ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 1500 PSI

EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

220.00

Arena de rio

M3

0.77

Gravilla de 1/2"

M3

0.77

Agua

Lt

182.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.06

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 2 Ayudantes

TOTAL EQUIPO..............$
VR. HORA
24,284.00

RENDIMIENTO
0.51

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 2000 PSI

EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

250.00

Arena de rio

M3

0.78

Gravilla de 1/2"

M3

0.78

Agua

Lt

182.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.09

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

OBSERVACIONES:

0.15

TOTAL EQUIPO..............$

MANO DE OBRA

VR. DIA

1 Oficial + 1 Ayudante

RENDIMIENTO

24,284.00

0.53

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 2500 PSI

EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

290.00

Arena de rio

M3

0.76

Gravilla de 1/2"

M3

0.76

Agua

Lt

182.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.13

Mezcladora electrica 1.5 bultos

50,000.00

0.06

Gasolina

6,000.00

0.15

OBSERVACIONES:

TOTAL EQUIPO..............$

MANO DE OBRA

VR. DIA

1 Oficial + 1 Ayudante

RENDIMIENTO

24,284.00

0.51

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 3000 PSI

EN OBRA (1:2:2,5)

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

330.00

Arena de rio

M3

0.78

Gravilla de 1/2"

M3

0.80

Agua

Lt

190.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.15

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:

TOTAL EQUIPO..............$

MANO DE OBRA

VR. DIA

1 Oficial + 1 Ayudante

24,284.00

RENDIMIENTO
0.64

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 3500 PSI

EN OBRA

CONCRETO 3500 PSI

EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

360.00

Arena de rio

M3

0.78

Gravilla de 1/2"

M3

0.78

Agua

Lt

210.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.09

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.65

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 4000 PSI

EN OBRA (1:2:1)

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

400.00

Arena de rio

M3

0.72

Gravilla de 1/2"

M3

0.74

Agua

Lt

215.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.12

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.65

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO 4200 PSI

EN OBRA (1:2:1)

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

420.00

Arena de rio

M3

0.75

Gravilla de 1/2"

M3

0.77

Agua

Lt

215.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

Equipo y herramienta menor

VR. DIA
26,497.00

RENDIMIENTO
0.09

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:

TOTAL EQUIPO..............$

MANO DE OBRA

VR. DIA

1 Oficial + 1 Ayudante

RENDIMIENTO

24,284.00

0.65

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO Impermeabilizado. 3000 PSI EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

330.00

Arena de rio

M3

0.78

Gravilla de 1/2"

M3

0.80

Plastocrete D.M

kg

1.65

Agua

Lt

190.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.15

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA

RENDIMIENTO

24,284.00

0.64

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

CONCRETO Impermeabilizado. 3500 PSI EN OBRA

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

360.00

Arena de rio

M3

0.78

Gravilla de 1/2"

M3

0.78

Plastocrete D.M

kg

1.80

Agua

Lt

210.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.09

Mezcladora electrica 1.5 bultos

50,000.00

0.05

Gasolina

6,000.00

0.15

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.65

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

MORTERO 1:4

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

364.00

Arena de rio

M3

1.16

Agua

Lt

150.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.01

Mezcladora electrica 1.5 bultos

50,000.00

0.03

Gasolina

6,000.00

0.10

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.49

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

MORTERO 1:3

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

454.00

Arena de rio

M3

1.09

Agua

Lt

165.00

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

Equipo y herramienta menor

VR. DIA
26,497.00

RENDIMIENTO
0.01

Mezcladora electrica 1.5 bultos

50,000.00

0.03

Gasolina

6,000.00

0.10

OBSERVACIONES:

TOTAL EQUIPO..............$

MANO DE OBRA

VR. DIA

1 Oficial + 1 Ayudante

RENDIMIENTO

24,284.00

0.49

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

MORTERO 1:4 IMPERMEABILIZADO

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

364.00

Arena de rio

M3

1.16

Agua

Lt

Sika 1

Kg

150.00
1.50

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.01

Mezcladora electrica 1.5 bultos

50,000.00

0.03

Gasolina

6,000.00

0.10

OBSERVACIONES:

