Package/Facility/Building/Area

Sub-

CODE

TILE

LEVEL

Package/Facility/
Contractor
Building/Area

Sub-Contractor No:

ICAD NO:

Description

POINTS

ICAD Latest
Submission
Date

SBG NO:

DAR Status

OGUZ Log Status


A/R/P

RELEASED
Y/N

RELEASE DATE

F120

31

02

Slab

EIS

421-F120-E-RIW-0009

421-F120-Y-RIW-08772

To inspect installed SAS EMT Conduits on slab at axis:


-G10'-G09/TW15-TW10(32 FA Points-1''EMT)
-F1,RM,MM are excluded

32

24-Mar-2015

421-F120-Y-RIW-14390

Pending DAR

4/9/2015

F120

30

01

Slab

EIS

421-F120-E-RIW-0010

421-F120-Y-RIW-08773

To inspect installed SAS EMT Conduits on slab at axis:


-G10'-G09/TW17-TW14(33 FA Points-1''EMT)
-F1,RM,MM are excluded

33

24-Mar-2015

421-F120-Y-RIW-14389

Pending DAR

4/9/2015

F120

30

02

Slab

EIS

421-F120-E-RIW-0008

421-F120-Y-RIW-08775

To inspect installed SAS EMT Conduits on slab at axis:


-G10-G09/TW16-TW14(20 FA Points-1''EMT)
-F1,RM,MM are excluded

20

24-Mar-2015

421-F120-Y-RIW-14391

Pending DAR

4/9/2015

F120

24

02

Slab

EIS

421-F120-E-RIW-0012

421-F120-Y-RIW-08791

To inspect installed SAS EMT Conduits on slab at axis:


-G03-G08/TW20-TW13(300 FA Points-1''EMT)

300

2-Apr-2015

4/19/2015

F120

30

02

Slab

EIS

421-F120-E-RIW-0015

421-F120-Y-RIW-08793

To inspect installed SAS EMT Conduits on slab at axis:


-SW16-SW16/WD(04 PA Points-1''EMT)

26-Mar-2015

421-F120-Y-RIW-14382

Pending DAR

4/9/2015

F120

34

02

Slab

EIS

421-F120-E-RIW-0013

421-F120-Y-RIW-08794

To inspect installed SAS EMT Conduits on slab at axis:


-G10'-G08/SE20-SE14(34 FA Points-1''EMT)

34

28-Mar-2015

421-F120-Y-RIW-14377

Pending DAR

4/9/2015

F120

27

02

Slab

EIS

421-F120-E-RIW-0021

421-F120-Y-RIW-08820

To inspect installed SAS EMT Conduits on slab at axis:


-TE05-TE14/G05-G10(187 FA Points-1''EMT)
-F1,MM & RM are excluded

187

28-Mar-2015

421-F120-Y-RIW-14388

Pending DAR

4/9/2015

F120

33

02

Slab

EIS

421-F120-E-RIW-0020

421-F120-Y-RIW-08821

To inspect installed SAS EMT Conduits on slab at axis:


-TE05-TE14/G11-G10(27 PA Points-1''EMT)

27

26-Mar-2015

421-F120-Y-RIW-14385

Pending DAR

4/9/2015

F120

32

02

Slab

EIS

421-F120-E-RIW-0019

421-F120-Y-RIW-08822

To inspect installed SAS EMT Conduits on slab at axis:


-TW05-TE05/G12-G10(26 PA Points-1''EMT)

26

28-Mar-2015

421-F120-Y-RIW-14386

Pending DAR

4/9/2015

421-F120-Y-RIW-08823

To inspect installed SAS EMT Conduits on slab at axis:


-TE15-TE14/G07-G08(04 PA Points-1''EMT)

26-Mar-2015

4/19/2015

F120

28

02

Slab

EIS

421-F120-E-RIW-0018

421-F120-Y-RIW-14478 Pending DAR

421-F120-Y-RIW-14413 Pending DAR

F120

27

02

Slab

EIS

421-F120-E-RIW-0017

421-F120-Y-RIW-08824

To inspect installed SAS EMT Conduits on slab at axis:


-TE05-TE10/G06-G09(20 PA Points-1''EMT)

