Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
Date
OVO
Chk'd by
1
Date
SEPT. 2014
Panel No. P1
App'd by
SEPT. 2014
fy = 410.0N/sq. mm.
Panel No. P1
lx = 3230.mm.
ly = 5260.mm.
ly/lx = 1.628
Short Span Coeff. -0.080 & 0.060 Long Span Coeff. -0.047 & 0.035
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
6.80
195.00
9.05
195.72
PROVIDE
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
3.94
5.30
176.80
176.80
PROVIDE
Date
SEPT. 2014
Project
Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
OVO
Date
SEPT. 2014
Chk'd by
2
Date
App'd by
SEPT. 2014
Date
SEPT. 2014
____________________________________________________________________________
Panel 2 of 9
Panel No. P2
Span Length
= 2030.mm.
Span
= 10.800kN/m.
UDL
Moment
Steel Required =
5.56kN. m
195.00sq. mm
Project
Job Ref.
Section
DEFLECTION
^^^^^^^^^^
Span/Depth = 20.0
NSE/PROJ/14/01
Sheet no./rev.
Date
OVO
Chk'd by
3
Date
SEPT. 2014
%As = 0.16
Fs = 273.5
App'd by
SEPT. 2014
____________________________________________________________________________
Panel 3 of 9
Panel No. P3
lx = 3830.mm.
ly = 5260.mm.
ly/lx = 1.373
Short Span Coeff. -0.069 & 0.052 Long Span Coeff. -0.047 & 0.035
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
8.21
195.00
10.95
PROVIDE
236.78
LONG SPAN
^^^^^^^^^^
Section
Moment (kN.m)
PROVIDE
Date
SEPT. 2014
Project
Section
Cont. Edge
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Span
Job Ref.
Calc. by
Date
OVO
5.54
4
Date
SEPT. 2014
176.80
7.45
Chk'd by
181.29
App'd by
SEPT. 2014
____________________________________________________________________________
Panel 4 of 9
Panel No. P4
lx = 4880.mm.
ly = 5630.mm.
ly/lx = 1.154
Short Span Coeff. -0.048 & 0.037 Long Span Coeff. -0.037 & 0.028
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
9.39
12.36
202.97
267.28
PROVIDE
Date
SEPT. 2014
Project
Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
Date
OVO
Chk'd by
5
Date
SEPT. 2014
App'd by
SEPT. 2014
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
7.20
176.80
9.52
231.69
PROVIDE
____________________________________________________________________________
Panel 5 of 9
Panel No. P5
lx = 2850.mm.
ly = 3830.mm.
ly/lx = 1.344
Short Span Coeff. -0.048 & 0.037 Long Span Coeff. -0.032 & 0.024
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Moment (kN.m)
PROVIDE
Date
SEPT. 2014
Project
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Cont. Edge
Span
Job Ref.
Calc. by
Date
OVO
3.24
6
Date
SEPT. 2014
195.00
4.23
Chk'd by
195.00
App'd by
SEPT. 2014
Date
SEPT. 2014
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
2.11
2.81
176.80
176.80
PROVIDE
____________________________________________________________________________
Panel 6 of 9
Panel No. P6
lx = 5030.mm.
ly = 5630.mm.
ly/lx = 1.119
Short Span Coeff. -0.055 & 0.041 Long Span Coeff. -0.047 & 0.035
Uniformly Distributed Load = 10.800kN/m.
Project
Job Ref.
Section
NSE/PROJ/14/01
Sheet no./rev.
Date
OVO
Chk'd by
7
Date
SEPT. 2014
App'd by
SEPT. 2014
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
11.23
14.96
PROVIDE
323.47
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
9.56
12.84
232.85
PROVIDE
312.68
____________________________________________________________________________
Panel 7 of 9
Panel No. P7
Date
SEPT. 2014
Project
Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
Date
OVO
Chk'd by
8
Date
SEPT. 2014
App'd by
SEPT. 2014
lx = 3830.mm.
ly = 5030.mm.
ly/lx = 1.313
Short Span Coeff. -0.047 & 0.036 Long Span Coeff. -0.032 & 0.024
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
5.70
195.00
7.45
195.00
PROVIDE
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
3.80
5.07
176.80
176.80
PROVIDE
____________________________________________________________________________
Date
SEPT. 2014
Project
Job Ref.
Section
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
Date
OVO
Chk'd by
9
Date
SEPT. 2014
App'd by
SEPT. 2014
Panel 8 of 9
Panel No. P8
lx = 3830.mm.
ly = 5030.mm.
ly/lx = 1.313
Short Span Coeff. -0.076 & 0.057 Long Span Coeff. -0.000 & 0.043
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
9.06
195.86
12.07
260.87
PROVIDE
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
6.81
0.00
176.80
176.80
PROVIDE
Date
SEPT. 2014
Project
Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
Designed: IGBIHERI.
OGHENEOVO
Calc. by
Date
OVO
Chk'd by
10
Date
SEPT. 2014
App'd by
SEPT. 2014
____________________________________________________________________________
Panel 9 of 9
Panel No. P9
lx = 2700.mm.
ly = 3830.mm.
ly/lx = 1.419
Short Span Coeff. -0.081 & 0.061 Long Span Coeff. -0.000 & 0.043
Uniformly Distributed Load = 10.800kN/m.
SHORT SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
4.80
195.00
6.38
195.00
PROVIDE
LONG SPAN
^^^^^^^^^^
Section
Span
Cont. Edge
Moment (kN.m)
3.39
0.00
176.80
176.80
PROVIDE
Date
SEPT. 2014
Project
DEFLECTION
^^^^^^^^^^
Span/Depth = 26.0
Job Ref.
NSE/PROJ/14/01
Sheet no./rev.
OVO
%As = 0.16
Date
SEPT. 2014
Fs = 273.5
Chk'd by
11
Date
App'd by
SEPT. 2014
____________________________________________________________________________
Date
SEPT. 2014