TOTAL EQUIPO..............$

MANO DE OBRA
1 Oficial + 1 Ayudante

VR. DIA

RENDIMIENTO

24,284.00

0.49

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

MORTERO 1:3 IMPERMEABILIZADO

MATERIALES

UN

CANTIDAD

Cemento gris

Kg

454.00

Arena de rio

M3

1.09

Agua

Lt

Sika 1

Kg

165.00
1.65

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

VR. DIA

RENDIMIENTO

Equipo y herramienta menor

26,497.00

0.01

Mezcladora electrica 1.5 bultos

50,000.00

0.03

Gasolina

6,000.00

0.10

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.49

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

ANALISIS DE PRECIOS UNITARIOS

DESCRIPCION DEL ITEM:

ACERO DE REFUERZO 60.000 PSI

MATERIALES

UN

CANTIDAD

Acero 60000 psi

Kg

1.00

Alambre negro #18

Kg

0.013

OBSERVACIONES:

SUMA.............................$
DESPERDICIO................$
TOTALMATERIALES.......$
EQUIPO

Equipo y herramienta menor

VR. DIA
26,497.00

OBSERVACIONES:
MANO DE OBRA
1 Oficial + 1 Ayudante

RENDIMIENTO
0.004

TOTAL EQUIPO..............$
VR. DIA
24,284.00

RENDIMIENTO
0.014

OBSERVACIONES:

TOTAL MANO DE OBRA...$

REVISO:

TOTAL COSTO DIRECTO

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

158,840.00

29000

22,330.00

161500

124,355.00

35

6,370.00

.........................$

USO COMIT

311,895.00

DICIO................$

6,237.90

ATERIALES.......$

318,132.90

VR. UNITARIO

VR.TOTAL

1,472.33

1,472.33

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

USO COMIT

4,872.00

VR. UNITARIO
12,335.00

VR.TOTAL
12,335.00

USO COMIT

MANO DE OBRA...$

12,335.00

COSTO DIRECTO

335,340.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

180,500.00

29000

22,620.00

161500

125,970.00

35

6,370.00

.........................$

USO COMIT

335,460.00

DICIO................$

6,709.20

ATERIALES.......$

342,169.20

VR. UNITARIO

VR.TOTAL

2,418.02

2,418.02

2,500.00

2,500.00

USO COMIT

900.00

900.00

QUIPO..............$

5,818.00

VR. UNITARIO

VR.TOTAL

12,901.00

USO COMIT

12,901.00

MANO DE OBRA...$

12,901.00

COSTO DIRECTO

360,888.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

209,380.00

29000

22,040.00

161500

122,740.00

35

6,370.00

USO COMIT

.........................$

360,530.00

DICIO................$

7,210.60

ATERIALES.......$

367,741.00

VR. UNITARIO

VR.TOTAL

3,410.11

3,410.11

3,000.00

3,000.00

900.00

900.00

QUIPO..............$

USO COMIT

7,310.00

VR. UNITARIO

VR.TOTAL

12,297.00

USO COMIT

12,297.00

MANO DE OBRA...$

12,297.00

COSTO DIRECTO

387,348.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

238,260.00

29000

22,620.00

161500

129,200.00

35

6,650.00

USO COMIT

.........................$

396,730.00

DICIO................$

3,967.30

ATERIALES.......$

400,697.30

VR. UNITARIO

VR.TOTAL

4,021.04

4,021.04

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

USO COMIT

7,421.04

VR. UNITARIO

VR.TOTAL

15,542.00

USO COMIT

15,542.00

MANO DE OBRA...$

15,542.00

COSTO DIRECTO

423,660.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

USO COMIT

722

259,920.00

29000

22,620.00

161500

125,970.00

35

7,350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

.........................$

415,860.00

DICIO................$

8,317.20

ATERIALES.......$

424,177.20

VR. UNITARIO
2,418.02

2,418.02

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

COSTO DIRECTO

USO COMIT

5,818.02

VR. UNITARIO

MANO DE OBRA...$

VR.TOTAL

15,745.06

VR.TOTAL
15,745.06

15,745.06

445,740.00 _

USO COMIT

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

USO COMIT

722

288,800.00

29000

20,880.00

161500

119,510.00

35

7,525.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

.........................$

436,715.00

DICIO................$

8,734.30

ATERIALES.......$

445,449.30

VR. UNITARIO

VR.TOTAL

3,225.25

3,225.25

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

USO COMIT

6,625.25

VR. UNITARIO
15,745.00

VR.TOTAL
15,745.00

USO COMIT

MANO DE OBRA...$

15,745.00

COSTO DIRECTO

467,820.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

303,240.00

29000

21,750.00

161500

124,355.00

35

7,525.00

.........................$

USO COMIT

456,870.00

DICIO................$

9,137.40

ATERIALES.......$

466,007.40

VR. UNITARIO
2,347.93

VR.TOTAL
2,347.93

USO COMIT

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

5,747.93

VR. UNITARIO

VR.TOTAL

15,745.00

USO COMIT

15,745.00

MANO DE OBRA...$

15,745.00

COSTO DIRECTO

487,500.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

238,260.00

29000

22,620.00

161500

129,200.00

6960

11,484.00

35.00

6,650.00

USO COMIT

.........................$

408,214.00

DICIO................$

8,164.00

ATERIALES.......$

416,378.00

VR. UNITARIO

VR.TOTAL

4,021.04

4,021.04

2,500.00

2,500.00

900.00

900.00

QUIPO..............$

USO COMIT

7,421.00

VR. UNITARIO

VR.TOTAL

15,542.44

USO COMIT

15,542.44

MANO DE OBRA...$

15,542.44

COSTO DIRECTO

439,341.00

OBRA:

FECHA :

CAPITULO:
BASICO

ITEM:

UNIDAD:
M3

VR. UNITARIO

VR.TOTAL

722

259,920.00

29000

22,620.00

161500

125,970.00

6960

12,528.00

35

7,350.00

.........................$

428,388.00

DICIO................$

8,567.76

ATERIALES.......$

436,955.76

VR. UNITARIO

2,418.02

2,500.00

2,500.00

900.00

900.00

USO COMIT

5,818.02

VR. UNITARIO

COSTO DIRECTO

VR.TOTAL

2,418.02

QUIPO..............$

MANO DE OBRA...$

USO COMIT

15,784.60

VR.TOTAL
15,784.60

15,784.60

458,558.00 _

USO COMIT

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

262,808.00

29000

33,640.00

35.00

5,250.00

.........................$

USO COMIT

301,698.00

DICIO................$

6,033.96

ATERIALES.......$

307,731.96

VR. UNITARIO

VR.TOTAL

264.97

264.97

1,500.00

1,500.00

600.00

600.00

QUIPO..............$

USO COMIT

2,364.97

VR. UNITARIO
11,899.16

VR.TOTAL
11,899.16

USO COMIT

MANO DE OBRA...$

11,899.16

COSTO DIRECTO

321,996.00

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

327,788.00

29000

31,610.00

35.00

5,775.00

.........................$

USO COMIT

365,173.00

DICIO................$

7,303.46

ATERIALES.......$

372,476.46

VR. UNITARIO
264.97

VR.TOTAL
264.97

USO COMIT

1,500.00

1,500.00

600.00

600.00

QUIPO..............$

2,364.97

VR. UNITARIO

VR.TOTAL

11,899.16

USO COMIT

11,899.16

MANO DE OBRA...$

11,899.16

COSTO DIRECTO

386,741.00 _

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

262,808.00

29000

33,640.00

35

5,250.00

7095

10,642.50

USO COMIT

.........................$

312,340.50

DICIO................$

6,246.81

ATERIALES.......$

318,587.31

VR. UNITARIO

VR.TOTAL

264.97

264.97

1,500.00

1,500.00

600.00

600.00

QUIPO..............$

USO COMIT

2,364.97

VR. UNITARIO

VR.TOTAL

11,899.16

USO COMIT

11,899.16

MANO DE OBRA...$

11,899.16

COSTO DIRECTO

332,851.00

OBRA:

FECHA :

CAPITULO:

ITEM:

UNIDAD:

BASICO

M3

VR. UNITARIO

VR.TOTAL

722

327,788.00

29000

31,610.00

35

5,775.00

7095

11,706.75

USO COMIT

.........................$

376,879.75

DICIO................$

7,537.60

ATERIALES.......$

384,417.35

VR. UNITARIO

VR.TOTAL

264.97

264.97

1,500.00

1,500.00

600.00

600.00

QUIPO..............$

USO COMIT

2,364.97

VR. UNITARIO

VR.TOTAL

11,899.16

USO COMIT

11,899.16

MANO DE OBRA...$

11,899.16

COSTO DIRECTO

398,681.00 _

OBRA:

FECHA :

CAPITULO:
BASICO

ITEM:

UNIDAD:
M3

VR. UNITARIO

VR.TOTAL

USO COMIT

4333

4,333.00

3290

42.77

.........................$

4,375.77

DICIO................$

0.00

ATERIALES.......$

4,375.77

VR. UNITARIO
105.99

QUIPO..............$

COSTO DIRECTO

USO COMIT

105.99

105.99

VR. UNITARIO

MANO DE OBRA...$

VR.TOTAL

339.98

VR.TOTAL
339.98

339.98

4,822.00 _

USO COMIT

ELABORACIN DE ESTUDIOS Y DISEOS TCNICOS BAJO CRITERIOS DE BIOCLIMTICA Y DE SOSTENIBILIDAD PARA LA CONS
DE LOS EDIFICIOS DE SIPOL Y GAUL ARAUCA DEPARTAMENTO DE ARAUCA

Los precios incluyen proyeccin para el ao 2015


ITEM

UNIDAD

VALOR UNITARIO

A.c.p.m

Gl

9,288.0

Acero 60000 psi

Kg

4,333.0

Agua

Lt

35.0

Alambre negro #18

Kg

3,290.0

Arena de rio

M3

29,000.0

Cemento blanco

Kg

822.0

Cemento gris

Kg

722.0

Concreto 1500 psi

M3

335,340.0

Concreto 2000 psi

M3

360,888.0

Concreto 2500 psi

M3

387,348.0

Concreto 3000 psi

M3

423,660.0

Concreto 3500 psi

M3

445,740.0

Concreto 4000 psi

M3

467,820.0

Concreto 4200

M3

487,500.0

Concreto 3000 impermeabilizado psi

M3

439,341.0

Concreto 3500 impermeabilizado psi

M3

458,558.0

Concreto ciclopeo

m3

365,935.0

Mortero 1:3

M3

386,741.0

Mortero 1:3 impermeabilizado

M3

398,681.0

Mortero 1:4

M3

321,996.0

Mortero 1:4 impermeabilizado

M3

332,851.0

Recebo comun de rio -arauca

M3

75,000.0

piedra de rio

M3

125,000.0

Sub- base granular arauca

M3

145,500.0

Base granular arauca

m3

152,500.0

Gravilla de 1/2"

M3
M3

161,500.0

Triturado 3/4"

163,500.0

Plastocrete D.M

kg

6,960.0

Sika 1

Kg

7,095.0

NIBILIDAD PARA LA CONSTRUCCIN


AUCA

PRECIO REAL
9287.6
53.5
3289.18
64735
1250
528

MANO DE OBRA
SALARIO AO 2015
SALARIO MINIMO MENSUAL

644,350.00

AUXILIO DE TRANSPORTE
TOTAL MENSUAL

74,000.00
718,350.00

CALCULO PERSONAL CONSTRATISTA


PERSONAL CORRIENTE

PROMEDIO

SUELDO BASICO

Oficial de Albaileria

1.90

1,224,265.00

Ayudante de Albaileria

1.50

966,525.00

Oficial de Carpinteria metalica

1.80

1,159,830.00

Ayudante de Carpinteria Metalica

1.50

966,525.00

Topografo

1.50

966,525.00

Cadenero

1.00

644,350.00

Oficial Pintor

1.50

966,525.00

Ayudante pintor

1.00

644,350.00

Oficial de Enchape

1.80

1,159,830.00

Ayudante de Enchape

1.40

902,090.00

Oficial de Plomeria

1.90

1,224,265.00

Ayudante de Plomeria

1.50

966,525.00

Oficial Carpinteria Madera

1.90

1,224,265.00

Ayudante Carpinteria Madera

1.50

966,525.00

Oficial Electrico

1.90

1,224,265.00

Ayudante Electrico

1.50

966,525.00

Oficial de Jardineria

1.50

966,525.00

Instalador Pisos

1.80

1,159,830.00

Ayudante de Instalacion Pisos

1.30

837,655.00

0.00

0.00

MANO DE OBRA AA
Oficial de Albaileria
Ayudante de Albaileria
TOTAL
MANO DE OBRA BB
Oficial de Plomeria

