Sunteți pe pagina 1din 1

FORMULAR C7

Lista consumurilor cu mana de lucru


-----------------------------------

Lucrarea: mojo dipl


Deviz: 25
suprastructura
-------------------------------------------------------------------------------------------------------------------------|Nr. |
Denumirea meseriei
|Consumuri (om-ore) |Tarif mediu |Valoare(exclusiv TVA)|
Procent
|
|Crt.|
|cu manopera directa | RON/ora
|
RON
|
100%
|
|
|
|
|
|
(2 x 3)
|
|
|----|--------------------------------------------|--------------------|------------|---------------------|--------------|
| 0 |
1
|
2
|
3
|
4
|
5
|
|----|--------------------------------------------|--------------------|------------|---------------------|--------------|
|
1|
102 BETONIST
|
1613.370
|
4.581|
7390.26 |
7390.26|
|
2|
107 DULGHER CONSTRUCTII
|
4231.465
|
4.437|
18776.56 |
18776.56|
|
3|
111 FIERAR BETON
|
5770.794
|
4.228|
24397.35 |
24397.35|
|
4|
122 IZOLATOR HIDROFUG
|
44.690
|
4.911|
219.47 |
219.47|
|
5|
123 IZOLATOR TERMIC
|
375.396
|
4.911|
1843.53 |
1843.53|
|
6|
125 MONTATOR PREFABRICATE BETON
|
1878.200
|
4.532|
8511.22 |
8511.22|
|
7|
134 ZIDAR
|
2959.709
|
4.514|
13359.31 |
13359.31|
|
8|
199 MUNCITOR DESERVIRE CONSTRUCTII|
4464.620
|
3.826|
17083.53 |
17083.53|
|
|
MONTAJ
|
|
|
|
|
|----|--------------------------------------------|--------------------|------------|---------------------|--------------|
|
|
T O T A L
|
21338.244
| RON
|
91581.22 |
91581.22|
|
|
|
|------------|---------------------|--------------|
|
|
|
| EURO
|
25090.75 |
25090.75|
--------------------------------------------------------------------------------------------------------------------------

Ofertant

S-ar putea să vă placă și