
6.25
10.625
14.84375
312.5
88.75

Tipo de Cambio
MANO DE OBRA INC. LEYES SOCIALES

HH

Alojamiento

CAPATAZ

hh

22.4

S/.

22.4

0.00

OPERARIO

hh

20.6625

S/.

20.66

0.00

OFICIAL

hh

17.3

S/.

17.30

0.00

PEON

hh

15.5625

S/.

15.56

0.00

OPERADOR EQUIPO

hh

16.92125

S/.

16.92

5.00

TOPOGRAFO

hh

19.30125

S/.

19.3

5.00

PEON ZARANDEADOR/ACOMODADOR

hh

14.64125

S/.

14.64

5.00

OPERADOR EQUIPO LIVIANO

hh

16.92125

S/.

16.92

5.00

Unidad

Cantidad

S/.

GASTOS GENERALES DIRECTOS (EN OBRA)


Descripcin

Gerente de Proyecto
mes
Gerente de Construccion
mes
Residente de Obra
mes
Ingeniero de QA/QC
mes
Ingeniero de Seguridad
mes
Ingeniero Administrador
mes
Personal Admnistrativo de Obra
mes
Personal Apoyo Oficina
mes
Suministros de Oficna
mes
Comunicaciones (Radio,telefono, fax, etc.)
mes
Transporte de Personal, Equipos y Mat. en Obra mes
Transporte de Personal Clave
mes
Mantenimiento de Campamento
Global
Alimentacion
Global
Elementos de Sealizacin
Global
Otros ( Pruebas )
Global
Poliza de Seguro Complementario Alto Riesgo
Mes
Contractual y extractual una poliza Car All Rist po Mes
Garantia por Fiel Cumplimiento del 10% Monto TotGlobal

12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.
12 S/.

Costo
Unitario S/.
12,000.00
12,000.00
12,000.00
4,500.00
3,500.00
4,500.00
2,500.00
1,500.00
600.00
600.00
4,000.00
4,000.00
1,400.00
1,500.00
1,200.00
500.00
283.76
7,167.36
1,626.80

SubTotal S/.
144,000.00
144,000.00
144,000.00
54,000.00
42,000.00
54,000.00
30,000.00
18,000.00
7,200.00
7,200.00
48,000.00
48,000.00
16,800.00
18,000.00
14,400.00
6,000.00
3,405.12
86,008.32
19,521.60

(agregar de ser necesario)

0.00

904,535.04

Gastos Directos para Obra


Garantia por fiel Cumplimiento por el 20%
Gastos del Contrato
Derecho de Imision
IGV
Pima Total

$
330
15.87
103.53
648.4

TC
3
3
3
3

S/.
990
47.61
310.59
1945.2

S/.
4880.40

Garantia Comercial

Carta Fianza para Adelanto en efectivo


Gastos del Contrato
Derecho de Imision
IGV
Pima Total
Garantia Comercial

Poliza de Seguro Complementario de Alto Riesgo Mensual

529

$
500
8.5
538.18
3370.68
2700

TC
3
3
3
3
3

1587

S/.
1500
25.5
1614.54
10112.04
8100

S/.
21352.08

Viaticos

Por DH

P HH

HH

ESP

Zapato

uniforme

Wantes

Lentes

Protector

0.00

179.2

22.4

22.40

0.00

165.3

20.6625

20.66

0.00

138.4

17.3

17.30

0.00

124.5

15.5625

15.56

15.00

135.37

16.92125

11.89

20.25

40

60

13

15.00

154.41

19.30125

14.27

20.25

40

60

13

15.00

117.13

14.64125

9.61

20.25

40

60

13

15.00

135.37

16.92125

11.89

20.25

40

60

13

Alojto.

Viaticos

Sueldo

750

600

6000

750

600

6000

750

600

6000

750

600

6000

750

600

6000

750

600

6000

1500

1300

12000

582,000.00

582000.00

10

20

213,600.00

213600.00

108,935.04

108935.04

30

12

72000

Tapon Oidos Respiradero

Total ESP

35

162

35

162

35

162

35

162

143.32
132.22
110.73
99.61

17.92
16.53
13.84
12.45

21.50
19.83
16.61
14.94

Partida
Rendimiento

01.01.01

Cdigo

Descripcin Recurso

Salida para seal de variador de frecuencia del piso 4 al techo, PVC-SAP 20mm
MO. 2.00
EQ. 2.0000
Unidad

Costo unitario directo por : m

227.00

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
20.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