Ayudante de Plomeria
TOTAL
PERSONAL DE OBRA

PERSONAL DE OBRA

PROMEDIO

SUELDO

Residente de Obra

6.00

3,866,100.00

Maestro de Obra

4.00

2,577,400.00

Tecnicos

4.00

2,577,400.00

Ayudante de Construccion

1.50

966,525.00

Celaduria doble Turno

5.80

3,737,230.00

OFICIAL

INGRESO DE
2 SMMLV

VALOR AO

AYUDANTE

1,2 SMMLV

21,409,762

TECNOLOGO

1,2 SMMLV

50,124,234

27,119,032

CALCULO DE CUADRILLAS AO 2014 arauca


CUADRILLA A-A ALBAILERIA
CUADRILLA A-A

1 - OFICIAL
2 - AYUDANTE DE OBRA

JORNAL / HORA

JORN./ HORA

$
$

9,416.33
14,867.89

24,284.00

BB
CUADRILLA BB

1 - OFICIAL
3- AYUDANTE DE OBRA

JORNAL / HORA

JORN./ HORA

$
$

9,416.33
22,301.84

31,719.00

CC
CUADRILLA CC

2- OFICIAL
2 - AYUDANTE DE OBRA

JORNAL / HORA

$
$

JORN./ HORA

18,832.66
14,867.89

33,701.00

DD CUADRILLA DD

2- OFICIAL
3 - AYUDANTE DE OBRA

JORNAL / HORA

JORN./ HORA

$
$

18,832.66
22,301.84

41,134.00

EE
CUADRILLA EE

3 - OFICIAL
3 - AYUDANTE DE OBRA

JORNAL / HORA

JORN./ HORA

$
$

28,248.99
22,301.84

50,551.00

CUADRILLA FF
CUADRILLA H H HIDROSANITARIA

CUADRILLA HH

JORNAL / HORA

1- OFICIAL

9,416.33

2 - AYUDANTE DE OBRA

7,433.95

CUADRILLA GG
CUADRILLA ESPECIALIZADA REDES ELECTRICAS / AIRES
CUADRILLA HH

JORNAL / HORA

1- TECNICO

0.5

17,404.25

1- OFICIAL

9,416.33

1- AYUDANTE DE OBRA

7,433.95

CUADRILLA HH

CUADRILLA ESPECIALIZADA REDES ELECTRICAS / MONTAJE DE EQUIPOS / AIRES


CUADRILLA HH

JORNAL / HORA

1- TECNICO

0.5

17,404.25

1- OFICIAL

9,416.33

2- AYUDANTE DE OBRA

7,433.95

COMISION TOPOGRAFICA
DD

CUADRILLA HH

JORNAL / HORA

JORN./ HORA

TOPOGRAFO

174,034.77

21,754.35

CADENERO

96,298.80

12,037.35

STA

PRESTACIONES SOCIALES
AUXILIO DE
TRANSPORTE

SALARIO MENSUAL
CON TRANSPORTE

INTERESES DE
CESANTIAS

CESANTIAS
10.90%

1.31%

140,600.00

1,364,865.00

148,770.29

1,948.89

111,000.00

1,077,525.00

117,450.23

1,538.60

133,200.00

1,293,030.00

140,940.27

1,846.32

111,000.00

1,077,525.00

117,450.23

1,538.60

111,000.00

1,077,525.00

117,450.23

1,538.60

74,000.00

718,350.00

78,300.15

1,025.73

111,000.00

1,077,525.00

117,450.23

1,538.60

74,000.00

718,350.00

78,300.15

1,025.73

133,200.00

1,293,030.00

140,940.27

1,846.32

103,600.00

1,005,690.00

109,620.21

1,436.02

140,600.00

1,364,865.00

148,770.29

1,948.89

111,000.00

1,077,525.00

117,450.23

1,538.60

140,600.00

1,364,865.00

148,770.29

1,948.89

111,000.00

1,077,525.00

117,450.23

1,538.60

140,600.00

1,364,865.00

148,770.29

1,948.89

111,000.00

1,077,525.00

117,450.23

1,538.60

111,000.00

1,077,525.00

117,450.23

1,538.60

133,200.00

1,293,030.00

140,940.27

1,846.32

96,200.00

933,855.00

101,790.20

1,333.45

0.00

0.00

0.00

0.00

PRESTACIONES SOCIALES
AUXILIO DE
TRANSPORTE

SALARIO MENSUAL

INTERESES DE
CESANTIAS

CESANTIAS
8.33%

1.00%

0.00

3,866,100.00

322,046.13

3,220.46

0.00

2,577,400.00

214,697.42

2,146.97

0.00

2,577,400.00

214,697.42

2,146.97

111,000.00

1,077,525.00

89,757.83

897.58

3,737,230.00

VALOR MES
2,259,919

VALOR DIA
75,331

9,416

ERROR
9,211

1,784,147

59,472

7,434

5,762

4,177,019

139,234

17,404

VALOR HORA

194,272.00

CUADRILLA./ HORA
$

9,416.33

14,867.89

V HORA CUADRILLA

24,284.22

CAS / AIRES
CUADRILLA./ HORA