20

26-Mar-2015

421-F120-Y-RIW-14384

Pending DAR

4/9/2015

F120

33

01

Slab

EIS

421-F120-E-RIW-0023

421-F120-Y-RIW-08825

To inspect installed SAS EMT Conduits on slab at axis:


-TE06-TE14/G10-G11(113 FA Points-1''EMT)
-F1,MM & RM are excluded

113

28-Mar-2015

421-F120-Y-RIW-14379

Pending DAR

4/9/2015

F120

34

01

Slab

EIS

421-F120-E-RIW-0022

421-F120-Y-RIW-08826

To inspect installed SAS EMT Conduits on slab at axis:


-G10-G10'/SE18-SE14(53 FA Points-1''EMT)
-F1,MM & RM are excluded

53

28-Mar-2015

421-F120-Y-RIW-14378

Pending DAR

4/9/2015

F120

33

02

Slab

EIS

421-F120-E-RIW-0016

421-F120-Y-RIW-08827

To inspect installed SAS EMT Conduits on slab at axis:


-G10-G11/TE05-TE14(97 FA Points-1''EMT)
-F1,MM & RM are excluded

97

28-Mar-2015

421-F120-Y-RIW-14380

Pending DAR

4/9/2015

F120

28

02

Slab

EIS

421-F120-E-RIW-0014

421-F120-Y-RIW-08861

To inspect installed SAS EMT Conduits on slab at axis:


-G06-G08/TE13-TE17( 83 FA points-1''EMT)
-F1 is excluded

83

26-Mar-2015

421-F120-Y-RIW-14414 Pending DAR

4/19/2015

F120

31

02

Slab

EIS

421-F120-E-RIW-0026

421-F120-Y-RIW-08968

To inspect installed SAS EMT Conduits on slab at axis:


-TW15-TW10/G09-G10'(06 PA points-1'' EMT)

6-Apr-2015

421-F120-Y-RIW-14482 Pending DAR

4/19/2015

F120

18

01

Slab

EIS

421-F120-E-RIW-0025

421-F120-Y-RIW-08969

To inspect installed SAS EMT Conduits on slab at axis:


-TE05-TE11/G03-G05(21 FA points-1'' EMT)
-clouded F1 is excluded

21

6-Apr-2015

421-F120-Y-RIW-14480 Pending DAR

4/19/2015

F120

24

GF

Slab

EIS

421-F120-E-RIW-0024

421-F120-Y-RIW-08971

To inspect installed SAS EMT Conduits on slab at axis:


-TW19-TW13/G04-G08(145 FA points-1'' EMT)
-F1,MM,RM are excluded

145

6-Apr-2015

421-F120-Y-RIW-14483 Pending DAR

4/19/2015

F120

15

02

Slab

EIS

421-F120-E-RIW-0011

421-F120-Y-RIW-08972

To inspect installed SAS EMT Conduits on slab at axis:


-TW15-TW11/G01-G04(76 FA points-1'' EMT)
-F1,MM,RM are excluded

76

6-Apr-2015

421-F120-Y-RIW-14479 Pending DAR

4/19/2015

F120

27

01

Slab

EIS

421-F120-E-RIW-0027

421-F120-Y-RIW-08973

To inspect installed SAS EMT Conduits on slab at axis:


-TE05-TE14/G10-G04(124 FA points-1'' EMT)
-F1,MM,RM are excluded

124

6-Apr-2015

421-F120-Y-RIW-14485 Pending DAR

4/19/2015

F120

25

GF

Slab

EIS

421-F120-E-RIW-0028

421-F120-Y-RIW-08974

To inspect installed SAS EMT Conduits on slab at axis:


-TW13-TW05/G04-G08(77 FA points-1'' EMT)
-F1,MM,RM are excluded

77

6-Apr-2015

421-F120-Y-RIW-14481 Pending DAR

4/19/2015

F120

33

01

Slab

EIS

421-F120-E-RIW-0029

421-F120-Y-RIW-08978

To inspect installed SAS EMT Conduits on slab at axis:


-TE07-TE14/G10-G12(29 PA points-1'' EMT)

29

6-Apr-2015

421-F120-Y-RIW-14484 Pending DAR

4/19/2015

F120

31

01

Slab

EIS

421-F120-E-RIW-0033

421-F120-Y-RIW-09063

To inspect installed SAS EMT Conduits on slab at axis:


-G10'-G09/TW14-TW06(31 PA points-1'' EMT)

31

11-Apr-2015

421-F120-Y-RIW-14575 Pending DAR

4/26/2015

F120

27

01

Slab

EIS

421-F120-E-RIW-0032

421-F120-Y-RIW-09064

To inspect installed SAS EMT Conduits on slab at axis:


-TE06-TE10/G06-G08(06 PA points-1'' EMT)

11-Apr-2015

421-F120-Y-RIW-14572 Pending DAR

4/26/2015

F120

25

01

Slab

EIS

421-F120-E-RIW-0031

421-F120-Y-RIW-09065

To inspect installed SAS EMT Conduits on slab at axis:


-G08-G09/TW14-TW07(10 PA points-1'' EMT)

10

11-Apr-2015

421-F120-Y-RIW-14573 Pending DAR

4/26/2015

To inspect installed SAS EMT Conduits on slab at axis:


-G10-G12/TW05-TE04(83 FA points-1'' EMT)
-FI,RM,MM are excluded

F120

32

GF

Slab

EIS

421-F120-E-RIW-0030

421-F120-Y-RIW-09066

83

11-Apr-2015

421-F120-Y-RIW-14576 Pending DAR

4/26/2015

F120

17

01

Slab

EIS

421-F126-E-RIW-0034

421-F120-Y-RIW-09110

To inspect installed SAS EMT Conduits on slab at axis:


-TW04-TE04/G01-G02(13 PA points-1'' EMT)

13

13-Apr-2015

421-F120-Y-RIW-14565 Pending DAR

4/26/2015

F120

25

GF

Slab

EIS

421-F120-RIW-00036

421-F120-Y-RIW-09140

To inspect installed SAS EMT Conduits on Slab at axis:


-G10-G08/TW06-TW05 (6 FA points-1'' EMT)

421-F120-Y-RIW-14564 Pending DAR

4/26/2015

F120

32

01

Slab

EIS

421-F120-RIW-00037

421-F120-Y-RIW-09138

To inspect installed SAS EMT Conduits on Slab at axis:


-G12-G09/TE04-TW05(8 FA points-1'' EMT)

15-Apr-2015

421-F120-Y-RIW-14584

F120

34

01

Slab

EIS

421-F120-RIW-00035

421-F120-Y-RIW-09139

To inspect installed SAS EMT Conduits on Slab at axis:


-G10-G08/TE14-TE16(8 PA points-1'' EMT)

421-F120-Y-RIW-14583

F120

32

GF

Slab

EIS

421-F120-RIW-00038

421-F120-Y-RIW-09198

F120

28

01

Slab

EIS

421-F120-RIW-00041

421-F120-Y-RIW-09404

F120

18

01

Slab

EIS

421-F120-RIW-00040

421-F120-Y-RIW-09433

F120

25

GF

Slab

EIS

421-F120-RIW-00042

421-F120-Y-RIW-09434

To inspect installed EMT Conduits at axis:


-TW07-TW06/G08-G10 (9 FA points-1'')

F120

15

GF

Slab

EIS

421-F120-RIW-00046

421-F120-Y-RIW-09451

F120

F120

24

31

GF

GF

Slab

Slab

EIS

EIS

421-F120-RIW-00045

421-F120-RIW-00044

421-F120-Y-RIW-09452

421-F120-Y-RIW-09454

15-Apr-2015

31

19-Apr-2015

To inspect installed SAS EMT Conduit on Slab at axis:


-G07-G03/TE12-TE19 (45 FA Points-1'')

45

28-Apr-2015

To inspect installed EMT Conduit on Slab at axis:


-TE04-TE10/G04-G01 (13 PA points-1'')

17

28-Apr-2015

28-Apr-2015

28-Apr-2015

28-Apr-2015

15

28-Apr-2015

To inspect installed SAS EMT Conduit on Slab at axis:


-TE02-TE06/G12-G10 (31 FA points-1''EMT )

To inspect installed EMT Conduit on Slab at axis:


-TW13-TW12/G03-G04 (2 FA points-1'')

To inspect installed EMT Conduit on Slab at axis:


-TW13-TW12/G03-G06 (5 FA points-1'')

To inspect installed EMT Conduit on Slab at axis:


-TW08-TW05/G11-G08 (15 FA points-1'')