169.76
0.00
1.88
1.50
0.53
0.35
1.53
1.53
1.05
3.13

0.849
0.000
37.500
3.000
1.575
0.700
0.000
0.000
0.000
3.125
46.75

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

169.76
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

4.244
4.000
0.000
0.000
0.000
0.000
2.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Costo unitario directo por : m

219.50

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Salida para seal de variador de frecuencia del u
Tuberia PVC SAP 3/4"
ml
Curva PVC SAP 3/4"
u
Union PVC SAP 3/4"
u
Conector PVC SAP 3/4"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja Octofonal
u
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.01.02

Cdigo

Descripcin Recurso

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Salida para seal de variador de frecuencia del piso 5 al techo, PVC-SAP 20mm
MO. 2.00
EQ. 2.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
16.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

169.76
0.00
1.88
1.50
0.53
0.35
1.53
1.53
1.05
3.13

0.849
0.000
30.000
3.000
1.575
0.700
0.000
0.000
0.000
3.125
39.25

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000

169.76
10.00
7.50
8.75
6.25
8.75
5.63

4.244
4.000
0.000
0.000
0.000
0.000
2.250

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Salida para seal de variador de frecuencia del u
Tuberia PVC SAP 3/4"
ml
Curva PVC SAP 3/4"
u
Union PVC SAP 3/4"
u
Conector PVC SAP 3/4"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja Octofonal
u
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS

%MO
hm
hm
hm
hm
hm
hm

MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.01.03

Cdigo

Descripcin Recurso

hm
hm
hm
hm
hm
hm
hm
hm

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Salida para seal de variador de frecuencia del sotano 3 al sotano 1, PVC-SAP 20mm
MO. 2.00
EQ. 2.0000
Unidad

5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Costo unitario directo por : m

212.00

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
12.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

169.76
0.00
1.88
1.50
0.53
0.35
1.53
1.53
1.05
3.13

0.849
0.000
22.500
3.000
1.575
0.700
0.000
0.000
0.000
3.125
31.75

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

169.76
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

4.244
4.000
0.000
0.000
0.000
0.000
2.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Costo unitario directo por : m

300.23

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Salida para seal de variador de frecuencia del u
Tuberia PVC SAP 3/4"
ml
Curva PVC SAP 3/4"
u
Union PVC SAP 3/4"
u
Conector PVC SAP 3/4"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja Octofonal
u
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.02.01

Cdigo

Descripcin Recurso

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Salida para seal de equipos conduit 20mm, piso 1


MO. 1.50
EQ. 1.5000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

1.0667
5.3333
5.3333
0.0000
11.7333

22.40
20.66
17.30
15.56

23.893
110.187
92.267
0.000
226.35

5%

0.1000
0.0000
9.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

226.35
0.00
4.06
4.11
1.69
1.66
1.53
1.53
1.05
5.63

1.132
0.000
36.525
8.225
5.063
3.325
0.000
0.000
0.000
5.625
59.89

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Salida para seal de equipos conduit 20mm, pi u
Tuberia PVC SAP 3/4"
ml
Curva PVC SAP 3/4"
u
Union PVC SAP 3/4"
u
Conector PVC SAP 3/4"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja 100X100X50mm
u

Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.02.02

Cdigo

Descripcin Recurso

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Enlace a equipo de azotea UC1-01, conduit 20mm


MO. 1.50
EQ. 1.5000
Unidad

226.35
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

5.659
5.333
0.000
0.000
0.000
0.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
13.99

Costo unitario directo por : m

417.92

0.5000
0.5333
0.0000
0.0000
0.0000
0.0000
0.5333
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

1.0667
5.3333
5.3333
0.0000
11.7333

22.40
20.66
17.30
15.56

23.893
110.187
92.267
0.000
226.35

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
Enlace a equipo de azotea UC1-01, conduit 20
Tuberia PVC SAP 3/4"
Curva PVC SAP 3/4"
Union PVC SAP 3/4"
Conector PVC SAP 3/4"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100X100X50mm

%MT
u
ml
u
u
u
ml
ml
ml
u

5%

0.1000
0.0000
38.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

226.35
0.00
4.06
4.11
1.69
1.66
1.53
1.53
1.05
5.63

1.132
0.000
154.217
8.225
5.063
3.325
0.000
0.000
0.000
5.625
177.59

Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.5333
0.0000
0.0000
0.0000
0.0000
0.5333
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

226.35
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

5.659
5.333
0.000
0.000
0.000
0.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
13.99

