VOD-IMP-FRM-0566 Rev 6

Form for Movement of Equipment In/Out of EIT&I Data Centres


(As required by the National Data Centre Access Policy VSA-ITB-POL-0068)

Notes:
1.
2.
3.

The completed form to be sent to EIT&I Data Centre email group.


IT Facilities management must be notified a minimum of 10 working days before the planned installation of
new equipment in a Data Centre, which is also subject to Change approval.
Any queries to be escalated to the IT Facilities management.

Site / Building:

Techno Centre
(E.g. Cape Town Techno Centre, Pier Place, Foreshore;

Midrand Commercial Park, Techno Park-MTC etc.)

Movement Type ( Tick one)


IN (New)

OUT (Scrap)

Transfer

From

Date of Installation of Equipment (dd/mm/yyyy):

2nd Floor

To

3rd Floor

10/05/2013

Equipment Details:
Make

Model

Serial No.

Number of Cabinets

HP

DL360 G6

CZ3136T6AP

1 Blade server

Enclosure Dimensions:
Height

Width

Depth

Weight

4.32 cm

42.62 cm

69.53 cm

15.97 kg

Technical Information:
Power Requirements (including
redundancy):

100 to 120 VAC, 200 to 240 VAC

LAN Connectivity Requirements:

3 Copper Interfaces

SAN Connectivity Requirements:

N/A

Equipment Host Name/s:

Standalone OMS Server

IP Addresses:

10.96.150.50/25

System Manager/Owner:

Haryanto Xinxinxkek

System Administrator:

RNC Engineer

Requestors details:
Full Name:

William Raats

Group/Dept.:

NSN PM - Swap

PO/Asset Number:

N/A

Date:

09/05/2013

Tel (O):

Tel (C):

072 362 6685

(Compulsory Field)

For System Administrators use only:

Date Received:

Change Number:

Completed by:
Document Number: VOD-IMP-FRM-0566 Rev6
Revised 06-March-2012
Title: Form for Movement of Equipment In/Out of EIT&I Data Centres

Prepared by: J. Kruse


Page 1 of 1