PILE SET CALCULATION FOR 200 mm x 200 mm RC PILE (WORKING LOAD = 450 kN AT 27 m
Set Calculation For Hammer Driven Piles Using Modofoed HILLEY's Formula
Based on Table 193, Reinforced Concrete Designer's Handbook - 9th Edition
Hammer Used
Pile Size
Pile Design Working Load
Estimated Pile Penetration Length, L
Assumed Type of Driving
Weight of Hammer, w
Factor of Safety, Fs
k Factor
Weight of Helmet, Dolly & Stationery Parts
Type of Soil
Proposed Hammer Drop, H
=
=
=
=
=
=
=
=
=
=
=
=
=
0.2 x 0.2 x 27 x 24
25.92
kN
=
=
25.92 + 5
30.92
Settlement Load, Wm
=
=
Driving Pressure, p
=
=
kN
= 0.044pL
= 0.56p
= 0.44p
= 0.044 x 0.024046 x 27
= 0.56 x 0.024046
= 0.44 x 0.024046
=
=
=
0.02856665
0.01346576
0.01058024
e =
1.030667
1.0
0.53
= [(W x H x e x n) / (1 + ac x n)] + W + P
Numbers of Blows, n
Wm - w - P
= 961.84 - 30 - 30.92
900.92
wxHxe
7155
Therefore, The Allowable Penetration (mm) Per Last 10 Blows During Pile Setting
s = 10/(n x Fs) = 10 / (0.160328 x 2.5)
=
24.95 mm
Testing
13-May-15
16:08
Se TH
Ir. Se Thiam Hai
Output
Title : abc
Reference
C1
Job Ref:
Date
Time :
Designed By:
Checked By :
Testing
13-May-15
16:08
Se TH
Ir. Se Thiam Hai
Output