Costo unitario directo por : m

253.25

Partida
Rendimiento

01.02.04

Cdigo

Descripcin Recurso

Enlace a equipo de azotea UC2-01, PVC-SAP 20mm


MO. 2.00
EQ. 2.0000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
34.0000

169.76
0.00
1.88

0.849
0.000
63.750

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Enlace a equipo de azotea UC2-01, PVC-SAP 20 u
Tuberia PVC SAP 3/4"
ml

Curva PVC SAP 3/4"


Union PVC SAP 3/4"
Conector PVC SAP 3/4"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100X100X50mm

u
u
u
ml
ml
ml
u

Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Partida
Rendimiento

01.02.06

Cdigo

Descripcin Recurso

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Enlace a equipo de azotea UC3-01, PVC-SAP 20mm


MO. 2.00
EQ. 2.0000
Unidad

2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

1.50
0.53
0.35
1.53
1.53
1.05
3.13

3.000
1.575
0.700
0.000
0.000
0.000
3.125
73.00

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

169.76
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

4.244
4.000
0.000
0.000
0.000
0.000
2.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Costo unitario directo por : m

245.75

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
30.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000

169.76
115.10
1.88
1.50
0.53
0.35
1.53
1.53
1.05
3.13

0.849
0.000
56.250
3.000
1.575
0.700
0.000
0.000
0.000
3.125
65.50

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

169.76
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

4.244
4.000
0.000
0.000
0.000
0.000
2.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Costo unitario directo por : m

418.28

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Enlace a equipo de azotea UC3-01, PVC-SAP 20 u
Tuberia PVC SAP 3/4"
ml
Curva PVC SAP 3/4"
u
Union PVC SAP 3/4"
u
Conector PVC SAP 3/4"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja 100X100X50mm
u
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4

Partida
Rendimiento
Cdigo

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

01.04.01

Salida para pir sotano 1 al 6, conduit 25mm


MO. 1.00
EQ. 1.0000
1.00
Descripcin Recurso
Unidad
Mano de Obra

Cuadrilla

Cantidad

Precio U$

Parcial U$

CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
Salida para pir sotano 1 al 6, conduit 25mm
Tuberia Conduit EMT 1"
Curva Conduit EMT 1"
Union Conduit EMT 1"
Conector Conduit EMT 1"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100x100x50mm
Caja Octofonal
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.04.02

Cdigo

Descripcin Recurso

%MT
u
ml
u
u
u
ml
ml
ml

0.2000
1.0000
1.0000
0.0000

1.6000
8.0000
8.0000
0.0000
17.6000

22.40
20.66
17.30
15.56

35.840
165.280
138.400
0.000
339.52

5%

0.1000
0.0000
5.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000
1.0000

339.52
0.00
6.14
4.11
1.69
1.66
1.53
1.53
1.05
5.63
3.13

1.698
0.000
30.708
8.225
5.063
3.325
0.000
0.000
0.000
5.625
3.125
57.77

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.8000
0.0000
0.0000
0.0000
0.0000
0.8000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

339.52
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

8.488
8.000
0.000
0.000
0.000
0.000
4.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
20.99

Costo unitario directo por : m

299.30

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Salida para pulsador de panico piso 1, conduit 20mm


MO. 1.50
EQ. 1.5000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

1.0667
5.3333
5.3333
0.0000
11.7333

22.40
20.66
17.30
15.56

23.893
110.187
92.267
0.000
226.35

5%

0.1000
0.0000
8.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000
1.0000

226.35
0.00
4.06
4.11
1.69
1.66
1.53
1.53
1.05
5.63
3.13

1.132
0.000
32.467
8.225
5.063
3.325
0.000
0.000
0.000
5.625
3.125
58.96

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.5333
0.0000
0.0000
0.0000
0.0000
0.5333
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

226.35
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00

5.659
5.333
0.000
0.000
0.000
0.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Materiales
CONSUMIBLES
Salida para pulsador de panico piso 1, conduit
Tuberia Conduit EMT 3/4"
Curva Conduit EMT 3/4"
Union Conduit EMT 3/4"
Conector Conduit EMT 3/4"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100x100x50mm
Caja Octofonal
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica

hh
hh
hh
hh

%MT
u
ml
u
u
u
ml
ml
ml
u

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Camioneta Pick Up 2x4


Partida
Rendimiento

01.04.03

Cdigo

Descripcin Recurso

hm

0.0000

Salida para pir piso 1, conduit 20mm


MO. 1.50
EQ. 1.5000
Unidad

0.0000

71.00

0.000
13.99

Costo unitario directo por : m

299.30

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

1.0667
5.3333
5.3333
0.0000
11.7333

22.40
20.66
17.30
15.56

23.893
110.187
92.267
0.000
226.35

5%

0.1000
0.0000
8.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000
1.0000

226.35
0.00
4.06
4.11
1.69
1.66
1.53
1.53
1.05
5.63
3.13

1.132
0.000
32.467
8.225
5.063
3.325
0.000
0.000
0.000
5.625
3.125
58.96

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.5333
0.0000
0.0000
0.0000
0.0000
0.5333
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

