SHUT DOWN

PLANNED S/D

UNPLANNED S/D - FORCED OUTAGES

STATION PULLOUT

PLANNED S/D

SELECT IP MODE
REDUCE LOAD IN IP MODE UPT0
130MW. REDUCE Pr TO 130 k.sc
SELECT LP MODE
ISOLATE HPH 5&6
ISOLATE EXT TO DEA. TAKE CRH TO
DEA. SOURCE

PLANNED S/D

BOILER MIN FIRING WITH 4 MILLS


REDUCE FURTHER LOAD TO 70 MW.
REDUCE PR BY OPENING HP B/P
SWITCH OVER TO STATION SUPPLY
CHECK AOP STARTING
TRIP THE BOILER. HP B/P OPENS ON
AUTO.
CHECK BD,BPE OPENING

PLANNED S/D

REDUCE Pr THROUGH B/P


CHECK AOP STARTING ON AUTO AT
2850 RPM OR START MANUALLY
NOTE DOWN CD VIBRATIONS
IF VIBRATION EXCEED LIMITS,
OPEN PARTIAL VAC.BREAKER VALVE
STOP ONE BFP &CWP( AFTER BALL
COLLECTION)

PLANNED S/D

CHANGE SEALS STEAM TO AST


SOURCE AT 1100 RPM
CHECK JOP STARTING ON AUTO AT
510 RPM OR START MANUALLY
CHECK GVG OPENING ON AUTO AT
210 RPM OR START MANUALLY
AT MS Pr 5 k.sc CLOSE HP B/P

PLANNED S/D

KILL THE VACUUM


ISOLATE STEAM TO CONDENSER
OPEN ALL THE DRAINS TO ATM.
STOP CEP
ISOLATE MAKEUP STATION &
SEALING VALVES
LOG METAL TEMP & SUPERVISORY
READINGS FOR EVERY ONE HOUR