Sunteți pe pagina 1din 2

CHECK DAM HYDRAULIC PARTICULARS

TOP BUND LEVEL (T.B.L)

+ 161.440 M

MAXIMUM WATER LEVEL (M.W.L)

+159.840 M

FULL RESERVOIR LEVEL (F.R.L)

+156.840 M

CREST LEVEL

+156.840 M

TAIL WATER LEVEL (T.W.L)

+158.200 M

MAXIMUM FLOOD DISCHARGE (Q)

26342.03 cusecs OR 746 cumecs

LENGTH OF THE CHECK DAM (L)

66 m

CALCULATION OF CISTERN LEVEL & LENGTH (100%Q)


Discharge,Q
U/S water level
D/S T.W.L
Length of weir,L
Assumed D1
U/S Va2 / 2g
D/S Vt2 / 2g

=
=
=
=
=
=
=

Discharge/m, q
V1
Fr
D2
D/S T.E.L --->
U/S T.E.L --->
Head loss HL
Critical Depth Dc

=
=
=
=
=
=
=
=

746.000
159.840
158.190
66.000
1.122
0.000
0.000

Cumecs
m
m
m
m
m (Vel. head at Approach)
m (Vel. head at D/S, tail channel)

Q/L
q / D1
V1 / (g.D1)1/2
D1/2((1+8F2)0.5 - 1)
D/S TWL + D/S Vt2/2g
U/S WL + U/S Va2/2g
U/S TEL - D/S TEL
(q2 / g)1/3

=
=
=
=
=
=
=
=

11.303
10.074
3.036
4.290
158.190
159.840
1.650
2.353

Cumec/m
m/s
m

m
m

3
Head loss, HL
= (D2-D1) / 4.D1.D2
(calculated using D1 & D2)

1.651 m

Basin floor level


Cistern length

=
=

153.900 m
15.838 m

Stilling Basin Level


Stilling Basin Length

=
=

D/S TWL - D2
5 ( D1~D2 )

= 153.500
= 16.000

m
m

S-ar putea să vă placă și