Sunteți pe pagina 1din 1

Conventional Coring

Performance
Summary

First Coring Run in Tarija succesfully recovered


95.3%.
Sbalo 101I, Tarija, Bolivia, Petrobras Bolivia. Q4 2012

Objective:
The main objective was to core an interval of 9m through
Cangapi Formation, which is composed of sandstone,
with an acceptable ROP and an excellent recovery rate.

Well Information:
The well is Sbalo 101I, an Injection Well located in the San
Antonio Block, Tarija, Bolivia.
6 1/8 X 2 5/8
SN: A142385

Summary:
The 4.75 P2500 Core Barrel was run with a Fluted Aluminum
inner tube, and a (6 1/8 x 2 5/8) CCPR911S Core bit which
achieved an average ROP of 2.7 m/hr.
A 8.14m core was successfully cut from 3700m to 3708.14m with
a great recovery rate of 95.3%.
The Core bit dull grading was 0-0-NO-A-X-I-NO-BHA

Results:
No dull condition on core bit
95.3% of recovery

www.nov.com/downhole

downhole@nov.com

2013 National Oilwell Varco. All rights reserved.


Unless otherwise stated, all trademarks referenced in this document are trademarks of
National Oilwell Varco

Rev. 01

S-ar putea să vă placă și