$

8,702.12

9,416.33

7,433.95

V HORA CUADRILLA

25,552.40

AJE DE EQUIPOS / AIRES /


CUADRILLA./ HORA
$

8,702.12

9,416.33

14,867.89

V HORA CUADRILLA

32,986.34

PRESTACIONES SOCIALES
PRIMA DE
SERVICIO

APORTES SEGURIDAD SOCIAL


VACACIONES

9.13%

4.16%

APORTES
TOTAL
PRESTACION SALUD
ES SOCIALES
8%

APORTES
PENSION
12%

APORTES
A.R.P.
9.66%

124,612.17

50,929.42

326,260.77

97,941.20

146,911.80

118,264.00

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

118,053.64

48,248.93

309,089.15

92,786.40

139,179.60

112,039.58

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

65,585.36

26,804.96

171,716.20

51,548.00

77,322.00

62,244.21

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

65,585.36

26,804.96

171,716.20

51,548.00

77,322.00

62,244.21

118,053.64

48,248.93

309,089.15

92,786.40

139,179.60

112,039.58

91,819.50

37,526.94

240,402.68

72,167.20

108,250.80

87,141.89

124,612.17

50,929.42

326,260.77

97,941.20

146,911.80

118,264.00

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

124,612.17

50,929.42

326,260.77

97,941.20

146,911.80

118,264.00

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

124,612.17

50,929.42

326,260.77

97,941.20

146,911.80

118,264.00

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

98,378.03

40,207.44

257,574.30

77,322.00

115,983.00

93,366.32

118,053.64

48,248.93

309,089.15

92,786.40

139,179.60

112,039.58

85,260.96

34,846.45

223,231.06

67,012.40

100,518.60

80,917.47

0.00

0.00

0.00

0.00

0.00

0.00

PRESTACIONES SOCIALES
PRIMA DE
SERVICIO

APORTES SEGURIDAD SOCIAL


APORTES
TOTAL
PRESTACION SALUD
ES SOCIALES
8%

VACACIONES

8.33%

4.16%

APORTES
PENSION
12%

APORTES
A.R.P.
9.66%

322,046.13

160,829.76

808,142.48

309,288.00

463,932.00

373,465.26

214,697.42

107,219.84

538,761.65

206,192.00

309,288.00

248,976.84

214,697.42

107,219.84

538,761.65

206,192.00

309,288.00

248,976.84

89,757.83

40,207.44

220,620.68

77,322.00

115,983.00

93,366.32

###

IDAD SOCIAL

APORTES PARAFISCALES

CAJA DE
TOTAL
COMPENSA APORTES
APORTES CION
I.C.B.F.
SEGURIDA FAMILIAR
D SOCIAL
4%
3%

APORTES
FIC
2.50%

APORTES
SENA
2%

TOTAL
APORTES DOTACION
PARAFISCA
LES
5.30%

363,117.00

48,970.60

36,727.95

30,606.63

24,485.30

140,790.48

64,886.05

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

344,005.58

46,393.20

34,794.90

28,995.75

23,196.60

133,380.45

61,470.99

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

191,114.21

25,774.00

19,330.50

16,108.75

12,887.00

74,100.25

34,150.55

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

191,114.21

25,774.00

19,330.50

16,108.75

12,887.00

74,100.25

34,150.55

344,005.58

46,393.20

34,794.90

28,995.75

23,196.60

133,380.45

61,470.99

267,559.89

36,083.60

27,062.70

22,552.25

18,041.80

103,740.35

47,810.77

363,117.00

48,970.60

36,727.95

30,606.63

24,485.30

140,790.48

64,886.05

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

363,117.00

48,970.60

36,727.95

30,606.63

24,485.30

140,790.48

64,886.05

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

363,117.00

48,970.60

36,727.95

30,606.63

24,485.30

140,790.48

64,886.05

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

