Sunteți pe pagina 1din 5
Development of Gyropress Method Since its first application to a project in northern Japan in 2004, Gyropress method has been successfully utilized for installing tubular piles on more than 80 environmentally challenging projects there. Please see the attached table for the past Gyropress projects. The innovative Gyropress equipment rotates and simultaneously press-in the tubular pile into the ground. The pile toe is equipped with a sacrificial cutting shoe, so the tubular pile can cut into hard soil including rock and solid obstacles including existing concrete structures without having to remove it. Just to summarize the advantages of this innovation, itis; 1, Penetrating through hard ground and concrete obstructions and simultaneously installing a tubular pile. It eliminates need for prior removal of obstru can reduce construction debris. 2. Capable of working under physical restrictions. Thanks to the underlying Press-in piling technology, its pile driving operations can be done within the minimum work zone. So, it is very suited for physically narrow and tight jobsites or projects underneath overhead obstructions. In addition, it does not require temporary working platforms for supporting the ‘equipment since it “walks” on already installed piles. 3. Very environmentally-friendly construction. It is quiet and generates almost no vibration. And, settlement and lateral movement of the surrounding ground is minimal due to the fact that the soil is not removed or shaken by this pile installation. It also uses bio-degradable oil and grease. 4. Offering a wide range of options in useable pile diameters and tube wall configurations for an economical solution. Six different models can deal with tubular piles ranging from 500mm to 2,500mm in diameter. Some models can install batter piles besides standard vertical piles. Ins or pre-drilling, therefore, it Major cities in North America and other metropolises in the world are constantly rebuilding their infrastructure in densely populated areas on top of mazes of utilities. Gyropress Method is certainly capable of and well suited for building high quality deep foundation in harmony with the urban environment, ae Mechanism of Gyropress Method test and Largest Model (GRV2540/SP11 2 Furukawa River Restoration Project in Tokyo, Japan (2007) i Details of Furukawa River Restoration Project (201 Different Models of Gyro Piler

S-ar putea să vă placă și