Make drawings of the reinforcement and prestressing in the wall and in the wall-to-base
connection (vertical and horizontal sections).
The required diagram are presented below:

Figure 16a - Plan view of reservoir

Figure 16b - Detail 1 showing the anchorage point and splitting reinforcement

33

Fig.17b: Detail 2 showing the monolithic wall-to-base connection

Figure 17a: Cross section A-A of reservoir (see Fig. 16a)

Fig. 17c: Detail 3 showing wall reinforcement and tendon (in duct)

34