51,225.83

344,005.58

46,393.20

34,794.90

28,995.75

23,196.60

133,380.45

61,470.99

248,448.47

33,506.20

25,129.65

20,941.38

16,753.10

96,330.33

44,395.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

IDAD SOCIAL

APORTES PARAFISCALES

CAJA DE
TOTAL
COMPENSA APORTES
APORTES CION
I.C.B.F.
SEGURIDA FAMILIAR
D SOCIAL
4%
3%

APORTES
FIC
2.50%

APORTES
SENA
2%

TOTAL
APORTES DOTACION
PARAFISCA
LES
0.00%

1,146,685.26

154,644.00

115,983.00

96,652.50

77,322.00

444,601.50

0.00

764,456.84

103,096.00

77,322.00

64,435.00

51,548.00

296,401.00

0.00

764,456.84

103,096.00

77,322.00

64,435.00

51,548.00

296,401.00

0.00

286,671.32

38,661.00

28,995.75

24,163.13

19,330.50

111,150.38

0.00

TOTALES

SUELDO MES

SUELDO
DIA

SUELDO
HORA

2,259,919.29

75,330.64

9,416.33

1,695,967.37

1,784,146.81

59,471.56

7,433.95

1,356,773.90

2,140,976.17

71,365.87

8,920.73

1,784,146.81

59,471.56

7,433.95

1,784,146.81

59,471.56

7,433.95

1,189,431.21

39,647.71

4,955.96

1,784,146.81

59,471.56

7,433.95

1,189,431.21

39,647.71

4,955.96

2,140,976.17

71,365.87

8,920.73

1,665,203.69

55,506.79

6,938.35

2,259,919.29

75,330.64

9,416.33

1,784,146.81

59,471.56

7,433.95

2,259,919.29

75,330.64

9,416.33

1,784,146.81

59,471.56

7,433.95

2,259,919.29

75,330.64

9,416.33

1,784,146.81

59,471.56

7,433.95

1,784,146.81

59,471.56

7,433.95

2,140,976.17

71,365.87

8,920.73

1,546,260.57

51,542.02

6,442.75

0.00

0.00

0.00

1.6557822885
VR HORA
9,416.33
7,433.95
16,850.28

9,416.33

7,433.95
16,850.28
TOTALES

SUELDO MES

SUELDO
DIA

SUELDO
HORA

6,265,529.24

208,850.97

26,106.37

4,177,019.49

139,233.98

17,404.25

4,177,019.49

139,233.98

17,404.25

1,695,967.37

56,532.25

7,066.53

3,737,230.00

124,574.33

15,571.79

LISTA DE EQUIPOS

ITEM
Herramienta menor
Retrocargador
Martillo compresor
Volqueta 6m3
Retroexcavadora
Vibro compactador o rana
Mezcladora electrica 1.5 bultos
Alquiler vibrador electrico
Equipo oxicorte
Formaleta tipo forsa marco en acero cara de contacto
en madera
Seccion de andamios tubular 1,50x 1,20
Alquiler de parales metalicos incluye crucetas
Alquiler pluma
Cortadora de ladrillo incluye disco diamantado
Cortadora de pavimento
Pulidora
Allanadora mecanica
Cortadora de mano
Vibrador de concreto
Mezcladora de concreto
Atornillador
Taladro incluye juego de brocas
Pistola de fijacion
Parales convencionales
Cerchas convencionales
Equipo de soldadura
Taladro rotopercutor
Estacion
Nivel de precision
Equipo topografica
Destroncada pulida y brillada (Incluye cera polimerica y
sellador acrilico)
Guadaa
Soplete

Transporte
Transporte sub base granular arauca
Mezcladora electrica 1.5 bultos

3.00

UNIDAD
Dia
Hora
Hora
Viaje
Hora
Hora
Mes
Mes
Dia

VALOR UNITARIO
26,497.00
85,000.00
50,000.00
130,000.00
144,844.00
22,000.00
1,500,000.00
306,240.00
80,000.00

M2
Hora
Hora
Hora
Hora
Hora
Dia
Dia
Hora
Hora
Hora
Dia
Dia
Dia
Un
Un
Dia
Hora
Dia
Dia
Dia

6,400.00
120.00
3,750.00
10,000.00
7,500.00
58,824.00
19,000.00
90,000.00
1,875.00
3,750.00
7,500.00
19,000.00
19,000.00
19,000.00
500.00
500.00
40,000.00
2,500.00
300,000.00
300,000.00
85,000.00

M2
Dia
Hora

35,800.00
30,000.00

Hora
M3/Km
DIA

15,800.00
30,000.00
900.00
50,000.00

10