GENERAL SPECIFICATION

REVISED FEBRUARY 2005

The following Section has been added :

Section 6

Protection of Substructure

The following Sections have been re-written :

Section 3

Excavation & Earthwork

Section 4

Concrete Work

Section 5

Blockwork

General Specification Feb 2005

REVISED APRIL 2004


The following sections have been re-written:
Section 7

Woodwork

Section 9

Floor, Wall and Ceiling Finishings now includes Gypsum Works

Section 13

Marble and Granite

The old Electrical Section 19 has now been broken down into nine Sections covering the
specializations within Electrical Works. Most of the content is unchanged however,
Section 22 has been substantially revised, particularly the Dimming clauses.
There is now a detailed index at the end of the specification
The following Particular Specifications have been revised:
Air Handling Units
Building Management Systems
Catering Equipment
Lifts
Sketch AIRCOND/011 has been revised.
Sketches AIRCOND/042 and 043 covering Gantries and Ceiling Access Doors have been
added.
Sketches INTDES/001 Manufactured Boards and INTDES/002 Ceiling Carcassing have
also been added and these are referred to in the Section 7.
Finally, in Section 16.2 covering Ductwork, it is now a requirement for A.C. ducting to be
pressure tested after installation and before the joints are insulated.