Sunteți pe pagina 1din 2
(CHECKLIST FOR SUBSTATION IN GROUND WITHIN BLDG (SINGL ROOM) a Part 1: ‘The following marked documents are not submitted. Arrange to submit the same to process your case. Copy of full set of DEWA Building NOC. “Copy of Affection/ site plane issved by Dubai Municipality/ JAFZA/ DAFZA /TECOM. ‘One copy of site esting out plan. ‘Thee copies of Architectural plan indicating the Substations) in Ground Floor. One copy of Above-Ground Floor Plan. ‘One copy of Basement floor plan (if applicable) One copy of Substation Room details drawing / plan showing sections (x-x & y-y). LV electrical room is not to be more than 15 meters away from the Substation, if main parel is private. LV cable route / arrangement to be indicated up to LV electrical room. One copy of Load Summary Sheet(with power required date and toial KWH metering) (One copy of Schematic Diagram showing load intake & metering arrangement. A floppy (soft copy) in Micro-station Version 95 (or AutoCAD 2000, to be saved in DXF file) of substation details, For Chillers / Motors load < 100KW (© Undertaking duly signed by the consultant (to confirm that there are no chillersimotor load above 100KW) © Total connected load of each motorfchiller Chillers /motors load approval fiom Consumer Services Department O oo00 OoDoonnDG C1 Forchilers /Motors load > 100KW © Gilles /motors load approval fiom Consumer Services Department Part Please find below the following marked deviations. Arrange to revise the same to process ‘your case. (1 sipstation clear helght—3-7mirs minimum Substation door{s) cloar height —2.75mirs. & cloar width — 3.05mtrs 1 Directly located on DM road / sikka. If substation is located on sikka, sikka should have a minimum clear width of 3.05 m as long as proposed substation is not more than 12m away from the main road. Otherwise, the sikka should have minimum clear width of 6.1m— Q__Ventitation (minimum two sides) with Aluminum louvers / doors. ussusihetnaxtsemesnstiitesssetestiteurmsanvereverstescscessssstitbiecsveessiseaessectioeciaal: Wet areas ( ie. kitchen, bath / tolet etc.) above Substation are not acceptable. Only in ‘exceptional unavoidable cases this may be accepied at the discretion of DEWA with the conditions as por tho Annoxure-A attachod along with this. “crear cept 0.95mtis. From FFL finished fioor level) of the Substati Others: trench & for cable entry. leer depth of 0.95mtrs. of from FFL of tho substation up to bod of the cable tray and minimum cloarence of 0.46mire is to be mainisined in botwoon bottom of the slab and tho bed of the cable tray for cable tray arrangement. The cable tray should pass through Publiclopen area and not through any closed area / room. FFL of the Substation should bo higher by minimum 0.16mirs. to maximum O.3mirs. with respect to adjacent ground leve! (towards substation door) Substation is suitable for releasing supply through feeders, each of 400A maximum rating if DEWA LVDB applicable. 32.561 (with minimum width of 4 57mtrs.) for 1x1000!1500 KVA transformer 59.9m? for 2 x1000/1800 KVA transforers (For every additional tensformer -approximetely 24,19? additional space is required) with minimum width of 6.1mtrs. if door provided toward 6.tmtrs. side. Chiller/motor load approval from consumer service department required if the total connected load of the chiller/motor >100KW, other wise confirmation letter from the party required (no chiller/motor above 100K W). ‘Space of 10m? to be provided if the total connected load is =SKW or the eapacity of transformers is >6MVA.

S-ar putea să vă placă și