226.35
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

5.659
5.333
0.000
0.000
0.000
0.000
3.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
13.99

Costo unitario directo por : m

299.30

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
Salida para pir piso 1, conduit 20mm
Tuberia Conduit EMT 1"
Curva Conduit EMT 1"
Union Conduit EMT 1"
Conector Conduit EMT 1"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100x100x50mm
Caja Octofonal
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.04.04

Cdigo

Descripcin Recurso

%MT
u
ml
u
u
u
ml
ml
ml
u

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

Salida para teclado LCD piso 1, conduit 20mm


MO. 1.50
EQ. 1.5000
Unidad

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

1.0667
5.3333
5.3333
0.0000
11.7333

22.40
20.66
17.30
15.56

23.893
110.187
92.267
0.000
226.35

5%

0.1000
0.0000
8.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000
1.0000

226.35
0.00
4.06
4.11
1.69
1.66
1.53
1.53
1.05
5.63
3.13

1.132
0.000
32.467
8.225
5.063
3.325
0.000
0.000
0.000
5.625
3.125
58.96

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000

0.5000
0.5333
0.0000
0.0000
0.0000
0.0000
0.5333

226.35
10.00
7.50
8.75
6.25
8.75
5.63

5.659
5.333
0.000
0.000
0.000
0.000
3.000

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

Materiales
CONSUMIBLES
%MT
Salida para teclado LCD piso 1, conduit 20mm u
Tuberia Conduit EMT 1"
ml
Curva Conduit EMT 1"
u
Union Conduit EMT 1"
u
Conector Conduit EMT 1"
u
Cable 1x4mm2
ml
Cable 1x4mm2 (N)
ml
Cable 1x2.5mm2 (T)
ml
Caja 100x100x50mm
Caja Octofonal
u
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS

%MO
hm
hm
hm
hm
hm
hm

MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4
Partida
Rendimiento

01.04.07

Cdigo

Descripcin Recurso

hm
hm
hm
hm
hm
hm
hm
hm

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

Salida para panel piso 2, pvc-sap 20mm


MO. 2.00
EQ. 2.0000
Unidad

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
13.99

Costo unitario directo por : m

203.88

Cuadrilla

Cantidad

Precio U$

Parcial U$

0.2000
1.0000
1.0000
0.0000

0.8000
4.0000
4.0000
0.0000
8.8000

22.40
20.66
17.30
15.56

17.920
82.640
69.200
0.000
169.76

5%

0.1000
0.0000
6.0000
2.0000
3.0000
2.0000
0.0000
0.0000
0.0000
1.0000
1.0000

169.76
0.00
1.88
1.50
0.53
0.35
1.53
1.53
1.05
3.13
3.13

0.849
0.000
11.250
3.000
1.575
0.700
0.000
0.000
0.000
3.125
3.125
23.62

5.00%
0.1000
0.0000
0.0000
0.0000
0.0000
0.1000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.5000
0.4000
0.0000
0.0000
0.0000
0.0000
0.4000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

169.76
10.00
7.50
8.75
6.25
8.75
5.63
5.63
4.38
5.63
5.00
8.50
11.88
250.00
71.00

4.244
4.000
0.000
0.000
0.000
0.000
2.250
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10.49

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Materiales
CONSUMIBLES
Salida para panel piso 2, pvc-sap 20mm
Tuberia Conduit EMT 1"
Curva Conduit EMT 1"
Union Conduit EMT 1"
Conector Conduit EMT 1"
Cable 1x4mm2
Cable 1x4mm2 (N)
Cable 1x2.5mm2 (T)
Caja 100x100x50mm
Caja Octofonal
Equipos
HERRAMIENTAS DE MANIOBRA
TALADROS
ESMERIL
PISTOLA DE DISPARO
DOBLADORA DE TUBOS
ANDAMIOS
ESCALERAS
MEGOMETRO
PINZA AMPERIMETRICA
TELUROMETRO
CIZALLA CORTACABLE
PRENSA TERMINAL MANUAL
PRENSA TERMINAL HIDRAULICA
Grua Hidraulica
Camioneta Pick Up 2x4

hh
hh
hh
hh

%MT
u
ml
u
u
u
ml
ml
ml
u

%MO
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm
hm

S-ar putea să vă placă și