Sunteți pe pagina 1din 2

NDE in ASME

Parts of ASME Section I


Part PFT
Requirements for Fire tube Boilers (PFT 1 52)

Part PFH
Optional Requirements for Feed water Heater (When Located within
Scope of Section I Rules) (PFH 1 )

Part PMB
Requirements for Miniature Boilers (PMB 1- 21)

Part PEB
Requirements for Electric Boilers (PEB 1 19)

Part PVG
Requirements for Organic Fluid Vaporizers (PVG 1 12)

Part PHRSG
Requirements for Heat Recovery Steam Generators (PHRSG 1- 5)

ASME Section I ( 11 Chapters and 371 Clauses)


Presentation title - 12/05/2015 P 5
ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

NDE in ASME
Parts of ASME Section I
Part PG
General Requirements for all Methods of Construction (PG 1
113)

Part PW
Requirements for Boilers Fabricated by Welding (PW 1 54)

Part PR
Requirements for Boilers Fabricated by Riveting (PR 1 28)

Part PB
Requirements for Boilers Fabricated by Brazing (PB 1 51)

Part PWT
Requirements for Water tube Boilers (PWT 1 15)
Presentation title - 12/05/2015 P 6
ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

S-ar putea să vă placă și