Total Spindle - 12000

All Cotton Quality


20s carded wvg
One Blow Room
eff- 90%
Idle-12%
waste - 6%
8 Card
LC300 V3A

0.125 HK
150 MPM
eff- 90%
Draft- 95
waste- 5%
Idle-12%
prodn/card/8hr =

One Bkr Drg


Trutzler

0.12HK
450 MPM
8 Dobling
eff-85%
Draft- 7.8
waste- 0.73%
Idle-8%
dia- 35mm
double deli very
prodn/machine/8hr =

2 Fin Drg
[RSB]

0.12 HK
400 MPM
8 Dobling
eff-85%
Draft- 7.8
Idle-8%
waste- 0.73%
dia-40 mm
single deli very
prodn/machine/8hr =

3 Simplex
[Zinser]

1 HK
Rpm-950
TM-1.31
eff-75%

Draft- 10.8
waste-0. 54%
Idle-10%
dia-27 mm
prodn/spdl/8hr =

14 Ringfram
G5/1

14500rpm
TM-4.2 to 4.3
eff-90%
Draft- 23
waste- 2.7%
idle- 2.7%
dia-27 mm
prodn/spdl/ 8hr =

3 Autoconer
Muratec
prodn/spdl/ 8hr =

Kindly suggest the production per machine and the hand allocation per machine in
[sider,tenter,reliever,operator,fitter,helper] for the above counts.
Please also mention the UKG and HOK including cost per spindle production for the
with formula for calculating the same. Necessary modification of the data already p
may be changed / corrected if required for keeping the balance in spin plan.
Please calculate also the realisation achieved for this production and the time take
drawing, simplex bobbin and ring bobbin with vice-versa empty for the above proc
regardsBhaskar Mitra

32s carded wvg

34s carded wvg

prodn/card/8hr =

prodn/card/8hr =

prodn/machine/8hr =

prodn/machine/8hr =

prodn/machine/8hr =

prodn/machine/8hr =

prodn/spdl/ 8hr =

prodn/spdl/ 8hr =

16000rpm
TM-4.2 to 4.3

16000rpm
TM-4.2 to 4.3

prodn/spdl/ 8hr =

prodn/spdl/ 8hr =

prodn/spdl/ 8hr =

prodn/spdl/ 8hr =

d allocation per machine in detais


ve counts.
r spindle production for the above
cation of the data already provided
balance in spin plan.
oduction and the time taken to full a can in carding
a empty for the above process with alloted speed.